    ANNUAL REPORTS, WAR DEPARTMENT
         FISCAL YEAR ENDED JUNE 30, 1942




          REPORT OF THE

CHIEF OF ENGINEERS
                 U. S. ARMY


                    1942

                IN TWO PARTS

                  PART 1
                    Vol. 1




                  UNITED STATES
            GOVERNMENT PRINTING OFFICE

                 WASHINGTON : 1943




Classification changed to "NOT FOR PUBLIC
RELEASE."
(0. C. of E. Circular Letter No. 2576,
Construction Division No. 635,
dated 12 October 1913).
     ANNUAL REPORT
          OF THE


CHIEF OF ENGINEERS
   UNITED STATES ARMY


          1942


                        III
                                       REPORT

                                            OF



THE CHIEF OF ENGINEERS
                          UNITED STATES ARMY


                                                 WAR DEPARTMENT,
                                     OFFICE OF THE CHIEF OF ENGINEERS,
                               Washington, D. C., October 31, 1943.
Subject: Annual Report.
To: The Secretary of War.
  I present for your information the following report on river and
harbor and flood-control operations under the charge of the Corps of
Engineers for the fiscal year ending June 30, 1942.

                       APPROPRIATIONS AND EXPENDITURES

   During the fiscal year 1942 net funds made available to the Depart-
ment for river and harbor and allied operations amounted to $76,558,-
390.08 and for flood-control operations, $187,823,997.91, a total of
$264,382,387.99. The expenditures from the appropriations thus made
available and from balances on hand at the beginning of the fiscal
year amounted to $204,049,331.38, of which $89,141,022.82 was for river
and harbor work and allied operations and $114,908,308.56 for flood-
control work. New work was completed on 34 river and harbor and
flood-control projects, materially advanced on 176 other projects, and
maintenance operations were in progress on 352 projects.
   The approximate quantities in the major classifications of the work
accomplished for river and harbor and flood-control operations during
the year were as follows:
Dredging and excavation ---..------------------- cubic yards, 354, 009, 558
Levee construction- --               ----------        ------------do___        30, 852, 973
Rock removal-------------------------------------do                              1, 875, 184
Concrete placed--------------------do-...                                        1, 874, 167
Dikes and bulkheads------                 --------------------- linear feet__       103, 977
Revetment --------------------------------------                      do---         301, 286
Stone placed in jetties and breakwaters ----------------- tons__                 1,532, 528
Embankment ------                 ------------------------- cubic yards-_       31, 533, 963
  The policy of the Department to have work performed by contract,
except when the best interests of the United States require hired labor
operations, has been followed closely during the year. Sixty-two and
four-tenths percent of all work performed was done by contract and
37.6 percent by Government plant and hired labor.
                                                                                   1


                             aCF                          qINT1L
2      REPORT OF CHIEF OF ENGINEERS, U.         S. ARMY,   1942

   The continuation of an adequate check on the cost of work performed
on river and harbor and flood-control projects has been maintained.
   Efforts to prevent accidental human and property destruction
throughout the Department were continued during the year.
                         RIVERS AND HARBORS

   The program now in force for Federal improvement of rivers and
harbors for navigation as authorized by Congress includes projects
located throughout the continental United States, Puerto Rico, Alaska,
and the Hawaiian Islands, there being approximately 1,000 projects
now in force. Public Law No. 490, Seventy-seventh Congress, ap-
proved March 7, 1942, authorized the construction of a new naviga-
tion lock to replace an obsolete and unused structure in the St. Marys
Falls Canal at Sault Ste. Marie, Mich., and Public Law No. 675,
Seventy-seventh Congress, approved July 23, 1942, authorized the
construction of a barge canal across the State of Florida and the
enlargement of the present Intracoastal Waterway from the vicinity
of Apalachee Bay, Fla., to Corpus Christi, Tex., and its extension to
the vicinity of the Mexican border.
   During the fiscal year 1942 national defense preparations and the
advent of war required the suspension of work on certain authorized
projects, the construction of which was not directly connected with
the defense or war efforts. Those suspension measures resulted in the
concentration of effort and the utilization of available construction
equipment, materials, and manpower on only those authorized proj-
ects having the direct connection with the defense and war effort. In
the accomplishment of this purpose, improvement and maintenance
operations were carried out on 398 separate projects of which 18
projects were fully completed. Attention is invited to the following
brief outline of operations as being typical of the improvements
accomplished:
   Dredging and rock removal, to provide a channel' 27 feet deep in
the Kennebec River, Maine, from the mouth to the shipbuilding facili-
ties at Bath, was actively prosecuted.
   Removal of rock ledge interfering with the operation of deep-draft
vessels in the main ship channel was carried out under the project for
Portland Harbor, Maine.
   Dredging and rock removal, to deepen and widen the channel in the
Hudson River between Albany and the entrance to the New York State
Barge Canal at Waterford and to secure a uniform depth of 14 feet at
mean low water, was actively prosecuted.
   Dredging of the 40-foot channel in the Delaware River from the sea
to the Philadelphia Navy Yard was completed in February 1942 except
for the removal of rock ledge in the westerly 400 feet of the channel in
the vicinity of Marcus Hook. The latter work was in progress at the
end of the year.
   Dredging of the main channel in Charleston Harbor, leading to the
navy yard and the Army terminals on the Cooper River, to a depth of
35 feet, was actively prosecuted during the year.
   Jetty reconstruction and extension at the Gulf of Mexico entrance
to Calcasieu River and Pass, La., was completed.
   The dredging of a channel 30 feet deep and 200 feet wide from the
Port Aransas-Corpus Christi waterway to and including a turning

           JMw3aQ flO
                        RIVEIRS AND HARBORS                          3
basin of the same depth, at the Encinal Peninsula naval seaplane base,
was completed.
  Work on the construction of a new navigation lock in the St. Marys
Falls Canal at Sault Ste. Marie, Mich., authorized in Public Law No.
490, Seventy-seventh Congress, approved March 7, 1942, was com-
menced during the latter part of the fiscal year.
  The dredging of a channel 20 feet deep in the Saginaw River to Sixth
Street, Saginaw, Mich., was completed.
  The widening of the channel and the extension of the turning basin
in the Cuyahoga River at Cleveland, Ohio, was substantially advanced
during the year.
   Work was actively prosecuted under the project for the construction
of a seaplane basin and the enlargement of the anchorage facilities at
San Diego, Calif., where approximately 12,000,000 cubic yards of mate-
rial were removed.
   At Los Angeles and Long Beach Harbors the construction of the
13,350-foot'addition to the breakwater system to provide additional
anchorage areas for deep draft vessels was advanced to 65 percent com-
pletion.
   Construction operations under the authorized project for the devel-
opment of hydroelectric power at the Bonneville Dam on the Colum-
bia River were vigorously prosecuted and advanced to 75 percent com-
pletion. Additional units, Nos. 5 and 6, were placed in operation in
September 1941 and May 1942, respectively. Work was actively prose-
cuted on the manufacture of the four 74,000-horsepower turbines and
four 60,000-horsepower generators for units 7 to 10. The completed
dam, navigation lock, and fishways were maintained and operated dur-
ing the year. The output of energy generated with the completed
power units during the fiscal year amounted to 1,826,131,000 kilowatt-
hours.
   Construction operations on the presently contemplated 35,000-kilo-
watt unit at Fort Peck were advanced to 32 percent completion.
   The Intracoastal Waterway system, extending along the Atlantic
and Gulf coasts and totaling more than 2,300 miles in length, continues
to show an increase in the volume of traffic. A channel of 12 feet or
more in depth has been completed throughout the Atlantic coast section
of the waterway from Trenton, N. J., to Jacksonville, Fla. Intensive
maintenance operations have been carried out on this section of the
waterway to insure the availability of an adequate channel for the
increased wartime traffic seeking a protected route.
   On the Gulf coast, a 9-foot channel has been completed from Apa-
lachicola Bay, Fla., to Corpus Christi, Tex. Public Law No. 675,
Seventy-seventh Congress, approved July 23, 1942, adopted a project
providing for a high-level barge canal from the St. Johns River across
Florida to the Gulf of Mexico and for the enlargement of the present
Intracoastal Waterway from Apalachee Bay, Fla., to Corpus Christi,
Tex., and its extension to the vicinity of the Mexican border, so as to
provide, throughout its entire length, a channel 12 feet deep.
   In addition to the maintenance of channels previously completed,
important channel and harbor improvements have also been effected on
waterways and at ports on the Atlantic, Gulf, and Pacific coasts, on
inland rivers, and on the Great Lakes. These include improvements at
Boston Harbor, Mass.; Cape Cod Canal, Mass.; Providence River and
4       REPORT OF CHIEF OF EGINEERtS, U. S. ARMY,          1942

Harbor, R. I.; Stamford Harbor, Conn.; Bronx River, New York
Harbor, New York and New Jersey Channels, Great Lakes to Hudson
River waterway, Great Kills Harbor, N. Y.; Raritan River and Sandy
Hook Bay, N. J.; Chesapeake and Delaware Canal, Del. and Md.;
Curtis Creek, Middle River, Wicomico River, and Fishing Creek, Md.;
Norfolk and Portsmouth Harbors, Va.; Mattaponi River, Va.; Roanoke
River, Oregon Inlet, and Silver Lake Harbor, N. C.; St. Augustine
Harbor, Fla.; Mobile Harbor, Ala.; Pascagoula Harbor, Miss.; Sa-
bine-Neches waterway, Tex.; Louisiana-Texas Intracoastal Waterway;
Mississippi River between the Ohio River and Minneapolis, Minn.;
Missouri River between the mouth and Sioux City; San Francisco
Harbor, San Pablo Bay and Mare Island Strait, and Bodega Bay,
Calif.; Columbia River between Vancouver and Bonneville; the upper
Columbia and Snake Rivers, Oreg., Wash., and Idaho; and Neah Bay,
Wash.
   In accordance with the provisions contained in section 1 of the River
and Harbor Act approved June 20, 1938, the Corps of Engineers under-
took during the year seven projects of a river and harbor nature, not
previously authorized by Congress but required for defense and war
activities by the Navy Department and other Government agencies,
with funds transferred to the Chief of Engineers by those agencies.
Expenditures on such projects amounted to $895,218. These works
are: Casco Bay, Maine; Los Angeles and Long Beach Harbors, Calif.;
Morro Bay, Calif.; Murrays Bay, Bermuda; Cold Spring Inlet, N. J.;
Delaware River at the Philadelphia Navy Yard; and channel Inner
Harbor Navigation Canal to Micheaud Canal, La.
   The water-borne commerce of the United States, Puerto, Rico,
Alaska, and the Hawaiian Islands, for the calendar year 1941, aggre-
gted 653,600,000 tons with a reported value of $26,150,000,000.
r    ndherihe provs'ions of Public Law No. 326, Seventy-seventh Con-
gress, approved December 1, 1941, the construction activities formerly
carried out under the supervision of the Quartermaster General,
United States Army, were transferred to the jurisdiction of the Chief
of Engineers, United States Army, on December 16, 1941. While re-
quiring extensive reorganization, the combining of the construction
activities formerly carried out under the two offices has been effected
with minimum dislocation, and the basic functional plans for the
efficient prosecution of civil works have been maintained intact.

                       GENERAL FLOOD CONTROL

   This section describes the authorized general flood-control program
exclusive of that for the alluvial valley of the lower Mississippi
River and that for the Sacramento River. The authorized programs
for those two rivers are discussed in the sections immediately follow-
ing this one.
   Congress in the Flood Control Act approved June 22, 1936, estab-
lished, and in the amendatory and supplemental general Flood Con-
trol Acts approved August 28, 1937, June 28, 1938, August 11, 1939,
and August 18, 1941, reaffirmed the general policy that flood control
throughout the United States is a proper activity of the Federal Gov-
ernment, in cooperation with the States and local communities, and
that the Federal Government should improve or participate in the
                         RIVERS AND HARBORS                             5
improvement of navigable waters or their tributaries for flood.-con-
trol purposes, if such projects are economically justified and if the
lives and social security of people are otherwise adversely affected.
Those acts also specified the local cooperation required for the projects
authorized therein.
   These requirements of local cooperation, in brief, are as follows:
    (a) Dam and reservoir projects authorized in any of the afore-
mentioned flood-control acts are constructed entirely at the expense
of the United States and are maintained and operated with the use of
Federal funds. No local cooperation is required for dam and reser-
voir projects unless specifically prescribed by special provisions of law.
    (b) For local flood-protection projects, except channel improve-
ment or channel rectification projects authorized by the acts of 1936,
1937, and 1938, local interests must provide without cost to the
United States all lands, easements, and rights-of-way necessary for
the construction of the projects, hold and save the United States
free from damages due to the construction works, and maintain and
operate all the works after completion in accordance with regula-
tions prescribed by the Secretary of War. Channel improvement
and channel rectification projects authorized by the acts of 1936
1937, and 1938 are built entirely at Federal expense, and no local
cooperation is required. Exceptions to these general rules are pro-
vided by law in the case of certain specific projects.
   Up to the end of the fiscal year 1942, authorizations totaling
$930,400,000 had been provided by Congress for the construction of
485 projects widely dispersed throughout the United States. On
June 30, 1942, funds in the total amount of $565,400,000 have been
provided by Congress for the prosecution of the general flood-control
program, including $129,200,000 for the fiscal year 1943. In addition
to these authorizations Congress has approved general comprehen-
sive plans covering most of the important river basins of the country
and including many additional projects for flood control, hydro-
electric power, and allied water uses. All of these projects are parts
of comprehensive coordinated plans for the river basins of the
Nation to provide desirable and economic flood protection and allied
benefits for a large number of centers of industry and population and
for many thousands of acres of rich agricultural land. A number
of reservoirs in the authorized program also provide favorable pos-
sibilities for the economic development of large quantities of hydro-
electric power. Several of the projects now under construction
include power generating machinery in the initial developments.
    The war emergency has affected to a large extent the Federal flood-
control program. All authorized flood-control projects are directly
connected with the national economy and are therefore either di-
rectly or indirectly related to the war effort, especially when it is
remembered that one major flood in a large river basin, such as the
Ohio or Mississippi, may easily accomplish in a few weeks at least
the same amount of damage that can be caused by intensive air raids.
Despite this fact, because of the impact of war on the Nation, the
general flood-control program was thoroughly realigned and coor-
dinated with the war activities of the Nation during the fiscal year
1942. In that year definite steps were taken to suspend all work not
directly connected with the war effort and the only flood-control
6       REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMVIY,   1942

works initiated were seven projects determined to have direct value
to the conduct of the war. Of these, three were multiple-purpose
dam and reservoir projects to supply additional power for war
industries, one was a multiple-purpose dam and reservoir project
to provide flood protection and increased water supply for the im-
portant steel-producing region in the Mahoning Valley, Ohio, and
two are local protection projects to give direct flood protection to
industries supplying materials for the Army and Navy. In line
with the Federal policy of curtailing many activities not essential
to the war and in order to conserve critical materials, manpower, and
construction equipment, all projects which were under way at the
beginning of the war emergency have been and are being brought
to completion or to a safe point of suspension as rapidly as possible,
without interference with work of direct importance to the war,
and with due regard to the necessity for protecting lives, the work
already accomplished, and the Federal investment in that work.
   In the fiscal year 1942, 17 local protection projects were completed
and 14 reservoirs were placed in operation; steps were taken to suspend
construction work on all or parts of numerous other projects. Many
of the suspended projects do, however, provide substantial amounts of
flood protection, even though they will not be fully effective until the
construction work is entirely completed. Plans and drawings are
being completed for the remaining portions of the suspended projects
and for many additional projects not yet initiated, in order that actual.
construction operations on a large scale can be undertaken without
delay at the end of the war to assist in accelerating an expanded public
works program during the period of readjustment from military to
renewed civil activities. This latter class of work is, of course, being
so conducted that it does not interfere in any way with the war
activities of the Department.
   Pursuant to existing law, from the initiation of the general flood-
control program to the end of the fiscal year 1942, 38 dams have been
substantially completed and placed in operation, including the Black-
water, Surry Mountain and Knightville Dams in New England, the
Arkport and Whitney Point projects in .southeastern New York, the
Tionesta, Crooked Creek, Loyalhanna, and Mahoning Creek Dams in
Pennsylvania, the Conchas Dam on the South Canadian River in New
Mexico, a system of 14 reservoirs in the Muskingum River Basin in
Ohio, the Hansen and Sepulveda Dams in the Los Angeles County
drainage area, California, and the Cottage Grove and Fern Ridge
projects in Oregon. The local flood-protection projects which have
been substantially completed total 92, including important works pro-
tecting industrial centers and cities in the Connecticut River Basin in
Massachusetts, the Susquehanna River Basin in New York and Penn-
sylvania, the Ohio River Basin, the Upper Mississippi River Basin,
the Columbia River Basin, and at numerous other localities.
   During the fiscal year 1942, 41 dam and reservoir projects and 91
local flood-protection projects were under construction, and mainte-
nance work was carried on where required by existing law. The
works under way included reservoirs in 17 States, such as the Franklin
Falls and Blackwater projects in the Merrimack River Basin, N. H.;
the Knightville and Birch Hill Reservoirs in the Connecticut River
Basin, Mass.; the Indian Rock Reservoir in the Susquehanna River
                         RIVERS AND    HARBORS


Basin, Pa.; the Youghiogheny and Loyalhanna Reservoirs in the
Allegheny-Monongahela Basin, Pa.; the Berlin, Dale Hollow, Center
Hill, Wolf Creek, and Bluestone Reservoirs in the Ohio River Basin,
Ohio, Tenn., Ky., and W. Va., the Norfork and Clearwater Reservoirs
in the White River Basin, Ark. and Mo.; the Denison Reservoir in
the Red River Basin, Okla. and Tex.; the John Martin, Fort Supply,
Great Salt Plains, Blue Mountain, and Nimrod Reservoirs in the
Arkansas River Basin, Ark., Okla., and Colo.; the Santa Fe Dam in
the San Gabriel River Basin, Calif.; and the Cottage Grove and Fern
Ridge Reservoirs in the Willamette River Basin, Oreg. The 91 local
flood-protection projects under construction during the fiscal year 1942
were also widely dispersed throughout the entire country. Examples
of this type of work are the levee and flood-wall projects along the
Connecticut, Susquehanna, and Ohio Rivers; the channel improve-
ment project for Johnstown, Pa. ; the levees along the Wabash, Illinois,
upper Mississippi, and Columbia Rivers; channel improvement and
pumping plants for the protection of the Kansas Citys, Mo. and Kans.;
and the large channel improvement project at Los Angeles, Calif.,
one unit of which is, notably, the Burbank-Western (lower) system.
    Under the provisions of the Flood Control Act of 1941 the De-
partment was authorized to expend flood-control funds in rescue work
or in the repair or maintenance of flood-control works threatened or
destroyed by flood not only on the Mississippi River and its tribu-
taries but also on navigable waters or their tributaries in the entire
country. During the fiscal year 1942, the Department made funds
available under this authority for emergency repairs and rescue work
on streams in Missouri, Illinois, California, Oregon, and New Mexico;
and was successful in saving many lives and preventing appreciable
amounts of possible damages to property.
    In the fiscal year 1942, substantial progress was made in the prose-
cution of authorized examinations, surveys, and review investiga-
tions for flood control and other purposes. A summary of the work
accomplished on this program of investigation is contained in the
report of the Board of Engineers for Rivers and Harbors. These
investigations are undertaken in close cooperation with other Federal
agencies and with the States in order that the recommendations
submitted to Congress in the reports on those investigations may con-
tain full consideration of the interests of those agencies in the im-
provements covered by the investigations. Those investigations which
are authorized primarily for flood control include also thorough
studies of all other feasible water uses of the streams under considera-
tion. In May 1942 the Department received instructions from higher
authority that no additional surveys should be initiated under present
war conditions and that the surveys then under way should be com-
pleted or work thereon suspended by August 1, 1942, unless it could
be shown that such surveys were necessary for the proper integration
of basin plans. The survey program of the Department has been
curtailed in accordance with those instructions.

                    SACRAMENTO RIVER FLOOD CONTROL

  The construction of the flood-control project for the Sacramento
River Valley, which was authorized by the Flood Control Acts ap-
proved March 1, 1917, May 15, 1928, August 26, 1937, and August
8       REPORT >OF CHIEF OF ENGINEES, U. S. ARMY,          1942

18, 1941, was continued during the year. This project provides for
the enlargement of river channels, the excavation of cut-offs, the con-
struction of levees, weirs, bank protection and pumping facilities in
the lower Sacramento River Valley, and for channel clearing, recti-
fication, and snagging on the Sacramento River and tributaries in
Tehama County, and from Red Bluff southerly, all at an estimated
Federal cost of $30,750,000. Up to the present time Federal funds
in the total amount of $23,045,000 have been appropriated by Con-
gress for the prosecution of this project, including $2,945,000 for the
fiscal year 1943. In addition to that amount, local interests have con-
tributed a total of approximately $5,822,000 for the construction of
protective works related to the authorized project.
   The Sacramento Basin is in the defense area which has been placed
by the War Department under the direct command of the command-
ing' general of the Western Defense Command. This basin includes
main lines of communication, both rail and highway, from the
Pacific coast to the remainder of the country, principal arteries of
communication running north and south along that coast, and access
roads to Army airports and other installations. The main line levees,
the bypasses, the bank protection works, and the levee set-backs of
the Sacramento flood-control project are vital to adequate flood pro-
tection for the main lines of communication which pass through this
valley.
   During the year levees were constructed along sections of the
Sacramento, Feather, Bear, and Yuba Rivers, and along the Yolo and
Sutter bypasses. Bank protection at Colusa Weir was accomplished,
and the levee set-back near Richfield dock was completed. A total
of about 38,000,000 cubic yards of material has been placed to date
in levees along the project waterways. The project as a whole was
approximately 73 percent complete at the end of the year.
                FLOOD CONTROL OF THE MISSISSIPPI RIVER

   Substantial progress was made during the fiscal year 1942 on the
flood-control project for the alluvial valley of the Mississippi River,
adopted by the Flood Control Act approved May 15,1928, and amended
by the acts approved June 15, 1936, June 28, 1938, and August 18, 1941.
The 1936 amendment retained the purpose of the 1928 act and the
features completed under that authority, and authorized an additional
$272,000,000 for extension of flood-control work on the lower Missis-
sippi River. The 193'8 amendment removed legislative restrictions
with respect to certain features of the amended plan and authorized
$40,000,000 for work in addition to that contemplated for the project
as amended in 1936. The 1941 amendment provided for the abandon-
ment of the Boeuf and Eudora floodways and extension, for raising
main Mississippi River levees to confine within those levee lines be-
tween the mouths of the Arkansas and Red Rivers the project flood
without a floodway west of the Mississippi River. That amendment
also authorized certain minor modifications and backwater protection
in the Yazoo and Red River backwater areas at an estimated additional
cost of $25,982,000. The total authorization for the project as amended
and supplemented is now $662,982,000. Of this amount $472,107,424
has been appropriated (including $29,954,000 for fiscal year 1943 made
available by the War Department Civil Appropriation Act approved
April 28, 1942).
                         RIVERS   AND HARMIORS


   With the approval of the 1938 Flood Control Act, work in the
Atchafalaya Basin which had not been initiated because of legal re-
strictions was freed from such restrictions and placed under way.
Noteworthy progress has been made on these features, namely, the
Morganza floodway, the Wax Lake Outlet, the Charenton Drainage
and Navigation Canal, and related works. At the same time urgent
main river work has been prosecuted and work on the tributary proj-
ects for headwater protection of the St. Francis and Yazoo Rivers,
including the construction of the Wappapello, Sardis, and Arkabutla.
Reservoirs, and backwater protection for the White River, has been
pushed vigorously within the limits of funds available for such work,
   Under section 6 of the 1928 act, flood-control work was undertaken
on the Mississippi River between Rock Island, Ill., and Cape Girardeau,
Mo., and on outlets and tributaries affected by backwaters of the Mis-
sissippi River wherever the local contributions of one-third of the costs
were provided as required by law.
   The Department was able to assist localities in the emergency repair
of flood-control works on tributaries of the Mississippi River threat-
ened or destroyed by flood, under the provisions of section 9 of the act
approved June 15, 1936.
   Work accomplished on the adopted project for the alluvial valley
of the Mississippi River has demonstrated its effectiveness by afford-
ing unbroken protection for a period of 15 years to date. However,
because of the elimination of the Eudora floodway by the Flood Con-
trol Act of 1941, the levee system which constitutes the major part
of the project is not yet sufficiently complete to afford protection
against predicted floods. Even a partial overflow of the valley may
interrupt postal service, transcontinental and interstate commerce,
and produce widespread destruction and disorder, national in scope.
As flood control of this vast alluvial valley and navigation of the
lower Mississippi River are most important to the orderly and effi-
cient progress of the war emergency, this project is being prosecuted
at the maximum rate consistent with the successful prosecution of the
war.
         SACRAMENTO RIVER AND TRIBUTARIES (DEBRIS CONTROL)

   Two of the four debris dams in the Sacramento Valley authorized
in 1935 have been completed, one on the north fork of the American
River and one at Upper Narrows on the Yuba River. These dams
are being used for the storage of hydraulic mining debris. The con-
struction of the Ruck-a-Chucky Dam on the middle fork of American
River and Dog Bar Dam on Bear River has been postponed. A re-
view report on the Sacramento River and tributaries, requested by
the Committee on Rivers and Harbors of the House of Representa-
tives with a view of determining whether any change should be made
in the previously proposed location of the Dog Bar Dam on Bear
River, is now being prepared.
PROJECTS UNDER THE PUBLIC WORKS AND EMERGENCY RELIEF PROGRAMS

  As of June 30, 1942, allocation of funds to the following works
and in the amounts indicated have been made available to the Corps
of Engineers supplementing the allocations as published in detail in
the Annual Report for the fiscal year 1939. The grand total of these
amounts is $517,761,459.47.
                                                                                                       RIVERS AND HARBORS'


                                                                                                                    National              Public Works                                        Emergency Relief acts
                                                                                                                   Industrial             Administration
                                                                                                                Recovery Act                     Act                   1935 act              1936 act              1937 act              1938 act

Total allocations to river and harbor projects to June 30, 1941 (see annual report                                                                                                                                                                          0
for 1941, vol. 1, part 1, p. 12)-.      .            .    -------------------------
                                                            .
Total allocations or rescissions since June 30, 1941, to June 30, 1942:
                                                                        -..--                   $183, 504, 464.73 $94, 200, 442.23 $103, 611, 847.93
   Missouri River, Kansas City, Mo., to Sioux City, Iowa (Rulo, Nebr., to
      Sioux City, Iowa) ___
    Kanawha River, W. Va__-----
                                           _
   Fort Peck Dam Reservoir, Missouri River --_---
                                                                            .
                                                               ---------------
                                                                                 -       .-------...------------
                                                                       ...---------------------------.
                                                                      --.--------.------


                                                           --------------------------------
                                                                                              -------------------------------
                                                                                                                                            -7-74.08 ..----------------......
                                                                                                                                           -114. 64----------------
                                                                                                               ---------------- ----------------                               -52.00--
                                                                                                                                                                                                                                                            li
                                                                                                                                                                                                                                                            0



      Total, rivers and harbors.....----.......------------....                                            183, 504, 464. 73
                                                                                         ...---------------....--...                       94, 200, 442. 23       103, 611, 607. 21 ..............

                                                                                                           FLOOD CONTROL

Total allocations to flood-control projects to June 30, 1941.....                              ..-------------------
                                                                                                                $72, 763, 887. 60          $3, 054, 196. 70       $20, 126, 260. 66       $10, 174, 168. 50    $19, 211, 455. 87        $2, 999, 707. 14
Allocations or rescissions since June 30, 1941, to June 30, 1942:
    Los Angeles flood control and water conservation-_-    ....   __.-------                    ----              ..----------------.--    ---------------               51, 588. 04                 -51. 97          -106. 75----             ---
    Construction of dam on South Canadian River_ ..- --                                                        ----------------               ----------                         4.8-------------3
                                                                                                                                                                                 . 83.
                                                                                                                                                                                34. 3.--                                   --
    Connecticut River at Hartford ....-...................................                                     -------------------------------------------------------------                                                                         . 50

      Total, flood control-___----                   ---------------------------------                           72, 763, 887. 60           3, 054, 196. 70        20, 074, 637. 79       10,174,116. 53        19, 211, 349. 12         2, 999, 686. 64


                                                                                                MISCELLANEOUS PROJECTS


Total allocations to miscellaneous projects to June 30, 1941$-------------------1, 654, 489. 01        $109,200.00                                                 $6, 384,626. 59            $11, 395. 47           $7, 592. 70   --
Allocations or rescissions since June 30, 1941, to June 30, 1942: Passamaquoddy
power protect at Cobscook Bay near Eastport, Maine....           ----------------- ----------------------------                                                           -232. 85--------              ------------------------------
      Total, miscellaneous              -------------            ------------------------------                    1, 654, 489. 01             109, 200. 00          6, 384, 393. 74           11, 395. 47            7, 592. 70

       Grand total to June 30, 1942__                                  ..----
                                                        .--------.-------                 ..           .....    257, 922, 841.34           97, 363, 838. 93       130, 070, 638. 74        10, 185, 512. 00     19, 218, 941. 82        $2, 999, 686. 64


                                                                                                                                                                                                                                                            w.
                        RIVERS AND HARBORS                           11
                                SURVEYS

   During the year reports in response to 310 items of law enacted by
Congress and resolutions adopted by congressional committees au-
thorizing investigations of potential river and harbor and flood con-
trol improvements were completed and transmitted to Congress with
the recommendations of the Chief of Engineers. Of these investiga-
tions 77 were preliminary examinations and 43 were surveys prepared
in response to authority contained in previously adopted River and
Harbor and Flood Control Acts, while 190 were reexaminations sub-
mitted in response to committee resolutions.
   On April 28, 1942, instructions were received from higher authority
that additional river and harbor and flood control surveys should
not be initiated and that by August 1, 1942, those surveys then under
way should be brought to completion or, where that was not feasible,
to a point of suspension, unless the surveys were necessary for the
proper integration of plans for an area. In May of 1942, definite
arrangements were made for conferences with the Bureau of the
Budget to determine the exact extent of curtailment of the Depart-
ment's authorized survey program as a result of the aforementioned
instructions. On June 30, 1942, although final arrangements had not
yet been made, it was expected that the details of the curtailment
program would be worked out by August 1942.
   The Beach Erosion and Shore Protection Boards carried out during
the year studies and investigations in cooperation with appropriate
agencies of various States and municipalities and with the field offices
of the department to develop efficient works for the protection and
stabilization of the shores and beaches of coastal and lake waters. Six
cooperative studies were completed and two interim reports were pre-
pared, while five departmental studies were completed during the
year. Research on the subject of wave action and related phenomena
was continued in the board's laboratory. Two articles reporting the
results of research were approved for publication.
  Preliminary investigations and surveys for the development of navi-
gation and hydroelectric power were completed in the International
Rapids section of the St. Lawrence River as authorized by Executive
Order, No. 8568, dated October 16,1940. The Dominion of Canada, the
Province of Ontario, and the Hydroelectric Power Commission of
Ontario, by furnishing engineering services, cooperated in the investi-
gations.
   The gathering of hydrological data in Nicaragua, under authority
contained in the River and Harbor Act approved June 20, 1938, was
continued.
   Field investigations and laboratory studies pertaining to the survey
of the Ohio River and its tributaries for pollution control, authorized
in section 5 of the River and Harbor Act approved August 26, 1937,
were finished and the report to Congress thereon has been under
preparation.
   The cooperative programs with the Weather Bureau and the United
States Geological Survey for the purpose of more adequately meeting
the requirements of the Department in the planning of flood control
and river and harbor improvements was continued.
12     REPORT OF CHIEF O'F ENGINEE'RS,      U.   S. ARMY,   1942

                     MISCELLANEOUS   CIVIL WORKS

   Miscellaneous civil works have, as heretofore, been administered by
the Corps of Engineers. These works are varied in character and in-
clude the administration of the Federal laws enacted for the protection
and preservation of the navigable waters of the United States, which
govern the following: Granting of permits for structures or opera-
tions in navigable waters; approval of the location and plans of
bridges, dams, dikes, or causeways; alteration of obstructive bridges;
investigation and removal of sunken vessels or other obstructions en-
dangering navigation; establishment of regulations for the use, ad-
ministration, and navigation of navigable waters, including draw-
bridge regulations; establishment of anchorage grounds, special an-
chorage areas, danger zones, dumping grounds, restricted areas, fishing
areas, and harbor lines; investigations of the discharge or deposit of
refuse matter of any kind in navigable waters; prevention of pollution
of coastal navigable waters by oil; determination of the heads of navi-
gation and the extent to which the laws shall apply to specific streams;
supervision of the harbor of New York to prevent obstructive or inju-
rious deposits in the tidal waters thereof, including the waters of Long
Island Sound; establishment of reasonable rates of toll for transit
across bridges over navigable waters; granting of permits for the occu-
pation and use of Federal works under control of the Corps of Engi-
neers; construction of Anacostia Park and the reclamation and devel-
opment of Anacostia River and Flats, D. C.; maintenance and repair
of the Washington Aqueduct, and increasing the water supply of the
city of Washington; surveys and charting of the northern and north-
western lakes, including the Lake of the Woods; studies for the preser-
vation of Niagara Falls and the supervision of power companies divert-
ing water therefrom; reports of international boards on operations
affecting international boundary waters; acquisition of lands and other
interests therein required for the prosecution of river and harbor and
flood-control projects; issuance of instruments authorizing the occu-
pation of Government-owned land under the jurisdiction of the Depart-
ment; and legislation in connection with the foregoing.
         Appropriations.-The funds with which the works for the maintenance and improvement of rivers and harbors
     and flood control were prosecuted during the fiscal year were derived from unexpended balances of priorappropriations
     and from the following appropriation acts, and from allotments from various emergency appropriation acts:
                                                                                                                                   I                        I                      I                            I

                                                                                                                                            Date of act          Rivers and            Flood control I Miscellaneous Total by appro-
                                                       Appropriation title                                                                                        harbors                                             priation acts

     Third Supplemental National Defense Appropriation Act, 1942:
a        Maintenance and improvement of existing river and harbor works                               -                                Dec. 17, 1941            $2, 700, 000. 00                                                                 $2, 700, 000. 00
         Flood control, general-------------------                                                                                      -    -do_ _                                    $25, 7500, 00000
                                                                                                                                                                                                     0                                           25, 750, 000. 00

           Total__      .      __-        --                          .                     - - ---              -    ---                                        2, 700, 000. 00           25, 750, 000. 00                                      28, 450, 000. 00
c
     First Deficiency Appropriation Act, 1942: Claims for damages by collision, river and harbor work_ Feb. 21, 1942                                                        00
                                                                                                                                                                         100.          _      -_                                                         100.00

     War Department Civil Appropriation Act, 1943:
        Maintenance and improvement of existing river and harbor works                                          . ------------._
                                                                                                          .--------                     Apr. 28,1942            66, 802, 500. 00                                         _                       66, 802, 500. 00
to       Flood control, general----------                                                                                              .---- do _                                      129, 226, 700. 00---------                               129, 226, 700. 00
         Emergency fund for flood control on tributaries of Mississippi River .------------                                             --. do _                                                 100. 00                                                  100. 00
                                                         --------------------
         Flood control, Mississippi River and tributaries...                                        --- _                              --     do ....                                  29, 954, 000.  00                                         29, 954, 000.00
         Flood control, Sacramento River Calif ..---------------------------------                                                     -- do                                           1 2, 945, 000. 00                                          2, 945, 000.00
         Power plant, Fort Peck Dam, Mont. (construction) .---------               ---------------------                               .-- do ....                                                                   $1, 300, 000. 00             1, 300, 000. 00
         Power plant, Bonneville Dam, Columbia River, Oreg. (construction)-.... -.-- .          -       -                                  do
                                                                                                                                       .....            -                    . . .. . .             .     .              4, 166, 000. 00          4, 166, 000. 00

          Total ...          .....                ..          .           -----------------------------                                ----- ---- --            66, 802, 500. 00       162, 125, 800.00                  5,466, 000. 00         234, 394, 300. 00
     Special fund (credits to account from licenses under Federal Power Act, Aug. 26, 1935): Mainte-
      nance and operation of dams and other improvements of navigable waters             -                                             Aug. 26, 1935               326, 263.65-------               ________________                              -.326, 263. 65
     Sixth Supplemental National Defense Appropriation Act, 1942: Development of landing areas
      for national defense, Office of Administrator of Civil Aeronautics (transfer to War), 1941-43 .__                                         (3)                             S108,                                        327, 093.34        108, 327, 093.34       ya
     District of Columbia Appropriation Act, 1942: Improvement of Washington Channel, D. C.,
       (transfer to War)       ----------------------------------------------                                                          June 27, 1942                64, 000.00         ...................                                  _         64, 000.00
     Allotments made from emergency appropriation acts:
         Emergency Relief, War, rivers and harbors, flood control, etc., 1935-37 __ -                                                  Apr. 8,1935                   2-473.57               2-51, 637. 89                                            -----.---------
                                                                                                                                                                                                                                                    -52,111.46
         Emergency R ef, War, rivers and harbors, flood control, etc.-certified claims: Second De-
          ficiency Apprrpriation Act, 1941 ............._ _......
                                                      --.---------------                                                .-------       July 3,1941                                                      15.02       --        -                            15.02
        Emergency Relief, War, Corps of Engineers, flood control, general (act July 19, 1937), 1938 --                                 July 19,1937                                            2-106. 75        -----                                    106. 75
        Emergency Relief, War, Corps of Engineers, flood control and other conservation, 1936-37 ..                                    June 22,1936                                                2-51.97                    -                         -51.97
        Emergency Relief, War, Corps of Engineers, public buildings, parks, utilities, flood control,
         etc., non-Federal projects (transfer from Work Projects Administration), 1938-39 ....     _...._ June 21,1938                                                                             2-20. 50 -                                           -20.50

             Total__                                              .                                                                                                   -473.57                -51, 802.09            j             .   ...           --52, 275.66
        1 Exclusive of $265,000 transferred and included under "Flood control, general."
        2 Represents unobligated balances rescinded since the preceding annual report.
        3 Various.
                                                             Appropriation title                                                                                    Date of act       Rivers and                     Floodcontrol        Miscellaneous       priationapctso-


     National Industrial Recovery, Public Works Administration (allotment to War, Corps of
      Engineers), 1933-43 .         ..--------------------------- ----........... ..------- --------- June 16,1933                                                                    ....----------------.----------.-------......         $676,000.00         $676,000.00
     Public Works Administration (allotment to War, Corps of Engineers), 1935-43. ------------- June 19, 1934                                                                              -------
                                                                                                                                                                                             .                       ------ ------             24, 000. 00         24,000.00     0

                                              ....-------....................----------------------------...
           Grand total, all appropriated funds----                                                                                                       ...    ---------------..............
                                                                                                                                                                                      $69,892, 390. 08 $187,823,997.91                   114, 493, 093. 34   372, 209, 481.33
                                                                                                                                                                                                                                                                                 O
     Emergency fund for the President, national defense (allotment to War, Corps of Engineers),
      1942..........
         -------------............................................................------------------------------------------------------------............         Apr.    5,1941          ----..-----------.                                500, 000.0          500,000.00      0
Trust funds (contributions and advances):
   Funds contributed for improvement of rivers and harbors.                    ---      ------      ---                                                                 (3)            42, 500. 00 ..        ..   ....                          42,500.00
                                                                                                                                                                                                                          ..---------------...----------------......
   Funds advanced for flood control, rivers and harbors      __......................       .......     ...                                                        Oct. 15, 1940 ---------------- 3, 352, 285.00 ----------------          3, 352, 285.00
   Funds contributed for flood control, rivers and harbors--------..................-...--.---                                                                          (3)          .       .        214, 925. 00 ......             .        214, 925. 00      I
        Total-........-------------------------
                                              .........                                         --....
                                                                                                    ..           ....--       ...................                  .............              42,500.00                3,567,210.00 ----------------           3, 609,710.00
Funds transferred from other departments as working funds:
   Working fund, War, Engineers, civil--....-.     .                                                                               -                                      (3)           -4,                                               782, 500.00
                                                                                                                                                                                                                                .-----------------------------------------
                                                                                                                                                                                                                                                        4,782,500.00
   Working fund, War, Engineers, civil, 1941 .....--.....--...-------------.................---------............----------------.                                        (3)             ..........----------                                 200.00          200.00
   Working fund, War, Engineers, civil, 1942..------------                        ------                        ------------                                              (3)        ........--------------.......                          6, 000.00       6,000. 00 Lj
   Working fund, War (National Industrial Recovery, Federal Administration of Public Works,
     allotment to Civil Aeronautics Authority), 1933--42--Gravelly Point National Airport project_                                                                        (3)       ....           .....                ---    --            670, 030. 00        670, 030. 00
           Total, working funds ..................................................------------------------------------------------..----------------.. ----------..---------------                                                         5, 458, 730. 00     5, 458, 730. 00
           Grand total, all funds----.._              ----                                               -----                                      -,         -------------.         9-----..-..-.-
                                                                                                                                                                                     69,934,  890. 08                191, 391, 207. 91   120,451,823.34      381, 777,921. 33
                                                                                                                                                                                                                                                                                 Pal
    SVarious.


                                                                                                                                                                                                                                                                                 ci



                                                                                                                                                                                                                                                                                 vN3
     The following amounts have been advanced by local interests for river and harbor improvements under the pro-
visions of section 11, River and Harbor Act, March 3, 1925, and for flood-control works under the provisions of the
act of October 15, 1940, and are returnable to the same interests when necessary Government funds are available:

                                                                                                                                           Balance due          Amount re-                 Amount re-          Balance due
                                                                                                                                           from United                                                         from United
                                        Project                                                           District                         Sttesune            ceived during             turned during         States June
                                                                                                                                              30 1941            fiscal year               fiscal year            30, 1942

Arecibo Harbor, Puerto Rico------------ ------------------------------
      HillsHarbor,$148,                                                                      San Juan, P. R                                        $148, 000 __,
                                                                                                                               ...-----------------------               --------------                                      000
Great Hills Harbor, Staten Island, N. Y --------------------------------                     New York, N. Y               .                          114, 500 ----------------     ----......                          114, 500
       Total, rivers and harbors-----........-------------------------------------------------------------------                                 262, 500 ...........-----------------         -------                 262, 500
Buffalo Bayou, Tex---..........................--------------------------------------        Galveston, Tex               ...------...            97, 715          $2,402, 285                                       2, 500, 000
Sacramento River, Calif ...................................-------------------------------   Sacramento, Calif_      .....                        ..---------------
                                                                                                                                                    ----.             950, 000                                          950, 000
       Total, flood control.....-----..............-------------------------------------------------------------       ----------------           97, 715             3, 352, 285 ---------------                    3, 450, 000    /2
       Grand total------..................---------------------------------------------------                                                    360, 215              , 352, 285 ........---------......---         3, 712, 500
                                                                                                                                                                                                                                   -z
     Expenditures.-The total actually expended under the direction of the Chief of Engineers in connection with the
maintenance and improvement of rivers and harbors, flood control, and other miscellaneous works during the fiscal
year ended June 30, 1942, is as follows:                                                                                                                                                                                           It
                                                                                                                                                                                                                                   0
                                                                                                                                                                                                                                   Cl




                                                                                                                                                                                         Expenditures
                                                                                                                                          Appropria-
                                                                                                                                            pronact
                                                         Appropriation title
                                                                                                                                                             New work                    Maintenance              Total

Rivers and harbors:
   Maintenance and improvement of existing river and harbor works_._.                                                     .------------------------------
                                                                                                                                        (1)      $36, 189, 718. 30      $44, 067, 511. 42                      $80, 257, 229. 72
   Improvement of Washington Channel, D. C. (transfer to War) .----------- -..----..----- ------------... July 15,1939                                 19, 200.01---           _-_____                               19, 200.01
   Claims for damages by collision, act June 5, 1920, river and harbor work....             ..        ..---------------------------. (2 3 4)           13, 723. 90 ----------------                                  13, 723.90
   National Industrial Recovery, War, rivers and harbors, 1933-43 .......................                                    .... June 16, 1933              4. 45                                                         4. 45
   Public Works Administration, allotment to War, rivers and harbors, 1935-43-------------            . --.. .             ..
                                                                                                                       -------     June 19, 1934        -117. 44 _----------------                                     -117. 44
   Emergency Relief, War, rivers and harbors, flood control, etc., 1935-37 ..               ..-----------.---------------- June 8, 1935                   -52.00 ----------        _------                              -52.00
   Power plant, Fort Peck Dam, Mont., construction_ ......           -------------------------
                                                                                        .            --.--- -------------               (1)           363, 909. 56 _---__--__-__-___                                363, 909. 56
   Power plant, Bonneville Dam, Columbia River, Oreg., construction .--.                  .     .          .      .      .              (1)        7, 515, 633. 31- -----------                                  7, 515, 633.31
   Emergency fund for the President, War (allotment to War, Corps of Engineers), 1940-42 (St. Lawrence
     waterway)..------------------------------------------------------------------------                                          June 13, 1940       315, 647. 42 ----------------                                315, 647. 42
                                                                                                                                                                                                                                   C.
                                                                                                                                                                                                                             Expenditures
                                                                                                                                                                               Appropr ia-
                                                              Appropriation title
                                                                                                                                                                                                        New work              Maintenance                Total
                                                                                                                                                                                                                                                                          w
                                                                                                                                                                                                                                                                          u




Rivers and harbors:-Continued
   Emergency funld for the President, national defense (allotment to War, Corps of Engineers), 1942 (construc-
     tion of submerged weir in the Niagara River)__________        ________________    __ ___.____ _____ ____ Apr.                                                                           5,1941       $178, 575. 57                                  $178, 575. 17

          Total, rivers and harbors.........................                            .-----.              .                   ..       .                  ...               _....         ....       44, 596, 243.08       $44, 067, 511.42        88, 663, 754. 50    O
                                                                                                                                                                                                                       - 1 -I                 -
Flood control (projects authorized in act of June 22, 1936, as amended and supplemented, and Emergency Re-
  lief projects):
     Flood control, general.............                      ..............                   .........               .....-------------------------------------... (1)                                84, 681, 787. 28       3, 197, 393. 67        87, 879, 180. 95
     Emergency Relief, War, rivers and harbors, flood control, etc., 1935-37 -- _ ........ ...............                                          _ .....    Apr. 8,1935                                    -252.50      -- - ---- -- --                  --25k. 50
     Emergency Relief, War, Corps of Engineers, public buildings, parks, utilities, flood control, etc., non-
        Federal projects (transfer from Work Projects Administration), 1938-39 -- -                                                                            June 21, 1938                                   -20. 50     -- -- ---------                    -20. 50         r
     Emergency Relief, War, Corps of Engineers, public buildings, parks, utilities, flood control, etc., (transfer
       fr om W o r k P ro j ec t s Ad m in i st r at io n ) , 1938-4 2 . . . .. . . . . . . . . . . . .. . . . . . . ... ---____ -----__ --- - -- -_     _ - .. _do..___                                      6,615.06 ----- ---------                       6,615.06
       Total, flood control, general.......--......__                                      ,_-------.__-.                                                                                               84, 688,129.31            3, 197, 393. 67     87, 885, 523. 01
Flood control, Mississippi River (act May 15, 1928, as amended):
    Flood control, Mississippi River and tributaries __-..-_______________-_____                                                                                                       (1)              18, 420, 058. 20          7, 760, 886.60       26,180, 944. 80
    Emergency fund for flood control on tributaries of Mississippi River ...            ..........------------------------- -                                                          (')                  323, 013. 39              71, 043. 55         394, 056. 94
    Flood control, emergency construction, act July 21, 1932- ---.-----  -    ------------------- ...-       -- - __                                                          July 21, 1932                  33, 644.97                                    33, 641.97

       Total, flood control, M ississippi River                       ----.. -
                                                                   ---...---       --     - -- ---           ------     .__.                              .. .                .............             18, 746, 716. 56          7, 831, 930. 15      26, 608, 646.71
Flood control, Sacramento River, Calif.:
    Flood control, Sacramento River. Calif- ---   -    - -. - .._ --- _-___ ...... ___ ___             _                                              _._              _               (1)                 367, 766. 08                 46, 373. 76       414, 139. 8t4
    National Industrial Recovery, War, flood control, 1933-13 --.------ . ---..       ---........... ..                                                                       June 16, 1933                     -1.00                                          -1.00
                                                                       ...........
        Total, flood control, Sacramento River, Calif.------------.........                                      ..         ..        .   .       .       .__          -- _                                367, 765.08                  46, 373. 76       414, 138.84
        Total, all flood control.------- -------------.                    .
                                                                         ........................................
                                                                                -                                                                                               .............          103, 832, 610. 98        11,075,697.58         114, 908, 308. 56
Miscellaneous appropriations:
   Investigation and survey of canal and highway across Republic of Nicaragua -_ ..                                                                                           nug.           9,1939'              93.44    ---------.......                      93.44
   National Industrial Recovery, Public Works Administration (allotment to War, Corps of Engineers),
        1933-43 ..----------------------------..                                                                                                                              June 16, 1933                457, 174.88                                    457, 174. 88
     Public Works Administration (allotment to War, Corps of Engineers), 1933-43 ..                                                                                           June 19,1.934                 20, 000. 00                                    20, 000. 00
     Development of landing areas for national defense, Office of Administrator of Civil Aeronautics (transfer to                                                                                                          -- - - - - - - -
        War), 1941-43-----..             -----
                                      ..-----..     ------        .---
                                                                 ---------------           .         -----
                                                                                                    .--
                                                                                                  --------            -_-                     - ___ --_          - -          Apr. 28, 1942'            18, 899, 327. 61     ~--
                                                                                                                                                                                                                             - - - -- - - -            18, 899, 327. 61
        Total miscellaneous appropriations ---- ------------------------------ ------------- -------- -----------                                                                                       19,376,595.93                                  19,376, 595. 93
Contributed and advanced funds:
   Funds contributed for improvement of rivers and harbors ..------      .....--
                                                                              ..--..                           ....--------------.-------- (7)                     357, 148. 94                       50, 858. 11        408, 007. 05
   Funds contributed for flood control, rivers and harbors --       -_             _.                               ..--------------------------.--------
                                                                                                                            ----            (7)                 1, 449, 550. 10                        5, 589. 16      1,455, 139. 26
   Funds advanced for improvement of rivers and harbors...........
                                                              ...........--                                            _-            Mar. 3, 1925                   38, 903.82                                            38, 903.82
   Funds advanced for flood control, rivers and harbors- .-------..--------                                                         Oct.     5, 1940               573, 473. 15                       56, 447.-- 2       573.473.15
     Total, contributed and advanced funds . _-                .
                                                          .. ...--           .       ..                       _..        ....                                   2, 419, 076. 01                       56, 447. 27      2, 475,  28
                                                                                                                                                                                                                             523.
                                                                                                                                                            -                     I
     Total, Engineer Department and contributed funds .....------------- ----.--.---.                 -.---------------...         -------------       (     170, 224, 526. 00              55,199, 656. 27                     27
                                                                                                                                                                                                                     225,424,182.
Working funds (transfers from other departments):
   Working fund, War, engineers, civil (various projects)      .......
                                                                    _ -.......
                                                                        -.........---                     -               ..-.--                            ------------ ----         ----------------                   895, 218. 15
   Working fund, War, engineers, civil, 1941 (various projects) .....................................----------------                                                                                                         613.69
   Working fund, War, engineers, civil, 1941-42 (Gravelly Point National Airport) ................------.                                                                                                                 33,701.00
   Working fund, War, eneineers, civil, 1942 (various projects)------.    ----------- --- --------------- t_--_                                                      --
                                                                                                                                                            ------------                                                   4. 488. 74
   Working fund, War, Engineers (National Industrial Recovery, Federal Emergency Administration of
    Public Works, allotment Civil Aeronautics Authority), 1933-42 (Gravelly Point National Airport) _ ...   .- June 16,1933                                                           .................
                                                                                                                                                                                      .....-----.-...                    644, 647. 76
   Working fund, War, Engineers (Public Works Administration, act of 1938, allotment to Commerce, Office
    of Administrator of Civil Aeronautics Authority), 1938-42 (Gravelly Point National Airport)_             __- June 21,1938                                                                                                 142.03     4
   Working fund, War, Corps of Engineers (Emergency Relief, Work Projects Administration, Federal con-
    struction projects), 1938-42 (Gravelly Point National Airport)-            _ _         -          __            do ....
                                                                                                                 -....
                                                                                                                                                                                                      . . -. -- --
                                                                                                                                                                                                                 .         3,860.70
   Working fund, War, Corps of Engineers (Emergency Relief, Work Projects Administration, Federal con-
    struction projects), 1942 (Gravelly Point National Airport).       .----------.--------------               ----do - ----                                                                                            228, 103. 78

       Total, working funds .    . .                  ---------...
                                        . ..---------------  . .. . . .. .. . . ..       . -.
                                                                                      ..---      ------                                                     ---------------           --      - - - - - - -            1,810,775. 85
       Grand total, expenditures by United States Engineer Department                     --------------------------                                         170, 224, 526. 00              55, 199, 656. 27         227, 234, 958. 12

   1 Annual or supplemental.
   2 First Deficiency Appropriation Act, 1940, Apr. 6, 1940, $8,771.95.
   3 Second Deficiency Appropriation Act, 1940, June 27, 1940, $3,803.28.
                                                                                                                                                                                                                                         d
   4 First Supplemental Civil Functions Appropriation Act, 1941, Oct. 9, 1940, $1,148.67.
   S Third Deficiency Appropriation Act, 1939.
                                                                                                                                                                                                                                         O
   6 Sixth Supplemental National Defense Appropriation Act, 1942, Apr. 28, 1942.
   7 Trust funds.
                                                                                Consolidated cost and financial summary as of June 30, 1949

                                                                                                                        Value of                                                                                                                                         Additional
                                                              Cost of new                  Cost of                   plntstoks,          Plusaccounts                Minus                   Total                    Balance                  Total to be                amount
                                                                                                                     and   undis-         reab                      accounts
                                                                 work                    maintenance                  tributed            receivable                payable               expenditures              unexpended                accounted for             required for
                                                                                                                        items                                                                                                                                           completion
                                                                                                                                                                                                                                                                                              0
Seacoast harbors and channels ----                     -    $688, 136, 115. 10 $302,100,283.13                           $732, 939. 62                     974,
                                                                                                                                           $602, 552. 08 $2,     76
                                                                                                                                                              697.                        $988, 597, 192. 17 $53, 503, 451. 53 $1,042,
                                                                                                                                                                                                                                     100,  70
                                                                                                                                                                                                                                        643.                                    260,
                                                                                                                                                                                                                                                                             $73,  865
Intracoastal canals and other water-
  ways ..               ------
                  -------     ------ 155, 355, 596. 34                                        75, 167, 495. 69            57, 061.95         16, 250. 37              487, 059. 06    230, 109, 345. 29                12, 179, 624. 62    242, 288, 969. 91                 75, 291, 225     0
Mississippi River system                -- - -------          835, 208, 717. 65              267, 182, 634. 39         2,154, 385. 80       695, 988. 65           1, 587, 659. 95 1, 103, 654, 066. 54                31, 881, 017. 40 1, 135, 535, 083. 94                 50, 675, 450
Lake harbors and channels_ ..                  __....            156,
                                                              209,     48
                                                                    611.                      78, 574, 036. 14           461, 083. 45        35, 127. 20             543, 037. 66           287, 683,  61
                                                                                                                                                                                                    820.               14,795,269.78       302, 479, 090. 39                  14, 864, 300
         Total _ ..         . . . . . . . .,                                           . . . --------------
                                                           - - - - - - - - - - - - - - -.                              ------- . -
                                                                                                                 . .. .-                ----.-
                                                                                                                                 ..- . ..-- -.-.-.
                                                                                                                                                -- - - -               - - - - ...-                                . . . -. . -7 -. -. -. - . - . - . - . . ---..
                                                                                                                                                                                      . -. -. - . - . - .- . - . --.-                                        . . . - . -- - -0
                                                                                                                                                                                                                                                                       ------
                                                                                                                                                                                                                                                                                     1, 8 4
                                                                                                                                                                                                                                                                               214,091,840

Examinations, surveys and contin-
  gencies of rivers and harbors -...- -                            7, 613, 720. 34            52, 957, 107. 78    16, 314. 01               136, 600. 37 207, 188. 97                        60, 516, 553. 53           1, 909, 669. 37          62, 426, 222. 90------------                 0
Removing sunken vessels_---                                                                    7, 706, 797.12---...---------               -----------------------                            7, 706, 797.12               167,106. 60            7, 873, 903. 72-_____----                   0
Power installation at Bonneville and
  Fort Peck___                                                    32, 045, 588. 11                  412, 586. 13               84,933.41-------------1,              439, 622. 25            31, 103, 485. 40          15, 759, 113. 79          46, 862, 599. 19                500, 000     -4
Dam No. 2, Tennessee River:
    Construction                        _ _- -                    46, 613, 947. 62                  359,592.52---------                  ---------------------------                         46, 973, 540. 14      ---------------               46, 973, 540. 14      -
    Operation and care of hydroelectric                                                                                                                                                                                                                                                       r
                                                                                                                                                                                                                                                                                              00
         development            ___--                                                           1, 711, 656. 48-----------------------------------------                                                                        1,711, 656. 48
                                                                                                                                                                                                1, 711, 656. 48------------..........
Passamaquoddy tidal power prQject,                                                                                                                                                                                                                                                            X
  Maine____------------------                                   6,384,393.74 --...    ------                                   ..
                                                                                                                               --    ..-
                                                                                                                                       -------         ...------------.   6,384,393.74---------------     6,384,393.74--                                                                      00
Flood control_          -           -          ---            917,554,355.32 122,637,147.96                            1,694, 206. 35 2,897,721.32 13,638,132.     06 1,031,145,298.89 265,133,448.04 1,296,278,746.93 828,016,000
Plant:
    River and harbor _---                                                                                          45,148, 873.95        13, 762, 217. 80          6, 440, 252. 39           52, 470, 839. 36           5, 543, 035. 31          58, 013, 874. 67---------
    Flood control           ...................                         .       .   ..       _._.......          . 12, 564, 317. 87       5,081, 150. 49           1, 737, 147. 75           15, 908, 320. 61           2, 116, 424. 12          18, 024, 744. 73.----------

         Total..._          _                        .. . 2, 898,069,045.70 908, 809, 337. 341162, 914,116. 41 23, 227, 608. 28 29, 054, 797. 85 3, 863, 965, 309.88 402, 988,160. 56 4, 266, 953, 470.44 1, 042, 607, 840
Unallotted balance June 30, 1942:
    Rivers and harbors                   ---                                                                                                                         - - --------------------                          19, 893, 097.90           19, 893, 097. 90.........----------
    Flood control, Mississippi River
      and tributaries .................                                                                                                                               S-----     ---------------                         34, 200. 00                   34, 200. 00 --.----------
    Emergency funds for flood control
      on tributaries of Mississippi
      R iver ..........................                                     -                                    -   -------                   -----------------                                                        1, 374, 087. 99           1, 374, 087. 99---------
    Flood control, general _-                                                            .       ..----       ---- -------------- --------------              -------------.            ----------------               13, 291,971. 27           13, 291,971.27

         T otal--     - - - - - - - - - - --                                                                                                                                               - ---               -       34, 593, 357. 16         34, 593, 357. 16             --- __----
                                                                                                     ......                                                                                        9       ,                      51   16,        3        6      1/....~.

         taran I    total   ____--__-------------------I------
                                                                                                                                                                                                                   43,581,517.72 4,301,546,827.601
                                                           I ni     -                                                                                                                                              4      5
1 Of this amount, $52,934,060.03 represents the value of plant, distributed as follows:

                                                                                                                                           Construction        Service plant       Tools and            Total
                                                                                                                                              plant                               equipment

    R iver and harbor_ ._______   ...   . --..--   ......   -... --. . . .. -. -.. - . -.. - ..-- - .. - - -   -   -   -   -   -   -   -   $28,914,395. 82      $9,658,023. 08    $3,623,970.68      $42,196, 389. 58
    Flood control_- ..-____-___.....---              ----     ---------------------------------------------. 4,839,947.31                                        3, 938,110.17     1, 959, 612.97     10, 737, 670.45
          Total .____-----------------------                   --------          -----------------------------------                        33, 754, 343. 13    13, 596,133. 25    5, 583, 583. 65    52, 934, 060. 03




                                                                                                                                                                                                                         I
                                                                                                                                                                                                                         0
                                                                                                                                                                                                                         rj




                                                                                                                                                                                                                         I.
20          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                               1942

  The amounts that can be profitably expended during the fiscal year
ending June 30, 1944, are as follows:
Maintenance and improvement of existing river and harbor works:
    New work------------------------------------------------                                            $38, 089, 300
    Maintenance -----------------------------------                                                      52, 905, 865

      Total rivers and harbors _--__--                         --          ____-________-__
                                                                              --                         90, 995, 165
Power installation ---------------------                                                                     500, 000
Flood control:
    Mississippi River and tributaries -------------             ____ 30, 078, 930
    Emergency work on tributaries of Mississippi River                        100    ------------
    Sacramento River, Calif----------------------------------2,          800, 000
    Projects adopted in act of June 22, 1936, and amendments
      thereto     ------------------------------------------         38, 577, 245
    Snagging and clearing pursuant to section 2 of the Flood Control
      Act approved Aug. 28, 1937, as amended---------------------        100, 000

            Total flood control _____-             _____-----_____-___71,                                    556, 275
            Grand total------ ------------------------------------                                      163, 051,440

                  THE BOARD OF ENGINEERS FOR RIVERS AND HARBORS

   The creation of the Board and the duties assigned to it under the
original and subsequent acts of Congress are described in the Annual
Report of the Chief of Engineers for the fiscal year 1922.
   A summary of the reviews accomplished by the Board during the
year and the status of its operations from its organization up to the
close of the fiscal year are shown by the following table:

                                                                    Number of       Total        Number
                                                 Number of           investi-      number       completed     Number
                                                   investi-          gations     completed        during     remaining
       Authority for investigations                gations           ordered     completed         during    remaining
                                                 previously         during fis- at   close of
                                                                                  preceding     year  end-
                                                                                                 ing June    to be com-
                                                                                                                pleted
                                                                     cal1942ordered
                                                                         year    fiscal year      30, 1942

River and harbor and flood-control acts----           4, 311                 66        3,852           143           382
Concurrent resolutions of Congress      -_---.             1                  0             1 .
Senate resolutions _________________________               1                  0             1
Resolutions of congressional committees__ _           1, 651                 65        1, 334          134          248
      Total_____________-__-__------   ______         5, 964                131        5,188           277           630


  NOTE.-Number of hearings held by the Board during the year, 31.

    Beginning in 1919 the statistics of water-borne commerce of rivers
and harbors have been prepared for publication as part 2 of the An-
nual Report of the Chief of Engineers by the statistical division of
the Board. The report contains detailed statistics of the water-borne
commerce for the individual ports and waterways under im-
provement and maintenance as well as numerous waterways not under
improvement. Of particular interest is the comparative statement
showing the water-borne commerce of the United States since 1920, in
which the foreign trade and domestic traffic is shown for both ports
and waterways.
    Studies prescribed by various river and harbor acts and by section
500 of the Transportation Act of 1920 were continued, and the results
published in four series of reports known as Port and Terminal Facil-
ities Reports (formerly Port Series Reports), Survey of Terminals
                            RIVERS AND HARBORS                                21
and Landings on the Inland Waterways of the United States, Trans-
portation Series, and Miscellaneous Series.
   The wartime policy of keeping the port studies confidential resulted
in withdrawing all books from sale at the Government Printing Office
and distribution has been limited to war transportation agencies and
other Federal agencies having direct need for the information. The
regulations issued in connection with confidential documents are be-
ing followed. The reports listed below were prepared and distribu-
tion made:
                      PORT AND TERMINAL FACILITIES REPORTS

Fernandina, Fort Pierce Harbor, Palm Beach, Port Everglades, Miami, Key West,
  and Tampa, Fla.
Mobile, Ala., Gulfport and Pascagoula, Miss., Pensacola, Panama City, and Port
  St. Joe, Fla.
Northern New England Ports.
Ports of San Juan, Ponce and Mayaguez, P. R., and St. Thomas, V. I.
Stockton and Sacramento, Calif.
Tacoma. Everett, Bellingham, Port Angeles, Olympia, and Grays Harbor, Wash.
Upper Hudson River Ports.
Boston, Mass.
Galveston and Texas City, Tex.
Houston, Tex.
Jacksonville, Fla.
Corpus Christi, Tex.
Los Angeles and Long Beach, Calif.
San Diego and Port San Luis, Calif.
Seattle, Wash.
Norfolk. Portsmouth, and Newport News, Va.
Ports of Southern New England.
Ports on the Delaware River.
Baltimore, Md.
Ports of the Territory of Hawaii.
Ports of the Territory of Alaska.

SURVEY OF TERMINALS   AND   LANDINGS ON THE INLAND WATERWAYS    OF THE UNITED
                                      STATES

Volume 1. Mississippi River.
Volume 2. Ohio River.
                               TRANSPORTATION   SERIES

No. 3. Transportation Lines on the Great Lakes, 1941 and 1942 issues.
No. 4. Transportation Lines on the Mississippi River System, 1941 and 1942.

                               MISCELLANEOUS SERIES

Two reports in this series, covering port and terminal charges at 124 United
  States sea and Great Lakes ports were compiled.
  Material was compiled on the following:
        SURVEY OF TERMINALS AND LANDINGS ON THE INLAND WATERWAYS
                           OF THE UNITED STATES

Volume 3. Ohio River Tributaries.
Volume 4. Atlantic Intracoastal Waterway.
                          PORT AND   TERMINAL FACILITIES

Port of New York, N. Y.
                               TRANSPORTATION   SERIES

No. 5. Transportation Lines on the Atlantic, Gulf, and Pacific Coasts, 1942
edition.
22     REPORT OF CHIEF OF ENGINEEiRS, U. S. ARMY,         1942

   A new report relative to descriptions and operations of fishing ves-
sels operating at ocean and Great Lakes ports of the United States
was initiated.
   Special studies were made during the year in connection with
projects coming before the Board. Data were compiled for articles
for such publications as World Ports, the American Year Book, and
Encyclopedia Britannica, and for use in other Government publica-
tions; and tables, graphs, and maps have been prepared as necessary
in connection therewith.
   Reports were prepared for the Office of the Petroleum Coordinator
of War to include details as to the number and capacities of petroleum
storage tanks, pipe-line connections, and owners and operators at all
ocean and Great Lakes ports and on the inland waterways of the
United States.
   A survey of the general cargo terminals throughout the country
was made for the Army and Navy Munitions Board and war trans-
portation agencies to obtain the physical details of the terminals and
their cargo handling capacities per month, and maps and photographs
for each terminal were prepared.
   A study was made of the use of inland waterways for the shipment
of oil to the eastern seaboard.
   A study was made of barge tankers and towboats operating on the
Mississippi River system, the Great Lakes, the New York State Barge
Canal, and on the Atlantic, Gulf, and Pacific coasts, for the use of
the War Production Board.
   On June 30, 1942, the Board was composed of the following mem-
bers: Maj. Gen. Thomas M. Robins, Col. Roger G. Powell, Col.
Charles L. Hall, Col. Beverly C. Dunn, Col. Malcolm Elliott, Col.
John S. Bragdon, and Col. T. F. Farrell.
   In addition to the foregoing, the following-named officers have also
been detailed for various periods during the year to membership on
the Board: Col. John N. Hodges, Col. Earl North, Col. Robert E.
Coughlin, and Col. Gordon E. Texter.

  IMPROVEMENT OF RIVERS AND HARBORS IN THE
            BOSTON, MASS., DISTRICT

   This district comprises all of Maine, the eastern two-thirds of New
Hampshire, and northeastern and eastern Massachusetts embraced
in the drainage basins tributary to the Atlantic Ocean north of
Nauset Harbor, inclusive on the east coast of Cape Cod, and to the
head of Buzzards Bay, Mass., north of Butlers Point at the southern
extremity of Sippican Neck, and Scraggy Neck. It also includes
the Cape Cod Canal.
   District engineer: Col. Leonard B. Gallagher, Corps of Engineers,
to June 5, 1942; and Maj. William G. Van Allen, Corps of Engineers,
since that date.
   Division engineer: North Atlantic division-Col. J. N. Hodges,
Corps of Engineers, to April 30, 1942; New England division-Col.
Leonard B. Gallagher, Corps of Engineers, from May 1, 1942.
             RIVERS    AND HARBORS-BOSTON,               MASS., DISTRICT            23
                                        IMPROVEMENTS

                 Navigation                             Navigation-Continued
                                         Page                                      Page
1.   Penobscot River, Maine ...           23   15. Other projects for which no
2.    Kennebec River, Maine ...            25         estimates are submitted _-     58
3.    Portland Harbor, Maine ---           28   16. Plant allotment                  59
4.    Saco River, Maine___....             31
5.    Kennebunk River, Maine_ _            33                Flood control
6.    NewLburyport Harbor, Mass_           35
7.   Gloucester Harbor and An-                 17. Merrimack    River    Basin,
        nisquam River, Mass    ----      x/37         N. H. and Mass-------
                                                18. Franklin Falls Reservoir,
                                                                                     61
8.   Mystic River, Mass_ ....             40
9.   Boston Harbor, Mass .....            42         Merrimack River Basin,
10.   Weymouth       Fore      River,                 N. H ------------              63
        Mass _                             47   19. Blackwater Reservoir, Merri-
11.   Weymouth      Back       River,                 mack River Basin, N. H__       65
        Mass                               49   20. Lowell, Merrimack      River
12.   Plymouth Harbor, Mass- --            51         Basin, Mass_                   67
13.   Cape Cod Canal, Mass_                53   21. Preliminary    examinations
14.   Examinations, surveys, and                      and surveys for flood con-
        contingencies (general) _-         57         trol-----------------          69

                           1. PENOBSCOT RIVER, MAINE

   Location.-This river drains a large number of lakes and small
streams in north central and eastern Maine and, after assuming defi-
nite character as a stream, flows about 100 miles in a southerly direc-
tion through the middle of the State, discharging into Penobscot Bay,
about 90 miles northeast of Portland, Maine. (See U. S. Coast and
Geodetic Survey Chart No. 311.)
   Previous projects.-Adopted by the River and Harbor Act of July
11, 1870, and modified by the River and Harbor Acts of July 5, 1884,
August 11, 1888, July 13, 1892, and March 3, 1899. For further
details of previous projects, see page 1732 of Annual Report for 1915,
and page 48 of Annual Report for 1938.
   Existing project.-This provides for dredging to a depth of 22
feet between Winterport and Bucksport, about 16 miles below Bangor;
for straightening, widening, and deepening to 15 feet the channel
near Sterns Mill and near Crosbys Narrows from 3 to 4.5 miles below
Bangor; for deepening the basin of the Kenduskeag stream at its
junction with the Penobscot to 5 feet; and for deepening the harbor
at Bangor to 14 feet and widening it along the Bangor front, giving
an additional width of from 100 to 300 feet for a length of about
2,000 feet. The project depths refer to mean low water, which is 3
feet above extreme low tide. The mean range of tide at Bangor is
13.1 feet, and the extreme about 15 feet.
   The estimate of cost for new work, made in 1906, was $130,000, ex-
clusive of amounts expended under previous projects. The latest
 (1906) approved estimate for annual cost of maintenance is $500.
24            REPORT OF CHIEF O'F ENGINEERS, U. S. ARMY,                                                  1942

  The existing project was authorized by the following river and
harbor acts:

       Acts                                Work authorized                                             Documents


July     5,1884   Widening the channel at Bangor and Crosbys Narrows_ ..--                   S. Ex. Doec. No. 44, 48th
                                                                                               Cong., 1st sess., and An-
                                                                                                  nual Report 1884, p. 475.
Aug. 11, 1888     Dredging between Winterport and Bucksport...------------                   H.     Ex. Doc. No. 133, 50th
                                                                                                  Cong., 1st sess., and An-
                                                                                                  nual Report 1888, p. 425.
July 13,1892      Widening the channel at Bangor-_ __               __.    _--   _ _ _ _I.   H.  Ex. Doc. No.       37, 52d
                                                                                               Cong., 1st seas.,   and An-
                                                                                               nual Report 1892,   p. 533.
Mar. 3,1899       Dredging Kenduskeag stream..........------------------------               H. Ex. Doc. No.       49, 55th
                                                                                               Cong., 1st sess.,   and An-
                                                                                               nual Report 1897,   p. 811.
Mar. 2,1907       Further widening of the harbor at Bangor            ---------------        11. Doc. No. 739, 59th Cong.,
                                                                                                1st sess.l


  I Contains the latest published map.           Other maps are in H. Doec. No. 652, 71st Cong., 3d sess.

   Terminal facilities.-The river front of Bangor Harbor has 18
wharves. They are of the timber-crib stone-ballasted type. In Ken-
duskeag stream there are 42 berths for small vessels. In general the
wharves are not modern and are in only fair condition. Eleven
wharves have physical connection with railroad. There is a ferry
location publicly owned. On the east side of the river at Brewer,
opposite Bangor, there is one water terminal, a coal-handling plant,
having mechanical appliances and adequate facilities. The remainder
of the terminals at this locality are without such facilities and in poor
condition. At South Brewer there is a large pulp and paper plant
which has water connections and all necessary facilities pertaining to
its business. A number of the private wharves are open to the public
at moderate charges. On the north side of the river at Bucksport there
are 3 important terminals, 1 a coal-handling plant and 2 used by a
large paper-manufacturing plant. There is also 1 large terminal which
has not been in use since 1935. The terminal facilities are considered
adequate for existing needs.
   Operations and results during fiscal year.-None. Final cost ad-
justment was made in connection with maintenance dredging in the
vicinity of Lawrence Cove by the U. S. seagoing hopper dredge
Absecon, at a cost of $2,120.42 for maintenance. The expenditures
were $8,455.18.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1913. In 1938 the channel from Bucksport to Winterport
and for a distance of about 4 miles at and below Bangor was sub-
stantially of project dimensions, except for a shoal area in Bangor
Harbor, on the Brewer side, having a maximum width of 200 feet
and a least depth of 4.6 feet at mean low water. Dredging to re-
move subsequent shoaling in the channel opposite Lawrence Cove
was completed in June 1941, at which time the controlling depth
at that point was 20 feet at mean low water for a width of 250 feet.
The costs and expenditures under the existing project have been
                   RIVERS AND HARBORS-BOSTON,                                   MASS.,      DISTRICT                    25
$185,348.68, of which $133,220.53 was for new work and $52,128.15
was for maintenance.
  Proposed operations.-No funds are available and no work is pro-
posed during the fiscal years 1943 and 1944.
                                         Cost and financial summary
Cost of new work to June 30, 1942---------------------------                                                $501, 020.53
Cost of maintenance to June 30, 1942-_----------------------                                                  52, 128. 15

      Total cost of permanent work to June 30, 1942--------------553,148. 68
Net total expenditures -----------------------                      553, 148. 68
Total amount appropriated to June 30, 1942_--                      553, 148. 68

    Fiscal year ending June 30                  1938            1939             1940          1941              1942


Cost of new work__
Cost of maintenance ..-------------            $2, 759. 52    $17, 253.03 ..                 $24, 715. 71        $2, 120. 42

Total expended .----------------------------                   20, 012. 55 ..     -     -     18, 380. 95         8,455. 18

Allotted -----------------------               50,000. 00    -18,   000. 00   -$11,987.45     27, 000. 00          -163. 87



Balance unexpended July 1, 1941-------------------------------                                                $8, 619. 05
Deductions on account of revocation of allotment------------------                                                163. 87
      Net amount to be accounted for--------------------------                                                 8, 455. 18
Gross amount expended_ _________----------     ----       -- ----                                              8, 455. 18

                                      2. KENNEBEC RIVER, MAINE

   Location.-Kennebec River drains a large number of lakes and
minor streams, and flows from Moosehead Lake about 150 miles in a
southerly direction and discharges into the Atlantic Ocean about 25
miles east of Portland. (See U. S. Coast and Geodetic Survey Charts
Nos. 288, 289, and 314.)
   Previous projects.-The first project was adopted by the River and
Harbor Act of March 2, 1827. Modifications and additions were au-
thorized by River and Harbor Acts of August 30, 1852, June 23, 1866,
July 11, 1870, March 3, 1871, March 3, 1873, March 3, 1881, August 11,
1888. For further details of previous projects see page 1735 of Annual
Report for 1915, and page 52 of Annual Report for 1938.
   Existing project.-This provides for a channel 27 feet deep and not
less than 500 feet wide, extending from the mouth to a point about 0.6
mile above the bridge at Bath; thence to Gardiner a channel not less
than 150 feet wide, with a depth of 17 feet at Beef Rock Shoal, at
the foot of Swan Island, 18 feet deep through rock at Lovejoy Nar-
rows, near the head of Swan Island, decreasing to 16 feet deep at
Gardiner; a channel west of Swan Island 100 feet wide, 12 feet deep,
except at the upper shoal, where the depth was to be 15 feet; and a
channel 125 feet wide and 11 feet deep from Gardiner upstream to
Augusta,at the head of navigation. The section of river included in
the project is about 44 miles in length. The work includes dredging,
rock excavation, and two riprap training walls. The project depths
refer to mean low water. The mean tidal range is 8.3 feet at the mouth
of the river, 6.5 feet at Bath, 5.5 feet at the foot of Swan Island, 5 feet
at Gardiner, and 4.1 feet at Augusta. The spring tides are about 1 foot
greater at the mouth and about 0.5 foot greater at Augusta.
26          REPORT        OF CHIEF O'F EGINEERS,                           U.   S. ARMY,             1942

   The estimate of cost for new work, revised in 1941, is $1,186,500,
exclusive of amounts expended under previous projects. The latest
 (1941) approved estimate for annual cost of maintenance is $5,000.
   The existing project was authorized by the following river and
harbor acts:

     Acts                              Work authorized                                          Documents 1



June 13,1902    Channel between Augusta and Gardiner, Maine......----------                H. Doc. No. 262, 56th   Cong.,
                                                                                             1st sess.
Mar. 2,1907     Channel below Gardiner, Maine. -..         .............. __ . .           H. Doc. No. 321, 59th   Cong.,
                                                                                             2d sess.
Mar.   4,1913   Channel west of Swan Island......--                       .
                                                          ________________..._.      . H. Doc. No. 746, 62d        Cong.,
                                                                                             2d sess.
Oct. 17,1940    27-foot channel from mouth to Bath--.--.-       -             -............S. Doc. No. 55, 77th    Cong.,
                                                                                         1st sess.

1 These documents contain the latest published maps.


   Recommended modifications of project.-In House Document No.
2107, Sixty-fourth Congress, second session, it was recommended that
the improvement and maintenance of the channel west of Swan Island,
near the town of Richmond, be abandoned.
   Terminal facilities.--Wharves capable of serving a useful purpose
are located at the towns of Bath, Richmond, Randolph, Gardiner,
Hallowell, and Augusta.
   Of the 30 wharves at Bath, 4 are publicly and 26 privately owned,
but about one-third of the privately owned wharves are in poor repair
and are little used. Rail connections are available at 19 of the wharves
at Bath. Depths alongside the wharves range from 12 to 25 feet.
   At the other above-named points there are 16 wharves in usable
condition. All but 1 are equipped with mechanism for handling pas-
sengers or freight. Those open to the public on equal terms are 2
at Hallowell and 1 each at Randolph and Augusta. None is publicly
owned. The facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-Under a contract for the
removal of ledge rock and other material to provide a channel 27 feet
deep at mean low water and not less than 500 feet wide from the mouth
of the river to a point abreast of the Bath Iron Works Corporation,
in progress at the beginning of the fiscal year, work was continued
through June 30, 1942. During the fiscal year there were drilled and
blasted 17,553 cubic yards, place measurement, of ledge rock, and there
were dredged 22,648 cubic yards, place measurement, of material, of
which 15,649 cubic yards were ordinary material and 6,999 cubic yards
were broken ledge, at a cost of $268,842.81 for new work.
   Work by hired labor, consisting of completion of a predredging
survey in connection with contract operations in the 27-foot channel
cost $2,250.23 for new work.
   Work by hired labor, consisting of a maintenance survey of the
river from Gardiner to Augusta, Maine, was commenced March 17,
1942, and carried on at intervals throughout the remainder of the fiscal
year, at a cost of $3,295.66 for maintenance.
                 RIVERS         AND HARBORS-BOSTON,                               MASS.,             DISTRICT                      27
   The total costs during the fiscal year were $274,388.70, of which
$271,093.04 was for new work and $3,295.66 was for maintenance. The
expenditures were $225,743.04.
   Condition at end of fiscal year.--The existing project was about
56 percent completed. The work remaining to be done is the
completion of removal of ledge rock and other material to provide
a 27-foot channel not less than 500 feet wide from the mouth of the
river to a point about 0.6 mile above the bridge at Bath, Maine. In
1940 the reach of the river from the mouth to Bath had a controlling
depth of 26 feet at mean low water in a crooked natural channel. In
1939 the controlling depths for the project channel widths were 13
feet from Abagadasset Point to the Gardiner-Randolph Bridge, and
8 feet thence to Augusta at the head of navigation. The costs under
the existing project have been $786,932.26, of which $658,592.71 was
for new work and $128,339.55 was for maintenance. The expendi-
tures have been $738,206.24.
   Proposed operations.-The funds unexpended at the end of the
fiscal year, including accounts receivable, amounting to $479,350.43,
will be applied as follows:
Accounts payable June 30, 1942     _____---  -______$48,                800.42
New work: Complete by Aug. 1, 1943, under a contract in force,
  removal of ledge rock and other material to provide a channel 27
  feet deep at mean low water and not less than 500 feet wide from
  the mouth to a point abreast of the Bath Iron Works Corporation_ 429, 084. 82
Maintenance: Complete by Sept. 1, 1942, maintenance survey of the
  river from Gardiner to Augusta, Maine, in progress; by hired
  labor------------       ------------------------------------       1, 465. 19

           Total.--------                -------------------------------                                               479, 350. 43
  The sum of $94,000 can be profitably expended during the fiscal
year 1944 for the completion of the project by dredging between the.
Bath Iron Works Corporation and a point about 0.6 mile above the
bridge at Bath, Maine.
                                         Cost and financial summary

Cost of new work to June 30, 1942___
Cost of maintenance to June 30, 1942_____--------------
                                                                   __----------                                  $1,168, 003. 74
                                                                                                                    128, 339. 55
      Total cost of permanent work to June 30, 1942                                                              ,296, 343. 29
                                                                                                                1----------
Plus accounts receivable June 30, 1942_  ___
                                           ---      __                                                       -___-         74. 40
      Gross total costs to June 30, 1942---- -----------        __                                               -1, 296, 417. 69
Minus accounts payable June 30, 1942_-     ---     ______-___--                                                       48, 800. 42
     Net total expenditures                                                                       247, 617. 27
                                                                                               1------------------------------,
Unexpended balance June 30, 1942 -- ___-                                      ________---------479, 276. 03
           Total amount appropriated to June 30, 19421--------------,                                                  726, 893. 30

    Fiscal year ending June 30                 1938              1939                   1940              1941              1942


Cost of new work .......--------------                                   -       ----                    $1, 061. 29      $271, 093. 04
Cost of maintenance                      -----------       -   $88,996.56          $4, 258. 55       -      --               3, 295.66
       Total cost ...
                   ___                   .______-------.        88, 996. 56             4, 258. 55        1,061. 29        274, 388. 70

Total expended_______________----------_                        87,753. 81              5, 501.30           980. 93        225, 743. 04

Allotted   -------------------           --------------        116, 000.00        -2,744.89              686,000.00...........
28         REPORT OF CHIEF OF ENGINEERS,                       U. S. ARMY,           1942

Balance unexpended July 1, 1941__________________ ________                            $705, 019. 07
Gross amount expended--------------------       $225,858.01
Less reimbursements collected---------------__-      114. 97
                                                                                       225, 743. 04

      Balance unexpended June 30, 1942______________________                           479, 276. 03
Outstanding liabilities June 30, 1942-------   ___ $48, 800. 42
Amount covered by uncompleted contracts--    _____ 430, 461. 17
                                                                                       479, 261. 59

      Balance available June 30, 1942 _____________________   -                              14. 44
Accounts receivable June 30, 1942------------------------------                              74. 40
        Unobligated balance available June 30, 1942 _______-_____                            88. 84

Amount (estimated) required to be appropriated for completion
  of existing project 1_-           ______              ________                        94, 000.00
Amount that can be profitably expended in fiscal year ending June
                               - -- -
30, 1944, for new work 1- - -____  __ - - - - - - - - - - - - - - - - - - - - - -      94, 000. 00
  1 Exclusive of available funds.

                            3. PORTLAND HARBOR, MAINE

   Location.-This harbor is on the southwestern coast of Maine, about
100 miles northeast of Boston, Mass. (See U. S. Coast and Geodetic
Survey Chart No. 325.)
   Previous projects.-Adopted by joint resolution of June 5, 1868,
and River and Harbor Act of June 10, 1872. For further details see
page 1736 of Annual Report for 1915, and page 40 of Annual Report
for 1936.
   Existing project.-This provides for a commodious anchorage off
the eastern end of the city, with a minimum depth of 30 feet; for
dredging the greater part of the inner harbor to a depth of 30 feet,
except for the lower part of the main harbor and its channel of ap-
proach, where the depth is to be 35 feet; for a channel 30 feet deep
and 300 feet wide in Fore River up to the Boston & Maine Railroad
bridge; for a channel 30 feet deep and 300 feet wide from the anchor-
age to the Grand Trunk bridge at the mouth of Back Cove; for rock
excavation to give a depth of 14 feet between the Grand Trunk and
Tukeys Bridges, and a channel 12 feet deep and 300 feet wide thence
to the head of Back Cove; for the removal of two obstructing ledges in
the main ship channel to a depth of 40 feet; and for a stone break-
water about 2,000 feet long on the southerly side of the mouth of the
inner harbor.
   The project depths refer to mean low water. The mean tidal range
is 8.9 feet, extreme 10.2 feet, though variations as great as 16 feet
have been observed under storm conditions.
   The estimate of cost for new work, revised in 1928, is $1,970,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $20,000.
   The existing project was authorized by the following river and
harbor acts:
                   RIVERS AND           HARBORS-BOSTON,                 MASS.,     DISTRICT                 29

       Acts                        Work authorized                                   Documents


July     4, 1836   Breakwater on southerly side of mouth of inner       H. Doe. No. 491, 23d Cong., 1st sess.
                     harbor.
June 23,1866       Extension of breakwater .....
June     3,1896    Dredging to 30 feet over greater part of inner       S. Doc. No. 271, 54th Cong., 1st sess.
                    harbor.
Mar. 3,1905        Extension of 30-foot depth up Fore River to Bos-
(Sundry civil)       ton & Maine R. R. bridge and in channel of
                     approach to Back Cove.
July 25,1912       30-foot anchorage;   14 feet at entrance to Back     H. Doc. No. 489, 62d Cong., 2d sess.
                     Cove; restoration of 12-foot depth in Back Cove
                     and 30-foot depth in the approach as well as in
                     lower part of harbor.
Aug.     8,1917    35-foot depth in lower part of main harbor and the   H. Doc. No. 71, 65th Cong., 1st sess.
                     channel of approach, and removal of two ob-
                     structing ledges in main channel.


  Latest published map in H. Doc. No. 560, 76th Cong., 3d sess.

   Recommended                 modifications
                                  of project.-Under date of December
15, 1939, the Chief of Engineers recommended modification of the ex-
isting project so as to provide for dredging an anchorage area 35 feet
deep at mean low water, and approximately 170 acres in area, north-
west of House Island, at an estimated first cost of $780,000 for new
work, with annual maintenance of $10,000, in addition to that now
required (H. Doc. No. 560, 76th Cong., 3d sess.).
   Local cooperation.-Fullycomplied with.
    Terminal facilities.-The harbor has a water front of about 81/2
miles, rather more than one-half of which has been developed. There
are about 54 wharves and 4 shipyards in Portland Harbor. The large
modern pier owned by the State is on the Portland side. Fifteen of
the wharves and all of the 4 shipyards are on the South Portland side.
The facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-New work: Under a con-
tract for the removal and disposal of a small ledge area in the main
ship channel northwest of House Island, work was commenced Feb-
ruary 2 and suspended February 25, 1942, due to unavailability of
dredging plant. Operations were resumed on June 2, 1942, and work
was in progress at the end of the fiscal year. There were drilled,
blasted, and removed 3,936 cubic yards, place measurement, of ledge
rock, at a cost of $77,290.97 for new work.
   Under a contract for dredging in the 35-foot channel in the vicinity
of the Portland Pipe Line Co.'s terminal, work was commenced Jan-
uary 27 and continued at intervals through March 21, 1942, on which
date operations were suspended for the balance of the fiscal year to
permit contractor to do essential dredging at certain war construction
plants at South Portland. During the fiscal year there were dredged
11,625 cubic yards, place measurement, of material at a cost of $9,718.40
for new work.
   Work by hired labor consisting of preliminary surveys in connec-
tion with contract operations cost $3,320.56 for new work.
    Work by hired labor consisting of a detailed survey of a ledge
disclosed by sweeping operations in 1942 in connection with contract
ledge removal operations cost $2,233.17 for new work.
           493202-43-pt. 1, vol. 1-3
30       REPORT OF CHIEF OF EGINEERS, U. S. ARMY,                      1942

   Maintenance: In connection with a maintenance survey of Fore
River Channel, Portland Harbor, to be carried out by hired labor, costs
were incurred in the amount of $184.38 for maintenance.
   The total costs during the fiscal year were $92,747.48, of which
$92,563.10 was for new work and $184.38 was for maintenance. The
expenditures were $32,229.10.
   Condition at end of fiscal year.-The existing project was about
90 percent completed. The remaining portion consists of the re-
moval of a depth of 40 feet at mean low water of two obstructive
ledges in the main ship channel (one of which was disclosed by sweep-
ing in connection with contract ledge removal operations during the
fiscal year 1942); completion of the removal to 40 feet at mean low
water of an obstructive ledge in the main ship channel northwest of
House Island; and completion of dredging in the 35-foot channel. In
1935 project depths were restored in the 30-foot anchorage, the 30-
and 35-foot channels in the lower harbor, and the 30-foot channel in
the inner harbor and Fore River. In 1931 the controlling depth be-
tween Grand Trunk and Tukeys bridges was 14 feet at mean low
water; and in the 30-foot channel of approach to Back Cove about 20
feet at mean low water, due apparently to deposits from the Pre-
sumpscot River. As this part of the channel is no longer used for
deep-draft traffic, no inconvenience is experienced. In 1941 the con-
trolling depth in Back Cove was 9 feet at mean low water.
   The total costs under the existing project have been $2,185,860.91,
of which $1,670,692.16 was for new work and $515,168.75 was for
maintenance. The expenditures have been $2,125,342.53.
   Proposedoperations.-The funds unexpended at the end of the fiscal
year, amounting to $124,770.90, together with $150,000 allotted during
August 1942, a total of $274,770.90, will be applied as follows:
Accounts payable June 30, 1942_ ------------------------------            $60, 518. 38

New work:
   Complete by July 15, 1942, under a contract in force, removal to
     depth of 40 feet below mean low water of obstructive ledge
     in main ship channel northwest of House Island------------             3, 209. 03
   Complete by Mar. 15, 1943, under a contract in force, dredging in
     the 35-foot channel in the vicinity of the Portland Pipe Line
     Co.'s terminal-------          ----------      ---------------------  47, 236. 60
   Remove to a depth of 40 feet below mean low water obstructive
     ledge disclosed by sweeping operations in 1942, by contract
     (Sept. 1, 1942 to Jan 15, 1943) ---------------------------          150, 000. 00
   Complete preliminary surveys, etc., in connection with new work,
     by hired labor--------------------------------------11,911.27

         Total new work ----------          ----------------------        212, 356. 90

Maintenance: Complete by October 1, 1942, maintenance survey of
Fore River Channel, by hired labor--------------------------                 1, 895. 62

       Total          --------------------------------------------- 274, 770. 90
  No additional funds can be, profitably expended during the fiscal
year 1944, as it is not believed that maintenance work will be required
during that year, and removal of the remaining ledge covered by the
existing project is not considered necessary at this time.
                   RIVERS                  AND HARBORS-BOSTON,                           MASS., DISTRICT                            31
                                                      Cost and financial summary

Cost of new work to June 30, 1942---------------------------1 $2, 363, 127. 41
Cost of maintenance to June 30, 1942-------------------- ---- --                                                     515, 168. 75

      Total cost of permanent work to June 30, 1942_------                                        -----            2, 878, 2C6. 16
Minus accounts payable June 30, 1942 -------------------------                                                         60, 518. 38

     Net total expenditures.. -------------------------------                                                     2, 817, 777. 78
Unexpended balance June 30, 1942-----------------------------                                                        124,770. 90

            Total amount appropriated to June 30, 1942--------------                                              12, 942, 548. 68

       Fiscal year ending June 30                       1938                  1939       1940        1941                    1942


Cost of new work .-----......-------......--..----- ---------------------------------------                                 $92, 563.10
Cost of maintenance---........------------       -- -------------- ----------------               ------------                   184.38
         Total cost--      ........-----        ..----------.----         -          .                        -             92, 747. 48
Total expended             ------------                                                                                     32, 229.10
Allotted        -------------------------------------------------------                               $92,000               65,000.00



Balance unexpended July 1, 1941     _______                                                                          $92, 000. 00
Amount allotted from War Department Civil Appropriation Act
  approved June 24, 1940______ ____                                                                                      65, 000.00
      Amount to be accounted for___                                                                                  157, 000. 00
Gross amount expended ______________         ______ $42, 754. 86
Less reimbursements collected _____________-
                                         -      __   10, 525. 76
                                                                                                                         32, 229. 10
      Balance unexpended June 30, 1942__                                                                             124, 770. 90
Outstanding liabilities June 30, 1942_____________                                          60, 518. 38
Amount covered by uncompleted contracts----------                                           50, 936. 10
                                                                                                                     111, 454. 48
           Balance available June 30, 1942-------------___------                                                         13, 316. 42
Amount (estimated) required to be appropriated for completion
of existing project 2- - - - - - - - - - _- - - - - - - -- - - - - - - -- -                              -          -
                                                                                                                         87, 000. 00
   1
    Exclusive of costs and expenditures (working fund, war, engineer, civil) on new work,
removal of shoal areas in Casco Bay, Maine.
  2 Exlusive of available funds.

                                                  4. SACO RIVER, MAINE
   Location.-This river rises in the White Mountain region of New
Hampshire at an elevation about 1,900 feet above sea level, flows about
105 miles in a general southeasterly direction, and discharges into the
Atlantic Ocean about 16 miles southwest of Portland, Maine. (See
U. S. Coast and Geodetic Survey Chart No. 231.)
   Existing project.-This provides for a channel depth of 8 feet at
mean low water in earth cuts, and 9 feet deep in ledge, from the sea
to the head of navigation at the cities of Saco and Biddeford, a dis-
tance of about 6 miles, the width to be 140 feet across the bar, 200
feet in the lower section between the jetties, 140 feet in the middle
section, and 100 feet in the upper section, to be secured by means of
dredging; a small quantity of rock excavation, several small riprap
jetties within the river, a riprap breakwater about 6,660 feet long,
extending seaward from the north side of the mouth of the river, and
a riprap jetty or training wall from the south side of the mouth of
32          REPORT OF CHIEF OF ENGINEERS,                        U. S. ARIVY,         1942

the river, practically parallel with the breakwater and about 4,800 feet
long. The mean tidal range is 8.8 feet; the extreme about 1 foot
greater.
   The estimate of cost for new work, revised in 1935, is $601,000,
including $20,000 contributed by local interests. The latest (1934)
approved estimate for annual cost of maintenance is $3,500.
  The existing project was authorized by the following river and
harbor acts:

     Acts                        Work authorized                               Documents


Mar. 2,1827     Erection of piers, placing of buoys, and the re-
                  moval of obstructions at the entrance to the
                  harbor.
June 23,186f    Breakwater on the north side of the mouth of the
                  river.
Sept. 19,1890   Jetty on the south side of the mouth of the river__ S. Ex. Doc. No. 44, 48th Cong., 1st
                                                                   sess., and Annual Report, 1884, p. 482.
June 25,1910    Channel improvements and jetty extension on H. Doc. No. 752, 61st Cong., 2d sess.l
                  the south side of the mouth of the river.
Mar. 3, 1925    Present project channel dimensions and exten- H. Doc. No. 477, 68th Cong., 2d sess.
                  sion of north breakwater about 1,600 feet.
Aug. 30, 1935   Extension of north breakwater to Sharps Ledge__ Rivers and Harbors Committee Doc.
                                                                   No. 11, 74th Cong., 1st sess.'


  1Contains the latest   published maps.

    Local cooperation.-Fully complied with.
    Terminal facilities.-There is a small pier near the mouth of the
river which is used for summer passenger business. There are five
wharves, all of solid-fill construction, at Saco and Biddeford, none
of which has railroad connection. Three are in good condition
:and used for private business; two are open to the public on mod-
erate terms; the other, no longer in use, was formerly used as an
'oil terminal. Depths range from 6 to 8 feet at mean low tide. The
traffic is small and is entirely coal. The facilities appear to be ade-
quate for existing demands.
    Operations and results during fiscal year.-None. The total costs
and expenditures during the fiscal year were $539.49 for work by hired
labor consisting of a maintenance survey to determine the controlling
depth in the bar channel at the mouth of the river.
     Condition at end of fiscal year.-The existing project was about
95 percent completed. The remaining portion consists of the removal
of a small quantity of ledge at Twin Islands. So far as known, there
is no urgent necessity for the removal of this ledge at this time.
In 1938 the controlling depth in the 8-foot channel in the river was
8 feet at mean low water, except over the ledge area at Twin Islands,
where the controlling depth is approximately 7.5 feet. In 1941 the
controlling depth over the bar was 5.5 feet at mean low water; and in
the buoyed channel to the southward of the bar, 9 feet. The several
small riprap jetties within the river were completed in 1893 and are
in generally good condition. The north and south jetties at the mouth
of the river were completed in 1938 and 1912, respectively. These
  jetties have settled in several places to such an extent as to require
                      RIVERS AND HARBORS-BOSTON,                        MASS.,        DISTRICT                       33
repair. The spur dike at the inner end of the north jetty, completed
in 1912, is in need of repair to minimize shoaling of the river channel.
The costs and expenditures have been $663,025.81, of which $531,715.89
was for new work and $131,309.92 was for maintenance. In addition,
$20,000 has been expended from contributed funds for new work.
   Proposedoperations.-The funds unexpended at the end of the fiscal
year, amounting to $37,710.51, will be applied to maintenance, by
contract, in the repair of the north and south jetties at the mouth
of the river, and the spur dike at the inner end of the north jetty
 (April 1 to June 30, 1943).
   No additional funds can be profitably expended during the fiscal
year 1944, as it is not believed that maintenance work will be required
during that year.
                                        Cost and financial summary

Cost of new work to June 30, 1942_-------------------------                                           $531, 715. 89
Cost of maintenance to June 30, 1942___________________-_---                                           131, 309. 92

           Total cost of permanent work to June 30, 1942__________                                    663, 025. 81

Net total expenditures_-----------_                              63, 025. 81
                                                                6-------------------------
Unexpended balance June 30, 1942----------------------------37,       710. 51

           Total amount appropriated to June 30, 1942_-                           ____                1700,    736.32

   Fiscal year ending June 30              1938           1939           1940            1941                 1942


Cost of new work_         --             $17, 213. 39   $19, 098. 28                                       --
Cost of maintenance-------------          34, 369. 01     9, 829. 33   $12, 653. 39                             $539. 49:

      Total cost_ -                       51, 582. 40    28, 927. 61    12, 653. 39                              539. 49

Total expended                    -__     47, 087. 61    34, 166. 32    15, 221. 33                              539. 49
Allotted   -_   _--    -     _-
                            -_            53, 000.00        639. 18         -7. 55     $38, 250. 00



Balance unexpended July 1, 1941----------------------------                                           $38, 250. 00
                        ___
Gross amount expended -------------                     $547. 69
Less reimbursements collected____-- ----------             8. 20
                                                                                                              539. 49

           Balance unexpended June 30, 1942_----------------------                                     37, 710. 51

Amount (estimated) required to be appropriated for completion
                                                         - -- - --
                                                                   of
existing project 2_______________________________________                                             22, 500. 00
  1 In addition $20,000 contributed funds expended for new work.
  2 Exclusive of available funds.



                                  5. KENNEBUNK RIVER, MAINE

  Location.-The source of Kennebunk River is in the central part of
York County in southwestern Maine. The stream flows about 15 miles
in a southeasterly direction and discharges into the Atlantic Ocean
about 30 miles southwest of Portland, Maine. (See U. S. Coast and
Geodetic Survey Chart No. 1205.)
  Existing project. This provides for the construction of a stone
breakwater on the easterly side of the mouth of the river about 550 feet
long, a pier or jetty on the westerly side of the mouth about 290 feet
long, the construction of a wharf about 700 feet upstream from the
34          REPORT OF CHIEF OF ENGINEERS,                              U. S. ARMY,           1942

shore end of the breakwater, the construction of a jetty on the east
bank a short distance farther upstream, and securing a depth of 4
feet at mean low tide for an average width of 100 feet up to Kenne-
bunkport, a distance of about 1 mile, by dredging and rock removal.
The mean tidal range is 9 feet; the extreme 13.5 feet. Work appears
to have been commenced by the State of Massachusetts in 1798, since
which date a number of small appropriations have been made for
maintenance and further improvement. There is no approved esti-
mate of cost for new work or maintenance.
   Those portions of the existing project adopted since 1829 were
authorized by the following river and harbor acts:

     Acts                        Work authorized                                      Documents


Mar. 2,1829      Repair of pier on east side of channel entrance----
Aug. 14,1876     Deepening at Wading Place and Mitchells Point_ Annual Report, 1875, p. 115.
Sept. 19, 1890   Jetty at Wading Place_________-----         .-.--   ..- H. Ex. Doc. No. 136, 51st Cong., 1st
                                                                          sess.; and Annual Report, 1890, p. 471.



   Terminal facilities.-There are seven privately owned piers in usable
condition at Kennebunkpbrt. The terminal facilities are of low effi-
ciency, but are regarded as sufficient for existing needs.
   There is one wharf on the east side of the river about one-fourth mile
above the mouth. It is owned by the Federal Government and is in
poor condition.
   Operations and results during fiscal year.--Under a contract for
maintenance dredging to restore project dimensions in the river chan-
nel, work was commenced September 30 and completed November 11,
1941. There were removed 14,822 cubic yards, place measurement, of
material, at a cost of $20,757.33 for maintenance.
   Final cost adjustment was made in connection with preliminary
survey by hired labor, at a cost of $4.84 for maintenance.
   The total costs during the fiscal year were $20,762.17 for maintenance.
The expenditures were $21,722.22.
   Condition at end of fiscal year.-The existing project was completed
in 1893. The jetties at the mouth of the river were repaired in 1935,
and the stone beacons on the jetty on the east bank of the river in 1936.
In 1941, project depth of 4 feet at mean low water was restored in the
river channel for its project width of 100 feet, except at a point abreast
of the mouth of Gooch Creek where the channel has a width of 80 feet,
due to a small ledge area on the westerly side of the channel over which
there is a depth of 2.3 feet at mean low water. This ledge area is
marked by a buoy. The costs have been $156,623.06, of which $83,584.01
was for new work and $73,039.05 was for maintenance. The expendi-
tures have been $156,630.93.
   Proposed operations.-No operations are proposed during the fiscal
years 1943 and 1944.
                 RIVERS AND HARBORS--BOSTON,                                   MASS., DISTRICT                               35
                                        Cost and financial summary
Cost of new work to June 30, 1942-------------------------      ---                                              $83, 584. 01
Cost of maintenance to June 30, 1942------------------------------                                                73, 039. 05

      Total cost of permanent work to June 30, 1942                                                               56, 623. 06
                                                                                                                 1--------------
Plus accounts receivable June 30, 1942------------------------------                                                      9. 58

      Gross total costs to June 30, 1942------------------------156, 632. 64
Minus accounts payable June 30, 1942_------------------------------    1.71

     Net total expenditures--------------------------------                                                      156, 630. 93
Unexpended balance June 30, 1942_ __--                 _                                                           4, 277. 78

          Total amount appropriated to June 30, 1942---------------                                              160, 908. 71

   Fiscal year ending June 30                 1938           1939               1940               1941               1942


Cost of new work--..--- ...         ................             ....------------------
                                                                                    ..--------------         ............
                      _..-------.---..... ....
Cost of maintenance ...                                ........--..-.....           .......          $952.18          $20, 762. 17
Total expended------............--------------------------------------------------------21,                              722. 22

Allotted ...............--------------------------------------------------------                 26, 000. 00..



Balance unexpended July 1, 1941.  -------------------------- $26, 000.00
Gross amount expended------------------    ------------------ 21, 722. 22
      Balance unexpended June 30, 1942      ------------------------                                               4, 277. 78
Outstanding liabilities June 30, 1942_-----------------------------                                                     1. 71

     Balance unexpended June 30, 1942----------------------                                                        4, 276. 07
Accounts receivable June 30, 1942---------------- -----------                                                           9. 58

          Unobligated balance available June 30, 1942_----------___                                                4, 285.65

                                6. NEWBURYPORT HARBOR, MASS.

   Location.-Newburyport is on the south bank of Merrimack River,
about 2.5 miles above the mouth and about 48 miles by water north
of Boston. (See U. S. Coast and Geodetic Survey Chart No. 331.)
  Existing project.-This provides for two rubblestone jetties, each
15 feet wide on top at elevation 12 feet above mean low water, with
slopes of 1 on 2 on the seaward face and 1 on 1 on the shoreward
face; one projecting from the north shore, 4,118 feet, the other from
the south shore, 2,445 feet, converging until 1,000 feet apart, and then
extending seaward parallel to the axis of the channel for a distance
of 1,000 feet; and for partially closing Plum Island Basin by a tim-
ber dike about 800 feet long and 5.5 feet above mean low water; the
object being to create at the outer bar a permanent channel 1,000 feet
wide and at least 17 feet deep at mean low water, to enable vessels
of such draft as can proceed at high tide to the wharves at Newbury-
port to enter the river at mean low water. The mean range of tide
is 7.9 feet at the bar and 7.8 feet at Newburyport. The extreme range
is about 9.1 feet at the bar and 8.8 feet at Newburyport.
   The estimate of cost for new work, revised in) 1942, is $474,000.
The latest (1917) approved estimate for annual cost of maintenance
is $2,500.
36          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                   1942

  The existing project was authorized by the following river and
harbor acts:

     Acts                               Work authorized                               Documents


June 14, 1880   Construction of rubblestone jetties_ _
June 25, 1910   Dredging the bar at entrance to harbor-----------------....   Annual Report, 1910, p. 59.


  For latest published maps see H. Doc. No. 703, 76th Cong., 3d sess.


   Recommended modifications of project.--Under date of April 10,
1940, the Chief of Engineers recommended modification of the existing
project so as to provide a continuous channel from the sea to the
wharves at Newburyport, 15 feet deep and 400 feet wide through the
bar; thence 12 feet deep and 200 feet wide to and including a widened
turning basin in front of the wharves, at an estimated first cost of
$102,000, with $18,000 annually for maintenance, subject to certain
conditions of local cooperation; pending compliance with these condi-
tions, the improvement to be in accordance with a plan to provide a
channel 12 feet deep and 400 feet wide through the bar; thence 9 feet
deep and 200 feet wide to and including a widened turning basin in
front of the wharves, at an estimated first cost of $27,000, with $11,000
annually for maintenance (H. Doc. No. 703, 76th Cong., 3d sess.).
   Terminal facilities.-The terminal facilities consist of 14 wharves
extending along a frontage of about 3,500 feet of the south bank of
the Merrimack River below the highway bridge, and 1 small pier on
the north side of the river.
   The terminal facilities are considered adequate for existing com-
merce. For full description, see Port Series No. 24, the Ports of North-
ern New England, 1934.
   Operations and results during fiscal year.-The U. S. seagoing hop-
per dredge Absecon was engaged in maintenance dredging on the bar
at the entrance to Newburyport Harbor from September 16 to October
9, 1941. There were removed during this period 141,990 cubic yards,
bin measurement, of material. The costs and expenditures were
$17,218.09 for maintenance.
   Condition at end of fiscal year.-The existing project was about 97
percent completed. The north jetty was completed in 1914; the south
Jetty was completed, except for a length of about 30 feet at its outer
end (the uncompleted portion of the existing project), in 1905. These
jetties are in good condition, and completion of the south jetty is not
now considered necessary. Plum Island Basin was closed in 1883 by
the construction of a timber dike. North Rock was removed in 1901.
The latest survey (1941) over the bar at the mouth of the river showed
a channel with a controlling depth of 14.6 feet at mean low water for a
width of 300 feet. The bar consists of shifting sand, and conditions
change rapidly and frequently. The costs and expenditures have been
 $754,279.25, of which $463,843.62 was for new work and $290,435.63 was
for maintenance.
    Proposed operations.-No operations are proposed during 1943.
    The sum of $40,000 can be profitably expended during the fiscal year
1944, to be applied to maintenance dredging on the bar at the entrance
to Newburyport Harbor by United States seagoing hopper dredge.
               RIVERS AND HARBORS-BOSTON,                                       MASS., DISTRICT                              37
                                      Cost and financial summary

Cost of new work to June 30, 1942     ---------------------------                                                $463, 843. 62
Cost of maintenance to June 30, 1942-_-------------------                                               -         290, 435. 63

         Total cost of permanent work to June 30, 1942                                                      -      54, 279. 25
                                                                                                                  7-----------

Net total expenditures -- ---------------------------------                                                      754, 279. 25
Unexpended balance June 30, 1942                       ----------                                           --     7, 981. 91
        Total amount appropriated to June 30, 1942--------------                                                 762, 261. 16

   Fiscal year ending June 30                 1938                  1939         1940             1941                1942


Cost of new work---                                                                           -----------             ---------
Cost of maintenance ..    _......._    $101, 348.69                   $33. 70   $1, 625. 00     $17, 730. 55         $17, 218.09

Total expended._----------------         110, 963. 43              10, 953.88    1, 625.00       17, 730. 55          17, 218. 09

Allotted----------------------               25, 000.00               -2. 52    24, 625. 00      19, 930. 55


Balance unexpended July 1, 1941_ ----------------------------                                                     $25, 200. 00
Gross amount expended------------------------- $18, 622.00
Less reimbursements collected-----------------------1, 403.91
                                                                                                                   17, 218. 09
        Balance unexpended June 30, 1942-------------------------                                                   7, 981. 91

Amount (estimated) required to be appropriated for completion of
   existing    project 1-______--     ----           -----------                                  ---              10, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance .-------------------------------------                                                  40,000.00
   1 Exclusive of available funds.

         7. GLOUCESTER HARBOR AND ANNISQUAM RIVER, MASS.

  Location.-GloucesterHarbor is situated at the southern extremity
of Cape Ann, about 23 miles northeast by water from Boston Harbor.
Annisquam River is a narrow tidal waterway extending across the
base of Cape Ann from Gloucester Harbor on the south side to
Ipswich Bay on the north side, a distance of approximately 4 miles.
A reach of this waterway, at the Gloucester Harbor end, for a length
of about 1,800 feet, is known as the Blynman Canal. (See U. S.
Coast and Geodetic Survey Chart No. 243.)
   Previous projects.-Projects for Gloucester Harbor were adopted
by River and Harbor Acts of June 10, 1872, August 5, 1886, and June
3, 1896. There were no previous projects for Annisquam River. For
further details see page 1740 of Annual Report for 1915, and page
41 of Annual Report for 1937.
   Existing project.-This provides:
   Gloucester Harbor.-
   (a) For a rubblestone breakwater 2,250 feet long, surmounted by
a superstructure of dry walls of heavy split stone enclosing a core
of rubblestone from Eastern Point over Dog Bar to Cat Ledge.
   (b) For the removal of three ledges in the inner harbor, 1 to 12
feet and 2 to 15 feet depth at mean low water, and five ledges in the
outer harbor, 4 to 18 feet and 1 to 25 feet depth at mean low water,
aggregating a total of 2,206 cubic yards, place measurement.
   (c) For removal to depth of 15 feet below mean low water of
ledges and boulders obstructing the approach to the wharves between
38          REPORT      OF CHIEF OF E TGINEERS,                     U.   S. ARMY,        1942

Harbor Cove and Pews wharf, near the head of the inner harbor:
dredging to the same depth the channel leading past the wharves and
dredging Harbor Cove to the depth of 10 feet at mean low water.
   Annisguam River.-For a channel 8 feet deep at mean low water
60 feet wide from Gloucester Harbor to the Boston & Maine Railroad
bridge, 100 feet wide from the railroad bridge to the mouth of the
river, and 200 feet wide across the bar in Ipswich Bay, including the
removal of a ledge near the Gloucester Harbor entrance.
   The mean range of tide in Gloucester Harbor is 8.9 feet; the ex-
treme range is 12.6 feet. The mean range of tide in Annisquam
River is 8.8 feet; the extreme range is about 10 feet.
   The estimates of cost for new work, exclusive of amounts expended
on previous projects, are as follows:
   Gloucester Harbor.--(a) For breakwater, $416,083.43, revised in
1902; (b) for removal of eight ledges, $51,000, made in 1908; (c) for
removal of ledges and boulders, and dredging, $65,000, made in 1887.
The latest (1928) approved estimate for annual cost of maintenance
of the breakwater is $1,000.
   Annisquam River.-$32,500, made in 1932. The latest (1932) ap-
proved estimate for annual cost of maintenance is $3,500.
   The existing project was authorized by the following river and
harbor acts:

     Acts                           Work authorized                                    Documents


Aug. 11, 1888   Removal of ledges and boulders, and dredging, in Gloucester    Annual Report, 1887, p. 503.
                 Harbor.
Aug. 18, 1894   Construction of breakwater at entrance to Gloucester Har.      H. Ex. Doc. No. 56, 48th
                 bor from Eastern Point to Round Rock Shoal.                     Cong., 2d sess., and An-
                                                                                 nual Report, 1885, p. 534.
June 13,1902    Termination at Cat Ledge of breakwater authorized by act       Annual Report, 1902, p. 89.
                 of Aug. 18. 1894.
June 25, 1910   Removal of 8 ledges in Gloucester Harbor.---_   ------------   H. Doc. No. 1112, 60th Cong.,
                                                                                 2d sess.l
Aug. 30,1935    Dredging in Annisquam River and removal of a ledge in          Rivers and Harbors Comn
                 Gloucester Harbor near the entrance to Annisquam                mittee, Doc. No. 39, 72d
                 River.                                                          Cong., 1st sess.l


  1These documents   and H. Doc. No. 329, 77th Cong., 1st sess., contain the latest published maps.

  Recommended modifications of project.-Under date of April 25,
1941, the Chief of Engineers recommended modification of the exist-
ing project so as to provide a dredged anchorage area about 17 acres
in extent and 8 feet deep at the entrance of Lobster Cove, at an
estimated first cost of $70,000, with $2,200 annually for maintenance
in addition to that now required, subject to certain conditions of
local cooperation (H. Doc. No. 329, 77th Cong., 1st sess.)
   Terminal facilities.-There are in Gloucester Harbor 61 wharves
worthy of mention. The depth beside the wharves varies from 0 to 20
feet at mean low water. Except for 3 wharves, 2 owned by the city
and the fish pier which is leased by the city from the Commonwealth
of Massachusetts, all are private and are not available to the public.
There are two commercial wharves on Annisquam River, on the east
bank. These facilities are considered adequate for the existing com-
                    RIVERS AND HARBORS-BOSTON,                     MASS.,        DISTRICT                   39
merce of the port. For full description see Port Series No. 24, The
Ports of Northern New England, 1934.
   Operations and results during fiscal year--Gloucester Harbor.-
None. Final cost adjustment was made in connection with mainte-
nance survey by hired labor to ascertain the controlling depths over two
ledges in Gloucester inner harbor, at ai cost of $29.68 for maintenance.
  Annisquam River.-A 7-cubic-yard boulder was drilled, blasted, and
removed, by hired labor, at a cost of $172.17 for maintenance.
   The total costs and expenditures during the fiscal year were $201.85
for maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1936. The removal of all ledges and boulders in Gloucester
Harbor between Harbor Cove and Pews Wharf, and other obstructing
rocks, was completed in 1896; the dredging of a channel in front of the
wharves and in Harbor Cove was completed in 1894; and the removal
of a pinnacle rock in the outer harbor in 1896. The breakwater which
was completed in 1905 was repaired in 1940 and is in good condition.
The removal of all ledges to project depth was completed in 1916.
The improvement of Annisquam River was completed in 1936 at a
cost of $33,975.89. The controlling depths over the ledges in the outer
harbor in 1916, were from 18 to 25 feet; over Ledge C in the inner
harbor in 1931, 14.6 feet; and over Ledges A and B in the inner harbor
in 1940, 13.6 and 15 feet, respectively. As ascertained by a survey
after maintenance dredging in 1940, project dimensions in Annisquam
River had been restored. The costs for Gloucester Harbor under
the existing project have been $501,178.84 for new work and $52,447.80
for maintena:nce, a total of $553,626.64. The costs for Annisquam
River have been $33,975.89 for new work and $55,702.36 for mainte-
nance, a total of $89,678.25. The total costs and expenditures under
the existing project have been $643,304.89, of which $535,154.73 was
for new work and $108,150.16 was for maintenance.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal years 1943 and 1944.
                                   Cost and financial summary

Cost of new work to June 30, 1942_       _____    ___--____- ___ $556, 154. 73
Cost of maintenance to June 30, 1942 ____-__________      __------ 108, 150. 16
      Total cost of permanent work to June 30, 1942-------------                                 664, 304. 89
Net total expenditures------------------------------------                                       64, 304. 89
Total amount appropriated to June 30, 1942 ___________     ---
                                                           __-                                   664, 304. 89

    Fiscal year ending June 30         1938           1939          1940            1941             1942


Cost of new work .-------------    -          ---                                          .
Cost of maintenance------------------------         $11,952. 76    $1,323. 22     $57, 679. 62         $201.85

Total expended-------------------------------         7, 246. 57    6, 029. 41    .57, 679. 62          201.85

         ........--------------
Allotted-----                     --------------     18,000.00     33,800.00       19, 500. 00        -142. 55



Balance unexpended July 1, 1941_-------------- --                                    ___ -          $344. 40
Deductions on account of revocation of allotment ---- __                          ----   _           142. 55

           Net amount to be account for_---------                                                    201. 85
Gross amount expended--------------------------------                                                201. 85
40          REPORT OF CHIEF OF ENIGINEERS, U. S. ARMY,                                1942

                                     8. MYSTIC RIVER, MASS.

   Location.-This river rises in Mystic Lakes, Mass., flows in a south-
easterly direction, and empties into Boston Harbor near the Charles-
town Navy Yard. It is 7 miles in length. (See U. S. Coast and
Geodetic Survey Chart No. 248 and U. S. Geological Survey Chart,
"Boston.")
   Previous projects.-Original project for the lower Mystic was
adopted by the River and Harbor Act of March 3, 1899, and cur-
tailed by the River and Harbor Act of June 25, 1910. For further
details see page 1743 of Annual Report for 1915, and page 59 of
Annual Report for 1938.
   There has been no previous project for the upper Mystic.
   Existing project.-This provides for a channel 30 feet deep at mean
low water downstream from the mouth of Island End River, through
the Chelsea (north) Bridge to the 35-foot channel of Boston Harbor,
about one-half mile, 600 feet wide at the upper end, and gradually
narrowing to 300 feet wide at the lower end, and widening of the
entrance channel leading to Mystic wharf; a channel 30 feet deep
at mean low water and 500 feet wide upstream from the mouth of
Island End River to the city playground at Charlestown; a channel
20 feet deep from the head of the existing 30-foot channel to a point
800 feet above the Malden Bridge with widths decreasing from 270
feet at the lower end to 75 feet through the drawspan, thence increas-
ing to approximately 340 feet to form a turning basin above the
bridge; a channel 6 feet deep at mean low water and 100 feet wide
from the Boston & Maine Railroad (western division) bridge to
about 2,500 feet above Wellington Bridge, about 1 mile, and thence
4 feet deep at mean low water, gradually narrowing from 100 feet
to 50 feet at the upper end for about 2 miles to the head of com-
mercial navigation at Cradock Bridge in Medford. The meal range
of tide is 9.6 feet. The extreme range is 13.7 feet.
   The estimate of cost for new work, revised in 1938, is $768,000,
exclusive of amounts expended on previous projects. The latest
 (1938) approved estimate of cost for annual maintenance is $7,500.
    The existing project was authorized by the following river and
harbor acts:

     Acts                      Work authorized                                 Documents


July 13,1892    Improvement of the upper Mystic-------------      Annual Report, 1891, p. 672.
June 25,1910    Improvement of channel downstream from mouth      H. Doc. No. 1086, 60th Cong., 2d sess.
                  of Island End River to the 35-foot channel of
                  Boston Harbor.
Aug. 30,19351   Improvement of channel upstream from mouth        Rivers and Harbors Committee Doe.
                  of Island End River to city playground at        No. 33, 74th Cong., 1st sess.
                  Chaflestown.                                                                            2
June 20,1938    Improvement of channel upstream from city         H. Doc. No. 542, 75th Cong., 3d sess.
                  playground at Charlestown to a point 800 feet
                  above the Malden Bridge.


  1 Also Emergency Relief Act of 1935.
  2 Contains latest published map.
          RIVERS   AND HARBORS-BOSTON,        MASS.,   DISTRICT        41

   A map showing the entire river is published in House Document
No. 2108, Sixty-fourth Congress, second session.
    Terminal facilities.-In the section of the river benefited by the
30-foot-channel project there are on the south bank of the river four
wharves aggregating over 4,000 feet of berthing space used for the
receipt, storage, and shipment of coal, lumber, and gypsum. These
wharves consist of substantial stone or wooden bulkheads filled solid,
and in some cases fronted by pile platforms. There is also on the
south bank a lumber terminal, the largest of its kind on the Atlantic.
coast. It is equipped with the most modern mechanical appliances,,.
has railroad connection, and occupies 4,400 feet of water front. One
the north bank of the river within the scope of this improvement
there is a large wharf for receipt and shipment of oil on an extensive
scale; immediately adjacent to this wharf is an extensive terminal
constructed in connection with an iron works; on the.west bank of
Island End River, which flows into Mystic River on the north about
midway of the 30-foot channel, are situated two large terminal wharvesk
of 800 feet dockage, for receipt and shipment of coal, coke, tar, and oil.
These wharves are connected with the 30-foot channel by a channel 30
feet deep at mean low water, dredged by private interests. None of
the above wharves is publicly owned, and none is open to general
public use.
    Beyond the scope of the 30-foot-channel improvement, and within
the scope of the 20-foot channel and the improvement of the upper
Mystic, there are on the south bank in Charlestown and Somerville
about 1,850 feet, and on the north bank in Medford about 1,235 feet of
available dockage, of which 450 feet on the south bank and 435 feet on
the north bank are customarily in use. A large automobile assembly
plant is located on the south bank in Somerville.
    The existing wharves consist of stone and wooden bulkheads, solid
filled. None is publicly owned, but two are open to the public on
payment of wharfage charges. The capacities of the lower Mystic are
being utilized to a gratifying extent.
    These facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-A survey of the 30-foot
channel was carried out by hired labor. The costs and expenditures
were $3,123.73 for maintenance.
   Condition at end of fiscal year.-The existing project was completed
in 1940, with the completion of the 20-foot channel in the vicinity of
Malden Bridge. The 30-foot channel from the mouth of Island End
River downstream to the 35-foot channel in Boston Harbor was com-
pleted in 1914, and the extension of this channel upstream to the city
playground at Charlestown was completed in 1938. A channel with
project depths of 6 and 4 feet at mean low water was completed in the
upper Mystic in 1906. A survey in 1916 showed that the portion of the
channel normally 6 feet deep had an available depth of about 4.5 feet at
mean low water, and that while the portion of the channel normally
4 feet deep had that depth throughout its length, the width had been
contracted by caving of the banks. A survey in 1941 showed a con-
trolling depth in the 30-foot channel, for its project width, of 29 feet
at mean low water from its mouth to a point abreast of Island End
River, and 25 feet thence to its upper limit. The costs and expenditures
under the existing project from regular funds have been $311,718.26,
42         REPORT OF CHIEF OF ENGINEE S, U. S. ARMY,                                                     1942

of which $293,341.72 was for new work and $18,376.54 was for main-
tenance. The costs and expenditures under Emergency Relief appro-
priation funds have been $476,783.40, all for new work. Total costs
and expenditures under all funds have been $788,501.66, of which
$770,125.12 was for new work and $18,376.54 was for maintenance.
   Proposed operations.--The funds unexpended at the end of the
fiscal year, amounting to $20,276.27, will be applied to maintenance
dredging, by contract, in those portions of the 30-foot channel where
shoaling is most obstructive (May 1943).
   No additional funds can be profitably expended during the fiscal
year 1944, as it is believed that the channel will be in a condition to meet
the reasonable requirements of navigation.
                                     Cost and financial summary

Cost of new work to June 30, 1942-----                              ---------------------- $895, 848. 32
Cost of maintenance to June 30, 1942                       --------------------------        28, 658.46
        Total cost of permanent work to June 30, 1942_                                                      924, 506. 78
Net total expenditures   ------------------------------------ 924, 506. 78
Unexpended balance June 30, 1942----------------------------20, 276. 27
        Total amount appropriated to June 30, 1942                                                           44, 783. 05
                                                                                                            9---------------

   Fiscal year ending June 30           1938                 1939              1940          1941                 1942

Cost of new work _---------_          $55, 872. 22                           $50, 714. 81   $$1,   783.40   ..
Cost of maintenance -- _-------- -     ---         ----    ----          -                          _             $3,123.73
'Total expended -----------
                    _---_              56, 671.84     _-_-__-----    -        50, 714. 81          .3,               123. 73
Allotted----------- -----------        52, 200. 00        $50, 000. 00            714. 81   23, 400. 00


Balance unexpended July 1, 1941-----------------------------                                                $23,400. 00
Gross amount expended...      .3--------------------------------------                                          123. 73
Balance unexpended June 30, 1942.........-----------------------------20, 276. 27

                                9. BOSTON HARBOR, MASS.

   Location.--This harbor includes all the expanse of tidewater lying
within a line from Point Allerton to Point Shirley and extending from
that line westward to the mainland. This comprises an area of about
47 square miles, exclusive of the islands. (See U. S. Coast and Geo-
detic Survey Charts Nos. 246 and 248.)
   Previous projects.--Adopted by the River and Harbor Acts of March
2, 1867, June 14, 1880, September 19, 1890, June 3, 1896, and July 25,
1912. For further details see page 174a of Annual Report for 1915,
page 81 of Annual Report for 1917, and page 63 of Annual Report for
1938.
   Existing project.-This provides for the following:
   (a) A channel 40 feet deep in general, but 45 feet deep through rock,
from the sea to President Roads through Broad Sound, 2 miles, 900
feet wide except at the outer end where it is widened to 1,100 feet.
   (b) Deepening the main ship channel from President Roads past
the United States Navy drydock No. 3 at South Boston to Common-
          RIVERS AND HARBORS-BOSTON,         MASS.,   DISTRICT       43
wealth pier No. 1, East Boston, to 40 feet for a width of 600 feet with
suitable widening at the bend in the channel.
   (c) An anchorage area 2,000 feet wide, 5,500 feet long, and 40 feet
deep, on the north side of President Roads.
   (d) Deepening to 40 feet that part of the approach channel to the
United States Navy drydock No. 3 at South Boston between the main
ship channel and the United States harbor line.
   (e) A channel 35 feet deep from the sea (along the same line as the
40-foot channel) through Broad Sound to the navy yard at Charles-
town and the Chelsea North, Meridian Street, and Charles River
Bridges, 1,500 feet wide from the sea to President Roads, 1.5 miles, and
thence 1,200 feet wide for the remaining distance of 6 miles.
   (f) A channel 2 miles long, 30 feet deep, and 1,200 feet wide from
the sea to President Roads through Broad Sound by a less direct route
than the 35- and 40-foot channels.
   (g) A channel 27 feet deep and 1,000 feet wide from Nantasket
Roads to President Roads, 3 miles.
   (h) A channel 15 feet deep, 300 feet wide, and 550 feet long through
the bar which extends from the north head of Long Island to Nixes
Mate Shoal, known as "Nixes Mate" or "Nubble" Channel.
   (i) A channel in Chelsea Creek 30 feet deep and generally 200 feet
wide, from the mouth of the creek, at the head of the 35-foot channel
in Boston Harbor, to a point opposite the Hartol Oil Co. terminal.
   (j) Improvement of Reserved Channel east of L Street Bridge by a
channel 30 feet deep and 300 feet wide.
   (k) A seaplane channel 12 feet deep and 1,500 feet wide, extending
northwesterly from President Roads, 17,500 feet to the easterly margin
of Boston Airport, and deposit of excavated material in such places
as will permit enlargement of the airport.
   (1) The Fort Point Channel, 23 feet deep and 175 feet wide from
its entrance in Boston Harbor, about four-fifths of a mile to near the
Dorchester Avenue (old Federal Street) Bridge.
   (m) Sea walls of coursed stone and riprap protecting the most ex-
posed headlands and islands.
   All depths are referred to mean low water. The mean range of
tide is 9 feet at Boston Light and 9.6 feet in the upper harbor, in
Chelsea Creek, and in Fort Point Channel. The extreme range is
about 4 feet greater.
   The estimate of cost for new work, revised in 1941, exclusive of
amount expended on previous projects and of sea walls for which no
estimate was given, is $20,043,700. The latest (1941) approved esti-
mate for annual cost of maintenance is $174,000.
   The existing project was authorized by the following river and
harbor acts:
44            REPORT           OF CHIEF O'F ENGINEERS,                         U.     S. ARMY,        1942



       Acts                                Work authorized                                         Documents

Mar.     2,1825    Preservation of islands by sea walls________________.___
Aug.     5,1886    Fort Point Channel      .__ ____......__      ___________
                                                          ............                     H. Ex. Doe. No. 206, 48th
                                                                                            Cong., 2d sess., and An-
                                                                                            nual Report, 1885, p. 543.
                   Channel 15 feet deep from Long Island to Nixes Mate Shoal               Annual Report, 1887, p. 517.
                     (Nixes Mate or Nubble Channel).
July    13,1892    Channel 27 feet deep from Nantasket Roads to President                  Annual Report, 1893, p. 766.
                     Roads.
Mar.     3,1899    For 30-foot channel from the sea to President Roads through
                                                                             H. Doc. No. 133, 55th Cong.,
                     Broad Sound by less direct route than the 35- and 40-foot 2d sess. Annual Report,
                     channels.                                                 1898, p. 886.
June 13,1902       For 35-foot channel from the sea to navy yard at Charles- H. Doc. No. 119, 56th Cong.,
                     town.                                                     2d sess. Annual Report,
                                                                               1901, p. 1096.
                Elimination from the project of the removal of Finns Ledge Authorized by Chief of
                  at the outer entrance.                                       Engineers, Mar. 11, 1913.
Aug. 8,1917     Depth of 40 feet (45 feet in rock) in Broad Sound Channel_ _ H. Doc. No. 931, 63d Cong.,
                                                                               2d sess.1
Aug. 30, 1935 2 Present project dimensions of channel from President Roads H. Doc. No. 244, 72d Cong.,
                  to Commonwealth pier No. 1, East Boston, and anchorage       1st sess.'
                     area north side of President Roads.
     Do ____       Present project dimensions of that part of approach channel            Rivers and Harbors Com-
                     to U. S. Navy drydock No. 3, at South Boston between                   mittee Doc. No. 29, 74th
                     Main Ship Channel and United States harbor line.                       Cong., 1st sess.'
Aug. 26,1937                                             ---
                   Chelsea Creek Channel, 30 feet deep.___-    --                         Rivers and Harbors Com-
                                                                                            mittee Doc. No. 24, 75th
                                                                                            Cong., 1st sess.'
Oct. 17, 1940     1 Reserved   Channel, 30 feet deep. _            -__                    H. Doc. No. 225, 76th Cong.,
                                                                                            1st sess.'
     Do--....      Seaplane channel, 12 feet deep----...---.   .     ---...-        .-- . H. Doc. No. 362, 76th Cong.,
                                                                                                      1
                                                                                            1st sess.


  1Contains latest published maps. See also Annual Report, 1911, p. 1178 (sea walls and Nixes Mate Chan-
nel) and Annual Report, 1903, p. 770 (Fort Point Channel).
  2 Authorized in part by Public Works Administration, Sept. 6, 1933.


  Local cooperation.-The River and Harbor Act of October 17,
1940, in authorizing the dredging of the seaplane channel, requires
that local interests furnish, free of cost to the United States, as and
when required, all lands, easements, and rights-of-way and spoil-
disposal areas for the initial work and for subsequent maintenance;
hold and save the United States free from claims for damages re-
sulting from the improvement; and give assurances satisfactory to
the Secretary of War that they will, at their expense, provide suit-
able bulkheads, dikes, or other structures for retention of excavated
material. To date these requirements have not been complied with.
It is understood that these requirements will be met in the event
Federal funds become available for this work. All prior require-
ments have been fully complied with.
  Terminal facilities.-The wharf development of Boston Harbor lies
westerly of Governors and Castle Islands. Bordering on the 35- and
40-foot channel and below all bridges there is about 4 miles of water-
front, fully developed with wharves of various types devoted to
commercial purposes; and on the Charlestown shore is located the
United States navy yard, with a frontage of about five-eighths of a
mile.
  The Boston Airport has been established easterly of the wharf
development on the East Boston front.
          RIVERS     AND HARBORS-BOSTON,      MASS.,   DISTRICT        45
   There are numerous public and private wharves, piers, ferry slips,
and drydocks. The facilities are considered adequate for existing
commerce. For further details see Port Series No. 2, Corps of En-
gineers, revised, 1936.
   Operations and results during fiscal year.-New work: Under a con-
tract for dredging to a depth of 30 feet at mean low water in the
Reserved Channel, in progress at the beginning of the fiscal year, work
was completed September 6, 1941. During the fiscal year there were
dredged 148,473 cubic yards, place measurement, of material at a cost
of $93,531.01 for new work.
   Preliminary work by hired labor in connection with contract dredg-
ing in the Reserved Channel cost $93.74 for new work.
   A sounding survey of Governors Island Channel was carried on by
hired labor at a cost of $3,920.54 for new work.
   A probing survey in connection with a possible extension of the
anchorage area in Boston Harbor was carried on by hired labor at a
cost of $779.50 for new work.
   Maintenance: A maintenance survey of Fort Point Channel, in
progress at the beginning of the fiscal year, was completed by hired
labor at a cost of $138.59 for maintenance.
   Tidal studies in Boston Harbor, in progress at the beginning of the
fiscal year, were completed by hired labor at a cost of $311.59 for
maintenance.
   In connection with a sweeping survey in the Boston Harbor 40-foot
channel, to be carried out by hired labor, costs were incurred in the
amount of $61.35 for maintenance.
   The total costs during the fiscal year were $98,816.10, of which
$98,304.57 was for new work and $511.53 was for maintenance. The
expenditures were $105,110.38.
   Condition at end of fiscal year.-The existing project was about 91
percent completed. The work remaining to complete the project con-
sists of the removal of isolated shoal areas from the inner harbor 40-
foot channel; dredging to 30 feet of a small area in Chelsea Creek in the
vicinity of a metropolitan district sewer siphon now under construc-
tion immediately below the Chelsea Street Bridge; and the dredging of
the 12-foot seaplane channel, on which no work has been done. Sea
walls of a total length of about 3.75 miles have been built and main-
tained on Great Brewster, Lovells, Gallops, Long, Rainsford, Deer,
and Georges Islands, and on Point Allerton. The Nixes Mate or
Nubble Channel was completed in 1892, the 30-foot channel in 1905,
the 27-foot channel in 1907, Fort Point Channel in 1909, the 35-foot
channel in 1915, the Broad Sound 40-foot channel in 1930, the 40-foot
anchorage in 1937, the 40-foot inner harbor channel (except for a few
isolated shoal areas) in 1941, and the 30-foot Reserved Channel in
1941.
   The controlling depths at mean low water in the various improved
channels of Boston Harbor at the dates they were last surveyed were:
Nixes Mate Channel, 15 feet (1932); 35-foot channel, 35 feet (1934);
40-foot anchorage, 39 feet (1937); Broad Sound 40-foot channel, 40
feet (1939) ; 30-foot channel, 30 feet (1939) ; inner harbor 40-foot chan-
nel, 37.5 feet (1941) ; Reserved Channel, 30 feet (1941) ; and Fort
Point Channel, 19 feet (1941).
     493202--43-pt. 1, vol. 1-4
46          REPORT OF CHIEF OF EEGINEERS, U. S. ARMY,                                                           1942

   The controlling depth in the 30-foot project channel of Chelsea Creek
 (1940) was 30 feet at mean low water, except for the reach extending
from a point about 170 feet downstream of the Chelsea Street Bridge
to the downstream end of the Grand Junction Railroad Bridge, in
which the controlling depth was 24 feet at mean low water. From the
upper end of the 30-foot channel to the bend just below the head of
navigation the controlling depth (1936) was 8 feet at mean low water.
   The costs and expenditures under the existing project to June 30,
1942, have been as follows:

                                                        New work            Maintenance               Total          Expenditures

Regular funds______ __-------------- ...              $13, 669, 056. 55      $1, 425, 300. 10    $15, 094, 356. 65   $15, 102, 966. 23
                                ....
Public Works funds ________-------                      1, 030, 806. 26   ----------------         1, 030, 806. 26     1, 030, 806. 26
Emergency Relief funds____ --------.....                   935, 303. 03--.----.-.--         __        935, 303.03         935, 303.03
      Total--                                   ---
                 ----------------.................     15, 635, 165. 84       1, 425, 300. 10     17, 060, 465. 94    17, 069, 075. 52



  Proposedoverations.-The funds unexpended at the end of the fiscal
year, including accounts receivable, amounting to $57,045.75, will be
applied as follows:
Accounts payable June 30, 1942--------------------------------$37. 00

New work:
   Dredge to a depth of 30 feet an area in Chelsea Creek in the vicinity
     of a metropolitan district sewer siphon immediately below the
     Chelsea Street Bridge, by contract (June 1-30, 1943)---------4, 500. 00
   Complete new work surveys, by hired labor-------------------          1, 129. 96

        Total new work ------------------------------------                                                             5, 629. 96

Maintenance:
   Dredge to a depth of 40 feet isolated shoal areas in the inner harbor
      40-foot channel, by contract (April 1 to May 31, 1943) ---------   47, 385. 14
   Complete by Dec. 1, 1942, sweeping survey of isolated shoal
      areas in the inner harbor 40-foot channel, by hired labor--------   3, 993. 65
           Total maintenance---------------------------------                                                         51, 378. 79
        Total-------------------------------------                                                                    57, 045. 75
  The sum of $76,000 can be profitably expended during the fiscal year
1944, to be applied to maintenance dredging, by contract, in restoring
to project width and depth the 23-foot Fort Point Channel from its
entrance in Boston Harbor to the vicinity of the Dorchester Avenue
Bridge.
                                            Cost and financial summary
Cost of new work to June 30, 1942------------ ------------                                                    $17, 100, 288. 80
Cost of maintenance to June 30, 1942 -------------                                                              1, 443, 179. 36
      Total cost of permanent work to June 30, 1942---------     18, 543, 468. 16
Plus accounts receivable June 30, 1942--------------------------       8, 646. 58
      Gross total costs to June 30, 1942---------------------18, 552, 114. 74
Minus accounts payable June 30, 1942    -------------------            37. 00
     Net total expenditures    -----------------------------                                                    18, 552, 077. 74
Unexpended balance June 30, 1942                                                                                     48, 399. 17
        Total amount appropriated to June 30, 1942 ---                                                        x--- 600, 476. 91
                                                                                                              118,
  1 Reduced     $20.22 for new work survey transferred to examinations and surveys.
                RIVEIRS         AND HARBORS-BOSTON,                                 MASS.,        DISTRICT                   47

Fiscal year ending June 30-             1938                     1939                1940           1941             1942


Cost of new work_                     $125, 586. 20         $1,119, 416. 32      $879, 562. 81    $481, 934. 58     1 $98, 304. 57
Cost of maintenance .........      _ _ . ..      ...         ..      _             23, 009. 83       6, 108. 91            511. 53

      Total cost_                      125, 586. 20           1,119, 416. 32       902, 572. 64    488, 043. 49       98, 816. 10

Total expended------------_             84, 924. 12           1, 022, 700. 76      939, 065. 67    593, 850. 27       105, 110. 38

Allotted    ________                 1,007, 000.00           2, 060, 700. 00    -440, 000. 00      138, 415. 16



Balance unexpended July 1, 1941---------------------------                                                    $153, 503. 55
Gross amount expended----------------------- $110, 032.43
Less reimbursements collected_------------------   4, 922. 05
                                                                                                                  105, 110. 38

      Balance unexpended June 30, 1942--------------------                                                         48, 399. 17
Outstanding liabilities June 30, 1942------------------------37.                                                            00

      Balance available June 30, 1942--------- --------------                                                     48, 362. 17
Accounts receivable June 30, 1942_----------------------                                                           8, 646. 58

           Unobligated balance available June 30, 1942 ----------
                                                               _                                                   57, 008. 75

Amount (estimated) required to be- appropriated                     for completion
                     2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
of existing project                                                                                         2, 300, 000. 00
Amount that can be profitably expended in fiscal year ending
   June 30, 1944, for maintenance                      2--_----                 --------                           76, 000. 00
   2 Exclusive of available funds.


                                10. WEYMOUTH FORE RIVER, MASS.

   Location.-Rises in Braintree, Mass., and flows in a northerly direc-
tion 7.5 miles, emptying into Hingham Bay, Boston Harbor. (See
U. S. Coast and Geodetic Survey Chart No. 246).
   Previous projects.-Adopted by the River and Harbor Act of Sep-
tember 19, 1890, and extended by the River and Harbor Acts of March
3, 1905, February 27, 1911, and July 27, 1916. For further details see
page 1745 of Annual Report for 1915, page 64 of Annual Report for
1932, and page 67 of Annual Report for 1938.
   Existing project.-This provides for (a) a channel 27 feet deep
with a general width of 300 feet from a point in Hingham Bay be-
tween Nut and Peddocks Islands to the Weymouth Fore River Bridge
at Quincy Point, about 3.0 miles; and (b) a channel in Nantasket Gut
27 feet deep and 400 feet wide, extending from deep water in Nan-
tasket Roads to Hingham Bay, a distance of about 2,000 feet; thence
through Hingham Bay 27 feet deep and 300 feet wide for a distance of
about 1.4 miles to deep water in Weymouth Fore River west of Sheep
Island. The plane of reference is mean low water. The mean range
of tide is 9.5 feet. The extreme range is 13.6 feet.
   The estimate of cost for new work, revised in 1941, is $496,000, ex-
clusive of amounts expended on previous projects. The latest (1941)
approved estimate for annual cost of maintenance is $4,500.
   The existing project was authorized by the following River and
Harbor Acts:
48          REPORT         OF CHIEF      OF ENIGINEES,      U.   S. ARMY,        1942



     Acts                        Work authorized                               Documents


Aug. 30,1935   27-foot channel from Hingham Bay (between Nut and       H. Doc. No. 207, 72d Cong.,
                 Peddocks Islands) to Weymouth Fore River Bridge.        1st sess.
Oct. 17,1940   27-foot channel through Nantasket Gut and Hingham Bay   H. Doc. No. 568, 76th Cong.,
                                                                                 1
                 to deep water in Weymouth Fore River west of Sheep      3d sess.
                 Island.


  1Contains latest   published map.


    Recommended modifications of project.-Under date of March 20,
1941, the Chief of Engineers recommended modification of the exist-
ing project so as to include the present 27-foot State-improved chan-
nel through and above the Weymouth Fore River Bridge and to
provide in this section a combined channel and maneuvering basin
of the same depth, with a length of about 2,500 feet and widths
varying from 470 to 900 feet, at an estimated first cost of $225,000 with
 $1,500 annually for maintenance in addition to the amounts now
required (H. Doc. No. 291, 77th C'ong., 1st sess.).
    Local cooperation.-Fully complied with.
    Terminal facilities.-At the head of the Federal improvement at
Quincy Point Bridge there is, on the westerly side below the bridge,
one wharf of masonry and concrete with pile platform extension hav-
ing aggregate dockage of 600 feet and depth in the berth of 30 feet
at mean low water. On the easterly side there is a wharf about 600
feet in length, in front of which the owners have dredged to 28 feet
at mean low water. A large electric power plant is located at this
point.
   Above Quincy Point Bridge and served by the Commonwealth of
Massachusetts improvements are eight wharves in use for water-borne
freight. There is also a terminal, with a depth of 32 feet, used for the
receipt of petroleum. In this area is the Fore River plant of the
Bethlehem Shipbuilding Corporation, with depths up to 32 feet, used
for the building and equipping of large naval and commercial vessels.
   These facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-A sweeping and sound-
ing survey to determine the controlling depth in the project channel
of Weymouth Fore River, in progress at the beginning of the fiscal
year, was completed, by hired labor, at a cost of $3,146.45 for main-
tenance. The expenditures were $3,255.61.
    Condition at end of fiscal year.-The existing project was about 78
percent completed. The work remaining to complete the project con-
sists of dredging the 27-foot channel through Nantasket Gut and
Hingham Bay to deep water in Weymouth Fore River west of Sheep
Island, authorized by the River and Harbor Act of October 17, 1940.
A survey of the river from Hingham Bay to Weymouth Fore River
Bridge, made in 1941, showed a controlling depth in the channel of
26 feet at mean low water for a width of 170 feet, and 25 feet for
the project width of 300 feet. The costs and expenditures under the
existing project have been $363,975.37, of which $355,227.34 was for
new work and $8,748.03 was for maintenance.
   Proposed operations.-The funds unexpended, $719.14, will be
applied to maintenance contingencies.
                 RIVERS        AND HARBORS-BOSTON,                      MASS.,        DISTRICT                   49
  The sum of $141,000 can be profitably expended during the fiscal
year 1944, to be applied to new work, dredging, and ledge removal by
contract, in providing a channel in Nantasket Gut 27 feet deep at
mean low water and 400 feet wide, extending from deep water in Nan-
tasket Roads to Hingham Bay, a distance of about 2,000 feet; thence
through Hingham Bay 27 feet deep and 300 feet wide for a distance
of about 1.4 miles to deep water in Weymouth Fore River, as au-
thorized by the River and Harbor Act of October 17, 1940.
                         Cost and financial sammary
Cost of new work to June 30, 1942     ---                ----
                                               __-------------                                     $991, 127. 34
Cost of maintenance to June 30, 1942 ______--------------------                                      13, 998. 03

        Total cost of permanent work to June 30, 1942__----                             ___-1, 005, 125. 37

Net total expenditures-------------------------------------                                      1, 005, 125. 37
Unexpended balance June 30, 1942_: -----------------------------                                        719. 14

            Total amount appropriated to June 30, 1942____________                                1, 005, 844. 51

  Fiscal year ending June 30-             1938            1939           1940            1941             1942


Cost of new work-- ---------      _     $30, 599. 44       $287. 38     $1, 352. 34    $65, 193. 11           _..
Cost of m aintenance ____ __    ____ ___ __________ _       _ ____..
                                                          ._____..            .5,           601. 58       $3, 146. 45
      Total cost________________        30, 599. 44        287. 38       1, 352. 34    70, 794. 69         3, 146. 45

Total expended    ---------------
                               64, 141. 28                 287. 38       1,173.80       70, 864. 07        3, 255. 61
Allotted_                                24, 894. 51    100,000.00     -33, 700.00       7, 000. 00       3, 000. 00



Balance unexpended July 1, 1941---------------------------------                                         $974. 75
Amount allotted from War Department Civil Appropriation Act
approved June 24, 1940--------------------------------------                                          3, 000. 00
      Amount to be accounted for-------------------------------                                        3, 974. 75
Gross amount expended__________--   _________________                                                  3, 255. 61

        Balance unexpended June 30, 1942-------------------------                                         719.14

Amount (estimated) required to be appropriated    for completion of
                                      - --- -- --- --- --- --- -- --- -
existing project 2                                                                                   141,000. 00
Amount that can be profitably expended in fiscal year ending June
                         -
  30, 1944, for new work __ ___               _------------------------                               141, 000.00
  1 In addition, $100,000 contributed funds expended for new work.
  2 Exclusive of available funds.


                          11. WEYMOUTH BACK RIVER, MASS.

  Location.-Rises in East Weymouth, Mass., and flows in a northerly
direction 4.5 miles, emptying into Hingham Bay at the mouth of
Weymouth Fore River. (See U. S. Coast and Geodetic Survey Chart
No. 246.)
  Previous projects.-Adopted by the River and Harbor Act of Au-
gust 18, 1894, and completed in 1912. For further details of pre-
vious project see page 67 of Annual Report for 1932, and page 65
of Annual Report for 1935.
  Existing project.-This provides for a channel 15 feet deep at mean
low water and 250 feet wide through the bar at the mouth of the
river, thence generally 200 feet wide to the downstream end of the
American Agricultural Chemical Co.'s wharf, with a turning basin
50     REPORT OF CHIEF OF ENGINEERS,            U. S. ARMY,     1942

350 feet wide and 400 feet long at its inner end. The mean range
of tide is 9.4 feet. The extreme range is 13.5 feet. The estimate of
cost for new work, made in 1932, is $60,000 (including $20,000 to
be contributed by local interests). The latest (1932) approved esti-
mate for annual cost of maintenance is $700.
   The existing project was adopted by the River and Harbor Act
of August 30, 1935 (Rivers and Harbors Committee Doc. No. 32,
72d Cong., 1st sess.). The latest published map is in that document.
   Local cooperation.-The River and Harbor Act of August 30, 1935,
required that local interests contribute the fixed sum of $20,000 to
the cost of the work and provide, free of cost to the United States,
suitable areas for the disposal of dredged material. The funds re-
quired to be contributed are available, and negotiations are in 'progress
for the furnishing of the required disposal areas.
   Terminal facilities.-The only commercial wharf has a frontage of
about 1,400 feet and is a stone wall, filled, with pile platform in front.
It is privately owned, not open to general public use, and is considered
adequate for existing commerce.
   Operationsand results during fiscal year.-None.
   Conditionat end of fiscal year.-No work has been done on the exist-
ing project. A survey of the channel in 1935 showed a controlling
depth of 12 feet at mean low water throughout. The Navy Depart-
ment has dredged a channel 12 feet deep at mean low water and 150
feet wide from the improved channel of that depth opposite the Amer-
ican Agricultural Chemical Company's wharf to the Lincoln Street
bridge; and, for an additional distance of 2,400 feet beyond that point,
a channel 14 feet deep and varying in width from 200 to 600 feet, with
a turning basin of the same depth and approximately 500 by 900 feet
in area at its inner end.
   Proposed operations.-Fundsin the amount of $59,000 allotted dur-
ing July 1942, together with funds in the amount of $20,000 to be
contributed, a total of $79,000, will be applied to new work, by con-
tract, in dredging the channel 15 feet deep at mean low water and 250
feet wide through the bar at the mouth of the river, thence generally
200 feet wide to the downstream end of the American Agricultural
Chemical Co.'s wharf, with a turning basin 350 feet wide and 400
feet long at its inner end, as authorized by the River and Harbor Act
of August 30, 1935 (Nov. 1, 1942, to Feb. 1, 1943.)
   No additional funds can be profitably expended during the fiscal
year 1944, as it is believed the project will be in a condition to meet the
reasonable requirements of navigation.
                         Cost and financial summary
Cost of new work to June 30, 1942-----------------                   $20, 478. 68
Cost of maintenance to June 30, 1942 _______________________           6, 521. 32
      Total cost of permanent work to June 30, 1942___________-___    27, 000. 00
Net total expenditures -__-____-_______.--..___                       27, 000. 00
      Total amount appropriated to June 30, 1942___ _________         27, 000. 00
                RIVERS    AND HARBORS-BOSTON,                   MASS.,     DISTRICT                  51
                             12. PLYMOUTH HARBOR, MASS.

   Location.-This harbor is 45 miles by water south of Boston. Its
outer anchorage, the "Cow Yard," is common to Plymouth, Duxbury,
and Kingston. (See U. S. Coast and Geodetic Survey Chart No. 245.)
   Previous projects.-Adopted by acts of May 26, 1824, March 3,
1875, and 1877, 1884, and 1885. For further details, see page 1746
of Annual Report for 1915, and page 72 of Annual Report for 1938.
   Existing project.-This provides for (a) protecting by riprap the
sections of Long Beach damaged by the storm of November 1898, and
for restoring Eel River to its former course; (b)dredging a channel
18 feet deep at mean low water and 200 feet wide, increased at the
entrance and on curves, from the bay to the town wharves, a distance
of about 2.5 miles, with a suitable turning basin at the inner end; (c)
dredging a channel 150 feet wide, 15 feet deep at mean low water,
extending in a northwesterly direction about 0.3 mile from a point off
the site of northerly Craigs wharf (now State pier) with a turning
basin 300 feet square, and of the same depth, at its northwesterly end;
this channel to be connected with the 18-foot channel by an area to be
dredged by the Commonwealth of Massachusetts or other local in-
terests; and (d) dredging an anchorage basin 18 feet deep at mean low
water, 850 feet wide, and 2,125 feet in average length on the southeast
side of the project channel near Long Beach. The mean range of tide
is 9.6 feet; the extreme range is 13.7 feet.
   The estimates of cost for new work, exclusive of amounts expended
on previous projects, were as follows: (a) For beach protection,
$95,700, made in 1899; (b) for dredging, $167,000, made in 1911; (c)
for dredging channel and turning basin, $102,000, made in 1920; (d)
for dredging 18-foot anchorage basin, $285,000, made in 1938, of which
one-third is to be contributed by local interests. The latest (1938)
approved estimate for annual cost of maintenance is $500 for beach
protectionr and $8,000 for dredging.
   The existing project was authorized by the following river and har-
bor acts:

    Acts                       Work authorized                               Documents


Mar. 3,1899     Beach protection-.................................
                                                       Annual Report for 1899, p. 1089.
Mar. 4,1913     Dredging 18-foot channel--------------------_
                                                 ___H.             Doe. No. 1194, 62d Cong., 3d sess.
                                                                                                       1
Sept. 22,1922   Dredging 15-foot extension, including turning   H. Doec. No. 996, 66th Cong., 3d sess.
                 basin.
June 20,1938    Dredging 18-foot anchorage basin-.................
                                                            H. Doc. No. 577, 75th Cong., 3d sess.l


  1Contains latest published maps.

   Local cooperation.-The River and Harbor Act of June 20, 1938,
provided for an anchorage basin 18 feet deep at mean low water, 850
feet wide, and 2,125 feet in average length on the southeast side of
the project channel near Long Beach, provided local interests fur-
nish, free of cost to the United States, spoil-disposal areas for initial
work and for subsequent maintenance as may be required, and con-
tribute one-third the initial cost of the improvement. These condi-
tions have not yet been complied with, but a bill now pending before
52         REPORT OF CHIEF O'F ENGINEERS, U. S. ARMY,                                                                   1942

the Massachusetts Legislature is expected to provide one-half the
required contribution, the State appropriation being contingent
upon provision of the remaining half by the local community.
All prior requirements have been fully complied with.
   Terminal facilities.-There are two wharves, both of which are
open to the public free of charge; one of which is owned by the
Commonwealth of Massachusetts, the other by the town. The east-
erly end of the town wharf is used for the receipt and storage of
coal. The facilities appear to be adequate for existing demands.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was about
56 percent completed. No work has been done on the 18-foot
anchorage basin authorized by the River and Harbor Act of June
20, 1938. Work of protecting by riprap the sections of Long Beach
damaged by the storm of 1898 was completed in 1905. Eel River
was restored to its former course in 1904. The dredging of a chan-
nel 18 feet deep at mean low water was completed in 1915. The
15-foot channel was completed in 1927. A survey made at the outer
end of the entrance channel upon completion of maintenance dredg-
ing in June 1939 showed a controlling depth over the dredged area
of 15 feet at mean low water. The costs and expenditures under
the existing project have been $322,222.30, of which $188,571.16 was
for new work and $133,651.14 was for maintenance. In addition,
$108,400 has been expended from contributed funds, of which $108,-
000 was for new work and $400 was for maintenance.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1943.
   The sum of $190,000 can be profitably expended during the fiscal
year 1944, to be applied to new work, by contract, in dredging the
18-foot anchorage basin authorized by the River and Harbor Act
of June 20, 1938. In addition, $95,000 is required to be contributed
by local interests.
                                           Cost and financial summary
Cost of new work to June 30, 1942-----------------------------$377, 217. 75
Cost of maintenance to June 30, 1942_______________ ___________ 135, 664.35
       Total cost of permanent work to June 30, 1942--____________ 512,882. 10
Net total expenditures ______________-___________                 1512, 882. 10
Total amount appropriated to June 30, 1942____________________    1512, 882. 10

  Fiscal year ending June 30-                        1938             1939                1940                   1941             1942

Cost of new work
Cost of maintenance
                   ---   -    .
                             __
                                      -.
                                      ..
                                               - -
                                                __
                                                      - - -   .   - - -   - -
                                                                     $1, 375. 71
                                                                                   .   --. .-.
                                                                                           $253.03     ..
                                                                                                            --    - -   . . . .    . .   .

Total expended-------------------------------                             71.09           1, 557. 65
Allotted                          .        .           . _..__      192, 000.00        -190, 371. 26 --------------.----------



Amount (estimated) required to be appropriated for completion of
   existing project 2_______________                                                                     _____           $190, 000. 00
Amount that can be profitably expended in fiscal year ending June 30,
                      -       -- - - - -
1944, for new work 2__   ____________________     __    _       __                                                        190, 000. 00
  1 In addition $108,000 expended for new work and $400 for maintenance from con-
tributed funds.
   2 In addition local interests are required to contribute $95,000.
               RIVERS AND HARBORS-BOSTON,                         MASS.,       DISTRICT                  53
                               13. CAPE COD CANAL, MASS.

   Location.-This waterway is a sea-level canal, extending from the
head of Buzzards Bay, Mass., to a point on Cape Cod Bay about 15
miles southeast of Plymouth Harbor, Mass. In general direction the
canal trends from Buzzards Bay easterly to Cape Cod Bay. (See U. S.
Coast and Geodetic Survey Charts Nos. 251 and 1208.)
  Existing project.-This provides for the purchase of the Cape Cod
Canal at a cost to the United States of $11,500,000, for an open canal
32 feet deep at mean low water with a width of 540 feet in the land
cut, 500 feet in a straight channel in Buzzards Bay to Wings Neck,
and 700 feet beyond Wings Neck; a harbor of refuge for small vessels,
by dredging a channel 15 feet deep and 100 feet wide into Onset Bay;
mooring basins; the construction of two fixed highway bridges having
a horizontal clearance of 500 feet with a vertical clearance at mean high
water of 135 feet; the construction of a railroad bridge with a vertical
lift of 500-foot span, and 135 feet vertical clearance when the span is
raised; an improved lighting system and other accessory and minor
features which may be deemed necessary, and to be in accordance with
plans approved by the Chief of Engineers.
   The land cut is 7.7 miles long, and with approach channels, the total
length of the canal is 171/2 miles.
   The mean range of tide in Cape Cod Bay is 9.4 feet and in Buzzards
Bay 4.0 feet. The mean range of spring tides is about 13 feet in Cape
Cod Bay, and 6.5 feet in Buzzards Bay.
   The estimate of cost for new work, revised in 1935, is $27,145,000,
exclusive of $11,500,000, purchase price of the canal and properties
which were taken over by the United States on March 31, 1928. The
latest (1936) approved estimate for annual cost of maintenance is
$619,000, including $219,000 for operation and care.
   The existing project was authorized by the following river and
harbor acts:

               Acts                           Work authorized                            Documents


Jan. 21, 1927 (sec. 2)_    _       Purchase of canal from the Boston,       H. Doc. No. 139, 67th Cong.,
                                     Cape Cod & New York Canal Co.,           2d sess.
                                     in accordance with contract dated
                                    July 29, 1921, executed by that com-
                                    pany.
Included in Public Works Ad-       Construction of 3 bridges and widen-     H. Doc. No. 795, 71st Cong.,
  ministration program, Sept. 6,     ing canal to 205 feet.                   3d sess.
  1933.
June 26, 1934 (Permanent Ap-       Operation and care of works of im-
  propriations Repeal Act).         provement provided for with funds
                                    from War Department appropria-
                                    tions for rivers and harbors.
Included in Public Works Ad-       Construction of a mooring basin- .....   H. Doc. No. 795, 71st Cong.,
  ministration program, Apr.                                                 3d sess.
  29, 1935.
Included in Emergency Relief       Dredging and bank protection .----
  program, May 28, 1935.
Aug. 30, 1935_------------____     Existing project adopted.                   Rivers and Harbors Commit-
                                                                    ...------------.
                                                                                  tee Doc. No. 15, 74th Cong.,
                                                                                  1st sess. (Contains latest
                                                                                  published map.)
54     REPORT OF CHIEF OF ENGINE.ERS,        U. S. ARMY,    1942

   Recommended modifications of project.-Under date of August 21,
1941, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for dredging a channel 150 feet wide and
15 feet deep at mean low water, extending from deep water in the
vicinity of Wickets Island to the town wharf at the village of Onset"
for enlargement of the 15-foot turning basin at the town wharf; and
for an anchorage basin of about 16 acres, contiguous to the proposed
channel and turning basin, having a depth of 8 feet at mean low
water; at an estimated cost of $96,000, with an annual maintenance of
$2,500; subject to certain conditions of local cooperation (H. Doc. No.
431, 77th Cong., 1st sess.).
   Terminal facilities.-There are three terminals on the danal-one
used for the receipt and freezing of fish and two for the receipt and
storage of oil. The terminals are considered adequate for the pur-
poses for which they are used. The Commonwealth of Massachusetts
has constructed a State pier on the north bank of the canal at Bourne
Neck.
   Operationsand results duringfiscal year.-New work (all new work
carried on during the fiscal year was performed by hired labor) :
   Drilling and blasting of submerged boulders within the canal prism
was carried on at intervals during the year, a total of 946 cubic yards
of such boulders having been drilled and blasted at a cost of $14,254.79
for new work.
   Material which had eroded from the south slope of the canal, sta-
tions 49 to 51, was replaced and secured in place with crushed stone
and riprap at a cost of $6,600.83 for new work.
   The rail assemblies of the Bourne and Sagamore highway bridges
were cleaned and painted, at a cost of $4,314.12 for new work.
   A well was driven at Sandwich and existing well points were re-
moved and cleaned, at a cost of $442.27 for new work.
   In connection with a lumber shed to be erected at Buzzards Bay,
costs were incurred in the amount of $19.32 for new work.
   In connection with landscaping and planting spoil areas, and plant-
ing beach grass on Stony Point Dike, completed during the previous
fiscal year, adjustments were made at a cost of $13.81 for new work.
   Maintenance.-An adjustment was made in connection with con-
tract dredging of the East Mooring Basin at a cost of $179.98 for
maintenance.
   The U. S. seagoing hopper dredge Absecon was engaged in mainte-
nance dredging of a shoal area in the Hog Island Channel from July
18 to August 9, 1941, during which period there were removed 57,750
cubic yards, bin measurement, of material at a cost of $13,553.99 for
maintenance.
   The U. S. seagoing hopper dredge Atlantic was engaged in main-
tenance dredging in the canal, approaches, and mooring basins from
February 25 to June 30, 1942, during which period there were re-
moved 684,738 cubic yards, bin measurement, of material at a cost of
$146,246.96 for maintenance.
   In connection with installation to be made by hired labor of elec-
trical equipment for the control of the highway bridge lights inde-
pendently of the canal bank lights, costs were incurred in the amount
of $1.85 for maintenance.
   Operating and care of canal.-The canal was open to navigation
and the railroad bridge operated througholut the year. The costs dur-
             RIVEiRS    AND HARBORS'--BOSTON,                 MASS.,   DISTRICT          55
ing the fiscal year for operating and care were $178,245.53 for main-
tenance.
   The total costs during the fiscal year were $363,873.45, of which
$25,645.14 was for new work and $338,228.31 was for maintenance.
The total expenditures were $489,461.34.
   Condition at end of fiscal year.-The existing project was about 99
percent completed. The canal is crossed by two high-level highway
bridges and a vertical-lift railroad bridge. The canal in the land
cut from the easterly entrance to station 430 has a least bottom width
of 480 feet, except opposite the State pier where the width is 450 feet.
From Station 430 to Wings Neck (Hog Island Channel) the width
is 500 feet, and beyond Wings Neck (Cleveland Ledge Channel), 700
feet. On June 30, 1942, the controlling depths at mean low water for
this project were as follows: Canal in the land cut, 30 feet; mooring
basin, north side, easterly end, 20 feet; Hog Island Channel, 30 feet;
Cleveland Ledge Channel, 30 feet. On June 30, 1942, the mooring
basin on the south side, westerly end, had depths varying from 22 to
38 feet. At the time it was last surveyed (1941) the controlling depth
in the Onset Channel was 15 feet.
   The total costs from regular funds have been $25,242,030.37, of which
$20,449,142.48 (including the purchase price of $11,500,000) was for
new work and $4,792,887.89 was for maintenance, including $1,539,-
624.75 for operating and care of the canal. Expenditures have been
$25,343,607.52.
   The total costs and expenditures from Public Works funds have been
$6,138,157.30 for new work.
   The total costs and expenditures from Emergency Relief appropria-
tion funds have been $4,849,739.57 for new work.
   The total costs, all funds, have been $36,229,927.24, of which $31,-
437,039.35 (including $11,500,000, the purchase price) was for new
work and $4,792,887.89 was for maintenance. The total expenditures
have been $36,331,504.39. In addition, the sum of $1,658,354.71 was ex-
pended between March 31, 1928, and June 30, 1935, on the operating
and care of the works of improvement, under the provision of the
permanent indefinite appropriation for such purposes.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, including accounts receivable, amounting to $234,477.43,
plus $100,000 advanced to Plant Allotment, a total of $334,477.43, will
be applied as follows:
Accounts payable June 30, 1942-----------------------------                       $9, 445. 20

New work: Erection of lumber shed at Buzzards Bay, by hired labor
  (Aug. 1-31, 1942) ----------------------------------------                         992. 68
Maintenance:
   Dredging by U. S. seagoing hopper dredge Atlantic (July 1 to
      Aug. 15, 1942) --------------          --------------                       60, 490. 56
    Repair of canal slopes, revetment, and service roads, stations
      288-292, north side, and 291+50-295+50, south side, eroded as
      a result of wreck in canal (Aug. 15 to Nov. 15, 1942)- ......               50, 930.26
    Removal of miscellaneous boulders from canal banks, by hired
      labor (July 1, 1942, to June 30, 1943) -------------- ___                   21, 215. 00
    Landscaping and planting spoil areas and canal slopes, by hired
      labor (July 1, 1942, to June 30, 1943) --------------------- ___            4, 621. 50
    Installation of electrical equipment for control of highway bridge
      lights independently of canal bank lights, by hired labor (Aug.
      15-30, 1942)        ______------------                   -,                    823. 23
56           REPORT OF CHIEF OF ENGNEERS., U. S. ARMY,                                                    1942

Operation and care of canal:
   Operation of canal, bridges, etc--------------------------$102,     082. 00
   Ordinary maintenance and repair--________________________       55, 214. 00
   Channel work__--_------         -------------------------       27, 663.00
           Total operating and care___ ________                                ______-__-___--       -          184, 959.00
           Total maintenance__                 _       ________       __               -____-______-___-_
                                                                                                       324, 039. 55
           Grand total--            --------------------------------------                                      334, 477.43
  The funds that can be profitably expended during the fiscal year
1944, $414,000, will be applied as follows:
Maintenance: Dredging by United States seagoing hopper dredge, 6
months       --------------------------------------------------                                                   200, 000
Operation and care of canal:
    Operation of canal, bridges, etc-______     -__-_______________-
                                                                  104, 000
   Ordinary maintenance and repair_.....________-__________        56, 000
   Channel work-------------------------------------------          54, 000
           Total operating and care-______________                                                   --            214, 000
           Grand total------------------------------------------                                                   414, 000

                                       Cost and financial summary

Cost of new work to June 30, 1942 __- -  --------          $31, 437, 039. 35
Cost of maintenance to June 30, 1942-----------------------6, 451, 242. 60)

       Total cost of permanent work to June 30, 1942-----------                                           37, 888, 281. 95
Undistributed costs June 30, 1942____________________________                                                 100, 000. 09
      Net total cost to June 30, 1942__________________________                                           37, 988, 281. 95
Plus accounts receivable June 30, 1942------------------------                                                 11, 022. 35
      Gross total costs to June 30, 1942 --------------------
                                            _                                                             37, 999, 304. 30
Minus acounts payable June 30, 1942 __________________________                                                  9, 445. 20
     Net total expenditures .  _____ _______ _________ _                                                  37, 989, 859. 10
Unexpended balance June 30, 1942_________________________                                                     223, 455. 08
           Total amount appropriated to June 30, 1942____________                                         38, 213, 314. 18

Fiscal year ending June 30             1938                 1939               1940             1941               1942

Cost of new work------------$2, 992, 196. 45            $1, 090, 107. 00   $1, 046, 020. 59   $151, 817. 00        $25, 645. 14
Cost of maintenance -           289, 588. 70                696, 085. 92       676, 635. 84    452, 022. 49        338, 228. 31
      Total cost------...         -. 3, 281, 785. 15     1, 786, 192. 92    1, 722, 656. 43    603, 839. 49        363, 873. 45
Total expended      _   .------------
                                   3, 692, 635. 62       1, 761, 354. 14    1, 847, 844. 87    632, 576. 36        489, 461. 34
Allotted   ------------------       4, 419, 559. 00      2, 442, 484. 13      655, 022. 10       80, 000. 00       273, 850. 00



Balance unexpended July 1, 1941_ _______ _-______________                                                      $439, 063. 42
Amount allotted from W. D. Civil Appropriation Act approved
Apr. 28, 1942 -------------------------------------------                                                      273, 850. 00
      Amount to be accounted for_____------------------------                                                   712, 916. 42
Gross amount expended         ___---------------------- $489, 764. 19
Less reimbursements collected__--__      _____-__----         302. 85
                                                                                                               489, 461. 34
           Balance unexpended June 30, 1942_-__________-
                                                     -__-223,                                                       455. 08
                 RIVERS AND HARBORS-BOSTON,                                   MASS., DISTRICT                            57

Outstanding liabilities June 30, 1942 --                                            ____-----------           $9, 445. 20
                                     ----
     Balance available June 30, 1942_____-   ------------                                                    214, 009. 88
Accounts receivable June 30, 1942-_____-__-_______        -_---                                                11, 022. 35

         Unobligated balance available June 30, 1942                              __-------                  225, 032. 23

Amount that can be profitably expended in fiscal year ending June
                              --
30, 1944, for maintenance 1      ____________________________                                               414, 000. 00
  1 Exclusive of available funds.

    14. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                  (GENERAL)

   The cost of work during the year amounted to $30,463.66; the ex-
penditures were $32,536.57. The balance unexpended June 30, 1942,
amounting to $43,558.25, including accounts receivable, together with
allotment to be made, will be applied as needed during the fiscal year
1943 to payment of expenses incurred under this heading. The addi-
tional sum of $50,000 can be profitably expended during the fiscal year
1944.
                                       Cost and financial summary
Cost of new work to June 30, 1942_____________-----------
Cost of maintenance to June 30, 1942_--_--         __-_-----------                                       $813, 973. 37

      Total cost of permanent work to June 30, 1942_----------                                               813, 973. 37
                                                   --
Plus accounts receivable June 30, 1942_______________--       ____                                             2, 379. 73

     Gross total costs to June 30, 1942  --   ________----------816, 353. 10
Minus accounts payable June 30, 1942----------------------------     227. 59

      Net total expenditures----------------------------------   816, 125. 51
Unexpended balance June 30, 1942-------------------- -----------  41, 178. 52

         Total amount appropriated to June 30, 1942_-__-____----                                   -         857, 304. 03

   Fiscal year ending Tune 30                 1938               1939           1940            1941              1942

Cost of new work___
Cost of maintenance-..                     $90, 926. 27      $113, 168. 13   $139, 175. 72    $49, 356. 87       $30, 463. 66

      Total cost-.........        _          90, 926. 27      113, 168. 13    139, 175. 72     49, 356. 87        30, 463. 66
Total expended..                               94, 108. 62
                                 ..-----------------          111, 676. 10    143, 520. 05     49, 706. 63        32, 536. 57
Allotted .....----------------------        130, 355. 49         250.00
                                                              196,            101, 000. 00     28, 544. 36



Balance unexpended July 1, 1941______________
                                ---------     -      -$73,                                                         715. 09
Gross amount expended -----------------              $62, 963. 83
Less reimbursements collected------------------------ 30, 427. 26
                                                                                                               32, 536. 57

      Balance unexpended June 30, 1942__----                                   __ ----------                   41, 178. 52
Outstanding liabilities June 30, 1942____                                    __-----------227.                          59
     Balance available June 30, 1942        __
                                        -_____--   _____________-                                              40, 950. 93
Accounts receivable June 30, 1942---------------------------------                                              2, 379. 73
          Unobligated balance available June 30, 1942 ---__________-_                                          43, 330. 66
Amount that can be profitably expended in fiscal year ending June
                                 1
  30, 1944, for maintenance _          _---------
                                             ------     ---                                                    50, 000. 00
  SExclusive of available funds.
 58                REPORT OF CHIEF OF ETNGINEERS, U.                                                                           S. ARMY,                  1942

     15. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED
                                                                                    i
                                                                                                      I                                                        I
                                                                                          For last            Cost and expenditures to
                                                                                        full report                 June 30, 1942                                  Estimated
                                                                                        see Annual                                                                   amount
                           Name of project                                                Report                                                                   required to
                                                                                            for-                                              Mainte-               complete
                                                                                                                New work                      nance

                                                                                           1935            1 $6, 384, 160. 89                                      (2).
   1. Passamaquoddy tidal-power project, Maine_
   2. St. Croix River, Maine 3_______------------                                          1924                   4 180, 549. 81      $6, 450. 19                  Completed.
   3. Cobscook Bay, Maine 5 6------------------                                            1866                       4, 173. 51                                        Do.
   4. Lubec Channel, Maine 3........------------                                           1912                     303, 365. 53        4, 067. 45                      Do.
   5. Machias River, Maine 5___-____------------                                           1877                      32, 000. 00                                        Do.
   6. Moosabec Bar, Maine 3 ___________-____.....                              ..          1930                     114, 000. 00      12, 600. 00                       Do.
   7. Pleasant River, M aine 5..................                                           1892                       3, 500. 00 ---.......                             Do.
   8. Narraguagas River, Maine                 5 6  ...... -                _              1907                      71, 643. 81 ------ -- --
                                                                                                                     31, 707. 06 ---......
                                                                                                                                                                        Do
   9. Corea Harbor, Maine 3........................                                        1939                                                                         Do.
10. Sullivan Falls Harbor, Maine 66                                                       1914                      54, 870. 64 ---......                              Do.
11. Bar Harbor, Maine 3_                          -----------                             1932                     406, 591. 12 ----....                          $57,900.
12. Bass Harbor Bar, Maine 5__..............                                              1920                       4, 076. 13        3, 418. 20                 Completed.
13. Union River, Maine 3 6                    --..............                            1912                     176, 854. 85      14, 095. 15                       Do.
14. Deer Island Thoroughfare, Maine 5----.......                                          1916                      40, 000. 00 ............                             Do.
15. Bagaduce River, Maine 3 5 6 -.............                                            1912                      28, 000. 00 ............                      $18,875.
16. Bucksport Harbor, Maine 5                                                             1907                      18. 420. 99             279. 01               Completed.
17. Stockton Harbor, Maine 3 56_________________                                          1915                      33, 000. 00 ---------                              Do.
18. Carvers Harbor, Maine 5----------------                                               1915                      59, 199. 70 ------..                               Do.
19. M atinicus Harbor, M aine 5-...................                                       1935                      14, 000. 00        7, 704. 64                      Do.
20. Criehaven Harbor, Maine 5                    -.................                       1939
                                                                                           1897
                                                                                                                   740, 775. 99
                                                                                                                     61, 561. 45
                                                                                                                                        7, 956. 28                      Do.
2 1. B e l fas t H ar bo r , M ai n e 3__. _. _._ . . . . . . . .                                                                                                      Do.
22. Camden Harbor, Maine 3 ______...........                               .              1931                     102, 400. 00      30, 200. 00                       Do.
23. Rockport Harbor, Maine 6--                                        ---                 1915                      47, 000. 00                                        Do.
24. Rockland        Harbor,    Maine        3________________.__                          1931                    915, 862. 73       24, 637. 27                       Do.
2 5 . O wls He a d H a rb o r, M a ine 3 5 6          --   . ...........
                                                                     . .
                                                                                           1855
                                                                                           1920
                                                                                                                     17, 897. 16 ............
                                                                                                                     18, 750. 00    -------- - - - -                    Do.
                                                                                                                                                                        Do.
26. Tenants H arbor, M aine 5.______________..                .
27. Georges River, M aine 3.__...................                                         1935                      25, 787. 91      39, 566. 38                       Do.
28.   Medomak       River,    Maine       5                                               1914                      17, 000. 00 .............                          Do.
29. New Harbor, Maine 3__ __ _                                           .                1937                      10, 500. 00      12, 566. 27                       Do.
30. Damariscotta River, Maine 5                     -----------           --              1906                       5, 000. 00 .............                          Do.
31. Sou t h B r is tol H a rb or , M ain e 3 56.._ . . . . . . . . . .                     1914                       3, 500. 00                                        Do.
32. East Boothbay Harbor, Maine 5 ............                                             1912                       6, 500. 00                                        Do.
33. Boothbay Harbor, Maine 3__ .....                              __                      1915                      18, 000. 00                                        Do.
34. Richmond Harbor, Maine 5__._____________-                                              1883                      20, 000. 00                                        Do.
35. Sasanoa River, Maine 5 6                     ---                                       1915                      92, 487. 69 - - - - -- -                           Do.
36. Cathance River. Maine 5 6______                                                        1884                      21, 000. 00                                        Do.
37. Harraseeket River, Maine 5                                                             1896                      30, 963. 62                                        Do.
38. Royal River, Maine 3 5 6______ ____________                                            1884                      21, 919. 03 ............
                                                                                                                                        8, 080. 97                      Do.
39. R ich mon ds Islan d H arbo r, M ain e 5 ..........                                    1882                     119,844. 22                                         Do.
40. Cape Porpoise Harbor, Maine 56-----------..                                            1911                     118, 501. 15                                        Do.
41. Wells Harbor, Maine 5 _______________-..__.                                            1874                                                 5, 000. 00              Do.
42. York Harbor, Maine 3_-_____________-____.                                              1936                       57, 400. 00               5, 660. 83              Do.
43. Portsmouth Harbor, N. H.3_                                                             1892                      130, 392. 61                                       Do.
44. Pepperells Cove, Maine 5-                                                              1920                      158, 262. 28                  137. 72              Do.
45. Cocheco River, N. H.5 6-                                                               1913                      289, 149. 93               9, 642. 54              Do.
46. Bellamy River, N. H.5 6_________________-__.                                           1897                       34, 642. 98                                       Do.
47. Lamprey River, N. H.,          5 _           -                                         1913                       19, 980. 58               8, 267. 53              Do.
                                                                                                                                          ............
48. Exeter River, N. H. ........                                   -_
                                                                   . . .                   1913                       62, 454. 42                                         Do.
49. Little Harbor, N. H.5 8-                                                               1909                      133, 227.33                3,121.74                  Do.
50. Isles of Shoals Harbor, Maine and N. H.5_____                                          1930                       80, 691. 53             34, 261. 68                 Do.
51. Lake Winnepesaukee, N.3 H.5 8 _                                                        1930                              7, 500. 00      5, 000. 00                   Do.
52. Merrimack River, Mass.          3      _                                               1940                    369, 891. 49            147, 860. 42                   Do.
53. Ipswich River, Mass. 6 -                                                               1895                      5, 617. 91                                           Do.
54. Essex River, Mass__                            3                                       1912                     21, 759. 21              98, 240. 79                  Do.
55. Sandy Bay, Cape Ann, Mass.           3
                                                    s 30                                   1922                 1, 925, 552. 30               15, 925. 70          $8,065,000.1t
56. R ockport H arbor, Mass. - ..----.. .                          . -                     1905                     91, 229. 25                                    Completed.
57. Manchester Harbor, Mass.12..                                                           1908                     23, 985. 57                                           (13)
                                       3
58. Beverly Harbor, Mass.                     -                                            1931                 14 246, 047. 76                      642. 65 Completed.
                                   1
59. Salem Harbor, Mass. l___                                                               1931                    100, 456. 57              7, 500.00          Do.
60. Marblehead Harbor,3 Mass.o6 -                                      --                  1905           ................
                                                                                                                                                  584.00        Do.
61. Lynn Harbor, Mass. 17-                                       -    - -                  1941                   755, 042. 91             100, 292. 70 $336,000.
62. Winthrop Harbor, Mass. ___________________                                             1895                     8, 992. 59                               Completed.
                                                                                                                                                  642.----65
                                                                                                                                                  096.92
63. Malden River, Mass.1-                                                    0
                                                                                           1922                 19104, 853.08               45,7,--500.00-      Do.
64. Dorchester Bay and Neponset          3          River, Mass.2 __                       1932                    94, 584. 55              33, 591. 89 $162,000.
65. Hingham Harbor, Mass.21 _____                                                          1913                    28, 316. 58              10, 000.   00 Completed.
                                                                                                                                                  584.----O0
66. Cohasset Harbor, Mass.3 ______________                                                 1904                    10, 000.00                                             (13)
67. Scituate Harbor, Mass. __                                                              1941                   274, 886.96                38, 930. 98           Completed.
68. Duxbury Harbor, Mass. ,___                                                             1908                    37, 000. 00                                     $5,800.
69. Kingston Harbor, Mass. (North Plymouth                                                 1895                     8, 940. 09                                     Completed.
       ,harbor).                         3
70. Wareham Harbor, Mass. ....-                             ..          -- -               1896                        95, 997. 30                                 $36,750.
    See footnotes at end of table.
                  RIVERS      AND     HARBORS-BOSTON,                            MASS.,          DISTRICT                      59

15. OTHER PROJECTS FIOR WHICH NO ESTIMATES ARE SUBMITTED-
                          Continued

                                                                For last       Cost and expenditures to
                                                               full report           June 30, 1942                   Estimated
                  Name of project                             see Annual                                 ___          amount
                                                                 Report                                             required to
                                                                  for-          New work            Mainte-          complete
                                                                                                    nance

                              23
71. Wellfleet Harbor, Mass.        ___                _            1895           $11, 350.37 ....          _       $22,000.
72. Provincetown Harbor,
                     3
                         Mass.3s                 _     ____        1941           347, 453. 72     $42,128. 73      $13, 300.
73. Town River, Mass. 2425.    -         -           _-__-     -_ 1941          28285, 779. 76      12, 577. 41     Completed.

   1 Includes $2,571.31 adjustment of costs from prior years. Includes minus $232.85 revoked during fiscal
year 1942.
   2 Work discontinued 1937. Facilities transferred to the Works Progress Administration.
   s Improvement adequate for commerce.
   4 Exclusive of $19,891.65 contributed by Canadian Government.
   5 No commerce reported.
   6 Abandonment recommended in H. Doc. No. 467, 69th Cong., 1st sess.
   7 Includes $775.99 (costs incurred in prior years) transferred to project during fiscal year 1941 from account
Emergency Relief Administration administrative expense.
   9 Elimination of maintenance dredging recommended in H. Doc. No. 467, 69th Cong., 1st sess.
   9 Exclusive of $5,000 contributed by Commonwealth of Massachusetts in 1908.
   to Abandonment of the project of July 5, 1884, was recommended in H. Doc. No. 411, 64th Cong., 1st sess.,
and Rivers and Harbors Committee Document No. 3, 65th Cong., 1st sess.
   11Amount carried in survey report forwarded to Congress Apr. 11, 1939 (report not printed).
   12Modification of existing project was recommended by the Chief of Engineers July 16, 1941, in H. Doc.
No. 447, 77th Cong., 1st sess.
   13Superseded by State project.
   14Exclusive of $100,000 expended from contributed funds.
   15Modification of existing project was recommended by the Chief of Engineers Apr. 10,1940, in H. Doc.
No. 701, 76th Cong., 3d sess.
   16 Further improvement recommended by the Chief of Engineers Nov. 18, 1940, in H. Doc. No. 85, 77th
Cong., 1st sess.
   17Awaiting local cooperation.
   is Under State maintenance.
   19Exclusive of $62,000 expended from contributed funds.
   20Modification of existing project was recommended by the Chief of Engineers June 19, 1941, in H. Doc.
No. 394, 77th Cong., 1st sess.
   21 Modification of existing project was recommended by the Chief of Engineers July 5, 1939, in H. Doc.
No. 425, 76th Cong., 1st sess.
   22Modification of existing project was recommended by the Chief of Engineers June 20, 1941, in S. Doc.
No. 115, 77th Cong., 1st sess.
   23 Modification of existing project was recommended by the Chief of Engineers Dec. 11, 1939, in H. Doc.
No. 557, 76th Cong., 3d sess.
   24Unexpended balance June 30, 1942, $716.75, less $150 accounts payable, to be revoked.
   25$3,000 revoked fiscal year 1942.
   28In addition, $111,762.76 contributed funds expended for new work. Balance of $25,157.24 from con-
tributed funds, June 30, 1942, to be revoked.

                16. PLANT ALLOTMENT, BOSTON, MASS., DISTRICT

                                     Cost and flnancial summary
Undistributed costs June 30, 1942 ------------                                      ------                       $673, 954. 68
Net total cost to June 30, 1942 --------------     ---------------                                                673, 954. 68
Plus accounts receivable June 30, 1942    ------------------------                                                254, 926. 90

      Gross total costs to June 30, 1942------- ----- -----                                                       928, 881. 58
Minus accounts payable June 30, 1942-----------------------                                                       197, 301.27

      Net total expenditures---- ---------------------------                                                       731, 580. 31
Unexpended balance June 30, 1942-----------     ------------                                                    -113, 232.66

            Total amount appropriated to June 30, 1942                           --------------                   618, 347.65

   Fiscal year ending June 30                 1938               1939             1940               1941               1942


Total expended.   ----------------       $23, 820. 42         $115, 378. 85   -$90, 068 54       -$33, 865. 07       $320, 569. 80
Allotted_                                    58, 609. 00        26, 337. 97     82, 977: 90                            -3, 355. 96
60          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                    1942

Balance unexpended July 1, 1941_____-_ __ ______ -_______       $210, 693.10
Deductions on account of revocation of allotment____--__- -___-    3, 355. 96

      Net amount to be accounted for-...  ___--__--                     207, 337. 14
                                                                 -_________
Gross amount expended ----      --  ____
                                    --         _____ $1, 991, 831.46
Less:
     Reimbursements collected---    $1, 666, 851. 51
    Receipts from sales ----------        4, 410. 15
                                                      1, 671, 261. 66
                                                                        320, 569. 80

      Balance unexpended June 30, 1942---------__                                           -113, 232.66
Outstanding liabilities June 30, 1942__----___________-_____                            _      197, 301.27

      Balance available June 30, 1942__________________________ -310, 533. 93
Accounts receivable June 30, 1942 ----_______  ________---____    254, 926. 90

         Unobligated balance available June 30, 1942_________________ --                       55, 607. 03

Status of all investigations for navigation called for by river and harbor acts
                           and committee resolutions

                                                         Date trans-
          Locality               Authorization act        mitted to       Document No.       Recommenda-
                                                          Congress


Belfast Harbor, Maine ....-    Commerce Committee
                                 resolution, Dec. 8,
                                 1941.
Boston Harbor, Mass _____      Rivers and Harbors
                                 Committee resolu-
                                 tion, Dec 10, 1941.
Boston Harbor, Mass., im-      Commerce Committee       Aug.   5, 1941                       Unfavorable.
provement at Shirley Gut.        resolution, May 2.
                                 1939.
Boston Harbor, Mass., deep     Rivers and Harbors       May    4, 1942                           Do.
channel from the seaplane       Committee resolu-
channel to property of          June 10, 1941.
Boston Port Development
Co.
Boston Harbor, Mass., chan-    Rivers and Harbors       July 23, 1942                            Do.
nel from the 40-foot chan-      Committee resolu-
nel to Pleasure Bay side of     tion, Aug. 26, 1941.
Fort Independence.
Cape Cod Canal, improve-       Commerce Committee Nov. 4, 1941 House, 431, 77th                Favorable.
ment at Onset Bay, Mass.        resolution, Oct. 4,                          Cong., 1st sess.
                                 1939.
     Do---------------- ..-  . Rivers and Harbors -....do -..       ._ -do .__.._____             Do.
                                 Committee resolu-
                                 tion, Oct. 24. 1939.
Cape Porpoise        Harbor,   Rivers and Harbors                   ......................
  Maine.                         Committee resolu-
                                 tion, Mar. 11. 1941.
Danvers River, Mass .....      Rivers and Harbors                   ......................
                                 Committee resolu-
                                 tion, Apr. 13, 1939.
Dorchester Bay and Nepon-      Rivers and Harbors Sept. 24, 1941         House, 391, 77th      Favorable.
  set River, Mass.               Committee resolu-                            Cong., 1st sess.
                                 tion, Feb. 1, 1939.
Duxbury Harbor, Mass ....      Commerce Committee Sept. 15, 1941         Senate, 115, 77th        Do.
                                 resolution, June 27,                         Cong., 1st sess.
                                 1939.
Gloucester Harbor and An- Rivers and Harbors July 19, 1941 House, 329, 77th                       Do.
  nisquam River, Mass.           Committee resolu-                            Cong., 1st sess.
                                 tion, Oct. 8, 1938.
Ipswich River, Mass ......
                       _       Rivers and Harbors July 18, 1941                                Unfavorable
                                 Committee resolu-
                                 tion, June 3, 1937.
     Do_-- - - - - - - - -     River and Harbor Act, .---do_------ ------------------- Do.
                                 Aug. 26, 1937.
Manchester Harbor, Mass_-      Rivers and Harbors     Nov. 21, 1941      House, 447, 77th      Favorable.
                                 Committee resolu-                            Cong.. 1st sess.
                                 tion, Dec. 22. 1938.
Merrimack River, Mass.,        River and Harbor Act, -- - -- - -- - ......................
  and N. H.; with view to        June 20, 1938.
  improvement for naviga-
  tion, flood control, and
  water power.
              RIVEIRS AND        HARBORS-BOSTON,                MASS.,     DISTRICT               61
Status of all investigations for navigation called for by river and harbor acts
                     and committee resolutions-Continued

                                                      Date trans-
         Locality              Authorization act      mitted to      Document No.      Recommenda-
                                                       Congress                            tion


Monhegan Harbor, Maine-_     Rivers and Harbors July 18,1941 -----..---..........       Unfavorable.
                               Committee resolu-
                               tion, Jan. 31, 1939.
    Do------------------     Commerce Committee ..- do..-------------------------......    Do.
                               resolution, Apr. 8,
                               1939.
North River, Scituate, Mass_ Rivers and Harbors Aug. 7, 1941 ------------------            Do.
                               Committee resolu-
                               tion, Mar. 22, 1938.
Portland Harbor, Maine, re- Rivers and Harbors----------
moval of Soldier Ledge in     Committee resolu-
Hussey Sound.                 tion, Dec. 3, 1941.
Portland Harbor, Maine, re- Rivers and Harbors                                --
moval of Soldier-Ledge in     Committee resolu-
  Hussey Sound and shoal       tion, Mar. 12, 1942.
  areas in Casco Bay.
Portland Harbor, Maine,      Rivers and Harbors
  modify existing project.     Committee resolu-
                               tion, June 6, 1939.
Presumpscot River, Maine     River and Harbor Act, --
                               Aug. 26, 1937.
Provincetown Harbor, Mass Commerce Committee Aug. 9, 1941 --------------------              Do.
                               resolution, Aug. 8,
                                1939.
Rock Harbor, Mass .------- Rivers and Harbors July 21, 1941 -------------------             Do.
                                Committee resolu-
                                tion, Apr. 17, 1939.
Sandy Bay, Cape Ann,         Rivers and Harbors June 16, 1942 -------------------           Do.
  Mass., harbor of refuge.      Committee resolu-
                                tion, July 28, 1941.



                 17. MERRIMACK RIVER BASIN, N. H. AND MASS.

  Location.-The works covered by the comprehensive plan are located
on the Merrimack River and its tributaries in New Hampshire and
Massachusetts.
  Existing project.-The Flood Control Act approved June 22, 1936,
authorized the construction of a system of flood-control reservoirs in
the Merrimack River Basin for the reduction of flood heights in the
Merrimack Valley generally at an estimated construction cost of
$7,725,000; cost of lands and damages, $3,500,000. The Flood Control
Act approved June 28, 1938, approved the general comprehensive plan
for flood control and other purposes as set forth in House Document
No. 689, Seventy-fifth Congress, third session, wherein the estimated
cost of $13,000,000 for construction and $8,000,000 for lands and dam-
ages is given, and modified the project authorized by the Flood Control
Act approved June 22, 1936, to provide, in addition to the construction
of a system of flood-control reservoirs, related flood-control works
which may be found justified by the Chief of Engineers.
   The following reservoirs and related flood-control works have been
considered for the comprehensive plan:




         493202-43-pt. 1, vol. 1-5
62            REPORT OF CHIEF OF                           ENGINEERS,                   U.   S.   ARMY,        1942


                              Name                                                       State                 Total estimated
                                                                                                                       cost 1


Reservoirs:
     Franklin Falls 2...     ---- ..-...   -    -     -- -------               New Hampshire-----------.                    $7,883,000
     Blackwater 2-----------             -   --- ----     ----         ---         do----                                    1,193,000
     Hopkinton-Everett -------------------- -----                  ----.           do-                                      11,300,000
     West Peterboro ---------------------------                              -     do-------------   - -                     1,170,000
     Mountain Brook------ - ------------------                     -         ----- do -      -     -                           370,000


                                                                                                                Estimated cost


                                                                                                           Construc-         Lands
                                                                                                                            damages

Local protection works:
   Nashua ------------                                                          do                             $99, 000         $1,000
   Lowell2_____        _ _                                                   Massachusetts                     465, 000         90,000
   North Andover-----------                                                     do--_                          146, 500          3, 500


1 Includes cost of lands and damages.
2 The details of this project are contained in an individual report.


   Local cooperation.-See page 5 for requirements.'
   Operations and results during fiscal year.-The stream-gaging pro-
gram for the Merrimack River Basin was continued during the fiscal
year.
   The costs from regular funds during the fiscal year were $2,006.97.
The expenditures were $729.53.
   Condition at end of fiscal year.-Work on the development of the
comprehensive plan preliminary to construction has been carried to
an advanced stage. The condition of projects selected for construction
under this authorization is given in individual reports.
   The costs to date from regular funds have been $270,482.21. The
expenditures to date from regular funds have been $269,122.16.
   The total costs and expenditures to date from emergency relief funds
have been $23,716.07.
   The costs of all work, all funds, have been $291,198.28. The total
expenditures have been $292,838.23.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $213,,509.64 regular funds, will be applied to
the payment of accounts payable, $1,360.05; to the continuation of the
stream-gaging program for the Merrimack River Basin and studies to
determine the functioning of the reservoirs in operation; and to the
continuation of studies and surveys for related flood-control works in
the comprehensive plan.
   The sum of $20,000 can be profitably expended during the fiscal year
1944 for the continuation of the stream-gaging program, reservoir
operation planning, and hydrologic studies.
                                           Cost and financial summary
Cost of new work to June 30, 1942-------------------------------                                                1$294, 198. 28
Cost of maintenance to June 30, 1942_                                                                           __________

      Total cost 'of permanent work to June 30, 1942----------                                                    1294,      198. 28
Minus accounts payable June 30, 1942_-..       .                                                                          1,
                                                                                                                          1__________________
                                                                                                                             3CO0.05
     Net total expenditures----------------------------------                                                         292 838. 23
Unexpended balance June 30, 1942___-------------                                                                      213, 509. 64
       Total amount appropriated to June 30, 1942------                                                    _      2   506, 347. 87
  1Includes $23,716.07 emergency relief funds.
                   RIVERS        AND HARBORS-BOSTON,                        MASS.,        DISTRICT                    63

   Fiscal year ending June 30           1938                 1939            1940              1941            1942


Cost of new work           ___       $160, 157. 95        $85, 384. 46    $123, 145. 47   -$76, 496. 57        $2, 006. 97
Cost of maintenance

Total expended            __          154, 612. 51        143, 280. 76      75, 897. 44    -81, 682. 01           729. 53

Allotted_-------    --------------    382, 000. 00          48, 716. 07    223, 131. 80   -147, 500. 00               -

Balance unexpended July 1, 1941_                                -_____----------_-_              .__-- $214, 239. 17
Gross amount expended-----------------------------                                    $1, 784. 62
Less reimbursements collected----------------- -------                                 1, 055. 09
                                                                                                               729. 53
      Balance unexpended June 30, 1942_----------------------                                             213, 509.61
Outstanding liabilities June 30, 1942 _                                                           _          , 360. 05
                                                                                                            1-----------------------_
         Unobligated balance available June 30, 1942-------------                                         212, 149. 59

Amount (estimated)    required to be appropriated for completion of
                 2- - - - - - - - - - - -- - - - - - -- - - - - - - - -
   existing project                                                                       __          12, 790, 400. 00
Amount that can be profitably expended in fiscal year ending June
   30, 1944, for new work                            ----------------                                      20, C0. 00
   2 Exclusive of available funds.



   18. FRANKLIN FALLS RESERVOIR, MERRIMACK RIVER BASIN, N. H.
   Location.-The dam site of the reservoir is located on the Pemige-
wasset River, the main tributary of the Merrimack River, about 21/2
miles above Franklin, N. H., and 92 miles north of Boston, Mass.
   Existing project.-The dam is of rolled earth fill with dumped rock
shell and toe, 1,740 feet long, with a maximum height of 136 feet. It
contains about 3,000,000 cubic yards of earth and rock fill. The spill-
way consists of a channel in an earth and rock cut in the right abutment
with a gravity-type concrete ogee section 550 feet long. Twin gate-
controlled outlet conduits are located in the right abutment. The
reservoir provides a storage capacity of 170,000 acre-feet and controls
a drainage area of 1,000 square miles. The total estimated cost is
$7,883,000, which includes construction, lands, damages, and highway
relocations. The project is a unit of the comprehensive plan for flood
control and other purposes in the Merrimack River Basin which was
authorized by the Flood Control Act approved June 22, 1936, and
modified by the Flood Control Act approved June 28, 1938.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
    Operations and results during fiscal year.-Construction of the dam
and appurtenant works was commenced by continuing contract on
November 14, 1939. Contract operations during the fiscal year con-
sisted of earth and rock excavation in the spillway and discharge
channels; constructing the closure section of the dam; placing rock
fill on the downstream terrace and on the banks of the spillway chan-
nel; pressure grouting in the main dam and east wall of the spillway;
placing concrete in the spillway, stilling basin, intake structure, and
the service bridge abutments and deck. The structural steel and
girders for the service bridge were assembled and erected and the gates
and gate operating machinery were installed. The main dam em-
bankment was carried to approximately elevation 410, and the intake
structure was completed.
64        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                   1942

   The work involved the excavation of approximately 1,880,000 cubic
yards of ordinary material; 245,000 cubic yards of rock excavation;
the placing of 1,221,000 cubic yards of rolled fill, 280,000 cubic yards
of rock fill, 80,000 cubic yards of sand and gravel in the embankment
for filters and backing, and 31,700 cubic yards of concrete in the re-
taining walls, spillway, stilling basin, intake structure, and service
bridge.
   A total of 2,044.59 acres of land has been acquired in the reservoir
area, of which 354.43 acres were acquired during the fiscal year. The
relocation of,about 7.86 miles of highway in the city of Franklin and
towns of Hill and Bristol, including the erection of a frame bridge
and an arch bridge was completed by the State of New Hampshire.
All cemeteries in the reservoir areas have been relocated.
   The total costs during the fiscal year, including contract operations,
land acquisition and relocations, were $2,137,860.56. The expenditures
were $2,267,743 65.
   Condition at end of fiscal year.--The existing project for the Frank-
lin Falls Reservoir is about 89 percent complete. The contract for
the construction of the dam and appurtenant works is about 95 percent
complete; the relocation of power lines is about 89 percent complete;
and the acquisition of land for the reservoir and borrow areas is about
77 percent complete. Final plans and specifications, and clearing of
the dam site and borrow areas are complete.
   The costs to date from regular funds have been $6,539,545.12. The
expenditures have been $6,159,391.95.
   Proposed operations.-Thebalance unexpended, including accounts
receivable, at the end of the fiscal year, amounting to $1,260,598.85
regular funds will be applied as follows:
Accounts payable, June 30, 1942--------------------------------- $409, 116. 24
New work: Completion of construction of dam and appurtenant
  works, including operating house superstructure and spillway;
  and completion of construction of embankment of terrace sections
and river sections to elevation 416, under contract; period July 1,
  1942, to Nov. 30, 1942_---------- ------------------------------- 311, 070. 22
Acquisition of lands, rights-of-way (hired labor) _                     325, 926. 80
Relocation of power lines and acquisition of town roads, bridges,
  and water supply (hired labor) --------------------------              194, 485. 59
       Subtotal, new work------------------------------------1, 240, 598. 85
Maintenance: Maintenance of Franklin Falls Dam-- -------------            20, 000. 00
       Total__-----------------------------------------_             1,.260, 598. 85
  The sum of $20,000 can be profitably expended during the fiscal year
1944 for maintenance of the dam and appurtenant structures.
                             Cost and finanbial summary
(ost of new work to June 30, 1942---------                            $6, 539, 545. 12
Cost of maintenance to June 30, 1942------------------
       Total cost of permanent work to June 30, 1942--------------     6, 539, 515.   12
Undistributed costs June 30, 1942------------------------------            20, 972.   27
       Net total cost to June 30, 1942---------------------------      6, 560, 517.   39
Plus accounts receivable June 30, 1942--------------------------            7, 990.   80
       Gross total costs to June 30, 1942-------------------------     6, 568, 508.   19
Minus accounts payable June 30, 1942--------------------------            409, 116.   24
       Net total expenditures-                                         6, 159, 391.   95
Unexpended balance June 30, 1942                                       1, 252, 608.   05
       Total amount appropriated to June 30, 1942---------             7, 412, 000.   00
                 RIVERS          AND HARBORS-BOSTON,                           MASS.,         DISTRICT                    65

   Fiscal year ending June 30                       1938        1939             1940             1941             1942

Cost of new work                 _ --------------
                       ___-----------_                      $160, 337. 55 $1, 068,935. 23 $3, 172, 411. 78     $2, 137,860.56
Cost of maintenance             -     ---                  ------              ------------------ ------- ------
Total expended-----------               --------------       155,462. 38       828,061.81     2,908, 124. 11    2, 267, 743. 65

Allotted_-----     -------------------------               5, 285, 000. 00   1, 400, 000.00     575, 000.00       152, 000.00



Balance unexpended July 1, 1941_-------------------------         $3, 368, 351. 70
Amount allotted from War Department Civil Ap-
propriation Act approved May 23, 1941___   __--$200,     000. 00
Amount allotted from War Department Civil Ap-
  propriation Act approved Apr. 28, 1942---------     20, 000. 00
                                                                      220, 000. 00

     Amount to be accounted for_ _ _ ___ __________------                                                 3, 588, 351. 70
Deductions on account of revocation of allotment                                                                  000. 00
                                                                                                              6__________---68,

       Net amount to be accounted for______-_____----_                                                    3, 520, 351.70
Gross amount expended-------------------           $2, 307, 878. 43
Less :
    Reimbursements collected--------$35, 767. 08
    Receipts from sales -----------   - 4, 367. 70
                                                        40, 134. 78
                                                                                                          2, 267, 743. 65
      Balance unexpended June 30, 1942__--------------------                                              1, 252, 608. 05
Outstanding liabilities June 30, 1942__________-- $409, 116. 24
Amount covered by uncompleted contracts--------    344, 986. 42
                                                                                                               754, 102. 68
     Balance available June 30, 1942 _____________________                                                     498, 505.39'
Accounts receivable June 30, 1942-----------------------------                                                   7, 990. 80'
          Unobligated balance available June 30, 1942______________                                            506, 496. 19
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance--------------------------------                                                     20, 000. 00
   1 Exclusive of available funds.

      19. BLACKWATER RESERVOIR, MERRIMACK RIVER BASIN, N. H.

  Location.-The dam site of the reservoir is located on the Black-
water River in New Hampshire, 8.2 miles above the confluence with the
Contoocook River and 118.8 miles above the mouth of the Merrimack.
The reservoir lies within the towns of Webster and Salisbury in the
county of Merrimack, the dam being situated just above the village of
Swetts Mills in Webster, 12.5 miles by highway northwest of Concord,
N. H.
    'Existing project.-The dam is
dumped-rock toe and a dumped-rock blanket on the upstream face, 750
                                                                    of the rolled-earth type, with a

feet long at the top, with a maximum height of approximately 60 feet
and a top width of about 39 feet containing about 239,000 cubic yards
of earth and rock fill. A gravity-type spillway, 240 feet long, 55 square
feet of gate-controlled and 22.5 square feet of ungated outlet conduits,
and a 16-foot diameter penstock intake, involving 24,300 cubic yards of
concrete have been constructed. The reservoir will provide a storage
capacity of 46,000 acre-feet and control a drainage area of 127.5 square
miles. The estimated cost, revised in 1942, is $1,193,000.00. The proj-
ect is a unit of the comprehensive plan for flood-control and other
66      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                 1942

  purposes in the Merrimack River Basin which was authorized by the
  Flood Control Act approved June 22, 1936, and modified by the Flood
  Control Act approved June 28, 1938.
     Local cooperation.-Section 2 of the Flood Control Act approved
  June 28, 1938, applies.
     Operationsand results during fiscal year.-Construction of the dam,
  dikes, and appurtenant works was commenced by continuing contract
  on April 23, 1940. The contract operations during the fiscal year con-
  sisted of placing earth and dumped rock fill in the main dam to finished
grade; completing concrete operations in the penstock intake spillway
  section; training walls and equipment room; excavating rock to grade
  in the discharge and approach channels; and topsoiling and seeding the
  dam embankment. The operations involved the excavation of
  approximately 26,000 cubic yards of ordinary material and 9,430 cubic
  yards of rock, the placing of 3,000 cubic yards of rolled fill and 4,600
. cubic yards of concrete. All contract operations were completed on
  November 22, 1941.
     The relocation of cemeteries in the reservoir area was continued by
  contract. An agreement was made on February 8, 1940, with the State
  of New Hampshire, for the relocation of 3.04 miles of state highway
  between the villages of Webster and Warner, New Hampshire, and
  between Webster and Swetts Mills, New Hampshire, and highway con-
  nections thereto. Contract operations under this agreement were con-
  tinued during the fiscal year. A total of 2,160.6 acres of land has been
acquired in the reservoir area, of which 128.7 acres have been acquired
  during the fiscal year.
     The costs during the fiscal year have been $352,336.16, of which
  $351,123.06 was for new work and $1,213.10 was for maintenance.
  The expenditures were $402,322.04 for new work.
     Condition at end of fiscal year.-Contract plans and specifications
  are complete. The contract for the construction of dam, dike, and
  appurtenant works is 100 percent complete. The relocation of high-
  ways is about 91 percent complete. The relocation of the cemeteries
  is 77 percent complete. The acquisition of lands and rights-of-way
  for the dam site and reservoir area is about 79 percent complete.
     The existing project is about 91 percent complete. The total costs
  for new work have been $1,074,237.58 and $1,213.10 for maintenance.
  The expenditures'have been $1,066,786.70 for new work.
     Proposed operations.-The balance unexpended at the end of the
  fiscal year, amounting to $135,213.30 regular funds, will be applied as
  follows :
Regular funds:
    Accounts payable, June 30, 1942------- -------------------          $8, 663. 98
    New work:
        Acquisition of lands and rights-of-way (hired labor) --------    39, 869. 89
        Relocation of highways, by agreement with the State of New
          Hampshire      --------------------------------------          60, 179. 43
        Relocation of cemeteries and power line, by contract-------      17, 500. 00
           Subtotal, new work------------------------------   126, 213. 30
     Maintenance: Maintenance of Blackwater Dam--------------- 9, 000. 00
       Total        -                    ----   ------------            135, 213. 30
                RIVEiRS AND HARBORS-BOSTON,                                               MASS., DISTRICT                                  67
  The sum of $9,000 can be profitably expended during the fiscal year
1944 for maintenance of the dam and appurtenant structures.
                                          Cost and financial summary

Cost of new work to June 30, 1942----------------- ..-----                                                               $1, 074, 237. 58
Cost of maintenance to June 30, 1942_ _-------------------------                                                               1, 213. 10

      Total cost of permanent work to June 30, 1942-                                                                         075, 450. 68
                                                                                                                          1----------,
Minus accounts payable June 30, 1942                                _________-------                     -----                  8, 663. 98

                          ---------------------------------- 1, C66, 786. 70
     Net total expenditures_
                                ------------------------------
Unexpended balance June 30, 1942__    _                          35, 213. 30

           Total amount appropriated to June 30, 1942-.....-----                                                          1, 202, 000. 00

   Fiscal year ending June 30                      1938                 1939                1940                  1941              1942


Cost of new work.----------------     _                                                 $151, 444. 44      $571, 670. 08          $351,123.06
Cost of maintenance-          -                -               -           -            --                     -                     1, 213. 10

                          ..   ..
      Total cost________________...       ..        ..    ..       ..     ..    .        151, 444. 44       571, 670.08           352, 336.16

Total expended ________     ___116,                                                           914. 82       547, 549. 84          402, 322. 04

Allotted                                                                               1, 300, 000. 00    -175,     000. 00         77, 000. 00



Balance unexpended July 1, 1941________________                                                          _____                $460, 535. 34
Amount allotted from War Department Civil Appro-
priation Act approved May 23, 1941_______________                                                 $68, 000. 00
Amount allotted from War Department Civil Appro-
priation Act approved Apr. 28, 1942-__-_____-__-                                                    9, 000. 00
                                                                                                                                77, 000. 00
      Amount to be accounted for-------------------------------                                                                537, 535. 34
Gross amount expended--------------------------$408, 803. 61
Less:
    Reimbursements collected-----------$5, 770. 17
    Receipts from sales-----------------   711. 40
                                                     6, 481. 57
                                                                                                                               402, 322. 04

      Balance unexpended June 30, 1942 -----------------------                                                                 135, 213. 30
Outstanding liabilities June 30, 1942..-------------- $8, 663. 98
Amount covered by uncompleted contracts ---------      0, 179. 43
                                                                                                                                68, 843.41

           Unobligated balance available June 30, 1942---------------                                                           66, 339. 89
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance '---------------------------                                                                     9, 000. 00
1 Exclusive of available funds.

                   20. LOWELL, MERRIMACK RIVER BASIN, MASS.

   Location.-The project is located on the left (north) bank, 39 miles
above the mouth of the Merrimack River in the city of Lowell, Middle-
sex County, Mass. The site is 25 miles northwest of Boston, Mass.
   Existing project.-The project consists of about 5,100 linear feet of
earth dike, sheet piling, and concrete wall, which will furnish protec-
tion to 930 acres of urban land in the Lakeview Avenue and Rosemont
sections of Lowell, Mass., and will include two pumping stations, on
West Street and Beaver Street, to carry the sanitary and storm-water
68       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                     1942

flow through the dikes during flood periods. The estimated cost is
$465,000 for construction and $90,000 for lands and damages. The
project is a unit of the comprehensive plan for flood control and other
purposes in the Merrimack River Basin which was authorized by the
Flood Control Act approved June 22, 1936, and modified by the Flood
Control Act approved June 28, 1938. Prior to the foregoing author-
ization, under provisions of the Emergency Relief Appropriation Act,
approved April 8, 1935, the sum of $794,373.46 was expended for en-
larging the available waterway at various places to provide adequate
channel capacity for flood discharge. For further details, see page 77
of the Annual Report for 1940.
   Local cooperation.-Section 3 of the Flood Control Act approved
June 22, 1936, applies. The city of Lowell, by resolution passed by
the city council and approved by the mayor on October 16, 1940, will
provide the necessary lands, rights-of-way, and sewer relocations in
accordance with the previously cited section 3 of the 1936 Flood Con-
trol Act.
   Operationsand results during fiscal year.-Constructionof the dikes
and pumping stations was commenced by continuing contract on July
23, 1941. The contract operations during the fiscal year consisted of
constructing the rolled fill earth dikes, reinforced-concrete flood walls
and pumping-station substructures, the brick masonry pumping-sta-
tion superstructures, and installing operating equipment. The oper-
ations involved the excavation of 66,000 cubic yards of material other
than rock, the placing and compacting of 55,000 cubic yards of fill,
the placing of 2,950 cubic yards of concrete and the driving of 35,000
square feet of steel sheet piling.
   The costs from regular funds have been $349,376.39. The expendi-
tures were $256,913.40.
   Condition at end of fiscal year.-Contract plans and specifications
are complete. The concrete flood walls have been completed. The
pumping stations are substantially complete except for the installa-
tion of pumping, heating, electrical, and plumbing equipment. The
earth dikes are complete except for topsoiling and seeding operations.
   The costs to date from regular funds have been $358,610.75. The
expenditures were $265,831.71.
   Proposedoperations.-The balance unexpended, including accounts
receivable, at the end of the fiscal year, amounting to $199,176.63, will
be applied as follows:
Accounts payable, June 30, 1942---------------------------- $92, 787.38
New work:
    Furnishing the balance of the pumping equipment for West St.
      and Beaver St. pumping stations, by contract; period July 1
       to Dc. 1, 1942 ___        _______                        _                064. 13
                                                                            6--------------0,
     Completion of the earth dikes and pumping stations, including the
      installation of pumping, electrical, heating, and plumbing
      equipment in West St. and Beaver St. pumping stations;
      period July 1 to Dec. 30, 1942 __________----- _   ______---          46, 325. 12
         Total--------------           _____------------------------------ 199, 176. 63
  No funds can be profitably expended during the fiscal year 1944 as
the project will be completed with the available funds.
                RIVERS AND HARBORS-BOSTON,                         MASS.,         DISTRICT                    69
                                  Cost and financial summary

Cost of new work to June 30, 1942______----__--------------------                             $358, 610. 75
Cost of maintenance to June 30, 1942__________-------------                                   ----------

      Total cost of permanent work to June 30, 1942 _____-------                                  358, 610. 75
Plus accounts receivable June 30, 1942__--- ---------------------                                        8. 34

     Gross total costs to June 30, 1.942----------------------                                    358, 619. 09
Minus accounts payable June 30, 1942_______---------------                                         92, 787. 38

     Net total expenditures__ ___..-------------------_                                           265, 831. 71
Unexpended balance June 30, 1942_________               _
                                           -----------------                                      199, 168. 29

            Total amount appropriated to June 30, 1942____________---                             465, 000. 00

    Fiscal year ending June 30          1938         1939            1940            1941              1942

Cost of new work___________ ___ ________ ____ __            _                  $9, 234. 36           $349, 376. 39
C ost of maintenance- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --            - - - - - -
Total expended _______________________________                                        , 918. 31       256, 913. 40
Allotted-          _                -          -     - -           $14, 000. 00    411, 000. 00        40, 000. 00


Balance unexpended July 1, 1941_______________--_---------  $416, 081.69
Amount allotted from War Department Civil Appropriation Act
approved May 23, 1941_ ________________________              40, 000. 00
            Amount to be accounted for___________             __        __-____-----              456, 081. 69

Gross amount expended______________________---_ $257, 004. 85
Less reimbursements collected__________- - -_______-   91. 45
                                                                                                  256, 913. 40
      Balance unexpended June 30, 1942_      ---------------------- _ 199, 168. 29
Outstanding liabilities June 30, 1942__________________ $92, 787. 38
Amount covered by uncompleted contracts -------------- 97, 268. 11
                                                                      190, 055. 49

      Balance available June 30, 1942____          _---__  __-----9,112. 80
Accounts receivable June 30, 1942____-_________________________        8. 34

            Unobligated balance available June 30, 1942________-----                                9, 121. 14
21. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL

  There were no costs and expenditures during the fiscal year 1942.
The sum of $20,000 allotted in August 1942 will be applied as needed
during the fiscal year 1943 to payment of expenses incurred under
this heading.
                                  Cost and financial summary
Cost of new work to June 30, 1942     ___________________________ _______
Cost of maintenance to June 30, 1942___________---_________--_  __ $147, 500
       Total cost of permanent work to June 30, 1942______________       147, 500
Net total expenditures__                                                 147, 500
                                                                -------------
Total amount appropriated to June 30, 1942 ------ ------------------- _ 147, 500
70          REPORT OF CHIEF OF ENGINEFRS,                                         U.       S. ARMY,                1942


   Fiscal year ending June 30             1938             1939                     1940                    1941                1942

Cost of new work ..-------                        ----                                                                      -
Cost of maintenance-----------         --------------      --------------------                             $147, 500 ---
Total expended--------------------------                 ----------       ------                             147, 500-
Allotted_ --------------------------------                     - -147,                                             500



Amount allotted in August 1942_-__________---     -          _-----                                                         $20, 000
Amount available during the fiscal year 1943______________________                                                           20, C00

Status of all investigations for flood control called for by flood-control acts and
                              committee resolutions

                                                                          Date trans-                     Document       Recommen-
               Locality                     Authorization act              mitted to                       number          dation
                                                                           Congress

Androscoggin River, Maine _--_--.         Flood Control Com-              .............................
                                                                  mittee resolution,
                                                                  Mar. 27, 1936.
    Do ..           _...----------------------- Commerce Commit-
                                                                 tee resolution, Mar.
                                                                 28, 1936.
    Do__----------------------- Flood Control Act,
                                                                 June 22, 1936.
Androscoggin River and tributaries, Flood Control Act,
  Maine and N. H.                                                 June 25, 1936.
Kennebec River, Maine....----------                             Commerce Commit-
                                                                  tee resolution, Mar.
                                                                  28, 1936.
Kennebec River and tributaries, Flood Control Act,
  Maine                                                          June 20, 1936.
Kennebec River, Maine .....----------                           Flood Control Act,
                                                                 June 22, 1936.
Merrimack River, Mass., and River and Harbor,
 ,N. H., improvement for naviga-                                 Act June 20, 1938.
  tion, flood control and water
  power.
Saco River, Maine_ -------------- Flood Control Com- Mar. 20, 1942 ------------- Unfavorable.
                                                                  riittee resolution,
                                                                  Mar. 27, 1936.
    Do ....          -----------------------                    Commerce Commit- -... do..-------...-------------- Do.
                                                                 tee resolution, Mar.
                                                                 28, 1936.
    Do............---------...............--------------------. Flood Control Act, ----.. do--------------------o.
                                                                 June 22, 1936.


     IMPROVEMENT OF RIVERS AND HARBORS IN THE
             PROVIDENCE, R. I., DISTRICT
  This district comprises western New Hampshire, eastern Vermont,
western and southeastern Massachusetts, all of Rhode Island, all of
Connecticut except a small portion along its western boundary, and
small portions of southeastern New York embraced in the drainage
basins tributary to Long Island Sound and the Atlantic Ocean east
of the New York-Connecticut State line and south of Nauset Harbor
on the east coast of Cape Cod, exclusive of the watershed tributary to
the head of Buzzards Bay, Mass., north of Butlers Point and Scraggy
Neck. It also includes Fishers Island, N. Y.
  District engineer: Lieut. Col. Harley Latson, Corps of Engineers,
to September 29, 1941; Lieut. Col. Leonard B. Gallagher, Corps of
Engineers, acting district engineer from September 30 to October 31,
1941; Col. H. S. Bishop, Jr., district engineer from November 1, 1941.
   Division engineer: North Atlantic division, Col. John N. Hodges,
           RIVERS AND     HARBORS-PROVIDENICE,             R. I.,    DISTRICT     71
Corps of Engineers, to April 30, 1942; New England division, Col.
Leonard B. Gallagher, Corps of Engineers, from May 1, 1942.
                                      IMPROVEMENTS

                Navigation                            Navigation--Conitnued
                                        Page                                      Page
1.   Pollock Rip Shoals, Nan-                 33. Examinations, surveys and
2.
        tucket Sound, Mass -...
      Chatham (Stage) Harbor,
                                        71           contingencies (general)---   131
                                               34. Other projects for which no
3.
        Mass
      Harbor of refuge at Nan-
                                        73           estimates are submitted --   132
                                               35. Plant allotment    ___         133
        tucket, Mass_                   74
4.   Cross Rip Shoals, Nantucket                           Flood control
        Sound, Mass____________          76
5.   Edgartown Harbor, Mass___          77    36. Connecticut River Basin,
6.   Vineyard    Haven Harbor,                     Vt., N. H., Mass., and
         Mass_ _                         78          Conn-__    --       ____     134
7.   New Bedford and Fairhaven             37. Claremont Reservoir, Con-
        Harbor, Mass________            79        necticut    River      Basin,
8.   Westport River, Mass __..         82        N. H-_                          137
9.   Fall River Harbor, Mass --        83. 38. Union    Village    Reservoir,
10.   Taunton River, Mass -----         85        Connecticut River Basin,
11.   Newport Harbor, R. I -_--         86        Vt _----- - - - -               138
12.   Providence River          and         39. Surry Mountain Reservoir,
        Harbor, R. I____                88        Connecticut River Basin,
13.   Pawtucket (Seekonk) River,                  N. H--_------       --- -_      139
        R.L         --     ---          90 40. Birch Hill Reservoir, Con-
14.   Harbor of refuge at Point                   necticut River Basin, Mass_     142
        Judith, R. I___________         92 41. Knightville Reservoir, Con-
15.   Harbor of refuge at Block                   necticut    River      Basin,
        Island, R. I___                 94        Mass_                           144
16.   Great Salt Pond,       Block          42. Tully Reservoir, Connecticut
        Island, R. I_____________       96        River Basin, Mass -..           146
17.   Pawcatuck River, R. I. and            43. Hartford, Connecticut River
         Conn__                         97        Basin, Conn_                    148
18.   Mystic River, Conn ____-_         99 44. East Hartford, Connecticut
19.   New London Harbor, Conn-         101        River Basin, Conn- --           152,
20.   Thames River, Conn_-_ __         102 45. Springfield,      Connecticut
21.   Connecticut     River below                 River Basin, Mass ......        155
        Hartford, Conn __        -     105 46. West Springfield, Connecti-
22.   Duck Island Harbor, Conn__       108        cut River Basin, Mass ___       157
23.   Branford Harbor, Conn _ -_       110  47. Chicopee, Connecticut River
24.   New Haven Harbor, Conn__         111        Basin, Mass___                  159
25.   Breakwaters at New Haven,             48. Holyoke, Connecticut River
        Conn-----------------          114        Basin, Mass_______------        160
26.   Milford Harbor, Conn- -.-        115  49. Northampton,      Connecticut
27.   Housatonic River, Conn --        117        River Basin, Mass_____          162
28.   Bridgeport Harbor, Conn___       119 50. Preliminary examinations and
29.   Southport Harbor, Conn -.        123        surveys for flood control__     164
30.   Norwalk Harbor, Conn -           124 51. Other flood-control projects
31.   Stamford Harbor, Conn ...        126        for which no estimates are
32.   Greenwich Harbor, Conn___        130        submitted-___-------_           165

           1. POLLOCK RIP SHOALS, NANTUCKET SOUND, MASS.

  Location.-Pollock Rip Channel is the northerly passage through
the shoals off the eastern entrance to Nantucket Sound connecting the
deep water of the sound with that of the ocean. It is about 33 miles
east from the harbor of Vineyard Haven, on the island of Marthas
Vineyard, Mass., and 60 miles south from Provincetown Harbor at the
northern extremity of Cape Cod. (See U. S. Coast and Geodetic
Survey Chart No. 250.)
  Existing project.-This provides for dredging through the shoals
at the eastern entrance to Nantucket Sound with a Government dredge,
which is to assist the natural agencies in obtaining such depth and
72          REPORT OF CHIEF OF ENGINEiRS, i..BS. ART~MY                               1942

width as may be found practicable, but not exceeding at depth of 30
feet at mean low water and a width of 1 mile. The mean tidal ranges
are about 3.7 feet at Monomoy Point, the nearest land, and 6.7 feet
at Chatham Light, about 9 miles to the north of this point. The
ranges of spring tides at these two points are 4.4 and 7.9 feet. The
ranges are largely affected by direction and force of storms. The
original expenditure authorized for experimental work was $250,000,
and later the operation of a dredge was authorized at an estimated
annual cost of $200,000.
   The estimated cost, revised in 1928, of providing a channel of suitable
-dimensions was $1,100,000 for new work and $30,000 for annual
maintenance.
   The existing project was authorized by the following river and
harbor acts:

     Acts                         Work authorized                                  Documents


July 25,1912   Experimental dredging through the shoals to determine if   H. Doe. No. 536, 62d Cong.,
                a channel could be secured and maintained not over 30      2d sess.
                feet deep and not over 1 mile wide.
July 27,1916   Continuation of work with a Government-owned hopper        Rivers and Harbors    Com-
                dredge.                                                    mittee Doc. No. 3, 64th
                                                                            Cong., 1st sess.



  The latest published map is in the Annual Report for 1915, page
2056.
  Terminal facilities.-None.
  Operations and results during fiscal yar.-None.
  Condition at end of fiscal year.-The existing project was completed
in 1925. The depths previously secured over the northern tongue of
the Stone Horse Shoal have been maintained. A cut 2,000 feet wide
has been dredged through Bearse and Pollock Rip Shoals. In Octo-
ber 1941 the controlling depth at mean low water was 30 feet for a
width of about 1,500 feet, and about 16 feet along the north edge of
the 2,000-foot channel. The costs and expenditures under the existing
project have been $1,083,504.41 for new work, and $660,012.15 for
maintenance, a total of $1,743,516.56.
  Proposed operations.-Itis proposed to apply the funds unexpended
on June 30, 1942, amounting to $66,562.90 on maintenance operations
with a United States seagoing hopper dredge, about 2 months, in
the fall of 1942, with necessary surveys.
  The sum of $75,000 can be profitably expended during the fiscal year
1944 for maintenance operations with a United States seagoing hopper
dredge for about 3 months in the spring of 1944.
                                Cost and financial snrnmary

Cost of new work to June 30, 1942__---___                       -_________    $1,083, 504.41
Cost of maintenance to June 30, 1942--__
                                    --                      -         -__________660, 012. 15
        Total cost of permanent work to June 30, 1942               ____     -__      1, 743, 516. 56
Net total expenditures ... _____--.....__-_                                           1, 743, 516. 56
Uniexpended balance June 30, 1942- -------------------                                    66, 562. 90
        Total amount appropriated to June 30, 1942-----                         -1, 810, 079. 46
                                                                             --...
             RIVERS       ANhID HAiRBOI S-PROVIDENCE,                           R.        I.,   DISTRICT


   Fiscal year ending J~re 30                 1138            1939           1940                 1941                1942


Cost of new work            --------------       ---      --------------                                  --------------
Cost of maintenance_------------$52, 400. 00              $107, 850. 76    $55,079. 59           $1, 409. 87

Total expended_-----------------             52, 400.00     83, 248. 92     60, 269.15           20, 822. 15   ---
                                                                                                               -


Allotted....----------------------       102, 147. 08      145, 000. 00     50, 000. 00         -2, 896. 88           -$11, 200



Balance unexpended July 1, 1941----------------------------                                                    $77, 762. 90
Deduct~ns on account of revocation of allotment----------------                                                 11, 200. 00

      Net amount to be accounted for-- -----------------------                                                     66, 562. 90
Balance unexpended June 30, 1942-------            -----------------                                               66, 562. 90

Amount that can be profitably expended      in fiscal year ending June
                            1     - - - - - - - - - - - - - - - -- - - - - - - - - - -
30, 1944, for maintenance -----                                                       -                           75, 000. 00
  1 Exclusive of available funds.

                         2. CHATHAM (STAGE)                          HARBOR, MASS.

   Location.-At the northeastern corner of Nantucket Sound. It is
about 15 miles east of Hyannis Harbor, Mass., and 66 miles south of
Provincetown Harbor at the northern extremity of Cape Cod. (See
U. S. Coast and Geodetic Survey Chart No. 1299.)
   Existing project.-This provides for a channel 6 feet deep at mean
low water through the bars at the entrance to the harbor, 200 feet wide
at the outer bar, 150 feet wide at the middle bar, and 100 feet wide at
the inner bar. The mean tidal range is 3.8 feet and the maximum
range, due to the combined effects of wind and other causes, about 7
feet.
   The estimate of cost for new work, revised in 1897, was $13,732.39.
There is no approved estimate for annual cost of maintenance.
   The existing project was authorized by the River and Harbor Act
of September 19, 1890 (Annual Report for 1889, p. 599). (For latest
published map, see H. Doc. No. 456, 77th Cong., 1st sess.)
   Recommended modification of project.-Under date of August 21,
1941, the Chief of Engineers recommended modification to provide an
entrance channel 10 feet deep at mean low water and 150 feet wide at
an estimated first cost of $87,000, with annual maintenance of $4,000,
subject to certain conditions of local cooperation (H. Doc. No. 456,
77th Cong., 1st sess.).
   Terminal facilities.-There are two commercial wharves on the
north side of the inner harbor. The facilities are considered adequate
for the existing commerce.
   Operations and results during fiscal year.--Maintenance dredging
through the bars in the entrance channel, by contract, was in progress
from July 5 to August 23, 1941. During the period 19,748 cubic yards,
place measure, of material were removed at a cost of $17,605.91 for
maintenance. Expenditures were $17,648.54.
   Condition at end of fiscal year.-The existing project was completed
in 1901. The controlling depth over the outer and inner bars was
6 feet at mean low water, as determined in August 1941. The costs and
expenditures have been $7,888.95 for new work and $41,745.37 for
maintenance, a total of $49,634.32.
   Proposed operations.-No funds are available and no operations are
contemplated during the fiscal years 1943 and 1944.
74           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                       1942

                                      Cost and financial summary
Cost of new work to June 30, 1942_ ----- _____                        -__-___- ____               $7, 888. 95
Cost of maintenance to June 30, 1942 -----------
                                               _--                      -------                   41, 745. 37
      Total cost of permanent work to June 30, 1942_.-...- --- __.                                49, 634. 32
Net total expenditures-_______- __-____________                                                   49, 634. 32
Total amount appropriated to June 30, 1942_ __-__-------       --__                               49, 634. 32

     Fiscal year ending June 30          1938          1939           1940           1941            1942

Cost of new work -----------------.-----------                                -        .0.
Cost of maintenance ____________ ______________ ______________ ______________         $457. 05      $17, 605. 91
Total expended_______________         ___________                                      414. 42       17, 648. 54
Allotted ...-----------------------             ---                                 24, 400.00      -6,   337.04



Balance unexpended July 1, 1941____ ________                                                     $23, 985. 58
Deductions on account of revocation of allotment___________--                                _     6, 337. 04

      Net amount to be accounted for__    ___-    ______-                               ____      17, 648. 54
Gross amount expended_________-_    ________________                                              17, 648. 54

                    3. HARBOR OF REFUGE AT NANTUCKET, MASS.

   Location.-On the north shore of Nantucket Island about 28 miles
east-southeast from Vineyard Haven, Mass. (See U. S. Coast and
Geodetic Survey Chart No. 343.)
   Previous projects.-Adopted by the River and Harbor Act of March
2, 1829. For further details see page 1747, Annual Report for 1915.
   Existing project.-This provides for a channel 15 feet deep at mean
low water, without prescribed width, through the bar at the entrance,
and for converging jetties of riprap, 6,987 feet and 5,755 feet long, on
the east and west sides, respectively, of the entrance. The mean range
of the tide is 3.1 feet, and the maximum range due to the combined
effect of wind and other causes is 5 feet or more.
   The estimate of cost for new work, revised in 1931, is $522,500, ex-
clusive of amounts expended under previous project. The latest (1928)
approved estimate for annual cost of maintenance is $10,000.
   The project was authorized by the following river and harbor acts:

     Acts                              Work authorized                                       Documents


June 14,1880       West jetty.    _   - -         -                              H. Doc. No. 18, 46th Cong.,
                                                                                  2d sess., and Annual Re-
                                                                                  port for 1880, p. 423.
Aug.     5, 1886   East jetty and dredging when necessary-      _--          _   Annual Report for 1885, p.
                                                                                  579.


  For latest published map see H. Doc. No. 115, 77th Cong., 1st sess.


   Recommended modifications of project.-Under date of November
14, 1940, the Chief of Engineers recommended modification of the
existing project so as to provide an anchorage area of about 50 acres
on the east side of the harbor opposite the wharves, about 2,800 feet
long, 300 to 1,100 feet wide, and 15 feet deep at mean low water; a
              RIVERS AND HARBORS--PROVIDENCE,                                            R.    I.,      DISTRICT                       75
fairway of the same depth extending southward through the harbor
along the west side of the anchorage to a point about 2,700 feet solth,
of Brant Point, at an estimated first cost of $63,000, with $1,500 an-
nually for maintenance in addition to that now required, and subject
to certain conditions of local cooperation (H. Doc. No. 115, 77th Cong.,
1st sess.).
   Local cooperation.-None required by law. The Commonwealth of
Massachusetts and local interests have expended for dredging and
boulder removal inside the harbor about $130,000.
   Terminal facilities.-These consist of four piers affording about
3,000 feet of berthing space. Facilities are considered adequate for
present commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.--The existing project was about
87 percent completed. The east jetty was completed in 1907 and the
channel in 1930. The jetties have been built to varying heights and
cross sections with a view to controlling and regulating scour between
them. The west jetty is in need of repairs; the east jetty is in good
condition. The controlling depth at mean low water in the channel
was 15 feet in the central 150 feet and about 9 feet on the edges, as
determined in April 1941. To complete the project would require
extension of the west jetty by about 800 feet and enlargement of 400
feet of the existing construction near its outer end to full section.
Widening of the channel and enlargement of the east jetty section
may be accomplished under the existing project if necessary. The
costs and expenditures under the existing project have been $456,-
42 25 for new work and $271,648.53 for maintenance, a total of
$728,130.78.
   Proposed operations.--Itis proposed to apply the funds unexpended
on June 30, 1942, amounting to $26,000, in maintenance dredging by
contract in May and June 1943, about 40,000 cubic yards of mud and
sand from the entrance channel.
   The sum of $30,000 can be profitably expended during the fiscal year
1944 on repairs to the west jetty at the entrance to the harbor, by
contract, placing about 3,850 long tons of stone.
                                    Cost and fin ancial summary
Cost of new work to June 30. 1942____________________________                                                          $502, 317. 00
Cost of maintenance to June 30, 1942_____________________-____                                                          271, 648. 53

         Total cost of permanent work to June 39, 1942___                                              __               773, 965. 53
Net total expenditures____________________________                                                                      773, 965. 53
Unexpended balance June 30, 1942________________________________                                                         26, COO. 00

         Total amount appropriated to June 30, 1942_________________                                                        799, 965. 53

   Fiscal year ending June 30                 1938               1939              1940                     1941                1942

Cost of new work                         --              -----------     --- -------------------------                 - --------------
Cost of maintenance     -------      .                 -- ---
                                               ..----------          -   - --------------          - --              .
                                                                                                                   --..  .     .   .
Total expended -                                                                    --        --

Allotted_..                                                                                                                       $26, 000
                                I                    ----   I               I                      I                    I
76           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                  1942

Amount allotted from War Department Civil Appropriation Act ap-
  proved Apr. 28, 1942-------------------------------------$26, 000. 00
Balance unexpended June 30, 1942-------------                   26, 000. 00

Amount (estimated)- - required     to be-- -appropriated
                                               -
                                                                for completion- -of- -
                                                      - - - - - - -- --- -- - - - -
existing project 1 - - - - - - - - - - - - -             --                                   66, 000. 00
Amount that can be profitably expended in fiscal year ending June 30,
                                                                                    - -----
1944, for maintenance - - - - - - - -- - - - - - - - - - - - - - - - - - - - - -              30, 000.00
   1   Exclusive of available funds.

                 4. CROSS RIP SHOALS, NANTUCKET SOUND, MASS.

   Location.-Nantucket Sound lies south of Cape Cod and north of
Nantucket and the eastern part of Martha's Vineyard. Cross Rip
Shoals are a little southerly and easterly of the geographical center of
the sound. They are about 17 miles east from Vineyard Haven on the
island of Marthas Vineyard and about 15 miles northwest from Nan-
tucket Harbor. (See U. S. Coast and Geodetic Survey Chart No. 1209.)
   Existing project.-This provides for a channel 4,000 feet wide and
30 feet deep at mean low water between Half Moon Shoal and Cross
Rip Shoal, about 1.7 miles. The mean tidal range is about 2 feet and
the maximum range, due to the combined effect of wind and other
causes, is 3 feet or more.
   The estimate of cost for new work, made in 1928, was $27,000. The
latest (1928) approved estimate for annual cost of maintenance is
$4,000. The existing project was authorized by the River and Harbor
Act of July 3, 1930 (H. Doc. No. 182, 70th Cong., 1st sess.). The latest
published map is in the project document.
   Terminal facilities.-None.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.--The existing project was completed
in 1931. In April 1941 the controlling depth was 30 feet at mean
low water except for minor shoals with a minimum depth of 26 feet
along the edges. The costs and expenditures under the existing project
have been $24.200.13 for new work and $40,737.07 for maintenance, a
total of $64,937.20.
   Proposed operations.-Itis proposed to apply the funds unexpended
on June 30, 1942, amounting to $7,500 in maintenance operations with
a United States seagoing hopper dredge for about 10 days in the fall
of 1942, with necessary surveys.
   No additional funds can be profitably expended during the fiscal
year 1944 as the completion of the above work will leave the channel
in satisfactory condition for use during that period.
                                   Cost and financial summary
Cost of new work to June 30, 1942-......                                                      $24, 200. 13
Cost of maintenance to June 30, 1942_____ ___________________                                  40, 737. 07

          Total cost of permanent work to June 30, 1942---------------- 64,937.20

Net total expenditures____     _____---------------_                     64, 937. 20
Unexpended balance June 30, 1942_         _----------------------------- 7, 500. 00
          Total amount appropriated to June 30, 1942---------------                            72, 437. 20
           RIVERS         AND       HARBORS-PROVIDENCE,                                R. I.,      DISTRICT                         77

   Fiscal year ending June 30               1938                 1939               1940               1941                 1942


C ost of new w ork .. . . . . . .       .   . . . .     . .      . .    .    . .   . . . . . .     .    . .   . .     . .     . .    .
Cost of maintenance-------------              $3, 600      ---                        $12, 500 -

Total expended   ....-----------    _          3, 600 -_                              12, 500

Allotted-------------------------              3, 600             $12, 500    - - - -                    $7, 500-             -




Balance unexpended July 1, 1941 .----------        -__-----------------                                               $7, 500. 00
Gross amount expended___       _____________-----------                                                                    79. 45
Less reimbursements collected------------------------------------                                                          79. 45
Balance unexpended June 30, 19427__________---
                                            _7--__                                                                  -7, 500. 00

                                   5. EDGARTOWN HARBOR, MASS.

  Location.--Between Chappaquiddick and Marthas Vineyard at the
southeastern end of the latter, about 18 miles southwest of Hyannis
Harbor, Mass. (See U. S. Coast and Geodetic Survey Chart No. 346.)
  Previous projects.-Adopted by the acts of March 2, 1829, June 10,
1872, and September 19, 1890. For further details, see page 183, An-
nual Report for 1874, part 2; page 890, Annual Report for 1897; and
page 99, Annual Report for 1938.
   Existing project.-This provides for a channel generally 150 feet
wide and 17 feet deep from Nantucket Sound into deep water of the
inner harbor, suitably widened at the bend inside the inner-harbor
entrance, together with the removal to a depth of 12 feet of the entire
Middle Ground Shoal and the outer portion of the shoal inside and
east of the entrance to the inner harbor. The plane of reference is
mean low water. The mean tidal range is 2 feet and the maximum
range due to the combined effects of wind and other causes is 5 feet
or more.
   The estimated cost for new work, made in 1936, was $21,175, includ-
ing $10,000 contributed by local interests but exclusive of amounts
expended on previous projects. The latest (1936) approved estimate
for annual cost of maintenance is $500.
   The existing project was adopted by the River and Harbor Act
approved August 26, 1937 (S3nate Committee Print, 74th Cong., 2d
sess.), which document contains the latest published map.
   Local cooperation.-Fully complied with.
   Terminal facilities.-These consist of a town wharf and one com-
mercial wharf, both open to public use, and numerous private landings
for pleasure boats. The facilities are ample for present traffic.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was completed
in 1939. The controlling depths at mean low water in July 1941
were: In the outer harbor channel, 16 feet; on Middle Ground Shoal,
12 feet; in the 17-foot widening, 17 feet; and in the 12-foot widening,
10 feet. The costs and expenditures have been $15,614.42 from regular
funds and $10,000 from contributed funds, a total of $25,614.42, all
for new work.
   Proposedoperations.-No funds are available and no operations are
contemplated during the fiscal year 1943.

        493202-43-pt. 1,vol. 1--6
78              REPORT OF CHIEF OF ENGINEERS,                      U. S. ARMY,           1942

  The sum of $24,000 can be profitably expended during the fiscal year
1944 as follows:
Maintenance :
    Dredging the entrance channel, by contract, about 10,000 cubic
      yards of sand----------------------------------------------                               $6, 000
    Dredging, by contract, the Middle Ground Shoal and the 12-foot
      and 17-foot widenings in the inner harbor, about 30,000 cubic
      yards of sand------------------------------          ------                               18, 000
                   Total-------------------------------------------------                       24, 000
                                        Cost and financial summary
Cost of new work to June 30, 1942------------------------------                            $45, 614. 42
Cost of maintenance to June 30, 1942____________________________

      Total cost of permanent work to June 30, 1942 __--                         -____-_ 45, 614. 42
Net total expenditures_____________________-___
                             __45,                                                           614. 42
Total amount appropriated to June 30, 1942 ___                                          145, 614. 42


    Fiscal year ending June 30               1938    1939           1940          1941          1942

Cost of new work___                                 $7, 489. 42,   $8, 125. 00
,Costof maintenance----
Total expended___       ._          -    _           5,127. 39     10, 487. 03
Allotted ............        .18,                       175. 00    -2, 560. 58



Amount that can be profitably expended in fiscal year ending June
  30, 1944, for maintenance                ________________-                               $24, 000. 00
1In addition, $10,000 expended from contributed funds for new work.
                             6. VINEYARD HAVEN HARBOR, MASS.

    Location.--On the north shore of Marthas Vineyard at the western
end of Nantucket Sound, about 27 miles via Quicks Hole southeast of
New Bedford, Mass. (See U. S. Coast and Geodetic Survey Chart
No. 347.)
    Previous projects.-Adopted by River and Harbor Act of August
11, 1888. For further details see page 82, Annual Report for 1909.
    Existing project.-This provides for dredging to a depth of 17 feet
at mean low water an area 150 to 275 feet wide north of the fairway
between the steamboat wharf and the State breakwater; and for dredg-
ing an anchorage 12 feet deep, about 10 acres in area, behind the
breakwater. Mean tidal range is 1.7 feet, with extreme tidal range,
due to wind or other causes, 4 feet or more.
    The estimate of cost for new work, mate in 1935, was $30,000, with
$1,100 annually for maintenance.
    The existing project was adopted by the River and Harbor Act
approved August 30, 1935 (Riyers and Harbors Committee Doc. No.
35, 74th Cong., 1st sess.), which document contains the latest pub-
lished map.
   Local cooperation.--None required by law. The Commonwealth
of Massachusetts and local interests have expended about $100,000
for dredging, breakwater, and jetty construction in the harbor.
    Terminal facilities.-Facilitiesat the seven piers in the upper har-
bor, one of which is open to public use, are considered adequate for
present commerce.
    Operationsand results during fiscal year.-None.
         RIVERS AND     HARBORS-PROVIDENCE,             R. I.,   DISTRICT      79
  Condition at end of fiscal year.-The existing project was com-
pleted in 1937. The controlling depths at mean low water, as de-
termined in July 1941, were 17 feet in the area north of the fairway
and 12 feet, except for a minor shoal on northeast.edge, in the an-
chorage basin. The costs and expenditures under the existing
project have been $27,186.12, all for new work.
  Proposed operations.-No funds are available and no operations
are contemplated during the fiscal year 1943.
   The sum of $20,000 can be profitably expended during the fiscal
year 1944 in maintenance dredging about 30,000 cubic yards of sand
from the 12-foot anchorage by contract.
                          Cost and financial summary
                                      ---       -$82,
Cost of new work to June 30, 1942______________---                          573. 47
Cost of maintenance to June 30, 1942__
      Total cost of permanent work to June 30, 1942_------------        82, 573. 47
Net total expenditures_ __ __ _ _ _                                     82, 573. 47
Total amount appropriated to June 30, 1942_________________________     82, 573. 47

Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance___              ____-----_--_____---             20, 000. 00

          7. NEW BEDFORD AND FAIRHAVEN HARBOR, MASS.
   Location.-New Bedford Harbor is a tidal estuary on the western
side of Buzzards Bay, about 27 miles northwesterly from the harbor
at Vineyard Haven, Mass., and about 37 miles to the eastward of
Point Judith Harbor, R. I. (See U. S. Coast and Geodetic Survey
Chart No. 252.)
   Previous projects.-Adopted by River and Harbor Acts of July 4,
1836, March 3, 1875, and August 11, 1888. For further details see
page 1748, Annual Report for 1915, and page 101, Annual Report
for 1938.
   Existing project.-This provides for a channel 30 feet deep and
350 feet wide from deep water in Buzzards Bay to a point just above
the New Bedford-Fairhaven Bridge, nearly 5 miles, with increased
widths for anchorage and maneuvering purposes in the area north-
west of Palmer Island and above the bridge; a channel 25 feet deep
between harbor lines along the New Bedford wharf front near the
bridge, about 0.2 mile; a channel 100 feet wide and 18 feet deep from
the 30-foot area north of Fish Island to Belleville, a distance of about
2 miles, with a turning basin at the upper end 300 feet wide; dredging
the area west of a line 50 feet channelward of the Fairhaven Harbor
line to a depth of 15 feet over widths of 150 to 4C0 feet from Peirce &
Kilburn wharf to the Old South wharf, and thence 10 feet deep and
150 feet wide to a point 1,000 feet south of the old causeway pier,
about 0.7 mile; and for the maintenance of the 25-foot anchorage area
east of the channel and north of Palmer Island. The plane of refer-
ence is mean low water, the mean range of the tide being 3.7 feet,
and the maximum range, due to the combined effect of wind and other
causes, 7 feet or more.
   The estimated cost for new work, revised in 1942, is $1,890,000, in-
cluding $20,385 contributed by local interests but exclusive of amounts
expended on previous projects. The latest (1937) approved estimate
for annual cost of maintenance is $23.250.
80            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                     1942

  The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                    Documents


Mar. 2,1907       The 25-foot anchorage area north of Palmer Island    H. Doc. No. 271, 59th Cong., 2d sess.
Mar. 3,1909       Extension of the 25-foot channel along the New       Specified in act.
                   Bedford wharf front near the bridge.
July 25,1912      The 18-foot channel in Acushnet River to Belle-      H. Doc. No. 442, 62d Cong., 2d sess.
                   ville.
July     3,1930   The 30-foot channel, anchorage, and maneuvering      H. Doc. No. 348, 71st Cong., 2d sess.l
                  areas (channel limited to width of 350 feet).
Aug. 30, 1935 2 Present project dimensions of the anchorage area       Rivers and Harbors Committee Doc.
                   northwest of Palmer Island and maintenance of         No. 16, 74th Cong., 1st sess.'
                   the 25-foot anchorage.
                  Elimination from the project of the prior authori-
                    zation for enlarging and deepening the maneu-
                   vering area 30 feet deep east of the harbor chan-
                   nel.
Aug. 26,1937      The 15-foot and 10-foot channel along the Fair-      Rivers and Harbors Committee Doc.
                                                                                                       1
                   haven wharf front.                                    No. 25, 75th Cong., 1st sess.


1 Contains latest published maps.
 - Also Emergency Relief Act, May 28, 1935.


   Local cooperation.-The River and Harbor Act of July 25, 1912,
imposed the condition that local interests construct a new bridge at
Coggeshall Street with a draw opening of at least 100 feet and build
a substantial wharf upon the city property at Belleville, the name
given to the northern part of the city. These conditions have not been
met, and there is no present prospect of their being complied with.
The condition imposed by the River and Harbor Act of August 26,
1937, was fully complied with.
   The Commonwealth of Massachusetts expended approximately
$120,000 in dredging a channel 25 feet deep and 100 feet wide from
Fish Island nearly to Coggeshall Street Bridge.
   Terminal facilities.These consist of 28 wharves and piers with
a total of about 17,580 feet of docking space; 3 wharves are owned by
the city of New Bdford, 2 by the Commonwealth, and one by the town
of Fairhaven; 7 of the wharves are open to public use and 6 have rail
connections. These facilities are considered adequate for the existing
commerce. (For further details see Port Series No. 18, Corps of
Engineers.)
   Operations and results during fiscal year.-The costs and expendi-
tures on preliminary work in connection with a proposed contract
for dredging the shoal of hard material along the east edge of the
turning basin above the New Bedford-Fairhaven bridge were
$1,431.64 for new work.
   Condition at end of fiscal year.-The existing project was about
98 percent completed. The controlling depths at mean low water
were as follows: 30 feet in the entrance channel and main channel to
the bridge except for small rocky shoals north of Palmer Island Light,
which have a minimum depth of about 27 feet in the midchannel
section and 24 feet in the remainder of the channel (May 1942); 30
feet for about one-third the area of the 30-foot turning basin above the
bridge, shoaling gradually to 20 feet along the edges (March 1941);
             RIVERS            AND              HARBORS-PROVIDENCE,                         R.   I.,   DISTRICT                81
25 feet for about one-half the area of the 25-foot anchorage, shoaling
gradually to about 22 feet (March 1941); 151/2 feet in 15-foot Fair-
haven waterfront channel, and 10 feet in 10-foot Fairhaven water-
front channel, (March 1939) ; 20 feet in 25-foot New Bedford water-
front channel (February 1938) ; in the Acushnet River, about 23 feet
to a point about 1,200 feet below Coggeshall Street bridge (May 1928);
and thence 7 feet to Belleville (1905). The head of navigation is
about 7 miles north of the entrance, opposite Sconticut Point. To
complete the project requires the removal of a rocky shoal along the
east limit of the turning basin above the bridge and the dredging of
the 18-foot channel to Belleville. The costs and expenditures from
regular funds have been $1,459,651.93 for new work and $254,050.59
for maintenance, a total of $1,713,702.52. The costs and expenditures
from Emergency Relief funds have been $227,264.49 for new work.
   The total costs and expenditures, United States funds, were $1,686,-
916.42 for new work and $254,050.59 for maintenance, a total of $1,-
940,967.01. In addition, the sum of $20,400 was expended for new
work from contributed funds.
   Proposedoperations.--It is proposed to apply the funds unexpended
on June 30, 1942 amounting to $10,568.36 for improvement dredging,
by contract, in the fall of 1942, about 3,000 cubic yards of mud, gravel
and boulders, from along the eastern edge of the turning basin above
the New Bedford-Fairhaven bridge.
   The sum of $105,000 can be profitably expended during the fiscal year
1944 as follows:
Maintenance :
   Dredging about 30,000 cubic yards of mud and sand from the en-
      trance channel, by contract______________________.__-__-_        $10, 500
   Dredging about 130,000 cubic yards of mud and sand from the 30-foot
      west maneuvering area, by contract___________---------------      45, 500
   Dredging about 60,000 cubic yards of mud and sand from the 30-foot
      turning basin above the bridge, by contract__________-
                                                    --------            21, 000
    Dredging about 80,000 cubic yards of mud and sand from the 25-foot
      anchorage, by contract--------------------------------------      28,000

             Total ---------------------------------------------------                                                  05, 000

                                                  Cost and financial summary
Cost of new work to June 30, 1942----------------------------1                                                 $1,857, 616. 42
Cost of maintenance to June 30, 1942_________------------------                                                   254, 050. 59
         Total cost of permanent work to June 30, 1942                                  ------------            2, 111, 667. 01

Net total expenditures2,--------------------------------------                                                      111, 667.01
Unexpended balance June 30, 1942------------------------------                                                       10, 568. 36

         Total amount appropriated to June 30, 1942___
                                                    --------                                                   '2, 122, 235. 37

   Fiscal year ending June 30                            1938            1939           1940            1941            1942

Cost of new work                                       $4, 675. 30    $241, 324. 84   $18, 867. 36                      $1, 431. 64
Cost of maintenance                 ----------------              -      3, 777. 01    48, 878. 95                         -____-


     Total cost_-----------------                        4, 675. 30    245, 101. 85    67, 746. 31                       1, 431. 64

Total expended                  -                        4, 132. 09    229, 782. 57    83,608. 80                        1, 431. 64

Allotted_____-         ---                ---          135, 000. 00    182, 285. 00       238. 46        $12, 000
82          REPORT OF CHIEF OF ENGINEEiRS,                             U. S. ARMY,                 1942

Balance unexpended July 1, 1941--------------------                           --                     $12, 00. 00
Gross amount expended_----------------------                                 $1, 502. 56
Less reimbursements collected _-------------------                                70. 92
                                                                                                          1, 431. 64
         Balance unexpended             June 30, 1942--------------------                             10, 568.36

Amount (estimated) required to be appropriated for completion
                      - - - -_ _ _- - - - - - - - - - - - - - - -               -
of existing project ___        _                                  ___          __                    84, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -   -
                                                                                                     105, 000.00
   1 In addition, $20.400 expended from contributed funds for new work.
   2 Exclusive of available funds.

                                  8. WESTPORT RIVER, MASS.

   Location.-On the southern coast of Massachusetts west of the en-
trance to Buzzards Bay and 18 miles east of Narragansett Bay. (See
U. S. Coast and Geodetic Survey Chart No. 237.)
   Previous project.-Adopted by the acts of August 5, 1886, and Sep-
tember 19, 1890. For further details see page 818, Annual Report for
1893, and page 104, Annual Report for 1938.
   Existing pro.ject.-This provides for an entrance channel east of
Half Mile Rock, 200 feet wide and 12 feet deep; a channel in East
Branch to Westport Point 100 feet wide and 9 feet deep, to be obtained
by the progressive construction of a training dike about 2,500 feet long
extending southwest from Great Flat along the middle ground called
Lions Tongue; a dike from Bailey Flat to Horse Neck Point; and sup-
plementary dredging. The plane of reference is mean low water, the
mean tidal range being 3.0 feet and the maximum range, due to the
effect of wind and other causes 6 feet or more.
   The estimated cost for new work, made in 1938, is $56,000, including
$28,000 to be contributed by local interests, but exclusive of the amounts
expended on previous projects. The latest (1938) approved estimate
for annual cost of maintenance is $2,000.
   The existing project was adopted by the River and Harbor Act
approved June 20, 1938 (H. Doc. No. 692, 75th Cong., 3d sess.). The
latest published map is in the project document.
   Local cooperation.-The project as authorized is subject to the pro-
visions that local interests furnish, free of cost to the United States,
such easements as may be required for the construction of dikes and
spoil disposal areas for initial work and subsequent maintenance as
may be required, and contribute one-half of the initial cost. Local
interests state that the requirements will be met.
   Terminal facilities.-There is a wharf at Westport Harbor and
three wharves at Westport Point, one of which is owned by the town.
There are also small landings scattered about the harbor. The facili-
ties are considered adequate for existing commerce.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-Work on the existing project had
not begun, as requirements of local cooperation have not been met.
The controlling depths at mean low water were as follows: Entrance
channel, about 8 feet (August 1941) ; shoal west of Horse Neck Point,
about 5 feet (May 1941). The head of navigation is as follows: West
Branch, at Adamsville, R. I., about 4 miles above the mouth; East
               RIVERS           AND       HARBORS--PROVIDENCE,                                       R. I.,       DISTRICT                             83
Branch, about 10 miles above the mouth. There have been no costs
or expenditures under the existing project.
  Proposed operations.-No funds are available and no operations are
contemplated during the fiscal year 1943.
  The sum of $28,000, together with $28,000 to be contributed by local
interests, can be profitably expended during the fiscal year 1944, by
contract, in the completion of the project.
                                             Cost and financial summary
Cost of new work to June 30, 1942------                              $3, 000
Cost of maintenance to June 30, 1942--------------------------------------
      Total cost of permanent work to June 30, 1942---------------                                                                               3, 000,
Net total expenditures------------------------- ---------------------                                                                            3, 000
Total amount appropriated to June 30, 1942                                                                                                       3, 000

    Fiscal year ending June 30                     1938                     1939                1940                  1941                      1942

C o st of n e w wo rk .........    .........    ......--     --.. ..   ..    ..-- ----   -------------.......   ......       ......    ......     ......
C ost of m aintenance .........        .........      ......- - -           ---      -    -- - - --. . .          .      .    .       . .   .     .    .
Total expended----
              ...........................--------------
Allotted -----------------------
                 _                             -      ---.
                                                       .                    $28, 000           -$28, 000         .....            .........


Amount (estimated) required to be appropriated for completion of
existing project' _              --------------------------------------- $28, 000
Amount that cah be profitably expended in fiscal year ending June 30,
1944, for new work 1-----------------                                     28, 00
   x In addition, $28,000 is to be contributed by local interests.

                                     9. FALL RIVER HARBOR, MASS.

   Location.-Situated at the mouth of Taunton River, on the east
side and at the head of Mount Hope Bay, which empties into the ocean
through Narragansett Bay and Sakonnet River. It is about 18 miles
northerly from Newport Harbor.         (See U. S. Coast and Geodetic
Survey Chart No. 353.)
   Previous projects.-Adopted by River and Harbor Acts of June 23,
1874, March 3, 1899, June 13, 1902, and June 25, 1910. For further
details see page 1749 of Annual Report for 1915, and page 106 of
Annual Report for 1938.
   Existing project.-This provides for a channel 30 feet deep at
mean low water and 400 feet wide through Mount Hope Bay and
Fall River Harbor, about 6.8 miles, with increased width opposite the
wharves below Slades Ferry Bridge; for the removal of the lower
end of Hog Island Shoal, and for the maintenance of the 25-foot
anchorage, about 42 acres in area, west of the harbor channel. The
mean tidal range is 4.4 feet and the maximum range, due to the com-
bined effect of wind and other causes, is 8 feet or more.
   The estimate of cost for new work, revised in 1941, is $530,000 ex-
clusive of amounts expended on previous projects. The latest (1941.)
approved estimate for annual cost of maintenance is $18.000.
   The existing project was authorized by the River and Harbor Act
of July 3, 1930 (H. Doc. No. 158, 71st Cong., 2d sess.). The latest
published map is in the project document.
84      REPORT OF CHIEF OF ENGINIEIRS, U. S. ARMY,                 1942

    Terminal facilities.-These consist of 17 wharves and piers, afford-
ing about 10,100 feet of docking space.
    Three of the piers have direct railroad connection. Two of the
wharves are owned by the city. One wharf is open to public use
:and two are available upon agreement. The facilities are considered
adequate for the commerce of the port.         (For further details see
Port Series No. 18, Corps of Engineers.)
    Operationsand results during fiscal year.-Emergency maintenance
dredging of shoals in the channel south of Borden Flats Light by the
U. S. hopper dredge Absecon was in progress from August 11 to 20,
1941. During the period 14,850 cubic yards, bin measure, ordinary
material, were removed at a cost of $5,103.80 for maintenance. Pre-
liminary work in connection with proposed contract for maintenance
dredging of the entrance channel and 25-foot anchorage cost $1,227.91.
Total costs were $6,331.71 all for maintenance. Expenditures were
$6,594.93.
    Condition at end of fiscal year.--The existing project was about 98
percent completed. The controlling depths at mean low water were as
follows: Hog Island Shoal, 20 feet at west edge of channel (December
1940); 30-foot channel, 28 feet except at edges (June 1942); 25-foot
anchorage, 19 feet (June 1942). To complete the work requires
removal of ledge rock at Hog Island Shoal. The costs and expend-
itures under the existing project have been $452,792.14 for new work
and $62,614.14 for maintenance, a total of $515,406 28 including
 $2,859.87 for maintenance dredging at the Firestone Wharf, under
section 3 of the River and Harbor Act of October 17, 1940.
   Proposedoperations.-Itis proposed to apply the funds unexpended
on June 30, 1942, $105,308.87, and accounts receivable, $263.22, a total
of $105,572.09, as follows:
Maintenance: Dredging the bay and river chennel, and the 25-foot
  anchorage, by contract July to November 1942, about 400,000 cubic
  yards of mud and sand--------------                             _ $98, 772.09
Balance available ------------------- __________,                     6,800. 00

      Total                                                                  572. 09
                                                                       1-----------------------------
  The sum of $70,000 can be profitably expended during the fiscal
year 1944 in completing the removal of Hog Island Shoal, by contract,
involving about 3,300 cubic yards ledge rock and 1,000 cubic yards of
other materials.
                         Cost and financial summary

Cost of new work to June 30, 1942 ____________ _____________          $782, 996.30
Cost of maintenance to June 30, 1942----------------------------       144, 024. 45

      Total cost of permanent work to June 30, 1942________------927, 020. 75
Plus accounts receivable June 30, 1942_ __--_-------------------      263. 22

      Gross total costs to June 30, 1942-----------------------        927, 283. 97
Net total expenditures_-------------------------------------           927, 283. 97
Unexpended balance June 30, 1942________________----------             105, 308. 87
      Total amount appropriated to June 30, 1942__--1_--           _ 1, 032, 592. 84
               RIVERS AND HARBORS--PROVIDENCE,                                        R.       I.,   DISTRICT                     85

    Fiscal year ending June 30                     1938           1939            1940                 1941              1942

Cost of new work          _   _ ___              $17, 609. 94       $167, 70    $27, 235. 86         $32, 103. 49    -- _______
Cost of maintenance .....             ...             390. 06     2, 477. 54     50, 554. 96                             $6, 331. 71
       Total cost-----------------                18, 000. 00     2, 645. 24     77, 790. 82          32, 103. 49         6, 331. 71
Total expended ........         ..-----------------18, 000.00       251. 50      79, 530. 64          32, 757. 41         6, 594. 93

Allotted__.....____________       ___.........    18, 000. 00   106, 500. 00     10, 000. 00           2, 859. 87       105, 083. 48.



Balance unexpended July 1, 1941_____________----------------                                                         $6, 820. 32
Amount allotted from War Department Civil Appro-
  priation Act approved June 24, 1940__----                   $6, 000. 00
Amount allotted from War Department Civil Appro-
priation Act approved Apr. 28, 1942_____----                100, 000. 00
                                                                                                                    106, 000. 00

     Amount to be accounted for-------------------------------112,                                                       820. 32
Deductions on account of revocation of allotment---------- -------                                                       916. 52

      Net amount to be accounted for--                              __-________-----111,                                 903. 80
Gross amount expended_________-------------                           ------------------                              6, 594. 93

     Balance unexpended June 30, 1942 __________-__-___----     -                                                   105, 308. 87
Accounts receivable June 30, 1942-------------------------------                                                         263.22

          Unobligated balance available June 30, 1942-----------------105,                                               572. 09

Amount (estimated) required to be appropriated for completion
                     1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
of existing project                                                                                                 70, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1944, for new work 1________-- _____________----                                                                70, 000. 00
   1 Exclusive of available funds.

                                            10. TAUNTON RIVER, MASS.

   Location.-Rises in Norfolk County, Mass., flows in a general south
by west direction about 36 miles, and empties into Mount Hope Bay
at Fall River. (See U. S. Geological Survey sheets Taunton and Fall
River.)
   Previous projects.-Adopted by River and Harbor Acts of July 11,
1870, and June 14, 1880. For further details see page 1748 of Annual
Report for 1915 and page 107 of Annual Report for 1938.
   Existing project.-This provides for a channel 12 feet deep at mean
low water, generally 100 feet wide up to a point about 2,800 feet below
Weir Bridge, thence 80 feet wide for about 2,000 feet, and thence 60
feet wide to the bridge.
   The mean tidal range is 4.4 feet at the mouth, and 2.8 feet at Weir
Bridge. The maximum range, due to the combined effects of wind
and other causes, is 8 feet or more at the mouth and about 6 feet at
the head of navigation.
   The estimate of cost for new work, made in 1930, is $780,000, exclusive
of amount expended on previous project. The latest (1930) approved
estimate for annual cost of maintenance is $10,000, including main-
tenance of the turning basin to be constructed by local interests.
   The existing project was authorized by the River and Harbor Act
of July 3, 1930 (H. Doc. No. 403, 71st Cong., 2d sess.). The latest
published map is in the project document.
86           REPORT         OF CHIEF OF                      ENGINEERS,           U.   S. ARMY,             1942

   Local cooperation.-The River and Harbor Act of July 3, 1930,
adopted the existing project subject to the provisions that local inter-
ests shall provide, at their own expense, a suitable turning basin near
the head of navigation and furnish, without cost to the United States,
:suitable bulkheaded areas for spoil disposal. Under date of March
26, 1931, the Chief of Engineers accepted the assurances of the Com-
monwealth of Massachusetts that the requirements would be fully
met.
   Terminal facilities.-These consist of wharves with docking space
of about 6,200 feet. The facilities are considered adequate for the
existing commerce.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was 40 percent
completed. The controlling depths at mean low water were about
11 feet to Peters Point (April 1941), thence 4 feet to Weir Bridge,
Taunton (1929). The head of navigation is 5 miles above Weir
Bridge. To complete the project requires the deepening of the channel
from Peters Point to Taunton. The costs and expenditures have been
$271,396.65 for new work and $85.53 for maintenance, a total of
$271,482.18.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
   The sum of $399,000 can be profitably expended during the fiscal
year 1944 in the completion, by contract, of the channel from Peters
Point to the lower wharves in Taunton.
                                            Cost and financial summary

Cost of new work to June 30, 1942                                   894. 58
                                                                $-------------------
Cost of maintenance to June 30, 1942----------------------------32, 916. 79

      Total cost of permanent work to June 30, 1942-------------- 475, 811. 37
      Net total expenditures------------------------------------  475, 811. 37
Total amount appropriated to June 30, 1942 ---------------------- 475, 811. 37

     Fiscal year ending June 30                1938               1939             1940              1941            1942

Cost of new work.____________                _______         _   $4, 781.90       $87,105.84    -.............-
                                                                                                             _----.....
                    -----------------
-Cost of maintenance___                                               8553---
                                                                      85. 53 -
       Total cost   -------------------...............------      4, 867. 43      87, 105. 84   _-                      -

"Total expended......
               -------------------------                          4, 749. 003 0   87,3 224.
                                                                                         9 24.27
                                                                                               -6,        -
                                                                                                 -------------     --

Allotted-................          --....      .      ....       60, 000. 00      31, 973. 27 .


Amount (estimated) required to be appropriated for completion of
existing project------------------------------------..
                                                      __                                                       399, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for new work -------------------------------------                                                 399, 000. 00

                                      11. NEWPORT HARBOR, R. I.

  Location.-On the east side of the main entrance to Narragansett
Bay, between Goat Island and the city of Newport. It is about 12
miles northeast of Point Judith Harbor. (See U. S. Coast and
Geodetic Survey Chart No. 236.)
            RIVERS AND HARBORS-PROVIDENCE,                            R.    I.,    DISTRICT               87
   Previous projects.-Adopted by River and Harbor Acts of March
3, 1873, March 3, 1881, July 5, 1884, July 13, 1892, and August 18,
1894. For further details, see page 1751 of Annual Report for 1915
and page 109 of Annual Report for 1938.
   Existing project.-This provides for a channel generally 300 feet
wide and 21 feet deep around both ends and along the east side of
Goat Island, about 11/4 miles; the maintenance of those portions of
a channel 750 feet wide and 18 feet deep along the south and east
sides of Goat Island lying outside of the 21-foot channel; an anchor-
age 18 feet deep south and east of the 18-foot channel, about 95 acres;
an anchorage 13 feet deep south of the 18-foot anchorage, and east
of the city stone pier, about 41 acres; and for the removal of Nourma-
hal Rock, in Brentons Cove, to 18-foot depth. The reference plane is
mean low water, the mean tidal range being 3.5 feet. The maximum
range, due to the combined effect of wind and other causes, is 6 feet
or more.
   The estimate of cost for new work, revised in 1937, was $482,900,
exclusive of amounts expended under previous projects. The latest
(1937) approved estimate for annual cost of maintenance is $1,850.
   The existing project was authorized by the following river and
harbor acts:

    Acts                              Work authorized                                   Documents



Mar.   2,1907   The 18-foot channel along the south and east sides of Goat H. Doc. No. 121, 58th Cong.,
                  Island.                                                   2d sess.
May 27, 1908    The 13-foot anchorage and the removal of Nourmahal Rock__ H. Doc. No. 438, 59th Cong.,
                                                                            2d sess.
June 25,1910    The 18-foot anchorage and increased width of the 18-foot H. Doec. No. 610, 61st Cong.,
                  channel south of Goat Island.                             2d sess.
Aug. 26, 1937   The 21-foot channel around the ends and east side of Goat     Rivers and Harbors Commit-
                  Island.                                                         tee Doec. No. 36, 75th Cong.,
                                                                                   1st sess. (Contains latest
                                                                                  published map.)



  Terminal facilities.-There are 26 wharves and piers in use or in
usable condition, having a total available berthage of about 11,520 feet
and accommodations for two ferry boats, adjacent to the harbor area.
Two of the facilities are owned by the city and one by the Govern-
ment. There are no commercial wharves open to public use and none
has rail connections. The facilities are considered adequate for exist-
ing commerce. (For further details see Port Series No. 18, Corps of
Engineers.)
  In addition to the above there are three wharves, recently acquired
by the United States Navy, that will be rehabilitated. They have a
total potential berthing capacity of about 3,400 feet and a usable berth-
age under present conditions, at two of them, of approximately 1,770
feet.
  Operations and results during the fiscal year.-None.
  Condition at end of fiscal year.--.The existing project was completed
in 1940. The controlling depths at mean low water, as determined in
April 1942, were as follows: 21-foot channel, about 20 feet; 18-foot
channel, 18 feet except for small shoals to 17 feet along east edge;
88         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                        1942

18-foot anchorage, 17 feet; and 13-foot anchorage, 12 feet. The costs
and expenditures under the existing project have been $498,828.20 for
new work and $26,962.08 for maintenance, a total of $525,790.28.
  Proposedoperations.-Itis proposed to apply the funds unexpended
on June 30, 1942, amounting to $16,039.41 in maintenance dredging,
by contract in April 1943, about 25,000 cubic yards of mud, sand, and
gravel from the 1-foot channel around the ends and along the east
side of Goat Island.
   No additional funds can be profitably expended during the fiscal
year 1944, as the completion of the above work will leave the project in
condition to meet the needs of existing navigation.
                                  Cost and financial summary
Cost of new work to June 30, 1942 --------------------------                                      $733, 523. 91
Cost of maintenance to June 30, 1942---------------------------                                     36, 962. 08
        Total cost of permanent work to June 30, 1942-----------__                                 770, 485. 99
        Net total expenditures_--------------------------------_                                   770, 485. 99
Unexpended balance June 30, 1942__                                                                  16, 039. 41
       Total amount appropriated to June 30, 1942---------------                                  786, 525. 40

   Fiscal year ending June 30          1938           1939          1940             1941               1942

Cost of new work .. ____________________
                     ..                        __   $36, 619. 12     $677. 72      $16, 201. 55
Cost of maintenance   .         _________                254. 94   12, 477. 35 _                         -
     Total cost__.       ____..
                     __....__     ______________     36, 874. 06   13, 155. 07      16, 201. 55
Total expended______. ______      _____________      34, 716. 14   14, 248. 76      17, 265. 78
Allotted-----------------------         $37, 500     18, 000. 00   36, 000. 00      10, 670. 09           $12. 500



Balance unexpended July 1, 1941---------------------------------$3,     539 41
Amount allotted from War Department Civil Appropriation Act ap-
  proved Apr. 28, 1942----    -------------------------------
                                               _                    12, 500. 00
       Amount to be accounted for----------------------------                                       16,039.41
Balance unexpended June 30, 1942----------------------------                                        16, 039. 41
                       12. PROVIDENCE RIVER AND HARBOR, R. I.

  Location.-Providence River is formed at the city of Providence by
the junction of the Pawtucket (Seekonk) River and two small streams
which rise in northern Rhode Island. It is tidal and flows southerly
in a deep channel between broad flats about 8 miles, emptying into
Narragansett Bay. (See U. S. Coast and Geodetic Survey Chart No.
278.)
   Previous projects.-Adopted by River and Harbor Acts of August
30, 1852; March 2, 1867; March 3, 1873; June 18, 1878; August 2,
1882; August 5, 1886; June 3, 1896; June 13, 1902; March 3, 1905;
March 2, 1907; June 25, 1910; and March 4, 1913. For further details
see page 1750, Annual Report for 1915, page 96, Annual Report for
1936, and page 111, Annual Report for 1938.
   Existing project.--This provides for an approach channel 35 feet
deep at mean low water and generally 600 feet wide through the
river from the deep water of Narragansett Bay opposite North Point
        RIVERS AND    HARBOR.S--PROVIDENCE,      R.   I.,   DISTRICT   89


on Popasquash Neck to the turn below Fields Point, 8.1 miles, and
thence with the same depth, and of width ranging up to 1,700 feet to
Fox Point, excluding a marginal strip 75 feet wide channelward of
the established harbor lines, about 2.6 miles. The mean tidal range
is about 4.6 feet and the maximum range, due to the combined effect
of wind and other causes, is 8 feet or more.
   The estimate of cost for new work, made in 1937, is $1,580,000, exclu-
sive of amounts expended on previous projects. The latest (1937)
approved estimate for annual cost of maintenance is $42,000.
   The existing project was authorized by the River and Harbor Act
of August 26, 1937 (H. Doc. No. 173, 75th Cong., 1st sess.). The latest
published map is in the project document.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
adopted the project subject to the condition that the widening of the
channel on the west side immediately below Fields Point shall not be
undertaken until local interests furnish assurances satisfactory to the
Secretary of War that they will proceed with the downstream exten-
sion of the municipal terminal at Fields Point. This extension has
been completed. In addition to extensive dredging prior to 1900 in
the channel from Fox Point to the head of navigation, the city of
Providence has since spent about $216,000 in maintaining a 20-foot
depth in this channel.
   Terminal facilities.-There are 33 wharves (in use or usable condi-
tion), including two owned by the State and four by the city, adja-
cent to the harbor area, Providence River below Crawford Street,
and Pawtucket (Seekonk) River below Red Bridge. The total avail-
able berthing space is 17,350 feet. The municipal wharf at Fields
Point and the State pier are open to general public use for commer-
cial purposes. One wharf is open to the public upon agreement with
the owner.      Twelve of the wharves have rail connections.         The
facilities are considered adequate for existing commerce.      (For fur-
ther details see Port Series No. 18, Corps of Engineers.)
   Operations and results during fiscal year.-Improvement dredging,
by contract, for widening the channel opposite and below Fields Point,
in progress at the beginning of the year, was suspended on July 5,
1941, and was not resumed during the fiscal year. During the period
65,653 cubic yards, place measure, ordinary material, were removed
at a cost of $7,640.10 for new work. Preliminary work in connection
with proposed contract for rock removal below Conimicut Light and
off Fields Point cost $177.07 during the period. Total costs were
$7,817.17 all for new work. Expenditures were $13,062.42.
   Condition at end of fiscal year.-The existing project was 96 percent
completed. Under the existing project a channel 600 feet wide from
the deep water at Narragansett Bay to the turn below Fields Point
thence to Fox Point with a width ranging up to 1,700 feet has been
dredged to a general depth of 35 feet. The head of commercial navi-
gation is at Crawford Street Bridge, about 0.8 mile above Fox Point.
The controlling depths at mean low water were as follows: In the
channel 35 feet (1940 and 1941) except on rock shoals about 1 mile
below Conimicut Light, 32 feet (June 1941); on rock shoal near edge
of channel off Fields Point, 28 feet (June 1941); and minor shoal
areas along the edges; in the widening below Fields Point, 5 to 35 feet
 (1941). To complete the project requires completion of the widening
90          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                    1942

of the channel at the turn below Fields Point by dredging operations
under contract in force and the removal of rock shoals near Conimicut
Light and off Fields Point. The costs under the existing project have
been $2 053,365.35 for new work and $387.95 for maintenance, a total
of $2,053,753.30. Expenditures have been $2,048,468.88.
  Proposedoperations.-It is proposed to apply the funds unexpended
on June 30, 1942, amounting to $108,979.67, as follows:
Accounts payable June 30, 1942        _----------------------------------                                        $5, 284. 42
New work :
    Dredging on west side of channel below Fields Point, by contract
      in force, to be completed in fall of 1942___ ___-__                                                        52, 263. 89
   Removal of rock and overburden from channel off Fields Point
      and below Conimicut Light, by contract in fall of 1942, about
      4,100 cubic yards_ _______     ____________                                                                51, 431.36
             Total _______--_------_                          ------------------------                         108, 979.67
  No additional funds can be profitably expended during the fiscal
year 1944 as the completion of the above work will leave the project
in condition to meet the needs of existing navigation.
                                      Cost and financial summary

Cost of new work to June 30, 1942____________                                      _                     $5, 814, 776. 91
Cost of maintenance to June 30, 1942__________                                    ___     _______            650, 524. 22

     Total cost of permanent work to June 30, 1942                                    ------------         6, 465, 301. 13
Minus accounts payable June 30, 1942__________________________                                                  5, 284. 42
          Net total expenditures            _                             ---------                        , 460, 016. 71
                                                                                                          6-------------
Unexpended balance June 30, 1942------------------------------                                                  108, 979. 67

          Total amount appropriated to June 30, 1942_______________                                        6, 568, 996.38

     Fiscal year ending June 30          1938                1939                 1940            1941              1942

Cost of new work    __                 $553. 17        $483,343.42            $882, 650.38     $679, 001. 21        $7,817.17
Cost of maintenance__________________________               387. 95
       Total cost_______________ __       553.17           483, 731.37          882, 650.38     679, 001.21          7, 817.17

Total expended___ ___________     ______________           398, 406. 18         899, 914. 39    737, 085.89         13, 062. 42

Allotted___                            209,505.39     1,354,900.00              592,548.55
                                                    SI_"


Balance unexpended July 1, 1941-------------------------------                                                 $122, 042. 09
Gross amount expended_-                          -  $18, 604. 95
Less reimbursements collected .____________________   5, 542. 53
                                                                                                                 13, 062. 42
      Balance unexpended June 30, 1942 ______________________                                                   108, 979. 67
Outstanding liabilities June 30, 1942-     _               1. 09
Amount covered by uncompleted contracts -----------  57, 547. 22
                                                                                                                 57, 548. 31
          Balance     available June 30, 1942____________________                                                51, 431. 36

                       13. PAWTUCKET (SEEKONK) RIVER, R. I.

   Location.-This river rises in the vicinity of Worcester, Mass., and
flows in a general southeasterly direction for about 52 miles, emptying
into Providence Harbor at Providence. (See U. S. Coast and Geodetic
Survey Chart No. 278.)
             RIVERS       AND     HARBORS-PROVIDENICE,                    R.     I., DISTRICT             91
  Previous projects.-Adopted by River and Harbor Acts of March 2,
1867, July 5, 1884, and March 3, 1899. For further details see page
1749 of Annual Report for 1915, and page 113 of Annual Report for
1938.
  Existing project.-This provides for a channel 16 to 18 feet deep at
mean low water and 150 to 230 feet wide from Red Bridge up to the
ledge rock between the wharves at Pawtucket, 3.2 miles; thence with
same depths 100 to 60 feet wide through the ledge to Division Street
Bridge, 0.2 mile. - The mean tidal range is about 4.6 feet at the mouth
of the river and about 5 feet at Pawtucket, and the maximum range
due to the combined effect of wind and other causes is 8 feet or more.
   The estimate of cost for new work, revised in 1922, was $423,035,
exclusive of amounts expended on previous projects but including the
expenditure of funds contributed by the State of Rhode Island to the
amount of $67,792. The latest (1928) approved estimate for annual
cost of maintenance is $10,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                              Work authorized                                    Documents


Mar.   3, 1905   The 16-foot channel from Red Bridge in Providence, to           Hi. Doc. No. 113, 56th Cong.,
                   Division St. Bridge in Pawtucket.                                1st sess.
Mar.   3, 1909   Provisional authorization to deepen the channel to 18 feet at   Specified in act.
                  mean low water and increasing the width at such places
                   as would best serve the interests of navigation.
Mar.   2, 1919   Widening the channel, except through the ledge at Paw-          H. Doc. No. 1283, 64th Cong.,
                  tuckeL, to 150 feet.                                             1st sess. (Contains latest
                                                                                   published map.)
Sept. 22, 1922   Present project width of channel through the ledge at Paw-      H. Doc. No. 654, 66th Cong.
                  tucket.                                                          2d sess.



   Local cooperation.-Fully complied with.
   Terminal facilities.-Including the five terminals at and near Phil-
lipsdale, the facilities cover about 5,260 feet of docking space, of which
700 feet is owned by the State of Rhode Island and 4,560 feet owned
and used by private owners. At the State terminal 100 feet of docking
space is available for public use. The facilities are considered ade-
quate for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was completed
in 1927. The controlling depths at mean low water, as determined in
July 1940, were nearly 17 feet to Pawtucket city line, thence nearly
16 feet to Division Street.                   The head of navigation is at Pawtucket
Falls, about 5.2 miles above the mouth of the river. The costs and ex-
penditures under the existing project have been $337,788 85 for new
work, and $341,817.87 for maintenance, a total of $679,606.72. In
addition, the sum of $67,792 has been expended for new work from
contributed funds.
  Proposed operations.-It is proposed to apply the funds unexpended
on June 30, 1942, amounting to $36,000 in maintenance dredging, by
contract in Mlay and June 1913, about 60,000 cubic yards of mud from
the river channel above Red Bridge, Providence, R. I.
92          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                          1942

   No additional funds can be profitably expended during the fiscal
year 1944 as the completion of the above work will leave the project
in condition to meet the needs of existing navigation.
                                       Cost and financial summary

                                         -
Cost of new work to June 30, 1942 ________________                                                   $672, 214. 17
Cost of maintenance to June 30, 1942_____________________                             -__             341, 817. 87

         Total cost of permanent work to June 30, 1942                                                014, 032. 04
                                                                                                   1------------,

Net total expenditures______- ___-_-__                                                         11, 014. 032. 04
Unexpended balance June 30, 1942_                      _______               __                        36, 000. 00

         Total amount appropriated to June 30, 1942 ______________                                 1, 050, 032. 04


   Fiscal year ending June 30             1938            1939           1940          1941               1942


Cost of new work -.-- - - - - - -- - - - - - - - - - - - - - - - - - - - --           -       ...-    .. . . . . .
Cost of maintenance.     __    _         $1, 778. 10     $6, 838. 30   $34, 481. 68   $2, 098. 08     -       ....--.

Total expended_-----------------          1. 396. 76      7,178. 59     28, 903. 57    7, 717. 24         -      -
Allotted______----------------------     10,000.00       25,000.00      10,196.16      -       -              $36,000


Amount allotted from War Department Civil Appropriation Act ap-
proved Apr. 28, 1942_------------------------------------------                                      $36, COD. 00
Amount to be accounted for_-------------------------------------                                       36, 000.00
Balance unexpended June 30, 1942----------------------_               __                               36, 000. 00
   In addition, $67,792 expended from contributed funds for new work.

                  14. HARBOR OF REFUGE AT POINT JUDITH, R. I.

   Location.-PointJudith marks the southwestern entrance to Narra-
gansett Bay. The harbor lies opposite the shallow bight west of the
point. It is about 14 miles southwesterly of Newport Harbor, R. I.,
and 33 miles east of New London Harbor, Conn. (See U. S. Coast
and Geodetic Survey Chart No. 276.)
   Existing project.-This provides for a main breakwater 6,970 feet
long, built in part on Squid Ledge approximately in the form of the
letter V, with its apex facing outward in about a south by west
direction, and lying from 1/2 to 11/ miles from shore; for an easterly
shore-arm breakwater 2,240 feet long, eastward of the main break-
water, leaving an entrance to the harbor 1,200 feet in width; for a
westerly shore-arm breakwater 3,640 feet long, extending toward the
west arm of the main breakwater, leaving an entrance to the harbor
1,500 feet in width; and for the removal of two shoals, one in the
anchorage area and the other near the easterly entrance, to a depth
of 18 feet at mean low water.
   All breakwaters are of the rubble-mound type, with the crests 8 and
10 feet above mean low water. The mean tidal range is 3.1 feet, and
the maximum range, due to the combined effect of wind and other
causes, is 7 feet or more.
   The estimate of cost for new work, revised in 1919, was $2,537,500.
The latest (1928) approved estimate for annual cost of maintenance
is $20,000.
   The existing project was authorized by the following river and
harbor acts:
             RIVERS         AND   HARBORS--PROVIDENCE,                               R.       I., DISTRICT                93

     Acts                   Work authorized                                               Documents


Sept. 19, 1890    The main breakwater         - -   -       H. Doc. No. 66, 51st Cong., 1st sess.
Mar. 2,1907       Present dimensions of eastern shore       H. Doc. No. 60, 58th Cong., 2d sess.
                    arm.
June 25, 1910     The western shore arm-_                   H. Doc. No. 911, 60th Cong., 1st sess.
Mar. 2, 1919      Removing 2 shoals from the harbor         H. Doc. No. 2001, 64th Cong., 2d sess.                (Contains
                    area.                                      latest published map.)



   Terminal facilities.-None.
   Operations and results during fiscal year.-Repairs to the west arm
of the main breakwater and the, east shore-arm breakwater, by con-
tract, in progress at the beginning of the year, were suspended on
September 27, 1941, resumed on December 5, 1941, and completed on
December 17, 1941. During these periods 9,674 long tons new stone
and 1,344 long tons salvaged stone were placed on the main breakwater
and 12,998 long tons new stone and 2,988 long tons salvaged stone on the
east shore-arm at a cost of $142,707.51 for maintenance. Costs for
preliminary surveys for repairs to the east arm of the main breakwater
and the west shore-arm breakwater were $700.48. The total costs were
$143,407.99 all for maintenance. Expenditures were $171,493.17.
   Condition at end of fiscal year.-The existing project was completed
in 1921. The breakwaters were completed in 1914, and the dredging
in 1921. The controlling depths at mean low water, as determined
in 1939, were as follows: West entrance, about 19 feet, east entrance,
about 22 feet, behind the breakwaters, 18 to, 25 feet. The east shore-
arm breakwater and the west arm of the main breakwater are in good
condition. The 1940 repairs of the east arm of the main breakwater
did not restore project dimensions to its entire length. Additional
stone will be required on this section to put it in good condition. The
west shore arm is in need of repairs. The costs and expenditures have
been $2,371',467.55 for new work and $739,633.93 for maintenance, a
total of $3,111,101.48.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
   The sum of $36,000 can be prcfitably expended during the fiscal year
1944 in the completion of repairs to the east arm of the main breakwater
and repairs to the west shore-arm breakwater, by contract, by placing
about 5,000 long tons of stone.
                                   Cost and financial summary
Cost of new work to June 30, 1942                                                                      $2, 371, 467. 55
Cost of maintenance to June 30, 1942______________---                                          -_________ 739, 633. 93
      Total cost of permanent work to June 30, 1942------------                                             3, 111, 101. 48
Net total expenditures____----------     -         --
                                              _______                                                       3, 111, 101. 48
Total amount appropriated to June 30, 1942 _____-   ___________                                             3, 111, 101. 48

   Fiscal year ending June 30           1938            1939                     1940              1941            1942

Cost of new work------------ ----------- -------- -
Cost of maintenance --      - ________. _ _    --                     _
                                                                          I.            - -
                                                                               $76, 203. 69
                                                                                                ---------
                                                                                                 $33, 813. 52    $143, 407. 99
Total expended----------------______________        ....                        76, 203. 69        5, 728. 34     171,493. 17

Allotted         ----                                      $72, 000            204, 400. 00       25, 500. 00    -48, 474. 80

           493202-43-pt. 1, vol. 1--7
94            REPORT       OF CHIEF OF ENGINEERS,                      U.   S. ARMY,    1942

Balance unexpended July 1, 1941_ _--                                                        $219, 967. 97
Deductions on account of revocation of allotment________-____                                 48, 474. 80

          Net amount to be accounted for___________________                         ____     171, 493. 17
Gross amount expended                     ____        _____________          $171,610. 80
Less reimbursements collected_______-----                      -_____             117. 63
                                                                                             171, 493. 17
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance______________                  ___                                 36, 000. 00
                   15. HARBOR OF REFUGE AT BLOCK ISLAND, R. I.

  Location.-Located on the east side of Block Island, near the south
end of the inner curve of the shore line. It is 13 miles south-southwest
from Point Judith Harbor and about 25 miles southeasterly from
Stonington Harbor, Conn. (See U. S. Coast and Geodetic Survey
Chart No. 276.)
  Existing project.-This provides for a rubble-mound breakwater
extending northerly about 1,950 feet from the shore; a similar break-
water about 1,100 feet long, extending northerly and easterly, enclosing,
with the main breakwater, an area about 800 feet square designated
as the inner harbor; masonry walls in the southeastern corner of the
inner harbor enclosing an area nearly 300 feet square designated as the
basin; and for dredging to a depth of 15 feet at mean low water the
outer protected area and about 67 percent of the inner harbor and of
the basin. The mean tidal range is 2.9 feet, and the maximum range,
due to the combined effects of wind and other causes, is 7 feet or more.
   The estimate of cost for new work, revised in 1928, is $615,300.
The latest (1928) approved estimate for annual cost of maintenance
is $3,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                               Work authorized                              Documents


July 11, 1870      The main breakwater_                                        Annual Report 1868, p. 785,
                                                                                 and S. Misc. Doc. No. 81,
                                                                                 40th Cong., 2d sess.
Aug.     5,1886    Breakwater enclosing the inner harbor--._   _ _-_           S. Doc. No. 27, 48th Cong.,
                                                                                 2d sess., and Annual Re-
                                                                                 port, 1885, p. 610.
June     3, 1896   Raising the crest of the main breakwater and making it      H. Doc. No. 83, 54th Cong.,
                    sandtight.                                                   1st sess.
July 25, 1912      Rebuilding the basin walls and present project dimensions   H. Doc. No. 828, 60th Cong.,
                    of the dredged areas.                                        1st sess. (Contains latest
                                                                                 published map.)



  Recommended modifications of project.-It is recommended that
this project be modified by eliminating the dredging of the outer
harbor west of the entrance channel (H. Doc. No. 467, 69th Cong., 1st
sess.).
  Terminal facilities.-There is one wharf with a total of 265 feet of
docking space, 240 feet of which is owned by the town. All landing
space is used to capacity and is considered adequate for existing com-
merce.
              RIVERS       AND HARBORS-PROVIDEN'CE,                                    R.       I.,   DISTRICT                        95
   Operations and results during fiscal year.-Maintenance dredging of
the channel and basin, by contract, was in progress from August 29,
to October 4, 1941. During the period 23,500 cubic yards, place meas-
ure, ordinary material, were removed at a cost of $14,564.64. Prelimi-
nary expenses on this work during the year amounted to $171.15. Total
costs were $14,735.79 all for maintenance. Expenditures were
$14,964.24.
   Condition at end of fiscal year.-The existing project was about 94
percent completed. The breakwater and harbor walls were completed
in 1916. The inner harbor and basin have been dredged to project
dimensions, and a channel 60 to 130 feet wide and 15 feet deep has been
dredged from deep water outside the harbor up to the town wharf.
The controlling depths at mean low water are as follows: Entrance
channel to head of basin, 15 feet (October 1941); Inner Harbor, 15
feet, except for shoals extending approximately 100 feet from north,
west and south edges (March 1941); and outer protected area 6 to 14
feet (October 1941). The east breakwater and harbor walls are in good
condition; the west breakwater is in poor condition.
   To complete the project requires the deepening of the outer pro-
tected area adjacent to the dredged channel. The costs have been
$576,856.47 for new work, and $215,868.98 for maintenance, a total of
$792,725.45. Expenditures have been $792,717.69.
  Proposed operations.-Itis proposed to apply the funds unexpended
on June 30, 1942, amounting to $17,507.76 as follows:
Accounts payable June 30, 1942_--_----------------------------------      $7.76
Maintenance: Dredging,.by contract in April and May 1943, about 50,000
  cubic yards of sand from the entrance channel and Inner Harbor __. 17, 500. 00
         Total-----------------------------------7,                                                                             507. 76
  No additional funds can be profitably expended during the fiscal
year 1944 as the completion of the above work will leave the project in
condition to meet the needs of existing navigation.

                                           Cost and financial summary

Cost of new work to June 30, 1942------------------------------                                                         $576, 856. 47
Cost of maintenance to June 30, 1942 ........                                                                            215, 868. 98
      Total cost of permanent work to June 30, 1942------------- 792, 725. 45
Minus accounts payable June 30, 1942-----------------------------       7. 76
      Net total expenditures ------------------------------------                                                        792, 717. 69
TJnexpended balance June 30, 1942------------------------------___                                                        17, 507. 76
         Total amount appropriated to June 30, 1942-----------------                                                    810, 225. 45

   Fiscal year ending June 30                     1938              1939           1940               1941                     1942
                            p              ____               -                                   ________-              -
Cost of new work                                                                                      -                  _~
Cost of maintenance   --      --   -          $2, 284. 56         $16, 835. 13   $16, 099. 54         $14, 908. 68            $14, 735. 79
Total expended -5,                                  862. 95         5, 747. 57    27, 164. 70             14, 694. 87          14, 964. 24
Allotted --------   -----------        -     ..---------           33, 000. 00    15, 916. 59             8, 697. 34           22, 465. 21
96            REPORT OF CHIEF OF ENGINEERS,                             U. S. ARMY,      1942

Balance unexpended July 1, 1941___------       ---------   ------                             $10, 006. 79
Amount allotted from War Department Civil Appropria-
tion Act approved June 24, 1940-------------------      $5, 200. 00
Amount allotted from War Department Civil Appropria-
  tion Act approved Apr. 28, 1942___     ____            17, 500. 00
                                                                                               22, 700. 00

Amount to be accounted for--------------------------------32,                                      706. 79
Deductions on account of revocation of allotment ________---__                                     234. 79

       Net amount to be accounted for -- ___-----__--------                                    32, 472. 00
Gross amount expended_______---------------------          $15, 012. 63
Less reimbursements collected-__-------------------              48. 39
                                                                                               14,964. 24

                                          _-
      Balance unexpended June 30, 1942_----------------                            --          17, 507. 76
Outstanding liabilities June 30, 1942 -----------------                            $0. 97
Amount covered by uncompleted contracts                                               6. 79
                                                                                                     7.   76


          Balance available June 30, 1942_           --------------------------                17, 500. 00

Amount (estimated) required to be appropriated for completion of
                   - - - - -- - - - - - - - - - - - - - - - - -- -- - - - - - - - - - - -
existing project 1                                                                            38, 400. 00
  1   Exclusive of available funds.
                      16. GREAT SALT POND, BLOCK ISLAND, R. I.

   Location.-On the west shore of Block Island, about 11 miles south-
west by south from Point Judith Harbor, R. I., and 18 miles south-
easterly from Stonington Harbor, Conn. (See U. S. Coast and
Geodetic Chart No. 276.)
  Existing project.-This provides for a channel from the ocean to the
pond 600 feet wide with a central depth of 25 feet for a width of 150
feet, sloping gradually up to a depth of 12 feet in a width of 504 feet;
thence up to low-water level with a 1 on 4 bottom slope; for two riprap
jetties at the entrance, the northerly one 1,200 feet long, and the
southerly one extending 350 feet beyond the 18-foot contour (actual
length, 1,691 feet, including 837 feet built by the State); and for stone
revetment and sand fences to protect the banks through the original
beach. All depths refer to mean low water. Mean tidal range is 2.8
feet, and the maximum range, due to the combined effect of wind and
other causes, is 7 feet or more.
   Estimated cost for new work, revised in 1928, is $560,000. The
latest (1918) approved estimate for annual cost of maintenance is
$1,500.
   The existing project was authorized by the following river and
harbor acts:

       Acts                            Work authorized           .                     Documents

June     3,1896   Channel and jetties___ ____________________________          H. Doe. No. 57, 54th Cong.,
                                                                                 1st sess.

June 13,1902      Extending south jetty and dredging________     ___________   Specified in act. An nual
                                                                                 Report for 1900, p. 1276,


  For latest published map see H. Doe. No. 60, 58th Cong., 2d sess.
         RIVERS   AND HARBORS-PROVIDENCE,            R.   I.,   DISTRICT        97
   Recommended modifications of project.-On June 24, 1926, the Chief
of Engineers recommended curtailment of the existing project by
omitting construction of the proposed north jetty (H. Doc. No. 467,
69th Cong., 1st sess.).
   Under date of April 29, 1941, the Chief of Engineers recommended
modification to provide for dredging an entrance channel 100 feet
wide and 12 feet deep at mean low water from Great Salt Pond into
the Inner Harbor and dredging a basin of about 1.4 acres in that
harbor to the same depth, at an estimated first cost of $16,000, with
annual maintenance of $500, subject to certain conditions of local co-
operation (H. Doc. No. 330, 77th Cong., 1st sess.)
   Local cooperation.-None required by law. The State of Rhode
Island and the town of New Shoreham expended $124,975.90 in dredg-
ing and protecting the channel.
   Termninal facilities.-These consist of a wharf with about 600 feet
of publicly available berthage and several privately owned and op-
erated small wharves and piers. These facilities are considered ade-
quate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was about 62
percent completed. The channel, 300 feet wide and 18 feet deep, with
a central depth of 25 feet over a width of 150 feet, has been dredged
into the pond. The south jetty was completed to its present length of
1,691 feet in 1905. The controlling depths at mean low water (May
1940) were about 20 feet in the central portion of the 150-foot width,
shoaled to 16 feet along the edges, about 16 feet in the 75-foot width
east of the central 150-foot width and 0 to 25 feet in the 75-foot width
west of the central 150-foot width. The jetty is in fair condition.
To complete the project would require the further widening and deep-
ening of the channel and the construction of the north jetty. The
costs and expenditures have been $189,036.65 for new work and $53,-
173.03 for maintenance, a total of $242,209.68.
   Proposedoperations.-No funds are available and no operations are
contemplated during the fiscal year 1943.
   The sum of $54,000 can be profitably expended during the fiscal
year 1944 in maintenance dredging, by contract, about 90,000 cubic
yards of sand from the channel between the jetties.
                         Cost and financial summary
Cost of new work to June 30, 1942---------------------------         $189, 036. 65
Cost of maintenance to June 30, 1942____-____
                                         --    ____________            53, 173. 03
      Total cost of permanent work to June 30, 1942 ------- __      -. 242, 209. 68
Net total expenditures __-- -------   -   -____---_____ ___-           242, 209. 68
Total amount appropriated to June 30, 1942- ------------ __-__         242,209. 68
Amount (estimated) required to be appropriated for completion of
existing project------ ---------                                      370, 900. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance-----------------------------                 54, 000. 00

                17. PAWCATUCK RIVER, R. I. AND CONN.

  Location.-Formedby the junction of the Wood and Charles Rivers
in southwestern Rhode Island, the river flows westerly and southerly
98      REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1942


18 miles and enters Little Narragansett Bay about 13 miles east of New
London Harbor. (See U. S. Coast and Geodetic Survey Charts Nos.
358 and 1211.)
    Previousprojects.--Adopted by the River and Harbor Acts of March
3, 1871, and August 5, 1886. For further details see page 1752 of the
Annual Report for 1915 and page 69 of the Annual Report for 1933.
    Existing project.-This provides for a channel in Little Narragan-
sett Bay and in the river. 10 feet deep at mean low water and 200 feet
wide from Stonington to Avondale, about 4 miles; 100 feet wide from
Avondale to the lower wharves at Westerly, about 3 miles; and 40 feet
wide between the lower and upper wharves of Westerly, about one-half
mile; and for the removal of obstructions at Watch Hill, at the south-
eastern part of the Little Narragansett Bay. The mean tidal range
is about 2.5 feet, and the maximum range, due to the combined effect
of wind and other causes, is 7 feet or more.
    The estimate of cost for new work, revised in 1928, is $150,000,
exclusive of amounts expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $3,000.
    The existing project was authorized by the following river and
harbor acts: The act of June 3, 1896, provided for the present channel
dimensions (H. Doc. No. 62, 54th Cong., 1st sess.) ; the act of March 3,
1905, provided for the removal of obstructions at Watch Hill. The
latest published maps are in the project document and in House Docu-
ment No. 839, Seventy-sixth Congress, Third session.
    Recommended modifications of project.-Under date of May 13,
1940, the Chief of Engineers recommended modification to provide
for a channel 100 feet wide and 10 feet deep at mean low water from
the mouth of the river into Watch Hill Cove; an anchorage basin in
the cove 10 feet deep and about 16 acres in area; and a riprap jetty
200 feet long near the southwest corner of the basin; at an estimated
first cost of $50,000 for new work with $1,000 annually for maintenance;
subject to certain conditions of local cooperation (H. Doc. No. 839,
76th Cong., 3d sess.).
    Terminal facilities.-These consist of two wharves with a total of
680 feet of docking space, which is adequate for present needs.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project was about 57
percent completed. The channels have been dredged to project di-
mensions; except that the channel in the bay has a general width of
100 feet, the channel in the river at Pawcatuck Rocks a width of 80
feet, and there is a slight deficiency in depth at the channel edges in
the vicinity of Rhodes Folly Beacon, due to ledge rock or large boulders
deeply embedded in the bottom. The most obstructive boulders in
the vicinity of Watch Hill have been removed, the work being com-
pleted in 1913. The controlling depths at mean low water were as
follows: About 9 feet (not full width) to head of improved channel at
Westerly, 6 feet in natural channel through Little Narragansett Bay
to Watch Hill, and 3 to 7 feet in Watch Hill Cove (1938 and 1939).
    To complete the project requires widening of the channel to 200
feet to Avondale and the removal of the rock at Pawcatuck Rocks and
in the vicinity of Rhodes Folly Beacon. The costs and expenditures
under the existing project have been $85,335.10 for new work and
 $119,553.93 for maintenance, a total of $204,889.03.
            RIVERS       AND HARBORS-              PROVIDENCE,          R.   I.,   DISTRICT             99
  Proposed operations.-No funds are available and no operations
are contemplated during the fiscal year 1943.
  The sum of $45,000 can be profitably expended during the fiscal year
1944 in dredging from the river channel, by contract, about 100.000
cubic yards of mud and sand.
                                    Cost and financial summary
Cost of new work to June 30, 1942      __         ----------------    1 $218, 692. 07
Cost of maintenance to June 30, 1942------------- -          --------
                                                                    _    119, 553. 93

      Total cost of permanent work to June 30, 1942 ----- ------ 1 338, 246. 00
                       --
Net total expenditures___                                          338,246.    00
                                                                   38-.------------------
Total amount appropriated to June 30, 1942--------------------- 338, 246. 00
Amount (estimated) required to be appropriated for completion of
existing project------------------------------------            --                            64, 600. 00
Amount that can be profitably expended in fiscal year ending June 30,
  1944, for maintenance _______--___-----_        ---------                                    45, 000. 00
  'Includes
reported.
           $35,856.96 expended on Little Narragansett Bay (1876-84);                       not previously

                                   18. MYSTIC RIVER, CONN.

   Location.-This river has its source in southeastern Connecticut.
flows in a southerly direction 8 miles, and empties into Fishers Island
Sound at Noank, 11 miles east of New London. (See U. S. Coast and
Geodetic Survey Charts No. 358 and No. 1211.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of September 19, 1890. For further details see page
1753 of Annual Report for 1915.
   Existing project.-This provides for a channel 100 feet wide and 15
feet deep from Fishers Island Sound to the highway bridge at Mystic,
about 21/2 miles, and the reducing of five bends in the natural channel;
and a channel having a general width of 100 feet and 12 feet deep
from the highway bridge at Mystic northerly about one-half mile to
a point 700 feet above the wharf of the Mystic Manufacturing Co.
The plane of reference is mean low water. The mean tidal range is
2.6 feet, and the maximum range due to the combined effect of wind
and other causes is 7 feet or more. The estimate of cost for new work,
revised in 1928, is $14,160, exclusive of amounts expended under previ-
ous projects. The latest (1917) approved estimate for annual cost of
maintenance is $400, to be appropriated in sums of $2,000 at intervals
of 5 years.
   The existing project was authorized by the following river and
harbor acts:

     Acts                        Work authorized                                   Documents


Sept. 19, 1890   Channel 100 feet wide and 15 feet deep from Fish-   Annual Report for 1889, p. 746.
                  ers Island Sound to highway bridge at Mystic,
                  and reducing of 5 bends.
July 25,1912     Restoration and maintenance of original project__   H. Doc. No. 858, 61st Cong., 2d sess.
Mar. 4,1913      Channel 100 feet wide and 12 feet deep from high-   H. Doc. No. 637,62d Cong., 2d sess.
                  way bridge at Mystic northerly to a point 700
                  feet above wharf of Mystic Manufacturing Co.


  For latest published map see H. Doc. No. 349, 77th Cong., 1st sess.
100          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                                   1942

   Recommended modifications of project.-Under date of June 3, 1941,
the Chief of Engineers recommended modification of the existing proj-
ect so as to provide for a channel 125 feet wide and 15 feet deep from
deep water in Fishers Island Sound to mile 2.4 in Mystic River, an
anchorage basin of 8.5 acres 9 feet deep north of Mason Island, and a
turning basin about 500 fget below the highway bridge by widening
the channel to 200 feet for a distance of 400 feet, at an estimated first
cost of $34,000, with $1,300 annually for maintenance in addition to
the amount now required, subject to certain conditions of local coopera-
tion (H. Doc. No. 349, 77th Cong., 1st sess.).
   Terminal facilities.-There are numerous wharves and piers. Need
is felt for a public small-boat terminal near the shopping center of
Mystic.
   Operations and results during fiscal year.-Maintenance dredging
in the 15- and 12-foot channels, by contract, was in progress from
October 10 to December 10, 1941. During the period 123,487 cubic
yards, place measure, ordinary material, were removed at a cost
of $42,814 96. Preliminary expenses on this work during the year
amounted to $395.39. Total costs were $43,210.35 all for maintenance.
Expenditures were $44,130.17.
   Condition at end of fiscal year.-The existing project was 81 per-
cent completed. A channel of project dimensions has been secured up
to the highway bridge and a channel of project depth but slightly
deficient in width has been secured from the highway bridge to the
head of the project. This work was completed in 1913. The con-
trolling depth at mean low water was 15 feet to the highway bridge
in Mystic, thence about 12 feet (not full width) to the head of the
project, all as determined in December 1941. The head of navigation
is about one-half mile above the head of the project. To complete
the project requires the widening of part of the channel above the
highway bridge by 10 to 20 feet. The costs and expenditures under
the existing project have been $11,525.50 for new work and $44,264.67
for maintenance, a total of $55,790.17.
   Proposed operations.-No funds are available and no operations
are contemplated during the fiscal years 1943 and 1944.
                                                      Cost and financial summary

Cost of new work to June 30, 1942 __________________ ____                                                                                       $48, 125. 50
Cost of maintenance to June 30, 1942______-_________-___                                                                                         44, 264. 67
      Total cost of permanent work to June 30, 1942________                                                                                      92, 390. 17
Net total expenditures--______------    ______-                                                                                                  92, 390. 17
Total amount appropriated to June 30, 1942_______________________                                                                                92, 390. 17

   Fiscal year ending June 30                                   1938                     1939              1940                   1941                 1942

C ost of new w ork -        -           -     -         - - -                       ----
                                                                                    -    -.-.---
                                                                                       ---   - -                ---
                                                                                                               ------    ----- ------              -   --------------
Cost of maintenance             ...........
                                 .                           .-
                                                  ______________                        -.   .     .-------  .
                                                                                                     _____________                 $919. 82        $43, 210. 35
Total expended     ....----------                 .......
                                                       _ -......-- _ _-
                                                                      ...........                      -   -    -   --    ----       --......          44, 130.17
Allotted......----------------..............-------------------------                               -------------
                                                                                                            ..    .              50, 000.00        -5, 869. 83
            RIVERS          AND HARBORS-PROVIDENCE,                                    R.   I.,   DISTRICT           101
Balance unexpended July 1, 1941_----      ------------     --------                                           $50, 000. 00
Deductions on account of revocation of allotment----------                                                      5, 869. 83

      Net amount to be accounted for--------------------------                                                 44, 130.17
Gross amount expended      -------------------------- $44, 448. 37
Less reimbursements collected---------------- -------      318. 20
                                                                                                               44, 130. 17

Amount (estimated) required to be appropriated for completion of
existing project-----------------------------------     -------                                                2, 500. 00

                               19. NEW LONDON HARBOR, CONN.

   Locality.-On the north shore of Long Island Sound, at its eastern
end and about 14 miles east of the mouth of the Connecticut River.
 (See U. S. Coast and Geodetic Survey Chart No. 293.)
   Previous projects.--Adopted by River and Harbor Acts of June 14,
1880, March 3, 1881, and July 13, 1892. For further details see Annual
Reports for 1915 and 1938, pages 1753 and 116, respectively.
   Existing projec.-This provides for an entrance channel generally
600 feet wide, widened at the approach to the State pier, 33 feet deep
and about 3.8 miles long from deep water in Long Island Sound to the
State pier; a channel 400 feet or more in width, 23 feet deep, and about
6,000 feet long skirting the water front of the city; a maneuvering
area 0 to 450 feet wide, 23 feet deep, west of the main channel and south
of the State pier; and for dredging Shaws Cove to a depth of 15 feet.
The plane of reference is mean low water, the mean tidal range being
2.5 feet. The maximum tidal range, due to the combined effects of
wind and other causes, is 7 feet or more. The estimate of cost for new
work, revised in 1937, was $568,400, exclusive of amounts expended on
previous projects. The latest (1937) approved estimate for annual
cost of maintenance is $3,900.
   The existing project was authorized by the following river and
harbor acts:

    Acts                            Work authorized                                               Documents


June 13,1902    Water-front channel-..............           _-.-._----- _-H.          Doe. No. 392, 56th Cong., 1st sess.
June 25,1910    Dredging in Shaws Cove_.....                                   H. Doe. No. 329, 60th Cong., 1st sess.
                                                               ______--------------------
                                                                                                                         1
July 27, 1916   Entrance channel________________--------.....................-----H.   Doe. No. 613, 63d Cong., 2d sess.
Aug. 26, 1937   Maneuvering area and present project extent of                    Rivers and Harbors Committee Doe.
                 entrance channel.                                                  No. 82, 74th Cong., 2d sess.l


  ' Contain latest published maps.

  Local cooperation.-Fully complied with.
  Terminal facilities.-These comprise 44 wharves and piers in a devel-
oped frontage of about 3 miles. Five piers are owned and used by the
Federal Government, one owned by the city, and one by the State.
Seven of the wharves are entirely or in part open to general public use
and two by agreement with the owners. Three wharves have direct
rail connections. The total available berthage space is about 27,000
feet. Facilities are considered adequate for existing commerce. (For
further details see Port Series No. 18, Corps of Engineers.)
  Operations and results durin fiscal year.-Preliminary work in
connection with proposed contract for maintenance dredging of the
102           REPORT OF CHIEF OF EINGINEERS,                                                    U.    S. ARMY,          1942

entrance and waterfront channels cost $361.66 for maintenance.
Expenditures were $7.50.
  Condition at end of fiscal year.-The existing project was completed
in 1938. The controlling depths at mean low water are: Entrance
channel from Long Island Sound to State pier, about 32 feet (June
1942); waterfront channel, except in Winthrop Cove, about 18 feet
(June 1942) ; Winthrop Cove, 22 feet (August 1941) ; and Shaws Cove,
15 feet (June 1941). The costs under the existing project have been
$567,974.19 for new work and $50,401.27 for maintenance, a total of
$618,375.46. Expenditures have been $618,021.30.
  Proposed operations.-Itis proposed to apply the funds unexpended
on June 30, 1942 amounting to $175,142.50 as follows:
Accounts payable June 30, 1942-----------------------------------     $354. 16
Maintenance: Dredging about 500,000 cubic yards of mud and sand
from the entrance and waterfront channels, by contract, July to
  December 1942___ ___________      _____________ _       _--     174, 788. 34

         Total ---------------------------------                                                                              175, 142. 50
  No additional funds can be profitably expended during the fiscal year
1944, as the completion of the above work will leave the project in
condition to meet the needs of existing navigation.
                                          Cost and financial summary
Cost of new work to June 30, 1942                       -----------                                                      $608, 774. 19
Cost of maintenance to June 30, 1942------------------------------                                                             50, 401. 27
      Total cost of permanent work to June 30, 1942----------------                                                           659, 175. 46
Minus accounts payable June 30, 1942__----------                                                                                   354. 16

         Net total expenditures                                                       ----------                              658, 821. 30
Unexpended balance June 30, 1942-------------------------------                                                               175, 142. 50
         Total amount appropriated to June 30, 1942-----------------833, 963.80

    Fiscal year ending June 30               1938                     1939                       1940            1941              1942

Cost of new work___ .                      $2, 691.74             $6, 892. 27            .---                -
Cost of maintenance .         ...   _ _    _______     __             415.99            .-..                                        $361.66
      Total cost_----------------           2, 691.7                  7, 308. 26          ..-   - --......                            361.65
Total expended __._                                               10, 000. 00                                                             7. 50
          ...-.________ _____.10,
Allotted___                         _          000.00       ......................................                        .       175,150. 00



Amount allotted from War Department Civil Appropriation Act ap-
  proved Apr. 28, 1942_---------------------------------------- $175, 150. 00
Gross amount expended -----------------------------------------         7. 50
      Balance unexpended June 30, 1942--------------------------                                                              175, 142. 50
Outstanding liabilities June 30, 1942_-----------------------------                                                                354. 16
         Balance available June 30, 1942_________________-----___                                                             174, 788. 34

                                        20. THAMES RIVER, CONN.

  Location.-This is a tidal estuary varying in width from about 400
feet to three-fourths of a mile, and extending from the junction of
the Yantic and Shetucket Rivers at Norwich, Conn., 15 miles south-
            RIVERS         AND HARBORS-PROVIDENCE,                        R.   I.,   DISTRICT          103
erly to Long Island Sound at New London. (See United States Coast
and Geodetic Survey Chart No. 359.)
   Previous projects.-Adopted by the River and Harbor Acts of July
4, 1836, and March 3, 1879. For further details see page 1754 of
Annual Report for 1915, and page 118 of Annual Report for 1938.
   Existing project.-This provides for a channel 25 feet deep and 250
feet wide to the upper end of Bartletts Crossover and thence to Nor-
wich generally 200 feet wide, with increased width in the bends,
through Long Reach, and at the head of navigation, a total distance
of about 8.6 miles; the construction of five training walls of pile
and stone or riprap, having their tops at mean high water and with an
aggregate length of about 13,800 feet, located, respectively, at Mo-
hegan, Trading Cove, Long Rock, Rolling Mill, and Norwich, and the
removal of obstructions in the Shetucket River at Norwich. The
plane of reference is mean low water, the mean tidal range being 2.5
feet at New London, and 3.1 feet at Norwich. The maximum range,
due to the combined effect of wind and other causes, is 7 feet or more.
   The estimate of cost for new work, revised in 1935, is $1,508,400,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $29,300.
   The existing project was authorized by the following river and
harbor acts:

    Acts                          Work authorized                                    Document



Aug. 2, 1882      Training walls___________________________________    Annual Report, 1882, p. 606.
June 25,1910      Removal of obstructions in the Shetucket River_ _    H. Doc. No. 397, 61st Cong., 2d sess.
Jan. 21, 1927     Channel 18 feet deep above Allyns Point              H. Doc. No. 107, 69th Cong., 1st sess.
July 3, 1930      Present project dimensions of channel up to Allyns   Rivers and Harbors Committee Doe.
                                                                                                    1
                    Point.                                              No. 14, 71st Cong., 2d sess.
Aug. 30,1935      Present project dimensions of channel above          Rivers and Harbors Committee Doe.
                    Allyns Point.                                       No. 18, 74th Cong., 1st sess.


  1Contains     latest published maps.


   Recommended modifications of project.-Under date of June 13,
1939, the Chief of Engineers recommended modification of the existing
project so as to provide for increasing the width of channel opposite
the United States submarine base by an average of 350 feet, at an
estimated first cost of $120,000, with annual maintenance of $1,700,
in addition to that now required (H. Doc. No. 367, 76th Cong., 1st
sess). This improvement was accomplished by the United States
Navy Department in 1940 at a cost of about $125,000 from special funds
allotted the Navy for extension of the submarine base.
   Terminal facilities.-Wharves along the river and at Norwich are
mainly of the bulkhead type, both with and without pile aprons. The
facilities are considered adequate for the existing commerce.
   Operations and results during fiscal year.-Additional Government
costs in connection with improvement dredging between Stoddards
Wharf and Norwich completed during the preceding fiscal year
amounted to $124.78. Preliminary surveys on a shoal of hard material
at Long Reach cost $2,154.82. Total costs, all for new work, were
$2,279.60. Expenditures were $12,890.61.
104          REPORT OF CHIEF OF ENGINEERS,                                           U.    S. ARMY,           1942

   Condition at end of fiscal year.-The existing project was about 99
percent completed. The training walls were completed in 1906, except
the upper end of the Rolling Mill dike, which is replaced by adjacent
shore improvements. The training walls are in fair condition. The
head of navigation is at Norwich about 15 miles above the mouth.
The controlling depth at mean low water (not full width) was 25 feet
to Norwich, except for minor shoals, as determined in March 1939 and
March 1941. To complete the project requires slight widening of the
channel at the upper end of Long Reach. The costs under the existing
project have been $1,323,571.87 for new work and $485,659.27 for main-
tenance, a total of $1,809,231.14. Expenditures have been $1,808,231.14.
  Proposed operations.-It is proposed to apply the funds unexpended
on June 30, 1942, amounting to $13,640.36, as follows:
Accounts payable June 30, 1942-      -       -     -      -    - --. $1, 000. 00
New work : Dredging to widen channel at the upper end of Long Reach,
  by contract-----------         -----------------------------       12, 640. 36
         Total                   ----------------------------------------------                                        13, 640. 36
  The sum of $50,000 can be profitably expended during the fiscal
year 1944 in maintenance dredging, by contract, about 125,000 cubic
yards of mud and sand from the channel opposite and above the
submarine base.
                                             Cost and financial summary

Cost of new work to June 30, 1942-------------------------- $1, 471, 919. 46
Cost of maintenance to June 30, 1942--------------------------  522, 255. 14
      Total cost of permanent work to June 30, 1942------------__ 1, 994,174. 60
Minus accounts payable June 30, 1942--------------------------         1, 000. 00
     Net total expenditures-----    --------------------------                                                      , 993, 174. 60
Unexpended balance June 30, 1942___                                                                                    1----------------------------
                                                                                                                        3, 640. 36
          Total amount appropriated to June 30, 1942--------------                                             2, 006, 814. 96

   Fiscal year ending June 30                      1938            1939                1940            1941                1942


Cost of new work                                                  $4, 072. 48       $367, 305. 60   $261, 584. 11          $2, 279. 60
Cost of maintenance........-----------.        $13, 734. 71           721. 03   _                     47, 697. 33
       Total cost...--                ----..
                          ...------- --..        13, 734. 71       4, 793. 51        367, 305. 60    309, 281. 44           2, 279. 60

Total expended........                             13, 419. 71
                                    ..----------------.            4, 407. 58        332, 960. 41    332, 716. 55          12, 890. 61
Allotted ------------                            15, 035. 22     820, 000.00    -125, 000. 00                                     .

Balance unexpended July 1, 1941-----------------------------                                                         $26, 530. 97
Gross amount expended       ----------------------- $12, 990. 43
Less reimbursements collected ----------------------      99. 82
                                                                                                                       12, 890. 61
     Balance unexpended June 30, 1942_------------------------                                                         13, 640. 36
Amount covered by uncompleted contracts-----------------                                                                1, 000. 00

          Balance available June 30, 1942_--------------------------                                                   12, 640. 36

Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance ----------------------------                                                           50, 000. 00
   1 Exclusive of available           funds.
            RIVERS AND HARBORS--PROVIDENICE,                            R. I.,    DISTRICT            105
                21. CONNECTICUT RIVER BELOW HARTFORD, CONN.
   Location.-This river has its source in Connecticut Lake in northern
New Hampshire, flows southerly 380 miles, and empties into Long
Island Sound at Saybrook, Conn., 14 miles west of New London.
Hartford, now the head of commercial navigation, is 51.9 statute miles
by channel from the mouth. (See U. S. Coast and Geodetic Survey
charts Nos. 215, 254, 255 and 256.)
   Previous projects.-Adopted by the River and Harbor Acts of
July 4, 1836, and July 11, 1870. For further details see page 1754,
Annual Report for 1915, and page 120, Annual Report for 1938.
   Existing project.-This provides for a channel 15 feet deep at mean
low water, 300 feet wide from the mouth to the Lyme railroad bridge,
about 3.4 miles, and thence 150 feet wide to Hartford, the channel to
be obtained by dredging and the construction of dikes, training walls,
revetments, and accessory works; for two riprap jetties at the mouth
of the river, the tops to be 5 feet above high water and 6 feet wide,
the easterly one about 2,300 feet and the westerly about 2,750 feet in
length; and for a training dike about 3,700 feet long at Hartford.
The mean tidal range is 3.5 feet at the mouth and, at summer stage
about 1 foot at Hartford. The maximum tidal range at the mouth,
due to wind or other causes, is 8 feet or more. At Hartford the usual
rise due to spring freshets is between 16 and 24 feet above mean low
water. The maximum recorded freshet at Hartford (March 1936)
was 35.5 feet above mean low water. Below Middletown the height
of the crest of the freshet decreases rapidly.
   The estimate of cost for new work, revised in 1935, is $918,000.
The latest (1932) approved estimate for annual cost of maintenance
is $53,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                  Documents


June 10, 1872    Jetties at the mouth .                  __   _     Present project dimensions approved
                                                                     by the Chief of Engineers, Dec. 22,
                                                                      1887.
Mar. 3,1881      The Hartford dike_                                 Present project dimensions authorized
                                                                      by the Chief of Engineers in 1889.
Feb. 27, 1911    Present project dimensions of the channel over     H. Doc. No. 1294, 61st Cong., 3d sess.
                  Saybrook Bar.
Mar. 2,1919      Dikes, training walls, and revetments ...- -  ..   H. Doc. No. 132, 65th Cong., 1st sess.t
Aug. 30,1935     Present project dimensions of channel and addi-    H. Doc. No. 49, 73d Cong., 1st sess.l
                  tional dikes, training walls, revetments, and
                  accessory works.


1Contains latest published maps.

  Recommended modifecatio s of project.-Under date of June 14,
1939, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for an anchorage in North Cove in the
town of Old Saybrook, Conn., connected with deep water in the Con-
necticut River by a channel 100 feet wide and 11 feet deep, all at an
estimated cost of $140,400 for new work, with $3,000 annually for
maintenance, in addition to the amount now required, subject to certain
conditions of local cooperation (H. Doc. No. 368, 76th Cong., 1st sess.).
106     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,              1942

   Local cooperation.-The River and Harbor Act of August 30, 1935,
authorized the 15-foot channel up to Hartford and additional dikes,
training walls, and revetments, subject to the provision that local inter-
ests shall furnish, free of cost to the United States, suitable areas for the
disposal of dredged material during initial construction and for future
maintenance as and when needed. Areas have been furnished where
required, and it is undertsood that future requirements will be met.
    Terminal facilities.-There are two or three wharves at each of the
river towns, one or more in each town being open to public use. At
Hartford and at Middletown there is approximately one-half mile of
wharf frontage along the west bank of the river. The facilities are
considered adequate for existing commerce.
    Operations and results during fiscal year-New work.-Preliminary
studies and designs for additional training works were continued at
a cost of $46.86, and tidal studies were continued at a cost of $1,679.69.
Preliminary work on the proposed contract for dikes at Glastonbury
Bend cost $1,471.08.
   Maintenance.-Repairsto revetments in the vicinity of Clay Banks,
Naubuc, Press Barn, Glastonbury Upper Bars, and Gildersleeve Shoal
by hired labor were in progress from October 15, 1941, to November 29,
1941. A total of 701.6 long tons stone and 4.65 cords brush were placed
at a cost of $1,999.33. Maintenance dredging which had been begun
during the preceding year on the bars below Middletown with the
U. S. hopper dredge Absecon was in progress from July 2 to July 16,
1941, and from August 21 to September 10, 1941. During these periods
187,440 cubic yards, bin measure, ordinary material were removed from
Potash, Warners Quarry, Haddam Island, Rock Landing, Scovill
Rock, and Sears Upper Bars and Eddy Rock and Sears Lower Shoals.
The cost of this work during the year was $17,942.88 in addition to
$244.30 preliminary costs. Maintenance dredging of the bars above
Middletown by contract was in progress from September 12 to October
21, 1941. During the period 220,851 cubic yards, place measure, ordi-
nary material were removed at a cost of $64,082.81 from Gildersleeve
Island Shoal and Cromwell, Pistol Point, Brownstone, Dividend, Two
Piers, Glastonbury, Press Barn, Naubuc, Cys Hollow and Clay Banks
Bars. Preliminary expenses on this work during the year amounted to
$263.84. Emergency dredging at Hartford due to the collapse of bridge
under construction cost $2,167.99. Preliminary work in connection
with proposed dredging of bars below Middletown by U. S. hopper
dredge Absecon cost $2,673.72 and in connection with proposed con-
tract for dredging bars above Middletown cost $2,163.91.
    The costs during the year were $3,197.63 for new work and $91,538.78
for maintenance, a total of $94.736.41. Expenditures were $96,741.89.
    Condition at end of fiscal year.-The existing project was about 80
percent completed. The 15-foot channel from the mouth to Hartford
was completed in 1937. The Saybrook jetties and training walls at
Hartford, Clay Banks, and Sears Shoal, were completed in 1915.
The stone dikes and timber spurs at Pistol Point, Glastonbury, Press
Barn, Naubuc, Cys Hollow, and Clay Banks were completed in 1927.
Timber pile dikes at Press Barn Bar were completed in 1940. The
Clay Banks, Cys Hollow, Naubuc, Press Barn, Glastonbury (including
Two Piers), and Gildersleeve Island Reaches have been revetted. The
jetties, training walls, dikes, and revetments are in good condition.
The head of commercial navigation is at Hartford 51.9 miles by
         RIVERS    AND HARBORS -- PROVIDENrCE,               R.   I.,   DISTRICT          107
channel from the mouth. A dam at Holyoke, Massachusetts, 34 miles
above Hartford, completely interrupts navigation.
  Due to the spring freshet of 1942, the channel dimensions above
Middletown are somewhat diminished. The controlling depths at
mean low water were 14 feet to Middletown (June 1942), and thence
13 feet to Hartford (May and June 1942). To complete the project
requires the construction of additional permanent works. The costs
under the existing project have been $740,778.85 for new work and
$1,072,637.57 for maintenance, a total of $1,813,416.42. Expenditures
have been $1,813,649.58.
  Proposedoperations.-It is proposed to apply the funds unexpended
on June 30, 1942, $184,915.57 and accounts receivable, $233.86, a total
of $185,149.43, as follows:
New work :
Accounts payable June 30, 1942-_ _      ___                                  $0. 70
    Training works at Glastonbury Bend, by contract, August to
      December 1942--        --------          ------------------       43, 228. 92
    Tidal study, Hartford to Saybrook, and studies and designs for
      additional training works, in progress----------------___          4, 187. 70
Maintenance :
    Dredging on river bars above Middleton, by contract, August to
      October 1942, about 126,200 cubic yards--------------------65, 232. 11
    Dredging on river bars below Middletown by a United States
      seagoing hopper dredge for about 1%/2 months in the fall of 1942_ 30, 000. 00
    Dredging on river bars below Middletown by a United States
      seagoing hopper dredge, for about 2 months in spring of 1943__    35, 000. 00
    Repairs to existing permanent works by hired labor, August
       to October 1942___ __      _---            --------                           5, 000. 00
    Preliminary expenses in connection with proposed dredging on
      river bars, by contract, in fiscal year 1944-------------------                2, 500. 00
         Total ---------------------------------------                    --      185, 149. 43
  The sum of $180,000 can be profitably expended during the fiscal year
1944 as follows:
New work: Dikes, training walls, and accessory works, by contract -__                 $75, 000

Maintenance:
   Dredging on river bars above Middletown, by contract, during the
      summer of 1943, removing about 200,000 cubic yards of sand -----                 65, 000
   Dredging on river bars below Middletown, using a United States sea-
      going hopper dredge, about 2 months in the spring of 1944-------                 35, 000
   Repairs to existing permanent works, by hired labor----------------                  5, 000
      Total for maintenance----------                                                 105, 000
      Total for all work.-_------- ----------                                         180, 000
                          Cost and financial summary

Cost of new work to June 30, 1942----------------------------                  $1, Q28, 153. 14
Cost of maintenance to June 30, 1942_------------------                         1, 438, 986. 04
      Total cost of permanent work to June 30, 1942-------------2, 467, 139. 18
Plus accounts receivable June 30, 1942---------------------------       233. 86
      Gross total costs to June 30, 1942------------------------               2, 467, 373. 04
Minus accounts payable June 30, 1942--------------------------                             .70
      Net total expenditures--------------------------         2, 467, 372. 34
Unexpended balance June 30, 1942------------------------------    184, 915. 57

      Total amount appropriated to June 30, 1942-_----                         2, 652, 287. 91
108             REPORT OF CHIEF OF ENGINEERS,                                    U.    S.   ARMY,        1942


    Fiscal year ending June 30                  1938                1939           1940           1941               1942


Cost of new work_____.......                 $14, 048. 15        $13, 626. 22    $45, 936. 76    $3, 571. 50         $3, 197. 63
Cost of maintenance _.........                81, 292. 42         47, 842. 90    152, 653. 78    73, 714. 60         91, 538. 78

       Total cost----------------              95, 340. 57         61, 469. 12   198, 590. 54    77, 286. 10         94, 736. 41

Total expended----------------               126, 403. 23          59, 912. 46   197, 580. 13    91, 486. 40         96, 741. 89

Allotted ....       ......--------------------- 283, 500. 00       90, 430. 00    90, 000. 00   135, 589. 28        105, 000. 00



Balance unexpended July 1, 1941__                                                                              $176, 657.46
Amount allotted from War Department Civil Appropriation Act ap-
  proved Apr. 28, 1942--_ ---------------------------------------                                                05, 000. 00

       Amount to be accounted for                                                                                81, 657.46
                                                                                                                2----------------------------
Gross amount expended_------------------------_    $99, 494. 76
Less reimbursements collected-----------------------2, 752. 87
                                                                                                                 96, 741. 89
      Balance unexpended June 30, 1942-----------------------184, 915. 57
Outstanding liabilities June 30, 1942-------------------             .70
     Balance available June 30, 1942-------------------------184, 914. 87
Accounts receivable June 30, 1942_------------------------------  233. 86

          Unobligated balance available June 30, 1942--------------                                             185, 148. 73

Amount (estimated) required to be appropriated for completion of
existing project _--------------                            -                                                  131, 300. 00

Amount that can be profitably expended in fiscal year ending June
30, 1944:
   For new work                                                                                                   5, 000. 00
                                                                                                                 7----------------------------
       For maintenance                                     ----------------                                    105, 000. 00

        Total                 -------------------------------------                                             180,000.00
   1 Exclusive of available funds.

                                22. DUCK ISLAND HARBOR, CONN.

  Location.-On the north shore of Long Island Sound about 20 miles
east of New Haven, Conn. (See U. S. Coast and Geodetic Survey
Chart No. 216.)
  Previous projects.--Adopted by River and Harbor Act of Septem-
ber 19, 1890. For further details, see page 1755 of Annual Report for
1915 and page 124 of Annual Report for 1938.
   Existing project.-This provides for the construction of three rip-
rap breakwaters, viz, one extending northwardly from Duck Island
1,100 feet, one extending westwardly from Duck Island 2,697 feet,
and one extending southwardly from Stone Island, just south of
Kelsey Point, 3,750 feet, each breakwater to be 8 feet wide on top,
9 feet high above mean low water, with side slopes of 2 on 3, except
on the northerly side of the one extending westerly from Duck Island
and the westerly side of the one extending northwardly from Duck
Island, where the slopes are to be 1 on 1; and for dredging to a depth
of 16 feet at mean low water a portion of the protected area back of
the breakwaters at Duck Island. The mean tidal range is 4.5 feet,
and the maximum range, due to the combined effect of wind and other
causes, is 9 feet or more.
            RIVERS        AND       HARBORS-PROVIDENCE,                              R.       I., DISTRICT             109
  The estimate of cost for new work, revised in 1916, was $370,000,
exclusive of amounts expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $10,000. The
existing project was authorized by the following river and harbor acts:

    Acts                          Work authorized                                               Documents



June 25,1910    The breakwaters_ __ ..         __-_-_---------------------       H. Doc. No. 398, 60th Cong., 1st sess.
July 27,1916    Dredging 16-foot area back of breakwaters- .. __..               H. Doc. No. 812, 64th Cong., 1st sess.
                                                                                  (Contains latest published map.)



   Terminal facilities.'-None.
   Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1917, the breakwaters having been completed in 1914. The
central portions of the anchorage area have project depth. The con-
trolling depths in the protected area behind the breakwater, as deter-
mined in January 1939, were 15 to 20 feet except in the extreme south-
east corner about 8 feet, all at mean low water. The breakwaters are
in good condition. The costs and expenditures under the existing
project have beefi $367,297.91 for new work and $307,782.60 for main-
tenance, a total of $675,080.51.
  Proposedoperations.-Itis proposed to apply the funds unexpended
on June 30, 1942, amounting to $50,000 for maintenance dredging in
the area behind the breakwaters by a United States hopper dredge in
the spring of 1943 about 300,000 cubic yards.
   No additional funds can be profitably expended during the fiscal
year 1944 as the completion of the above work will place the project
in condition to meet the needs of existing navigation.
                                      Cost and financial summary

Cost of new work to June 30, 1942________________                                       ___-----              $482, 165. 81
Cost of maintenance to June 30, 1942 --------------                                                            313, 116. 70

        Total cost of permanent work to June 30, 1942-________-                                           _    795, 282. 51

Net total expenditures ._______________----- --                                    --                   795, 282. 51
Unexpended balance June 30, 1942 -_____-- -                                  -            -     -_______- 50, 000. 00
        Total amount appropriated to June 30, 1942___--                                   ______               845, 282. 51

   Fiscal year ending June 30              1938             1939                 1940              1941             1942

Cost of new work-                   ---------------             --              ------    --------
Cost of maintenance        -            $31, 649. 83       $6, 988. 15       $19, 248. 12     -                 .
Total expended ______ ____.__             30, 892. 53       1, 419. 38        25, 574. 19
Allotted_.. _       ------                34, 000. 00      22, 149. 83           1, 736. 27        $50, 000 -



Balance unexpended July 1, 1941_________---------            ---- _                                            $50,000. 00
Balance unexpended June 30, 1942___-------------------------------                                              50, 000. 00


        493202-43-pt. 1, vol. 1--8
 110           REPORT OF CHIEF OF                ENGINEERS,               U.    S.      ARMY,     1942

                                 23. BRANFORD HARBOR, CONN.

    Locality.-On the north shore of Long Island Sound, 5 miles east
of New Haven Harbor. (See U. S. Coast and Geodetic Survey Chart
No. 217.)
   Existing project.-This provides for a channel 81/2 feet deep and
100 feet wide through the shoals at the mouth of the harbor, about one-
half mile and of the same depth, width, and length between the lower
and upper wharves in Branford River. The plane of reference is
mean low water. The mean tidal range is 5.9 feet, and the maximum
range, due to the combined effect of wind and other causes, is 10 feet or
more.
    The estimate of cost for new work, revised in 1905, was $10,000. The
latest (1928) approved estimate for annual cost of maintenance is
 $2,500.
   The existing project was authorized by the following river and
harbor acts:

       Acts                           Work authorized                                           Documents



June 13,1902      Channel between upper and lower wharves in the river ..              H. Doc. No. 100, 56th Cong.,
                                                                                          2d sess., and Annual Re-
                                                                                         port for 1901, p. 1188.
Mar.    2, 1907   Channel at the mouth of the harbor    -                          _   Specified in act.


   For latest published maps see H. Doc. No. 1292, 64th Cong., 1st sess.


    Terminal facilities.-These facilities, comprising two wharves near
the head of the harbor and one at the mouth of the river are consid-
ered adequate for existing commerce.
    Operations and results during fiscal year.-None.
    Conditionat end of fiscal year.-The project was completed in 1907.
The controlling depth at mean low water, as determined in February
1938, was 9 feet to the head of navigation. The cost and expendi-
tures have been $9,537.45 for new work and $73,559.49 for maintenance,
a total of $83,096.94.
    Proposedoperations.-No funds are available and no operations are
contemplated during the fiscal year 1943.
    The sum of $30,000 can be profitably expended during the fiscal year
1944 as follows:
Maintenance :
     Dredging about 40,000 cubic yards of mud and sand from the harbor
       channel, by contract----------------------------------------    $20, 000
     Dredging about 20,000 cubic yards of mud and sand from the river
       channel, by contract ._____._____      ________-__-__---         10, 000
              Total_                              -------------------------------                          30, 000
                                    Cost and finaneial sum ary
.ost  of new work to June 30, 1942--------------------------------                                    $9, 537. 45
Cost of maintenance to June 30, 1942 ----------------- ----------                                    73, 559. 49
       Total cost of permanent work to June 30, 1942_  -------                                        83, 096. 94
Net total expenditures-_-        - _- -
                              - ___             ---
                                              ____         ----                                       83, 096. 94
Total amount appropriated to June 30, 1942_-----------                                               83, 096. 94
            RIVERS AND           HARBORS--PROVIDENiCE,                     R.      I.,         DISTRICT                111

   Fiscal year ending June 30          1938            1939            1940                     1941               1942


Cost of new work . .  ...-                                   ....   .....---            ...    --------........
,Cost of maintenance-----------      $25, 670. 10 ..
Total expended       -------------    25, 670. 10----------------------                    ------------------------

Tllotted-   ----------------          25, 670. 10---------       -------        ------           ----        --------------


,Amount that can be profitably expended
                                        in fiscal year ending June 30,
  1944 for maintenance_________________________-_              -       $30, 000. 00

                               24. NEW HAVEN HARBOR, CONN.

    Location.-On the north shore of Long Island Sound, about 67 miles
to the east of New York City. (See U. S. Coast and Geodetic Survey
Chart No. 218.)
    Previous projects.-Adopted by River and Harbor Acts of August
.30, 1852, March 3, 1871, June 10, 1872, and for West River, March 3,
1905. For further details, see page 1755 of Annual Report for 1915
and page 127 of Annual Report for 1938.
    Existing project.-This provides for a channel 25 feet deep, 400 feet
wide, and 31/2 miles long from Long Island Sound to opposite Fort
Hale; thence of same depth 500 feet wide (increased to 1,111 feet at
the turn opposite Long wharf) 2 miles to Tomlinson Bridge; two
anchorage basins below Tomlinson Bridge of 16- and 15-foot depths;
a pile-and-riprap dike, total length about 4,200 feet, to contract tidal
flow at Fort Hale Bar; a channel 12 feet deep and 100 to 150 feet
wide, from the southwest corner of the 16-foot anchorage basin via
Oyster Point and the West Haven wharf front to Kimberly Avenue
Bridge; thence 12 feet deep and prevailing width of 75 feet up West
River approximately to the railroad bridge, and an anchorage basin
6 feet deep in West River opposite Mars wharf ; a channel 100 feet wide
and 12 feet deep from the 15-foot anchorage basin toward Brewery
Street, about 1,500 feet; a channel 200 feet wide and 18 feet deep
up Quinnipiac River to Ferry Street Bridge, and thence 200 feet wide
and 16 feet deep to Grand Avenue; a channel up Mill River 12 feet
deep, 200 feet wide, to the junction of the two branches above Chapel
Street, thence to Grand Avenue, 100 feet wide in the East Branch and
generally 125 feet wide in the West Branch; and the removal of certain
obstructive rocks in Morris Cove. All depths refer to mean low water,
the mean tidal range being 6.2 feet. The maximum tidal range, due
to the combined effect of wind and other causes, is 10 feet or more.
    The estimate of cost for new work, revised in 1941 is $975,000, ex-
elusive of amounts expended on previous projects. The latest (1941)
approved estimate for annual cost of maintenance is $57,000.
    The existing project was authorized by the following river and
harbor acts:
112           REPORT OF CHIEF OF EGINEERS,                         U.     S
                                                                          S.   ARMY,       1942




       Acts                     Work authorized                                     Documents



Aug.    2,1882                       ..    _
                 Sandy Point dike ------------ ---.-----.   _       Plans approved by a Board of Engi-
                                                                        neers, Oct. 2, 1882.
Mar. 3,1899      The 16-foot anchorage basin_ __    -   --  _ H. Doc. No. 82, 55th Cong., 1st sess.
June 25,1910     Brewery Street Channel, removal of rocks in H. Doc. No. 1159, 60th Cong., 2d sess.
                  Morris Cove and present project dimensions of
                  the 15-foot basin.
July 25,1912    Present project dimensions of the channels in       H. Doec. No. 26, 62d Cong., 1st sess.
                  Mill River.
    Do .-- __ Present project dimensions of the West River          H. Doec. No. 535, 62d Cong., 2d sess.
                  Channel and anchorage.
July 3, 1930    Present project dimensions of channel in Quin-      H. Doc. No. 686, 69th Cong., 2d.sess.
                  nipiac River.
Aug. 30, 1935 1 The 25-foot channel___-                             H. Doec. No. 479, 72d Cong., 2d sess.


1 Also Public Works Administration, Sept. 6, 1933.

The latest published map is in H. Doec. No. 307, 76th Cong., 1st sess.


   Recommended modifications of project.-Underdate of May 25, 1939,
the Chief of Engineers recommended modification of the existing
project for New Haven Harbor, Conn., so as to provide a main chan-
nel 30 feet deep at mean low water, 400 to 1,111 feet wide from Long
Island Sound to Tomlinson Bridge, two anchorage basins, one 30 feet
deep, 1,100 feet wide, and 4,900 to 2,700 feet long, and one 16 feet deep,
600 feet wide, and 2,700 feet long, at the head of the harbor, south of
Long Wharf and west of the main channel, at an estimated first cost
of $1,673,000, with annual maintenance of $12,250 in addition to that
now required; and a channel in Quinnipiac River 27 feet deep at mean
low water, 350 to 170 feet wide from Tomlinson Bridge to Ferry Street
Bridge with a turning basin of the same depth, about 3 /2 acres in
area at the junction of Mill and Quinnipiac Rivers, at an estimated
first cost of $835,000, with annual maintenance of $1,200 in addition
to that now required; subject to certain conditions of local cooperation
 (H. Doc. No. 307, 76th Cong., 1st sess.).
   Terminal facilities.-The wharves and piers served by this improve-
ment are grouped near the head of the main harbor; on both sides of
Mill River between Chapel Street and Grand Avenue; on both sides
of Quinnipiac River throughout the greater part of its improved por-
tion; at Oyster Point; and along the westerly side of West River. The
total length of berthing space available at 55 wharves or piers is about
16,670 feet. One of the wharves is open to public use, six are open to
public use upon agreement with the owners, and nine have direct rail
connections.
   The facilities are not considered adequate, and various plans have
been prepared and considered by the municipality for extensive addi-
tions and improvements. (For further details see Port Series No. 18,
Corps of Engineers.)
   Operations and results during fiscal year.-Rock removal from the
entrance channel by the U. S. lighter Babcock, in progress at the be-
ginning of the year, was completed on July 16, 1941. During the year
52 cubic yards of ledge rock were removed at a cost of $6,224.95 for
new work. Preliminary work in connection with proposed contract
for maintenance dredging Mill River channel cost $886.91. Total
              RIVERS          AND   HARBORS-PROVIDENCE,                             R. I.,    DISTRICT              113

costs were $6,224.95 for new work and $886.91 for maintenance, a total
of $7,111.86. Expenditures were $11,845.40.
   Conditionat end of fiscal year.-The existing project was practically
completed in 1935, the Sandy Point dike having been completed in 1890.
The latter is in poor condition. The controlling depths at mean low
water were as follows: Main channel to within 300 feet of Tomlinson
Bridge, nearly 25 feet, except at the edges; thence to Tomlinson
Bridge, 18 feet (August 1939), 16-foot anchorage, 9 to 18 feet (April
1942); 15-foot anchorage, 16 feet except at edges (August 1940);
Brewery Street Channel, 12 feet except at edges (August 1940) ; West
Haven 6-foot anchorage, 0 to 6 feet. (April 1942); West River about
10 feet (April 1942); Mill River about 11 feet except in branches,
east about 4 feet, west about 7 feet (April 1942); Quinnipiac River,
18 feet except minor shoals at edges (January 1941).
   To complete the project requires the deepening of the main channel
for about 300 feet immediately below Tomlinson Bridge. The total
costs and expenditures, all funds, under the existing project have been
$2,040,065.45, of which $609,364.08 regular funds, and $350.083.75,
Public Works funds, a total of $959,447.83, was for new work, and
$1,080,617.62 for maintenance.
  Proposed operations.-Itis proposed to apply the funds unexpended
on June 30, 1942, amounting to $113,482.28, as follows:
Maintenance :
   Dredging in the Mill River channel, by contract, August to
      October 1942, about 66,000 cubic yards__ ______--
                                                   --------       $38, 482. 28
    Dredging in the 16-foot anchorage, by contract, April to May
      1943, about 250,000 cubic yards   -------------------------- 75, 000. 00
              Total          --------------------------------------------                                   113, 482. 28
  No additional funds can be profitably expended during the fiscal
year 1944 as the completion of the above work will have the project
in condition to meet the needs of existing navigation.
                                       Cost and financial summary
Cost of new work to June 30, 1942---------------------------- $1, 291, 073. 49
Cost of maintenance to June 30, 1942__________________------,     113, 187. 62

            Total cost of permanent work to June 30, 1942 ________----                                 2, 404, 261. 11

Net total expenditures___________---_                                                                  2, 404, 261. 11
Unexpended balance June 30, 1942_ 1---------                                                              113, 482. 28

            Total amount appropriated to June 30, 1942 ___________                                     2, 517, 743. 39

   Fiscal year ending June 30             1938            1939                  1940           1941             1942

Cost of new work ---   -      .....
                                ....         .__.....            .     ..--.           ....   $5, 145. 59       $6, 224. 95
Cost of maintenance----------- _        $77,136. 78     $70,460. 39       $31, 629.12         54. 582. 03           886. 91

      Total cost---------_    ---        77, 136. 78     70, 460. 39           31, 629. 12    59, 727. 62        7, 111.86
Total expended--_--------                93, 593.08      57, 351. 67           44, 864. 50    54, 990. 23       11, 845. 40
Allotted.                --              88, 000. 00     73,000. 00 -------------......       35, 764. 72       85, 769. 36
114         REPORT         OF CHIEF OF            ENGINEERS,           U. S. ARMY,          1942

Balance unexpended July 1,1941-                                                                  $39, 558. 32
Amount allotted from War Department Civil Appro-
priation Act approved June 24, 1940--------------                          $10, 769. 36
Amount allotted from War Department Civil Appro-
priation Act approved Apr. 28, 1942---------------__                         75, 000. 00
                                                                                                  85, 769. 36
      Amount to be accounted for-----              ______ _ _                                    125, 327. 68
Gross amount expended---------------------------$12, 014. 11
Less reimbursements collected---------------------      68. 71
                                                                                                 -11, 845. 40


         Balance unexpended June 30, 1942-----------------------                                 113,482. 28

Amount (estimated) required to be appropriated for completion
   of existing project 1______--________                      ___________---------               15, 000. 00
  1Exclusive of available funds.

                     25. BREAKWATERS AT NEW HAVEN, CONN.

   Location.-On the north shore of Long Island Sound, about 67 miles:
east of New York City. (See U. S. Coast and Geodetic Survey Chart
No. 218.)
   Existing project.-This provides for a harbor of refuge at the en-
trance to New Haven Harbor by constructing three riprap break-
waters, the east 3,450 feet long, extending from Quixes Ledge to South-
west Ledge; the middle, 4,450 feet long, extending across Ludington:
Rock; and the west, about 4,200 feet long, extending northwesterly
from a point 6,000 feet south 54° west from Ludington Rock; the cross
section of these breakwaters to be 12 feet wide on top and 6 feet above
mean high water, with outer slopes of 1 on 11/2 and inner slopes 1 on 1.
The mean tidal range is 6.2 feet, and the maximum range, due to the
combined effect of wind and other causes, is about 10 feet.
   The estimate of cost of new work, revised in 1910, was $1,264,000.
The latest (1915) approved estimate for annual cost of maintenance
is $1,000.
   The existing project was authorized by the following river and
harbor acts:

     Acts                        Work authorized                                     Documents


Mar.   3, 1879   East breakwater_________-----------------------       Annual Report, 1880, p. 450. Plans ap-
                                                                        proved by the Secretary of War Jan-
                                                                        31, 1880.
Sept. 19, 1890   Location of the middle and west breakwaters_____      Annual Report, 1889, p. 678.
                 Present dimensions of breakwaters approved by
                   the Chief of Engineers, Apr. 21 1910 (Annual
                   Report, 1910, p. 124).


  For map, see H. Doe. No. 1159, 60th Cong., 2d sess.


  Terminal facilities.-None.
  Operations and results during fiscal year.--None.
  Conditionat end of fiscal year.-The existing project was completed
in 1915. The breakwaters were damaged by the hurricane of 1938 and
need repairs. The anchorage available exceeds 2,000 acres, of which
over 500 acres are from 20 to 27 feet deep and the remainder 9 to 20
            RIVERS            AND HARBORS-PROVIDENCE,                                                    R.       I.,        DISTRICT                115
feet deep. The costs and expenditures have been $1,242,246.09 for
new work and $40,253.91 for maintenance, a total of $1,282,500.
   Proposed operations.-It is proposed to apply the funds.unexpended
on June 30, 1942, amounting to $25,000, for repairs to east, middle, and
west breakwaters, by contract, in the fall of 1942, placing of about
7,000 long tons of stone.
  No additional funds can be profitably expended during the fiscal year
1944 as the completion of the above work will restore the breakwaters
to good condition.
                                                Cost and financial summary

Cost of new work to June 30, 1942____________________________ $1, 242, 246. 09
Cost of maintenance to June 30, 1942------ ---------------------    40,253.91
        Total cost of permanent work to June 30, 1942------------                                                                   1, 282, 500. 00

Net total expenditures------------------------------------                                                                          1, 282, 500. 00
Unexpended balance June 30, 1942------------------------------                                                                          25, 000. 00

         Total amount appropriated to June 30, 1942                                                                                    307, 500. 00
                                                                                                                                    1--------------,

   Fiscal year ending June 30                            1938                       1939             1940                    1941                1942

Cost of new work                                          ..                    .....            .                      ..
Cost of maintenance ...       .       ..    .    .        ..        .       .   .   ..     .    ----------    -     --------------
Total expended - -   -    -       -    -    --       -     -    -       -       .-  ---        - -   -   -                    -          .-
Allotted ...--------------             -------------------------------------------                                            $25, 000



                              ------------------------------
Balance unexpended July 1, 1941_                                                                                                          $25, 000. 00
Balance unexpended June 30, 1942______------                                                                                                  25, 000. 00

                                           26. MILFORD HARBOR, CONN.

   Location.-On the north shore of Long Island Sound, about 8 miles
west of New Haven Harbor. (See U. S. Coast and Geodetic Survey
Chart No. 219.)
   Previous projects.-Adopted by acts of June 23, 1874, June 18, 1878,
June 14, 1880, and August 2, 1882. For further details see Annual
Report for 1915, page 1756, and Annual Report for 1938, page 129.
   Existing project.-This provides for two riprap jetties 510 and 250
feet in length on the east and west sides, respectively, of the entrance
to the river; a channel across the bar and through the lower harbor 10
feet deep and 100 feet wide to Merwin's wharf, a distance of about
3,000 feet; an anchorage basin of the same depth, of about 6 acres in
area, on the east side of the channel; a channel 8 feet deep and 100
feet wide, widened at bends and at the upper end, from Merwin's
wharf to 400 feet above the town wharf, about 3,000 feet; and for an
anchorage basin west of the channel inside of the entrance 2,000 feet
long and 7.8 acres in area, 10 feet deep in the lower 600 feet and 8 feet
deep above. The plane of reference is mean low water. The mean
tidal range is 6.6 feet, and the extreme range, due to the combined
effects of wind and other causes, is 10 feet or more.
   The estimate of cost for new work, revised in 1937, is $94,500, in-
cluding $15,500 contributed by local interests, but exclusive of amounts
116         REPORT OF CHIEF OF ENGINEEiRS, U. S. ARMY,                                    1942

expended on previous projects. The latest (1937) approved estimate
for annual cost of maintenance is $3,000.
  The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                    Documents


June 23, 1874   East jetty at the mouth of the river-              H.     Ex. Doc. No. 107, 42d Cong., 3d
                                                                        sess., and Annual Report for 1873, p.
                                                                        1042.
                West jetty at the mouth of the river    -------------
                                                             Authorized by Department               Oct. 16,
                                                                     1879; Annual Report for 1879, p. 342.
June 13, 1902   Entrance channel and anchorage basin east of it_   H. Doc. No. 280, 56th Cong., 1st sess.
Aug. 26, 1937   Anchorage west of the channel and present proj-    H. Doc. No. 77, 75th Cong., 1st sess.
                  ect dimensions of the channel above Merwin's          (Contains latest published map.)
                  wharf.



   Local cooperation.-Fully complied with.
   Terminal facilities.-There are three bulkhead wharves near the
entrance used in the oyster trade. The town wharf near the head of
navigation is open to public use and the Connecticut State Shellfish
Commission operates a small wharf not open to the public. There
are also several yacht landings. The facilities are ample for existing
traffic.
   Operations and results during fiscal year.-Maintenance dredging
of the 10- and 8-foot channels and anchorages, by contract, was in prog-
ress from October 13 to October 16, 1941, when operations were sus-
pended at the completion of the 10-foot project. During the period
4,491 cubic yards, place measure, ordinary material were removed.
Work was resumed on November 12 and completed on December 8,
1941. During the period 38,441 cubic yards, place measure, ordinary
material were removed from the 8-foot channel and anchorage. The
costs were $17,442.29. Preliminary costs on the work were $472.40.
Total costs and expenditures were $17,914.69, all for maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1939, except for a portion of the 10-foot anchorage basin on
the east side of the channel where ledge rock prevents completion at
reasonable cost. The jetties were completed in 1880. They are in
poor condition. The controlling depths at mean low water were as
follows: Ten feet to Merwins Wharf, thence 8 feet to the head of the
project; 10 feet in the lower 600 feet of the west basin; 8 feet in the
upper portion of the west basin (all as determined in January 1942),
and 0 to 10 feet in the east basin (December 1939). The costs and ex-
penditures have been $46,376.48 from regular funds and $11,379.58
from contributed funds for new work and $44,713.50 for maintenance,
a total of $102,469.56.
   Proposedoperations.-It is proposed to apply the funds unexpended
on June 30, 1942, amounting to $8,085.31 to repairing the east (Long)
jetty, by contract in the fall of 1942, placing about 250 long tons of
stone at an estimated cost of $2,000.
   No additional funds can be profitably expended during fiscal year
1944 as the completion of the above work will place the project in
condition to meet the needs of existing navigation.
              RIVERS AND HARBORS--PROVIDENCE,                                   R.   I.,    DISTRICT              117

                                       Cost and financial summary
                                 --
Cost of new work to June 30, 1942________  ___-----------------_                                 -        $88, 716. 92
Cost of maintenance to June 30, 1942___ __________---_----------                                           47, 873. 06

          Total cost of permanent work to June 30, 1942_-------------                                     136, 589. 98

Net total expenditures____________         -                                                              1136,589:98
Unexpended balance June 30, 1942______---------------_______                                     __         8, 085. 31

          Total amount appropriated to June 30, 1942---------------- 144, 675. 29

      Fiscal year ending June 30             1938           1939           1940               1941             1942


C ost of new w ork --.. .. ... .. ..----- .               $14, 512. 03    $8,'247. 12      ............................
Cost of  maintenance..
       Total cost    --------------..-------
                                      -------                  127. 59      -                             $17, 914. 69
        Total cost ..........              ..----
                                             -.            14, 639. 62    $8, 247. 12 .. _ _ ._..              17, 914. 69

Total expended-             ...----------------------.      2,1 68. 55    200;218. 19                -_        17, 914. 69

Allotted __ ___    _____....._   ...        31, 000. 00---------         -8, 113. 26           $26, 000


Balance unexpended July 1, 1941 ______   ____---_---_____-           $26, 000. 00
Gross amount expended ____________---______--_ $17, 999. 42
Less reimbursements collected__----------------------      - -84. 73
                                                                      17, 914. 69

     Balance unexpended June 30, 1942------------------------                                                8, 085. 31
Amount       .(estimated)
                    required to be appropriated for completion of
                               -- -- -- --- -- --- -- --- --- --- -- --- --- -- ---
    existing project 2 - - - -                                                    _                         36, 700.00
  1 In addition, $11,379.58 expended from contributed funds for new work.
  2   Exclusive of available funds.

                                 27. HOUSATONIC RIVER, CONN.

   Location.-Rises in northwestern Massachusetts, flows southerly
130 miles through Massachusetts and Connecticut, and empties into
Long Island Sound at Stratford, 5 miles east of Bridgeport Harbor.
(See U. S. Coast and Geodetic Survey Chart No. 219.)
   Existing project.-This provides for a channel 18 feet deep at mean
low water and 200 feet wide from the mouth to the lower end of Culvers
Bar, about 5 miles, and thence 7 feet deep and 100 feet wide to Derby
and Shelton, about 8 miles; a riprap breakwater at the mouth, consist-
ing of an inner arm 3,250 feet long, 3 feet high above mean low water,
top width 6 feet, side slopes 1 on 1, and an outer arm 2,571 feet long,
6 feet high above mean high water, top width 12 feet, outer slope 1
on 2, inner slope 1 on 1; riprap dike in the river below Stratford not to
exceed 1,500 feet in length; and a riprap jetty 163 feet long at Sow
and Pigs Rocks. The mean tidal range, exclusive of the winter season
and freshets, is 6.7 feet at the mouth, 5.5 feet at Stratford, and 5 feet
at Shelton; the extreme range due to combined effect of wind and
other causes is about 11 feet at the mouth, diminishing toward the head.
The spring freshets occasionally rise to a height of 18 feet or more
above summer low water, but only average about 12 feet above that
datum.
   The estimate of cost for new work, revised in 1928, is $810,000, of
which $150,000 is to be contributed by local interests. The latest
 (1930) approved estimate for annual cost of maintenance is $19,000.
   The existing project was authorized by the following river and
harbor acts:
118            REPORT OF CHIEF OF EfNGINEEIRS,                        U.      S.   AR.MY,     19   4




       Acts                       Work authorized                                      Documents



Mar.     3, 1871   A jetty at Sow and Pigs Reef and the present        H.     Doc. No. 95, 41st Cong., 3d sess.,
                    project width of the channel across the outer           and Annual Report, 1871, p. 781.
                    bar.
Aug. 11, 1888      Breakwater at the mouth and the present proj-       S. Doc. No. 103, 50th Cong., 1st sess.,
                    ect dimensions of the river channel above the        and Annual Report, 1888, p. 554.
                    lower end of Culvers Bar.
                   The Stratford dike -------------------              Authorized by Department; project
                                                                         submitted by the district engineer
                                                                         July 15, 1892.
July     3, 1930   Present project dimensions of channel up to Cul-    H. Doc. No. 449, 70th Cong., 2d sess.1
                    vers Bar.


  1 Contains latest published map.


   Local cooperation.-The River and Harbor Act of July 3, 1930,
authorized the 18-foot channel up to Culvers Bar subject to the pro-
vision that no work shall be started until local interests have con-
tributed $150,000 toward the cost of the work, and provided further
that local interests shall furnish, free of cost to the United States,
:suitable bulkheaded areas for the deposit of dredged material, or in
lieu thereof an additional $50,000 in cash. These conditions have not
been complied with, but spoil areas have been secured and the provi-
sion of more than one-half of the necessary funds assured.
   Terminal facilities.-There are three wharves for commercial use
at Stratford, one at Devon, and eight at Shelton and Derby. The
facilities are considered adequate for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was about
29 percent completed. The up-river channels were completed in
1893. The breakwater at the mouth was completed in 1914, except
that the outer arm has a top width of 8 feet and outer slope of 1 on 11/.
instead of project dimensions; the Stratford dike was completed to its
present length of 1,255 feet in 1916, and the jetty at Sow and Pigs
Rocks was completed in 1871. The breakwater is in good condition
and the dike and jetty in fair condition. The head of navigation is
at Derby and Shelton about 14 miles above the mouth. The control-
ling depth at mean low water, as determined in 1939 and 1940, was
7 feet. To complete the project requires the enlargement of the outer
arm of the breakwater to provide a top width of 12 feet and an outer
slope of 1 on 2, which is not required at this time, the extension of
the Stratford dike not more than 245 feet, and deepening and widen-
ing of the channel from the mouth up to the lower end of Culvers Bar.
The costs and expenditures have been $234,364.92 for new work and
$231,935.14 for maintenance, a total of $466,300.06.
   Proposed operations.-No funds are available and no operations
are contemplated during the fiscal year 1943.
   The sum of $20,000 can be profitably expended during the fiscal
year 1944 in maintenance dredging about 50,000 cubic yards of mud
and sand from the river bars by contract.
               RIVERS              AND HARBOIRS-PROVIDENCE,                                                           R. I.,      DISTRICT                         119

                                                      Cost and financial summary

C~ost of new work to June 30, 1942-----------------------------  $234, 364. 92
Cost of maintenance to June 30, 1942_--------------------------- 231, 935. 14
      Total cost of permanent work to June 30, 1942                466, 300. 06
Net total expenditures_______ ___-____-_______                     466, 300. 06
Total amount appropriated to June 30, 1942------------------------ 466, 300. 06

   Fiscal year ending June 30                              1938                         1939                      1940              1941                       1942


C ost of new work . .          .    .   .    .    .    .    .     . .        .     .     .        .   . .   .     . . . .         . . . . .            .       .   .        .
Cost of maintenance---                                          _....                                           $10, 833. 85       $18, 184. 56            -           --

      T o t a l e xp e nd ed . -. - - - - - - -       . - - - -_ . . . . .       ....        ..                  8 , 6 3 9. 0 1    20 , 3 7 9 .4 0

Allotted__ _              _                                                              $21, 000                12, 200. 00      -3, 750. 10                  -$431.           49



Balance unexpended July 1, 1941 ----------------------------------                                                                                         $431.49
Deductions on account of revocation of allotment__-----------------                                                                                         431. 49

Amount (estimated) required to be appropriated for completion of
   existing project 1 _-_____                                                                                                                        425, 000. 00
Amount that can be profitably expended in fiscal year ending June
   30, 1944, for maintenance _                    -   -                                                                                               20, 000. 00
   1 In addition, $150,000 is to be contributed by local interests.

                                        28. BRIDGEPORT HARBOR, CONN.

   Location.--On the north shore of Long Island Sound, about 51
miles east of New York City. (See U. S. Coast and Geodetic Survey
Chart No. 220.)
   Previous projects.-Adopted by the River and Harbor Acts of July
4, 1836, March 3, 1871, and (for Black Rock Harbor) July 5, 1884. For
further details see page 1756 of Annual Report for 1915, and page
133 of Annual Report for 1938.
   Existing project.-This provides for-
   (1) Two riprap breakwaters, one 3,823 feet long on the easterly side,
and one 2,110 feet long on the westerly side of the entrance to the
main harbor.
   (2) The construction and maintenance of shore protection on Fayer-
weather Island, including a seawall connecting the northerly and
southerly portions of the island.
   (3) Main channel 25 feet deep and 300 feet wide, widened to within
75 feet of the harbor line opposite the City Lumber Co. terminal, from
Long Island Sound to Stratford Avenue Bridge across the Poquonock
River.
   (4) Three anchorage basins: One 25 feet deep and 29.4 acres in area,
opposite the inner breakwater; one 18 feet deep and 36 acres in area,
adjoining the main channel on the west above the inner breakwater;
and one 12 feet deep, in two areas, aggregating 14 acres to the east
of the main channel.
   (5) Poquonock River Channel, 18 feet deep and from 125 to 200
feet wide from the lower bridge to a point about 500 feet below the
dam at Berkshire Avenue, about 1.1 miles.
   (6) Yellow Mill Channel, 18 feet deep and 150 to 200 feet wide from
the 18-foot anchorage to a point about 370 feet from Crescent Avenue,
about 1 mile.
120           REPORT OF CHIEF OF' ENGINEERS,                            U.   S.    ARMY,     1942

   (7) Johnsons River Channel, 18 feet deep and 150 to 250 feet wide
from the 25-foot anchorage tb a point 600 feet below Hollisters Dam,
about 1 mile.
   (8) Black Rock and Cedar Creek Channel, 18 feet deep and 100 to
200 feet wide from the 18-foot curve in Black Rock Harbor to the
heads of bothbranches of Cedar.Creek, about 2.4 miles.
   (9) Burr Creek Channel, 7 feet deep and 100 feet wide from its
junction with Cedar Creek Channel to the south side of Yacht Street
extended, about one-quarter mile.
   All depths refer to mean low water, the mean tidal range being
6.8 feet. The extreme tidal range, due to wind and other causes, is 11
feet or more.
   The estimate of cost for new work, revised in 1937, is $1,410,000, of
which $39,000 is to be contributed by local interests, exclusive of
amounts expended under previous projects. The latest (1937) ap-
proved estimate for annual cost of maintenance is $28,000.
   The existing project was authoried by the following river and
harbor acts:

       Acts                             Work authorized                                    Documents


July     4, 1836   Fayerweather Island sea wall ..............................
Mar.     3,1899    Shore protection of Fayerweather Island_                        Annual Report, 1899, p. 1173.
Mar.     2,1907    West breakwater and present project dimensions of east          H. Does. Nos. 275 and 521,
                    breakwater.                                                      59th Cong., 2d sess.
Mar.     2,1919    Present project depths of the 18- and 12-foot anchorage         H. Doc. No. 898, 63d Cong.,
                    basins and of Burr Creek Channel.                                2d sess.
July     3, 1930   Present project d:mensions of the 25-foot entrance channel,     H. Doc. No. 281, 71st Cong.,
                    the 25-foot anchorage, the channels through the Poquo-           2d sess.
                    nock River, Yellow Mill Pond, Johnsons River, Black
                     Rock Harbor, and Cedar Creek.
Aug. 12, 19371     The present extent of Burr Creek Channel-------------           Specified in act.
Aug. 26, 1937      The 25-foot channel through the main harbor, and present        H. Doc. No. 232, 75th Cong.,
                    project location and extent of the 18- and 12-foot anchorage     1st sess.
                    basins.

  I The latest published maps are in H. Doc. No. 819, 76th Cong., 3d sess., Public, No. 276, 75th Cong.



   Recommended modifications of project.-Under date of May 13.
1940, the Chief of Engineers recommended modification of the exist-
ing project so as to eliminate the present 12-foot anchorage area and
provide for a main channel 30 feet deep at mean low water and 400
feet wide from Long Island Sound to a point just beyond the south
end of East Main Street extended; thence decreasing in width to 250
feet at a point about 720 feet below Stratford Avenue Bridge across
the Poquonock River, with widening at the bend opposite the Cilco
terminal to within 75 feet of the established harbor line, at an esti-
mated first cost of $529,000 with annual maintenance of $6,000 in
addition to that now required, subject to certain conditions of local
cooperation (H. Doc. No. 819, 76th Cong., 3d sess.).
   Local eooperation.-The River and Harbor Act of July 3, 1930,
required as a condition precedent to work on the Johnsons River
Channel that local interests contribute one-half ($39,000) of the esti-
mated cost of that work. This condition has not been met. Pre-
liminary surveys and studies for the development of the contiguous
         RIVERS AND       HARBORSI-PROVIDENCE,            R. I.,   DISTRICT        121

territory have been made, but financial arrangements have not been
completed.
   Terminal facilities.-There are 45 wharves and piers in'use or in
usable condition, including 1 modern deep-water public terminal on
the main harbor and 4 owned by the city, that are served by the im-
provement. The total available length for berthing is about 12,470
feet. Four of the wharves are open to general public use and 3 may
be used by the public upon agreement with the owners or operators.
Direct rail connections are available at 3 wharves. The existing
facilities are considered adequate for existing commerce. (For fur-
ther details see Port Series No. 18, Corps of Engineers.)
   Operations and results during fiscal year.-Preliminaryinvestiga-
tions of rocky shoals in Black Rock Harbor channel cost $974.70 for
new work. Maintenance dredging of the 18-foot anchorage, by con-
tract, was in progress from August 26 to December 23, 1941. During
the period, 121,974 cubic yards, place measure, ordinary material were
removed at a cost of $20,749.44 during the year. Preliminary costs on
proposed maintenance dredging of the 25-foot anchorage, and the
Black Rock Harbor, and Cedar Creek channels amounted to $1,377.39.
Floating debris was removed at a cost of $253.99. Total costs were
$974.70 for new work and $22,380.82 for maintenance, a total of
$23,355.52. Expenditures were $17,770.40.
   Condition at end of fiscal year.-The existing project was about
86 percent completed. The breakwaters were completed in 1908.
The east breakwater at the' entrance is in good condition, the west
breakwater and the shore protection works on Fayerweather Island
are in need of repairs. To complete the project requires the deepening
of the channel in Johnsons River, and rock removal in Yellow
Mill and Black Rock Channels. The controlling depths at mean low
water were as follows: Main channel to the lower bridge, 25 feet
 (1940) ; Poquonock River, about 16 feet to head of improved channel
 (March 1941); Yellow Mill Channel, 18 feet to head of improved
channel, except for rocky shoals on the east side near upper end
 (1939) ; Johnsons River, 12 feet to first bend at entrance to river, thence
9 feet (1938); Black Rock Harbor, 17 feet (January 1942); Cedar
Creek, 14 feet (January 1942) ; Burr Creek, about 3 feet; 25-foot
anchorage basin, 18 to 25 feet (February 1912); 18-foot anchorage
basin, 18 feet (January 1942); 12-foot anchorage basin, 2 to 12 feet
 (1939). The costs under the existing project have been $1,217,008.93
for new work, and $415,028.46 for maintenance, a total of $1,632,037.39.
Expenditures have been $1,626,709.99.
   Proposed operations.-Itis proposed to apply the funds unexpended
on June 30, 1942, amounting to $331,915.64, as follows:
Accounts payable June 30, 1942________________-----------------------------   $5,327. 40
Maintenance :
    Dredging in 25-foot anchorage, by contract September to October
      1942, about 120,000 cubic yards____________________________             47, 000. 00
    Dredging in Black Rock and Cedar Creek channels, by contract,
      August to November 1942, about 186,000 cubic yards---------             84, 212. 94
    Repairs to west breakwater at entrance to main harbor, by con-
      tract, September 1942, about 2,000 long tons of stone _____             12, 250. 00
    Repairs to Fayerweatbhr Island breakwater and seawall, by con-
     tract, October 1942, about 1,200 long tons of stone----__       11, 100. 00
    Dredging in main channel, by contract, March to May 1943,
     about 250.000 cubic yards--__ _-----                   -
                                                      _______-__-- _ 75, 000. 00
122          REPORT OF CHIEF OF E NGINEERS, U. S. ARMY,                                                            1942

Maintenance--Continued.
   Dredging in Poquonock River channel, by contract, April to May
      1943, about 60,000 cubic yards----------------------------- $18, 000. 00
   Dredging in Yellow Mill channel, by contract, May to June 1943,
      about 100,000 cubic yards---   ---------------------------- 30, 000. 00
   Dredging in Johnsons River channel, by contract, June 1943,
      about 30,000 cubic yards-----------------------------------    9, 000.-00
    Balance available-----------------------------------------     40, 025. 30
          Total ---------------------------                                                                              331, 915. 64
  No additional funds can be profitably expended during the fiscal
year 1944, as the completion of the above work will leave the project
in condition to meet the Teeds of existing navigation.
                                             Cost and financial summary
Cost of new work to June 30, 1942-------------------------- $1,595, 458. 46
Cost of maintenance to June 30, 1942 ------------------------- 426, 977. 43
     Total cost of permanent work to June 30, 1942___----_   2,022, 43.5.89
Minus accounts payable June 30, 1942-------------------------    5, 327. 40
     Net total expenditures--_                               -------------------------                              2, 017, 108. 49
Unexpended balance June 30, 1942                               ----------------------------                            331, 915. 64
          Total amount appropriated to June 30, 1942---------------                                                 2, 349, 024. 13

    Fiscal year ending June 30                  1938                 1939                 1940              1941              1942

Cost of new work ______________                $1, 367. 95       $181, 053. 71             $743. 90                             $974. 70
Cost of maintenance ..    .. .                     200. 89         36, 122. 21                            $13, 889. 97        22, 380. 82

      Total cost _-----------------             1, 568. 84        217, 175. 92              743. 90        13, 889. 97        23, 355. 52

Total expended ..      ..-----------------       , 054. 59        209, 144. 69            9, 289. 38       14, 147. 69        17, 770. 40
                ..
Allotted _________..-__--
            .         .             ....      240, 777. 80       -19, 000. 00            32, 323. 66      136, 000. 00       187, 010. 91



Balance unexpended July 1, 1941__________________                                                  -____             $162, 675. 13
Amount allotted from War Department Civil Appro-
priation Act approved June 28, 1939 _______-____                                                      $431. 49
Amount allotted from War Department Civil Appro-
priation Act approved June 24, 1940_________                                                    11, 974. 80
Amount allotted from War Department Civil Appro-
priation Act approved May 23, 1941_____________                                                 42, 604. 62
Amount allotted from War Department Civil Appro-
priation Act approved Apr. 28, 1942_    _____-_                                              132, 000. 00
                                                                                                                         187, 010. 91

      Amount to be accounted for-------___________                                                                       349, 686.04
Gross amount expended_______-_---       ___________                                           $18, 112. 58
Less reimbursements collected-------------------                                                   342. 18
                                                                                                                          17, 770. 40

      Balance unexpended June 30, 1942_________                                                  _____---- _             331, 915. 64
Outstanding liabilities June 30, 1942_______________                                                   $9. 30
Amount covered by uncompleted contracts ---------                                                 10, 113. 10
                                                                                                                          10, 122. 40
         Balance available June 30, 1942_______-------                                                                   321, 793. 24
Amount (estimated) required to be appropriated for completion
of existing project 12----                                                                                               79, 600. 00
  'Exclusive    of available fun.ds.
   2 In addition, $39,000 is to be            contributed by local interests.
             RIVERS      AND HARBORS-PROVIDENCE,                        R.   I.,   DISTRICT        123
                             29. SOUTHPORT HARBOR, CONN.

   Location.-On the north shore of Long Island Sound, about 50 miles
east of New York City. (See United States Coast and Geodetic
Survey Chart No. 220.)
   Previousprojects.-Adopted by the River and Harbor Act of March
2, 1829, and modified in 1876 and 1881. A second project was adopted
by the River and Harbor Act of June 13, 1902, and modified by the
River and Harbor Act of July 25, 1912. For further details see
Annual Reports for 1915 and 1936, pages 1758 and 121, respectively.
   Existing project.-This provides for a stone breakwater about 1,320
feet long at the harbor mouth ;'a 1,350-foot dike along the east side
of the harbor; a channel 9 feet deep to the upper end of the wharves,
100 feet wide from Long Island Sound to opposite East Main Street,
thence 400 to 175 feet wide; and for an anchorage basin 6 feet deep, 300
feet wide, and 500 feet long. The reference plane is mean low water,
the mean tidal range being 6.9 feet. The maximum range, due to the
combined effect of wind and other causes, is 11 feet or more.
   The estimate of cost for new work, made in 1935, is $90,400, includ-
ing $16,500 contributed by local interests but exclusive of amounts
expended on previous projects. The latest (1935) approved estimate
for annual cost of maintenance is $1,200.
   The existing project was authorized by the following river and
harbor acts:

    Acts                              Work authorized                                 Documents



Mar.   2, 1829   Breakwater and dike _______________________________-          Annual Report for 1871, p.
                                                                                 824.
Aug. 30, 19351   Anchorage basin and present channel dimensions ----           Rivers and Harbors Com-
                                                                                 mittee Doc. No. 36, 74th
                                                                                                  2
                                                                                 Cong., 1st sess.


  1Also Emergency Relief Appropriation Act of May 28, 1935.
  2 Contains latest published map.


   Local cooperation.-Fully complied with.
   Terminal facilities.-The several small wharves and private land-
ings for pleasure craft are ample for existing traffic.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1936. The dikes and breakwater are in fair condition. The
controlling depths were 9 feet in about one-half of the channel out-
side the breakwater with edges shoaled to about 6 feet, as determined
in January 1941; 9 feet in remainder of channel to Golf Club Wharf,
and 6 feet in the anchorage basin, as determined in March 1940. The
costs and expenditures under the existing project have been $37,713.69
from Emergency Relief funds and $16,500 from contributed funds,
all for new work, a total of $54,213.69.
   Proposed operations.-No funds are available and no operations
are contemplated during the fiscal year 1943.
   The sum of $15,000 can be profitably expended during the fiscal year
1944 in maintenance dredging, by contract, about 25,000 cubic yards
of mud and sand from the channel and anchorage.
124      REPORT OF CHIEF OF ENGINEERS,                 U. S. ARMY,     1942

                                Cost and financial summary

Cost of new work to June 30, 1942_--------------------       -------     $96, 926. 72
Cost of maintenance to June 30, 1942__-----------    ------------          8,931.91

       Total cost of permanent work to June 30, 1942----------    105, 858. 63
Net total expenditures----------------------------------------1105, 858. 63
       Total amount appropriated to June 30, 1942--------------- 1105, 858. 63

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance-------------------------------------          15, 000. 00
1In addition, $18,285 expended from contributed funds of which $1.785 was for work
outside the approved project.

                         30. NORWALK HARBOR, CONN.

   Location.-On the north shore of Long Island Sound, about 40
miles east of New York City. (See U. S. Coast and Geodetic Sur-
vey Chart No. 221.)
   Previous projects.-Adopted by River and Harbor Acts of June
10, 1872, June 3, 1896, and March 2, 1907. For further details see
page 1757 of Annual Report for 1915, and page 137 of Annual Report
for 1938.
   Existing project.-This provides for a channel 12 feet deep from
the outer harbor to the highway bridge at South Norwalk, about 31/8
miles, 200 feet wide to Dorlon Point, thence 150 feet wide to South
Norwalk, and 250 feet wide along the South Norwalk wharves; an
anchorage basin 10 feet deep and about 17 acres in area opposite
Fitch Point; a channel 10 feet deep and generally 100 feet wide
from South Norwalk to the head of navigation at Norwalk, about
1.5 miles; and for the maintenance of the channel 6 feet deep and
75 feet wide along the east side of the harbor to the head of naviga-
tion at East Norwalk. The reference plane is mean low water, the
mean tidal range being 7.1 feet. The maximum range due to the
combined effect of wind and other causes is 12 feet or more.
   The estimate of cost for new work, revised in 1927, was $284,000,
exclusive of amounts expended on previous projects. The latest
 (1919) approved estimate for annual cost of maintenance is $8,000
for the first 3 years and $4,000 thereafter.
   The existing project was adopted by the River and Harbor Act
of March 2, 1919 (H. Doc. No. 1143, 63d Cong., 2d sess.). For the
latest published map see the project document.
   Recommended modifications of project.-Under date of March 4,
1939, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for a channel 6 feet deep from the
10-foot anchorage to East Norwalk, 125 feet wide to the bend be-
yond Third Street, and thence 150 feet wide to the head, a total dis-
tance of 2,900 feet; and for an irregular-shaped anchorage basin
of about 7 acres, 6 feet deep, adjacent to the upper portion of the
enlarged channel, all at an estimated first cost of $46,000, with annual
maintenance of $1,000 in addition to that now required, subject to
certain conditions of local cooperation (H. Doc. No. 220, 76th Cong.,
1st sess.).
   Local cooperation.-Fullycomplied with.
   Temrrinal facilities.-There are 19 privately owned wharves and
piers in use or in usable condition, having a total available length
            RIVERS     AND HARBORS--PROVIDENCE,                                            R.    I.,   DISTRICT                        125
for berthing of about 3,150 feet. None of the wharves are open to
general public use and only one has direct rail connections. The
facilities are considered adequate for existing commerce.        (For
further details see Port Series No. 18, Corps of Engineers.)
   Operations and results during fiscal year.-Maintenance dredging
of the entrance channel, by contract, which had been begun during the
preceding year, was in progress from December 1, 1941, to February
12, 1942. During the period 65,814 cubic yards, place measure, ordi-
nary materials were removed at a cost of $19,306.29. Floating debris
was removed at a cost of $190.38. Total costs were $19,496.67 all for
maintenance, and expenditures were $19,551.74.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1929. The controlling depths at mean low water were as
follows: To Gregory (Dorlon) Point, 12 feet (February 1942) thence
to Washington Street Bridge in South Norwalk, 12 feet (1937); in
the anchorage basin, 10 to 12 feet (1937); in the East Norwalk
Channel, 7 feet nearly to the head (1938); and between Washington
Street Bridge in South Norwalk and the head of navigation in Nor-
walk, a general depth of 11 feet (April 1940). The costs and expendi-
tures have been $256,689.72 for new work and $208,768.08 for main-
tenance, a total of $465.457.80.
  Proposed operations.-Fundsunexpended on June 30, 1942, amount-
ing to $2,402.95 will be applied to maintenance contingencies.
  The sum of $15,000 can be profitably expended during the fiscal
year 1944 in maintenance dredging, by contract, removing about
30,000 cubic yards of mud and sand from the East Norwalk Channel.
                                       Cost and financial summary
Cost of new work to June 30, 1942_-----------------------------                                                            $419, 206. 53
                                    ---------------------- _
Cost of maintenance to June 30, 1942..                                                                                      274, 888. 52

         Total cost of permanent work to June 30, 1942------------- 694, 095. 05
Net total expenditures----------------------------------------                                                                  94,095.05
Unexpended balance June 30, 1942_____________________-___                                                                        2, 402. 95

         Total amount appropriated to June 30, 1942----------------                                                            696, 498. 00

   Fiscal year ending June 30                    1938              1939                 1940                  1941                 1942

Cost of new work -_             ..-   -----...  . . ..        .    ..     .     ...     . . . .        ...          . ...         ..........
Cost of maintenance        '                 $8, 030. 28                              $24, 107. 69           $1, 565. 11           $19, 496. 67
Total expended.._                                8, 030. 28                            24, 107. 69            1, 510. 04            19, 551. 74
Allotted-----------------------                  8, 300. 00       39, 000. 00           -270.   89           11, 980. 53           -3, 515. 80



Balance unexpended July 1, 1941--------------------------------                                                                $25, 470. 49
Deductions on account of revocation of allotment -----------------                                                               3, 515. 80
      Net amount to be accounted for----------------------------                                                                21, 954. 69
Gross amount expended__ --------------------------       ---                                                                    19, 551. 74

        Balance unexpended June 30, 1942--------------------------                                                               2, 402. 95
Am unt that can be profitably expended in fiscal year ending June 30,
                             - -- - - - - - - - - - - - - - - - - -- - - - - - - -                                         -
1944, for maintenance 1                                                                                                        15, 000. 00
1 Exclusive of available funds.

      493202-43-pt. 1, vol. 1-----9
126        REPORT OF CHIEF OF ENGINEERS,                             U. S. ARMY,          1942

                            31. STAMFORD HARBOR, CONN.

   Location.-On the north shore of Long Island Sound, 32 miles east
of New York City. (See U. S. Coast and Geodetic Survey Chart
No. 221.)
   Previous projects.-Adopted by the acts of August 5, 1886, and
July 13, 1892. For further details see page 1758 of Annual Report
for 1915, and page 139 of Annual Report for 1938.
   Existing proyect.-This provides for two detached breakwaters;
one 1,200 feet long on the easterly side, and one 2,900 feet long on the
westerly side of the channel at the entrance to the harbor; an entrance
channel 18 feet deep, 200 feet wide to the upper end of the 18-foot
anchorage, about 0.55 mile, and thence 15 feet deep to the junction of
the branches, about 0.5 mile; a channel in the west branch 15 feet deep,
125 feet wide, and about three-fourths mile long, and a basin of the
same depth at the head of the branch of such widths as to exclude
extensive rock excavation along the northeast side; a channel in the
east branch 12 feet deep and 100 feet wide, with increased width at the
turns, to a point 1,100 feet from the head of navigation, thence of the
same depth and from 85 to 125 feet wide to the head of navigation, a
total distance of about 1.5 miles; an anchorage basin 18 feet deep on
the west side of the 18-foot entrance channel, 600 feet wide, and 1,000
to 1,900 feet long, and an anchorage area 8 feet deep east of the en-
trance channel north of buoy No. 6, about 17 acres. The plane of ref-
erence is mean low water, the mean tidal range being about 7.2 feet.
The extreme tidal range, due to the combined effects of wind and other
causes, is 12 feet or more.
    The estimate of cost for new work, revised in 1937, is $907,000, in-
cluding a conditional contribution of $180,000, to be made by local
interests, but exclusive of amounts expended on previous projects.
The latest (1937) approved estimate for annual cost of maintenance
is $20,900.
    The existing project was authorized by the following river and
harbor acts:

    Acts                       Work authorized                                     Documents


Mar.   2,1919   The East Branch Channel and the present project       H. Doec. No. 1130, 63d Cong., 2d sess.
                 width of the entrance channel.
Aug. 30,1935    The 8-foot anchorage area, the present project        Rivers and Harbors Committee Doc.
                 depth of the upper portion of the entrance             No. 8, 74th Cong., 1st sess.
                 channel, and the present project dimensions of
                 the West Branch Channel and Basin.
Aug. 26, 1937   The breakwaters, the 18-foot anchorage basin, and     Rivers and Harbors Committee Doe.
                 present project depth of the outer section of the      No. 29, 75th Cong., 1st sess. (Con-
                 entrance channel.                                      tains latest published map.)



  Local cooperation.-The conditions of local cooperation imposed by
the River and Harbor Act of March 2, 1919, have been fully complied
with. The River and Harbor Act of August 30, 1935, contained the
provision that the 8-foot anchorage area shall be dredged only after
local interests contribute one-half ($8,000) of the estimated first cost
         RIVERS   AND   HARBOtRS-PROVIDENCE,     R.   I.,   DISTRICT   127
  thereof. This requirement has not been met, and no assurance has
  been received that it may be expected.
    The River and Harbor Act of August 26, 1937, authorized the break-
  waters, the 18-foot anchorage basin, and the 18-foot channel to the
  upper end of the basin, subject to the provisions that local interests
either contribute one-third the entire costs of the proposed improve-
  ments or contribute one-third the cost less $50,000, and, in addition,
  provide the proposed 18-foot anchorage basin west of the entrance
channel. These requirements have been met and approved by the
Chief of Engineers April 1, 1940.
    Terminalfacilities.-There are 19 privately owned wharves and piers
in use and in usable condition adjacent to the channels in the East and
West Branches. The total available berthage is about 3,615 feet. None
of the wharves is open to general public use. Two have direct rail
connections. The facilities are considered adequate for existing com-
merce. (For further details see Port Series No. 18, Corps of
Engineers.)
    Operations and results during fiscal year.-Breakwaterconstruction
at the entrance to the harbor, by contract, in progress at the beginning
of the year, was completed on September 13, 1941. During the year
7,032 long tons of riprap were placed on the east breakwater, and 6,677
long tons on the west breakwater at a cost of $40,139 for new work.
Improvement dredging of the 18-foot entrance channel and anchorage
basin, by contract, was begun on December 17, 1941, and was in progress
at the end of the year. During this period 109,641 cubic yards ordinary
material and 9 cubic yards of boulders exceeding 2 cubic yards each
in size were removed at a cost of $36,924.24 for new work. Preliminary
costs on this work during the year amounted to $292.47. Total costs
were $77,355.71, of which $44,912.85 were United States funds and
$32,442.86 contributed funds, all for new work. Expenditures were
$68,727.93 United States funds and $32,442.86 contributed funds, a total
of $101,170.79.
    Condition at end of fiscal year.-The existing project was about 94
percent completed. The East Branch Channel was completed except
for a slight deficiency in width opposite Ludlow Street. The West
Branch Channel and entrance channel north of the 18-foot anchorage
have been dredged to 15 feet and all of the basin similarly deepened.
The controlling depths at mean low water were as follows: Entrance
channel to north end 18-foot anchorage 15 feet (May 1942), entrance
channel to junction of branches, 15 feet except for minor shoals (1941) ;
West Branch Channel and basin, 14 feet except along edges (1941);
East Branch Channel, 12 feet (not full width) (1941) ; 18-foot anchor-
age, 9 to 25 feet (May 1942); 8-foot anchorage, 3 to 8 feet (February
1942). To complete the project requires a slight widening (not essen-
tial to navigation) in the East Branch Channel opposite Ludlow Street,
the completion of the dredging in the 18-foot entrance channel and the
18-foot anchorage, and the dredging of the 8-foot anchorage. Costs
under the existing project have been $710,498.99 for new work and
$136,356.38 for maintenance, a total of $846,855.37. Expenditures
have been $841,417.07. In addition, $144,798.06 was expended from
contributed funds for new work.,
128         REPORT OF CHIEF OF EINGINEE RS, U. S. ARMY,                                                        1942

  Proposedoperations.--Itis proposed to apply the funds unexpended
on June 30,1942, $89,556.92, together with $27,201.94 contributed funds,
a total of $116,758.86, as follows:
Accounts payable June 30, 1942---------------------------------         $5, 438. 30
New work: Dredging 18-foot channel and anchorage basin, by contract
  in progress, to be completed in the fall of 1942------------------___ 75, 320. 56
Maintenance: Dredging about 90,000 cubic yards of mud and sand
  from the 15-foot portion of the entrance channel and the West
  Branch Channel and basin, by contract in the spring of 1943------ 36, 00. 00

         Total---------------                      __------------------                    -------                   116, 758. 86
  The sum of $36,000 can be profitably expended during the fiscal year
1944 in maintenance dredging, by contract, about 90,000 cubic yards of
mud and sand from the East Branch Channel.
                                         Cost and financial summary

                                                UNITED STATES FUNDS

Cost of new work to June 30, 1942--------------------------                                                        $845, 641. 84
Cost of maintenance to June 30, 1942 --                                                                             1-----------------------95,
                                                                                                                          776. 37
      Total cost of permanent work to June 30, 1942---------_  1, 041, 418. 21
Minus accounts payable June 30, 1942--------------------------      5, 438. 30
     Net total expenditures -------------------------------
                                .                           1, 035, 979. 91
Unexpended balance June 30, 1942 --------------------------- 89, 556. 92

          Total amount appropriated to June 30, 1942_                                                            1, 125, 536. 83

    Fiscal year ending June 30                 1938              1939               1940                1941                1942

Cost of new work          __                  $56, 717. 62     $34, 722. 02       $59, 911.83        $243, 892. 51         $44, 912. 85
Cost of maintenance            ..-------------. 23, 041. 37         755. 96   -
      Total cost   ----------------           79, 758. 99       35, 477. 98        59, 911. 83        243, 892. 51          44, 912. 85
Total expended----------------                87, 765. 52       27, 935. 15        68, 792. 80        217, 345. 15          68, 727. 93
Allotted .....----..-----------------       114, 000. 00       355, 000. 00   -------------               .....-------------- 36, 000. 00



Balance unexpended July 1, 1941_        -------------------------                                                  $122, 284. 85
Amount allotted from War Department Civil Appropriation Act ap-
  proved Apr. 28, 1942    -------------------------------   _ __                                                      36, 000. 00
      Amount to be accounted for__-------------------------_                                                         158, 284. 85
Gross amount expended------------------------- $101, 287. 38
Less reimbursements collected---------------------- 32, 559. 45
                                                                                                                      68, 727. 93
     Balance unexpended June 30, 1942-----------------------                                                          89, 556. 92
Amount covered by uncompleted contracts_            -___                                                              44, 730. 86
         Balance available June 30, 1942-------------------------_                                                    44, 826. 06
Amount (estimated) required to be appropriated for completion of
existing project 1 2    - - - - - - - - - - - - - - - - - - - - - -- - -- - -- - -- - --
                                                                            _                                          24, 000.00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance                1
                                  --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
                                                                                                                       36, 000.00
   1 Exclusive of available funds.
   2 In addition, $8,000 is to be contributed                 by local interests.
                  RIVERS               AND         HARBORS-PROVIDENCE,                               R.      I.,    DISTRICT                        129
                                                          CONTRIBUTED FUNDS

Cost of new work to June 30, 1942__________       _______------- $144, 798.06
Cost of maintenance to June 30, 1942-      ------------------------
             Total cost of permanent work to June 30, 1942__-                                                      __---               144, 798. 06

Net total expenditures --   -----------------------------------                                                                        144, 798. 06
Unexpended balance June 30, 1942___-------------- ------------                                                                          27, 201. 94

             Total amount contributed to June 30, 1942---------------                                                                  172, 000. 00


    Fiscal year ending June 30                          1938            1939                     1940                   1941                     1942

Cost of new work-----..----------------------------------------$112, 355.20                                                                     $32, 442. 86
Cost of maintenance ..----------------------------------------------------------
Total expended               ___         __..        __.____.__      ___--------------___        _____-_             112, 355.20                 32, 442. 86
Contributed..........--------------- --------------                    ......--------------       172, 000 ..............--------------......


Balance unexpended July 1, 1941------------------------------                                                                          $59, 644.80
Gross amount expended -----                       -----
                                       _________--_                                                                                     32, 442. 86

     Balance unexpended June 30, 1942_____________-____---                                                                                27, 201. 94
Amount covered by uncompleted contracts____________________-                                                                              21, 583.20

             Balance available June 30, 1942 ___ _____________-                                                       ____-5,                    618. 74

Amount (estimated) required to be appropriated for completion of
existing project 1 __------      ----                      ___                                                                             8, 000. 00
1 Exclusive of available funds.

         CONSOLIDATED COST AND FINANCIAL SUMMARY FOR STAMFORD HARBOR, CONN.

Cost of new work to June 30, 1942--------------------------                                                                          $990, 439. 90
Cost of maintenance to June 30, 1942______________-______                                                                             195, 776. 37

      Total cost of permanent work to June 30, 1942----------1,                                                                        186, 216. 27
Minus accounts payable June 30, 1942--------------------------                                                                           5, 438. 30

     Net total expenditures   -----------------------------    1,180,777. 97
Unexpended balance June 30, 1942   ---------------------------   116, 758. 86

             Total amount appropriated and contributed to June 30, 1942_ 1, 297, 536. 83


     Fiscal year ending June 30                         1938             1939                    1940                   1941                     1942

Cost of new work----
                __-------                            $56, 717. 62     $34, 722. 02             $59, 911. 83        $356, 247. 71                $77, 355. 71
Cost of maintenance....------------                   23, 041. 37          755. 96            ..............
          Total cost-.................                 79, 758. 99      35, 477. 98             59, 911.83           356, 247. 71                77, 355. 71
Total expended-----------------.................       87, 765. 52      27, 935. 15             68, 792. 80          329, 700. 35               101, 170. 79
Allotted and contributed---------.........            114, 000. 00    355, 000. 00             172, 000. 00         - - - - -......              36, 000. 00
130     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                    1942

Balance unexpended July 1, 1941--------------------------             $181, 929:65
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942_------------------------                        36, 000. 00

      Amount to be accounted for________________ -       _____-        217, 929. 65
Gross amount expended--      ---------------------- $133, 730. 24
Less reimbursements collected---------------------    32, 559. 45
                                                                       101, 170. 79
    Balance unexpended June 30, 1942__    __-       -______ -_ 116, 758. 86
Amount covered by uncompleted contracts ____-____--______       66, 314. 06

      Balance available June 30, 1942_-_-                _ _____--      50, 444. 80

Amount (estimated) required to be appropriated for completion of
existing project 12--    ____----      _____                           24, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1--------_--                -      __        36, 000. 00
1Exclusive of available funds.
2 In addition. $8,000 is to be contributed by local interests.



                         32. GREENWICH HARBOR, CONN.

   Location.-On the north shore of Long Island Sound, about 29
miles east of New York City. (See U. S. Coast and Geodetic Survey
Chart No. 222.)
   Previous projects.-Adopted by River and Harbor Act of June 3,
1896. For further details see Annual Report for 1917, page 198, and
Annual Report for 1938, page 142.
  Existing project.-This provides for a channel 12 feet deep, 130 feet
wide through the outer harbor, about 0.8 mile, and 100 feet wide along
the wharf front to a point 500 feet from the head of the harbor, nearly
0.5 mile. The plane of reference is mean low water, the mean tidal
range being 7.4 feet, and the extreme range due to the combined effect
of wind and other causes 12 feet or more.
   The estimate of cost for new work, made in 1919, was $49,000, exclu-
sive of amounts expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $2,250.
   The existing project was adopted by the River and Harbor Act of
March 2, 1919 (H. Doc. No. 289, 63d Cong., 1st sess.). The project
document and House Document No. 125, Seventy-sixth Congress, first
session, contain the latest published maps.
   Recommended modifications of project.-Under date of December
28, 1938, the Chief of Engineers recommended modification of the
existing project so as to provide for a northerly extension of the exist-
ing 12-foot channel for a distance of 450 feet, with a width of 100 to
140 feet, and for anchorage areas west of the existing channel, 8 feet
deep east and south of Grass Island and 6 feet deep north thereof, at
an estimated total cost of $62,000 for new work, with $3,100 annually
for maintenance in addition to the amount now required subject to
certain conditions of local cooperation (H. Doc. No. 125, 76th Cong.,
1st sess.).
   Terminal facilities.-These consist of wharves and piers with a total
of about 2,500 feet of berthing space, of which about 1,300 feet is
open to public use at the convenience of the owners. The facilities
are considered adequate for the existing commerce.
             RIVERS AND HARBORS-PROVIDENCE,                                       R.       I.,    DISTRICT         131
  Operations and results during fiscal year.--None.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1924. The controlling depth, as determined on May 25, 1940,
was 13 feet from Long Island Sound to the north limit of the project.
The costs and expenditures have been $37,295.45 for new work and
$62,763.39 for maintenance, a total of $100,058.84.
  Proposedoperations.-No funds are available and no operations are
contemplated during the fiscal year 1943.
  The sum of $20,000 can be profitably expended during the fiscal year
1944 in maintenance dredging about 40,000 cubic yards of mud and
sand from the channel by contract.
                                    Cost and financial summary
Cost of new work to June 30, 1942___________
                                 --------                ____-_ $54, 312. 64
Cost of maintenance to June 30, 1942____________________________ 75,669.90

      Total cost of permanent work to June 30, 1942_______________ 129, 982. 54
Net total expenditures__--_    ---------------------               129, 982. 54
Total amount appropriated to June 30, 1942                         129. 982. 54

   Fiscal year ending June 30            1938               1939             1940                   1941        1942


Cost of new work        ...------------            ----.....
                                        ----........                       ...      ------- --
Cost ofmaintenance-- ....--..--------------------------------                $32,500 .............................

Total expended ..--------. -----.   -----------.---------       --------         32,500,         ..........................

Allotted_       --------------- --------------               $43, 500            000
                                                                             --11,


Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance__-------------------------             $20, 000. 00

  33. EXAMINATIONS,                 SURVEYS, AND CONTINGENCIES                                         (GENERAL)

  The cost of the work during the year amounted to $29,066.28; the
expenditures were $29,396.39. The balance unexpended on June 30,
1942, amounting to $20,726.71, will be applied as needed to payment
of expenses incurred under this heading throughout the fiscal year
1943.
  The additional sum of $60,000 can be profitably expended during
the fiscal year 1944.
                                    Cost and financial summary

Cost of new work to June 30, 1942__________________   ________
Cost of maintenance to June 30, 1942_______________________--$592, 805. 59
      Total cost of permanent work to June 30, 1942-------------                                           592, 805. 59
Minus accounts payable June 30, 1942_______________----- __--_                                                  366. 10

     Net total expenditures-------                           -----           ------------                  592, 439. 49
Unexpended balance June 30, 1942                     ----------------------------                           20, 726. 71

         Total amount appropriated to June 30, 1942--------------                                          613, 166. 20
132           REPORT OF CHIEF OF ENGINEEIRS, U. S. ARMY,                                               1942


      Fiscal year ending June 30           1938                1939           1940              1941              1942


Cost of new work ......---------....-
                                   -----------------------------------                     --------------    -----------
Cost of maintenance..--......... $78, 707.72             $100, 627. 21      $67, 494.77       $45,857.35         $29, 066.28

                                 78, 330. 82  96, 745. 28
Total expended .........----------------........                             71, 434. 19       46, 487. 26        29, 396.39

Allotted      .--.    .   --.- ..        119, 299. 63     126, 570. 00       50,000. 00        40, 000. 00


Balance unexpended July 1, 1941     ______ _______________                                                   $50, 123. 10
Gross amount expended -------------------------- $31, 029. 86
Less reimbursements collected_____- ____---
                                     -      -  ____   1,633.47
                                                                                                              29,396. 39

      Balance unexpended June 30, 1942.__---------------------                                                20, 726.-71
Outstanding liabilities June 30, 1942_______________________                                                     371.62
           Balance available June 30, 1942__                          -   ------ ___________           -      204355. 09
Amount that can be profitably expended in fiscal year ending June
30. 1944 for maintenance ------      -------------------------                                               60, 000. 00
      1 Exclusive of available funds.

34. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED

                                                              For last     Cost and expenditures to
                                                               full re-          June 30, 1942                 Estimated
                     Name of project                          pert see                                         amount re-
                                                              Annual                                            quired to
                                                               Report      New work           Mainte-           complete
                                                                for-                          nance


1.   Hyannis Harbor, Mass.' 2 __      -_                        1937      $197, 382. 58      $27, 067. 78 Completed.
2.   Little Harbor, Woods Hole, Mass.' 2---.......              1906         18,000.000.
                                                                                       00 --------------      Do.
3.   Woods Hole Channel, Mass.2_----------_                     1940       338, 599.92        11, 660.57     Do.
4.   Canapitsit Channel, Mass.' 2 4________________            1899           9, 112.54                      Do.
5.   Cuttyhunk Harbor, Mass.2_.----------                    -_ 1940       8 27, 167. 86      17,660. 50     Do.
6.   Sakonnet Harbor, R. I.' 2      -_____-- _____              1940         62, 202. 50       9, 967. 97    Do.
                         3--------
7. Sakonnet River, R. 1.2                                      1909         38, 426. 95    ...........           Do.
8. Harbor at Coasters 2Harbor Island, R. 1.1                   1911          5, 500. 00      13, 052. 49         Do.
9. Warren River, R. I. _______________________                 1890          5, 000. 00          .Do.
10. Greenwich Bay, R. I.1 2__
                            1                                   1893          2, 000. 00  ___          ___         Do.
11. Potowomut River, R. I. 2 4__            _   _               1882          5,000. 00 ____-________              Do.
12. Wickford Harbor, R. I.212--           _   -   -             1900         16, 300. 00  __ _______               Do.
13. Entrance to Point Judith Pond, R. I.12 .                    1917         12, 000.00 ____________               Do.
14. Stonington Harbor, Conn ..... __------______                1941        337, 453. 83      45, 007. 85     $2,500.
15. Hay (West) Harbor, N. Y.2 -----------------                 1931          8,401. 15 -------------...
                                                                                                     ....     Completed.
16. Eightmile River, Conn.' 2 6                                 1913          9, 000. 00  _--     _-__- _     $1,500.
17. Connecticut River above Hartford, Conn. 8___                1932        116, 324. 81      14, 373. 54     $1,000,000.7
18. Clinton Harbor, Conn.' 2 10                                 1894          6,330. 02        1,917.25       Completed.
19. Westport Harbor and Saugatuck River,
               ........
      Conn. ____________________________________                1927         32, 104. 55     3, 360. 44 $5,800.
20. Harbor at Wilson Point, Conn. 2____- _                -     1895         54, 176. 90 .....         _ Completed.
21. Fivemile River Harbor, Conn.2 11-....-. _                   1938         35, 490. 44    31, 311.43 $10,500.

  1 No commerce reported.
   2 Maintenance unnecessary or not urgent.
   3 Commerce included under Tiverton Harbor, R. I.

   4 Abandonment recommended in H. Doc. 467, 69th Cong., 1st sess.
   2 Completion unnecessary for existing commerce.
   8 Awaiting local cooperation. Under date of Jan. 14, 1939, the Chief of Engineers recommended modi-
fication of the existing project to provide for construction of a lock, dam, and power plant at Enfield Rapids
(H. Doc. 165, 76th Cong., 1st sess.).
   7 Estimated cost of project, $3,384,000; expenditures limited by law to $1,000,000.
   8 In addition, $11,643.37 was expended from contributed funds.
  9 Modification recommended Nov. 15, 1940, in H. Doc. 98, 77th Cong., 1st sess.
   10Modification recommended Dec. 28, 1938, in H. Doc. 240, 76th Cong., 1st sess.
   21 Curtailment recommended Dec. 15, 1914, in H. Doc. 1419, 63d Cong., 3d sess.
   12 Modification recommended Apr. 29, 1941, in S. Doc. No. 105, 77th Cong., 1st sess.
              RIVERS AND HARBORS-PROVIDENCE,                                                                    R. I.,         DISTRICT                 133
              35. PLANT ALLOTMENT, PROVIDENCE, R. I., DISTRICT

                                                Cost and financial summary
Undistributed costs June 30, 1942___________----------------------                                                                             $47, 496. 32

      Net total cost to June 30, 1942-----------------------------47, 496. 32
Plus accounts receivable June 30, 1942 _____-_______-------------77, 024. 65
     Gross total costs to June 30, 1942 ------ ----------------- 124, 520. 97
Minus accounts payable June 30, 1942-------------------           76, 614. 06

     Net total expenditures________-------------------                                                                                          47, 906. 91
Unexpended balance June 30, 1942--_ ------------------------------                                                                              38, 335. 99

            Total amount appropriated to June 30, 1942---------------                                                                           86, 242. 90

   Fiscal year ending June 30                          1938              1939                          1940                         1941            1942


Total expended--_--------------$68, 368. 21                         $25, 804. 65 -$112, 157. 86                                $94, 032. 97       $67, 359.41

Allotted---------             -- --      ----     ---------             39,300.00                               ..........



                               -------------------------------
Balance unexpended July 1, 1941__                                                                                                             $105, 695. 40
Gross       amount expended                     -----------------                                           $1, 507,106.44
Less:
    Reimbursements collected------- $1, 438, 578.97
    Receipts from sales                    , 168. 06
                                          1-------------
                                                                                                                  1, 439, 747. 03
                                                                                                                                                67, 359. 41
      Balance unexpended June 30, 1942.--------                                                                                                 38, 335. 99
Outstanding liabilities June 30, 1942_________________ ___________                                                                              84, 354. 62

     'Balance available June 30, 1942_______________--________ -46,018. 63
Accounts receivable June 30, 1942_ ______________________________ 77, 024. 65
        Unobligated balance available June 30, 1942______________--_                                                                            31, 006. 02

Status of all investigations for navigationcalled for by river and harbor acts and
                               committee resolutions

                                                                             Date trans-
            Locality                        Authorization act                mitted to                     Document number                    Recomn
                                                                              Congress

Bass River Harbor, Mass_--               Rivers and           Harbors      Feb. 14, 1942 ---------                                  ____      Unfavorable.
                                          Committee resolu-
                                          tion, Jan. 18, 1938.
Block Island, R. I., inner               Commerce Commit-                  July 18, 1941                    House 330,                77th    Favorable.
  harbor.                                   tee resolution, Mar.                                                  Cong., 1st sess.
                                            5, 1940.
   Do_ _------------------_              Rivers and           Harbors .            do.---------..-do------------                                  Do.
                                            Committee resolu-
                                            tion, Mar. 26, 1940.
Chatham      Harbor,    Mass.,           Rivers and           Harbors      Dec. 10, 1941                    House 456,                77th    Favorable.
from Nantucket Sound to                    Committee resolu-                                                     Cong., 1st sess.
deep water in Stage Har-                   tion, Jan. 19, 1940.
bor.
Connecticut River, between               Rivers and Harbors                Oct.           8, 1941-----------------....Unfavorable.
Hartford, Conn., and                     Committee resolu-
  Holyoke, Mass.                            tion, Apr. 17 1940.
Mianus River, Conn- ....               . River and Harbor Act,           --------------......................
                                          Aug. 26, 1937.
Mystic River, Conn-..           - -.     Rivers and           Harbors      Aug.          4, 1941            House            349,     77th    Favorable.
                                            Committee          resolu-                                            Cong., 1st sess.
                                            tion, Oct. 24, 1939.
Providence River and Har-                Commerce Commit- Oct. 15,1941 --------------....                                                     Unfavorable.
  bor, R.I.                               tee resolution, June
                                            6, 1939.
134         REPORT OF CHIEF OF ENGINEERS,                             U. S. ARMY,                  1942

Status of all investigations for navigation called for by river and harbor acts and
                         committee resolutions--Continued

                                                            Date trans-
           Locality              Authorization act           mitted to        Document number        Recommenda-
                                                             Congress                                    tion

Sakonnet Harbor, R. I-.....    Rivers and Harbors       Oct. 15, 1941         ----------             Unfavorable.
                                 Committee resolu-
                                 tion, Feb. 15, 1939.
                            Rivers and Harbors
Taunton River, Mass_______......                        .
                               Committee resolu-
                                 tion, May 15, 1939.
Westport   Harbor and Sau-     Rivers and Harbors       Aug. 8,1941--------              _                Do.
gatuck    River, Conn., en-     Committee resolu-
larging   basin at Compo        tion, Feb. 16, 1939.
Beach.
Westport   Harbor and Sau-     Rivers and Harbors ....- do------          _           ----
                                                                                _--____                -_Do.
gatuck    River, Conn., to      Committee resolu-
modify existing project.       tion, Feb. 16, 1940.
Wickford Harbor, R. I _ _      Commerce Commit-         July 18,1941          Senate   105,   77th   Favorable.
                                 tee resolution, Mar.                           Cong., 1st sess.
                                 26, 1940.
Woods Hole and Little          Rivers and Harbors
Woods Hole Harbor,              Committee resolu-
Mass.                           tion, June 6, 1939.


      36. CONNECTICUT RIVER BASIN, VT., N. H., MASS., AND CONN.

   Location.-The works covered by this project are a series of dams
and reservoirs on tributaries of the Connecticut River in Vermont,
New Hampshire, and Massachusetts, within a radius of 230 miles from
Hartford, Conn., and local protection works at several cities in the
basin.
  Existing project.-The Flood Control Act, approved June 22, 1936,
as amended by the act approved May 25, 1937 (Public, No. 111, 75th
Cong.), authorized the construction of 10 reservoirs on tributaries of
the Connecticut River in accordance with plans in House Document
No. 412, Seventy-fourth Congress, second session, as the same may be
revised upon further investigation of the 1936 flood; estimated con-
struction cost, $10,028,900; estimated cost of land and damages,
$3,344,100.
   The Flood Control Act, approved June 28, 1938, approved a general
comprehensive plan for the control of floods and other purposes in the
Connecticut River Valley, as set forth in House Document No. 455,
Seventy-fifth Congress, second session, and authorized the sum of
$11,524,000 for construction of local flood-protection projects in the
plan. The act of October 15, 1940, modified the act of June 28, 1938,
to provide additional protection at East Hartford, Conn., as set forth
in House Document No. 653, Seventy-sixth Congress, third session, at
an additional cost of $1,640,000. The act of August 18, 1941, modified
the comprehensive plan approved in 1938 to include the improvements
recommended in House Document 653, Seventy-sixth Congress, third
session, and House Document 724, Seventy-sixth Congress, third ses-
sion, with such further modifications as may be found justifiable in
the discretion of the Secretary of War and the Chief of Engineers.
The latter act also authorized to be appropriated the additional sums
of $6,000,000 for local protection works and $10,000,000 for reservoirs.
Following are lists of the reservoirs and local protection works consid-
ered in the modified comprehensive plans:
                                                                                       DAMS AND RESERVOIRS

                                                                                                   Distance                                                                                   Estimated cost
                                                                                                    above
                       Name                                           Nearest city                 mouth of    Height                  Type                       Reservoir
                                                                                                   Connect-                                                       capacity     Construc-          Land and
                                                                                                     icut                                                                                         damages 1      Total
                                                                                                    River                                                                        tion
                                                                                                                                                                                                                                     17000
--                                                                                             1      -                   -                               -   I                               I            -

Massachusetts:                                                                                      Miles       Feet                                      Acre-feet
     Knightville 2____________- _ -_____               Knightville, Mass  .--..                      102. 8      160       Earth fill-..-..... 39, 300                         $2, 296, 000        $874, 000    $3, 170, 000
     West Brookfield __________---------               West Brookfield, Mass___                       99. 1       31      -_    do .. .. .. .                33, 900              635, 000        1,682, 000     2, 317,   000
     Barre 2Falls................-------------------   Barre, Mass_                                  130. 2       63. 5 ....    do ..........                24, 300              876, 000            89, 000       965,   000
     T u lly    -
               -----------       -----------------     Fryville, Mass__                              148. 7       62     .....  d o .. . .. .                22, 150              596, 000           163, 000       759,   000
   Birch Hill 2_                                       South Royalston, Mass                         153. 3       56     .. . ..d o . . . . . . . . . . .    49, 900            1,215, 000        2, 885, 000    4,100,    000
New Hampshire:                                                                                                           -_     do ..-       ----
   Honey Hill -------------------------                Keene, N. H____                                168. 9      65                                         26, 200            1, 398, 000          537, 000   1, 935, 000
   Surry Mountain 2_______________                 .... do_ -                                         174. 4      83    _ . do -- -- -                       32, 500            1, 291, 000          354, 000   1, 645, 000
   Clarem ont 2 ..__......... ..........            Claremont, N. H___________                        202. 4     122. 5 -       do ...-- -                   78, 400            3, 170, 000       1, 990, 000   5,160, 000           O
   West Canaan_____________                         West Canaan, N. H___                              233. 8      79    _.      do_ _-                       34, 100               968, 000       1,552, 000     2, 520, 000
   Sugar Hill _...             ...------------------Lisbon, N. H     -                                280. 9     163     .....do ----                        91, 600            3, 500, 000       3, 385, 000    6, 885, 000
Vermont:
   W illiamsville _. .........         .. .....     Brattleboro, Vt_                                  154. 5     300          Concrete- _------                     445, 000   25, 028, 000       4, 072, 000   29, 100, 000
   Cambridgeport-----_      ---------------- Cambridgeport, Vt .__-                                   180. 3     101          Earth fill _--- ---                    21, 600    1, 355, 000          620, 000    1, 975. 000         b
   Brockway .-       ------                         Brockway Mills, Vt_                               182. 0     132      _.-- do       .--- -                       32, 300    1, 380, 000       1,564, 000     2, 944, 000
   North Springfield____                           North Springfield, Vt__ -                          191. 3     106      .. ..do        _-- - .-
                                                                                                                                        .-            -              33. ,J     1,693, 000          325, 000     2, 018, 000         0
   Ludlow__--------------                           Ludlow, Vt .                                      211.8      118      .....
                                                                                                                              do         _---- -                     23, 900      925, 000        1,275, 000     2, 200, 000
   North Hartland______________                     North Hartland, Vt___                             211. 7     176      ---     do      _---       - -             71, 100   3, 300, 000          330, 000     3, 630, 000     0
   South Tunbridge--------                          South Royalton, Vt ....
                                                    Gaysville, Vt_
                                                                                                      234. 5     105            -do ..........                       32, 600   1, 305, 000
                                                                                                                                                                               2,665, 000
                                                                                                                                                                                                    970, 000     2, 275, 000
                                                                                                                                                                                                                 4, 785, 000
                                                                                                                                                                                                                                      g
   Gaysville_---     -------------------                                                              246. 8     178          Concrete __                            84, 300                      2,120,000
     Union Village 2- ..        _____                  Union Village, Vt_     - -                     228. 4
                                                                                                      306. 0
                                                                                                                 170
                                                                                                                  75
                                                                                                                              Earth fill -_-----                     30, 200
                                                                                                                                                                     28, 200
                                                                                                                                                                               2, 108, 000
                                                                                                                                                                               1, 100, 000
                                                                                                                                                                                                    268, 000     2, 376, 000
                                                                                                                                                                                                                 1, 415, 000
                                                                                                                                                                                                                                     0a
     Victory_-------------------                       North Concord, Vt    _. .-...                                      _--_    do    ...-------                                                  315, 000


     1Includes highway,    railroad, and utilities relocation.
     2 Details of these project items are given in individual reports.
                                                                                                                                                                                                                                     -


                                                                                                                                                                                                                                     0
                                                                                                                                                                                                                                     4-4
136         REPORT OF CHIEF OF ENGINEERS,                                          U. S. ARMY,                 1942

                                       LOCAL PROTECTION WORKS

                                 Distance                                                               Estimated cost
                                  above
                                 mouth
         Location                of Con-            Type of structure
                                 necticut                                                Construc-        Land and        Total
                                   River                                                   tion           damages
                                  (miles)

Hartford, Conn.1                       52 Wall and levee------------...                   $5, 485,000       $730, 000    $6, 215, 000
East Hartford, Conn.'L
                  1      -_            52     - do_-----              _           --        2, 350, 000      270, 000     2, 620, 000
Springfield, Mass. .-...               76 _-do---_               ----                      -925, 000         272, 000     1, 197, 000
West Springfield, Mass.L_-             76   .-- do-------------------                       1, 252, 000       30, 000     1, 282, 000
Chicopee, Mass.i..       _             80        do                .....------------------- 1, 592, 000      500, 000     2, 092, 000
Holyoke, Mass.1 -----------            85    --- do-----------           --------           2, 424, 000      150, 000     2, 574, 000
Northampton, Mass.1 _--                94 -       ..
                                                 do_                  _                        960, 000      150, 000     1, 110, 000
Springdale, Mass----------             84     .. do_                                         390, 000         57, 000       447, 000
Riverdale, Mass....-----------         80       do ...... _._.                 ...           490, 000         50, 000       540, 000
Winsted, Conn-..........              115    Channel improvement                ...--        140, 000          3, 000       143, 000

  ' Details of this project item are given in individual reports.

   Operations and results during fiscal year.-Stream gaging, rainfall
studies, foundation exploration, laboratory tests, and design in con-
nection with reservoir sites were conducted during the year. The
cost was $10,652.04. The expenditures were $7,489.58.
   Condition at end of fiscal year.-Surveys and plans for the develop-
ment of the comprehensive plan have been well advanced. The con-
struction progress of projects selected for construction under this au-
thorization is given in individual reports. The total costs under the
existing project have been $666,798.31. The expenditures have been
$697,304.40.
  Proposed operations.-It is proposed to apply the funds unexpended
on June 30, 1942, amounting to $5,695.60, plus accounts receivable of
$6,517.72, a total of $12,213.32, to accounts payable, $1,517.80, and to
new work, rainfall studies, stream flow studies, laboratory tests, de-
sign, hydraulic and geologic studies, period July 1942 to June 1943,
$10,695.52.
   The sum of $300,000 can be profitably expended during the fiscal
year 1944 in continuing engineering studies and the preparation of
plans and specifications for flood control dams and reservoirs, and
local protection works included in the comprehensive plan.
                                     Cost and financial summary

Cost of new work to June 30, 1942___                                    -------                                    $666, 798. 31
Cost of maintenance to June 30, 1942_

      Total cost of permanent work to June 30, 1942________--                                                       666, 798. 31
Undistributed costs June 30, 1942______
                                   -------   -----------                                                             25, 506. 17

      Net total cost to June 30, 1942_____________--------------                                                    692, 304. 48
Plus accounts receivable June 30, 1942____________
                                            ---------                                                                 6, 517. 72

     Gross total costs to June 30, 1942_----------- -----                                                   --- - 698, 822. 20
Minus accounts payable June 30, 1942_-----------------                                                              1, 517. 80

     Net total expenditures_______-------------------6---                                                          697, 304 .40
Unexpended balance June 30, 1942_---------                                                                           5, 695. 60
         Total amount appropriated to June 30, 1942__ ___----                                                       703, 000.00
                   RIVERS               AND HARBOIR&~--PROVIDENCE,                                     R.    I.,     DISTRICT                  137

   Fiscal year ending June 30-                                1938                1939              1940               1941                1942

Cost of new work--.-----                         -.... -   $305, 460. 52       $201, 776. 95   $95, 252. 63          $53, 656. 17         $10, 652. 04
Cost of m aintenance ...........                       . . . . .     . . . .    . .. . . . . . .     ....................... I-------------
Total expended---------------...............--              302, 305. 16        297, 617. 25       44, 205. 04        45, 687.37            7, 489. 58
Allotted .......................----------------------      713, 000. 00         75,000.00     125, 000.00         -210, 000. 00 --..             .


Balance unexpended July 1, 1941                                         ---------------- -----------                                $13, 185. 18
Gross amount expended--------     -------------- $59, 870. 61
Less reimbursements collected-------------------  52, 381. 03
                                                                                                                                        7, 489. 58

      Balance unexpended June 30, 1942------------------- --                                                                             5, 695. 80
Outstanding liabilities June 30, 1942                                                                                                   1-----------------------
                                                                                                                                        1,  517. 80
     Balance available June 30, 1942--------------------                                                                                4, 177. 80
Accounts receivable June 30, 1942-----------------------------                                                                          6, 517. 72

              Unobligated balance available June 30, 1942--------------                                                              10, 695. 52

Amount (estimated) required to be appropriated for completion
of existing project 1-----------------------------------                                                                      0, 000, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for new work - - - - - -- -- - - - - - - - - - - -- - - - - - - - -                                                 300, 000. 00
    1 Exclusive of available funds.

        37. CLAREMONT RESERVOIR, CONNECTICUT RIVER BASIN, N. H.

  Location.-The site of the proposed Claremont Dam is on the Sugar
River, about 7 miles above its junction with the Connecticut River and
about 1 mile southeast of Claremont, N. H. The reservoir will extend
upstream approximately 4.5 miles.
  Existing project.-This project provides for the construction of a
rolled-fill earth dam 2,300 feet long at the crest line, rising 122.5 feet
above the stream bed and providing a total storage capacity of 78,400
acre-feet. The reservoir will be operated as a unit of a coordinated
reservoir system for the control of floods in the Connecticut River
Basin.
   The estimated cost, revised in 1940, is $3,170,000 for construction
and $1,990,000 for lands and damages, including highway, railroad,
and utilities relocation, a total of $5,160,000 for new work. The esti-
mated cost for annual maintenance is $18,500, of which $5,000 is for
operating and care.
   The existing project was adopted by the Flood Control Act ap-
proved June 22, 1936, as modified by the act of June 28, 1938 (H. Doc.
No. 455, 75th Cong., 2d sess.).
  Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Operationsconsisted of
dam site surveys, geological investigations, land surveys, and pre-
liminary designs. The costs were $18,042.01 for new work. The ex-
penditures were $20,480.06.
   Condition at end of fiscal year.-Geologicalinvestigations were com-
pleted. Dam site surveys were 90 percent complete. Preliminary
design was 13 percent complete.
   The total costs under the project have been $110,044.76 for new work.
The expenditures have been $110,071.09.
138       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                       1942

   Proposed operations.--Itis proposed to apply the funds unexpended
on June 30, 1942, amounting to $39,928.91 and accounts receivable of
$26.33, a total of $39,955.24, to new work, surveys, foundation explora-
tions, engineering studies, and design by hired labor, July 1942 to
June 1943.
                                    Cost and financial summary
Cost of new work to June 30, 1942 -------    __---.______---                                               $110, 044. 76
Cost of maintenance to June 30, 1942      ________    ____
      Total cost of permanent work to June 30, 1942______________                                              110, 044.76
Plus accounts receivable June 30, 1942_-............      ------____                                                 26. 33
        Gross total costs to June 30, 1942 -- __------..                                  __-         _        110, 071. 09
Net total expenditures--------------- ---------------------   110, 071. 09
Unexpended balance June 30, 1942-----------------------------39, 928. 91
        Total amount appropriated to June 30, 1942----------------                                             150, 000. 00

  Fiscal year ending June 30--            1938                1939              1940              1941              1942

Cost of new work----------------____________--------------
Cost of maintenance -    ---     -- - - - - - -          --
                                                          ------                 $33.04
                                                                             - - - - --
                                                                                                $91,969. 71
                                                                                            - - -- -       -
                                                                                                                  $18,042.01
                                                                                                                 -- ----
Total expended___ _..............___
                                __________             ____________________________              89, 591.03         20,480.06
Allotted.......         ......--------------------------------------------    150, 000. 00--------------


Balance unexpended July 1, 1941-----------------------------$60, 408. 97
Gross amount expended______________________-_____             20, 480. 06
      Balance unexpended June 30, 1942------------------------39, 928. 91
Accounts receivable June 30, 1942 __-- ____ -__-_______---         26. 33

        Unobligated balance available June 30, 1942_________                                       ___          39, 955. 24
Amount (estimated) required to be appropriated for completion of
existing project _ ------------------------    -------------- 5, 010, 000. 00
  1 Exclusive of available funds.

   38. UNION VILLAGE RESERVOIR, CONNECTICUT RIVER BASIN, VT.
  Location.-The site of the proposed Union Village Dam is on the
Ompompanoosuc River, about 4 miles above its junction with the Con-
necticut River and one-quarter mile north of Union Village, Vt. The
reservoir will extend upstream approximately 31/2 miles.
  Existing project.-This project provides for the construction of an
hydraulic-fill earth dam, 1,100 feet long at the crest line, rising 170
feet above the stream bed and providing a total storage capacity of
30,200 acre-feet. The spillway will have a broad-crested weir, 370 feet
long, built on rock, with a discharge capacity of 52,000 cubic feet per
second. The outlet will consist of a 13-foot diameter tunnel 1,200 feet
long. Control will be accomplished by gates mechanically operated
from a house over a shaft near the middle of the tunnel. The drainage
area controlled is approximately 126 square miles. Provision will be
made for future installation of penstocks for the development of hy-
droelectric power. The reservoir will be operated as a unit of a coor-
dinated reservoir system for the control of floods in the Connecticut
River Basin.
   The estimated cost, revised in 1939, is $2,108,000 for construction and
$268,000 for lands and damages, including highway relocation, a total
             RIVERS AND HARBORS$-PROVIDENCE,                                                    R.   I.,   DISTRICT                  139

of $2,376,000 for new work. The estimated cost for annual mainte-
nance is $16,300, of which $5,000 is for operating and care.
   The existing project was authorized by the Flood Control Acts ap-
proved June 22, 1936, and June 28, 1938 (H. Doc. No. 455, 75th Cong.,
2d sess.).
  Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
  Operations and results during fiscal year.--None. The costs were
$8.40, and expenditures were minus $618.58 for new work.
   Condition at end of fiscal year.-Revision of plans and specifica-
tions was 85 percent complete. No construction operations were in
progress at the end of the year. The total costs under the project
have been $21,317.81, for new work. The expenditures have been
$21,317.81. In addition, $104,411.93 from funds allotted for develop-
ment of the general comprehensive plan for flood control in the Con-
necticut River Basin was applied to preliminary exploration, sur-
veys, and design of the Union Village Reservoir.
   Proposedoperations.-Itis proposed to apply the funds unexpended
on June 30, 1942, amounting to $18,682.19, to new work, surveys,
foundation explorations, and design by hired labor, July 1942 to June
1943.
                                       Cost and financial summary
Cost of new work to June 30, 1942-------------------------------                                                           $21, 317. 81
Cost of maintenance to June 30, 1942......-.      -   --
         Total cost of permanent work to June 30, 1942---------------21, 317. 81
Net total expenditures------------------_                       21, 317. 81
Unexpended balance June 30, 142--------------------------------18, 682. 19
         Total amount appropriated to June 30, 1942-------------------                                                      40, 000. 00

  Fiscal year ending June 30-                  1938                 1939                    1940             1941               1942

Cost of new work ---------------     _______       ___    _     $14, 073. 28               $4, 353. 08      $2, 883. 05              $8. 40
Cost of maintenance --------------------                  ------                      --                            --           -

Total expended..........._         ___--------------               13, 771. 65              5, 281. 69       2, 883. 05          -618. 58
Allotted-       _ __-------.   _               _                  600, 000. 00 --------------
                                                      _--------------                                      560, 000. 00



Balance unexpended July 1, 1941_______-------------------_                                      _                          $18, 063. 61
Reimbursements collected   .__________________                                                       ____-----                  618. 58

          Unobligated balance available June 30, 1942-----------------                                                      18, 682. 19
Amount (estimated) required to be appropriated for completion of
existing project 1------     ----             ---------                                                                 2, 336, 000. 00
   1 Exclusive of available funds.

39. SURRY MOUNTAIN RESERVOIR, CONNECTICUT RIVER BASIN, N. H.

  Location.-The site of the Surry Mountain Dam is on the Ashuelot
River, about 34.6 miles above its junction with the Connecticut River
and 5 miles north of Keene, N. H. The reservoir will extend upstream
about 3 miles.
  Existing project.-This project provides for the construction of a
rolled-fill earth dam 1,670 feet long at its crest, rising 85 feet above
140     REPORT OF CHIEF OF ENGINEERS,         U.   S.   ARMY,   1942

the stream bed, and providing a total storage capacity of 32,500 acre-
feet. The spillway consists of an open side channel with a low con-
crete weir 337.5 feet long, with a discharge capacity of 40,900 cubic
feet per second. The outlet consists of a 10-foot-diameter tunnel 383
feet long. Control is accomplished by gates mechanically operated,
through a shaft, from a house above. The drainage area controlled is
approximately 100 square miles. The reservoir is operated as a unit
of a coordinated reservoir system for the control of floods in the Con-
necticut River Basin.
   The estimated cost, revised in 1941, is $1,291,000 for construction
and $354,000 for lands and damages, including highway relocations, a
total of $1,645,000 for new work. The estimated cost for annual main-
tenance is $11,700, of which $5,000 is for operating and care.
   The existing project was authorized by the Flood Control Acts
approved June 22, 1936, and June 28, 1938 (H. Doc. No. 455, 75th
Cong., 2d sess.).
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Work on the construc-
tion of the dam and appurtenant works was initiated in August 1939
under continuing contract and was completed June 6, 1942. Con-
struction during the year included placing material in the dam em-
bankment, buildingthe spillway and weir, and construction of op-
erating house, and the installation of gates and equipment. This
work involved the excavation of 326.200 cubic yards of earth, and
29,600 cubic yards of rock, placing 257,500 cubic yards of earth fill,
37,000 cubic yards of rock fill, and 4,850 cubic yards of concrete, at
a cost of $357,.571.19. No additional work was done on utility relo-
cation and the work remains about 90 percent complete. No costs
were incurred. Work was continued and about 80 percent complete
at the end of the year on land acquisition in the dam site and reser-
voir areas; 287.17 acres of land were acquired, at a cost of $44,300.23.
The total costs, including engineering, amounting to $6,013.63, were
$407,885.05 for new work. The expenditures were $445,560.40.
Maintenance and operation costs were $255.39.
   Condition at end of fiscal year.-The existing project is approxi-
mately 95 percent complete. The work required to complete the
project consists of the preparation of final construction plans and
report, removal of rock slide from spillway, completion of utility
relocation, and land acquisition, miscellaneous fencing, sodding and
seeding, the construction of operators' quarters and a permanent
field office and the clearing of the reservoir area of floating materials.
   The costs of the existing project for new work have been $1,556,.
193.02. The expenditures have been $1,499,241.95.            In addition,
$104,708.83 from funds allotted for the development of the general
comprehensive plan for flood control in the Connecticut River Basin
was applied to preliminary explorations, surveys, and designs of
the Surry Mountain Reservoir project.
   The, costs of maintenance and operations were $255.39. The ex-
penditures were $96.72.
   Proposed operations.--It is proposed to apply funds unexpended
on June 30, 1942, amounting to $172,758.05, and accounts receivable,
$162.42, a total of $172,920.47 as follows:
              RIVERS           AND HARBORS-PROVIDENCE,                                                R. I.,          DISTRICT                           141
Accounts payable---------------- ---------------------------          $57, 368. 88
New work: Acquisition of rights-of-way and lands, clearing of reser-
  voir area, removal of fallen rock from spillway channel, construc-
  tion of operators' quarters and permanent field office, period July
  1942 to June 1943-----------------------------------------           88, 648. 31
Maintenance: Operation and maintenance of the flood-control reser-
  voir, period July 1942 to June 1943 -------------------------        26, 903. 28

            Total-------------------------------------------------                                                                         172, 920. 47
  The above operations will complete the Surry Mountain Dam and
Reservoir.
  The sum of $11,700 can be profitably expended during the fiscal
year 1944 for the operation and maintenance of the flood-control
reservoir.
                         Cost and financial summary
Cost of new work to June 30, 1942---------------------------                                                                     $1, 556, 193. 02
Cost of maintenance to June 30, 1942--------------------------                                                                            255. 39

          Total cost of permanent work to June 30, 1942-----------                                                                  1, 556, 448. 41
Plus accounts receivable                       June 30, 1942                                                                                          62. 42
                                                                                                                                                     1----------

      Gross total costs to June 30, 1942------------------------1, 556, 610. 83
Minus accounts payable June 30, 1942--------------------------      57, 368. 88
     Net total expenditures---------------------------------                                                                        1, 499, 241. 95
Unexpended balance June 30, 1942 -----------------------------                                                                         172, 758. 05

           Total amount appropriated to June 30, 1942--------------                                                                 1, 672, 000. 00

   Fiscal year ending June 30-                      1938                     1939                1940                    1941                       1942


Cost of new work -------------                                             $14, 642. 98      $344, 216. 39           $789, 448. 60                $407, 885. 05
Cost of maintenance-..                                     . .--
                                              --------------..                                                                                          255. 39

       Total cost--------------------------                        -14,         642. 98       344, 216. 39            789, 448. 60                 408, 140. 44

                                                    ----
T o t a l e x pe n de d-. . . . . . . . . . . . . . . . .          .        12 , 8 6 8. 16    2 8 7 , 7 2 6 . 59      7 5 3, 08 6 . 8 0            4 4 5 , 56 0. 4 0

Allotted..-------               --------------                         1,070, 000.00          275, 000. 00            260, 000. 00                  67, 000. 00

Balance unexpended July 1, 1941_                                                                                                          $551, 318. 45
Amount allotted from War Department Civil Appropria-
    tion Act approved June 28, 1939 .. __--                                    -------                             $25, OOC
Amount allotted from War Department Civil Appropria-
tion Act approved April 28, 1942_______________
                                      -                                                                            42, 00O
                                                                                                                                            67, 000. 00

       Amount to be accounted for------------------------------                                                                            618, 318. 45
Gross amount expended ______________---------_ $446, 742.18
Less :
    Reimbursements collected-------------   $19. 78
       Receipts        from             ---------
                                   sales_ ___                          _            1,162. 00
                                                                                                              1,181.78
                                                                                                                                           172, 758. 05
      Balance unexpended June 30, 1942___________                                                                                          172,      758.     05


Outstanding liabilities June 30, 1942________________ $13.121. 38
Amount covered by uncompleted contracts------------ 67,699. 79
                                                                                                                                            80, 821. 17
     Balance available June 30, 1942 _____ _____________-                                                                                   91, 936. 88
Accounts receivable June 30, 1942__    ________                                                                                                 162. 42
           Unobligated balance available June 30, 1942____________                                                                          92, 099. 30
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance 1                                                                                                           11, 700. 00
1Exclusive of available funds.
          493202-43-pt. 1, vol. 1-                      10
142     REPORT OF CHIEF OF ENGINEERS,        U. S. ARMY,    1942

   40. BIRCH HILL RESERVOIR, CONNECTICUT RIVER BASIN, MASS.

    Location.-The site of the Birch Hill Dam is on the Millers River,
about 27.3 miles above its junction with the Connecticut River, and 1.3
miles northeast of South Royalston, Mass. The reservoir extends
up the Millers River about 61/2 miles and up the Otter River about 3
miles.
    Existing project.-This project provides for an earth dam of
rolled-fill construction, extending across the Millers River, and over-
flow spillway sections closing natural saddles in the right bank.
The dam is 1,400 feet long and rises 56 feet above the river bed.
'The spillway weir consists of two concrete overflow sections, sepa-
rated by a natural knoll, and a short weir closing an abandoned rail-
road cut. The main spillway is approximately 810 feet long, the.
adjacent spillway 350 feet, and the small one 23 feet. The total dis-
charge capacity is approximately 57,000 cubic feet per second at a
surcharge of 6 feet. The outlet works consist of an intake channel
1,500 feet long, with a bottom width of 70 feet; a gate structure with
operating gatehouse directly above; and an outlet channel 1,150 feet
long, with a bottom width of 70 feet. The intake and gate-operating
tower contain gates mechanically controlled from the operating house
above. The gross drainage area controlled is approximately 175
square miles. The reservoir provides a storage capacity of 49,400
acre-feet at spillway crest. The reservoir is operated as a unit of
'a coordinated reservoir system for the control of floods in the Con-
necticut River Basin.
    The estimated cost, revised in 1941, is $1,215,000 for construction
and $2,885,000 for lands and damages, including highway and rail-
road relocations, a total of $4,100,000 for new work. The estimated
cost for annual maintenance is $12,000, of which $5,000 is for operat-
ing and care.
    The existing project was authorized by the Flood Control Acts
approved June 22, 1936, and June 28, 1938 (H. Doc. No. 455, 75th
C~ong., 2d sess.).
    Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
    Operations and results during fiscal year.-Work on the construc-
tion of the dam and appurtenant works was initiated in June 1940
under a continuing contract and was completed in May 1942. Con-
struction during the year included placing material in the dam
'embankment, excavation of the outlet channel and construction of
the spillway, construction of the operating house and installation
of gates and equipment. This work involved the excavation of
369,400 cubic yards of earth, 5,260 cubic yards of rock, placing 188,380
cubic yards of earth fill, 40,850 cubic yards of rock fill, and 6,680
cubic yards of concrete, at a cost of $421,539.64. Work was in
progress, under contract on the relocation of the Boston & Maine
Railroad; at the close of the fiscal year it was practically completed
at a cost of $388,200.43. Negotiations with officials of the State of
Massachusetts and Worcester County, providing for relocation of
State highway and county roads are in progress. Costs of surveys
by Worcester County were $1,400.54. Work was completed under
contract on the relocation of a power line, at a cost of $36,035.55.
The construction of the dike for the protection of the filter beds in
         RIVERS AND HARBOIRS--PROVIDENCE,                        R. I., DISTRICT       143
the town of Winchendon, Mass., was begun in August 1941 and com-
pleted May 22, 1942, at a cost of $62,000.66. Work was continued
and about 85 percent complete at the end of the year on land acquisi-
tion in the dam site and reservoir areas; 671.07 acres of land were
acquired, at a cost of $352,995.70. A well for water supply to opera-
tor s quarters was completed at a cost of $1,679.03. A terminal pole
for the incoming power supply was installed at a cost of $45.71. The
total costs for new work were $1,258,216.70. The expenditures were
$1,575,430.29. Maintenance and operation costs were $1,271.73.
   Condition at end of fiscal year.-The existing project is approxi-
mately 85 percent complete. The work remaining to be done to com-
plete the project consists of the preparation of final construction
plans and report, completion of the railroad, highway and utility
relocations, acquisition of lands, clearing of reservoir area, miscel-
laneous fencing and sodding and seeding, and construction of opera-
tors' quarters and permanent field office.
   The costs of the existing project for new work have been $3,174,-
723.23 and $1,271.73 for maintenance and operation, a total of $3,175,-
994.96. The expenditures have been $3,058,897.64. In addition, the
sum of $11,039.82 from funds allotted for development of the gen-
eral comprehensive plan for flood control in the Connecticut River
Basin was applied to preliminary explorations, surveys, and designs
of the Birch Hill Reservoir project.
   Proposed operations.--It is proposed to apply funds, including ac-
counts receivable, unexpended on June 30, 1942, amounting to $1,046,-
087. 36 as follows:
Accounts payable---------------------------------------                $120, 082. 32
New work: Completion of the railroad relocation, continuation of
  highway relocations, relocation of utility lines, acquisition of
  rights-of-way and lands, clearing of reservoir area, construction
  of power line and construction of operators' quarters and perma-
  nent field office, and miscellaneous fencing, sodding and seeding,
  period July 1942 to June 1943          -----------------              900, 078. 23
Maintenance: Operation and maintenance of the flood-control reser-
  voir, period July 1942 to June 1943__                                  25, 926. 83
                                                  -------------------------

       Total       -------------------------------------------               1, 046, 087. 36
  The sum of $37,000 can be profitably expended during the fiscal
year 1944, as follows:
New work: Completion of acquisition of rights-of-way and land, fencing,
  landscaping, etc., period July 1943 to June 1944--------------------  $25, 000
Maintenance: Operations and maintenance of the flood-control reservoir,
  period July 1943 to June 1944-----------------------------------12, 000
      Total------------------------------------------------------                   37,000
                         Cost and financia summary
Cost of new work to June 30, 1942------------------------$3, 174, 723. 23
Cost of maintenance to June 30, 1942-------------------------- 1, 271. 73
      Total cost of permanent work to June 30, 1942-----------3, 175, 994. 96
Plus accounts receivable June 30, 1942-------------------------    2, 985. 00
      Gross total costs to June 30, 1942---------------------3, 178, 979. 96
Minus accounts payable June 30, 1942------------------------    120, 082. 32
     Net total expenditures___-------------------                           3, 058, 897. 64
Unexpended balance June 30, 1942 -    _-----------                          1, 043, 102. 36
       Total amount appropriated to June 30, 1942- .....                     4, 102, 000. 00
144               REPORT OF CHIEF OF ENGINEERS,                                                U.    S.      ARMY,        1942


   Fiscal year ending June 30-                         1938                 1939                 1940              1941               1942


Cost of new work -------------------                             _       $31, 839. 93        $227, 133. 04 $1, 657, 533. 56      $1, 258, 216. 70
Cost of maintenance--...... -- ----------                                                       -
                                                                                           -------  -_---_ _ __1----------             1,
                                                                                                                                       1------------
                                                                                                                                       1.....
                                                                                                                                          271.73

         Total cost..............               ....--------------..       31, 839. 93        227, 133. 04    1, 657, 533. 56     1, 259, 488. 43

Total expended...                                --------------
                                   ..--------------                        29, 998. 28        203, 644.49     1, 249, 824. 58     1, 575, 430. 29

Allotted ....................                .....         ......-----------------
                                                                         1, 302, 000. 00      813, 000. 00    1, 510, 000. 00        477, 000. 00



Balance unexpended July 1, 1941 --------------------------- $2, 141, 532. 65
Amount allotted from War Department Civil Appropriation Act
  approved April 28, 1942________________                _      477, 000. 00

       Amount to be accounted for____ ---    ---------------                                                                2, 618, 532:65
Gross amount expended______________________ $1, 576, 741. 60
Less :
    Reimbursements collected---------- $563. 31
    Receipts from sales --___-__--   ___ 748. 00
                                                     1, 311. 31
                                                                                                                            1, 575, 430. 29
                                      -------- _____-__
     Balance unexpended June 30, 1942__                      _                                                              1, 043,102. 36
Outstanding liabilities June 30, 1942             $77, 322. 17
Amount covered by uncompleted contracts---------- 168, 874. 97
                                                                                                                                246, 197. 14
     Balance available June 30, 1942----------------    -796,                                                                        905. 22
Accounts receivable June 30, 1942___________________________                                                                      2, 985. 00

             Unobligated balance available June 30, 1942__                                                                      799, 890. 22

Amount (estimated) required to be appropriated for completion of
existing project -----------------------------------------                                                                      25, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944:
   For new work 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                               25, 000. 00
   For maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                                12, 000. 00
                          - - - - - - - - - - - - - - -       - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
              Total                                                                                                             37, 000. 00
    1 Exclusive of available funds.

    41. KNIGHTVILLE RESERVOIR, CONNECTICUT RIVER BASIN, MASS.

    Location.-The site of the Knightville Dam is on the Westfield
River, about 27.5 miles above its junction with the Connecticut River
and 4 miles north of the town of Huntington, Mass. The reservoir
extends up the Westfield River about 6 miles and up the Little River
about 1 mile.
    Existing project.-This project provides for the construction of
an hydraulic-fill earth dam, 1,600 feet long at the crest line, including
400 feet of spillway, rising 160 feet above the stream bed and pro-
viding a total storage capacity of 39,300 acre-feet. The outlet con-
sists of a 16-foot diameter tunnel approximately 605 feet long. Con-
trol is accomplished by gates mechanically operated from a tower
located at the intake end of the tunnel. The drainage area controlled
is approximately 164 square miles. Provision has been made for future
installation of penstocks for the development of hydroelectric power.
The reservoir is operated as a unit of a coordinated reservoir system
for the control of floods in the Connecticut River Basin.
         RIVERS AND HARBORS-TPROVIDENCE,             R.   I., DISTRICT     145
  The estimated cost, revised in 1941, is $2,296,000 for construction
and $874,000 for lands and damages, including highway relocations,
a total of $3,170,000 for new work. The estimated cost for annual
maintenance is $18,700, of which $5,000 is for operating and care.
  The existing project was authorized by the flood-control acts ap-
proved June 22, 1936, and June 28, 1938 (11. Doc. No. 455, 75th Cong.,
2d sess.).
  Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.--Work on the construc-
tion of the dam and appurtenant works was initiated in August 1939
under a continuing contract and was completed in December 1941.
Construction during the year included placing material in the em-
bankment, construction of control works and operating house, and
construction of spillway. This work involved the excavation of
231,900 cubic yards of earth, 4,520 cubic yards of rock, and placing
107,700 cubic yards of earth fill. The costs were $194,740.79. Work
was continued, under contract, on the relocation of 3.5 miles of high-
way and was about 90 percent complete at the end of the year. The
costs were $78,192.11.    Work was continued on the relocation of
utilities at a cost of $2,626.13. Land acquisition in the dam site
and reservoir areas was continued, and about 60 percent complete
at the end of the year. A total of 1,022.70 acres was acquired at a
cost of $9,917.58.   Cemetery relocation was completed. Work was
started on the construction of operator's quarters at a cost of $1,042.48.
The total costs were $304,511.57 for new work.        The expenditures
were $407,695.18. Maintenance and operation costs were $5,231.01.
   Condition at end of fiscal year.-The existing project is approxi-
mately 93 percent complete.       The work required to complete the
project consists of the completion of the highway relocation, com-
pletion of land acquisition, clearing of reservoir area of floating ma-
terials, removal of rock slide from outlet portal, and construction
of operator's quarters and permanent field office. Total costs for
new work have been $2,951,423.84, and $5,231.01 for maintenance, a
total of $2,956,654.85.   The expenditures have been $2,907,252.93.
In addition, the sum of $105,798.28 from funds allotted for the de-
velopment of the general comprehensive plan for flood control in
the Connecticut River Basin was applied to preliminary explora-
tions, surveys, and designs of the Knightville Reservoir project.
   Proposed operations.--It is proposed to apply funds unexpended on
June 30, 1942, amounting to $311,747.07, as follows:
Accounts payable      ----------------------------------------     $49,401.92
New work: Acquisition of rights-of-way and lands, relocation of
  highways, clearing of reservoir area, construction of operator's
  quarters, and permanent field office, sodding and seeding and
  removal of rock slide from outlet portal, period July 1942 to
  June 1943_________------------------------------------------___  233, 611. 66
Maintenance: Operation and maintenance of the flood control reser-
  voir, period July 1942 to June 1943-----------------------        28, 733. 49
       Total     -------------------------------------------        311, 747. 07
  The above operations will complete the Knightville Dam and
Reservoir.
146              REPORT OF CHIEF OF ENGINEERS,                                      U. S. ARMY,                1942

   The sum of $18,700 can be profitably expended during the fiscal
year 1944 for the operation and maintenance of the flood control
reservoir.
                                             Cost and financial summary
Cost of new work to June 30, 1942------------------------                                                      $2, 951, 423.84
Cost of maintenance to June 30, 1942------------------------                                                         5, 231. 01
      Total cost of permanent work to June 30, 1942-----------2, 956, 654. 85
Minus accounts payable June 30, 1942 _____________________        49, 401.92
     Net total expenditures_____----_______-_____    __     _ 2, 907, 252.93
Unexpended balance June 30, 1942 --------------------------      311, 747. 07
            Total amount appropriated to June 30, 1942- -------------                                           3, 219, 000. 00

     Fiscal year ending June 30                    1938            1939               1940              1941              1942

Cost of new work-----
                  .-------------....                             $21, 484. 79   $1, 069, 565. 63 $1, 555, 861. 85       $304, 511. 57
Cost of maintenance.........------..........                ..              ------------
                                                                      _-------------- _                                     5, 231.01
         Total cost-......          .        .__.-----.--
                                                 .-- .      __    21, 484. 79    1, 069, 565. 63   1, 555, 861. 85       309, 742. 58
             .20,
Total expended_.----________________._                               566. 66       797, 757. 03    1, 681, 234. 06 .     407, 695. 18
Allotted--------------.-----------------1,                       300, 000. 00    1, 360, 000. 00     400, 000. 00        159, 000. 00



Balance unexpended July 1, 1941---------------------------$560, 442. 25
Amount allotted from War Department Civil Appro-
  priation Act approved June 28, 1939------       __ $50, 000. 00
Amount allotted from War Department Civil Appro-
  priation Act approved Apr. 28, 1942_____________   109, 000. 00
                                                                  159, 000. 00

      Amount to be accounted for ____--    _________-__--____                                                        719, 442. 25
Gross amount expended---    _______-------  ____ $408, 731. 15
Less reimbursements collected__--___--____---         1, 035.97
                                                                                                                     407, 695. 18

      Balance unexpended June 30, 1942 _______    ___________                                                        311, 747. 07
Outstanding liabilities June 30, 1942--__________  $49, 374. 00
Amount covered by uncompleted contracts----------120, 233. 64
                                                                                                                     169, 607. 64

             Unobligated balance available June 30, 1942 _____________142, 139. 43

Amount that can be profitably1 -expended in fiscal year ending June
                                  -  -                          -
   30, 1944, for maintenance _____________                         _                                                   18, 700. 00
    1   Exclusive of available funds.

           42. TULLY RESERVOIR, CONNECTICUT RIVER BASIN, MASS.

  Location.-The site of the proposed Tully Dam is on the Tully
River, about 3.8 miles above its junction with the Millers River, and
1 mile north of Fryville, Mass. The reservoir will extend up the
Tully River about 21/2 miles.
  Existing project.-This project provides for the construction of a
rolled-fill earth dam, 1,500 feet long at its crest and rising 62 feet
above the stream bed, providing a total storage capacity of 22,150
acre-feet. A spillway will be constructed on rock in a saddle located
about 800 feet south of the left ablutment of the dam. The outlet will
consist of a 6-foot diameter tunnel approximately 296 feet long.
             RIVERS AND HARBO<RS-PROVIDENCE,                                   R.      I.,    DISTRICT             147

Control will be accomplished by gates mechanically operated from a
tower located at the upper end of the tunnel. The drainage area
controlled is approximately 50 square miles. The design includes
provisions for future raising and adaptation to the development of
hydroelectric power. The reservoir will be operated as a unit of a
coordinated reservoir system for the control of floods in the Con-
necticut River Basin.
   The estimated cost, revised in 1940, is $596,000 for construction,.
and $163,000 for lands and damages, including highway and utilities
relocation, a total of $759,000 for new work. The estimated cost of
annual maintenance is $7,700, of which $5,000 is for operating and
care.
   The existing project was authorized by the flood-control acts ap-
proved June 22, 1936, and June 28, 1938 (H. Doc. No. 455, 75th Cong.
2d sess.).
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-Geological investigations, dam-site
surveys, plans, and specifications are completed. Land surveys are 90
percent complete. No operations were in progress at the end of the
year.
   The total costs and expenditures under the project have been
$72,820.21 for new work. In addition, the sum of $25,292.65 from funds
allotted for development of the general comprehensive plan for flood
control in the Connecticut River Basin was applied to preliminary
explorations, surveys, and design of the Tully Reservoir project.
   Proposedoperations.-It is proposed to apply the funds unexpended
on June 30, 1942, amounting to $27,179.79, to new work, surveys, foun-
dation exploration, engineering studies, and design, by hired labor,
July 1942 to June 1943.
                                   Cost and financial summary
Cost of new work to June 30, 1942----------_-------------------- $72, 820. 21
Cost of maintenance to June 30, 1942_____________________--------------

        Total cost of permanent work to June 30, 1942--------------                                          72, 820. 21

Net total expenditures __________________                -------------                                       72, 820. 21
Unexpended balance June 30, 1942_____________-----------                                                     27, 179. 79

        Total amount appropriated to June 30, 1942--                                ______-------100, 000. 00

   Fiscal year ending June 30             1938               1939            1940              1941              1942

Cost of new work---------------    ------------         --------------    $70, 804. 92        $2, 015. 29          __
Cost of maintenance- .-------     I--------------
Total expended-_ __    _-                           -    - - - --          69, 492. 20         3, 328. 01
Allotted .   ------------------..--------------           $310,00.00     -210,000.00


Balance unexpended July 1, 1941----------------------                                ----------             $27, 179. 79
Unobligated balance available June 30, 1942---------                                         ______          27, 179. 79

Amount (estimated) required to be appropriated for completion of
                  -
existing project __ _____-----------------------------          659, 000. 00
    Exclusive of available funds.
148     REPORT OF CHIEF OF ENGINEERS,         U. S. ARMY,    1942

         43. HARTFORD, CONNECTICUT RIVER BASIN, CONN.

   Location.-Hartford,Conn., is located in Hartford County on the
west bank of the Connecticut River, 52 miles above the mouth.
   Existing project.-The plan of improvement provides for the con-
struction of a system of levees and floodwalls approximately 38,000
feet long, along the Connecticut River from high ground immediately
north of town to high ground immediately south of town, with the
Park River, which discharges into the Connecticut River at about the
center of town, to be confined between concrete walls discharging
through a short conduit section through the Connecticut River dike,
including pumping stations for the disposal of interior drainage. The
improvement as planned involved the construction of approximately
4,000 linear feet of concrete floodwall, 22,000 feet of earth dike, and an
enlargement of 12,000 feet of existing dike along the Connecticut River,
the construction of 7,000 linear feet of concrete walls and 800 linear
feet of concrete conduit on the Park River, construction of four stop-
log structures, three pumping stations, and other appurtenant drain-
age structures and facilities. The project grade for levees and walls
was designed to protect against a flood greater than any of record, as
modified by an approved plan of 20 reservoirs for flood control in the
Connecticut River Basin. The grades at all points were above the
maximum stage of the record flood, that of March 1936. At the re-
quest of the city of Hartford, the wall and dike grades were increased
5 to 6 feet, the crown width for levees increased from 10 feet to 15 feet,
and a conduit provided for the Park River in lieu of the open channel
improvement. Additional expense of approximately $2,524,230 in-
volved in these changes is being borne by the city of Hartford. The
existing project was authorized by the Flood Control Act approved
June 28, 1938 (H. Doc. No. 455, 75th Cong., 2d sess.), and modified by
the Flood Control Act of August 18, 1941 (H. Doc. No. 653, 76th
Cong., 3d sess.). The estimated cost of new work for the authorized
project, revised in 1941, is $5,485,000 for construction and $730,000 for
lands and damages, exclusive of the cost of the additional work desired
by the city. In addition to the authorized existing project, supple-
mentary work with relief labor has been undertaken at a cost of
$388,221.82 pursuant to the provisions of the Emergency Relief Act
approved June 21, 1938.
   Local cooperation.-See page 5 for requirements. Assurances of
local cooperation were approved by the Secretary of War on Decem-
ber 6, 1938, July 9, and August 26, 1940. Rights of entry have been
furnished for all construction undertaken to date. The sum of
$3,023,630 has been contributed by the city to cover the increased cost
of constructing the dikes to a higher grade, constructing a conduit
instead of walls for the Park River, changing the dike alinement
around the Hartford Electric Light Co. plant and providing addi-
tional riprap protection.
   Operations and results during fiscal year.-Work was completed
during fiscal year 1941, under contract, on the construction of 16,250
feet of earth dike extending from Memorial Bridge northward to
high ground immediately north of town. Construction was started
September 1940, under continuing contract, on the 5,600-foot double-
barreled pressure conduit for inclosing the Park River. The work
        RIVERS AND      HARBOIRS-PROVIDENCE,           R. I.,    DISTRICT      149
was about 65 percent complete at the end of the year and included
54,590 cubic yards of excavation, 69,581 linear feet of concrete piling,
48,300 cubic yards of earth fill, and 49,625 cubic yards of concrete
at a cost of $1,415,932.95. *Construction was started in September
1940 and was in progress at the end of the year, under contract, on
the remaining section of earth dike and concrete flood wall, extend-
ing from Memorial Bridge 9,700 feet south to the existing dike. The,
work was about 90 percent complete at the end of the year and in-
cluded dredging and placing 212,346 cubic yards of river sand, plac-
ing 50,713 cubic yards of impervious fill, 56,425 square feet of steel
sheet piling, and 11,609 cubic yards of concrete at a cost of $773,195.27.
Additional work, for the reconstruction of the Masseek Street Sewer
and of the dike damaged by slide which occurred July 1941, was
started at a cost of $94,491.62, including costs of $44,080.33 for in-
vestigations, engineering studies and design. Preliminary work and
preparation of engineering plans and design for the Keeney Lane
and Bushnell Park pumping stations were in progress at the end of
the year at a cost of $2,162.05.
   The total costs were $961,941.14 from contributed funds, and $1,-
306,979.36 from regular funds, including cost adjustments for work
completed in 1941, a total cost of $2,268,920.50 for new work. The
expenditures were $961,941.14 from contributed funds, and $1,501,-
007.65 from regular funds, a total of $2,462,948.79.
   Condition at end of fiscal year.-The existing project is approxi-
mately 75 percent complete. The work remaining to be done con-
sists of the completion of the dike below the Memorial Bridge, the
completion of the Park River Conduit, and the construction of the
Keeney Lane and Bushnell Park pumping stations.
   The costs of the existing project have been $835,000 from Public
Works Administration funds, and $2,935,578.03 from regular funds,
a total of $3,770,578.03, all for new work. In addition, costs of $2,181,-
372.31 apply to contributed funds. The expenditures have been
$835,000 from Public Works Administration funds, and $2,664,890.95
from regular funds, a total of $3,499,890.95. In addition, $2,181,372.31
was expended from contributed funds.
   Proposed operations.-Itis proposed to apply the funds unexpended
on June 30, 1942, $2,565,366.74, and accounts receivable, $107,029.85, a
total of $2,672,396.59, as follows:
Accounts payable___        ________                   -------        $377, 716. 93
New work : Completion of construction under contract in force of
  the 9,700 feet of dike below Memorial Bridge, period July to
December 1942; continuation of construction under continuing
contract of the Park River conduit; period July 1942 to June 1943;
initiation of construction under contract of Keeney Lane pumping
station and design and construction of the Bushnell Park pumping
station, period July 1942 to June 1943----------------------       2, 294, 679. 66
       Total -------------------------------------------------
                      ___                        __                   2, 672, 396. 59
   Funds on hand are sufficient to complete the construction of the
flood-protection works as proposed under the approved project. The
additional sum of $262,000 can be expended during the fiscal year 1944
in reimbursement to the city of Hartford for funds heretofore con-
tributed to the United States by said city for the realinement of the
150             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                   1942

South Meadows section of the flood-protection works. These opera-
tions will complete the existing project for local protection work at
Hartford, Conn.
                                                 Cost and financial summary

                                                          UNITED STATES FUNDS

Cost of new work to June 30, 1942____________________________                                                            '$3, 770, 578. 03
Cost of maintenance to June 30, 1942___             ________________

       Total cost of permanent work to June 30, 1942----------                                                              ' 3, 770, 578. 03
Plus accounts receivable June 30, 1942--------------------------                                                                 107, 029. 85

      Gross total costs to June 30, 1942__---------____--------                                                               3, 877, 607. 88
Minus accounts payable June 30, 1942___----_____________________                                                                 377, 716. 93

      Net total expenditures----------------__-      ____                                                                   1 3, 499, 890. 95
Unexpended balance June 30, 1942-------------------------                                                                     1, 723, 109. 05
            total amount appropriated to June 30, 1942____________                                                           5, 223, 000.00

     Fiscal year ending June 30                          1938                 1939                 1940              1941              1942

Cost of new work-----------....                --------------             $179, 484. 94         $998, 448. 89 $1, 285, 664. 84 $1, 306, 979. 36
Cost of maintenance ....
                       -                 ---                .   .   .     ..----
                                                                        -------------      -       .. .. .. .. .. .. .. .. .. .. .. .. ..
                                                                                               ------------..
Total expended ........---------------------------                          170, 307. 76         963, 588. 65     864, 986. 89      1, 501, 007. 65
Allotted...---------------..--...---................----------....       2, 014, 000. 00         600, 000. 00   1, 776, 000. 00       833, 000.00



Balance unexpended July 1, 1941__________-------                                                                            $2, 391, 116. 70
Amount allotted from War Department Civil Ap-
  propriation Act approved May 23, 1941----        $650, 000. 00
Amount allotted from War Department Civil Ap-
  propriation Act approved Apr. 28, 1942 --------- 183, 000. 00
                                                                                                                                  833, 000. 00
      Amount to be accounted for________________________                                                                     3, 224, 116. 70
Gross amount expended_____________------      $2, 468, 461. 34
Less reimbursements collected_---_----    __-     967, 453. 69
                                                                                                                             1, 501, 007. 65

      Balance unexpended June 30, 1942________--   ______----                                                                1, 723, 109. 05
Outstanding liabilities June 30, 1942___________--$4, 395. 63
Amount covered by uncompleted contracts------ 1,350, 059. 68
                                                                                                                              1,354, 455.31

      Balance available June 30, 1942___ ___________________368, 653. 74
Accounts receivable June 30, 1942___________________________ 107, 029. 85

           Unobligated balance available June 30, 1942______________                                                              475, 683. 59

Amount (estimated) required to be appropriated for completion
                           _
of existing project "____    __ __                                                                                               262, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for new work 2____--____ --------------------.. --                                                                262, 000. 00
   1 Includes $835,000 Public Works funds.
   a Exclusive of available funds.
              RIVERS AND HARBORS-PROVIDENCE,                                                      R. I., DISTRICT                             151
                                                        CONTRIBUTED FUNDS

Cost of new work to June 30, 1942_______________                                                  _______-$2,                   181, 372. 31
Cost of maintenance to June 30, 1942
          Total cost of permanent work to June 30, 1942                                               ___----2,                 181, 372. 31

Net total expenditures___----______----__ -------                                                                         2, 181, 372. 31
                                           __ ------
Unexpended balance June 30, 1942_________--_--                                                                               842, 257. 69
          Total amount contributed to June 30, 1942 ----                                              ------              3, 023, 630. 00

    Fiscal year ending June 30                      1938                 1939                 1940                1941                     1942


Cost of new work....        ... _ _ ...------ .....
                       ______                             $510, 680. 10                   $59, 049. 90       $649, 701. 17            $961,941. 14
Cost of maintenance ...--..------              -------.--------------                   -----------           ------ -----              -    -

'Total expended_--          -__          _ ____________                457,112. 37           82, 887. 63      679, 431. 17             961, 941. 14

Contributed. -------------               _                             540, 000. 00          54, 230. 00    2, 429, 400. 00


Balance unexpended July 1, 1941 _____________________ $1, 804,198. 83
Gross amount expended ---------------                     961, 941. 14

Balance unexpended June 30, 1942 --       ____    __________ ____                                                               842, 257. 69
Outstanding liabilities June 30, 1942_______________      $364. 44
Amount covered by uncompleted contracts-----------841, 893. 25
                                                                                                                                842, 257. 69

           CONSOLIDATED COST AND FINANCIAL SUMMARY FOR HARTFORD, CONN.

Cost of new work to June 30, 1942_____________________________1 $5, 951. 950. 34
Cost of maintenance to June 30, 1942
      Total cost of permanent work to June 30, 1942_____________                                                          5, 951, 950. 34
Plus accounts receivable June 30, 1942------ --------                                                                        107, 029. 85

      Gross total costs to June 30, 1942______________________                                                            6, 058, 980. 19
Minus accounts payable June 30, 1942__________________________                                                               377, 716. 93

     Net total expenditures _________________________   __                                                               15,    681,263. 26
Unexpended balance June 30, 1942____________________________                                                              2, 565, 366. 74
          Total amount appropriated and contributed to June 30, 1942_                                                     8, 246, 630. 00

    Fiscal year ending June 30                     1938                  1939                 1940                1941                     1942

Cost of new work _____________ . _ ______________
                                               $690, 165. 04 $1,057, 498. 79 $1,935, 366. 01                                     $2, 268, 920. 50
Cost of maintenance ---      -----   -       - -    -      -     - -     -   -    -     -     -   -    -    - -          -- -    -     -     - -   -
Total expended-.. _.____
                    ....             .                         - -     627, 420. 13     1,046, 476. 28      1,544, 418. 06           2, 462, 948. 79
Allotted and contributed------------.....               ------- 2, 554, 000. 00             654, 230. 00    4, 205, 400. 00            833, 000. 00

Balance unexpended July 1, 1941_________________________                                                                 $4, 195, 315. 53
Amount allotted from War Department Civil Ap-
  appropriation Act approved May 23, 1941.__    $650, 000. 00
Amount allotted from War Department Civil Ap-
  propriation [Act approved Apr. 28, 1942______  183, 000. 00
                                                                                                                                833, 000. 00
      Amount to be accounted for ___- ___.____ ____________                                                               5, 028, 315. 53
Gross amount expended___      ___       _____ $3, 430, 402. 48
Less reimbursements collected ----------------    967, 453. 69
                                                                                                                          2, 462, 948. 79
          Balance unexpended June 30, 1942-                                      ---_             -__._._.                2, 565, 366. 74
   , Includes $835,000 Public Works funds.
152        REPORT OF CHIEF OF ENGINEERS,               U. S. ARMY,        1942

Outstanding liabilities June 30, 1942-____--  _             $4, 760. 07
Amount covered by uncompleted contracts -----           2, 191, 952.93
                                                                          $2, 196, 713. 00
      Balance available June 30, 1942- ------------------
                                           ,                                 368, 653. 74
Accountsr receivable June 30, 1942---------------------------                107, 029. 85

        Unobli    tedt   balance available June 30, 1942-------------        475, 683. 59

Amount (estimated)         required to be appropriated for comple-
tion     of existing project 2___________________-_                          262, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for new work 2-------         ---------                       262, 000. 00
2   Exclusive of available funds.

         44. EAST HARTFORD, CONNECTICUT RIVER BASIN, CONN.

   Location.-East Hartford, Conn., is located in Hartford County
on the east bank of the Connecticut River, 52 miles above the mouth.
  Existing p o jet.-The plan of imp        ement provides for the con-
struction of a system of levees and concrete flood walls consisting
of the following features: Approximately 19,000 feet of earth levee
and 750 feet of concrete flood wall along the Connecticut and
Hockanum Rivers extending from the high ground near Greene Ter-
race in the north, to high ground at Brewer Lane and Central Ave-
nue in the south; two stop-log structures; three pumping stations
for the disposal of interior drainage; and appurtenant drainage
structures and facilities. The levees and walls are designed to pro-
tect against a design flood, greater than any of record, reduced by
the approved plan of 20 reservoirs for flood control in the Connecti-
cut River Basin. The levee and wall grades are at all points above
the maximum stage of the greatest flood of record, that of
March 1936. The existing project was authorized by the Flood Con-
trol Act approved June 28, 1938, as modified by Public, No. 859,
Seventy-sixth Congress, approved October 15, 1940. The estimated
cost of new work, revised in 1941, is $2,350,000 for construction and
$270,000 for lands and damages. In addition to the authorized ex-
isting project, supplementary work with relief labor has been un-
dertaken at a cost of $150,008.77 pursuant to the provisions of the
Emergency Relief Act approved June 21, 1938.
   Local cooperation.-See page 5 for requirements. Assurances
were approved by the Secretary of War January 5, 1939. Rights
of entry have been furnished, free of cost to the United States, for
all construction undertaken to date. In addition to the above, the
town of East Hartford contributed $5,400 for the construction of
interconnecting certain sewer lines.
   Operations and results during fiscal year.--Work was completed,
during fiscal year 1941, under contract, .on the construction of 6,130
feet of earth levee and 570 feet of concrete flood-wall extending from
the New York, New Haven, and Hartford Railroad downstream along
the Connecticut River. Costs this fiscal year were $20.82. Construc-
tion was in progress at the end of the year, under contract, on two
sections of earth dike attaching to the completed section of dike and
extending therefrom 6,800 feet and 7,100 feet respectively to high
ground in the north and south sections of the town. The work was
about 70 percent complete at the end of the year and included 315,664
         RIVERS AND        HARBORS--PROVIDENCE,             R. I.,   DISTRICT           153
cubic yards of excavation, 214,440 cubic yards of earth fill, and 668,340
cubic yards of dredged material placed in dike, at a cost of $736,987.87.
Construction was begun and was in progress at the end of the year,
under contract, of two pumping stations at Cherry Street and Pitkin
Street. The work was about 92 percent complete at a cost of $57,701.76.
Construction was begun and was in progress at the end of the fiscal
year, under contract, of the Meadow Hill pumping station. The work
was about 79 percent complete at a cost of $122,362.75. Preliminary
work and preparation of engineering plans and design were in
progress during and at the end of the year at a cost of $16,313.25.
   The total costs were $933,386.45 from regular funds. The expendi-
tures were $844,303.57 from regular funds.
   Condition at end of fiscal year.-The existing project is approxi-
mately 75 percent complete. The work required to complete the
project consists of the completion of the dike work in the north and
south portions of town, completion of the Cherry Street and Pitkin
Street pumping stations and completion of the Meadow Hill pumping
station.
   The costs of the existing project have been $380,000 from Public
Works Administration funds, and $1,245,054.42 from regular funds, a
total of $1,625,054.42 all for new work. In addition, costs of $5,400
apply to contributed funds. The expenditures have been $380,000 from
Puiblic Works Administration funds, and $1,110,587.01 from regular
funds, a total of $1,490,587.01. In addition, $5,400 was expended from
contributed funds.
   Proposedoperations.-Itis proposed to apply the funds unexpended
on June 30, 1942, amounting to $787,037.99, as follows:
Accounts payable---------------------------------------                      $134, 467. 41
New work: Completion of construction, under contract in force, of
the remaining dike work, consisting of 2 sections 6,800 feet long
  and 7,100 feet long, in the north and south sections of the town,
  respectively, period July 1942 to October 1942; completion, under
  contract in force, of Cherry Street and Pitkin Street pumping
  stations, period July 1942 to October 1942; and completion, under
  contract in force, of Meadow Hill pumping station, period July
  1942 to October 1942-----------                   ------------------------- 627, 570. 58
Estimated amount available for revocation--------------------                  25, 000. 00

       Total__        ---------------------------------------------              787, 037. 99
  No additional funds can be profitably expended during the fiscal
year 1944, as the above will complete the local protection work at East
Hartford, Connecticut.
                             Cost and financial summary
                                 UNITED STATES FUNDS

Cost of new work to June 30, 1942---------------               --------   1   $1, 625, 054. 42
Cost of maintenance to June 30, 1942__

      Total cost of permanent work to June 30, 1942----------- 11, 625, 054. 42
Minus accounts payable June 30, 1942------------------------       134, 467. 41

     Net total expenditures----------------------------1                        , 490, 587.01
Unexpended balance 'Junie: 30, 1942- --------------------------                   784, 412.99

       Total amount appropriated to June 30, 1942------------                 2, 275, 000. 00
   Includes $380,000 Public Works funds.
 154          REPORT OF CHIEF OF ENGINEERS,                                          U. S. ARMY,                    1942


    Fiscal year ending June 30                      1938             1939             1940                  1941                   1942


Cost of new work..                             ......-------------- $56, 914. 57
                                        ...------------                          $349, 980. 39           $284, 773. 01           $933, 386. 45
Cost of maintenance ----        -----.------------- -------------------------------                  -

Total expended                      ..--------------------------    46, 932. 04     286, 265. 92          313, 085. 48           844, 303. 57
Allotted------------------- --------------....                     780, 000. 00 ------------- 1, 570, 000. 00                    -75, 000. 00


Balance unexpended July 1, 1941------------------------------$1,                                                         703, 716. 56
                                                   ---
Deductions on account of revocation of allotment__.--___-                                                                 75, 000. 00

      Net amount to be accounted for__ --                                                                              628, 716. 56
                                                                                                                     1_______---_
                                                                                                                    1,
Gross amount expended_________-------- -------                                         $896, 459. 13
Less reimbursements collected__-------    _____---52,                                        155. 56
                                                                                                                         844, 303. 57

      Balance unexpended June 30, 1942_______      ____----....                                                          784, 412. 99
Outstanding liabilities June 30, 1942______________       $22. 78
Amount covered by uncompleted contracts ---------- 726, 844. 77
                                                                                                                          726, 867. 55

         Unobligated balance available June 30, 1942____                                     ______                        57, 545. 44

                                                       CONTRIBUTED          FUNDS


Cost of new work to June 30, 1942_____________________________                                                             $5, 400. 00
Cost of maintenance to June 30, 1942_______________________                                                  --------------
         Total cost of permanent work to June 30, 1942----                                         ____--5,                       400. 00

Net total expenditures-------------------------------------5,                                                                      400. 00
Unexpended balance June 30, 1942-------------------                                                                          2, 625. 00

         Total amount contributed to June 30, 1942 ___________-_                                                             8, 025. 00

   Fiscal year ending June 30                      1938             1939             1940                  1941                   1942


Cost of new work ....-                                                              $5, 400. 00
Cost of maintenance_                                                   -
Total expended ....                                                                  5, 400. 00      -----------                    ...--.
                                                                                                                                       -

Contributed         _------------------ --------------                $5, 400                                                           $2, 625



Amount contributed under authorizing act of July 19, 1937..__                                                                2, 625. 00
Balance unexpended June 30, 1942___________-___________                                                                     2, 625. 00
Amount covered by uncompleted contracts____________________                                                                 2, 625.00

        CONSOLIDATED COST AND FINANCIAL SUMIIARY FOR EAST HARTFORD, CONN.

Cost of new work to June 30, 1942__ ________________                                                               $1, 630, 454. 42
Cost of maintenance to June 30, 1942---------------------                                                         ----       -----
      Total cost of permanent work to June 30, 1942________- 1, 630, 454. 42
Minus accounts payable June 30, 1942 _____________----_____-134, 467. 41

     Net total expenditures______________            _                                              -         -1,        495, 987. 01
Unexpended balance June 30, 1942_____-___-_____-__-_                                                                     787, 037. 99
         Total amount appropriated and contributed to June 30,
            1942g                                                                                                   :Loo                     a
                                                                                                                    Z,   Z-,),     V,   ..   vv

  1 Includes $380,000 Public Works funds.
                 RIVERS            AND          HARBORS---PROVIDENCE,                               R.    I.,        DISTRICT                      155


    Fiscal year ending June 30                            1938                1939                1940                  1941                  1942


Cost of new work__                              -                    -        $56, 914. 57  $355, 380. 39            $284, 773. 01          $933, 386. 45
C ost of m ainten ance ..          -    ---..
                                          .         --.    ---   ---.    ---.-... .. .. .. ... .. .. ...        ..    .. ... .. ..    ...     .. .. .
Total expended .............................                                 46, 932. 04     291, 665. 92             313, 085. 48           844, 303. 57
Allotted and contributed_                 -         --           -          785, 400. 00   -___      _-          1, 570, 000. 00            -72,   375. 00



Balance unexpended July 1, 1941----------------------------                                                                    $1, 703, 716.56
Amount contributed under authorizing act of July 19, 1937_______                                                                     2, 625. 00
      Amount to be accounted for-------------------------                                                                       1, 706, 341. 56
Deductions on account of revocation of allotment                                                                                    7_____..__.
                                                                                                                                    75, 000. 00
      Net amount to be accounted for _____________________                                                                      1, 631, 341. 56
Gross amount expended_________________________ $896, 459. 13
Less reimbursements collected_______________- _   52, 155. 56
                                                                                                                                            335
                                                                                                                                     844_'_74
                                                                                                                                       .. , VVJ.        I


      Balance unexpended June 30, 1942______________________                                                                         787, 037. 99
Outstanding liabilities June 30, 1942 ____________     $22. 78
Amount covered by uncompleted contracts---------- 729, 469. 77
                                                                                                                                     729, 492. 55

             Unobligated balance available June 30, 1942 .......                                                __.                    57,545. 44

                  45. SPRINGFIELD, CONNECTICUT RIVER BASIN, MASS.

    Location.-Springfield, Mass., is located in Hampden County, on
the east bank of the Connecticut River, 76 miles above the mouth.
    Existing project.-The plan of improvement provides for the pro-
tection from flooding by the Connecticut River of two large low areas
located in the northern and southern sections of the city. Protection
is provided for the northern area by earth levees and concrete walls
extending from high ground north of the Chicopee-Springfield town
line downstream to high ground near the Boston & Albany Railroad
bridge and for the southern area by concrete walls extending from high
ground below the Memorial Bridge to high ground at the South End
Bridge, and a pressure conduit, extending from the Connecticut River
up the Mill River, to provide protection against backwater and to
carry the flow of the Mill River. The improvement involves the con-
struction of approximately 700 feet of earth levee, 13,000 feet of con-
crete flood wall, 1,700 feet of concrete conduit, wing walls along the
  Mill River above two dams and above a highway bridge, one pumping
  station and appurtenant drainage features to supplement the city
  system of disposal of interior drainage. The levees and walls are
  designed to protect against a flood, greater than any of record, reduced
by the approved plan of 20 reservoirs. The levee and wall grades are
  at all points above the maximum stage of the greatest flood of record,
  that of March 1936. The existing project was authorized by the Flood
  Control Act approved June 28, 1938 (H. Doc. No. 455, 75th Cong.,
  2d sess.) and modified by the Flood Control Act of August 18, 1941
   (H. Does. 653 and 724, 76th Cong., 3d sess.).
     The estimated cost of new work, revised in 1941, is $925,000 for con-
  struction and $272,000 for lands and damages. In addition to the
156          REPORT OF CHIEF OF ENGIN EERS, U.                                          S.        ARMY,          1942


authorized existing project, supplementary work with relief labor
has been undertaken at a cost of $204,385.81 pursuant to the provisions
of the Emergency Relief Act approved June 21, 1938.
   Local cooperation.- Se page 5 for requirements. The city has
furnished assurances of required cooperation for the entire plan of
improvement. Assurances for work beween North End Bridge and
Chicopee town line, between Memorial Bridge and South End Bridge,
and for the Mill River conduit were approved by the Secretary of War
on February 6, 1939, May 16, 1939, and April 19, 1940, respectively.
Rights-of-way have been furnished free of cost to the United States
for all construction on the project. In addition to the above, the city
of Springfield has contributed $5,350 for the construction of inter-
cepting sewers and additional surface drains.
   Operations and results during fiscal year.-Work was completed by
hired labor on the construction of Mill River Lane at a cost of $737.59.
Work was completed under contract on the alterations to the pumping
station at Plainfield Street, Chicopee, Mass., at a cost of $994.25.
Preparation of final construction plans and of reports for the work
under construction was completed at a cost of $1,558.87.
   The total costs were $3,290.71 from regular funds, for new work.
The expenditures were $8,145.73 from regular funds.
   Condition at end of fiscal year.-The existing project was prac-
tically completed during the fiscal year 1942. The work remaining
to be done consists of the construction of wing walls along the Mill
River, and the preparation of final reports. The costs have been
$355,000.00 from Public Works Administration funds, and $508,004.10
from regular funds, a total of $863,004.10. In addition, costs of
$5,350 apply to contributed funds. The expenditures have been $355,-
000 from Public Works Administration funds, and $508,004.10 from
regular funds, a total of $863,004.10. In addition $5,350 has been
expended from contributed funds.
   Proposed operations.-The balance unexpended on June 30, 1942,
amounting to $11,995.90, is available for revocation.
                                         Cost and financial summary

Cost of new work to June 30, 1942_____________________                                            _______ 1 $863, 004. 10
Cost of maintenance to June 30, 1942 .....
           Total cost of permanent work to June 30, 1942 _____________                                                 863, 004. 10

     Net total expenditures__-___ ___------___                                          _          __        -         863, 004. 10
Unexpended balance June 30, 1942------------                                                                 _          11, 995. 90
           Total amount appropriated to June 30, 1942______________                                                    875, 000. 00

   Fiscal year ending June 30                   1938               1939             1940                  1941               1942


Cost of new work .......     .       .. _ .          _...       $125, 334. 99   $460, 092. 44       $274, 285. 96            $3, 290. 71
Cost of maintenance -            -              -           -          -        -           ---                          -          -

Total expended.                               - -.                62, 887. 01    481,503. 22            310, 468. 14          8, 145. 73
Allotted    ...--     .......----------------------------- 940,000.00 --                   ----     -65,000.00

   1Includes $355,000 Public Works funds; in addition, the sum of $5,350 was expended
from contributed funds.
           RIVERS AND HIARBORS-PROVIDENCE,                          R.   I.,   DISTRICT           157

Balance unexpended July 1, 1941   ---------------------------                              $20,141. 63
Gross amount expended--------------------------- -- $8, 345. 31
Less reimbursements collected_-------------              1-19. 58
                                                                                             8, 145. 73

        Unobligated balance available June 30, 1942-----------                  ----        11, 995. 90

Amount (estimated) required      to be appropriated for completion of
                    - - -- - -- - -- - -- - - -- -- - -- - -- - -- - -- - -- -- -- -   -
existing project2                                                                          50, 000. 00
  2 Exclusive of available funds.

        46. WEST SPRINGFIELD, CONNECTICUT RIVER BASIN, MASS.

   Location.-West Springfield, Mass., is located in Hampden County
on the west bank of the Connecticut River, 76 miles above the mouth.
   Existing project.-The plan of improvement provides for the con-
struction of a system of levees and floodwalls, approximately 24,500
feet in length, extending along the Connecticut and Westfield Rivers
for the protection of the section of town located on the point of land
above the junction of and between the two rivers. Three pumping
stations are provided for the disposal of the interior drainage. The
protection system extends from high ground in the vicinity of Harri-
son Place downstream along the Connecticut River and thence up-
stream along the Westfield River to high ground at the Boston &
Albany Railroad and involves the construction of approximately
2,300 feet of concrete flood wall, enlargement of 13,700 feet of existing
levee, 2,400 feet of bank improvement, 6,100 feet of foundation treat-
ment and three pumping stations. The levees and walls are designed
to protect against a flood, greater than any of record, reduced by the
approved plan of 20 reservoirs. The levee and wall grades are at all
points above the maximum stage of the greatest flood of record, that
of March 1936. The existing project was authorized by the Flood
Control Act approved June 28, 1938 (H. Doc. No. 455, 75th Cong., 2d
sess.), and modified by the Flood Control Act of August 18, 1941 (H.
Doc. No. 653, 76th Cong., 3d sess.). The estimated cost of new work,
revised in 1941, is $1,252,000 for construction and $30,000 for lands and
damages. In addition to the authorized existing project, supplemen-
tary work with relief labor has been undertaken at a cost of $223,947.21
pursuant to the provisions of the Emergency Relief Act approved June
21, 1938.
   Local cooperation.-See page 5 for requirements. The town has
provided the required assurances of cooperation for the entire plan
of improvement. Assurances covering work north of the North End
Bridge; between North End Bridge and Memorial Bridge; south of
Memorial Bridge to point near Circuit Avenue; from point near Cir-
cuit Avenue to Agawam Bridge; and north of Agawam Bridge, were
approved by the Secretary of War on February 28, 1939, January 31,
1940, May 23, 1939, March 31, 1941, and February 20, 1939, respectively.
Rights-of-way have been furnished free of cost to the United States
for all construction undertaken to date.
   Operations and results during fiscal year.--Work was completed
under contract on the construction of the Circuit Avenue pumping
station at a cost of $51,711.37. Work was in progress under contract,
        493202-43--pt. 1, vol. 1-11
158               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                       1942

and practically complete, on the construction of the Bridge Street
pumping station at a cost of $115,881. Work was in progress, under
contract, and about 92 percent complete, on the construction of the
Warren Street pumping station at a cost of $80,406.55.
  The total costs were $247,998.92 from regular funds for new work.
The expenditures were $235,426.91 .from regular funds.
    Condition at end of fiscal year.--The existing project is approxi-
mately 83 percent complete. The work remaining to be done to com-
plete the project consists of the completion of the BridgeStreet and
Warren Street pumping stations, and the initiation and completion
of the foundation treatment for a section of dike along the Westfield
River south of Agawam Bridge. The costs of the existing project
have been $245,000 from Public Works Administration funds, and
$636,091.08 from regular funds, a total of $881,091.08 for all new work.
The expenditures have been $245,000 from Public Works Administra-
tion funds and $610,877.80 from regular funds, a total of $855,877.80.
   Proposed operations.--It is proposed to apply funds unexpended
on June 30, 1942, amounting to $91,122.20, as follows:
Accounts payable___________-------------------------------------- $25, 213.28
New work: Completion of construction under contract, of the Bridge
  Street and Warren Street pumping stations, period July 1941 to
  September 1942--------------------------------                   65, 908. 92

               Total ------------                            -------------------              -------------               91, 122. 20
                                                    Cost and financial sumnmary
Cost of new work to June 30, 1942_ ---                                             -------- _________-                  $881, 091.08
Cost of maintenance to June 30, 1942
     Total cost of permanent work to June 30, 1942 _____________                                                    1881, 091. 08
Minus accounts payable June 30, 1942 ________________________                                                             25, 213. 28

     Net total expenditures _____-- ___----------          _                                                      _ 1855, 877. 80
Unexpended balance June 30, 1942_____________________________                                                         91, 122. 20
              Total amount appropriated to June 30, 1942 ______________                                                 1947,   000. 00

     Fiscal year ending June 30                           1938             1939            194(            1941                 1942


Cost of new work ________________  ..                ..------------     $179, 188. 19   $277, 701. 25   $176, 202. 72      $247, 998. 92
Cost of maintenance.......-------..--...                ------ --
Total expended_                _         _                               138, 325. 82    287, 326. 66    194, 798. 41       235, 426. 91
Allotted-----..................-------------....   -------------         578, 000. 00    402, 000. 00   -33, 000. 00


Balance unexpended July 1, 1941----- ----------------------                                                             $32, 549. 11
Gross amount expended-----------------------$235, 766. 12
Less reimbursements collected -___------_____-           339. 21
                                                                                                                         235, 426. 91
      Balance unexpended June 30, 1942----------------------                                                              91,122. 20
Outstanding liabilities June 30, 1942-------------------$95.      24
Amount covered by uncompleted contracts _____--__        90, 291. 98
                                                                                                                          90, 387. 22
              Unobligated balance availablE June 30, 1942-_--                                                                   734. 98
Amount (estimated) required to be_ appropriated for completioh
     of existing project 2------                                            ---                               -          305, 000. 00
    12 Includes $245,000 Public Works                          funds.
       Exclusive          of available funds.
        RIVERS   AND HARBO!RS-PROVIDENCE,        R.   I.,   DISTRICT   159
          47. CHICOPEE, CONNECTICUT RIVER BXSIN, MASS.

   Location.-Chicopee, Mass., is located in Hampden County on the
east bank of the Connecticut River, 80 miles abcve the mouth.
   Existing project.-The plan of improvement provides for the con-
struction of a system of levees and floodwalls, approximately 25,700
feet in length, extending along the Connecticut River and north and
south banks of the Chicopee River which flows into the Connecticut
River in the southern section of town, and pumping stations for the
disposal of interior drainage. The protection system consists of two
short sections of dike in the Willimansett section in the extreme north-
ern portion of the city; 20,200 feet of levee extending from high
ground about 2 miles below the Willimansett Bridge downstream
along the Connecticut River and up the north bpink of the Chicopee
River to high ground above the Boston and Maine Railroad Bridge;
3,200 feet of floodwalls and 1,500 feet of levee alon:g the south bank of
the Chicopee River and Connecticut River from high ground above
the highway bridge over the Chicopee River to high ground north of
the highway bridge over the Connecticut River; three stop-log struc-
tures; six pumping stations, and appurtenant irainage structures.
The levees and walls are designed to protect against a flood, greater
than any of record, that of March 1936. The existing project was
authorized by the Flood Control Act approved June 28, 1938. The
estimated cost of the new work, revised in 1941, is $1,592,000 for con-
struction and $500,000 for lands and damages. In addition to the
authorized existing project, suplementary work with relief labor has
been undertaken at a cost of $168,677.26 pursuant to the provisions
of the Emergency Relief Act approved June 21, 193S.
   Local cooperation.-See page 5 for requirements. The city has
provided the required assurances of cooperation for the entire plan
of improvement. Assurances were approved by the Secretary of
War November 10, 1938. Rights of entry have been furnished, free
of cost to the United States, for all construction undertaken to date.
   Operations and results during fiscal year.-Work was completed,
under contract, on 2,500 feet of concrete floodwall, 830 feet of earth
dike, and a pumping station along the south bank of the Chicopee
River, east of the Boston & Maine Railroad. Construction during the
year included 6,612 cubic yards of earth excavation, 15,810 cubic yards
of earth fill, 1,000 square feet of steel sheet piling, 1,230 cubic yards
of hand-placed riprap, and 1,456 cubic yards of concrete, at a cost of
$122607.18. Work was completed, under contract, on four pumping
stations along the Connecticut River at Bertha Avenue, at a cost of
$1,423.50; Paderewski Street, at a cost of $1,279.63; Jones Ferry Road,
at a cost of $2,814.20, and Call Street, at a cost of $6,510.83. During
the year the costs of preliminary work, engineering plans, and design
for the dike work in the Willimansett section and the Charbonneau
Terrace pumping station were $769.61.
   The total costs were $135,404.95 from regular funds. The expendi-
tures were $213,889.26 from regular funds.
   Condition at end of fiscal year.-The existing project is approxi-
mately 85 percent complete. Work remaining to be done consists of
the completion of design and construction of the dike in the Williman-
sett section and the Charbonneau Terrace pumping station.
160            REPORT OF CHIEF OF ENGINEERS,                                                  U. S. ARMY,              1942

  The costs of the existing project have been $295,000 from Public
Works Administration funds, and $1,209,806.47 from regular funds,
a total of $1,404,806.47, all for new work. In addition, costs of
$385.00 apply to contributed funds. The expenditures have been
$295,000 from Public Works Administration funds, and $1,058,843.53
from regular funds, a total of $1,353,843.53. In addition, $385 was
expended from contributed funds.
  Proposed operations.-It is proposed to apply funds unexpended
on June 30, 1942, $68,156.47, as follows:
Accounts payable----------------------------------------         $50, 962. 94
New work: Completion of design of Willimansett section dike work
  and pumping station, period July 1942 to June 1943-------__-    17, 193. 53

           Total -------------------                                       ------------------                                      68, 156. 47
                                             Cost and financial summary

Cost of new work to June 30, 1942_-        __                                          _______---------             1 $1, 404, 806. 47
Cost of maintenance to June 30, 1942 .........
      Total cost of permanent work to June 30, 1942---____-                                                            1 1, 404, 806. 17
Minus accounts payable June 30, 1942 ---------------      -                                                                        50, 962. 94

      Net total expenditures__--------------- --                                                                       11,     353, 843. 53
Unexpended balance June 30, 1942-..---------------- _____                                                                       68, 156. 47

           Total amount appropriated to June 30, 1942 .----                                                        11, 422, 000. 00
                                                                                                                -____._

    Fiscal year ending June 30                      1938                  1939                    1940          1941                  1942


Cost of new work-------------------------                            $160, 844. 77         $372, 821. 31    $735, 735. 44           $135, 404. 95
Cost of maintenance ...---          --------------                               -           --                             ----             -

Total expended--....----.-------------                     -------      95, 286. 94          426, 353. 02    618, 314. 31            213, 889. 26
Allotted---.....--...............--..--------------------------      1, 523, 000. 00         474, 000. 00   -575, 000. 00


Balance unexpended July 1, 1941 ___                                                                                         $282, 045. 73
Gross amount expended__---------------                                                             $214, 192. 76
Less reimbursements collected__-----------                                                               303. 50
                                                                                                                               213, 889. 26

      Balance unexpended June 30, 1942-----------------------                                                                      68, 156. 47
Outstanding liabilities June 30, 1942-------- __       $11.96
Amount covered by uncompleted contracts ---------- 55, 152. 93
                                                                                                                                   55, 164. 89

              Unobligated balance available June 30, 1942-------------___                                                          12, 991. 58

Amount (estimated) required to be appropriated for completion
of existing project 2___________________-_____________   __                                                                  170, 000.00
   1 Includes $295,000 Public Works funds; in addition, the sum of $385 was expended from
contributed funds.
  2 Exclusive of available funds.


                    48. HOLYOKE, CONNECTICUT RIVER BASIN, MASS.

   Location.-Holyoke, Mass., is located in Hampden County on the
west bank of the Connecticut River, 85 miles above the mouth.
   Existing project.-The plan of improvement provides for the con-
struction of a system of levees and concrete flooa walls, consisting of
the following features: Approximately 400 feet of earth levee and
        RIVERS   AND   HARBOtRS-PROVIDENCE,     R. I.,   DISTRICT   161

approximately 5,600 feet of concrete flood wall along the Connecticut
River, extending from the Holyoke Water Power Co. dam southerly
to high ground near Mosher Street; about 10,000 feet of concrete
flood wall along the Connecticut River, from high ground near Ap-
pleton Street southerly to the existing Springdale levee, including a
concrete flood wall along both banks of a power canal, the level of
which is below flood grade; 7 pumping plants for the disposal of
interior drainage; 14 stop-log structures; 28 gate structures for inlet
and outlet works of existing power developments; and appurtenant
drainage structures. The levees and walls are designed to protect
against a flood, greater than any of record, reduced by the approved
plan of 20 reservoirs. The levee and wall grades are at all points
above the maximum stage of the greatest flood of record, that of
March 1936. The existing project was authorized by the Flood Con-
trol Act approved June 28, 1938, and modified by the Flood Control
Act of August 18, 1941.
    The estimated cost of new work, revised in 1941, is $2,424,000 for
construction and $150,000 for lands and damages. In addition to the
authorized existing project, supplementary work with relief labor
has been undertaken at a cost of $344,236.87 pursuant to the pro-
visions of the Emergency Relief Act approved ,June 21, 1938.
    Local cooperation.-See page 5 for requirements. The city has
furnished the required assurances of cooperation for the entire plan
of improvement. The assurances were approved by the Secretary of
War, January 19, 1939. Rights of entry have been furnished, free
of cost to the United States, for all construction undertaken to date.
In addition to the above, $3,355.70 was contributed by the city of
Holyoke to cover cost of relocation of poles of the Holyoke Water
Power Co. and connecting certain intersecting city sewers with the
project drainage system.
    Operations and results during fiscal year.-The cost of prelimi-
nary work, engineering plans, and design for dike construction and
pumping stations south of Mosher Street was $7,409.05.
    The total costs were $7,409.05 from regular funds. The expendi-
tures were $15,684.73 from regular funds.
    Condition at end of fiscal year.-The construction work authorized
under the existing project is about 45 percent completed. Work re-
maining to be done consists of completion of stop-log structures and
of design and construction of the dike and pumping stations south
of Mosher Street. The costs of the existing project have been $610,000
from Public Works Administration funds, and $469,139.20 from regu-
lar funds, a total of $1,079,139.20. In addition, costs of $3,355.70
apply to contributed funds. The expenditures have been $610,000
from Public Works Administration funds and $469,139.20 from regu-
lar funds, a total of $1,079,139.20. In addition $3,355.70 was expended
from contributed funds.
   Proposed operations.--It is proposed to apply the funds unex-
pended on June 30, 1941, amounting to $31,860.80, to new work, com-
pletion of the surveys, engineering studies, and design of the local
protective work south of Mosher Street, and completion of stop-log
structures, period July 1942 to July 1943.
162           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                        1942

                                        Cost and financial summary
Cost of new work to June 30, 1942__-----------------------1                                                    $1, 079, 139. 20
Cost of maintenance to June 30, 1942______________

      Total cost of permanent work to June 30, 1942---------- 1, 079, 139. 20
Net total expenditures----------------------------------      11, 079, 139. 20
Unexpended balance June 30, 1942----------------------------       31, 860. 80
          Total amount appropriated to June 30, 1942__                                              _          1 , 111, 000. 00

    Fiscal year ending June 30                 1938               1939            1940                  1941                   1942


Cost of new work- -.------------                              $119, 990. 99    $633, 591. 13      $318, 148. 03                $7, 409.05
Cost of maintenance                                   ----                                -----         -      -     -    --
Total expended .................                  _             119, 664. 22    524, 872. 64       418, 917. 61                15. 684. 73
Allotted-................          .........                 -- 660, 000. 00    466, 000. 00      -15, 000. 00 - -__.              _ _.


Balance unexpended July 1, 1941 ....                                                                                 $47, 545. 53
Gross amount expended ---------------------                                           $16, 362.01
Less reimbursements collected--------------------                                          677. 28
                                                                                                                         15, 684. 73

          Unobligated balance available June 30, 1942-------                                   ------                    31, 860. 80

Amount (estimated) required to be appropriated for completion
                       - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
of existing project                                                                                               1, 313, 000. 00
   1 Includes $610,000 Public Works funds; in addition, the sum of $3,355.70 was expended
from contributed funds for new work.
   2 Exclusive of available funds.

             49. NORTHAMPTON, CONNECTICUT RIVER BASIN, MASS.

   Location.-Northampton, Mass., is located in Hampshire County,
on the west bank of the Connecticut River, 94 miles above the mouth.
   Existing project.-The plan of improvement provides for closing
off the valley of the Mill River within the town limits and the diver-
sion of Mill River through a canal to the Connecticut River via Ox Bow
Lake south of town; and a pumping station for the disposal of interior
drainage. The improvement involved the construction of two closing
dikes consisting of approximately 5,000 feet of levee in the eastern
portion of town along the Connecticut River, extending from high
ground at Pomeroy Terrace across the bed of the Mill River to high
ground west of United States Highway No. 5, and 1,900 feet of levee
and 500 feet of floodwall along the eastern bank of the Mill River in
the western portion of town; a diversion canal approximately 10,500
feet long, of which 2,700 feet is riprapped, to carry the flow of Mill
River and a combined concrete bridge and drop structure and a smaller
concrete bridge; a pumping plant; three stop-log structures, and ap-
purtenant drainage structures. The levees and walls are designed to
protect against a flood, greater than any of record, reduced by the
approved plan of 20 reservoirs. The levee and wall grades are at all
points above the maximum stage of the greatest flood of record, that
of March 1936. The existing project was authorized by the Flood
Control Act approved June 28, 1938. The estimated cost of new work,
revised in 1941, is $960,000 for construction and $150,000 for lands
and damages. In addition to the authorized existing project, sup-
              RIVERS            AND HARBORS----PROVIDENCE,                             R.    I.,   DISTRICT                 163
plementary work with relief labor has been undertaken at a cost of
$259,658.36 pursuant to the provisions of the Emergency Relief Act
approved June 21, 1938.
  Local cooperation.-See page 5 for requirements. The town has
furnished the required assurances of cooperation for the entire plan of
improvement. The assurances were approved by the Secretary of
War January 17, 1939. Because of changes in plan of construction,
new assurances were obtained for levee work along the east bank of the
Mill River and for the storage pond for the pumping station. The
assurances for these two sections were approved by the Secretary of
War on November 9, 1939, and April 17, 1940, respectively. Rights
of entry have been furnished, free of cost to the United States, for
the construction of the project.
   Operations and results during fiscal year.-Work was completed,
under contract, on the construction of a pumping station and short
section of closing dike located in the old bed of the Mill River in the
eastern section of town at a cost of $4,045.53. An adjustment in the
cost of the construction of a stop-log storage shelter reduced the cost
of that feature of the project by $3.47.
   The total costs were $4,042.06 from regular funds, for new work.
The expenditures were $27,589.37 from regular funds.
   Condition at end of fiscal year.-The existing project is practically
complete. The work remaining to be done consists of the construc-
tion of a stop-log storage shelter.
   The -costs of the existing project have been $280,000 from Public
Works Administration funds and $674,307.55 from regular funds, a
total of $954,307.55, all for new work. The expenditures have been
$280,000 from Public Works Administration funds and $674,307.55
from regular funds, a total of $954,307.55.
  Proposed operations.-Itis proposed to apply funds unexpended on
June 30, 1942, $5,692.45, to the construction by hired labor of a storage
shelter for stop-logs.
   No additional funds can be profitably expended during the fiscal
year 1944, as the above operations will complete the local protection
work at Northampton, Mass.
                                           Cost and financial summary
Cost of new work to June 30, 1942____--------------------------                                              '$954, 307. 55
Cost of maintenance to June 30, 1942__

          Total cost of permanent work to June 30, 1942 -----------                                              1954, 307. 55
Net total expenditures__________---__----------------
Unexpended balance June 30, 1942_----------------------------
                                                                                                             -   1954,5, 307. 55
                                                                                                                         692. 45
          Total amount appropriated to June 30, 1942 __ __---                                          -___1960,
                                                                                                               000. 00

    Fiscal year ending June 30                    1938             1939             1940              1941               1942

Cost of new work------           ......---------- _------.     $140, 338. 49      $585, 865. 98    $224, 061. 02         $4, 042. 06
Cost of maintenance .-------                                         .
                                             -------------- --------------           .
                                                                             . --------------.. --- --.. .           .      .
Total expended                            - ---    ----- -      130, 965. 23      554, 234. 27     241, 518. 68          27, 589. 37
Allotted--.......--- ...-....                      ........     856, 000. 00      200, 000. 00     -96, 000.'00...........

     Includes $280,000 Public Works funds.
164           REPORT OF CHIEF OF ENGINERS,                                             U. S. ARMY,                  1942

Balance unexpended July 1, 1941-------------------------                                                                   $33, 281. 82
Gross amount expended__------     -------- ----       $27, 953. 18
Less reimbursements collected------------------------      363. 81
                                                                                                                            27, 589. 37

           Unobligated balance available June 30, 1942 --------                                              _----            5, 692. 45

50. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL

  The cost of work during the year amounted to $17,643.90. The ex-
penditures were $17,676.12. The total costs have been $221,606.61, and
the expenditures $221,591.69. The balance unexpended on June 30,.
1942, amounting to $3,958.31, will be applied during the fiscal year
1943, to payment of expenses incurred under this heading.
  The sum of $50,000 can be profitably expended during the fiscal
year 1944.
                                             Costs and financial summary
Cost of new work to June 30, 1942------
Cost of maintenance to June 30, 1942-----                                            ------------------                   $221, 606.61

     Total cost of permanent work to June 30, 1942                                                   ___ ---               221, 606. 61
Minus accounts payable June 30, 1942                                                                                             1__------------------
                                                                                                                                14.92

     Net total expenditures__--       __---------------                                                                    221, 591. 69
Unexpended balance June 30, 1942_--_-------------------_                                               --------              3, 958. 31
           Total amount appropriated to June 30, 1942----------------                                                      225, 550. 00

    Fiscal year ending June 30                    1938                1939               1940                1941                1942


Cost of new work------                                                          --   ------      - ----    - ----   ---    --------------
Cost of maintenance---
                    .             --..--..         $12, 000      $12, 827. 79        $157, 749. 20        $21, 385. 72          $17, 643.90'

Total expended ............-----------------         11,996       12, 831.79          158, 762. 35         20, 325. 43           17, 676.12"

Allotted...............                              49,000
                                ......------------------------    95, 850. 00          90, 700. 00        -10, 000. 00


Balance unexpended July 1, 1941---__-                            --          -     ----------------- $21, 634. 43
Gross amount expended -___---_-_-                                       ______-----       $17, 776. 12
Less reimbursements collected___--_-                                     ---------             100. 00
                                                                                                       17, 676. 12

      Balance unexpended June 30, 1942-------------------------                                                              3, 958. 31
Outstanding liabilities June 30, 1942-------------____-__                                                                    -_ 22. 10
           Unobligated balance available June 30, 1942_--------------                                                         3, 936. 21

Amount that can be profitably expended in fiscal year ending June
                              --  - -- - -    -
30, 1944, for maintenance 1                 __     _____________                                                           50, 000. 00
   1Exclusive       of available funds.
               RIVERS AND            HARBORS--NEW                 YORK,        N.     Y.,   DISTRICT            165

51. OTHER FLOOD-CONTROL PROJECTS FOR WHICH NO ESTIMATES
                      ARE SUBMITTED


                                                                  For last  Cost and expenditures         Estimated
                                                                full report    to June 30, 1942             amount
                        Name of project                         see Annual                                 required
                                                                  Report                 Mainte-            to com-
                                                                    for-    New work       nance              plete


1.   Clyde, Pawtuxet River Basin, R. I                             1941
                                                    ....----------------   ----------- -------------         $277,000
2.   Pontiac Diversion, Pawtuxet River Basin, R. I ----            1941 -.......-------.....          .     1,042,500
3.   Thames River Basin, Conn., R. I., and Mass-------             1941      .13,206,                              000
4.   Riverdale, Connecticut River Basin, Mass----------            1941 ------------------------              490, 000
5.   Springdale, Connecticut River Basin, Mass       "--           1941     .-......             ......       390, 000
6.   Winsted, Connecticut River Basin, Conn..-----------....       1941 ------------------------              140, 000


Status of all investigations for flood-control called for by flood-control acts and
                              committee resolutions

                                                               Date trans-                             Recommenda-
             Locality                Authorization act          mitted to           Document No.           tion
                                                                Congress

Blackstone River, Mass. and Flood Control Act,-------                      --------------------
  R. I.                        June 22, 1936.
Connecticut and Chicopee Flood Control Act,-------                         --------------------
  Rivers.                       Aug. 28, 1937.
Connecticut River and trib- Flood Control Com--------                      --------------------
  utaries, including West-     mittee resolution,
  field River.                 June 16, 1938.
Connecticut River and trib- Flood Control Com- June 18,1942 House, 804, 77th                           Favorable.
  utaries, flood control on    mittee       resolution,                             Cong., 2d sess.
  Gulley Brook.                 May 28, 1941.
Connecticut River and trib- _....do-....-----         -----------------------------
  utaries, for substitute
  flood-control project in
  place of Sugar Hill Dam
and Reservoir on Ammo-
  noosuc River, N. H.
Connecticut River, Mass., Flood Control Act,-------                        --------------------
  between Hatfield and          Aug. 11, 1939.
  Mount Tom.
Green River, Mass ..          . _------------do................
Housatonic River, Conn.... Flood Control Com- July 26,1941 House, 338, 77th                               Do.
                                mittee resolution,                                  Cong., 1st sess.
                                Apr. 2, 1936.
Seekonk River, R. I. (tribu- Flood Control Act,--------                     --------------------
  tary of Pawtuxet River).      June 22, 1936.


IMPROVEMENT OF RIVERS AND HARBORS IN THE NEW
            YORK, N. Y., DISTRICT
   This district comprises western Vermont, small portions of western
Massachusetts and Connecticut, eastern New York, including Long
Island, and northeastern New Jersey, embraced in the drainage basins
tributary to Lake Champlain and the St. Lawrence River system east
thereof and to the Atlantic Ocean from the New York-Connecticut
State line to the head of Barnegat Bay at Bayhead, N. J., exclusive of
the drainage basin of the Mohawk River above Crescent, N. Y.
   It exercises jurisdiction, however, over all matters pertaining to
navigation on the Great Lakes to Hudson River waterway; and, for
the purposes of study, investigation, and survey for the St. Lawrence
River seaway and power project, over the International Rapids sec-
tion of the St. Lawrence River, extending from Chimney Point to the
foot of Cornwall Island.
   District engineer: Former St. Lawrence River district: Col. A. B.
Jones, Corps of Engineers, to April 30, 1942.
166       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                   1942

   New York district: Col. L. S. Dillon, Corps of Engineers, to April
9, 1942; Lt. Col. A. J. Sheridan, Corps of Engineers, acting district
engineer to April 30, 1942, and Col. A. B. Jones, Corps of Engineers,
since that date.
   Division engineer: Col. J. N. Hodges, Corps of Engineers, to May 4,
1942, and Col. B. C. Dunn, Corps of Engineers, since that date.
                                      IMPROVEMENTS

                 Navigation                          Navigation-Continued
                                       Page                                      Page
1.   Port Chester Harbor, N. Y__       166 29. Burlington Harbor, Vt _..        237
2.   Mamaroneck Harbor, N. Y_           168 30. Newark, Bay, Hackensack
3.   East Chester Creek, N. Y __       170         and Passaic Rivers, N. J__   240
4.   Westchester Creek, N. Y_-         173 31. New York and New Jersey
5.   Bronx River, N. Y___---           174         Channels           _ __ _    243
6.   Harbor at Flushing Bay,                32. Raritan River to Arthur Kill
        N. Y                            178         Cut-off Channel, N. J --     249
7.   Glencove Creek, N. Y______        180 33. Woodbridge Creek, N. J____       250
8.   Huntington Harbor, N. Y___        182 34. Great Kills Harbor, Staten
9.   Mattituck Harbor, N.    Y____     185        Island, N. Y_________         252
10.
11.
      Peconic River, N. Y __--
      Long Island     Intracoastal
                                        187 35. Raritan River, N. J-  ------
                                             36. Washington Canal and South
                                                                                 255

        Waterway, N. Y                  188        River, N. J___                261
12. Fire Island Inlet, N. Y -
13. East Rockaway (Debs) Inlet,
                                        190 37. Sandy Hook Bay, N. J    ---.
                                             38. Shrewsbury River, N. J ---
                                                                                 263
                                                                                 266
      N. Y __                           192 39. Manasquan River, N. J ....       268
14. Jamaica Bay, N. Y ....              194 40. Examinations, surveys, and
15. New York Harbor: Entrance                      contingencies (general)___    270
      Channels and Anchorage                 41. Preliminary investigations of
        Areas _ _ __ _ _                197        St. Lawrence River _...       271
16. Bay Ridge and Red Hook                   42. Other projects for which no
      Channels, N. Y_                   201        estimates are submitted -     274
17. Buttermilk Channel, N. Y___         203 43. Plant allotment__                275
18. East River, N. Y________            206
19. Newtown Creek, N. Y
20. Harlem River, N. Y _-
                              ----.     209
                                        212
                                                           Flood control

21. Hudson River Channel, New                44. Rutland, Otter Creek, Vt___     277
      York Harbor_-____                 214 45. North Adams, Hoosic River
22. New York Harbor: Collec-                       Basin, Mass_-       -         278
      tion and removal of drift _       217 46. Hoosick Falls, Hoosic River
23. Peekskill Harbor, N. Y -_-          219        Basin, N. Y_                  278
24. Wappinger Creek, N. Y _ _           220 47. Preliminary      examinations
25. Rondout Harbor, N. Y       ---      221        and surveys for flood con-
                                                   trol    _________-            279
26. Hudson River, N. Y .-----           223
27. Great Lakes to Hudson River              48. Other flood-control projects
      Waterway-------                   230        for which no estimates are
28. Narrows of Lake Champlain,                     submitted_-            __     280
      N. Y. & Vt-                       235

                       1. PORT CHESTER HARBOR, N. Y.

   Location.-This harbor, located at the boundary between the States
of New York and Connecticut, comprises the tidal mouth, about 1.7
miles in length, of the Byram River whose source is in Byram Lake
about 12 miles north of Port Chester. The river empties into Long
Island Sound about 32 miles by water east of the Battery, New York
City. (See U. S. Coast and Geodetic Survey Chart No. 222.)
  Previous projects.-Adopted by River and Harbor Act of June
10, 1872, modified in 1884 and 1888, and by the River and Harbor
Acts of March 3, 1899, and March 2, 1907. For further details see
Annual Report for 1915, page 1758, and Annual Report for 1938,
page 157.
               RIVERS       AND     HARBORS-NEW               YORK,      N.      Y.)    DISTRICT            167
   Existing project.-This provides for an anchorage basin near the
breakwater, 12 feet deep, for fenders on the east bank opposite the
southern end of Fox Island, and for a channel 12 feet deep at mean
low water and 150 feet wide from Long Island Sound to the mouth
of the river at the southerly point of Fox Island; thence 10 feet
deep and 100 feet wide to 900 feet below the fixed bridge at Mill
Street in Port Chester, including a turning basin opposite the steam-
boat landing; and thence 3 feet deep and 175 to 100 feet wide to 100
feet below the fixed bridge. The length of the section included in the
project is about 1.7 miles. Mean tidal range, 7.1 feet; mean range of
spring tides, 8.5 feet; irregular fluctuations due to wind and baro-
metric pressure vary from 4 feet below mean low water up to 4.5 feet
above mean high water.
   The estimate of cost for new work, revised in 1938, is $380,000,
exclusive of amounts expended on previous projects, of which $5,500
is to be contributed by local interests. The latest (1927) approved
estimate for annual cost of maintenance after completion is $3,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                             Work authorized                                      Documents


June 25, 1910      Entrance channel 12 feet deep, thence 10 feet deep to and      H. Doc. No. 1165, 60ty Cong.,
                    including turning basin, thence 3 feet deep to head of im-      2d sess.
                    provement.
July     3, 1930   Widening turning basin, dredging anchorage basin, and           Rivers and Harbors Com-
                    constructing fenders on east bank.                              mittee Doc. No. 23, 70th
                                                                                       Cong.. 2d sess.   (Contains
                                                                                       latest published map.)



  Local cooperation.-The River and Harbor Act of July 3, 1930,
provides that local interests shall contribute $5,500 in cash toward
widening the channel at the turning basin. This condition has not
been complied with.
  Terminal facilities.-Water terminals, 17 in number, with avail-
able dockage of 2,900 feet, are located on Byram River at and between
Fox Island and the Mill Street Bridge. Two of the terminals are
publicly owned. In addition, there are 2,140 feet of bulkheaded shore,
of which 880 feet are located at the upper end of the project where
dockage is limited by shoal depths of 1 to 6 feet at high water. The
existing facilities appear to be adequate for existing commerce.
  Operationsand results during fiscal year.-None.
  Condition at end of fiscal year.-The existing project was about
94 percent completed. When examined in May 1941 the controlling
mean low water depth was 12 feet for a width varying from 150 to
60 feet from Long Island Sound to Fox Island; 10 feet in the anchor-
age basin; thence 10 feet for a width of 30 to 100 feet to the turning
basin; 10 feet in the turning basin; thence 3 feet for a width of 60
feet to within 400 feet of the head of the improvement; thence de-
creasing to 1 foot at the head of the improvement. The work remain-
ing to be done under the existing project consists of widening the
turning basin and constructing fenders on the bank opposite the
southern end of Fox Island.
168             REPORT OF CHIEF OF E1NGINEERS,                                          U. S. ARMY,                 1942

  The total cost and expenditures of the existing project to June 30,
1942, were $440,080.10-$358,475.33 for new work and $81,604.77 for
maintenance.
  Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
  Completion of the existing project will not be necessary during
the fiscal year 1944. Maintenance dredging will be necessary during
the fiscal year 1944. The sum of $30,000 can, therefore, be profitably
expended during the fiscal year ending June 30, 1944, in dredging,
under contract for maintenance, to restore the entrance channel to
project dimensions.
                                                       Cost and financial summary
Cost of new work to June 30, 1942-_--------------              $433, 470. 43
Cost of maintenance to June 30, 1942---------------------------97, 973.89
       Total cost of permanent work to June 30, 1942--------------531, 444. 32
Net total expenditures    -------------------------------------
                               _                                   531, 444. 32
Total amount appropriated to June 30, 1942--------------------     531, 444. 32

    Fiscal year ending June 30                            1938           1939              1940              1941          1942


Cost of new work...---------------                       $1, 546. 53   $18, 037. 67------            ----------------------------
Cost of maintenance_......__                       -..    1, 250. 96     9, 612 31    .......-..-
        Total cost- ..............                 .      2, 797. 49    27, 649. 98
Total expended .                                -    2, 643. 20
                                          -.............                28, 728. 24
Allotted......------------------................
                                            ----         27, 500.00      2, 500. 00   ............



Amount (estimated) -required       to be appropriated for completion of
                      - - - - - - - - - - - - - - - - - -- - - -- - -- - -- - -- - - -- - -
existing project                                                                                                     $16, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944 for maintenance----------------------------------                                                            30, 000. 00
   SIn addition, $5,500 to be contributed by local interests.

                                           2. MAMARONECK HARBOR, N. Y.

   Location.-This harbor is situated on the north shore of Long
Island Sound, 5 miles west of the Connecticut State line, and 27
miles by water east of the Battery, New York City. (See U. S. Coast
and Geodetic Survey Chart No. 222.)
   Previous projects.-Adopted by River and Harbor Act of August
2, 1882, modified in 1899, and by River and Harbor Act of July 25,
1912. For further details see Annual Reports for 1915, 1924, and
1938, pages 1759, 141, and 160, respectively.
   Existing project.-This provides for a channel 10 feet deep at
mean low water and 100 feet wide from deep water in Long Island
Sound to Orienta Point, and thence 80 feet wide to a point about
150 feet below the Boston Post Road, including an extension to the
northeast, 300 feet long and 80 feet wide, all with widening at bends;
for an anchorage in the East Basin of same depth; and for an
anchorage in the West Basin 6 feet deep at mean low water with
a channel of like depth and 80 feet wide connecting this anchorage
with the main channel. Length of section included in project, 1.8
miles. Mean tidal range, 6.9 feet; mean range of spring tides, 8.3
             RIVERS       AND HARBORS-NEW                     YORK,       N. Y.,     DISTRICT           169
feet; irregular fluctuations due to wind and barometric pressure vary
from 4 feet below mean low water up to 4.5 feet above mean high
water.
  The estimated cost for new work, revised in 1935, was $161,000, ex-
clusive of amounts expended on previous projects but including an
estimated local contribution of $26,500. The latest (1935) approved
estimate of cost of annual maintenance is $1,500.
  The existing project was authorized by the following river and
harbor acts:

     Acts                        Work authorized                                     Documents


Sept. 22, 1922   Dredging 10-foot channel and anchorage-_ -_---... -H.      Doc. No. 651, 66th Cong., 2d sess.
Aug. 30, 1935    Dredging 6-foot anchorage in West Basin and its         Rivers and Harbors Committee Doe.
                  approach channel.                                       No. 4, 74th Cong., 1st sess. (Con.
                                                                          tains latest published map.)


   Local cooperation.-Fullycomplied with except that local interests
are required to provide adequate and suitable spoil-disposal areas
suitably diked or bulkheaded as needed.
   Terminal facilities.-Water terminals, four in number, with a total
available dockage of 660 linear feet, a private boat landing and a
boat yard are located on the East Basin. Two small-boat repair
yards, with about 500 feet of dockage for small boats and 2 boat
landings open to the public are situated on the west branch of the
harbor. These facilities are adequate for present requirements of
commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in July 1939. When examined in May 1940, the controlling
mean low-water depth in the main channel was 10 feet for a width
varying from 100 to 30 feet from Long Island Sound to the East
Basin anchorage area, where the depth was 9 feet. The controlling
depth in the West Basin and connecting channel, when examined in
March-July 1939, was 6 feet below mean low water.
   The total cost and expenditures of the existing project to June 30,
1942, were $184,737.43-$145,407.89 for new work, of which $126,-
679.83 were United States funds and $18,728.06 contributed funds,
and $39,329.54 for maintenance.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
   Maintenance dredging will be necessary during the fiscal year 1944.
The sum of $25,000 can, therefore, be profitably expended during the
fiscal year ending June 30, 1944, in dredging, under contract for
maintenance, to restore the main channel and East Basin anchorage to
project dimensions.
                                     Cost and financial summary
Cost of new work to June 30, 1942------------------------     1$207, 404. 26
Cost of maintenance to June 30, 1942-------------------------    52, 744. 40
         Total cost of permanent work to June 30, 1942 ._____                           ___      260, 148. 66
Net total expenditures ___---------     -       --                                            1260, 148. 66
Total amount appropriated to June 30, 1942_---------,                       _                  260, 148. 66
   1 In addition, $18,728.06 contributed funds expended for new work.
170           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                    1942


    Fiscal year ending June 30                  1938               1939              1940           1941              1942


Cost of new work     ........--------------- $1,003. 12          $18, 789. 83     -$1,064. 90    ........
Cost of maintenance ...........- ------------.... -            -----------      -------------        $417.73
Total expended ____________-----                   997. 74        14, 859. 80       2. 870. 51        417. 73     -    -
Allotted       ......                             26, 500.00
                           .....------------------.....          -5, 500. 00        7, 728. 05    -9, 582. 27



Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance ------------------    ------------  - $25, 000. 00

                                   3. EAST CHESTER CREEK, N. Y.

   Location.-This creek, also known as Hutchinson River, is a small
tidal stream emptying into East Chester Bay, an indentation in the
north shore of Long Island Sound immediately north of Throgs Neck,
12 miles southwest of the Connecticut State line and 21 miles by water
northeast of the Battery, New York City. (See U. S. Coast and Geo-
detic Survey Chart No. 223.)
   Previous projects.-Adopted by the River and Harbor Acts of March
3, 1873, and June 25, 1910. For further details see Annual Report for
1915, page 1761, Annual Report for 1929, page 167, and Annual Report
for 1938, page 163.
   Existing project.-This provides for a channel 8 feet deep at mean
low water and generally 150 feet wide from Long Island Sound
through East Chester Bay to a point 700 feet below the Boston Post
Road Bridge, and thence 70 feet wide to the northern terminus of the
project, about 300 feet above the Fulton Avenue Bridge, and for a
passing basin in the vicinity of the Boston Post Road Bridge. Length
of section included in project, 4.7 miles. Mean tidal range, 7.3 feet in
the estuary; mean range of spring tides, 8.6 feet; irregular fluctuations
due to wind and barometric pressure vary from 4 feet below mean low
water up to 4.5 feet above mean high water.
    The estimate of cost for new work, made in 1930, is $283,000, exclu-
sive of amounts expended on previous projects.                                                   The latest (1930)
approved estimate for annual cost of maintenance is $15,000 for the
first 3 years and $12,000 annually thereafter.
   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (Rivers and Harbors Committee Doc. No. 37, 71st Cong.,
2d sess.). The latest published map is in the project document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-Water terminals, 24 in number, consisting of
privately owned bulkheads having a total available dockage of 6,570
feet, are located in the upper 3,500 feet of the improvement.                                                   These ter-
minals are adequate to meet the present requirements of commerce.
 (For further details see Port Series No. 20, Corps of Engineers.)
   Operations and results during fiscal year.-Under a contract for
dredging to a depth of 8 feet in the project channel and for dredging
in the Y-shaped extension, the latter being done for local interests,
work was commenced April 11, 1940, and completed August 22, 1941.
There were removed during the fiscal year 380 cubic yards, place meas-
urement, of rock, and 10,770 cubic yards, place measurement, of mate-
            RIVERS         AND HARBORS--NEW                  YORK,     N.    Y.,     DISTRICT                 171

rial other than rock from the project channel. The cost of dredging,
exclusive of $30.94 contributed funds for dredging the Y-shaped exten-
sion, was $13,680.98 for new work. A plus adjustment of $523.08
regular funds and a minus adjustment of $523.08 contributed funds
were made during the fiscal year in the costs previously reported for
preliminary work.
   The total cost of work, exclusive of minus $492.14 contributed funds,
was $14,204.06, all for new work. The expenditures, exclusive of minus
$492.14 contributed funds, were $30,882.10.
   Condition at end of fiscal year.-The existing project was completed
in August 1941. When examined in June and July 1936, April to
August 1939, and November 1940 to August 1941, the controlling depth
at mean low water was 8 feet for a width of 150 feet from East Chester
Bay to 700 feet below the Boston Post Road Bridge, thence 8 feet deep
and 70 feet wide to 300 feet above the Fulton Avenue Bridge. The
minimum width through bridge draws is 59.6 feet.
   The total cost of the existing project to June 30, 1942, exclusive of
$14,402.80 contributed funds, was $392,436.86-$183,507.10 from Emer-
gency Relief funds and $208,929.76 "from regular funds, all for new
work. The total expenditures, exclusive of $14,402.80 from contributed
funds, were $392,336.86.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $8,170.24, less accounts payable of $100, a
balance of $8,070.24, is available for revocation.
   Maintenance dredging in the upper reach of the channel will be
necessary during the fiscal year 1944. The sum of $30,000 can, there-
fore, be profitably expended during the fiscal year ending June 30,
1944, in dredging, under contract for maintenance, to restore the chan-
nel extending from about 2,000 feet below the Boston Post Road Bridge
to the head of the project to authorized dimensions.
                                     Cost and financial summary
                                         UNITED STATES FUNDS

Cost of new work to June 30, 1942_
                                 ---------------------------                                        $592, 056. 65
Cost of maintenance to June 30, 1942_____-------- --                              -------            165, 023. 65

     Total cost of permanent work to June 30, 1942--------------757, 080. 30
                                         ---------------------
Minus accounts payable June 30, 1942______                           100.00

     Net total expenditures_______ ____-__-----------756,                                                980. 30
Unexpended balance June 30, 1942------       ___--------------                                         8,170. 24

        Total amount appropriated to June 30, 1942_________-___                                      765, 150. 54

   Fiscal year ending June 30           1938          1939           1940              3.941              1942


Cost of new work__________--- -------------   -------------- $20, 695. 17     $174, 537. 63              $14, 204. 06
Cost of maintenance---------------      ----- -------------- -------------- --------------           -----     -

Total expended    ......        _-- --------
                            _--------          --------------       20,144. 51       158, 310. 25         30, 882.10

Allotted_.._---------------------.   -45, 904. 08 --------------   195, 000. 00       12, 000. 00         10,000. 00
172          REPORT OF CHIEF OF ENGINEE1RS, U. S. ARMY,                                              1942

Balance unexpended July 1, 1941_..   .    ____                   $29, 052. 34
Amount allotted from War Department Civil Appropriation Act
approved June 11, 1938------------------      -----------------  10, 000. 00

      Amount to be accounted for ___      ____----            ---
                                                    ____ - _______                                          39, 052. 34
Gross amount expended ---- ____-- -      _____-___- _ $30,913.04
                                     ----
Less reimbursements collected_--________-       __-   _      30. 94
                                                                                                            30, 882.10

      Balance unexpended June 30, 1942_______        ___ -____                                               8, 170.24
Outstanding liabilities June 30, 1942________
                                      -       _____-       $100. 00
Amount covered by uncompleted contracts ______-       _  3, 750. 00
                                                                                                              3, 850. 00

          Balance available June 30, 1942_-__                      _______--        -         -              4, 320. 24

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance               1-----------
                                            ----- ---------                                                 30, 000. 00
   1Exclusive     of available funds.

                                                CONTRIBUTED FUNDS

Cost of new work to June 30, 1942 _____________________
                                      --                                                                   $14, 402.80
Cost of maintenance to June 30, 1942     ______  _______                                           _______

      Total cost of permanent work to June 30, 1942 .--   _____  _   14, 402.80
Net total expenditures                                                   402. 80
                                                                     1_________---------------
      Total amount contributed to June 30, 1942_---     -___-__-__-- 14, 402. 80

    Fiscal year ending June 30              1938            1939            1940              1941              1942

Cost of new work_---------------------------------...
Cost of maintenance--------- ---------------------------                            ----------
                                                                             $178. 76
                                                                          ----------    $14, 716. 18            -$492. 14
                                                                                                             -- -----

                                             ...----........---------..
Total expended--.......-----......------...------------                       178. 76        14, 716. 18         -492. 14
Contributed......... ----......    ..--------
                                         ___                 $15, 550       2, 000. 00- --     .....- .        -3, 147. 20


Balance unexpended July 1, 1941 -____________________                                                       $2, 655. 06
Deductions on account of revocation of allotment-----------------                                            3, 147. 20

      Net amount to be accounted for -------------                                      -----------          -492.      14
Gross amount expended_-_----   ____------                                          _         $30.94
Less reimbursements collected----------------                                           -- 523. 08
                                                                                                             -492.      14

   CONSOLIDATED COST AND FINANCIAL SUMMARY FOR EAST CHESTER CREEK,                                             N. Y.

Cost of new work to June 30, 1942_--
                                   .....    ------                           _____-__                 $606, 459. 45
Cost of maintenance to June 30, 1942 ... __      --                           -.                  ___ 165, 023. 65
      Total cost of permanent work to June 30, 1942 __.___                                        __-      771, 483. 10
Minus accounts payable June 30, 1942 ___________- -______-                                         -._          100. 00
     Net total expenditures---       --------------------------                                            771, 383. 10
Unexpended balance June 30, 1942 __...._____--- ___ _--         __-                                          8, 170. 24
          Total amount appropriated and contributed to June 30, 1942__                                     779, 553. 34
             RIVERS         AND HARBORS--NEW                            YORK,      N.    Y.,    DISTRICT              173


   Fiscal year ending June 30               1938                 1939            1940             1941             1942


Cost of new work ......---------....--------------.......--------------       $20, 873. 93     $189, 253. 81      $13, 711.92
Cost of maintenance                      ---------        ----              --------.          ---------------
                                                                                        ----- .-...
Total expended            _
                         .........   ...------------------
                                           __          ___ ______..            20, 323. 27      173, 026. 43       30, 389. 96
Allotted and contributed........        -$45, 904. 08            $15, 550      197, 000. 00      12, 000. 00        6, 852. 80



Balance unexpended July 1, 1941 ---------------------------                                                    $31, 707. 40
Amount allotted from War Department Appropriation Act approved
  June 11, 1938-------------   -----------------------------                                                    10, 000. 00

         Amount to be accounted for-----                              ------------       ----------             41, 707. 40
Deductions on account of revocation of allotment----------                                                       3, 147. 20
         Net amount to be accounted for                            ------------------------                     38, 560. 20
Gross amount expended_--__      ------   _____       $30, 943. 98
Less reimbursements collected ----------------------      554. 02
                                                                                                                30, 389. 96

      Balance unexpended June 30, 1942_                                                                          8, 170. 24
Outstanding liabilities June 30, 1942----------------                                          $100. 00
Amount covered by uncompleted contracts ----------                                            3,750.00
                                                                                                                 3, 850. 00

         Balance available June 30, 1942 .---------------------                                                  4, 320. 24

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance --------------------------------                                                     30, 000. 00
   1 Exclusive of available funds.

                                  4. WESTCHESTER CREEK, N. Y.

   Location.-This creek is a tidal stream flowing into the East River
from the north at a point 14 miles by water northeast of the Battery,
New York City. (See U. S. Coast and Geodetic Survey Chart No.
226.)
   Previous projects.-Adopted by the River and Harbor Act of June
25, 1910. For further details see page 238 of Annual Report for 1921,
and page 164 of Annual Report for 1938.
   Existing project.-This provides for a channel 12 feet deep at mean
low water, 100 feet wide for a length of 2,000 feet through the estu-
ary; thence 80 feet wide for 3,000 feet; and thence 60 feet wide to
the head of navigation at East Tremont Avenue (Fort Schuyler
Road), a distance of 8,800 feet, with widening at bends, and with two
turning basins, one near the upper end of the channel and another
near the Eastern Boulevard '(Unionport) Bridge, a total length of
about 2.6 miles. Mean tidal range, 7 feet; mean range of spring
tides, 8.4 feet; irregular fluctuations due to wind and barometric
pressure vary from 4 feet below mean low water up to 3.5 feet above
mean high water.
   The estimate of cost for new work, revised in 1932, was $117,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $5,000.
   The existing project was adopted by the River and Harbor Act
approved September 22, 1922 (Rivers and Harbors Committee Doc.

         493202-43-pt. 1, vol. 1-               12
174        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                          1942

No. 8, 67th Cong., 2d sess.). The latest published map is printed
in House Document No. 370, Sixty-fourth Congress, first-session.
   Local cooperation.-Fullycomplied with.
   Terminal facilities.--Water terminals, 15 in number, with available
dockage of 2,900 feet, are located along both sides of the waterway.
One of the terminals is publicly owned. The facilities appear to be
adequate. (For further details see Port Series No. 20, Corps of
Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was completed
in 1933. When examined in March to May 1941, the controlling mean
low-water depth of the channel was 10 feet for a width varying from
100 to 30 feet from the entrance in East River to the head of the
project at East Tremont Avenue.
   The total cost and expenditures of the existing project to June 30,
1942, were $158,699.09-$98,666.88 for new work and $60,032.21 for
maintenance.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
   Maintenance dredging will be necessary during the fiscal year 1944.
The sum of $60,000 can, therefore, be profitably expended during the
fiscal year ending June 30, 1944, in dredging, under contract for main-
tenance, to restore the channel to project dimensions.
                                      Cost and financial summary

Cost of new work to June 30, 1942_________________________ $175, 848. 52
Cost of maintenance to June 30, 1942               ___   __ 126, 632. 35
                                                            1_____________-
      Total cost of permanent work to June 30, 1942_____________                                302, 480. 87
Net total expenditures________    --     ________________                                       302, 480. 87
Total amount appropriated to June 30, 1942---____-__---_______                                  302, 480. 87

   Fiscal year ending June 30           1938          1939              1940           1941          1942

C ost of new w ork . . . . . . . . . . . . . . . . . . . . . . . .     . . . . . . . . . .
Cost of maintenance________...........__ $1, 551.64 $58, 448. 36
Total expended....-----------------     1, 524. 63   58, 475. 37
Allotted_ ..-----------.---            30, 000. 00   30, 000.00----------       I--- ----
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance________ _____-      _________-   _     $60, 000. 00

                                      5. BRONX RIVER, N. Y.

   Location.-This stream empties into a shallow bay in the north
shore of East River, 11 miles by water northeast of the Battery, New
York City. (See U. S. Coast and Geodetic Survey Chart No. 226.)
   Previous project.-Adopted by the River and Harbor Act of June
3, 1896. For further details see Annual Report for 1915, page 1762,
and Annual Report for 1938, page 166.
   Existing project.-This provides for a channel 10 feet deep at
mean low water and 100 feet wide, to extend from deep water in
East River to the head of navigation at the dam at East One Hun-
dred and Seventy-seventh Street, involving tlhe first dredging from
        RIVERS   AND HARBORS--NEW       YORK,   N.   Y.,   DISTRICT   175

East River to Randall Avenue to a width of 200 feet; thence to Spof-
ford Avenue, 150 feet; thence to Watson Avenue, 125 feet; thence
to the railroad bridge near Westchester Avenue, 100 feet, except in
the southern approach to the bridge, where it is to be 140 feet; and
above the bridge 100 feet, with increase at bends where permissible,
including a turning basin at the head of the improvement. The
length of the section included in the project is about 3.3 miles. Mean
tidal range, 6.9 feet in the estuary; mean range of spring tides, 8.2
feet; irregular fluctuations due to wind and barometric pressure vary
from 4 feet below mean low water up to 3.5 feet above mean high
water
   The estimate of cost for new work, revised in 1942, is $2,237,000,
exclusive of amounts expended under previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $7,500.
   The existing project was adopted by the River and Harbor Act of
March 4, 1913 (H. Doc. No. 897, 62d Cong., 2d sess.). For latest
published map see Annual Report for 1912, page 1470.
   Local cooperation.-The River and Harbor Act of March 4, 1913,
provides that any right-of-way that may be necessary for the execu-
tion of the project shall be furnished free of cost to the United States.
Right-of-way within the bulkhead lines below the Westchester Ave-
nue Bridge was accepted by the Chief of Engineers under date of
June 9, 1920, and above the Westchester Avenue Bridge under date
of October 4, 1928. Under date of September 10, 1940, the Chief of
Engineers approved releases from damages furnished by adjoining
property owners in the reach of the river between Westchester Ave-
nue and East One Hundred and Seventy-fourth Street. Under date
of November 12, 1940, the Chief of Engineers approved an agreement
under which the city of New York would reimburse the United States
for the cost of a retaining wall to protect adjoining property in the
reach of the river between Westchester Avenue and New York, New
Haven & Hartford Railroad bridge in lieu of furnishing additional
right-of-way. On October 28, 1940, the Secretary of War authorized
the acceptance of $10,000 from the city of New York to defray the
cost of the retaining wall. The $10,000 was deposited to the credit
of the United States on December 7, 1940. Additional right-of-way
required in the section above East One Hundred and Seventy-fourth
Street has not been furnished. The city of New York has indicated
that it does not feel justified in acquiring any additional land along
the river.
   Terminal facilities.-Water terminals, 16 in number, with available
dockage of 3,330 feet, are located along the east and west banks from
Randall Avenue to East One Hundred and Seventy-third Street.
One of the terminals is publicly owned. Additional terminals with
modern facilities will be needed when the existing project is de-
veloped. (For further details see Port Series No. 20, Corps of
Engineers.)
    Operations and results during fiscal year.--Under a contract for
excavation to a depth of 10 feet from Westchester Avenue Bridge to
East One Hundred and Seventy-fourth Street, and construction of a
concrete retaining wall above the bridge, the latter being done for
local interests, work was commenced December 11, 1940, and com-
pleted November 3, 1941. During the fiscal year 8,673 cubic yards,
176    REPORT OF CHIEF OF ENGINEERS,        U. S. ARMY,   1942

place measurement, of rock and 43,880 cubic yards, place measure-
ment, of material other than rock were removed and 2,484 linear feet
of line holes were drilled in connection with channel excavation. In
the construction of the retaining wall 145 cubic yards, place measure-
ment, of rock were removed; 1,111 linear feet of line holes were
drilled, 284 cubic yards of concrete and 10,184 pounds of reinforcing
steel were placed; and the drain pipe was completed. The cost of
work, exclusive of $9,176.67 contributed funds for the retaining wall,
was $97,080.30 for new work.
   The cost of surveys and engineering preliminary to dredging of
channel below Westchester Avenue was $2,814.47 for maintenance.
   The total cost of work, exclusive of $9,176.67 contributed funds was
$99,894.77-$97,080.30 for new work and $2,814.47 for maintenance.
The expenditures, exclusive of $9,176.67 contributed funds were
$164,670.58.
   Condition at end of fiscal year.-The existing project was about
57 percent completed. A channel to project dimensions was com-
pleted from deep water in East River up to the Westchester Avenue
Bridge in 1926. A channel 10 feet deep and 65 to 123 feet wide from
Westchester Avenue Bridge to East One Hundred Seventy-fourth
Street Was completed in 1941. When examined in July to November
1941, the controlling mean low water depth was 10 feet for a width
varying from 100 to 60 feet from East River to a point 2,200 feet
below Eastern Boulevard Bridge; thence 8 feet for a width vary-
ing from 100 to 60 feet to a point 1,200 feet above Eastern Boule-
vard Bridge; thence 5 feet for a width varying from 80 to 60 feet
to Westchester Avenue Bridge; thence 9 feet for a width varying
from 123 to 60 feet to East One Hundred and Seventy-fourth Street.
As shown by an examination made in May 1934, the depth in the sec-
tion above East One Hundred and Seventy-fourth Street varied from
1 foot below mean low water to an extreme height of 4.5 feet above
mean low water just below the dam at the head of the improvement.
The work remaining to be done under the project consists of com-
pleting the channel above the Westchester Avenue Bridge to project
dimensions.
   The total cost and expenditures of the existing project to June 30,
1942, exclusive of $10,000 contributed funds for new work were
$1,264,956.99-$1,080,910.37 for new work and $184,046.62 for main-
tenance.
   Proposed operations. The balance unexpended at the end of the
fiscal year, amounting to $65,078.81, will be applied to the completion
of dredging by October 31, 1943, under contract to be entered into for
maintenance, to restore the channel from East River to the Westchester
Avenue Bridge to project dimensions.
   The deepening of the channel above East One Hundred and Seventy-
fourth Street is not considered necessary at this time. Further
maintenance dredging will not be necessary during fiscal year 1944.
Therefore, no funds can be profitably expended during the fiscal year
ending June 30, 1944.
                   RIVERS AND HARBORS-NEW YORK, N. Y., DISTRICT                                                                                 177
                                                      Cost and financial summary
                                                             UNITED STATES             FUNDS

Cost of new work to June 30, 1942---_--_ _ --    --------                                                                       $1, 149, 946. 09
Cost of maintenance to June 30, 1942_ _       _-------------                                                                        210, 967. 95

             Total cost of permanent work to June 30, 1942--1---------                                                            , 360, 914. 04

Net total expenditures---------------------------------,      360, 914. 04
Unexpended balance June 30, 1942------------------ ---------- 65, 078. 81
             Total amount appropriated to June 30, 1942- ...--                                               -                   1, 425, 992. 85

      Fiscal year ending June 30                             1938               1939                1940             1941                   1942

Cost of new work ...........---------           -------.......
                                                         ............         $16, 730. 35    $169, 296. 07                                $97, 080. 30
Cost of maintenance----.........---...----------                          ----------------------------......
                                                            ...--------------                                                                2, 814. 47
         Total cost...............                      .......                    ....--------------16, 730. 35   169, 296. 07             99, 894. 77

Total expended------------------.................            4, 907. 98   ---------------         16, 380. 96      104, 869. 65            164, 670. 58

Allotted ......................----------------------        9, 248. 65         $950, 000 --------------           610, 000. 00             11, 000. 00



Balance unexpended July 1, 1941                                                                                                   $218, 749.39
Amount allotted from War Department Civil Appropriation Act
  approved May 23, 1941-----------------------------------                                                                          11, 000. 00

      Amount to be accounted for-- ------------------                                                             _--              229, 749. 39
Gross amount expended-----------------------                                                            $173, 911.71
Less reimbursements collected ------------                                                                 9, 241. 13
                                                                                                                                    164, 670. 58

              Balance unexpended June 30, 1942 --------------------                                                                  65, 078. 81

Amount (estimated) required to be appropriated for completion
  of existing project 1 - - - -- - - - -- - - - -- - - -- - - - - -- - -- - --                                              -
                                                                                                                                 1,
                                                                                                                                 1 148, 000. 00
     I Exclusive of available funds.

                                                                  CONTRIBUTED FUNDS

Cost of new work to June 30, 1942-------------------                                                                            $10, 000. 00
Cost of maintenance to June 30, 1942--------------------                                                                    -------------
      Total cost of permanent work to June 30, 1942_-----------                                                                     10, 000. 00
Net total expenditures_ ____    ______________________                                                                              10, 000. 00
Total amount contributed to June 30, 1942 -------------                                                                             10, 000. 00

      Fiscal year ending June 30                             1938               1939                1940             1941                   1942


Cost of new work---------                           ----------------------------..-----------............-- $823. 33                     $9, 176. 67
Cost of maintenance ....-                      .       .    .. --.--------------
                                                                             .   ..---------
                                                                                 ----------      - --------------                    -----------
Total expended..----------..........-----------------------------------------                                           823. 33              9, 176. 67

Contributed--------------...............              . -------------         ------------------ -------            10, 000. 00


Balance unexpended July 1, 1941-------------- -----------                                                                           $9,     176.677



Gross amount expended--------------------------------                                                                                9,     176.   67?
178           REPORT OF CHIEF OF ENGINEERS,                                         U. S. ARMY,                1942

           CONSOLIDATED             COST AND FINANCIAL SUMMARY FOR BRONX RIVER, N. Y.

Cost of new work to June 30, 1942-------------------------                                                     $1, 159, 946. 09
Cost of maintenance to June 30, 1942--------------------------                                                     210, 967. 95

          Total cost of permanent work to June 30, 1942                                                            370, 914.04
                                                                                                                1-----------,

Net total expenditures-------------------1,-------------                                                            370, 914. 04
Unexpended balance June 30, 1942_-----------         --                                                              65, 078. 81
          Total amount appropriated and contributed to June 30, 1942                                            1, 435, 992. 85

    Fiscal year ending June 30                   1938                 1939               1940           1941             1942

Cost of new work        .    .....----------------......
                                            ___________            ..........       $16, 730. 35    $170, 119. 40      $106, 256. 97
Cost of maintenance----__ -------------- -------------- ---------------------------                                       2, 814.47
       Total cost    ._________........    .               __.                       16, 730. 35     170, 119. 40       109, 071.44

Total expended----------------                 $4, 907. 98                           16, 380. 96     105, 692. 98       173, 847. 25

Allotted and contributed-------.......         -9, 248. 65            $950, 000   -------------    -600, 000. 00         11, 000. 00



Balance unexpended July 1, 1941-------------------------------     $227, 926. 06
Amount allotted from War Department Civil Appropriation Act ap-
  proved May 23, 1941--------------------------------       ------   11, 000.00

       Amount to be accounted for---         _---------------                                                       238, 926. 06
Gross amount expended-__       _______----------$183, 088. 38
Less reimbursements collected____-----------               9, 241. 13
                                                                                                                    173, 847. 25

          Balance unexpended June 30, 1942 __-________                                          _____      -         65, 078. 81

Amount (estimated) required to be appropriated for completion of
                                                                  _
   existing project            1___________                      ________-------------                          1, 148, 000.00
   1Exclusive       of available funds.

                                6. HARBOR AT FLUSHING BAY, N. Y.

   Location.-The harbor is located on the north shore of Long Island,
12 miles by water northeast of the Battery, New York City, and
consists of Flushing Bay, 2.0 miles long and Flushing Creek, 1.0 mile
long. (See U. S. Coast and Geodetic Survey Chart No. 226.)
   Previous projects.-Adopted by River and Harbor Acts of March
3, 1879, and March 4, 1913. For further details see Annual Reports
for 1915, 1932, and 1938, pages 1772, 169, and 168, respectively.
   Existing project.-This provides for a channel 12 feet deep at mean
low water from that depth in East River through Flushing Bay and
in Flushing Creek to the Main Street Bridge, with widths of 200 feet
through the bay and in the creek to the Northern Boulevard Bridge,
thence decreasing uniformly to 160 feet at the Main Street Bridge;
a branch channel 12 feet deep and 200 feet wide from the main channel
to a maneuvering area of the same depth outside the municipal boat
basin at the south end of the bay, with an anchorage basin of 8-foot
depth and approximately 700-foot width west of the branch channel;
and for the repair and reconstruction of 3,739 linear feet of dike.
   The length of the section included in the project is about 3.7 miles.
Mean tidal range, 6.8 feet; mean range of spring tides, 8.1 feet; ir-
regular fluctuations due to wind and barometric pressure vary from
4 feet below mean low water up to 3.5 feet above mean high water.
            RIVERS AND            HARBORS-NEW                YORK,         N.   Y.,   DISTRICT             179
   The estimate of cost for new work, revised in 1942, is $662,000, ex-
clusive of amounts expended on previous projects. The latest (1937)
approved estimate for annual cost of maintenance is $20,000.
  The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                       Documents


Mar.   4,1913   Construction of new dike; repair of old dike     -__--   H. Doc. No. 1333, 61st Cong., 3d sess.
Mar.   3,1925                                         .
                Dredging 12-foot channel-... ----.__ _....-_ _           H. Doc. No. 124, 68th Cong., 1st sess.
Aug. 26, 1937   Branch channel, maneuvering area, and anchor-            Rivers and Harbors Committee Doc.
                                                                                                        2
                  age basin. Modified conditions of local cooper-          No. 35, 75th Cong., 1st sess.
                  ation.
June 20, 1938   Providing 6-foot channel along west side of har-         Senate committee print, 75th Cong.,
                                                                                    2
                  bor during period of the world's fair.1                  3d sess.


1 No work was done.
2 Contain latest published maps.

   Local cooperation.-The River and Harbor Act of August 26, 1937,
provides that the branch channel and anchorage shall not be con-
structed until local interests give assurances satisfactory to the Sec-
retary of War that they will construct a suitable landing for excursion
boats and a boat basin of appropriate capacity; provide and maintain
a public landing of permanent construction for small boats, with
necessary service and supply facilities; provide adequate parking
spaces for automobiles in the immediate vicinity suitably connected
to the public-highway system and open to the public on equal terms,
and that no dredging shall be done in the Flushing Creek Channel
closer than 100 feet to the established harbor line at any wharf struc-
ture without previous consent of the owner and release of the United
States from any resultant claims for damages. Assurances providing
compliance with the local cooperation required for all improvements
authorized under this act, except for dredging in the creek channel,
were accepted by the Secretary of War on October 18, 1937.
   Terminal facilities.-Waterterminals, 19 in number, with available
wharfage of 3,900 feet, are located within the limits of the adopted
project. An excursion-boat landing and boat basin at the south end
of Flushing Bay, constructed in accordance with the requirements of
local cooperation and owned by the city of New York, is open to
the public. The facilities are considered adequate for existing com-
merce. (For further details see Port Series No. 20, Corps of En-
gineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was about 59
percent completed. The 12-foot channel in the bay, branch channel,
and maneuvering area and the 8-foot anchorage area were completed
in November 1938. When examined in October 1938, April 1940, and
April 1942 the controlling mean low-water depth was 11 feet for a width
varying from 150 to 200 feet in the main channel through the bay to
the mouth of Flushing Creek, and thence 70 to 130 feet wide to the
Broadway Bridge; thence 8 feet for a width of 60 feet to the Roosevelt
Avenue Bridge; thence 5 feet for a width varying from 50 to 160 feet
180           . REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                       1942

to the Main Street Bridge. When examined in April 1942 the depth
in the branch channel and maneuvering area was 11 feet and in the
anchorage area the depth was 7 feet. The work remaining to be done
under the existing project consists of the construction of the channel
in the creek to a depth of 12 feet and the repair and reconstruction
of dike.
  The total cost and expenditures of the existing project to June 30,
1942, were $389,629.46, all for new work.
  Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
   It is expected that the remaining conditions of local cooperation
affecting the 12-foot channel will not be met during the next two
years. The reconstruction of dikes is not considered necessary at
this time. Maintenance dredging will be necessary during the fiscal
year 1944. The sum of $40,000 can, therefore, be profitably ex-
pended during the fiscal year ending June 30, 1944, in dredging,
under contract for maintenance, to restore the channel from East
River to the mouth of the creek to project dimensions.
                                                           Cost and financial summary
Cost of new work to June 30, 1942-----------------------------                                                   $628, 502. 37
Cost of maintenance to June 30, 1942 ________-___--------206,                                                          411. 47

      Total cost of permanent work to June 30, 1942 ------- ___ 834, 913. 84
Net total expenditures-----------------------------------834,        913. 84
Total amount appropriated to June 30, 1942 _____________-       834, 913. 84

     Fiscal year ending June 30                                1938            1939          1940        1941          1942

Cost of new work ........------.                        .. $224, 751.49     $164, 877.97   .
Cost of maintenance.......-----                          - -------------- ------------ ---------------------------------------
Total expended----..............------------...              171, 145. 62    218, 483. 84

Allotted---------------------........................        455,000. 00    -65, 370. 54..


Amount (estimated) required to be appropriated for completion of
existing project_--------------- ------------------------          $272, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance__------------- ---                     -   40, 000. 00

                                                          7. GLEN COVE CREEK, N. Y.

   Location.-This is a narrow tidal inlet extending eastwardly about
1 mile from the east side of Hempstead Harbor on the north shore
of Long Island, 26 miles northeast of the Battery, New York City,
(See U. S. Coast and Geodetic Survey Chart No. 223.)
   Existing project.-This provides for a channel 100 feet wide and 8
feet deep at mean low water from deep water in Hempstead Harbor
to the head of navigation at the city of Glen Cove, a total length of
about 1 mile, to be protected by a sand fence along its north side where
it crosses the beach. Mean tidal range, 7.4 feet; mean range of spring
tides, 8.7 feet; irregular fluctuations due to wind and barometric
pressure vary from 4 feet below mean low water up to 4.5 feet above
mean high water.
         RIVERS     AND HARBORS--NEW              YORK,    N.   Y.,    DISTRICT        181

    The estimate of cost for new work (of which one-half is to be borne
by local interests), revised in 1934, is $109,000, with $6,000 the first year
and $4,000 annually thereafter for maintenance.
   The existing project was adopted by the River and Harbor Act of
March 3, 1925 (H. Doc. No. 207, 68th Cong., 1st sess.). The latest
published map is in the project document.
   Local cooperation.--The River and Harbor Act of March 3, 1925,
provides that local interests shall pay one-half of the first cost of the
work, provide without cost to the United States all rights-of-way,
spoil-disposal areas, and bulkheads, and give assurances satisfactory
to the Secretary of War that adequate terminals will be built. Com-
plied with as to contribution of one-half of first cost of work done
to date, cession of rights-of-way, provision of disposal areas, and the
construction of terminals. Pending construction of bulkheads by
local interests along the southerly side of the channel in the upper
1,600 feet of the improvement, a channel of less than project width
has been excavated.
    Terminal facilities.-There are four terminals at present, with avail-
able wharfage of 1,875 feet, which are considered adequate for present
needs. There is ample water front, both public and private, for addi-
tional terminals as needs arise.
    Operationsand results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project was about 55
percent completed. The work done provided a channel 100 feet in
width from deep water in Hempstead Harbor for a distance of 3,470
feet,, thence gradually decreasing to 50 feet in width for a distance
of 180 feet, and 50 feet in width for a distance of about 1,450 feet
to the head of the improvement. When examined in March 1942
the controlling mean low water depth was 8 feet for a width varying
from 100 to 55 feet from the mouth to within 1,600 feet of the head of
the improvement; thence 7 feet for a width of 35 feet for a distance
of 900 feet; thence 6 feet for a width of 35 feet to the head of the
project. The work remaining to be done to complete the existing
project consists in widening to 100 feet the upper 1,630 feet of channel
and building a sand fence along the north side of channel where it
crosses the beach.
    The total cost and expenditures to June 30, 1942, were $59,534.17,
all for new work, of which $29,760.06 were United States funds and
$29,774.11 contributed funds.
    Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
    Completion of the existing project is not considered necessary dur-
ing the fiscal year 1944. Shoaling is occurring near the entrance from
Hempstead Harbor and in the upper section of the improvement.
Therefore, the sum of $15,000 can be profitably expended during the
fiscal year ending June 30, 1944, in dredging, under contract for main-
tenance, to restore the channel to dimensions previously obtained.
                             Cost and financial summary
Cost of new work to June 30, 1942____------                               _____ 129, 760. 06
Cost of maintenance to June 30, 1942_____                              _____
       Total cost of permanent work to June 30, 1942 ------                      29, 760. 06
Net total expenditures-_- ---------------             ---                        29, 760. 06
Total amount appropriated to June 30, 1942------------                          129, 760. 06
  1 Exclusive of $29,774.11 contributed funds expended for new work.
182                REPORT                 OF CHIEF OF ENGINEERS,                       U.     S.   ARMY,          1942


     Fiscal year ending June 30                             1938             1939        1940              1941              1942


Cost of new work----------------   -$14.04........................
Cost of maintenance-------------------- ----------------                            ------    ----------                 -      ---
Total expended.----------------                              -14. 04
Allotted----------------------.........................   -6, 014. 04.....


Amount (estimated) required to be appropriated for completion of
                   - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - --
existing project                                                                                $25, 000. 00

Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance      ------------------------------------                                                     15,000. 00
     2 In addition, $25,000 to be contributed by local interests.

                                                  8. HUNTINGTON HARBOR, N. Y.

    Location.-This is an indentation of the north shore of Long Island,
40 miles northeast of the Battery, New York City, and 8 miles south-
east of Stamford Harbor, Conn. (See U. S. Coast and Geodetic Sur-
vey Chart No. 224.)
   Previous project.-The project was adopted by the act of June 10,
1872. For further details see page 1772 of Annual Report for 1915.
and page 174 of Annual Report for 1938.
    Existing project.-This provides for a channel 8 feet deep at mean
low water and 100 feet wide from the 8-foot contour in Huntington
Bay to a turning basin of same depth and 200 feet wide, located Qppo-
site the Old Town dock, thence 6 feet deep and 100 feet wide to a point
450 feet north of the causeway, an anchorage of the same depth and
14 acres in extent on the west side of the 6-foot channel and a cross-
channel, 8 feet deep and 100 feet wide from the main 8-foot channel to
and along the wharves on the west side of the harbor, extending to
within 150 feet of the causeway. The length of the section included
in the project is about 2.5 miles. Mean tidal range, 7.4 feet; mean
range of spring tides, 8.7 feet; irregular fluctuations due to wind and
barometric pressure vary from 4 feet below mean low water up to
3.5 feet above mean high water.
   The estimate of cost for new work, revised in 1938, is $131,500,
exclusive of amounts expended on previous projects, but including
an estimated local contribution of $51,000. The latest (1938) ap-
proved estimate for annual cost of maintenance is $8,000.
  The existing project was authorized by the following river and
harbor acts:

        Acts                                         Work authorized                                   Documents


Sept. 19, 1890            8-foot channel to and including turning basin at              H. Ex. Doc. No. 200, 48th Cong., 2d
                             Old Town dock.                                               sess.
June 20, 1938             6-foot channel, 6-foot anchorage area, and 8-foot             H. Doc. No. 638, 75th Cong., 3d sess.
                              cross channel.                                                 (Contains latest published map.)
        RIVERS AND HARBORS-NEW          YORK,   N.   Y.,   DISTRICT   183
  Local cooperation.-The River and Harbor Act of June 20, 1938,
provides for the 6-foot channel and anchorage area, and the 8-foot
cross channel subject to the conditions that local interests shall:
   (a) Furnish free of cost to the United States suitable spoil-disposal
areas for new work and subsequent maintenance as may be required.
   (b) Agree to provide and maintain adequate landing facilities open
to the public on equal terms to all.
   (c) Contribute prior to commencement of work on either the 6-foot
or 8-foot improvement one-half of the initial cost thereof, but not in
excess of $51,000.
   The local cooperation required for the improvements authorized
under this act, except for dredging of the 8-foot cross channel, has
been met.
   Terminal facilities.-Nine terminals, consisting of timber and con-
crete bulkheads, with available dockage of 3,023 feet, of which town-
owned wharfage amounting to 760 feet is open to the public, are lo-
cated at the southern end of the harbor. Upon completion of the
public dock to be constructed in accordance with the requirements of
local cooperation, the terminals will be sufficient for existing and
reasonably prospective commerce.
   Operations and results during fiscal year.-There were no costs.
An adjustment of minus $349.71, regular funds, and adjustment of
plus $349.71, contributed funds, were made in the expenditures pre-
viously reported.
   Condition at end of fiscal year.-The existing project was about 52
percent completed. The main 8-foot channel and the turning basin
were completed in 1904. The 6-foot channel and anchorage on the
east side of the harbor were completed in 1941. The controlling mean
low water depth when examined in May 1941 was 8 feet for a width
of 80 to 100 feet in the main channel and in the turning basin, except
for a shoal along the west channel line about 2,500 feet south of the
entrance having a least depth of 6 feet; thence 6 feet to the head of
the project. The controlling depth in the anchorage area was 6 feet
below mean low water. In the cross channel the depth varied from
4 feet below mean low water at the entrance to 1 foot above mean low
water at the head of the channel. The work remaining to be done to
complete the project consists of dredging the 8-foot cross channel.
   The total cost and expenditures of the existing project to June 30,
1942, were $116,108.16-$49,034.92 from United States funds and $19,-
545.86 from contributed funds, a total of $68,580.78 for new work; and
$47,527.38 from United States funds for maintenance.
  Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
   It is expected that the conditions of local cooperation under this
project affecting the 8-foot cross channel will not be complied with
during the next two years. Maintenance dredging will not be neces-
sary during the fiscal year 1944. Therefore no funds can be profitably
expended during the fiscal year ending June 30, 1944.
184           REPORT OF CHIEF OF ENGINEER.S,                                                 U. S. ARMY,                    1942

                                             Cost and financial summary

                                                     UNITED STATES FUNDS

Cost of new work to June 30, 1942                                                                                                 $71, 534. 92
Cost of maintenance to June 30, 1942------------------------                                                                       47, 527. 38
      Total cost of permanent work to June 30, 1942__.---......      .119, 062. 30
Net total expenditures ________________-        ____           -
                                                             ___-- -    119, 062. 30
Total amount appropriated to June 30, 1942_ _-__-         -- _____- 119, 062.30

    Fiscal year ending June 30                       1938                    1939                  1940              1941                 1942

Cost of new work___.... - -. --. ---- -----..............        $240. 69                                       $19, 305. 17       --     ------
Cost of maintenance--.......--------- ------------- --------------------                                             503. 25
       Total cost-------..........----------------------------------                                 240. 69        19, 808.42
Total expended---___..................                  ....       ..............                    179. 61        20,219. 21            -$349. 71
          ...............................------..........--------------
Allotted-------------------------                                                             35, 000. 00       -12, 758.34              -2,192. 55



Balance unexpended July 1, 1941_--------------------------                                                                         $1, 842. 84
Deductions on account of revocation of allotment---------------                                                                     2, 192. 55

      Net amount to be accounted for----------     ----                                                                             -- 349. 71
Less reimbursements collected   -----------------------------                                                                       -- 349. 71

Amount (estimated) required to be appropriated for completion of
   existing project                        ----------                                   --------                                   29, 500. 00
   1 In addition, $16,500 to be contributed by local interests.

                                                       CONTRIBUTED FUNDS

Cost of new work to June 30, 1942_-.....                                            ___       __          ___-----                $19, 545. 86-
Cost of maintenance to June 30, 1942

      Total cost of permanent work to June 30, 1942------------- 19, 545. 86
Net total expenditures ___.__-----______-------_                  19, 545. 86
Total amount contributed to June 30, 1942---------------------19,     545. 86

    Fiscal year ending June 30                       1938                    1939                  1940              1941                 1942

Cost of new work----------------............. --------------..                 $605. 17      $18,940. 69
Cost of maintenance.............-----------...................------------..........-------------
Total expended.------------------_____                ______       ________             _           605. 17         18, 590. 98             $349.71
Contributed--------..........-----------3..-.. ...             -                              34, 500. 00 -------------                 -14, 954.14


Balance unexpended July 1, 1941_-------                                                                         __--        -$15,    303. 85
Deductions on account of revocation of allotment-....                                                                         -- 14, 954. 14
      Net amount to be accounted for ... _____                                                     ______--------                         349. 71
Gross amount expended ____.____-.-._                                                                                                      349. 71
Amount (estimated) required to be appropriated for completion of
existing project-----------------------------------------                                                                         16, 500. 00
   CONSOLIDATED COST AND FINANCIAL SUMMARY FOR HUNTINGTON                                                                HARBOR, N. Y.

Cost of new work to June 30, 1942 ____                                           ___        ____-----------                       $91, 080. 78
Cost of maintenance to June 30, 1942                                              ---         -------                              47, 527. 38
      Total cost of permanent work to June 30, 1942 - - --                                                                        138, 608. 16
Net total expenditures_ ---                                                                                                       138, 608. 16
Total amount appropriated and contributed to June 30, 1942-.....                                                                  138, 608. 18
               RIVERS          AND        HARBORS-NEW                     YORK,        N.   Y.,    DISTRICT              185

    Fiscal year ending June 30                    1938             1939            1940              1941           1942


Cost of new work-----....-------------------. --------------            $845.86                   $38, 245. 86 ------------
                                ----- --------------------------- -------------
Cost of maintenance-------.............                                                                503. 25 ---------....
       Total cost---.........------------....------------..     ------------.          845. 86     38,749. 11   ------

Total expended----.......------.....----...------------...----------------             784.78      38,810.19------------

Allotted and contributed----..........--------------......... --------------      69, 500. 00     -12, 758.34    -$17, 146. 69


Balance unexpended July 1, 1941--------------------------------     $17, 146. 69
Deductions on account of revocation of allotment-----------------17,146. 69
Gross amount expended--------------------------------------              349. 71
Less reimbursements collected-------------------------    ---------      349. 71
JAmount    (estimated) required to be appropriated for completion
    of existing project 1-     -       ---                                                                      46, 000. 00
   I Includes $16,500 to be contributed by local interests.

                                        9. MATTITUCK HARBOR, N. Y.

    Location.-This is a tidal inlet on the north shore of Long Island,
85 miles east of the Battery, New York City, and 24 miles southeast
of New Haven Harbor, Conn., extending southward about 21/4 miles
to the village of Mattituck. (See U. S. Coast and Geodetic Survey
Chart No. 299.)
   Existing project.-This provides for a channel 7 feet deep at mean
low water from Long Island Sound to the bridge at Waterville, pro-
tected at the entrance by two parallel jetties 400 feet apart, thence
7 feet deep at mean high water to the village of Mattituck, the widths
being 100 feet at the entrance and 80 feet elsewhere. Total length
of the channel is about 2.3 miles. Mean tidal range, at entrance, 4.9
feet; at Old Mill Bridge, Waterville, 5.1 feet; mean range of spring
tides at entrance, 5.8 feet; at Old Mill Bridge, 6.0 feet; irregular
fluctuations due to wind and barometric pressure vary from 2.5 feet
below mean low water up to 2.5 feet above mean high water.
    The estimate of cost for new work, revised in 1935, including the
cost of maintenance up to June 30, 1909, was $125,000. The latest
 (1935) approved estimated cost of annual maintenance is $5,000.
    The existing project was authorized by the following river and
harbor acts:

      Acts                               Work authorized                                           Documents


June 3,1896                                                     _....-
                    The 7-foot channel, and 2 riprap jetties --...-               Annual Report, 1891, p. 843.
Aug. 30, 1935      250-foot extension to west jetty ..........----------------   H.    Doc. No. 8, 71st Cong., 1st sess.
                                                                                       (Contains latest published map.)



   Local cooperation.--Fully complied with.
   Terminal facilities.-Thereis a timber bulkhead at Waterville, with
available wharfage of 710 feet. At the head of the project there is a
crib pier, in poor condition, with 50 feet of available wharfage. The
commerce is of such a light nature that much of it can be handled
from small boats run up on the shore. These facilities are considered
adequate for existing commerce.
186         REPORT          OF CHIEF OF E[NGINEERS,                          U.      S. ARMY,                1942

   Operations and results during fiscal year.-The-cost and expendi-
tures of a survey to determine the condition of the channel were
$549.27, for maintenance.
   Condition at end of fiscal year.-The existing project is completed.
The dredging was completed in 1914. The east jetty was completed
in 1906 for a length of 775 feet. The west jetty was completed in
1938. When examined in May 1937 and September 1941, the con-
trolling mean low water depth was 4 feet for a width varying from
100 to 40 feet through the entrance, thence 7 feet for full project width
to the bridge at Waterville. In July 1928 the controlling mean high
water depth was 7.6 feet (2.5 feet mean low water) from the bridge
to Long Creek; thence 6.1 feet (1 foot mean low water) to the village
of Mattituck. The minimum width through the bridge draw is 57
feet. Both east and west jetties are in good condition. No further
work of improvement appears necessary at this time.
   The total cost and expenditures of the existing project to June 30,
1942, were $260,315.30-$133,344.15 for new work and $126,971.15 for
maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $950.73, will be applied to surveys to deter-
mine the condition of the channel.
   Maintenance dredging will be necessary during the fiscal year 1944.
Therefore, the sum of $25,000 can be profitably expended during the
fiscal year ending June 30, 1944, in dredging under contract for main-
tenance, to restore the entrance channel to project dimensions.
                                        Cost and financial summary

Cost of new work to June 30, 1942--   -----------------------                                                  $133, 344. 15
Cost of maintenance to June 30, 1942------------------------_                                                   126, 971. 15

          Total cost of permanent work to June 30, 1942                                  -----------             260, 315. 30

Net total expenditures------------------------------------                                                       260, 315. 30
Unexpended balance June 30, 1942 __    __-___-------    -----                                                         950. 73

          Total amount appropriated to June 30, 1942--------------                                               261, 266. 03

    Fiscal year ending June 30             1938            1939                   1940                1941               1942


                              ------
Cost of new work....___--------.....     $14, 777.93     $23, 609. 82-----.--.-
Cost of maintenance_ ___.-.....            8, 331. 47     11, 223. 21                                                       $549. 27
       Total cost_.-------------          23, 109. 40     34, 833.03                     -                                     549. 27
Total expended ..---.---------            10, 920. 31     46, 878. 49-------                                                   549. 27
            .......------------------
Allotted------                            31, 000. 00   -22, 331. 52                                  $1, 500 ..............
                                                                                         .--------------



Balance unexpended July 1, 1941 _______________---     ________-                                                    $1, 500. 00
Gross amount expended-----------------------------------------                                                          549. 27
          Balance unexpended June 30, 1942--------------------------                                                     950. 73
Amount that can be profitably expended in fiscal year ending June 30,
                            - -- - -- - -- - - -- - -- - -- - -- - - -- -- - -- - - --
1944, for maintenance                                                                                              25, 000. 00
     Exclusive of available funds.
        RIVERS AND   HARBORS-NEW        YORK,   N.   Y.,   DISTRICT   187

                      10. PECONIC RIVER, N. Y.

   Location.-This is a narrow tidal stream at the intersection of the
north and south forks of Long Island, 74 miles east of the Battery,
New York City, extending westwardly about 3 miles to a dam near
Peconic Avenue in the village of Riverhead, N. Y. (See U. S. Coast
and Geodetic Survey Charts Nos. 299 and 1212.)
   Existing project.-This provides for a channel 6 feet deep at mean
low water and 75 feet wide for a distance of about 2.8 miles to the
Terry and Wells dock, about 1,100 feet below Peconic Avenue. Mean
tidal range, 2.7 feet; mean range of spring tides, 3.1 feet; irregular
fluctuations due to wind and barometric pressure vary from about 3
feet below mean low water to about 3 feet above mean high water.
   The estimate of cost for new work made in 1871 is $32,818.50. There
is no estimate for cost of annual maintenance.
    The existing project was adopted by the River and Harbor Act of
March 3, 1871 (H. Ex. Doc. No. 60, 41st Cong., 3d sess.). There is no
published map.
    Recomnmended modifications of project.-Under date of March 15,
1939, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for extending the channel at a depth of
6 feet and a width of 100 feet to deep water in Great Peconic Bay,
at an estimated first cost of $20,000, with annual maintenance of
$1,000, in addition to that now required, subject to certain condi-
tions of local cooperation (H. Doc. No. 2p37, 76th Cong., 1st sess.).
    Terminal facilities.-Twelve water terminals, with a total dock-
age of 1,540 feet, are located on the waterway. Two of the terminals,
with a total dockage of 140 feet, are open to the public. The facilities
are adequate for present commerce.
    Operations and results during fiscal year.-Under a contract for
dredging the channel to a depth of 6 feet, work was commenced March
12, 1942, and completed June 13, 1942. During this period there was
removed a total of 59,830 cubic yards, place measurement, of material
at a cost of $21,403.78 for maintenance. The cost of surveys and en-
gineering preliminary to the dredging was $1,856.21 for maintenance.
    The total cost of work was $23,259.99 for maintenance. The total
expenditures were $22,985.21.
    Condition at end of fiscal year.-The existing project was about
76 percent completed. When examined in August 1941 and April to
June 1942, the controlling mean low water depth was 6 feet for a width
of 60 feet from the mouth to the head of the project. The work re-
maining to be done to complete the existing project consists of dredging
the entire channel to project dimensions.
    The total cost of the existing project to June 30, 1942, was $78,-
444.56-$25,000 for new work and $53,444.56 for maintenance. The
total expenditures were $78,169.78.
    Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $3,014.79 less accounts payable of $274.78, a
balance of $2,740.01 is available for revocation.
    Neither completion of the existing project nor maintenance dredg-
ing will be necessary during the fiscal year 1944. Therefore, no funds
can be profitably expended during the fiscal year ending June 30, 1944.
188           REPORT OF CHIEF OF ENGINEEERS,                                                U. S. ARMY,                       1942

                                      Cost and financial summary

Cost of new work to June 30, 1942-----------------------------$25, 000. 00
Cost of maintenance to June 30, 1942_--------------------------- 53, 444. 56

      Total cost of permanent work to June 30, 1942--------------- 78, 444. 56
Minus accounts payable June 30, 1942-----------------------------274. 78

      Net total expenditures-------------------------------78, 169. 78
Unexpended balance June 30, 1942----------------------------- 3, 014. 79

           Total amount appropriated to June 30, 1942__---------------                                                           81, 184. 57

    Fiscal year ending June 30                  1938                  1939                      1940                 1941              1942

Cost of new work-....      ------------------
Cost of maintenance        ---.............--------------     -------------             ------------ --------------                   $23, 259.99
Total expended------....        ------------------------------------------                                           ......            2-------------
                                                                                                                                       22, 985. 21
Allotted-----------------....-------------                    -------------..........................-------------    $26, 000



Balance unexpended July 1, 1941- -                       __$26, 000. 00
Gross amount expended------- ---------------------------     22, 985.21
      Balance unexpended June 30, 1942------------------------                                                                       3, 014. 79
Outstanding liabilities June 30, 1942 ----------------------------                                                                      274. 78
           Balance available June 30, 1942-------------------------                                                                  2, 740. 01
Amount (estimated) required to be appropriated for completion
of existing project 1_-------------_                                                                                                7, 800.00
   1 Exclusive of available funds.

                11. LONG ISLAND INTRACOASTAL WATERWAY, N. Y.

  Location.-This waterway extends from East Rockaway Inlet, on
the south side of Long Island, to Great Peconic Bay at the eastern
end of Long Island. The section included under this project ex-
tends from Great South Bay opposite Patchogue to the south end
of Shinnecock Canal. (See U. S. Coast and Geodetic Survey Chart
No. 578.)
  Existing project.-This provides-for a channel 100 feet wide and
6 feet deep at mean low water from the federally improved channel
in Great South Bay opposite Patchogue to the south end of Shinne-
cock Canal. The length of the section included in the project is 34
miles. The mean tidal range varies from 0.3 foot in Shinnecock Bay
to 0.7 foot in Moriches Bay, the rise and fall depending largely upon
meteorological conditions. Irregular fluctuations due to wind or
other causes are seldom of sufficient extent to affect navigation.
  The estimated cost for new work, made in 1937, is $286,000. The
approved estimated cost of annual maintenance made in 1937 is
$15,000.
  The existing project was adopted by the River and Harbor Act of
August 26, 1937 (H. Doc. No. 181, 75th Cong., 1st sess.). The latest
published map is in the project document.
  Local cooperation.-Fully complied with except that local inter-
ests are required to furnish suitable spoil disposal areas for subse-
quent maintenance as required.
              RIVERS AND HARBORS--NEW                                       YORK,         N. Y.,    DISTRICT                 189

   Terminal facilities.-There are 17 boat repair and storage yards
within the area immediately adjacent to the Federal improvement.
There is ample room for expansion and development of terminals
when future commerce warrants.
   Operations and results during fiscal year.-Final cost of $1,734.42
was reported during the fiscal year for new work under contract com-
pleted September 26, 1940, for dredging to a depth of 6 feet from oppo-
site Patchogue to the Shinnecock Canal. The cost of survey and engi-
neering preliminary to dredging of the channel opposite Moriches
Inlet was $1,526.01 for maintenance.
   The total cost of work was $3,260.43-$1,734.42 for new work and
$1,526.01 for maintenance. The total expenditures were $3,221.15.
   Conditionat end of fiscal year.-The existing project was completed
in 1940. When examined intermittently from March 1939 to August
1940, the controlling mean low water depth in the channel was 6 feet
for a width of 100 feet from opposite Patchogue to the south end of
the Shinnecock Canal. An examination made in 1942 indicates that
the channel opposite Moriches Inlet has shoaled to a depth of 1.1 feet.
   The total cost to June 30, 1942, was $237,490.26-$235,964.25 for new
work and $1,526.01 for maintenance. The expenditures were $237,-
350.98.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $39,436.66, will be applied as follows:
Accounts payable June 30, 1942----------------------------------        $139. 28
Maintenance: Complete by Oct. 31, 1942, under contract to be entered
into. dredging to restore the channel, opposite Moriches Inlet to
project dimensions     __-------------------------------------------39, 297. 38

           Total-----------                          ---------   -------------------------- 39, 436. 66
   Additional maintenance dredging will be necessary during the fiscal
year 1944. Therefore, the sum of $30,000 can be profitably expended
during the fiscal year ending June 30, 1944, in dredging, under con-
tract for maintenance, to restore project dimensions in the portions
of the channel subject to rapid shoaling.
                                           Cost and financial summary
Cost of new work to June 30, 1942___ ----------------------                                                        $235, 964. 25
Cost of maintenance to June 30, 1942------------------------                                                          1, 526. 01

      Total cost of permanent work to June 30, 1942------ ------                                                   237, 490. 26
Minus accounts payable June 30, 1942-------------------------                                                           139. 28

     Nlet total expenditures ----------------------------                                                           237, 350. 98
Unexpended balance June 30, 1942------------------------                                                             39, 436. 66

           Total amount appropriated to June 30, 1942                                     -------------             276, 787. 64

   Fiscal year ending June 30                    1938                1939              1940           1941               1942
                                           _____________I   I                   -             -..       I                       --

Cost of new work ...    .___.......                                                 $173, 568. 59   $60, 661. 24         $1, 734.42
Cost of maintenance _.......____                                                    -------------                         1, 526.01

      Total cost .........        __.                            .     -173,              568. 59    60, 661.24           3, 260. 43

Total expended .              ---- __....... _____           ----------              155, 982. 06    78,147. 77           3, 221. 15

Allotted                                         ------              $286,000       -42, 000.00      30,000.00            2, 787.64


           493202--43-pt. 1, vol. 1-                  13
190      REPORT       OF CHIEF OF ENGINEERS,        U.   S. ARMY,    1942

Balance unexpended July 1, 1941 ______---------------------     $39, 870. 17
Amount allotted from War Department Civil Appropriation Act ap-
proved April 28, 1942_------------------------------------40, 000. 00

      Amount to be accounted for____     ______----__----79,                 870. 17
Deductions on account of revocation of allotment----                     37, 212. 36

      Net amount to be accounted for------------------------42,                657.81
Gross amount expended__          ___-___________                     _      3, 221.15

      Balance unexpended June 30, 1942 _____-.     _______-----          39, 436. 66
Outstanding liabilities June 30, 1942_--- ___--____-__    _______            139. 28

                                            --
       Balance available June 30, 1942-________          ---        -_   39, 297.38

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance ---------------------                         30, 00. 00
  1 Exclusive of available funds.

                            12. FIRE ISLAND INLET, N. Y.
  Location.-FireIsland Inlet is situated on the south shore of Long
Island, about 50 miles by water south and east of the Battery, New
York City. It is the main entrance into Great South Bay from the
Atlantic Ocean. (See U. S. Coast and Geodetic Survey Chart No.
578.)
   Existing project.-This provides for the construction of a jetty
extending generally southwest and south for a length of 5,000 feet
from high ground on Democrat Point at the west end of Fire Island.
Mean tidal range, 3.6 feet; mean range of spring tides, 4.3 feet. Ir-
regular fluctuation due to wind and other causes do not materially
affect navigation.
   The estimate of cost for new work, made in 1937, is $759,000, in-
cluding $100,000 contributed by local interests. The approved esti-
mated cost of annual maintenance, made in 1937, is $25,000.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (Rivers and Harbors Committee Doc. No. 33, 75th
Cong., 1st sess.). The latest published map is in the project document.
  Local cooperation.--Fully complied with.
   Terminal facilities.-No terminals are within the area immediately
adjacent to the Federal improvement. At Patchogue there are four
wharves with available dockage of 2,000 feet and 1,200 feet of bulk-
head. At West Sayville two mooring basins have an available wharf-
age of 2,000 feet. In addition, towns and villages have provided 3,500
linear feet of bulkhead for public use for mooring purposes. The
terminals are ample for present and probable future needs. There is
room for expansion should future commerce warrant.
   Operations and results during fiscal year.--None. Adjustments
of plus $9,809.61 regular funds and minus $9,809.61 contributed funds
were made in cost and expenditures reported in previous fiscal year.
   Condition at end of fiscal year.-The existing project was completed
in 1941. The controlling mean low water depth through Fire Island
Inlet was 7 feet when examined in June 1940.
   The total cost and expenditures to June 30, 1942, were $684,545.08-
$594,354.69 from United States funds and $90,190.39 contributed funds,
all for new work.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
  Repairs to the jetty will be necessary during the fiscal year 1944.
                 RIVERS AND HARBORS-NEW                                   YORK, N. Y., DISTRICT                                                 191
  Therefore, the sum of $50,000 can be profitably expended, under
contract for maintenance, during the fiscal year ending June 30,
1944, in the repair of the jetty where necessary.
                                             Cost and financial summary

                                               UNITED      STATES FUNDS

Cost of new work to June 30, 1942__ ________________---__                                                                    $594, 354. 69
Cost of maintenance to June 30, 1942_

      Total cost of permanent work to June 30, 1942 ----------- 594, 354. 69
Net total expenditures ----------------------------------       594, 354. 69
Total amount appropriated to June 30, 1942------------------ 594, 354. 69

    Fiscal year ending June 30                 1938               1939                1940                     1941                      1942

Cost of new work .--....-- ---------------------             $4, 197.04            $144, 521. 27       $435, 826. 77                    $9, 809. 61
Cost of maintenance- ..---------------------------------
Total expended-------------
              ..............----------                                               97, 216. 48        487, 328.60                      9, 809. 61

Allotted ..-------------------------------                  650, 000.00       -------------              -3,222.47                  -52, 422.84



Balance unexpended July 1, 1941_________________ ______--                                                                      $62, 232. 45
Deductions on account of revocation of allotment______-   ___                                                                --- 52, 422. 84
      Net amount to be accounted for--------------------------                                                                     9, 809. 61
Gross amount expended____--                            ---
                              ___------------_____________                                                                         9, 809. 61
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance----------------------------------                                                                   50, 000. 00

                                                 CONTRIBUTED FUNDS


Cost of new work to June 30, 1942---------------------------$90, 190. 39
Cost of maintenance to June 30, 1942

      Total cost of permanent work to June 30, 1942______-- -__-90, 190. 39
Net total expenditures-------------------------------------      90, 190. 39
Total amount contributed to June 30, 1942--------------------90, 190.39

    Fiscal year ending June 30                 1938           1939                    1940                 1941                         1942

Cost of new work .----------.----------                .........   .                  $100, 000                                    -$9,809.61
                                                                                                                                   ---------
C ost of m aintenance .........--.                        . . .._ . .
                                             -------------.....                .     . . .   . . . . . . . .                   .        . . .    .
Total expended ----------
                     _               -                                                 100,000     ---------          ----          -9, 809.61
Contributed       -------       -----...                      $100,000 ---------                                                    -      809. 61------------


Deductions on account of revocation of allotment_____          ___                                                             $9, 809. 61
Net amount to be accounted for_________-------------------------------                                                          9, 809 61
Less reimbursements collected_--------------------------------                                                                  9, 809. 61
             CONSOLIDATED COST ANI               FINANCIAL SUMMARY FOR FIRE INLET, N.                                          Y.

Cost of new work to June 30, 1942_-_                        ---          __-------                                  $684, 545. 08
                                                                                                                -____--
Cost of maintenance to June 30, 1942                               __         ___________
          Total cost of permanent work to June 30, 1942 .......                                                          - 684, 545. 08
Net total expenditures -------------------        ---      -     -684, 545. 08
Total amount appropriated and contributed to June 30, 1942 -----    684, 545. 08
192         REPORT OF CHIEF OF ENGINEERS,                                U. S. ARMY,              1942


    Fiscal year ending June 30            1938         1939                1940            1941             1942

Cost of new work ______________
                   ......           .........        $4, 197. 04  $244, 521. 27         $435, 826. 77
Cost of maintenance _---   - ---------------       . .     . . . . . ... .. . .
                                                 -------------..                         .. .. .. .         - --------------
                                                                                                                  -..


Total expended __________-
                  --           __                    ___________         197, 216. 48    487, 328. 60   -- --
Allotted and contributed-------      -------------   750, 000. 00 ----                     3, 222.47     -$62, 232.45


Balance unexpended July 1, 1941---------------------------- $62, 232. 45
Deductions on account of revocation of allotment______________ -62, 232. 45
      Net amount to be accounted for
Gross amount expended-- -----------------------------------    9, 809. 61
Less reimbursements collected--__-____-_____-____-
                                         -                  -- 9, 809. 61
Amount that can be profitably expended in fiscal year ending June
30, 1944 for maintenance__________________                                                             50,000. 00

                       13. EAST ROCKAWAY (DEBS) INLET, N. Y.

   Location.-The inlet is situated on the south shore of Long Island
between the main body of the island and the western end of Long
Beach. It is 10 miles east of Rockaway Inlet and about 27 miles by
water south and east from the Battery, New York City. (See U. S.
Coast and Geodetic Survey Charts Nos. 579 and 1215.)
   Existing project.-This provides for a channel 12 feet deep at mean
low water and 250 feet wide from the 12-foot contour in the Atlantic
Ocean to the 12-foot contour in Long Beach Channel,, a distance of
about 0.6 mile, protected by jetties. Mean tidal range, 4.1 feet; mean
range of spring tides, 4.9 feet; irregular fluctuations due to wind and
barometric pressure vary from about 31/2 feet below mean low water
up to about 31/2 feet above mean high water.
   The estimate of cost for new work made in 1929 is $710,000 (in-
cluding $100,000, local contribution). The latest (1929) approved
estimate for annual cost of maintenance is $20,000.
   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (H. Doc. No. 19, 71st Cong., 1st sess.). The latest pub-
lished map is in the project document.
   Local cooperation.-The River and Harbor Act of July 3, 1930, pro-
vides that local interests shall contribute $100,000 to the cost of the
work; give assurances satisfactory to the Secretary of War and the
Chief of Engineers that they will provide and maintain at their own
expense interior channels suitable for navigation, not less than 12 feet
deep, from East Rockaway Inlet to the Hempstead-Oyster Bay line, a
distance of about 15 miles, to Hewlett Harbor and to Freeport Har-
bor; furnish, without expense to the United States, necessary land,
easements, and rights-of-way for construction and maintenance of the
jetties, and agree to hold and save the United States free of claims
for damages to public and private property resulting from the im-
provement.
   Assurances of compliance with the conditions of local cooperation
precedent to construction of entrance channel and east jetty were
approved by the Chief of Engineers and Secretary of War on July 14
and 15, 1932, respectively. Local contribution of $100,000 was de-
posited to the credit of the United States on August 23, 1932. Since
the construction of the west jetty is not considered necessary at this
        RIVERS   AND   HARBORS-NEW      YORK,   N.   Y.,   DISTRICT   193
time, easements, rights-of-way and release of claims for damages neces-
sary for construction are not being secured.
   Termninal facilities.-No terminals are within the area immediately
adjacent to the Federal improvement. The water front on the north
side of Long Beach has been bulkheaded. There are five water termi-
nals at Oceansidq with an available wharfage of 2,000 feet. Three
are oil terminals, of which one has a spur railroad confection; the
other two are unused at present. There are two terminals at Island
Park having a wharfage of 400 feet. There are public wharves at
East Rockaway and Woodmere. It is expected that additional dock-
age will become available when needed.
   Operations and results during fiscal year.-The U. S. derrick boat
Babcock was employed from August 8 to 30, 1941, in the rearranging
of stone on the outer 610 feet of the west jetty. During this period
212 tons of stone were rehandled at a cost of $6,004.74 for maintenance.
   By the use of United States lighters and scows, approximately 375
tons of stone were placed along the east side of the outer end of the
jetty during the period December 12 to 13, 1941, at a cost of $1,669.33
for maintenance.
   The cost of engineering preliminary to repair of jetty was $32.37 for
maintenance. The cost of survey to determine the condition of the
channel was $302.63 for maintenance.
   The total cost of work was $8,009.07 for maintenance. The total
expenditure was $7,902.41.
   Condition at end of fiscal year.-The existing project was about 85
percent completed. The east jetty, 4,250 feet long, was completed in
1934. The project channel was completed in 1935. When examined
in June 1942 the controlling mean low-water depth through the chan-
nel was 12 feet for a width of 250 feet. The work remaining to be
done under the existing project consists of building a west jetty, if
necessary, to protect the channel.
   The total cost of the existing project to June 30, 1942, was $595,-
427.34--$421,368.68 from regular funds and $82,600 from Public Works
funds, a total of $503,968.68 for new work, and $91,458.66 from regular
funds for maintenance. The total expenditures, United States funds,
were $595,298.25. In addition, the costs and expenditures from con=
tributed funds were $100,000 for new work.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $43,738.23, less accounts payable of $129.09
and less $17,000 to be revoked, a balance of $26,609.14 will be applied
to dredging by use of one United States seagoing hopper dredge for
1 month (April 1943) to restore the channel to project dimensions.
   Neither completion of the project nor further maintenance dredging
will be necessary during the fiscal year 1944. Repair of the jetty will
be necessary during the fiscal year 1944. Therefore the sum of $60,000
can be profitably expended during the fiscal year ending June 30, 1944,
for maintenance repairs under contract to restore the jetty to a satis-
factory condition.
194         REPORT OF CHIEF OF ENGINEES, U. S. ARMY,                                           1942

                                     Cost and financial summary                .

Cost of new work to June 30, 1942_____
                                  --------------------                                         1   $503, 968. 68
Cost of maintenance to June 30, 1942 __----___                                 ---    __-_           91, 458. 66

      Total cost of permanent work to June 30, 1942_ ..-------..                                     595, 427. 34
Minus accounts payable June 30, 1942 -- _----.. --       - __ -- ___                                      129. 09

     Net total expenditures________--- ---- ------------                                             595, 298. 25
Unexpended balance June 30, 1942-----------------------------                                         43, 738. 23
         Total amount appropriated to June 30, 1942___-----                              ___       1 639, 036. 48


   Fiscal year ending June 30           1938           1939            1940             1941             1942

C ost of n ew work ............................................................................
Cost of maintenance--_...--     __    $28, 762. 51    $21, 049. 84 -------------- $17, 676. 80           $8, 009. 07
Total expended..-.-_._------
                      _                28, 762. 51    19, 964. 99     $1, 084. 85      17, 654. 37        7, 902.41
Allotted- ...   .......   ........     30, 585. 20    27, 000. 00     21, 482. 60      15, 000. 00       25, 000. 00


Balance unexpended July 1, 1941------------------__                 -_                               $26, 640. 64
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942    ..--------- ------- -------------------                                   25, 000. 00
      Amount to be accounted for___------____                                                         51, 640. 64
Gross amount expended.-------------          -__________$8, 530. 07
Less reimbursements collected__-----------------            627. 66
                                                                                                       7, 902.41
      Balance unexpended June 30, 1942________                                         ..---
                                                                                     ______           43, 738. 23
Outstanding likbilities June 30, 1942 ___----___ -------__------                                          129. 09
         Balance available June 30, 1942_.....---
                                         ----                  __----_                                43, 609. 14
Amount (estimated) required to be appropriated for completion
                       -   --                                        -               -
of existing project -____    .. ______                    __                                      106, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance     - - - - - - - - - - - - - -  - - - - -  - - - - - - - - - - - - - -  60, 000.00
   1 In addition. $100.000 contributed funds expended for new work.
   2 Exclusive of available funds.



                                     14. JAMAICA BAY, N. Y.

  Location.-This is a bay inside the south shore of Long Island, the
entrance being about 17 miles by water south and east of the Battery,
New York City. (See U. S. Coast and Geodetic Survey Chart No.
542.)
  Previous projects.-Adopted by the acts of June 14, 1880, and
July 13, 1892'. For further details see page 1770 of Annual Report
for 1915, and page 185 of Annual Report for 1938.
  Existing project.-This provides for an entrance channel 30 feet
deep at mean low water and 1,500 feet wide, with widening at bends;
a main channel extending from the entrance channel up to the mouth
of Cornells Creek, to be 30 feet deep at mean low water and 1,000
feet wide, with widening at bends; and for the protection of the
entrance channel by one or two riprap jetties, as may be necessary.
Length of section included in the project, 14.8 miles; mean tidal
range, 4.9 feet at Barren Island to 5.1 feet at Canarsie and Ham-
mels; mean range of spring tides, 5.9 and 6.1 feet, respectively; ir-
             RIVERS       AND HARBORS-NEW YORK,                         N.   Y.,   DISTRICT           195

regular fluctuations due to wind and barometric pressure vary from
4 feet below mean low water up to 3.5 feet above mean high water.
   Estimated cost to the United States for new work, made in 1919, is
$11,806,000, exclusive of amounts expended on previous projects.
Estimated cost of annual maintenance work, made in 1919, in en-
trance channel, $160,000; in main channel, $100,000; total, $260,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                         Work authorized                                   Documents


June 25,1910     Dredging 30-foot channel and construction of 1 or    H. Doc. No. 1488, 60th Cong., 2d sess.
                  2 riprap jetties as may be necessary.                 (Contains latest published map.)
Sept. 22, 1922   Modified conditions of local cooperation...--.....   Specified in act.



   Recommended modifications of project.-Under date of April 11,
1940, the Chief of Engineers recommended that in lieu of the existing
project there be provided: (a) An interior channel extending from
the vicinity of the Marine Parkway Bridge along the west and north
shores of the bay, 18 feet deep and 300 feet wide to Mill Basin, with
a swinging basin 1,000 feet wide and 1,000 feet long at that point,
thence 12 feet deep and 200 feet wide to Fresh Creek Basin; (b) an
interior channel extending from the same locality along the south
shore to head of bay, 15 feet deep and 200 feet wide; and (c) an en-
trance channel connecting the two interior channels with deep water
in the Atlantic Ocean, of suitable hydraulic dimensions to maintain
the present tidal prism in the bay but not less than 18 feet deep and
500 feet wide from opposite Barren Island to Rockaway Point, thence
enlarging to not less than 20 feet deep and 1,000 feet wide, protected
by one existing riprap jetty, at an estimated additional cost of $270,000
for new work, with $9,000 annually for maintenance, in addition to
that required for existing channels and jetty, subject to certain condi-
tions of local cooperation (H. Doc. No. 700, 76th Cong., 3d sess.).
   Local .cooperation.-The River and Harbor Act of September 22,
1922, provided that any funds heretofore or hereafter appropriated
for this improvement may be applied to providing the channels speci-
fied in House Document No. 1488, Sixtieth Congress, second session,
with a depth of 30 feet at mean low water whenever and to such
extent as the city of New York shall construct or provide for the
construction of terminals with facilities suitable to channels of that
depth. It also provided that the city of New York may be reimbursed
for dredging and disposing of the material dredged in the main in-
terior channel at actual cost, which shall not exceed a rate of 10 cents
per cubic yard, including any cost of inspection borne by the United
States, such reimbursement to include overdepth allowance not exceed-
ing 1 foot.
   The city of New York has, at its expense, met in part the conditions
prescribed by Congress in adopting the project. The terminal at
Canarsie has been partly completed; highway and railroad connec-
tions with this terminal have yet to be made; and facilities for han-
dling cargoes, suited to the kind of freight to be handled by lessees,
are to be installed at the time of leasing. For further details on
196     REPORT OF CHIEF OF ENGINTEERS, U. S. ARMY,                1942

work done by local interests see page 126 of Annual Report for 1934.
The city of New York has indicated that it is not prepared to construct
further terminal facilities.
  Terminal facilities.-There are 11 piers, 13 wharves, and 34 bulk-
heads, with a total available dockage of 19,800 feet located within the
bay. Of 11 publicly owned terminals, 4 are open to the public. Eight-
een yacht clubs, 17 boat yards, and numerous privately owned pleas-
ure-boat landings are located within the bay. The boat yards are
equipped with marine ways. The existing facilities are fairly ade-
quate for the existing commerce, but are wholly inadequate for the
commerce for which the project was adopted. (For latest full de-
scription of terminal facilities, see Port Series No. 20, Corps of
Engineers.)
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-The project was about 36 percent
completed. The main interior channel has been dredged to a depth of
30 feet at mean low water and width of 1,000 feet from Barren Island
up to Canarsie, a length of about 18,100 feet; thence up to a point 500
feet east of Fresh Creek Basin, a stretch of about 3,400 feet, it has been
dredged to a depth of 18 feet at mean low water and width of 500 feet.
The east jetty was completed August 4, 1933, for a total length of
about 8,400 feet. The controlling mean low-water depth was 20 feet
for a width varying from 600 to 1,800 feet from the entrance to Barren
Island, when examined in July 1934, August and September 1937, July
and August 1938, and May 1941; thence 30 feet for a width varying
from 400 to 1,000 feet to Canarsie, when examined July 1932; thence
18 feet for a width of 500 feet to Fresh Creek Basin, when examined
in July 1932. The work remaining to be done at the expense of the
United States to complete the existing projedt consists in dredging the
entrance channel to a depth of 30 feet and width of 1,500 feet, and in
building a west jetty, if necessary to maintain a channel of project
dimensions, and in dredging the main interior channel to a depth of
30 feet at mean low water and width of 1,000 feet from Canarsie up to
the head of the projected improvement at the mouth of Cornell Creek.
   The total cost and expenditures of the existing project to the United
States to June 30, 1942, were $4,314,689.60-$4,228,439.36 for new work
and $86,250.24 for maintenance.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
   It is expected that the conditions of local cooperation under this
project will not be complied with during the next two years. The
repair of the jetty will be necessary during the fiscal year 1944. There-
fore, the sum of $50,000 can be profitably expended during the fiscal
year ending June 30, 1944, for maintenance repairs under contract, to
restore the jetty to a satisfactory condition.
                         Cost and financial summary

Cost of new work to June 30, 1942--------------------------        $4, 307, 771. 72
Cost of maintenance to June 30, 1942 -----------------                  89, 211.69
      Total cost of permanent work to June 30, 1942 --      ___- -4,      396, 983. 41
Net total expenditures    .-- ---    --     ---------                  4, 396, 983.41
Total amount appropriated to June 30, 1942_      -
                                                ---------              4, 396, 983.41
                 RIVERS            AND HARBORS-NEW                      YORK,     N.   Y.,   DISTRICT       197


     Fiscal year ending June 30                     1938         1939           1940         1941        1942


C ost of new w ork- - - - - - - - - - - - - - - - - - -- - - - - -- - - - - - - - - - -
Cost of maintenance .     ...        $355. 70 $33, 591. 03
Total expended _ -__                  -            - -_----     33, 946. 73-
Allotted........----...........------------- ---   30,000. 00    3, 946. 73--------------------     --------------


Amount (estimated) required to be appropriated for completion
  of existing project-------------------------------------- $7, 578,000.00
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance----------------------------      50, 000 00

15. NEW YORK                       HARBOR:              ENTRANCE CHANNELS                AND ANCHORAGE
                                                            AREAS

   Location.-The works included under the above title are in the
upper and lower bays, New York Harbor. The harbor is 330 miles
southwest by water of Boston Harbor, Mass., and 165 miles northeast
of the entrance to Delaware Bay, N. J. and Del.
   The upper bay extends southerly from the junction of Hudson and
East Rivers opposite the Battery, New York City, a distance of about
51/2 miles to the Narrows. The lower bay extends from the Narrows
to the sea, a distance of about 9 miles. (See U. S. Coast and Geo-
detic Survey Charts Nos. 369 and 541.)
   Existing project.-This provides for the Ambrose Channel 45 feet
deep and 2,000 feet wide, extending from the sea to deep water in the
lower bay, length about 10.2 miles; for the Anchorage Channel, an
extension of Ambrose Channel, with the same depth and width, in the
upper bay, opposite the anchorage grounds, length about 5.7 miles;
for Bayside-Gedney Channel 35 feet deep and 800 feet wide, extending
from the sea to the junction with Main Ship Channel, length about
6.2 miles; for the Main Ship Channel, 30 feet deep and 1,000 feet wide,
extending from Bayside-Gedney Channel to deep water in the lower
bay, length about 5.3 miles; for the removal of Craven Shoal to a
depth of 30 feet; for a channel 16 feet deep, 200 feet wide, and about
2.3 miles long, extending from bell buoy 23 to Hoffman and Swinburne
Islands, for an irregularly triangular-shaped anchorage area in the
southerly half of Red Hook Flats (approximately 442 acres in extent),
40 and 30 feet deep; an anchorage in the vicinity of Liberty (Bedloe)
Island (about 160 acres in extent) 20 feet deep, and for a channel
along the New Jersey pierhead line connecting Kill Van Kull with
deep water in Anchorage Channel, south of the Liberty Island an-
chorage, 20 feet deep for a width of 500 feet and a length of about
3 miles. The project depths refer to mean low water. Mean tidal
range, 4.7 feet; mean range of spring tides, 5.6 feet; irregular fluctua-
tions due to wind and barometric pressure vary from 4 feet below
mean low water up to 4 feet above mean high water.
  The estimate of cost for new work, revised in 1942, is $15,200,000.
The latest (1937) approved estimate for annual cost of maintenance
is $315,000.
198         REPORT OF CHIIEF OF ENGINEERS, U. S. ARMY,                                      1942

  The existing project was authorized by the following river and
harbor acts:

    Acts                           Work authorized                                   Documents


July   5, 1884   Main Ship-Bayside-Gedney to 30 feet for width       Annual Reports, 1887, p. 62; and 1888,
                  of 1,000 feet (dimensions fixed by Secretary of     p. 63.
                  War, Dec. 27, 1886, by authority of the act of
                  Aug. 5, 1886).
Mar. 3,1899      Ambrose Channel (East Channel) to 40 feet .-
                                                            _ H. Doe. No. 159, 55th Cong., 3d sess.
                                                                          (Annual Report 1899, p. 1279).
June 25, 1910    Maintenance of entrance channel under one head_ _
Aug.   8,1917    Anchorage Channel, the extension of Ambrose         H. Doc. No. 518, 63d Cong., 2d sess.
               Channel into Upper Bay.
  Do ..-...   Removal of Craven Shoal_______________-___             H. Doc. No. 557, 64th Cong., 1st sess.
  Do---------Channel between Staten Island and Hoffman and           H. Doc. No. 625, 64th Cong., 1st sess.
               Swinburne Islands.
July 3, 1930 Relocation of southerly section of Anchorage            Rivers and Harbors Committee Doc.
                  Channel.                                                No. 18, 71st Cong., 2d sess.
Aug. 30, 1935    Dredging south end of Red Hook Flats, Liberty       H.    Doc. No. 183, 73d Cong., 2d sess.)
               Island Anchorage, and channel along New
               Jersey pierhead line.
Do_ ... ____ Deepening Bayside-Gedney Channel to 35 feet            H. Doc. No. 133, 74th Cong., 1st sess.t
               for a width of 800 feet.
Aug. 26,1937 Deepening Ambrose and Anchorage Channels to             Senate committee print, 75th Cong,.
               45 feet for a width of 2,000 feet.                      1st sess.1


  I Contain latest published maps.

   Termina facilities.-In the harbor (Lower Bay, the Narrows, and
the Upper Bay) there are 53 piers, 3 ferry' terminals, 5 car-float
 (railroad) terminal bridges, and various bulkheads and wharves, with
a total available wharfage of 94,100 feet. Of the terminals, 27 are
publicly owned, 26 have mechanical freight-handling devices, and 29
have railroad connections. The Lower Bay is largely undeveloped,
having 8 piers and 3 bulkheads along the shores. At the Narrows,
along the Staten Island water front there are 29 piers and 3 ferry
terminals in addition to the United States quarantine station for the
port of New York. Along the westerly shore of the Upper Bay (Con-
stable Hook, N. J., to Ellis Island) there are 15 piers, 10 wharves, and
5 car-float (railroad) bridges, including 4 large railroad freight
terminals. The facilities are considered adequate for present com-
merce.     (For latest full description of terminal facilities see Port
Series No. 20, Corps of Engineers.)
   Operations and results during fiscal year.-Under a contract for
dredging Liberty Island Anchorage to a depth of 20 feet, work was
commenced January 16, 1942, and was in progress at the end of the
fiscal year. During the fiscal year there was removed a total of 605,-
400 cubic yards, place measurement, of material at a cost of $290,-
449.44 for new work.
   The cost of engineering preliminary to deepening of Liberty Island
Anchorage was $4,046.03, the cost of survey and engineering prelim-
inary to dredging in Red Hook Flats Anchorage was $834.57 and the
cost of a survey of Ambrose Channel was $89.20, all for new work.
   The total cost of work was $295,419.24, all for new work. The total
expenditures were $190,438.36.
   Condition at end of fiscal year.-The existing project was about 68
percent completed.
         RIVERS   AND HARBORS--NEW          YORK,   N.   Y.,   DISTRICT       199
   Main Ship-Bayside-Gedney Channel was completed to a depth of
30 feet in 1891.     The deepening of Bayside-Gedney Channel to 35
feet for a width of 800 feet was completed in 1939.
   Ambrose Channel was completed to a depth of 40 feet in 1914.
   Relocation of Anchorage Channel was completed to a depth of 40
feet in 1932.
   The channel between Staten Island and Hoffman and Swinburne
Islands was completed in 1920 up to within 300 feet of the southerly
limits of the project. The dredged channel meets all the needs of
navigation and no further work of improvement is contemplated for
the present.
   The channel along the New Jersey pierhead line from Kill Van Kull
to Anchorage Channel was completed in 1939.
   The controlling mean low water depths of the channels included
in this project are as follows: Ambrose Channel, 40 feet for a width
of 2,000 feet (November, December 1939, and March 1940 to January
1941); Main Ship Channel, 30 feet, 300 to 1,000 feet wide (December
1939 and April to August 1940); Bayside-Gedney Channel, 35 feet,
700 to 800 feet wide (December 1938-May 1939); Anchorage Chan-
nel, 42 feet, 900 to 2,000 feet wide (May 1942); Craven Shoal, 30 feet
except for a shoal 100 feet by 600 feet, with a least depth of 27 feet,
located along westerly channel line (July 1931); channel between
Staten Island and Hoffman and Swinburne Islands, 14 feet, 200 feet
wide, from buoy 23 southerly for 1 mile (September 1938), thence to
Swinburne Island, 12 feet, 140 to 200 feet wide (July 1931) ; anchorage
area at south end of Red Hook Flats, 16 feet except at southeasterly
portion where depth is 40 feet (May 1942); Liberty (Bedloe) Island
anchorage 6 feet (July 1941) ; channel along the New Jersey pierhead
line, 20 feet, 100 to 500 feet wide (October 1940).
   The work remaining to be done under the existing project consists
of completing the dredging of the south end of Red Hook Flats to
40 feet and 30 feet, and dredging the Liberty (Bedloe) Island an-
chorage to 20 feet, all as authorized in 1935; and deepening Ambrose
and Anchorage Channels to 45 feet for a width of 2,000 feet as author-
ized in 1937.
   The total cost of the existing project to June 30, 1942, was
$11,655,699.88-$9,082,551.23 for new work, including $116,530 applied
to removing wrecks authorized by acts prior to the adoption of the
existing project, and $2,573,148.65 for maintenance. The total expen-
ditures were $11,550,719.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $2,399,719.19 will be applied as follows:
Accounts payable June 30, 1942-----------------------------          $104, 980. 88
New work:
    Complete by Aug. 30, 1943, under contract in
     force, dredging of the Liberty Island An-
      chorage to project dimensions_____________ $1, 158, 738. 31
    Dredge by use of 3 United States seagoing
      hopper dredges for a total of 26.5 dredge-
     months during the period July 1, 1942, to
      June 30, 1943, in the deepening of Red Hook
     Flats Anchorage to 40 and 30 feet---------- 1, 036, 000. 00
                                                                    2, 194, 738. 31
Maintenance: Dredge by use of 1 United States seagoing hopper
dredge for 1.6 months (May 13 to June 30, 1943) in the re-
moval of shbals from the entrance channels--- -----          100, 000. 00
      Total ------------------------------------------- 2, 399, 719. 19
200          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                           1942

  The deepening of Ambrose Channel to 45 feet should be continued
during the fiscal year 1944. The existing channels should be main-
tained. Therefore, the sum of $1,450,000 can be profitably expended
during the fiscal year ending June 30, 1944, as follows:
New work: Dredge by use of 2 United States seagoing hopper dredges
  for a total of 21 dredge-months during the fiscal year to continue
  the deepening of Ambrose Channel to 45 feet__----___-----. $1, 200,000
Maintenance:
    Complete by June 30, 1944, under contract to be entered into,
      dredging to restore the channel along the New Jersey pierhead
      line to project dimensions-----------      -----               100, 000
    Dredge by use of 1 United States seagoing hopper dredge for
      about 5 months during the fiscal year to restore the entrance
      channels to project dimensions ----------------------------    150, 000
             Total_-------                     -----                  --------------------                   ___        11, 450, 000
                                               Cost and financial summary
Cost of new work to June 30, 1942-------------------------- $9, 082, 551.23
Cost of maintenance to June 30, 1942 ___--------__-  --  ___ 2, 573, 148. 65
      Total cost of permanent work to June 30, 1942----------- 11, 655, 699. 88
Minus accounts payable June 30, 1942------------------------ 104, 980. 88

     Net total expenditures----------------------------       11, 50, 719. 00
Unexpended balance June 30, 1942__     ------           __-2,     399, 719. 19
        Total amount appropriated to June 30, 1942_                                             ____-__          13, 950, 438. 19

   Fiscal year ending June 30                       1938              1939               1940             1941              1942

Cost of new work_          _                    $407, 453. 37      $810, 641. 91         $325. 60      $96,076.38         $295, 419. 24
Cost of maintenance_____________                      648. 24            250. 50      274, 008. 58      65, 799. 36

      Total cost---------------                   408, 101. 61      810, 892. 41      274, 334. 18     161, 875. 74        295, 419. 24

Total expended..                  ..----------------343, 817. 81   862, 306. 88       280, 096. 86     163, 634. 97        190, 438. 36
Allotted__   .-----------------                   662, 000. 00      103, 000. 00      743, 000. 00   1, 246, 598. 33      940, 360. 41



Balance unexpended July                            1, 1941-__ _________       _____--                            $1, 649. 797. 14
Amount allotted from War                           Department Civil Ap-
propriation Act approved                         June 28, 1939---------     $2, 192. 55
Amount allotted from War                           Department Civil Ap-
propriation Act approved                         Apr. 28, 1942       --------
                                                                         1, 051, 000. 00
Amount allotted from War                           Department Civil Ap-
  propriation Act approved                        June 11, 1988---------     86, 807. 45
                                                                                                                  1, 140, 000. 00
                            '
     Amount to be accounted for-------------------------2,                                                             789, 797. 14
Deductions on account of revocation of allotment---------------                                                        199, 639. 59
      Net amount to be accounted for-------------- ------                                                         2, 590, 157. 55
Gross amount expended------------------------------------                                                               , 438. 36
      Balance unexpended June 30, 1942        ______----------                                                    2, 399, 719. 19
Outstanding liabilities June 30, 1942------------- $104, 980. 88
Amount covered by uncompleted contracts------ 1, 158, 465. 19
                                                                                                                  1, 263, 446. 0
        Balance available June 30, 1942_---__----------------                                                     1, 136, 273. 12
                RIVERS        AND HARBORS---NEW                      YORK,      N.   Y.,   DISTRICT           201
Amount (estimated) required to be appropriated for completion
of existing project                                                                               931, 000. 00
                                                                                                 $---------------------

Amount that can be profitably expended in fiscal year ending
June 30, 1944:   - - -- - - -- -- - - -- -- - -- - -- - -- - -- -- - -- -- - -
   For new work                                                                              1, 200, 000. 0O
   For maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -    250, 000. 00

              Total 1____-_                                                                        1,450, 000. 00
   2Exclusive       of available funds.

                    16. BAY RIDGE AND RED HOOK CHANNELS, N. Y.

  Location.-These channels lie along the east shore of the Upper
Bay, New York Harbor, and, with Buttermilk Channel, form an
easterly channel along the Brooklyn water front from the Narrows
to East River. (See U. S. Coast and Geodetic Survey Charts Nos.
369 and 541.)
  Previous projects.-Adopted by River and Harbor Acts of March
3, 1881, August 11, 1888, September 19, 1890, August 18, 1894, and
June 3, 1896. For further details see page 1768 of Annual Report
for 1915, and page 195 of Annual Report for 1938.
  Existing project.-This provides for a channel 1,200 feet wide and
40 feet deep at mean low water from the Narrows to Bay Ridge
Avenue, Brooklyn, thence 1,750 feet wide to the junction of Bay
Ridge and Red Hook Channels, thence 1,200 feet wide through Red
Hook Channel to the junction with Buttermilk Channel, and a chan-
nel of the same depth extending into Gowanus Bay from the junc-
tion of Bay Ridge Channel with Red Hook Channel, narrowing uni-
formly in width to about 500 feet at Twenty-eighth Street, Brooklyn.
Length of section included in the project, 4.5 miles. Mean tidal
range, 4.7 feet; mean range of spring tides, 5.6 feet; irregular fluctua-
tions due to wind and barometric pressure vary from 4 feet below
mean low water up to 4 feet above mean high water.
   The estimate of cost for new work, revised in 1930, is $4,609,000,
exclusive of amounts expended on previous projects. The latest (1930)
approved estimate for annual cost of maintenance is $150,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                           Work authorized                                      Documents


Mar.    3, 1899     Channel 40 feet deep and 1,200 feet wide .....---------   H. Doc. No. 337, 54th Cong., 2d sess.;
                                                                               Annual Report, 1897, p. 1177.
Mar.    2, 1907     Dredging to obtain, first, a depth of 35 feet, sub-
                      sequently increasing depth to 40 feet for full
                      width.
July    3, 1930     Widening of Bay Ridge Channel to 1,750 feet ._.-          Rivers and Harbors Committee Doc.
                                                                                No. 44, 71st Cong., 2d sess. (Con-
                                                                               tains latest published map.)
202     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                       1942

   Terminal facilities.-There are 72 piers afnd bulkheads along the
water front served by the improvement having a total dockage of
about 91,000 feet. Of the terminals, 30 have mechanical freight-
handling devices and 20 have railway connections. Included in the
terminals is a large shipyard with drydock facilities. In addition,
there are 6 railroad float bridges and 2 ferry slips. Four of the ter-
minals are Government-owned and 16 are owned by the city of New
York of which 1 is for public use. The terminal facilities are con-
sidered adequate for existing commerce. (For latest full description
of terminal facilities, see Port Series No. 20, Corps of Engineers.)
   Operations and results during fiscal year.-The U. S. seagoing
dredge Harding was employed from January 26 to June 30, 1942, in
dredging Bay Ridge Channel opposite the Army base, Brooklyn, to
a depth of 40 feet. There were removed a total of 1,230,044 cubic
yards, place measurement, of material at a cost of $166,368.98 for
maintenance.
   The cost of contingencies preliminary to dredging was $1,484.34
for maintenance. The cost of survey to determine the condition of
Bay Ridge Channel was $160.53 for maintenance.
   The total cost of work was $168,013.85 for maintenance. The total
expenditure was $136,555.64.
   Condition at end of fiscal year.-The existing project was completed
in 1940. Bay Ridge Channel was completed in 1939 and Red Hook
Channel in 1940. The controlling mean-low water depths when ex-
amined from January 1938 to June 1942 were as follows: In Bay
Ridge Channel, 40 feet for full project width from deep water in the
Narrows to Fifty-sixth Street, Brooklyn, thence 40 feet for a width of
350 to 1,700 feet to Thirty-third Street, and thence 34 feet for a width
of 1,C00 to 400 feet in Gowanus Bay to Twenty-eighth Street; in Red
Hook Channel, 37 feet for a width of 500 feet.
   The total cost of the existing project to June 30, 1942, was $7,246,-
370.06-$4,212,636.95 regular funds and $64,559.68 Public: Works
funds, a total of $4,277,196.63 for new work and $2,969,173.43 for
maintenance.
   The total expenditures were $7,214,911.85.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $226,748.34 will be applied as follows:
Accounts payable June 30, 1942            ____
                                           --        ____________-___
                                                      --------          _ $31, 458. 21
Maintenance :
   Dredge by use of 1 United States seagoing hopper dredge for
      0.5 month (July 1 to 15, 1942) in the removal of shoals in Bay
      Ridge Channel-------------------------------------------              19, 290. 13
   Dredge by use of 1 United States seagoing hopper dredge for 2.8
      months (Feb. 18 to May 12, 1943) to restore Red Hook Channel
      to project dimensions ....----            _---- _____ _-____       _ 176,   00. 00

        Total --   ___------------------------226,                                748. 34
   Bay Ridge and Red Hook Channels should be maintained. There-
fore, the sum of $200,000 can be profitably expended in dredging by
use of one United States seagoing hopper dredge for about 6 months
during the fiscal year ending June 30, 1944, in the removal of shoals
from the channels.
              RIVERS AND HARBORS-NEW YORK, N. Y., DISTRICT                                                     203
                                       Cost and financial summary

Cost of new work to June 30, 1942---------------------------                                   $5, 523, 296. 63
Cost of maintenance to June 30, 1942___-----------------                                        2, 969, 173. 43

      Total cost of permanent work to June 30, 1942 ---------- 8, 492, 470. 06
Minus accounts payable June 30, 1942-------------------------      31, 458. 21

     Net total expenditures_------------     ----    ------- 8, 461, 011. 85
Unexpended balance June 30, 1942___ -----------------------     226, 748. 34

         Total amount appropriated to June 30, 1942_-_______- -                                 8, 687, 760. 19

    Fiscal year ending June 30             1938           1939           1940           1941               1942


Cost of new work      ___-------------- $97, 359. 01   $186, 433. 02   $47, 077. 06
Cost of maintenance__ __......          106, 073. 53     75. 630. 30   436, 361. 58   $10, 450. 05       $168, 013. 85

      Total cost          __            203, 432. 54    262, 063. 32   483, 438. 64    10, 450. 05        168, 013. 85

Total expended _----------------        214, 462. 96    272, 865. 06   469, 614. 40    20, 493. 16        136, 555. 64

Allotted......_.__-.       .....   .    620, 000. 00    253, 000. 00   153, 000. 00    55, 000. 00        222. 000. 00



Balance unexpended July 1, 1941__--__--------------                                                  $141, 303. 98
Amount allotted from War Department Civil Appro-
priation Act approved May 23, 1941___- _____--     $90, 000. 00
Amount allotted from War Department Civil Appro-
priation Act approved Apr. 28, 1942- ----------- 160, 000. 00
                                                                                                      250, 000. 00
     Amount to be accounted for---_. -----------                                                      391, 303. 98
Deductions on account of revocation of allotment__-____-
                                                       -                                               28, 000. 00
      Net amount to be accounted for __________________                                               363, 303. 98
Gross amount expended ___________-____          ___$144, 948.78
Less reimbursements collected ------      _____       8, 393. 14
                                                                                                      136, 555. 64

      Balance unexpended June 30, 1942_____                            ___________                    226, 748. 34
Outstanding liabilities June 30, 1942___-----____                        ____________                  31, 458. 21
          Balance available June 30, 1942-- ___--                      ______--___-                   195, 290. 13
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance 1________
                                      ----    ______-_-                                               200, 000. 00
   1Exclusive of available funds.

                               17. BUTTERMILK CHANNEL, N. Y.

  Location.-This channel connects deep water in the Upper Bay,
New York Harbor, southwest of Governors Island, with deep water
in East River northeast of Governors Island, and, with Bay Ridge
and Red Hook Channels, forms an easterly channel along the Brook-
lyn water front from the Narrows to East River. It lies between
Governors Island and Brooklyn Borough, New York City. (See
U. S. Coast and Geodetic Survey Charts Nos. 541 and 745.)
  Previous projects.-Adopted by River and Harbor Acts of June 14,
1880, July 13, 1892, and June 3, 1896. For further details see page
205, Annual Report for 1932.
  Existing project.-This provides for a channel 1,000 feet wide, 40
feet deep at mean low water for the width of the existing 500-foot
204         REPORT OF CHIEF OF ENGINEERS,                             U. S. ARMY,        1942

channel and 35 feet deep for the remaining 500-foot width west of
the existing channel, with suitable widening at the junctions with
East River and Red Hook and Anchorage Channels. Length of sec-
tion included in the project, 2.3 miles. Mean tidal range, 4.4 feet;
mean range of spring tides, 5.3 feet; irregular fluctuations due to
wind and barometric pressure vary from 4 feet below mean low water
up to 4 feet above mean high water.
   The estimated cost for new work, revised in 1935, is $1,605,000, ex-
clusive of amounts expended on previous projects. The latest (1935)
approved estimated cost of annual maintenance is $20,000.
   The existing project was authorized by the following river and har-
bor acts:

    Acts                        Work authorized                                   Documents


June 13,1902    Channel 1,200 feet wide and not less than 30 feet     H. Doc. No. 122, 56th Cong., 2d sess.
                 deep.                                                  (Annual Report 1901, p. 1299).
Aug. 30, 1935   Channel 1,000 feet wide to depths of 40 and 35 feet   Rivers and Harbors Committee Doe.
                                                                       No. 55, 74th Cong., 1st sess.   (Con-
                                                                       tains latest published map.)



   Terminal facilities.-There are 26 piers, bulkheads, and wharves
along the water front served by the improvement, with a total dock-
age of 31,400 feet; 14 have railroad connections and 18 have mechani-
cal freight handling devices. Two of the terminals are owned by the
city of New York of which 1 is open to public use. In addition there
are 2 float bridges and 2 ferry slips. .Practically all of the available
water front is occupied and the facilities are considered adequate for
existing commerce. (For latest full description of terminal facilities
see Port Series No. 20, Corps of Engineers.)
   Operations and results during fiscal year.-The cost of survey and
engineering preliminary to dredging of a 35-foot channel was $530.80
for new work. The expenditure was $521.14.
   Condition at end of fiscal year.-The existing project was about 75
percent completed. The easterly 500-foot width of channel from An-
chorage Channel to East River was completed to a 40-foot depth in
1935. The westerly 500-foot channel, including the widening at the
junction with the East River, was completed to a 35-foot depth for the
northerly three-quarters of a mile of its length in 1939. The control-
ling mean low-water depth in the easterly 500-foot channel was 35 feet
for a width varying from 250 to 500 feet from Anchorage to Red Hook
Channels, thence 40 feet for a width varying from 400 to 500 feet to the
East River (April and May 1940 and February 1942). The controlling
mean low-water depth in the westerly 500-foot channel was 20 feet for
the southerly 11/2 miles of its length except along the westerly channel
line, where it was 16 feet and less (June 1937 and May 1942) and 35
feet for full project width for the remainder of its length, including
the widening at the junction with East River (July to December 1939).
The work remaining to be done under the project consists of complet-
ing the deepening to 35 feet of the westerly 500-foot channel and the
widening at the Junctions with Red Hook and Anchorage Channels.
             RIVERS AND HARBORS-NEW YORK, N. Y., DISTRICT                                                      205

   The total cost of the existing project to June 30, 1942 was $1,441,-
321.67-$122,051.24 Public Works funds and $1,086,374.09 regular
funds, a total. of $1,208,425.33 for new work and $232,896.34 for
maintenance. The total expenditures were $1,4 1,312.01.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $269,478.86, less $80,000) revoked, a balance
of $189,478.86 will be applied as follows:
Accounts payable June 30, 1942----------------------------------                                             $9. 66
New work: Dredge by use of 1 United States seagoing hopper
  dredge for 4 months (July 1 to Oct. 31, 1942) in the deepening
  of the southerly 2,000 feet of the westerly half of the channel
  and the junctions with Anchorage and Red Hook Channels to
  project depths------------------------------------------                                             135, 469. 20
Maintenance: Dredge by use of 1 United States seagoing hopper
  dredge for 1.7 months (Nov. 1 to Dec. 20, 1942) to restore the
  existing 40-foot channel to project dimensions------------ ----                                       54, 000. 00

          Total-------------------------------                                    ----------           189, 478. 86
   Neither completion of the deepening of the 35-foot channel nor
further maintenance dredging is considered necessary during the
fiscal year 1944. Therefore, no funds can be profitably expended
during the fiscal year ending June 30, 1944.
                                      Cost and financial summary

Cost of new work to June 30, 1942____________________________$1, 701, 675. 33
Cost of maintenance to June 30, 1942_      -----------           232, 896. 34

     Total cost of permanent work to June 30, 1942              1, 937, 571. 67----------
Minus accounts payable June 30, 1942---------------------------           9. 66

     Net total expenditures-----------------------------1,                                             937, 562. 01
Unexpended balance June 30, 1942 --------------------------                                            269, 478. 86

        Total amount appropriated to June 30, 1942______________ 2,207, 040. 87

   Fiscal year ending June 30              1938            1939            1940            1941             1942


Cost of new work        ___ __        _                 $190, 787. 12   $196, 989. 14                         $530. 80
Cost of maintenance_________     __    $33, 939. 87       29, 184. 20

      Total cost -------                  33, 939. 87    219, 971. 32    196, 989. 14                          530. 80
Total expended_                           31, 531. 59     83, 627. 86    336, 899. 15        ------            521.14

Allotted________________________          80, 000. 00    370, 400. 00         384. 23 --------------       270, 000. 00



Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942----------------------------------270,                                               000. 00
Amount to be accounted for_______________________________                                              270, 000. 00
Gross amount expended      --------------------------                                                       521. 14

      Balance unexpended June 30, 1942------------------                                               269, 478. 86
Outstanding liabilities June 30, 1912                                                                         9. 66

         Balance available June 30, 1942-----------------------                                        269, 469. 20

Amount (estimated) required to be appropriated for completion
   of existing project 1--------------261,                                                                  000
   2 Exclusive of available funds.
        493202-43--pt. 1, vol. 1--             14
206     REPORT   OF" CHIEF OF ENGINEERS,        U. S. ARMY,     1942

                          18. EAST RIVER, N. Y.

    Location.-This is a tidal strait about 16 miles long and 600 to 4,000
feet wide, connecting Hudson River and the Upper Bay at the Bat-
tery, New York City, with Long Island Sound at Throgs Neck, New
York City, and separating Long Island from Manhattan Island and
the mainland.         (See U. S. Coast and Geodetic Survey Charts Nos.
223, 226, and 745.)
    Previous projects.-Adopted by River and Harbor Acts of August
30, 1852, July 25, 1868, March 3,.1899, and June 25, 1910. For further
details see page 210, Annual Report for 1932.
    Existing project.-This provides for channels of the following
dimensions (depths refer to mean low mater): From deep water in
the upper New York Bay to Wallabout Channel, 40 feet deep and
1,000 feet wide; from Wallabout Channel to Throgs Neck, 35 feet deep,
with widths varying from about 550 to 1,000 feet, according to locality;
east of Welfare (Blackwells) Island up to English Place (43d Drive),
Long Island City, 30 feet deep and varying in width from 500 to 900
feet, with widening in the approach from the main channel; between
South Brother and Berrian Islands, 20 feet deep and 300 feet wide,
with widening in the approach from the main channel; for the re-
moval of Coenties Reef to a depth of 40 feet, also the removal of the
following rocks and reefs lying outside of the limiting lines of the
main channel to give access to wharves: Along the Brooklyn shore,
Brooklyn Bridge to Manhattan Bridge (Fulton Ferry Reef), to a
depth of 25 feet; Jay Street Reef, 25 feet; Corlears Reef, 35 feet;
Shell Reef, 25 feet; Horns Hook, 40 feet; Rhinelander Reef, 26 feet;
and reef off Oak Point, 30 feet; and for the construction of a dike in
Pot Cove in Hell Gate. The length of the section included in the
improvement is about 16 miles.            The mean range of tides varies
according to locality from 4 feet at Wallabout Channel and 4.4 feet
at the Battery to 4.9 feet at Hallets Point, 6.3 feet at Port Morris, and
7.1 feet at the eastern entrance at Throgs Neck; mean range of spring
tides, 4.8, 5.3, 5.9, 7.4, and 8.5 feet, respectively; irregular fluctuations
due to wind and barometric pressure vary according to locality from
4 feet below mean low water at the Battery, 3.5 feet at Wallabout
Channel and 4 feet at Throgs Neck up to about 4 feet above mean high
water at the Battery and 4.5 feet above mean high water at Throgs
Neck; extreme fluctuations do not seriously affect navigation.
    The estimate of cost for new work, revised in 1933, exclusive of
amounts expended on previous projects, is $24,000,000.             The latest
  (1921) approved estimate for annual cost of maintenance is $25,000.
    The existing project was authorized by the following river and
harbor acts:
                    RIVERS     AND HARBORS--NEW YORK,                        N.      Y.,   DISTRICT         207



       Acts                           Work authorized                                      Documents


Mar. 3, 19151        Removal of Coenties Reef to 35 feet, conditioned      H. Doc. No. 188, 63d Cong., 1st sess.
                      upon local interests increasing depth to 40 feet.
July 27,1916         Channel across Diamond Reef 35 feet deep and              Do.
                       1,000 feet wide.
Aug.     8, 1917     Channel east of Blackwells Island to 20 feet; chan-       Do.
                      nel between South Brother and Berrian Islands,
                      to 20 feet; channel between North and South
                       Brother Islands to 26 feet.
    Do    -. ----    Channel 40 feet deep through East River and           H. Doc. No. 140, 65th Cong., 1st sess.
                      Hell Gate.
July 18, 1918        Secure a depth of 40 feet in channel through East     Specified in act.
                       River and Hell Gate as soon as practicable.
Sept. 22, 1922       Depth limited to 35 feet in the through channel       Rivers and Harbors Committee Doc.
                      between Wallabout Channel and Throgs Neck.             No. 3, 67th Cong., 2d sess. (Con-
                       Channel east of Blackwells Island, 30 feet to         tains latest published map.)
                       English Place and eliminated 20-foot channel
                      north of English Place. Eliminated channel
                      between North and South Brother Islands
                      except as authorized prior to existing project.
                       Removal of certain rocks and reefs and con-
                       struction of dike in Pot Cove, Hell Gate.


  1Pub.    Res. No. 67, 63d Cong., 3d sess.


   Recommended modifications of project.-Under date of December
11, 1939, the Chief of Engineers recommended modification of the
existing project so as to provide a channel generally 40 feet deep at
mean low water, 550 to 1,000 feet wide, extending from the upper
]imit of the existing 40-foot depth at Wallabout Channel to Throgs
Neck, with widening of the bend in the channel south of Belmont
Island to a depth of 40 feet, dredging a cross channel 20 feet deep
and 1,000 feet wide between Belmont and Welfare Islands, dredging
East Channel at Welfare Island 25 feet deep and 500 to 600 feet
wide, removal of certain portions of Hallets Point to depths of 25,
40, and 47 feet, removal of the southern arm of Mill Rock to a depth of
20 feet, removal of ledges near Mill Rock and along the east bank
of East River in the vicinity of the Triborough Bridge to a depth of
40 feet, filling an area in the vicinity of Hogs Back Light and con-
structing a dike from this area to Wards Island, cutting back Negro
Point on Wards Island to a depth of 40 feet, and dredging a channel
40 feet deep and 650 feet wide between North and South Brother
Islands, all at an estimated initial cost of $34,509,000 with no increase
in the present annual cost of maintenance (H. Doc. No. 554, 76th Cong.,
3d sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-Both shores of the East River from the Bat-
tery, Manhattan Borough, to Clason Point, east of Hell Gate, a length
of about 12 miles, are occupied by 120 piers, 10 ferry slips, 19 car-float
bridges, and 52,200 feet of bulkheaded water front; a total available
dockage of 136,700 feet. Of the terminals, 142 are publicly owned,
5 provide public wharfage, 111 have mechanical freight handling facil-
ities, and 46 have railway connections. The facilities are considered
adequate for present needs. (For latest full description of terminal
facilities, see Port Series No. 20, Corps of Engineers.)
208     REPORT OF CHIEF OF EiNGINEEiRS,                     U. S. ARMY,    1942

   Operations and results during fiscal year.-The cost of survey to
determine the condition of the channel between Wallabout Channel
and the Battery was $5,309.65 for maintenance. The expenditures
were $5,237.63.
   Condition at end of fiscal year.-The existing project was about
99 percent completed.
   The controlling mean low-water depth from deep water in the Upper
Bay to Wallabout Channel is 39 feet for full channel width except
for a small section opposite the Battery where the width is limited to
400 feet and at Corlears Reef where it is limited to 900 feet. From
Wallabout Channel through the West Channel at Welfare (Black-
wells) Island and Hell Gate to Throgs Neck at Long Island Sound,
the controlling mean low-water depth is 35 feet for widths varying
from 550 to 1,000 feet. In the section of the East Channel at Welfare
 (Blackwells) Island included in the existing project it is 28 feet from
off Newtown Creek to English Place (43d Drive), Long Island City,
and continuing through the natural channel of navigable width to
deep water off the north end of Welfare (Blackwells) Island it is
24 feet. The controlling depth in the channel between South Brother
and Berrian Islands is 20 feet for a width of 300 feet. The controlling
depths are those determined by intermittent surveys made during the
period 1910 to 1942.
   The work remaining to be done to complete the existing project con-
sists of the removal of a small shoal area along the east side of the
35-foot channel between Grand Street and North Third Street, Brook-
lyn. The construction of the dike at Pot Cove in Hell Gate and a part
of the widening near the pierhead line in Jay Street Reef were omitted
as being unnecessary.
   The total costs of the existing project to June 30, 1942, were $24,307,-
806.73-$1,743,265.42 Public Works funds and $22,106,453.80 regular
funds, a total of $23,849,719.22 for new work and $458,087.51 for
maintenance. The total expenditures were $24,307,734.71.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $117,262.37 will be applied as follows:
Accounts payable June 30, 1942____________________             ____   $72.02
Maintenance: Complete by June 30, 1943, under contract to be entered
  into, the removal of shoals in the channel from upper bay, New York
Harbor to Wallabout Channel_______________________ 117, 190.35

      Total----------       ----   -----------------------------              117, 262. 37
  Additional maintenance will not be necessary during the fiscal year
1944. Therefore, no funds can be profitably expended during the fiscal
year ending June 30, 1944.
                         Cost and financial summary

Cost of new work to June 30, 1942__________________                       $30, 037, 412. 72
Cost of maintenance to June 30, 1942____________________---                    495, 751.46

      Total cost of permanent work to June 30, 1942-----------             30, 533, 164.18
Minus accounts payable June 30, 1942_ _-----------------                             72.02

     Net total expenditures------------------------------30,                   533, 092. 16
Unexpended balance June 30, 1942_ _C_._.117,                                        262. 37

      Total amount appropriated to June 30, 1942---,,_-                    30, 650, 354. 53
           RIVERS       AND HARBORS-NEW YORK,                                   N.   Y.,   DISTRICT              209

   Fiscal year ending June 30               1938            1939            1940             1941            1942

Cost of new work------          -------              --      $822-----      -    ---------------             $
Cost of maintenance    __         -       $30, 940. 68       $822. 23                ........                $5, 309. 65
                      __ _ _.
Total expended_ ....-..                    36, 862. 06      -102. 21            $6. 52        _-5,               237. 63
Allotted------------                       50, 00. 00     -2, 500. 00    -26, 709. 45        $22, 500       100, 000.00



Balance unexpended July 1, 1941------------------------------                                           $22, 500. 00
Amount allotted from War Department Civil Appropriation Act
approved April 28, 1942-------------------------------------                                           100, 000. 00

       Amount to be accounted for -_____---------------------     -                                     122, 500. 00
Gross amount expended_-___ ______--_____               $5, 764. 91
Less reimbursements collected_ -              -527.
                                     ___--------                28
                                                                                                           5,237. 63
      'Balance unexpended June 30, 1942-                                                                     262. 37
                                                                                                        11------------------
                                                                                                        117,
Outstanding liabilities June 30, 1942 ______________________                                                   72. 02

        Balance available June 30, 1942_____--_____---                               -----              117, 190. 35

Amount (estimated) required to be appropriated for completion
of existing project 1                                ----                                              1------------------------------
                                                                                                         50,000.00
  1 Exclusive of available funds.

                                   19. NEWTOWN CREEK, N. Y.

  Location.-This creek is a tidal waterway entering the East River,
N. Y., about 41/2 miles by water northeast of the Battery, New York
City, and forms a part of the boundary between the Boroughs of
Brooklyn and Queens, New York City. (See U. S. Coast and Geodetic
Survey Chart No. 745.)
  Previous projects.-Adopted by River and Harbor Acts of June 14,
1880, July 5, 1884, and June 3, 1896. For further details see page"1769
of Annual Report for 1915, and page 207 of Annual Report for 1938.
  Existing project.-This provides for a channel 23 feet deep and
130 feet wide from the East River to a point about 150 feet north
of Maspeth Avenue; for a turning basin at the former location of
Mussel Island and a triangular area lying on the north side of the
entrance to the creek of the same depth; for a channel 20 feet deep
at mean low water elsewhere in Newtown Creek, including Dutch Kills,
Maspeth Creek, and English Kills, of the following widths: 150 feet
wide from Maspeth Avenue to Grand Street Bridge, thence 125 feet
wide to Metropolitan Avenue on the East Branch; 100 feet wide for
a distance of 2,000 feet up Maspeth Creek; 75 to 100 feet wide for a
distance of 2,800 feet up Dutch Kills with a turning basin at the
head; and 150 feet wide in English Kills, or West Branch, to the
Metropolitan Avenue Bridge, including the easing of bends, and for
a channel 12 feet deep and 100 feet wide in English Kills from the
Metropolitan Avenue Bridge to within 80 feet of the Montrose Avenue
Bridge, suitably widened at bends and materially widened by excavat-
ing upland at the second bend above the Metropolitan Avenue Bridge.
The total length of channel included in the project is about 5.2 miles.
Mean tidal range, 4.2 feet; mean range of spring tides, 5 feet; irregular
fluctuations due to wind and barometric pressure vary from about 3.5
feet below mean low water up to about 4 feet above mean high water.
210        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                           1942

  The estimate of cost for new work, revised in 1937, is $1,196,500,
exclusive of amounts expended on previous projects. The latest (1937)
approved estimate for annual cost of maintenance is $22,000.
  The existing project was authorized by the following river and
harbor acts:

    Acts                         Work authorized                                       Documents


Mar. 2,1919    20-foot channel............----------------------------   H. Doc. No. 936, 64th Cong., 1st sess.'
July 3,1930    23 foot channel------_ __....-----------------.--         Rivers and Harbors Committee Doc.
                                                                           No. 42, 71st Cong., 2d sess.'
Aug. 26,1937   12-foot channel in English Kills- ..-.--...---    -....   Rivers and Harbors Committee Doc.
                                                                           No. 4, 75th Cong., 1st sess.'
               Minor modification of project in the vicinity of
                Mussel Island, without change in cost, ap-
                 proved by the Secretary of War, Mar. 22, 1920.


1Contains latest published maps.

   Local cooperation.-The River and Harbor Act of March 2, 1919
requires that all land needed for right-of-way be furnished without
cost to the United States, and provides that no work shall be done
in Maspeth Creek, in the removal of Mussel Island, or in English
Kills until this has been done in each case and corresponding changes
made in existing harbor lines; also that no work shall be undertaken
under the existing project in Dutch Kills until the obstructive bridges
near its mouth have been suitably modified.
   The River and Harbor Act of August 26, 1937, requires that local
interests furnish, free of cost to the United States, necessary ease-
ments or rights-of-way for the enlargement of the channel in English
Kills above Metropolitan Avenue and give assurances satisfactory
to the Secretary of War that they will remove obstructive deposits:
resulting from the discharge of sewage into the waterway. That act
also requires that before widening the second bend south of Metro-
politan Avenue local interests shall furnish necessary lands or rights-
of-way and construct a new bulkhead on the widened channel.
   The lands needed in Maspeth Creek, Mussel Island, and the East
Branch have been ceded to the United States by the city of New York
by deed. The work of modifying the bridges near the mouth of
Dutch Kills was completed in 1923. No action has been taken by the
city authorities to comply with the requirements for dredging in
English Kills (West Branch).
   Terminal facilities.-The length of water front measured along both
sides of the improvement is 11.6 miles, of which 9.6 miles are bulk-
headed and about 2.0 miles of frontage, distributed over the entire
length of this waterway, is yet undeveloped. The total available
dockage is 49,000 feet. Of the terminals, 9 are owned by the city
of New York of which 5 are open to public use; 58 are equipped
with mechanical handling devices and 22 have railroad connections.
The terminal facilities are considered adequate for present needs.
 (For latest full description of terminal facilities see Port Series No.
20, Corps of Engineers.)
        RIVERS AND   HARBORS-NEW       YORK,   N. Y.,   DISTRICT   211
    Operations and results during fiscal year.-The cost and expendi-
tures of engineering preliminary to dredging Englihsh Kills were
$1,209.90 for maintenance.
   Condition at end of fiscal year.-The existing project was about 64
percent completed. The work of enlarging the main channel to 23-
foot depth and 130-foot width from the entrance to 150 feet north of
Maspeth Avenue, including the triangular area at the entrance, and
a turning basin at the former location of Mussel Island, is about 90
percent completed. Dutch' Kills has been dredged to project depth,
20 feet, for a width of 75 to 100 feet except at a few places near the
head of improvement, where unstable bulkheads restricted dredging
operations. Maspeth Creek has been dredged to project dimensions
throughout. The controlling mean low water depth in the main
channel of Newtown Creek, according to a survey made in May 1941,
was 20 feet for a width of 100 to 130 feet from the entrance to 150
feet north of Maspeth Avenue. In the turning basin at the former
location of Mussel Island the depth was 21 feet. When examined in
June 1940, the controlling depth in Dutch Kills was about 14 feet
except at Hunters Point Avenue Bridge, where it was 11 feet. As
shown by an examination made in September 1938, the depth in
Maspeth Creek was 15 feet to a point 400 feet west of the easterly
limit of the project thence decreasing to zero depth at the easterly
limit of the project. The controlling mean low water depth in
East Branch, according to surveys made in October 1929, July 1933,
and May 1937, was 16 feet from 150 feet north of Maspeth Avenue to
opposite the entrance to English Kills; thence to Grand Street, 13
feet; and thence to Metropolitan Avenue, 12 feet. When examined
in May and August 1941 the depth in English Kills (West Branch)
to within 1,400 feet of Metropolitan Avenue was 16 feet, 85 to 125
feet wide, thence 10 feet, 60 to 120 feet wide to within 500 feet of
Metropolitan Avenue, and thence to 80 feet north of Montrose
Avenue (the head of the project) the depth was about 8 feet.
The work remaining to be done consists of completing to project
dimensions: The 23-foot main channel between Greenpoint and
Meeker Avenues, and between 800 and 150 feet north of Maspeth
Avenue; the 20-foot channel in the East Branch; and the 20- and
12-foot channels in English Kills.
    The total cost and expenditures of the exist;ng project to June
30, 1942 were $921,411.28-$767,093.96 for new work and $154,317.32 for
maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $23,790.10, will be applied to the completion
of dredging by September 30, 1943, under contract to be entered into
for maintenance, to restore the channel in English Kills to the Metro-
politan Avenue Bridge to dimensions authorized under the previous
project.
    It is expected that the conditions of local cooperation under this
project will not be complied with during the next 2 years. Addi-
tional maintenance dredging will not be necessary during the fiscal
year 1944. Therefore, no funds can be profitably expended during
the fiscal year ending June 30, 1944.
212              REPORT OF CHIEF OF ENGINEERS,                                           U. S. ARMY,                   1942

                                                    Cost and financial summary

Cost of new work to June 30, 1942_________________________$1, 168, 354. 47
Cost of maintenance to June 30, 1942--------------- --------- 322, 186. 78

      Total cost of permanent work to June 30, 1942-.__...         1, 490, 541.25
Net total expenditures -------------             -   __-1,            490, 541. 25
Unexpended balance June 30, 1942__   -----------   -       __--23,         790.10

             Total amount appropriated to June 30, 1942-...----.                                                        1, 514,331. 35

     Fiscal year ending June 30                          1938                1939         1940                  1941                1942


Cost of new work--------------------------------------------                                               --           -           --
Cost of maintenance-.-                      . __     _________             $1, 086. 18                --         - -                $1, 209.90

Total expended......                   ..---------------..      _------      1,08. 18            --         ----            -        1, 209.90
Allotted... ..............-----------------------            $8, 000      -19, 314. 43                           $25, 000 _______


Balance unexpended July 1, 1941__----------------------------                                                                   $25, 000. 00
Gross amount expended-____-----  __------_------------ _      _                                                                   1, 209. 90

             Balance unexpended June 30, 1942___________---_----------                                                           23, 790. 10

Amount (estimated) required to be appropriated for completion of
    existing project 1_______________________----------                                                                         429, 400. 00
     Exclusive of available funds.

                                                    20. HARLEM RIVER, N. Y.

   Location.-Harlem River and Spuyten Duyvil Creek, both in-
cluded in the project for the improvement of Harlem River, are two
connecting tidal waterways, of a joint length of about 8 miles, lying
wholly within the limits of Greater New York and separating Man-
hattan Island from the mainland. (See U. S. Coast and Geodetic
Survey Chart No. 274.)
   Previous projects.-Adopted by the River and Harbor Act of June
23, 1874. For further details see Annual Report for 1915, page 1762,
and Annual Report for 1938, page 210.
   Existing project.-This provides for a continuous channel 15 feet
deep at mean low water and 400 feet wide from East River to Hudson
River except in the vicinity of Washington Bridge, where the adopted
width is 354 feet, and at the rock cut through Dyckmans Meadow,
where it is 350 feet and the depth is 18 feet. It also provides for
straightening the channel at Johnson Iron Works by making a cut
15 feet deep and 400 feet wide. The length of channel included in
the project is about 8 miles. The mean tidal range varies, according
to locality, from 4.9 feet at Willis Avenue Bridge to 3.7 feet at
Spuyton Duyvil Bridge; range of spring tides, 5.9 and 4.4 feet,
respectively. Irregular fluctuations due to wind and barometric
pressure vary from 3 feet below mean low water up to 4 feet above
mean high water at Willis Avenue Bridge and from 3.5 feet below
mean low water up to 3.5 feet above mean high water at Spuyten
Duyvil Bridge.
   The estimate of cost for new work, revised in 1928, was $5,470,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $25,000.
              RIVER.S     AND HARBORS--NEW                    YORK,           N.   Y.,     DISTRICT            213
  Theexisting project was authorized by the following river and
harbor acts:

    Acts                         Work authorized                                           Documents


June 18,1878    Channel 15 feet deep and 350 feet wide--_----_----      H. Ex. Doc. No. 75, Pt. 9, 43d Cong.,
                                                                          2d sess.       (Annual Report, 1875, pt. 2,
                                                                          p. 224.)
                Chief of Engineers authorized widening to 400           Annual Report, 1886, p. 674.
                 feet throughout except at Dyckmans Cut,
                 where width was kept at 350 feet and depth
                 increased to 18 feet.
                Chief of Engineers in 1893 reduced width of chan-       Annual Report, 1912, p. 198.
                 nel in vicinity of Washington Bridge to 354 feet.
Mar. 4,1913     Straightening channel at Johnson Iron Works          -_.-H. Doc. No. 557, 62d Cong., 2d sess.
                                                                          (Contains latest published maps.)



   Local cooperation.-Fullycomplied with.
   Termninal facilities.-The length of water front along both shores of
the Harlem River is about 16 miles; of which 4 miles are unavailable
for commercial use. About 5 miles of water front are occupied by 84
piers, wharves, and bulkheads, with a total available dockage of
26,700 feet, of which 28 with a dockage of 10,400 feet are owned by the
city of New York and 3 with a dockage of 860 feet are owned by the
State of New York. One of the latter is used as a barge-canal termi-
nal. Of the terminals owned by the city, 5 are open to the public on
equal terms. Eleven terminals have railroad connections. The
terminal facilities are considered adequate for present needs. (For
latest full description of terminal facilities see Port Series No. 20,
Corps of Engineers.)
   Operations and results during flscal year.-None.
   Condition at end of fiscal year.-The existing project was substan-
tially completed in 1938. Remaining widening to be done in the section
above High Bridge is prohibited by the proximity of bulkheads to the
channel line. The present width is considered adequate for navigation.
No further improvement is contemplated under the project. A chan-
nel 15 feet deep at mean low water and 400 feet wide has been excavated
from East River to High Bridge, thence 15 feet deep and 350 to 400
feet wide to the Hudson River. The rock cut through Dyckmans
Meadow was completed to 18-foot depth and 350-foot width in 1896.
The straightening of the channel at Johnson Iron Works was com-
pleted to 15-foot depth and 400-foot width in 1938. The controlling
depth from East River to Hudson River, as shown by examinations
made from 1933 to 1940, was 15 feet at mean low water through a nav-
igable channel varying from 120 to 350 feet in width. The widths of
channel through bridge draws are 98 to 164 feet, except at Broadway
Bridge, where the width is 60 feet.
   The total cost and expenditures of the existing project to June 30,
1942, were $3,859,828.94-$3,595,119.48 for new work and $264,709.46
for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $22,500, will be applied to the completion by
September 30, 1943, under a contract to be entered into for maintenance,
of the removal of isolated shoals from the existing channel.
214           REPORT            OF CHIEF OF ENGINEERS,                               U.          S. ARMY,                        1942

   Further maintenance dredging will not be necessary during the
fiscal year 1944. Therefore, no funds can be profitably expended dur-
ing the fiscal year ending June 30, 1944.
                                           Cost and financial summary
Cost of new work to June 30, 1942_____----- __________        $3, 616, 119. 48
Cost of maintenance to June 30, 1942--------------------------264, 709. 46
                                                                                                               ____
          Total cost of permanent work to June 30, 1942------------                                                               3, 880, 828. 94

Net total expenditures -----------------------------------                                                                        3, 880, 828. 94
Unexpended balance June 30, 1942----------------------------                                                                          22, 500. 00

          Total amount appropriated to June 30, 1942____----                                                                      3, 903, 328. 94

    Fiscal year ending June 30                    1938            1939                     1940                          1941                  1942

Cost of new work----------------             $531, 816. 09
Cost of maintenance -------------
                      ...                      74, 440. 23       $6, 379. 80   ---                                                              -

       Total cost .                              606, 256. 32
                                 ...---------------.              6, 379. 80    .    .      .      .      .    .         .   .    .   .    .        .   .
Total expended-       .......
                         -               -... 654, 816. 48       14, 329. 17                    $50. 62       --------                    --- ---
Allotted ----------------------...            227, 000. 00      -26, 446. 73         -3,        266. 84                  $22, 500



                               -------------------------------
Balance unexpended July 1, 1941_                                                                                                      $22, 500.00
Balance unexpended June 30, 1942___-----------------------------                                                                       22, 500. 00

                21. HUDSON RIVER CHANNEL, NEW YORK HARBOR

   Location.-Hudson River empties into the Upper Bay of New York
Harbor at the Battery, New York City. The section included under
this title extends from deep water in upper New York Bay to just
north of Harlem River (Spuyten Duyvil Creek), a distance of about
14.5 miles. (See U. S. Coast and Geodetic Survey Charts Nos. 274,
745, and 746.)
   Previous projects.-Adopted by acts of March 3. 1875, June 6, 1900,
March 3, 1905, and March 4, 1913. For further details see Annual
Report for 1915, page 1765, and Annual Report for 1938, page 213.
   Existing project.-This provides for a channel 48 feet deep and
2,000 feet wide, suitably widened at the bends, from West Fifty-ninth
Street, Manhattan, to West Fortieth Street, thence 45 feet deep of the
same width to deep water in Upper Bay; for a channel 40 feet deep
for the full width of the river extending from the north line of
Fifty-ninth Street to the south side of Little Basin, and thence a chan-
nel of the same depth to deep water in the Upper New York Bay off
Ellis Island, substantially as shown on maps in House Document
No. 309, Seventy-second Congress, first session, subject to the pro-
vision that no dredging shall be done under the project within 50 feet
of the pierhead lines; a channel 750 feet wide and 30 feet deep along
the Weehawken-Edgewater water front; the removal of a shoal on
the New York side between West Fifty-ninth and West Sixty-first
Streets to a depth of 40 feet; and the removal of an obstruction
north of the mouth of Spuyten Duyvil Creek to the depth of the
surrounding river bottom. The length of channel included in the
project is about 11 miles. The plane of reference is mean low
                    RIVERS AND HARBORS-NEW                         YORK,           N.   Y.,   DISTRICT           215

water. Mean tidal range at the Battery, 4.4 feet, and at the mouth
of Spuyton Duyvil Creek, 3.7 feet; mean range of spring tides, 5.3
feet and 4.4 feet, respectively; irregular fluctuations due to wind
and barometric pressure vary from 4 feet below mean low water
at the Battery up to 4 feet above mean high water, and at the
mouth of Spuyten Duyvil Creek from 3.5 feet below mean low
water. up to 3.5 feet above mean high water.
  The estimate of cost for new work, revised in 1937, is $6,383,000,
exclusive of the amounts expended on previous projects. The latest
(1937) approved estimate for annual cost of maintenance is $169,000.
  The existing project was authorized by the following river and
harbor acts:

        Acts                          Work authorized                                         Documents
                                                                             i



M¢ar.     4, 1913    Channel 30 feet deep from Ellis Island to Newark            H. Doe. No. 719, 62d Cong., 2d sess.
                       St., 40 feet deep through the shoal from Newark
                       St. to Castle Point and channel 26 feet deep and
                      550 feet wide along Weehawken-Edgewater
                      water front. Removal of shoal east side of
                      river between West 19th and West 32d Sts.;
                      removal of rock near the Battery to 40 feet, and
                      removal of obstruction near Spuyten Duyvil
                       Creek.
Mar.      4, 1915    Additional dredging through shoal from Newark               Annual Report, 1914, pp. 234-235.
                      St. to Castle Point.
Aug.      8,1917     Removal of shoal between West 32d and West                  H. Doc. No. 1697, 64th Cong., 2d sess.
                      61st Sts. to 40 feet and widening the 40-foot
                      channel between the Battery and Canal St. to
                      2,000 feet.
Mar.      3, 1925    Channel 30 feet deep and 750 feet wide along                H. Doe. No. 313, 68th Cong., 1st sess.
                      Weehawken-Edgewater water front.
Jan.     21,1927     Modification of conditions of local cooperation
                      affecting channel along Weekawken-Edgewater
                      water front.
                                                                                                                         2
July      3, 1930    Channel 40 feet deep between pierhead lines from            H. Doc. No. 450, 70th Cong., 2d sess.
                      20th St., Manhattan, to a point 1,300 feet below
                       Newark St., Hoboken, thence 2,800 feet wide
                      to deep water off Ellis Island. Channel 30 feet
                       deep between 40-foot channel and channel along
                      Jersey City water front.
Aug. 30,19351        Widening the 40-foot channel to full width of               H. Doe. No. 309, 72d Cong., 1st sess.'
                      river from north line of 59th St. to south side of
                       Little Basin, thence a channel of same depth to
                      deep water off Ellis Island.
       Do-------     Waiver of all conditions of local cooperation affect-       Rivers and Harbors Committee Docu-
                      ing the channel along the Weehawken-Edge-                   ment No. 49, 72d Cong., 2d sess.
                      water water front.
Aug. 26, 1937        Channel 45 and 48 feet deep and 2,000 feet wide__           Senate Committee print, 75th Cong.,
                                                                                   1st sess.2


  1Also Public Works Administration           Sept. 6, 1933, and Apr. 27, 1935.
2   Contain latest published maps.

   Terminal facilities.-The direct length of water front included in
the project for improvement, measured along both shores of the river,
is 32 miles; of this length, 7 miles of the Manhattan water front and
10 miles of the New Jersey water front have been developed for com-
mercial use by the construction of terminals consisting of piers,
bulkheads, warehouses equipped with modern appliances for handling
216    REPORT OF CHIEF OF ENGINEERS,         U. S. ARMY,    1942

freight, modern coal piers, bridges for the transfer of cars to and
from floats, marine railways, drydocks, and ferry racks.
   The total available dockage along the Manhattan water front in use
for commercial purposes is 129,200 linear feet and along the New
Jersey water front about 182,200 linear feet. Many terminals have
direct railroad connection. The facilities are adequate for present
requirements. (For latest full description of terminal facilities see
Port Series No. 20, Corps of Engineers.)
   Operations and results during fiscal year.-The cost and expendi-
ture of a survey to determine the condition of channel along Wee-
hawken-Edgewater water front was $517.88 for maintenance.
   Condition at end of fiscal year.-About 91 percent of the work
under the existing project has been completed. The work of widen-
ing and deepening Weehawken-Edgewater Channel to project dimen-
sions was completed in 1937. The work of widening the 40-foot
channel for the full width of the river from Ellis Island to West
Fifty-ninth Street, Manhattan, was completed in 1939. An area
1,400 feet wide extending along the Manhattan water front from
West Fortieth to West Fifty-fourth Street was deepened to 48 feet
in 1939.
   When examined intermittently from 1935 to 1939 the controlling
mean low water depth was 40 feet for the full width of the river from
opposite Ellis Island to West Fifty-ninth Street, except for minor
scattered shoals along the east and west channel lines. From West
Fbrtieth to West Fifty-fourth Street along the Manhattan water
front, the controlling depth was 48 feet for an area 1,000 feet wide.
   When examined in April 1942, the controlling mean low water
depth in Weehawken-Edgewater Channel was 27 feet for full project
width from opposite West Fifty-ninth Street to opposite West One
Hundred and Twentieth Street, thence 22 feet for a width varying
from 500 to 750 feet to the upper end of the channel.
   The work remaining to be done under the existing project consists
of completing the dredging of the 45- and 48-foot channels for a width
of 2,000 feet from Upper Bay to West Fifty-ninth Street, as author-
ized in 1937.
   The total cost and expenditures of the existing project to June 30,
1942, were $7,764,094.06-$668,820.36 Public Works funds and $5,158,-
802.95 regular funds, a total of $5,827,623. 31 for new work and $1,936,-
470.75 for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $180,482.12 less $175,511.20 to be revoked, a
balance of $4,970.92 will be applied to surveys to determine the condi-
tion of the channels.
   Completion of the project is not considered necessary during the next
2 years. Further maintenance dredging will be necessary during the
fiscal year 1944. Therefore, the sum of $150,000 can be profitably ex-
pended for dredging by use of 1 United States seagoing hopper dredge
for about 5 months during the fiscal year ending June 30, 1944, in the
removal of shoals from the existing channels.
                   RIVERS AND HARBORS-NEW YORK, N. Y., DISTRICT                                                       217
                                       Cost and financial summary

Cost of new work to June 30, 1942----------------------------                                           $5, 897, 252. 43
Cost of maintenance to June 30, 1942___-------------------------                                         1, 936, 470. 75

           Total cost of permanent work to June 30, 1942-------------                                    7, 33, 723. 18

Net total expenditures-------------------------                             ---           --             7, 833, 723. 18
Unexpended balance June 30, 1942 _---------- -----                             ----                           180, 482. 12

           Total amount appropriated to June 30, 1942_---------------                                    8, 014, 205. 30


    Fiscal year ending June 30            1938            1939             1940                  1941              1942


Cost of new work___                    $416, 357. 02   $401, 708. 90      $4, 028. 57
Cost of maintenance .....                                17, 483. 27     121, 765. 22           $1, 413. 56         $517. 88

        Total cost_----   -      --     416, 357. 02    419, 192. 17     125, 793. 79            1, 413. 56          517. 88

Total expended..    ----------------    432, 110. 12    420, 018. 15     138, 036. 41            1, 582. 64          517. 88

Allotted __.....                 ..     815,000.00      202, 900.00      125, 000. 00          -1, 246. 96        31, 000. 00



Balance unexpended July 1, 1941 ----------------------------                                              $150, 000. 00
Amount allotted from War Department Civil Appropriation
                            --------------------------------
  Act approved Apr. 28, 1942__                                                                                100, 000. 00
      Amount to be accounted for_ ----------------------------                                                250, 000. 00
Deductions on account of revocation of allotment--------------                                                 69, 000. 00

      Net amount to be accounted for --.---------------------                                                 181, 000. 00
Gross amount expended--------------------------------------                                                        517. 88
           Balance unexpended Jun                30, 1942----------------------                               180, 482. 12

Amount (estimated) required to be appropriated for completion
   of    existing project 1------------------                     ----                  ---                   555, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1-------------------------------                                                   150, 000. 00
   1 Exclusive of available funds.

     22. NEW YORK HARBOR-COLLECTION AND REMOVAL OF DRIFT

   Location.-This project applies to the Lower and Upper Bays, New
York Harbor; East River, Harlem River, Hudson River Channel,
N. Y., New York and New Jersey Channels, Newark Bay, N. J., and
their tributaries.
   Existing project.-This provides for the collection and removal of
drift from New York Harbor and its tributary waters, and authorizes
the Secretary of War to allot such amounts as may be necessary for
the work from appropriations for maintenance and improvement of
existing river and harbor works or other available appropriations, and
that this work shall be carried as a separate and distinct project. It
is wholly a work of maintenance. The purpose of the work is to
afford relief from variable conditions of obstruction, and no advance
estimate of the amount of work required and its proper cost can be
made.
218           REPORT OF CHIEF OF E'NGINEERS                             U. S. ARMY,               1942

  The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                            Documents


                   Allotment from appropriations made for New York Harbor
Marug. 4,1915       and its immediate tributaries may be used for collection
                    and removal of drift in these waterways.
July     3, 1930   Carrying on this work as a separate and distinct project .-


   Terminal facilities.-Described in the separate reports covered.
   Operationsand results during fiscal year.-The U. S. steam lighters
Rockaway and N. Y. 20 and the U. S. motor tenders Astoria and
Staniwix were assigned to the work of removing and disposing of
drift when not employed on other work. There were removed and
disposed of during the fiscal year 481,715 cubic feet (3,763.4 cords)
of driftwood ranging in size from small blocks up to timber of large
dimensions, including piles and pieces of wreckage.
   The cost of this work was $149,305.71, all for maintenande. The
expenditures were $143,167.73.
   Condition at end of fiscal year.-The existing project is one of con-
tinuous maintenance for which no percentage of completion exists.
Navigation has been made safer by the continual patrol of the harbor
and the removal of large quantities of drift material. The total cost
of operations to June 30, 1942, has been $1,408,234.60. The total
expenditures amounted to $1,399,207.43.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $206,743.10 will be applied as follows:
Accounts payable June 30, 1942------------------------------ $9, 027. T17
Maintenance: Continue the work of drift removal by use of United
States lighters and motor tenders (July 1942 to June 1943)-     197, 715.93
           Total ---------------------------------------------                             _            206, 743. 10
   It is necessary for the safety of navigation that the removal of drift
material be carried on regularly. Therefore, the sum of $175,000 can
be profitably expended on this work by the operation of United States
lighters and motor tenders during the fiscal year ending June 30, 1944.
                                      Cost and financial summary
Cost of new work to June 30, 1942__________________--------------------
Cost of maintenance to June 30, 1942---------------------- $1,408, 234. 60
     Total cost of permanent work to June 30, 1942                                                 1____________
                                                                                                    , 40S, 234. 60
Minus accounts payable June 30, 1942_______                                                             9______________---9
                                                                                                           027. 17
      Net total expenditures__________________________      1, 399, 207. 43
Unexpended balance June 30, 1942---------------------------206, 743.10
           Total amount appropriated to June 30, 1942____________                                  1, 605, 950. 53

       Fiscal year ending June 30          1938            1939            1940            1941              1942

Cost ofnew work
Cost of maintenance                      $57, 341. 22    $65, 587. 46   $112, 200. 23   $103, 056. 97     $149. 305. 71

Total expended-- -...-. _..
                        .                 59, 318. 53     59, 910. 47    118, 618. 71    102, 494. 53       143, 167. 73
Allotted-.---------------------          134, 998. 65    100, 000. 00    100, 000. 00    125, 000. 00      225, 000.00
              RIVERS AND HARBORS-NEW                               YORK,        N.   Y.1    DISTRICT          219
Balance unexpended July 1, 1941___                                                                  $124, 910. 83
Amount allotted from War Department Civil Ap-
  propriation Act approved May 23, 1941___________                                   $50, 000. 00
Amount allotted from War Department Civil Ap-
  propriation Act approved April 28, 19-42_________                                  175, 000. 00
                                                                                                       225, 000. 00
      Amount to be accounted for-----------------------------                                          349, 910. 83
Gross amount expended __________________           $143, 16. 13
Less reimbursements collected_--        ____ _----           .40
                                                                                                       143,167. 73
      Balance unexpended June 30, 1942____________
                                      --------                                                         206, 743. 10
Outstanding liabilities June 30, 1942                     ----------------------------                   9, 027. 17
          Balance available June 30, 1942                       ---------------------                  197, 715.93
Amount that can be profitably expended in fiscal year ending June
  30, 1944, for maintenance ----------------
                            __-------                                                                  175, 000. 00
  2Exclusive       of available funds.

                                  23. PEEKSKILL HARBOR, N. Y.
   Location.-This harbor is an indentation about five-eighths of a
mile long and 1     miles wide in the eastern shore of Hudson River,
42 miles above the Battery, New York City. (See U. S. Coast and
Geodetic Survey Chart No. 282.)
   Existing project.-This provides for a chanel 10 feet deep at
mean low water, 100 feet wide, and about 1.8 miles long, extending
from deep water in Hudson River north of the village to deep water
south of it, following generally the contour of the shore, and two
turning basins, 200 by 150 feet, of the same depth in front of the
lower and center wharves. Mean tidal range, 2.9 feet; mean range
of spring tides, 3.4 feet; extreme range, 7.1 feet; irregular fluctua-
tions are infrequent and do not materially affect navigation.
   The estimate of cost for new work made in 1896 was $50,000. The
latest (1928) approved estimate for annual cost of maintenance is
$4,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                        Documents



June     3, 1896   Channel 10 feet deep and 100 feet wide ...........      H. Doc. No. 37, 53d Cong., 3d sess.;
                                                                            Annual Report, 1895, p. 999.
                   Chief of Engineers authorized construction of 2         Annual Report, 1896, p. 839.
                    turning basins.


  For latest published map see Annual Report for 1903, page 885.

  Terminal facilities.-Water terminals, five in number, with available
dockage of 2,240 feet, of which one with dockage of 650 feet is open to
the public, are located along the water front. Four of the terminals
are provided with mechanical appliances for handling cargoes. The
existing terminals are considered adequate for present and prospective
needs of commerce.
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-The existing project was completed
in 1899. The controlling depth at mean low water, as shown by an
220         REPORT OF CHIEF OF ENGINEERS,                    U. S. ARMY,      1942

examination made in April 1942 was 10 feet for full project width in
the north entrance channel, 9 feet for full project width in the south
entrance channel, and 9 feet for a width varying from 60 to 100 feet in
the channel along the wharf fronts.
   The total cost and expenditures of the existing project to June 30,
1942 were $77,932.07-$19,400 for new work and $58,532.07 for main-
tenance.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
   Maintenance dredging will be necessary during the fiscal year 1944.
Therefore, the sum of $25,000 can be profitably expended during the
fiscal year ending June 30, 1944, in dredging, under contract for main-
tenance, to restore the channel to project dimensions.
                                       Cost and financial summary
                                         ------------
Cost of new work to June 30, 1942____________---                                $19, 400. 00
Cost of maintenance to June 30, 1942___        ____--------------58,                 532. 07

      Total cost of permanent work to June 30, 1942_______________               77, 932. 07
Net total expenditures ___________                                               77, 932. 07
Total amount appropriated to June 30, 1942_____________-----__  __               77, 932. 07


   Fiscal year ending June 30            1938         1939    1940     1941          1942


Cost of new work -      ---                            --
Cost of maintenance_          --   .    $8..
                                        $8,619.87--                                   -

Total expended ....-----------------     9, 907. 91

                                 1,760. 08
Allotted.....................-----------------------..



Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance_________-______        __   ___------          $25, 000.00

                                   24. WAPPINGER CREEK, N. Y.

   Location.-This creek is a small stream which empties into Hudson
River from the east, about 64 miles by water north of the Battery,
New York City, and one-half mile below the village of New Ham-
burg, N. Y. (See U. S. Coast and Geodetic Survey Chart No. 283.)
   Existing project.-This provides for a channel 8 feet deep at mean
low water, 80 feet wide, and about 2 miles long, extending from the
mouth to about 200 feet below the lower falls. Mean tidal range, 2.7
feet; mean range of spring tides, 3.1 feet; extreme range, 12.6 feet;
irregular fluctuations are infrequent and do not materially affect
navigation.
   The estimate of cost of new work, made in 1890, was $13,000. The
latest (1928) approved estimate for annual cost of maintenance is
$750.
   The project was adopted by the River and Harbor Act of Septem-
ber 19, 1890 (H. Doc. No. 25, 51st Cong., 1st sess., and Annual Report,
1890, p. 758). For latest published map see Annual Report for 1904,
page 1051.
   Terminal facilities.-Water terminals, two in number, with avail-
able dockage of 1,740 feet, are located close to the head of navigation.
In addition there are 1,766 feet of timber and masonry bulkhead at
            RIVE~S AND          HARBORS-NEW                         YORK,    N.    Y.,   DISTRICT        221

four locations along the creek, formerly used for commercial pur-
poses, but at present in poor condition and used only by occasional
boats for tie-up purposes. The facilities appear to be adequate for
existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in 1892.
As shown by an examination made in April 1941, the controlling depth
at mean low water was 8 feet for a width varying from 40 to 80 feet
from the Hudson River to within 300 feet of the head of the improve-
ment; thence decreasing to 1 foot at the head of the improvement.
   The total costs and expenditures of the existing project to June 30,
1942, were $53,832.02--$13,000 for new work and $40,832.02 for main-
tenance.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
   Shoaling has occurred throughout the channel. The sum of $15,000
can, therefore, be profitably expended during the fiscal year ending
June 30, 1944, in dredging, under contract for maintenance, to restore
the channel to project dimensions.
                                    Cost and financial summary
Cost of new work to June 30, 1942----------------------------           $13, 000. 00
Cost of maintenance to June 30, 1942          -------------------------- 40, 832. 02
      Total cost of permanent work to June 30, 1942             53, 832. 02 ---------------
Net total expenditures   ------------------------------------- 53, 832. 02
Total amount appropriated to June 30, 1942---------------------53, 832. 02


   Fiscal year ending June 30          1938                 1939            1940          1941         1942

Cost of new work--                                -   ---   ,-               ------        ---------------
Cost of maintenance___ _..      _     ____ - ___             $12, 500.
Total expended-------- ----- ---- _   __      _                      500
                                                                 12, 50
Allotted ------------------------       $10,000                  2, 500


Amount that can be profitably expended in fiscal year ending June
30, 1944 for maintenance         -------------------------------- $15, 000. 00

                                25. RONDOUT HARBOR, N. Y.

  Location.-This harbor comprises the tidal mouth, about 1.8 miles
in length, of Rondout Creek, whose source is about 18 miles west of
Rondout. The creek empties into the Hudson River from the west,
about 89 miles north of the Battery, New York City, and 55 miles
south of Albany. (See U. S. Coast and Geodetic Survey Chart No.
283.)
  Existing project.-This provides for a channel 100 feet wide,
widening at the bends, and 14 feet deep from deep water in Hudson
River to the highway bridge 1.3 miles above the mouth, thence 12 feet
deep to the west end of Island dock, 1.8 miles above the mouth, two
parallel dikes 350 feet apart, to maintain the channel, and for a
branch dike to extend upstream from the outer end of the north dike
to protect that dike from running ice in Hudson River.
        493202-43-pt. 1, vol. 1--15
222        REPORT OF CHIEF OF ENGINEERS,                              U.     S. ARMY,        1942

   Mean tidal range, 3.6 feet; mean range of spring tides, 4.1 feet;
extreme range, 8.2 feet; irregular fluctuations due to freshets, are
infrequent and do not materially affect navigation.
   The estimate of cost for new work, revised in 1935, was $105,000.
The latest (1935) approved estimate for annual cost of maintenance
is $5,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                       Documents



June 10, 1872   Parallel dikes, branch dike, and entrance channel     S. Ex. Doc. No. 35, 42d Cong., 2d sess.;
                  14 feet deep.                                         Annual Report, 1872, p. 810.
Aug. 30, 1935   Extension of the 14-foot channel and for thel2-foot   Rivers and Harbors Committee Doc.
                  channel.                                              No. 17, 734 Cong., 2d sess. (Con-
                                                                           tains latest published map.)



   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 17 timber wharves with a total avail-
able dockage of 10,930 feet located along the section of the waterway
under improvement. Of the terminals, 1 with available dockage of
550 feet is open to the public. Some of the terminals are equipped with
transfer facilities; all are privately owned. The existing terminals
appear to be adequate for present needs of commerce. (For latest full
description of terminal facilities, see Port Series No. 25, 1936, Corps of
Engineers.)
   Operations and results during the fiscal year.-By the use of Gov-
ernment plant and hired labor, repairs to 285 linear feet of south dike
were commenced on April 29, 1942, and completed on May 8, 1942. The
cost of work during this period was $3,112.47, for maintenance. The
cost of engineering, surveys, and contingencies was $159.64 for main-
tenance.
   The total cost of work was $3,272.11 all for maintenance. The total
expenditures were $6,003.71.
   Condition at end of fiscal year.-The existing project was substan-
tially completed in 1938; part of the diking originally proposed was
not built because deemed of doubtful usefulness. Two parallel dikes
of an aggregate length of about 5,000 feet, generally 350 feet apart,
with a now obsolete spur from the old lighthouse south of the south
dike, have been built across the bar at the mouth of the creek. A
branch dike about 1,000 feet long extending northerly from the outer
end of the north dike was also constructed. The project channel was
completed in 1938. When examined in April 1941 the controlling
depth at mean low water, from the Hudson River to the west end of
Island dock, was 14 feet for a width of 70 to 100 feet, for a distance of
1.25 miles, thence 12 feet for a width of 60 to 100 feet to the head of the
project, except for a shoal opposite the Texas Co. plant where the chan-
nel is restricted to a width of 60 feet with an available depth of 13 feet.
   The total cost of the existing project to June 30, 1942 was $306,-
794.84--$123,108.63 for new work and $183,686.21 for maintenance.
The total expenditures were $306,792.19.
             RIVERS AND HARBORS-NEW                           YORK, N. Y., DISTRICT                           223

   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $6,093.14 will be applied as follows:
Accounts payable June 30, 1942------------------------------------                                           $2. 65
Maintenance: Repair dikes by use of Government plant and hired
  labor (July 1942-June 1943) ----------------------------------                                         6, 090. 49

          Total ----------------------------------------------------                                      , 093. 14

  Maintenance of the channel will be necessary during the fiscal year
1944. Maintenance of the dikes should be continued. Therefore, the,
sum of $23,500 can be profitably expended during the fiscal year ending,
June 30, 1944, as follows:
Maintenance :
    Complete by June 30, 1944, under a contract to be entered into,
      the removal of shoals in the project channel-__________----- _ __ $20, 000
    Repair dikes by use of Government plant and hired labor (July
      1943-June 1944) --------------------------------------------        3, 500
             Total --------------              --------------------------------                      -     23, 500
                                      Cost and financial summary
Cost of new work to June 30, 1942--- -__  _____--__--__-____ _ $123, 108. 63
Cost of maintenance to June 30, 1942----------------------------183, 686. 21
      Total cost of permanent work to June 30, 1942------------__                                   306, 794. 84
Minus accounts payable June 30, 1942 ----------------------------                                          2. 65
         Net total expenditures -------------------                         ---                     306, 792. 19
Unexpended balance June 30, 1942-------------------------------                                          6, 093. 14
         Total amount appropriated to June 30, 1942-----------------312, 885. 33

    Fiscal year ending June 30          1938           1939          1940              1941                1942


Cost of new work_                      $1, 715. 99   $31, 392. 64
Cost of maintenance __                  6, 467. 73     9, 115.52    $4, 726. 46       $7, 719.06           $3, 272.11
      Total cost_                       8, 183. 72    40, 508. 16    4, 726. 46        7, 719. 06           3, 272. 11
Total expended                          5, 805. 84    42, 931. 78    4, 029. 06        5, 636. 47           6, 003. 71
Allotted----------- --------------     25, 000. 00    29, 000. 00   5, 000. 00         8, 000. 00           3, 500.00



Balance unexpended July 1, 1941___                      ______                                      $8, 596. 85
Amount allotted from War Department Civil Appropriation Act ap-
  proved Apr. 28, 1942_-------------------------------------------                                   3, 500. 00
      Amount to be accounted for                                                               _    12, 096. 85
Gross amount expended----------------------                                       -                  6,003. 71
      Balance unexpended June 30, 1942_-------------------__                                         6, 093. 14
Outstanding liabilities June 30, 1942-------------------------------                                      2, 65
        Balance available            June 30, 1942--------------------------                         6, 090. 49

Amount that can be profitably expended in fiscal year ending June 30,
                                   ---
1944, for maintenance 1 __________-----       _____---                                             23, 500. 00
SExclusive of available funds.

                                     26. HUDSON RIVER, N. Y.

  Location.-This river has its source in the Adirondack Mountains,
about 250 miles in a direct line and 315 miles along its course from
224     REPORT OF CHIEF OF ENGINEERS,               U. S. ARMY, 1942

the Battery, New York City, and flows in a generally southerly direc-
tion into New York Bay. The section under improvement extends
from New York City to Waterford, a distance of about 156 miles.
 (See U. S. Coast and Geodetic Survey Charts Nos. 281 to 284,
inclusive.)
   Previous projects.-The original project for improvement by the
United States was adopted by River and Harbor Act of June 30,
1834, and modified in 1852 and 1866.
   A second project was adopted by River and Harbor Act of July
13, 1892, and modified in 1899. For further details see page 1764,
Annual Report for 1915, and page 226, Annual Report for 1938.
   Existing project.-This provides for a channel 27 feet deep at
mean low water and 300 feet wide up to Hudson; thence of same
depth and 400 feet wide through rock cuts and 300 feet wide else-
where, from Hudson to the site of the former Albany-Greenbush
Bridge at Albany; thence 14 feet deep at lowest low water and gen-
erally 400 feet wide to the Federal lock at Troy; and thence of same
depth and 200 feet wide to the southern limit of the State barge canal
at Waterford; with widening at bends and in front of the cities of
Troy and Albany to form harbors 12 feet deep at lowest low water;
and removal of State dam at Troy and the construction of a lock and
dam about 21/2 miles below Waterford.
   The channel is to be formed by dredging and rock excavation, and
to be maintained by dredging and by constructing new and raising
and repairing old longitudinal dikes, built partly under previous proj-
,ects and partly by the State of New York. The mean range of pool
elevation above the Federal dam at Troy, in seasons of moderate
rains, is about 2.2 feet, as determined in 1934. The mean tidal range
as determined in 1936 is about 4.7 feet at the Federal dam at Troy
and about 4.6 feet at Albany. The mean range during the summer
months is about 4.7 feet.
   The normal pool level above the Federal dam from Troy to Water-
ford is 14.33 feet above mean sea level at Sandy Hook, N. J. In the
tidal section of the river below the dam the assumed lowest low-water
plane from Troy to Albany is 3 feet below mean sea level at Sandy
Hook, N. J.
   The following table contains information concerning the various
features of the lock and dam included in the existing project:
Location:
    Below Waterford------------------- --------------------- miles__             2.2
    Above Battery, New York City-------------------------do__                 153. 8
Lock :
    Clear width-_------------------              --------------------- feet__ 44. 44
    Greatest length available for full width--------------               do__ 492. 5
    Lift at lowest stages----------              ------------------      do__ 17.3
    Depth on miter sills:
          Upper (at normal pool level) ____------------------do__              16. 3
          Lower (at lowest low water) _________---------------           do__ 13. 0
Character of foundation: Rock.
Kind of dam: Fixed.
Type of construction: Concrete.
Completed : 1917.
Cost : $1,463,014.07.
  The estimated cost for new work, revised in 1938, is $17,168,000,
exclusive of amounts expended on previous projects. The latest (1930)
               RIVERS       AND HARBORS-NEW YORK,                          N.   Y.,   DISTRICT            225
approved estimate for annual cost of maintenance is $337,300, includ-
ing $21,300 for operation and care of the lock and dam.
  The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                    Documents 1


June 25,1910       Channel 12 feet deep from Hudson to Waterford,        H. Doc. No. 719, 61st Cong., 2d sess.
                    removal of State lock and dam at Troy and con-
                    struction of a new lock and dam.
Mar. 3,1925        Channel 27 feet deep from Hudson to Albany____.       H. Doc. No. 350, 68th Cong., 1st sess.
July     3, 1930   Channel 27 feet deep below Hudson_    ------------    H. Doc. No. 210, 70th Cong., 1st sess.
        (2)        Operation and care of lock and dam at Troy were
                    included in project July 1, 1935.
Aug. 30,1935 3     Relocation of the 12-foot channel between Troy        S. Doc. No. 155, 72d Cong., 2d sess.
                     and Waterford.
June 20,1938       Deepening channel between Albany and Water-           H. Doc. No. 572, 75th Cong., 3d sess.
                    ford to 14 feet, with no change in depths for har-
                     bors in front of Albany and Troy.


  I These documents contain latest published maps.
  2 Permanent Appropriations Repeal Act approved June 26, 1934.
  3 P. W. A., Sept. 6, 1933.


   Local cooperation.-Fully complied with.
   Terminal facilities.-The piers and other terminal or transfer facil-
ities served by the improvement are as follows:
   Between Waterford and the Federal dam at Troy there are 14
wharves aggregating approximately 5,000 feet in length. The State of
New York has constructed a barge-canal terminal at Cohoes. There
is a dock 325 feet long on the west side of the river just north of the
Federal dam.
   At Troy there are 10 terminals with available dockage of 2,395 feet,
including the State barge canal terminal with 960 feet. In addition,
11/4 miles of concrete bulkhead were constructed along the water front
by the city of Troy. At Watervliet there is a stone bulkhead 800 feet
long. Between this point and Albany there are 5 timber wharves
aggregating 4,275 feet in length.
   At Albany and Rensselaer, on the east side of the river, there are 28
terminals aggregating 18,037 feet of available berthage, including a
city-owned recreation pier of 900 feet and the State barge canal termi-
nal with 1,550 feet located on the west side of the river. These termi-
nals are adequately served with railroad trackage. There are 4 transit
sheds, 1 warehouse, a 13,500,000-bushel grain elevator, and a molasses-
storage plant, all provided by the Albany Port District Commission.
   Between Albany and Hudson there are about 100 timber wharves
aggregating 36,700 feet in length; at Hudson there are 12 timber
wharves aggregating 5,000 feet in length; at Athens there are 9 timber
wharves aggregating 4,000 feet in length.
    Between Hudson and the upper limits of New York City the entire
water fronts of Poughkeepsie, Newburgh, and Yonkers are equipped
with transfer facilities. At Poughkeepsie there are 13 terminals with
available dockage of 3,153 feet, including a city-owned pier of 270 feet.
At Newburgh there are 16 terminals with a total dockage of 8,034 feet,
of which 3 with 1,124 feet of dockage are open to the public. At Yon-
226     REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1942

kers there are 24 terminals with dockage of 8,378 feet, of which 816 feet
are for public use.
   The existing wharves are ample for Hudson River traffic. (For
latest full description of terminal facilities see Port Series No. 25,
1936, Corps of Engineers.)
   Operations and results during fiscal year.-Under a contract for
dredging and rock removal to a depth of 14 feet in the channel between
Albany and the Troy-Menands Bridge, work commenced May 14,
1940, was in progress at the end of the fiscal year. During the fiscal
year there were removed 201,939.2 cubic yards, place measurement, of
material other than ledge rock, 47,088.7 cubic yards, place measure-
ment of ledge rock, and an adjustment of minus 16,369.2 cubic yards
of ledge rock was made in the amount previously reported for drilling
and blasting, at a cost of $238,626.23 for new work.
   Under a contract for dredging and rock removal to a depth of 14
feet in the channel between the Troy-Menands Bridge and the Troy
Barge Canal terminal, work commenced September 10, 1940, was in
progress at the end of the fiscal year. During the fiscal year there
were removed 82,766 cubic yards, place measurement, of material
other than ledge rock, 110,327 cubic yards, place measurement, of ledge
rock, and 21,785 cubic yards of ledge rock were drilled and blasted, at
a cost of $434,060.37 for new work.
   Under a contract for dredging and rock removal to a depth of 14
feet in the channel between the Troy Barge Canal terminal and the
Federal lock at Troy, N. Y., work commenced May 17, 1941, was in
progress at the end of the fiscal year. During the fiscal year there
were removed 105,449 cubic yards, place measurement, of material
other than ledge rock, 50,859 cubic yards, place measurement, of ledge
rock, 8,254 cubic yards of rock were drilled and blasted, and 14,528
linear feet of line holes were drilled, at a cost of $312,853.11 for new
work.
   The U. S. derrick boat No. 1 was employed from July 1 to October
29, 1941, and from May 22 to June 30, 1942, in removing isolayted
shoals in the channel at Beacon Island and Van Wies Point. A
total of 42,964 cubic yards, place measurement, of material was re-
moved at a cost of $40,179.87, all for maintenance.
   By the use of Government plant and hired labor, snags and stumps,
which formed a potential menace to navigation, were removed from
the shores of the river between Troy and Hudson, at a cost of
$8,050.34, all for maintenance.
   By the use of Government plant and hired labor, repairs were made
to Port Schuyler, Breaker Island, Hillhouse Island, Lower Patroons
Island Paved, Bath Crossover, Overslaugh No. 2, Campbell Island,
Schodack Paved, New Baltimore, Mulls Island Half, Coxsackie Island,
Fordham Point, and West Dikes. The cost of this work was $45,-
433.86, all for maintenance.
   The lock and dam in the Hudson River at Troy, N. Y., was operated
and maintained during the fiscal year. Repairs were made to the
lock machinery and lock property. Operations of the lock for the
1941 navigation season were suspended December 22, 1941, and were
commenced April 1, 1942, for the 1942 season. By use of Government
                RIVERS           AND           HARBORS-NEW                         YORK,            N. Y.,         DISTRICT             227
plant the lock was unwatered and emergency repairs were made to
the lock valves, machinery, walls, sills, and gates during the period
when the lock was closed to navigation. The cost of work during the
fiscal year was as follows: Operations, $28,812.29; ordinary repairs,
$7,350.14; and emergency repairs, $24,904.49; a total of $61,066.92.
   The cost of engineering, surveys, and contingencies was $43,023.41,
all for maintenance.
   The cost of all work was $1,183,294.11-$136,687.48 for maintenance,
$985,539.71 for new work, and $61,066.92 for operating and care. The
total expenditures were $1,149,796.94.
   Condition at end of fiscal year.-About 89 percent of the existing
project had been completed. The construction of new lock and dam
at Troy, removal of old dam at Troy, and construction of 15,545
linear feet of new dikes have been completed. In the reconstruction
of old dikes, 39,672 linear feet have been raised to the adopted crest
height. The channel from Albany to Troy has been completed to
a depth of 12 feet, with the exception of a small part of the widening
to form harbors at Albany and Troy, which work is not deemed
necessary for the present. The channel from Troy to Waterford
has been completed to a depth of 14 feet. The work of deepening the
channel south of Albany to 27 feet mean low water has been com-
pleted with the exception of about 1,500 linear feet at the northern
end.
   The controlling mean low water depth from New York City to Al-
bany, N. Y., is 27 feet through a navigable channel 300 to 400 feet in
width. The controlling lowest low water depth from Albany to the
lock and dam at Troy is 11 feet through a channel varying in width
from 400 feet at Albany to 100 feet near the south entrance to the
lock at Troy. At the lock entrance it is 12 feet deep for a width of 50
feet. The controlling pool level depth in the channel above the lock
at Troy to Waterford, the head of the improvement, is 14 feet for a
width of about 200 feet.
   The work remaining to be done under the existing project consists
in completing the deepening of the channel from Albany to Water-
ford to 14 feet, completing the widening of the harbors in front of
Troy and Albany to a depth of 12 feet, completing the construction
and reconstruction of dikes, and completing the deepening of the
27-foot channel from New York City to the site of the former Albany-
Greenbush Bridge.
   The total costs under the existing project to June 30, 1942, were as
follows :

                                                           New work               Maintenance                Operating and         Total


Regular funds       ________                            $14,113, 531. 52    $3, 585, 168. 56                  $293, 743. 21    $17, 992, 443. 29
Public W orks funds ....................            I        238, 350. 00 _...............................                          238, 350. 00
Emergency Relief funds . . ......                             311,461.08                      ----........-
                                                                                          .---------                -   . .        311,461.08
        Total ....... _     _.    ..       .   ..         14, 663, 342. 60           3, 585, 168. 56            293, 743. 21    18, 542, 254. 37
228       REPORT OF CHIEF OF ENGINEERS,                             U. S. ARMY,   1942

   The total expenditures under the existing project to June 30, 1942,
were $17,866,823.62 regular funds; $238,350 Public Works funds; and
$311,461.08 Emergency Relief funds; a total of $18,416,634.70. In ad-
dition the sum of $454,272.93 was expended between August 18, 1915,
and June 30, 1935, on the operation and care of the works of improve-
ment under the provisions of the permanent indefinite appropriation
for such purposes.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $1,392,496.88 will be applied as follows:
Accounts payable June 30, 1942_________ _____________---_                           $125, 619. 67

New work:
   Complete by Oct. 9, 1943, under contract in force, dredging
     and rock removal to provide project depth of 14 feet between
     Albany and the Troy-Menands Bridge__________________                            149, 611. 00
   Complete by June 19, 1943, under contract in force, dredging
     and rock removal to provide project depth of 14 feet between
     the Troy-Menands Bridge and the Troy Barge Canal termi-
     nal ---------------                                                             198, 417. 21
   Complete by Sept. 4, 1943, under contract in force, dredging
     and rock removal to provide project depth of 14 feet between
     the Troy Barge Canal terminal and Federal lock at Troy____                      582, 191. 00

        Total---------------------------------------------                           930, 219. 21

Maintenance:
      Complete by Aug. 31, 1943, under a contract to be entered into,
        the removal of shoals from the 27-foot channel between Hud-
       son and Albany____________--           __---___           __                  111, 658. 00
      Operate 1 United States derrick boat with attendant plant
        for about 6 months in the removal of shoals over rock areas
        between Hudson and Waterford and removing from the
        shores, stumps and snags which are likely to be carried
        into the river (July 1942 to June 1943) ----------------                         65, 000. 00
      Operate Government-owned plant consisting of pile driver, der-
        rick boats, etc., in repairing dikes where found to be most
        urgently needed (July 1942 to June 1943) ____-___-___                            60, 000.00
      Miscellaneous surveys, sweepings, and current observations
        pertaining to maintenance operations (July 1942 to June
        1943)_                                 -                                         52, 000. 00
      Operate, maintain, and repair lock and dam at Troy, N. Y., dur-
        ing the fiscal year------------------------------------                          48, 000. 00

           Total            -------------------------------------                    336, 658.00

           Grand total-------------------------------------                        1,392,496.88
   The new work will complete the deepening of the channel between
Albany and Waterford to 14 feet. Completion of the 27-foot channel
and the widening of the harbors in front of Troy and Albany to a
depth of 12 feet are not considered necessary at this time. It is im-
portant that full project dimensions be maintained in the channel
south of Albany, that dikes be kept in a proper state of repair, and that
the operation and care of the lock and dam at Troy be continued.
Therefore, the sum of $263,000 can be profitably expended during the
fiscal year ending June 30, 1944, as follows:
           RIVERS AND HARBORS-NEW YORK, N. Y.,                                              DISTRICT                 229
Maintenance:
    Complete by Aug. 31, 1944, under a contract to be entered into, the
      removal of shoals in the 27-foot channel between Hudson and
      Albany ------------           -------------------------------      $90, 000
    Operate 1 United States derrick boat with attendant plant for about
      5 months during the fiscal year in removing shoals over rock areas
      between Hudson and Waterford and removing from the shores
      stumps and snags which are likely to be carried into the river___ 45, 000
    Operate Government-owned plant consisting of pile driver, derrick
      boats, etc., during the fiscal year in repairing dikes where found
      to be most urgently needed_____---------___------------------       45, 000
    Miscellaneous surveys, sweepings, and current observations pertain-
      ing to maintenance operations during the fiscal year                42, 000      -----------
    Operate, maintain, and repair lock and dam at Troy, N. Y., during
      the fiscal year     -----------------------------------------       41, 000
        Total-------------------                        ----------------------                                  263, 000
                                   Cost and financial summary

Cost of new work to June 30, 1942_________________________---                                       $19, 775, 936. 10
Cost of maintenance to June 30, 1942______________________                                            4,679, 981. 78

     Total cost of permanent work to June 30, 1942__________
Minus accounts payable June 30, 1942_ __ -----      ------                             _                 24, 455, 917. 88
                                                                                                             125, 619. 67

                             -----------------------------
     Net total expenditures___                                                                           24, 330, 298. 21
Unexpended balance June 30, 1942___________                                -------
                                                                        ___-----                          1, 392, 496. 88

        Total amount appropriated to June 30, 194--                           -         -                25, 722, 795. 09

   Fiscal year ending June 30         1938             1939               1940                1941               1942


Cost of new work__             _              _       $8, 409. 81       $65, 255.16     $469,758.67            $985, 539. 71
Cost of maintenance_....._ ____.   $287,094.96       244, 271.98        400, 794. 50     245, 821. 86           197, 754. 40

     Total cost _                   287, 094. 96     252, 681. 79       466, 049. 66        715, 580. 53      1, 183, 294. 11

Total expended        __            264, 846. 21     246, 706. 63       457, 806. 54        671, 351. 86      1, 149, 796. 94

Allotted .....-                     560, 000. 00   1, 651,000. 00       945, 672. 25        785, 000. 00        223, 000. 00



Balance unexpended July 1, 1941___ _____________________      $2, 319, 293. 82
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942 -- ------------------------       --     233, 000. 00

                                         -
        Amount to be accounted for_ ______-                         _------------ _ --                    2, 552, 293. 82
Deductions on account of revocation of allotment-----------                                 ----              10, 000.00

       Net amount to be accounted for__________-___-------2, 542, 293.82
Gross amount expended--------------------        $1,151,802.38
Less reimbursements collected-------------------      2, 005.44
                                                                1,149, 796. 94

      Balance unexpended June 30, 1942________--- _---------                                              1, 392, 496. 88
Outstanding liabilities June 30, 1942___________- $125,619. 67
Amount covered by uncompleted contracts --------   930, 219. 09
                                                                                                          1, 055, 838. 76

        Balance available June 30, 1942--__-----------                            -             _           336, 658. 12

Amount (estimated) required to be appropriated for completion- -                                     -
                     1- - - - - - - - - - - - - -- - - - - - - - - - - - -- -- --
of existing project                                                                                        943, 000. 00
Amount that can be profitably expended in fiscal year ending June
                                      -- -- -- --- -- -- --- -- --- -- --- -- ---
  30, 1944, for maintenance 1                                                                               263, 000. 00
  1 Exclusive of available funds.
230     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,            1942

27. GREAT LAKES TO HUDSON RIVER WATERWAY-ENLARGEMENT OF
                NEW YORK STATE BARGE CANAL

  Location.-This waterway consists of that portion of the New York
State Barge Canal system extending from the Hudson River at Water-
ford to Oswego Harbor on Lake Ontario. (See U. S. Lake Survey
Charts Nos. 182, 183, 184, and 185.)
  Existing project.-This provides for the allotment of Federal funds
to the State of New York for expenditure under suitable Federal
control and supervision in the improvement of the canal connecting
Lake Ontario with the Hudson River. The improvement includes
deepening between locks to 14 feet below normal pool levels widening
at bends and elsewhere, and increasing the overhead clearance to 20
feet at maximum navigable stage at bridges and other overhead struc-
tures. The widths of channel to be provided under the project are
104 feet in earth cuts, 120 feet in rock cuts, 200 feet in river sections,
with widening at bends and elsewhere as may be necessary.
  The length of the waterway included in the project is about 184
miles, of which 160 miles are in the Erie Canal from Waterford to
Three Rivers Point and 24 miles are in the Oswego Canal from Three
Rivers Point to Oswego.
  The estimated cost for new work, made in 1933, is $27,000,000. The
project document provides that the total amount to be allotted shall
not exceed $27,000,000 and that not to exceed $3,285,000 shall be ex-
pended on bridges and other overhead structures. No estimate of
maintenance with Federal funds is included, as maintenance of the
canal is not a part of the Federal project.
  The existing project was authorized May 28, 1935, under the Emer-
gency Relief Appropriation Act of 1935, and by the River and Har-
bor Act approved August 30, 1935 (Rivers and Harbors Committee
Doc. No. 20, 73d Cong., 2d sess.), which document contains the latest
published map.
  Recommended modifications of project.-Modification of the existing
project for Great Lakes-Hudson River Waterway was recommended
by the Chief of Engineers in a report requested by Rivers and Har-
bors Committee resolution adopted May 1, 1940, and transmitted to
Congress by the Secretary of War June 15, 1942.
  Local cooperation.-Fully complied with.
  Terminal facilities.-The State of New York has provided terminal
and transfer facilities at all important points along the Erie and Os-
wego Canals, and at Buffalo, Troy, Albany, and New York Harbor.
The freight-handling equipment, as well as the storage and dock
facilities, are governed by the requirements of the particular locality.
The State-owned terminal at Oswego is equipped with a grain elevator
of 1,000,000 bushels capacity. The Albany Port District Commission
has erected a grain elevator of 13,500,000 bushels capacity at Albany.
The State grain elevator in New York Harbor on Gowanus Bay has a
capacity of 2,000,000 bushels.
  Terminals at Buffalo, Rochester, Syracuse, Schenectady, Troy, Al-
bany, and Oswego are provided with direct railroad connections. All
State-owned terminals are open to the public on equal terms. Lake-
port terminals are extensive in character. The available terminals
appear ample to meet all requirements.
        RIVERS AND HARBORS-NEW          YORK,   N.   Y.,   DISTRICT   231

   Operations and results during fiscal year.-The following work
was done by contract:
   Excavating all material, including ledge rock, and drilling line holes
at various locations between lock 10 at Cranesville and lock 13 at
Yosts. Work was commenced October 23, 1940, and was completed
November 18, 1941. During the fiscal year, 10,888.7 cubic yards, place
measurement, of ledge rock, 22,351.4 cubic yards, place measurement, of
other material, 149.8 cubic yards of boulders, 50 percent of the shoal in
area No. 2 were removed, and 822 linear feet of line holes were drilled
at a cost of $106,971.21.
   Excavating all material, including ledge rock, and drilling line
holes at various locations between lock 13 at Yosts and lock 16 at
Mindenville. Work was commenced October 1, 1940, and was 97
percent completed at the end of the fiscal year. During the fiscal year
65,311 cubic yards, place measurement, of ledge rock and 49,742 cubic
yards, place measurement, of other material were removed and 1,991
linear feet of line holes were drilled at a cost of $385,222.39.
   Excavating all material, including ledge rock, and drilling line
holes from guard gate 3 at Indian Castle to lock 17 at Little Falls.
Work was commenced May 16, 1940, and was completed September 5,
1941. During the fiscal year 5,021.2 cubic yards, place measurement,
of ledge rock; 30,508.7 cubic yards, place measurement, of other ma-
terial; and 0.2 cubic yard of boulders were removed; 57 linear feet
of line holes were drilled; and an adjustment of minus 21,302 cubic
yards, place measurement, of material not rehandled was made at a
cost of $33,389.67.
   Excavating all material, including ledge rock and incidental work
thereto, between lock 17 and Hansen Avenue Bridge, Little Falls,
except in the immediate vicinity of guard gate 4 and Hansen Avenue
Bridge. Work was commenced June 29, 1939, and was completed May
1, 1941. During the fiscal year the contractor was credited with the
removal of 331 cubic yards, place measurement, of ledge rock and 255
cubic yards, place measurement, of existing masonry, with the placing
of 0.2 cubic yard of second-class concrete, 8 pounds of miscellaneous
iron and steel, and 296.95 tons of bank gravel for concrete lining, with
the drilling of 1,065 linear feet of line holes and with the completion
of the backfilling of a concrete retaining wall. Adjustments of minus
180 cubic yards, place measurement, of other material, minus 0.1 cubic
yard of dry rubble masonry and minus 0.7 square yard of bitumi-
nous macadam were made; and tax adjustments of minus $521.82 for
old age benefits and plus $260.64 for gasoline tax were made on the
final account at a cost of $2,155.82.
   Excavating all material, including ledge rock, and drilling line
holes between lock 5 at Minetto and lock 7 at Oswego and between
lock 8 at Oswego and Oswego Harbor. Work was commenced Decem-
ber 11, 1939, and was completed June 12, 1941. During the fiscal year
the contractor was credited with the removal of 617.7 cubic yards,
place measurement, of ledge rock and 715.26 cubic yards, place measure-
ment, of other material and with the drilling of 25.8 linear feet of
line holes at a cost of $3,348.80.
   Excavating all material, including ledge rock, drilling line holes,
and performing other miscellaneous work between locks 7 and 8, Os-
wego. Work was commenced January 13, 1941, and was completed
232    REPORT OF CHIEF OF ENGINEERS,         U.   S. ARMY,   1942

June 12, 1941. During the fiscal year the contractor was credited with
underpinning a concrete wall at a cost of $1,816.01.
   Furnishing and placing crushed stone and quarry stone for bank pro-
tection and performing other miscellaneous work at Herkimer Termi-
nal, Herkimer (at various locations from approximately 0.7 mile west
of lock 18 to 1.4 miles west of Herkimer Terminal). Work' was com-
menced August 4, 1941, and was completed December 2, 1941. During
the fiscal year 26,451.0 cubic yards, place measurement, of material
other than ledge rock, were removed; 4,997.9 tons of crushed stone and
17,105.2 tons of quarry stone were placed at a cost of $73,666.73.
   Raising bridge E-2 at Fourth Street, Waterford. Work was com-
menced April 4, 1941, and was completed November 13, 1941. The cost
during the fiscal year was $19,495.73.
    Raising bridge E-3 at Saratoga Avenue, Waterford. Work was
commenced April 13, 1942, and was 4 percent completed at the end
of the fiscal year. The cost during the fiscal year was $3,516.50.
    Raising Delaware & Hudson Railroad bridge E-4 at Waterford.
Work was commenced June 17, 1941, and was 57 percent completed
at the end of the fiscal year. The cost during the fiscal year was
 $116,964.30.
    Raising bridge E-26 at St. Johnsville. Work was commenced July
8, 1941, and was completed June 11, 1942. The cost during t4he fiscal
year was $32,032.82. Final costs have not been determined.
    Raising emergency bridge E-31 at Little Falls. Work was com-
menced July 31, 1941, and was completed December 5, 1941. The cost
during the fiscal year was $10,922.39.
    Raising bridge E-42 at West Schuyler Road, Herkimer County,
N. Y. Work was commenced November 18, 1941 and was 58 percent
completed at the end of the fiscal year. The cost during the fiscal year
was $36,669.06.
    Raising bridge E-43 at Park Avenue, Utica. Work was com-
menced April 21, 1941, and was completed October 23, 1941. The
cost during the fiscal year was $30,770.(0. Final costs have not been
determined.
    Raising New York Central Railroad bridge E-50 east of Rome.
Work was commenced October 6, 1941, and was 4 percent completed
at the end of the fiscal year, at which time further operations were
suspended. The cost during the fiscal year was $7,959.25.
    Raising New York Central Railroad bridge E-56 west of Rome.
Work was commenced August 14, 1941 and was 7 percent completed
at the end of. the fiscal year, at which time further operations were
suspended. The cost during the fiscal year was $13,965.02.
    Raising bridge E-57 at Stony Brook Road near New London. Work
was commenced April 14, 1941, and was completed October 29, 1941.
The cost during the fiscal year was $14,849.56.
    Raising New York Central Railroad bridge E-65 at Brewerton.
Work under the contract had not been commenced at the close of the
fiscal year. The cost of engineering during the fiscal year was $144.69.
    Raising New York Central Railroad bridge E-70 at Three Rivers.
Work was commenced September 18, 1940, and was completed July
15, 1941. The cost during the fiscal year was $2,114.24. Final costs
have not been determined.
               RIVERS         AND       HARBORS--NEW                 YORK,          N.   Y.,        DISTRICT                  233

   Raising bridge 0-5 at Hinmansville. Work was commenced June
25, 1941, and was completed December 5, 1941. The cost during the
fiscal year was $20,543.50.
   Raising bridge 0-9 at Oneida Street, Fulton. Work was com-
menced April 2, 1941, and was completed August 8, 1941. The cost
during the fiscal year was $7,047.76.
   Raising bridge 0-11 over lock 7, Oswego. Work was commenced
September 3, 1941, and was completed December 1, 1941. The cost
during the fiscal year was $15,565.26.
   The cost of contingencies preliminary to operations under proposed
contracts was $175.57. The total cost of all work was $939,306.98 for-
new work. The expenditures were $1,146,818.93.
   Condition at end of fiscal year.-The existing project was about 77
percent completed. The status of the channel deepening and widen-
ing is as follows:

                                                                                                     Distance (miles)


                  From-pleted                                                              CFrom- Work remaining to
                                                                                                                  be done
                                                                                               to       -                -      -      -
                                                                                          project           Work in          Future
                                                                                                            progress         work


Hudson River__ -                                 Guard gate 2 at Waterford ....-..               2. 6     ---.-                     0. 2
Guard gate 2 at Waterford              _.   __   Lock 10 at Cranesville_____________            32. 2
Lock 10 at Cranesville ...............           Lock 16 at Mindenville -_......                35. 2            10. 9
Lock 16 at Mindenville_                          Guard gate 5 at Herkimer ........              15. 5 ..........                     .7
Guard gate 5 at Herkimer ...........             Oswego Harbor__ ___________ ______             96. 7
       Total (184 miles)           .---------------
                                              ----------- -         ------............
                                                                  ---                          182. 2            0.9                 .9

  I Overburden removed and material blasted.


   Quarry stone has been placed as bank protection from Lock 18 to
Rome, from Lock 21 to Lake Oneida, and from Lake Oneida to Three
Rivers Point.
   Thirty-two Barge Canal bridges have been raised to project clear-
ance with Federal funds under this improvement. Two additional
bridges were raised, four were removed, and two were removed and
replaced by new structures at project clearance; all by other agencies.
  The present depth is 12 feet at normal pool levels for the follow-
ing widths: 75 feet in earth cuts, 94 feet in rock cuts, and 200 feet in
canalized rivers and lakes. The 29 locks, 22 in Erie Canal east of
Three Rivers Point, and 7 in Oswego Canal, north of Three Rivers
Point, have a clear width of 45 feet, usable length of 300 feet, and
depth over miter sills of 12 feet. Numerous fixed bridges, trans-
mission lines, and other structures span the waterway. There are
69 bridges between Waterford and Three Rivers Point and 13 be-
tween Three Rivers Point and Oswego. The minimum clearance
under existing bridges and other overhead structures is 14.66 feet
above maximum navigable stage.
   The work remaining to be done to complete the project consists
of widening and deepening the channel by excavation, including the
234       REPORT OF CHIEF OF ENGINEERS,                 U. S. ARMY,       1942

removal of ledge rock and work incidental thereto, for a total distance
of 1.8 miles, as described in the above table, the raising of 26 Barge
Canal bridges, the lengthening of 1 bridge, and the raising of 7 guard
gates, and the revetment of banks with quarry stone where necessary.
   The total cost of the existing project to June 30, 1942, was
$20,790,993.61 for new work-$15,977,593.45 from regular funds and
$4,813,400.16 from Emergency Relief funds, and the total expendi-
tures were $20,664,289.33-$15,850,889.17 from regular funds and
$4,813,400.16 from Emergency Relief funds.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $1,618,110.83, will be applied as follows:
Accounts payable to June 30, 1942_____ _________-      ___________ $126, 704. 28
New work:
    Complete by Sept. 26, 1942, under contract in force, dredg-
      ing, and rock removal between lock 13 at Yosts and lock 16
      at Mindenville-------------------------------------------20,          610. 29
    Complete by Oct. 23, 1942, under contract in force, raising of
      bridge E-42 at West Schuyler---------------------                 26, 600. 30
    Final payment under contract completed July 15, 1941, for
      raising of New York Central R. R. bridge E-70 at Three
      Rivers---------------------------------------------------19, 406. 55
    Final payment under contract completed June 1., 1942, for
      raising of bridge E-26 at St. Johnsville___________    ______      1, 978. 75
    Complete by Oct. 24, 1942, under contract in force, raising of
      bridge E-3, Saratoga Ave., Waterford___________________           73, 718. 91
    Complete by Dec. 1, 1943, under contract in force, raising of
      Delaware & Hudson R. R. bridge E-4 at Waterford ---------         88, 417. 94
    Balance remaining---------------------------------------        1, 260, 673. 81
       Total __---------------------------------------------         --    1, 618, 110. 83
   The above work, together with work performed under previous
allotments, will result in the widening and deepening to 14 feet of
approximately 183.1 miles of canal and the deepening to restricted
width of the remaining 0.9 mile of the waterway; in the placing of
bank protection where needed over 74 miles of completed canal; and
in the raising of 35 bridges to a vertical clearance of 20 feet at maxi-
mum navigable stage.
    The improvement should be continued. Therefore, the sum of
$1,000,000 can be profitably expended for new work during the fiscal
year ending June 30, 1944, to reimburse the State of New York for
work of excavating and of raising bridges, under contracts to be
entered into during the fiscal year, as follows:
New work:
   Resume, under contract in force to be completed about Dec. 31,
     1944, raising of New York Central R. R. bridge E-56, west of
     Rome ----------------------------------------------------                   $179,400
   Resume, under contract in force to be completed about Mar. 1,
     1944, raising of New York Central R. R. bridge E-50 east of
        Rome    _-----_________    ________   __   -----------   _               171,900
      Raising of New York Central R. R. bridge E-65 at Brewerton_____             387, 000
      Furnishing and placing of stone for bank protection at locations
       between Rome and lock 21_____________------------             _            261, 700
        Total    ----------------------------------------------------         1, 000, 000
              RIVEiRS AND HARBORS-NEW YORK, N. Y., DISTRICT                                                                235
                                       Cost and financial summary

Cost of new work to June 30, 1942_______________--------------                                          $20, 790, 993. 61
Cost of maintenance to June 30, 1942_______------------------                                           --------------

     Total cost of permanent work to June 30, 1942-----------20, 790, 993. 61
Minus accounts payable June 30, 1942-----------------------      126, 704. 28

     Net total expenditures----------------------------                                                    20, 664, 289. 33
Unexpended balance June 30, 1942--------------------------                                                  1, 618, 110. 83

         Total amount appropriated to June 30, 1942---------_                                              22, 282, 400. 16

   Fiscal year ending June 30               1938               1939                1940             1941                1942


Cost of new work-...............       $5, 033, 455. 61   $4, 186, 377. 24 $3, 237, 037. 05 $1, 426, 014. 44         $939, 306. 98
Cost of maintenance .        -            ----------- ---------------------------------------                    ----------

Total expended       .--------------- 4, 947, 309.17      4, 756, 857. 66    3, 874, 750. 64   1, 477, 319. 20      1, 146, 818. 93

Allotted __....... ----      - - ---   5, 750, 000. 00    5, 250, 000. 00      468, 087. 46      700, 000. 00         269, 000. 00


Balance unexpended July 1, 1941------------------------ :t $2, 495, 929. 76
Amount allotted from War Department Civil Appropriation Ac
approved Apr. 28, 1942__-------   --------------------        269. 000. 00

      Amount to be accounted for______-___-------------                                                    2, 764, 929. 76
Gross amount expended______---      ----------    $1, 146, 913. 80
Less reimbursements collected.-___-_,__------               94. 87
                                                                                                            1, 146, 818. 93

      Balance unexpended June 30, 1942----------------                                                      1, 618, 110. 83
Outstanding liabilities June 30, 1942 ----------- $126, 704. 28
Amount covered by uncompleted contracts-----_      595, 651. 65
                                                                                                                 722, 355. 93
         Balance available June 30, 1942 .                                  ___.                                 895, 754. 90
Amount (estimated) required to be appropriated for completion
of existing project 1                                                                                     4, 717, 600. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for new work 1                                                                                   1, 000, 000. 00
  1Exclusive      of available funds.

               28. NARROWS OF LAKE CHAMPLAIN, N. Y. AND VT.

   Location.--This waterway, 37 miles long, comprises the southern
end of Lake Champlain and extends from Whitehall to Crown Point,
N. Y. The portion included in the project extends from Whitehall,
N. Y., at the southern extremity of the lake, northerly to Benson
Landing, Vt., a distance of 13.5 miles. (See U. S. Lake Survey Chart
No. 174.)
   Previous projects.-Adopted by River and Harbor Acts of July
4, 1836, March 3, 1837, July 7, 1838, August 5, 1886, July 13, 1892, and
March 3, 1899. For further details, see page 256, Annual Report for
1932.
   Existing project.-This provides for a channel extending from
Whitehall, N. Y., at the head of Lake Champlain, to Benson Landing,
to be 12 feet deep at low lake level and generally. 200 feet wide, and
the installation of fender booms at Putts Rock, Putts Leap, Narrows
near Dresden, Pulpit Point, and Cedar Mountain. The reference plane
236       REPORT OF CHIEF OF ENGINEERS,                            U.         S. ARMY,     1942

of low lake level is 92.5 feet above mean sea level at Sandy Hook, N. J.
The length of the section included in the project for improvement is
about 13.5 miles. The usual annual variation of the lake level is from
4 to 5 feet, and the extreme variation varies from 0.6 foot below up to
8.8 feet above the low lake level.
   The estimate of cost for new work, revised in 1928, is $1,196,000,
exclusive of amounts expended on previous projects. The latest (1918)
approved estimate for annual cost of maintenance is $5,000.
   The existing project was adopted by the River and Harbor Act of
August 8, 1917 (H. Doc. No. 1387, 62d Cong., 3d sess.). The latest
published map is in the project document.
   Terminal facilities.-Terminal facilities are located in Whitehall
Harbor and consist of three timber wharves, aggregating 4,200 feet in
length. The State of New York has constructed a barge canal terminal
at Whitehall, just south of the terminus of the canal, which has been
equipped with a 15-ton hand-operated derrick and a storehouse. The
facilities are considered adequate for present commerce.
   Operations and results during fiscal year.-The fender booms oppo-
site the Delaware & Hudson Railroad Co.'s coal trestle were repaired at
a cost of $371.94 and the automatic recording gage at Fort Mont-
gomery, Rouses Point, N. Y., was maintained at a cost of $613.61, a
total cost of $985.55, for maintenance. The total expenditures were
$1,006.13.
   Condition at end of fiscal year.-The existing project was about 47
percent completed. A channel 12 feet deep at low lake level and
least width of 150 feet has been excavated throughout the length of
the improvement, except at the Elbow, where the width is 110 feet.
Fender booms have been placed at the Elbow (Putts Leap) and op-
posite the Delaware & Hudson Railroad Co.'s coal trestle. No fender
booms appear to be needed at the Narrows near Dresden, Pulpit Point,
and Cedar Mountain. The controlling depths at low lake level, as
disclosed by surveys made in September and October 1940, through the
reach included in the project, were as follows:

                                   Locality                                              Depth    Width

                                                                                          Feet     Feet
Whitehall to the Elbow- . . -----------                   ---------- ------        -      12       140-300
At the Elbow ------------------------------------------------------- -----                12            110
From the Elbow to Maple Bend--     ---------------
                                        ,-------    -- - ------- --        -              12       100-150
From Maple Bend to Red Rock Bay-------------------------------------_                     12            150
From Red Rock Bay to Benson Landing _..................            __
                                                                  .........               12              140


   The work remaining to be done to complete the project consists in
widening the channel throughout its length to the project width of
200 feet.
   The total cost and expenditures of the existing project to June 30,
1942, were $736,393.91-$566,811.14 for new work and $169,582.77 for
maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $2,498.03 will be applied as follows:
               RIVERS AND HARBORS-NEW                                 YORK, N. Y., DISTRICT                         237
Maintenance:
   Repair and care of fender booms at the Elbow and opposite the
      Delaware & Hudson R. R. trestle during the working seasons
      (July 1942 to June 1943)----------------------------------     $1, 798. 03
    Operate automatic recording gauge at Fort Montgomery, Rouses
      Point, N. Y. (July 1942 to June 1943) ------------------------     700. 00

          Total-----------------------------------------------------                                           2, 498. 03
  Neither completion of the project nor maintenance dredging will be
necessary during the fiscal year 1944. The operation of the Fort
Montgomery Gage should be continued and the fender booms at the
Elbow and opposite the Delaware & Hudson Railroad trestle should
be maintained. Therefore, the sum of $1,500 can be profitably ex-
pended during the fiscal year ending June 30, 1944, as follows:
Maintenance:
   Repair and care of fender booms during the working season- ------                                                $800
   Operate the Fort Montgomery gage                                                                                   00
                                                                                                                     7-------------------

          Total-----------------------------                                --------------------------              , 500
                                              Cost and financial summary

Cost of new work to June 30, 1942_____ ____________-______--                                               $681, 811. 14
Cost of maintenance to June 30, 1942 1111111111111111    ____                                               188, 723. 12

          Total cost of permanent work to June 30, 1942--------------- 870, 534. 26
Net total expenditures---------------- ---                                                                   870, 534. 26
Unexpended balance June 30, 1942----_  --------------------                                            -       2, 498. 03

          Total amount appropriated to June 30, 1942________________                                         873, 032. 29

Fiscal year ending June 30                      1938          1939              1940           1941             1942

Cost of new work ....
Cost of maintenance          -.....   __ _        $609.87    $81, 507. 07       $7, 242. 80   $45, 686. 07         $985.55
Total expended                 __                  471. 03    81, 761. 95        7, 062.50     45, 765. 17        1,006. 13
Allotted--..._--_-.-------               --     42,000.00     48,000. 00        45,000.00       1, 500.00         1, 500.00



Balance unexpended July 1, 1941_________________________  __                                                  $2, 004. 16
Amount allotted from War Department Civil Appropriations Act
  approved Apr. 28, 1942____________                                                                           1, 500. 00
      Amount to be accounted for__________                                                                     3, 504. 16
Gross amount expended-___-         ______________1006.                                                         1,      13
          Balance unexpended June 30, 1942 ___________________--                                   -           2, 498. 03
Amount (estimated) required to be appropriated for completion of
existing project--------------------------------------- -----        629, 200. 00
Amount that can be profitably expended in fiscal year ending June 30,
1944 for maintenance-----------------------------------------1, 500. 00
   x
  Exclusive of available funds.
                                        29. BURLINGTON HARBOR, VT.

  Location.-This harbor, about 100 acres in extent, is located in a
half-moon-shaped indentation in the eastern shore of Lake Champlain,
about 40 statute miles south of the international boundary line, 70
          493202-43-pt. 1, vol. 1--16
238            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                              1942

statute miles north of the southern end or head of the lake, and 20
statute miles southeast of the harbor at Plattsburg, N. Y. (See U. S.
Lake Survey Chart No. 172.)
   Existing project.-This provides for a breakwater 6,000 feet long
located about 1,000 feet from the shore and practically parallel with
it, to be built of stone-filled timber cribs, capped with large stone or
concrete. The completed breakwater is to be in two sections, the
northerly 500 feet being separated from the southerly 5,500 feet by
a gap 200 feet wide for the purpose of safety in entering the harbor
during storms. The reference plane of low lake level is 92.5 feet above
mean sea level at Sandy Hook, N. J. The level of the lake has varied
from 0.6 foot below up to 8.8 feet above the low lake level. The usual
annual variation is 4 to 5 feet.
   The estimate of cost for new work, revised in 1928, was $1,095,000.
The latest (1928) approved estimate for annual cost of maintenance is
$8,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                           Documents


July     4, 1836   Construction of first 1,000 feet of breakwater      .---   H. Doc. No. 131, 23d Cong., 1st sess.
June 23, 1866      Extension of 1,500 feet to breakwater- _._-----_           H.     Ex. Doc. No. 56, 39th Cong., 2d
                                                                                   sess., pp. 17 and 179, printed in pts.
                                                                                   3 and 4, Annual Report, 1866.
Mar. 3,1875        Extension of 2,000 feet to breakwater-- _---...-.          Annual Report, 1874; p. 274.
                   Chief of Engineers authorized extension southerly          Annual Report, 1887, p. 2407.
                     of 1,000 feet and northerly for 500 feet.


  For latest published map, see Annual Report for 1897, p. 3298.


   Terminal facilities.-The terminals consist of bulkheaded shore
front and open pile and solid filled piers having a total dockage of
6,520 feet. Of the terminals, five wharves, two piers, and one ferry
slip are in use. Five of the terminals have railroad connections. The
facilities are considered adequate for present needs of commerce.
   Operations and results during fscal year.-Under                                                     a contract
for repairs to 130 linear feet of the stone protection mound, and a
supplemental agreement for repairs to 24 additional linear feet of
the breakwater, work was commenced October 29, 1941, and was sus-
pended for the season on January 9, 1942. Work had not been re-
sumed at the end of the fiscal year due to high water in the lake.
There were placed during this period 3,400 tons of core stone at a
cost of $14,680.09 for maintenance.
   The cost of engineering and contingencies preliminary to repair of
the breakwater was $311.33 for maintenance.
   The total cost of work was $14,991.42 for maintenance. The total
expenditures were $13,818.43 for maintenance.
   Condition at end of fiscal year.-The existing project was prac-
tically completed in 1890; part of the breakwater originally proposed
was not built, the work completed being considered sufficient for the
needs of navigation. The breakwater has been built in two sections,
364 and 3,793 feet in length, respectively, separated by a gap of
              RIVERS         AND HARBORS--NEW                           YORK,    N.    Y.,     DISTRICT               239

200 feet. Sections of the stone and concrete superstructure of the
breakwater have been displaced by wave action and the failure of
the timbers in the tops of the wooden cribs. The controlling depth
in June 1939 was about 8.5 feet at low lake level at the wharves,
increasing considerably toward the breakwater.
   The distinction between new work and maintenance was not made
in the early reports, hence it is impossible to separate the costs prior
to July 1, 1886.
   The total cost under the existing project to June 30, 1942,
amounted to $968,081.28; since June 30, 1886, the cost of maintenance
amounted to $261,667.17, leaving $706,414.11 as the cost of new work,
including maintenance prior to July 1, 1886. The total expenditures
amounted to $966,908.29.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $16,181.57 will be applied as follows:
Accounts payable June 30, 1942-------------------------------           $1, 172. 99
Maintenance: Complete by Oct. 30, 1942, under contract in force, repair
   of the stone protection mound of the breakwater---------------                                              15, 008. 58
          Total----------------------------------------                                                  -- 16, 181. 57
   Further repair of the breakwater will not be necessary during the
fiscal year 1944. Therefore, no funds can be profitably expended dur-
ing the fiscal year ending June 30, 1944.
                                            Cost and financial summary

Cost of new work to June 30, 1942------__ --------------------- $706, 414. 11
Cost of maintenance to June 30, 1942------------------------- 261, 667. 17
      Total cost of permanent work to June 30, 1942----------  968, 081. 28
Minus accounts payable June 30, 1942--------------------------   1, 172. 99

     Net total expenditures-------------------------------   966, 908. 29
Unexpended balance June 30, 1942---------------------------- 16, 181. 57
           Total amount appropriated to June 30, 1942----------                                 -----         983, 089. 86

    Fiscal year ending June 30                     1938          1939           1940              1941              1942

Cost of new work ................--------------
Cost of maintenance..........-------------.       $8, 723. 78    $472. 42    $40, 170.89     --------------        $14, 991.42
Total expended------....     ------------          8,581.44       869.18        40,186.56 --------------            13, 818.43
Allotted........----------------------            46, 250. 00   12, 642.90   -16,601.86         $30, 000.00 ..



Balance unexpended July 1, 1941   ----.                        $30, 000. 00
Gross amount expended----       ------------------------------- 13, 818. 43
      Balance unexpended June 30, 1942-----------------------                                                  16, 181. 57
Outstanding liabilities June 30, 1942-----------------$1, 172. 99
Amount covered by uncompleted contracts ----------- 14, 320.99
                                                                                                                 15, 493. 98
           Balance available June 30, 1942---------------------------                                               687. 59
240     REPORT OF CHIEF OF ENGINEERS,       U.   S. ARMY,   1942

      30. NEWARK BAY, HACKENSACK AND PASSAIC RIVERS, N. J.

   Location.-Newark Bay is an estuary about 11/4 miles wide and 6
miles long, extending southerly from the confluence of the Hacken-
sack and Passaic Rivers to New York and New Jersey Channels.
   The Hackensack River rises near Haverstraw, Rockland County,
N. Y., and flows into Newark Bay. It is about 45 miles long.
   The Passaic River rises in the highlands of northeastern New Jersey
and flows into Newark Bay. It is about 80 miles long. (See U. S.
Coast and Geodetic Survey Charts Nos. 287 and 369 and U. S. Geo-
logical Survey chart of New York City and vicinity.)
   Previous projects.-Adopted by River and Harbor Acts of August
30, 1852, June 10, 1872, June 14, 1880, June 13, 1902, March 2, 1907,
July 25, 1912, March 2, 1919, and September 22, 1922. For further
details see pages 265 and 266 of Annual Report for 1926; page 301,
Annual Report for 1929; and page 244, Annual Report for 1938.
   Existing project.-This provides for the following:
   (a) Newark Bay: A channel 30 feet deep and about 1,800 feet
wide at the entrance, including the removal to a depth of 30 feet of
part of the rock area at Bergen Point, shown on project map as area
A (H. Doc. No. 206, 67th Cong., 2d sess.), narrowing to 400 feet in the
vicinity of the Central Railroad of New Jersey bridge across the bay,
and continuing with that width to the junction of the Passaic and
Hackensack River Channels, a distance of about 4.7 miles.
   (b) A branch channel in Newark Bay 30 feet deep and 400 feet
wide, widened at the turn, to the Port Newark terminal extending
from the main channel as far as the United States pierhead line, a
distance of 0.2 mile.
   (c) Hackensack River: A channel 30 feet deep and 400 feet wide
from the upper end of the Newark Bay Channel to the Central Rail-
road of New Jersey bridge, about 1.1 miles, thence 30 feet deep and 300
feet wide to a point about 2,000 feet north of the Delaware, Lackawanna
& Western Railroad bridge, 2.8 miles, thence 12 feet deep and 200
feet wide to Little Ferry, 10.1 miles, and thence 12 feet deep and
150 feet wide to the New York, Susquehanna & Western Railroad
bridge, 2.5 miles, a total distance for the Hackensack River of about
16.5 miles.
   (d) Passaic River: A channel 30 feet deep and 300 feet wide, from
Newark Bay to a point 3,000 feet above the Lincoln Highway bridge,
2.6 miles; thence 20 feet deep and 300 feet wide to the Nairn Linoleum
Works, about 4.4 miles; thence 16 feet deep and 200 feet wide to the
Montclair & Greenwood Lake Railroad bridge, about 1.1 miles; thence
10 feet deep and 150 feet wide to the Eighth Street Bridge at Passaic,
7.3 miles, a total distance for the Passaic River of 15.4 miles.
   All depths refer to the plane of mean low water. The mean tidal
range in Newark Bay is 4.9 feet, in Hackensack River at Court Street
bridge, 5.3 feet; in Passaic River at Pennsylvania Railroad freight
bridge, 5.1 feet; and iiiPassaic River at the Gregory Avenue Bridge,
4.9 feet; mean range of spring tides, 5.8, 6.4, 6.1, and 5.9 feet, re-
spectively. High easterly or westerly winds cause a fluctuation of as
much as 2 feet above or below mean tidal range.
   The estimate of cost for new work, revised in 1936, is $5,604,000,
exclusive of amounts expended on previous projects. The latest (1930)
approved estimate for annual cost of maintenance is $152,000.
                RIVERS       AND HARBORS-NEW                     YORK, N.        Y.,   DISTRICT             241

  The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                    Documents


Mar. 2,1907 16-foot channel in Passaic River _ __-                        H. Doc. No. 441, 59th Cong., 2d sess.
Feb. 27,1911 Widening 16-foot channel in Passaic River                        Do.
July 25,1912 20-foot channel in Passaic River___-------------             H. Doc. No. 707, 62d Cong., 2d sess.
     Do _--- 12-foot channel in Hackensack River_............             H . Doc. No. 643, 61st Cong., 2d sess.
Sept. 22, 1922 30-foot channel in Hackensack River below Cen-             H. Doc. No. 206, 67th Cong., 2d sess.t
                      tral R. R. of New Jersey bridge, 30-foot channel
                      in Newark Bay, and 30-foot Port Newark con-
                      necting channel.
Jan.     21, 1927   10-foot channel in Passaic River------------------    H. Doc. No. 284, 69th Cong., 1st sess.
           ....--
       Do----       30-foot channel in Hackensack River above Cen-        H. Doc. No. 429, 69th Cong., 1st sess.t
                      tral R. R. of New Jersey bridge.
July      3, 1930   30-foot channel in Passaic River   __-----     ----   H. Doc. No. 156, 71st Cong., 2d sess.l


  1 Contains latest published maps.

  Recommended modifications of project.-'Under date of July 5,
1939, the Chief of Engineers recommended modification of the exist-
ing project for the section of Passaic River, N. J., extending from the
Montclair & Greenwood Lake Railroad bridge to the Eighth Street
Bridge in Passaic to provide that when spoil-disposal areas are not
available or the placing of dredge spoil ashore is uneconomical as
compared with other methods of disposal, local interests shall not be
required to furnish disposal areas for maintenance dredging (H. Doc.
No. 430, 76th Cong., 1st sess.).
  Modification of the existing project for Newark Bay, N. J., was
recommended by the Chief of Engineers in a report requested by
resolution of the Committee on Commerce adopted May 21, 1941,
and transmitted to Congress by the Secretary of War July 22, 1942.
  Local cooperation.-Fully complied with as required by the River
and Harbor Act approved January 21, 1927, except that local inter-
ests are required to provide suitable spoil-disposal areas for mainte-
nance dredging in the 30-foot channel in the Hackensack River above
Central Railroad of New Jersey bridge; in the 10-foot channel in the
Passaic River; and whenever required by the Secretary of War, for
dredging in the 30-foot channel in Newark Bay and the Hackensack
River below the Central Railroad of New Jersey bridge, as required
by the River and Harbor Act approved September 22, 1922.
   Terminal facilities.-There are 156 piers, wharves, and bulkheads,
and one large shipyard located along the waterways included in
the project with a total available dockage of 69,000 -feet. Twelve
of the terminals are publicly owned, the largest of which, Port
Newark, owned and operated by the City of Newark, provides about
11,000 feet of wharfage. Five of the terminals with a total wharf-
age of 1,300 feet are open to the public; 56 have mechanical handling
devices; and 77 have railroad connections. The facilities are con-
sidered adequate for existing commerce. (For further details see
Port Series No. 20, Corps of Engineers.)
   Operations and results during fiscal year.-Under a contract for
the removal of shoals to a depth of 12 feet in the Hackensack River
from Secaucus, N. J., to Hackensack, N. J., work was commenced
242    REPORT   OF CHIEF ,OF ENGINEERS,      U.   S. ARMY,   1942

August 18, 1941, and completed April 9, 1942. During this period
there was removed a total of 177,498 cubic yards, place measure-
ment, of material at a cost of $45,609.11 for maintenance.
   The U. S. derrick lighter N. Y. 20 was employed on April 13, 1942,
in removing obstructions from the channel in Hackensack River at
the site of the former Bergen Turnpike Bridge. A length of piling
and a piece of concrete were removed at a cost of $375.84 for
maintenance.
   The cost of contingencies preliminary to dredging in the Hacken-
sack River was $15.11 for maintenance. The cost of survey to de-
termine the condition of Newark Bay was $2,767.40 for maintenance.
   The total cost of work was $48,767.46, all for maintenance. The total
expenditures were $48,650.84.
   Condition at end of fiscal year.-The existing project was about 90
percent completed. The 30-foot channels in Newark Bay and Port
Newark entrance channel, the 30- and 12-foot channels in Hacken-
sack River, and the 30-, 16-, and 10-foot channels in Passaic River are
completed. The 20-foot channel in Passaic River is completed to
Jackson Street, Newark.
   The controlling mean low water depths of the various channels, as
shown by surveys made intermittently from September 1932 to April
1942, are as follows: 30 feet for a width of 180 to 400 feet through
Newark Bay, thence in the Hackensack River 30 feet for a width of
200 to 400 feet to a point about 2,000 feet above the Delaware, Lacka-
wanna & Western Railroad bridge, thence 12 feet, for a width of 200
feet to 1,500 feet above the Route 3 highway bridge; thence 12 feet
for a width of 90 to 150 feet to the head of the project at the New York,
Susquehanna & Western Railroad bridge; and in the Passaic River, 30
feet for a width of 300 feet to 2,650 feet above the Lincoln Highway
Bridge; thence 16 feet for a width of 160 to 300 feet to the Jackson
Street Bridge; thence 15 feet for a width of 150 to 300 feet to the Erie
Railroad bridge (Newark branch) ; thence 14 feet for a width of 100 to
150 feet to the Montclair & Greenwood Lake Railroad bridge; thence
10 feet for a width of 70 to 150 feet to the Second Street Bridge; thence
8 feet for a width of 70 to 150 feet to 500 feet below the Eighth Street
Bridge; thence 4 feet for a width of 80 to 120 feet to the Eighth Street
Bridge. The depth in Port Newark entrance channel was 26 feet for
a width of 400 feet. The minimum widths through bridge draws are:
Hackensack River-30-foot project 930 feet, 12-foot project 56 feet;
Passaic River-30-foot project 100 feet, 20 and 16-foot projects 75 feet,
10-foot project 45 feet.
   The work remaining to be done under the existing project consists
of the completion of the 20-foot channel in Passaic River from Jackson
Street to the Nairn Linoleum Works. This work includes the removal
of a small quantity of rock on the west side of the channel above Center
Street Bridge. Adjacent property owners are opposed to the removal
of this rock.
   The total cost of the existing project to June 30. 1942, was $6.919,-
306.70-$5,063,756.27 for new work and $1,855,550.43 for maintenance.
The total expenditures were $6.919,025.78.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $70,747.30, will be applied as follows:
                   RIVERS AND HARBORS-NEW YORK,                            N. Y., DISTRICT                    243

Accounts payable June 30, 1942______     ___----_--  ----------------   $280. 92
Maintenance:
    Final payment under contract completed Apr. 9, 1942, for the re-
      moval of shoals in the 12-foot channel in Hackensack River __-- 16, 791. 82
    Complete by Dec. 31, 1943, under contract to be entered into,
      dredging to restore the main channel through Newark Bay from
      New York and New Jersey Channels to Port Newark branch
      channel and the branch channel to project dimensions_ --- ____ 53, 674. 56
                   Total--------------------------------------------------70, 747. 30
   Neither completion of the project nor further maintenance dredging
is considered necessary during the fiscal year 1944. Therefore, no
funds can be profitably expended during the fiscal year ending June
30, 1944.
                                        Cost and financial summary

Cost of new work to June 30, 1942----------------------------                                  $6, 819, 077. 73
Cost of maintenance to June 30, 1942__________________                                     _    2, 298, 035. 87

      Total cost of permanent work to June 30, 1942__--------                                   9, 117,113. 60
                                            -___-
Minus accounts payable June 30, 1942-____- __- _      ---------                                        280. 92

     Net total expenditures-------------------------------                                           , 116, 832. 68
                                          _ ---------------
Unexpended balance June 30, 1942 __________-                                                            70, 747. 30

        Total amount appropriated to June 30, 1942________---__-                                9, 187, 579. 98

   Fiscal year ending June 30              1938           1939          1940            1941              1942

Cost of new work ---------------         $60, 222. 29
Cost of maintenance-............          32, 355. 21   $8, 612. 46   $69, 156.29    $310, 478. 72       $48, 767.46
     Total cost        -          ---     92, 577. 50    8, 612.46    $69, 156. 29    310, 478.72         48, 767.46
Total expended                  ___       92, 575.43     4, 971. 18    72, 118.50     310, 997. 56        48, 650.84
Allotted_   - --           --           -75, 838. 67    143,000.00    275, 000. 00     35, 000.00 .



      Balance unexpended July 1, 1941_-__-------------                               __              $119, 398.14
Gross amount expended_---_-____----------                                                              48, 650. 84

      Balance unexpended June 30, 1942______________---
                                            ---                                                        70, 747. 30
Outstanding liabilities June 30, 1942_______________ $280. 92
Amount covered by uncompleted contracts --.-- __-_ 6, 900. 00
                                                                                                        7, 180. 92
        Balance available June 30, 1942________ ________________--                                    $63, 566. 38
Amount (estimated) required to be appropriated for completion
of existing project --------                             ___                                         540, 000. 00
  1 Exclusive of available funds.

                       31. NEW YORK AND NEW JERSEY CHANNELS

  Location.-These channels extend from deep water northwest of
Sandy Hook, through lower New York Bay and Raritan Bay, to
Perth Amboy, and thence through Arthur Kill, lower Newark Bay,
and Kill Van Kull to deep water in upper New York Bay. This
route is located approximately along the boundary line between the
States of New York and New Jersey. (See U. S. Coast and Geo-
detic Survey Charts Nos. 285, 286, and 369.)
244             REPORT OF CHIEF OF ENGINEERS,                           U. S. ARMY,             1942

   Previous projects--(a) Raritan Bay.-Adopted by River and Har-
bor Acts of March 3, 1881, September 19, 1890, and June 3, 1896.
   (b) Staten Island Sound.-Adopted by River and Harbor Acts
of June 23, 1874, March 3, 1875, June 14, 1880, August 11, 1888, May 15,
1889, and October 20, 1890, June 3, 1896, June 13, 1902, June 25, 1910,
and March 4, 1913.
   (c) New York and New Jersey Channels.-Adopted by River and
Harbor Act of September 22, 1922. For further details, see page 284
of the Annual Report for 1923, and page 194 of the Annual Report
for 1934.
   Existing project.-This provides for a channel through lower New
York Bay, Raritan Bay, Arthur Kill, lower Newark Bay, and Kill
Van Kull to upper New York Bay, the depth to be 37 feet in rock
and 35 feet in soft material throughout, except in Arthur Kill be-
tween a point 1,000 feet north of the mouth of Smiths Creek and
a point 1,000 feet south of Buckwheat Island, where the depth will
be 30 feet; the width to be 600 feet across lower New York Bay
and Raritan Bay and in the Arthur Kill to a point 500 feet south
of Morse Creek, widened to 800 feet in the vicinities of Seguine
Point and Wards Point, respectively, thence 500 to 600 feet wide
and passing north of Shooters Island and protected by a dike on
its northern side to the junction of the channel into Newark Bay;
and thence 800 feet wide through Kill Van Kull to upper New York
Bay; with two anchorages 38 feet deep to accommodate five vessels
each, one in the vicinity of Sandy Hook and one south of Perth
Amboy, all with suitable easing at the bends and junctions. Length
of section included in project 30.6 miles. All depths refer to the
plane of mean low water. The mean range of tides varies between
4.9 and 5.1 feet; the mean range of spring tides, 5.8 to 6.1 feet.
Extreme easterly or westerly winds produce fluctuations of 1 to 3 feet
above or below the mean range.
   The estimate of cost for new work, revised in 1939, is $37,630,000,
exclusive of amounts expended on previous projects. The latest
 (1935) approved estimate for annual cost of maintenance is $195,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                    Documents


   ----              Construction of dike.    (Completed under pre-     H. Doc. No. 653, 66th Cong., 2d sess.
                      vious projects; River and Harbor Act, Sept. 22,
                  1922.)
Sept. 6, 1933                 off  PerthAmboyRivers                           and Harbors Committee Doc.
Aug. 3,1935                               Amboy to 33 feetNo.               17, 71st Cong., 2d sess.
May 28,1935 2       tin         ect     a who.                         Hs Doc. No. 133, 74th Cong., 1st sess.
Aug. 30,1935 JExisting       project as a whole---------------------(contains      latest published map.)
Aug.    30,   1935                                                        (Contains   latest   published   map.)




  1 Public Works Administration.
  2 Emergency Relief Act of 1935.


  Local cooperatioin.-Workunder the existing project is subject to the
following conditions of local cooperation:
   (a) That where the project channel encroaches upon upland property
and extends shoreward of harbor lines, the completion of the encroach-
        RIVERS   AND HARBORS-NEW YORK,           N.   Y.,   DISTRICT   245
ing portions of the project shall be deferred until the necessary rights-
of-way for channel purposes shall have been granted free of cost to the
United States; and
    (b) That local interests provide areas of land adjacent to the water-
way, free of cost to the United States, for the disposal of dredged
materials, except where, in the judgment of the Chief of Engineers, no
suitable disposal areas exist.
   Under condition (a), a portion of Buckwheat Island necessary for
channel purposes has been ceded to the United States. Local interests
are taking steps toward providing rights-of-way required for the im-
provement of the channel at Howland Hook. Condition (b) is being
complied with.
   Terminal facilities.-There are 217 piers, wharves and bulkheads
along the waterway with a total available dockage of about 111,900
feet. Seventeen terminals are publicly owned, 9 of which, with 950
feet of dockage, are open to the public. Included in the terminals are
5 large shipyards. The facilities are considered adequate for existing
commerce. (For further details see Port Series No. 20, Corps of
Engineers. )
    Operations and results during fiscal year.--Under a contract for
dredging and rock removal to a depth of 37 feet in section 7, area 8
and easterly part of area 10, in the northerly half of the channel in Kill
Van Kull in the vicinity of Bergen Point, work was commenced March
3, 1941, and discontinued on June 18, 1942. During the fiscal year
78,177 cubic yards, place measurement, of rock were drilled and blasted
and 101,827 cubic yards, place measurement of rock and 13,451 cubic
yards, place measurement, of material other than rock were removed
at a total cost of $798,684.14 for new work.
    Under a contract for dredging and rock removal to a depth of 37
feet in section 7, area 9 in the northerly half of the channel in Kill
Van Kull in the vicinity of Bergen Point, work was commenced May 1,
1941, and discontinued February 12, 1942, due to transfer of contractor's
plant to work of more urgent nature. During the fiscal year 73,440
cubic yards, place measurement, of rock were drilled and blasted and
29,569 cubic yards, place measurement of rock and 3,280 cubic yards,
place measurement, of material other than rock were removed at a
total cost of $476,172.23 for new work.
    Under a contract for dredging and rock removal to a depth of 37
feet in section 7, westerly part of area 10, in the northerly half of the
channel in Kill Van Kull, in the vicinity of Bergen Point, work was
commenced March 7, 1942, and discontinued April 18, 1942, due to
transfer of contractor's plant to work of more urgent nature. During
the fiscal year 12,565 cubic yards place measurement of rock were
drilled and blasted at a cost of $62,113.72 for new work.
    Under a contract for dredging and rock removal to a depth of 37
feet in section 7, area 12, in the southerly half of the channel in Kill
Van Kull off the easterly end of Shooters Island, work was commenced
January 31, 1942, and was in progress at the end of the fiscal year.
During the fiscal year 55,413 cubic yards, place measurement, of rock
were drilled and blasted and 37,365 cubic yards, place measurement, of
rock and 15,269 cubic yards, place measurement, of material other than
ledge rock were removed at a total cost of $543,033.06 for new work.
246        REPORT OF CHIEF OF ENGINEERS,                                   U. S. ARMY,              1942

   The cost of surveys and engineering preliminary to contract dredg-
ing and for a condition survey of channel north of Shooters Island was
$25,813.88-$24,571.09 for new work and $1,242.79 for maintenance.
   Under a contract for dredging to a depth of 30 feet in the channel
south of Shooters Island, work was commenced June 4, 1941, and was
completed August 20, 1941. During the fiscal year, a total of 136,067
cubic yards, place measurement, of material were removed at a cost of
$69,328.51 for maintenance under the previous project.
   The cost of survey to determine the condition of the old channel off
Wards Point was $648.89 for maintenance under previous project.
   The total cost of work under the previous project was $69,977.40 for
maintenance. The total expenditures were $69,972.40.
   The total cost of work under the existing project was $1,905,817.03-
$1,904,574.24 for new work and $1,242.79 for maintenance. The total
expenditures were $1,661,212.72.
   Condition at end of fiscal year.-The existing project was about
47 percent completed. Work completed thus far has consisted of
providing project depth of 35 feet in soft material and 37 feet in
rock in a 21/ 4-mile reach in Raritan Bay extending westward from
Bayside-Gedney Channel; the westerly half of the channel from Buck-
wheat Island to Elizabethport; the channel in Newark Bay and north
of Shooters Island from Elizabethport to the easterly end of Shooters
Island; the northerly half of the channel in Kill Van Kull from
Shooters Island to Constable Point, except for a one-half mile reach
at the Bayonne Bridge; the channel from Constable Point to St.
George; and of providing 33-foot depth in the northeasterly portion
of the Perth Amboy anchorage.
   The controlling mean low water depth when examined intermit-
tently from 1933 to 1942 was 35 feet for a 600-foot width for a distance
of 21/4 miles westward from Bayside-Gedney Channel in Raritan Bay;
thence 30 feet and 400 feet wide to Buckwheat Island, following the
previous project channel at the westerly end of Raritan Bay; thence
35 feet and 250 to 800 feet wide to the entrance of Kill Van Kull in
New York Harbor, except in the vicinity of the Bayonne Bridge, where
the depth was 30 feet.
   The work remaining to be done under the existing project consists
of completing the deepening and widening of the entire channel to
dimensions authorized by the River and Harbor Act of August 30,
1935, the completion of the deepening of the anchorage south of Perth
Amboy, and dredging the anchorage in the vicinity of Sandy Hook.
   The total costs and expenditures under the existing project to June
30, 1942, were as follows:

                                                                      Costs
                                                                                                         Expenditures
                                             New work              Maintenance            Total


Regular funds____________ ___________-.    $14, 866, 379. 73         $221, 781. 61   $15, 088, 161. 34   $14, 732. 261. 76
Public Works funds                              807, 000. 00    -_                        807, 000.00         807, 000. 00
Emergency Relief funds-----------_ _         2, 023, 308. 41                           2, 023, 308. 41     2, 023, 308. 41

     Total United States funds-------- 17, 696, 688. 14               221, 781. 61    17, 918, 469. 75    17, 562, 570. 17
Contributed funds..._______ _______          7, 711. 82        _                            7, 711. 82          7, 711. 82
      Total, all funds   ---....   -      - 17, 704, 399. 96          221, 781. 61    17, 926, 181. 57    17, 570, 281. 99
         RIVERS AND IHARBORS-NEW YORK, N. Y.,                   DISTRICT          247

   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $5,161,404.11, will be applied as follows:
Accounts payable June 30, 1942--------------------------------           $355, 904. 58
New work:
    Complete by July 19, 1942, under continuing con-
     tract in force, dredging and rock removal in the
     northerly half of the channel in Kill Van Kull in
     the vicinity of Bergen Point, section 7, area 8 and
     easterly portion of area 10----------__------       $99, 947. 00
    Complete by Sept. 26, 1942, under continuing con-
     tract in force, dredging and rock removal in
     the northerly half of the channel in Kill Van Kull
     in the vicinity of Bergen Point, section 7,
     area 9------------------------------__              367,669. 00
   Complete by July 12, 1943, under contract in force,
     dredging and rock removal in the northerly half
     of the channel in Kill Van Kull in the vicinity
     of Bergen Point, section 7, westerly portion of
     area 10------------------------------------554, 168. 00
    Complete by June 21, 1943, under continuing con-
     tract in force, dredging and rock removal in the
     southerly half of the channel in Kill Van Kull off
     the easterly end of Shooters Island, section 7,
      area 12----------------------__--------------      387,081. 00
   Complete by Mar. 1, 1944, under contract in force,
     dredging and rock removal in the northerly half
     of the channel in Kill Van Kull in the vicinity of
     Bergen Point, section 7, area 11-----------  ___    976,634. 53
    Complete by Mar. 1, 1944, under contract to be
     entered into, dredging and rock removal in the
     easterly half of the channel in Arthur Kill from
     Piles Creek to Morse Creek, section 5, area 7___    744, 000. 00
   Complete by Jan. 1, 1944, under contract to be
     entered into, dredging and rock removal in the
     easterly half of the channel in Arthur Kill from
     Morse Creek to Elizabeth River, section 5,
     area 8-------------------------------------- 744, 000. 00
   Complete by Nov. 1, 1943, under contract to be
     entered into, dredging and rock removal in the
     easterly half of the channel in Arthur Kill from
     Elizabeth River to Elizabethport, section 5,
     area 9---------------------------         ------    738,000. 00
                                                         -      -       4, 612, 499. 53
Maintenance: Complete by June 30, 1943, under con-
tract to be entered into, dredging to restore the
existing channel north of Shooters Island to project
dimensions_--------------------------------------------------            193,000. 00

      Total ___   -------   __   _      _______
                                     --------     _     -----           5, 161, 404. 11

   The deepening of the channel to project dimensions should be con-
tinued. The existing channels in Raritan Bay should be maintained.
Therefore, the sum of $5,050,000 can be profitably expended during the
fiscal year ending June 30, 1944, as follows:
New work:
   Complete by June 30, 1944, under contract to be entered into, dredg-
     ing and rock removal in the southerly half of the channel in Kill
     Van Kull in the vicinity of Port Richmond, section 7, area 13____ $860, 000
   Complete by June 30, 1944, under contract to be entered into, dredg-
     ing and rock removal in the southerly half of the channel in Kill
     Van Iull in the vicinity of Port Richmond, section 7, area 14_____ 860, 000
    Complete by June 30, 1944, under contract to be entered into, dredg-
      ing and rock removal in the southerly half of the channel in Kill
      Van Kull in the vicinity of Port Richmond, section 7, area 15 ._   860, 000
248          REPORT OF CHIEF OF ENGINEERS,                                          U. S. ARMY,                 1942

New work-Continued.
    Complete by June 30, 1944, under contract to be entered into, dredg-
     ing in the southerly half of the channel in Kill Van Kull between
     Port Richmond and West New Brighton, section ?, area 16___- $600,000                                        -
   Complete by Dec. 31, 1944, under contract to be entered into, dredg-
      ing and rock removal in the southerly half of the channel in Kill
      Van Kull between West New Brighton and St. George, section 7,
      areas 17-A and 17-B--      --------------------- -------------     720, 000
    Under a continuing contract to be entered into in the amount of
     $1,120,000 to be completed about June 30, 1945, for completion of
     the deepening of Perth Amboy Anchorage, section 9. Amount to'
     be expended during the fiscal year ______________________ 470, 000
    Dredge by use of 2 United States seagoing hopper dredges for about
      16 dredge months during the fiscal year, to continue deepening the
      channel through Raritan Bay, section 2__________-------------      630, 000

       Total-----------        ------------------------------         5,000,000
Maintenance: Dredging by contract to restore the existing channels in
Raritan Bay to previous project dimensions----------------------        50, 000

           Total               ----------------------------------------------                                          5, 050, 000

                                             Cost and financial summary

Cost of new work to June 30, 1942-----------------------1                                                    $30, 506, 662. 86
Cost of maintenance to June 30, 1942__-- ------------                                                          1, 063, 110. 87
      Total cost of permanent work to June 30, 1942_________                                               12 31,     569, 773. 73
Minus accounts payable June 30, 1942_             --
                                             __-____    -355,                                                              904. 58

     Net total expenditures_______________________   12 31, 213, 869. 15
Unexpended balance June 30, 1942-___-__________---__     5, 161, 404. 11

           Total amount appropriated to June 30, 1942----------                                            12   36, 375, 273. 26
  1 Exclusive of $7,711.82 expended from contributed: funds for new work.
  2 Includes $6,621 for new work and $1,621 for maintenance of Lemon Creek.




   Fiscal year ending June 30                     1938              1939               1940              1941               1942

Cost of new work __                          $2, 805, 903. 66 $3, 948, 414. 80 $2, 758, 703. 37 $1, 274, 823. 94       $1, 904, 574. 24
Cost of maintenance             ...------------- 46, 960. 83                          , 603. 55
                                                                                     1-------------- 43, 568. 34            71, 220. 19
      Total cost ....          ......--------------
                                               2, 852, 864.49   3, 948, 414. 80   2, 760, 306. 92   1, 318, 392. 28     1, 975, 794.43
Total expended ...                            2, 617, 292. 56
                               ...--------------                4, 201, 446. 72   2, 789, 283. 98   1. 423, 687. 44     1, 731, 185. 12
Allotted    ...--- -........   .._.     ..   5, 711, 656. 34    3, 867, 000. 00   1, 281, 000. 00   2, 708, 000. 00     3, 750, 000. 00



Balance unexpended July 1, 1941______---------------------------                                                $3, 142, 589. 23
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942---------------------------------3,                                                           750, 000. 00
      Amount to be accounted for____________________________                                                     6, 892, 589. 23
Gross amount expended __--____-___           $1, 731, 286. 83
Less reimbursements collected---------------          101. 71
                                                                                                                 1, 731, 185. 12
      Balance unexpended June 30, 1942---------------------                                                      5, 161, 404. 11
Outstanding liabilities June 30, 1942---------  $355, 904. 58
Amount covered by uncompleted contracts--      1, 404, 365. 88
                                                                                                                  1, 760, 270. 46
           Balance available June 30, 1942_ __.-                              --------------                     3, 401, 133. 65
             RIVERS AND HARBORS-NEW                                YORK, N.          Y., DISTRICT              249

Amount (estimated) required       to be- appropriated   for completion
                     - - - -- - -          - -------- - -- -- - -- -- -
of existing project                                                                               $15, 321, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1944:  -- - -- - -- - -- - -- - -- - -         - - - - - - - - - - - - - - -- - -
   For new work 3 3 - - - - - - - _- - - - - - - - - - - - - - - - -                                 5, 000, 000. 00
                                                                         - - - -- - - - -
   For maintenance                                                                                       50, 000. 00
                  -- - - - - - - - - - - - - - - - - -   -- -- - -- -- - -- - -- -   - - -- -- -
        Total                                                                                        5, 050, 000. 00
   aExclusive    of available funds.

    32. RARITAN RIVER TO ARTHUR KILL CUT-OFF CHANNEL, N. J.

   Location.-This channel is in the western portion of Raritan Bay,
off Perth Amboy, and about 23 miles by water southwest of the Bat-
tery, New York City. (See U. S. Coast and Geodetic Survey Chart
No. 286.)
   Existing project.-This provides for a channel about 1 mile long,
20 feet deep at mean low water and 800 feet wide, connecting the
Raritan River Channel with the southern end of the Arthur Kill
Channel, New York and New Jersey Channels project. The mean
range of tides is 5.1 feet; mean range of spring tides, 6.1 feet, High
easterly or westerly winds cause irregular tidal fluctuations from 1
to 2 feet above or below the mean range.
    The estimate of cost of new work made in 1933 was $600,000. The
latest (1935) approved estimate of annual cost of maintenance is
$21,000.
    The existing project was authorized by the Public Works Admin-
istration under date of September 6, 1933, and by River and Harbor
Act approved August 30, 1935 (H. Doc. No. 50, 73d Cong., 1st sess.),
which document contains latest published maps.
    Terminal facilities.-No terminal facilities are served by the im-
provement, which is a connecting channel.
   "Operations and results during fiscal year.-Under a contract for
dredging to a depth of 20 feet, work was commenced December 24,
1941, and discontinued on January 27, 1942, due to transfer of con-
tractor's plant to work of more urgent nature. There was removed
during the fiscal year a total of 45,919 cubic yards, place measure-
ment, of material at a cost of $24,286.56 for maintenance. The cost
of survey and engineering preliminary to dredging was $1,897.66 for
maintenance.
    The total cost of work was $26,184.22, all for maintenance. The
total expenditure was $24,735.88.
    Condition at end of fiscal year.-The existing project was completed
in 1935. When examined in September 1941 and February 1942 the
controlling mean low water depth through the channel was 17 feet
for a width varying from 350 to 800 feet.
    The total cost of the existing project to June 30, 1942, was
 $976,332.47-$810,500 Public Works funds for new work and
 $165,832.47 regular funds for maintenance. The total expenditure was
 $974,312.03.
250             REPORT OF CHIEF OF ENGINEERS,                                           U. S. ARMY,                1942

   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $237,139.82, will be applied as follows:
Accounts payable June 30, 1942--_--------------------------------- $2, 020. 44
Maintenance :
    Estimated settlement to be made to contractor as a result of
      termination of contract for dredging to restore the channel to
      project dimensions----------------------------------------     18, 000. 00
    Balance remaining--------------------------------- -------- 217, 119. 38
            Total_ --                                                           -__                                      237, 139. 82

   Maintenance dredging will not be necessary during the fiscal year
1944. Therefore, no funds can be profitably expended during the
fiscal year ending June 30, 1944.
                                               Cost and financial summary
Cost of new work to June 30, 1942-------------------------------  $810, 500. 00
Cost of maintenance to June 30, 1942------------------------------ 165, 832. 47

      Total cost of permanent work to June 30, 1942----------------976, 332. 47
Minus accounts payable June 30, 1942-----------------------------      2, 020. 44

     Net total expenditures_---------------------------------                                                            974, 312. 03
Unexpended balance June 30, 1942-----------------------_                                                                 237, 139..82

            Total amount appropriated to June 30, 1942                                             _                1, 211, 451. 85

    Fiscal year ending June 30                    1938              1939                1940                1941             1942


C ost of new w ork .. . . ..          . . .. . . .. . . .. . . ..    . . ..    . . ..   . . .      -
Cost of maintenance -----              ------  $138, 951. 85                                                 $696. 40       $26, 184. 22

Total expended _.-------------_                 138, 951. 85   _                                              124. 30        24, 735. 88
Allotted----------.........--------------...    138, 951. 85                        $55, 000. 00       72, 000. 00          135, 000. 00


Balance unexpended July 1, 1941-__                                         -                            -               $126, 874. 70
Amount allotted from War Department Civil Appropria-
tion Act approved June 28, 1939-                 -                                             $10, 000. 00
Amount allotted from War Department Civil Appropria-
tion Act approved June 24, 1940-------------------                                                25, 000. 00
Amount allotted from War Department Civil Appropria-
tion Act approved May 23, 1941 -------------------                                             100, 000. 00
                                                                                                                         135, 000. 00

      Amount to be accounted for--------------------------------                                                         261, 875. 70
Gross amount expended--                                  $24, 817. 78
Less reimbursements collected__                                81. 90
                                                                                                                          24, 735. 88

      Balance unexpended June 30, 1942--------------------------                                                        237, 139. 82
Outstanding liabilities June 30, 1942-   -    -       $2, 020. 44
Amount covered by uncompleted contracts-   --   -    216, 000. 11
                                                                                                                        218, 020. 55

           Balance available June 30, 1942--- ----------------------                                                      19, 119. 27

                                         33. WOODBRIDGE CREEK, N. J.

  Location.-This is a small creek, rising near Rahway, N. J., and flow-
ing through marshes into the west side of Arthur Kill, about 20 miles,
by water, southwest of the Battery, New York City. (See U. S. Coast
and Geodetic Survey Charts Nos. 286 and 369.)
        RIVERS    AND   HARBORS-NEW          YORK, N.    Y.,   DISTRICT        251

   Previous project..-Adopted by River and Harbor Act of March 3,
1879. For further details see page 1777, Annual Report for 1915, and
page 256, Annual Report for 1938.
   Existing project.-This provides for a channel 8 feet deep at mean
low water and 50 feet wide, extending from Arthur Kill to the Sal-
amander dock, a distance of about 1.9 miles. Mean tidal range, 5.1
feet; mean range of spring tides, 6.1 feet. High easterly or westerly
winds cause tidal fluctuations of about 2 to 4 feet above and below the
mean range.
    The estimate of cost for new work, made in 1902, was $35,000, ex-
clusive of amounts expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $5,000.
   The existing project was adopted by the River and Harbor Act of
June 13, 1902 (H. Doc. No. 282, 56th Cong., 1st sess., and Annual
Report for 1900, p. 1552). The latest published map is in the project
document.
    Terminal facilities.-There are 2 terminals with a total dockage of
118 feet. One of the terminals with a dockage of 50 feet is publicly
owned. The terminals are adequate for present commerce.
    Operations and results during fiscal year.-Under a contract for
dredging the project channel to a depth of 8 feet, work was commenced
August 25, 1941, and was completed November 29, 1941. During this
period there was removed a total of 88,884 cubic yards, place measure-
ment, of material at a cost of $27,372.85 for maintenance. The cost
of contingencies preliminary to dredging was $92.57 for maintenance.
    The total cost of work was $27,465.42, all for maintenance. The
total expenditure was $29,103.17.
    Condition at end of fiscal year.-The existing project was completed
in 1908. When examined in March, October and November 1941, the
controlling mean low water depth was 8 feet for a width of 50 feet
from the mouth to the town dock, thence 1 foot to the head of the
project.
    The total cost and expenditures of the existing project to June 30,
1942, were $205,953.20-$30,822.70 for new work and $175,130.50 for
maintenance.
    Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $3,896.83, is available for revocation.
    Maintenance dredging will not be necessary during the fiscal year
1944. Therefore, no funds can be profitably expended during the
fiscal year ending June 30, 1944.
                          Cost and financial summary

Cost of new work to June 30, 1942___________________________----$49, 822. 70
                                                     -175,
Cost of maintenance to June 30, 1942_____________---__----           130. 50
      Total cost of permanent work to June 30, 1942    __---   __-   __- 224, 953. 20

Net total expenditures____--_-_------- -____------------------           224, 953. 20
Unexpended balance June 30, 1942____ .       -.        __--__----        - 3, 896. 83

      Total amount appropriated to June 30, 1942__---------- -----        228,850. 03
252           REPORT OF CHIEF OF ENGINEERS,                                           U. S. ARMY,           1942


    Fiscal year ending June 30                      1938             1939              1940          1941             1942

Cost of new work ..............         ......................-----.........-                                       -.......
                       ............-- ........-------..---------------
Cost of maintenance-----------                                                   -------------     $1, 637. 75       $27, 465.42
Total expended.........                   -------.....     --     --------      .---------------------------          29, 103. 17
Allotted-.......................--------------------. ---------- ---------------- ---------         30, 000. 00        3,000.00


Balance unexpended July 1, 1941   ----------------------------- $30, 000. 00
Amount allotted from War Department Civil Appropriation Act ap-
  proved June 24, 1940-------------------   -----------------     3, 000. 00

      Amount to be accounted for                                                                                      000. 00
                                                                                                                  3-----------------------------3
Gross amount expended-----------------------------------                                                          29, 103. 17

           Balance unexpended June 30, 1942------------------                                                      3, 896. 83

                     34. GREAT KILLS HARBOR, STATEN ISLAND, N. Y.

   Location.--Great Kills is a small harbor contiguous to lower New
York Bay, located on the southeasterly shore of Staten Island, N. Y.,
about 8 miles northwest of Sandy Hook, N. J., and 161/2 miles south-
west of the Battery, New York City. (See U. S. Coast and Geodetic
Survey Chart No. 369.)
  Existing project.-This provides for an entrance channel 10 feet
deep and 150 feet wide from deep water in lower New York Bay
through the entrance to the harbor in the vicinity of the present west-
erly end of Crooks Island, thence of same depth and width along the
west side of the harbor and for an anchorage area of 138 acres and
8-foot depth. The length of the section included in the project is
about 1.9 miles. The mean range of tide is 4.7 feet, mean range of
spring tides, 5.7 feet. Extreme easterly or westerly winds produce
fluctuations of from 3 feet below mean low water to 3 feet above mean
high water.
   The estimate of cost for new work, revised in 1938, is $265,000, in-
cluding $114,500 contributed by local interests. The latest (1938)
approved estimate for annual cost of maintenance is $15,000.
   The existing project was authorized by the following river and
harbor acts:

      Acts                               Work authorized                                           Documents


Jan. 21, 1927        Entrance channel to Crooks Island-_--------                  .    H. Doe. No. 252, 69th Cong., 1st sess.
June 20,1938         Extension of entrance channel and for an anchor-                  H. Doc. No. 559, 75th Cong., 3d sess.
                      age area.                                                         (Contains latest published map).



   Local cooperation.-Fullycomplied with except that local interests
are required to furnish suitable spoil-disposal areas for maintenance.
   Terrminal facilities.-No terminals suitable for commercial pur-
poses have been established. There are eight small piers used for
mooring and landing purposes. Four commercial boat yards are
located at Great Kills. Upon completion of the two public terminals
to be constructed in accordance with the requirements of local coop-
eration, the terminals will be sufficient for present needs.
          RIVERS          AND HARBORS-NEW        YORK,   N.   Y.,   DISTRICT      253

   Operations and results during fiscal year.-Under a contract for
dredging to a depth of 10 feet in the channel along the west side of
the harbor and to a depth of 8 feet in the anchorage area, work was
commenced July 21, 1941, and suspended on February 10, 1942. The
contractor was unable to resume work as the concern went into bank-
ruptcy. The contractor's right to proceed with the work was ter-
minated by letter dated April 13, 1942. During the fiscal year, 933,500
cubic yards, place measurement, of material were removed at a cost
of $107,012.82 for new work of which $62,800.13 were from contributed
funds and $44,212.69 from advanced funds.
   The cost of survey and engineering preliminary to completion of
dredging was $36.08 for new work from advanced funds.
   The total cost of work was $107,048.90, all for new work of which
$62,800.13 were from contributed funds and $44,248.77 from advanced
funds. The total expenditures were $96,141.98 of which $57,238.16
were from contributed funds and $38,903.82 from advanced funds.
   Condition at end of fiscal year.-The existing project was about
59 percent completed. The entrance channel up to Crooks Island
was completed in 1935. When examined in December 1939, March
and April 1941, and March to May 1942, the controlling depth at mean
low water was 10 feet for full project width in the entrance channel
to Crooks Island, thence 9 feet for full project width in the channel
along the west side of the harbor for a distance of 2,000 feet, thence
0.9 foot for full project width to the head of the project, and 8 feet in
the anchorage except in the northwest corner where the least depth
was 1 foot. The work remaining to be done under the project con-
sists of completing the dredging of the channel along the west side
of the harbor and the anchorage area.
   The total cost of the existing project to June 30, 1942, was $157,-
100.28-$36,000 Public Works funds, $64,727.72 contributed funds, and
$44,293.65 advanced funds, a total of $145,021.37 for new work and
$12,078.91 regular funds for maintenance. The total expenditures
were $146,148.48 of which $59,165.75 were contributed funds, $38,903.82
advanced funds, and $48,078.91 United States funds.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $130,930.43, of which $55,334.25 are con-
tributed funds and $75,596.18 are advanced funds, will be applied as
follows:
Accounts payable June 30, 1942--------------------------------- $10,951.80
New work: Complete by December 31, 1942, under contract to be en-
  tered into, the extension of the entrance channel along the west side
  of the harbor and the dredging of the anchorage basin to project
  dimensions ----------------------------------------------
                      ___                                               119, 978. 63
      Total_ ----------------------------
                  _--______                                     -          130, 930. 43
   This work will complete the existing project. Maintenance dredging
will not be necessary during the fiscal year 1944. The return of funds
advanced by local interests will not be necessary during the fiscal
year 1944. Therefore, no funds can be profitably expended during the
fiscal year ending June 30, 1944.


      493202-43-pt. 1, vol. 1-              17
254            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1942

                                                 Cost and flnancial summary

                                                              UNITED STATES FUNDS

Cost of new work to June 30, 1942_--------------------------                                                                  $36, 000. 00
.Cost of maintenance to June 30, 1942---------    ----------------                                                              12, 078. 91

      Total cost of permanent work to June 30, 1942---------------    48, 078. 91
Net total expenditures--_--____----__------------                     48, 078. 91
Total amount appropriated to June 30, 1942 _____      ___ ____-- -48,     078. 91

    Fiscal year ending June 30                            1938                  1939             1940               1941              1942


C ost of n ew w ork ...-------.-.-.....---....-.-.---..-----... ...... .....                                   ......   .....     ....- -
Cost of maintenance_ _-___    ___                    $43. 70   $12, 035. 21                                                   -
                                                                                                                   ._____________

Total expended..---------------------------------------                                         12, 078. 91
         ....--.......--......
Allotted----                                ......--------------.....          15, 000. 00     -2, 921.09



Amount (estimated) required to be appropriated for completion of
existing project 1- _______________________
                     -
                                                                 $114, 500. 00
   1For repayment of funds advanced by local interests.

                                                               CONTRIBUTED FUNDS

Cost of new work to June 30, 1942________________________________                                                               $64, 727. 72
Cost of maintenance to June 30, 1942

     Total cost of permanent work to June 30, 1942--------- ------                                                               64, 727. 72
Minus accounts payable June 30, 1942--------------------------                                                                    5, 561.97
     Net total expenditures__ -- ___--___________                  59, 165. 75
Unexpended balance June 30, 1942__-----------------------------55,     334. 25
           Total amount contributed to June 30, 1942_______________                                                            114, 500. 00


    Fiscal year ending June 30                            1938                  1939             1940              1941               1942

Cost of new work          _...                                ----------------                                    $1,927.59          $62,800. 13
Cost of maintenance....------------............--------------------------------------------------
Total expended ..--------------.............         -----------------------                 --------------        1,927.59           57, 238.16
Contributed ....-------..           -----------............
                                                   ----                                                         114,500. 00



Balance unexpended July 1, 1941 __ ----__________                  $112, 572. 41
Gross amount expended-----------________                             57, 238. 16
      Balance unexpended June 30, 1942-----------------------55,         334.25
Outstanding liabilities June 30, 1942 __   ___________ $5, 561. 97
Amount covered by uncompleted contracts-----------10, 746. 93
                                                                     16, 308. 90
      Balance available June 30, 1942____________________________    39, 025. 35
                                                                ADVANCED           FUNDS

Cost of new work to June 30, 1942______-____--------------         $44, 293. 65
Cost of maintenance to June 30, 1942_________
      Total cost of permanent work to June 30, 1942 ________------44, 293. 65
Minus accounts payable June 30, 1942---     ------------------       5, 389. 83
     Net total expenditures-......-     --------                                                                    -           38, 903. 82
Unexpended balance June 30, 1942- ----       _                                                                -------           75, 596. 18
     Total amount advanced to June 30, 1942----------                                                                      -   114, 500. 00
                RIVERS          AND HARBORS-NEW YORK,                                                                 N.          Y.,    DISTRICT                   255

      Fiscal year ending June 30                         1938                         1939                       1940                       1941                 1942
                                               I                                               -      I.-..I..                                           I
Cost of new work__                                                                                                                              $44.88          $44, 248.77
Cost of maintenance..-----------
Total expended ....-------------.....---                               --- - ..-.------                   ----        ------        -------------                38,903.82

Advanced..............-----------------                                - . .   ...........             --------------                    114,500.00 ------------



Balance unexpended July 1, 1941--     -------------------------- $114, 500. 00
Gross amount expended--___----------------     ----                38, 903. 82

      Balance unexpended June 30, 1942-----------------------                                                                                                75, 596. 18
Outstanding liabilities June 30, 1942----------------$5, 389. 83
Amount covered by uncompleted contracts------------   29, 385. 33
                                                                --                                                                                           34, 775. 16

            Balance available June 30, 1942------------------------                                                                                          40, 821. 02

      CONSOLIDATED COST AND FINANCIAL SUMMARY FOR GREAT KILLS HARBOR, STATEN
                                    ISLAND, N. Y.

Cost of new work to June 30, 1942    --------------------------- $145, 021. 37
Cost of maintenance to June 30, 1942_ -------------------------- 12, 078. 91
      Total cost of permanent work to June 30, 1942-------------157, 100. 28
Minus accounts payable June 30, 1942            ---------         10, 951. 80

     Net total expenditures--------------------------------146, 148. 48
Unexpended balance June 30, 1942-------- -----------------   130, 930. 43

            Total amount appropriated to June 30, 1942----------------                                                                                   277, 078. 91

      Fiscal year ending June 30                        1938                          1939                       1940                     1941                  1942
                                                                                                                      I-------i          ----


Cost of new work .----       - - --     - ..       .. . -          -           --     _--      7....---
                                                                                                     -.    -      . --.    .             $1,972.47            $107, 048.90
Cost of maintenance ------------               -        -----                              $48. 70         $12,035.21              - -........ ...

Total expended .         .      .-                 -------------       -       -     ---        ---            12,078.91                  1,927.59              96, 141. 98
Allotted, contributed, and ad-
vanced ............ _.........                    .......   ----                   15, 000.00             -2, 921. 09                  229, 000.00



Balance unexpended July 1, 1941------------------------------ $227, 072. 41
Gross amount expended----------------------- --        ---      96, 141. 98

     Balance unexpended June 30, 1942-----------------------                                                                                             130, 930. 43
Outstanding liabilities June 30, 1942 .-. ---
                                          __ _____-- $10, 951. 80
Amount covered by uncompleted contracts------------ 40, 132. 26
                                                                                                                                                             51, 084. 06

            Balance available June 30, 1942_                                                                           ___----
                                                                                                                         ___
                                                                                                                 -_________                        _         79, 846. 37
  Amount (estimated) required to be appropriated for completion of
  existing project'                   ---------------------------------                                                                                114, 500. 00
  1 Exclusive      of available funds.
  2   For   repayment of funds advanced by local interests.

                                            35. RARITAN RIVER, N. J.

  Location.-This river rises in the north-central part of New Jersey
and flows in a general southeasterly direction into Raritan Bay, be-
tween Perth Amboy and South Amboy, about 24 miles, by water, south
256           REPORT OF CHIEF OF ENGINEERS,                             U.     S. ARMY,         1942

of the Battery, New York City. (See U. S. Coast and Geodetic Survey
Chart No. 375.)
   Previous projects.-A survey of Raritan River for the improvement
of New Brunswick Harbor was made in 1836. Subsequent projects
were adopted by acts of June 18, 1878, and March 3, 1881.
   For further details see page 1777 of Annual Report for 1915, page
359 of Annual Report for 1918, and page 259 of Annual Report for
1938.
   Existing project.-This provides for a channel 25 feet deep and 300
feet wide extending from the turn in New York and New Jersey chan-
nels near Great Beds Light to the Government wharf on the main
channel, a distance of 5.8 miles, widened to 600 feet for a length of 1,000
feet opposite the wharf to form a turning basin of same depth; thence
a channel 15 feet deep and 200 feet wide, to the Washington Canal,
a distance of 3.0 miles; thence 10 feet deep in soft material, 11 feet deep
in rock, and generally 100 feet wide with widening at bends to the
Delaware and Raritan Canal entrance at New Brunswick, a distance
of 5.0 miles; and for a south channel, 25 feet deep and 300 feet wide
from the junction with the main channel at Keasby to the upper limit
of the Titanium Pigment Co. property, a distance of 0.8 mile; thence
10 feet deep and 150 feet wide to the upper junction with the main
channel at Crab Island, a distance of 2.4 miles. The plane of reference
is mean low water. The mean range of tides is 5.1 feet at the mouth of
the river and 5.3 feet at New Brunswick; mean range of spring tides,
6.1 and 6.3 feet, respectively. High easterly or westerly winds cause
irregular tidal fluctuations from 1 to 2 feet above or below the nlean
range.
   The estimate of cost for new work, revised in 1940, is $1,415,000,
exclusive of amounts expended on previous projects but including
$66,000 contributed by local interests. The latest (1940) approve([
estimate for annual cost of maintenance is $60,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                      Documents


Mar. 2,1919        Channel 15 feet deep to Washington Canal, thence     H. Doc. No. 1341, 62d Cong., 3d sess.
                    10 feet deep and 150 feet wide to canal locks and
                    10 feet deep through south channel.
                                                                                                                 1
July     3, 1930   Channel 25 feet deep up to New York & Long           H. Doc. No. 127, 70th Cong., 1st sess.
                     Branch R. R. bridge.
                                                                                                                 1
    Do .......     Channel 10 feet deep in earth and 11 feet in rock    H. Doc. No. 454, 70th Cong., 2d sess.
                    to New Brunswick. Width reduced to 100 feet.
   Do-......       Relocation of lower reach of south channel-----      Rivers and Harbors Committee Doc.
                                                                             No. 31, 71st Cong., 2d sess.1
Aug. 26, 1937      Channel 25 feet deep and 300 feet wide to junction   Rivers and Harbors Committee Doc.
                    of main and south channels, thence of same            No. 74, 74th Cong., 2d sess.'
                     depth in south channel to Titanium Pigment
                     Co.
Oct. 17, 1940      Channel 25 feet deep and 300 feet wide from junc-    Report on file in the Office, Chief of
                    tion of main and south channels to the Govern-       Engineers (report not printed).
                    ment wharf, including a turning basin.


  SContain latest published maps.
        RIVERS AND HARBORS-NEW          YORK,   N.   Y.,   DISTRICT   257
   Local cooperation.-Fully complied with except that local interests
are required to furnish spoil-disposal areas for the.maintenance of the
25-foot channel from New York and Long Branch Railroad bridge
to junction of main and south channels, and in the south channel to
the Titanium Pigment Company property.
   Terminal facilities.-There are 25 terminals located along the water-
way with a total dockage of 17,000 feet. Two of the terminals are
municipally owned of which one is open to the public. Ten of the
terminals have railroad connections. The terminals are considered
adequate for the existing commerce. (For further details see Port
Series No. 20, Corps of Engineers.)
    Operations and results during fiscal year.-Unddr a contract for
dredging to 25 feet in the main channel from 300 feet east of the
New York & Long Branch Railroad bridge to the junction of the
main and south channels, thence in the south channel to the upper
limit of the Titanium Pigment Co. property; and for dredging to
10 feet in the south channel from the upper limit of the Titanium
Pigment Co. property to Crossman's Dock, work was commenced
October 7, 1940, and was discontinued on April 29, 1942, because of
the contractor's inability to remove the remaining shoals with available
equipment. During the fiscal year 1,265,099 cubic yards, place meas-
urement, of material were removed at a cost of $159,423.46 for new
work, of which $95,092.31 were United States funds, $31,845.06
Ordnance funds, and $32,486.09 were contributed funds; and 178,194
cubic yards, place measurement, of material were removed at a cost
of $17,345.46 for maintenance.
   Under a contract for dredging to a depth of 25 feet in the main
channel from the junction of the main and south channels to and
including a turning basin opposite the Raritan Arsenal wharf, work
was commenced January 27, 1941, and completed July 5, 1941. During
the fiscal year there were removed 144,261 cubic yards, place measure-
ment, of material at a cost of $27,554.83 for new work, from Ordnance
funds.
   The cost of survey to determine the condition of the channel from
Raritan Arsenal to New Brunswick was $4.28 for maintenance.
   The total cost of work was $201,328.03-$186,978.29 for new work
of which $32,486.09 were contributed funds, $59,399.89 Ordnance funds,
$95,092.31 regular funds, and $17,349.74 regular funds for main-
tenance. The total expenditures were $233,611.01 of which $32,486.09
were contributed funds, $80,761.07 Ordnance funds, and $120,363.85
regular funds.
   Condition at end of fiscal year.-Work under the existing project
was about 87 percent completed. The main channel has been dredged
25 feet deep and 300 feet wide from the junction with New York and
New Jersey Channels to and including a turning basin of the same
depth opposite the Government wharf, except for a shoal along the
northerly channel line in the vicinity of the Victory Bridge, thence
15 feet deep and 200 feet wide to the mouth of the Washington Canal,
thence 10 and 11 feet deep and 100 feet wide to the Delaware and Rari-
tan Canal outlet locks at New Brunswick. The south channel has been
dredged 25 feet deep and 300 feet wide for a distance of 3,200 feet,
thence 10 feet deep and 150 feet wide for a distance of 12,400 feet to
within 1,300 feet of the junction with the main channel at Crab Island.
258      REPORT OF CHIEF OF ENGINEERS,               U. S. ARMY,        1942

The controlling depth at mean low water in the main channel is 25 feet
for a width of 300 feet from the New York and New Jersey Channels
to the Government wharf except for a shoal having a least depth of
21 feet at the south end of the wharf and 22 feet in the turning basin
opposite the wharf (November 1940-December 1941) ; thence 15 feet
for a width of 100 to 200 feet to the Washington Canal (1935) ; thence
10 feet for a width of 100 feet to the Delaware and Raritan Canal
lock at New Brunswick (1932 and 1935); in the south channel 25 feet
for a width of 300 feet to the north end of the Titanium Pigment Co.
dock, 14 feet opposite the dock thence 10 feet for a width of 150 feet
to Crossman's Dock (March 1941-April 1942), thence 3 feet for about
6,000 feet, thence to the junction with the main channel opposite Crab
Island about 1.5 feet (1935). The work remaining to be done under
the existing project consists of completing the dredging of the main
channel to a depth of 25 feet, and the dredging of the south channel
to a depth of 25 feet and a width of 300 feet from 3,200 feet south
of the junction with the main channel at Keasby to the upper limit
of the Titanium Pigment Co. property and 10 feet deep and 150 feet
wide for a length of 1,300 feet at the upper junction with the main
channel at Crab Island.
   The total cost of the existing project to June 30, 1942, was $1,566,-
423.62--$877,105.53 from regular funds, $292,685.07 from Ordnance
funds, and $54,804.17 from contributed funds, a total of $1,224,594.77
for new work, and $341,828.85 from United States funds for main-
tenance. The expenditures were $1,565,398.48-$1,217,909.24 from
regular funds, $292,685.07 from Ordnance funds, and $54,804.17 from
contributed funds.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $23,810.98, of which $11,195.83 are contributed
funds, will be applied as follows:
Accounts payable June 30, 1942_____ _______________________           $1, 025. 14
New work: Complete by June 30, 1943, under contract to be entered
  into, dredging of south channel for a distance of 1,150 feet in the
  vicinity of the Titanium Pigment Co. property ____________________ 22, 785. 84
                                                                                           23,
      Total_                                         -_ ----   __---________   23,810.98

  Completion of the existing project is not considered necessary at
this time. Maintenance dredging of the existing channels will be
necessary during the fiscal year 1944. Therefore, the sum of $60,000
can be profitably expended during the fiscal year ending June 30,
1944, under contract for maintenance, in the removal of shoals from
the existing channels.
                           Cost and financial summary
                      MAINTENANCE    AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1942 ___________________________ $1, 550, 260. 85
Cost of maintenance to June 30, 1942__-_ ---_________ __--        453, 248. 28
      Total cost of permanent work to June 30, 1942____________-         2, 003, 509. 13
Minus accounts payable June 30, 1942_____----------------                     1, 025. 14
      Net total expenditures-____ ______       _______------             2, 002, 483. 99
Unexpended balance June 30, 1942__ __- __________--------------              12, 615. 15
      Total amount appropriated to June 30, 1942________-----2, 015, 099. 14
              RIVERS AND HARBORS-NEW                                         YORK, N. Y., DISTRICT                                         259

    Fiscal year ending June 30                     1938               1939                    1940                1941                  1942


Cost of new work . .             ..-__           ___                 .______________      ..
                                                                               ____.. _______..                 $73, 974. 13           $95, 092. 31
Cost of maintenance ....------------             $16,172. 92            $103.02         $194.15                 212, 696.64             17, 349. 74

      Total cost- .--..---.-----.   -             16,172.92              103.02                  194.15         286, 670.77            112, 442.05

Total expended-----------------                   16, 172.92                                     173.87         277, 847.13            120, 363. 85

Allotted-------------------------                      828.59        45, 000. 00            296, 000. 00         70, 000. 00-----------



Balance unexpended July 1, 1941__----    __------------------                                                              $132, 979. 00
Gross amount expended___-___------------             $153, 603. 16
Less reimbursements collected-------------------       33, 239. 31
                                                                                                                                   120, 363. 85
      Balance unexpended June 30, 1942_______________________                                                                       12, 615.15
Outstanding liabilities June 30, 1942_-_-.----..       1, 025. 14
Amount covered by uncompleted contracts--------       10, 622. 29
                                                                                                                                   -11, 647. 43

         Balance available June 30, 1942___________--------                                                                             967. 72

Amount (estimated) required to be appropriated for completion
  of existing project 1----                                                                                                        168, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944 for maintenance 1                                                                                                         60, 000. 00
   xExclusive of available funds.

                                         ORDNANCE DEPARTMENT FUNDS

Cost of new work to June 30, 1942__                                       __                _______            __              $292, 685.07
Cost of maintenance to June 30, 1942_

      Total cost of permanent work to June 30, 1942____________                                                                292, 685.07
Net total expenditures_                                                                                                        292, 685. 07
Total amount appropriated to June 30, 1942____-------------                                                                    292, 685. 07


    Fiscal year ending June 30                     1938               1939                    1940                1941                  1942

Cost of new work      -                    -      -             --                                             $233, 285.18           $59, 399.89
Cost of maintenance_____________
                                                                                                           I                   I

Total expended ..                        -----                                                                  211,924. 00             80, 761.07

           ------------------------------------
Allotted---........                         ------------                           -    -                       300, 000. 00           -7, 314.93



Balance unexpended July 1, 1941____                                                                                                $8, 076. 00
Deductions on account of revocation of allotment__                                                                                    7, 314. 93

          Net amount to be accounted for_                                              -                        -_        -80,          761.07
Gross amount expended_----          ________                                           ___________                                  80, 761.07
        CONSOLIDATED COST AND FINANCIAL SUMMARY FOR UNITED STATES FUNDS

Cost of new work to June 30, 1942----------------------$1, 842, 945. 92
Cost of maintenance to June 30, 1942_ -.----------------- - 453, 248. 28
      Total cost of permanent work to June 30, 1942----------2, 296, 194. 20
Minus accounts payable June 30, 1942                                 025. 14
                                                                  1--------------------------,

      Net total expenditures ------------                                                                               2, 295, 169.06
                                                                                                               ___-------------
Unexpended balance June 30, 1942                                                                       -
                                                                                                  -_____           -_____ 12,   615. 15
                                                                                                                             1________-

          Total amount appropriated to June 30, 1942-------------                                                         2, 307, 784. 21
260         REPORT OF                CHIEF        OF        ENGINEERS,             U.      S.    ARMY,           1942



   Fiscal year ending June 30                   1938               1939                 1940              1941                 1942

Cost of new work .______________       ___________...         _______.          .____________        $307, 259. 31           $154, 492.20
Cost of maintenance___.._       ___.. $16, 172. 92                $103. 02             $194. 15       212, 696. 64             17, 349. 74
      Total cost_                          16, 172. 92               103. 02              194. 15       519, 955. 95          171, 841.94

Total expended                             16, 172. 92                                    173. 87       489, 771. 13          201, 124. 92
Allotted_________ __________-__                   828. 59         45, 000. 00     296, 000. 00          370, 000. 00          -7, 314. 93



Balance unexpended July 1, 1941_____________________________                                                           $221, 055. 00
Deductions on account of revocation of allotment_                                                                         7, 314. 93

      Net amount to be accounted for__   -_________________                                                             213, 740. 07
Gross amount expended ______________________ $234,364. 23
Less reimbursements collected_                   33, 239. 31
                                                                                                                        201, 124. 92
        Balance unexpended June 30, 1942_                                                                                12, 615. 15
Outstanding liabilities June 30, 1942__________                                                 $1, 025. 14
Amount covered by uncompleted contracts- -                                                      10, 622. 29
                                                                                                                         11, 647. 43
        Balance available June 30, 1942_                                                                                       967. 72
Amount (estimated) required to be appropriated for completion
of existing project 1____ _      -                                                                                     168, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1__                                                                                           60, 000. 00
   1 Exclusive of available funds.

                                                 CONTRIBUTED              FUNDS


Cost of new work to June 30, 1942 ___________________________                                                           $54, 804. 17
Cost of maintenance to June 30, 1942______
         Total cost of permanent work to June 30, 1942                                     -----------                   54, 804. 17
Net total expenditures__________________________                                                                         54, 804. 17
Unexpended balance June 30, 1942_ __________-______________                                                              11, 195. 83
        Total amount contributed to June 30, 1942 ______________                                                         66, 000. 00

   Fiscal year ending June 30                   1938               1939                 1940              1941                 1942

Cost of new work ________________      .______________             ____            $6, 185. 46          $16, 132. 62          $32, 486. 09
C ost of m aintenance ............. ..............           -                                      -                    -         -
Total expended ..                                                                    6, 185. 46
                                                                                     6185.   4I_________
                                                                                                    16, 132. 62                32, 486.09
Contributed             ........--     -..---                    -----------       66, 000. 00



Balance unexpended July 1, 1941__                                                                                       $43, 681.92
Gross amount expended_____---------------------------                                                                    32, 486. 09
     Balance unexpended June 30, 1942_____________________                                                               11, 195. 83
Amount covered by uncompleted contracts                                                                                  10, 637. 75
        Balance available June 30, 1942 ..                                 ._____                                               558.08
            RIVERS AND HARBORS--NEW YORK,                                        N. Y., DISTRICT                        261
       CONSOLIDATED        COST AND     FINANCIAL SUMMARY                    FOR RARITAN           RIVER,    N.    J.


Cost of new work to June 30, 1942____________________________                                            $1, 897, 750. 09
Cost of maintenance to June 30, 1942________________________                                                 453,248. 28

     Total cost of permanent work to June 30, 1942                                                        2, 350, 998. 37
Minus accounts payable June 30, 1942-------------------------                                                  1, 025. 14
                            --------------
    Net total expenditures_______                                                                        2, 349, 973. 23
Unexpended balance June 30, 1942_______------ -------------                                                  23, 810. 98
         Total amount appropriated and contributed to June 30,
          1942 _--                                               2, 373, 784. 21
                                                            _------------------------

   Fiscal year ending June 30           1938                   1939            1940               1941              1942

Cost of new work_                   _________        __ _$6,                     185. 46    $323, 391. 93         $186, 978. 29
Cost of maintenance___ _             $16, 172.92                $103. 02         194. 15     212, 696. 64           17, 349. 74

      Total cost_                      16, 172. 92               103. 02       6, 379. 61    536, 088. 57          204, 328. 03
Total expended _______________         16, 172. 92                             6, 359. 33    505, 903. 75          233, 611. 01

Allotted and contributed ........         828. 59          45, 000. 00       362, 000. 00    370, 000. 00          -7, 314. 93



Balance unexpended July 1, 1941-------------------------------$264,                                                  736. 92
Deductions on account of revocation of allotment .__..____---__                                                   7, 314. 93

      Net amount to be accounted for___-_____________--------                                               257, 421. 99
Gross amount expended--______----------------         $266, 850.32
Less reimbursements collected ___    _____-----------   33, 239. 31
                                                                                                            233, 611. 01

      Balance unexpended June 30, 1942_------------------------                                               23, 810. 98
Outstanding liabilities June 30, 1942________ _____11$1, 025. 14
Amount covered by uncompleted contracts-       -      21, 260. 04     -___
                                                                                                              22, 285. 18
                                            .
        Balance available June 30, 1942 __________________                                  ___                   1, 525. 80

Amount (estimated) required to be appropriated for completion
of existing project 1__-___- ____----------------                                                          168, 000. 00
Amount that can be profitably expended in fiscal year ending June
                                 --
30, 1944, for maintenance 1_______________________________                                                   60, 000. 00
   1 Exclusive of available funds.

               36. WASHINGTON CANAL AND SOUTH RIVER, N. J.
   Location.-South River rises in central New Jersey and empties into
the Raritan River from the south, about 8 miles above South Amboy,
N. J. (See U. S. Coast and Geodetic Survey Chart No. 375.)
   Previous projects.-Adopted by River and Harbor Acts of March 3,
1871, June 14, 1880, and July 25, 1912. For further details see page
1778 of Annual Report for 1915, page 323, Annual Report for 1929,
and page 262, Annual Report for 1938.
   Existing project.-This provides for a channel, to be obtained by
diking and dredging, 12 feet deep and 100 feet wide in Washington
Canal, 0.8 mile, and 12 feet deep and generally 150 feet wide in
South River following cut-off No. 1 up to Old Bridge, 4.4 miles. The
mean range of tides at the canal is 5.2 feet, and at Old Bridge, 5.6 feet;
mean range of spring tides, 6.2 and 6.7 feet, respectively. Irregular
tidal fluctuations from 1 to 2 feet, above or below the mean range
take place during high easterly or westerly winds.
 262           REPORT OF CHIEF OF ENGINEERS,                                      U.     S. ARMY,                     1942

    The estimate of cost for new work, made in 1929, was $90,000, ex-
clusive of amounts expended on previous projects. The latest (1929)
approved estimate for annual cost of maintenance is $8,000.
    The existing project was adopted by the River and Harbor Act
of July 3, 1930 (H. Doc. No. 109, 71st Cong., 1st sess.). The latest
published map is in the project document.
    Local cooperation.-Fullycomplied with.
    Terminal facilities.-There are eight private wharves and one pub-
licly owned wharf located along the waterway with a total dockage
of 1,093 feet. The facilities are considered adequate for existing
commerce. (For further details see Port Series No. 20, Corps of
Engineers.)
    Operations and results during fiscal year.-Under a contract for
dredging to a depth of 12 feet in critical sections of the channel in
South River, work was commenced August 26, 1941, and completed
October 15, 1941. During this period there were removed 349,228
cubic yards, place measurement, of material at a cost of $68,875.45 for
maintenance. The cost of engineering preliminary to dredging was
 $565.48 for maintenance.
    The total cost of work was $69,440.93 for maintenance. The total
expenditure was $71,816.20.
    Condition at end of fiscal year.-Work on the section of the existing
project to be done by the United States, extending from the mouth of
Washington Canal to the highway bridge at South River, was com-
pleted in 1931. The section from the highway bridge at South River
to Old Bridge was completed by the State of New Jersey. As de-
termined by surveys made in June 1910, and April, September, and
October 1941, the controlling depth at mean low water was 12 feet
for a width of 100 to 150 feet through Washington Canal and South
River up to the first highway bridge, thence 11 feet for a width of 50
to 150 feet to within 2,000 feet of the head of the project at Old Bridge,
thence decreasing to 2 feet at the head of the project. The minimum
width through bridge draws is 48 feet.
    The total cost and expenditures of the existing project to June 30,
1942, were $171,017.11-$48,891.82 for new work and $122,125.29 for
maintenance. In addition the costs and expenditures from contrib-
uted funds were $364.73 for new work.
    Proposed operations.--No funds are available and no work is con-
templated during the fiscal years 1943 and 1944.
                                           Cost and financial summary
                                                                                                                      1
Cost of new work to June 30, 1942 _____________   -__                                                                    $206, 116. 23
Cost of maintenance to June 30, 1942 _________________----__--_                                                           207, 059. 75
        Total cost of permanent work to June 30, 1942 ______.___                                                           413, 175. 98
Net total expenditures_   --                                                                                             1413, 175.98
Total amount appropriated to June 30, 1942----------------------                                                          413, 175. 98

     Fiscal year ending June 30                  1938              1939             1940                       1941             1942

Cost of new w ork- __ _,  - -            I --       . . . . . . .
                                                  -------..                                                        I
                                                                          . . . . . . . . . . . ........-.............          .........-
'Cost of maintenance--.............                I__....        . ..
                                                               ____________                  ..          . $2,375.27          $69,440.93
Total expended ...............                         .    ...     ..                           ....   ._.      . ..         71,816. 20
Allotted -----------------            -     -$7,912.83                              ___
                                                                      ..... __ ........                    75, 000. 00         -3,183.80

    1 Exclusive of $364.73 contributed funds expended for new work.
        RIVERS    AND HARBORS-NEW YORK,                  N.   Y.,   DISTRICT       263
Balance unexpended July 1, 1941-------------------------------            $75, 0000
                                                                                3.
Amount allotted from War Department Civil Appropriation Act
  approved June 24, 1940-----------------------------------                    4, 000. 00

      Amount to be accounted for        __   -----                         79, 000, 00
Deductions on account of revocation of allotment     -         -      -        7, 183. 80
                                     ---------------------
      Net amount to be accounted for___                                    71, 816. 20
Gross amount expended---------------------------- $71, 837.94
Less reimbursements collected------------------------    21. 74
                                                                           71, 816. 20

                        37. SANDY HOOK BAY, N. J.

  Location.-This bay is the southern portion of Lower New York
Bay, west of and adjoining the projecting arm of Sandy Hook, N. J.
(See U. S. Coast and Geodetic Survey Charts Nos. 369 and 543.)
   Existing project.-This provides for the construction of a continu-
ous rubble-mound breakwater about 4,000 feet in length extending
eastward from the New Jersey Central Railroad steamboat dock. at
Atlantic Highlands, N. J., and dredging of the area in its lee and sea-
ward of the new pierhead line to a depth of 8 feet at mean low water.
Mean range of tides, 4.6 feet, mean range of spring tides, 5.6 feet;
irregular fluctuations due to wind conditions vary from 1 to 2 feet
above or below the mean range.
   The estimate of cost for new work made in 1937 is $850,000 includ-
ing $81,250 contributed by local interests. The latest (1937) ap-
proved estimate of cost of annual maintenance is $6,000.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (H. Doc. No. 292, 75th Cong., 1st sess.). For latest
published map see the project document.
   Local cooperation.-Fully complied with except that local interests
must furnish easements and rights-of-way necessary for subsequent
maintenance as and when required.
   Terminal facilities.-Three terminals, with available dockage of
1,340 feet, are located along the water front at Atlantic Highlands
westerly of and adjacent to the anchorage area. Under the conditions
of local cooperation, 5 boat basins with mooring stalls and servicing
facilities for pleasure boats are being constructed. The existing
terminals and those being constructed will be sufficient for present
needs. There is ample space for additional wharves and boat basins
should future needs warrant their construction. (For further details
of existing facilities see Port Series No. 20, Corps of Engineers.)
  Operations and results during fiscal year.-Under a contract for
dredging the anchorage area to a depth of 8 feet, work was commenced
July 14, 1941, and was completed December 3, 1941. During this
period there were removed 408,977 cubic yards, place measurement, of
material at a cost of $57,664.31 for new work.
  Adjustments of minus $27,459.97 contributed funds and plus
$27,459.97 regular funds were made in costs previously reported.
  The total cost of work was $57,664.31 of which minus $27,459.97
were contributed funds and $85,124.28 United States funds, all for
new work. The expenditures were $57,819.47 United States funds.
  Conditionat end of fiscal year.-The existing project was completed
in 1941. The breakwater was completed in 1940, and the anchorage
264           REPORT OF CHIEF OF ENGINEE'RS,                            U.' S. ARMY,                   1942

area was completed in 1941.                     When examined in September to Novem-
ber 1941, project depth existed throughout the anchorage area.
  The total cost of the existing project to June 30, 1942, was $562,-
726.43 for new work, of which $508,936.40 were United States funds
and $53,790.03 contributed funds. The total expenditures were
$562,726.43, of which $481,476.43 were United States funds and $81,250
contributed funds.
    Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $54,854.59, plus accounts receivable of
$27,459.97, a total of $82,314.56, will be applied as follows:
Accounts payable June 39, 1942__--   _______-                                                               $27, 459.97
New work:
    Return of proportionate share of contributed funds -                                               _      27, 459. 97
    Balance remaining---------------------------------------                                                  27, 394. 62

           Total___------_-----_                                       __                                     82, 314. 56
  Maintenance will not be necessary during the fiscal year 1944.
Therefore no funds can be profitably expended during the fiscal year
ending June 30, 1944.
                                     Cost and financial summary

                                          UNITIED   STATES FUNDS


Cost of new work to June 30, 1942_____       ________                                    _______ $508, 936. 40
                                           -__------
Cost of maintenance to June 30, 1942_____________                                   _______-

      Total cost of permanent work to June 30, 1942_                                                        508, 936. 40
Minus accounts payable June 30, 1942______                                                                   27, 459. 97

           Net total expenditures__                  --_                                         ___        481, 476. 43
Unexpended balance June 30, 1942_____________ __________________                                              54, 854. 59
           Total amount appropriated to June 30, 1942----____-__                                            536, 331. 02

   Fiscal year ending June 30            1938              1939              1940              1941                    1942

Cost of new work                                            $871. 19   $159, 455. 93       $263, 485. 00           $85, 124. 28
Cost of maintenance__
Total expended             .. .      ___________________________            89, 898. 94     333, 758. 02               57, 819. 47
Allotted    ---.........                              768, 750.00                          -196, 070. 12          -36, 348. 86



Balance unexpended July 1, 1941________________________________                                            $149, 022. 92
Deduction on account of revocation of allotment________                                   ________            36, 348. 86
           Net amount to be accounted for_____-- _____________________                                      112, 674. 06
Gross       amount expended                                 $66, 823.23
Less       reimbursements          collected_____________________                         9, 003. 76
                                                                                                              57, 819. 47
      Balance unexpended June 30, 1942__                                                      --__     _      54, 854. 59
Outstanding liabilities June 30, 1942_                                                           ---          27, 459. 97
           Balance available June 30, 1942__                                                                   27,
                                                                                                  ------------------   394. 62
               RIVERS AND HARBORS-NEW YORK, N. Y.1 DISTRICT                                                              265
                                                CONTRIBUTED FUNDS


Cost of new work to June 30, 1942___-------------------                                                       $53, 790. 03
Cost of maintenance to June 30, 1942__________-------                                                        -----------
Total cost of permanent work to June 30, 1942                                      ------                      53, 790. 03
Plus accounts receivable June 30, 1942___                                   ___----------- __-                 27, 459. 97

          Gross total costs to June 30, 1942___                                                                81, 250. 00

Net total expenditures_________-_                                                                              81, 250. 00
Unexpended balance June 30, 1942_____   ___                                          -----------
Total amount appropriated to June 30, 1942                                                                     81, 250. 00

   Fiscal year ending June 30                 1938             1939             1940             1941              1942


Cost of new work                                                             $81, 250. 00                       -$27, 459. 97
Cost of maintenance ---         ----    ---------------------------       -------------- --------
Total expended        ___________                    ___      __.              8____.
                                                                               81, 250.00      .____

             _ -- ------------
Allotted -------                            ----------     -------------- 81, 250. 00



Accounts receivable June 30, 1942______________________________                                               $27, 4591. 97
Unobligated balance available June 30, 1942__                                                                  27, 459. 97

      CONSOLIDATED COST                AND FINANCIAL         SU1[MARY     FOR SANDY          HOOK BAY,          N., J.

Cost of new work to June 30, 1942___ _-                                                                      $562, 726. 43
Cost of maintenance to June 30, 1942__________
      Total cost of permanent work to June 30, 1942:-------------                                             562, 726. 43
Plus accounts receivable June 30, 1942------------------------                                                 27, 459. 97

          Gross total costs to June 30, 1942---------                                   -----------           590, 186. 40
Minus accounts payable June 30, 1942_                                      _                ______             27, 459. 97

      Net total expenditures___________ --------------                                                        562, 726. 43
Unexpended balance June 30, 1942_________________------------                                                  54, 84. 59

          Total amount appropriated and contributed to June 30, 1942__                                        617, 581. 02

   Fiscal year ending June 30                 1938             1939             1940             1941              1942


Cost of new work_____                                           $871.19    $240,705.93       $263, 485. 00        $57, 664. 31
Cost of maintenance ............

Total expended_____                                                         171,148.94        333,758.02           57,819.47

Allotted and contributed__                                   768,750.00        81,250.00    -196,070.12          -36, 348.86


Balance unexpended July 1, 1941__________________________----                                                $149, 022. 92
Deductions on account of revocation of allotment______                                                         36, 348. 86
      Net amount to be accounted for _______________----------112, 674. 06
Gross amount expended                             $66, 823.23
Less reimbursements collected________________                                               9, 003. 76
                                                                                                               57, 819. 47

      Balance unexpended June 30, 1942________________________                                                 54, 854. 59
Outstanding liabilities June 30, 1942_____________________________                                             27, 459. 97
     Balance available June 30, 1942_________________________                                                  27, 394. 62
Accounts receivable June 30, 1942_____________________________                                                 27, 459. 97
          Unobligated balance available June 30, 1942 _____________                                            54, 854. 59
266        REPORT        OF CHIEF OF ENGINEERS,                          U.    S. ARMY,          1942

                              38. SHREWSBURY                  RIVER,          N. J.

  Location.-This river is mainly a large tidal basin in the eastern
part of New Jersey, the outlet being at the southeast end of Sandy
Hook Bay, about 4 miles south from the point of Sandy Hook. (See
U. S. Coast and Geodetic Survey Chart No. 543.)
  Previous projects.-Adopted by River and Harbor Acts of August
30, 1852; March 3, 1871; March 3, 1879, modified in 1883 and 1887;
and by the River and Harbor Act of March 2, 1919. For further
details see page 1778 of Annual Report for 1915, page 373 of Annual
Report for 1918, and page 267 of Annual Report for 1938.
  Existing project.-This provides for a channel 12 feet deep
and 300 feet wide, following the westerly shore, from deep water in
Sandy Hook Bay to a point 600 feet south of tho railroad bridge at
Highlands, a distance of 2.2 miles; thence 9 feet deep and generally
150 feet wide, suitably widened at bends and turns, in the south
branch of the river to the Branchport Avenue Bridge in the city of
Long Branch, a distance of 6.8 miles; and for a channel in the
north branch 6 feet deep and 150 feet wide from the junction to
Red Bank, a distance of 6.1 miles. All depths refer to the plane of
local mean low water. The mean range of tides at the mouth is
4.6 feet; at Highlands Bridge, 3.8 feet; at Seabright, 1.7 feet; at
Branchport, 1.7 feet; and at Red- Bank, 3.0 feet. Mean range of
spring tides are 5.6, 4.6, 2.1, 2.2, and 3.6 feet, respectively. High
easterly or westerly winds cause irregular tidal fluctuations from 1
to 2 feet above or below the mean range.
   The estimate of cost for new work, revised in 1935, was $539,000,
exclusive of amounts expended on previous projects and exclusive of
$50,000 contributed by local interests. The latest (1935) approved
estimate of cost for annual maintenance is $45,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                         Work authorized                                         Documents 1


Mar. 2,1919     Channel 6 feet deep in North Branch__----------_                  H. Doe. No. 1296, 62d Cong., 3d sess.
Aug. 30, 1935   Channel 12 feet deep_ .......                                     H. Doc. No. 157, 71st Cong., 2d sess.
                                                     ..........-----------------------..
   Do___-..                         ..............----- -----------. River and Harbors Committee Doca
                Channel 9 feet deep-----
                                                                              No. 31, 74th Cong., 1st sessa


  1 These documents contain latest published maps.

  Local cooperation.-Fully complied with.
   Terminal facilities.-There are 5 publicly owned and 18 privately
owned wharves used for commercial purposes with a total available
dockage of 5,132 feet. In addition there are many pleasure-boat land-
ings; these are not.open to the public. None of the terminals has
direct rail connections. The terminals are considered adequate for
existing commerce.
   Operations and results during fiscal year.-The cost of surveys and
engineering to determine the source of shoaling in the vicinity of the
Highlands Bridge was $2,794.70 for maintenance. The expenditures
were $2,772.11.
            RIVERS      AND HARBORS-NEW                       YORK,        N.     Y.,    DISTRICT                 267

   Condition at end of fiscal year.-The existing project was completed
in 1937. The controlling depth at mean low water when examined
in October 1938, March 1939, and April 1942 was 8 feet for a width
of 100 to 300 feet from Sandy Hook Bay to 500 feet south of the high-
way bridge at Highlands, thence 5 feet for full channel width in the
main stem and South Branch to the Branchport Avenue Bridge at
Long Branch, N. J., and 6 feet for a width of 100 to 150 feet in the
north branch to the head of the project opposite Maple Avenue, Red
Bank, N. J.
   The total cost of the existing project to June 30, 1942, was $683,-
461.03-$466,562.59 for new work and $216,898.44 for maintenance.
The total expenditures were $683,438.44. In addition, the costs and
expenditures from contributed funds were $36,311.03, for new work.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amnounting to $16,884.04, less $16,500 to be revoked and
accounts payable of $22.59, a balance of $361.45 will be applied to
surveys of the channel in the vicinity of the Highlands Bridge.
   Maintenance dredging will be necessary during the fiscal year 1944.
Therefore, the sum of $15,000 can be profitably expended during the
fiscal year ending June 30, 1944, under contract for maintenance, in
the removal of shoals from the existing channels.
                                Cost and financial summary
                                                                                                      1
Cost of new work to June 30, 1942_------ --------------------                                             $687, 456. 54
Cost of maintenance to June 30, 1942-------------------------                                              503, 504. 49

      Total cost of permanent work to June 30, 1942------------1, 190, 961. 03
Minus accounts payable June 30, 1942 ---------------------------        22. 59

      Net total expenditures  ----------------------------                                           11, 190, 938. 44
Unexpended balance June 30, 1942 ---------------------------                                              16, 884. 04

        Total amount appropriated to June 30, 1942                                _                  x1,   207, 822. 48


   Fiscal year ending June 30       1938             1939                1940                 1941             1942

Cost of new work- - - - - - - - - - - - - - - - - - -                  - - - - -------------
Cost of maintenance _ _ _ _ _ _ _ _ _ _ _ _   $1, 495. 37               $1, 780. 34   $26,033.09               $2, 794. 70
Total expended                     --                                    2, 627. 65       26, 681. 15           2, 772. 11
Allotted_                        -$4, 899. 73       30, 000. 00         10, 200. 00      -1, 235. 05           10, 000. 00



Balance unexpended July 1, 1941 -----------------------                                                     $9, 656. 15
Amount allotted from War Department Civil Appropriation Act
   approved Apr. 28, 1942_                      ------                          ------                      10, 000. 00

        Amount to be accounted for                       -----------                     --                 19, 656. 15
Gross amount expended------------------------------------                                                    2, 772. 11

      Balance unexpended June 30. 1942......                                                                16, 884. 04
Outstanding liabilities June 30, 192-----------------__                                                          22. 59
        Balance available June 30, 1942 -                                                                   16, 861. 45

Amount that can be profitably expended in fiscal year ending- June -
                                                        --     - -
30, 1944, for maintenance 2- - - - - - - - - - - - -- ---- --                                              15, 000. 00
   1 Exclusive of $36.311.03 contributed funds expended for new work.
   ' Exclusive of available funds.
268            REPORT OF CHIEF OF ENGINEERS,                        U.   S. ARMY,       1942

                                   39. MANASQUAN RIVER, N. J.

   Location.-This is a small stream located in the eastern part of New
Jersey, rising near Freehold and flowing easterly to the Atlantic
Ocean, about 26 miles south of Sandy Hook. (See U. S. Coast and
Geodetic Survey Chart No. 1216.)
   Previous projects.- Adopted by River and Harbor Act of March 3,
1879. For further details see Annual Report for 1909, page 186, and
Annual Report for 1938, page 269.
   Existing project.-This provides for the opening of Manasquan
Inlet and the provision of works designed to secure a channel at least
8 feet deep at mean low water. It also provides for a widening of the
channel to same depth on its northerly side by dredging an area ap-
proximately 200 feet wide by 3,150 feet long. The mean tidal range
in the inlet is 3.9 feet, and at Highway Bridge No. 35, 3.4 feet; mean
ranges of spring tides, 4.8 and 4.1 feet, respectively. The mean tidal
range in the easterly lagoon is about 2 feet.
   The estimate of cost for new work, revised in 1935, was $646,000
exclusive of amount expended on previous projects, but including
$300,000 contributed by local interests. The latest (1935) approved
estimate for annual cost of maintenance is $20,000.
    The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                              Documents 1


July     3, 1930   Channel 8 feet deep and provision of works de-   H. Doc. No. 482, 70th Cong., 2d sess.
                     signed to secure the channel.
Aug. 30, 1935                                                      Senate committee
                   Widening of channel on northerly side------------                      document,    74th
                                                                     Cong., 1st sess.


  1 These     documents contain the latest published maps.

  Recommended modifications of project.-Under date of January 3,
1939, the Chief of Engineers recommended the adoption of a project
entitled "New Jersey Intracoastal Waterway," to provide a channel
12 feet deep at mean low water and generally 100 feet wide, extending
from the Atlantic Ocean at Manasquan Inlet, N. J., to Delaware Bay
above Cape May, N. J., by the further improvement of Manasquan
River and Inlet, N. J., and the present New Jersey intracoastal
waterway, and by the construction of a canal of similar dimensions
from Cape May Harbor to Delaware Bay via the New England Creek
Basin, with adequate jetties at the Delaware Bay entrance; all at an
estimated first cost of $2,100,000 with annual maintenance of $150,000,
subject to certain conditions of local cooperation (H. Doc. No. 133,
76th Cong., 1st sess.).
  Under date of June 21, 1941, the Chief of Engineers recommended
modification of the existing project so as to provide for deepening the
existing Federal channel, including a slight extension, to 12 feet, ex-
cept in the reach seaward of the inner end of the north jetty, where
the depth is to be 14 feet; dredging to a depth of 10 feet an anchorage
of 19 acres south of the existing project; and dredging to a depth of
12 feet an anchorage of 27.5 acres about 0.5 mile west of the Route 35
         RIVERS AND HARBORS---NEW       YORK,   N.   Y.,   DISTRICT   269
highway bridge; at an estimated cost of $143,000, with $6,000 annually
for maintenance, in addition to that now required, subject to certain
conditions of local cooperation. (H. Doc. No. 356, 77th Cong.,
1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-Five small landings used by commercial fish-
ermen, and 7 landings and boat basins, 5 of which are equipped with
marine railways, are available for charter and party fishing boats.
All are located along the Manasquan River and its branches. Two
yacht clubs with a mooring capacity of 51 boats and numerous private
pleasure boat landings are also located along the waterway. None
of the terminals has railroad connections. The terminal facilities
available are considered sufficient for present requirements.
   Operations and results during fiscal year.-The U. S. derrick boat
Babcock was employed from September 5 to 18, 1941, in removing 268
tons of stone that had fallen into the channel and placing the stone on
the jetty. The cost of this work was $6,445.61 for maintenance. The
cost of contingencies preliminary to repair of the jetty was $34.25 for
maintenance.
   The total cost of work was $6,479.86, all for maintenance. The
total expenditure was $6,483.86.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1938. A rubble-mound jetty 1,230 feet long north of the
entrance and one 1,030 feet long south of the entrance were com-
pleted in 1931. Two steel bulkheads, each 950 feet long, at the
inshore ends of the jetties were completed in 1937. A steel bulk-
head, 698 feet long, and two steel groins of an aggregate length of
570 feet, constructed on the northerly beach, were completed in 1938.
A channel 10 feet deep and 250 feet wide from the 10-foot contour
in the ocean to a point near the inshore end of the jetties and thence
8 feet deep and 300 feet wide to a point 700 feet below the New York
& Long Branch Railroad bridge, was completed in 1933, and the
200-foot widening on the northerly side of the channel was com-
pleted in 1937. When examined in August 1940 and September 1941
the controlling depth at mean low water through the channel was 8
feet for a width varying from 240 to 300 feet.
   The total cost and expenditures of the existing project to June 30,
1942, were $641,052.36-$335,342.16 for new work and $305,710.20 for
maintenance. In addition, the costs and expenditures from contrib-
uted funds were $300,000.for new work.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $31,904.73 will be applied to the completion by
June 30, 1943, under contract to be entered into, of dredging to restore
the entrance channel to project dimensions.
   Further maintenance dredging will not be necessary during the fiscal
year 1944. Repair of the north jetty will be necessary during the fiscal
year 1944. The sum of $50,000 can, therefore, be profitably expended
during the fiscal year ending June 30, 1944, for maintenance repairs
under contract, to restore the north jetty to a satisfactory condition.



      493202-43-pt. 1, vol. 1----18
270            REPORT OF CHIEF OF ENGINEERS,                         U. S. ARMY,              1942

                                       Cost and financial summary

,Cost ofnew work to. June 30, 1942--_------------------------1                                     $374, 342. 16
Cost of maintenance to June 30, 1942    ____ -           --
                                                   - _____                                          307, 764. 31

           Total cost of permanent work to June 30, 1942_ ---                       _____-          682,106. 47

Net total expenditures---------------                          --------------------                 682,106. 47
Unexpended balance June 30, 1942__---- --                      _______________           __          31, 904. 73
           Total amount appropriated to June 30, 1942_________.._                                  1714, 011. 20

    Fiscal year ending June 30            1938          1939           1940           1941              1942

Cost ofnew work ..-.. ......            $43,136. 04
C ost of m aintenance-.............       2,701. 77    $2,208. 18    $41,167. 02    $19, 118. 52        $6,479.86

        Total cost------------_   --     45, 837. 81    2, 208. 18    41, 167. 02    19, 118. 52         6, 479. 86

Total expended-_------------_            59, 215. 20    1, 414. 13    38, 845. 91    22, 229. 68         6, 483. 86

Allotted_----------------------          32, 000. 00   59, 831. 52     6, 046. 79    10, 000. 00        25, 000. 00'


Balance unexpended July 1, 1941________________--                                                  $13, 388. 59
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942------------------------------------                                          25, 000. 00

      Amount to be accounted for _________-------------38,                                               388. 59
Gross amount expended -----     ----          ---------------                                         6, 483. 86

           Balance unexpended June 30, 1942 ____________--------31,                                     904. 73

Amount that can be profitably expended in fiscal year ending June
                               -- - - - - _ -- -            -
30, 1944, for maintenance 2_______           __________                                            50, 000. 00
1 Exclusive of $300,000 contributed funds expended for new work.
   2   Exclusive of available funds.

       40. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

   The cost of work during the fiscal year amounted to $166,179.63.
The expenditures were $159,104.23. The balance unexpended and
accounts receivable at the end of the fiscal year, amounting to
$2,167.32, together with an allotment of $119,200 to be made in July
1943, a total of $121,367.32, will be applied as needed during the
fiscal year 1943 to payment of expenses incurred under this heading.
The additional sum of $150,000 can be profitably expended during the
fiscal year ending June 30, 1944.
                                       Cost and financial summary

Cost of new work to June 30, 1942
Cost of maintenance to June 30, 1942___----------------------                                $1,831, 420. 41
      Total cost of permanent work to June 30, 1942_______--
                                                          -  1, 831, 420. 41
Plus accounts receivable June 30, 1942__ ________________------912. 92

     Gross total costs to June 30, 1942                                                     1, 832, 333. 33
                                                                                         ._________---------
Minus accounts payable June 30, 1942_______--- -----------                                       6, 686. 16

      Net total expenditures ---------      --                                                1,825, 647.17
Unexpended balance June 30, 1942__ _________--_-----------                                        1, 254. 40
          Total amount appropriated to June 30, 1942-------                                   1,826, 901. 57
            RIVERS      AND HARBORS--NEW                     YORK,        N.   Y.,     DISTRICT                 271

   Fiscal year ending June 30         1938            1939             1940             1941                 1942


Cost of new work --      --       -- -        -    -     - -       -     - -         -      - -    -
Cost of maintenance ...
                      ..          $157, 937. 88
                                .....              $162, 412. 41    $123, 528. 32     $166, 442.06 $166, 179. 63
Total expended          _           162, 296. 91    157, 578. 94     133, 636.97      170, 224. 18          159, 104. 23
Allotted___         -   -   -       264, 500. 00    162, 000.00      154, 000. 00     100, 000.00            50,000.00



Balance unexpended July 1, 1941_------__-------------------___                                       $110, 358. 63
Amount allotted from War Department Civil Appro-
  priation Act approved June 24, 1940 _--.    ___---   $4, 000. 00
Amount allotted from War Department Civil Appro-
  priation Act approved May 23, 1941------------_      46, 000. 00
                                                                                                       50, 000. 00

      Amount to be accounted for____----- ___-----_---_-----                                          160, 358. 63
Gross amount expended_ _________----_______           $169, 704. 56
Less reimbursements collected _____________-____        10, 600. 33
                                                                                                      159, 104. 23

      Balance unexpended June 30, 1942 ____                                                             1, 254. 40
Outstanding liabilities June 30, 1942_                                                                  6, 686. 16

     Balance available June 30, 1942 ____________                                                     -5,    431. 76
Accounts receivable June 30, 1942_______________ _________                                                   912. 92

        Unobligated balance available June 30, 1942_______________                                    -4,     518. 84

Amount that can be profitably expended
                                I
                                       in fiscal year ending
June 30, 1944, for maintenance   -     __-_                                                          150, 000. 00
   1Exclusive of available funds.
   41. PRELIMINARY INVESTIGATIONS OF THE ST. LAWRENCE RIVER


   Location.-The International Rapids Section of the St. Lawrence
lies between the State of New York in the United States and the Prov-
ince of Ontario in Canada, generally between the cities of Ogdens-
burg, N. Y., and Cornwall, Ontario. The international boundary
follows approximately the center of the river, leaving the islands
Galop, Ogden, Croil, Long Sault, and Barnhart in the United States,
and the Sheek and Cornwall Islands in Canada. These islands are the
principal ones in this section, although numerous smaller ones exist.
This area for river and harbor and flood-control work is under the
jurisdiction of the district engineer, Buffalo, N. Y.
   Existingq project.-There is no existing project; however, an investi-
gation was authorized by Executive Order No. 8568, dated October
16, 1940. The work consists of preliminary investigations and sur-
veys of the International Rapids Section of the St. Lawrence River
with respect to the development of navigation and hydroelectric
power. The proposed plan provides for the development of navigation
by the construction of canals and channels 27 feet deep, with a depth
of 30 feet over the sills of the necessary locks, and also provides for
the development of power by utilizing the difference in head of about
80 feet between the pool above Long Sault Dam and the river below.
   The investigation proposes construction to include the following
major items: Canadian and American powerhouses at the foot of
Barnhart Island, Long Sault Canal; two locks extending from Rich-
ards Point, four miles northeast of Massena, N. Y., to the mouth
272     REPORT OF CHIEF OF ENGINEERS,              U. S.   ARMY,      1942

of the Grass River; Long Sault Dam from the New York main-
land to the head of Barnhart Island; Iroquois Point Dam near
Iroquois, Canada; Point Rockway Canal and lock around Iroquois
Dam; and channels and cuts in the St. Lawrence River. In addition
some rehabilitation of towns, relocation of railroads, highways, and
transmission lines, construction of dikes, and adjustments to existing
canals are necessary.
   Local cooperation.--None required. However, the Dominion of
Canada, the Province of Ontario, Canada, and the Hydroelectric
Power Commission of Ontario have, by furnishing engineering serv-
ices, fully cooperated.
   Operations and results during fiscal year.-Subsurface explorations;
field surveys; investigation of sources of aggregate for concrete;
preparation of contract plans and specifications, design analyses, and
cost estimates for Long Sault Dam, Iroquois Dam, Barnhart Island
powerhouse, Long Sault Canal, Massena Canal intake works, Point
Rockway Canal, Robinson Bay lock, Grass River lock, Point Rockway
lock, dikes, Seaway Village for Government employees, access high-
ways and railroads, river channels, and hydraulic cuts; and prepara-
tion of plans for bridges, relocation of highways, railroads, canal, and
transmission lines; were performed at a cost of $608,959.17 for new
work. The expenditures were $684,346.96. Field work was aban-
doned in the spring of 1942 and from then on work was limited pri-
marily to the preparation of the final report.
   Condition at end of fiscal year.-The contract plans, specifications,
design analyses, and cost estimates have been completed for the major
items of construction mentioned in the preceding paragraph subject
to final checking and necessary approvals by higher authority. Prepa-
ration and printing of the final report on the work accomplished
respecting the improvement of the international section of the St.
Lawrence River is in progress. The cost to June 30, 1942, was $1,179,-
729.78. The expenditures were $1,269,208.90.
   Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to $80,791.10 plus accounts receivable of $8,061.39,
a total of $88,852.49 will be applied as follows:
Accounts payable June 30, 1942 ___$18,                                        726. 16
New work: Completion and printing of final report                         70, 126. 33
      Total------------------------    ----------------------------       88, 852. 49
  No funds can be profitably expended during the fiscal year ending
June 30, 1944.
                          Cost and financial summary
                      EMERGENCY   FUND FOR THE PRESIDENT

Cost of new work to June 30, 1942__ _____________--                     $868, 351. 23
Cost of maintenance to June 30, 1942_                         ----           -
      Total cost of permanent work to June 30, 1942_                      868, 351. 23
Undistributed costs June 30, 1942------------------------------            41, 546. 12
      Net total cost to June 30, 1942---_  -----------------------       909, 897. 35
Plus accounts receivable June 30, 1942_                                      , 702. 65
                                                                            6--------------------------
       Gross total costs to June 30, 1942- -----------------------      '916, 600. 00
Minus accounts payable June 30, 1942_-----------                           16, 090. 64
       Net total expenditures-     -__---     ---- _            ---      900, 509. 36
Unexpended balance June 30, 1942____ ___------------                       49, 490. 64
       Total amount appropriated to June 30, 1942-------                  950, 000. 00
                    RIVERS AND HARBORS--NEiW YORK,                                               N.    Y.,    DISTRICT                   273

     Fiscal year ending June 30                                                1939             1940            1941                  1942


Cost of new work ... . = ........                                                                            $570, 770. 61          $297, 580.62
Cost of maintenance-------------
Total expended .................                                                                              584,861. 94            315,
                                                                                                                                     315, 647.42
                                                                                                                                          647. 42

Allotted ........................                                                                             950,000.00



Balance unexpended July 1, 1941____                                                             _____________ $365, 138. 06
Gross amount expended__ --      -____-                                                  -__________
                                                                                                  $542, 755.46
Less reimbursements collected _ __                                                                     227, 108. 04
                                                                                                                              315, 647. 42

      Balance unexpended June 30, 1942___________                                                                               49, 490. 64
Outstanding liabilities June 30, 1942______________                                                                             56, 193.29

      Balance available June 30, 1942____________                                                            -------          -6,     702.65
Accounts receivable June 30, 1942_ _________                                                                                        6, 702. 65
                                                        PUBLIC WORKS FUNDS


Cost of new work to June 30, 1942_______________________________                                                             $311, 378. 55
Cost of maintenance to June 30, 1942
              Total cost of permanent work to June 30, 1942_____________                                                      311, 378. 55
Undistributed                   costs June 30, 1942__________________ ___                                _______                58, 597. 77

       Net total cost to June 30, 1942____________________________                                                            369, 976. 32
Plus. accounts receivable June 30, 1942______                                                                                   1,358. 74

              Gross total costs to June 30, 1942__________________                                                            371, 335. 06
Minus accounts payable June 30, 1942__________________________                                                                      2, 635. 52

     Net total expenditures ___        __   _____                                                                            368, 699. 54
Unexpended balance June 30, 1942_____________________________                                                                  31. 300. 46
              Total amount appropriated to June 30, 1942_____________                                                         400, 000. 00


     Fiscal year ending June 30                        1938                    1939             1940            1941                  1942


Cost of new work --------------                                                         ----             -             -            $311, 378.55
Cost of maintenance
Total expended_____________                                                                                                          368, 699. 54

Allotted                                                                                   --                                        400, 000.00



Amount allotted from War Department Civil Appropriation Act
  approved June 16,                   !1933-------------------------------------$400,                                                  000. 00
Gross amount expended___ _________------------$445, 587. 57
Less reimbursements collected _______-- __- ___ __ 76, 888. 03
                                                                                                                              368, 699. 54

      Balance unexpended June 30, 1942_                                                                                         31, 300. 46
Outstanding liabilities June 30, 1942 1111111111111111------__                                                                  32, 659. 20

      Balance available June 30, 1942_...,__                                                                                  -1, 358. 74
Accounts receivable June 30, 1942-------------------------------                                                                1, 358. 74
274          REPORT         OF CHIEF     OF        ENGINEERS,                                U.     S.    ARMY,         1942


CONSOLIDATED          COST AND FINANCIAL SUMMARY FOR PRELIMINARY                                                    INVESTIGATIONS-
                                     ST. LAWRENCE RIVER

Cost of new work to June 30, 1942_ ______________________ $1, 179, 729. 78
Cost of maintenance to June 30, 1942_________________ _______                                                         -------------
      Total cost of permanent work to June 30, 1942_ _________                                                            1, 179, 729. 78
Undistributed costs June 30, 1942____________   ---------------                                                              100, 143. 89
      Net total cost to June 30, 1942                                           __          ______________                1,279, 873. 67
Plus accounts receivable June 30, 1942-                                         ---                    __                     8, 061. 39

           Gross total costs to June 30, 1942____________________                                                         1, 287, 935. 06
Minus accounts payable June 30, 1942________________________                                                                             18, 726. 16

           Net total expenditures______ _...                          .          _            __                          1, 269', 208. 90
Unexpended           balance June 30, 1942_                                                               _ ______                       80, 791. 10
           Total amount appropriated to June 30, 1942-                                                   --1, -__               350, 000. 00

      Fiscal year ending June 30       1938                         1939                          1940            1941                       1942

Cost of new work .....                                                                                       $570, 770. 61                 $608, 959. 17
Cost of maintenance .....

Total expended                             - - - -- - -       -
                                                              .--   - -   - -   - -
                                                                                                                584, 861. 94                684, 346. 96
Allotted         -                                                                                              950., 000. 00 I            400, 000. 00



Balance unexpended July 1, 1941 _----------                                                                                    $365, 138. 06
Amount allotted from War Department Civil Appropriation Act
approved June 16, 1933_ _---------      -__-----------------                                                                       400, 000. 00              k




           Amount to be accounted for___________________                                                                            765, 138. 06
Gross amount expended-_______________________ $988, 343. 03
Less reimbursements collected ________303,                                                                  996. 07
                                                                                                                                684, 346.96

      Balance unexpended June 30, 1942___---                                                      ____-----__-                           80, 791. 10
Outstanding liabilities June 30, 1942                                                        ______________                              88, 852. 49
      Balance available June 30, 1942__________________ ______                                                                      -8, 061. 39
Accounts receivable June 30, 1942_                                                                                                     8, 061. 39

42. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE S\ BMITTED
                                                          I                           I
                                                                                                                                i
                                                                For last                    Cost and expenditures to                     Estimated
                                                              fallt report                        June 30, 1942                          amountre-
                     Name of project                          see Annual
                                                                Report                                                                    quired to
                                                                  for-                      New work        Maintenanice                  complete


1. Larchmont Harbor, N. Y.1___________________                       1916                   $76, 064.85            $211.42                   (2)
2. Echo Bay Harbor, N. Y.3_                                          1941                    64,583.89           6,215.72                    (2)
3. New Rochelle Harbor, N. Y.3.                                      1941                    73, 213. 67        21, 223. 39                  (2)
4. Manhasset Bay, N. y.4                                             1941                ---.---------...-------------
                                                                                                                                              5 $63, 000
5.   Hempstead Harbor, N. Y.3...................                     1941                    39, 468. 11        65, 937. 23                  (2)
6.   Glencove Harbor, N. Y.3 6                  -                    1911                    72, 000. 00                                        63, 000
7.   Port Jefferson Harbor, N. Y.3 4                                 1932                   171,426. 71         10,125.44                    7 152, 700
8.   Greenport Harbor, N. Y.3____________________                    1941                    74, 680.83         17, 537.01                   (2)
9.   Sag Harbor, N. Y.3-                                             1941                   121,805. 39                                      (2)
10.   Great South Bay, N. Y.3.....................                    1941                    99, 820. 82       149, 573. 99                         6, 100
11.   Browns Creek, N. Y.3________________________                    1.941                   33, 976. 03        71, 553. 82                        51,000
12.   Sumpawanus (Babylon Creek) Inlet, N. Y.3 6-                     1895                        7, 000.00 _                       .I              16, 000
13.   Sheepshead Bay, N. Y.3____________________                      1931                    33, 827. 59         3, 342. 81                  (2)
14.   Coney Island Channel, N. Y.3-                                   1941                   111, 371.21        217, 265. 00        i
                                                                                                                                              (2)
15:   Coney Island Creek, N. Y.4 ..................                   1938                    69, 488. 84                                           91,000
16.   Gowanus Creek Channel, N. Y.3____                               1940                   145,000.00          68,821.88                    (2)
17.   Wallabout Channel, N. Y. ..................                     1940                    18,173. 69         34, 845. 24                  (2)

      See footnotes at end of table.
                RIVERS    AND      HARBORS--NEW                        YORK,            N.   Y.,     DISTRICT                    275

42. O'rl ER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED-
                           Continued

                                                              For last          Cost and expenditures to              Estimated
                                                            full report               June 30, 1942                   amount re-
                   Name of project                          see Annual                                                 quired to
                                                              Report                                                   complete
                                                               for-             New work         Maintenance


18. Irvington Harbor, N. Y.4                                    1941        .       .        .      .        .               $15, 000\
19. Tarrytown Harbor, N. Y.3                                    1941            $69, 836. 48         $56, 628. 41          (2)
20. Saugerties Harbor, N. Y.3 .................... 1936                          81, 904. 91          85, 094. 28          (2)
21. Otter Creek, Vt.3-_                            1932                          60, 253. 50           5,246.50               13,500
22. Gordons  Landing, Lake Champlain, Vt.3 6 __
       nebwnN(2)                                   1892                          34, 750.00         _23C
23. Channel between North and 3South Hero
      Islands, Lake Champlain, Vt. 6_                           1909             31, 000. 00                               (2)
24. St. Albans Harbor, Lake Champlain, Vt.3           86        1917              3, 125. 45               384. 55         (2)
25. Swanton Harbor, Vt.      6 ____                             1888             70, 500.00                                  169, 500
26.   Rouses Point, Lake Champlain, N. Y.3 .....                1895             98,467.55                                 (2)
27.   Great Chazy River, N. Y.3 __________________              1895             18,000.00                                 (2)
28.   Plattsburg Harbor, N. Y.3                                 1941            198, 415. 13            38, 424. 75        (2)
29.   Port Henry Harbor, N. Y.3                                 1931            869, 406. 46             1, 252. 75               2, 000
30.   Ticonderoga River, N. Y.3 6                               1895             16, 500.00                                      26, 000
31.   Elizabeth River, N. J.4                                   1941             60, 481. 15            58, 791. 21              74, 000
32. Rahway River, N. J.                                         1941             37,000.00                                       35, 400
33. Lemon Creek, Staten Island, N. Y.4  .                       1937             9 6, 621. 00        9 1, 621. 00             43, 000
34. Cheesequake Creek, N. J.3                                   1928             40, 000. 00         24, 956. 69              50, 000
35. Keyport Harbor, N. J.3                                      1940             40, 475. 00         174, 427. 79          (2)
36. Matawan Creek, N. J.3                                       1934             21,000.00            73, 964. 09             12, 000
37. Shoal Harbor and Compton Creek, N. J.a o10                  1941             47, 281. 99         189, 708. 83          (2)

  1 Modification of existing project was recommended by the Chief of Engineers, Apr. 10, 1940 (H. Doc.
No. 697, 76th Cong., 3d sess.).
2 Completed.
8Improvement adequate for commerce.
4 Awaiting local cooperation.
5 In addition, $50,000 to be contributed by local interests.
6 No commerce reported.
7 In addition, $57,000 to be contributed by local interests.
8 Exclusive of $10,000 expended from contributed funds.
9 These amounts also included in report for New York and New Jersey Channels.
10 Modification of existing project was recommended by the Chief of Engineers, Feb. 27, 1940 (H. Doc.
No. 673, 76th Cong., 3d sess.).

                43. PLANT ALLOTMENT, NEW YORK, N. Y., DISTRICT

                                           Cost and financial summary

Undistributed costs June 30, 1942------------------------- $7, 307, 009. 81
Plus accounts receivable June 30, 1942 _____--___-------789,        759. 23

                                         ---
      Gross total costs to June 30, 1942______         ____----                                                   8, 096, 769. 04
Minus accounts payable June 30, 1942__------------------------                                                       274, 553. 45
     Net total expenditures_ ______-_______--_____                                                   _            7, 822, 215. 59
Unexpended balance June 30, 1942______________
                                --------                                                                             302, 159. 2&
           Total amount appropriated to June 30, 1942______________                                               8, 124, 374. 87

      Fiscal year ending June 30              1938             1939                 1940                 1941             1942


Total expended....----------------$53, 338. 60 $3, 408, 105. 98             -$213, 427. 54 $2, 022, 033. 70           -$131, 423. 26

Allotted_ ---     ____     ___--      --    28, 418. 14   3, 309, 568. 87    -230, 706. 31         1, 977, 311. 53


Balance unexpended July 1, 1941__---_-_        - - - -             -_ $170, 736. 02
Gross amount expended_----_------------____       $5, 990,023. 62
Less:
     Reimbursements collected---   $5,957, 343.94
     Receipts from sales_
                       ------------ 164; 102. 94
                                                   6, 121, 446. 88
                                                                     -131, 423. 26

                                               .302, -_______
           Balance unexpended June 30, 1942- . --                                                                         159. 28
276            REPORT OF CHIEF OF ENGINEERS,                                        U. S. ARMY                    1942

Outstanding liabilities June 30, 1942_____ ______ $274, 553. 415
Amount covered by uncompleted contracts--------- 300, 668. 416
                                                                                                                    $575, 221. 91
      Balance available June 30, 1942 _________                                                _                   -273, 062. 63
Accounts receivable June 30, 1942_  ____________                                                                     789, 759. 23
           Unobligated balance available June 30, 1942______________ _                                               516, 696. 60

Status of all investigations for navigation called for by river an d harbor acts
                           and committee resolutions

                                                                       Date trans-
             Locality                   Authorization act               mitted to             Document No.          Recommenda-
                                                                        Congress                                        tion

Bay Shore Harbor, N. Y____ River               and   Harbor
                                        Act, June 20, 1938.
Burlington Harbor, Vt .....            Rivers and    Harbors       May        2, 1942                               Unfavorable.
                                        Committee        resolu-
                                         tion, Aug. 2, 1939.
Delaware and Raritan Ca-               River and Harbor Act            May 20, 1942                                      Do.
  nal, N. J.                            Aug. 30, 1935.
East River and Flushing                Rivers 'and. Harbors
  Bay and Creek, N. Y.,                  Committee resolu-
  seaplane channels and an-              tion, Jan. 19, 1940.
  chorage basin in vicinity
  of North Beach Airport.
East River and Hell Gate,              Rivers and    Harbors
  N. Y., between South                   Committee       resolu-
  Brother and Berrian Is-               tion, Apr. 17, 1940.
  lands.
Great Lakes-Atlantic Tide-             Rivers and Harbors
waters deep waterway                    Committee resolu-
 (under Special Board).                  tion, Mar. 7, 1928.
Great Lakes-Hudson River               Commerce Commit-            June 15, 1942             (Confidential) __      Favorable.
waterway.                               tee resolution, May
                                          1, 1940.
     Do_     .... _.._.........._      Rivers and Harbors          -
                                         Committee resolu-
                                         tion Apr. 28, 1942.
Hudson River channel, and              Rivers and Harbors
  Hudson River, N. Y.                   Committee        resolu-
                                         tion May 8, 1941.
Jones Inlet, N. Y ........             Rivers and Harbors              Oct.   17, 1941       House 409, 77tl h           Do.
                                          Committee resolu-                                    Cong., 1st sess
                                         tion, Nov. 3, 1939.
Keyport Harbor, N. J          --....   River and Harbor
                                        Act, Aug. 30, 1935.
Manasquan River, N. J        Rivers and Harbors                    Aug.        8, 1941       House 356, 77tl h           Do.
                                Committee resolu-                                              Cong., 1st sess.
                                tion, Apr. 14, 1938.
Manhasset Bay, N. Y-......   Rivers and Harbors
                                 Committee resolu-
                                tion, Mar. 25, 1938.
        - .-
   Do - .-  .. .. .-       - R ive rs a nd H a rb o r s
                     ---- .-
                   . .-
                                Committee resolu-
                                tion, Dec. 30, 1938.
Matawan Creek, N. J-.....    Rivers and Harbors
                                         Committee       resolu-
                                         tion, Jan. 24, 1936.
     Do _................._            Rivers and Harbors
                                         Committee       resolu-
                                        tion, Jan. 26, 1940.
Newark Bay, N. J.........              Commerce Commit-            July 22, 1942             (Confidential)__            Do.
                                        tee resolution, May
                                        21, 1941.
New York Bay-Delaware                  Commerce Commit-            Aug. 11, 1942             _.__do_                     Do.
River Section of Intracoastal          tee resolution, Dec.
Waterway.                               15, 1936.
Nissequogue River, Long                River and     Harbor                                                   .
Island, N. Y.                          Act, Aug. 30, 1935.
Otter Creek, Vt., from                 Commerce Commit-
  Proctor, Vt., northward               tee resolution, May
 (navigation and flood con-             31, 1939.
trol).
Raritan River, N. J_                   Rivers and    Harbors
                                        Committee resolu-
                                        tion, Mar. 27, 1941.
Rouse Point Harbor, Lake               Rivers and Harbors          Nov. 25, 1941         .         -..   --         Unfavorable.
Champlain, N. Y.                         Committee resolu-
                                         tion, Oct. 18, 1940.
            RIVERS      AND HARBORS-NEW                 YORK,         N.   Y.,    DISTRICT        277
Status of all investigations for navigation called for by river and harbor acts
                             and committee resolutions-Continued

                                                     Date trans-
          Locality              Authorization act     mitted to         Document No.      Recommenda-
                                                      Congress                                tion

St. Lawrence River, Inter-    Presidential   order .
  national Rapids section.       Oct. 16, 1940.
Shrewsbury River, N. J         Commerce Commit- Oct.        7, 1941   _Unfavorable.
                                tee resolution, May
                                30, 1940.
Way Cake (Waackaack)           River and Harbor      Feb.   9, 1942    House 624, 77th    Favorable.
Creek, N. J.                   Act, Aug. 30, 1935.                     Cong., 2d sess.
Woodbridge Creek, N. J____     Rivers and Harbors .
                                 Committee resolu-
                                tion, Mar. 24, 1942.


                             44. RUTLAND, OTTER CREEK, VT.
   Location.-Otter Creek rises in the Green Mountains at Dorset,
Vt., flows generally north about 107 miles and enters Lake Cham-
plain 19 miles south of Burlington, Vt. It has a drainage area of 936
square miles. The city of Rutland is located about 72 miles above the
river's mouth at the junction of East Creek and the main stream.
 (See U. S. Geological Survey map covering Rutland, Vt.,
quadrangle.)
   Existing project.-This provides for channel clearing and construc-
tion of earth levees and concrete walls along East Creek in the
vicinity of Rutland. The aggregate length of the levees and walls
is about 6,000 feet, of which 4,500 feet are earth embankment and
1,500 feet are concrete walls. The installation of a pumping plant
and the removal of two bridges are included in the project.
   The estimate of cost for new work, revised in 1939, is $308,000,.
exclusive of land and other work to be provided by local interests.
   The existing project was authorized by the Flood Control Act
approved June 22, 1936, and modified by the Flood Control Act
approved August 18, 1941. (See H. Doc. No. 171, 76th Cong., 3d
sess., which contains the latest published map.)
   Local cooperation.-See page 5 for requirements. These require-
ments have not been fulfilled.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on this
project, and there has been no cost or expenditure.
   Proposed operations.-No funds are available, and no work is
contemplated during the fiscal year 1943.
   The sum of $20,000 can be profitably expended during the fiscal
year 1944 for the preparation of plans.
                                  Cost and financial summary

Cost of new work to June 30, 1942-
Cost of maintenance to June 30, 1942_______________________                                    ---
      Net total expenditures_________-------------------
Total amount appropriated to June 30, 1942__

Amount       (estimated). required to be- appropriated for completion of
existing project _----------------------                      ----$308, 000
Amount that can be profitably expended in fiscal year ending June
30, 1944, for new work ---------------------------------            20, 000
278     REPORT OF CHIEF OF ENGINEERS,              U.   S. ARMY,   1942

             45. NORTH ADAMS, HOOSIC RIVER BASIN, MASS.

   Location.-The Hoosic River rises in northwestern Massachusetts,
flows generally north and northwest, crossing the southwest corner of
Vermont to the vicinity of Eagle Bridge, New York, where it turns
west and joins the Hudson River about 16 miles above Troy, N. Y. It
is 66 miles long and has a drainage area of 713 square miles. North
Adams, Mass., is situated on the Hoosic River about 14 miles below the
source of the river. (See U. S. Geological Survey map covering Grey-
lock, Mass.-Vt., quadrangle.)
   Existing project.-This provides for channel paving of the Hoosic
River and the North Branch to form a flume 6,200 feet long; channel
clearing, earth levees, and concrete walls on the South Branch; and
channel clearing, earth levees, and concrete walls on the main stream at
Braytonville. The aggregate length of the levees and flood walls, in
addition to the concrete flume, is 14,340 feet, of which 2,450 feet are
concrete wall and 11,890 feet are earth embankment. Removal of a
portion of the dam and installation of a vertical lift gate in the Phoenix
Dam, and the removal of an abandoned dam on the South Branch are
included in the project.
   The estimate of cost for new work, revised in 1938, is $1,471,000, ex-
clusive of land and other work to be provided by local interests.
   The existing project was authorized by the Flood Control Act ap-
proved June 22, 1936, and modified by the Flood Control Act approved
August 18, 1941. (See H. Doc. No. 182, 76th Cong., 1st sess., which
contains the latest published map.).
   Local cooperation.-See page 5 for requirements. In addition to
the usual requirements for local cooperation as provided by law, local
interests are required to give assurances satisfactory to the Secretary
of War that they will insure against future encroachments upon the
flood channels to be provided by the improvements. These require-
ments have not been fulfilled.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on this
project, and there has been no cost or expenditure.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
   The sum of $60,000 can be profitably expended during the fiscal year
ending June 30, 1944, for new work, for the preparation of detailed
plans.
                          Cost and financial summary

Cost of new work to June 30, 1942---------------------------------------
Cost of maintenance to June 30, 1942------------------------ ----------

      Net total expenditures --------------------------------          ----------
Total amount appropriated to June 30, 1942--                             ---------

Amount (estimated) required to be appropriated for completion of
existing project     ------------------------------------      ----- $1, 471, 000
Amount that can be profitably expended in fiscal year ending June 30,
1944, for new work-------------------------------------------             60,000

             46. HOOSICK FALLS, HOOSIC RIVER BASIN, N. Y.

   Locatin.-The Hoosic River rises in northwestern Massachusetts,
flows generally north and northwest, crossing the southwest corner of
         RIVERS AND HARBORS-NEW               YORK,   N.   Y., DISTRICT   279

Vermont to the vicinity of Eagle Bridge, N. Y., where it turns west
and joins the Hudson River about 16 miles above Troy, N. Y. It is
66 miles long and has a drainage area of 713 square miles. Hoosick
Falls, N. Y., is situated on the Hoosic River about 26 miles above the
mouth. (See U. S. Geological Survey map covering Hoosick, N. Y.-
Vt. quadrangle.)
   Existing project.-This provides for channel clearing and for the
construction of earth levees and concrete walls on the east bank of the
river. The aggregate length of levees and flood walls is 3,960 feet, of
which 3,060 feet are earth embankment and 900 feet are concrete wall.
Installation of a pumping plant and the construction of a concrete
box culvert are included in the project.
   The estimate of cost for new work, revised in 1938, is $137,000,
exclusive of land and other work to be provided by local interests.
   The existing project was authorized by the Flood Control Act
approved June 22, 1936, and modified by the Flood Control Act ap-
proved August 18, 1941. (See H. Doc. No. 182, 76th Cong., 1st sess.,
which contains the latest published map.)
   Local cooperation.-See page 5 for requirements. In addition to
the usual requirements for local cooperation as provided by law, local
interests are required to give assurances satisfactory to the Secretary
of War that they will insure against future encroachments upon the
flood channels to be provided by the improvements. These require-
ments have not been fulfilled.
   Operations and results during fiscal year.-None.
   Condition at end of ffscal year.-No work has been done on this
project, and there has been no cost or expenditure.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
   The sum of $10,000 can be profitably expended during the fiscal year
ending June 30, 1944, for new work, for the preparation of detailed
plans.
                           Cost and financial summary
Cost of new work to June 30, 1942__________----------------------------
Cost of maintenance to June 30, 1942--------------------- ----------

      Net total expenditures_-----------        --------          ----------
Total amount appropriated to June 30, 1942--------------------     ---------

Amount (estimated) required to be appropriated for completion of
existing project___---------------------------------        ------   $137, 000
Amount that can be profitably expended in fiscal year ending June 30,
1944, for new work------------------------------------- ---------      10, 000

47. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL

  The cost of work during the fiscal year amounted to $9,298.28. The
expenditures were $9,887.63. The balance unexpended at the end of
the fiscal year, amounting to $2,762.35, and the sum of $2,100 allotted
in August 1942, will be applied as needed during the fiscal year 1943
to payment of expenses incurred under this heading.
280          REPORT        OF CHIEF OF ENGINEERS,                           U.          S. ARMY,     1942

                                      Cost and financial summary

Cost of new work to June 30, 1942
Cost of maintenance to June 30, 1942________                                                                $137, 463. 961
      Total cost of permanent work to June 30, 1942__                                                        137, 463. 96
Minus accounts payable June 30, 1942____________________                                                          476. 31

      Net total expenditures_                                                                                136, 987. 65
Unexpended balance June 30, 1942___                                                                            2, 762.35

           Total amount appropriated to June 30, 1942_                                  -                    139, 750. 00


     Fiscal year ending June 30            1938           1939                  1940           1941               1942

                                      --------------                    .............
Cost of new work     ---------
Cost of maintenance ..........           $55,937.01     $41,562.89          $21, 750.58       $8, 915. 20        $9, 298. 28
Total expended                            52. 277. 09    44, 265. 13          22, 097. 57      8, 460. 23          9, 887. 63
Allotted_       _                           000. 00
                                         113,             6, 500. 00          12, 000. 00      8, 250. 00



Balance unexpended July 1, 1941___________________________                                                   $12, 649. 98
Gross amount expended_____________________________   $10, 073.33
Less reimbursements collected _____-__  __--     -_       185. 70
                                                                                                                9, 887. 63,

      Balance unexpended June 30, 1942___------      ______- __                                                 2, 762. 35
Outstanding liabilities June 30, 1942___________________________                                                   476. 31

    Unobligated balance available June 30, 1942________________- 2, 286. 04
Amount allotted in August 1942_______________ ___________---2, 100. 00

Amount available during the fiscal year 1943_________________                                                   4, 386. 04

48. OTHER FLOOD-CONTROL PROJECTS FOR WHICH NO ESTIMATES
                      ARE SUBMITTED

                                                        For last full      Cost and expenditure to       Estimated
                                                        report see               June 30, 1912            amount
                    Name of project                      Annual
                                                         Report                                       - required to
                                                           for-          New work           Maintenancce complete


1. Lamoille River, Vt.1                                     1939         2 $49, 837. 43                           . $26, 500
2. Waterbury, Winooski River Basin, Vt........              1941                                                    880, 000,
3. Proctor, Otter Creek Basin, Vt.4 .........               1937                                                    3 22, 500
4. Adams, Hoosic River Basin, Mass..      ........          1941                                                    271,000
5. Bennington, Hoosic River Basin, Vt.........              1941                                                    291,000
6. Waterford, Hudson and Mohawk Rivers,
   N. Y.4.......................................            1939                                                     315, 000,
7. Winooski River, Vt.                 -                    1940        4, 897, 427. 37                            (5)


     1 One unit of project completed; remaining unit awaiting local cooperation.
     2 Includes $23,507.43 Emergency Relief funds.
     3 Completion not desired by local interests.
     SAwaiting local cooperation.
     5 Completed.
             RIVERS AND          HARBORS--SYRACUSE,                  N.    Y.,   DISTRICT          281
Status of all investigations for flood control called for by flood-control acts and
                              committee resolutions

                                                       Date trans-
          Locality              Authorization act      mitted to          Document No.   Recommenda-
                                                                                             tion
                                                        Uongress

Blind Brook and tributaries, Flood Control Act,
  New York.                      Aug. 18, 1941.
Bronx River and tributaries, _--- d o .--------------
  New York.
Byram River and tribu- ___ do ......... -------
  taries, Connecticut.
Cromline Creek, N.Y., flood Commerce Commit- May 10, 1942                                Unfavorable.
  protection at town of          tee resolution Oct.
  Chester.                       7, 1938.
Hutchinson River and trib- Flood Control Act,
  utaries, New York.             Aug. 18, 1941.
Kayaderosseras Creek, Fish Flood Control Act,          Feb. 21, 1942                         Do.
  Creek, and their tribu-        June 28, 1938.
  taries, and Saratoga Lake,
  N. Y.
Kinderhook Creek, N. Y.        Commerce Commit-
  and Mass.                      tee resolution Oct. ...............
                                 28, 1941.
Mamaroneck and Sheldrake Flood Control Act,
  Rivers and their tribu-         Aug. 18, 1941.
  taries, New York.
M ettaw ee R iver, N . Y ..... Flood Control Act, Feb. 12,1942_                              Do.
                                  Aug. 28, 1937.
New Creek, N. Y .__            Flood Control Act, Apr. 15, 1942_                             Do.
                                  June 22, 1936.
Otter Creek, Vt., from         Commerce Commit-
  Proctor, Vt., northward         tee resolution, May
  (navigation and flood con-      31, 1939.
  trol).
Passaic River, N. J  -----.... Flood Control Act,
                                  May 6, 1936.
     Do __                     Flood Control Act,
                                  June 22, 1936.
Saw Mill River and tribu- Flood Control Act,
  taries, New York.               Aug. 18, 1941.
Wallkill River, N. Y., and Commerce Commit- May 20, 1942                                     Do.
  N. J.                           tee resolution Oct.
                                  5, 1938.
Winooski River and tribu- Flood Control Com-
  taries, Vermont.                mittee resolution
                                  June 20, 1940.



FLOOD CONTROL IMPROVEMENTS IN THE SYRACUSE,
                N. Y., DISTRICT
   This district comprises the watershed of the Mohawk River and
its tributaries in northeastern New York, the watershed of the Oswego
River and its tributaries in northern New York, and the watershed
of the Ssuequehanna River and its tributaries, above and includ-
ing Shamokin Creek, in south central New York and northern
Pennsylvania.
   District engineer: Col. J. C. Marshall, Corps of Engineers.
   Division engineer: Col. J. N. Hodges, Corps of Engineers, to May
4, 1942, and Col. B. C. Dunn, Corps of Engineers, since that date.
282       REPORT OF CHIEF OF ENGINEERS,                 U.     S. ARMY,     1942

                                      IMPROVEMENTS

                               Flood-control projects
                                       Page                                           Page
1.   Syracuse,    Oswego     River         11. Williamsport, Susquehanna
         Basin, N. Y_                   282       River, Pa___________                310
2.   Owasco Lake, Oswego River             12. Wilkes-Barre-Hanover Town-
         Basin, N. Y      _             283       ship, Susquehanna River,
3.   Canandaigua Lake, Oswego                    Pa_                                 313
         River Basin, N. Y ......       284 13. Kingston-Edwardsville, Sus-
4.   Keuka Lake, Oswego River                    quehanna River, Pa_ ___             315
          Basin, N. Y________           285 14. Plymouth, Susquehanna Riv-
                                                     er, Pa_    --   - -   - -   --   317
5.   Hammondsport, Oswego Riv-
         er Basin, N. Y______           286 15. Sunbury, Susquehanna Riv-
                                                   er, Pa-------------                319
6.   Ithaca, Oswego River Basin,           16. Snagging and clearing under
         N. Y -                         287       authority of section 2 of
7.   Watkins Glen, Oswego River                  the Flood Control Act ap-
        Basin, N. Y_____________        288       proved August 28, 1937, as
8. Montour Falls, Oswego River                    amended                            320
       Basin, N. Y_____________         289 17. Preliminary examinations and
9. Southern New York Flood                       surveys for flood control__         320
       Control Project -......          290 18. Other flood-control projects
10. Stillwater Reservoir, Lacka-                  for which no estimates are
       wanna River, Pa___ -             309       submitted _ _ _ _                   321

                 1. SYRACUSE, OSWEGO RIVER BASIN, N. Y.

   Location.-Syracuse, N. Y., is located in Onondaga County at the
southern end of Onondaga Lake. (See U. S. Geological Survey topo-
graphical map of New York State.)
   Existng p rojet.--The plan of improvement provides for in-
creasing the capacity of Onondaga Creek Channel through the city
between Atlantic and Dorwin Avenues, 4.5 and 6.3 miles, respec-
tively, above the mouth of Onondaga Creek from 1,000 to 6,000
cubic feet per second by widening and realigning the channel and
constructing a levee on the right bank just south of Atlantic Avenue.
Two new highway bridges will be required over the new channel.
   It also provides for constructing a retention reservoir on the south
branch of Onondaga Creek about 121/2 miles above the mouth of
Onondaga Creek, with a capacity of 12,800 acre-feet at spillway
crest, consisting of an earth dam 66 feet high, a concrete spillway
channel, and an outlet tunnel with appurtenant structures; and for
constructing a retention reservoir on the west branch of Onondaga
Creek about 13 miles above the mouth of Onondaga Creek, with a
capacity of 7,400 acre-feet at spillway crest, consisting of an earth
dam 45 feet high, a concrete spillway channel, and an outlet tunnel
with appurtenant structures. This will provide protection for the
city of Syracuse against a flood approximately seventy percent
greater than the largest of record.
   The existing project was authorized by the Flood Control Act
approved August 18, 1941 (H. Doc. No. 846, 76th Cong. 3d sess.).
   The estimated Federal cost is $2,210,000 for construction, and the
estimated local cost is $475,000 for lands and damages.
   The principal features of the reservoirs are shown in the fol-
lowing table:
             RIVERS AND             HARBORS----SYRACUSE,                 N.       Y.,     DISTRICT               283
                                         Dams and reservoirs

                             Distance                                                    Estimated cost
                              above                                                onstruc- Landnd
Name       Nearest city      mouth of     Height        Type     capacity
                             Onondaga                              pacity         Constru-       Land andTotal
                              Creek                                                     tion     damages 1

                               hliles      Feet                  Acre-feet
   4A    Syracuse, N. Y-__        12 8         66     Earth fill_. 12, 800        $1, 062, 000   $209, 000 $1, 271, 000
   5A     . do        _           13           45    _____do        7,400             768,000     136,000      904, 000

              Total_ _____      _____ _.__ _
                                .__                 ______       _____        _    1,830,000      345,000    2,175, 000

1To be borne by local interests.


  Local cooperation.-The improvement is subject to the condition
that responsible local agencies furnish assurances satisfactory to the
Secretary of War that they will provide without cost to the United
States all lands, easements, and rights-of-way necessary for the con-
struction of the project including the reservoirs; hold and save the
United States free from claims for damages due to the construction
work; maintain and operate the works after completion in accordance
with regulations prescribed by the Secretary of War; take such
measures as may be necessary to prevent any encroachments upon
the flood channel capacities to be provided by the proposed improve-
ments; and bear the expense of all utility and bridge changes. As-
surances have not as yet been received.
   Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-No work has been done.
  Proposed operations.-The sum of $60,000 allotted in August 1942
will be applied to engineering studies and design by hired labor for
reservoirs and channel improvement on Onondaga Creek, during the
current fiscal year ending June 30, 1943. The additional sum of
$120,000 can be profitably expended during the fiscal year 1944 for
completion of. design of two reservoirs and channel improvement on
Onondaga Creek.
                                    Cost and financial summary

Cost of new work to June 30, 1942____________________                                                            ___
Cost of maintenance to June 30, 1942________________
      Net total expenditures__________________________         __
Total amount appropriated to June 30, 1942 ....
Amount allotted in August 1942-----__ -         ____     -______                                       $60, 000. 00
Amount available during the fiscal year 1943__________________                                          60, 000. 00
Amount (estimated) required to be appropriated for completion
  of    existing    project 1__-------------____________________                                    2, 150, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1944, for new work 1_______________________________                                          120, 000. 00
  1 Exclusive of available funds.

                   2. OWASCO LAKE, OSWEGO RIVER BASIN, N. Y.

  Location.-Owasco Lake, N. Y., is located in the central portion of
the Oswego River watershed. The city of Auburn, N. Y., is situated
284      REPORT OF CHIE            OF ENGINEERS,             U. S. ARMY,   1942

at the outlet at the northern end of the lake. The outlet flows north-
erly for 17 miles and empties into the Seneca River. (See U. S.
Geological Survey topographic maps of New York State.)
  Existing project.--There is an old masonry dam, known as the
State Dam, in the city of Auburn across the outlet channel about
9,600 feet downstream from the lake. The plan of improvement
provides for the replacing of the old dam with a new dam about
9,400 feet downstream from the lake, consisting of a rolled earth
section and a concrete spillway section, sluice gates, head gates, a
concrete wall between the power inlet and sluiceway, and the im-
proving and deepening of the channel through a length of about 9,600
feet. The improved channel will be 15 feet wide at the bottom, with
side slopes of 1 on 2 in earth and 4 on 1 in rock.
   The project will afford a substantial reduction of flood heights at
Auburn and Owasco Lake in general.
   The existing project was authorized by the Flood Control Act
approved August 18, 1941 (H. Doc. No. 846, 76th Cong., 3d sess.).
  The estimated cost is $113,000 for construction, including $7,000 to
be contributed by local interests. The estimated local cost for lands
and damages is $1,000.
   Local cooperation.-See page 5 for requirements. In addition to
the usual requirements for local cooperation as provided by law, local
interests are required to take such measures as may be necessary to
prevent any encroachments upon the flood channel capacities to be
provided by the proposed improvements; contribute $7,000 which is
the excess cost of providing new control gates for the raceway to the
pumping plant; secure the necessary agreements to permit regulation
of lake levels; remove the remaining portion of the old prison dam
and the abandoned masonry columns and wall near Genesee Street
Bridge; relocate the pipe under the Genesee Street Bridge; and re-
move that portion of the Goldman block on North Street which
obstructs the outlet channel. Assurances have not as yet been
received.
   Operations and results during fiscal year.-None.
   Conditionat end of fiscal year.-No work has been done.
  Proposed operations.-The sum of $5,000 allotted in August 1942
will be applied to engineering studies, design, and preparation of
plans and specifications for flood protection works on Owasco Lake
outlet during the current fiscal year ending June 30, 1943.
                              Cost and financial summary
Cost of new work to June 30, 1942 ......
Cost of maintenance to June 30, 1942___

      Net total expenditures________-----
Total amount appropriated to June 30, 1942_________________
Amount allotted in August 1942____________-----____-_______-_                      $5, 000
Amount available during the fiscal year 1943 -------------                          5, 000
Amount    (estimated)     required to be appropriated for completion of
  existing project 1 -_            _____________________--                        101, 000
  1Exclusive of available funds.

           3. CANANDAIGUA LAKE, OSWEGO RIVER BASIN, N. Y.
  Location.--CanandaiguaLake is the most westerly of the Finger
Lakes in the Oswtgo River watershed. The lake outlet flows north-
              RIVERS AND HARBORS-SYRACUSE, N.                     Y.,   DISTRICT          285
eastward and joins the Clyde River at Lyons, N. Y. The city of
Canandaigua is located at the north end of the lake near the outlet.
 (See U. S. Geological Survey topographic maps of New York State.)
   Existing project.-The flow from Canandaigua Lake is carried by
two channels at its northerly end, the outlet and a feeder canal which
join about 2 miles below the lake. The plan of improvement provides
for the improvement of the outlet channel from the outlet sill to a
point about 4 miles downstream, so as to secure a minimum bottom
width of 20 feet with side slopes of 1 on 21/2 feet; the improvement of
the feeder canal for its total length of about 11/2 miles from the lake
to its confluence with the outlet channel, so as to secure a bottom width
of 20 feet with side slope of 1 on 21/2 feet; and the lowering of the
outlet sill 114 feet.
   The project will afford a substantial reduction in flood stages on
Canandaigua Lake.
   The existing project was authorized by the Flood Control Act ap-
proved August 18, 1941 (H. Doc. No. 846, 76th Cong., 3d sess.).
   The estimated Federal cost is $29,000 for construction, and the esti-
mated local cost is $1,000 for lands and damages.
   Local cooperation.-See page 5 for requirements. In addition
the usual requirements for local cooperation as provided by law, local
interests are required to take such measures as may be necessary to
prevent any encroachments upon the flood-channel capacities to be pro-
vided by the proposed improvements, and secure the necessary agree-
ments to permit regulation of lake levels. Assurances have not as yet
been received.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done.
   Proposed operations.-No funds are available and no operations are
proposed in the fiscal year 1943. The sum of $2,000 can be profitably
expended for engineering studies and design for the flood protection
on Canandaigua Lake outlet during the fiscal year ending June 30,
1944.
                                   Cost and financial summary

Cost of new work to June 30, 1942__             ----------------------             -------
Cost of maintenance to June 30, 1942-----------------------                        ----
        Net total expenditures---------------                                      -------
Total amount appropriated to June 30, 1942_--------

Amount (estimated) required to be appropriated for completion of exist-
  ing project----                                  -   --------               -    $29, 000
Amount that can be profitably expended in fiscal year ending June 30,
1944, for new work-----------------------------------------------                    2, 000

                    4. KEUKA LAKE, OSWEGO RIVER BASIN, N. Y.
  Location.-Keuka Lake, N. Y., is located in the southwestern portion
of the Oswego River watershed and is shaped in the form of a Y. The
outlet is at the northern end of the eastern branch of the lake. The
village of Penn Yan is situated at the northern end of the lake along
the outlet. (See U. S. Geological Survey topographic maps of New
York State.)
  Existing project.-There is a dam across the outlet channel about
1 mile downstream from the lake, with raceways at both ends. Two
       493202-      43- pt. 1, vol. 1--19
286    REPORT    OF CHIF OF       ENGINE'ERS,    U.   S. ARMY,   1942

streams enter the outlet channel between the lake and the dam. The
plan of improvement provides for removing shoals in the channel just
upstream from the dam and at the mouths of the two streams entering
the outlet channel, replacing the present small gate in the raceway at
the southern end of the dam by a single modern structure and appur-
tenances, and lowering the sill 2 feet.
   The project will afford a substantial reduction in flood stages in
Keuka Lake.
   The existing project was authorized by the Flood Control Act ap-
proved August 18, 1941 (H. Doc. No. 846, 76th Cong., 3d sess.).
   The estimated Federal cost is $18,200 for construction, and the esti-
mated local cost is $1,800 for lands and damages.
   Local cooperation.-See page 5 for requirements. In addition to
the usual requirements for local cooperation as provided by law, local
interests are required to take such measures as may be necessary to
prevent any encroachments upon the flood-channel capacities to be pro-
vided by the proposed improvements, and secure the necessary agree-
ments to permit regulation of lake levels. Assurances have not as yet
been received.
   Operations and results during fiscal year.-None.
   Conditionat end of fiscal year.-No work has been done.
   Proposed operations.-Nofunds are available and no operations are
proposed in the fiscal year 1943. The sum of $2,000 can be profitably
expended for engineering studies and design for the flood protection
on Keuka Lake outlet during the fiscal year ending June 30, 1944.
                         Cost and financial summary

Cost of new work to June 30, 1942
Cost of maintenance to June 30, 1942___________________________
      Net total expenditures
Total amount appropriated to June 30, 1942
Amount (estimated) required to be appropriated for completion of exist-
ing project----------------------------                                $18, 200
Amount that can be profitably expended in fiscal year ending June 30,
1944, for new work------- --            ---- -----------------------     2, 000

           5. HAMMONDSPORT, OSWEGO RIVER BASIN, N. Y.

   Location.-The village of Hammondsport, N. Y., is located in Steu-
ben County and is situated at the southern end of Keuka Lake. (See
U. S. Geological Survey topographic maps of New York State.)
  Existing project.-The lower portion of Glen Brook, from its mouth
at Keuka Lake to a point about 2,450 feet upstream, is carried by an
existing concrete flume, the safe carrying capacity of which is limited
by a 900 bend at its upper end to 1,800 cubic feet per second. The
plan of improvement provides for increasing the channel capacity to
5,000 cubic feet per second by widening, deepening, and straightening
the upper 700 feet of the present flume, constructing reinforced-con-
crete cascades at the bend, clearing the channel above the flume, and
constructing 4 timber check dams in the channel above the flume to
reduce debris deposited in the flume. This will provide a safe channel
capacity of 5,000 cubic feet per second for Glen Brook, or approximately
40 percent greater than the discharge of the largest flood of record.
           RIVERS AND     HARBORS--SYRACUSE,          N.   Y., DISTRICT          287
   The existing project was authorized by the Flood Control Act ap-
proved August 18, 1941 (H. Doc. No. 846, 76th Cong., 3d sess.).
   The estimated cost is $163,000 for construction, and the estimated
local cost is $2,000 for lands and damages.
   Local cooperation.-See page 5 for requirements. In addition to
the usual requirements for local cooperation as provided by law, local
interests are required to take such measures as may be necessary to
prevent any encroachments upon the flood channel capacities to be
provided by the proposed improvements. Assurances have not as
yet been received.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done.
   Proposed operations.-No funds are available and no operations
are proposed in the fiscal year 1943. The sum of $5,000 can be profit-
ably expended for engineering studies and design for the flood protec-
tion on Glen Brook during the fiscal year ending June 30, 1944.
                           Cost and financial summary

Cost of new work to June 30, 1942--------                                 -
Cost of maintenance to June 30, 1942 ....
      Net total expenditures

Total amount appropriated to June 30, 1942_--------

Amount (estimated) required to be appropriated for completion of
existing project____________________________                                 $163,000
Amount that can be profitably expended in fiscal year ending June 30,
1944, for new work----------------------------------------------               5, 000

                 6. ITHACA, OSWEGO RIVER BASIN, N. Y.

   Location.-The city of Ithaca, N. Y., is located in Tompkins County
and is situated at the southern end of Cayuga Lake. (See U. S.
Geological Survey topographical maps of New York State.)
   Existing project.-Fall Creek flows along the northern edge of
the city and discharges into Cayuga Lake, and Cascadilla Creek
flows through the center of the city and empties into Cayuga Inlet
about 1/2 mile above its mouth. The plan of improvement provides
for widening Fall Creek channel from the foot of the falls at Lake
Street to a point 2,900 feet downstream and for constructing levees
on both banks of the channel, the levee on the left bank to be 5 feet
higher than the levee on the right bank so as to protect the left
bank from flows of 20,000 cubic feet per second and the right bank
from flows of 14,000 cubic feet per second; protecting the Fall Creek
channel slopes upstream from the railroad bridge with a concrete
crib wall and protecting bridge piers and abutments with riprap; in-
creasing the capacity of Cascadilla Creek channel from 1,200 to 1,800
cubic feet per second by clearing the channel from the mouth of
the gorge to Lincoln Street, a distance of about 4,200 feet; paving
the bottom of Cascadilla Creek channel at the bend near Cayuga
Street bridge; and constructing a timber check dam at the mouth
of the gorge to reduce debris deposits in the channel.
   The plan of improvement for Fall Creek will protect the area
along the left bank from floods about 30 percent greater than the
288       REPORT OF CHIEF OF ENGINEERS,                  U.     S.   ARMY,   1942


largest flood of record and along the right bank from floods approxi-
mately equal to the largest flood of record. The plan for Cascadilla
Creek will provide protection against floods about 30 percent greater
than the largest flood of record.
   The existing project was authorized by the Flood Control Act
approved August 18, 1941 (H. Doc. No. 846, 76th Cong., 3d sess.).
   The estimated Federal cost is $108,500 for construction, and the es-
timated local cost is $1,500 for lands and damages.
   Local cooperation.-See page 5 for requirements. In addition to
to the usual requirements for local cooperation as provided by law,
local interests are required to take such measures as may be necessary
to prevent any encroachments upon the flood-channel capacities to
be provided by the proposed improvements. Assurances have not
as yet been received.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done.
   Proposed operations.-No funds are available and no operations
are proposed in the fiscal year 1943. The sum of $3,000 can be profit-
ably expended for engineering studies and design for the flood pro-
tection on Fall and Cascadilla Creeks, during the fiscal year ending
June 30, 1944.
                                   Cost and financial summary
Cost of new work to June 30, 1942__________________________________
Cost of maintenance to June 30, 1942       _________

        Net total expenditures____________              ________
Total amount appropriated to June 30, 1942_---                                      -
Amount (estimated)            required to be appropriated for completion of
  existing project_----------------------                                           $108, 500
Amount that can be profitably expended in fiscal year ending June 30,
  1944, for new work_-------------------------------                                    3, 000

                 7. WATKINS GLEN, OSWEGO RIVER BASIN, N. Y.

  Location.-Watkins Glen, N. Y., is located in Schuyler County at
the southern end of Seneca Lake. (See U. S. Geological Survey topo-
graphical maps of New York State.)
   Existing project.-The plan of improvement provides for the
improvement of the Glen Creek channel through the village of Wat-
kins Glen from the mouth of the gorge to below the village by increas-
ing the capacity of the channel to 10,000 cubic feet per second by
widening and deepening the channel and for the construction of 150
feet of concrete wall on the right bank above Franklin Street, 50 feet
of concrete wall on each bank below the railroad, a levee on the left
bank upstream from the railroad, and a levee on the right bank down-
stream from Decatur Street. It also provides for protecting the chan-
nel banks between Franklin and Decatur Streets with concrete cribs
and stone riprap, and for replacing one highway bridge and adding
spans to one highway and one railroad bridge. This will provide a
safe channel capacity for flood discharges of Glen Creek equal to that
of the largest flood of record.
   The existing project was authorized by the Flood Control Act
approved August 18, 1941 (H. Doc. No. 846, 76th Cong., 3d sess.).
          RIVERS     AND HARBORS--SYRACUSE, N.                     Y.,        DISTRICT             289
   The estimated Federal cost is $104,000, of which $72,000 is for con-
struction and $32,000 is for reimbursement to local interests for one-
half the cost of bridge alterations, lands, easements, and rights-of-way
in excess of the cost of channel improvements, and the estimated local
cost is $104,000 for lands and damages.
   Local cooperation.-See page 5 for requirements. In addition to
the usual requirements for local cooperation as provided by law, local
interests are required to take such measures as may be necessary to pre-
vent any encroachments upon the flood channel capacities to be pro-
vided by the proposed improvements, and to replace one highway
bridge and add spans to one highway and one railway bridge, with the
division of costs for that work between local interests and the United
States as stated in the previous paragraph. Assurances have not as
yet been received.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done.
   Proposed operations.-No funds are available and no operations are
proposed in the fiscal year 1943. The sum of $3,000 can be profitably
expended for engineering studies and design for the flood protection on
Glen Creek during the fiscal year ending June 30, 1944.
                                 Cost and financial summary
Cost of new work to June 30, 1942______________--
Cost of maintenance to June 30, 1942_______________________________--                               --
     Net total expenditures .---                                          -               ---

Unexpended balance June 30, 1942               _________________               _______          -----
      Total amount appropriated to June 30, 1942_----                                    -----

Amount   (estimated)     required to be appropriated for completion of
  existing project   -----------------                                                   $104, 000
Amount that can be profitably expended in fiscal year ending June 30,
  1944, for new work_--_                 --   ------                -3,                                 000

            8. MONTOUR FALLS, OSWEGO RIVER BASIN, N. Y.

   Location.-The village of Montour Falls, N. Y., is located in Schuyler
County and is situated 2.5 miles from the southern end of Seneca Lake.
(See U. S. Geological Survey topographic maps of New York State.)
   Existing project.-CatherineCreek flows northerly through the cen-
ter of the village of Montour Falls and discharges into Seneca Lake.
Havana Glen Creek joins Catherine Creek just south of the village,
Catlin Mill Creek flows through a diversion channel to the east of the
village and joins Catherine Creek north of the village, and Shequaga
Creek flows through a diversion channel along the northwest edge of
the village and joins Catherine Creek north of the village. The plan
of improvement for Catherine and Havana Glen Creeks provides for
the diversion of Catherine Creek to the east of the village to join the
present diversion channel of Catlin Mill Creek, involving the excava-
tion of a channel about 5,000 feet long and the corstruction of a levee
along the left bank of the channel so as to secure a channel with a
capacity of 35,000 cubic feet per second; the diversion of the lower
part of Havana Glen Creek to enter the Catherine Creek diversion
channel; the construction of timber check dams on Havana Glen Creek
290       REPORT OF CHIEF OF ENGINEERS,                     U.   S. ARMY,    1942

and on Catlin Mill Creek ;bank protection where scour is likely'to occur;
construction of a small gate in the levee where it crosses the present
Catherine Creek channel to provide water for sewage disposal; and
construction of two-new highway bridges across the Catherine Creek
diversion channel, one at Oswego Street and one at Broadway Street.
   The plan of improvement for Shequaga Creek provides for increas-
ing the capacity through the village to 11,000 cubic feet per second to be
secured by widening and deepening the channel and construction of a
wall and levee along the right bank. The plan also includes construc-
tion of a stilling basin at the base of the falls and replacing one high-
way bridge at Steuben Street with a more adequate structure.
   The project will provide substantial flood protection for the village
of Montour Falls.
   The existing project was authorized by the Flood Control Act ap-
proved August 18, 1941 (H. Doc.No. 846, 76th Cong., 3d sess.).
   The estimated Federal cost is $478,000 for construction, and the
estimated local cost is $173,000 for lands and damages.
   Local cooperation.-See page 5 for requirements. In addition to
the usual requirements for local cooperation as provided by law, local
interests are required to take such measures as may be necessary to
prevent any encroachments upon the flood-channel capacities to be pro-
vided by the proposed improvements, and replace the Broadway Street
Bridge and the Steuben Street Bridge, estimated to cost $86,000 and
$20,000, respectively. Assurances have not as yet been received.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done.
   Proposed operations.-The sum of $35,000 allotted in August 1942
will be applied to engineering studies and design for channel improve-
ment and check dams on Shequaga. and Catherine Creeks, during the
current fiscal year ending June 30, 1943.
                             Cost and financial summary

Cost of new work to June 30, 1942__
Cost of maintenance to June 30, 194__--------------                    -------

       Net total    expenditures_____       _____________
Total amount appropriated to June 30, 1942___
                               -
Amount allotted in August 1942__                     --               --            $35, 000
Amount available during the fiscal year 1943____________________                     35, 000
Amount (estimated) required to be appropriated for completion of
   existing project       __-________________________                               443, 000
   Exclusive of available funds.

          9. SOUTHERN NEW YORK FLOOD CONTROL PROJECT

   Location.-The work covered by this project is in the upper water-
shed of the Susequehanna River to and including the Chemung River.
This includes about 6,050 square miles in south central New York, and
about 1,480 square miles in northern Pennsylvania. (See U. S. Geo-
logical Survey index maps of New York and Pennsylvania.)
   Existing project.-The Flood Control Act approved June 22, 1936,
authorized the construction of detention reservoirs and related flood-
control works for protection of Binghamton, Hornell, Corning, and
other towns in New York and Pennsylvania, in accordance with plans
approved by the Chief of Engineers on recommendation of Board of
         RIVERS AND HARBORSr-SYRACUSE, N.         Y.,   DISTRICT   291
                                                                   2

Engineers for Rivers and Harbors. The individual units which con-
stitute the approved plan of improvement are described in the follow-
ing paragraphs:
   Davenport Center Reservoir: This reservoir will be located on
Charlotte Creek near Davenport Center, N. Y. The dam will be of
the earth-filled type, 1,770 feet long at the top of the embankment and
rising 95 feet above the stream bed, with a concrete spillway and out-
let conduit in the right abutment. The reservoir will provide a storage
capacity of 52,600 acre-feet. The estimated cost of new work, revised
in 1941, is $1,771,000 for construction and $1,219,000 for lands and
damages.
   West Oneonta Reservoir: This reservoir will be located on Otego
Creek near West Oneonta, N. Y. The dam will be of the earth-filled
type, 1,300 feet long at the top of the embankment and rising 78 feet
above the stream bed, with a concrete spillway and outlet conduit in
the right abutment. The reservoir will provide a storage capacity
of 32,500 acre-feet. The estimated cost of new work, revised in 1941,
is $1,709,000 for construction and $1,072,000 for lands and damages.
   East Sidney Reservoir: This reservoir will be located on Ouleout
Creek near East Sidney, N. Y. The dam will be of the earth-filled
type, 1,890 feet long at the top of the embankment and rising 124 feet
above the stream bed, with a concrete spillway and outlet conduit in
the left abutment. The reservoir will provide a storage capacity of
32,000 acre-feet. The estimated Federal cost of new work, revised in
1941, is $1,896,000 for construction and $300,000 for lands and damages.
   Copes Corner Reservoir: This reservoir will be located on Butternut
Creek near Copes Corner, N. Y. The dam will be of the earth-filled
type, 940 feet long at the top of the embankment and rising 63 feet
above the stream bed, with a concrete spillway and outlet conduit in
the right abutment. The reservoir will provide a storage capacity of
38,700 acre-feet. The estimated Federal cost of new work, revised in
1941, is $1,906,000 for construction and $765,000 for lands and damages.
   Whitney Point Reservoir: The reservoir is located on the Otselic
River near Whitney Point, N. Y. The dam is of the earth-filled type,
4,300 feet long at the top of the embankment and rising 90 feet above
the stream bed, with a concrete spillway and outlet conduit in the left
abutment. The reservoir has a storage capacity of 87,600 acre-feet.
The estimated Federal cost of new work, revised in 1942, is $3,946,300
for construction and $889,300 for lands and damages.
   Arkport Reservoir: The reservoir is located on the Canisteo River
near Hornell, N. Y. The dam is of the earth-filled type, 1,200 feet long
at the top of the embankment and rising 100 feet above the stream
bed, with a concrete spillway and outlet conduit in the right abutment.
The reservoir has a storage capacity of 8,000 acre-feet. The Federal
cost of new work is $1,753,000 for construction and an estimated
$127,000 for lands and damages.
    Almond Reservoir: This reservoir will be located on Canacadea
Creek near Hornell, N. Y. The dam will be of the earth-filled type,
1,350 feet long at the top of the embankment and rising 85 feet
above the bed of the stream, with a concrete spillway and outlet
conduit in the left abutment. The reservoir will provide a storage
capacity of 14,800 acre-feet. The estimated Federal cost of new work,
revised in 1941, is $2,154,000 for construction and $745,000 for lands
and damages.
292    REPORT   OF CHIEF OF ENGINEERS,     U.   S. ARMY,   1942

   Oxford, N. Y.: The plan of improvement provides for the con-
struction of earth levees and the clearing of the Chenango River
channel, consisting of the following features: About 2,100 feet of
earth levee on the left bank of the Chenango River, extending from
high ground near Cemetery Drive and running mostly along the
railroad to high ground near Main Street; removal of the dam and
island below Main Street; raising of the Delaware, Lackawanna &
Western Railroad over the levee; and appurtenant drainage struc-
tures. The improvement provides protection for the village of Ox-
ford on the left bank against a flood of magnitude approximately 5
feet higher than the maximum flood of record, which occurred in
July 1935. The estimated Federal cost of new work, revised in 1940,
was $86,000 for construction. The estimated Federal cost of lands,
revised in 1941, is $46,100. The estimated local cost of lands and
damages is $37,500.
   Lisle, N. Y.: The plan of improvement provides for channel re-
alinement and the construction of earth levees and concrete flood
walls, consisting of the following features: Relocation of about
3,000 feet of the Dudley Creek channel, extending from 1,200 feet
west of the intersection of Cortland and Main Streets to the con-
fluence with the Tioughnioga River; realinement of some 5,700 feet
of the Tioughnioga River channel east of the village; about 3,700
feet of earth levee and 1,000 feet of concrete wall on the right bank
of Dudley Creek and the Tioughnioga River, extending from Main
Street just above Collier Street, to the railroad crossing on River
Street; raising of about 1,700 feet of the Delaware, Lackawanna &
Western single-track railroad over the levee; relocation of about
1.500 feet of Cortland Street; a new bridge over the relocated Dudley
Creek; and appurtenant drainage structures. The improvement will
provide protection for the village of Lisle against a flood of mag-
nitude approximately 3 feet higher than the maximum flood of record,
which occurred in July 1935. The estimated Federal cost of work,
revised in 1941, is $319,300 for construction and $50,000 for lands
and damages. The estimated local cost of lands and damages is
$112,000.
   Whitney Point, N. Y.: The plan of improvement provides for
channnel realinement and construction of earth levees, consisting
of the following features: Realinement of about 1,800 feet of the
Tioughnioga River channel, above the confluence with the Otselic
River; about 7,100 feet of earth levee along the right bank of the
Tioughnioga River, extending from high ground on Main Street
above the village to Collins Street just below the village; and
appurtenant drainage structures. The improvement, supplemented
by the Whitney Point Reservoir above the area, will provide
protection for the village of Whitney Point against a flood of
magnitude approximately 4 feet higher than the maximum flood
of record, which occurred in July 1935. The estimated Federal
cost of new work, revised in 1941, is $176,000 for construction and
$2,000 for lands and damages. The estimated local cost of lands
and damages is $38,000.
   Binghamton, N. Y.: The plan of improvement provides for the
construction of earth levees and concrete flood walls, consisting of
the following features: About 900 feet of channel excavation and
about 1,400 feet of earth levee along Phelps Creek, town of Port
         RIVERS AND HARBORS-SYRACUSE,        N.   Y.,   DISTRICT   293
Dickinson; new concrete wall on the right bank of the Chenango
River extending downstream from high ground near the city
limits to the existing flood wall, a distance of about 500 feet;
raising about 3 feet the existing earth levee on the right bank of
the Chenango River, extending from the Cutler Dam downstream
for a distance of about 1,200 feet; about 2,900 feet of the earth
levee on the left bank of the Chenango River north of the city
limits in the village of Port Dickinson, extending from Church
Street to high ground just north of the city line; about 3,900
feet of earth levee on the left bank of the Chenango River from
DeForest Street to Noyes Island; new concrete flood walls and
river bank revetment for a distance of about 5,500 feet, extending
on the left bank of the Chenango River from Noyes Island to
the junction with the Susquehanna River; about 700 feet of con-
crete flood wall and raising of about 1,000 feet of existing concrete
flood wall on the right bank of the Susquehanna River, extending
from the Delaware, Lackawanna & Western Railroad downstream
to the Tompkins Street Bridge; about 2,000 feet of earth levee, about
1,800 feet of concrete flood wall on the right bank of the Susque-
hanna River, extending from Stuyvesant Street to the mouth of the
Chenango River; about 9,000 feet of earth levee and about 2,000
feet of concrete flood wall on the left bank of the Susquehanna
River, extending from Pierce Creek to high ground at State High-
way Route No. 17 about one-half mile below Pennsylvania Avenue;
a concrete pressure conduit, 1,200 feet long, to carry the flow of
Park Creek from Vestal Avenue to the Susquehanna River; about
700 feet of levee extending from the Erie Railroad to high ground
along the right bank of the Chamberlain Creek near the mouth; a
weir, drop structure, about 1,300 feet of earth levee, and about
1,500 feet of channel excavation and raising of about 500 feet of
existing concrete flood wall for the improvement of Pierce Creek
from its mouth to about 1,000 feet above Conklin Avenue; and
appurtenant drainage structures. The improvement, supplemented
by the authorized flood-control dams above the area, will provide
protection for the city of Binghamton against a flood of magnitude
approximately 4 feet higher than the maximum of record, which
occurred in March 1936. The estimated Federal cost of new work
revised in 1942, is $2,558,000 for construction and $77,800 for lands
and damages. The estimated local cost of lands and damages is
 $600,000. Local interests have agreed to contribute an additional
amount of $156,400 for the construction of improvements not in-
cluded in the authorized project.
    Elmira, N. Y.: The plan of improvement provides for the con-
struction of earth levees and concrete flood walls, consisting of the
following features: About 5,900 feet of earth levee, enlargement of
about 6,200 feet of existing earth levee, and about 4,100 feet of con-
crete flood wall on the right bank of Chemung River, extending from
  South Hoffman Street to a point below the city near the upper end
  of Big Island; about 13,700 feet of earth levee and about 6,800 feet
  of concrete wall on the left bank of the Chemung River extending
  from Evergreen Avenue to Sullivan Street; about 10,000 feet of
  earth levee on the right bank of Newtown Creek, extending from
  about the intersection of the Delaware Lackawanna and Western
  Railroad and East Church Street to high ground near the intersec-
294    REPORT   OF CHIE~F   OF ENGINEERS,   U.   S. ARMY,   1942

tion of Sullivan and Warren Streets; about 4,300 feet of earth levee
on the right bank of Diven Creek; about 2,000 feet of concrete conduit
enclosing Hoffman Brook from West Second Street to the Chemung
River; about 15,300 feet of earth levee on the left bank of Seely
Creek, extending from the Erie Railroad to high ground approxi-
mately 3,500 feet northwest of the intersection of South Broadway
and Pennsylvania Avenue, a pumping plant for the disposal of in-
terior drainage; and appurtenant drainage structures. The improve-
ment will provide protection for the city of Elmira against a flood
of magnitude approximately 5 feet higher than the maximum flood
of record, which occurred in June 1889. The estimated Federal cost
of new work, revised in 1940, is $3,075,000 for construction. The
estimated local cost of lands and damages is $400,000.
    Corning, N. Y.: The plan of improvement provides for the con-
struction of earth levees and concrete flood walls, consisting of the
following features: About 4,300 feet of earth levee, enlargement of
about 8,610 feet of existing earth levee, and about 3,100 feet of con-
crete flood wall on the right bank of Chemung River, extending
from the Erie Railroad bridge to high ground at Park Avenue be-
low the city; about 200 feet of concrete flood walls; about 2,500 feet
of earth levees, and enlargement of about 11,500 feet of existing
earth levee on the left bank of the Chemung and Cohocton Rivers,
extending from the Erie Railroad bridge over the Cohocton River to
the mouth of Post Creek; about 2,500 feet of earth levee and enlarge-
ment of about 4,700 feet of existing earth levee on the right bank
of Post Creek from its mouth to Watson Street; realinement of
about 3,000 feet of channel, about 8,800 feet of earth levee, about
3,000 feet of channel excavation, a pressure conduit about 400 feet
long, a drop structure and a weir for the improvement of Cutler
Creek, extending from its mouth to high ground at Deckertown Road
and Hornby Road; and appurtenant drainage structures. The im-
provement will provide protection for the city of Corning against a
flood of magnitude approximately 6 feet higher than the maximum
flood of record, which occurred in July 1935. The estimated Federal
cost of new work, revised in 1942, is $2,064,500 for construction and
$114,500 for lands and damages. The estimated local cost of lands
and damages is $212,000.
    Painted Post, N. Y.: The plan of improvement provides for chan-
nel realinement and the construction of earth levees and concrete flood
walls, consisting of the following features: Realinement of about 6,000
feet of the Cohocton River channel, extending from about one-half
mile above State Highway Route No. 17 to the Chemung River; con-
struction of about 3,000 feet of earth levee and raising of about 1,200
feet of existing flood wall along the left bank of the Cohocton River,
extending from the mouth of Hodgman Creek to the Chemung River;
about 2,900 feet of earth levee, and about 2,100 feet of concrete flood
wall, extending on the left bank of Hodgman Creek, from its mouth
to high ground above State Highway No. 2; and appurtenant drain-
age structures. The improvement provides protection for the village
of Painted Post against a flood of magnitude approximately 7 feet
higher than the maximum flood of record, which occurred in July
1935. The estimated Federal cost of new work, revised in 1941, is
$411,000 for construction and $9,500 for lands and damages. The
estimated local cost of lands and damages is $51,000.
         RIVERS   AND HARBORS-SYRACUSE, N.        Y.,   DISTRICT    295
   Addison, N. Y.: The plan of improvement provides for the con-
struction of earth levees and concrete flood walls, consisting of the
following features: About 1,500 feet of channel realinement on the
Canisteo River, extending from the Baltimore & Ohio Railroad Bridge
to the Main Street Bridge; construction of about 1,500 feet of earth
levee and about 500 feet of concrete flood wall on the right bank of
the Canisteo River, extending from high ground on Steuben Street
near the Baltimore & Ohio Railroad to the mouth of Tuscarora Creek;
removal of existing dam, mill, and raceway from the channel; con-
struction of about 600 feet of earth levee and raising of about 2,400
feet of existing levee on the left bank of Tuscarora Creek, extending
from Tuscarora Street to the Canisteo River; cutting of a new outlet
channel on Tuscarora Creek approximately 500 feet long at its mouth;
reshaping of about 2,100 feet of existing earth levee on the right
bank of Tuscarora Creek, extending from the Baltimore & Ohio Rail-
road to South Street; and appurtenant drainage structures. The im-
provement, supplemented by the Arkport and Almond Reservoirs
above the area, will provide protection for the village of Addison
against a flood of magnitude 1 foot above the maximum flood of
record, which occurred in July 1935. The estimated Federal cost of
new work, revised in 1941, is $164,500 for construction and $31,000 for
lands and damages. The estimated local cost of lands and damages is
$08,000.
   Bath, N. Y.: The plan of improvement provides for the construc-
tion of earth levees and concrete flood walls along the Cohocton River,
consisting of the following features: Raising of about 4,100 feet of
the Erie Railroad from Belfast Street to a point opposite Cruger
Street, the embankment to serve as a levee; construction of about 4,200
feet of earth levee and about 800 feet of concrete flood wall, extending
from Cameron Street to the turn-out of the Bath & Hammondsport
Railroad; about 2,000 feet of earth levee running to high ground near
the junction of Morris Street and State Highway Route No. 2; a
pumping plant in the vicinity of the sewage treatment plant for the
disposal of interior drainage effluent from the sewage treatment plant;
and appurtenant drainage structures. The improvement will pro-
vide protection for the village of Bath against a flood of magnitude
of approximately the maximum of record which occurred in July 1935.
The estimated Federal cost of new work, revised in 1941, is $331,000
for construction. The estimated local cost of lands and damages
is $20,000.
   Avoca, N. Y.: The plan of improvement provides for the construc-
tion of earth levees, channel improvement, and channel realinement,
consisting of the following features: Improvement and realinement,
of about 8,300 feet of the Cohocton River channel, extending from
above the Erie Railroad to below the junction of Main Street and
State Highway Route No. 2; construction of about 8,500 feet of earth
levee on the left bank of the Cohocton River, extending from high
ground above Alexander Avenue to about 1,300 feet below the junc-
tion of Main Street and State Highway Route No. 2; about 4,500 feet
of earth levee on the right bank of Salmon Creek, extending from high
ground above Alexander Avenue to the Erie Railroad; a new high-
way bridge for State Highway No. 2 over the Cohocton River; raising
of the Erie Railroad bridge 4 feet; and appurtenant drainage struc-
tures. The improvement provides protection for the village of Avoca
296     REPORT   OF CHIEIF OF ENGINEERS,     U.   S.   ARMY,   1942

against a flood of magnitude approximately 5 feet higher than the
maximum flood of record which occurred in July 1935. The estimated
Federal cost of work, revised in 1941, is $415,000 for construction and
 $39,000 for lands and damages. The estimated local cost of lands
and damages is $95,000.
    Canisteo, N. Y.: The plan of improvement provides for the con-
struction of earth levees, consisting of the following features: About
9,000 feet of earth levees on the right bank of the Canisteo River,
extending from high ground 1,350 feet west of State Highway
Route No. 17F above the village to the mouth of Bennett Creek;
about 10,000 feet of earth levee and about 300 feet of concrete flood
wall on the left bank of Purdy and Bennett Creeks, extending from
the mouth of Bennett Creek to high ground above Greenwood Street;
a timber crib debris dam above Greenwood Street; a new highway
bridge at Greenwood Street; about 2,000 feet of new outlet channel
for Bennett Creek; and appurtenant drainage structures. The im-
provement, supplemented by the Arkport and Almond Reservoirs
above the village, will provide protection for the village of Canisteo
against a flood of magnitude of approximately the maximum flood
of record, which occurred in July 1935. The estimated Federal cost
of new work, revised in 1941, is $263,500 for construction and $47,000
for lands and damages. The estimated local cost of lands and dam-
ages is $34,000.
   Hornell, N. Y.: The plan of improvement provides for channel
realinement and the construction of earth levees and concrete flood
walls, consisting of the following features: Realinement of about
4,600 feet of Canisteo River channel, and about 5,800 feet of earth
levee on its right bank, extending from Seneca Street upstream to
the junction of the Pittsburg, Shawmut & Northern Railroad and
the Erie Railroad; construction of about 4,500 feet of earth levee,
extending on both sides of Seneca Street from the Canisteo River to
Wightman Avenue and the junction of Cleveland Avenue and Be-
thesda Drive; construction of about 7,200 feet of earth levee, about
2,500 feet of concrete flood wall, and raising of about 1,500 feet of
existing concrete flood wall on the right bank of the Canisteo River,
and about 12,000 feet of channel improvement, extending from
Seneca Street to the Erie Railroad; construction of about 2,500 feet
of earth levee, about 2,100 feet of concrete flood wall on the left bank
of Canisteo River, extending from a point opposite Walnut Street
to the Erie Railroad; a ring earth levee about 2,800 feet long around
the sewage-disposal plant on the left bank of the Canisteo River;
about 4,500 feet of realinement and improvement of the Canisteo
River channel, with about 4,500 feet of earth levee on its right bank,
extending from Cedar Street downstream to about 1,400 feet above
East Avenue; about 2,400 feet of channel paving, 1,400 feet of earth
levee, and raising of about 1,900 feet of concrete flood wall on Cana-
cadea Creek; about 1,600 feet of channel paving on Chauncey Run
with about 300 feet of new wall and about 300 feet of wall capping;
removal of five bridges, erection of three bridges, miscellaneous
bridge structures, and two drop structures; and appurtenant drain-
age structures. The improvement, supplemented by the Arkport and
Almond Reservoirs above the area, will provide protection for the
city of Hornell against a flood of magnitude approximately 4 feet
higher than the maximum flood of record which occurred in July
                   RIVERS         AND        HARBORS--SYRAC'USE,                      N.   Y.,     DISTRICT                 297

1935. The estimated Federal cost of new work, revised in 1941, was
$2,728,000 for construction and $460,000 for lands and damages.
   Almond, N. Y.: The plan of improvement provides for channel
realinement and the construction of earth levees, consisting of the
following features: About 4,300 feet of earth levee on the left bank
of Canacadea Creek, extending from high ground above the village
to high ground below the village; realinement of about 3,200 feet of
channel on Canacadea Creek, extending downstream from Angelica
Street; and appurtenant drainage structures. The improvement will
provide protection for the village of Almond against a flood of
magnitude of approximately the maximum flood of record, which
occurred in July 1935. The estimated Federal" cost of new work,
revised in 1941, is $48,000 for construction and $2,400 for lands and
damages. The estimated local cost of lands and damages is $8,500.
                                                Dams and reservoirs 1
                                                                       7                          Estimated Federal cost


       Name                   Nearest city             River           8          *




D a v e n p or t            Oneonta ....... Charlotte Creek___             5    95 52, 600 $1, 771,000 $1, 219, 000 $2, 990, 000
  Center.
West Oneonta ......      do-.........           Otego Creek                 2 78 32, 500    1,709, 000 1, 072,000 2, 781,000
East Sidney .....   _____do__________           Ouleout Creek___            2 124 32. 000   1,896, 000    300, 000 2, 196, 000
Copes Corner___ Sidney ........       _         Butternut Creek__           3 63 38, 700    1, 906, 000   765, 000 2, 671,000
Whitney Point 2__ Binghamton                    Otselic River....           1 90 87, 600    3,946, 300    889, 300 4,835,600
Arkport 3--------- Hornell ........             Canisteo River __          50 100 8,000     1,753,000     127, C00 1, 880, 000
Almond                   do -........           Canacadea Creek_            3 85 14,800     2, 154,000    745, 000 2, 899, 000
                                                                                            15, 135, 300 5, 117, 300 20, 252, 600

  1All dams, located in New York State, of earth-fill type.                    2 Under construction.             3 Completed.

                                             Local flood-protection works

                                                                                                   Estimated Federal cost


    New  York
    NeLocation                    River                        Type of structare




Oxford- 1...   -     .. _   Chenango              40    Levee and channel improve-                 $86, 000   $46, 100   $132, 100
                                                           ment.
Lisle 2 ..-.......          Tioughnioga           12    Walls, levee, and channel re-              319, 300    50,000     369, 300
                                                           alinement.
Whitney Point                   do ---- -         10    Levee, and channel realine-                176,000      2,000     178, 000
                                                           ment.
Binghamton 3_____            Susquehanna-----  328      Wall, levee, and conduit ......          2, 558, b00 77, 800 42, 635, 800
Elmira 3-.........           Chemung -.......   27     -_
                                                        _ do_        -                           3,075,000 --....
                                                                                                                _     3,075,000
Corning3 -    .             ---.
                              . do _ --....... 44      ..... do_                                 2, 064, 500 114, 500 2, 179,000
Painted Post 1___            Cohocton ........   0      Wall, levee and channel re-                 411, 000   9, 500    420, 500
                                                           alinement.
A ddison--------- Canisteo .........               8        ..do _ -164,                                500    31, 000    195, 500
Bath       .....-----------Cohocton ........      21    Wall and levee_                            331, 000          0    331, 000
Avcca 1--....           _-- _ do.                 30    Levee and channel improve-                 415, 000    39, 000    454, 000
                                                          ment and realinement.
Canisteo __-_---            Canisteo______-- .    36    Levee and wall______________               263, 500    47, 000    310, 500
Hornell1    _                ___do........ _      42    Wall, levee and channel re-              2,728, 000   460, 000 3, 188, 000
                                                          alinement.
            -
Almond .....-..             Canacadea Creek        6    Levee and      channel realine-             48, 000     2,400      50, 400
                                                         ment.

       Total___-__ _             __________                                -    _ _----------12,639,800       879,30013,519,100

  1 Construction completed.                                        4 Does not include contributed funds of $153,400 by
  2 Part of project completed.                                   the city of Binghamton and $3,000 by the village of
  3 Under construction.                                          Port Dickinson.
298    REPORT   OF CHIEF OF ENGINEE'RS,     U.   S. ARMY,   1942

   Local cooperation.-See page 5 for requirements. The Secre-
tary of War accepted as satisfactory the assurances of the State
of New York to comply with conditions and cooperation for local
improvement projects or parts thereof, within the purview of sec-
tion 3 of the Flood Control Act, approved June 22, 1936, at Avoca,
Lisle, Oxford, and Painted Post, N. Y., on December 15, 1936; at
Binghamton, N. Y., on November 15, 1937; at Corning and Elmira,
N. Y., on May 8, 1940; and at Whitney Point, N. Y., on June 22,
1940. Permission to enter those properties on which surveys and
foundation investigations are necessary is being obtained as need
therefor arises, and lands, easements, and rights-of-way required
for construction activities are being acquired as operations progress.
The city of Binghamton has contributed a total of $103,400 and will
contribute an additional $50,000, and the village of Port Dickinson
has contributed a total of $3,000 to the United States to defray the
cost of related features of construction desired by the city but not
required for the authorized project.
   Operations and results during fiscal year.-Whitney Point Reser-
tvoir.-Construction of the earth dam and appurtenant works was
completed under continuing contract on June 10, 1942. Work in-
cluded the placement of material in the embankment, excavation,
and construction of the spillway, construction of the operating
house, and installation of the light and power system; it involved
the excavation of 770,712 cubic yards of earth and 38,938 cubic yards
of rock, placement of 686,783 cubic yards of earth fill and 30,348
cubic yards of riprap, installation of 463,478 pounds of steel and
other metals, placement of 14,083 cubic yards of concrete in the op-
erating house, spillway, and other structures, placement of 10,651
cubic yards of compacted topsoil, and the seeding of a total area
of 19.67 acres on the embankment. Detailed appraisals and investi-
gations necessary to consummate purchase of land for the project
were completed by hired labor. Acquisition of land for the reser-
voir was continued by the State of New York. Cost of this work
was $897,405.16 of which $897,257.68 was for new work and $145.48
for maintenance:
   Arkport Reservoir.-Appraisals for lands, easements, rights-of-
way, and utility relocations for the reservoir were completed by hired
labor. Acquisition of land, for the reservoir, except for old high-
way rights-of-way, was completed by the State of New York. Cost
of this work was $3,747.52, of which $148.01 was for new work, and
 $3,599.51 was for maintenance.
   Almond Reservoir.-Design was completed and specifications were
prepared. Offers for the purchase of lands for the dam site were
secured and approved, and acquisition of the land was initiated by
the State of New York. Cost for this work was $17,070.35 for
new work.
   Lisle.-Design was completed and specifications were prepared on
the Dudley Creek portion of the local flood protection, by hired labor.
Appraisals were completed and offers secured and approved for pur-
chase of lands, easements, and rights-of-way. Land acquisition was
completed by the State of New York for all of the land required for
the previously constructed flood protection. Cost of this work was
$6105.85 for new work.
         RIVERS   AND HARBORS-SYRACJJSE, N.         Y.,   DISTRICT    299
   Whitney Point (village).-Design was completed and specifica-
tions were prepared for the construction of earth levees and concrete
flood walls and realinement of a portion of the river channel. Ap-
praisals were completed for purchase of lands, easements, and rights-
of-way. Land acquisition was initiated by the State of New York.
Cost for this work was $11,684.87 for new work.
   Binghamton, section No. 1.-Construction of the local flood protec-
tion on the Susquehanna River and Park Creek was begun on June
20, 1940, under contract, and was completed on October 30, 1941.
Work consisted of the construction of about 1,500 linear feet of earth
levee, 270 linear feet of concrete flood wall, and 200 linear feet of con-
crete pressure conduit; it involved the stripping of about 327 cubic
yards of levee foundation, the excavation of 13,518 cubic yards of
earth, the removal of Vestal Avenue Bridge, the removal of 529 cubic
yards of walls, slabs, and paving, the placement of 3,793 square feet of
sheeting, 19,533 cubic yards of backfill and embankment, the place-
ment of 7,786 cubic yards of toplsoil, the placement of 411 cubic yards
of riprap, the placement of 2,155 cubic yards of concrete in the conduit,
walls, manholes, and paving, the installation of 1,621 square feet of
steel sheet piling, and 4,765 pounds of reinforcement steel and the in-
stallation of 9,789 pounds of cast iron pipe. Engineering studies and
design in connection with the construction were completed by hired
labor. Appraisals for lands, easements, rights-of-way, and utility
relocations were completed. Acquisition' of lands required for the
project was continued by the State of New York. Cost of work was
$67,621.15 for new work.
   Binghamton, section No. 2.-Construction of the local flood protec-
tion on the Chenango and Susquehanna Rivers and Pierce Creek was
begun on July 15, 1940, and was completed October 31, 1941, under
contract. Work included the construction of about 2,100 linear feet
of earth levee and 495 linear feet of concrete flood wall; it involved the
excavation of 62,292 cubic yards of earth, the placement of 6,109 square
feet of sheeting, the placement of 50,501 cubic yards of earth fill and
14,679 cubic yards of topsoil, the seeding of 23 acres, the placement of
1,081 cubic yards of riprap, the placement of 1,530 cubic yards of con-
crete for walls and other structures, the placement of 562 square feet of
steel sheet piling and 152,451 pounds of reinforcing steel and other
metals, and 1,392 pounds of cast iron pipe and fittings. Engineering
studies and design in connection with the construction were completed
by hired labor. Appraisals for lands, easements, rights-of-way, and
utility relocations were completed. Acquisition of lands required for
the project was continued by the State of New York. Cost of this
work was $117,358.80 for new work, which includes $3,000 contributed
funds.
    Binghamton, section No. 3.-Construction of the local flood protec-
tion on the Susquehanna River was begun on January 7, 1941, and
completed on October 31, 1941, under contract. Work included the
construction of about 200 linear feet of new concrete flood wall and the
completion of raising about 970 feet of existing concrete wall; it in-
volved the excavation of 2,218 cubic yards of earth, the placement of
3,450 cubic yards of compacted earth fill and 1,159 tons of riprap, the
placement of 375 cubic yards of concrete and the installation of 31,579
pounds of reinforcement steel, 282 square feet of steel sheet piling,
1,580 pounds of structural steel, 524 linear feet of corrugated metal
300    REPORT OF CHIEF OF ENGINEERS,         U.   S.   ARMY,   1942

pipe, and 1,968 pounds of miscellaneous metal. Engineering studies
and design in connection with the construction of the project were
completed by hired labor. Acquisition of lands required for the
project was continued by the State of New York. Cost of this work
was $24,002.65 for new work:
  Binghamton, section No. 4.-Construction of the local flood protec-
tion on the Chenango River was begun on July 23, 1941. Work in-
cluded the construction of about 1,600 linear feet of concrete flood
wall and 3,889 linear feet of intercepting sewer; it involved the exca-
vation of 32,840 cubic yards of earth, the removal of 1,364 cubic yards
of concrete and old wall, the placement of 20,775 cubic yards of com-
pacted earth fill, the placement of 94 cubic yards of dumped riprap,
200 cubic yards of gravel and sandbacking, and 4,905 cubic yards of
concrete, the installation of 664,300 pounds of reinforcement steel and
other metals, and the driving of 27,925 square feet of steel sheet piling.
Engineering studies and design in connection with the project were
continued by hired labor. AcquisitioA of lands required for the proj-
ect was continued by the State of New York. Cost of this work was
$474,377.41 for new work.
   Binghamton, section No. 5.-Engineering studies, design, prepara-
tion of specifications, and preparation of appraisals for lands, ease-
ments, and rights-of-way for the project were completed. Acquisition
of lands required for the project was initiated by the State of New
York. Cost of this work was $1,372.14 for new work.
   Binghamton (local improvement and maintenance) .- Total cost for
channel clean-up (all sections) and maintenance was $6,253.90, of
which $1,490.13 was for maintenance of completed channel work.
   Elmira, section No. 1.-Construction of the local flood protection on
the Chemung River was begun on June 9, 1941, under contract. Work
included the construction of about 800 linear feet of earth levee and
about 1,400 linear feet of concrete flood wall; it involved the excava-
tion of 35,623 cubic yards of earth, placement of 24,803 cubic yards
of earth in the levee and backfill, placement of 2,057 cubic yards of
concrete, installation of 241,462 pounds of reinforcement steel and
other metals, and placement of 31,995 square feet of steel sheet piling.
Engineering studies and design in connection with the construction
of the project were continued by hired labor. Relocation of utilities
was in progress under contract. Detailed appraisals and investiga-
tions necessary to consummate purchase of land for the project were
continued by hired labor. Acquisition of lands required for the proj-
ect was continued by the State of New York. Cost of the work was
$173,173.77 for new work.
   Elmira, section No. 2.-Construction of the local flood protection
on the Chemung River, Diven Creek, Newtown Creek, and Seely Creek
was begun on April 25, 1942, under contract. The work involved the
excavation of 57,545 cubic yards of earth, the placement of 19,965
cubic yards of earth in the levee and backfill, and the installation of
363 feet of drainage pipe. Engineering studies and design in con-
nection with the construction of the project were continued by hired
labor. Relocation of utilities was in progress under contract. De-
tailed appraisals and investigations necessary to consummate pur-
chase of land for the project was initiated by hired labor. Acquisition
of lands required for the project was in progress by the State of New
York. Cost of the work was $155,258.92 for new work.
          RIVERS    AND HARBORS--SYRACUSE, N.     Y.,   DISTRICT    301
   Elmira pumping plant.-Preliminary design studies and land ap-
praisals were started by hired labor. Cost of this work was $4,541.33
for new work.
   Corning, section No. 1.-Construction of the local flood protection
on the Chemung River and Cutler Creek was completed May 30, 1942,
under contract. Work included the construction of about 7,700 linear
feet of earth levee, excavation of about 1,000 linear feet of channel,
construction of about 400 feet of concrete pressure conduit, the re-
moval of one bridge, and construction of one bridge; it involved the
excavation of 176,190 cubic yards of earth, placement of 126,108 cubic
yards of earth in the levee and backfill, placement of 6,247 cubic yards
of concrete, installation of 1,147 feet of drainage pipe, installation of
163,003 pounds of structural steel in the bridge, installation of 494,199
pounds of reinforcement steel and other metals, and placement of
11,380 square feet of steel sheet piling. Engineering studies and de-
sign in connection with the construction of the project were made by
hired labor. Relocation of utilities was completed under contract.
Detailed appraisals and investigations necessary to consummate pur-
chase of land for the project were made by hired labor. Acquisition
of lands required for the project on Cutler Creek was continued by
the State of New York. Cost of this work was $336,805.16 for new
work and $195.68 for maintenance.
   Corning, section No. 2.-Construction of the local flood protection
on the Chemung River was started on September 8, 1941, under con-
tract. Work included the construction of about 1,200 linear feet of
earth levee and 950 feet of concrete flood wall; it involved the ex-
cavation of 227,500 cubic yards of earth, placement of 161,900 cubic
yards of earth in the levee and .backfill, placement of 4,233 cubic
yards of concrete, installation of 511,020 pounds of reinforcement
steel and other metals, and placement of 17,400 square feet of steel
sheet piling. Engineering studies and design in connection with the
construction of the project were continued by hired labor. Detailed
appraisals and investigations necessary to consummate purchase of
land for the project were continued by hired labor. Relocation of
utilities was continued under contract. Acquisition of lands.required
for the project was continued by the State of New York. Cost of
this work was $382,055.72 for new work.
    Corning pumping plant and equipment.-Construction of the
pumping plant and appurtenant works was started under contract
on July 31, 1941, and completed on June 16, 1942. Work included
the construction of the plant, installation of equipment, and excava-
tion of about 720 linear feet of channel; it involved the excavation
of 14,635 cubic yards of earth, placement of 13,118 cubic yards of earth
in the levee and backfill, placement of 807 cubic yards of concrete and
installation of 108,623 pounds of reinforcement steel and other metals.
The cost of this work was $107,750.70 for new work.
   Painted Post.-The completed channel improvement works were
maintained during the fiscal year by hired labor. The total cost of
this work was $378.85 for maintenance.
    Avoca.-The completed channel improvement works were main-
tained during the fiscal year by hired labor. The total cost of this
work was $100.23 for maintenance.
      493202-43-pt. 1, vol. 1-20
302        REPORT          OF CHIEF OF ENGINEERS,                           U.      S. ARMY,                1942

   Addison.-Engineering studies and design preparatory to construc-
tion for the local flood protection on the Canisteo River and Tuscarora
Creek were in progress by hired labor. Cost of this work was $52.97
for new work.
   Canisteo.-Engineeringstudies and design preparatory to construc-
tion for local flood protection on the Canisteo River and Purdy, and
Bennett Creeks were in progress by hired labor. Cost of this work was
$22.44 for new work.
   Hornell, middle section.-Constructionof the channel improvement
on the Canisteo River and Canacadea Creek was completed December
18, 1941, under contract. Work included about 11,000 linear feet of
channel excavation, construction of about 3,900 feet of earth levee, and
about 4,500 feet of concrete flood wall; it involved the excavation of
63,372 cubic yards of earth, placement of 70,098 cubic yards of earth
in the levee and backfill, placement of 4,730 cubic yards of stone, place-
ment of 2,317 cubic yards of concrete in concrete flood walls, concrete
paving, and other structures, installation of 174,245 pounds of rein-
forcement steel and other metals, and installation of 522 feet of drain-
age pipe. Engineering studies and design in connection with the
construction of the project were made by hired labor. Relocation of
utilities was completed under contract. Detailed appraisals and in-
vestigations necessary to consummate purchase of land for the project
were made by hired labor. Acquisition of lands required for the
project was continued by the State of New York. Cost of this work
was $146,377.56 for new work.
   Hornell, upper and lower sections.-The completed channel im-
provement works were maintained during the fiscal year by hired
labor. Reimbursement to the State of New York for lands, ease-
ments, and rights-of-way was continued. Total cost of this work
was $9,272.27, of which $8,319.38 was for new work and $952.89 was
for maintenance.
   Summary.--The total cost of new work for the fiscal year was
 $2,936,120.63, which, reduced by a credit adjustment of $81.65, results
in a net cost for new work of $2,936,038.98 for the fiscal year. The
total cost, of maintenance work for the fiscal year was $6,862.77.
   Condition at end of fiscal year.-The entire project is approximately
40 percent complete. The Federal cost of new work to June 30, 1942,
and the percentage of construction work completed for each project
unit are as follows:

                                   of new
                             Costwork            Percent                                           Cost of new             Percent
                                   to June       of con                                                                    of con-
              Unit          work to June          struc-                 Unit                     work to June              struc-
                             30, 1942 (all      tion cornm-                                        30, 1942 (all           tc-
                                funds)                                                                funds)             tion com-
                                                 pleted                                                                    pleted

Reservoirs:                                                   Local flood protection
    Davenport Center__         1 $68, 351. 94             0    -Contd.
    West Oneonta-..---          1 62,196. 10              0      Elmira _..........                  $476, 661. 72               9
    East Sidney ________        1 72,862.44               0      Corning.._________                 1,513, 206. 98              72
    Copes Corner _.             1 55, 942. 73             0      Painted Post _....                    401, 976. 26             98
    Whitney Point ....        3, 822, 820. 61         100        Addison __.......                      1 4, 288. 04             0
    Arkport............       1, 768, 249. 14         100        Bath______- ______                     1 6, 682. 02             0
    Almond__    _..            1 257, 458.17            0        Avoca_. ____-__ ___                   405,083.31               98
Local flood protection:                                          Canisteo ....
                                                                           -   _ -- -                   1   6, 139. 80           0
    Oxford .___________          86, 066. 78          100        Hornell------------                2, 715, 462. 99             96
    Lisle ___________           158, 507. 43           45        Almond......------------......         1 1,072. 88              0
    Whitney Point...             21, 320. 72            0
    Binghamton        -..... 2 1,853, 030. 49          59           Total .........         ..    2 13, 757, 380. 55            40

  1 Costs for preliminary work only.
  2 Includes $23,500 contributed funds.
          RIVERS AND HARBORS-SYRACUSE, N.                 Y.,   DISTRICT       303
   The remaining work necessary for completion of the existing project
consists of completion of the project units now under construction
and engineering studies, foundation investigations, design, acquisi-
tion of lands and easements, utility and highway relocations, and
constructing of remaining project units.
   The total cost for new work to June 30, 1942, was $13,757,380.55,
of which $12,998,608.00 was from regular funds, $735,271.64 from
Emergency Relief funds and $23,500 from contributed funds. The
total expenditures for new work to June 30, 1942, were $13,626,396.88,
of which $12,867,625.24 was from regular funds, $735,271.64 from
Emergency Relief funds and $23,500.00 from contributed funds.
   The total cost for maintenance to June 30, 1942, was $13,316.54,
all from regular funds. The total expenditures for maintenance
to June 30, 1942, were $11,859.22, all from regular funds.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $5,387,915.54 (including contributed funds in the amount
of $82,900.00), plus accounts receivable, $306,401.27, plus the esti-
mated value of plant and materials on hand which will be used up
in proposed operations, $149,283.57, amounted to $5,843,600.38. This
amount, plus the sum of $105,000 allotted in August 1942 will be
applied as follows:
Accounts payable on June 30, 1942_----------------------------          $510, 003. 28
New work :
    East Sidney Reservoir:
        Engineering studies and partial design for
           the dam on Ouleout Creek, and partial
         . reimbursement to the State of New York
           for the costs of lands, easements, and
           rights-of-way: period July 1942 to June
           1943:
              Design (hired labor)                          10, 500. 00
                                                           $----------------
              Lands (hired labor) -----------------          9, 000. 00
                                                                          19, 500. 00
    Whitney Point Reservoir:
        Final payment for construction of the dam
           on the Otselic River, and completion of
            reimbursement to the State of New York
           for the costs of lands, easements, rights-
           of-way, and utility relocations; period
           July 1942 to June 1943:
              Construction (contract) ___--------------__  197, 800. 00
              Lands (hired labor) ----------------         799, 900. 00
                                                                         997, 700. 00
    Arkport Reservoir :
        Completion of reimbursement to the State of New York
            for the costs of lands, easements, and rights-of-way for
            the dam and reservoir on the Canisteo River; period
           July 1942 to June 1943: Lands (hired labor)----------         111, 000. 00
    Almond Reservoir:
         Completion of reimbursement to the State of New York
            for costs of lands, easements, and rights-of-way, for the
            dam site on Canacadea Creek; period July 1942 to
            June 1943: Lands (hired labor)_    ---------------------- 128, 000. 00
     Oxford :
         Completion of reimbursement to the State of New York
            for the cost of'lands, easements, rights-of-way, and
            utility relocations on the Chenango River; period July
            1942 to June 1943: Lands (hired labor)______________          46, 000. 00
304       REPORT OF CHIEF OF ENGINEERS,                U. S. ARMY,       1942

New work--Continued.
   Lisle:
        Construction of walls and levees on the Tieughnioga
          River and Dudley Creek, and completion of reimburse-
          ment to the State of New York for the costs of lands,
          easements, and rights-of-way; period July 1942 to June
          1943:
            Construction (contract)----------------$160, 700. 00
              Lands (hired labor)    -----------              50, 000. 00
                                                                            $210, 700. 00
      Whitney Point (village) :
         Construction of walls and levees on the Tioughnioga
            River, and completion of reimbursement to the State of
            New York for the cost of lands, easements, and rights-
            of-way :
              Construction (contract) ______________ $116, 600. 00
              Lands (hired labor) -------------------     1, 500. 00
                                                                              118, 100. 00
      Binghamton:
          All sections: Completion of clean-up riverward of walls
            and levees to improve hydraulic efficiency of river chan-
            nels, and preparation of final engineering studies and
            reports by hired labor; period July 1942 to June 1943_             30, 100.00
          Section No. 1:
              Completion of reimbursement to the State of New
                 York for the costs of lands, easements, utilities,
                 and rights-of-way on Park Creek; period July 1942
                 to June 1943: Lands (hired labor) _-                          27, 600. 00
          Section No. 2:
               Completion of reimbursement to the State of New
                 York for the costs of lands, easements, utilities,
                 and rights-of-way on Pierce Creek; period July 1942
                 to June 1943: Lands (hired labor) __ -            __--_       38, 000. 00
          Section No. 4:
               Completion of construction of concrete flood walls on
                 the Chenango River; period July 1942 to June 1943:
                 Construction (contract) exclusive of an additional
                 amount of $50,000 to be contributed by local inter-
                 ests_                       _________-___                    772, 800. 00
          Section No. 5:
               Commencement and completion of construction of
                 levees on the Susquehanna River and Chamberlain
                 Creek; period July 1942 to November 1942: Con-
                 struction (contract)________________________1____             20, 600. 00
      Elmira:
          Section No. 1:
               Completion of construction by contract of concrete
                 flood walls and levees on the Chemung River; period
                 July 1942 to June 1943: Construction (contract)___           156, 200. 00
          Section No. 2:
               Continuation of construction by continuing contract of
                 concrete flood walls and levees on the Chemung
                 River, Seely, Newtown, Diven Creeks, and Hoffman
                 Brook, and the completion of reimbursement to the
                 State of New York for the costs of land, easements,
                 utilities, and rights-of-way on Hoffman Brook;
                 period July 1942 to June 1943:
                    Construction      (continuing   con-
                       tract) ---------------------      $1, 434, 300.00
                    Lands (hired labor)-------------          86, 000. 00
                                                                            1, 520, 300. 00
          Pumping plant:
             Engineering studies for design of pumping plant:
               period July 1942 to June 1943: Design (hired
               labor) _                                                        20, 000. 00
          RIVERS AND HARBORS--SYRACU'SE, N. Y., DISTRICT                                       305
New work-Continued.
   Corning:
       All sections :
            Channel clean-up, final engineering studies and re-
              ports; period December 1942 to June 1943: Con-
              struction (hired labor) --------------------------                        10, 000. 00
       Section No. 1:
            Completion of construction of flood protection works
              on Chemung and Cohocton Rivers and Cutler Creek,
              and completion of reimbursement to the State of
              New York for the costs of lands, easements, utilities,
              and rights-of-way on Cutler Creek; period July 1942
              to June 1943:
                 Construction (hired labor)______ _    $10, 000. 00
                 Lands (hired labor) _-------------     55, 000. 00
                                                                                         65, 000. 00
        Section No. 2:
            Completion of construction by contract of concrete
               flood wall and earth levees on the Chemung River
               and Post Creek; period July 1942 to November 1942:
               Construction (contract) --------------------------                       578, 700. 00
        Pumping plant :
             Completion of construction of pumping plant for drain-
               age of area behind levees on the Cohocton River and
               Cutler Creek; period July 1942 to June 1943: Con-
               struction (hired labor) ---------------------------                       12, 000. 00
    Painted Post :
        Completion of reimbursement to the State of New York for
          costs of lands, easements, utilities, and rights-of-way on
          the Cohocton River; period July 1942 to June 1943:
           Lands (hired labor)__-------------------                                       9, 500. 00
    Bath:
        Engineering studies and design for levees and walls on the
          Cohocton River; period July 1942 to June 1943: Design
           (hired labor) -----------------               --           -----------         5, 000. 00
    Avoca:
        Completion of reimbursement to the State of New York for
           costs of land, easements, utilities, and rights-of-way on
           the Cohocton River and Salmon Creek; period July 1942
           to June 1943: Lands (hired labor) --                       -       -          39, 000. 00
    Hornell :
        Upper and lower sections:
              Completion of reimbursement to the State of New
                York for costs of lands, easements, utilities, and
                rights-of-way on the Canisteo River; period July
                1942 to June 1943: Lands (hired labor)                    __---         101, 000. 00
         Middle section :
            Completion of reimbursement to the State of New
               York for costs of lands, easements, utilities, and
               rights-of-way on Canisteo River and Canacadea
               Creek; period July 1942 to June 1943: Lands (hired
                labor) __--____-_____                         ___   ______-         _   214, 700. 00
     Crosby Creek and Chauncey Run:
         Engineering studies and design for flood protection on
           Crosby Creek and Chauncey Run, preparation of plans
           and specifications for debris control works on Chauncey
           Run; period July 1942 to June 1943: Design (hired
           labor) _------------              -------------------                         16, 419. 29
     East Sidney Reservoir:
         Engineering studies and design, and preparation of plans
           and specifications; period July 1942 to June 1943:
           Design (hired labor) --------------------------------                         75, 000. 00
306      REPORT OF CHIEIF OF ENGINEERS, U. S. ARMY,                        1942

New work-Continued.
   Bath :
       Engineering studies and design, and preparation of plans
          and specifications for walls and levees on the Cohocton
          River; period July 1942 to June 1943: Design (hired
          labor) --------                -                                     $30, 000. 00
             Total new work---------------------------------       5, 882, 922. 57
Maintenance: The following units of the Southern
New York flood-control project will be maintained
by hired labor; period July 1942 to June 1943:
   Whitney Point Reservoir________________-___       $13, 600. 00
   Arkport Reservoir__ __--_                       _    5, 000. 00
    Hornell local protection _______- ________-_       20, 000. 00
    Oxford local protection---------------------        3, 000. 00
    Painted Post local protection                       4, 000. 00
   Avoca local protection------------------------_      3, 500. 00
    Binghamton local protection------------------       7, 700. 00
    Corning local protection-----------------           5, 800. 00
    Lisle local protection ____________-----3,             077. 81
       Total maintenance _______       ____________-_______                         65, 677. 81

       Total for all work                                                   5,5_____________________-
                                                                                948, 600. 38
   Additional funds that can be profitably expended for design, con-
struction, lands, easements, utility relocations, and rights-of-way, and
maintenance, during the fiscal year ending June 20, 1944, estimated to
be $808,000, will be used as follows:
New work :
   East Sidney Reservoir: Completion of engineering studies, design,
     plans, and specifications---------------------      ----  --------- $15, 000
   Elmira :
        Section No. 2:
             Continuation of construction of earth levees and concrete
               flood walls, on the Chemung River and Newtown, Seely,
               and Diven Creeks, and Hoffman Brook ; period July 1943 to
               June 1944: Construction (continuing contract in force)__ 600, 000
   Hornell :
        Completion of design, and construction of flood protec-
          tion on Crosby Creek; period July 1943 to June 1944:
             Design (hired labor) ----------                       $5, 000
             Construction (contract) -------------------------    141, 000
                                                                              ---     146 000


                 Total, new work         ----------                                   761. 000
Maintenance: The project units at the following localities will be
maintained during the fiscal year July 1943 to June 1944:
   WThitney Point Reservoir_---------__-                                  $10, 000
   Airkport Reservoir---- ----------------------------------- 5. 000
    O,xford------------------------------------------------                 3, 000
   L isle                               -------------------------------     4. 000
    B inghamton-------------------- ------------------------                5, 000
   C(orning--------                ------------                         -   6, 000
   P ainted Post__             ------------------------------               3, 000
   A voca__-------------------------------------------------                3, 000
    H[ornell--------------------_----                                       8, 000
                                                                        --- --- ---     47, 000

       Total, new work and maintenance_________--------------------                   808, 000
                RIVERS             AND HARBORS--SYRACUSE, N.                                     Y., DISTRICT                      307
                                           Cost and financial summary

                                                      REGULAR FUNDS

Cost of new work to June 30, 1942___________________________                                                        $13, 733, 880. 55
Cost of maintenance to June 30, 1942_______13,                                                                                316. 54
      Total cost of permanent work to June 30, 1942 _____--                                                  _      113, 747, 197. 09
Undistributed costs June 30, 1942_                                                                                        71, 161. 02
      Net total cost to June 30, 1942_______________------_                                                          13, 818, 358. 11
Plus accounts receivable June 30, 1942_________-_________---                                                             306, 401. 27

      Gross total costs to June 30, 1942 ________________---                                                         14, 124, 759. 38
Minus accounts payable June 30, 1942 ___________----------                                                               510, 003.28

     Net total expenditures___________________________ _ 1 13, 614, 756. 10
Unexpended balance June 30, 1942____ _________________----_ 5, 305, 015. 54
         Total amount appropriated to June 30, 1942 __________--_                                                    18, 919, 771. 64

Fiscal year ending June 30                 1938                1939                1940                     1941              1942

Cost of new work...........   $1, 761, 555. 52             $2, 029, 343. 20   $2, 795, 185. 88        $4, 214. 756. 97     $2, 933, 03R. 98
Cost of maintenance ________ _______________                ____ _________    _____________                 6, 453. 77           6, 862. 77
      Total cost ..........         _   1, 761, 555. 52     2, 029, 343. 20    2, 795, 185. 88          4, 221, 210. 74     2, 939 901 75
Total expended------------1, 737, 171. 78                   2, 022, 533. 49     2, 464, 534. 40         3, 842, 764. 02     3, 547, 752. 41
Allotted ___-__               _-        8, 439, 049. 92     2, 633, 400.00     2, 062, 221. 72          3, 438, 000. 00     2, 347, 100. 00



Balance unexpended July 1, 1941-____                                                                                $6, 505, 667. 95
Amount allotted from War Department
  Civil Appropriation Act approved June
  24,1940__------------------------_____                                           $190, 070. 20
Amount allotted from War Department
  Civil Appropriation Act approved May
  23, 1941______________-_____________                                               459, 929. 80
Amount allotted from. War Department
  Civil Appropriation Act approved Apr.
   28, 1942______________                     ____        _____-                 2, 228, 500. 00
                                                                                                                      2, 878, 500. 00

      Amount to be accounted for __ _ __                                                                              9, 384, 167. 95
Deductions on account of revocation cf al-
   lotment _________________________--
                          -                                                                                               531, 400. 00
       Net amount to be accounted for__----------                                                                     8, 852, 767. 95
Gross amount expended __________ __             $4, 410, 015. 36
Less:
     Reimbursements     col-
       lected__________    _ $861, 860. 45
      Receipts from sales __ _                             402. 50
                                                                                     862 262. 95v
                                                                                     v   e   y   ..   ....

                                                                                                                      3, 547, 752. 41

      Balance unexpended June 30, 1942                                              --                                5, 305, 015. 54
Outstanding liabilities June 30, 1942 _                        -__             $1, 582, 242. 77
Amount covered by uncompleted contracts                                          1, 454, 163. 73
                                                                                                                      3, 036, 406.. 50
          Balance available June 30, 1942---------------------
                                                _                                                                     2, 268, 609. 04
  1 Includes $735,271.64 Emergency Relief fuuds.
308       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                  1942

Accounts receivable June 30, 1942 _                                                                    $306, 401. 27

        Unobligated balance available June 30, 1942----------                                         2, 575, 010. 31
Amount allotted in August 1942_          ------------                                                     105, 000. 00

        Amount available during the fiscal year 1943                          ---                     2, 680, 010. 31

Amount (estimated) required to be appropriated for completion
  of existing project 2                  _ _ _ _-                                                    14, 746, 900. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1944:
      For new work 2----------                                                            -               761, 000. 00
      For maintenance 2_________                                                                           47, 000. 00
        Total 2                                                                                  -808,000.00
2 Exclusive of available funds.

                                        CONTRIBUTED              FUNDS

Cost of new work to June 30, 1942__ ____ ___-                            -                                $23, 500. 00
Cost of maintenance to June 30, 1942
        Total cost of permanent work to June 30, 1942_                                                     23, 500. 00
Net total expenditures  _ _______ _-_ ____-_    _                                                          23, 500. 00
Unexpended balance June 30, 1942 __ ___-
                                     --      _ _-                                                          82, 900. 00
        Total amount contributed to June 30, 1942-                                                        106, 400. 00


   Fiscal year ending June 30          1938               1939           1940                 1941             1942

Cost of new work-.      .....-              -                                 ..-------
                                                                             .-                $20, 500           $3, 000
Cost of maintenance-                                                                             -

Total expended ..... .             -    -         -       -__                                   20, 500               3, 000
Contributed   -..   .     -   -                                              $53, 400            3, 000           50, 000



Balance unexpended July 1, 1941 ___      -----------                                                      $35, 900. 00
Amount contributed under authorizing act of July 19, 1937__                                                50, 000. 00

        Amount to be accounted for________                                                                 85, 900. 00
Gross amount expended_______ _________________ _____                                                        3, 000. 00
     Balance unexpended June 30, 1942_                                                                     82, 900. 00
Amount covered by uncompleted contracts                                                                    82, 900. 00

CONSOLIDATED COST AND              FINANCIAL          SUMMARY      FOR       SOUTHERN         NEW      YORK     FLOOD
                                                CONTROL    PROJECT

Cost of new work to June 30, 1942________________________ 1 $13, 757, 380. 55
Cost of maintenance to June 30, 1942_ _   __                      13, 316. 54

      Total cost of permanent work to June 30, 1942_ .....                                      1 13, 770, 697. 09
Undistributed costs June 30, 1942_ _   - _                                                             71, 161. 02

        Net total cost to June 30, 1942__                                                            13, 841, 858. 11
Plus accounts receivable June 30, 1942                    -----                                           306, 401. 27

      Gross total costs to June 30, 1942 _                                                           14, 148, 259., 38
Minus accounts payable June 30, 1942 __--_                                                               510, 003. 28

      Net total expenditures _______________________-                                                13, 638, 256. 10
Unexpended balance June 30, 1942_      _ __ _ __ _ _ __ _                                             5, 387, 915. 54

        Total amount appropriated to June 30, 1942----------                                    1 19, 026, 171. 64
  1 Includes $735,271.64 Emergency Relief funds.
                RIVERS              AND HARBORS-SYRACUSE, N.                                                 Y.,      DISTRICT                    309

Fiscal year ending June 30                       1938                     1939                     1940                  1941                 1942

Cost of new work    -           -          $1, 761, 555. 52 $2, 029, 343. 20                $2, 795, 185. 88       $4, 235,256. 97        $2, 936, 038. 98
Cost of maintenance                       __              .
                                                   . _________ __     ._                           _        .            6, 453. 77             6, 862. 77

     Total cost                .....          , 761, 555. 52        2,029, 343. 20              2, 795, 185.88       4,241,710. 74         2,942, 901.75

Total expended        .......-------------- 1, 737, 171. 78         2, 022, 533. 49             2,464, 534. 40       3,863,264.02          3, 550, 752. 41

Allotted---------------------8,                439, 049. 92         2, 633, 400. 00             2, 115, 621. 72      3, 441,000. 00        2, 397, 100. 00



Balance unexpended July 1, 1941                                  ____               __ _                      ___
                                                                                                   _____---------                    $6, 541, 567. 95
Amount allotted from War Department Civil Ap-
propriation Act approved June 24, 1940-......  $190, 070. 20
Amount allotted from War Department Civil Ap-
propriation Act approved May 23, 1941 ------    459, 929. 80
Amount allotted from War Department Civil Ap-
propriation Act approved April 28, 1942- ---.2, 228, 500. 00
Amount contributed under authorizing act of
July 19, 1937-------------------------------     50, 000.00
                                                                                                                                     2, 928, 500. 00
      Amount to be accounted for--------------------------                                                                           9, 470, 067. 95
Deductions on account of revocation of allotment ----------                                                                             531, 400. 00
      Net amount to be accounted for----------------------                                                                            8, 938, 667. 95
      Gross amount expended ----------------- 4, 413, 015. 36
Less: Reimbursements collected__ $861, 860. 45
        Receipts from sales_ _ ____-_                                               402. 50
                                                                                                       862, 262. 95
                                                                                                                                      3, 550, 752. 41
        Balance unexpended June 30, 1942___                                                _-         _______                         5, 387, 915. 54
Outstanding liabilities June 30, 1942_ ___-- __--                                                   1, 582, 242. 77
Amount covered by uncompleted contracts_.___                                                       1, 537, 063. 73
                                                                                                                                     3, 119, 306. 50
        Balance available June 30, 1942----------------------_                                                                       2, 268, 609. 04
Accounts receivable June 30, 1942__.                                        ________                        __------------_             306, 401. 27

     Unobligated balance available June 30, 1942-----------                                                                          2, 575, 010. 31
Amount allotted in August 1942___ -  -__     _     ____                                                                                 105, 000. 00
        Amount available during the fiscal year 1943-_-___                                                               _           2, 680, 010. 31
Amount (estimated) required to be appropriated for completion
  of existing project 2_------                                             ------                                             -14,      746, 900. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1944: 2
     For new work                   2                          ----------------                                                         761,000.00
    For maintenance 2-----------                                                                                                         47, 000.00
        Total 2--------------------------------------------                                                                             808, 000. 00
  2 Exclusive of available funds.

           10. STILLWATER RESERVOIR, LACKAWANNA RIVER, PA.

  Location.-The Stillwater Dam site is on the Lackawanna River,
37 miles from the mouth of the stream and about 2 miles upstream
from Forest City, Susquehanna County, Pa. (See U. S. Geological
Survey quadrangle sheet "Pennsylvania-Honesdale.")
  Existing project.-This provides for the construction of the Still-
water Dam, of the concrete gravity type, with spillway crest 50 feet
310      REPORT OF CHIEF               OF ENGINE'ERS,   U.   S. ARMY,    1942

above river level. The reservoir capacity will be 13,300 acre-feet, of
which 12,480 acre-feet will be for flood-control storage and 820 acre-
feet will be utilized to maintain the existing water-supply reservoir
for Forest City, Pa., at this site. The reservoir area will be 550
acres, and the pool will extend 3 miles upstream. The reservoir will
control 55 percent of the watershed above Carbondale, 28 percent
above Olyphant, and 17 percent above Scranton. The existing proj-
ect was authorized by the Flood Control Act approved August 18,
1941, as a modification of the southern New York and eastern Penn-
sylvania project authorized by the Flood Control Act approved June
22, 1936. The estimated construction cost is $866,000; the cost of
lands and damages is $1,554,000.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done.
   Proposed operations.-The sum of $75,000 allotted in August 1942
will be applied to engineering studies, design, and plans and specifi-
cations for the dam on the Lackawanna River, during the current fiscal
year ending June 30, 1943.
   The additional sum of $55,000 can be profitably expended during the
fiscal year 1944 for continuation of studies and design.
                              Cost and financial summary

Cost of new work to June 30, 1942                                             -     ----
Cost of maintenance to June 30, 1942                                    ___

      Net total expenditures__
Total amount appropriated to June 30, 1942..________.
Amount allotted in August 1942 -   _______-____ ____--          ______-           $75, 000

Amount available during the fiscal year 1943---------- ----                        75, 000

Amount (estimated) required to be appropriated for completion of
  existing project 1__-_______--___-                                          2, 345, 000
Amount that can be profitably expended in fiscal year ending June
30, 1944, for new work '____________--------------                                55, 000
1 Exclusive of available funds.

                11. WILLIAMSPORT, SUSQUEHANNA RIVER, PA.

   Location.-Williamsport, the county seat of Lycoming County, Pa.,
is located on the left bank of the West Branch of the Susquehanna
River, 40 miles above its mouth and immediately below the mouth
of Lycoming Creek. (See U. S. Geological quadrangle sheets, "Penn-
sylvania-Trout Run and Williamsport.")
  Existing project.-The plan of improvement provides for the con-
struction of a system of levees and concrete flood walls, consisting of
the following features: About 25.120 feet of earth levee and 3,770
feet of concrete flood wall along the left bank of the West Branch
of the Susquehanna River, extending from high ground near Meade
Street and Lose Avenue generally parallel to and on the right bank of
Millers Run to the Susquehanna River, thence extending upstream
along the left bank of the river and Lycoming Creek; about 15,350
         RIVERS   AND   HARBORS--SYRACUSE,    N.   Y.,   DISTRICT   311
feet of earth levee and 4,450 feet of concrete flood wall along the left
bank of the West Branch of the Susquehanna River, extending from
high ground at Mill Lane generally parallel to and on the right bank
of Lycoming Creek to the Susquehanna River, thence extending up-
stream along the left bank of the river to Reighard Avenue, thence
to high ground at Dove Street and Wayne Avenue; about 10,150 feet
of earth levee and 1,550 feet of concrete flood wall along the right
bank of the West Branch of the Susquehanna River in South Wil-
liamsport, extending from high ground at Central Avenue and
Charles Street, along Charles Street to the river, thence upstream
along the river to high ground at Maynard Street; a reinforced con-
crete pressure culvert about 2,250 feet long to provide for control of
Hagerman Run; 10 pumping stations for the disposal of interior
drainage; and appurtenant drainage structures. The project will
provide protection for the city of Williamsport and the borough of
South Williamsport against floods 4 feet higher than the maximum
flood of record, which occurred in March 1936. The existing project
was authorized by the Flood Control Act approved June 22, 1936.
The estimated cost of the new work, revised in 1940, is $5,278,000 for
construction, and $571,700 for lands and damages.
   Local cooperation.-See page 5 for requirements. Local interests
have furnished assurances that all the requirements will be complied
with. Rights-of-way have been acquired for the first and second
units of construction work.
   Operations and results during fiscal year.-All operations during
the fiscal year were on section I of the protection, which extends along
the left bank of the Susquehanna River between Lycoming Creek and
Millers Run, and along the banks of the two small streams. Five
pumping plants are included in section I. Surveys for the prepara-
tion of plans, foundation investigations, hydrology studies, and the
preparation of plans and specifications were in progress. A contract
for the construction of levees and walls for part of levee unit No. 1
of section I was completed. The work included the construction of
8,200 linear feet of levee and about 1,050 linear feet of concrete flood
wall; it involved 27,948 cubic yards of stripping; 634,086 cubic yards
of borrow excavation, 20,454 cubic yards of structure excavation,
445,585 cubic yards of levee fill, 51,841 cubic yards of topsoil, and
3,160 cubic yards of riprap and rock gutters. The costs, all for new
work, were $511,706.86.
   Condition at end of fiscal year.-The construction of the project is
18 percent complete. Section I is 29 percent complete. No construc-
tion has been done on sections II and III. Work remaining to be
done on levee unit No. 1 includes construction of two stop-log struc-
tures, one highway ramp, one relief culvert, and approximately 1.000
feet of levee and wall. Other remaining work on section I includes
construction of additional levee units and construction of the five
pumping plants. The total costs, all for new work, were $979,944.11,
of which $978,057.08 were from regular funds and $1,887.03 from
emergency funds. The total expenditures, all for new work, were
$989,171.39, including $9,709.13 accounts receivable, of which
$977,575.23 were regular funds and $1,887.03 from emergency funds.
312              REPORT OF CHIEF OF ENGINEERS,                                           U. S. ARMY,                                   1942

   Proposad operations.-The unexpended balance at the end of this
fiscal year, $743,715.64 plus accounts receivable, $9,709.13, amounted
to $753,424.77. This amount will be applied as follows:
Accounts payable June 30, 1942_ ____ ___--   _____ _______ ____-- _                                                                               $3, 983. 31
New work :
    Section No. 1:
        Repair of flood damage to levees; period Septem-
                     ber to October 1942, construction (hired labor) _ $3, 000. 00
                 Continuation of engineering studies and design
                   for levees, walls, and pumping plants and con-
                   tinuation of construction on the West Branch of
                   the Susquehanna River; period July 1942 to
                  June 1943:
                      Design (hired labor)-----------------------73,                                                          000. 00
                                                                                  76, 000. 00
                          Construction (additional contract)-------------------- 673, 441. 46

                                                         _----------
                                 Total---------------------__                                                        -                           753,424. 77

                                               Cost and financial summary
Cost of new work to June 30, 1942_----------------------------  $979, 944. 11
Cost of maintenance to June 30, 1942-----------------------------------
      Total cost of permanent work to June 30, 1942                                                 ------------                                979, 944. 11
Undistributed costs June 30, 1942-------------------------------                                                                                  3, 501. 46

      Net total cost to June 30, 1942_ ------------
                                                ___            -------------                                                                     983, 445. 57
Plus accounts receivable June 30, 1942--------------------------                                                                                   9, 709. 13

      Gross total costs to June 30, 1942 ----------------------                                                                                  993, 154. 70
Minus accounts payable June 30, 1942--------------------------                                                                                     3, 983. 31
     Net total expenditures_--------------------------------                                                                                    '989, 171. 39
Unexpended balance June 30, 1942---------------------------                                                                                       743, 715. 64
             Total amount appropriated to June 30, 1942-                                                    ___                            '1, 732, 887. 03

     Fiscal year ending June 30                     1938                 1939                 1940                            1941                    1942


Cost of new work .....-.-..                        $5,269. 86          $60, 516.08     $113, 762. 14                 $288, 689. 17                  $511,706.86
Cost of maintenance ..........                                                                      - - -   - _---   -    -    -   -   -    -

Total expended ...............                      3, 427.91           65, 986.08       117, 226.90                     220, 986.25                 581, 544.25
                                                                ,419         6       7_209                      6
                                                                                                               .j4        5                            1~Z
Allotted .....................                    25, 000.00           641, 887.03       366, 000. 00                    200,000. 001                500, 000. 00



Balance unexpended July 1, 1941_______                                                                                                          $825, 259.89
Amount allotted from War Department Civil Appropriation Act
    approved Apr. 28, 1942_____________________                                                                                                  500, 000. 00

             Amount to be accounted for__                                                                    --- _-_-_-_____ 1,325, 259. 89
Gross amount expended___________________                                                     _---     $590,567. 73
Less reimbursements collected_____ _                                                                     9, 023.48
                                                                                                                                                 581, 544. 25
      Balance unexpended June 30, 1942                                                                                                           743, 715.64
Outstanding liabilities June 30, 1942__________                                                                                                       330.24

             Balarce available June 30, 1942________                                                                                             743,385. 40
    1 Includes $1,887.03 Emergency Relief funds.
           RIVERS     AND HARBORS-SYRACUSE, N.            Y.,   DISTRICT         313
Accounts receivable June 30, 1942__--------------------------------        $9, 709. 13

      Unobligated     balance available   June 30, 1942 ____________    753, 094.53

Amount (estimated)       required to be appropriated for completion
  of existing project 2-----___      _     ---
                                           ______________      __   3, 545, 112. 97
  2Exclusive of available funds.

12. WILKES-BARRE-HANOVER             TOWNSHIP,      SUSQUEHANNA        RIVER, PA.

   Location.-The city of Wilkes-Barre, with Hanover Township ad-
joining, is located in the central part of Luzerne County, Pa., on the
left bank of the North Branch of the Susquehanna River, approxi-
mately 62 miles above its mouth. (See U. S. Geological Survey
quadrangle sheets "Pennsylvania-Pittston and Wilkes-Barre.")
   Existing project.-The plan of improvement provides for the con-
struction of a system of levees and concrete flood walls, consisting
of the following features: About 25,350 feet of earth levee and 161.5
feet of concrete flood wall along the left bank of the North Branch
of the Susquehanna River, extending from high ground at the Lehigh
& West Virginia Railroad near Union Street in Wilkes-Barre down-
stream along the left bank of the river to high ground near the nmouth
of Solomon Creek in Hanover Township; eight pumping stations
for the disposal of interior drainage; appurtenant drainage struc-
tures; about 17,900 feet of electric transmission line; and two trans-
former substations for furnishing power to the pumping stations.
The project will provide protection for the city of Wilkes-Barre and
the borough of Hanover Township against floods 4 feet higher than
the maximum flood of record, which occurred in March 1936. The
existing project was authorized by the Flood Control Act approved
June 22, 1936. The estimated cost for new work, revised in 1942,
is $3,409,700 for construction, and $210,000 for lands and damages.
   Local cooperation.-See page 5 for requirements. All rights-
of-way requirements have been met.
   Operations and results during fiscal year.-Surveys for the prepa-
ration of detailed plans and specifications were continued. Con-
struction of one pumping station was completed under contract.
The construction of transmission lines, which was completed under
contract, included the completion of three transformer substations,
8,762 feet of underground transmission lines, 9,544 feet of overhead
transmission lines, and appurtenant structures. Construction of the
Solomon Creek pumping station was begun, under contract. The
major features of construction included 3,150 linear feet of levee
and 325 linear feet of channel excavation. The work involved 11,100
cubic yards of stripping, 122,500 cubic yards of borrow excavation,
106,200 cubic yards of levee fill, 21,864 cubic yards of structure excava-
tion, 3,590 cubic yards of backfill, 3,614 cubic yards of concrete, and
4,550 cubic yards of channel excavation. The costs, all for new work,
from regular funds were $335,835.41.
   Condition at end of fiscal year.-The project is about 86 percent
complete. The remaining work includes the completion of the Solo-
mon Creek pumping station and the. Wilkes-Barre-Hanover Town-
ship relief culvert, placing of dumped riprap on the levee and com-
pletion of minor repairs. The total costs, all for new work, were
$2,838,739.18, of which $1,966,024.45 were regular funds and $872,-
714.73 from emergency funds. The total expenditures, all for new
314         REPORT OF CHIEF OF ENGINEERS,                                     U. S. ARMY,               1942

work, were $2,769,476.05, of which $1,896,761.32 were regular funds
and $872,714.73 from emergency funds.
   Proposed operations.-The unexpended balance at the end of this
fiscal year, $465,177.60, and the sum of $175,000 allotted in July 1942,
a total of $640,177.60, will be applied as follows:
Accounts payable, June 30, 1942______________________             ___ $74,                                           477. 91
New work:
    Solomon Creek pumping station:
        Continuation of construction of pumping station for drain-
           age of area behind levees on the Susquehanna River, and
           construction of a stop-log structure and electric transmis-
           sion line for the pumping station; period July to Oct.
           27, 1942: Construction (contract) -------------------       434,                                          499. 69
    Relief culvert:
        Completion of construction of relief culvert thru levee on
           the Susquehanna River; period July to Oct. 1942: Con-
           struction (contract) _________ ___--------------------93,                                                 700. 00
    Repair and general clean-up:
        Repair of flood damage to levees, pumping stations, and
           water tunnel, general clean-up, and preparation of final
           drawings and reports; period July 1942 to June 1943: Con-
           struction (hired labor) _____________________           ___  37,                                          500. 00

                   Total new work __-__                            _____--__-_______---            -           640, 177. 60
                                            Cost and financial summary

Cost of new work to June 30, 1942__________________________                                             $2, 838, 739. 18
Cost of maintenance to June 30, 1942___

      Total cost of permanent work to June 30, 1942____________ 12, 835, 739. 18
Undistributed costs June 30, 1942________________________             5, 214. 78

      Net total cost to June 30, 1942________________________                                            2, 843, 953. 96
Minus accounts payable June 30, 1942_________________________                                                74, 477. 91

      Net total expenditures___________------ --------   _                                              12, 769, 476. 05
Une;zpended balance June 30, 1942____________________--_______                                              465, 177. 60
         Total amount appropriated to June 30, 1942______________                                        3, 234, 653. 65

    Fiscal year ending June 30                 1938             1939            1940             1941                1942


Cost of new work          ..-------------   $468, 352. 43    $879, 531. 11   $472, 321. 75    $682, 698. 48       $335, 835. 41
Cost of maintenance .                  ---
                               .----------            --    ---------------------------- -------
Total expended-----------___     -           452, 249. 60     930, 303. 46    391, 286. 03     694, 853. 59        300, 783. 37

                           --------- 3, 790, 281. 57
Allotted.........------.....----......                      --381, 517.31                    --134,110.61          -40, 000.00


Balance unexpended July 1, 1941____________________________                                                   $805, 960. 97
Deductions on account of revocation of allotment___________                                                     40, 000. 00

      Net amount to be accounted for_______________________                                                    765, 960. 97
Gross amount expended_______________________ $311, 618. 88
Less reimbursements collected                        0, 835. 51
                                                    1------------------
                                                                                                               300, 783. 37

      Balance unexpended June 30, 1942________--__-----------                                                  465, 177. 60
Outstanding liabilities June 30, 1942______________ $14, 803. 14
Amount covered by uncompleted contracts--------- 450, 374. 46
                                                                                                               465.  177. 60
                                                                                                               _VV , . . .. ....


         Amount allotted in July 1942_________                                      _--_------                 175, 000. 00

Amou nt available during the fiscal year 1943 ___--------------                                                175, 000. 00
   1Includes    $872,714.73 Emergency Relief funds.
         RIVERS AND HARBORS----SYRAC!USE, N.      Y.y   DISTRICT    315
     13. KINGSTON-EDWARDSVILLE, SUSQUEHANNA RIVER, PA.

   Location.-The boroughs of Kingston and Edwardsville, Pa., are
located in Luzerne County, Pa., on the right bank of the North
Branch of the Susquehanna River approximately 62 miles above its
mouth. (See U. S. Geological Survey quadrangle sheet, "Pennsyl-
vania-Pittston.")
   Existing project.-The plan of improvement provides for the con-
struction of a system of levees consisting of the following features:
About 18,169 feet of earth levee along the right bank of the North
Branch of the Susquehanna River, extending from high ground, near
Rutter Avenue and Church Street in Kingston southeasterly to the
river, thence downstream along the right bank of the river to the
Kingston-Edwardsville borough line, thence northerly generally par-
allel to the Edwardsville borough line, to high ground near Toby
Creek and Plymouth Street; a concrete pressure culvert about 6,659
feet long to carry the flow of Toby Creek; three pumping stations for
the disposal of interior drainage; 3,080 feet of concrete intercepting
sewer; appurtenant drainage structures; and about 16,700 feet of elec-
tric transmission lines with 2 transformer substations for furnishing
power to the pumping stations. The project will provide protection
for the boroughs of Kingston and Edwardsville against floods 4 feet
higher than the maximum flood of record, which occurred in March
1936. The existing project was authorized by the. Flood Control Act
approved June 22, 1936. The estimated cost of new work, revised in
1942, is $4,331,600 for construction, and $370,000 for lands and
damages.
   Local cooperation.-See page 5 for requirements. All rights-of-
way requirements have been met.
   Operations and results during fiscal year.-The contract for con-
struction of transmission lines was completed. The major features
of construction included the completion of two transformer substa-
tions 15,569 feet of overhead transmission line, and. 1,835 feet of
underground transmission line. The contract for construction of the
Toby Creek outlet works and pumping stations was completed. The
work included the construction of 544 linear feet of pressure culvert,
the superstructure of the Woodward and Loveland pumping stations,
and installation of pumps, motors, and electrical equipment; it in-
volved the placement of 6,678 cubic yards of earth in the levee and
backfill, the excavation of 424 cubic yards of channel, and the place-
ment of 271 cubic yards of riprap and 259 cubic yards of concrete. A
total of 989 tons of riprap stone was placed around the intake of Toby
Creek pressure culvert in the impounding basin, by hired labor. The
contract for the construction of the Toby Creek intercepting sewer in-
cluded the construction of 135 linear feet of levee, 66 linear feet of
channel excavation, and 1,920 feet of intercepting sewer. The work
involved 11,231 cubic yards of structure excavation, placing 3,035
cubic yards of concrete, 3,379 cubic yards of borrow excavation, 3,834
cubic yards of backfill, and 4,066 cubic yards of miscellaneous fill. The
costs, all for new work, were $224,140.98.
   Condition at end of fiscal year.-The project is practically complete.
The work remaining includes the completion of the Toby Creek inter-
cepting sewer, repairs to the Church Street levee, cleaning of the Toby
316        REPORT OF CHIEF                             OF ENGINEERS, U. S. ARMY,                                         1942

Creek pressure culvert, and incidental repairs. The total costs, all
for new work, were $4,089,016.84 of which $2,926,468.42 were regular
funds and $1,162,548.42 from emergency funds. The total expendi-
tures, all for new work were $4,078,645.59 of which $2,916,097.17 were
regular funds and $1,162,548.42 were from emergency funds.
   Proposed operations.-The unexpended balance at the end of this
fiscal year, $252,902.83, plus accounts receivable, $18,365.01, amounted
to $271,267.84. This amount will be applied as follows:
Accounts payable, June 30, 1942 ______________------_____ $58, 426. 53
New work :
    Toby Creek intercepting sewer:
        Completion of construction of intercepting sewer above Toby
          Creek; period July 1942 to November 1942: Construction
           (contract)--------------------------------          -     127, 841.31
    Toby Creek impounding basin:
        Repairs and modifications to the Toby Creek impounding
          basin; period August 1942 to November 1942: Construction
          (contract)-------------------------------         -------- 55, 000. 00
    General repair and clean-up:
        Repair of flood damage to levees, removal of debris from
          Toby Creek pressure culvert, general clean-up and prepara-
          tion of final drawings and reports; period July 1942 to
          June 1943: Construction (hired labor) _____                 30, 000.00

                  Total_                                                                                                __ 271, 267. 84
                                            Cost and financial summary
                                   .
Cost of new work to June 30, 1942__________                                            -__                              1 $4, 089, 016. 84
Cost of maintenance to June 30, 1942_________-                                          -

        Total cost of permanent work to June 30,
         1942_------------------------------------------------'                                                              4,089,016.84

Undistributed costs June 30, 1942_------------------------------                                                                    29, 690. 27

      Net total cost to June 30, 1942_------------------------                                                               4, 118, 707. 11
Plus accounts receivable June 30, 1942---------                                                                                  18, 365.01

        Gross total costs to June 30, 1942_                                        __        -   --          -               4, 137, 072. 12
Minus accounts payable June 30, 1942                                                                                                 58, 426. 53
     Net total expenditures----------------------------------                                                                 4, 078, 645. 59
Unexpended balance June 30, 1942 ----------------------------                                                                    252, 902. 83
        Total amount appropriated to June 30, 1942---                                                                        4, 331, 548. 42
                                                                                                                             1




   Fiscal year ending June 30                       1938              1939                1940                   1941                        1942
                                                                                                       _                --       I-------




Cost of new work               -_        -_-._   $703, 761. 50 $1, 503, 724. 65        $638, 236. 88 $1, 019, 152. 83                   $224, 140. 98
Cost of maintenance        -        -
Total expended,                     --            777, 560. 26   1, 500, 222. 30        466, 042. 92       1, 097, 498. 38                  237, 321. 73
Allotted ___________________                 2, 426, 935. 29     1,922,000.00      -                        -57, 376. 87                     40, 000.00

  ' Includes $1,162,548.42 emergency relief funds.
         RIVERS      AND HARBORS-SYRACUSE, N.              Y,, DISTRICT         317
Balance unexpended July 1, 1941____________________________             $450, 224. 56
Amount allotted from War Department Civil Appropriation Act
approved June 38, 1939-        __________----40,                             000. 00

       Amount to be accounted for___-----------------------              490, 224. 56
Gross amount expended__________________________ $244, 638.45
Less:
     Reimbursements collected---------- $6, 333. 37
     Receipts from sales                    983. 35
                                                           7, 316. 72
                                                                         237, 321. 73

      Balance unexpended June 30, 1942 -            --       --
                                                           ___           252, 902. 83
Outstanding liabilities June 30, 1942___________          $4, 381. 38
Amount covered by uncompleted contracts ........         153, 064. 24
                                                                         157, 445. 62

      Balance available June 30, 1942_______________________              95, 457.21
Accounts receivable June 30, 1942_ ____- ___-- _____--____                18, 365. 01

      Unobligated balance available June 30, 1942                         113, 822. 22

               14. PLYMOUTH, SUSQUEHANNA RIVER, PA.
   Location.-The borough of Plymouth is located in Luzerne County,
Pa., on the right bank of the North Branch of the Susquehanna
River, 59.5 miles above its mouth. (See U. S. Geological Survey
quadrangle sheet "Pennsylvania-Wilkes-Barre.")
   Existing project.-The plan of improvement provides for the con-
struction of a system of levees consisting of the following features:
About 8,680 feet of earth levee along the right bank of the North
Branch of the Susquehanna River, extending from high ground
near the Carey Avenue Bridge downstream along the right bank of
the river to Mras Street, thence northerly to high ground near Main
Street approximately paralleling Flat Road; a diversion channel
about 2,670 feet long on the outside of the levee system from Main
Street to the river paralleling Flat Road; two pumping stations for
the disposal of interior drainage; appurtenant drainage structures;
and about 4,100 feet of electric transmission lines, with one trans-
former substation for supplying power to the pumping stations.
The project will provide protection for the borough of Plymouth
against floods 4 feet higher than the maximum flood of record, which
occurred in March 1936. The existing project was authorized by
the Flood Control Act approved June 22, 1936. The estimated cost
of new work, revised in 1942, is $1,311,900 for construction and
$150,000 for lands and damages.
   Local cooperation.-See page 5 for requirements. Local inter-
ests have furnished assurances that all the requirements will be com-
plied with. All rights-of-way requirements have been met.
    Operations and results during fiscal year.-Surveys for the prepa-
ration of plans, hydrology studies, and the preparation of plans and
specifications were in progress during the year. Construction of the
Plymouth levees was completed under; contract. The work included
construction of 150 linear feet of levee; it involved 58,619 cubic yards
of borrow excavation, 4,054 cubic yards of levee fill, 1,337 yards of com-
mon excavation, and 52 cubic yards of riprap.
   Construction of the Coal Creek diversion channel was started under
contract. The work included construction of 1,200 linear feet of
      493202- 43-   pt. 1, vol. 1-   21
318         REPORT OF CHIEF OF ENGINEERS,                             U. S. ARMY,                          1942

channel excavation and 451 linear feet of concrete channel paving; it
involved 840 cubic yards of stripping, 37,862 cubic yards of channel
excavation, 8,269 cubic yards of structure excavation, and placement of
876 cubic yards of concrete and 2,360 cubic yards of earth in the levee
and backfill. Construction of the Plymouth pumping stations started
under contract. The major feature of construction was the placement
of 4,433 linear feet of intercepting sewer; it involved 42,468 cubic yards
of excavation, 24,310 cubic yards of backfill, and 82 cubic yards of
concrete.
   The costs, all for new work, were $233,589.44.
   Condition at end of fiscal year.-The project is about 49 percent com-
plete. The remaining work consists of the completion of the Coal
Creek diversion channel, the Plymouth pumping stations, the Plym-
outh transmission lines, and repairs to levees. The total costs, all for
new work, were $527,919.55, of which $523,562.79 were regular funds
and $4,356.76 were from emergency funds. The total expenditures
were $470,100.34, of which $465,743.58 were regular funds and $4,356.76
were from emergency funds.
   Proposed operations.-The unexpended balance at the end of this
fiscal year is $818,256.42. This amount will be applied as follows:
Accounts payable, June 30, 1942--________----------                        $57, 819. 21
New work:
    Brown Creek and Wadham Creek pumping stations:
        Completion of construction of pumping stations near Brown
          Creek and Wadham Creek, for drainage of the area behind
          the levees on the Susquehanna River, installation of equip-
          ment, and installation of electric power lines to the stations ;
          period July 1942 to April 1943: Construction (contract) .. _ 685, 137. 21
    Coal Creek diversion:
        Completion of construction of diversion channel for Coal
          Creek, period July 1942 to September 1942: Construction
           (contract) ---------------------------------------               67, 300. 00
        Repair of flood damage to completed structures and prepara-
                 tion of final drawings and reports, period July 1942 to June
                 1943: Construction (hired labor) ----------------                                                    8, 000. 00
                  Total-        ----------                    ---------------------                           818, 256. 42
                                      Cost and financial summary

Cost of new work to June 30, 1942--------------------------------1                                           $527, 919. 55
Cost of maintenance to June 30, 1942
      Total cost of permanent work to June 30, 1942______________  1527, 919. 55
Minus accounts payable June 30, 1942 -__-__-    __ -      -_______-_ 57, 819. 21

     Net total expenditures   --- -------------------------                                                  1470, 100. 34
Unexpended balance June 30, 1942_-__ ___ __-___________                                                       818, 256. 42
        Total amount appropriated to June 30, 1942________________1, 288, 356. 76

   Fiscal year ending Jlne 30            1938           1939             1940                     1941                  1942
        -               ---      I-                                                   I                       I----
Cost of new work__
                 ..                     $6, 013. 55   $14, 073. 20     $6, 824.34          $204, 419. 02                       44
                                                                                                                      $233, 589.
Cost of maintenance_                                                                      ..............


Total expended......_                    5, 656. 29    15, 012. 64      69, 923. 46           179, 917. 26             199, 590. 69
Allotted_   -"                          20, 000. 00   705, 356. 76     109, 000. 00             97, 000.00             357, 000.00

    Includes $4,356.76 Emergency Relief funds.
              RIVERS       AND HARBORS               SYRACUSE, N.          Y.,    DISTRICT             319
Balance unexpended July 1, 1941---------------------------                                     $660, 847. 11
Amount allotted from War Department Civil Appropriation Act ap-
  proved April 28, 1942----------       --------------------------                              357, 000. 00

      Amount to be accounted for__--------------------            1,017, 847. 11
Gross amount expended-_ ___        -_______-----    $201, 007. 93
Less reimbursements collected_- --- ___---       __    1,417. 24
                                                                    199, 590. 69

      Balance unexpended June 30, 1942-----------------------                                   818, 256. 42
Outstanding liabilities June 30, 1942_____--- ----- $93, 741. 01
Amount covered by uncompleted contracts_-----       360, 557. 16
                                                                                                454, 298. 17

         Unobligated balance available June 30, 1942__                           ___----        363, 958. 25

Amount (estimated) - required      to be appropriated- for              completion- -of- - -
                                                                  - - - - - - - - -
existing project 2 - - - - - - - - - - - - - - - - - - - - - - -                                23, 500. 00
  2
      Exclusive of available funds.

                       15. SUNBURY, SUSQUEHANNA RIVER, PA.

   Location.-Sunbury, Pa., is situated on the Susquehanna River in
Northumberland County, Pa. (See U. S. Geological Survey quad-
rangle sheet "Pennsylvania-Sunbury.")
   Existing project.-This provides for protection of people and prop-
erty at Sunbury, Pa., against floods somewhat higher than the 1936
flood, by means of levees, flood walls, and related works along the
river front and at the northern and southern limits of the city. The
existing project was authorized by the Flood Control Act approved
June 22, 1936, as modified by the Flood Control Act approved August
18, 1941 (H. Doc. No. 366, 76th Cong., 1st sess.). The estimated con-
struction cost is $1,900,000; the cost of lands and damages is $53,000.
   Local cooperation.-See page 5 for requirements Assurances of
cooperation have been furnished by local authorities.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done.
   Proposed operations.-The sum of $20,000 allotted in August 1942
will be applied to engineering studies and design for levees on the
Susquehanna River and Shamokin Creek, during the current fiscal
year ending June 30, 1943.
                                   Cost and financial summary
Cost of new work to June 30, 1942    __
Cost of maintenance to June 30, 1942
     Net total expenditures____
     Total amount appropriated to June 30, 1942                                                  .........
Amount allotted in August 1942-______-
                                     --- ___________                                               $20, 000
Amount available during the fiscal year 1943_------ ---------
                                                            __                                      20, 000
Amount (estimated) required to be appropriated for completion of
existing project ---- ----------------- ---       ------        1, 880, 000
  1 Exclusive of available funds.
 320          REPORT           OF CHIEF        OF ENGINEERS,               U. S. ARMY,         1942

16. SNAGGING AND CLEARING UNDER AUTHORITY OF SECTION 2 OF
   THE FLOOD CONTROL ACT .APPROVED AUGUST 28, 1937, AS
   AMENDED

    The Flood Control Act approved August 28, 1937, as amended by
the Flood Control Acts approved August 11, 1939, and August 18,
1941, authorized the allotment of not to exceed $500,000 from the
flood-control appropriations for any one fiscal year for the removal
of accumulated snags and other debris from, and the clearing and
straightening of channels in navigable streams and tributaries
thereof when such work is advisable in the interest of flood control;
provided that not more than $25,000 shall be allotted for this purpose
for any single tributary from the appropriations for any one fiscal
year.
    Funds in the amount of $11,500 were allotted in the fiscal year
1941 for the removal of debris and channel clearing on the Lacka-
wanna River and tributaries at Scranton, Pa.
    Operations during the year have consisted of preliminary office
work and preparation of plans and estimates. The snagging and
clearing operations have not been started. The costs were $180.27.
The expenditures were $237.10. The balance unexpended on June
30, 1942, amounting to $10,447.08, will be applied as needed during
the fiscal year 1943 to payment of expenses incurred under this
heading.
                                       Cost and financial summary

Cost of new work to June 30, 1942----------------------------                                        $1, 052. 92
Cost of maintenance to June 30, 1942__

           Total cost of permanent work to June 30, 1942_____________                                 1, 052. 92

Net total expenditures_____-----------------------                                                   1, 052. 92
Unexpended balance June 30, 1942________________________                                            10, 447. 08

           Total amount appropriated to June 30, 1942______________                                  11, 500. 00

   Fiscal year ending June 30               1938           1939            1940         1941            1942


Cost of new work    .     ....----- -----------------------------------------            $872. 65         $180. 27
Cost of maintenance .----- ---------------------------------- --------------       -    -------

Total expended     ....-----   ---------------- ---   ------------- ------------          815.82           237.10

Allotted     ---   - ----                               ---------- ---   ---           14, 000.00      -2,500.00



Balance unexpended July 1, 1941__---------------                                                    $13, 184. 18
Deductions on account of revocation of allotment-------------__                                       2, 500. 00

      Net amount to be accounted for____  _________                                                 10, 684. 18
Gross amount expended------------------------------                                                     237. 10

           Unobligated balance available June 30, 1942 __------                                     10, 447. 08

17. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL

   There were no costs or expenditures under this heading for the fiscal
year and there is no unexpended balance.
  The balance unexpended on June 30, 1941, amounting to $7,274.66,
plus reimbursements collected in the amount of $591.86, a total of
$7,866.52. was revoked.
                 RIVERS AND             HARBORS-SYRACTTSE, N.                          Y.,    DJST &CT                   321
                                         Cost and financial summary
Cost of new work to June 30, 1942_--------------------------------------
Cost of maintenance to June 30, 1942------------------------     $280, 251. 38

          Total cost of permanent work to June 30, 1942--------------                                          280, 251. 38

Net total expenditures---------------------                                  ------------                      280, 251. 38

          Total amount appropriated to June 30, 1942 -----------                                               280, 251. 38

    Fiscal year ending June 30                1938             1939             1940             1941                 1942


Cost of new work----------------
Cost of maintenance.. ------ .-              $2, 613. 70   $130, 580.46       $83, 878. 92     $63, 178. 30    -
                         ------
Total expended------------                    2, 613. 70     114, 871.09       98, 528. 71      64, 829. 74           -$591. 86

Allotted ________________       ___.
                                   .         80, 850.00       69, 000.00       92, 640. 00      45, 627. 90          -7, 866. 52

Balance unexpended July 1, 1941__ _-________-____-__--------- 7,274.66
Deductions on account of revocation of allotment_______-----7, 866. 62
      Net amount to be accounted for_________
                                          --             _-------------591.                                                  86
Less reimbursements collected --__----_----------------------
                                  __-591.                                                                                    86

18. OTHER FLOOD CONTROL PROJECTS FOR WHICH NO ESTIMATES
                      ARE SUBMITTED

                                                              For last      Cost and expenditures to               Estimated
                                                            full report          June 30, 1942                     amount re-
                    Name of project                         see Annual                                              quired to
                                                              Report2                                                  mplete
                                                               for-         New work         Maintenance            co


Milton, Pa..------------------...--------------                 1937        -------------.----...
                                                                               -                        $263, 900
Montgomery, Pa ----------------------------
                                ___                             1937                                      139, 100
Muncy, Pa------------------------                      -        1937       --------------............... 360, 800
Jersey Shore, Pa____________________ __________                 1937                                      395, 900
Lock Haven, Pa                 _            ----------          1937         -                         2, 860, 000
Bloomsburg, Pa-----------------------------                     1937                                      131,300
West Pittston, Pa_____________________________                  1937              - -                     100, 000
Swoyerville and Forty Fort, Pa__ ____________                   1937                                      529, 800
Nanticoke,    Pa       _                                        1937                                                   381, 700
  1 No funds have been allotted and no work has been done on these projects.
  2 Prior to 1942 the projects were reported by the Baltimore district.

Status of all investigations for flood control called for by flood-control acts and
                               committee resolutions

                                                                 Date trans-                                  Recommenda-
            Locality                   Authorization act          mitted to          Document No.             Recommenda-n
                                                                  Congress

Canisteo River, N. Y.1   -- Flood Control Act, Apr. 11, 1942 House, 702, 77th Favorable.
                                    June 22, 1936.                                Cong., 2d sess.
Chemung River, N.   Y.1 ------         do----------       -----    do -do             ------------                 Do.
Chenango River, N.  Y.1                do-----------------do                    .. do                .------------ Do.
Cohocton River, N.  Y.1        .       do-----------------         do          .. do ....------------              Do.
Lackawanna River,   Pa .-         Commerce Commit-
                                    tee resolution, July
                                    8, 1942.
Mohawk River, N. Y -.. -          Flood Control Act,_.................
                                    Aug. 11, 1939.
Owasco Inlet and Outlet, --.. .do .............-------------- July 20,1942 House, 815, 77th                        Do.
  and tributaries, Cayuga                                                         Cong., 2d sess.
  and Tompkins Counties,
  Crane   Brook,    Jericho
  Brook and Cold Spring
  Brook, Cayuga County,
  N.Y.
Susquehanna River, N. Y.          Flood Control Act, Apr. 11, 1942 House, 702, 77th                                Do.
  and Pa.                           June 22, 1936.                                Cong., 2d sess.
Tioga River, N. Y.1          -- .     do                           doo.......... do         -.   ...               Do.
Tioughnioga River, N. Y.1 ....        do                        _- do ...... -     do                              Do.
1Included in report on Susquehanna River, N. Y., Pa., and Md., by division engineer, North Atlantic
Division.
132             T OF             OF   E~-iAt         S,   U.   S. ~MY,    1942

  IMPROVEMENT OF RIVERS AND HARBORS IN THE
          PHILADELPHIA, PA., DISTRICT
   This district comprises a portion of southeastern New York, east-
ern Pennsylvania, western and southern New Jersey, northern and
southeastern Delaware, and a small part of northeastern Maryland
embraced in the drainage basin of the Delaware Bay and River sys-
tem and those basins tributary to the Atlantic Ocean from the head
of Barnegat Bay, N. J., to the south boundary of Delaware. It also
includes the Chesapeake and Delaware Canal and the approach chan-
nel thereto in Chesapeake Bay and Elk River, Md.
  District engineer: Col. H. B. Vaughan, Jr., Corps of Engineers.
   Division engineer: Col. J. N. Hodges, Corps of Engineers, to May
4, 1942, and Col. B. C. Dunn, Corps of Engineers since that date.
                                     IMPROVEMENTS

               Navigation                                 Navigation-Continued
                                      Page                                            Page
1. Delaware. River between
      Philadelphia,    Pa., and
                                               Rancocas River, N. J
                                               13.                             ----   352
                                               Cooper River, N. J -- --
                                               14.                                    353
      Trenton, N. J____                322     15.
                                               Big Timber Creek, N. J ___             354
2. Delaware River, Pa., N. J.,                Raccoon Creek, N. J ......
                                               16.                                    356
      and Del., Philadelphia,                  17.
                                               Salem River, N. J                      357
      Pa., to the sea_                 325     18.
                                               Cohansey River, N. J ..--              358
3. Delaware River at Camden,                  19.
                                               Cold Spring Inlet, N. J ____           360
      N .J. - - - -              -     330     Absecon Inlet, N. J _ _ _
                                               20.                                    362
4. Schuylkill River, Pa ___..         332     Barnegat Inlet, N. J __..
                                               21.                                    364
5. Wilmington Harbor, Del -           334     Examinations, surveys, and
                                               22.
6. Inland waterway from Dela-                   contingencies (general)___           366
      ware River to Chesapeake             23. Other projects for which no
      Bay, Del. and Md ......          337       estimates are submitted__            367
7. Smyrna River, Del___ ----          342 24. Plant allotment -_   __ _              367
8. Little River, Del_ _ __            343
9. Murderkill River, Del .....        344                     Flood control
10. Mispillion River, Del ......       346
11. Inland waterway between                25. Mount   Holly, Rancocas
      Rehoboth Bay and Dela-                    Creek, N. J_________                  369
      ware Bay, Del ___......          347 26. Preliminary  examinations
12. Indian River Inlet and Bay,                 and surveys for flood
      Del_                             350      control__________                     370

       1. DELAWARE RIVER BETWEEN PHILADELPHIA, PA., AND
                         TRENTON, N. J.

   Location.-This river has its source in southeastern New York,
flows in a general southerly direction, forming the boundary line
between the States of New York and New Jersey on the east and
Pennsylvania and Delaware on the west, and empties into Delaware
Bay. (See U. S. Coast and Geodetic Survey Charts Nos. 1218, 280,
294, 295, and 296.)
   Previous projects.-Adopted by River and Harbor Acts of June 10,
1872; March 3, 1875; June 14, 1880; July 5, 1884; August 18, 1894;
March 2, 1907; June 25, 1910; July 25, 1912; June 5, 1920; and March
3, 1925. For further details see page 1778 of the Annual Report for
1915; page 311 of the Annual Report for 1924; page 220 of the
Annual Report for 1934; and page 296, Annual Report for 1938.
   Existing project.-This provides for a channel 28 feet deep and 300
feet wide from Allegheny Avenue, Philadelphia, to the Pennsylvania
              RIVERS AND HARBORS-PHILADELPHIA,                                PA.,    DISTRICT               323
Railroad bridge at Delair; thence 25 feet deep and 300 feet wide to
the upper end of the municipal marine terminal at Trenton, including
a turning basin 500 feet wide and 1,700 feet long at the terminal,
widening the 25-foot channel at bends above Delair, and the main-
tenance of a channel 12 feet deep and 200 feet wide from the upper
end of the 25-foot channel to the Pennsylvania Railroad bridge at
Trenton, dredged under a previous project. The project also pro-
vides for an auxiliary channel 20 feet deep and 200 feet wide east of
Burlington Island extending easterly from the main channel to the
upper end of the United States Pipe & Foundry Co.'s property at
East Burlington, with a turning basin 450 feet wide at the upper end,
aRd for the initial excavation only, of a cross chanel 8 feet deep and
200 feet wide through the artificial island opposite Delanco, N. J.
The total length of the section included in project is about 301/2 miles,
excluding the auxiliary channel east of Burlington Island which is
1.4 miles long, and the cross channel opposite Delanco. The lower
end is about 55 miles above the mouth of the river at Liston Point.
All depths refer to the plane of mean low water. The mean tidal
range at Trenton is 6.2 feet, an increase of 0.8 foot since the comple-
tion of the 25-foot channel. Freshets, which occur usually during
February and March, attain a height of 9 to 20 feet above mean low
water in the vicinity of Trenton. Navigation is usually suspended
during the winter months on account of ice.
   The estimate of cost for new work, revised in 1937, was $5,189,000,
exclusive of amounts expended on previous projects but including
$15,000 contributed funds. T.he latest (1935) approved estimate for
annual cost of maintenance is $131,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                  Documents


July     3, 1930   A channel 28 feet deep, 300 feet wide between         Rivers and Harbors Committee Doe.
                                                                                                     1
                     Allegheny Ave., Philadelphia, Pa., and Delair        No. 3, 71st Cong., 1st sess.
                    Bridge.
Aug. 30,1935   2   Deepening the channel to 25 feet from Delair          Rivers and Harbors Committee Doe.
                     Bridge to Trenton, N. J., and for maintenance        No. 11, 73d Cong., 1st sess.
                    of the 12-foot channel from the upper end of the
                    25-foot project to Pennsylvania R. R. bridge at
                    Ferry St., Trenton.
    Do _-___       Auxiliary channel, 20 feet deep, east of Burlington   Rivers and Harbors Committee Doe.
                                                                                                         1
                    Island.                                                No. 66, 74th Cong., 1st sess.
Aug. 26, 1937      A cross channel 8 feet deep, opposite Delanco,        Rivers and Harbors Committee Doe.
                    N. J.                                                  No. 90, 74th Cong., 2d sess.


  1 Contains latest published maps.
2Also Public Works       Administration, Sept. 6, 1933, and Emergency Relief Administration, May 28, 1935.


  Local coooperationn.-Fully complied with.
  Terminal facilities.-There are 21 piers, wharves, and docks within
the improvement, exclusive of those within limits of city of Phila-
delphia. The facilities are considered adequate for existing com-
merce. (For further details see Port and Terminal Facilities at Port
on the Delaware River 1941, Corps of Engineers.)
324        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                              1942

  Operations and results during fiscal year.-Under maintenance by
hired labor, tide gages were operated and maintained at a cost of
$685.04; and surveys and channel examinations were made at a cost
of $5,840.43.
   The total cost of all work was $6,525.47, for maintenance. The ex-
penditures were $6,350.17.
   Conditionat end of fiscal year.-The existing project was completed
in 1939.
   The latest examinations show minimum depths, at mean low water,
on or near the center line as follows:

    Date                                          Section                                         Project       Present
                           Date                                                                   depth          depth


                                                                                                       Feet       Feet
May 25, 1942     Allegheny Ave. to Delair Bridge                                                          28         28. 3
June 1, 1942     Delair Bridge to Trenton Marine Terminal                                                 25         21.0
May 13, 1941     Trenton Marine Terminal to Pennsylvania R. R. bridge-............                        12          8.8
Apr. 30, 1940    Channel east of Burlington Island  _______________                                       20         13. 5



   The total costs and expenditures under the existing project were
as follows:
                                             Public Works        Emergency          Regular funds              Total
                                                 funds           Relief funds        euar

New work-----------_     ------------- $2, 189, 955. 51 $2, 636, 456. 26              $363, 405. 46       $5, 189, 817. 23
Maintenance__________________________ _______________ _______________                  898, 927. 19          898, 927. 19
      Total__________________________          2, 189, 955. 51    2, 636, 456. 26    1, 262, 332. 65        6, 088, 744. 42
Expenditures_.    ..   -   -    -    -_        2, 189, 955. 51    2, 636, 456. 26    1, 261, 491. 25        6, 087, 903.02


  In addition, $15,000 contributed funds were expended for new
work.
  Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1942, amounting to $210,655.91 as follows:
Accounts payable June 30, 1942 __--------------------------------    $841. 40
Maintenance:
    Dredging in 25-foot channel from Delair Bridge to Bordentown
      with a United States hopper dredge, and rehandling with a
      pipe-line dredge (October to November 1942) ________        140, 014. 51
    Dredging in 25-foot channel from Bordentown to Trenton Marine
      Terminal by contract (September to November 1942) -------- 69, 800. 00

           Total               --------------------------------------------                               210, 655. 91
  The sum of $200,000 can be profitably expended during the fiscal
year 1944 in maintenance dredging in the 28-foot, 25-foot, 20-foot, and
12-foot channels as required.
                                     Cost and financial summary
Cost of new work to June 30, 1942_-----------------------
                                       _$7,                                                               678, 990. 68
Cost of maintenance to June 30, 1942--_ ----------------------                                          , 451, 647. 65
     Total cost of permanent work to June 30, 1942-----------9, 130, 638. 33
Minus accounts payable June 30, 1942-------------------------        841. 40
         Net total expenditures ------------                                                      19, 129, 796. 93
Unexpended balance June 30, 1942 ------------------------                                                210, 655. 91
         Total amount appropriated to June 30, 1942-.--------                                          9, 340, 452. 84
   1 In addition $15,000 contributed funds expended for new work.
             RIVERS       AND HARBORRS-PHILADELPHIA,                                            PA.,   DISTRICT               325

   Fiscal year ending June 30               1938           1939                     1940                 1941              1942

Cost of new work       ............       . _. ...       $62,116. 02                       _           $16, 612.19
Cost of maintenance--.--....- -.          $71, 619. 26    72, 140. 25             $9, 166. 83          142, 920. 89        $6, 525. 47

        Total cost-----------------        71, 619. 26   134, 256. 27               9,166. 83          159, 533. 08         6, 525. 47

Total expended----------------            166, 495. 57   159, 638. 01           -- 94, 348. 95         142, 537. 67         6, 350. 17
Allotted_---------   ----------.-     -   311,104. 07    149, 295.09            -141,973. 34           148, 453. 44        56, 300. 00



Balance unexpended July 1, 1941 _                                 -----------                                         $160, 706. 08
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942_-_______111111                                                                                 6---------
                                                                                                                       63, 500. 00

     Amount to be accounted for___                                                                                     224, 206. 08
Deductions on account of revocation of allotment                                 ------------                            7, 200. 00

      Net amount to be accounted for----------------------_                                                            217, 006. 08
Gross amount expended--------------------------------------                                                              6, 350. 17

      Balance unexpended June 30, 1942 ---------------------                                                           210, 655. 91
Outstanding liabilities June 30, 1942____________ ____..                                         --------                   841. 40
          Balance available June 30, 1942-....                                                                         209, 814. 51

Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance 2- - - - - - - - - - - - - - - - - - - - - - - - - - - -                               200, 000. 00
   2   Exclusive of available funds.

2. DELAWARE RIVER, PA., N. J., AND DEL., PHILADELPHIA, PA., TO
                           THE SEA
   Location.-See page 322, also United States Coast and Geodetic
Survey Charts Nos. 1218, 294, 295, and 280.
   Previous projects.-Adopted by River and Harbor Acts of July 4,
1836; March 3, 1873; March 3,1875; June 18, 1878; March 3,1879;
July 5,1884; August 11, 1888; and March 3, 1899. For further de-
tails, see page 1779 of Annual Report for 1915 and page 299, Annual
Report for 1938.
   Existing project.-This provides for a channel 35 feet deep from
Allegheny Avenue, Philadelphia, Pa., to the Philadelphia-Camden
Bridge, thence 37 feet deep to the Philadelphia Navy Yard, thence 40
feet deep to deep water in Delaware Bay, 800 feet wide in the straight
reaches from the bridge to a point in Delaware Bay near Ship John
Light, thence 1,000 feet wide to deep water in Delaware Bay, with
1,200 feet width at Bulkhead Bar and 1,000 feet width at other bends
and in Philadelphia Harbor. The project includes the construction
of dikes and training works for the regulation and control of the
tidal flow and dredging to provide for an anchorage 35 feet deep and
about 6,400 feet long at Port Richmond; for an anchorage area 30
feet deep and about 3,500 feet long at Gloucester, N. J.; for an anchor-
age 35 feet deep and about 7,300 feet long in the vicinity of Mantua
Creek; and for an anchorage 35 feet deep, 1,200 feet wide, and aver-
aging 5,700 feet long at Marcus Hook, Pa.; for straightening the
channel and extending the 1,000-foot width from Philadelphia Har-
bor to Horseshoe Bend; and for the maintenance of any areas
dredged by local interests to a depth of 35 feet between the channel
and a line 100 feet channelward of the pierhead line between Point
326           REPORT OF CHIEF OF ENGINEERS,                          U.   S.   ARMY,     1942


House wharf and the Philadelphia Navy Yard, when in the opinion
of the Chief of Engineers such areas are so located as to be of benefit
to general navigation. The total length of the section included in the
project is about 96.5 miles. All depths refer to the plane of mean
low water.
   The mean range of tide at various points on the river and bay is as
follows: Philadelphia, Pa., 5.5 feet; Chester, Pa., 5.4 feet; New Cas-
tle, Del., 5.3 feet; Liston Point, Del., 5.6 feet; and Lewes, Del., 4.1
feet. Under the influence of heavy and long-continued winds the
extreme range of tide is about 14 feet. The normal maximum ve-
locity of tidal current in the dredged channel varies between 2 and
31/2 miles per hour. Storm tides may increase the maximum to as
much as 41/2 miles per hour.
   The estimate of cost for new work, revised in 1941, is $26,200,000,
exclusive of amounts expended on previous projects. The latest
 (1938) approved estimate for annual cost of maintenance is
$1,700,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                      Work authorized                                  Documents


June 25, 1910     Channel 35 feet deep from Allegheny Ave., Phila-   H. Doc. No. 733, 61st Cong., 2d sess.
                    delphia, Pa., to Delaware Bay.
July 3, 1930      For 35-foot anchorages at Port Richmond and        H. Doe. No. 304, 71st Cong., 2d sess.t
                 Mantua Creek, a 30-foot anchorage at Glou-
                 cester, N. J., and extending the 1,000-foot chan-
                 nel width in Philadelphia Harbor to Horseshoe
                 Bend.
Aug. 30, 1935 2 For a 35-foot anchorage at Marcus Hook, Pa __        Rivers and Harbors Committee Doc.
                                                                       No. 5, 73d Cong., 1st sess.
June 20, 1938     For channel 37 feet deep from Philadelphia-Cam-    S. Doc. No. 159, 75th Cong., 3d sess.l
                   den Bridge to the navy yard, thence 40 feet
                   deep to deep water in Delaware Bay.


  1Contain latest published   maps.
  2   Also Public Works Administration, Sept. 6, 1933.


   Recommended modifications of project.-Under date of January
11, 1940, the Chief of Engineers recommended modification of the
existing project so as to provide for a depth of 37 feet in the channel
from Allegheny Avenue to the Philadelphia-Camden Bridge and in
Port Richmond Anchorage, at an estimated cost of $1,036,000 for new
work and $25,000 annually for maintenance in addition to that now
authorized (H. Doc. No. 580, 76th Cong., 3d sess.).
   Under date of June 4, 1941, the Chief of Engineers recommended
further modification of the existing project so as to provide for an
anchorage area at Mantua Creek 37 feet deep, 1,400 feet wide and hav-
ing a mean length of 11,600 feet, and for an anchorage area at Marcus
Hook, of the same depth and width and with mean length of 10,500
feet, both with suitable flared approaches, at an estimated first cost
for dredging of $3,380,000, with $75,000 annually for maintenance in
addition to the amount now required (H. Doc. No. 340, 77th Cong.,
1st sess.).
       RIVERS AND    HARBOtRS-PHILADELPHIA,      PA.,   DISTRICT   327
  Local cooperation.-The River and Harbor Act of June 20, 1938,
imposes the condition that the cities of Philadelphia and Camden shall
agree to dredge not less than 110,000 cubic yards annually in maintain-
ing the channel and anchorages in Philadelphia Harbor between Alle-
gheny Avenue and the mouth of Schuylkill River. This condition will
become effective after completion of initial dredging of the 40-foot and
37-foot channels.
   Terminal facilities.-There are 291 wharves on the river between
Allegheny Avenue, Philadelphia, and the sea, 235 located on the water-
front of Philadelphia and Camden, and 56 below Philadelphia.
Twelve are owned by the United States, 3 by the State of New Jersey,
33 by municipalities, 75 by railroad companies, and 168 by private
interests. The public and railroad piers are open to public use, some
free and others on payment of charges. Most of the piers which are
equipped to handle general cargo have direct rail connections with
three railroad systems operating in the area. The facilities are con-
sidered adequate for existing commerce. (For further details see Port
and Terminal Facilities at Ports on the Delaware River 1941, Corps
of Engineers.)
   Operations and results during fiscal year-New work-Contract.-
Dredging the channel to 40 feet on Tinicum, Bellevue, Cherry Island,
Bulkhead Bar, and New Castle ranges by a leased pipe-line dredge in
progress at the end of the previous fiscal year was completed Febru-
ary 20, 1942. There were removed 5,464,400 cubic yards of material
at a cost of $618,035.44.
   Drilling in connection with the removal of ledge rock to 41 feet
in the west half of the channel on Marcus Hook, Chester, Eddystone,
and Tinicum ranges was commenced April 20, 1942, and was in progress
at the end of the fiscal year. No material was removed. The cost
was $13,025.40.
   New work-Hired labor.--Dredgingin the channel to 40 feet from
that depth in Delaware Bay to the Philadelphia Navy Yard in progress
at the end of the previous fiscal year was completed February 28, 1912.
Plant operating on this work included the U. S. hopper dredges At-
lantic, Chinook, Clatsop, Delaware, Goethals, Harding, Manhattan,
Marshall, Navesink, New Orleans, Raritan and Rossell. There were
removed and deposited in rehandling basins or outside the channel
limits 26,290,428 cubic yards, bin measurement, of material. The cost
of dredging, including rehandling by pipe-line dredges, was $3,049,-
403.17. In addition, 499,833 cubic yards of material was removed by
the U. S. pipeline dredge Gulfport at a cost of $62,715.97, and 769,830
cubic yards of material was removed by scouring by the hopper dredge
Chinook at a cost of $12,997.97.
   Other costs were: Sweeping and boulder removal by the U. S. der-
rick boats Babcock, Rattler, and No. 32, $114,366.93, and rental of
buoys from United States Coast Guard for marking channel during
dredging operations, $21,439.10, a total of $135,806.03.
   The channel from the Philadelphia Navy Yard to the sea, except
ledge rock areas on Marcus Hook, Chester, Eddystone, and Tinicum
Ranges, was completed to project dimensions.
   Maintenance-Contract.-Dredgingthe channel to 40 feet on Eddy-
stone and Tinicum ranges by leased pipe-line dredge was in progress
at intervals from April 1, 1942, to the end of the fiscal year. There
328        REPORT OF CHIEIF OF ENGINEERS,                            U.   S. ARMY,                1942


were removed 571,085 cubic yards of material at a cost of $47,239.53.
   The construction of a training dike in Delaware River at Penns-
ville, N. J., commenced April 20, 1942, was 1 percent completed at
the end of the fiscal year. The cost was $20,551.76.
   Maintenance-Hired labor.-Dredging in the 35-foot and 40-foot
channels where required was in progress throughout the year. Plant
operating on this work included the U. S. hopper dredges Atlantic,
Chinook, Clatsop, Delaware, Goethals, Manhattan, Navesink, New
Orleans, Raritan, and Rossell. There were removed 20,500,198 cubic
yards of material. The cost, including rehandling by pipe-line
dredges was $2,035,381.98. Other costs were operation of tide gages,
$1,058.57; surveys and channel examinations, $54,337.97; resurvey
of Delaware River and Bay from Philadelphia to Bombay Hook
Point, Del., $10,985.24, and model studies of shoaling in the channel
on Deepwater.Point, New Castle, and Finns Point ranges by the
United States Waterways Experiment Station, Vicksburg, Miss.,
$13,828.64; a total of $80,210.42.
   Total costs for all work were $3,891,983.98 for new work, and
$2,183,383.69 for maintenance, a total of $6,075,367.67. The total ex-
penditures were $6,280,654.48.
   Condition at end of fiscal year.-The existing project was about 93
percent completed. The 40-foot channel from the Philadelphia Navy
Yard to the sea, except ledge rock areas on the west half of Marcus
Hook, Chester, Eddystone, and Tinicum ranges has been completed.
The work remaining to be done is the removal of ledge rock to a depth
of 41 feet now in progress on the west half of the channel on Marcus
Hook, Chester, Eddystone, and Tinicum ranges, the removal of
boulder uncovered by dredging, and the dredging of the channel from
the Philadelphia Navy Yard to the Philadelphia-Camden Bridge to
a depth of 37 feet.
   The latest examination shows controlling depths, at mean low
water, available to navigation as follows:

                                                                                                  Project       Present
    Date                                       Section                                            depth          depth
                                                                                                                 (feet)
                                                                                                   (feet)


June 29, 1942   Allegheny Ave. to Philadelphia-Camden Bridge.                  .....--------------------- 35           31.7
Apr. 21, 1942   Philadelphia-Camden Bridge to navy yard----------------             ----------           37            34.4
June 19, 1942   Navy yard to the sea_                     _                                              40            36. 7




  The costs and expenditures under the existing project were as
follows :

                                                              Public Works Regular funds
                                                                 funds                                         Total


New work-            ___     _-__              _-__      _    $813, 045. 79      $23, 471, 354. 28      $24, 284, 400. 07
Maintenance. ___________________ ___________________ __________________ __        33, 316, 188. 03       33, 316, 188. 03
     Total ______________________________________________       813, 045. 79      56, 787, 542. 31        57, 600, 588. 10
Expenditures .___________________________________________       813, 045. 79      56, 696, 783. 09        57, 509, 828. 88
                RIVERS AND HARBORS-PHILADELPHIA,                                                          PA., DISTRICT                   329
  Proposed operations.--It is proposed to apply the funds unex-
pended on June 30, 1942, amounting to $4,260,922.62 as follows:
Accounts payable June 30, 1942--------------------------------                                                                   $90, 759. 22
New work:
    Continue and complete removal of ledge rock on west half of
      Marcus Hook, Chester, Eddystone, and Tinicum ranges by
     contract, in force (July 1942 to December 1943)-----------                                                            2, 437, 615. 43
    Sweeping and removing boulders by a United States derrick-
      boat (July to October 1942) -----------------------------                                                                   45, 000. 00

        Total new work _________-------------------------        2, 482, 615. 43
Maintenance :
   Continue and complete construction of training dike in river
      near Pennsville, N. J., by contract in force (July 1942 to
      December 1943) ---------------------------------              496, 312. 08
    Continue and complete maintenance dredging by leased plant
      (July to August 1942) ----------------------------------      124, 860.47
    Dredging with United States hopper dredges and rehandling
      with pipe-line dredges as required throughout the year___ 1, 066, 375. 42
                Total maintenance_____---_                             -------------------                                 1, 687, 547. 97

                Total for all work__----------_                         -------------------------                          4, 260, 922.62
  The sum of $2,743,700 can be profitably expended during the fiscal
year 1944, as follows:
New work: Dredging 37-foot channel from Philadelphia Navy Yard
  to the Philadelphia-Camden Bridge by United States hopper
  dredges and rehandling by United States pipeline dredges_ __-__ $743, 700. 00
Maintenance: Dredging in 35-foot, 37-foot, and 40-foot channel by
  United States hopper dredges and rehandling by United States
  pipe-line dredges throughout the year as required __---_______ 2, 000, 000. 00

            Total --------------------------------------------------                                                          2, 743, 700.00
    The proposed new work will complete the project.
                                             Cost and financial summary
Cost of new work to June 30, 1942--------------------------                                                            $37, 260, 457. 68
Cost of maintenance to June 30, 1942_______.  ____________                                                              34, 341, 597.05
      Total cost of permanent work to June 30, 1942                                               ----------              71, 602, 054. 73
Minus accounts payable June 30, 1942 -----------------------                                                                   90, 759. 22
     Net total expenditures--------------------------------                                                               71, 511, 295. 51
Unexpended balance June 30, 1942--------------------------                                                                 4, 260, 922. 62
            Total amount appropriated to June 30, 1942-------------                                                       75, 772, 218. 13

    Fiscal year ending June 30                       1938                   1939                 1940              1941                 1942

Cost of new work .....                                                                       $245, 498. 84 $2, 312, 643. 26        $3, 891, 983. 98
Cost of maintenance ----                     $1, 109, 951. 88 $1, 219, 109. 90              1, 344, 955. 93 1, 230, 649. 43         2,183,  383.69
         Total cost..........--         --    1,109, 951.88            1,219,109.90         1, 590, 454. 77    3, 543, 292. 69      6, 075, 367. 67
Total expended            .-.........         1, 147, 225. 10          1,022, 689. 38        -38, 459. 52      3, 299, 383. 44      6, 280, 654. 48
                                                                   1,5 271 66.
                                                                             30,00000         354 25. 0         , 73,95. 0          722600.0
Allotted ......----...........                                                                                                      7,226,000.00
                                             S1,   827,   668.15       1 1, 360, 000.00 1     354255.00       1 4,973,90.00
:330          REPORT OF CHIEF OF ENGINEERS,                                      U.     S. ARMY,               1942

Balance unexpended July 1, 1941--------------------------                                                      $3, 315, 577. 10
Amount allotted from War Department Civil Ap-
  priatio Act approved June 24, 1940-----------$2, 416,000
Amount allotted from War Department Civil Ap-
  priation Act approved Apr. 28, 1942-----------   2, 110, 000
Amount allotted from Third Second National De-
  fense Appropriation Act approved Dec. 17, 1941__ 2, 700, 000
                                                                                                                7, 226, 000. 00

      Amount to be accounted for-----____----___                                 ____--                   --   10, 541, 577. 10
Gross amount expended --     --                                                                                  , 280, 654. 48
                                                                                                                6---------------------------

      Balance unexpended June 30, 1942---------------------                                                     4, 260, 922. 62
Outstanding liabilities June 30, 1942-----------    $74, 472. 18
Amount covered by uncompleted contracts--..      3, 075, 075. 02
                                                                                                                3,149, 547. 20

          Balance available June 30, 1942----------------------                                                 1, 111, 375. 42

Amount (estimated) required to be appropriated for completion
of existing project 1____------------------------------                                                           743, 700. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1944:
   For new work -7--------------------------------------                                                            43, 700. 00
   For maintenance 1________----------------------                                                              2, 000, 000. 00
                     - --- - - - -     - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - -
          Total 1-                                                                                              2, 743, 700. 00
  1 Exclusive of available funds.

                          3. DELAWARE RIVER AT CAMDEN, N. J.
   Location.-Camden, N. J., is located on the east bank of the Dela-
ware River, directly opposite the city of Philadelphia, Pa. It is
about 55 miles above the mouth of the river and about 101 miles above
the harbor of refuge at the mouth of Delaware Bay. (See U. S. Coast
and Geodetic Survey Charts Nos. 295 and 280.)
   Previous projects.--Adopted by River and Harbor Act of June 25,
1910. No work was done on this project. For further details see
page 321, Annual Report for 1932.
   Existing project.--This provides for dredging in front of Camden
to a depth of 18 feet at mean low water from that depth north of
Cooper Point to Berkley Street and 30 feet from the latter point to
Newton Creek, these depths to extend from the 35-foot channel in the
Delaware River to a line parallel with and 50 feet distant from the
established pierhead line. The distance from Cooper Point to Berkley
Street is about 1.5 miles, and from Berkley Street to Newton Creek
is about 2.5 miles. The mean range of tide is 5.5 feet, and the extreme
range under the influence of prolonged heavy winds is about 14 feet.
   The estimate of cost for new work, revised in 1930, was $480,300,
exclusive of $15,000 contributed funds. The latest (1930) estimate
for annual cost of maintenance is $25,000.
   The existing project was authorized by the following river and
harbor acts:
       Acts                          Work authorized                                                Documents

Mar. 2,1919        For a depth of 30 feet from Newton Creek to                     H. Doc. No. 1120, 63d Cong., 2d sess.l
                    Kaighn Point, thence 18 feet to Cooper Point.
July     3, 1930   Extending the 30-foot depth upstream to Berkley                 H. Doc. No. 111, 70th Cong., 1st sess.l
                    St. Terminal.
  1 Contain latest published maps.
            RIVERS       AND HARBORS-PHILADELPHIA,                                 PA.,     DISTRICT        331

   Recommended modifications of project.-Underdate of June 3, 1941,
the Chief of Engineers recommended modification of the existing
project so as to provide for a depth of 37 feet between the deep ship
channel and a line 50 feet channelward from the established pierhead
line in front of the Camden Marine Terminals, extending about 2,900
feet along the inshore side and about 5,100 feet along the ship channel,
at an estimated first cost of $373,000, with no increase in the estimated
annual cost for maintenance, subject to certain conditions of local
cooperation (H. Doc. No. 353, 77th Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 60 piers, wharves, and docks along
the Delaware River water front at Camden, including 3 oil terminals
on Pettys Island. Two are modern terminals designed for overseas
and domestic general cargo, and are open to all carriers on equal terms.
They are the Beckett Street Terminal, owned by the South Jersey Port
District, and the Spruce Street Municipal Pier, owned by the city of
Camden. The piers have direct railroad connections. The facilities
are considered adequate for existing commerce. (For further details
see Port and Terminal Facilities at Port on the Delaware River 1941,
Corps of Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was completed
in 1931. The latest examination (June 1941) Indicates that project
depths are well maintained except along the eastern border of the
project.
   The costs and expenditures under the existing project, excluding
$15,000 contributed funds expended for new work, were $462,905.66 for
new work and $68,715.77 for maintenance, a total of $531,621.43.
   Proposed operations.-Itis proposed to apply the funds unexpended
on June 30, 1942, amounting to $66,070.39 as follows:
Maintenance :
    Dredging in front of Camden Marine Terminal and upper end of
      project, by contract (March to June 1943) ------------------- $29, 070.39
   Balance available_______-_-_------------------- _    _            37,000. 00
     Total------------------------------ ----------------------- 66,070.39
  The sum of $40,000 can be profitably expended during the fiscal year
1944 in maintenance dredging by contract.
                                      Cost and financial summary
Cost of new work to June 30, 1942------------------------------ 1$462, 905. 66
Cost of maintenance to June 30, 1942-----------------------------  68, 715. 77
      Total cost of permanent work to June 30, 1942-------------- 531, 621. 43
     Net total expenditures----------------------------         5------
                                                                 31,621. 43
Unexpended balance June 30, 1942--------------------------.      66 070 39
     Total amount appropriated to June 30, 1942--5-------------597, 691. 82
   ' In addition $15,000 contributed funds expended for new work.


  Fiscal year ending June 30-                1938          1939             1940              1941        1942

Cost of new work                     -- -    ------
                                              -.           .------------
                                                                      -------------       ---------.
Cost of maintenance------     _---          $21,970.43   $43, 812. 31        $350. 21          $329. 40
      Total cost    ..-- _--------- - 21. 970. 43         43 812. 31         350. 21           399.40
Total expended .. _ . _ _         -...20. 990. 90         44. 791 84    -    347. 00           .2 1
Allotted.        .... ........        67, 000. 00         21, 282. 74     50,000.00       -22, 750 00     17,000.00
332           REPORT OF CHIE F OF ENGINEERS, U. S. ARMY,                                      1942

Balance unexpended July 1, 1941______________                                                      $49, 070. 39
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942----------------------------                                                29, 000. 00

      Amount to be accounted for_----------------------_                                            78, 070. 39
Deductions on account of revocation of allotment -    --                               ____         12, 000. 00
      Net amount to be accounted for __                                                             66, 070. 39
Balance unexpended June 30, 1942_ ----------------------------                                      66, 070. 39

Amount that can be profitably expended in fiscal year ending June
                            -  ---- -----
30, 1944, for maintenance 2 _ _    _                                                               40, 000. 00
  2Exclusive       of available funds.

                                     4. SCHUYKILL RIVER, PA.

   Location.-This river has its source in Schuylkill County, Pa.,
flows in a general southeasterly direction, and empties into the
Delaware River at Philadelphia, Pa. (See U. S. Coast and Geodetic
Survey Charts Nos. 295 and 280.)
   Previous projects.-Adopted by River and Harbor Act of July 11,
1870, and modified April 26, 1892. For further details see page 325,
Annual Report for 1932.
   Existing project.-This provides for a channel 30 feet deep and 400
feet wide in Delaware River to the mouth and within the river to
Twenty-Ninth Street,                  3/4
                         mile above the mouth; thence the same depth
and 300 feet wide to Passyunk Avenue Bridge, 31/2 miles above the
mouth; thence 26 feet deep and 200 feet wide to Gibsons Point, 41/2
miles above the mouth; and thence 22 feet deep and 200 feet wide to
University Avenue Bridge, 6 miles above the mouth, including widen-
ing at bends. The total length of the section included in the project
is about 61/2 miles. All depths refer to the plane of mean low water.
The mean tidal range at the mouth is 5.4 feet and at Grays Ferry
Bridge about 1/2 mile below University Avenue Bridge, 5.8 feet. The
extreme tidal range, due to freshets and prolonged heavy winds is
about 14 feet.
   The estimate of cost for new work, revised in 1930, is $1,490,000,
exclusive of amounts expended on previous projects. The latest
(1930) approved estimate for annual cost of maintenance is $200,000,
in addition to $1,300,000 required to restore the project depths
between the mouth and Passyunk Avenue Bridge.
   The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                     Documents


Aug.     8,1917    For depths of 35 feet from mouth to Girard Point,      H. Doc. No. 1270, 64th Cong., 1st sess.
                     thence 30 feet, 26 feet, and 22 feet to University
                     Ave. Bridge, Philadelphia.
July     3, 1930   For a depth of 30 feet instead of 35 feet between      Rivers and Harbors Committee Doc.
                     the mouth and Girard Point, and for the con-          No. 40, 71st Cong., 2d sess; (Con-
                     ditional restoration and maintenance of the           tains latest published maps.)
                     channel below Passyunk Ave. by the United
                     States.
           RIVERS AND HARBORS-PHILADELPHIA,                                PA.,   DISTRICT            333
   Local cooperation.-The existing project, as originally adopted, im-
posed the condition that the city of Philadelphia or the State of
Pennsylvania should maintain the improved channel until the com-
pletion of the city's projected sewage-treatment works. The River
and Harbor Act of July 3, 1930, provides for restoration and main-
tenance of the project from the mouth to Passyunk Avenue Bridge by
the United States in advance of the completion of the municipal
sewage-treatment works, provided the city of Philadelphia shall give
assurances satisfactory to the Secretary of War and the Chief of Engi-
neers that it will dredge not less than 300,000 cubic yards annually in
maintaining the channel above Passyunk Avenue Bridge and in coop-
eration with the United States in channel maintenance below Pass-
yunk Avenue. On December 23, 1930, the Secretary of War approved
an ordinance passed by the City Council of Philadelphia, and letter
from the mayor giving assurance that the required annual dredging
will be done, as satisfactory compliance with the project requirements
for local cooperation.
    Terminal facilities.-There are 39 wharves located within the limits
of the improvement. These terminals are considered adequate for
existing commerce. (For further details see Port and Terminal facili-
ties at Port on the Delaware River 1941, Corps of Engineers.)
    Operations and results during fiscal year.-Maintenance dredging
in the channel between Delaware River and Passyunk Avenue Bridge
by the U. S. hopper dredge Clatsop was in progress from July 1 to
August 2, 1941, and from January 13 to March 4, 1942, a total of
567,231 cubic yards, bin measurement, of material was removed at a
cost of $91,181.12. Surveys and channel examinations were made at
a cost of $5,194.66 for maintenance. The total cost was $96,375.78 for
maintenance. The expenditures were $95,065.78.
    In compliance with local cooperation requirements, the city of Phila-
delphia dredged a total of 311,740 cubic yards of material from the
channel above Passyunk Avenue Bridge.
    Condition at end of fiscal year.-The existing project was about 98
percent completed. The work remaining to be done is the removal
of a few rock shoals in the channel above Passyunk Avenue Bridge.
  This work will be deferred until the overlying mud shoals are removed
by the city of Philadelphia as required under the project.
    The latest examination (June 1942) showed controlling depths, at
  mean low water, available to navigation as follows:

                                      Section                                       Project        Present
                                                                                   depth feet     depth feet

                                                                                      Feet           Feet
Delaware River to Twenty-ninth St-------_---------------------------------____               30             27.8
Twenty-ninth St. to Passyunk Ave__-------_------       ---------------------------
                                                                          _                  30             26.2
Passyunk Ave. to Gibson Point--------------------------------.---------------            -26                11.5
Gibson Point to University Ave ---------------------------------------------               22               10.8



  The costs under the existing project were $1,456,001.01 for new
work and $2,917,675.94 for maintenance, a total of $4,373,676.95.
The expenditures were $4,372,975.65.

        493202-43-pt. 1, vol. 1-22
334         REPORT OF CHIEF OF ENGINEERS,                                          U. S. ARMY,                       1942

  Proposed.operations.--It is proposed to apply the funds unex-
pended on June 30, 1942, amounting to $254,139.03, as follows:
Accounts payable June 30, 1942__ _______________
                                          --            _________      $701.30
Maintenance: Dredging from Delaware River to Passyunk Avenue
  Bridge with a United States hopper dredge, including rehandling
  with a United States pipe-line dredge as required during the fiscal
  year               ----------------------------------      ------ 253, 437. 73
          Total ---             --------------------                                                                       254, 139. 03
  The sum of $250,000 can be profitably expended during the fiscal
year 1944 for channel maintenance from Delaware River to Passyunk
Avenue Bridge, with Government plant.
                                         Cost and financia summary
Cost of new work to June 30, 1942________________    _________ $1, 981, 001. 01
Cost of maintenance to June 30, 1942 ----------------       __ 2, 917, 675. 94
     Total cost of permanent work to June 30, 1942                                       ----------                   4, 898, 676.95
Minus accounts payable June 30, 1942 ______________________                                                                   701. 30
      Net total expenditures___ ----------       _________                                                            4, 897, 975. 65
Unexpended balance June 30, 1942___________________________                                                              254, 139.03
         Total amount appropriated to June 30, 1942                                                                   5, 152, 114. 68

  Fiscal year ending June 30-                  1938               1939                1940                    1941               1942


Cost of new work..      ----------           ...-----------   - - ------       -     -       -    -       -          - -       - ... .
Cost of maintenance.        ...------------$65, 243. 22        $233, 817.51        $209,285.65        $71, 286. 49              $96, 375. 78

      Total cost-------------
                .............--- 65, 243. 22                    233, 817. 51       209, 285. 65        171, 286. 49              96, 375. 78
Total expended -----------------              60,145. 72        244, 006. 59       195,180. 96         187, 625. 73             95, 065. 78
Allotted..........---------------------. 265, 500. 00           180.000. 00        214,000. 00         198.614. 68              167,000.00
Balance unexpended July 1, 1941                                                                                         $182, 204. 81
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942                                                                                                      167,000. 00
      Amount to be accounted for__--     -------                                                                 -           349, 204. 81
Gross amount expended___--- ------------                                                                                      95,065. 78
      Balance unexpended June 30, 1942_------             ---                                                                254,139. 03
Outstanding liabilities June 30, 1942-__ ------------------                                                           ----       701. 30
         Balance available June 30, 1942 --------------                                               -         _--          253, 437. 73

Amount (estimated) required        to be appropriated for completion
                       -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -   - - -
of existing project 1                                                                                                        34, 000. 00
Amount  that can be profitably    expended         in  fiscal    year     ending        June
30, 1944, for maintenance 1_____----- --                                ____________                                        250, 000. 00
   1 Exclusive of available funds.

                                   5. WILMINGTON HARBOR, DEL.
  Location.-This harbor is formed by Christina River, which rises
in New Castle County, Del., flows northeasterly 16 miles, passing
through the city of Wilmington, Del., and empties into Delaware
River about 29 miles below Philadelphia, Pa. (See U. S. Coast and
Geodetic Survey Chart No. 294.)
  Previous projects.-Work was done on Christina River from 1836
to 1838. The original project was adopted by River and Harbor
Act of July 11, 1870, and modified by River and Harbor Acts of
March 3, 1881, and July 5, 1884. For further details see page 1785
of Annual Report for 1915 and page 308 of Annual Report for 1938.
              RIVERS AND           HARBOiRS--PHILADELPHIA,                      PA.,    DISTRICT            335
   Existing project.-This provides for a channel 30 feet deep and
400 feet wide in Delaware River to the mouth of Christina River and
within the river to Lobdell Canal, 3/4 mile above the mouth; thence
21 feet deep and 250 feet wide to the mouth of Brandywine River,
1% miles above the mouth; thence the same depth and 200 feet
wide to the pulp works, 33/4 miles above the mouth; thence de-
creasing to a depth of 10 feet in 750 feet to the Pennsylvania Rail-
road bridge No. 4; and thence 7 feet deep and 100 feet wide to New-
port, 9 miles above the mouth, including an inner basin 30 feet deep
formed by widening the channel to an average width of 600 feet and
extending approximately 4,400 feet upstream from the mouth to
Lobdell Canal. It also provides for the removal of about 1,200 feet
of the outer end of a stone-filled, pile and timber-crib jetty con-
Atructed 2,150 feet long on the north side of the entrance; for a
steel-sheet pile jetty 2,300 feet long, with 120-foot inshore wing, on
the south side of the entrance; and for a -shaped stone-filled pile
and timber jetty at the mouth of Brandywine River, 430 feet long
on the Brandywine side and 260 feet long on the Christina side.
The total length of the section included in the project is about 9
miles. All depths refer to the plane of mean low water. The mean
tidal range at the mouth is 5.1 feet, and at Newport 3.9 feet. The
extreme tidal range due to prolonged heavy winds is about 13 feet.
   The estimate of cost for new work, revised in 1935 to include the
cost of the south entrance jetty, was $1,197,700, exclusive of amounts
expended on previous projects. The latest (1930) approved estimate
for annual cost of maintenance is $281,000, of which $152,000 is the
estimated cost for annual maintenance of the 30-foot channel.
   The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                      Documents


June  3, 1896                                                             H. Doc. No. 66, 54th Cong., 1st sess.;
Mar.  3,1899    For depths of 21, 10, and 7 feet, and for jetties -_ __     Annual Report, 1896, p. 973; Annual
       Mar3,1899Report,                                                            1897, p. 1250.1
July 25, 1912 Purchase or construction of a dredge and auxil-              H. Doc. No. 359, 62d Cong., 2d sess.
                    iaries, including a wharf and depot, and for
                    maintenance of the project.
                   Entrance channel and basin with 25-foot depth          H. Doc. No. 114, 67th Cong., 1st sess.,
     22,1922
MarSept.            and for construction by local interests of the         and Senate Committee Print, 68th
                    new south jetty.                                        Cong., 1st sess.1
July     3, 1930   For 30-foot depth between Delaware River and           Rivers and Harbors Committee Doc.
                    the Lobdell Canal and modification or removal           No. 20, 71st Cong., 2d sess.'
                 of a portion of the north jetty.
Aug. 30, 1935 2 Completion of the new south jetty by the United           Rivers and Harbors Committee Doc.
                    States; subject to the provision that the city of       No. 32, 73d Cong., 2d sess.
                    Wilmington shall reimburse the United States
                    for the cost, without interest, of any part of the
                    structure that may subsequently be occupied
                    and utilized for the city activities.
Oct. 17, 1940      Permit temporary occupancy by the city of Wil-         H. Doc. No. 658, 76th Cong., 3d sess.
                    mington of any part of the south jetty for city
                    activities under revocable license, provided the
                    occupied portion of the jetty is properly main-
                    tained without expense to the United States.


  I Contain latest published maps.
  2 Also May 28, 1935, under Emergency Relief Administration.
336          REPORT OF CHIEF OF ENGINEERS,                                 U.       S. ARMY,          1942

   Local cooperation.-Fully complied with.
   Terminal facilities.-A modern marine terminal is located just
inside the entrance to the harbor. This terminal is operated for the
city of Wilmington by a board of harbor commissioners, and is
open to all on equal terms. Railroad connection on the terminal
wharf provides for direct interchange of freight between car and
ship. There are 34 other wharves and landings within the Chris-
tina River which forms the harbor. The facilities are considered
adequate for existing commerce. (For further details see Port and
Terminal Facilities at Ports on the Delaware River 1941, Corps of
Engineers.)
   Operations and results during fiscal year.-Maintenance dredging
in the channel between Delaware River and Lobdell Canal by the
U. S. hopper dredges Rossell, Clatsop, and Hains was in progress at
intervals during the year. There were removed a total of 1,074,343
cubic yards, bin measurement, of material at a cost of $105,404.22.
Dredging in the channel between Lobdell Canal and Market Street
Bridge by the U. S. hopper dredge Absecon was in progress from
December 29, 1941, to March 5, 1942. There were removed a total of
188,877 cubic yards, bin measurement, of material at a cost of $47,-
907.05. Surveys and channel examinations were made at a cost of
$2,495.50 for maintenance. The cost of all work was $155,806.77 for
maintenance. The expenditures were $149,722.76.
   Condition at end of fiscal year.-The existing project was about
99 percent completed. The work remaining to be done is the deep-
ening of the inner basin to a depth of 30 feet.
   The latest examinations showed controlling depths, at mean low
water, as follows:

                                                                                                     Project    Present
         Date                                         Section                                        depth,     depth,
                                                                                                      feet       feet

                                                                                               _--        30           23.2
June 26, 1942-----
June 17, 1942----
    Do----------
                     - Delaware River to Lobdell Canal-           - --
                         Lobdell Canal to Market St. Bridge_ ------
                                                                          --
                                                                         ----
                                                                                ----

                         Market St. Bridge to the pulpworks - -------------------
                                                                                  --
                                                                                                -
                                                                                                          21
                                                                                                          21
                                                                                                                       15.1
                                                                                                                       12.8
    Do----------         Pulpworks to Pennsylvania R. R. bridge No. 4            -----------              10            9.3
    Do.----------        Pennsylvania R. R. bridge No. 4 to Newport -----------------                      7            6.3



  The costs and expenditures under the existing project, excluding
$60,000 contributed funds expended for maintenance, were as follows:

                                                                  Emergency            Regular funds           Total
                                                                  Relief funds                 fud             Toa


New work ..---------------      -----------------------         $206, 176. 75            $924,  356.12    $1,130,532.87
Maintenance .......--------------------------------------------------------             4, 214, 763. 31    4, 214, 763. 31

     Total .......--------------------------------------             206, 176. 75       5, 139, 119. 43    5, 345, 296. 18
Expenditures .....                                                   206, 176. 75
                             ...... ....-------------------------------------           5, 132, 988. 05    5, 339, 164. 80



  Proposedoperations.-Itis proposed to apply the funds unexpended
on June 30, 1942, amounting to $175,929.12, as follows:
             RIVERS AND HARBORS-PHILADELPHIA,                                                 PA., DISTRICT                337
Accounts payable June 30, 1942_____     ______________-__________   $6, 131.38
Maintenance: Dredging from Delaware River to Market St. Bridge
with a United States hopper dredge and rehandling with a pipe-
line dredge as required throughout the year__---- -- ____________ 169, 797. 74
           Total _____________--___,,_                                                                            175, 929. 12
  The sum of $230,000 can be profitably expended during the fiscal
year 1944 for channel maintenance from Delaware River to Market
Street Bridge with Government plant.
  The completion of the project is not now required by existing com-
merce.
                                               Cost and financial summary

Cost of new work to June 30, 1942_                                                                          $1, 532, 654. 08
Cost of maintenance to June 30, 1942__________________________                                               4, 214, 763. 31
      Total cost of permanent work to June 30, 1942------------- 5, 747, 417. 39
Minus accounts payable June 30, 1942_________________________         6, 131. 38
     Net total expenditures--------------------------------    5, 741, 286. 01
Unexpended balance June 30, 1942_-- --------------------------    175, 929. 12
           Total amount appropriated to June 30, 1942______________                                          5,917, 215. 13

   Fiscal year ending June 30                       1938              1939            1940           1941              1942

Cost of new work----    - -     ------        -------------             -
                                                               --------------     ------- -----        $676. 75
Cost of maintenance                ----          $230, 700. 34    $128, 182. 75    $197, 714. 26   137, 857.00       $155, 806. 77
      Total cost    __----------          -      230, 700. 34      128, 182. 75     197, 714. 26   138, 533. 75       155, 806. 77
Total expended     ------ ___                    213, 881. 73      163, 661. 42     196, 114. 23   139, 775. 11       149, 722. 76
Allotted      -------------------                394, 000. 00      227, 000.00       77, 000.00    180, 588. 38       140, 000.00


Balance unexpended July 1, 1941__________________________                                                     $185, 651. 88
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942--------------------------------------                                                    140, 000.00
    Amount to be accounted for-------------------------                                                           325, 651. 88
Gross amount expended --------------------------------------                                                      149, 722, 76
    Balance unexpended June 30, 1942___________________----                                                       175, 929. 12
Outstanding liabilities June 30, 1942___________                                                                    6, 131. 38
      Balance available June 30, 1942---------------------------                                                  169, 797. 74

Amount (estimated) required to be appropriated for completion
   of existing project 2 -                             -----------------                                           67, 850. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance "-_____________________----__                                                     230, 000. 00
  1 In addition, $60.000 contributed funds expended for maintenance.
  2 Exclusive of available funds.

6. INLAND WATERWAY FROM DELAWARE RIVER TO CHESAPEAKE BAY,
                       DEL. AND MD.

  Location.-This waterway begins at Reedy Point on Delaware
River, about 41 miles below Philadelphia, Pa., and passes through the
sea level Chesapeake & Delaware Canal, a distance of 14 miles, to Back
Creek, at Chesapeake City, Md. It then passes for 5 miles down Back
Creek, and thence 9 miles down Elk River to Chesapeake Bay. A
338    REPORT   OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1942


branch channel connects Delaware River at Delaware City, Del., with
the main channel at a point about 1 /2 miles west of Reedy Point. (See
U. S. Coast and Geodetic Survey Charts Nos. 294, 1226, 570, and 572.)
   Previous projects.-The River and Harbor Act of August 8, 1917,
made appropriation for preliminary studies with a view to taking over
the Chesapeake & Delaware Canal.
   The project adopted by the River and Harbor Act of March 2, 1919,
provided for the purchase of the Chesapeake & Delaware Canal. Its
enlargement was authorized by the River and Harbor Acts of January
21, 1927, and July 3, 1930. For further details see Annual Report for
1934, page 242, and Annual Report for 1938, page 312.
   Existing project.-This provides for a sea-level channel to accom-
modate vessels drawing 25 feet and having a depth of 27 feet and a
width of 250 feet from Delaware River to Elk River and thence 400
feet wide down Elk River and Chesapeake Bay to deep water at or
near Pooles Island; alteration of existing bridges over the canal; ex-
tension of the entrance jetties at Reedy Point; the enlargement of the
anchorage and mooring basin in Back Creek to afford an area about
400 feet wide, 1,000 feet long, and 12 feet deep, including provision of
sluice gates at the fixed highway bridge; dredging the Delaware City
Branch Channel to a depth of 8 feet and a width of 50 feet; deepening
the existing basin to the same depth; revetment of both banks east of
Fifth Street Bridge; and construction of bulkheads.
    The project also provides for the construction of a four-lane high-
level fixed highway bridge across the canal at or near Saint Georges,
Del., of such type, design, and clearances for navigation as are
approved by the Chief of Engineers.
    The total length of the section included in the project, excluding the
Delaware City Branch Channel, which is about 2 miles long, is about
46 miles. All depths refer to the plane of mean low water in Dela-
ware River. The mean tidal range at the Delaware River entrance is
5.2 feet and in Elk River at the mouth of Back Creek, 2.2 feet. The
extreme tidal range is from 6.3 feet above mean high water to 3.0 feet
below mean low water.
    The estimate of cost for new work, revised in 1939, is $15,089,000.
The latest (1939) approved estimate of cost for annual maintenance
is $730,000, including $130,000 for operation and care of the water-
way.
    The existing project was adopted by the River and Harbor Act
of August 30, 1935 (H. Doc. No. 201, 72d Cong., 1st sess., and Rivers
and Harbors Committee Docs. Nos. 18 and 24, 73d Cong., 2d sess.).
    The act approved August 7, 1939 (Pub., No. 310, 76th Cong., 1st
sess.) authorized the construction of a four-lane high-level fixed
highway bridge at or near St. Georges, Del.
    The latest published map of the canal is found in Rivers and
Harbors Committee Document No. 24, Seventy-third Congress, second
session. Operation and care of the canal and appurtenant works were
included in the project July 1, 1935, under the provisions of the
Permanent Appropriations Repeal Act approved June 26, 1934.
    Local cooperation.-Fully complied with.
    Terminal facilities.-A freight station is maintained at Chesapeake
City by the Baltimore & Philadelphia Steamboat Co., no charges for
wharfage being made. Ample mooring facilities at the eastern and
       RIVERS   AND HARBORS-PHILADELPHIA,         PA.,   DISTRICT   339
western ends of the canal and bulkheads at Delaware City and St.
Georges have been constructed by the United States. A harbor for
small boats has been provided and a wharf has been constructed at
Chesapeake City. The facilities are considered adequate for existing
commerce.
    Operations and results during fiscal year-New work-Contract.-
Bank stabilization on the north side, of the canal, in the Deep Cut,
stations 54+ 370 to 57 +010,    in progress at the end of the previous
fiscal year was completed December 13, 1941. The cost was
$148,621.28.
    Construction of an 800-foot rubble stone extension to the existing
north jetty at the Delaware River entrance, commenced October 1,
1941, was completed April 28, 1942. A total of 27,025.12 tons of stone
were placed at a cost of $106,704.10.
    Costs in connection with a contract for bank stabilization near
Summit Bridge, Stations 52+400 to 54+500, completed during the
previous fiscal year were $5,725.38.
    Costs in connection with preliminary work on additional bank
stabilization were $1,602.62. The total cost of new work was
$262,653.38.
    Maintenance-Contract.-Theconstruction of the substructure for
a fixed high-level highway bridge crossing the canal at St. Georges
in progress at the end of the previous fiscal year, was completed
August 8, 1941. The cost was $15,451.96.
    The construction of the superstructure for the bridge at'St. Georges
in progress at the end of the previous fiscal year was completed May
15, 1942. The cost was $771,265.01.
    The construction of approaches for the bridge at St. Georges in
progress at the end of the previous fiscal year was completed De-
cember 1, 1941. The cost was $26,136.86. Engineering services in
connection with the construction of the bridge at St. Georges were
procured at a cost of $22,567.06.
    Maintenance-Hired labor.-Dredging of miscellaneous shoals
between the Delaware River entrance and Courthouse Point, was
in progress at intervals during the year by the U. S. hopper dredge
Clatsop, the U. S. pipeline dredge Alabama, and the U. S. derrick-
boat No. 37. There were removed 393,262 cubic yards of material
at a cost of $97,822.74.
    Dredging of the channel in Elk River and Chesapeake Bay from
Courthouse Point to Pooles Island by the U. S. hopper dredge
Manhattan, commenced March 18, was in progress at the end of the
fiscal year. There were removed 1,796,759 cubic yards of material
at a cost of $288,124.20.
    Other hired labor costs included maintenance and repairs to banks,
 $33,398.66; drainage of banks, $30,812.48; seeding and planting wind-
breaks along banks, $23,809.95; maintenance and repairs of auxiliary
works, $31,465.41; maintenance and operations of tide gages, $785.97;
removal of miscellaneous obstructions and debris, $7,776.96; and
surveys, examinations, and collections of miscellaneous engineering
data, $35,557.02; a total of $163,606.45. The total cost of all main-
tenance was $1,384,974.28.
    Operating and care-Hired labor.-The waterway and highway
bridges crossing it were operated and maintained throughout the
340         REPORT OF CHIEIF OF ENGINEERS,                                   U.     S. ARMY,          1942

year, and a ferry at St. Georges until May 1942. The costs were
$168,745.53 for operating the canal, ferry, and bridges, and $24,-
287.25 for maintenance and repairs of bridges, a total cost of $193,-
032.78.
   The total cost of all work was $262,653.38 for new work, $1,384,-
974.28 for maintenance, and $193,032.78 for operating and care, a
total of $1,840,660.44. The expenditures were $2,146,269.88.
   Condition at end of fiscal year.-The existing project was about
87 percent completed. The work remaining to be done is the comple-
tion of bank stabilization through the Deep Cut; dredging the Dela-
ware City branch channel from a point 400 feet east of Fifth Street
Bridge to its junction with the canal; stabilizing Summit Bridge;
bank treatment at railroad bridge, north side; protecting slopes with
vegetal cover; widening Reedy Point entrance channel; and construct-
ing extensions to existing jetties at the Delaware River entrance.
   The controlling depths in June 1942 were as follows: From Dela-
ware River to Courthouse Point at the mouth of Back Creek, 25.9
feet; and thence in Elk River and Chesapeake Bay, 24.5 feet. The
controlling depth in the Delaware City branch channel (October
1941) was 3.0 feet.
   The total costs and expenditures under the existing project were as
follows:
                                                                     Emergency          Regular funds          Total
                                                                     Relief funds              rfns            Tt

New work___________ ___________________         __       $4, 756, 247. 79               $8, 366, 974.16    $13, 123, 221. 95
Maintenance _________________________ _______________ _             __                   5, 574, 267. 51     5, 574, 267. 51
Operating and care___----  ____..........----___-----...                                 1, 195, 023. 61     1, 195, 023. 61

     Total ....          .......... _.    ......   ._ _.. ........    4, 756, 247. 79   15, 136, 265. 28     19, 892, 513.07
Expenditures -------....          ----------------------------
                                   ..                                 4, 756, 247. 79   15, 082, 616. 89     19, 838, 864. 68



  In addition, the sum of $2,513,270.24 was expended between August
1918 and June 1935 on operating and care of the works of improve-
ment under provisions of the permanent indefinite appropriation for
such purposes.
  Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1942, amounting to $725,680.56 as follows:
Accounts payable June 30, 1942___________________-_______-             $53, 648. 39
New work: Bank stabilization between stations 57+010 and 58+840
  by contract (August 1942 to March 1943) ----------------------       175, 000. 00
Maintenance :
    Payments in connection with construction of superstructure for
      bridge at St. Georges under contract completed May 15, 1942__ 84, 496. 42
    Consultant services in connection with the construction of high-
      way bridge at St. Georges__________________ ______________            333. 15
    Dredging in Elk River and Chesapeake Bay with a United States
      hopner dredge and rehandling with a United States pipe-line
      dredge (August to September, 1942)_----_-------- $120, 000. 00
    Dredging from Delaware River to Elk River with a
      United States hopper dredge and derrickboat, and
      rehandling with a United States pipe-line
      dredge as required during the year __ ______         52, 202. 60
    Maintenance of canal bank and auxiliary works
       Seeding canal banks and planting windbreaks__ ___                                   10, 000. 00
       Removal of obstructions and debris throughout
         the year_   -    --
                         ________--            ___----_                                    15, 000. 00
                                                                                                           332, 032. 17'
            RIVERS AND HARBORS-PHILADELPHIA,                                            PA., DISTRICT                 341
Maintenance-Continued.
   Maintenance (operation and care) :
            General operation of canal and bridges                      ------          $150,000.00
            Ordinary maintenance and repairs to bridges__                                  15, 000. 00
                                                                                                -----
                                                                                                   -$165,         000. 00
               Total for maintenance--------------------------------                                         412, 202. 60
               Total for all work_ --------------------------------                                          725, 680. 56
  The sum of $1,348,500 can be profitably expended during the fiscal
year 1944, as follows:
New work:
   Bank stabilization between stations 58-840 and 63+700
     by contract (July 1943 to April 1944) -------------- $450, 000
   Stabilizing Summit Bridge by contract (August to Decem-
     ber 1943) ------------------------------------------   90, 000
   Planting and seeding graded slopes by hired labor------- 50, 000
      Total for new work----------------------------------------                                               $590, 000
Maintenance:
    Dredging from Delaware River to Elk River with a
      United States hopper dredge and derrick boat, and
      rehandling with a pipe-line dredge, as required
      throughout the year______________________________ $216, 500
    Dredging in Elk River and Chesapeake Bay with a
      United States hopper dredge and rehandling with a
      pipe-line dredge (July to September 1943)----------     225, 000
    Seeding and planting canal banks-_________________         20, 000
    Maintenance of canal banks and auxiliary works
      throughout the year,__----------------------------       90, 000
    Removing obstructions and debris throughout the year__     12, 000
                                                                                                                 563, 500
Maintenance (operating and care) :
    General operating expenses of canal and bridges------ 66, 000
    Ordinary maintenance and repair of bridges-----------29, 000
                                                                                                                 19_o
                                                                                                                 -L  9, VVV

         Total for maintenance _________________________                                               ___       758, 500
         Total for all work __________________..
                                    .____________                                              _              1, 348, 500

                                    Cost and financial summary
Cost of new work to June 30, 1942___________________________                                           $23, 832, 976. 96
Cost of maintenance to June 30, 1942__________________________                                          13, 673, 038. 98
      Total cost of permanent work to June 30, 1942___________                                          37, 506, 015. 94
Minus accounts payable June 30, 1942____________________   ___-                                              53, 648. 39
     Net total expenditures___________________________                                                  37, 452, 367. 55
Unexpended balance June 30, 1942_______________________                                            _        725, 680. 56
         Total amount appropriated to June 30, 1942___ ______----38, 178, 048. 11

    Fiscal year ending June 30           1938              1939                  1940           1941              1942


Cost of new work_         __     _ $2, 912, 160. 91    $148, 197. 85       $362, 023.89     $555, 333. 18       $262, 653. 38
Cost of maintenance-- ...-....         924, 059. 82     696, 205. 68        987, 322. 38   2, 375, 459. 61     1, 578, 007. 06
      Total cost _--                3, 836, 220. 73     844, 403. 53     1, 349, 346. 27   2, 930, 792. 79     1, 840, 660. 44

Total expended-            _        4, 104, 483. 45   1, 092, 008. 87    1, 129, 653.17    2, 586, 390. 21    2, 146, 269.88
Allotted ------_-----___--       __ 3, 487, 611.00    2, 267, 579. 11    3, 053, 491.34      995, 700. 00        267, 500. 00
342      REPORT OF CHIEIF OF ENGINEERS,                 U. S. ARMY,   1942

Balance unexpended July 1, 1941____----- _ -------------              $2, 604, 450. 44
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942-----------------------------------               271, 000. 00

      Amount to be accounted for------------ ------------              2, 875, 450. 44
Deductions on account of revocation of allotment .________----              3, 500. 00

      Net amount to be accounted for _______________-------2, 871, 950. 44
Gross amount expended____--- ----    _     ________-- _      2, 146, 269. 88

      Balance unexpended June 30, 1942___________________--  __          725, 680. 56
Outstanding liabilities June 30, 1942______________ $16, 424. 24
Amount covered by uncompleted contracts---------135, 382. 90
                                                                         151, 807. 14
       Balance available June 30, 1942___________________--___           573, 873. 42

Amount (estimated) required to be appropriated for completion
  of existing project    1           ----------------                   , 785, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1944:
    For new work 1_--------------------------------                      590, 000. 00
   For maintenance 1 __--         __ ___ ___-____-- _ _-758,                  500. 00

       Total 1__                     ___________________               1, 348, 500. 00
  1 Exclusive of available funds.

                               7. SMYRNA RIVER, DEL.

   Location.-This river, formerly Duck Creek, rises in New Castle
and Kent Counties, Del., flows northeasterly 15 miles along the bound-
ary line between the two counties, and empties into Delaware Bay
about 57 miles below Philadelphia, Pa. (See U. S. Coast and Geodetic
Survey Charts Nos. 294 and 1218.)
   Previous projects.-Adopted by River and Harbor Acts of June
14, 1880, August 11, 1888, June 13, 1902, and March 3, 1905. For
further details see page 1786, Annual Report for 1915, and page 321
of Annual Report for 1938.
   Existing project.-This provides for a channel 7 feet deep at mean
low water, 100 feet wide in Delaware Bay to the mouth, and thence
60 feet wide to Smyrna Landing, 83/4 miles above the mouth. It also
provides for three cut-offs in the river and for two parallel, stone-
filled, pile and timber jetties spaced 375 feet apart at the mouth, the
north jetty 800 feet long and the south jetty 2,700 feet long. The total
length of the section included in the project is about 91/2 miles. The
mean tidal range at the mouth is 5.8 feet, and at Smyrna Landing 3.4
feet. The extreme tidal range is from about 1 foot below mean low
water to about 2 feet above mean high water.
   The estimate of cost for new work, revised in 1942, is $164,000,
exclusive of amounts expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $3;000.
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 815, 60th Cong., 1st sess.). The latest
published map is in that document.
    Local cooperation.-Fully complied with.
    Terminal facilities.-There are nine wharves and landings of pile
and timber construction. The terminals are considered adequate for
existing commerce.
               RIVERS   AND HARBOIRS-PHILADELPHIA,                           PA., DISTRICT                 343

   Operations and reslults during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was about
96 percent completed. The work remaining to be done is the dredg-
ing of a small section of the river at the upper end of the project near
Smyrna Landing. The controlling depths, at mean low water, in
June 1942, were as follows: From Delaware Bay to the mouth, 5.5
feet; thence to Prices Landing, 4.2 feet; and thence to Smyrna Land-
ing, 3.5 feet.
  The costs and expenditures under the existing project were $143,-
759.16 for new work and $79,369.03 for maintenance, a total of $223,-
128.19.
  Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1942, amounting to $12,200 to maintenance dredg-
ing in the entrance channel and on shoal areas in the upper section
of the river, by contract (August to September, 1942).
  No funds can be profitably expended during the fiscal year 1944,
as it is believed that no maintenance will be necessary.
  The completion of the project is not now required by existing
commerce.
                                     Cost and financial summary
Cost of new work to June 30, 1942_________________________                                       $198, 843. 94
Cost of maintenance to June 30, 1942________________________--                                    102, 091. 88
          Total cost of permanent work to June 30, 1942_________                             _   300, 935. 82

Net total expenditures___               _-----
                                     ___--                      -                                300, 935. 82
Unexpended balance June 30, 1942_____                      --                 _____                12, 200. 00

          Total amount appropriated to June 30, 1942_______________                              313, 135. 82

    Fiscal year ending June 30           1938          1939           1940            1941            1942
Costof new work                                     $42, 294L.75   $1, 162. 3
Cost of new work ___.                                $42, 294. 75   $21, 162. 36
Cost of maintenance .                     $624. 00

Total expended .-.                         624. 00    28, 747. 51    34, 709.60-------------------------

Allotted_-_.    _   _   __       _     -- 5,168.15    54, 457. 11     9, 000. 00   $12, 200.00 _-



Balance unexpended July 1, 1941__               -------------                                     $12, 200. 00
Balance unexpended June 30, 1942------------------------------                                     12, 200. 00

Amount (estimated) required to be appropriated for completion of
existing project ----------------------------------------------
                                             __                                                    20, 000. 00
   1 Exclusive of available funds.

                                     8. LITTLE RIVER, DEL.

  Location.-This river rises in Kent County, Del., flows easterly 7
miles, and empties into Delaware Bay about 32 miles above Cape
Henlopen. (See U. S. Coast and Geodetic Survey Chart No. 1218.)
  Existing project.-This provides for a channel 5 feet deep at mean
low water from the 5-foot contour in Delaware Bay to the bridge
at Little Creek Landing, 3 miles above the mouth, 60 feet wide
across the bar outside the mouth, and 40 feet wide in the river, in-
cluding several cut-offs to eliminate sharp bends, which shortened
the distance about half a mile. The mean tidal range at the mouth
344          REPORT OF CHIEF OF ENGINEERS,                                               U.   S. ARMY,           1942


is 5.1 feet and at Little Creek Landing 5.2 feet. The extreme tidal
range is from 2 feet below mean low water to 1 foot above mean
high water.
   The estimate of cost for new work, made in 1912, was $14,000.
   The latest (1928) approved estimate for annual cost of main-
tenance is $3,000.
   The existing project was adopted by the River and Harbor Act
of July 25, 1912 (H. Doc. No. 626, 62d Cong., 2d sess.). There is
no published map of the river.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are three pile-and-timber wharves or
landings on this stream. The terminal facilities are considered ade-
quate for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1914. The controlling depths, at mean low water, in June
1942, were as follows: From Delaware Bay to the mouth, 1.4 feet;
and thence to the highway bridge at Little Creek Landing, 1.5 feet.
   The costs and expenditures under the existing project were $12,-
015.86 for new work and $46,020.59 for maintenance, a total of
$58,036.45.
   Proposed operations.--It is proposed to apply the funds unex-
pended on June 30, 1942, amounting to $20,000 to maintenance
dredging throughout the project, by contract (August to October
1942).
   No funds can be profitably expended during the fiscal year 1944,
as it is believed that no maintenance will be necessary.
                                          Cost and financial summary

Cost of new work to June 30, 1942______________________--___ $12, 015. 86
Cost of maintenance to June 30, 1942 --------------------- __    _ 46, 020. 59
      Total cost of permanent work to June 30, 1942______________ 58, 036. 45

Net total expenditures      ________----------__         -----                                                        58, 036. 45
Unexpended balance June 30, 1942_--_---- ---------------                                                              20, 000. 00
        Total amount appropriated to June 30, 1942------- ----------                                                  78, 036. 45

   Fiscal year ending June 30                    1938                   1939              1940            1941             1942


                 ..
Cost of new work--------------------------- --------------            . . .. ....
                                                     . .. . .... -------------..      . . . .....        . ...
                                          .
Cost of m aintenance-------------- ------------.. -.... .. . . .. ...                   . .. ..--------------
                                                                       . .. . . ... .. --------------
T o tal expen d ed ...----------..
                                .------------...--------......                                   ... ... ... .. ... ... ... ..--...
Allotted--          _-----------------------------------------------------------------                                       $20,000



Amount allotted from War Department Civil Appropriation Act ap-
proved June 24, 1940--------------- -------------------------- $20,000. 00
Balance unexpended June 30, 1942_______________---
                                        -------------            20, 000. 00

                                     9. MULRDERKILL RIVER, DEL.

  Location.-This river rises in Kent County, Del., flows north-
easterly 19 miles through the county, and empties into Delaware Bay
about 25 miles above Cape Henlopen. (See U. S. Coast and Geodetic
Survey Chart No. 1218.)
             RIVERS AND HARBOIRS-PHILADELPHIA,                                     PA.,   DISTRICT          345
   Existing project.-This provides for a channel 7 feet deep at mean
low water, 150 feet wide in Delaware Bay to the mouth, and thence
80 feet wide to Frederica, 71/2 miles above the mouth. The total
length of the section included in the project is about 81/2 miles. The
mean tidal range at the mouth is 4.8 feet and at Frederica 2.5 feet.
The extreme tidal range is from about 1 foot below mean low water
to about 2 feet above mean high water.
   The estimate of cost for new work, revised in 1928, is $60,000.
The latest (1928) approved estimate for annual cost of maintenance
is $5,000.
   This project was adopted by the River and Harbor Act of July
13, 1892 (H. Ex. Doc. No. 21, 52d Cong., 1st sess., and Annual Report
for 1892, p. 981). The latest published map is in House Document
No. 1058, Sixty-second Congress, third session.
   Terminal facilities.-There are a number of light timber wharves
on both sides of the river inside the mouth and a wharf at Frederica,
all of which are privately owned. The facilities are considered ade-
quate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was about
63 percent completed. The work remaining to be done is the widen-
ing of the channel to project width outside the mouth and within
the river. The controlling depths, at mean low water, in June 1942
were as follows: From Delaware Bay to the mouth, 5.5 feet; and
thence to Frederica, 6.1 feet.
   The costs and expenditures under the existing project were $37,-
630.07 for new work and $168,140.06 for maintenance, a total of
$205,770.13.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
   The sum of $15,000 can be profitably expended during the fiscal
year 1944, to be applied to maintenance dredging in the entrance
channel, by contract (September to October 1943).
   The completion of the project is not now required by existing
commerce.
                                          Cost and financial summary
Cost of new work to June 30, 1942____________________________ $37, 630. 07
Cost of maintenance to June 30, 1942__________________________ 168, 140. 06
      Total cost of permanent work to June 30, 1942     ___      205, 770. 13
Net total expenditures--    ________-________----                205, 770. 13
Total amount appropriated to June 30, 1942______________________ 205, 770. 13

   Fiscal year ending June 30                 1938            1939          1940          1941           1942


Cost of new work .-.-------------
Cost of maintenance-                .__
                                     .    ---------       -------- ----   $13,335. 37 -------------           ----
                                                                                                        -------


Total expended _...                            $385. 31                    13, 335. 37

Allotted        ------------------ -13, 516. 23               $12, 000      1, 335. 37        ....-..



Amount (estimated) required to be appropriated for completion of
existing project) -      ___--- __--------------------------$22,400. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance____ _-----__----          --           15, 000. 00
346        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                      1942

                               10. MISPILLION RIVER, DEL.

   Location.-This river rises in Kent and Sussex Counties, Del.,
flows northeasterly 15 miles along the boundary line between the two
counties, and empties into Delaware Bay about 16 miles above Cape
Henlopen. (See U. S. Coast and Geodetic Survey Chart No. 1218.)
   Previous projects.-Adopted by River and Harbor Acts of March
3, 1879; July 13, 1892, modified July 3, 1893, and by River and Har-
bor Act of March 2, 1907. For further details see page 1786, An-
nual Report for 1915, page 448 of Annual Report for 1918, and page
327 of Annual Report for 1938.
   Existing project.-This provides for a channel 6 feet deep at mean
low water, 80 feet wide in Delaware Bay to the mouth, and thence
60 feet wide to Milford, 11 miles above the mouth, with additional
width at sharp bends. It also provides for four cut-offs, 50 feet
wide, and for two parallel stone-filled pile and timber jetties at the
mouth, spaced 210 feet apart, the south jetty 5,850 feet long and the
north jetty about 6,496 feet long extending to a point opposite the
end of the south jetty. The total length of the section included in
the project is about 12 miles. The mean tidal range at the mouth is
4.3 feet and at Milford 3.4 feet. The extreme tidal range is from
about 1 foot below mean low water to about 2 feet above mean high
water.
   The estimate of cost for new work, revised in 1937, was $177,350,
exclusive of amounts expended on previous projects. The latest
 (1937) approved estimate for annual cost of maintenance is $7,400.
The existing project was authorized by the following river and
harbor acts:

    Acts                       Work authorized                                     Documents


Mar.   2,1919   For 6-foot depth and extension of south jetty______   H. Doc. No. 678, 62d Cong., 2d sess.'
Aug. 26, 1937   Extension of north jetty__ _..       _ _ _____        Rivers and Harbors Committee Doc.
                                                                                                       1
                                                                        No. 83, 74th Cong., 2d sess.


  1Contains latest published maps.

   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 2 wharves inside the mouth of the
river and 10 piers or wharves at Milford, 2 of which are owned by
the city of Milford. There is also a marine railway at Milford.
The facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-Maintenance dredging
in the entrance channel, by contract, was commenced August 8, and
completed September 9, 1941. There were removed 9,132 cubic yards,
place measurement, of material. The costs and expenditures were
$9,118.07 for maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1939. The controlling depths, at mean low water, in June
1942, were as follows: From Delaware Bay to the mouth, 6.3 feet;
thence to the highway drawbridge, 4.3 feet; and thence to the fixed
highway bridge at Milford, 6.1 feet.
              RIVERS AND HARBOiRS-PHILADELPHIA,                                PA.,        DISTRICT           347
  The costs and expenditures under the existing project were $216,-
390.72 for new work and $127,349.87 for maintenance, a total of
$343,740.59.
  Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
  The sum of $60,000 can be profitably expended during the fiscal
year 1944, as follows:
Maintenance:
    Repairing existing south jetty at the mouth of the river, by con-
      tract (August to December 1943)-----------------------------    $50, 000
    Dredging shoals in upper section of the river, by contract (July
      15 to Sept. 15, 1943)---------------------------------------10,000

         Total ------------------------------------------                            -------------         60, 000
                                     Cost and financial summary

Cost of new work to June 30, 1942----------------------------$365,189. 13
Cost of maintenance to June 30, 1942------------------------  - 188, 522.29

      Total cost of permanent work to June, 1942---------------- 553, 711. 42
Net total expenditures----------------------------------------   553, 711.42
Total amount appropriated to June 30, 1942-------------------553,711.42

   Fiscal year ending June 30            1938           1939            1940               1941            1942

Cost of new work .......--...-          .             $20, 784.38    $108, 356. 45
Cost of maintenance___________         $11, 251. 84     2, 285. 72                                         $9,118. 07

      Total cost-____________ __        11, 251. 84    23, 070. 10    108, 356. 45_                         9, 118. 07

Total expended ______________    _      11, 116. 05     4, 444. 05    127, 118. 29                          9, 118. 07

Allotted. _   -.            _         -10, 000. 00    112,300.00       14, 700.00             $3, 200       5, 918. 07


Balance unexpended July 1, 1941---------------------------------$3, 200. 00
Amount allotted from War Department Civil Appropria-
  tion Act approved June 24, 1940--------------------- $1, 318. 07
Amount allotted from War Department Civil Appropria-
   tion Act approved May 23, 1941--------------____                       _           4, 600. 00
                                                                                                         5, 918. 07
      Amount to be accounted for___-------------------------------                                      9, 118. 07
Gross amount expended__------------- ---------------------------                                        9, 118.07

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance-----------------_______---------------------                                 60, 000.00

11. INLAND WATERWAY BETWEEN REHOBOTH BAY AND DELAWARE
                        BAY, DEL.

  Location.-This waterway, a tidal canal, is situated in the south-
easterly part of Sussex County, Del. It extends 12 miles northward
from Rehoboth Bay through the highland west of the town of Reho-
both to Gordon Lake; thence through the marshes back of Cape Hen-
lopen to Lewes River; thence down Lewes River to its junction with
Broadkill River near its mouth. An entrance to the waterway from
Delaware Bay is located about 4 miles above Cape Henlopen. (See
U. S. Coast and Geodetic Survey Charts Nos. 379, 1218, and 1219.)
348        REPORT OF CHIEF O*F                  ENGINEERS,             U.    S. ARMY,         1942

  Previous projects.-A canal along a slightly different route formed
a part of the projected waterway from Chincoteague Bay, Va., to
Delaware Bay, begun in 1886 and abandoned in 1905.
  Existing project.-This provides for a waterway 6 feet deep and
100 feet wide from Broadkill River to South St. Bridge at Lewes
and a basin of the same depth 1,200 feet long and up to 375 feet in
width at the latter point; an entrance channel of the same depth and
200 feet wide from Delaware Bay near Lewes, protected by 2 parallel
steel-sheet pile jetties reinforced with riprap stone spaced 500 feet
apart and 1,700 feet long; a channel 6 feet deep and 50 feet wide (40
feet wide through Deep Cut near Lewes), from Lewes to Rehoboth
Bay, and for 2 parallel rubble-mounted jetties 725 feet long at the
Rehoboth Bay entrance. The project also includes the construction
of one railroad bridge and one highway bridge at Rehoboth. The
total length of the section included in the project is about 12 miles.
The mean tidal range in the waterway opposite the Delaware Bay
entrance is 3.9 feet, at Lewes 3.7 feet, and at Rehoboth 0.6 foot. The
extreme tidal range is from about 1 foot below mean low water to
about 3 feet above mean high water.
  The estimate of cost for new work, made in 1935, is $526,000, ex-
clusive of amount expended on previous projects, and exclusive of
$60,000 contributed funds, but including $14,275 for the purchase of
land since obtained free of cost to the United States, making the
actual estimated cost for the construction of the canal $571,725,
which includes $60,000 contributed funds and $37,343.58 awarded the
railroad company in full for all damages to that company for the
erection and maintenance of a railroad bridge across the canal at
Rehoboth. The latest (1935) approved estimate for annual cost of
maintenance is $19,500.
   The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                        Documents


July 25,1912    For a 6-foot-depth canal to connect Rehoboth Bay        H. Doc. No. 823, 60th Cong., 1st sess.,
                 and Delaware Bay.                                          and Rivers and Harbors Committee
                                                                            Doc. No. 51, 61st Cong., 3d sess.
Aug. 30, 1935   For a 6-foot-depth entrance near Lewes, for jetties,    Rivers and Harbors Committee Doc.
                  for widening the canal from Broadkill River to          No. 56, 74th Cong., 1st sess. (Con-
                  Lewes, and basin.                                       tains latest published maps.)



  Recommended modification of project.-Under date of May 29,
1941, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for extending the jetties at the entrance
from Delaware Bay and for a depth of 10 feet in the channel from
Delaware Bay to and including the turning basin at Lewes at an
estimated cost of $224,000, with $9,000 annually for maintenance in
addition to the amount now required; subject to certain conditions
of local cooperation (H. Doc. No. 344, 77th Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 3 wharves at Lewes, Del., one
owned by the town, one government owned and one privately owned,
all open to public use. There are a number of small landings for
              RIVERS           AND HARBORS-PHILADELPHIA,                        PA.,     DISTRICT                349
fishing parties and private boats on the inland waterway. At Lewes
on the north bank of the waterway, the Lewes Anglers Association
has constructed a wharf about 600 feet long with 43 slips for fishing
party boats. At Rehoboth there are two private wharves of pile
and timber construction. At Henlopen Acres, adjoining Rehoboth,
a private yacht basin, with accommodations for more than 50 fishing
party boats and pleasure craft, connects with the canal.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was about
85 percent completed. The work remaining to be done is the rein-
forcing of the jetties at the Rehoboth Bay entrance, built in 1903
under a previous project. The controlling depths at mean low water
in June 1942 were as follows: From Delaware Bay to mouth, 4.9
feet; thence to the highway bridge at Lewes, 2.7 feet; and thence to
Rehoboth Bay, 2.3 feet.
   The costs and expenditures under the existing project, excluding
$60,000 contributed funds expended for new work, were $435,383.07
for new work and $28,037.97 for maintenance, a total of $463,421.04.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1942, amounting to $13,500, to maintenance
dredging between Delaware Bay and South Street Bridge at Lewes,
by contract (August to October 1942).
   No funds can be profitably expended during the fiscal year 1944,
as it is believed that no maintenance will be necessary.
   The completion of the project is not required at this time.
                                         Cost and financial summary

Cost of new work to June 30, 1942______________________________                                     $435, 383. 07
Cost of maintenance to June 30, 1942____________________________                                        28, 037. 97

          Total cost of permanent work to June 30, 1942__                                            463, 421. 04

Net total expenditures    _____________463,                                                                 421. 04
Unexpended balance June 30, 1942 ________                               ____         ____               13, 500. 00

          Total amount appropriated to June 30, 1942_________________                               476, 921. 04
   1 In addition, $60,000 contributed funds expended for new work.


   Fiscal year ending June 30               1938          1939           1940            1941              1942


Cost of new work       ...............    $38, 246. 63                                          -   -      - -
Cost of maintenance ____________            5, 202.06    $1, 159. 88       $72. 50

       Total cost___________               43,448.69      1,159. 88         72.50                                --
Total expended_        -----               64, 723. 98    1, 459. 56        72.50

Allotted.._                                 8, 082.39     4, 162.89    -4,927. 50    .     .                 $13, 500



Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942_--- ________________________                                                 $13, 500. 00
Balance unexpended June 30, 1942 _____________________ _________                                        13, 500. 00

Amount (estimated) - required to be appropriated for completion
of existing project 2 -                             --                                                 76, 350. 00
   2 Exclusive of available funds.
         493202-43--pt. 1, vol. 1--23
350       REPORT OF CHIEF OF ENGINEERS,      U.   S. ARMY,   1942

               12. INDIAN RIVER INLET AND BAY, DEL.

   Location.-This bay is a shallow lagoon 6 miles long and 2 miles
wide on the Delaware coast about midway between Cape Henlopen
and the Maryland State line. The inlet is an opening through the
barrier beach separating Indian River Bay and the Atlantic Ocean.
(See U. S. Coast and Geodetic Survey Chart No. 1219.)
   Previous projects.-Adopted by River and Harbor Act of August
2, 1882. For further details see page 744, Annual Report for 1888.
   Existing project.-This provides for an inlet channel 15 feet deep
and 200 feet wide from the ocean to a point in Indian River Bay
7,000 feet from the ocean shore line; and thence a channel of pro-
gressively decreasing depth, and width decreasing from 200 to 100
feet to the 6-foot depth curve in the bay. It also provides for two
parallel jetties spaced 500 feet apart, each 1,566 feet long with inshore
end sections of steel-sheet pile construction reinforced with stone, the
north jetty 904 feet long and the south jetty 890 feet long, and with
outshore end sections of all stone construction. The project also
provides that the interior channel dimensions may, in the discretion
of the Chief of Engineers, be modified as may be found desirable to
increase the hydraulic efficiency of the channel, without increasing the
cost. The total length of the section included in the project is about
21/2 miles. All depths refer to the plane of mean low water. The
mean tidal range in the ocean at the inlet is 3.8 feet, and at the high-
way bridge inside the inlet 2.4 feet. The extreme tidal range at the
highway bridge is about 6 feet.
   The estimate of cost for new work made in 1937 was $443,000, includ-
ing $160,000 contributed funds. The latest (1937) approved estimate
for annual cost of maintenance is $10,000.
   The existing project was adopted by the River and Harbor Act
approved August 26, 1937 (Rivers and Harbors Committee Doc. No.
41, 75th Cong., 1st sess.). The latest published map is in the project
document.
   Recommended modifications of project. Under date of May 25,
1939, the Chief of Engineers recommended modification of the exist-
ing project so as to provide a channel 9 feet deep, 100 feet wide in the
bay, and 80 feet wide in the river, from that depth in the existing
channel in Indian River Bay to and including a turning basin 9
feet deep, 175 feet wide, and 300 feet long at Old Landing; thence
about 8,200 feet to the highway bridge at Millsboro, 60 feet wide and
4 feet deep; at an estimated first cost of $201,000, with annual main-
tenance of $10,000 in addition to that now required, subject to certain
conditions of local cooperation. (H. Doc. No. 330, 76th Cong., 1st
sess.).
   Local cooperation.--Fully complied with.
   Terminal faciliaes.-There are two wharves located at Oak Or-
chard, on Indian River Bay.
   Operationsand results during fiscal year.-The construction of two
steel sheet pile bulkheads west of the highway bridge at the inlet, by
contract, was commenced October 30, 1941, and was about 58 percent
completed at the end of the fiscal year. The cost was $60,111.20. Sur-
veys and channel examinations were made at a cost of $2,079.71 for
maintenance. The total cost of all work was $62,190.91 for main-
tenance. The expenditures were $57,032.11.
            RIVERS AND HARBORS-IPHILADELPHIA,                                       PA., DISTRICT               351
  Condition at end of fiscal year.-The existing project was completed
in 1940. The controlling depths at mean low water in May 1942 were
as follows: Through the inlet channel to a point in the bay 7,000 feet
from the ocean shore line, 8.9 feet; and thence to deep water in the
bay, 0.4 foot.
  The costs under the existing project, excluding $160,000 contributed
funds expended for new work, were $270,119.19 for new work and
$88,864.65 for maintenance, a total of $358,983.84.                                     The expenditures:
were $352,759.96.
  Proposed operations.-Itis proposed to apply the funds unexpended'
on June 30, 1942, amounting to $104,740.04, as follows:
Accounts payable June 30, 1942_----------------------------------                                         $6, 223. 8g
Maintenance:
    Continue and complete construction of two steel-sheet pile bulk-
      heads west of the highway bridge at the inlet under contract
      in force (July to September 1942) ----------------------
                                                ___                                                      42, 233. 87
    Dredging the inlet channel to project dimensions between the
      sea and the highway bridge by a United States hopper dredge
      (October 1942) ----------------------------------           __                                     25, 000.00
    Dredging the channel west of the highway bridge by contract
      (October 1942)    -------------------------------------- _                                         31, 282. 29

            Total_-----------------------------_                                                        104, 740. 04
  The sum of $50,000 can be profitably expended during the fiscal
year 1944, in maintenance dredging throughout the project.
                                      Cost and financial summary
Cost of new work to June 30, 1942_ _--------------_______                                         1$280, 119. 19
Cost of maintenance to June 30, 1942_-------------------_                               -------      88, 864. 65
     Total cost of permanent work to June 30, 1942----------                                            368, 983. 84
Minus accounts payable June 30, 1942 ------------------------                                             6, 223. 88

                                     _ __
        Net total expenditures -----------------------------                                            362, 759. 96
Unexpended balance June 30, 1942_-----------                                 --------                   104, 740. 04

        Total amount appropriated to June 30, 1942                                                     1467, 500. 00
   1In addition, $160,000 contributed funds expended for new work.

   Fiscal year ending June 30             1938            1939              1940          1941              1942
Cost of new work                         $6, 349. 74   $228, 105. 98     $35, 663. 47
Cost of maintenance___            _____________ _       _________ ___$26,                   673. 74        $62, 190. 91

      Total cost-_                        6, 349. 74    228, 105. 98      35, 663. 47    26, 673. 74        62, 190. 91
Total expended __________________ _____________         204, 680. 78      65,003. 94     26,043. 13         57,032. 11
Allotted_________________________       283, 000. 00 _____________        88, 000. 00    86, 500.00-

Balance unexpended July 1, 1941------------------------------                                      $161, 772. 15
Gross amount expended----------------------------$57, 056. 89
Less reimbursements collected -----------------------    24. 78
                                                                                                         57, 032. 11
      Balance unexpended June 30, 1942------------------------                                          104, 740. 04
Outstanding liabilities June 30, 1942___                $24. 73
Amount covered by uncompleted contracts             48, 433. 02
                                                                                                         48, 457. 75

        Balance available June 30, 1942__                              ___-------                        56, 282. 29

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 2-----------          --------                                               50, 000. 00
2Exclusive of available funds.
352    REPORT OF CHIEF OF ENGINEERS,         U. S. ARMY,,   1942

                      13. RANCOCAS RIVER, N. J.

    Location.-This river is formed by the confluence of its North
Branch and South Branch a few miles west of Mount Holly, the
county seat of Burlington County, N. J. From the junction of its
two branches it flows westerly about 8 miles and empties into Dela-
ware River opposite the northerly limit of Philadelphia, Pa. (See
U. S. Coast and Geodetic Survey Chart No. 296.)
    Existing project.-This provides for a channel 6 feet deep, 150
to 200 feet wide from Delaware River to Centreton, 7 miles above
the mouth; and thence 5 feet deep to Mount Holly, 13 miles above
the mouth. It also provides for a timber dike at Coates Bar, 38/4
miles above the mouth. The total length of the section included in
the project is about 13 miles. All depths refer to the plane of mean
low water. The mean tidal range at the mouth is 5.7 feet, at Centre-
ton 5.2 feet, and at Mount Holly 1.1 feet. The extreme tidal range
is about 10 feet.
    The estimate of cost for new work, made in 1881, was $81,236. No
estimate for annual cost of maintenance has been made.
    The existing project was adopted by the River and Harbor Act of
March 3, 1881 (H. Ex. Doc. No. 34, 46th Cong., 3d sess., and Annual
Report for 1881, p. 796). There is no published map of the river.
    Terminal facilities.-There are four wharves on the river, one at
Riverside, one at Bridgeboro, and two at Centreton, all privately
owned and without direct rail connections. There is also a boat yard
at Riverside with a marine railway and facilities for construction,
repairs, and storage. The facilities are considered adequate for
existing commerce.
    Operations and results during fiscal year.-Maintenance dredging
in the channel near the highway bridge at Centreton, by contract, was
commenced October 23, and completed December 19, 1941. There were
removed 17,738 cubic yards, place measurement, of material. The
costs and expenditures were $13,090.94 for maintenance.
    Condition at end of fiscal year.-The existing project was about 55
percent completed. Operations from 1881 to 1895 resulted in the
dredging of a channel 6 feet deep and 100 feet wide to Centreton;
thence 5 feet deep and 50 feet wide to the Forks; and thence 4 feet deep
and 25 feet wide to Mount Holly, and the construction of a dike at
Coates Bar. The work remaining to be done is the dredging of a
channel in Mount Hally Branch to project dimensions.
    The controlling depths, at mean low water, in May 1942, were as
follows: From Delaware River to the mouth, 6.9 feet; thence to Bridge-
boro, 8.0 feet; thence to Centreton, 6.0 feet; and thence to Mount
Holly, + 0.3 foot.
    The costs and expenditures under the existing project were $44,-
  500.21 for new work, and $13,090.94 for maintenance, a total of
 $57,591.15.
    Proposed operations.-No funds are available and no work is con-
templated during the fiscal years 1943 and 1944. The completion of
the project is not required by existing commerce.
             RIVERS                  AND            HARBORS-PHILADELPHIA,                               PA., DISTRICT                 353
                                                     Cost and financial summary

Cost of new work to June 30, 1942_____________________________ $44, 500. 21
Cost of maintenance to June 30, 1942-------------------------- 13, 090. 94
      Total cost of permanent work to June 30, 1942_______________                                                            57, 591. 15
Net total expenditures  --------------------------------------                                                                57, 591. 15
Total amount appropriated to June 30, 1942_-__________________                                                                57, 591. 15

   Fiscal year ending June 30                                 1938             1939             1940             1941            1942

Cost of new work                     --        -      - ---                                                        ----         ---
Cost of maintenance-
                           ----
                                     -        - -          - --      -     -          -
                                                                                           --
                                                                                            -     -     -        - -            $13,090.94
Total expended----------.--_                                                                                                     13,090.94
Allotted--   --   --   -   _5,   -   --   -          - -                              --                          ---     -       5240.94

Balance unexpended July 1, 1941_  ----------------------                                                                      $7, 850. 00
Amount allotted from War Department Civil Appropriation Act ap-
  proved May 23, 1941________                                            ______________                                        6, 100.00

     Amount to be accounted for ___________                                                                 __                13, 950. 00
Deductions on account of revocation of allotment .                                                    -.-        --               859. 06
      Net amount to be accounted for______ ____________- -                                                                    13, 090. 94
Gross amount expended______---------------------------------                                                                  13,090. 94
Amount (estimated) required to be appropriated for completion of
existing project__      -_____________ __-______                                                                             36, 750. 00

                                                      14. COOPER RIVER, N. J.

   Location.-This river rises in Camden County, N. J., flows north-
westwardly 13 miles, passing through the northern part of the city
of Camden, and empties into Delaware River opposite the central
portion of Philadelphia, Pa. (See U. S. Coast and Geodetic Survey
Chart No. 295.)
   Existing project.-This provides for a channel 12 feet deep at mean
low water and 70 feet wide. in Delaware River to the mouth and
within the river to what was formerly Browning Chemical Works,
11/2 miles above the mouth. The total length of the section in-
cluded in the project is about 13/4 miles. The mean tidal range at
the mouth is 5.5 feet. The extreme tidal range is about 14 feet.
   The estimate of cost for new work, made in 1895, was $35,000. The
latest (1929) approved estimate for annual cost of maintenance
is $13,500.
   The existing project was adopted by the River and Harbor Act of
June 3, 1896 (H. Doc. No. 176, 53d Cong., 3d sess., and Annual Report
for 1895, p. 1102 et seq.). The latest published map is in House
Document No. 134, Sixty-third Congress, first session.
   Terminal facilities.-There are 11 wharves on the river, all in the
city of Camden; 10 are privately owned and 1 is owned by the city.
The facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-Maintenance dredging
in the entrance channel by the U. S. derrickboat No. 37 was com-
menced September 18 and completed October 1, 1941. There were
removed 3,808 cubic yards, place measurement, of material. The
costs and expenditures were $4,741.16 for maintenance.
354         REPORT OF CHIEF OF ENGINEERS,                                 U. S. ARMY,                  1942

  Condition at end of fiscal year.--The existing project was com-
pleted in 1920. The controlling depths, at mean low water, in May
1942 were as follows: From Delaware River to a point 600 feet
downstream from the upper end of the project, 9.8 feet; and thence
to the upper end of the project at what was formerly Browning
Chemical Works, 9.1 feet. The costs and expenditures under the
existing project were $33,101.64 for new work and $109,997.17 for
maintenance, a total of $143,098.81.
  Proposed operations.-No work is proposed during the fiscal years
1943 and 1944.
                                          Cost and financial summary
Cost of new work to June 30, 1942___________         -
                                                  __------   -                                                  $33, 101. 64
Cost of maintenance to June 30, 1942----------------------------                                                109, 997. 17

           Total cost of permanent work to June 30, 1942------------                                            143, 098. 81

Net total expenditures_ __   _____________--------------                                                        143, 098. 81
                                        -----
Unexpended balance June 30, 1942_ ______--                                       -                               12, 258. 84

           Total amount appropriated to June 30, 1942________________                                           155, 357. 65

   Fiscal year ending June 30                1938           1939              1940            1941                     1942


Cost of new work ---- - - - - - - - - - -           - -- - - - - -- - - - --                  -----             -
Cost of maintenance      --           ----            ----------- --- --------------     -------                       $4,741. 16
Total expended ...    ..        .   ..-                                   -          -    -           -4,                 741. 16
Allotted                   --                                                                  $17, 000



Balance unexpended July 1, 1941                         ------------                                            $17, 000. 00
Gross amount expended--                                                                                           4,-------------------------
                                                                                                                  4 741. 16

           Balance unexpended June 30, 1942_______________-----------_                                      _       12, 258. 84
                                     15. BIG TIMBER CREEK, N. J.

  Location.-This creek rises in Camden and Gloucester Counties,
N. J., and with its south branch flows northwestwardly 16 miles along
the boundary line between the two counties, emptying into Delaware
River opposite the south portion of Philadelphia, Pa. (See U. S.
Coast and Geodetic Survey Chart No. 295.)
   Existing project.-This provides for a channel 10 feet deep at mean
low water, generally 75 feet wide from the 10-foot contour in Delaware
River to the mouth and within the creek to Marters sand plant, 31/2
miles above the mouth, and thence 60 feet wide to Clements Bridge, 5
miles above the mouth, including 4 cut-offs. The total length of the
section included in the project is about 51/2 miles. The mean tidal
range at Westville, near the mouth is 5.4 feet and at Clements Bridge
4.3 feet. The extreme tidal range is from about 11/2 feet below mean
low water to about 2 feet above mean high water.
   The estimate of cost for new work, revised in 1935, was $104,500, of
which $50,000 has been contributed by local interests. The latest
(1935) approved estimate for annual cost of maintenance is $4,000.
   The existing project was authorized by the following river and
harbor acts:
               RIVERS       AND HARBOIS-PHILADELPHIA,                                 PA.,    DISTRICT               355

       Acts                           Work authorized                                        Documents 1


July     3, 1930    For a 10-foot depth from       Delaware River to          H. Doc. No. 217, 70th Cong., 1st sess.
                     Marters sand plant.
Aug. 30, 1935       Extension of project to Clements Bridge       .--__ _     Rivers and Harbors Committee Doc.
                                                                                No. 15, 73d Cong., 1st sess.


  1Contain latest published maps.

   Local cooperation.-Fully complied with.
   Terrminal facilities.-There is one wharf and one boat yard for the
repair and storage of small boats at Westville. The wharf is privately
owned but open to public use. The facilities are considered adequate
for existing commerce.
   Operations and results during fiscal year.-No operations were in
progress. Costs amounting to $486 were incurred in connection with
contract for new work dredging completed near the end of the previous
fiscal year. Surveys were made at a cost of $136.45 for maintenance.
The total costs were $622.45. The expenditures were $9,387.29.
   Condition at end of fiscal year.-The existing project was completed
in 1941. The controlling depths at mean low water in May 1942 were
as follows: Delaware River to the mouth, 6.3 feet; thence to Westville,
10.7 feet; thence to Marters sand plant, 8.8 feet; and thence to Clements
Bridge, 9.0 feet.
   The costs and expenditures under the existing project, excluding
$50,000 contributed funds expended for new work, were $58,664.77 for
new work and $4,751.59 for maintenance, a total of $63,416.36.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal years 1943 and 1944.
                                        Cost and financial summary

Cost of new work to June 30, 1942__ _                                                              --       1$58, 664. 77
Cost of maintenance to June 30, 1942___                                                                         4,751.59

      Total cost of permanent work to June 30, 1942________                                                    63, 416.36
Net total expenditures______. _  __         __________                                                       163, 416. 36
Total amount appropriated to June 30, 1942_______________                                                    '63, 416.36
   1 In addition, $50,000 contributed funds expended for new work.



   Fiscal year ending June 30               1938           1939               1940             1941               1942

Cost of new work______________                              $440. 57        $35, 109. 41      $6, 571. 40           $486. 00
Cost of maintenance__      ...... _       -_ __
                                              --     _ ____.........-_ ______________          4, 615. 14            136. 45
        Total cost__                                         440. 57         35, 109. 41      11, 186. 54            622. 45
Total expended_______________________________                405. 25         31, 922. 52       5, 643. 91          9, 387. 29
Allotted -__       ___________________ _._______          42, 061. 35 - -                      7, 083. 75        -1, 786. 13



Balance unexpended July 1, 1941                                                                              $11, 173.42
Deductions on account of revocation of allotment                                                                , 786. 13
                                                                                                               1------------------
       Net amount to be accounted for-------------------------                                                  9, 387. 29
Gross amount expended-----------------      ----------------                                                    9, 387. 29
356        REPORT OF CHIEF OF ENGINEERS,                            U.    S. ARMY,        1942

                                   16. RACCOON CREEK, N. J.

   Location.-This creek rises in Gloucester County, N. J., flows north-
westerly 16 miles through the county, and empties into Delaware
River about 20 miles below Philadelphia, Pa. (See U. S. Coast and
Geodetic Survey Chart No. 295.)
   Previous projects.-Adopted by River and Harbor Act of August
2, 1882. For further details see page 1784, Annual Report for 1915,
and page 344, Annual Report for 1938.
   Existing project.-This provides for a channel 7 feet deep at mean
low water, 75 feet wide in Delaware River to the mouth and within
the creek to Bridgeport, 13/4 miles above the mouth; thence 60 feet
wide to Springers wharf, 5 miles above the mouth; and thence 40
feet wide to Swedesboro, 9 miles above the mouth. It also provides
for a cut-off at Molonox Shoal, 71/2 miles above the mouth, and for a
stone-filled, pile and timber-crib south jetty at the mouth, 950 feet
long. The total length of the section included in the project is about
93/4 miles. The mean tidal range at the mouth is 5.3 feet, and at
Swedesboro, 4.4 feet. The extreme tidal range is about 10 feet.
   The estimate of cost for new work, made in 1913, was $106.535,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $3,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                       Work authorized                                      Documents


June 13, 1902   For 7-foot depth to Springers wharf and 5 feet to    H. Doc. No. 231, 56th Cong., 1st sess.,
                  Swedesboro.                                          and Annual Report 1900, p. 1590.
Mar.   2,1907   For cut-off, Molonox Shoal                  _        Specified in act.
Mar.   2,1919   For 7-foot depth extension to Swedesboro, and        H. Doc. No. 800, 63d Cong., 2d sess.
                 jetty at mouth.                                         (Contains latest published maps.)



  Local cooperation.-Fully complied with.
   Terminal facilities.-There are 11 wharves of pile-and-timber con-
struction, all privately owned. The facilities are considered adequate
for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1922. The controlling depths, at mean low water, in May
1942 were as follows: From Delaware River to mouth, 7.4 feet;
thence to the highway bridge at Bridgeport, 7.6 feet; thence to
Springers wharf, 6.5 feet; and thence to Swedesboro, 3.4 feet.
   The costs and expenditures under the existing project were $82,-
907.73 for new work and $147,548.80 for maintenance, a total of
$230,456.53.
  Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
   The sum of $15,000 can be profitably expended during the fiscal
year 1944 for maintenance dredging in the entrance channel and
in the creek near Swedesboro, by contract (August to October 1943).
            RIVERS AND HARBOIRS-PHILADELPHIA,                                 PA.,   DISTRICT            357
                                        Cost and financial summary

Cost of new work to June 30, 1942______ ____-___-___________                                      $83,664.96
Cost of maintenance to June 30, 1942____________________________                                  147,548. 80

    Total cost of permanent work to June 30, 1942_---------------_ 231, 213. 76
Net total expenditures__ ___________________-                ___- 231, 213. 76
Total amount appropriated to June 30, 1942_--------------------- 231,213. 76
   Fiscal year ending June 30              1938           1939         1940          1941             1942


Cost of new work ...           -
Cost of maintenance___ __________           ________________         $27, 369. 00     $740. 98

Total expended_--      -           __       $108. 94                  23, 417. 96    4, 692. 02

Allotted_ - - -   _        -       -     -1, 139. 44       $20,000     9, 000.00     -890.   02



Amount that can be profitably expended in fiscal year ending June
   30, 1944, for maintenance____ ______________                          ________                 $15,000. 00

                                        17. SALEM RIVER, N. J.

   Location.-This river rises in Salem County, N. J., flows through
the county westwardly 13 miles, thence southwardly 7 miles to the
city of Salem, and thence westwardly 3 miles, emptying into Dela-
ware River about 45 miles below Philadelphia, Pa. It is joined at
Salem by Little Salem River, or Fenwick Creek, from the east. (See
Coast and Geodetic Survey Chart No. 294.)
   Previous projects.-The River and Harbor Act of July 11, 1870,
provided for a survey and the original project was adopted by River
and Harbor Act of March 3, 1871, and modified in 1878, and a subse-
quent project adopted by River and Harbor Act of March 2, 1907.
For further details see page 1784, Annual Report for 1915; page 349
of Annual Report for 1924; and page 346 of Annual Report for 1938.
   Existing project.-This provides for a channel 12 feet deep at
mean low water, 150 feet wide in Delaware River across Salem Cove
to the mouth, and thence 100 feet wide to the fixed highway bridge
in Little Salem River at Salem, 21/ nmiles above the mouth. It also
provides for a cut-off to eliminate a large horseshoe bend between the
mouth and Salem. The total length of the section included in the
project is about 4 miles. The mean tidal range is 5.4 feet. The ex-
treme tidal range is from about 1 foot below mean low water to
about 2 feet above mean high water.
   The estimate of cost for new work, revised in 1927, is $175,000 (one-
half of which is to be contributed by local interests), exclusive
of amounts expended under previous projects. The latest (1927)
approved estimate for annual cost of maintenance is $8,000.
   The existing project was adopted by the River and Harbor Act
of March 3, 1925 (H. Doc. No. 110, 68th Cong., 1st sess.). The latest
published map is in that document.
   Local cooperation.-The existing project requires that local inter-
ests contribute 50 percent of the estimated cost of new work and that
a right-of-way for the proposed cut-off shall be conveyed to the
United States free of cost. The contributions thus far made provide
the right-of-way for the cut-off and for 50 percent of the cost of the
12-foot channel up to a point 225 feet above the county (Penns Neck)
358          REPORT OF CHIEF OF ENGINEERS, U.                                                     S. ARMY,        1942

highway bridge, amounting to $51,825.10, of which $27,905.82 was
contributed by the State of New Jersey, $19,932.73 by the county of
Salem, and $3,986.55 by the city of Salem.
   Terminal facilities.-There are seven wharves on the river, all at
Salem. There are also three marine railways at two yards with
repair and storage facilities for small boats. All wharves are pri-
vately owned. The facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was about 60
percent completed. The work remaining to be done is the deepening
of the river channel, from a point about 225 feet above Penns Neck
Bridge to the fixed highway bridge at Salem, to 12 feet. The con-
trolling depths, at mean low water, in May 1942, were as follows:.
From Delaware River across Salem Cove to the cut-off, 7.1 feet;
thence to Penns Neck Bridge, 13.3 feet; and thence to the fixed high-
way bridge at Salem, 8.8 feet.
   The costs and expenditures under the existing project, excluding
$51,825.10 contributed funds expended for new work, were $51,825.09
for new work and $29,278.32 for maintenance, a total of $81,103.41.
  Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
  The sum of $12,000 can be profitably expended during the fiscal
year 1944, to be applied to maintenance dredging in the entrance
channel, by contract (July to September 1943).
   The completion of the project is not required by existing com-
merce.
                                            Cost and financial summary

Cost of new work to June 30, 1942-----------------------------                                                         $107, 634. 43
Cost of maintenance to June 30, 1942 .... ____________      ____                                                         77, 278. 32

      Total cost of permanent work to June 30, 1942-------------                                                        184, 912. 75
Net total expenditures------      --------------------------                                                           184, 912. 75
      Total amount appropriated to June 30, 1942_____--_--______                                                       1184, 912. 75

    Fiscal year ending June 30                           1938              1939              1940         1941                1942


Cost of new work ..
Cost of maintenance
                           . .
                          _.-_...
                                    . .-
                                       --
                                            .     -. - .- . - -. .
                                                    $7, 534. 92
                                                                     --- ---
                                                                     . .     .    .   .   ---------    --------    -      -     -.



Total expended -----------------                         7, 537. 28--------------------------                 -    -

Allotted-      -----------------            ---          1,496. 59                            -



Amount (estimated) required to be appropriated for completion of
existing project  __          _____________    ______   _____                                                          $36, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance----------------------------------                                                             12,000.00
   1 In addition, $51,825.10 contributed funds expended for new work.
   2 In addition, local interests are required to contribute an equal amount.



                                           18. COHANSEY RIVER; N. J.
  Lovction.-This river rises in Salem County, N. J., flows southerly
and southwesterly 27 miles through Cumberland County, and empties
into Delaware Bay about 62 miles below Philadelphia, Pa. (See U. S.
Coast and Geodetic Survey Chart No. 1218.)
           RIVERS AND HARBORS-PHILADELPHIA,                             PA.,    DISTRICT          359
   Previous projects.-Adopted by River and Harbor Act of March
3, 1873, and modified in 1879. For further details, see page 1785,
Annual Report for 1915, and page 348, Annual Report for 1938.
   Existing project.-This provides for a channel 12 feet deep, 100
feet wide from that depth in Delaware Bay through a neck of land
at the mouth and within the river to the south side of Glass Street
in Bridgeton, 19 miles above the mouth; thence a channel 8 feet deep,
100 feet wide to Broad Street; and thence 75 feet wide to Commerce
Street Bridge, 191/4 miles above the mouth; and for a turning basin
12 feet deep and 800 feet long formed by widening the channel on
the south side to a maximum width of 250 feet just below Glass Street.
The total length of the section included in the project is about 191/2
miles. All depths refer to the plane of mean low water. The mean
tidal range at the mouth is 5.7 feet, and at Bridgeton 6.2 feet. The
extreme tidal range is from about 2 feet below mean low water to
about 3 feet above mean high water.
   The estimated cost for new work, revised in 1937, was $140,000
exclusive of amounts expended on previous projects. The latest (1937)
approved estimate for annual cost of maintenance is $9,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                      Work authorized                                   Documents


Mar. 2,1907    For a 7-foot depth over entire project.._......   H. Doc. No. 645, 59th Cong., 1st sess.'
Aug. 26,1937   For a 12-foot depth to Glass St., thence 8-foot   Senate committee print, 75th Cong.,
                depth to Commerce St., with turning basin.         1st sess.l


1 Contains latest published maps.

  Local cooperation.-Fully complied with.
  Terminal facilities.-There are 22 wharves on this river, of which
16 are at Bridgeton and 6 at Greenwich piers. Three wharves at
Bridgeton and one at Greenwich piers have direct rail connections.
A marine railway is located at the latter place. The facilities are
considered adequate for existing commerce.
  Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was completed
in 1939. The controlling depths, at mean low water, in May 1942,
were as follows: Delaware Bay to mouth, 11.9 feet; thence to Glass
Street in Bridgeton, 11.3 feet; thence to Broad Street Bridge, 5.2
feet; and thence to Commerce Street Bridge, 3.2 feet.
  The costs and expenditures under the existing project were $110,-
755.75 for new work and $104,691.66 for maintenance, a total of
$215,447.41.
  Proposed operations.--It is proposed to transfer the funds unex-
pended on June 30, 1942, amounting to $15,500, to another project
within the district.
  No funds can be profitably expended during the fiscal year 1944,
as it is believed that no maintenance will be necessary.
360         REPORT OF CHIEF OF ENGINEERS,                         U. S. ARMY,               1942

                                   Cost and financial summary
Cost of new work to June 30, 1942_-__---------  --    _____---                                   $146, 755. 75
Cost of maintenance to June 30, 1942______________________                                  _     104, 691. 66

           Total cost of permanent work to June 30, 1942____________                              251, 447. 41

Net total expenditures_____-_______--------____                                                   251, 447. 41
Unexpended balance June 30, 1942_________________--__-___                                          15, 500. 00
           Total amount appropriated to June 30, 1942 _______________                             266, 947. 41

   Fiscal year ending June 30         1938           1939          1940              1941                1942

Cost of new work_                                  $59, 337. 41   $2, 839. 45   .................-----          ----
Cost of maintenance    -   --        $3, 421. 55
Total expended_        _   ---        8, 782. 37    47, 188. 31   14, 988. 55
Allotted                             86, 670. 55   -30, 617. 06    1, 793. 92         $15, 500

Balance unexpended July 1, 1941__                                                                 $15, 500. 00
Balance unexpended June 30, 1942 _______________________________                                   15, 500. 00

                                 19. COLD SPRING INLET, N. J.

   Location.-This inlet is located in Cape May County, southern
New Jersey, about 3 miles east of Cape May City and about 16 miles
northeast of Delaware Breakwater. The inlet connects Cold Spring
Harbor with the Atlantic Ocean and is about 1 mile in length. (See
U. S. Coast and Geodetic Survey Charts Nos. 234, 827, and 1219.)
   Existing project.-This provides for an inlet entrance channel 25
feet deep at mean low water and 400 feet wide, protected by two
parallel jetties spaced 850 feet apart, the east jetty 4,548 feet long
and west jetty 4,410 feet long, with inshore end wings 750 feet and 297
feet long, respectively, the wings and the 2,000-foot inshore end sec-
tion of west jetty of stone-filled pile and timber construction, and the
entire east jetty and the outshore end section of the west jetty of
rubble mound construction. The total length of the section included
in the project is about 1 mile. The mean tidal range at the inner ends
of the jetties is 4.3 feet. The extreme tidal range, due to ocean
storms, is about 11 feet.
   The estimate of cost for new work, made in 1906, was $1,311,000,
including $100,000 contributed funds. The latest (1928) approved
estimate for annual cost of maintenance is $20,000.
   The existing project was adopted by the River and Harbor Act
of March 2, 1907 (H. Doc. No. 388, 59th Cong., 2d sess.). The latest
published map is in the Annual Report for 1911, page 1382.
   Recommended modifications of project.-Under date of May 20,
1941, the Chief of Engineers recommended modification of the exist-
ing project for Cold Spring Inlet, N. J., to provide an entrance chan-
nel 25 feet deep and 400 feet wide, protected by parallel jetties, and
extending from the 25-foot depth in the Atlantic Ocean to a line 500
feet harborward of a line joining the inner ends of the jetties, thence,
20 feet deep and 300 feet wide to deep water in Cold Spring Harbor;
at an estimated cost of $71,000 to complete the project and $30,000
annually for maintenance of the entire project (H. Doc. No. 262, 77th
Cong., 1st sess.).
             RIVERS AND HARBORS-PHILADELPHIA,                                             PA.,   DISTRICT                 361
   Local Cooperation.-All cooperation has been completed, except the
work of deepening and enlarging the inner harbor, which is 80 per-
cent completed.
   Terminal facilities.-- harves with docking facilities for com-
mercial fishing vessels and fishing party boats are located on the inner
end of the harbor at Cape May. There is also a well-equipped marine
railway adjoining the fish dock, a number of small wharves for
private craft and party boats and a yacht basin with accommoda-
tions for about 50 boats. North of the inlet entrance channel at Wild-
wood Crest is another large well-equipped wharf for commercial
fishing boats. Both fish docks have direct railroad connections. The,
facilities are considered adequate for existing commerce.
   Operations and results during tiscal year.-Maintenance dredging
in the inlet channel by the U. S. hopper dredge Absecon was com-
menced April 14 and completed June 12, 1942. A total of 177,360
cubic yards, bin measurement, of material was removed at a cost of
$31,851.39 for maintenance. The expenditures were $25,427.21.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1917. The controlling depth, at mean low water, in June
1942, from the Atlantic Ocean to the inner limit of the project was
22.0 feet.
   The costs under the existing project, excluding $100,000 contributed
funds expended for new work, were $879,274.62 for new work and
$574,900.53 for maintenance, a total of $1,454,175.15. The expendi-
tures were $1,447,750.97.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1942, amounting to $34,572.79 as follows:
Accounts payable June 30, 1942_----------------_________________    _  $6, 424. 18
Maintenance: Dredging throughout the project with a United States
  hopper dredge (October to November 1942) --_______             __ __ 28, 148. 61
          Total             ------------------------------------------                                        _ 34, 572. 79
  The sum of $50,000 can be profitably expended during the fiscal
year 1944 for channel maintenance, with Government plant, as re-
quired.
                                       Cost and financial summary

Cost of new work to June 30, 1942------------------------------                                               $879, 274. 62
Cost of maintenance to June 30, 1942-------------------------.                                                 574, 900. 53
     Total cost of permanent work to June 30, 1942 ------------                                                  , 454, 175. 15
Minus accounts payable June 30, 1942                                                                                  , 424. 18
                                                                                                                     6-------------------------

      Net total expenditures-------------------- ------------                                               1, 447, 750. 97
Unexpended balance June 30, 1942------------------------_34,                                                        572. 79
           Total amount appropriated to June 30, 1942__-------------                                        1, 482, 323. 76
   1 In addition, $100,000 contributed funds expended for new work.


    Fiscal year ending June 30                 1938              1939              1940              1941               1942

Cost of new work---------------        ---      ------      ----------   --------...   --- -------
Cost of maintenance ..    _...               $29, 580. 61         $181. 63      $46, 032. 76     $27, 732. 84          $31, 851. 39
Total expended_                               29, 580. 61          181. 63        46, 032. 76      27, 732. 84          25, 427. 21

Allotted ..........   . ......    ..          30, 000. 00       19, 762. 24       66,032. 76     -11,000:00             58, 732. 84
362      REPORT OF CHIEF OF ENGINEERS,           U. S. ARMY,      1942

Balance unexpended July 1, 1941 _________                            $1, 267.16
Amount allotted from War Department Civil Appropria-
tion Act approved May 23, 1941_________________     $15, 000
Amount allotted from War Department Civil Appropria-
tion Act approved Apr. 28, 1942 __________________ _ 45,000
                                                                     60, 000. 00

      Amount to be accounted for_____________________________        61, 267. 16
Deductions on account of revocation of allotment_____________         1, 267. 16
      Net amount to be accounted for _________-___-- _____--60,          000. 00
Gross amount expended_____________________-_______                   25, 427.21
      Balance unexpended June 30, 1942                       __      34, 572. 79
Outstanding liabilities June 30, 1942_________________________        6, 424. 18
       Balance available June 30, 1942_                              28, 148. 61
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance 2______                              50, 000. 00
  a Exclusive of available funds.

                             20. ABSECON INLET, N. J.

   Location.-This inlet is located on the coast of New Jersey about
65 miles north of Delaware Breakwater, between Brigantine Beach
on the north and Absecon Beach on the south. It forms the entrance
to the harbor at Atlantic City, N. J. (See U. S. Coast and Geodetic
Suvery Charts No. 826 and 1217.)
   Previous project.-Adopted by River and Harbor Act of July
25, 1912. The project was completed in 1916. For further details
see Annual Report for 1936, page 319.
   Existing project.-This provides for an inlet entrance channel
20 feet deep at mean low water and 400 feet wide. It also provides
that should the channel at any time have a deleterious effect on the
Atlantic City beach, work upon the improvement may cease, it being
understood that the project is adopted on the basis that the interests
of the beach in front of the city are superior to those of the inlet.
The total length of the section included in the project is about 1 mile.
The mean tidal range in the ocean is 4.0 feet and at the inlet gorge
3.6 feet. The extreme tidal range, due to ocean storms, is about
11 feet.
   The estimate, of cost for new work, revised in 1942, is $510,000.
The latest (1922) estimate for annual cost of maintenance is $50,000.
   The existing project was adopted by the River and Harbor Act
of September 22, 1922 (H. Doc. No. 375, 67th Cong., 2d sess.). The
latest published map is contained in the Annual Report for 1887,
page 818.
   Terminal facilities.-There are nine wharves served by this im-
provement; one is Government owned, six are privately owned and
open to the general public use upon payment of moderate wharfage,
and two are publicly owned. Three of the wharves have direct
railroad connection. There is also a continuous line of piers or
landing places for pleasure craft on both sides of the large basins
which indent the south shore of the inner channel. There are three
                    RIVERS         AND HARBORS-PHILADELPHIA,                                      PA.,     DISTRICT               363

shipyards and three marine railways at this locality. The facilities
are considered adequate for the existing commerce.
   Operations and results during fiscal year.-Surveys to determine
channel conditions were made at a cost of $4,240.12 for maintenance.
The expenditures were $4,255.66.
   Condition at end of fiscal year.-The existing project was about 43
percent completed. The work remaining to be done is the completion
of the dredging of the inlet channel to project dimensions. The con-
trolling depth, at mean low water, in May 1942, in the channel across
the ocean bar, was 17.2 feet.
   The costs under the existing project were $208,647.66 for new work
and $641,527.18 for maintenance, a total of $850,174.84. The expendi-
tures were $850,043.
  Proposedoperations.-Itis proposed to apply the funds unexpended
on June 30, 1942, amounting to $102,898.90, as follows:
Accounts payable June 30, 1942__________________________________     $131. 84
Maintenance: Dredging throughout the project with a United States
  hopper dredge (August to December 1942)                         102, 767. 06
              Total-----                         --------------------------------                                        102,898.90
  The sum of $75,000 can be profitably expended during the fiscal year
1944 for channel maintenance, with Government plant, as required.
  The completion of the project has been deferred pending the results
of studies being made to determine the probable effect of proposed
inlet jetties.
                                                Cost and financial summary
Cost of new work to June 30, 1942__ _                                                                                   $435, 144. 55
Cost of maintenance to June 30, 1942-------                                        --       --------                     877, 312. 79
      Total cost of permanent work to June 30, 1942 .       ___  1, 312, 457. 34
Minus accounts payable June 30, 1942 ---------------------------         131. 84
     Net total expenditures________________________                                                                1, 312, 325. 50
Unexpended balance June 30, 1942 ----------------------------                                                         102, 898.90
              Total amount appropriated to June 30, 1942-----------                                                1, 415, 224. 40

      Fiscal year        ending June 30               1938            1939                1940             1941               1942

Cost of new work .--------..                         ... ... ....
                          .-.----------...---------.--..                                                  ... ... ....     ... ... ...
Cost of maintenance---....                  --..... $117, 233. 46   $85, 891. 24        $58, 331.34      $63, 592. 82         $4, 240. 12
Total expended--_-__-_--------_                   137, 985. 47       86, 436. 69         58, 084. 50      64, 465. 39          4, 255. 66
Allotted----.......-----..   --------........     216, 016. 23       57, 500. 00         40, 706. 08      70, 104. 99         39, 000. 00



Balance unexpended July 1, 1941--   _________                                                      -_                    $68, 154. 56
Amount allotted from War Department Civil Appropriation Act
    approved Apr. 28, 1942------------___________                                                                         54, 000.00

      Amount to be accounted for_------------------_----_       _                                                        122, 154. 56
Deductions on account of revocation of allotment__-- __________._                                                         15, 000. 00
              Net amount to be accounted for_------------------------_                                                  107, 154.56
364        REPORT OF CHIEF OF ENGINEERS,                           U. S. ARMY,          1942

Gross amount expended-----------------------------------------                                $4, 255. 66

      Balance unexpended June 30, 1942--------------------- _                                102, 898. 90
Outstanding liabilities June 30, 1942-----------------------------                                131. 84

        Balance available June 30, 1942                                                       02, 767. 06
                                                                                             1---------------------------

Amount (estimated) required to be appropriated for completion of
existing project 1---------------------------------------                                   300, 000. 00
Amount that can be profitably expended in fiscal year ending June
  30, 1944, for maintenance 1------------                                                     75, 000. 00
  1 Exclusive of available funds.


                                21. BARNEGAT INLET, N. J.

   Location.-This inlet is located on the east coast of New Jersey,
about 50 miles south of Sandy Hook and 23 miles north of Little
Egg Harbor. It forms the main entrance to Barnegat Bay, the
largest of the bays on the New Jersey coast which are separated from
the ocean by narrow barrier beaches. The inlet lies between Island
Beach on the north and Long Beach on the south. (See U. S. Coast
and Geodetic Survey Charts Nos. 825 and 1216.)
   Existing project.-This provides for a channel 8 feet deep through
the inlet and 10 feet through the outer bar, the channel to be pro-
tected by two converging stone jetties extending to the 12-foot con-
tour in the ocean and spaced 1,000 feet apart at the outer ends. The
north jetty is 4,900 feet long and the south jetty 2,950 feet long, each
with pile and timber sheet pile inshore end sections 769 and 750 feet
long, respectively, and outshore end sections of all stone construction.
A channel of suitable hydraulic characteristics extending in a north-
westerly direction from the gorge in the inlet to Oyster Creek Channel
just northwest of Sunset Shoal, thence via Oyster Creek Channel to
deep water in the bay. The total length of the section included in
the project is about 4.5 miles. The plane of reference is mean low
water. The mean range of tide at the inlet gorge is 2.7 feet and in
Barnegat Bay 0.5 foot. The extreme range of tide at the inlet is
from about 2 feet below mean low water to about 3 feet above mean
high water.
   The estimate of cost for new work, revised in 1940, was $500,000,
exclusive of $300,000 contributed by local interests. The latest (1937)
approved estimate for annual cost of maintenance is $15,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                              Work authorized                                  Documents

Aug. 30, 1935   For 8-foot depth through the inlet to Oyster Creek Channel     Rivers and Harbors Com-
                 and across inner bar, 10-foot depth through outer bar and       mittee Doc. No. 19, 73d
                 for jetties.                                                    Cong., 2d sess.'
Aug. 26, 1937   For a channel of suitable hydraulic characteristics from the   Rivers and Harbors Comrn-
                 gorge to Oyster Creek Channel, and thence to deep water         mittee Doec. No.1 85, 74th
                 in bay.                                                         Cong., 2d sess.


  1 Contains latest published maps.

  Local cooperation.-Fullycomplied with.
  Terminal facilities.-There are four docks or terminals located in
the inner harbor at Barnegat City which furnish adequate facilities
              RIVERS      AND HARBOR°S-               PHILADELPHIA,                         PA.,    DISTRICT               365
for the present commerce of the locality. All are private, three being
used for fishing interests.
   Operations and results during fiscal year.-Costs under maintenance
were as follows: Surveys to determine channel conditions, $6,230.24,
and acquisition of easements on land for disposal of dredged ma-
terial, $78.71. The total cost was $6,308.95 for maintenance. The
expenditures were $6,618.05.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1940. The controlling depths, at mean low water, in May
1942, were as follows: From the Atlantic Ocean through the inlet
channel, 7.2 feet; thence through the main channel, 7.2 feet; and
thence through Oyster Creek Channel to Barnegat Bay, 6.8 feet.
   The costs and expenditures under the existing project, excluding
$300,000 contributed funds, expended for new work, were $448,849.09
for new work and $10,585.24 for maintenance, a total of $459,434.33.
   Proposed operations.-Itis proposed to apply the funds unexpended
on June 30, 1942, amounting to $77,365.67 to maintenance dredging in
the channel between the ocean and Oyster Creek Channel, by contract
(August to December 1942).
   The sum of $20,000 can be profitably expended during the fiscal
year 1944 for maintenance dredging throughout the project, by con-
tract (February to April 1944).
                                     Cost and financial summary

Cost of new work to June 30, 1942______________________________                                                   $448, 849. 90
Cost of maintenance to June 30, 1942___________________________                                                     10, 585. 24
           Total cost of permanent work to June 30, 1942____________                                               459, 434. 33
Net total expenditures__________________________                                                                   459, 434. 33
Unexpended balance June 30, 1942_________________________                                                           77, 365. 67
           Total amount appropriated to June 30, 1942_______________                                               536, 800. 00


   Fiscal year ending June 30            1938                1939                   1940             1941              1942



Cost of new work________________      $18, 884. 52        $323, 520. 98       $348, 348. 66        $58, 094. 93 -
Cost of maintenance             _ ___________4,                                                         276. 29        $6, 308. 95

      Total cost-----------------       18, 884. 52       323, 520. 98            348, 348. 66      62, 371. 22         6, 308. 95

Total expended__                        14, 111. 50        293, 457. 17           321, 042. 61     124, 205. 00         6, 618. 05

Allotted    -----------        -       600, 000. 00----                   -140,       000. 00       96, 800. 00


Balance unexpended July 1, 1941 _____________________________                                                     $83, 983. 72
Gross amount expended______----------------------__                                                                 6, 618. 05
     Balance unexpended June 30, 1942----------       ______ -                                                      77, 365. 67
Amount that can be profitably expended in fiscal year ending
                                  -- - -      -- -- -- -
June 30, 1944, for maintenance 2        ____          ______                                                       20, 000. 00
  1 In addition, $300,000 expended from contributed funds for new work.
  2 Exclusive of available funds.



           493202-43-pt. 1, vol. 1--24
366          REPORT OF CHIEE                      OF ENGINEERS, U.                  S. ARMY,              1942

    22. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

   The cost of work during the year was $75,588.37. The expendi-
tures were $70,644.08. The balance unexpended June 30, 1942,
amounting to $2,522.66, will be applied as needed during the fiscal
year 1943 to payment of expenses incurred under this heading.
   The sum of $85,000 can be profitably expended during the fiscal
year 1944.
                                            Cost and financial summary

Cost of new work to June 30, 1942
Cost of maintenance to June 30, 1942_______________________                                                     $933, 231.81

      Total cost of permanent work to June 30, 1942________ ___                                                 933, 231. 81
Minus accounts payable June 30, 1942 _____________-- ______---                                                    8, 590. 05

     Net total expenditures-__---- ------                                                                        924, 641. 76
Unexpended balance June 30, 1942____ .                                ___.__        ____             __            2, 522. 66
           Total amount appropriated to June 30, 1942_----___---_                                                927,164. 42


    Fiscal year ending June 30                 1938            1939             1940               1941               1942


Cost of new work .-----------------------------------------
Cost of maintenance .........------------    $60, 461. 32   $77, 372. 57    $109, 950. 68        $71, 046. 67        $75, 588. 37

Total expended ._..-----.....                 59, 744. 56     69, 529. 44      88, 596. 19        98, 025. 09         70, 644. 08

Allotted      --------------------- 122, 400. 00            113, 700. 00       66, 360. 09        71, 246. 56         14, 645. 19



Balance unexpended July 1, 1941_ -----__     -- -----       -                                                    $58, 521. 55
Amount allotted from War Department Civil Appropria-
tion Act approved June 24, 1940--__-__- __     __-_ $1, 786. 13
Amount allotted from War Department Civil Appropria-
tion Act approved May 23, 1941-----____--_---  -     12, 859. 06
                                                                                                                  14. 645. 19
      Amount to be accounted for                                                        ------                     3, 166. 74
                                                                                                                  7--------------
Gross amount expended----------------------------                                                                 70, 644. 08
      Balance unexpended June 30, 1942__-----------       -                                                -       2, 522. 66
Outstanding liabilities June 30, 1942-------- __ -____--___                                                        8, 590. 05
      Balance available June 30, 1942------       -----            -6, 067. 39
Amount that can be profitably expended in fiscal year ending June
                                                          _
30, 1944, for maintenance 1'---__      __----__-
                                   ---------                      - 85, 000. 00
1
   Exclusive of available funds.
             RIVERS AND HARBORS-PHILADELPHIA,                                             PA., DISTRICT                           367
  23. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED

                                                            For last           Cost and ex pennditures to
                                                          full report,               June: 30, 1942                   Estimated
                 Name of project                          see Annual                                                    amount
                                                            Report                                                    required to
                                                             for-              New work         1M
                                                                                                 Maintenance           complete
                                        ----          I                  -I

1. Delaware River, N. Y., N. J., and Pa., at or
      near mouth of Neversink River 12                        1917                     None              None            $61, 392. 50
2. Chester River, Pa.3_      ___                             1931                $6, 000. 00          $650. 26            3, 600. 00
3. Ice Harbor at Marcus Hook, Pa.4                           1928               208, 963. 64       14, 336. 36             (5)

4. Ice Harbor at New Castle, Del.4                           1898               224, 703. 84                 0             (5)
                                 3              -
5. Appoquinimink River, Del.                                 1931                36, 973. 35       40, 998. 56             3, 000. 00
                       3
6. Leipsic River, Del. -__________ ___________               1931                36, 956. 06       32, 167. 94             (5)
                         6
7. St. Jones River, Del. __          _                       1940               207, 102. 37       64, 537. 22          267, 500. 00
8. Broadkill River, Del.3                                    1941                68, 227. 97      101, 723. 67             (5)

9. Harbor of Refuge, Delaware Bay, Del.e_____.               1939            4, 987, 657. 13      120, 455. 55           65, 000. 00
10. Inland Waterway from Chincoteague Bay,
                                   2
      Va., to Delaware Bay, Del. 7_                           1939              168, 411. 88      8 42, 794. 40             (5)

11. Woodbury Creek, N. J.3__       ________________           1940               27, 093. 01        55,   405.   91         (5)

12. Mantua Creek, N. J.3      _.                              1940              169, 687. 08        79,   736.   42         (5)

13. Oldmans Creek, N. J.3 ---------------------               1941               31, 188. 43        31,   676.   20       88, 800. 00
14. Alloway Creek, N. J. 3      __                            1931               21, 397. 73        33,   002.   27         (5)

15. Dennis Creek, N. J.3.                                     1897                4, 701.05                       0         (5)

16. Goshen Creek, N. J.2 3__------------------                1905               15, 358. 77            870.     (0         (5)

17. Absecon Creek, N. J.3 . .        -.     . .               1941               11, 934. 96        67, 725.     34         (5)

18. Little Egg Harbor, N. J.1 2 9__          --                                  15, 048. 00                      0         (5)

19. Tuckerton Creek, N. J.3_                                  1941               60, 242. 16       127, 818.     96         (5)
                         2
20. Double Creek, N. J.    3 10                               1912                7, 800. 00                      0         (5)
21. Toms River, N. J.3 11                                     1940               10, 050. 00        19, 818.     21         (5)
22. Maurice River, N. J.6 12                                  1941              143, 984. 49       118, 558.     91              ()
                                                                                                                         120),0010.


  1 Abandonment recommended in H. Doc. No. 467, 69th Cong., 1st sess.
  2No commerce reported.
  3 Channel adequate for commerce.
  4 Harbor not now required by existing commerce.
  5Completed.
  6 Awaiting local cooperation.
  7 Cost of maintaining bridges assumed by State of Delaware.
  s In addition to $2,000 expended from contributed funds for maintenance.
  9 Last appropriation for this project was in 1852. No information is at hand relative to work done.
  10 Maintenance assumed by local authorities as required by act authorizing the project.
  11 Modification of existing project recommended in H. Doc. No. 393, 77th Cong., 1st sess.
  12 Expended $4.84 and $50.91 revoked, fiscal year 1942.


             24. PLANT ALLOTMENT, PHILADELPHIA, PA., DISTRICT
                         Cost and financial summary
Undistributed costs June 30, 1942___  ----------------                                                           $7, 459, 484. 94

Net total cost to June 30, 1942___----  __---------                                         ______                7, 459, 484.94
Plus accounts receivable June 30, 1942------------                                         ____----_                  79, 535. 51

      Gross total costs to June 30, 1942_..... _____---------                                                     8,139, 020. 45
Minus accounts payable June 30, 1942 ----_____------------__                                                        475, 770. 23

      Net total expenditures---------------------------------                                                     7, 663, 250. 22
Unexpended balance June 30, 1942__      ______________-------_                                                    1, 047, 716. 01

        Total amount appropriated to June 30, 1942_----                                         ___ -__           8, 710, 966. 23

   Fiscal year ending June 30            1938                1939                 1940               1941                 1942

Total expended____________          -$168, 339. 12    -$195, 444. 47 $1, 946, 498. 70             $631, 529. 80       $2, 382, 319. 16

Allotted__    _------------------     -39,159. 60         -11, 300. 00        2,173, 580. 02     3, 358, 929. 72 __
368        REPORT OF CHIEF OF ENGINEERSY                        U.   S. ARMY,       1942

Balance unexpended July 1, 1941--------------------------                            $3, 430, 035. 17
Gross amount expended____________________ $10, 934, 841. 13
Less:
    Reimbursements collected___ $8, 541, 314. 91
    Receipts from sales---------         11, 207. 06
                                                          8, 552, 521. 97
                                                                                      2, 382, 319. 16
      Balance unexpended June 30, 1942_____________________                           1, 047, 716. 01
Outstanding liabilities June 30, 1942----------  $786, 208. 46
Amount covered by uncompleted contracts-- -__   1, 873, 905. 74
                                                                                      2, 660, 114. 20

     Balance available June 30, 1942____________________                           -- 1, 612, 398. 19
Accounts receivable June 30, 1942___________________________                             679, 535. 51

        Unobligated balance available June 30, 1942______________                     -932,   862. 68

Status of all investigations for navigation, called for by river and harbor acts
                           and committee resolutions

                                                     Date trans-
          Locality             Authorization act      mitted to      Document No.        Reamen-
                                                      Congress                            dation

Absecon Inlet, N. J ---       __ Rivers and Harbors
                                   Committee resolu-
                                  tion, Apr. 16, 1935.
Absecon Inlet, N. J., im- Commerce Committee
  provement and mainte-           resolution, May 12,
  nance of Gardners Basin.        1941.
Absecon Inlet, N. J., im- Rivers and Harbors
  provement of anchorage           Committee resolu-
  area and small boat har-        tion, Feb. 28, 1941.
  bor on Clam   Creek.
Barnegat Inlet, N. J _-.-_.      Rivers and Harbors
                                   Committee resolu-
                                   tion, Feb. 9, 1939.
B roadkill River, Del    .-.-    Rivers   and Harbors Aug. 1,1941 House, 344, 77th Favorable.
                                   Committee resolu-                   Cong., 1st sess.
                                   tion, May 11, 1939.
Broadkill River and water- Commerce Committee -_ _ do _-              ---  do.......-.__ Do.
  way from Indian River In-       resolution, May 16,
  let to Rehoboth Bay, Del.        1939.
Delaware River between Rivers and Harbors July 31,1941 House, 340, 77th                     Do.
  Philadelphia and the sea.        Committee resolu-                   Cong., 1st sess.
                                  tion, Feb. 11, 1941.
Delaware River in vicinity Rivers and Harbors Aug. 5, 1941 House, 353, 77th                 Do.
  of Camden, N. J.                 Committee resolu-                   Cong., 1st sess.
                                  tion, Feb. 16, 1940.
Delaware River, N. Y., Pa., Rivers and Harbors                    ------------....--
  N. J., and Del., construc-       Committee resolu-
  tion of dams in vicinity of     tion, Jan. 24, 1939.
  Tocks Island, Belvedere
  and Chestnut Hill, Pa.
   (navigation and power).
Delaware River to Chesa- Commerce Committee
  peake Bay, Del. and Md.,        resolution, Mar. 28,
  Inland Waterway (with            1939.
  particular reference to
  bridges).
Pleasantville, N. J., to At- Rivers and Harbors Aug. 8,1941                              Unfavorable.
  lantic City, N. J., water-       Act, Aug. 26, 1937.
  way through Lake Bay,
  including connecting chan-
  nel to Ocean City.
Rehoboth Bay to Delaware Commerce Committee Aug. 1, 1941            House, 344, 77th Favorable.
  Bay, Del., inland water-        resolution, May 2,                   Cong., 1st sess.
  way.                             1939.
     Do.------..........__       Rivers and Harbors ----.do...... _        do...........    Do.
                                   Committee resolu-
                                   tion, May 8, 1939.
Toms River, N. J., channel Rivers and Harbors Sept. 24, 1941 House, 393, 77th               Do.
  from the Highway Bridge          Committee resolu-                   Cong., 1st sess.
  to New Jersey Intracoastal       tion, July 18, 1939.
  Waterway.
Townsend Inlet, N. J----....... Rivers and Harbors
                                   Committee resolu-
                                   tion, May 18, 1937.
        RIVERS    AND HARBOIRS-PHILADELPHIA,            PA., DISTRICT          369
              25. MOUNT HOLLY, RANCOCAS CREEK, N. J.
   Location.-Mount Holly, the county seat of Burlington County,
N. J., is located on Rancocas Creek, 13 miles above its mouth. Ran-
cocas Creek empties into Delaware River opposite the upper limits of
Philadelphia, Pa. Its drainage area covers a large portion of Bur-
lington County. (See U. S. Geological Survey Chart, Mount Holly,
N. J., quadrangle.)
   Existing project.-This provides for the enlargement of sections
of the existing channel through the eastern and western sections of
Mount Holly; the construction of a controlled bypass channel to
divert floodwaters from that part of the existing channel which loops
through the center of the town; the construction of a new channel
extending upstream from the upper end of the bypass channel so as
to pass around the business section and rejoin the existing channel in
the eastern part of the town; and the construction of one highway
and one railroad bridge across the new channel. The estimated cost
of the existing project is $350,000, exclusive of land and other work to
be provided by local interests.
   The existing project was authorized by the War Department Civil
Appropriation Act approved May 23, 1941, and by the Flood Control
Act approved August 18, 1941 (H. Doc. 128, 77th Cong., 1st sess.).
   Local cooperation.-See page 5 for requirements.            Assurances
were approved by the Secretary of War March 30, 1942. Rights of
entry have been furnished, free of cost to the United States, for all
construction undertaken to date.
   Operations and results during fiscal year.--New work: The con-
struction of a bypass channel and a highway bridge at Mount Holly,
by contract, commenced April 20, 1942, was about 17 percent com-
plete at the end of the fiscal year. The cost was $20,221.19.
   The excavation of a new cut-off channel, and the enlargement of
the existing channel above and below the bypass channel, by contract,
commenced June 17, 1942, was about 4 percent complete at the end of
the fiscal year. The cost was $657.32. Other costs were: Prelimi-
nary work on plans and designs, $7,755.99, and field surveys, $223.55, a
total of $7,979.54. The total cost was $28,858.05 for new work. The
expenditures were $12,993.90.
   Condition at end of fiscal year.-The existing project was about 10
percent complete. The work remaining to be done is the completion
of the bypass channel and highway bridge, and the cut-off channel
and excavation, under contracts in force, and the construction of a
railroad bridge for which a contract has been awarded. The costs
under the existing project were $31,343.17, and the expenditures were
$13,741.97.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1942, amounting to $336,258.03, as follows:
Accounts payable June 30, 1942 ---------------------------------        $17, 601. 20
New work :
    Continue and complete construction of a bypass channel and
      a highway bridge under contract in force (July to Septem-
     ber 1942) ------------------------------------------------         173, 332. 66
    Continue and complete excavation of new cut-off channel and
      enlarge existing channel by contract in force (July to October
      1942) _______________---                                         -87,   504. 68
    Construct railroad bridge over new cut-off channel by contract
       (July to August 1942) ----------------------------                57, 819. 49
             Total------             ------------                       336, 258. 03
370         REPORT OF CHIE                     OF ENGINEERS,                     U. S. ARMY,                      1942

  The proposed work will complete the project.
  No funds can be profitably expended during the fiscal year 1944,
as the project will be completed with the available funds.
                                      Cost and financial summary

Cost of new work to June 30, 1942------------------------------
                                          _______________                                                              $31, 343. 17
Cost of maintenance to June 30, 1942_-.-_

      Total cost of permanent work to June 30, 1942_______________                                                       31, 343. 17
Minus accounts payable June 30, 1942-----------------------------                                                        17, 601. 20

     Net total expenditures_------------------------------------13,      741.97
Unexpended balance June 30, 1942________________________         __ 336, 258.03

         Total amount appropriated to June 30, 1942-----------------350,                                                     000. 00

   Fiscal year ending June 30               1938                 1939                 1940                1941               1942


Cost of new work      _   ....       ..__ . . _..__....
                                                    . . ...__.. . . ..   . . .. . . ..       . . .       $2, 485.12         $28, 858.05
Cost of maintenance         -------------     -       ----------------        ------------               ------       --------       -
Total expended                                                               --------------                  748.07          12, 993.90
Allotted ---------                                                                -        ....      350, 000.00


Balance unexpended July 1, 1941 ______________                    $349, 251.93
Amount allotted from War Department Civil Appropriation Act ap-
proved May 23, 1941--------------------------------  ---- ------ 342, 962. 27

      Amount to be accounted for_-------------------------------_                                                      692, 214. 20
Deductions on account of revocation of allotment ___________-__                                                        342, 962. 27
      Net amount to be accounted for______________________-_                                                           349, 251.93
Gross amount expended_______________________-______                                                                     12, 993.90

      Balance unexpended June 30, 1942_________________________                                                        336, 258. 03
Outstanding liabilities June 30, 1942____ _              $122. 12
Amount covered by uncompleted contracts--------------192, 872. 87
                                                                                                                       192, 994.99

         Unobligated balance available June 30, 1942-________________                                                  143, 263.04

26. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL

   The cost of work during the year was $8,995.78. The expenditures
were $9,885.60. The balance unexpended June 30, 1942, amounting to
$3,217.09, will be applied as needed during the fiscal year 1943 to pay-
ment of expenses incurred under this heading.
                                      Cost and financial summary
Cost of new work to June 30, 1942
Cost of maintenance to June 30, 1942___
                                        ______________________-                                                    ----------
                                                                                                                     $50, 388. 91
     Total cost of permanent work to June 30, 1942-------------_ 50, 388. 91
Minus accounts payable June 30, 1942 ______________________-----6. 00

      Net total expenditures._ ________-___-                                           _                                 50, 382. 91
Unexpended balance June 30, 1942_          ---                                               ---------                    3, 217.09

         Total amount appropriated to June 30, 1942 ----------                                                           53, 600. 00
             RIVERS     AND      HARBORS-PHILADELPHIA,                                       PA.,   DISTRICT               371

   Fiscal year ending June 30            1938                 1939                   1940            1941              1942

Cost of new work-----
Cost of maintenance_____________ ______________          $19, 577. 97            $16, 595. 99       $5, 219. 17        $8, 995. 78
Total expended____________                                   17, 707. 41          17, 517. 06        5, 272. 84         9, 885. 60
Allotted       _                                             23, 500. 00          13, 100. 00       17, 000. 00

Balance unexpended July 1, 1941_________________                                                                  $13, 102. 69
Gross amount expended_________________________- -----                                                               9, 885. 60
      Balance unexpended June 20, 1942________----------------3,                                                        217. 09
Outstanding liabilities June 30, 1942------------------------------                                                       6. 00

           Unobligated balance available June 30, 1942                                 __________                    3, 211. 09
Status of all investigations for flood control, called for by flood-control acts and
                               committee resolutions
                                                                 Date trans-
            Locality              Authorization act               mitted to                 Document No.          Recommenda-
                                                                                                                      tion
                                                                  Congress

Beaverkill River, Sullivan      Flood    Control     Act,      Aug.        4, 1941                                Unfavorable.
  County, N. Y.                   Mar.   3, 1936.
   Do-                          Flood    Control     Act,       --     do -                                          Do.
                                  June   22, 1936.
Delaware River, East            -_   do -       ... _... ..
                                                  .....         -_     do-                                           Do.
Branch, Sullivan County,
N. Y.
   Do__                         Flood Control         Act,     __      do-                                           Do.
                                  Mar. 3, 1936.
Delaware River, N. Y -...       Flood Control        Act,      _._ do                                                Do.
                                 June 22, 1936.
    Do __-                      Flood Control        Act,      ....do_                                               Do.
                                  Aug. 28, 1937.
Delaware River and tribu-       Flood Control        Act,
  taries, in vicinity of Mor-    Aug. 11, 1939.
  risville, Bucks County,
  Pa.
Delaware River, N. Y., Pa.,     Rivers and Harbors
  N. J., and Del., construc-      Committee resolu-
  tion of dams in vicinity of    tion, Jan. 24, 1939.
  Tocks Island, Belvedere
  and Chestnut Hill, Pa.
  (navigation and power).
Lehigh River_            -      Flood Control Com-              Aug.       4, 1941                                   Do.
                                  mittee resolution,
                                  Mar. 19, 1937.
Neshaminy Creek, Bucks          Flood Control Act,              Aug.         7,1941                                  Do.
County, Pa.                      Aug. 11, 1939.
Neversink Creek, Ulster         Flood Control Act,              Aug.       4,1941                                    Do.
County, N. Y.                    Mar. 3, 1936.
   Do__        __               Flood Control Act,              -_ do .......                                        Do.
                                  June 22, 1936.
Neversink River, Sullivan       Flood Control Act,             - -....
                                                                   do ......                                         Do.
County, N. Y.                    Mar. 3, 1936.
   Do__--   -- __ __            Flood Control Act,              -...do        -......                                Do.
                                  June 22, 1936.
Pequest River and tribu-        Flood Control Act,
  taries, Warren and Sussex       Aug. 11, 1939.
  Counties, N. J.
Willowemoc River, Sullivan  Flood Control             Act,      Aug.         4,1941                                  Do.
  County, N. Y.               Mar. 3, 1936.
    Do ................... Flood Control              Act,       _do
                                                                ...        ._._                                      Do.
                              June 22, 1936.

    IMPROVEMENT OF RIVERS AND HARBORS IN THE
             BALTIMORE, MD., DISTRICT
  This district comprises central southern Pennsylvania, eastern
Maryland, southwestern Delaware, and eastern Virginia, embracing
Chesapeake Bay and its tributaries north of Cove Point, Md., on the
western shore of the bay, and Onancock River, Va., on the eastern
shore, and the watersheds tributary to the Atlantic Ocean between
the south boundary of Delaware and a point north of White Creek
and Gargathy Inlet on the Atlantic coast. It includes the drainage
372     REPORT OF CHIEF OF ENGINEERS,                   U. S. ARMY,   1942

basin of the Susquehanna River exclusive of that portion north of
and including Shamokin Creek, Pa.
  District engineer: Col. F. C. Boggs, Corps of Engineers, to Janu-
ary 25, 1942, and Col. Conrad P. Hardy, Corps of Engineers, since
that date.
  Division engineer: Col. J. N. Hodges, Corps of Engineers (North
Atlantic division), to March 31, 1942, and Col. Thomas F. Farrell,
Corps of Engineers (Middle Atlantic division), since that date.
                                        IMPROVEMENTS

                 Navigation                            Navigation-Continued
                                         Page                                   Page
1. Baltimore Harbor and Chan-                  9. Examinations, surveys, and
     nels, Md                             372       contingencies (general) ___- 387
2. Middle River and Dark Head                10. Other projects for which no
     Creek, Md-____________               376       estimates are submitted.__. 388
3. Chester River, Md__                   378 11. Plant allotment _--__          389
4, Wiscomico    River,   Md .   -..      379
5. Twitch Cove and Big Thor-                              Flood control
      oughfare   River, Md ...--.         381
6. Starlings Creek, Va__        383 12. York, Codorus Creek, Pa ____ 391
7. Ocean City Harbor and Inlet       13. Other flood-control projects
     and Sinepux Bay, Md          --.
                                384       for which no estimates are
8. Fishing Creek, Md___________ 386       submitted _- ___            393
                1. BALTIMORE HARBOR AND CHANNELS, MD.
   Location.-Baltimore Harbor consists of the Patapsco River and
its tributaries. Patapsco River is formed by the junction of the
North and South Branches, both of which rise in central Maryland.
It is about 65 miles long and flows in a general southeasterly direction.
 (See U. S. Coast and Geodetic Survey Chart No. 549.)
   Previous projects.-Patapsco River: The original project was
dated July 4, 1836. Modifications were contained in the River and
Harbor Acts of August 30, 1852; June 10, 1872; March 3, 1881; June
3, 1896; March 3, 1905; March 3, 1909; February 27, 1911; and March
4, 1913.
   Middle Branch: The original project was dated June 3, 1896.
   Curtis Bay: The original project was dated July 15, 1892. It was
modified by the River and Harbor Act of June 13, 1902.
   York Spit: The original project was dated March 3, 1905.
   For further details see pages 1787 and 1788 of the Annual Report
for 1915, and page 389 of the Annual Report for 1932.
   Existing project.-This provides for: (a) A main channel between
Cape Charles, Va., and Fort McHenry, Baltimore, Md., with dimen-
sions as follows: 37 feet deep and 1,000 feet wide between the curves
of 37-foot depth in Chesapeake Bay opposite York Spit, a distance of
about 4 miles (under jurisdiction of the Norfolk, Va., district);
37 feet deep and a general width of 600 feet from the 37-foot curve
in Chesapeake Bay at the entrance to the Craighill section to the
west side of the main private channel to Sparrows Point, a distance
of about 121/2 miles, and thence 35 feet deep and 600 feet wide to
Fort McHenry, a distance of about 71/2 miles; (b) for branch chan-
nels with dimensions as follows: 35 feet deep and 400 feet wide from
the main channel to head of Curtis Bay, a distance of about 21/5 miles;
35 feet deep and 400 feet wide from the main channel at Fort
McHenry to Ferry Bar, and thence 27 feet deep and 250 feet wide to
the Western Maryland Railway bridge, a total distance of about
                   RIVERS      AND HARBORS-BALTIMORE,                          MD.,    DISTRICT              373
31/8 miles; (c) for widening the angle between the Fort McHenry
and Ferry Bar sections; (d) for widening at the approaches and
bends and for anchorages and turning basins, as approximately shown
on the maps accompanying Rivers and Harbors Committee Docu-
ment No. 11, Seventieth Congress, first session, and House Document
No. 29, Seventy-first Congress, first session; (e) it is further pro-
vided that as rapidly as the city of Baltimore, at its own expense,
extends the 35-foot depth into the Northwest Branch (inner harbor)
the United States shall take over the maintenance of that depth; (f)
and a channel 22 feet deep and generally 200 feet wide from the
22-foot depth curve in Curtis Creek immediately below the Penn-
ington Avenue Bridge; 18 feet over an irregular area of about 3
acres at the head and adjacent to the 22-foot channel; a depth of 15
feet for a general width of 450 feet from the head of the 22-foot
channel to the upper end of the marginal wharf of the United States
ordnance depot.
   All depths refer to mean low water. The mean range of the tide
in the upper sections of the harbor is a little more than 1 foot under
ordinary conditions, with an extreme range of 12.8 feet. In the
York Spit Channel these ranges are 2.5 and 3.3 feet, respectively.
   The estimate of cost for new work, revised in 1942 is $4,368,500,
exclusive of amounts expended on previous projects. The latest
 (1941) approved estimate for annual cost of maintenance is $164,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                          Work authorized                                    Documents


Mar. 3, 1905        Main channel 35 feet deep and 600 feet wide            H. Doec. No. 186, 57th Cong., 2d sess.
                      throughout.
Mar.     3,1909     Anchorage basin near intersection of Fort Mc-
                      Henry and Curtis Bay Channels (within origi-
                      nal limit of cost authorized by act of Mar. 2,
                      1907).
Feb. 27, 1911       Width increased at entrances and bends (increase
                      to be made within the limit of original estimate).
Aug.     8,1917     Branch channel 35 feet deep to head of Curtis Bay,     H. Doc. No. 799, 64th Cong., 1st sess.
                      and one 35 feet deep and 400 feet wide into the
                      Southwest Branch of the Patapsco River to a
                      point near Ferry Bar, and 27 feet deep and 250
                      feet wide to Western Maryland Ry. bridge,
                      widened at approaches and bends, and with
                      anchorage and turning basins. Inclusion of
                      Patapsco River and tributaries into 1 project
                      for Baltimore Harbor.
Jan.    21,1927     Change in location of the anchorage near upper
                      end of the Fort McHenry Channel.
July     3, 1930    Increased anchorage facilities_     --     -     _     Rivers and Harbors Committee, Doe.
                                                                             No. 11, 70th Cong., 1st sess.'
       Do _...      For 37-foot depth in that portion of channel to        H. Doc. No. 29, 71st Cong., 1st sess.i
                     Baltimore lying between the 37-foot curve near
                     Baltimore Light to the Sparrows Point entrance
                     channel; widening the angle between Fort
                     McHenry and Ferry Bar sections; and for width
                     of 400 feet in the Curtis Bay section.
Oct. 17, 1940       For the 22-, 18-, and 15-foot channels in Curtis       Adopted as a national defense project
                     Creek from the 22-foot depth below Pennington          (no printed report).
                     Ave. Bridge to the upper end of the marginal
                     wharf of the United States ordnance depot.
1 Contain latest published maps.
374    REPORT OF CHIEF OF ENGINEERS,        U. S. ARMY,   1942

   Local cooperation.-The River and Harbor Act of August 8, 1917,
required that on all new work under the project approved by that act,
except the channel into Curtis Bay, improvement by the United States
is made conditional upon local interests providing, whenever required
by the Chief of Engineers, free of cost to the United States, suitable
areas behind bulkheads or other revetments, satisfactory to the dis-
trict engineer, in which the dredged material may be deposited.
This condition has been met as far as the channel has been completed.
   The River and Harbor Act of July 3, 1930, provided for increased
anchorage facilities, subject to the provisions that no work shall be
started on the area therein recommended until local interests have
provided suitable disposal areas satisfactory to the district engineer
alongside of bulkheads behind which said interests will agree to pump
the material without delay to the Government work; or, in lieu of the
above requirement, agree to contribute the sum of 5 cents per cubic
yard, scow measure, to cover the, additional cost to the United States
for disposal of the material on its own dumping area. This condition
has been met.
   Terminal facilities.-The total length of developed water front in
Baltimore Harbor, measured along the established bulkhead line, is
about 27 miles. Extensive areas remain which are available for
further development. The existing terminal facilities include
wharves, piers, grain elevators, coal and ore piers, storage and bunk-
ering facilities for fuel oil, terminal warehouses, marine railways,
drydocks, and shipyards.
   The State legislature has authorized the city of Baltimore to incur-
an indebtedness of $50,000,000 for the development of the, port. The
Port Development Commission, which is charged with administration
under this authorization, has completed an $8,500,000 terminal pier at
Port Covington. For further details, see page 391, Annual Repoft
for 1932.
   Operations and results during fiscal year.-Maintenance dresdging
was commenced by the U. S. dredge, Navesink, June 19, 1942, and was
in progress at the end of the year in the Cutoff-Brewerton Angle.
A total of 58,991 cubic yards (bin measure) of material was removed
and deposited on the Government dump in Chesapeake Bay, Md.
Dredging by contract in Curtis Creek section to the United States
ordnance depot was completed July 28, 1941. A total of 109,611 cubic
yards of material was removed. The total cost was $42,745.42, of
which $29,075.89 was for new work and $13,669.53 for maintenance.
The total expenditures were $50,641.81.
   Condition at end of fiscal year.-The existing project, excluding
York Spit Channel which is under the jurisdiction of the Norfolk
district, was about 74 percent completed. The Ferry Bar section as
far as the entrance channel to Port Covington Lane and the Curtis
Bay channel have both been dredged to project depth, 35 feet and
width, 400 feet; the channel and basins in Curtis Creek, Md., have
been dredged to project dimensions, channel 22 feet deep and gener-
ally 200 feet wide from the 22-foot depth curve in Curtis Creek
immediately below the Pennington Avenue Bridge; 18 feet over an
irregular area of about 3 acres at the head and adjacent to the 22-
                   RIVERS             AND        HARBORS-BALTIMORE',                                    MD.,        DISTRICT                    375

foot channel; a depth of 15 feet for a general width of 450 feet from
the head of the 22-foot channel to the upper end of the marginal
wharf of the United States ordnance depot. All depths refer to
mean low water.
  The work remaining to be, done, excluding completion of the York
Spit section by the Norfolk district, includes completion of the Ferry
Bar section from Port Covington entrance channel to Ferry Bar,
and the Spring Garden section, including turning basin from Ferry
Bar to Western Maryland Railroad bridge.
  The controlling depths were as follows:

                                                                                                                       Feet       Date ascertained


Craighill entrance:
    Along the center----             -------------------------------------------                                          37. 0   November 1939.
    Along the easterly side                      ...........                                                              34: 4
                                                                                                     ....-------------------         Do.
    Along the westerly side__                     --------------------------------------                                  35. 2      Do.
Craighill section:
    Along westerly side, 500 f6dt width -_                              _                                                 37. 5   April 1942.
    Along easterly side, 100-foot width                                 ----------------------------                      35.0       Do.
Craighill cut-off angle:
    Along the center line              ---        -----------------                 -----------------                     37. 0   June 1941.
    Along the easterly side ...... .....             ......       .....--          ---------------..            ..-       33. 3   M arch 1941.
    Along the westerly side ------------------                                                  -_--       .....--        37. 0   June 1941.
Cut-off section----------   __----          -          ..-----
                                                  ------------------------------------                                    37. 0   May 1940.
Cut-off Brewerton angle                                                                                                   32. 0   May 1942.
Brewerton section to entrance to Sparrows Point_                                                                          37.0        Do.
Remainder of the section to Brewerton-Fort McHenry angle -                                                                35. 0   April 1942.
Brewerton-Fort McHenry angle-------------                                                                                 35. 0       Do.
Fort McHenry section ---             . ..        ..        ..        ..     ..           ----------------
                                                                                   ..----------                           35. 0   May 1939.
Curtis Bay section          _-                                                                                            35.0    December 1939.
Ferry Bar section (from its intersection with the Fort McHenry section to the                                             35. 0   May 1939.
  private channel leading to the Western Maryland Ry. piers).
Thence to Ferry Bar        _                                                  -------                                     20.7    August 1938.
Ferry Bar to the Hanover St. Bridge                                       _                                               24. 5      Do.
Thence in the old Southwest Baltimore harbor channel, above Hanover St.                                                   17. 9      Do.
  Bridge.
Quarantine anchorage --- -- -- -- --- -- -- -- -- ---                                         --. - -                     35. 0   M arch 1939.
Fort M cH enry anchorage ----------------                     -------------------               ----       -- -           35.0        Do.
Riverview anchorage ................                    ------------            --                                        35. 0   April 1942.
Curtis Creek:
    Approach channel --------          ---------------------------                                        -------         22. 0   July 1941.
    Southerly anchorage area -                          ---------------                 ----------------                  15. 0       Do.
    Easterly anchorage area _-----------                    --        -      -           -----------------                18.0        Do.



  The total cost under the existing project was $7,415,752.61, of
which $3,258,195.30 was for new work and $4,157,557.31 for main-
tenance. The total expenditures were $7,405,552.37.
  Proposed operations.-The unexpended balance July 1, 1942, $329,-
946.59, will be applied as follows:
                                   _    _
                                       ___
Accounts payable, June 30, 1942-----------    _-                      $12,182. 65
Maintenance: Dredging in Cut-off-Brewerton angle, Craighill en-
  trance, Craighill-Cut-off angle and the Craighill section by United
  States hopper dredge, July 1, 1942, to June 30, 1943_ ___----       317, 763.94

              Total-------------- ------------------------------------ 329, 946.59
  The additional sum of $164,000 can be profitably expended during
the fiscal year 1944 in maintenance dredging by United States hop-
per dredges where needed in various sections of the main channel.
376         REPORT OF CHIEF OF ENGINEERS,                                 U. S. ARMY,                    1942

                                     Cost and financial summary
Cost of new work to June 30, 1942____- _____________________                                       1$12, 022, 198. 70
Cost of maintenance to June 30, 1942                                                                     14, 557, 359. 08
      Total cost of permanent work to June 30, 1942__________                                        1   16, 579, 557. 78
Undistributed costs June 30, 1942__________________-______                                                     1, 982. 41
      Net total cost to June 30, 1942 __-_________________-                                              16, 581, 540. 19
Minus accounts payable June 30, 1942___ __-12,                                                                    182. 65
        Net total expenditures____________________-__-_                                              1 16, 569, 357. 54
Unexpended balance June 30, 1942_________________________                                                       329, 946. 59

        Total amount appropriated to June 30, 1942--------------                                     116, 899, 304. 13

   Fiscal year ending June 30           1938            1939                 1940                1941                       1942

Cost of new work-                                                                              $13, 881. 91                $29,075. 89
Cost of maintenance      .........    $51, 375. 16   $274, 829. 05       $164, 931. 32         169, 643. 72                 13, 669. 53
                                                                                 --    -   -              -     I--   --       -   -

      Total cost ....    .........     51, 375. 16    274, 829. 05        164, 931. 32         183, 525. 63                 42, 745. 42
Total expended_                        30, 296. 38    295, 715. 35        167, 714. 64         162, 838. 16                 50, 641. 81
                -- ---
Allotted .--------   -------          237, 000.00     357,000.00          250, 000. 00          89, 738. 64                100,000.00



Balance unexpended July 1, 1941____         _________                                                          $280, 588. 40
Amount allotted from War Department Civil Appropriation Act
  app roved Apr. 28, 1942_____ _-----------               _                                                     100, 000. 00

         Amount to be accounted for__                                                                            380, 588. 40
Gross    amount         expended__                                   _--------------                                  50, 641.81

       Balance unexpended June 30, 1942-.....                                                                   329, 946. 59
Outst anding liabilities June 30, 1942--------------------_                                                      12, 182. 65
         Balance available June 30, 1942------------------------                                                317, 763. 94
Amount (estimated) required to be appropriated for completion
  of existing project "_-            ______---                                                                1, 139, 400. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance ____________________________                    164, 000. 00
  1 Includes costs and expenditures for York Spit Channel prior to fiscal year 1942.
  2 Exclusive of available funds.

                 2. MIDDLE RIVER AND DARK HEAD CREEK, MD.

   Location.-Middle River is a tidal estuary which enters the west
side of Chesapeake Bay about 8 miles above the mouth of the Patapsco
River. Dark Head Creek joins Middle River about 3 miles above its
mouth. (See U. S. Coast and Geodetic Survey Chart No. 1226.)
   Existing project.-This provides for a channel 150 feet wide and
10 feet deep from that depth in Chesapeake Bay to the head of Dark
Head Creek.
   The estimated cost of new work, made in 1939, is $108,000, of which
one-half, but not to exceed $54,000, is to be contributed by local inter-
ests. The latest (1939) approved estimate for annual cost of main-
tenance is $2,000.
  The existing project was adopted by the River and Harbor Act of
October 17, 1940 (H. Doc. No. 556, 76th Cong., 3d sess.). The latest
published map is in the project document.
          RIVERS     AND    HARBORS-BALTIMORE,              MD.,   DISTRICT              377
   Local cooperation.-Local interests are to furnish, free of cost to
the United States, all lands, easements, and rights-of-way and spoil-
disposal areas for the initial work and for subsequent maintenance,
when and as required; hold and save the United States free from
claims for damages resulting from the improvement; and contribute
one-half the initial cost, but not to exceed $54,000; provided further,
that no dredging be done at Federal expense within 50 feet of the face
of the seaplane ramp. Fully complied with. Approved by the Chief
of Engineers June 23, 1941.
   Terminal faecilities.-There are a number of small privately owned
pleasure-boat landings along the shores of Middle River and its tribu-
taries. The Glenn L. Martin Co. has constructed a substantial timber
bulkhead and concrete seaplane runways at the head of Dark Head
Creek. Inauguration of large-scale water-borne commerce to and from
the Martin plant would probably necessitate the erection of additional
terminal and handling facilities in the locality, and. sufficient areas are
available for their construction on Middle River and at the head of
Dark Head Creek.
    Operations and results during fiscal year.-The existing ,lr :je"t
was completed to project dimensions and at the request of the Un i ed]
States Navy Department the project channel was enlargd(l to a wit'th
of 200 feet for the full length and project depth, al(l an anclor'ng
basin 10 feet deep at mean low water, 2,000 feet long and g enerallT:
400 feet wide in the branch of Dark Head Creek, extending north-
easterly from the head of the aforesaid channel, was lrovidle(l.
Dredging by contract for completion of the enlarged channel and
basin was commenced and completed during the year. A total of
648,140 cubic yards of material was removed and deposited on author-
ized dumping areas. The total costs, all for new work, were United
States War Department, $37,856.76; United States Navy Department,
$111,581.43. The total expenditures were United States War Depart-
ment, $38,186.71; contributed funds $54,000.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1942. The controlling depth in the enlarged channel and
basin was 10 feet at mean low water ascertained in April 1942. The
total costs and expenditures of the existing project, to the United
States War Department, all for new work, were $38,603.66. The total
cost of the existing project to the United States Navy Department,
all for new work, was $165,581.43. In addition, $54,000 was expended
from contributed funds for new work.
    Proposed operations.-The unexpended balance July 1, 1942, $15,-
396.34, will be applied to payment of outstanding liabilities.
    No funds can be profitably expended during the fiscal year 1944.
                             Cost and financial summary

Cost of new work to June 30, 1942____________________________                  2 $38, 603. 66
Cost of maintenance to June 30, 1942...___

      Total cost of permanent work to June 30, 1942 __________                    38, 603. 66
Net total expenditures__                                                         2*38,603. 66
Unexpended balance June 30, 1942           ___       __________________           15,
                                                                                  1-- 396. 34

        Total amount appropriated to June 30, 1942-____________  -                54, 000. 00
  1 In addition costs of $111,581.43 were incurred by U. S. Navy Department.
  2 In addition, $54,000 contributed funds expended for new work.
378          REPORT OF CHIEF OF ENGINEERS,                                    U. S. ARMY,                      1942


    Fiscal year ending June 30               1938              1939              1940                 1941                1942


Cost of new work        .......-----------------.....--..----------------   --------------........         $746. 90      $37, 856.76
                                             --.---------------------------------------
Cost of maintenance ..-----------.....................----
Total expended .......------------.   .        --------------           -      -.....      ..               416.95              71
                                                                                                                          38,186.
Allotted----------..........---------....---..-----54,---------       ------------..                 54,000.00


Balance unexpended July 1, 1941-________                                                                              $53, 583. 05
Gross amount expended--_________------_____                                                                            38, 186. 71
      Balance unexpended June 30, 1942_-- ---__---------                                                               15, 396. 34
Outstanding liabilities June 30, 1942____________--_ $6, 000. 00
Amount covered by uncompleted contracts _____-____ 6, 910. 77
                                                                                                                       12, 910. 77

          Balance available June 30, 1942_______                                        ____--------____                2,485. 57

                                          3. CHESTER RIVER, MD.

   Location.-Rises in Kent County, Del., flows in a generally south-
westerly direction, and empties into Chesapeake Bay. Its total
length is less than 50 miles. (See U. S. Coast and Geodetic Survey
Chart No. 78.)
   Previous projects.-The original project was adopted by the River
and Harbor Acts of March 3, 1873, and March 3, 1881. For further
details see page 129 of Annual Report for 1882 and page 333 of An-
nual Report for 1935.
   Existing project.-This provides for a channel 6 feet deep and 60
feet wide at mean low water from Crumpton to Jones Landing, a
distance of 61/4 miles, the lower end of the improved section being
about 33 miles from the mouth of the river. The mean range of tide
is 2.4 feet and the extreme tidal range, is 4 feet under ordinary con-
ditions.
   The estimate of cost for new work, revised in 1941, was $23,500,
exclusive of the amount expended on previous projects. The latest
(1922) approved estimate for annual cost of maintenance is $1,200.
The existing project was adopted by the River and Harbor Act of
September 19, 1890 (H. Ex. Doc. No. 65, 51st Cong., 1st sess.). Maps
of the locality are printed in House Documents Nos. 797 and 1587,
Sixty-third Congress, second and third sessions, respectively.
   Terminal facilities.-There are two bulkhead wharves on the
Chester River section, in poor condition, with dockage room of 100
and 120 feet, and available depths of 2 and 6 feet, respectively.
In Kent Island Narrows there are eight timber pile wharves adja-
cent to crab and oyster houses, in fair condition, aggregating ap-
proximately 700 lineal feet of dockage, with available depths of from
3 to 13 feet. All privately owned and open to general public use
and considered adequate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was about
78 percent completed and is in good condition except for widening
and deepening the Kent Island Narrows section. The controlling
depth at mean low water in the river proper, November 1929, was
6 feet, and 3.8 feet in Kent Island Narrows section, April 1942. The
              RIVERS           AND HARBORS-BALTIMORE,                                  MD.,      DISTRICT               379
total costs and expenditures under the existing project were $79,-
679.92, of which $18,060.84 was for new work and $61,619.08 for
maintenance.
   Proposed operations.-The unexpended balance July 1, 1942, $18,-
000, will be applied to maintenance dredging by contract for restora-
tion of the channel in Kent Island Narrows between Chester River
and Eastern Bay to a width of 75 feet and project depth, August 1,
to November 30, 1942.
   No funds can be profitably expended during the fiscal year 1944.
                                           Cost and financial summary

Cost of new work to June 30, 1942-------------------------------                                                 $56, 102. 30
Cost of maintenance to June 30, 1942 -----------------------                                                      61, 619. 08
           Total cost of permanent work to June 30, 1942 ..............                                          117, 721. 38

Net total expenditures_ __ _-----------------------------------117, 721. 38
Unexpended balance June 30, 1942-----------------------------18, 000.00
           Total amount appropriated to June 30, 1942_                                         ___               135, 721. 38

   Fiscal year ending June 30                     1938           1939              1940              1941            1942

Cost of new work_                     _ _          _--                       - ---      _             $401. 36
Cost of m aintenance       __........          - -- -
                                              _--
                                   .............                        ---- --------------            361.30 ....
Total expended                                           -----               ----------                762. 66              --

Allotted                               -      -                                     $10, 000     -9, 237. 34        $18, 000.00



Amount allotted from War Department Civil Appropriation Act ap-
proved Apr. 28, 1942-----------------------------------------                                                   $18, 000. 00

           Balance unexpended June 30, 1942--------------------
                                                              _                                                   18, 000. 00

Amount (estimated) required to be appropriated for completion of
                                   -
  existing       project 1-----------------                                                                        8, 000. 00
   Exclusive of available funds.

                                           4. WICOMICO RIVER, MD.

   Location.-This river has its source in the northern part of Wi-
comico County, Md., and flows in a generally southwardly direction,
emptying into Monie Bay, a tributary of Tangier Sound. (See U. S.
Coast and Geodetic Survey Charts Nos. 77 and 567.)
   Previous projects.-Adopted by River and Harbor Act of June 10,
1872. For further details see page 1789 of Annual Report for 1915,
and page 380 of Annual Report for 1938.
   Existing project.-This provides fora channel 14 feet deep and 150
feet wide from Chesapeake Bay to Salisbury;/a depth of 14 feet in
the channels and turning basins in the North and South Prongs with
channel widths of 100 feet and a basin 6 feet deep, 100 feet wide, and
400 feet long at Webster Cove with a channel of the same depth and
60 feet wide, extending to the 6-foot contour in Wicomico River. The
plane of reference is mean low water. Mean range of tide is about
3 feet and the extreme tidal range is 4.4 feet under ordinary conditions.
   The estimate of cost for new work, revised in 1937, is $356,300,
380         REPORT OF CHIEF OF ENGINEER1,                             U. S. ARMY,          1942

exclusive of amount expended on previous projects. The latest (1937)
approved estimate for annual cost of maintenance is $6,000.
  The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                    Documents


Sept. 19,1890   Channel 9 feet deep from Main St. Bridge to           H. Doc. No. 20, 51st Cong., 1st sess.,
                  about 2 miles below.                                 and Annual Report, 1890, p. 947.
June 25, 1910   Extension of 9-foot depth into the north prong        H. Doc. No. 569, 61st Cong., 2d sess.
                 from Main St. Bridge to the Salisbury Dam
                 and turning basin.
Mar. 2,1919     Extension of 9-foot depth into south prong to the     H. Doc. No. 1509, 63d Cong., 3d sess.
                 head of navigation at Cathell St., including a
                 turning basin and extending the project down
                 to the mouth of the river in Monie Bay.
July 3, 1930    A 12-foot channel below the Main St. Bridge ..--
Aug. 26,1937    A 14-foot channel, 150 feet wide; depths of 14 feet   Senate Committee Print, 75th Cong.,
                  in the north and south prongs and a basin 6 feet     1st sess.   (Contains latest published
                  deep at Webster Cove and approach channel            map.)
                  thereto of the same depth.



    Local cooperation.-Fully complied with.
    Terminal facilities.-The present water front at Salisbury consists
of pile-and-timber bulkheads with earth fills. Some of the wharves
have warehouses and factories with mechanical freight-handling facil-
ities and rail sidings. With exception of a wharf on the North Prong
owned by the State roads commission, and a wharf on the South Prong,
owned by the county, all of the terminals are privately owned. A
shipyard, with two marine railways with capacities of 1,200 and 500
tons, respectively, is located on the right bank of the river below the
prongs. Areas for the development of new terminals on the north and
south prongs are limited. Areas for a considerable expansion of ter-
minal facilities are available on the main river /A public wharf on
the main river at Salisbury is desirable but not ssential.
    There is a pile-and-timber wharf which is situated about 4 miles
above the mouth of the river at Mount Vernon. There is a wharf of
similar construction at White Haven.
    Operations and results during fiscal year.-Dredging under con-
tract for completion of the project was continued until November 21,
1941, at which time all work under the contract was accepted as com-
pleted. A total of 281,632 cubic yards of material was removed from
the main river and deposited ashore in authorized dumping areas.
The total costs, all for new work, were $49,536.75. The total expendi-
tures were $78,394.15.
    Condition at end of fiscal year.-The existing project was about
99 percent completed. The work remaining to be done consists of
the removal to project depth of ledge rock, boulders and debris which
were encountered in the main channel and in the South Prong at the
Division Street Bridge. The controlling depths were 14.0 feet at
mean low water in the main river, except that at Patricks Landing
the depths were 11.0 feet at mean low water on the north side for a
40-foot width and 14.0 feet at mean low water for the remaining 110-
foot width, 14.0 feet at mean low water in the North Prong, 8.2 feet
              RIVERS      AND HARBORS-BALTIMORE,                                            MD.,     DISTRICT                 381
at mean low water in the South Prong ascertained in November 1941
and 6.0 feet at mean low water in the channel and basin at Webster
Cove ascertained in May 1940. The total cost under the existing
project was $494,588.11, of which $407,847.03 was for new work and
$86,741.08 for maintenance. The total expenditures were $494,523.06.
In addition, $14,000 was expended from contributed funds for new
work.
  Proposed operations.--The unexpended balance July 1,                                                                      1942,
$2,966.06, will be applied as follows:
Accounts payable, June 30, 1942_--------------------------------      $65. 05
New work: Dredging by contract for completion of the project, Oct. 1,
  to Dec. 1, 1942----------------    ---------------------------2, 901. 01

           Total ---              ---------------------------                                                           2, 966. 06
   No funds can be profitably expended during the fiscal year 1944.
                                    Cost and financial summary

Cost of new work to June 30, 1942------------------------                                                        $457, 847. 03
Cost of maintenance to June 30, 1942__-------------------------                                                    86, 741. 08
      Total cost of permanent work to June 30, 1942------------544,                                                        588. 11
Minus accounts payable June 30, 1942----------------------------                                                            65. 05
     Net total expenditures -----------------------------                                                             544, 523. 06
Unexpended balance June 30, 1942    ---------------------                                                               2, 966. 06

           Total amount appropriated to June 30, 1942------------                                                    '547, 489. 12

   Fiscal year ending June 30             1938                  1939                    1940            1941              1942


Cost of new work________________.___.___.__                    $2, 128. 08         $21, 224. 47      $194, 209. 69       $49, 536. 75
Cost of maintenance     .-------      $168. 93
Total expended                               435. 93            1, 898. 22             16, 670. 18    170, 071. 39        78, 394. 15
Allotted         .          ..--------------------------------- 215, 000. 00      -        - -         55, 000. 00



Balance unexpended July 1, 1941_                                                            -                         $81, 360. 21
Gross amount expended _    -                                                   -----                                   78, 394. 15
     Balance unexpended June 30, 1942_____________________                                                              2, 966. 06
Amount covered by uncompleted contracts _________________160.32

           Balance available June 30, 1942_______________________                                                       2, 805. 74
  1 In addition $14,000 was expended from contributed funds for new work.

                 5. TWITCH COVE AND BIG THOROUGHFARE, MD.

  Location.-This is a tidal waterway about 4 miles long traversing
Smiths Island, Md., in a southeasterly direction from Chesapeake Bay
on the west to Tangier Sound on the east. (See U. S. Coast and
Geodetic Survey Chart No. 78.)
   Existing project.-This provides for a channel 7 feet deep at mean
low water and 60 feet wide from Twitch Cove on Tangier Sound
through Big Thoroughfare River, thence through the canal at Ewell,
Md., thence through Levering Creek and Big Thoroughfare River to
the vicinity of Swan Point, thence of the same depth and 100 feet
       493202-43-pt. 1, vol. 1--25
382           REPORT OF CHIEF OF ENGINEERS,                             U.   S. ARMY,         1942


wide through the offshore bar to deep water in Chesapeake Bay with
twin jetties at the entrance; and for a channel 4 feet deep and 25 feet
wide around the point between Big Thoroughfare River and Tylers
River. The mean range of tide is 1.7 feet, and the extreme tidal
range is 3 feet under ordinary conditions.
   The estimate of cost for new work, revised in 1938, was $159,400.
The latest (1937) approved estimate for annual cost of maintenance
is $3,700.
   The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                   Documents


July 25,1912       A channel 4 feet deep and 25 feet wide from Tan-     H. Doc. No. 285, 62d Cong., 2d sess.
                    gier Sound into Big Thoroughtare River, and
                    one of the same dimensions around the point
                    between said river and Tylers River.
July     3, 1930   A channel 5 feet deep at mean low water and 25       H. Doc. No. 313, 71st Cong., 2d sess.
                    feet wide from Twitch Cove on Tangier Sound
                    through Big Thoroughfare River to a point on
                     Levering Creek about 800 feet north of the canal
                    at Ewell, Md.
Aug. 30,1935       A channel 7 feet deep and 60 feet wide from Twitch   Rivers and Harbors Committee Dou.
                     Cove through Big Thoroughfare River to a            No. 67, 74th Cong., 1st sess.
                    point on Levering Creek about 800 feet north
                    of the canal at Ewell, Md.
June 20, 1938      Present project for channel 7 feet deep at mean      Rivers and Harbors Committee Doc.
                     low water and 60 feet wide from Twitch Cove         No. 49, 75th Cong., 2d sess.  (Con-
                     on Tangier Sound to the vicinity of Swan Point,     tains latest published maps.)
                     thence of the same depth and 100 feet wide
                     through the offshore bar to deep water in Chesa-
                     peake Bay with twin jetties at the entrance.


   Local cooperation.-Fully complied with.
   Terminal facilities.-There are nine small open-pile wharves pri-
vately owned open to the general public use, which are considered
adequate for existing commerce.
   Operations and results during fiscal year.-Operations were con-
fined to preliminary office work. The total costs, all for main-
tenance, were $221.07.
   Condition at end. of fiscal year.-The existing project was com-
pleted in November 1940. The controlling depths at mean low
water were as follows: 7.0 feet from Tangier Sound to the branch
channel to Tylerton, ascertained in February 1937, thence 3.0 feet
to Ewell, Md., in June 1942; thence 7.0 feet to Swan Point; thence
9.0 feet to deep water in Chesapeake Bay, in June 1940 and 4.0 feet
around the point between Big Thoroughfare River and Tylers River,
in January 1941. The total costs were $178,184.03, of which $164,-
174.53 was for new work and $14,009.50 for maintenance. The total
expenditures were $177,962.96.
   Proposed operations.-The unexpended balance July 1, 1942, $10,-
000 will be applied as follows:
Accounts payable------------------------ ------------------- $221. 07
Maintenance: Restoration of that portion of the project channel
in Big Thoroughfare River, Md., to project dimensions by con-
tract dredging Oct. 1 to Dec. 15, 1942_    -------------                                            9, 778. 93
           Total--             - -__-_----------                                          -      10, 000. 00
                  RIVERS      AND HARBORS-BALTIMORE,                                  MD.,     DISTRICT              383
  The additional sum of $3,700 can be profitably expended during
the fiscal year 1944 in maintenance of the jetty at Swan Point.
                                         Cost and financial summary

Cost of new work to June 30, 1942_------------------    ---------- $164, 174. 53
Cost of maintenance to June 30, 1942---------        -------------    14, 009. 50
      Total cost of permanent work to June 30, 1942                                                          178, 184. 03
Minus accounts payable June 30, 1942------__ --------                                                             221. 07

     Net total expenditures--                                    -----------------          177, 962. 96
Unexpended balance June 30, 1942                                                              0, 000. 00
                                                                              ------------- 1-----------

           Total amount appropriated to June 30, 1942___________                                             187, 962.96

  Fiscal year ending June 30                   1938                1939           1940           1941             1942

Cost of new work ___________________._________              $59, 972. 99    $75, 801. 54                       ------------
Cost of maintenance ------------------------ --------------      487. 84 --- __                                     $221.07
     Total cost--__---     ___-_____----------------                             60, 460. 83    75, 801.54           221.07
Total expended ______________________________                                    36, 605. 61    99, 656.76
Allotted    ...       ..---
                  ---------------               ..-------------- $131, 000. 00    5, 533. 77     - 271. 40        10, 000.00



Amounted allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942--------------------------------------$10,                                                 000.00

      Balance unexpended June 30, 1942-----------------                                                       10, 000. 00
Outstanding liabilities June 30, 1942-....                                                                        700. 00

           Balance available June 30, 1942----------------------9,                                                300. 00

Amount that can be profitably expended in fiscal year ending June
                                         - - - - - - - - - - - - -- - - - - - - -
30, 1944, for maintenance       __- - -                                                                       3, 700. 00
  1 Exclusive of available funds.

                                       6. STARLINGS CREEK, VA.

   Location.-Starlings Creek, about 1,500 feet long, is an estuary
of Pocomoke Sound at the southerly end of Saxis Island, Accomac
County, Va., about 11 miles southeasterly of Crisfield, Md.
   Existing project.-This provides for a channel 7 feet deep and 60
feet wide from that depth in Pocomoke Sound to the mouth of
Starlings Creek, with a turning basin of the same depth and 1,000
feet long inside the entrance, all essentially as shown on the project
map. The mean tidal range is about 1 foot at mean low water.
   The estimate of cost for new work, made in 1935, was $27,000.
The latest (1935) approved estimate of cost for annual maintenance
is $1,000. The existing project was adopted by the River and Harbor
Act of August 30, 1935 (Rivers and Harbors Committee Doc. No. 46,
74th Cong., 1st sess.). This document .contains the latest published
map.
   Local cooperation.--Fullycomplied with except that local interests
are to. furnish spoil-disposal areas as needed for future maintenance.
   Terminal facilities.-Bulkhead as required under local cooperation.
   Operations and results during fiscal year.-Operations were con-
fined to preliminary office work. The total costs, all for maintenance,
were $4.81.
384               REPORT OF CHIEF OF ENGINEERS,               U. S. ARMY,     1942

   Condition at end of fiscal year.-The existing project was com-
pleted in 1937. The controlling depths, ascertained in May 1940,
were 4.5 feet at mean low water in the channel and 4.4 feet at mean
low water in the turning basin. The total costs were $16,542.28 of
which $16,537.47 was for new work and $4.81 for maintenance. The
total expenditures were $16,537.47.
   Proposed operations.-The unexpended balance July 1, 1942, $17,-
500, will be applied as follows:
         Accounts payable, June 30, 1942_        ____-____ __                   $4. 81
         Maintenance: Restoration of the channel and turning basin to
          project dimensions by contract dredging Oct. 1 to Dec. 15, 1942_ 17, 495. 19

                       Total-----------------------------------
                                                             _         -----       17, 500. 00
     No funds can be profitably expended during the fiscal year 1944.
                                        Cost and financial summary

Cost of new work to June 30, 1942____________                                 __ $16, 537.47
Cost of maintenance to June 30, 1942______________                                         4.81

      Total cost of permanent work to June 30, 1942                                16, 542. 28
Minus accounts payable June 30, 1942_______________                                        4. 81

      Net total expenditures_                                                  _   16, 537. 47
Unexpended balance June 30, 1942_________________                                  17, 503. 00
             Total amount appropriated to June 30, 1942-                           34, 037. 47

     Fiscal year ending June 30           1938       1939      1940    1941             1942

Cost of new work______________
Cost of maintenance -     -                                                                    $4.81

Total expended ....-.-.--.....
A llotted ...............     -......                                                   17,500.00



Amount allotted from War Department Civil Apipropriation Act ap-
proved Apr. 28, 1942 ---- --  --                                $17, 500).
                                                                          00

Balance unexpended June 30, 1942       --       _-                                 17,500. 00
                                                                                   --

Outstanding liabilities June 30, 1942 _____________                                   500. 00
             Balance available June 30, 1942______--                               17, 000. 00

       7. OCEAN CITY HARBOR AND INLET AND SINEPUXENT BAY, MD.

  Location.-Ocean City is on a barrier island between Sinepuxent
Bay and the Atlantic Ocean about 35 miles south of the entrance to
Delaware Bay. (See U. S. Coast and Geodetic Survey Chart No.
1220.)
  Existing project.-This provides for the construction of an inlet
between the Atlantic Ocean- and Sinepuxent Bay, with a depth of
10 feet and width of 200 feet, protected by jetties; a channel 6 feet
deep and 150 feet wide from the inlet to Green Point, and thence
100 feet wide into Chincoteague Bay; a channel 10 feet deep at mean
low water, 100 feet wide, and 3,000 feet long from the inlet channel
into the marsh area south of the railroad on the west side of Sine-
puxent Bay, with two turning basins of the same depth; and for a
              RIVERS      AND HARBORS-BALTIMORE,                       MD.,     DISTRICT            385
channel 6 feet deep and 125 feet wide from the inlet channel to a
point opposite North Eighth Street in Ocean City, thence 75 feet
wide into Isle of Wight Bay.
  The estimate of cost for new work, revised in 1935, was $870,000,
including $500,000 contributed by local interests. The latest (1935)
approved estimate for annual cost of maintenance is $32,000. The
mean range of ocean tide is 3.4 feet.
  The existing project was authorized by the following river and
harbor acts:
    Acts                      Work authorized                                   Documents 1


Aug. 30, 1935 2 Construction of an inlet between the Atlantic       Rivers and Harbors Committee Doe.
                 Ocean and Sinepuxent Bay, 10 feet deep and          No. 38, 72d Cong., 1st sess.
                 200 feet wide, protected by jetties, a channel 8
                 feet deep and 100 feet wide from the inlet to
                 Ocean City, 6 feet deep and 150 feet wide to
                 Green Point, and 100 feet wide into Chinco-
                 teague Bay.
Aug. 30, 1935 3 Modification providing a 10- by 100-foot channel    Rivers and Harbors Comn mittee Doe.
                 from the inlet to the west side of the bay with      No. 60, 74th Cong., 1st sess.
                 2 turning basins, a channel 6 feet deep 125 feet
                 wide from the inlet channel to opposite North
                 8th St., Ocean City, and 75 feet wide into Isle
                 of Wight Bay.


   1 Contains latest published maps.
   2 Included in Public Works Administration program Sept. 16,1933. The site chosen for the inlet under
this authorization was that opened just south of Ocean City by natural forces during a severe storm in
August 1933. This eliminated the necessity for an 8-foot channel from the inlet to Ocean City.
   3 Included in Emergency Relief program, 1935.



   Local cooperation.-Fully complied with.
   Terminal facilities.-Numerous wharves and landings of pile and
timber construction are located along the bay and the marsh channel
at Ocean City.
   Operations and results during fiscal year.-Operations consisted
of office studies for future maintenance of the improvement. The
total costs and expenditures, all for maintenance, were $2.66.
   Condition at end of fscal year.-The existing project was com-
pleted in 1936. The controlling depths at mean low water were
10.0 feet in the inlet, ascertained in September 1940, thence 5.0 feet
to the end of the channel in Chincoteague Bay, in August 1935, and
8.3 feet in the fishing harbor in September 1940, and 5.0 feet in the
channel to Isle of Wight Bay, to the Ocean City Yacht Club, thence
3.2 feet to the end of the project in the bay, in June 1939. The costs
and expenditures under the existing project to June 30, 1942, have
been $283,007.93 Public Works funds and $67,185.09 Emergency
Relief funds, a total of $350,193.02 for new work, and $155,599.59
regular funds for maintenance, a total of $505,792.61. In addition,
$500,000 was expended from contributed funds for new work.
   Proposed operations.-The unexpended balance July 1, 1942, $48,-
023.24, will be applied as follows:
Ma intenance :
    Repairs to north jetty by contract, Apr. 1 to June 30, 1943..   $39, 548. 24
    Examination     and surveys of channels for maintenance
       dredging, Apr. 1 to May 31, 1943_              _           -   8, 475. 00

        Total ________              ______                 ____                              48, 023. 24
386          REPORT OF CHIEF OF ENGINEERS,                                     U.   S. ARMY,             1942

  The additional sum of $32,000 can be profitably expended during
the fiscal year 1944 in maintenance of jetties.
                                        Cost and financial summary

Cost of new work to June 30, 1942_                                     ____________1                          $350, 193.02
Cost of maintenance to June 30, 1942_                                      ______
                                                                           ---------          _                155, 599. 59

         Total cost of permanent work to June 30, 1942_                                -----------            505, 792. 61

Net total expenditures_ _-____ _ _ _ _                                     __   _----
                                                                                   _ __                    1 505, 792. 61
Unexpended balance June 30, 1942__                               _-____-________-- -              _           48, 023.24

         Total amount appropriated to June 30, 1942                             -- ____                       1 553, 815. 85

   Fiscal year ending June 30              1938               1939              1940              1941               1942

Co st of n ew w ork
Cost of maintenance__         __.....
                                          ------..----
                                        ------    .... ... .... ...
                                         $15, 487. 99
                                                               -------.----------.-..
                                                             $5, 694. 26  $5, 142.37         $12, 775.60
                                                                                                         ........
                                                                                                                        $2. 66

Total expended         __----__           38, 649. 46         4, 543. 29        6, 461. 71    12, 655. 75                   2. 66
Allotted _    _ _---     --    ---        45, 000.00         10, 822.83        28, 000.00         5, 800.00         -7, 000.00



Balance unexpended July 1, 1941_ _ __-_---                                                                    $55, 025. 90
Deductions on account of revocation of allotment -----------------                                               7, 000. 00

         Net amount to be accounted for ---------------------------                                             48, 025. 90
Gross amount           expended--                       ----------------                                               2. 66

         Balance unexpended June 30, 1942-------                                                                48, 023. 24

Amount that can be profitably expended in fiscal year ending June
   30, 1944, for maintenance                 ________                 ______                                    32, 000.00
  1 In addition $500,000 contributed funds expended for new work,
  2 Exclusive of available funds.

                                        8. FISHING CREEK, MD.

   Location.-The creek is a narrow winding tidal stream which enters
Chesapeake Bay from the west 56 miles south of Baltimore and about
26 miles south of Annapolis, Md. (See U. S. Coast and Geodetic
Survey Chart No. 1225.)
   Existing project.-This provides for a channel 7 feet deep with
widths of 100 feet and 60 feet from deep water in Chesapeake Bay
to an anchorage of the same depth, 120 feet wide and 400 feet long,
located in the marsh 500 feet above the mouth of the creek and for
twin stone jetties at the entrance. The mean tidal range is about
1 foot.
   The estimate of cost of new work made in 1937 is $97,000. The
latest (1937) approved estimate of cost for annual maintenance is
$2,500.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (H. Doc. No. 241, 75th Cong., 1st sess.). The latest
published map is in the project document.
   Local cooperation.-Fully complied with.
   ITerminal facilities.-None.
   Operationsand results during fiscal year.-Work under contract on
construction of twin stone jetties at the entrance of the creek was
             RIVERS       AND HARBORS-BALTIMORE,                MD.,     DISTRICT                 387

continued and completed during the year. A total of 11,158 tons of
stone was placed. Dredging by contract for completion of the project
was commenced and completed during the year. A total of 111,262
cubic yards of material was removed and deposited on authorized
dumping areas. The total costs, all for new work, were $82,719.85.
The total expenditures were $74,795.39.
   Condition at end of fiscal year.-The existing project was completed
in 1942. The controlling depth, ascertained in May 1942, was 7.0 feet
at mean low water in the channel and anchorage basin. The total
costs, all for new work, were $100,539.48. The total expenditures were
$79,275.61.
   Proposed operations.-The unexpended balance July 1, 1942, $34,-
674.39, will be applied to payment of outstanding liabilities and any
unneeded funds will be recommended for revocation.
   No funds can be profitably expended during the fiscal year 1944.
                                Cost and fina.ncial summary

Cost of new work to June 30, 1942_______________________________                  _ $100, 539. 48
Cost of maintenance to June 30, 1942________________
        Total cost of permanent work to June 30, 1942_______________                    100, 539. 48
Minus accounts payable June 30, 1942_ ___-___                                            21, 263. 87

        Net total expenditures_ ______________-_-_--------79,                                  275. 61
Unexpended balance June 30, 1942_ _______------                                          34, 674. 39

        Total amount appropriated to June 30, 1942____ _________                        113, 950. 00

   Fiscal year ending June 30       1938         1939        1940          1941                1942

Cost of new work                                  $222. 56      $2. 68   $17, 594. 39      $82, 719. 85
Cost of maintenance .           -
Total expended      .           --------------     222. 56      2. 68      4, 254. 98          74, 795.39
Allotted....------------------------------       2, 000.00                58, 550.00           53,400.00



Balance unexpended July 1, 1941__________________--____-----                            $56, 069. 78
Amount allotted from War Department Civil Appropriation Act ap-
  proved June       24,   1940___ _____________                                          53,400. 00

      Amount to be accounted for_____________________                                   109, 4G9. 78
Gross amount expended_____        ___      _     _                                       74,795. 39

     Balance unexpended June 30, 1942______________________                              34, 674. 39
Amount covered by uncompleted contracts____________________                              24, 868. 46
        Balance available June 30, 1942 ____________________________                      9,      5. 93

    9. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

  The cost of work during the year amounted to $27,315.13. The
expenditures were $27,218.66. The balance unexpended June 30, 1942,
$21,823,10, will be applied as needed during the fiscal year 1943 to
payment of expenses incurred under this heading.
  The additional sum of $50,000 can be profitably expended during
the fiscal year 1944.
388            REPORT OF CHIEF OF ENGINEERS,                                     U. S. ARMY,                   1942

                                               Cost and financial summary

Cost of new work to June 30, 1942------------------------                                                       ------------
                                        --
Cost of maintenance to June 30, 1942_____--- --------                                                  ----      $396, 109. 93

     Total cost of permanent work to June 30, 1942___ --    __---                                                    396, 109. 93
Minus accounts payable June 30, 1942____________________________                                                       2, 290. 39

     Net total expenditures_                                                                                         393, 819. 54
Unexpended balance June 30, 1942_______--_______--_______                                                             21, 823. 10

        Total amount appropriated to June 30. 1942________________                                                   415, 642. 64


   Fiscal year ending June 30                     1938             1939            1940                 1941               1942


Cost of new work                 ------- ---------- --         ------------ --------------       -     ---    -------
Cost of maintenance ..-.            - ..- -  $49, 270.53         $59, 609.00    $45, 240. 38          $25, 368. 11        $27, 315. 13

Total expended_                      -    --     51, 230. 44      56, 326. 38     48, 553. 66          24, 317. 53         27, 218. 66

Allotted__--    ------------------               90, 000.00       75, 000.00      47, 301. 99          14, 000.00



Balance unexpended July 1, 1941_____-_                                                                               $49, 041. 76
Gross amount expended__ __------_--_---______--                                                                       27, 218. 66

      Balance unexpended June 30, 1942--------------      ___                                                           21, 823. 10
Outstanding liabilities June 30, 1942________----------___                                                               4, 000. 00

         Balance available June 30, 1942--___ ____- __-__--                                      __       -             17, 823. 10

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1_______________________ .. __________                                                       50, 000. 00
   1 Exclusive of available funds.

10. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED

                                                                                Cost and expenditures to
                                                                For last full
                                                                                      June 30, 1942                     Estimated
                     Name of Project
                                                                 report see                                               amount
                                                                Annual Re-                                              required to
                                                                 port for-      New work         Maintenance             complete

1. Susquehanna River above and below Havre
      de Grace, Md.1 2-   1                                         1941        $270, 664. 40     3 $77, 530. 62            (4)
2. Northeast River, M d.' -..-.
                               ...........    ... ..                1940           28, 488. 71                              (4)
3. Elk and Little Elk Rivers, Md., 5_-..__---_                     1932         6 90, 121. 28         44, 342. 35          (4)
4. Rockhall Harbor, Md.l__                                         1940          139, 757.13           9,762.04            (4)
5. Corsica River, Md.1'           -                                1932           39, 070. 85         17, 611. 85          (4)
6. Queenstown Harbor, Md.1 7                                       1931           44, 858. 27         26, 314. 84          (4)
7. Channel Connecting Plain Dealing Creek
      and Oak Creek, Md.8                                           1940              111. 57                             $74,000. 00
8. Claiborne Harbor, Md.l-                                         1933          42, 973. 65          48, 584. 27          (4)
9. Knapps Narrows, Md.__                                           1936          46, 121. 20                               (4)
10. Tilghman Island Harbor, Md.1 7 9...........                     1922               29. 73                               7,790. 00
11. Tred Avon River, Md. 10____________________                     1923          12, 692. 87           1, 140. 93         22, 000.00
12. Island Creek, Md.' 11________________________                   1940           6, 229. 93                               (4)
13. LaTrappe River, Md.1 7_                                         1922           8, 063.87           15, 967. 97          (4)
14. Choptank River, Md.l_                                           1931          84, 296. 34          21, 649. 83          (4)
15. Tuckahoe River, Md. 7-                                          1923           9, 727. 36           1, 092. 64          (4)
16. Warwick River, Md.'                    -                        1922          22, 040. 82          24, 641.00           (4)
17. Cambridge Harbor, Md.s                                          1940          81, 973.94            6, 987. 30         33, 500.00
18. Waterway from Little Choptank to Chop-
      tank River, Md.s                                              1939              305. 45                              58, 700. 00
19. Slaughter Creek, Md.'                                           1922           4, 140. 00             500. 00           (4)
20. Honga River and Tar Bay (Barren Island
      Gaps), Md.1 11                                                1939          27, 667. 94          14, 169. 78           (4)
21. Fishing Bay, Md.'        -                                      1940          33,874. 19                                (4)
22. Nanticoke River, Md.l_                                          1940          73, 243. 18                                (4)
23. Nanticoke River (including Northwest
      Fork), Del. and Md.1               12                         1940          48,815.31            33, 312. 79          (4)
24. Broad Creek River, Del.'     -                                  1935          64, 520. 00          43, 313. 59          (4)
25. Tyaskin Creek, Md.' 7__-__--- -----                             1923          16, 296. 63          18, 266. 39          (4)

   See footnotes at end of table.
              RIVERS AND HARBORS-BALTIMORE,                                        MD.,      DISTRICT               389
10. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMIT-
                      TED-Continued

                                                        For last full Cost and expenditures to                Estimated
                                                         Name ofsee
                                                         report  Project    June 30, 1942                      amount
                                                        Annual   Re-                                         required to
                                                         port for-- New work       Maintenance                complete


26. Upper Thoroughfare Deals Island, Md.'                       1940        $62,445.73        $3, 975. 31         (4)
27. Lower Thoroughfare, at or near Wenona,
      Deals Island, Md.' 7 13                                   1922          12, 200.00          700. 00         (4)
28. Manokin River, Md.1 7                                       1919       is34, 788. 05      31, 874. 44         (4)
29. Crisfield Harbor, Md.14 _______________________             1941        211, 961. 83       2, 839. 46       $32, 750. 00
30. Broad Creek, Md.l            ..             _               1939         28, 227. 19      44, 603. 63         (4)
31. Pocomoke River, Md.1 _____________________                  1940        181, 957. 83      27, 404. 18         (4)
32. Tangier Channel, Va. 16______________________               1939         57, 627. 98      24, 489. 57         (4)
33. Waterway on the coast of Va.' 17_      -                    1931           9, 404. 45     11, 802. 46         (4)
34. Chincoteague Bay, Va.1l______________
                                        .     ____              1940         25, 125. 92    - .                   (4)
35. Herring Bay and Rockhold Creek, Md.l        -....           1941         50, 591. 47     _ -- .               (4)
36. Parish Creek, Md.1                                          1937          19, 170. 27                         (4)
37. Back Creek, Anne Arundel County, Md.1                       1941         23, 061. 22                          (4)
38. Annapolis Harbor, Md.1                                      1941         34, 249. 61                          (4)
39. Cypress Creek, Md. 11_______________________                1940           3, 057. 27                         (4)

  1 Channels adequate for commerce.
  2 Modifications of existing project recommended by the Chief of Engineers, Apr. 5, 1939, (S. Doc. No. 67,
76th Cong. 1st Sess.).
  3 Exclusive of$2,498.62 for dredging to 12-foot depth at Port Deposit, Md., F. Y, 1942, under sec. 3, R. & H.
Act approved Oct. 17, 1940.
  4 Completed.
  5 Awaiting local cooperation for completion to full width for 1,500 feet at lower end of project.
  6 in addition $8,414.09 was expended from contributed funds.
  7 Abandonment recommended in 1926 (H. Doc. No. 467, 69th Cong., 1st sess.).
  8 Awaiting local cooperation.
  9 Insufficient potential commerce to justify the improvement.
  10oAwaiting local cooperation for work in north fork.
  11No commerce reported.
  12Modifications recommended March 20, 1941 (S.Doc.No.69, 77th Cong., 1st sess.).
  13 Modification of existing project was recommended by the Chief of Engineers Jan. 11, 1939 (H. Doc.
No. 238, 76th Cong., 1st sess.).
  14Modification of existing project was recommended by the Chief of Engineers July 24, 1939 (H. Doc.
No. 457, 76th Cong., 1st sess.).
  15Modifications of existing project recommended by the Chief of Engineers July 5, 1939 (H. Doc. No. 429,
76th Cong., 1st sess.).
  16Modifications recommended Jan. 23, 1941 (H. Doc. No. 141, 77th Cong., 1st sess.).
  17Modifications of existing project recommended by the Chief of Engineers April 5, 1939, in H. Doc.
No. 268, 76th Cong., 1st sess.
  IsIncludes $2,000 expended outside the project limits.

              11. PLANT ALLOTMENT, BALTIMORE, MD., DISTRICT
                                    Cost and financial summary
Undistributed costs June 30, 1942____ ________________                                                      $39, 185. 46
Net total cost to June 30, 1942_________________________________                                             39, 185. 46
Plus accounts receivable June 30, 1942_________________________..                                           432, 308. 52
      Gross total costs to June 30, 1942_______________________                                             471, 493. 98
Minus accounts payable June 30, 1942      __________________                                                 65. 053. 10
         Net total expenditures________ ________                           ____       ______--              406, 440. 88
Unexpended balance June 30, 1942_                                                                      -321, 442. 91
     Total amount appropriated to June 30, 1942                                                             4. 997. 97
                                                                                                          8______________

   Fiscal year ending June 30            1938                  1939           1940             1941             1942

Total expended_       _       _       $80, 229.75     -$34, 210. 56        -$3, 285. 37     -$68, 989.27      $386, 473. 09
Allotted_________                     106, 391. 00      -86,     587. 80    -3, 138. 01                           3, 355. 96


Balance unexpended July 1,1941_____________________________--                                               $61, 674. 22
Amount allotted from War Department Civil Appropriation Act
  approved June 24, 1940--------------------------------------                                                3, 355. 96
      Amount to be accounted for_______ --       --     --    _--_                                           65,030. 18
390         REPORT OF CHIEF OF ENGINEERS,                           U. S. ARMY,           1942

Gross amount expended __________-------------         $1, 316, 450. 94
Less :
    Reimbursements collected------- $929, 824. 10
    Receipts from sales -------------         153. 75
                                                          929, 977. 85
                                                                                               $386, 473.09

      Balance unexpended June 30, 1942______________________                                   -321,    442. 91
Outstanding liabilities June 30, 1942-..           $67, 585. 88
Amount covered by uncompleted contracts -------     30, 921. 39
                                                                                                  98, 507. 27

      Balance available June 30, 1942________     __---_____-----                              -419, 950. 18
Accounts receivable June 30, 1942 --- __     ____________------                                  432, 308. 52

                                                    ---------------
          Unobligated balance available June 30, 1942_                                            12, 358. 34

Status of all investigations for navigation, called for by river and harbor acts
                            and committee resolutions

                                                        Date trans-Recommenda-
           Locality             Authorization act        mitted to     Document No_             Recommenda-
                                                         Congress
Baltimore Harbor and          Rivers and Harbors
Channels, Md.                  Committee resolu-
                                tion, Jan. 11, 1932.
    Do.                       River and Harbor
                               Act, Aug. 26, 1937.
Baltimore Harbor and          River and Harbor
   Channels, Md., cut-off       Act, June 20, 1938.
  channel to inland water-
  way from Delaware River
  to Chesapeake Bay.
Broad Creek River, Del -- __ Commerce Committee         Aug. 9, 1941                             Unfavorable.
                                resolution, May 2,
                                1939.
Broadwater Creek Anne Rivers and Harbors                Feb.   9, 1942   House 622, 77th         Favorable.
   Arundel County, Md.          Committee resolu-                         Cong. 2d Sess.
                                tion, Dec. 10, 1937.
Cambridge Harbor, Md ....     Rivers and Harbors        June 15, 1942 ----_
                                                                          --_
                                                                            -_------_            Unfavorable.
                                Committee resolu-
                                tion, Feb. 28, 1939
Chincoteague Bay, Va ---    . Rivers and Harbors        Aug    7, 1941                                 Do.
                               Committee resolu-
                                tion, June 23, 1939.
Crisfield Harbor, Md -.- - Rivers and Harbors           May 20, 1942                                   Do.
                                Committee resolu-
                                tion, Feb. 11, 1941.
       Do.                    Commerce Commit-          -----
                                                          do......                                     Do.
                                tee resolution Mar.
                                4, 1941.
Curtis Creek, Md..._____..... Rivers and Harbors
                                Committee resolu-
                                tion Aug. 21, 1937__-
Farm Creek, Md ..- ______-    Rivers and Harbors        Oct. 17, 1941                                  Do.
                                Committee resolu-
                                tion, Aug. 28, 1940.
Herring Bay to West River, River and Harbor Act,        Nov. 28, 1941                                  Do.
   Anne Arundel County,         Aug. 26, 1937.
   Md., channel via Rockhold
   Creek.
Jefferson Island, Chesapeake __--.do- .--------------
   Bay, Md., channels to,
   as aid to navigation, and
   establishment of harbor of
   refuge.
Manokin River, Md .......     Rivers and Harbors
                                Committee resolu-
                                tion Apr. 4, 1939.
McCreadys Creek, Md ... - - Rivers and Harbors          May 2, 1942         _-_---_---_---_-
                                                                         ----                          Do.
                                Committee resolu-
                                tion, Feb. 28, 1941.
Susquehanna River, Pa. Sec. 1 of River and              Apr. 11, 1942    House 702, 77th         Favorable.
   and Md., for navigation,     Harbor Act, Jan. 21,                      Cong. 2d sess.
   flood control, power and     1927.
   irrigation (308 report).
Susquehanna River, Pa. Commerce Commit-                 May 23, 1942                             Unfavorable.
   from Columbia to Mar-        tee resolution, May
   ietta, Pa.                   21, 1941.
Twitch Cove and Big Rivers and Harbors                  Nov. 28, 1941                                  Do.
   Thoroughfare River, Md.,     Committee resolu-
   channel to Tylers River.     tion, Aug. 1, 1940.
                                  -s    o
         RIVERS   AND   HARBORS-BALTIMORE,     MD.,   DISTRICT     391
                   12. YORK, CODORUS CREEK, PA.

   Location.-York, Pa., is on Codorus Creek 10 miles above its con-
fluence with the main Susquehanna River. Codorus Creek with its
tributary branches is located in York County in the south central
part of Pennsylvania. (See U. S. Geological Survey quadrangle
sheets "Pennsylvania-York and Hanover.")
   Existing project.-The plan of improvement provides for the con-
struction of Indian Rock Dam, an earth and rock fill dam about
1,200 feet long at the top, rising 82 feet above the stream bed, with
a reservoir providing for the controlled storage of 28,000 acre-feet
at the elevation of the spillway crest. The dam site is located on
the main branch of Codorus Creek about 3 miles above York. The
outlet works are located in the right abutment and the uncontrolled
spillway is located on the right bank, discharging upstream from
the tunnel outlet. The reservoir will control the entire drainage
area of the main branch of Codorus Creek and 41 percent of the
drainage area above York. The plan also provides for improvements
to Codorus Creek channel in the vicinity of and through the city
of York for a distance of about 22,969 feet extending from 300 feet
above Richland Avenue to a point downstream from the Pennsyl-
vania Railroad crossing known as Black Bridge. The improvements,
which will increase the channel capacity to 24,000 cubic feet per
second, include widening and deepening the channel and construct-
ing bank protection. The existing project was authorized by the
Flood Control Act approved June 22, 1936. The estimated cost of
new work, revised in 1940, is $4,115,000.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Surveys and plans in
connection with the contracts and surveys for land acquisition were in
progress during the year. Work under the contract for furnishing
certificates of title was continued. There were 442.11 acres of land
acquired in fee and 6.53 acres of land acquired by easement for Indian
Rock Dam and Reservoir and 37.22 acres of land acquired by easement
for Codorus Creek improvements. The contract construction work at
Indian Rock Dam was continued. The construction of the major fea-
tures completed includes 78,289 cubic yards excavation in borrow
areas, 16,425 cubic yards rock excavation for spillway, 52,064 cubic
yards impervious fill in embankment, 29,442 cubic yards rock fill in
embankment, 9,357 lineal feet of drilling in rock or concrete, 236,505
pounds of steel reinforcement incorporated in the work, 15,479 cubic
yards of concrete in weir and walls, 6,416 cubic yards of concrete in
spillway, 17,511 cubic yards of rock in embankment, and 4,819 cubic
yards of rock facing. The contract construction work for Codorus
Creek improvements was continued. The construction of the major
features completed includes 7,433 cubic yards of stripping, 399,626
cubic yards of common channel excavation, 48,104 cubic yards of rock
channel excavation, 9,407 cubic yards of structure excavation, 208,414
cubic yards of levee fill, 15,539 cubic yards of dumped riprap, 14,803
cubic yards of hand-placed riprap, 4,223 cubic yards of concrete, and
158,224 pounds of steel reinforcement incorporated in the work. The
costs, all for new work, were $1,330,080.86. The expenditures were
 $1,329,308.68.
392          REPORT OF CHIEF OF ENGINEERS,                                  U. S. ARMY,                 1942

   Condition at end of fiscal year.-The construction of Indian Rock
Dam is practically completed, the construction of Codorus Creek im-
provements is about 63 percent complete, and the total project is about
77 percent complete. The work remaining to be done is the completion
of the acquisition of lands, the completion of Indian Rock Dam and
the completion of the construction of Codorus Creek improvements
and appurtenant flood protective works. The total costs, all for new
work, were $3,364,452.59, of which $11,588.14 were Emergency Relief
funds and $3,352,864.45 regular funds. The total expenditures were
$3,180,754.13, of which $11,588.14 were Emergency Relief funds and
$3,169,165.99 regular funds.
   Proposed operations.-The balance unexpended on June 30, 1942,
$945,934.01, and accounts receivable, $694.79, a total of $946,628.80 will
be applied as follows:
Accounts payable, June 30, 1942_ --------
                                     -_-_____
                                           _  ----------        $192, 598. 89
New work :
   Acquisition of right-of-way, easements, land, wand damages for
     Indian Rock Dam, July 1, 1942, to June 30, 1943           --                                              68, 713. 00
   Completion of Indian Rock Dam by contract, Juty 1 to Sept.
     15, 1942_-----------------------------------------------                                                  97, 135. 00
   Acquisition of right-of-way, easements, lands, and damages for
     Codorus Creek improvements, July 1, 1942, to June 30, 1943___                                             38, 253. 00
   Completion of Codorus Creek improvements by contract, July 1,
     1942, to Jan. 31, 1943------------------------       ----                                                537, 828. 91

         Total --------------------------------
               ___                                    -     --                                               934,    628. 80
      Maintenance: Maintenance and operation of Indian Rock Dam
       by hired labor__                                                                                        12, 100. 00

             Total -----------------------------------------------                                           94, 628. 80
   It is expected that the project will be completed as a result of the
above proposed operations.
   The additional sum of $12,100 can be profitably expended during the
fiscal year 1944 for maintenance and operation of Indian Rock Dam by
hired labor.
                                      Cost and financial summtary
Cost of new work to June 30, 1942 ----------------------------                                          $3, 364, 452. 59
Cost of maintenance to June 30, 1949-                                                                        ----
          Total cost of permanent work to June 30, 1942                                     -           '3, 364, 452. 59
Undistributed costs June 30, 1942 ______________________________                                                8, 205. 64

          Net total cost to June 30, 1942_                                                               3, 372, 658. 23
Plus accounts receivable June 30, 1942                                                                            C94. 79
                                                                                                                 66----

      Gross total costs to June 30, 1942                                                                 3, 373, 353. 02
Minus accounts payable June 30, 1942                                                                        192, 598. 89

     Net total expenditures -3,                                                                              180, 754. 13
Unexpended balance June 30, 1942__                       ------                                              945, 934. 01

          Total amount appropriated to June 30, 1942______________                                      4, 126, 688. 14
   Fiscal year ending June 30            1938                1939             1940              1941                 1942
Cost of new work                       $49, 795. 76    $103,860. 36        $470, 455. 70 $1, 410, 259. 91      $1,330,080. 86
Cost of maintenance---        -   -                    ---    ------   -      -----------          --                  ----   ---

Total expended-------------_            50, 676. 63      93, 391. 66        341, 532. 50    1, 365,844. 66      1, 329, 308.68
Allotted --------------------.....      60,000.00     1,626, 588. 14        185,000.00      1,375,000.00            880, 100.00
   1Includes $11,588.14 Emergency Relief funds.
               RIVERS          AND HARBORS-BALTIMORE,                                             MD.,       DISTRICT                  393
Balance unexpended July 1, 1941 -----------------        ---                                                             $1, 395, 142. 69
Amount allotted from War Department Civil Ap-
  priation Act approved May 23, 1941 _______----$300, 000. 00
Amount allotted from War Department Civil Ap-
  propriation Act approved Apr. 28. 1942 .__._____ 580, 100. 00
                                                                                                                              880, 100. 00

      Amount to be accounted for_________________-----------                                                              2, 275, 242. 69
Gross amount expended__________________-----            $1,329, 310. 23
Less reimbursements collected_____-----                           1. 55
                                                                                                                          1, 329, 303. 68'

       Balance unexpended June 30, 1942________                                                                               945, 934. 01
Outstanding liabilities June 30, 1942 _____------ $101, 719. 43
Amount covered by uncompleted contracts--------- 832, 114. 58
                                                                                                                               933, 834. 01
     Balance available June 30, 1942______________________                                                                      12, 100. 00
Accounts receivable June 30, 1942-_____--       --
                                           _____________                                                                            694. 79

           Unobligated balance available June 30, 1942_                                                                         12, 794. 79

Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance 2________________________                                                                       12, 100. 00
   2 Exclusive of available funds.

13. OTHER FLOOD-CONTROL PROJECTS FOR WHICH NO ESTIMATES
                      ARE SUBMITTED

                                                                For last             Cost and expenditures to
                                                               full report                 June 30, 1942                        Estimated
                   Name of project                             see Annual                                                         amount
                                                                 Report                                                         required to
                                                                  for-               New work              Maintenance           complete

                       1
1. Harrisburg, Pa. ___                                                 1937                                                         $104, 000
2. Federalsburg, Marshyhope Creek, Md. .                               1941               $4, 061. 08                                216, 000

  1 No funds have been allotted and no work has been done on this project.
  2 Awaiting local cooperation.

Status of all investigations for flood control, called for by flood-control acts and
                               committee resolutions
                                  I                                I                        I                             I
                                                                          Date trans-                                         Recommanda-
            Locality                    Authorization act                 mitted to                 Document No.                  tion
                                                                           Congress

Lackawanna River, Pa.' ...             Flood     Control    Act,        Apr. 11, 1942            House, 702, 77th             Favorable.
                                         June   22, 1936.                                         Cong. 2d sess.
    Do.'      -. . _-__
            ....-          -           Flood     Control    Act, ----- do . ....                .... do -        _-...           Do.
                                         June   25, 1936.
Susquehanna River, N. Y.,              Flood     Control    Act,       ----   do   ----         -----do      - -....--           Do.
  and Pa.'                               June   22, 1936.
Susquehanna River, Pa.,               --..do    -_____                 -__    do .....          -----   do ... -_-_              Do.
  tributaries, sources, and
  headwaters.'
                      - __-
                  . -__-
     Do.'1 . _._...                   Flood Control Act, - -    do - - -                        -----
                                                                                                    do ....
                                                                                                          _-          _---       Do.
                                        June 20, 1936.
Susquehanna River, protec-            Flood Control Act,
                                                             .. do . .                            --- do .   .     . .
                                                                                                                   _.            Do.
  tion at Lewiston, Pa.'                June 22, 1936.
Susquehanna River, Pa.,               Sec. 1 of River and - -_do__                              --- -do ----     - -...          Do.
  and Md., for navigation,              Harbor Act Jan. 21,
  flood control, water power,           1927.
  and irrigation (308 report).'

  1Included in report on Susquehanna River, N. Y., Pa., and Md., by division engineer, North Atlantic
division.
394       REPORT OF CHIEF OF ENGINEERS,                U.   S. ARMY,      1942

      IMPROVEMENT OF RIVERS AND HARBORS IN THE
              WASHINGTON, D. C., DISTRICT

   This district comprises a portion of south central Pennsylvania,
western Maryland, eastern West Virginia, and northern Virginia
embracing the western part of Chesapeake Bay and its tributaries
from Cove Point, Md., to the watershed line between the northerly
arm of Winter Harbor and Garden Creek, Va.
   District engineer: Col. W. J. Barden, Corps of Engineers, to
April 30, 1942; Maj. D. A. Phelan, Corps of Engineers, since that
date.
   Division engineer: Col. John N. Hodges, Corps of Engineers
 (North Atlantic division), to March 31, 1942; Col. T. F. Farrell,
Corps of Engineers (Middle Atlantic division), since that date.

                                     IMPROVEMENTS


                Navigation                            Navigation-Continud
                                      Page                                  t        Page
1. Washington Harbor, D. C__          394 11. Examinations, surveys, and
2. Potomac River, north side of                 contingencies (general)_ __         412
      Washington Channel, D. C.        397 12. Other projects for which no
3. Potomac River at Alexan-
      dria, Va----------------
4. Potomac River below Wash-
                                                 estimates are submitted__
                                       400 13. Plant allotment_____       _-_        413
                                                                                     413
      ington, D. C------               402              Flood control
5. Potomac     River   at   Mount
         Vernon, Va_                   404 14. Washington, D. C_                     414
6.   Occoquan Creek, Va _------       405 15. Preliminary     examinations
7.   Little Wicomico River, Va__      407       and surveys for flood con-
8.   St. Jeromes Creek, Md            408       trol ________________    _          416
9.   Rappahannock River, Va___        409 16. Other flood-control projects
10.   Totuskey Creek, Va      -_..     410       for which no estimates are
                                                    submitted _ _ _ _ _          _   417

                        1. WASHINGTON HARBOR, D. C.

   Location.-Washington Harbor is located at the junction of the
Anacostia River with the Potomac River within the District of
Columbia, 108 miles upstream of the mouth of the Potomac River,
southerly 202 miles by water from Baltimore, Md., and northerly
195 miles from Norfolk, Va. (See U. S. Coast and Geodetic Survey
Chart No. 560.)
  Previous projects.--The original project for the Potomac River
was adopted by the River and Harbor Acts of March 2, 1833, July
11, 1870, and August 2, 1882. For further details see page 1791 of
Annual Report for 1915, and page 295 of Annual Report for 1934.
The River and Harbor Act of September 19, 1890, authorized an
allotment for work on the Anacostia River, joint resolution of Con-
gress of April 11, 1898, made appropriation for a survey, and a proj-
ect was adopted by the River and Harbor Act of June 13, 1902 (H.
Doc. No. 87, 55th Cong., 3d sess., and Annual Report for 1899, p.
1443). For further details, see page 430 of Annual Report for 1932
and page 421 of Annual Report for 1938.
  Existing project.-This project is a combination and extension of
the latest projects for the Potomac River at Washington, D. C., and
       RIVERS AND    HARBORS-WASHINGTON,       D.   C.,   DISTRICT   395

the Anacostia River, D. C. The project provides for (1) Virginia
Channel, from Giesboro Point to Francis Scott Key Bridge, 24 feet
deep and 400 feet wide, with the width increased as necessary to afford
a low-water cross-section area of 25,000 square feet; (2) Washington
Channel, from Hains Point to the head of Washington Channel, 24
feet deep and 400 feet wide; (3) Anacostia River, from Giesboro
Point to Anacostia Bridge, 24 feet deep and 400 feet wide, with
turning basin 800 feet wide and approximately 2,400 feet long of
same depth opposite the navy yard; (4) Anacostia River from Ana-
costia Bridge, 24 feet deep and 200 feet wide to turning basin 400
feet square of same depth at foot of Fifteenth Street SE. The chan-
nel lengths including turning basins are Virginia Channel 25,000 feet,
Washington Channel 10,000 feet, and Anacostia River 15,000 feet.
The plane of reference is mean low water. Tidal ranges are: Mean,
3.0 feet; extreme, 4.5 feet; and irregular, 7.5 feet.
   The estimate of cost for new work, made in 1935, is $325,000,
exclusive of expenditures on previous projects. The latest (1935)
approved estimate for annual cost of maintenance is $83,000.
   The existing project was adopted by the River and Harbor Act
of August 30, 1935 (Rivers and Harbors Committee Doc. No. 22,
74th Cong., 1st sess.). The latest published maps are in the project
document.
    Terminal facilities.-On the Virginia Channel (Georgetown water
front) there are 8 wharves generally of the bulkhead type, of timber,
stone, and concrete, privately owned. Railroad and crane service are
available at a number of the wharves. On the Washington Channel
are 26 wharves of open pile and bulkhead construction, all owned by
the Federal Government, but most of which are leased to private
parties or serve governmental agencies. On the Anacostia River are
about 23 miles of commercial water front on which are located 33
privately owned and 2 Government wharves, and 3,500 linear feet of
bulkhead with slips for governmental agencies. Some of the wharves
and slips have transfer and rail facilities. The wharves of the Wash-
ington Harbor are only open to the public by special arrangement,
except for the District of Columbia fish wharves on the Washington
Channel.
    Terminal facilities, except for those in the Washington Channel,
are considered adequate for existing commerce.
    Operations and results during fiscal year.-The tidal gates were
repaired and operated throughout the year at a cost of $3,663.99.
Plans and specifications were completed for maintenance dredging in
the Virginia Channel downstream of the railroad bridge, at a cost
of $397.19. Water chestnut growth (trapa natans) was removed by
hired labor and Government plant from areas adjacent to the chan-
nels in July and August 1941-June 1942 at a cost of $1,945.03. Main-
tenance dredging by contract was started in the Virginia Channel be-
tween the Highway Bridge and Memorial Bridge on August 15, 1940,
and suspended for the winter on December 15, 1940, to be resumed
March 16, 1941. As contractor's plant was engaged on work im-
portant to national defense at resumption, authority was granted to
waive requirements of resumption and completion until such time as
plant is available. A total of 316,300 cubic yards was removed. The
contract is 53 percent completed. Cost for the year was $1.05.
396       REPORT OF CHIEF OF ENGINEERS,                  U. S. ARMY,   1942

   Total costs for the year were $6,007.26, all applied to maintenance.
Total expenditures were $6,925.69.
   Condition at end of fiscal year.-The existing project was about 50
percent completed. The channels and basins in the Anacostia River
are completed and those at forks of the channel at Hains Point are
partially completed. No new work has been done downstream of the
Key Bridge in the Virginia Channel. The controlling depth in June
1942 was 14.9 feet in the Virginia Channel, Potomac River, for a width
of 400 feet; and in July 1940 was 22.4 feet in the Washington Channel,
Potomac River, for a width of 300 feet. The controlling depth in
February 1938 was 24.0 feet in the Anacostia River for a width of
400 feet downstream of Anacostia Bridge and for a width of 200 feet
upstream of Anacostia Bridge to the foot of Fifteenth Street, SE.,
except immediately under the drawspan of the bridge, where the
controlling depth was 22.1 feet for a width of 100 feet. The total cost
of the existing project was $409,130.91, of which $162,006.33 was for
new work and $247,124.58 was for maintenance. The total expendi-
tures were $404,944.18.
   Proposed operations.-The balance unexpended June 30, 1942,
 $116,161.09, will be applied as follows:
Accounts payable June 30, 1942___ _____________________________            $4, 395. 15
Maintenance :
   Emergency dredging of approximately 260,000 cubic yards from
      the Virginia Channel between Easby Point and Hains Point
      (April to June 1943) ___________________________ 102, 765. 94
    Maintenance and repair of tidal gates, Tidal Basin by hired labor
        (July 1, 1942, to June 30, 1943)             -   -----------          5,000. 00
      Eradication of water chestnut growth with Government plant
        and hired labor (July 1, 1942, to June 30, 1943)-------               4,000. 00

          Total-------------------------116,161.09
  The additional sum of $276,000 can be expended profitably during
the fiscal year 1944 as follows:
Maintenance:
   Dredging by contract, approximately 600,000 cubic yards in the
      Virginia Channel from Easby Point to Hains Point (July to De-
      cember 1944)----------------------------------------------    $240,000
   Eradication of water chestnut growth with Government plant and
        hired labor (July 1, 1943, to June 30, 1944)     -__                     1, 000
      Maintenance and repair of tidal gates, Tidal Basin, by hired labor
         (July 1, 1943, to June 30, 1944) ----------------
                                           ____________             _            5, 000
      Construction of levees in Oxon Run for disposal basin for Wash-
        ington Harbor dredging by Government plant and hired labor
        (July 1943 to June 1944) --------------------------------               30, 000
           Total ______- ___                        __                         276,000
  No funds are requested for new work of rock removal in the Virginia
Channel downstream of Key Bridge or for dredging at the forks of
the channels at Hains Point, as this work is not considered necessary
for present navigation.
                         Cost and financial summary
Cost of new work to June 30, 1942_______________________-___ $3, 191, 007. 11
Cost of maintenance to June 30, 1942_________________________ 2, 078, 734.20
      Total cost of permanent work to June 30, 1942 ----------- 5, 269, 741. 31
Minus accounts payible June 30, 1942           ----------            4, 395. 15
      Net total expenditures------ __ -------               --  5, 265, 346. 16
Unexpended balance June 30, 1942-------------__                    116, 161. 09
      Total amount appropriated to June 30, 1942--...           5,381, 507. 25
           RIVERS             AND HARBORS-WASHINGTON,                        D.      C.,    DISTRICT              397

   Fiscal year ending June 30           1938             1939    -      1940                 1941              1942

Cost of new work                     $115, 537.01
Cost of maintenance---------....      62, 531. 07       $6, 440. 32    $4, 655. 17         $56, 754. 22        $6, 007. 26

      Total cost_                     178, 068. 08       6, 440. 32     4, 655. 17          56, 754. 22         6, 007. 26

Total expended ---       --     -     140, 029. 52       7, 648.77      4, 420. 27          50, 726. 74         6, 925. 69

Allotted----   ------------------      70, 603. 06      50, 000. 00    23, 000. 00          55, 000. 00         7, 000. 00



Balance unexpended July 1, 1941----------------------------   $116, 086. 78
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942-------------   ---------------------    7, 000. 00

      Amount to be accounted for--------------------   -                                                  123, 086. 78
Gross amount expended---------------------------------                                                      6, 925. 69

      Balance unexpended June 30, 1942__           _                                                      1---------------------
                                                                                                           16, 161. 09
Outstanding liabilities June 30, 1942_-----------------     $33. 37
Amount covered by uncompleted contracts-------          57, 008. 12
                                                                                                           57, 041. 49

         Balance         available   June      30,   1942 ----             -------                         59, 119. 60
Amount (estimated) required to be appropriated for completion of
   existing project 1                                    -----          --------                          160, 000. 00
Amount that can be profitably expended in fiscal year ending June
   30, 1944, for maintenance 1                           _----------                                      276, 000. 00
   1 Exclusive of available funds.

   2. POTOMAC RIVER, NORTH SIDE OF WASHINGTON CHANNEL, D. C.

   Location.-The area covered by the project is the north side of the
Washington Channel water front upstream of the War College, all
located in the District of Columbia. (See U. S. Coast and Geodetic
Survey Chart No. 560.)
   Existing project.-This provides for development of the commer-
cial water front of Washington Channel by construction of (1) a
yacht harbor in four sections on the upstream half of the section,
with berthing space for about 286 boats; (2) two wharves for activi-
ties of the District of Columbia; (3) three wharves for existing
transportation lines and general service; (4) construction of bulkhead
walls; (5) removal of the old and dilapidated existing structures, etc.
   The estimate of cost of new work, revised in 1941, is $3,108,430,
of which the District of Columbia is to contribute $389,000, the cost
of the two wharves for District of Columbia activities.
   The existing project was adopted by the River and Harbor Act of
August 30, 1935 (Rivers and Harbors Committee Doc. No. 13, 73d
Cong., 1st sess.).
   Local cooperation.-The approved project provides that the Dis-
trict of Columbia shall contribute $389,000 toward the cost of the
improvement, of which $325,000 has been appropriated. The remain-
ing $64,000 will become available July 1, 1942.
   Terminal facilities.-The entire commercial water front is Govern-
ment owned, and of the 26 wharves only 5 can be classed as modern,
which includes 1 large new wharf constructed under the new project.
The District of Columbia constructed in 1916 a municipal fish wharf
and a harbor police wharf partially completed at a total cost of
         493202-43--pt. 1, vol. 1-26
398      REPORT OF CHIEF OF ENGINEERS,                  U.    S. ARMY,   1942

$236,360. A public sales-and-service pier and 2 yacht basins have
been completed under the project. The facilities are considered in-
adequate for existing commerce.
   Operationsand results during fiscal year.-Constructionof the third
unit of construction (pier No. 5 at the foot of N Street SW.) was
completed by contract December 5, 1941, at a cost of $86,909.02.
Dredging by contract for the fourth unit of construction (excursion
pier No. 4) was completed November 6, 1941, at a cost of $33,369.88.
Foundation tests at pier No. 4 were completed and plans and specifica-
tions were prepared and were 85 percent completed on June 30, 1942,
at a cost of $4,063.53. Alterations to existing wharves to provide tem-
porary facilities for water-front tenants during construction were in
progress with hired labor and plant during the year at a cost of
$2,217.53. Miscellaneous surveys were made throughout the year at
a cost of $163.39.
   Total costs for the year, all for new work, were $126,723.35, all
United States funds. Expenditures were $164,280.02 United States
funds and $19,200.01 contributed funds, a total of $183,480.03.
   Condition at end of fiscal year.-The existing project was about
40 percent completed. Construction of the first two yacht basins was
completed in November 1940, and the basins were leased for commer-
cial use and transferred to the District of Columbia for operation
December 3, 1940. Commercial pier No. 5 at the foot of N Street SW.
was completed in December 1941, and jurisdiction of the structure
transferred to the District of Columbia for operation March 21, 1942.
Removal of existing structures and dredging for construction of excur-
sion pier No. 4 (fourth unit of construction) was completed November
6, 1941, and plans and specifications were 76 percent completed.
   The work remaining to be done to complete the project consists of
(1) construction of two yacht basins; (2) two wharves for activities
of the District of Columbia; (3) construction of excursion pier No. 4,
and construction of two wharves for existing transportation lines and
general service; (4) completion of bulkhead walls; and (5) completion
of removal of existing structures. The controlling depth in Washing-
ton Channel in July 1940 was 22.4 feet for a width of 300 feet. Total
costs, all for new work, were $1,161,034.89, of which $900,034.89 were
United States funds and $261,000 contributed funds. Total expendi-
tures were $899,657.33 United States funds and $261,000 contributed
funds, a total of $1,160,657.33.
   Proposed operations.-Thebalance unexpended June 30, 1942, $304,-
172.67, plus a contribution of $64,000 in the fiscal year 1942 and an
anticipated contribution of $64,000 in the fiscal year 1943 from the
District of Columbia, a total of $432,172.67, will be applied as follows:
Accounts payable June 30, 1912___ _______________----------         -            $377. 56
New work :
    Completion of plans and specifications for pier No. 4 and founda-
     tion tests and preparation of plans and specifications for pier
     No. 3 (fifth unit of construction) (September 1942 to June
     1943) ----------------------------------------------------             22,795.11
    Construction of pier No. 4 (fourth unit of construction) by con-
       tract (October 1942 to June 1943) _-__ ___-__------------           340, 000.00
    Clearing and preliminary dredging at site of pier No. 3 by contract
      (September 1942 to June 1943) ______________-__                       64,000. 00
    Rearrangement of facilities for water-front tenants during con-
      struction (September 1942 to June 1943) __-____--_                        5, 000. 00
         Total            -    --       -   _----
                                              --
                                               __    _--____        -_     432,172.67
                RIVERS              AND HARBORS-WASHINGTON,                                          D. C., DISTRICT                          399
  The additional sum of $212,000 can be profitably expended during
the fiscal year 1944 for commencing construction of pier No. 3 (fifth
unit of construction).
                                                   Cost and financial summary
                                                       UNITED STATES FUNDS

Cost of new work to June 30, 1942------------------------------ $900, 034. 89
Cost of maintenance to June 30, 1942-------------------------------------
      Total cost of permanent work to June 30, 1942 -------------                                                                    900, 034. 89
Minus accounts payable June 30, 1942               --------------                                                                         377. 56

     Net total expenditures__-------------- ---------------------                                                                    899, 657. 33
Unexpended balance June 30, 1942------------------------------                                                                       304, 172. 67

             Total amount appropriated to June 30, 1942                                                                           203, 830. 00
                                                                                                                               1---------------,
                                               I                    I                   I                      I
                                                                                                                       (
     Fiscal year ending June 30                        1938                1939               1940                    1941                1942
                   Cost ofnewwork                                   i
Cost of new work___--------                          $45, 815. 05       $315, 513. 63       $96, 724. 19           $301 , 21 5.52       $126, 723. 35
Cost of maintenance- .----------
                                                      56, 216. 44       232, 750.
                                                                        232, 750. 58
                                                                                  58        170, 671.98
                                                                                            170, 671. 98            263,12f 8. 59        164, 220. 02
Total expended_------                   .---
                                                               - 1.                     1                  -
A llotted_-------
               ------- ----              ..-         569, 680.00          76, 150. 00       221, 000. 00             46 ,00(0.00         276,000.00


                                           _
Balance unexpended July 1, 1941_____________------ _-------                                                                         $192, 452. 69
Amount allotted from War Department Civil Appropriation Act
approved June 24, 1940-----------------------      --                                                                               270, 0(0. 00

             Amount to be accounted for__________________---------                                                                   468, 452. 69
Gross amount expended--___--                                    ___-------------------                                               16.4,280. 02

      Balance unexpended June 30, 1942___                                                                                            301, 172. 67
Outstanding liabilities June 30, 1942------------------ $277. 56
Amount covered by uncompleted contracts ------------ 15, 007. 58
                                                                                                                                      15, 285. 14

             Balance available June 30, 1942_ __-_-_---------                                                                        288, 887. 53

Amount (estimated) required to be appropriated for completion of
    existing project 1_______---------------------------                                                                       1, 515, 600. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for new work --------------------------------------                                                                      212,000,00
    1 Exclusive of available funds.


                                                   DISTRICT    OF COLUMBIA FUNDS

Cost of new work to June 30, 1942___------------------------------                                                                 $261, 000. 00
Cost of maintenance to June 30, 1942
             Total cost of permanent work to June 30, 1942 __________                                                                261, 000. 00

Net total expenditures ------------------------                                                  -------                            261, 000. 00
Unexpended balance June 30, 1942__________________------------_____                                                                   64, 000. 00
             Total amount appropriated to June 30, 1942_______________                                                              325, 000. 00

     Fiscal year ending June 30                        1938                1939               1940                    1941                1942

Cost of new work -_____-__--____    ___------- ...          $69,000    $63,745.57   $128, 254. 43                                    ----------__-
Cost of maintenance       ----- -----------        -------------- -----------------   -        --
Total expended                            I----
                                    ----------- -------                      62, 100        64,271. 01             115, 428.98          $19, 200.01
Allotted ------------------------                       $69, 000             64,000         64, 000. 00              64, 000. 00          64, 000. 00
400          REPORT          OF CHIEF OF ENGINEERS,                         U.    S.     ARMY,         1942

Balance unexpended July 1, 1941_____________________                                                         $19, 200. 01
Amount allotted from District of Columbia Appropriation Act, July
1, 1941                                                                                                       4, 000. 00
                                                                                                              6----------------

      Amount to be accounted for_-------------------------------                                              83, 200. 01
Gross amount expended---------------------------------------                                                  19, 200. 01
           Balance unexpended June 30, 1942 ------------------------                                           4, 000. 00

Amount (estimated) required to be appropriated for completion of
existing project 1------'-----      --- _      ---                                                           64, 000. 00
   1 Exclusive of available funds.

      CONSOLIDATED COST AND FINANCIAL SUMMARY FOR NORTH SIDE WASHINGTON
                                    CHANNEL

Cost of new work to June 30, 1942 __________________________                                           $1, 161, 034. 89
Cost of maintenance to June 30, 1942

      Total cost of permanent work to June 30, 1942 ____________                                        1, 161, 034. 89
Minus accounts payable June 30, 1942______-------                                                              377. 56

                                                 --
      Net total expenditures._____________ - __----_1---                                                 , 160, 657. 33
Unexpended balance June 30, 1942___________________________                                                368, 172. 67

           Total amount appropriated to June 30, 1942_-...                              ________        1, 528, 830. 00

   Fiscal year ending June 30                 1938            1939            1940              1941               1942


Cost of new work- _._.......       ....     $45, 815. 05   $384, 513. 63   $160, 469. 76     $429, 469. 95      $126, 723.35
Cost of maintenance

Total expended-      -   -   -     -         56, 216. 44    294, 850. 58    234, 942. 99      378, 557. 57        183, 480. 03

Allotted                     - -       --   638, 680. 00    140, 150. 00    285, 000. 00      110, 000. 00       340, 000. 00



Balance unexpended July 1, 1941_______________________ ______     $211, 652. 70
Amount allotted from War Department Civil Appro-
  priation Act approved June 24, 1940               276, 000. 00
                                                   $_____________
Amount allotted from District of Columbia Appro-
priation Act, July 1, 1941__ _________________-_    64, 000. 00
                                                                   340, 000. 00
           Amount to be accounted for_________________                                                       551, 652. 70
Gross amount expended_____________                                   ___________             ____            183, 480. 03
      Balance unexpended June 30, 1942-                                                                      368, 172. 67
Outstanding liabilities June 30, 1942________________                                      $277. 56
Amount covered by uncompleted contracts_                                               15, 007. 58
                                                                                                              15, 285. 14
Balance available June 30, 1942- ______________                                                              352, 887.53
Amount (estimated) required to be appropriated for completion
   of existing project 1----------------                                                                1, 579, 600. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for new work 1_____________________________                                                  212, 000. 00
   1 Exclusive of available funds.

                         3. POTOMAC RIVER AT ALEXANDRIA, VA.

  Location.-Alexandria, on the right bank of the Potomac River, is
5 miles below Washington, D. C., and 105 miles above the mouth of
the river. (See U. S. Coast and Geodetic Survey Chart No. 560.)
        RIVERS    AND HARBORS-WASHINGTON,                       D.   C.,   DISTRICT              401

   Existing project.-This provides for a depth of 24 feet in front
of Alexandria between the through channel and a line drawn 20 feet
outside of the established pierhead line. This area is about 6,700
feet in length and averages 300 feet in width. The lower end of the
improved section is 104 miles from the mouth of the river. The
plane of reference is mean low water. Tidal ranges are: Mean, 2.8
feet; extreme, 4.5 feet; irregular, 6 feet.
   The estimate of cost for new work, made in 1908, was $116,000.
The latest (1928) approved estimate for annual cost of maintenance
is $5,500.
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 1253, 60th Cong., 2d sess.). The latest
published map is in the project document.
   Terminal facilities. Alexandria has 18 regular shipping wharves
or landings; 15 of these are privately owned (of which 4 are open
to the public by special arrangement) and 1 owned by the United
States. The terminal and transfer facilities are considered adequate
for existing commerce.
   Operations and results during fiscal year.-Water-chestnut growth
 (trapa natans) was removed by hired labor and Government plant
in July and August 1941 and May and June 1942 along the Alexan-
dria water front at a cost of $2,011.27. Plans and specifications for
dredging in front of the wharves along the water front were pre-
pared at a cost of $411.26. Total costs for the year were $2,422.53,
all applied to maintenance. Total expenditures were $3,760.05.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1912. The controlling depth in June 1942 was 19.1 feet in
the lower section and 18.7 feet in the upper section. Total costs
were $266,437.22, of which $95,214.52 was for new work and $171,-
222.70 for maintenance. Total expenditures were $266,240.98.
   Proposed operations.-The balance unexpended June 30, 1942,
$37,529.76, will be applied as follows:
Accounts payable June 30, 1942 _ _____--____-           __-_---------                        $196. 24
Maintenance :
   Eradication of waterchestnut growth along the Alexandria
      water front by Government plant and hired labor (July 1,
      1942, to June 30, 1943) -------------------------------------                         9,548. 54
    Dredging approximately 92,000 cubic yards in front of the
      wharves along the water front by contract (April to June,
      1943) _      __    __      ________-__                                              27,784.98

         Total          __-_____                                                          37, 529. 76
   The additional sumn of $1,000 can be expended profitably during the
fiscal year 1944 for eradication of water chestnut growth by Govern-
ment plant and hired labor.
                              Cost and financial summary

Cost of new work to June 30, 1942                   __----------------------------        $95, 214. 52
Cost of maintenance to June 30, 1942___---_                                   __          171, 222. 70
     Total cost of permanent work to June 30, 1942---                                     266, 437. 22
Minus accounts payable June 30, 1942-..........                                                196. 24
     Net total expenditures__-------                                                      266,240.98
Unexpended balance June 30, 1942-----------------                                    .-    37, 529. 76

      Total amount appropriated to June 30, 1942            -....                         303, 770. 74
402          REPORT OF CHIEF OF ENGINEERS,                             U.   S. ARMY,                1942


   Fiscal year ending June 30            1938            1939            1940               1941             1942

Cost of new work .......     -- ....----
                                      ---------------                  ----------    ---
Cost of maintenance__ . _.._ ..     . .          .---. ._                    $450          $4, 793. 95       $2, 422. 53
Total expended-     - -_------                  -----------------   --------------          3,710.19          3,760.05

Allotted                          ----    ---         -----------           4,000          37,000.00          4, 000.00




Balance unexpended July 1, 1941------------------------------ $37,289.81
                                                              $
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942----------------------------            4,00. 00

           Amount to be accounted for____________-----------------------                                 41,289. 81
Gross amount expended__-------- ---------------------------------                                          3, 760. 05

      Balance unexpended June 30, 1942-__-_____________--------                                          37,529.76
Outstanding liabilities June 30, 1942   ____-------- --------                                      ---      196.24

           Balance available June 30, 1942 _____________-______-__-_-                                    37, 333.52

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -_______________
                                                                                               1,000. 00.
   1Exclusive of available funds.

                  4. POTOMAC RIVER BELOW WASHINGTON, D. C.

   Location.-The Potomac River is formed 21 miles below Cumber-
land, Md., and flows southeasterly about 285 miles and enters Chesa-
peake Bay about 80 miles from the Atlantic Ocean. (See U. S. Coast
and Geodetic Survey Charts Nos. 557, 558, 559, and 560.)
   Existing project.-This provides for a channel 24 feet deep and
200 feet wide between the mouth of the river and Washington, D. C.,
a distance of 108 miles. The plane of reference is mean low water.
Tidal ranges are: Mean, 1.3 feet at the mouth, 3 feet at Washington ;
extreme, 2 feet at the mouth, 4.5 feet at Washington; irregular, 2.4
feet at mouth, 7.5 feet at Washington.
   The estimate of cost for new work made in 1891 was $158,400.
The latest (1928) approved estimate for annual cost of maintenance
is$20,000.
   The existing project was adopted by the River and Harbor Act of
March 3, 1889 (H. Doc. No. 33, 52d Cong., 1st sess.). The latest
published map is in the Annual Report for 1902, page 1038, and in
House Document No. 859, Sixtieth Congress, first session.
   Terminal facilities.-In general, the improvement is a main river
channel, and terminal facilities are only served where the channel
runs close to either bank of the river. In all, 23 wharves are thus
served. These wharves are of open and solid fill construction and
bulkhead type. The .facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-Under an allotment to
10 tributaries and an allotment for maintenance on this project,
water chestnut growth was removed from a number of infested areas
by Government-owned underwater cutting machines and by man-
ually pulling the plants during July and August 1941 and May and
June 1942.
             RIVERS        AND HARBORS-WASHINGTON,                                 D.      C., DISTRICT                   403

  Costs for the year were $1,500 on Piscataway Creek, Md.; $776.18
on Dogue Creek, Va.; $1,036.77 on Mattawoman Creek, Md.; $1,490.30
on Quantico Creek, Va.; $435.80 on Chopawamsic Creek, Va.;
$3,110.78. for general areas in the vicinity of the project below
Washington, D. C. Plans and specifications for dredging at Upper
and Lower Smith Point Bars and Maryland Point Bar were pre-
pared at a cost of $180.08.
  Total costs for the year were $8,529.91, all for maintenance.
Total expenditures were $10,750.81.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1905. Controlling depths were as follows:

                                         Name of barlir-                                                               Date

                                                                                                      Feet
Naval Magazine----------                                                                                24.0        April 1940.
Marshall Hall --                                                                                           24. 0    June 1939.
Mattawoman                                                                                                 24. 4    July 1939.
Upper Smith Point              ---------------------------                                                 24. 1        Do.
Lower Smith Point-Maryland Point--                                                                         22. 1    August 1939.
Kettle Bottom     _      ------------------               --------                                         25.3         Do.

   Total costs and expenditures were $615,065.27, of which $153,836
was for new work and $461,229.27 for maintenance, which includes
$1,000 for each of the following tributaries: Little Wicomico River,
Va.; Herring Creek, Md.; Coan River, Va.; and $10,000 under allot-
ments to 10 tributaries for water chestnut eradication.
  Proposedoperations.-The balance unexpended June 30, 1942, $138,-
558.33, will be applied as follows:
Maintenance:
    Eradication of water chestnut growth downstream of the Dis-
      trict of Columbia boundary line on the main river and tribu-
      taries, July 1, 1942, to June 1943     -------------------------$18, 738. 41
   Dredging approximately 800,000 cubic yards at Upper and Lower
      Smith Point Bars and at Maryland Point Bar by contract
      (August to November 1942) ------------------------------       119, 819. 92

                 Total--------------------------------------------                                                 138, 558. 33
   The additional sum of $10,000 can be expended profitably during the
fiscal year 1944 for eradication of water chestnut growth by Govern-
ment plant and hired labor.
                          Cost and financial summary
Cost of new work to June 30, 1942_____     __--________-----                                                    $153, 836. 00
Cost of maintenance to June 30, 1942___________________--------                                                  461, 229. 27

           Total cost of permanent work to June 30, 1942 _________-----615, 065. 27

Net total expenditures_---_  -----------   ---------------     615, 065. 27
Unexpended balance June 30, 1942.-1---------------------------38, 558. 33
           Total amount appropriated to June 30, 1942___--------------                                             753, 623. 60

    Fiscal year ending June 30                1938             1939           1940                  1941                1942

Cost of new work--       ----    -----           ------ -------------- -     ---        -------       .      .-- . .     .     .
Cost of maintenance                          $1, 689. 43        $388. 83    $11, 011. 17           $5, 511. 76          $8, 529. 91
Total expended_                               1,935. 40 ... .....            10, 000. 00            4, 690. 86          10, 750. 81
Allotted                                    -4, 536. 64       10, 000. 00     4, 000. 00          140, 000. 00          10, 000. 00
404          REPORT OF CHIEF OF ENGINEERS,                             U.   S.   ARMY,         1942

Balance unexpended July 1, 1941_ _________                              ___------------___ _    $139, 309. 14
Amount allotted from War Department Civil Appropriation Act ap-
proved April 28, 1942-----------------------------------------                                    10, 000. 00

      Amount to be accounted for --_ ----------------------------                                 149, 309. 14
Gross amount expended-------------- ------------------                                             10, 750. 81
         Balance unexpended June 30, 1942--------------                              ---          138, 558. 33

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1                                                                           000. 00
                                                                                                   1-----------------0,
  ' Exclusive of available funds.

                      5. POTOMAC RIVER AT MOUNT VERNON, VA.
  Location.-Mount Vernon lies in Fairfax County, Va., on the right
bank of the Potomac River about 141/2 miles below Washington, D. C.
(See U. S. Coast and Geodetic Survey Chart No. 560.)
  Existing project.-This provides for dredging a channel 200 feet
wide and 9 to 10 feet deep, at mean low water, between the main
channel of the Potomac River and the Mount Vernon wharf, a dis-
tance of about 2,200 feet, with a turning basin of the same depth
and a radius of 200 feet at the wharf. Tidal ranges are: Mean, 2.2
feet; extreme, 3 feet; and irregular, 5 feet.
  The estimate of the total cost of the project made in 1888 was
$26,000.
  The existing project was authorized by the following river and
harbor acts:

       Act                        Work authorized                                     Documents


Mar.    3, 1879   Channel 6 to 7 feet deep, 150 feet wide, from Po-    Annual Report, 1879, vol. 1, p. 83.
                    tomac River Channel to Mount Vernon wharf,
                    with turning basin at wharf.
                  Channel increased to 9- to 10-foot depth, 200-foot   Annual Report, 1888, vol. 1, p. 814.
                   width, turning basin to have 200-foot radius.



   Terminal facilities.-There is one privately owned and operated
wharf on the Mount Vernon estate at the head of the channel.
   Operations and results during fiscal year.-Water chestnut growth
in and adjacent to the channel and turning basin was removed during
July 1941 and June 1942 by a Government underwater cutting machine
at a total cost for the year of $2,228.79 applied to maintenance. Ex-
penditures for the year were $2,268.32.
   Condition at end of fiscal year.-The existing project was partially
completed in 1891. The controlling depth in April 1939 was 13.5 feet
in the turning basin and for a channel 100 feet wide. Total costs and
expenditures under the existing project were $31,766.85, of which
$17,000 was for new work and $14,766.85 for maintenance.
   Proposed operations.-The balance unexpended June 30, 1942, $6,-
183.15, will be applied to eradication of water chestnut growth (main-
tenance) at Mount Vernon, Va., July 1, 1942, to June 30, 1943.
   The additional sum of $3,000 can be expended profitably during the
fiscal year 1944 for the eradication of water chestnut growth at Mount
Vernon.
             RIVERS      AND HARBORS-WASHINGTON,                  D.       C.,   DISTRICT             405
                                   Cost and financial summary

Cost of new work to June 30, 1942-------------------------------                               $17, 000. 00
Cost of maintenance to June 30, 1942---------------------------                                 14, 766. 85

           Total cost of permanent work to June 30, 1942-------------                           31, 766. 85

Net total expenditures_   -------------------------------                                       31, 766. 85
Unexpended balance June 30, 1942 ----------------- --                                            6, 183. 15

           Total amount appropriated to June 30, 1942----------------                           37, 950. 00

   Fiscal year ending June 30          1938        1939        1940               1941             1942


Cost of new work-----                                             ----------
Cost of maintenance _____________ ______________    $10, 950                     $1, 588. 06       $2, 228. 79

Total expended       _                               10, 950                      1, 548. 53        2, 268. 32

Allotted      _                                      10, 950     $4, 000          4, 000. 00        2, 000. 00



Balance unexpended July 1, 1941         ------                                                  $6, 451. 47
Amount allotted from War Department Civil Appropriation Act ap-
   proved April 28, 1942____________---------                                                    2, 000. 00

      Amount to be accounted for_   ------------                                                 8, 451. 47
Gross amount expended ________________                                                           2, 268. 32

           Balance unexpended June 30, 1942-----                                   --            6, 183. 15

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance ' _ _-_- ---                        __                                3, 000. 00
   1 Exclusive of available funds.

                                  6. OCCOQUAN CREEK, VA.

  Location.-Occoquan Creek is formed by the junction of Bull and
Broad Runs, about 5 miles southeast of Manassas, Va., and flows about
13 miles in a southeasterly direction, emptying into the Potomac River
about 26 miles below Washington, D. C. (See U. S. Coast and Geo-
detic Survey Chart No. 560.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of March 3, 1873. For further details see page
1792, Annual Report for 1915, and page 363, Annual Report for
1936.
   Existing project.-This provides for a channel 6 feet deep and 150
feet wide from deep water in the Potomac River to Taylors Point, and
thence 100 feet wide to the town of Occoquan, 6 miles from the mouth,
and the protection of the channel above Taylors Point by riprap-stone
dikes 2,200 feet long. The plane of reference is mean low water.
Tidal ranges are: Mean, 2 feet; extreme, 3 feet; irregular, 5 feet.
   The estimate of cost for new work, revised in 1907, is $64,000, exclu-
sive of expenditures on previous projects. The latest (1923) ap-
proved estimate for annual cost of maintenance is $3,000.
   The existing project was adopted by the River and Harbor Act of
September 19, 1890 (H. Doc. No. 75, 51st Cong., 1st sess.) ; was modi-
fied December 5, 1890 (see Annual Report for 1890, p. 1089, and for
1891, p. 1254).; and was extended by River and Harbor Act of March
2, 1907 (H. Dbc. No. 190, 59th Cong., 1st sess.). The latest published
406          REPORT          OF CHIEF     OF ENGINEERS,      U. S. ARMY,                  1942

map is in House Document No. 661, Sixty-third Congress, second
session.
   Terminal faoilities.-There are 10 landings or wharves in Occo-
quan Creek. The principal terminal is solid fill and open-pile struc-
ture; all the other wharves or landings are solid bulkhead structures.
The terminal facilities are considered sufficient for the present traffic.
   Operationsand results during fiscal year.-Removal of water chest-
nut growth was in progress in Belmont Bay near the mouth of Occo-
quan Creek during July and August 1941 and June 1942 by a Govern-
ment underwater cutting machine at a total cost and expenditure for
the year of $2,072.92 applied to maintenance.
   Condition at end of fiscal year.-The existing project was 92 percent
completed; the only work remaining to be done is the construction of
the dike at Upper Mud Bar, which is not at present considered neces-
sary. Stone dikes aggregating 1,953 linear feet were built and chan-
nels, aggregating 2.6 miles were dredged. The controlling depth was
6.9 feet over Outer Bar in April 1940. Total costs and expenditures
under the existing project were $127,863.49, of which $41,252.95 was
for new work and $86,610.54 for maintenance.
   Proposed operations.-The balance unexpended June 30, 1942, $5,-
623.36, will be applied to the eradication of water chestnut growth
 (maintenance) at Occoquan Creek, Va., July 1, 1942 to June 30, 1943.
   The additional sum of $1,000 can be expended profitably during the
fiscal year 1944 for the eradication of water chestnut growth at Occo-
quan Creek, Va.
                                    Cost and financial summary
Cost of new work to June 30, 1942_-------------------_                                        $66, 252.95
Cost of maintenance to June 30, 1942-------------------------------                            86, 610. 54

           Total cost of permanent work to June 30, 1942-----------                           152, 863. 49

Net total expenditures--------------------------------152,                                          863. 49
Unexpended balance June 30, 1942                     -------                                     5, 623. 36

           Total amount appropriated to June 30, 1942____________---158, 486. 85

    Fiscal year ending June 30          1938     1939        1940                1941              1942

Cost of new work-----
Cost of maintenance -------------   -              $1, 200          $150        $2, 153. 72        $2, 072. 92
Total expended____                                                1,200          2, 303. 72         2, 072. 92
Allotted        _      -_                _                        4, 000         4, 000. 00         2, 000. 00



Balance unexpended July 1, 1941----                 -                                          $5, 696. 28
Amount allotted from War Department Civil Appropriation Act ap-
  proved April 28, 1942_ _-_ _________ _____-                                                    2, 000. 00
      Amount to be accounted for      _  ----------                                              7, 696. 28
Gross amount expended__ ___-______________----                                        -          2, 072.92

           Balance unexpended June 30, 1942___ _             _-            --------              5, 623. 36
Amount (estimated) required to be appropriated for completion of
                              - - -
existing project 1__ - - _ __________       - - -   -   -
                                                         _                                     22, 700. 00
Amount that can be profitably expended in fiscal year ending June
   30, 1944, for maintenance                       --------------                                   000. 00
                                                                                                 1,------------
   1 Exclusive of available funds.
          RIVERS     AND HARBORS-WASHINGTON,                   D.    C.,   DISTRICT      407
                         7. LITTLE WICOMICO RIVER, VA.
   Location.-Little Wicomico River is a tidal estuary 6 miles in
length lying in Northumberland County, Va., flowing in a south-
easterly direction to the Potomac River, which it enters on the right
bank one-half mile upstream of its mouth. (See U. S. Coast and
Geodetic Survey Chart No. 557.)
   Existing project.-This provides for a channel 8 feet deep, 150 feet
wide, and 4,800 feet long, extending from deep water in Potomac
River to deep water in Little Wicomico River, for two stone jetties
extending to the 8-foot contour in Potomac River, and for bulkhead
walls from the inner ends thereof extending sufficiently into Little
Wicomico River to stabilize the dredged inner channel. The plane
of reference is mean low water. The mean tidal range is 1.2 feet in
the Potomac River at the entrance and about 1.0 foot within the
river, with winds causing variations of 2 to 3 feet.
   The estimate of cost for new work, made in 1935, was $75,000, in-
cluding $5,000 contributed by local interests. The latest (1935) ap-
proved estimate for annual cost of maintenance is $2,000.
   The existing project was adopted by 'the River and Harbor Act
of August 30, 1935 (Rivers and Harbors Committee Doc. No. 24, 74th
Cong., 1st sess.). The latest published map is in the project
document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are two wharves open to the public and
numerous small wharves and stagings for private use, an oyster
shucking and packing plant, and a marine railway and boatbuilding
yard. These facilities are considered adequate for present commerce.
   Operations and results during fiscal year.-Plans and specifications
for maintenance dredging were prepared, and advertised. The only
bid received was considered excessive and was rejected for advertising
at a later date. Total costs and expenditures for the year were $27.84
applied to maintenance.
   Condition at end of fiscal year. The existing project was completed
in 1937. The controlling depth was 3.4 feet at mean low water for a
150-foot width in June 1942 in the channel between the jetties. Total
costs and expenditures under the existing project were $96,913.27 of
which $81,885.43 United States funds, and $5,000 contributed funds
were for new work and $15,027.84 for maintenance.
   Proposed operations.-The balance unexpended June 30, 1942,
$11,472.16, will be applied to maintenance dredging of approximately
40,000 cubic yards between the jetties at the entrance by contract
 (March-April 1943).
   The additional sum of $4,000 can be expended profitably during the
fiscal year 1944 for necessary maintenance work on the stone jetties by
contract in August 1943.
                         Cost and financial summary
Cost of new work to June 30, 1942 -----------------------------                  $81, 885. 43
Cost of maintenance to June 30, 1942___--__________________________               15, 027. 84

       Total cost of permanent work to June 30, 1942_--              ________     96, 913. 27
Net total expenditures __---- _----------------                              -   96, 913. 27
Unexpended balance June 30, 1942---_ _               _-11,
                                                  -----                              472. 16
       Total amount appropriated to June 30, 1942-           -108.                    385. 43
408          REPORT              OF CHIEF        OF ENGINEERS,               U.    S. ARMY,             1942


   Fiscal year ending June 30                1938               1939           1940              1941              1942

Cost of new work                          $28, 110. 53
Cost of maintenance.                                           $3, 336. 77   $10, 159. 63       $1, 503. 60           $27. 84
      Total cost-.............      _      28, 110. 53          3, 336. 77    10, 159. 63        1, 503. 60               27. 84
Total expended_                            43, 109. 19          3. 336. 77     4, 510. 38        7, 152. 85               27. 84
Allotted                                   19, 885. 43         11, 000. 00     2, 500.00         5. 000. 00


Balance        unexpended
Gross amount expended
                                   'July ___1,   1941__ _________---------                                    $11, 500. 00
                                                         -__                                                        27. 84

           Balance unexpended June 30, 1942-_ _._
                                              _                                   --
                                                                                   _ _..
                                                                                  ___       _   _       -      11,472. 16
Amount that can be profitably expended in fiscal year ending June
     30, 1944, for maintenance 2__ __--        _____________                                                     4.00.      00
  1In addition $5,000 was expended from contributed funds for new work.
  2 Exclusive of available          funds.

                                     8. ST. JEROMES CREEK, MD.
   Location.-St. Jeromes Creek is a tidal estuary in St. Marys
County, Md., on the western shore of the Chesapeake Bay, 6 miles
north of Point Lookout, at the mouth of the Potomac River. (See
U. S. Coast and Geodetic Survey Chart No. 557.)
   Previous project.-The original project for improvement was
adopted by the River and Harbor Act of March 3, 1881. For further
details see Annual Report for 1890, page 114, and Annual Report
for 1938, page 432.
   Existing project.-This provides for a channel 100 feet wide and
7 feet deep from Chesapeake Bay to the vicinity of Airedele, thence
60 feet wide to deep water in the creek, with a turning basin of the
same depth 200 feet wide and 300 feet long opposite Airedele. The
plane of reference is mean low water. The mean range of tide is 1.3
feet, with variations due to winds of 1 to 3 feet.
   The estimate of cost for new work made in 1937 was $19,500, ex-
clusive of amounts expended under previous projects. The latest
 (1937) approved estimate for annual cost of maintenance is $1,600.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (H. Doc. No. 174, 75th Cong., 1st sess.). The latest
published map is in the project document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 10 privately owned wharves, 2 of
which are open to the public. It is considered that the present
terminal facilities are adequate for present and prospective com-
merce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-Under the previous project the
entrance channel across the offshore bar was partially completed in
1886. The existing project was completed in 1939. The controlling
depth in November 1939 was 7.1 feet in the entrance channel. Total
costs and expenditures under the existing project were $17,856.95,
all for new work.
   Proposed operations.-None during fiscal year 1943. The addi-
tional sum of $9,000 can be expended profitably during the fiscal year
1944 for maintenance dredging in the entrance channel by contract
 (August 1944).
            RIVERS         AND HARBORS-WASHINGTON,                           D.      C.,   DISTRICT      4,09

                                     Cost and financial summary
Cost of new work to June 30, 1942_____________-----------                                        $44,356. 95
'Cost of maintenance to June 30, 1942______________                                   __          --------
       Total cost of permanent work to June 30, 1942                                               44, 356. 95
Net total expenditures-----       -----------------------                                         44,356.95
'Total amount appropriated to June 30, 1942______-- __---                                  __      44, 356.95

   Fiscal year ending June 30            1938           1939             1940              1941        1942


Cost of new work-          -         -       -        $17, 856. 95
Cost of maintenance                  -------------   -----------------                     --------------
Total expended     -----                               17, 856. 95 --
Allotted------------------------          $19, 500    -1, 000. 00        -$643. 05



Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintinance---------------------------------                                        $9, 000. 00
                                   9. RAPPAHANNOCK RIVER, VA.

   Location.-RappahannockRiver rises in the Blue Ridge Mountains,
in Virginia, and flows southeasterly about 212 miles to enter Chesa-
peake Bay, about 40 miles north of Old Point Comfort. (See U. S.
Coast and Geodetic Survey Charts Nos. 534, 535, 5 6.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of March 3, 1871, and modified in 1879. For further
details see page 1793 of Annual Report for 1915 and page 433 of Annual
Report for 1938.
   Existing project.-This provides for a channel 12 feet deep and
200 feet wide between the mouth and Port Royal and 12 feet deep
and 100 feet wide between Port Royal and Fredericksburg by dredg-
ing and the construction of 20,401 feet of crib and pile dikes and
1,906 feet of riprap-stone dikes, the dikes being designed to retain
the excavated material deposited behind them. The length of sec-
tion included in the project is 107 miles. The plane of reference is
mean low water. Tidal ranges are: Mean, 2.8 feet at Fredericks-
burg, 1.6 feet at Tappahannock; extreme 3.5 feet at Fredericksburg,
2.5 feet at Tappahannock; irregular, 6 feet at Fredericksburg, 5 feet
at Tappahannock.
   The estimate of cost for new work, made in 1905, was $171,000, ex-
clusive of amount expended on previous project. The latest (1926)
approved estimate for annual cost of maintenance is $22,000.
   The existing project was adopted by the River and Harbor Act
of March 3, 1905 (Annual Report for 1906, pp. 1110-1113). The
latest published map is in the Annual Report for 1910, page 1364.
   Terminal facilities.-In the section under improvement extending
from Fredericksburg, Va., to Tappahannock, Va., a distance of 65
miles, there are 26 wharves, of which 9 are solid bulkhead type and
17 are open pile structures. From Tappahannock to the mouth there
are 15 open pile wharves. Most of the wharves are open to the public.
The terminals are considered adequate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project, was com-
pleted in 1910. The controlling depth was 11.8 feet at Spottswood
410          REPORT               OF CHIEF OF ENGINEERS,                   U.    S.       ARMY,       1942


Bar in May 1940. The total costs and expenditures under the exist-
ing project were $783,411.11, of which $217,487.20 was for new work,
and $565,923.91 for maintenance, which includes $994.59 for Parrotts
Creek and $1,000 each for Greenvale, Mill, and Beach Creeks, and
$1,600 for Queens Creek, of which $600 was contributed by local
interests.
   Proposed operations.-The balance unexpended June 30, 1942,
$25,000, will be applied to maintenance dredging of approximately
80,000 cubic yards at three bars upstream of Port Royal by contract,
May-June 1943.
   The additional sum of $35,000 can be expended profitably during
the fiscal year 1944 for maintenance dredging of approximately
125,000 cubic yards at four bars upstream of Port Royal by contract,
July to September 1944.
                                               Cost and financial summary
Cost of new work to June 30, 1942_           _____________                                                $414, 633. 03
Cost of maintenance to June 30, 1942__-------------------------_                                          1678, 823. 91

           Total cost of permanent work to June 30, 1942                                                 093, 456. 94
                                                                                                       1-----------,

Net total expenditures_-----------------____-                                                         11, 093, 456. 94
Unexpended balance June 30, 1942______     __________                                             _        25,000. 00
           Total amount appropriated to June 30, 1942-------------                                    11, 118, 456. 94

   Fiscal year ending June 30                     1938        1939          1940              1941             1942


Cost of new work_
Cost of maintenance.............                   $38, 800     $3, 000   $25, 738. 26

Total expended ..            _..............        38, 800      3, 000    24, 604. 72       $1, 133. 54

Allotted   __ -   -_   -   _--      ----            38, 800     38, 000               -     -9, 261. 74          $25, 000



Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942_------------------------------------_ --                                          $25, 000. 00
Balance unexpended June 30, 1942______________________         __                                           25, 000. 00

Amount that can be profitably - expended in fiscal year ending June
                                --
30, 1944, for maintenance 2_____________         _________     ____                                        35, 000. 00
   1In addition $600 contributed funds was expended for maintenance on Queens Creek.
   2 Exclusive of available funds.


                                               10. TOTUSKEY CREEK, VA.

  Location.-Totuskey Creek, located in Richmond County, Va., flows
in a southerly direction about 15 miles to the Rappahannock River,
which it enters on the left bank about 35 miles upstream of its mouth.
(See U. S. Coast and Geodetic Survey Chart No. 535.)
  Previous projects.-After a survey and examination authorized by
the River and Harbor Act of June 23, 1874, appropriations were made
by the River and Harbor Acts of June 14, 1880, March 3, 1881, and
August 2,1882. For further details, see page 403 of Annual Report for
1937.
  Existing project.-This provides for a channel 8 feet deep, 150 feet
wide through the bar at the mouth, and 80 feet wide upstream to Totus-
key Bridge, a distance of about 41/2 miles, and the repair of dike at
             RIVERS       AND HARBORS-WASHINGTON,                   D.   C.,   DISTRICT      411

Booker Bar constructed under the previous project. The plane of
reference is mean low water. The mean tidal range is 1.6 feet at the
mouth and 2 feet at Totuskey Bridge, with winds causing variations
of 2 to 3 feet.
   The estimate of cost for new work made in 1931 was $36,000, exclusive
of amount expended on previous projects, but including $1,000 con-
tributed .by local interests. The latest (1935) approved estimate for
annual cost of maintenance is $2,000.
   The existing project was adopted by the River and Harbor Act of
August 30, 1935, (H. Doc. No. 183, 72d Cong., 1st sess.) The latest
published maps are in the project document.
   Recommended imodifcations of project.-Under date of March 21,
1940, the Chief of Engineers recommended modification of the exist-
ing project so as to provide a channel 10 feet deep from that depth
in Rappahannock River to and including a turning basin below Totus-
key Bridge, with a width of 150 feet through the bar at the entrance and
100 feet thence upstream, suitably widened at bends, at an estimated
total first cost of $45,000, with annual maintenance of $1,500 in addi-
tion to that now required, subject to certain conditions of local cooper-
ation (H. Doc. No. 686, 76th Cong., 3d sess.).
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-There are 2 county-owned wharves and 13 pri-
vately owned wharves or landings. Terminal facilities are considered
adequate for existing and future commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was completed
in 1937. The controlling depth in April 1940 was 8.1 feet. Total costs
and expenditures under the existing project were $54,148.46, of which
$27,648.46, United States funds, and $1,000, contributed funds, were
for new work and $25,500 for maintenance.
  Proposed operations.---he balance unexpended June 30, 1942,
$10,000, will be applied to maintenance dredging by contract. (April
1943). No funds can be profitably expended during the fiscal year
1944 as it is believed maintenance will not be necessary.
                                   Cost and financial summary

Cost of new work to June 30, 1942_------------------------------                      $37, 648. 46
Cost of maintenance to June 30, 1942____________________________                       25, 500. 00
           Total cost of permanent work to June 30, 1942_________-              __--63, 148. 46
Net total expenditures ---_____-- __-____ ____________________                        163, 148. 46
Unexpended balance June 30, 1942__________________________                             10, 000. 00
           Total amount appropriated to June 30, 1942___                          _    7_____--
                                                                                      13, 148. 46

   Fiscal year ending June 30          1938     1939         1940              1941       1942

Cost of new work -- - - - - - - - - - - - -- - - - - - - - - - - - -- - - - - - - - - - -
Cost of maintenance____     _
                           ----1-   _
                                  ..........
                                          ................    $25,500----------------------------
Total expended --- __        _--    -____                      25, 500
Allotted                                                       25, 500                      $10, 000

  1 In   addition $1,000 was expended from contributed funds for new work.
412        REPORT OF CHIEF OF ENGINEERS,                                U. S. ARMY,              1942

Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942 ----------   ------------------------ $10, 000. 00
Balance unexpended June 30, 1942---_______-___________          10, 000. 00

    11. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                             (GENERAL)

   The cost of work during the fiscal year amounted to $79,195.93 and
expenditures were $75,037.85. The balance unexpended June 30, 1942,
$19,472.44 plus an anticipated allotment of $19,000, a total of $38,472.44
will be applied as needed during the fiscal year 1943 to expenses
incurred under this heading.
   The additional sum of $34,000 can be expended profitably during the
fiscal year 1944.
                                  Cost and financial summary

Cost of new work to June 30, 1942_
Cost of maintenance to June 30, 1942_________________________                                         $725, 419. 47

      Total cost of permanent work to June 30, 1942 -------------                                      725, 419. 47
Minus accounts payable June 30, 1942__                            -                                      6, 384.15
                                                                                                         6-------------

     Net total expenditures------______ _ --                -            ____         -__              719, 035. 32
Unexpended balance June 30, 1942 _______                          ---                                   19, 472. 44

        Total amount appropriated to June 30, 1942                       __----_____             -738,         507. 76

   Fiscal year ending June 30         1938           1939                1940            1941                  1942

                               ------...............--- ---
C ost of new work ---------------...                        . . . .------ - - --.
                                                                               . . . .                   .      . . .
Cost of maintenance-...   .. _   $64, 145. 47     $67, 305. 89   $57, 539. 21  $52, 016. 23                   $79, 195. 93
Total expended                       68, 548. 92    64, 549. 88         63, 579. 32     51, 101. 99            75, 037.85
Allotted_- _     _                   99, 000. 00    78, 291. 02         68, 000.00      71, 000. 00            17, 000. 00


Balance unexpended July 1, 1941___--- .   ____ ___________ $77, 510. 29
Amount allotted from War Department Civil Appropriation Act
  approved June 24. 1940------------------------------------17,  000.00
      Amount to be accounted for-----------------                                                       94, 510. 29
Gross amount expended------------------------------------75,                                                037.85
      Balance unexpended June 30, 1942________-__-__ -                                      __          19, 472.44
Outstanding liabilities June 30, 1942                                                                    8, 499. 15
        Balance available June 30, 1942 ________
                                              --                                ___                     10, 973. 29
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance 1 - - - - - -- - - - - _ - _ ___ -                                      34, 000. 00
i Exclusive of available funds.
                   RIVEIRS              AND          HARBORS-WASHINGTON,                                 D.        C.,    DISTRICT              413

12. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED

                                                                             For last         Cost and expenditures to                   Estimated
                                                                           full report              June 30, 1942                          amount
                            Name of project                                see Annual                                                    required to
                                                                             Report                                                           plete
                                                                              for-            New work              Maintenance           complete


  1.   Aquia Creek, Va.1     __    ________                                    1928            $52, 464. 84              $11, 750. 00        (3)
  2.   Potomac River at Lower Cedar Point, Md.l__                              1920             10, 233. 51                6, 216. 49        (3)
 .3.   Upper Machodoc Creek, Va.'            -1916                                              20, 281. 28                6, 118. 72        (3)
  4.   Neale Sound, Md.' 12_-                 _                                1939             12, 600.00         ---------------           (3)
  5.   Nomini Bay and Creek, Va.' -      - -                                   1935             78, 446. 21               30, 841.62            $9, 500
  6.   Breton Bay, Md. -------------------------                               1936             47, 923. 55               11, 879. 00             7, 500
  7.   Monroe Bay and Creek, Va.l                                              1940             12, 460. 07               18, 793. 63        (3)
  8.   Smith Creek, Md.'___                                                    1936              5, 252. 22        --------------            (3)
  9.   Coan River, Va.1 2-    -                                                1937       -                                                     54, 000
10.    Patuxent River, Md.- 3 4                                                1905
                                                                               1932       - - 14, 000. 00           --      -.
                                                                                                                         -----                  5 6,
                                                                                                                                                  9 , 0000
                                                                                                                                                        00
11.    Cockrells Creek, Va.
12.    Dymers Creek, Va.' ---                                                  1912              5, 581.99                3, 418. 01         (3)
13.    Hoskins Creek, Va.' 10                                                  1941           1119, 362. 22               8, 400.00          (3)
14.    Urbanna Creek, Va.1 5____                                               1938             38, 811.77               45, 563. 97         (3)
15.    Mulberry Creek, Va.'---                                                 1940              2, 392. 60               1, 767. 10         (3)
16.    Carters Creek, Va.1 2                                                   1937             28, 397. 55              82, 190. 93           78, 000
17.    Locklies Creek, Va.1' -         -                                       1928             11, 581. 22                  518. 78         (3)
18.    Mill Creek, Va.'                                                        1937              5, 444. 95        --------------            (3)
19.    Jackson Creek, Va.' -- --                                               1937              8, 500. 00         -------                  (3)
20.    Milford Haven, Va.-----------------------                               1937              5 , 0568.
                                                                                                24,    0 0 . 025     -- 13, 389. 73          (3)2 0 , 0 0 0
21.
22.
       Neabsco Creek, Va. 8
       Accotink Creek, Va.
                           8                                                   1 8 84
                                                                               1 8 78             5
                                                                                                    ,
                                                                                                      000. 0 0
                                                                                                          00
                                                                                                               0
                                                                                                                         -
                                                                                                                   --------------               14 000
                                                                                                                                                    ,
23.    Lower Machodoc Creek, Va.'8                                             1904               9, 916. 47                 600. 00         (3)
24.    Shenandoah River, W. Va. 9                                              1888               1, 416. 60

     1 Channels adequate for commerce.
     2 Awaiting local cooperation.
     3 Completed.
     4 Abandonment recommended in 1903 (Rivers and Harbors Committee Doc. No. 32, 61st Cong., 2d sess.).
     5Modification recommended Apr. 20, 1939, in H. Doc. No. 285, 76th Cong., 1st sess.
    .8 Exclusive of $700 contributed.
     7 Exclusive of $4,000 to be contributed.
     8 No commerce reported.
     9 No project was adopted. Costs were for surveys and plans.
   10 Modification recommended Nov. 22, 1940, in H. Doc. No. 129, 77th Cong., 1st sess.
   11Exclusive of $500 contributed.
   12 Exclusive of $1,000 contributed.


                   13. PLANT ALLOTMENT, WASHINGTON, D. C., DISTRICT

                                                         Cost and financial summary
Undistributed costs June 30, 1942--------------------------$491,                                                                             898. 64

Net total cost to June 30, 1942___ __ _____-----------------                                                                            491, 898. 64
Plus accounts receivable June 30, 1942 -- ----------------------                                                                        608, 292. 83
      Gross total costs to June 30, 1942 _ _________
                                           -     --  ------                                                                         1,100, 191. 47
Minus accounts payable June 30, 1942- --------------     ----                                                                          92, 445. 63
     Net total expenditures--------------       ---------------                                                                      , 007, 745. 84
                                                      -
Unexpended balance June 30, 1942_ __-.-____________-----                                                                            -184, 922.33
              Total amount appropriated to June 30, 1942...--------------                                                               822, 823. 51

       Fiscal year ending June 30                           1938              1939                1940                     1941             1942

Total expended _----------------                          $63,046.99        $27,822. 21       $123, 525. 86          $100, 644. 77        $247, 448. 57
Allotted.....----------------------...................     47, 500. 00   --------------        245, 473. 98              -5, 000. 00        67, 300. 00




             493202-43-pt. 1, vol. 1-27
414          REPORT OF CHIEF OF ENGINEERS,                                     U. S. ARMY,               1942

Balance unexpended July 1, 1941__                                                                              -_-__________-__-
                                                                                                              -$4, 773. 76
Amount allotted from War Department Civil Appro-
  propriation Act approved June 24, 1940---------- $17, 300. 00
Amount allotted from War Department Civil Appro-
  propriation Act approved May 23, 1941   ______ _ 50, 000. 00
                                                                                                                 67, 300. 00
Amount to be accounted for--____--------     -
                                         _____-                                       ____--                     62, 526. 24
Gross amount expended_______--------_-___                                             $1, 607, 433. 55
Less reimbursements collected                                                            , 359, 984. 98
                                                                                       1------------------
                                                                                                                247, 448. 57

      Balance unexpended June 30, 1942_____________________ -- 184,922.33
Outstanding liabilities June 30, 1942 ____-------$_ 158, 425.93
Amount covered by uncompleted contracts______-___    21, 940. 74
                                                                                                               180, 366. 67
      Balance available June 30, 1942--_________--_______                                                    -- 365,289. 00
Accounts receivable June 30, 1942-------------                                                                   08, 292. 83
                                                                                                                6--------------

          Unobligated balance available June 30, 1942______________                                            243, 003. 83

Status of all investigations for navigation, called for by river and harbor acts
                            and committee resolutions

                                                                 Date trans-
           Locality                  Authorization act           mitted to              Document No.           Recommenda-
                                                                  Congress

Anacostia River, D. C.
and Md.
                                   Rivers and Harbors ___
                                     Committee resolu-
                                                                      ___ ___ ___   ---............
                                     tion, Nov. 17, 1937.
Rap p ah an n o ck Riv er , V a.   Se c . 6, R iv e r an d H ar- _ ___ . .        .-..
                                                                             __. __ .. . .. . .. . . . .
  (Sup. 308).                        bor Act, Aug. 30,
                                     1935.
W indmill Point Creek, Va.,        Rivers and Harbors ...................................
for improvement of Deep             Committee resolu-
Hole Creek.                         tion, Mar. 24, 1942.


                                          14. WASHINGTON, D. C.

   Location.-Washington, D. C., is located at the junction of the
Anacostia River with the Potomac River, within the District of Colum-
bia, 110 miles upstream from the mouth of the Potomac River. (See
U. S. Coast and Geodetic Survey Chart 560.)
   Previous project.-A project providing for levees and grade raising
to protect Bolling Field was authorized by the Emergency Relief Ap-
propriation Act approved June 22, 1936. Items of the project upon
which work remained to be done on June 30, 1937, were transferred
to the authorized project described in this report for completion.
  Existing project.-This provides for levees and grade raising to
protect the downtown portion of Washington, the Arlington Exper-
imental Farm, Bolling Field, and Anacostia Naval Air Station.
   The estimate of cost of new construction is $522,500 and the esti-
mated cost of land and damages is $16,000.
   The existing project was adopted by the Flood Control Act ap-
proved June 22, 1936 (H. Doc. No. 101, 73d Cong., 1st sess.). The
latest published maps are in the project document.
   Local cooperation.-See page 5 for requirements. Local coopera-
tion is fully complied with except for the Arlington County levees
             RIVERS        AND HARBORS--WASHINGTON,                          D.      C.,    DISTRICT              415
where easements have not been provided due to unsettled questions of
ownership.
   Operations and results during fiscal year.-New work: Operations
on the Anacostia River levees for the protection of Bolling Field and
the Naval Air Station consisted of miscellaneous plans and surveys
at a cost of $57.31, from regular funds.
   The total costs and expenditures for the year for flood protection
works in the vicinity of Washington, D. C., were $57.31, from regular
funds.
   Condition at end of fiscal year.-The project for flood protection at
Washington, D. C., exclusive of the Arlington Experimental Farm
levee, was substantially completed in 1939. The levees for the, protec-
tion of Bolling Field and the Anacostia Naval Air Station were essen-
tially complete at the end of the fiscal year 1940, and the maintenance
assumed by the Government agencies in charge of the property on
which these levees are located. The Potomac Park levees were com-
pleted and their maintenance assumed by the National Capital Park
Service in 1939. The total costs and expenditures for all work were
$293,749.12, of which $187,249.12 were from regular funds and $106,500
from emergency relief funds, all applied to new work. In addition to
the above costs and expenditures the sum of $161,995.39 was expended
for work included in the Bolling Field project authorized by the
Emergency Relief Appropriation Act, approved June 22, 1936, uncom-
pleted items of which were transferred to the authorized project for
completion. The work remaining to be done consists of miscellaneous
clean-up work on the Bolling Field levees and the construction of
Arlington Experimental Farm levee.
   Proposed operations.-The unexpended balance June 30, 1942, $21,-
949.97, will be applied as follows:
New work :
   Bolling Field levee: Retopping of levee, miscellaneous clean-up
     and restoration by Government plant and hired labor (July
     1942 to June 1943) ---------------------------------             $6, 891. 61
   Balance available for revocation_,__                __--__---___ _ 15, 058. 36

          Total -------------------------------------------------                                          21, 949. 97
                                       Cost and financial summary
Cost of new work to June 30, 1942______________------                                               1$293, 749. 12
Cost of maintenance to June 30, 1942

         Total cost of permanent work to June 30, 1942_______-------                                      293, 749. 12

Net total expenditures----______ -------                              -- ___                  _           293, 749. 12
Unexpended balance June 30, 1942------_____--                         ---------                            21, 949. 97

          Total amount appropriated to June 30, 1942__------------                                        315, 699. 09

    Fiscal year ending June 30            1938           1939            1940                1941              1942

Cost of new work--___-.-_-.--_--_      $229, 765. 31   $49, 693. 61     $1, 954.05         $12, 278. 84           $57. 31
Cost of m aintenance -- - - - - - -- - - - - - -- - - - - -- - - - - - -- -------                 - -        -- - - - -
Total expended......----------------    253, 385. 72    26, 514. 72        361. 69          13, 429. 68               57. 31
               1        e20,
Allotted----------------------s275, 500.00              20, 199. 09        000.00.

   2Includes $106,500 emergency               relief funds.
416            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                      1942

Balance unexpended July 1, 1941_____________________________                                                       $22, 007.28
Gross amount expended ______------   -----    _    __ $117. 80
Less reimbursements collected-----------------____      60. 49
                                                                                                                           57. 31

           Unobligated balance available June 30, 1942------------                                                  21, 949. 97

        15. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD
                              CONTrROL

   The costs for the year were $10,074.65 and the expenditures $9,956.61.
The balance unexpended on June 30, 1942, amounting to $71,091.35,
and the sum of $17,250 allotted in August 1942 will be applied as needed
during the fiscal year 1943 to payment of expenses to be incurred under
this heading.
                                             Cost and financial summary

Cost of new work to June 30, 1942_
                                           --
Cost of maintenance to June 30, 1942--___________                                          ______                  $88, 408. 65
     Total cost of permanent work to June 30, 1942_ ----                                         ____---            88, 408. 65
Minus accounts payable June 30, 1942----------------                                                                    118. 04

      Net total expenditures__-_--                   _
                                   --------------------                                                             88, 290. 61
Unexpended balance June 30, 1942----------------------------                                                        71, 209. 39

           Total amount appropriated to June 30, 1942___--__-------                                                159, 500. 00

    Fiscal year ending June 30                    1938               1939           1940               1941               1942


Cost of new work   --
Cost of maintenance_---------
                                             ----------------------------
                                                __--------------   $24, 469. 19
                                                                                        ----------
                                                                                  $36, 286. 89       $17, 577.92
                                                                                                                   --------------
                                                                                                                        $10, 074.65
Total expended .........----..------------      ------------        20, 578. 28    39, 436. 12        18, 319.60           9, 956. 61
Allotted.----------------------                   $100, 000         50, 000.00 ----------------------         ------       9,500. 00


Balance unexpended July 1, 1941__________ - ___- ________       $71, 666. 00
Amount allotted from War Department Civil Appropriation Act ap-
proved May 23, 1941-------    ------------------------------     9, 500. 00
     Amount to be accounted for- --- -_____-___-___--
                                                 -    -81,166.                                                                 00
Gross amount expended-------------------------------      ------                                                        9, 956.61
      Balance unexpended June 30, 1942-______________________                                                          71, 209.39
Outstanding liabilities June 30, 1942 -------- __-__-___________                                                           118. 04
    Balance available June 30, 1942_-____--. ___ -_____   -                                                         71, 091.35
Amount allotted in August 1942_-   -___________     __ ___                                                          17, 250.00
           Amount available during fiscal year 1943_....__.-------                                                  88,341.35
                    RIVERS          AND   HARBORS-NORFOLK,                           VA.,     DISTRICT                     417
16. OTHER FLOOD-CONTROL PROJECTS FOR WHICH NO ESTIMATES
                      ARE SUBMITTED

                                                               For last      Cost and expenditures to                Estimated
                     Name of project                          full report          June 30, 1942                     amount re-
                                                             see Annualr-
                                                                                                                      quired to
                                                             Reportfo        New work         Maintenance             complete

1. Harpers Ferry, W. Va..............---------------------       1937       _.- _.     ..        - ------.......         $164, 900
2. Moorefield, W. Va.1 __-----------------                       1940           $7, 928. 12   ---------------             158, 270
3. Cumberland, Md., and Ridgeley, W. Va.L.. -                    1941           63, 071.88 -                              743, 400

  1 Awaiting local cooperation.

Status of all investigations for flood control, called for by flood control acts and
                               committee resolutions

                                                                   Date trans-
            Locality                  Authorization act            mitted to           Document No.                Recommenda-
                                                                    Congress                                           tion

Anacostia River and tribu-           Flood Control     Act,
  taries.                             June 22, 1936.
Garden      Creek,     Mathews       Flood Control     Act,
  County, Va.                         Aug. 18, 1941.
Potomac River and tribu-             Flood Control     Act,
  taries.                             May 5 1936.
    Do-----                  ..--------------
                                      Flood dontrol    Act,
                                      June 22, 1936.
Potomac       River,       North     Flood Control     Act,
  Branch      of,    and   tribu-     Aug. 28, 1937.
taries, in vicinity of Key-
ser, W. Va.
Rappahannock River, Va.              Sec. 6,   River    and
  (Sup. 308).                         Harbor Act, Aug.
                                      30, 1935.



IMPROVEMENT                          OF RIVERS AND HARBORS                                                     IN        THE
                                    NORFOLK, VA., DISTRICT
  This district comprises a small portion of southeastern West Vir-
ginia, central and eastern Virginia, and a portion of northern North
Carolina embraced in the west shore drainage basins tributary to
the southern part of Chesapeake Bay south of the watershed line be-
tween the northerly arm of Winter Harbor and Garden Creek, Va.,
and the eastern shore drainage basins south of and including Onan-
cock River, Va.; the drainage tributary to the Atlantic Ocean from
White Creek and Gargathy Inlet, inclusive, to the Virginia-North
Carolina State line; the Roanoke River Basin above Weldon, N. C.;
the Meherrin River Basin above Murfreesboro, N. C.; and the Cho-
wan River Basin above the confluence of the Nottaway and Black-
water Rivers, Va. It also includes the Virginia portion of the Intra-
coastal Waterway between Norfolk, Va., and Beaufort Inlet, N. C.,
and the portion of the waterway from Norfolk to the sounds of
North Carolina north of Albemarle Sound.
  District engineer: Lt. Col. Robert R. Neyland, Jr., retired Corps
of Engineers.
  Division engineer: Col. J. S. Bragdon, Corps of Engineers (South
Atlantic division), to March 31, 1942, and Col. T. F. Farrell, Corps
of Engineers (Middle Atlantic division), since that date.
418    REPORT   OF CHIEF     OF ENGINEERS,      U.   S. ARMY,   1942

                              IMPROVEMENTS

            Navigation                        Navigation-Continued
                                  Page                                    Page
1. Norfolk Harbor, Va-..._       418 17. Waterway from Norfolk, Va.,
2. Thimble Shoal Channel, Va_    423       to the Sounds of North
3. Channel to Newport News,                Carolina----- -------         448
      Va--------------------      424 18. Inland waterway from Nor-
4. James River, Va-_ ----    -   426       folk, Va., to Beaufort In-
5. Willoughby Channel, Va ...    429       let, N. C_---------------     452
6. Hampton Creek, Va --.----     430 19. Blackwater River, Va_..._       456
7. Appomattox River, Va ----     431 20. Knobbs Creek, N. C-------       458
8. Pagan River, Va------------   434 21. Examinations, surveys, and
9. Nansemond River, Va .....     435       contingencies (general)-...   459
10. Portsmouth Harbor, Va - -     437 22. Other projects for which no
11. Mattaponi River, Va-------    438       estimates are submitted_-     460
12. Pamunkey River, Va-------     440 23. Plant allotment- - - -          460
13. York Spit Channel, Va ---     441               Flood control
14. Onancock River, Va- --    _   443
15. Occohannock Creek, Va.-.      445 24. Preliminary examinations
16. Cape Charles City Harbor,               and surveys for flood con-
      Va -------------------      446       trol_--------------------     462

  The following improvement is divided into three subheads: (1)
Norfolk Harbor, (2) Thimble Shoal channel in the southern end of
Chesapeake Bay, and (3) the channel leading to Newport News from
Hampton Roads.
                         1. NORFOLK HARBOR, VA.

   Location.-Norfolk, Va., is 187 miles south of Baltimore, Md., and
30 miles frbm the entrance to Chesapeake Bay at Cape Charles and
Cape Henry. The harbor extends between the 40-foot contour in
Hampton Roads and 2,500 feet above the Norfolk & Western Railway
bridge over the Southern Branch of the Elizabeth River, a distance
of 16.03 miles. '(See U. S. Coast and Geodetic Survey Charts Nos.
400 and 452.)
   Previous projects.-Adopted by River and Harbor Acts of August
14, 1876; July 5, 1884; modified June 30, 1885; and by River and
Harbor Acts of September 19, 1890; June 3, 1896; July 7, 1898; June
13, 1902; March 3, 1905; and March 2, 1907. For further details see
page 1795 of Annual Report for 1915, and page 454 of Annual Report
for 1938.
   Existing project.-This provides for a main channel 40 feet deep,
750 feet wide from Hampton Roads to the mouth of the
Southern Branch of Elizabeth River, and 450 feet wide up
this branch to the Belt Line Railroad bridge, a total distance of
11.88 miles, and dredged areas in front of the navy yard, on either
side of the 40-foot channel, immediately downstream from the Belt
Line Railroad bridge, 35 feet deep for a width varying from 600
feet to 800 feet; thence 30 feet deep, 375 feet wide, and 1.05 miles
long to the Virginian Railway bridge; and thence 25 feet deep and
generally 200 feet wide, and 3.10 miles long to a point 2,500 feet
above the Norfolk & Western Railway bridge, making a total dis-
tance of 16.03 miles; a channel in the Eastern Branch, 25 feet deep,
500 feet wide, and 1.09 miles long, from the 40-foot channel at the
mouth to the Norfolk & Western Railway bridge, including within
its limits, for a distance of about 1,000 feet above the mouth, a channel
30 feet deep and 300 feet wide to a point opposite the terminal of the
                   RIVERS       AND      HARBORS-NORFOLK,                      VA.,    DISTRICT                419
Imperial Tobacco Co. in Berkley; thence 25 feet deep, 200 feet wide,
and 1.75 miles long to the Virginian Railway bridge; a channel in the
Western Branch, between the 40-foot channel at the mouth and a point
about 3,000 feet above the West Norfolk Highway Bridge, a distance
of about 1.72 miles, 24 feet deep, 300 feet wide, 0.78 mile, and 200 feet
wide, 0.37 mile to the bridge; thence 18 feet deep, 150 feet wide, 0.57
mile; a channel in Scotts Creek between the 40-foot channel at the
mouth and a point 100 feet above the Atlantic Coast Line Railroad
bridge (about 0.73 mile upstream), 12 feet deep and 100 feet wide;
and anchorage areas on the west side of the 40-foot channel opposite
Lambert Point and south of Craney Island aggregating 171 acres,
consisting of: 1 anchorage space 1,200 feet by 2,400 feet by 30 feet
deep; 1 anchorage divided into 2 spaces, each 1,200 feet by 1,200 feet
by 22 feet deep; 1 space 900 by 1,900 feet by 16 feet deep; and another
anchorage of 45 acres, 12 feet deep near Pinner Point. All depths
are referred to mean low water.
   The mean tidal range is 2.7 feet and the extreme 3 feet. The ex-
tremes of irregular fluctuations, due to combined effect of tides and
wind, referred to mean low water, are -2 feet and + 9.62 feet.
   The estimate of cost for new work, revised in 1940, exclusive of
amounts expended on previous projects, is $6,739,700. The latest
 (1940) approved estimate for annual cost of maintenance is $89,500.
   The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                      Documents


                       HAMPTON ROADS AND ELIZABETH RIVER


Mar. 2,1907        A channel 30 feet deep to the navy yard .__._._          H. Doc. No. 381, 59th Cong., 1st sess.
June 25,1910       Depth of 35 feet to the navy yard_---                    H. Doc. No. 551, 61st Cong., 2d sess.
Aug. 8,1917        Depth of 40 feet and width of 750 feet to the mouth      H. Doc. No. 140, 65th Cong., 1st sess.
                     of the Southern Branch.

                                    SOUTHERN BRANCH


June 25, 1910      For a channel with depths of 22 and 25 feet .....-       H. Doc. No. 551, 61st Cong., 2d sess.
Aug. 8,1917     Depth of 40 feet and width of 450 feet from the             H. Doe. No. 140, 65th Cong., 1st sess.
                 mouth to the Belt Line R. R. bridge.
                                                                                                                     1
Mar. 3,1925 Channel 30 feet deep and 375 feet wide to the Vir-              H. Doc. No. 226, 68th Cong., 1st sess.
                 ginian Ry. bridge, thence 25 feet deep and gen-
                 erally 200 feet wide to the Norfolk & Western
                 Ry. bridge.
Aug. 30, 1935 2 Depth of 25 feet and width of 200 feet from the             H. Doc. No. 182, 73d Cong., 2d sess.1
                 Norfolk & Western Ry. bridge to a point 2,500
                 feet above, with a turning basin 500 feet square.

                                   EASTERN BRANCH


July 5, 1884       Improvement of the Eastern Branch ............           Annual Report, 1885, p. 1015.
Mar. 2,1907        Width of 500 feet and depths of 25 feet and 22 feet --   H. Doc. No. 373, 59th Cong., 1st sess.
    Do ______      Removal of shoals at the mouth______________             Specified in act.
Mar. 3,1925        Depth of 25 feet and width of 200 feet from the          H. Doc. No. 226, 68th Cong., 1st sess.'
                     Norfolk & Western Ry. bridge to the Virginian
                     Ry. bridge.
July     3, 1930   The 30-foot channel to a point opposite the ter-         H. Doc. No. 37, 71st Cong., 1st sess.
                    minal of the Imperial Tobacco Co. in Berkley.
   See footnotes at end of table.
420               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                       1942


       Acts                           Work authorized                                      Documents


                                    WESTERN BRANCH


Mar.     4,1913     Channel with depth of 24 feet and widths of 300          H. Doc. No. 566, 62d Cong., 2d sess.
                      and 200 feet to the West Norfolk highway bridge.
July     3, 1930    For the 18-foot channel to a point about 3,000 feet      H. Doc. No. 265, 70th Cong., 1st sess.)
                      above the West Norfolk highway bridge.

                                       SCOTTS CREEK


      Do. -   -     For the present project dimensions.......-------------   H. Doc. No. 189, 70th Cong., 1st sess.

                                       ANCHORAGES


June 25,1910        A 30-foot anchorage at Lambert Point..----------.        H. Doc. No. 551, 61st Cong., 2d sess.
                                                                                                                   1
Aug. 8,1917         Present project dimensions of the anchorage at           H. Doc. No. 605, 63d Cong., 2d sess.
                      Pinner Point.
July     3, 1930    Present project dimensions of anchorage opposite         H. Doc. No. 143, 70th Cong., 1st sess.
                      Lambert Point and elimination of the 35-foot
                      anchorage authorized by the act of Aug. 8, 1917.
Oct. 17,1940        Extension of present anchorage to afford two             H. Doc. No. 683, 76th Cong., 3d sess.
                      anchorage spaces 22 feet deep and one anchorage
                     space 16 feet deep.


  1 Contains latest published maps.
  9   Included in the Emergency Relief program May 28, 1935.


   Recommernded nmodifcations of project.-Under date of March 4,
1939, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for a channel in the Eastern Branch of
Elizabeth River, between the Norfolk & Western Railway bridge and
the Campostella Bridge, 25 feet deep and 300 feet wide, extending
between a line 100 feet north of and parallel to the line connecting
the centers of the draw spans of the bridges and a line 200 feet south
of and parallel to the same line; and for maintenance at a depth of 25
feet of the existing turning basin approximately 5'1/2 acres in extent
at the head of the existing project just below the Virginian Railway
bridge; all at an estimated first cost of $35,000, with annual main-
tenance of $3,300, in addition to that now required (H. Doc. No. 224,
76th Cong., 1st sess.).
   Local cooperation.-The River and Harbor Act of July 3, 1930, in
adopting the project for a channel in the Eastern Branch, 30 feet deep
and 300 feet wide, extending from the 40-foot channel to a point oppo-
site the terminal of the Imperial Tobacco Co., imposed the condition
that local interests give assurance satisfactory to the Secretary of
War and the Chief of Engineers that they will provide and maintain,
without cost to the United States, a branch channel of equal depth to
the tobacco terminal. This condition has not been complied with.
   All prior requirements and the condition imposed by the River
and Harbor Acts of August 30, 1935, and October 17, 1940, have been
complied with.
   Terminal facilities.-The terminal facilities within the limits of
this improvement include about 227 wharves, piers, etc., with an
aggregate length available for wharfage purposes of about 32 miles.
             RIVERS    AND   HARBORS-NORFOLK,           VA.,   DISTRICT          421
It is considered that the facilities are adequate for the present com-
merce of the port.
    Operations and results during fiscal year.-New work dredging,
under contract, to provide one 16-foot and two 22-foot anchorages
south of the existing Craney Island Anchorage, in progress at the
close of the fiscal year, was continued until September 9, 1941, when
the work was suspended. There were removed 134,223 cubic yards of
material. The cost of the work was $78,387.07.
    Maintenance dredging in the Norfolk Harbor 40-foot channel with
the U. S. hopper dredge Chinook, was commenced on February 3, 1942,
and continued until May 31, 1942, when the work was completed.
There were removed 2,164,354 cubic yards of material, bin measure-
ment. The cost of the work was $225,719.82.
   Miscellaneous surveys, water level studies, and maintenance of tide
gages were carried on during the year at a cost of $11,226.67.
    The total cost was $315,333.56, of which $78,387.07 was for new work
and $236,946.49 for maintenance. The total expenditure was
 $300,758.90.
   Condition at end of fiscal year.-The existing project was about
96 percent completed at the end of the fiscal year.
   The controlling depths are as follows: From Hampton Roads
to the mouth of the Eastern Branch, 38.9 feet; thence to the Belt
Line Railroad bridge, 38.7 feet; in the Southern Branch between
the Belt Line Railroad bridge and the Virginian Railway bridge and
between the Virginian Railway bridge and a point 2,500 feet above
the Norfolk & Western Railway bridge, 27.3 feet and 24.3 feet, re-
spectively; in the Eastern Branch between the 40-foot channel and
the Virginian Railway bridge, 22.7 feet; in Scotts Creek, 10.7 feet;
and in the Western Branch between the 40-foot channel and the
West Norfolk Highway Bridge, 16.9 feet and thence to a point 3,000
feet above the West Norfolk Highway Bridge, 18 feet. This infor-
mation is based upon surveys made between 1934 and 1942.
   The work remaining to be done consists of dredging a channel 30
feet deep and 300 feet wide in the Eastern Branch between the
40-foot channel at the mouth and a point opposite the terminal of the
Imperial Tobacco Co., a distance of about 1,000 feet; and dredging
a turning basin 500 feet square to a depth of 25 feet at a point 2,500
feet above the Norfolk & Western Railway bridge across the South-
ern Branch.
   The cost under the existing project has been $9,711,230.86, of which
$6,401,647.01 was regular funds, and $49,978.50 Emergency Relief
funds, a total of $6,451,625.51 for new work and $3,259,605.35 regular
funds for maintenance. The expenditures were $9,645,412.81 regular
funds and $49,978.50 Emergency Relief funds, a total of $9,695,-
391.31. In addition, $23,935.71 was expended from contributed
funds.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $480,861.52, will be applied as follows:
Accounts payable June 30, 1942---------------------------                 $15, 839. 55
New work: Completion under an existing contract-Construction
  of 3 additional anchorage areas, south of the present Craney
  Island Anchorage (2 areas, 1,200 feet by 1,200 feet to a depth
  of 22 feet, and 1 area 900 feet by 1,900 feet to a depth of 16 feet),
  267,000 cubic yards, July-November 1942-- --         --                 134, 412. 06
422           REPORT OF CHIEF OF ENGINEERS,                                      U. S. ARMY,                1942

Maintenance:
   Maintenance of the 40-foot channel between the Belt Line
      R. R. bridge across the Southern Branch of Elizabeth River
      and Hampton Roads, 1,500,000 cubic yards, with United
      States hopper dredge, January-May 1943----------------$180, 000. 00
   Maintenance of the 25-foot channel in the Eastern Branch of
      Elizabeth River, with United States hopper dredge, 190,000
      cubic yards, April-May 1943 ____________________________                    54, 000. 00
   Maintenance of the 25-foot channel in the Southern Branch
      of Elizabeth River, by contract, 143,000 cubic yards,
     May-June 1943-----------------------------------                             50, 000. 00
   Maintenance of the 30-foot channel in the Southern Branch
      of Elizabeth River, by contract, September-October, 1942_                   34, 000. 00          -_
   Miscellaneous Surveys, triangulation controls, and tide gaging,
      July 1942-June 1943_______________________--------------------------------- 12, 609.91

              Total for all work---------------____--_--                               _ ------ --      -       480, 861. 52
  The additional sum of $390,000 can be profitably expended during
the fiscal year 1944, as follows:
Maintenance:
   Maintenance of the 40-foot channel between the Belt Line R. R.
      bridge across the Southern Branch of Elizabeth River and Hamp-
      ton Roads, with United States hopper dredge, January-April,
      1944        ------------------------------------------------    $225, 000
   Maintenance of the 30-foot channel in the Southern Branch of
      Elizabeth River, by contract, April-May 1944-----------------     45, 000
   Maintenance of Craney Island 30-foot anchorage by contract, July-
      October 1943------            ---------------------------------  100, 000
   Miscellaneous surveys, triangulation controls, and tide gagings,
      July 1943-June 1944------------------------------------           20, 000

         Total for all work -----------------------------------                                                    390, 000

  No funds are required for the turning basin, Southern branch of
the Elizabeth River, as this work is not considered necessary at the
present time, nor for the 30-foot channel in the Eastern branch of
the Elizabeth River, since compliance with the conditions of local
cooperation is not expected during the fiscal year.
                                                Cost and financial summary

Cost of new work to June 30, 1942-------------------------                                                  $9, 013, 329. 78
Cost of maintenance to June 30, 1942---------------------                                                    3, 331, 644. 62

      Total cost of permanent work to June 30, 1942--------                                                 12, 344, 974. 40
Minus accounts payable June 30, 1942 ------------------------                                                    15, 839. 55

      Net total expenditures  ----------------------------                                                  12, 329, 134. 85
Unexpended balance June 30, 1942--------------------------                                                     480, 861. 52

         Total amount appropriated to June 30, 1942-----------1 12, 809, 996. 37

   Fiscal year ending June 30                      1938           1939              1940             1941           1942

Cost of new work      ______________________________________            _____                     $4, 620. 62      $78, 387. 07
Cost of maintenance .... __------ _ $150, 977. 49 $206, 875. 36 $399, 294. 35                    776, 127. 11      236, 946. 49
      Total cost-----------.............---..    150, 977. 49   206, 875. 36     399, 294. 35    780, 747. 73      315, 333. 56
Total expended----------------                   115, 110. 16   200, 071. 66     436, 459. 15    788, 595. 30      300, 758. 90
Allotted ------............             ....     352, 000. 00   333, 000. 00   1, 016, 470. 11   330, 000. 00      239, 300. 00

   1 In addition, $23,935.71 expended from contributed funds for new work.
   2 Includes $2,400.81, work on removal of shoals in Hampton Roads mine wharf.
             RIVERS AND         HARBORS-NORFOLK,                 VA.,   DISTRICT             423
Balance unexpended July 1, 1941                                                    $542, 320. 42
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942----------------------------------                          245, 000. 00

     Amount to be accounted for-------------------------                            787, 320. 42
Deductions on account of revocation of allotment--------------                        5, 700. 00

      Net amount to be accounted for---                                              81, 620. 42
                                                                                    7---------------------
Gross amount expended- ------               _-_------------                         300, 758. 90

     Balance unexpended June 30, 1942---------------------                          480, 861. 52
Amount covered by uncompleted contracts----------------------                       134, 412. 06

       Balance available June 30, 1942--            -----------------               346, 449. 46

Amount (estimated) required to be appropriated for completion of
existing project ____------------------------------------                           41, 200.00
Amount that can be profitably expended in fiscal year ending June
30, 1944 for maintenance '___    ________----------------                         '390, 000. 00
  ' Includes $$,537.55 outstanding liabilities.
  4 Exclusive of available funds.

                        2. THIMBLE SHOAL CHANNEL, VA.

  Location.-Thimble Shoal lies in the channel between Hampton
Roads and the ocean and is 20 miles northeast of the center of Norfolk
Harbor, extending southeasterly 11 miles from a point 11/4 miles east
of Thimble Shoal Lighthouse toward the entrance to Chesapeake Bay.
(See U. S. Coast and Geodetic Survey Chart No. 1222.)
  Previous projects.--Adopted by River and Harbor Act of June 25,
1910. For further details see page 470, Annual Report for 1932.
  Existing project.-This provides for dredging a channel 11 miles
long, 750 feet wide, and 40 feet deep at mean low water. Under or-
dinary conditions the mean tidal range is 2.6 feet and the extremes 2
and 3 feet. The extremes of irregular fluctuation, due to combined
wind and tides, referred to mean low water, are -2 feet and +9.5
feet.
  The estimate of cost for new work, revised in 1928, was $2,325,000,
exclusive of amounts expended on previous projects. The latest (1928)
approved estimate of cost for annual maintenance is $50,000.
  The existing project was adopted by the River and Harbor Act of
August 8, 1917 (H. Doc. No. 140, 65th Cong., 1st sess.). The latest
published map is in House Document No. 551, Sixty-first Congress,
second session.
   Terminal facilities.-Fora description of the terminal facilities for
these points see this heading under "Norfolk Harbor" and "Channel
to Newport News, Va."
   Operations and results during fiscal year.-Miscellaneous condition
surveys were made during the year at a cost of $1,930.38, all for main-
tenance. The total expenditure was $2,869.95.
   Condition at end of fiscal year.-The existing project was completed
in 1929. The controlling depth in August 1941 was 39 feet at mean
low water.
  The total cost under the existing project was $2,938,224.40 of which
$2,283,772.56 was for new work and $654,451.84 for maintenance. The
total expenditure was $2,937,638.20.
424          REPORT OF CHIEF OF ENGINEERS,                                                 U. S. ARMY,              1942

   Proposed operations.-The unexpended balance at the end of the
fiscal year, $45,000, will be applied as follows:
Accounts payable, June 30, 1942--------------------------------    $586. 20
Maintenance: Maintenance of the channel with U. S. hopper dredge
  Chinook, 550,000 cubic yards, July-August, 1942---------------44, 413.80

           Total for all work------------------------------------                                                         45, 000. 00
   The additional sum of $150,000 can be profitably expended during
fiscal year 1944 to be applied to maintenance dredging with United
States hopper dredge, July-September 1943.
                                                      Cost and financial summary
Cost of new work to June 30, 1942-----------------------------                                                      $2, 617, 381. 44
Cost of maintenance to June 30, 1942                                                                                     54, 451. 84
                                                                                                                        6--------------------------

     Total cost of permanent work to June 30, 1942----------- 3, 271, 833. 28
Minus accounts payable June 30, 1942--------------------------        586. 20

      Net total expenditures------------------------------                                                           3, 271, 247. 08
Unexpended balance June 30, 1942-----------------------------                                                           45, 000. 00

           Total amount appropriated to June 30, 1942---------------                                                 3, 316, 247. 08

   Fiscal year ending June 30                               1938              1939           1940            1941             1942

Cost of new work .
Cost of maintenance-----
                                                      I                 . . . . . .. . . . . .-
                                                               .---------..
                    ...                   --      _        $3, 318. 98       $1, 265. 92   $75, 301. 76   $195, 669. 98       $1, 930. 38
       Total expended-----....                 .. _         3, 290. 79          278. 74     74, 932. 58    195, 523. 76        2, 869. 95
Allotted      ................---------------------       105, 000. 00   --------------    362,626. 51    -190,730.69         45, 000. 00


Balance unexpended July 1, 1941-----------------------------                                                               $2, 869. 95
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942-------------------------- ----------                                                               45, 000. 00
      Amount to be accounted for----------------------------                                                               47, 869. 95
Gross amount expended--------------2,                                                                                          869. 95

           Balance unexpended June 30, 1942----------------------                                                          45, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance ---------------------------                                                               150, 000. 00
   1Exclusive of available funds.
   2Includes $586.20 outstanding liabilities.
                                      3. CHANNEL TO NEWPORT NEWS, VA.

  Location.--This channel, which is 10 miles west of Norfolk Harbor,
connects deep water in James River with Hampton Roads. (See
U. S. Coast and Geodetic Survey Chart No. 400.)
  Previous projects.-Adopted June 13, 1902. For further details,
see page 1797 of Annual Report for 1915, and page 459 of Annual
Report for 1938.
  Existing project.-This provides for dredging a channel 40 feet
deep at mean low water, 600 feet wide, increased to 1,000 feet at the
ends, and 31/4 miles long through the shoal north of Middle Ground
Light. Under ordinary conditions the mean tidal range is 2.7 feet
and the extremes 2.1 and 3 feet. The extremes of irregular fluctua-
                RIVERS      AND      HARBORS--NORFOLK,                   VA.,    DISTRICT                 425

tions due to combined wind and tides, referred to mean low water,
are -2 feet and + 9.5 feet.
   The estimate of cost for new work, revised in 1927, was $1,521,515,
exclusive of amount expended on previous projects. The latest
 (1927) approved estimate for annual cost of maintenance is $20,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                         Work authorized                                     Documents


June 25,1910    Channel 35 feet deep and 400 feet wide .--------- H. Doc. No. 550, 61st Cong., 2d. sess.
Aug. 8,1917     Channel 35 feet deep and 600 feet wide ........---------- H. Doc. No. 605, 63d Cong., 2d sess.l
Jan. 21, 1927   Present project dimensions...-..........._-------         H. Doc. No. 486, 67th Cong., 4th sess.


  1Contains latest published map.

   Terminal facilities.-There are four piers at Newport News, which
are the property of the city and which are open to general public use on
equal terms. All of the other piers and wharves served by this improve-
ment are owned by private corporations or companies. The principal
terminal and transfer facilities are those of the Chesapeake & Ohio
Railway Co. and the Newport News Shipbuilding & Dry Dock Co.
There are also at Newport News a wharf used by steamers of the
Eastern Steamship Co. and a small boat harbor. The facilities are
considered adequate for present commerce.
   Operations and results during fiscal year.---Miscellaneous condition
surveys were made during the year at a cost of $2,311.89, all for main-
tenance. The total expenditure was $1,681.08.
   Condition at end of fiscal year.-The existing project was completed
in 1931. The controlling depth in October 1941 was 39.2 feet at mean
low water.
   The total cost under the existing project was $1,422,646.07 of which
$1,252,261.99 was for new work and $170,384.08 for maintenance. The
total expenditure was $1,422,015.26.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $16,500, will be applied as follows:
Accounts payable June 30, 1942_-----___-------__      ___      ----- _
                                                              __-       $630. 81
Maintenance: Dredging in the channel with U. S. hopper dredge Chi-
  nook, 183,000 cubic yards, July 1942-.       _--------------    __- 15, 869. 19
           Total for all work__-- .......            ____         -__    -_______-       -          16, 500. 00
  No funds can be profitably expended during fiscal year 1944 as the
proposed work will meet the needs of navigation until a later date.
                                     Cost and flnancial summary
Cost of new work to June 30, 1942..-------------------------- $1, 477, 261.99
Cost of maintenance to June 30, 1942-- ------------------------   182, 884. 08
      Total cost of permanent work to June 30, 1942---------                                     1, 660, 146. 07
Minus accounts payable June 30, 1942-__-----   __-     -__-                                            "630. 81
           Net total expenditures .---------                                                     1, 659, 515. 26
Unexpended balance June 30, 1942-_---------                                                 _      16, 500. 00
           Total amount appropriated to June 30, 1942_-----------                                1, 676, 015. 28
426           REPORT OF CHIEF OF ENGINEERS,                                              U. S. ARMY,                   1942


   Fiscal year ending June 30                     1938                1939                1940                  1941             1942

Cost of new work----------------
                     .      .    . ..--                ---                - -        -    -   ---     -     -     -
Cost of maintenance ... ____----------____
                                     _____        ____________          ________         $1,186. 58        $55, 132. 34          $2, 311.89
Total expended .       .     .         .___
                                      ________ ______            ___
                                                          __..................   ________________           56, 318.92            1, 681.08
Allotted .....................................                    $50, 000.00            40, 000.00       -32,000.00             16, 500. 00


Balance unexpended July 1, 1941___________     ________------------                                                        $1, 681.08
Amount allotted from War Department Civil Appropriation Act
approved June 24, 1940--____-___-______------                                                                             16, 500. 00

      Amount to be accounted for_...                               _______-                      -
                                                                                         ________----                      18, 181. 08
Gross amount expended-_____-__---                                                         -     -                -___       1, 681. 08

          Balance unexpended June 30, 1942 ----------------------                                                         116,   500. 00
   1 Includes $630.81 outstanding liabilities.

                                                 4. JAMES RIVER, VA.

   Location.-This river is formed by the junction of the Cowpasture
and Jackson Rivers, in Botetourt County, Va., flows easterly 340 miles
and empties into Hampton Roads at Newport News, Va. (See U. S.
Coast and Geodetic Survey Charts Nos. 529, 530, and 531.)
   Previoss projects.-Adopted by River and Harbor Act of July
11, 1870. For further details see page 1797 of Annual Report for 1915,
and page 461 of the Annual Report for 1938.
   Existing project.-This provides for a channel 25 feet deep and
300 feet wide from the mouth to Hopewell, 69.2 miles; thence 25 feet
deep and 200 feet wide, following the cut-off route between Hopewell
and the Richmond deep-water terminal, 17.2 miles; thence a channel
18 feet deep and 200 feet wide from the deep-water terminal to the
Richmond lock, 4.4 miles; and the removal of the obstruction in Rich-
mond Harbor known as Trigg cofferdam.
   Depths of channels are referred to mean low water. The total
length of channel included in the project is 90.8 miles.
   The mean tidal ranges under ordinary conditions for different parts
of the river are as follows: Mouth, 2.7 feet; Jamestown, 1.85 feet; City
Point, 2.8 feet; Dutch Gap, 3.5 feet; Richmond, 3.9 feet. Following
are the extreme ranges under ordinary conditions at the same locali-
ties: Mouth, 2.1 to 3 feet; Jamestown, 1.6 to 2.3 feet; City Point, 2.3
to 3.2 feet; Dutch Gap, 2.9 to 3.9 feet; Richmond, 3.2 to 4.2 feet. The
ordinary fluctuations of stage at Richmond, due to floods, are 6 to 12
feet above mean low water. The extreme fluctuations are 16 to 32
feet. The flood heights, below Richmond diminish rapidly, the ex-
treme, according to available information, being about 11 feet lower
at Dutch Gap, 14 miles below, and 17 to 18 feet lower 20 miles below.
   The estimate of cost for new work, revised in 1941, exclusive of the
amount expended on previous projects, is $6,641,000. The latest (1930)
approved estimate of cost for annual maintenance is $100,000.
   The existing project was authorized by the following river and
harbor acts:
                   RIVERS       AND HARBORS-NORFOLK,                         VA.,    DISTRICT              427

       Acts                         Work authorized                                    Documents


July     5, 1884   Channel 22 feet deep from mouth to Richmond             S. Ex. Doc. No. 147, 47th Cong., 1st
                     and construction of spur and training dikes.           sess.
June 13, 1902      Extension of improvement to Richmond lock gate_
Mar. 3,1905        Forming a turning basin by widening channel at          H. Doc. No. 234, 56th Cong., 1st sess.
                     Richmond.
                                                                                                               1
July 3, 1930       Present project dimensions ... . _ .._    . ..      _   H. Doc. No. 314, 71st Cong., 2d sess.
Aug. 26,1937       Removal of the Trigg cofferdam_ ._---------------       Rivers and Harbors Committee, Doc.
                                                                                                           1
                                                                             No. 68, 74th Cong., 1st sess.


1 Contain latest published maps.

   Recommended modifications of project.--Under date of March 12,
1942, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for dredging and maintaining a turning
basin 200 feet wide, 600 feet long, and 18 feet deep at mean low water,
to occupy the same area dredged by the city of Richmond as a turn-
ing basin, at an estimated initial cost of $27,000, with annual mainte-
nance of $1,500, subject to certain conditions of local cooperation (H.
Doc. No. 738, 77th Cong., 2d sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-The river's commerce at Richmond is handled
at the city-owned terminals, city wharf, and Richmond dock, and at
14 privately owned wharves located within or in the immediate vi-
cinity of Richmond Harbor. The Richmond deep-water terminal at
the head of the 25-foot depth serves ocean-going vessels and the larger
ships engaged in coastwise trade. Below the deep-water terminal the
improvement is served by 42 wharves. The Richmond terminals and
wharves, together with the wharves between Richmond and the river's
mouth, are adequate for the river's commerce.
   Operations and results during fiscal year.-Maintenance dredging
under contract in Richmond Harbor was commenced January 28,
1942, and continued to February 21, 1942, when the work was com-
pleted. There was removed 36,965 cubic yards of material. The cost
of the work was $17,096.14.
   Miscellaneous surveys, inspections, and river flow studies and pay-
ment made for damages to private residence caused by blasting while
dredging, were made during the year at a cost of $16,873.33.
   The total cost of the work was $33,969.47, all for maintenance.
The total expenditure was $36,842.95.
   Condition at end of fiscal year.-The existing project was about 90
percent completed at the end of the fiscal year. The controlling
depth between the mouth and Hopewell was 22.7 feet; between Hope-
well and Richmond deep-water terminal, 25 feet; between Richmond
deep-water terminal and the Buxton Line dock in Richmond Harbor,
16.7 feet; and thence to the Richmond lock, 9.9 feet. This informa-
tion is based upon surveys made between 1940 and 1942.
   The work remaining to be done is the removal of about 118,900
cubic yards of rock and overburden at the mouth of Falling Creek
and between the Richmond deep-water terminal and Richmond lock
for the completion of the project.
428           REPORT OF CHIEF 0OF ENGINEERS,                                 U. S. ARMY,            1942

   The total cost under the existing project, all funds, was $5,405,-
076.08 from regular funds and $583,836.53 Public Works funds, a
total of $5,988,912.61 for new work and $1,693,668.67 for maintenance,
a total cost of $7,682,581.28. The total expenditure was $7,682,280.49.
   Proposed operations.--The unexpended balance at the end of the
fiscal year, $360,235.56, will be applied as follows:
Accounts payable June 30, 1942-------------------- __---------        $300. 79
Maintenance:
    Dredging shoals, after freshets, in Richmond Harbor, by con-
      tract, as needed, July 1942 to June 1943----- -----------
                                                           _        50, 000. 00
    Dredging shoals between Richmond deep-water terminal and
      the mouth with privately owned rented dredge or United
      States pipe-line dredge, February to June 1943_-----------   200, 000. 00
    Condition surveys above and below Hopewell, and continu-
      ance of river flow studies, July 1942 to June 1943--------25, 000. 00
    Balance available------------        ------------ --------- -- 84, 934.,77
           Total for all work-----------------------------------                                          360, 235. 56
  The additional sum of $180,000 can be profitably expended dur-
ing the fiscal year 1944 as follows:
Maintenance :
   Dredging shoals, after freshets, in Richmond Harbor, by contract,
      as needed, July 1943 to June 1944-----------------------------                                           $30, 000
   Dredging shoals between Richmond deep-water terminal and the
      mouth with United States pipe-line dredge, November 1943 to
      March 1944--------------------------------------------                                                   125, 000
   Condition surveys above and below Hopewell, and continuance of
      river flow studies, July 1943 to June 1944--------------------                                            25, 000

              Total for all work -----------------------------------                                           180, 000
  No funds are required for new work during the fiscal year 1944
as the present condition of the project will adequately provide for
the needs of navigation until a later date.
                                          Cost and financial summary

Cost of new work to June 30, 1942_________________                                                  $6, 751, 912. 61
Cost of maintenance to June 30, 1942--___--__--____________                                          1, 693, 668. 67
     Total cost of permanent work to June 30, 1942-----------8, 445, 581. 28
Minus accounts payable June 30, 1942_-------    --------------    - 300. 79
     Net total expenditures_-----------------------------                                            8, 445, 280. 49
Unexpended balance June 30, 1942__--- --------      --------                                            360, 235. 56
           Total amount appropriated to June                         30, 1942-----------8,                805, 516. 05

   Fiscal year ending June 30                 1938            1939            1940           1941               1942

Cost of new work- ---                      $136, 566.01    $283, 154. 56   $227, 712. 03   $11, 429. 55    _      ---
Cost of maintenance--....--....             171, 926. 27    153, 925.34     167, 285. 86   179, 182. 94        $33, 969. 47
       Total cost_ - - - - - - - -    -     308, 492. 28    437, 079. 90    394, 997. 89   190, 612. 49         33, 969. 47
Total expended----....        -............403, 771. 95     363, 354. 11    470, 303. 35   187, 437. 83         36, 842. 95
Allotted                 ---- - - -
               - - - - - --                 251, 800. 00    839, 000. 00    176, 300. 00   107, 500. 00        168, 592.60


   i Includes $837.98 for removal of shoals in Bennetts Creek. Va.
              RIVERS     AND     HARBORS-NORFOLK,               VA.,   DISTRICT            429

Balance unexpended July 1, 1941---------------------------                         $228, 485. 91
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942-----------------------------------                         205, 000.00
    Amount to be accounted for----------------------------                          433, 485. 91
Deductions on account of revocation of allotments--------------                      36, 407. 40
      Net amount to be accounted for________-----------------------                 397, 078. 51
Gross amount expended --------------------------------                               36, 842. 95
      Balance unexpended June 30, 1942___--------------------                      2360,235. 56
Amount (estimated) required to be appropriated for completion
  of existing project                     _-------------------------------------    652, 000. 00
Amount that can be profitably expended - -in           fiscal year ending
                                                                - ---
                                                  - - - - - - ---
  June 30, 1944, for maintenance a__________                                 __     180, 000. 00
  2Includes $300.79 oustanding liabilities.
  8 Exclusive of available funds.


                           5. WILLOUGHBY CHANNEL, VA.

   Location.-This channel is located in Hampton Roads and extends
from deep water in Hampton Roads to the entrance to Willoughby
Bay. (See U. S. Coast and Geodetic Survey Charts Nos. 400 and
1222.)
   Existing project.-This provides for dredging a channel 10 feet
deep at mean low water, over a bottom width of 300 feet, from deep
water in Hampton Roads to a point opposite the extreme tip of
Willoughby Spit, a distance of approximately 8,400 feet. Under or-
dinary conditions the mean tidal range is 2.7 feet and the extremes
 -2 and + 9.5 feet.
   The estimate of cost for new work made in 1929 was $8,500. The
latest (1929) approved estimate for annual cost of maintenance is
$500.
   The existing project was adopted by the River and Harbor Act
of July 3, 1930 (H. Doc. No. 507, 70th Cong., 2d sess.). The latest
published map is in the project document.
   Termniny facilities.--A ferry wharf, owned by the Chesapeake
Ferry Co. and used by its ferries operating between Willoughby Spit
and Old Point Comfort, is the only commercial wharf located on
Willoughby Spit.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was completed
in 1931. The controlling depth in October 1940 was 10 feet at mean
low water. The total costs and expenditures were $24,100.27 of which
$8,500 was for new work and $15,600.27 for maintenance.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $9,000, will be applied to maintenance dredging in the
channel with United States hopper dredge, April 1943.
   No funds can be profitably expended during the fiscal year 1944, as
the proposed work will meet the needs of navigation until a later date.
                                 Gost an4 financial summary

Cost of new work to June 30, 1942 __      ___-__-________-______                     $8, 500. 00
Cost of maintenance to June 30, 1942--------------------------                       15, 600. 27
      Total cost of permanent work to June 30, 1942 ------- __-__                    24, 100. 27
Net total expenditures ---      --------   ----    --                                24, 100. 27
Unexpended balance June 30, 1942--------     --------                                  9,000. 00
      Total amount appropriated to June 30, 1942- -----------                         33, 100. 27
        493202---43--pt. 1, vol. 1-28
430         REPORT OF CHIEF OF ENGINEERS,                                       U.       S. ARMY,          19.42


   Fiscal year ending June 30                          1938              1939    1940               1941            1942


Cost of new work -------            -    ---   -   - - -   - - -    --               -       --
Cost of maintenance ------              .....         $7, 369. 58 -                      -         $8, 230. 69     ---       _        -

Total expended___......-.----
                          ..                           7, 369. 58                                   8, 230. 69           -       --

Allotted_        ----------------
                  d--                                  7, 369. 58               $7, 500.00            730. 69       $9, 000.00



Amount allotted from War Department Civil Appropriation Act ap-
  proved Apr. 28, 1942   -------------------------------------                                $9, 000.00
Balance unexpended June 30, 1942                          __---------------------------------- 9, 000. 00

                                                   6. HAMPTON CREEK, VA.

   Location.-This creek is a tidal estuary of Hampton Roads, located
entirely within Elizabeth City County, Va. It is about 3 miles in
length, flows in a southerly direction, and empties into Hampton Roads
about 1.5 miles west of Fort Monroe. (See U. S. Coast and Geodetic
Survey Charts Nos. 400 and 1222.)
   Previous projects.-Adopted by River and Harbor Act of June 18,
1878. For further details see Annual Reports for 1878, 1879, and 1938,
pages 72, 85, and 465, respectively.
   Existing project.-This provides for dredging a channel 12 feet deep
from the vicinity of Old Point Comfort across Hampton Flats and up
the creek to Hampton Highway Bridge at Queen Street, about 2.8
miles, with a width of 200 feet in the outer portion of the channel and
a width of 150 feet in the creek, suitably widened at the bends. Under
ordinary conditions the mean tidal range is 2.6 feet and the extremes
-2 feet and +9.5 feet.
    The estimate of cost for new work, revised in 1935, was $88,000. The
latest (1935) approved estimate for annual cost of maintenance is
$3,000.
   The existing project was authorized by the following river and har-
bor acts:

     Acts                                      Work authorized                                    Documents


Sept. 19, 1890   Channel 9 feet deep, varying from 200 to 300 feet              Annual Report, 1889, p. 974.
                  wide on bar at mouth; and same depth and 200
                   feet wide from mouth to Hampton Highway
                  bridge.
Aug. 30,1935     Present project dimensions----             __                  Rivers and Harbors Committee Doc.
                                                                                     No. 34, 72d Cong., 1st sess.            (Con.
                                                                                     tains latest published map.)



   Recommended modifications of project.-Under date of December
11, 1939, the Chief of Engineers recommended modification of the ex-
isting project so as to provide for a channel in Herberts Creek having
widths of 100 feet and 80 feet and a depth of 12 feet at mean low
water, extending from the existing improved channel in Hampton
Creek upstream to Jackson Street, at an estimated first cost of $15,000,
with annual maintenance of $1,000, in addition to that now required;
subject to certain conditions of local cooperation (H. Doc. No. 559,
76th Cong., 3d sess.).
              RIVERS       AND HARBORS-NORFOLK,                                 VA.,       DISTRICT                  431

   Local cooperation.-Fully complied with.
   Terminal facilities.-There are about 30 wharves located on Hamp-
ton Creek, with a total frontage of about 3,000 feet. None of the
wharves has direct rail connection but are connected to the streets of
Hampton with the highways of the locality. Most of the wharves
are privately owned and are utilized in connection with local enter-
prises. One public wharf owned by the county of Elizabeth City,
open to the public without charge, and a wharf owned by the Hamp-
ton Yacht Club are utilized without charge by visiting yachts. The
facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-Miscellaneous condi-
tion surveys were made during the year. The total cost and expen-
ditures were $2,623.97, all for maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1939. The controlling depth in January 1942 was 11.5 feet
at mean low water. The total costs and expenditures under the exist-
ing project were $129,390.86, of which $123,787.85 was for new work
and $5,603.01 for maintenance, of which $2,979.04 was applied to
Herberts Creek under the provisions of section 3 of the River and
Harbor Act of October 17, 1940. In addition, $40,000 was expended
from contributed funds for new work.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $21,376.03, will be applied to maintenance of the channel,
by contract, January to March 1943.
   No funds can be profitably expended during the fiscal year 1944 as
the work proposed will meet the needs of navigation until a later
date.
                                      Cost and financial summary

Cost of new work to June 30, 1942_____________________________                                           1$135, 787. 85
Cost of maintenance to June 30, 1942______________________                                                   5, 603. 01
         Total cost of permanent work to June 30, 1942 ___________                                             141, 390. 86

Net total expenditures_----_-_--_---    -     - _                                                              141, 390. 86
Unexpended balance June 30, 1942___________________________                                                     21, 376. 03

         Total amount appropriated to June 30, 1942- _____________1 162, 766. 89
  1 In   addition, $40,000 expended from contributed funds for new work.


   Fiscal year ending June 30                 1938             1939            1940              1941              1942

Cost of new work--------------
                .............                   $571.59        $113, 216. 26-----------------------
Cost of maintenance.....              ..........--------------------------- --------------.
                                                                             _                 $2, 979. 04         $2, 623.97
Total expended...-------------          ---     12. 27       113, 264. 90       $510. 68         2, 979. 04         2, 623.97
Allotted------------------      ..      117, 000. 00     .              --------------
                                                                 .---------                    26, 979. 04


Balance unexpended July 1, 1941 _________              -                                                       $24, 000. 00
Gross amount expended -----------------------------------------                                                  2, 623.97
         Balance unexpended June 30, 1942--__.                                        -___
                                                                                       ______-.---            - 21, 376. 03

                                 7.     APPOMATTOX RIVER, VA.
  Location.--This river rises in Appomattox County, Va., flows
northeasterly 137 miles, and empties into the James River at Hope-
 432        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                            1942

well, Va. The portion under improvement extends from its mouth to
Petersburg, Va., a distance of 11 miles, which is the length of the
tidal reach. (See U. S. Coast and Geodetic Survey Chart No. 531.)
   Previous projects.-None. A survey of the river was made prior
to the adoption of the existing project. For further details see page
469, Annual Report for 1938.
   Existing project.-This provides for a navigable channel 80 feet
wide and 10 feet deep at mean low water between the mouth of the
river and Petersburg, the head of navigation, a distance of 11 miles,
and a turning basin at Petersburg; for a dam at Petersburg and
the excavation for a width of from 200 to 300 feet of a diversion
channel connecting the river above the darn at Petersburg with the
river at a point 21/2 miles below; for about 1.7 miles of levees on the
low grounds between the navigable and diversion channels; for a
highway bridge and a railway bridge across the diversion channel;
and for other work incidental to the diversion channel. Under or-
dinary conditions the mean tidal range is 2.9 feet and the extremes 2.4
and 3.3 feet. There are no records available of the heights of stage
due to ordinary floods. These are estimated at 6 to 8 feet above mean
low water at Petersburg, where the extremes are from 15.6 to 17.1
feet.
   The estimated cost of the navigable channel, revised in 1927, was
$578,136 for new work, and the estimated cost (1909) of the diversion
channel and work incident to its construction was $260,000. The es-
timated cost of maintenance (1927) of the navigable channel is $6,500
annually.
   The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                         Documents


Mar.   3,1871   Channel 12 feet deep at mean high water and 60             Annual Report 1874, pt. II, p. 54.
                 feet wide.
June 13,1902 1Diersion channel and work incident thereto. _H.                 Doc. No. 139, 56th Cong., 2d sess.,
Mar. 3,1909            channel and work incidental thereto                   and Annual Report, 1901, p. 1467.
June 25, 1910   Increasing channel to width of 80 feet and main-           H. Doc. No. 952, 60th Cong., 1st sess.
                  tenance of diversion works.                                (Contains latest published map.)
Jan. 21,1927    Present project dimensions   -..-   .....------------...   H. Doc. No. 215, 69th Cong., 1st sess.



   Recommended modifications of project.--Under date of March 7,
1939, the Chief of Engineers recommended modification of the ex-
isting project so as to provide for extending the existing turning basin
to a point 100 feet below the center line of Lieutenant Run; for widen-
ing this basin to-160 feet at the bend at the mouth of the run and to
140 feet at the lower end; for removal of all rock lying less than 18
feet below mean low water in the north half of the lower 200 feet of the
basin; for removal of soft material in the south half of the lower 200
feet of this basin to rock; for dredging the remainder of the turning
basin to a depth of 12 feet; for dredging a basin 20 feet deep, 150 feet
wide, and 200 feet long at the mouth of Poes Run; for dredging a
channel 12 feet deep and 80 feet wide from the mouth of the river to the
lower end of the turning basin; and for dredging a channel 80 feet wide
and of such depth, not exceeding 12 feet, as can be obtained without
            RIVERS   AND   IHARBORS-NORFOLK,           VA.,   DISTRICT          433
rock excavation from the upper end of the turning basin to the head of
the existing project, generally in accordance with the plan presented by
the division engineer, at an estimated first cost of $110,000, with
annual maintenance of $11,000, including that now required, subject
to certain conditions of local cooperation (H. Doc. No. 223, 76th Cong.,
1st sess.).
   Local cooperation.-Fullycomplied with.
   Terminal facilities.--Wharves and terminals served by the Appo-
mattox are situated on the river front at Petersburg. The wharves
constitute a continuous timber bulkhead on piling and having an ag-
gregate length of about 2,313 feet. Between Petersburg and the mouth,
2.5 miles downstream, there is one mooring trestle used for sand and
gravel loading. The terminal facilities are considered adequate for
the present river commerce.
   Operationsand results during fiscal year.-Preliminarydesigns and
estimates for the repair of the levee between the navigation and diver-
sion channels and miscellaneous surveys were made during the year at
a total cost and expenditure of $353.57, all for maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The controlling depth in March 1941 was 9.2 feet at
mean low water.
   The total costs and expenditures, under the existing project were
$1,198,122.60 of which $830,151 was for new work and $367,971.60
for maintenance. Of the total expenditure, $903,122.60 was applied
to the navigable channel and $295,000 to the diversion channel.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $41,209.77, will be applied as follows:
Maintenance :
    Maintenance of the channel, by contract, between the mouth
      and Petersburg, September 1942 and May and June 1943.___ $30,000.00
    Snagging and bank trimming between the mouth and Peters-
      burg, with United States derrick boat, December 1942 to
      February 1943----    ----------------------------------   11, 209. 77

        Total for all work_,--------------------------------              41, 209. 77
  The additional sum of $33,000 can be profitably expended during
the fiscal year 1944 and will be applied as follows:
Maintenance of the channel between the mouth and Petersburg by con-
  tract, March and April 1944 ------------------------------           $15, 000
Repair of levee between the navigation and diversion channels, by con-
  tract, November and December 1943---------------------------          18, 000
      Total for all work-------------------------------------                33,000

                         Cost and financial summary
Cost of new work to June 30, 1942_    ------------------------       $852, 651. 00
Cost of maintenance to June 30, 1942 ------------------------         367, 971. 60
      Total cost of permanent work to June 30, 1942   -----------   1, 220, 622. 60
Net total expenditures----------------------------------1,               220, 622. 60
Unexpended balance June 30, 1942----------------------------              41, 209. 77
      Total amount appropriated to June 30, 1942 -------------      1,261, 832. 37
434            REPORT OF CHIEF OF ENGINEERS,                                                     U. S. ARMY,                        1942


    Fiscal year ending June 30                   1938                      1939                     1940                  1941              1942

Cost of new work    -----
            Cos ofnewwor____-_-,---     _I__--------          ----------           ----   --------------         )--------------)      --------------
Cost of maintenance--_..-.....--              $19, 388. 67          $10, 407. 65                  $6, 620. 25          $29, 320. 45            $353. 57
Total expended-----------------                 21, 119. 09           10, 407. 65                   6, 620. 25          29, 320. 45             353. 57

Allotted----------------------                   5, 000. 00           20, 000. 00                 27, 500. 00           17, 500. 00         12, 500. 00


Balance unexpended July 1, 1941 .___                                                                                                  $29, 063. 34
Amount allotted from War Department Civil Appropriation Act
  app roved Apr. 28, 1942__ _____________---   __30,                                                                                         000. 00
      Amount to be accounted for----__---__-------                                                                                     59, 063. 34
Deduc tions on account of revocation of allotment________                                                                              17, 500. 00

      Net amount to be accounted for __        -------                                                                                 41, 563. 34
Gross amount expended---------------------------------------                                                                               353. 57

           Balance unexpended June 30, 1942 ---                                              --------------                            41, 209. 77

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1--------------------                                                                                       33, 000. 00
   1 Exclusive of available funds.

                                               8. PAGAN RIVER, VA.

  Location.-This river, a tidal stream, rises in Isle of Wight County,
Va., flows northeast 10 miles, and empties into James River. (See
U. S. Coast and Geodetic Survey Chart No. 529.)
  Previous projects.-Adopted by River and Harbor Acts of June
14, 1880, and March 3, 1905. For further details see page 1798 of
Annual Report for 1915 and page 442 of Annual Report for 1937.
  Existing project.-This provides for a channel having a least width
of 80 feet and a depth of 10 feet at mean low water between the wharf
of the Smithfield, Newport News & Norfolk Steamship Co. (formerly
the Old Dominion Steamship Co.) at Smithfield, and the 10-foot con-
tour in James River, a distance of about 62/3 miles. Under o~rdinary
conditions the mean tidal range is 2.7 feet. No data for extreme ranges
of tides are available.
  The estimate of cost for new work, revised in 1920, exclusive of
amount expended on previous projects, was $54,600. The latest (1928)
approved estimate for annual cost of maintenance is $3,000.
   The existing project was authorized by the following river and
harbor acts:

     Acts                          Work authorized                                                           Documents


June 25,1910        Channel widening at bends___.....                      ..   H. Doc. No. 397, 60th Cong., 1st sess.
Mar. 2,1919         Present project dimensions .....-....-                        H. Doc. No. 591, 64th Cong., 1st sess.                   (Contains
                                                                                   latest published map.)


   Terminal facilities.-There are 16 wharves or landings on this
river, of which 14 are at Smithfield, Va., and 2 at Battery Park,
about 1 mile above the river's mouth. The length of dockage avail-
able at Smithfield is about 1,100 feet. At Battery Park the length
of dockage is about 85 feet. The facilities are considered adequate
for present and prospective requirements.
                RIVERS        AND HARBORS--NORFOLK,                                 VA.,       DISTRICT                 435
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1923. The controlling depth in April 1941 was 8.1 feet at
mean low water. The head of navigation is at Cofer Landing, 9
miles above the mouth. Navigation is practicable throughout the
year.
  The total cost and expenditures under the existing project were
$165,879.66 of which $30,754.48 was for new work and $135,125.18
was for maintenance.
  Proposed operations.-No funds are available and no operations
are proposed during fiscal year 1943.
  The sum of $10,000 can be profitably expended during the fiscal
year 1944 and will be applied to maintenance dredging in the channel
between James River and Smithfield, Va., by contract, November
1943.
                                      Cost and financial summary
Cost of new work to June 30, 1942_____--- -------                                                              $51, 425. 49
Cost of maintenance to June 30, 1942__________________                                                         135,125. 18
      Total cost of permanent work to June 30, 1942 ________-                                                  186, 550. 67
Net total expenditures-----------------------------------------                                                186, 550. 67
Total amount appropriated to June 30, 1942----------------------                                               186, 550. 67

   Fiscal year ending June 30                 1938              1939              1940            1941               1942

Cost of new work--------------    I---------         ----         -------------                        ..
                                                                                          ---- - --------        ------------
Cost of maintenance--___________ ______________ ______________--- ________--                    $39,112.57
Total expended___-                    -___.          /_
                                                     -      _               -      _______       39, 112. 57 -
Allotted ------------------       I     -- $1, 432. 50 --------------              $17, 500      21, 612. 57



Amount that can be profitably expended in fiscal year ending June 30,
   1944, for maintenance_                _______---__                                           _    _ $10, 000. 00
                                                                                              -_________


                                  9. NANSEMOND RIVER, VA.
  Location.-This river, a tidal stream, rises in Nansemond County,
Va., flows northerly 25 miles, and empties into James River imme-
diately above the mouth of the latter stream in Hampton Roads. (See
U. S. Coast and Geodetic Survey Chart No. 529.)
  Previous projects.-The original project for Nansemond River was
adopted by the River and Harbor Act of March 3, 1873, and modified
by the act of June 18, 1878. For further details see page 1797 of An-
nual Report for 1915, and page 412 of Annual Report for 1935.
  Existing project.-This provides for dredging a channel between
the mouth and a point 0.45 mile above the highway bridge at Suffolk, a
distance of about 18.66 miles, 12 feet deep and 100 feet wide, with a
turning basin 200 feet square at Suffolk; and dredging a channel in
the Western Branch between its mouth and Reids Ferry, a distance of
about 2 miles, to a depth of 10 feet over a bottom width of 80 feet.
Depths of channels are referred to mean low water.
  The mean tidal ranges under ordinary conditions for different parts
of Nansemond River are as follows: Suffolk Bridge, 3.4 feet; New-
mans Point, 2.8 feet. The extreme ranges under ordinary conditions at
the same localities are as follows: Suffolk Bridge, 2.8 feet to 4 feet;
Newmans Point, 2.3 feet to 3.3 feet.
436           REPORT OF CHIEF OF ENGINEERS, U. S.                                        ARMY,       1942

  The estimate of cost for new work, revised in 1930, exclusive of the
amount expended on previous projects, was $135,000. The latest (1930)
approved estimate for annual cost of maintenance is $3,500.
  The existing project was adopted by the following river and harbor
acts :


       Acts                       Work authorized                                            Documents



Aug. 11, 1888      Channel 12 feet deep, 400 to 200 feet wide, Town             Annual Report for 1887, p. 1001.
                    Point to mouth of Western Branch; thence, 12
                    feet deep, 100 feet wide to Suffolk; turning basin
                    200 feet square at Suffolk; and spur dikes and
                    training walls at mouth of Western Branch.
July     3, 1930   Present project dimensions_       ..-------------------      H. Doc. No. 184,,70th Cong., 1st sess.


  For latest published map, see H. Doc. No. 1246, 62d Cong., 3d sess.

   Local cooperation.-Fullycomplied with.
   Terminal facilities.-There are 15 wharves on the river, of which
4 are at Suffolk, Va. All are open-pile construction and are pri-
vately owned. The facilities are considered adequate for commerce.
For further details see page 490, Annual Report for 1932.
   Operations and results during fiscal year.-Miscellaneous condition
surveys were made during the year at a cost of $4,530.20, all for
maintenance. The total expenditure was $4,498.58.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1932. The controlling depth in Nansemond River was 9.2
feet, ascertained in January 1942, and 10 feet in the Western Branch,
ascertained in March 1932. The head of navigation is at its forma-
tion at the junction of Smiths and Cohoons Creeks, 19 miles above
the mouth. Navigation is practicable throughout the year.
   The total cost under the existing project was $183,632.92 of which
$137,477.11 was for new work and $46,155.81 was for maintenance.
The total expenditure was $183,601.30.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $30,501.42, will be applied as follows:
Accounts payable June 30, 1942 _________________-____                 $31. 62
Maintenance: Dredging between the mouth and Suffolk, Va., by con-
  tract, August 1942---___________------_____ -_--______          30, 469. 80
           Total for all work -----------------------                    ____             _____            30, 501. 42
  No funds can be profitably expended during the fiscal year 1944
as the work proposed will meet the needs of navigation until a later
date.
                                     Cost and financial summary
Cost of new work to June 30, 1942_________________----                                                  $167, 477. 11
Cost of maintenance to June 30, 1942__ ________53,                                                            155. 81
     Total cost of permanent work to June 30, 1942 ----------                                             220, 632. 92
Minus accounts payable June 30, 1942     -------                                                                31. 62
           Net total expenditures __.                  -----                         ____220,
                                                                                  ---------                     601. 30
Unexpended balance June 30, 1942---                                                                        30, 501.42
           Total amount appropriated to June 30, 1942- -----                                       --     251, 102. 72
                   RIVERS            AND        HARBORS--NORFOLK,                               VA.,     DISTRICT                     437

    Fiscal year ending June 30                       1938                     1939            1940             1941             1942


Cost of new work .-------------- .
Cost of maintenance....-------.............---
                                                         .
                                                     ------
                                                               .    .     .      .             . .
                                                                                         . --------------    .          --------------
                                                                                                                  . ..--------------
                                                                                            --------------------------
                                                                                  ...--------------
                                                                                                          . --------------
                                                                                                                                  $4,530.20
Total expended _____              _-------------------        ----- -------                    ----------- ----------            4, 498.58

Allotted                  --------------
               ....---------                ....----------------- -------------------------                  $35,000.00 ..---------


Balance unexpended July 1, 1941 ---------------    ----------                                                            $35, 000. 00
Gross amount expended-----------------------------------                                                                   4, 498. 58

           Balanced unexpended June 30, 1942__------------------                                                         130, 501.42
   1 Includes $31.62          outstanding liabilities.

10. PORTSMOUTH HARBOR, VA., CHANNEL TO NANSEMOND ORDNANCE
                            DEPOT

    Location.-This channel is located at the westerly end of Hampton
Roads, at the mouth of Nansemond River. (See U. S. Coast and
Geodetic Survey Charts Nos. 400, 529, and 1222.)
    Existing project.-This provides for dredging a channel 100 feet
wide from deep water in Hampton Roads shoreward approximately
2,400 feet to a turning basin varying in width from 100 feet to 300
feet, approximately 300 feet long, all to a depth of 12 feet at mean low
water; and the construction of a timber wharf approximately 650 feet
long connecting the turning basin with the shore. Under ordinary
conditions the mean tidal range is 2.7 feet and the extremes minus 2
feet and plus 9.5 feet.
   The estimated cost of new work revised in 1940 was $117,000. The
latest (1940) approved estimate for annual cost of maintenance is
$5,000.
    The existing project was adopted by the River and Harbor Act
of October 17, 1940, in accordance with a report on file in the Office of
the Chief of Engineers.
   Terminal facilities.-There are no terminal facilities located in the
vicinity, except the wharf proposed under the project. The terminal
facilities proposed are considered adequate for existing commerce.
    Operations and results during fiscal year.-New work dredging, by
contract, in the approach channel and turning basin in progress at
the end of the fiscal year was continued to August 19, 1941, when the
work was completed. There were removed 60,533 cubic yards of
material. The cost of the work was $11,799.99.
   New work, under contract, for the construction of a railway pier and
breakwater was commenced on August 15, 1941, and continued to
April 18, 1942, when the work was completed. The cost of the work
was $127,946.40. Miscellaneous surveys and investigations were made
during the year at a cost of $687.10.
   The total cost was $140,433.49, all for new work. The total expendi-
ture was $147,606.24.
   Condition at end of fiscal year.-The existing project was completed
in 1942. The controlling depth in February 1942 was about 10.4 feet
at mean low water.
   The total cost was $169,753.59, all for new work. The total expendi-
ture was $165,243.38.
438         REPORT OF CHIEF OF ENGINEERS,                                   U. S. ARMY,                  1942

   Proposed operations. The unexpended balance at the end of the
fiscal year, $35,056.62, will be applied as follows:
Armounts payable, June 30, 1942____--_________--___________________ $4, 510. 21
Maintenance: Dredging shoals in the channel and turning basin to
  restore project dimensions, by contract, October-November, 1942__ 30, 546. 41

                                          -
         Total for all work___._____________-- _______-------                                                   35, 056. 62
   No funds can be profitably expended during fiscal year 1944 as it
is expected that the proposed work will meet the needs of navigation
until a later date.
                                     Cost and financial summary
Cost of new work to June 30, 1942__ ____________-_____--___$169, 753. 59
Cost of maintenance to June 30, 1942_______________-__--_-----------

      Total cost of permanent work to June 30, 1942_________                                                   169, 753. 59
Minus accounts payable June 30, 1942____________--_____--                                                        4, 510. 21

      Net total expenditures_ ________________________________                                                 165, 243. 38
Unexpended balance June 30, 1942 ______--____---- - - -  ___                                                    35, 056. 62
         Total amount appropriated to June 30, 1942__--                               ________-                200, 300. 00


   Fiscal year ending June 30                1938           1939              1940                1941              1942

Cost of new work ...____        _     - _______
                                           -.       _   ______________ __          ___     _    $29, 320. 10      $140, 433.49
Cost of maintenance .---------                ----------------------------------------------------
Total expended _---------._          _-17,
                                    ---                                                             637. 14        147, 606. 24
Allotted........-----------------...-------------------------              ....--------------    43, 000.00        157, 300.00



Balance unexpended July 1, 1941________
                                  --             ______ __________ $25, 362. 86
Amount allotted from War Department Civil Appro-
  priation Act approved Apr. 1, 1941_______________ $139, 800. 00
Amount allotted from War Department Civil Appropria-
  tion Act approved Apr. 28, 1942 __________________    17, 500. 00
                                                                    157, 300. 00

      Amount to be accounted for __________________-------182, 662. 86
Gross amount expended ___                    ----    --     147, 606. 24
      Balance unexpended June 30, 1942___ ____________-
                                               -_____35,                                                            056. 62
Outstanding liabilities June 30, 1942___---_-------____                                                  -       7, 137. 02
            Balance available June 30, 1942                        _____         ______________                 27, 919. 60

                                    11. MATTAPONI RIVER, VA.

  Location.-MattaponiRiver rises in central Virginia and flows in a
southeasterly direction for about 120 miles to its junction with the
Pamunkey River at West Point, Va., forming the York River. (See
U. S. Coast and Geodetic Survey Chart No. 504.)
  Previous projects.-The original project was adopted by the River
and Harbor Act of June 14,1880, and modified by the River and Harbor
Act of July 13,1892. For further details see page 531 of Annual Report
for 1918 and page 438 of Annual Report for 1938.
    'wisting project.-This provides for a channel 9 feet deep and 150
feet wide from the mouth to Locust Grove, a channel 7 feet deep and
100 feet wide from Locust Grove to Rosespout, with a basin immedi-
               RIVERS     AND HARBORS--NORFOLK,                  VA.,    DISTRICT              439
ately above Rosespout 7 feet deep, 180 feet wide, and 400 feet long, and
snagging between the mouth and Dunkirk, Va. The distances from
the mouth to Locust Grove, Rosespout, and Dunkirk are 28, 34, and
41 miles, respectively. The plane of reference is mean low water.
Tidal ranges are: Mean, 3.9 at Walkerton, 2.9 at West Point; extreme,
4.5 at Walkerton, 3.9 feet at West Point; irregular, 7 feet at Walkerton,
-6feet at West Point.
   The estimate of cost for new work, revised in 1935, was $19,250, ex-
clusive of amount expended on previous projects. The latest (1935)
approved estimate for annual cost of maintenance is $4,500.
   The existing project was authorized by the following river and
harbor acts:

    Act                      Work authorized                                Documents


Mar. 2,1919    Improved channels to Pointers (Rosespout) and   H. Doc. No. 861, 64th Cong., 1st sess.
                snagging to Dunkirk.
Aug. 30,1935   Present project authorized_--------------_ ___Rivers and Harbors Committee Doc.
                                                                No. 47, 73d Cong., 2d sess.    (Con-
                                                                tains latest published map.)



   Local cooperation.-Fully complied with.
   Terminal facilities.-In the portion of the waterway between
Walkerton and Pointers there are 2 shore landings. In the deeper
portions of the waterway below Walkerton there are about 14
wharves of open-pile construction and about 13 shore landings.
Five of these wharves are located at West Point, Va. All of the
facilities are privately owned, but some are open to public use at
nominal wharfage charges. The facilities are considered adequate
for existing commerce.
   Operations and results during fiscal year.-New work, under con-
tract, for dredging the river to project dimensions between the
mouth and Rosespout was commenced July 9, 1941, and continued to
August 8, 1941, when the work was completed. There were removed
109,505 cubic yards of material. The total cost for the fiscal year was
$29,984, all for new work. The total expenditure was $30,018.45.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1941. The controlling depth in September 1941 was 9 feet
to Locust Grove and 7 feet to Rosespout (Pointers). The total costs
and expenditures under the existing project were $85,643.61 of which
$32,586.39 was for new work and $53,057.22 was for maintenance.
   Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1943.
   The sum of $4,000 can be profitably expended during the fiscal
year 1944, and will be applied to maintenance snagging and bank
trimming between Walkerton and Aylett with United States derrick
boat, August 1943.
                                Cost and financial summary
Cost of new work to June 30, 1942__    ___----- ---------                               $83, 835. 87
Cost of maintenance to June 30, 1942__________------___                                 113, 497. 45

          Total cost of permanent work to June 30, 1942________                         197, 333.32
Net total expenditures _------------------------                                        197, 333. 32
Total amount appropriated to June 30. 1942__ --------                                   197, 333. 32
440              REPORT OF CHIEF OF ENGINEERS,                                      U.     S. ARMY,         1942


    Fiscal year ending June 30                       1938           1939               1940          1941            1942


Cost of new work--------------------....                 -------------- ------------- $2,602.39          $29,984.00
Cost of maintenance------..............--------......-------- ------------- $3,000.00 ...---------- --------------
Total expended-------------..................--             ..--------------------------3, 000.00    2, 567. 94      30, 018.45
Allotted......--------------------------------                    $3, 000.00         19, 250.00     22, 317. 94     -8, 981.55


Balance unexpended July 1, 1941    ______--------------- -------------- $39, 000. 00
Amount allotted from War Department Civil Appropriation Act ap-
  proved June 24, 1940----------------------------------               --    407. 40

      Amount to be accounted for_       -----                     39, 407. 40
Deductions on account of revocation of allotments-----------------9, 388. 95

      Net amount to be accounted for----------------------------                                                  30, 018. 45
Gross amount expended--------------------- ------ $30, 158.15
Less reimbursements collected ------------------------    139. 70
                                                                                                                  30, 018. 45
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance--------------------------- -------                                                      4, 000.00
                                                  12. PAMUNKEY RIVER, VA.

  Location.-PamunkeyRiver rises in central Virginia and flows in a
southeasterly direction for about 130 miles to its junction with the
Mattaponi River at West Point, Va., forming the York River. (See
U. S. Coast and Geodetic Survey Chart No. 504.)
  Existing project.-Thisprovides for a channel 7 feet deep at mean
low water and 100 feet wide between Bassett Ferry and the mouth of
the river, a distance of 50 miles. Tidal ranges are: Mean, 4 feet at
Newcastle Ferry, 2.9 feet at West Point; extreme, 5 feet at Newcastle
Ferry, 3.9 feet at West Point; irregular 7.5 feet at Newcastle Ferry, 6
feet at West Point.
   The estimate of cost for new work made in 1875 was $17,508. The
estimated cost was revised in 1908 to $55,000 to cover increased depth
and width of channel below Bassett Ferry. The latest (1926) ap-
proved estimate for annual cost of maintenance is $4,000.
   The existing project was authorized by the following river and
harbor acts:

       Act                                    Work authorized                                       Documents


June 14,1880          Dredging and snagging for channel 5 to 6 feet                  Annual Report, 1875, pt. 2, p. 162.
                         deep and 40 to 60 feet wide to Hanovertown,
                         Va.
                      For channel 7 feet deep and 100 feet wide on lower             Annual Report, 1885, pt. 2, p. 982.
                        bars with dikes on 2 bars.
                      Limits dredging and snagging for channel 7 feet                Annual Report, 1908, pt. 1, p. 249.
                        deep and 100 feet wide to Bassett Ferry.



    The latest published map is in Annual Report for 1890, p. 1074.
    Recommended modifwations of project.-Under date of February
27, 1940, the Chief of Engineers recommended modification of the
existing project so as to provide a channel 5 feet deep and 50 feet
                 RIVERS          AND       HARBORS-NORFOLK,               VA.,       DISTRICT        441
wide between Bassett Ferry and Manquin Bridge, at an estimated first
cost of $10,000, with annual maintenance of $1,000 in addition to that
now required; subject to certain conditions of local cooperation (H.
Doc. No. 671, 76th Cong., 3d sess.).
    Terminal facilities.-There are no wharves existing in the im-
proved section. Six shore landings are located along the banks
where deep water is available. They appear to be adequate for the
requirements of present and prospective commerce. In the deep
portion of the waterway below the section under improvement there
exist 20 wharves or landings.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1913. Channels aggregating 1.6 miles were dredged. Lon-
gitudinal sheet pile dikes, aggregating 1,478 linear feet, and perme-
able spur dikes, aggregating 2,332 linear feet, have been built. The
dikes are in good condition. The controlling depth in March 1938
was 6.2 feet except at the extreme upper end of the project. Total
costs and expenditures were $139,624.97 of which $31,37.44 was for
new work and $108,248.53 was for maintenance.
    Proposed operatzons.-No funds are available and no operations
are proposed during the fiscal year 1943.
    The sum of $4,000 can be profitably expended during the fiscal
year 1944, and will be applied to maintenance snagging and bank
trimming between Whitehouse and Bassett Ferry, with United States
derrick boat, July 1943.
                                        Cost and financial summary
Cost of new work to June 30, 1942-----------    -------------- $31,376. 44
Cost of maintenance to June 30, 1942------------------------ 108, 248. 53

      Total cost of permanent work to June 30, 1942------------139, 624. 97
Net total expenditures-----------------------------------------  139, 624.97
Total amount appropriated to June 30, 1942---------------------- 139, 624. 97

   Fiscal year ending June 30                  1938         1939        1940            1941       1942

Cost. of new work--------               -------------
Coskot mainteance.........-----         ------------- -      $746.08    $3,253.92 -
Total expended......----------          ----------------- --------      4, 000. 00
Allotted- - - -. . .- - -.....                          .   3,000. 00   1,      00 .........
                                                                               .000.

Amount that can be profitably expended in
                                          fiscal year ending June
30, 1944, for maintenance----------------------------------                                    $4,000.00
                                  13.      YORK SPIT CHANNEL, VA.
  Location.-York Spit Channel lies in the lower Chesapeake Bay
opposite the mouth of York River and about 20 miles northerly from
Atlantic Ocean at the entrance of Chesapeake Bay. (See U. S. Coast
and Geodetic Survey Chart No. 1222.)
  Previous projects.-The original project was adopted March 3,
1905. For further details see page 389 of the Annual Report for
1932.
  Existing project.-This provides for a channel 4 miles long, 1,000
feet wide, and 37 feet deep at mean low water between the contours
442           REPORT OF CHIEF OF ENGINEERS,                               U. S. ARMY,            1942

of that depth in Chesapeake Bay opposite York Spit. Under or-
dinary conditions the mean tidal range is 2.5 feet and the extreme 3.3
feet. The extremes of irregular fluctuation, due to combined wind and
tides, referred to mean low water, are minus 2 feet and plus 9.5 feet.
   The estimated cost of new work revised in 1930 is $590,400. The
latest (1930) approved estimate for annual cost of maintenance is
$24,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                       Documents


Mar. 3,1905        A channel 35 feet deep and 600 feet wide ....---------...H. Doc. No. 186, 57th Cong., 2d sess.
Mar. 4,1913        Channel width increased to 1,000 feet.....----------. H. Doc. No. 1190, 62d Cong., 3d sess.
July     3, 1930   Channel depth increased to 37 feet   ------------     H. Doc. No. 29, 71st Cong., 1st sess.
                                                                           (Contains latest published map.)



   Terminal facilities.-Fora description of the terminal facilities for
this channel, see Baltimore Harbor and Channels, Maryland.
   Operations and results during fiscal year.-Miscellaneous condition
surveys and preliminary investigations were performed during the
year. The total cost and expenditures were $3,448.20, of which
$694.60 was for new work and $2,753.60 for maintenance.
   Condition at end of fiscal year.-The existing project was about
90 percent completed. The channel has been dredged to a depth of
37 feet at mean low water for a center width of 900 feet, and 34.9
feet deep at mean low water for a width of 1,000 feet. The project
is expected to be completed during the fiscal year 1943. The control-
ling depths in November 1941 were as follows: 35.6 feet along the
center and 33.1 feet along the edges.
   The total costs and expenditures prior to fiscal year 1942 were in-
cluded in the project for Baltimore Harbor and Channels, Maryland.
Since that date the total costs and expenditures have been $3,448.20,
of which $694.60 was for new work and $2,753.60 for maintenance.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $311,551.80, will be applied as follows: -
New work: Widening of the channel from 900 feet to 1,000 feet to
  a depth of 37 feet for the completion of the project with United
  States hopper dredge, 175,000 cubic yards, August to September
  1942 ------------     -------------------------------------             $47, 600. 00
Maintenance:
    Maintenance of the channel for restoration of project dimen-
      sions, with United States hopper dredge September to Decem-
      ber 1942 and June 1943--               ---------------------------- 243, 451.80
    Balance available          -------------------------------------- 20, 500. 00
          Total for all work-----------------------------------                                      311, 551. 80
   The additional sum of $75,000 can be profitably expended during
the fiscal year 1944, and will be applied to maintenance of the chan-
nel with United States hopper dredge, May to June 1944.
                    RIVERS          AND HARBORS-NORFOLK,                                       VA.,    DISTRICT               443
                                              Cost and financial summary
Cost of new work to June 30, 1942____ ___       -$694.
                                          _____-__--__-                                                                          60
Cost of maintenance to June 30, 1942---------      ---- __---                                                            2, 753. 60
          Total cost of permanent work to June 30, 1942--------------                                                    3, 448. 20

Net total expenditures________---- __-----------                                                                -13,        448. 20
Unexpended balance June 30, 1942____                                                                                   311, 551. 80
          Total amount appropriated to June 30, 1942_--______                                               -     1.315, 000. 00

  Fiscal year ending June 30                         1938             1939                   1940        1941              1942

Cost of new work ..------                ...--------------     ..--------------
                                                              ...---------------------------                                 $694. 60
Cost of maintenance .               --      ..         _ ._                      ___------
                                                                                   -_-----                                  2, 753.60
       Total cost--------------------                         --------------------------               --------------       3, 448. 20
Total expended-----               ----------------            --------------------------------------                        3, 448. 20
Allotted.......------------..-----....--------.......----------------------------..                      $270, 000         45, 000. 00



Balance unexpended July 1, 1941                                 $270, 000. 00
Amount allotted from War Department Civil Appropriation Act ap-
  proved Apr. 28, 1942--------------------------------------45,       000. 00
      Amount to be accounted for--- __ -    __ -_,_____---                                                             315, 000. 00
Gross amount expended-------------------------------                                                                     3 448.20
          Balance unexpended June 30, 1942_______                                          _______ -     ____-         311, 551. 80
Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance 2____ ___ -   ______     _____________                                                           75, 000. 00
   1 Costs and expenditures prior to fiscal year 1942 are included in Baltimore Harbor and
Channels project.
  2 Exclusive of available funds.

                                            14. ONANCOCK RIVER, VA.

   Location.-This river, a tidal stream, rises in Accomac County, Va.,
flows in a westerly direction about 6.5 miles and empties into. Ches-
apeake Bay. The portion under improvement extends from the mouth
of the river to Onancock, Va., a distance of about 5 miles which is the
approximate length of the tidal reach. (See U. S. Coast and Geodetic
Survey Chart No. 1223.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of March 3, 1879, and was modified by the River and
Harbor Act of September 19, 1890. The modified project was super-
seded by a project adopted by the River and Harbor Act of June 25,
1910, work under which was completed in 1911. For further details
see page 1799 of Annual Report for 1915, page 493 of Annual Report
for 1924, and page 388 of Annual Report for 1938.
   Existing project.-This provides for a channel 12 feet deep at mean
low water, 200 feet wide across the bar, a distance of 5,200 feet, and
generally 100 feet wide in the river to a point roughly 1,200 feet above
the mouth of the North Branch, widened at the upper end to form
a basin 200 feet square; a turning basin about 2.3 acres in area at
Onancock with the understanding that the initial dredging in the
river shall be 10 feet only. Full project depth to be provided if the
needs of commerce are later found to demand it. A channel 6 feet deep
444        REPORT OF CHIEF OF ENGINEERS,                              U. S. ARMY,          1942

and 100 feet wide in the lower 500 feet of Joynes Branch and an
anchorage basin 6 feet deep and 3.9 acres in area at the mouth of
Titlow Creek. Under ordinary conditions the mean tidal range is
1.7 feet and the extremes are 1.5 and 2 feet.
  The estimate of cost for new work revised in 1937, exclusive of
amounts expended on previous projects, is $137,045. The latest (1937)
approved estimate for annual cost of maintenance is $5,500.
   The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                    Documents



Mar.   3,1925   A channel 12 feet deep and 200 feet wide across the   H. Doc. No. 219, 68th Cong., 1st sess.
                  bar and generally 100 feet wide in the river with
                  a turning basin near the head of navigation.
Aug. 26, 1937   Extending the 12-foot channel in North Branch         H. Doc. No. 74, 75th Cong., 1st sess.
                 with a basin 200 feet square and a 6-foot channel      (Contains latest published map.)
                  100 feet wide in Joynes Branch, and an anchor-
                 age basin 6 feet deep, at the mouth of Titlow
                  Creek.



   Recommended modifications of project.-Under date of June 13,
1939, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for extending the 12-foot channel in North
Branch to a point, roughly, 1,200 feet above the mouth of the branch,
the extended channel to be widened at the upper end to form a basin
200 feet square; for a channel 6 feet deep and 100 feet wide in the
lower 500 feet of Joynes Branch; and for an anchorage basin 6 feet
deep and 3.9 acres in the area at the mouth of Titlow Creek, at an
estimated first cost of $25,500, with maintenance estimated at $1,000
annually in addition to that now required; subject to certain condi-
tions of local cooperation (H. Doc. No. 358, 76th Cong., 1st sess.).
   Local cooperation.-The River and Harbor Act of August 26,
1937, provides that local interests furnish free of cost to the United
States suitable disposal areas for new work and subsequent mainten-
ance. Sufficient disposal areas for new work have been furnished
but none for subsequent maintenance.
   Terminal facilities.-There are five small timber wharves on this
river with a total wharfage space of about 980 linear feet as follows:
Three at Ononcock and one each at Poplar Cove and Finneys. Ves-
sels are permitted to tie up at the wharves without charge. Two
wharves at Onancock are privately owned but are open to general
public use upon payment of wharfage. A county road extends to
each of them. These facilities are considered adequate for existing
commerce.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-The project adopted by the River
and Harbor Act of March 3, 1925, was completed in 1936. No work
was done under the existing project as modified in 1937 pending com-
pliance with conditions of local cooperation. The controlling depth
in the river in January 1942 was 9.5 feet at mean low water.
                   RIVERS AND HARBORS-NORFOLK,                                    VA.,   DISTIRICT                       445
  The total costs and expenditures under the existing project were
$88,289.28 of which $86,059.49 was for new work and $2,229.79 for
maintenance.
  Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1943.
  The sum of $10,000 can be profitably expended during the fiscal year
1944, and will be applied to maintenance of the channel between the
bar at the mouth and Onancock, Va., by contract, April 1944.
  Compliance with the conditions of local cooperation is not expected
within the next two years; therefore, no funds can be profitably ex-
pended for new work during the fiscal year 1944.
                                            Cost and financial summary

Cost of new work to June 30, 1942----------------------_          $119, 608. 51
Cost of maintenance to June 30, 1942------------------------------26, 983. 55
       Total cost of permanent work to June 30, 1942                                                             1---------------46,
                                                                                                                       592. 06
Net total expenditures-----------------------------------------                                                  146, 592. 06
'Total amount appropriated to June 30, 1942-                                                                      146, 592.06

  Fiscal year ending June 30                      1938        1939             1940          1941                     1942

Cost of new work ----------------------------
                    .....                                     $306. 36   ......          .          ..........
Cost of maintenance           -

Total expended.........           .... ........           _    306. 36   -
                                                          25, 500. 00----------------------------------
Allotted------------------ ----..............................----------


Amount (estimated) required to be appropriated for completion
of existing project------------------------------------------                                                   $25, 500. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance-------------------------------------                                                   10, 000. 00
                                     15. OCCOHANNOCK CREEK, VA.

  Location.-This creek, a tidal estuary of*Chesapeake Bay, forms a
portion of the dividing line between Accomae and Northampton
Counties, Va., and lies wholly within the limits of these two counties.
(See U. S. Coast and Geodetic Survey Chart No. 1223.)
  Existing project.-This provides for dredging a channel 9 feet
deep at mean low water, over a bottom width of 100 feet across the
bar at the mouth of Occohannock Creek, a distance of about one-
half mile. Under ordinary conditions the mean tidal range is about
1.5 feet and the extreme about 4.5 feet.
   The estimate of cost for new work made in 1929 is $17,000. The
latest (1929) approved estimate for annual cost of maintenance is
$1,500.
   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (H. Doc. No. 165, 71st Cong., 2d Sess.). No project
map has been published.
   Terminal facilities.-There are two timber wharves on this stream
with an available frontage of about 100 linear feet each. The wharf-
age facilities are believed to be adequate for the existing commerce
on the creek.
          493202-43--pt. 1, vol. 1-                  29
446        REPORT OF CHIEF OF ENGINEERS,                            U. S. ARMY,               1942

   Operations and results during fiscal year.-Preliminary surveys
and investigations in connection with maintenance dredging were
made at a cost of $274.22. No expenditure was made.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931, and provides a direct entrance channel. Based on
surveys completed in April 1942, the controlling depth in the direct
entrance channel was 1.7 feet at mean low water. The controlling
depth in the natural circuitous entrance channel was found to be 6.4
feet. Due to excessive shoaling in the direct entrance channel, the
natural entrance channel has been used for several years. The total
cost was $28,448.56 of which $13,859.14 was for new work and
$14,589.42 for maintenance. The total expenditure was $28,174.34.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $19,000, will be applied as follows:
Accounts payable, June 30, 1942_ ______ ____--______
                                               ------                                                $274. 22
Maintenance: Dredging in the channel, through the bar at the mouth
by privately-owned rented dredge, July 1942____________________                                 18, 725. 78

        Total for all work_____---_---------------------------                                   19, 000. 00
  No funds can be profitably expended during the fiscal year 1944 as
the work proposed will meet the needs of navigation until a later
date.
                                   Cost and financial summary
Cost of new work to June 30, 1942_______________-_____________                                  $13, 859. 14
Cost of maintenance to June 30, 1942_____________________________                                14, 589. 42

      Total cost of permanent work to June 30, 1942--------------                                28, 448. 56
Minus accounts payable June 30, 1942----------------------------                                     274. 22

     Net total expenditures                                                                      28, 174 34
Unexpended balance June 30, 1942___________________________-___                                  19, 000. 00
        Total amount appropriated to June 30, 1942--_______ ___                                  47, 174. 34


  Fiscal year ending June 30          . 1938          1939           1940             1941.           1942


Cost of new work    -----         - -------------- -------------- ----------------
Cost of maintenance- -$7------2-----------      ---
                                                                                          ---
                                                                  -------------- -----------           $274.222--------------
             ..
Total expended---------           I-------
                             -----------                                 -

Allotted----.......--------------- ----- ----------------------------------- ------                   19, 000. 00


Amount allotted from War Department Civil Appropriation Act
approved June 24, 1940--______________--______________      _   $17, 500.00
Amount allotted from War Department Civil Appropriation Act
approved May 23, 1941------ -----------------------------------   1, 500. 00
        Amount to be accounted for____________________________                                   19, 000. 00
Balance unexpended June 30, 1942________________________________                                119, 000. 00
1 Includes $274.22 outstanding liabilities.


                       16.     CAPE CHARLES CITY HARBOR, VA.
   Location.-The town of Cape Charles, Va., is located on Chesa--
peake Bay on the west side of the peninsula separating the bay from
the Atlantic Ocean. It is about 11 miles north of the southern ex-
tremity of the peninsula and 45 miles south of the Maryland-Vir-
ginia State line. Cape Charles City Harbor is an artificial land-
                 RIVERS       AND HARBORS-NORFOLK,                       VA.,   DISTRICT               447
locked harbor situated on the south side of the town. (See U. S.
Coast and Geodetic Survey Chart No. 1222.)
   Existing project.-This provides for dredging channels through
Cherrystone Inlet and bar 16 feet deep and 100 feet and 200 feet
wide, respectively, the dredging of an entrance channel 100 feet wide
and 16 feet deep, the dredging of the harbor 11 acres in area to 14
feet deep and a basin 10 feet deep, 180 feet wide, and 420 feet long
at the head of Mud Creek, with a channel 10 feet deep and 100 feet
wide extending to that depth in the harbor, flared through its inner
250 feet to a width of 180 feet, and the construction of stone jetties
on each side of the entrance to the harbor. The plane of reference
is mean low water. The mean range of tide under ordinary condi-
tions is 2.5 feet and the extremes 2.0 and 2.7 feet.
   The estimate of cost of new work, revised in 1938, was $132,500.
The latest (1938) approved estimate of cost for annual maintenance
is $800. No estimate of cost of maintenance was approved for the
original project.
   The' existing project was authorized by the following river and
harbor acts:

     Act                         Work authorized                                  Documents


Sept. 19, 1890   Dredging a channel through Cherrystone Inlet         HI. Doe. No. 29, 51st Cong., 1st sess.,
                   and bar 16 feet deep and 100 and 200 feet wide,      and Annual Report 1890, p. 971.
                   respectively; dredging an entrance channel 100
                   feet wide, 16 feet deep; dredging a harbor 11
                  acres in area, 14 feet deep; and construction of
                  stone jetties on each side of the entrance to the
                  harbor.
June 20,1938     Modified to provide a basin 10 feet deep, 180 feet   H. Doc. No. 580, 75th Cong., 3d sess.
                  wide, and 420 feet long, at the head of Mud          (Contains latest published map.)
                   Creek, with a channel 10 feet deep and 100 feet
                   wide, extending to that depth in the present
                   harbor, flaring through its inner 250 feet to a
                   width of 180 feet.



   Recommended modifications of project.-Under date of October 8,
1915, the Chief of Engineers recommended abandonment of the project
authorized in the River and Harbor Act approved September 19, 1890
 (H. Doc. No. 524, 64th Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are four wharves and two transfer slips
with a total dockage space of about 1,500 feet in the railroad harbor.
The facilities and the entire water front are owned by the railroad
company. Two of the wharves are open to general public use with-
out charge under certain restrictions; the others are used exclusively
by the railroad company. The facilities have rail and highway con-
nections. The harbor is congested, and little space on the north side
is available for new terminals.
   Operations and results during fiscal year.-Maintenance work, by
hired labor, for construction of a ditch to provide proper drainage,
was performed between February 2 and 9, 1942. There were con-
structed 1,440 lineal feet of ditch and 400 cubic yards of material
448           REPORT OF CHIEF OF ENGINEERS,                                               U.     S. ARMY,               1942

were removed. The total costs and expenditures were $500.09, all for
maintenance.
   Conditionat end of fiscal year.-The existing project was completed
in 1940. The controlling depths are as follows:

                                         Name                                                Depth             Width               Date

Cherrystone bar and entrance channel- ............----------------                                 13. 3     100-200           January 1942
Cape Charles Harbor                       ...---------------------------------------               14.0 ----                       Do.
Harbor to head of Mud Creek                        .......                                          7.8
                                                                  .........---------------------------------    100-180            Do.


   The total costs and expenditures were $180,362.35, of which $120,-
049.27 was for new work and $60,313.08 for maintenance.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $25,000, will be applied to maintenance dredging of the
entrance channel and basin at the head of Mud Creek by contract dur-
ing January and February 1943.
   No funds can be profitably expended during the fiscal year 1944 as
the proposed work will meet the needs of navigation until a later
date.
                                                   Cost and financial summary

Cost of new work to June 30, 1942___-----------------------$120, 049.27
Cost of maintenance to June 30, 1942_____-_______--- - ___--  60, 313. 08

           Total cost of permanent work to June 30, 1942-------------180, 362. 35

Net total expenditures                                                                                                           80, 362. 35
                                                                                                                                1-----------------------------
Unexpended balance June 30, 1942---------------------------                                                                      25, 000. 00

           Total amount appropriated to June 30, 1942--------------205, 362. 35

    Fiscal year ending June 30                        1938              1939                1940                 1941                1942


Cost of new work _____-----------  ------------
                                    __......                         .. .      .           $1, 162. 75         $13, 352. 84 ----
Cost of maintenance ..___-- --------------------                  ------------                  44.83           20, 561. 79              $500.09

       Total cost ..........----------------   -    -----------       - --     -             1, 207. 58         33, 914. 63              500. 09

Total expended...........------------......-- ----------------------------                   1, 128. 14          33, 994. 07             500. 09

Allotted.........................
           ----------------------------------                             $27, 000         22,000.00           - 13,785. 10          25, 407. 40



Balance unexpended July 1, 1941------------ -----------------                                                                        $92.69
Amount allotted from War Department Civil Appro-
priation Act approved June 24, 1940--------------    $407.40
Amount allotted from War Department Civil Appro-
priation Act approved Apr. 28, 1942----------------25, 000. 00
                                                                                                                                 25, 407. 40

     Amount to be accounted for --------------------------- 25, 500. 09
Gross amount expended--------------------------------------     500.09
           Balance unexpended                         June 30, 1942---------------------25, 000. 00

17. WATERWAY FROM NORFOLK, VA., TO THE                                                                 SOUNDS OF NORTH
                       CAROLINA
  Location.-This water route extends south from Norfolk, Va., to
Pamlico Sound, N. C. (See U. S. Coast and Geodetic Survey Charts
              RIVERS AND          IHARBORS--NORFOLK                 VA.,   DISTRICT               449
Nos. 1227, 1228, 1229, and 1231.) For description see page 492,
Annual Report for 1932.
  Existing project.-This provides for dredging channels to depths
of 10 feet at mean low water, over a least bottom width of 80 feet,
in Deep Creek, Va., Turners Cut, Pasquotank River, and Croatan
Sound, N. C., and maintaining the Dismal Swamp Canal (which
connects Deep Creek and Turners Cut) to a depth of about 9 feet
over a bottom width of 50 feet. The limiting width of 80 feet ap-
plies to Turners Cut; the channels in Deep Creek and Pasquotank
River have been dredged to depths of 10 feet over bottom widths of
100 feet, while the Croatan Sound channel has been dredged to a
depth of 12 feet over a bottom width of 200 feet. The project fur-
ther provides for the protection of banks in Turners Cut with sheet
piling, and cutting certain sharp points in Pasquotank River, in
order to shorten its course. The component parts of the waterway
and their lengths are about as follows: Deep Creek, Va., 3 miles;
Dismal Swamp Canal, 22 miles; Turners Cut, 4.5 miles; Pasquotank
River, 30 miles; Albemarle Sound, 20 miles; and Croatan Sound,
12.5 miles; a total of 92 miles. The total length of the Dismal
Swamp Canal is about 25 miles, of which a 22-mile portion, a lock
canal extending between Deep Creek, Va., and South Mills, N. C.,
alone is navigable.
             Data relative to the completed locks included in the project

                                  Dimensions          Depth on
                                                      miter sills
Miles                                                                                Year   Estimated
from                                                                Character of     opened or actual
Nor-        Location         Width Greatest                         foundation      togaion    cost of
                                                                                        navi- echloc
folk,                          of   length            Up- Low-
Va.                            of  available   Lift   Up-    Low-
                             cham-  for full          per     er
                               Der  width

                              Feet    Feet     Feet   Feet   Feet
10. 7   Dismal Swamp   Ca-      52      300      12     12     12   Natural earth    1940    $348, 878.83
         nal (Deep Creek,                                            with cut-off
         Va.).                                                        walls.
33. 1   Dismal Swamp Ca-         52      300     12     12     13    .. do-- _...    1941     372, 556. 40
         nal (South Mills,
         N. C.).


   The waterway is nontidal in Deep Creek, where the mean tidal
range under ordinary conditions is 3 feet and the extremes 2.3 and 3.2
feet. The extremes of irregular fluctuation in this stream, due to
combined effect of tides and wind, referred to mean low water, are
about -2 feet and + 9.62 feet. The remaining sections of the waterway
are nontidal and not subject to flood. There are at times, however,
variations of 1 to 2 feet in level, due to wind.
   The estimate of cost for new work, made in 1899, was $274,310,
exclusive of the purchase price of the Dismal Swamp Canal. The
latest (1928) approved estimate of cost for annual maintenance is
$50,000, including $45,000 for operation and care of the waterway.
450        REPORT OF CHIEF OF ENGINEERS,                          U. S. ARMY,          1942

  The existing project was authorized by the following river and
harbor acts:

    Acts                      Work authorized                                  Documents

Mar. 3,1899    Present project dimensions and original route___   H. Doc. No. 317, 54th Cong., 1st sess.,
                                                                    and Annual Report, 1896, p. 1086;
                                                                    H. Doc. No. 131, 55th Cong., 3d sess.,
                                                                    and Annual Report, 1899, p. 1485.
Mar. 3,1925    Purchase of the Lake Drummond Canal (Dismal        Rivers and Harbors Committee Doc.
                Swamp Canal).                                      No. 5, 67th Cong., 2d sess.
June 26, 1934 1 Operating and care of the works of improvement
                 provided for with funds from War Department
                 appropriations for rivers and harbors.

1 Permanent Appropriations Repeal Act.
Latest published map is found in H. Doc. No. 391, 62d Cong., 2d sess.

   Terminal facilities.-The northern end of this waterway is in Nor-
folk Harbor, Va., the terminal facilities of which are described under
this heading in the report on that improvement. There are three
small wharves on the Dismal Swamp Canal. There are three land-
ings along the Pasquotank River between the south end of the canal
and Elizabeth City. At Elizabeth City, N. C., there are 18 wharves.
Below Elizabeth City there are two wharves on the east bank of the
Pasquotank River. The facilities are considered adequate for exist-
ing commerce.
   Operations and results during fiscal year.-Maintenance work by
hired labor for grading and landscaping lock sites, removal of struc-
tural parts of old locks, construction of roadways, placing fence
around lock sites and construction of lock offices at the Deep Creek
and South Mills locks, in progress at the end of the fiscal year, was
completed during December 1941. The cost of the work was $8,967.36.
   Acquisition of a parcel of land by condemnation for the realign-
ment of the lock at Deep Creek, Va., was completed during the year.
The cost was $8,320.
   Maintenance snagging and bank trimming with U. S. derrick boat
Roanoke6 in the Dismal Swamp Canal, Deep Creek, and Turners Cut
was performed intermittently between April 1, 1942, and the end of
the fiscal year. The cost of the work was $5,047.08.
   Miscellaneous surveys and triangulation controls were made during
the year at a cost of $3,999.39.
   Due to insufficient depth of water for navigation, caused by drought.
conditions, the Dismal Swamp Canal was closed to navigation from
December 5, 1941, to April 15, 1942, and from May 1, 1942, until the
close of the fiscal year.
   Maintenance cost for work done in connection with the operation
and care of the Dismal Swamp Canal was as follows:
   Operation, $76,537.54; maintenance and repairs, $5,829.41; improve-
ment and reconstruction, $2,067.81.
   The total cost was $110,768.59, of which $26,333.83 was for main-
tenance and $84,434.76 was for operation and care of the Dismal
Swamp Canal. The total expenditure was $110,247.71.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1903. The Dismal Swamp Canal was acquired by the United
States March 30, 1929, from the Lake Drummond Canal & Water Co.
                 RIVERS       AND HARBORS-NORFOLKy                       VA., DISTRICT                            451

for $500,000. The controlling depth at the end of the fiscal year was
8 feet, this depth occurring in Turners Cut.
   The total cost has been $2,678,310.39 of which $751,196.46 (including
$500,000 for the purchase of the Dismal Swamp Canal) was for new
work; $384,559.91 for operating and care, and $1,542,554.02 was for
maintenance.
   The total expenditure was $2,675,127.26. In addition, the sum of
$338,837.89 was expended between March 30, 1929, and June 30, 1936,
on the operation and care of the works of improvement under the pro-
visions of the permanent indefinite appropriation for such purpose.
   Proposed operations.-The unexpended balance at, the end of the
fiscal year, $225,442.74, will be applied as follows:
Accounts payable, June 30, 1942                      ______------------------   ------                     $3,183. 13
Maintenance :
   Maintenance of the channels in Deep Creek, Dismal Swamp
      Canal, and Turners Cut, by contract, March to June 1943_ ___                                         70, 000. 00
   Dredging, snagging, and bank trimming in the Dismal Swamp
      Canal, Turners Cut, and Pasquotank River with United States
      derrick boat Roanoke, July to November 1942-----------------                                         16, 000. 00
   Miscellaneous surveys, triangulation control, and water-level in-
      vestigation, July 1942 to June 1943___--               -
                                                     _________- ----                                       15, 159. 61
   Operation of Dismal Swamp Canal:
        Operation of locks, dams, and other works_-----------___                                           85, 700. 00
        Maintenance and repairs__---------------------------                                               19, 400. 00
        Improvement and reconstruction_______________________                                              16, 000. 00

                 Total for all work ___          _________-----------------225, 442. 74
  The additional sum of $173,900 can be profitably expended during
the fiscal year 1944 as follows:
Maintenance:
    Maintenance of the channels in Deep Creek, Dismal Swamp Canal,
      and Turners Cut, by contract, May to June 1944 ___________-__                                          $20, 000
    Dredging, snagging, and bank trimming in Dismal Swamp Canal,
      Turners Cut, and Pasquotank River, with United States derrick
      boat, December 1943 to February 1944-------------------------                                            10, 000
    Miscellaneous surveys, triangulation control, and water-level in-
      vestigation, July 1943 to June 1944 _________________________                                            10, 000
    Operation of Dismal Swamp Canal:
        Operation of locks, dams, and other works------------------                                            98, 900
        Maintenance and repairs_____________________     _____-_25,                                                000
        Improvement and reconstruction---------------------------                                              10,000
                 Total for all work___________________------                                                  173, 900
                       Cost and financial summary
Cost of new work to June 30, 1942_         _______________                                           _   $751, 196. 46
Cost of maintenance to June 30, 1942 ___________________________ 2, 265, 951. 82
      Total cost of permanent work to June 30, 1942___________ 3, 017, 148. 28
Minus accounts payable June 30, 1942 -                              3, 183. 13
      Net total expenditures----     ________________          3, 013, 965.15
Unexpended balance June 30, 1942____________________________      225, 442. 74
      Total amount appropriated to June 30. 1942 __.________ 3, 239, 407. 89

   Fiscal year ending June 30           1938           1939             1940                 1941              1942

Cost of new work .-.---------------                                                      --------------
                                                                                    --------------
Cost of maintenance-............      $59, 337. 59   $87, 575. 79   $475, 026. 76      $390, 005. 13         $110,768.59
Total expended_-                       63, 160. 63    84, 268. 21    426, 278. 95        441, 477. 90         110, 247. 71
Allotted_    -                        125, 200. 00   863, 000. 00     68, 400. 00        101,000. 00          185, 600. 00
452         REPORT OF CHIEF ,OF ENGINEERS,                               U. S. ARMY,          1942

Balance unexpended July 1, 1941    __-------- --   -        -_______$150, 090. 45
Amount allotted from War Department Civil Appro-
  priation Act approved June 24, 1940-------------    $24, 900. 00
Amount allotted from War Department Civil Appropri-
  ation Act approved April 28, 1942_ 11-----       1_ 160, 700. 00
                                                                     185, 600. 00
      Amount to be accounted for_           ______-_ __                                       _   335, 690. 45
Gross amount expended_--__   ------------------------ __                                          110, 247.71
      Balance unexpended June 30, 1942_____________________                                   _   225, 442. 74
Outstanding liabilities June 30, 1942__-___---_---- __---                                           3, 322. 35
          Balance available June 30, 1942_____________________--                                  222, 120. 39
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance 1 __ - - - - - - - - - - - - - - - - - - - - - - - - - - - 173, 900. 00
   1 Exclusive of available funds.
18.      INLAND WATERWAY FROM NORFOLK, VA., TO BEAUFORT INLET,
                              N. C.
   Location.-The improvement described consists of a sea-level in-
land water route ,approximately paralleling the Atlantic coast be-
tween Norfolk, Va., and Beaufort Inlet, N. C., a distance of 197.91
statute miles. For description of the waterway see pages 495-497,
Annual Report for 1932. (See U. S. Coast and Geodetic Survey
Charts Nos. 1227, 1228, 1231, and 1233.)
   Previous projects.-Partialprojects were adopted by River and
Harbor Acts of March 3, 1873, June 18, 1878, March 3, 1879, June 14,
1880, March 3, 1881, and September 19, 1890. For further details see
page 497, Annual Report for 1932, and page 476, Annual Report for
1938.
   Existing project.-This provides for an inland waterway with a
depth of 12 feet at mean low water between Norfolk, Va., and Beau-
fort Inlet, N. C., a distance of 197.91 miles, with bottom widths vary-
ing from 90 feet in land cuts to 300 feet in open waters, for the
construction of a tidal guard lock in the Albemarle and Chesapeake
Canal at or near Great Bridge, Va., and for the construction, opera-
tion, and maintenance of a suitable bridge across the waterway near
Fairfield, N. C.
   Data relative to the completed lock included in the project is as
follows:

                                         Dimensions            Depth on
                                                               miter sills
Miles                                                                                        Year     Estimated
from                                        Great-                            Character of opened     or actual
fol-           Location           Widthlegth                                  foundation   to navi-    cost of
folk
Va.                               of
                                   of-  avail-
                                        avail-         Lift
                                                       Lift    Up-    Low-                  gation    each lock
                                  chamin-    able              per     er
                                   ber      for full
                                            width


                                   Feet      Feet      Feet    Feet   Feet
12. 04   Albemarle and Ches-          75       600      2. 7    (1)     (1)   Piles in sand   1932    $499, 913. 09
          apeake Canal                                                         and shells.
           (Great Bridge, Va.).

  1 16 feet at mean low water.
                  RIVER'S AND         IHARBORS-NORFOLK,                 VA.,    DITRICTr                453
  The waterway is nontidal except in the Southern Branch of Eliza-
beth River and in Beaufort Inlet, N. C. In the Southern Branch the
mean tidal range under ordinary conditions is 2.7 feet, and the ex-
tremes are 2.3 and 3.2 feet. The extremes of irregular fluctuation,
due to the combined effect of the tide and wind, referred to mean
low water are -2 and + 9.62 feet. In Beaufort Inlet, N. C., under
ordinary conditions, the mean tidal range is 2.6 feet and the extremes
are 2.3 and 3.2 feet.
   The estimate of cost for new work, revised in 1933, was $7,870,600,
exclusive of amounts expended on previous projects, but including
the purchase price of the canal. The latest (1933) approved estimate
for annual cost of maintenance is $196,600, including $106,000 for
operation and care of the waterway.
  The existing project was authorized by the following river and
harbor acts:

       Acts                       Work authorized                                  Documents


July 25,1912      Original route of the Norfolk-Beaufort Inlet sec-   H. Doc. No. 391, 62d Cong., 2d sess.
                   tion.
Aug.     8,1917   Change in route; following changes approved by      H. Docs. Nos. 1478, 63d Cong., 3d sess.,
                   Secretary of War Apr. 14, 1919:                      and 1136, 64th Cong., 1st sess.1
                     Albemarle Sound-Pamlico Sound section:
                       Changed from "Alligator River-Rose Bay
                      route" to "Alligator River-Pungo River
                      route."
                     Pamlico   Sound-Neuse      River section:
                        Changed    from "Pamlico     Sound-Brant
                        Shoal-Neuse River route" to "Goose
                        Creek-Bay River route."
July 18,1918      Alligator River-Pungo River route (proposed         Approved by Secretary of War May 15,
                   land cut connecting the rivers): Changed from a      1919.
               straight line to a bent line approaching nearer
               the town of Fairfield, N. C.
Mar. 4, 19332 Construction of a suitable bridge near Fairfield,       Rivers and Harbors Committee Doc.
                   N. C.                                                No. 5, 72d Cong., 1st sess.
                                                                                                              1
July     3,1930Construction of a tidal lock at Great Bridge at a      S. Doc. No. 23, 71st Cong., 1st sess.
                limit of cost of not to exceed $500,000.
June 26, 19343 Operating and care of the works of improvement
                provided for with funds from War Department
                appropriations for rivers and harbors.


  1 Contain latest published maps.
  2 Public, No. 433, 72d Cong.
  8 Permanent Appropriations Repeal Act.


  Recomm ended modifications of project.-Under date of December 28,
1938, the Chief of Engineers recommended modification of the exist-
ing project so as to provide protection to the canal property in the
vicinity of the lock at Great Bridge against flooding by storm tides,
through construction of necessary dikes and appurtenant works, at an
estimated cost of $39,000, and an annual maintenance of $1,000, in ad-
dition to that now required. (H. Doc. No. 117, 76th Cong., 1st sess.)
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-The north end of this waterway is in Norfolk
Harbor, the terminal facilities of which are described in the report on
that improvement. Between Norfolk and Albemarle Sound there are
13 wharves or landings. Along the route between Albemarle Sound
454    REPORT OF CHIEF OF ENGINEERS,         U. S. ARMY,   1942

and Pamlico River are 10 wharves. Located upon waters tributary to
the Pamlico River-Neuse River section are 15 wharves, aggregating a
frontage of about 600 feet. There are 8 wharves on the section of the
waterway from Neuse River to Beaufort Inlet, with a combined front-
age of about 400 feet. At Morehead City, N. C., there are 27 wharves,
their total frontage being about 500 feet. Contiguous to the harbor
at Beaufort, N. C., the southern terminus of the waterway, there are
46 wharves, their total frontage being about 1,200 feet. The facilities
are considered adequate for existing commerce.
    Operationsand results during fiscal year.-Maintenancework, under
contract, for the construction of a highway bridge at Great Bridge,
Va., was commenced on August 22, 1941, and continued to June 5, 1942,
when the work was suspended. The cost of the work was $95,279.17.
   Maintenance snagging with U. S. derrick boat Roanoke in Virginia
land cut and North Landing River, in progress at the close of the
last fiscal year, was continued to September 4, 1941, when the work
was completed. The cost of the work was $5,747.73.
    Maintenance dredging under contract in North Landing River was
commenced on December 3, 1941, and continued to January 15, 1942,
when the work was completed. There were removed 172,823 cubic
yards of material. The cost of the work was $43,953.64.
    Maintenance snagging with U. S. derrick boat Northeast in the
Alligator River-Pungo River, and the Adams Creek-Core Creek land
cuts, was performed between January 9 and February 22, 1942. The
cost of the work was $2,686.
    Maintenance dredging under contract for the removal of 28 shoals
between Morehead City and Coinjock Bay, was commenced on Janu-
ary 16, and continued to the end of the fiscal year. There were
removed 763,559 cubic yards of material. The cost of the work was
 $89,348.15.
    Maintenance dredging with U. S. pipe-line dredge Talcott in the
Newport River section, was commenced on June 3, 1942, and continued
to the end of the fiscal year. There were removed 220,150 cubic yards
of material. The cost of the work was $26,245.23.
    Miscellaneous surveys, plans and specifications, water-level studies,
and tide gagings were made during the year it a cost of $19,781.64.
    Maintenance costs for work done in connection with the operation
and care of the waterway were as follows: Operations, $103,008.17;
maintenance and repairs, $28,623; improvement and reconstruction,
 $4,989.33; and emergency removal of obstructions in the channel,
 $63.86.
    The total cost of the work was $419,725.92, of which $283,041.56 was
for maintenance, and $136,684.36 for operation and care. All work
was for maintenance, of which $253,602.12 'pertains to the Norfolk
district, and $166,123.80 to the Wilmington, N. C., district.
    The total expenditure was $382,963.24, of which $240,955.29 was
disbursed by the Norfolk district and $142,007.95 was disbursed by the
Wilmington district.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1935. The controlling depth at the end of the fiscal year
  was 12 feet except in the Virginia Cut section, where the depth is 11.0
  feet and in Lower North Landing River where the depth is 11.6 feet.
    The Albemarle and Chesapeake Canal was acquired by the United
                 RIVERS AND HARBORS--NORFOLK,                                            VA.,    DISTRICT                 455
States from the Chesapeake & Albemarle Canal Co. on April 30,
1913, for $500,000.
  The total costs and expenditures on the existing project to June
30, 1942, were as follows:

                                                    New work            Maintenance             Operating            Total


Norfolk district:
    Regular funds--------__-_------         _      $8, 123, 213.36     1 $1, 651, 949. 80        $655, 563. 57   $10, 430, 726. 73
    Public Works funds.---_---__                         80, 282. 36   __                                              80, 282. 36
Wilmington district____________________             ___________               467, 754. 28        175, 644. 23       643, 398. 51

      Total__         _------------------------      8, 203, 495. 72        2, 119, 704. 08       831, 207. 80    11, 154, 407. 60


  1 Includes $904.95 for Bennetts Creek, N. C.


   The expenditures were $11,036,082.17 from regular funds and $80,-
282.36 from Public Works funds, a total of $11,116,364.53 of which
$10,497,206.98 was disbursed by the Norfolk district, and $619,157.55
was disbursed by the Wilmington district.
   In addition, the sum of $975,744.25 was expended between May 1,
1913, and June 30, 1936, on the operation and care of the works of im-
provement under the provision of the permanent indefinite appropri-
ation for such purposes.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $798,192.66, will be applied as follows:
Accounts payable, June 30, 1942_           _____                       $38, 043. 07
Maintenance:
    Completion, under an existing contract, construction of the bridge
      at Great Bridge, Va., July to November 1942----------------171, 000. 00
    Dredging north of the Virginia-North Carolina State line by
      privately owned rented dredge, July to October 1942----------_ 189, 000. 00
    Snagging and bank trimming in Virginia land cut and North
      Landing River, with United States derrick boat, March to
      June 1943------------------------------------------                12, 000. 00
    Construction of 1,500 linear feet of timber bulkhead on south
      side of Virginia land cut, east of Great Bridge, to prevent bank
      erosion beyond right-of-way by contract, September to Novem-
      ber 1942--------------------------_   -----                        40, 000. 00
    Completion of dredging and construction of dikes and necessary
      spillways between Virginia-North Carolina State Line and
      Beaufort Inlet, N. C., with United States pipe-line dredge and
      by contract, July 1942 to June 1943--------------------__         122,737. 43
    Miscellaneous surveys and water level investigations, July 1942
      to June 1943---------------------------------------------         27, 427. 16
    Operation of the waterway:
        Operation of locks, dams, and other works                      1--------------10,
                                                                             900. 00
        Ordinary maintenance and repairs---------------------57, 835.00
        Improvement and reconstruction----------------------- 29, 250. 00

                Total for all work                --------------------------------                               798, 192. 66
  The additional sum of $332,500 can be profitably expended during
the fiscal year 1944 as follows:
Maintenance:
   Dredging north of the Virginia-North Carolina State line, by contract,
     May-June 1944-------            -----------------------------        $40, 000
    Snagging and bank trimming in Virginia land cut and North Landing
      River with United States derrick boat, March-June 1944--------- 12, 000
   Dredging between the Virginia-North Carolina State line and Beau-
      fort Inlet, N. C., with Government plant and hired labor, as needed
       July 1943-June 1944--                        -----                _-_           __-___________ _67, 500
456             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                    1942

Maintenance-Continued.
   Snagging and bank trimming in land cuts with United States derrick
     boat, as needed, September 1943-June 1944______-----------           $10, 000
   Miscellaneous surveys and water-level investigation, July 1943-
     June 1944                  -------------------                        15,-----------
                                                                   ------ 15,   000
   Operation of the waterway:
       Operation of locks, dams, and other work ------------------        108, 900
       Ordinary maintenance and repairs .-.       __--------------         74, 100
   Improvement and reconstruction__ --------------------                     5, 000
            Total for all work------------------------------------                                                     332, 500

                                                   Cost and financial summary
Cost of new work to June 30, 1942------------------------                                                    $8, 495, 591. 37
Cost of maintenance to June 30, 1942_  -------      -----                                                     3, 979, 460. 48
      Total cost of permanent work to June 30, 1942 ----------                                               12, 475, 051. 85
Minus accounts payable June 30, 1942 _______--------- -------                                                     38, 043. 07

     Net total expenditures--------------------------------                                                  12, 437, 008. 78
Unexpended balance June 30, 1942_-----------                                                                     798,192. 66
            Total amount appropriated to June 30, 1942 __-------                                      -      13, 235, 201.44

     Fiscal year ending June 30                       1938            1939            1940            1941              1942

Cost of new work- .......
Cost of maintenance-----------                     $333, 044. 77   $136, 779. 24   $307, 954. 94   $191,908. 37       $419, 725. 92
Total expended----------------..................    390, 839. 17    140, 444. 80    299, 642. 25    206, 515. 17       382, 963. 24
Allotted_                                       329, 630. 42
                                      .--------------------- 327, 300.00            269, 400. 00    479, 700. 00       623, 625. 00



Balance unexpended July 1, 1941__-                                                                                 $557, 530. 90
Amount allotted from War Department Civil Appro-
  priation Act approved June 24, 1940________-- __$82, 100.00
Amount allotted from War Department Civil Appro-
  priation Act approved May 23, 1941______________ 263,000. 00
Amount allotted from War Department Civil Appro-
priation Act approved April 28, 1942_____________ 278, 525. 00
                                                                                                                    623, 625. 00

      Amount to be accounted for-------------------------               1, 181, 155. 90
Gross amount expended__-----------------------            $383, 016. 51
Less reimbursements collected ------- __----------               53. 27
                                                                           382, 963. 24

      Balance unexpended June 30, 1942__                                                                            798, 192. 66
Outstanding liabilities June 30, 1942 ---- _____-$29, 221. 77
Amount covered by uncompleted contracts -----     289, 969. 46
                                                                                                                    319. 191. 23

             Balance available June 30, 1942____________----- ---------                                             479, 001.43

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1--------     -------------------                                                        332, 500. 00
    1 Exclusive         of available funds.

                                               19. BLACKWATER RIVER, VA.

  Location.-This river rises in Prince George County, near Peters-
burg, Va., and flows in a general southeasterly direction for 80 miles,
where it unites with the Nottoway River to form the Chowan River,
which empties into Albemarle Sound. The portion under improve-
          RIVERS AND   HARBORS-NORFOLK,      VA.,   DISTRICT     457
ment extends from its mouth to Franklin, Va., a distance of 13 miles.
 (See U. S. Geological Survey, Holland quadrangle, Virginia.)
   Previos project.-The original project was adopted by the River
and Harbor Act of June 18, 1878. For further details see page 1802
of Annual Report for 1915 and page 480 of Annual Report for 1938.
   Existing project.-This provides for clearing the 13 miles of river
below Franklin, Va., of obstructions, so as to afford a condition of
easy navigation for boats of 7-foot draft. The stream is nontidal.
The portion of the river under improvement is subject to freshets
of short duration, causing rises of 3 to 4 feet, but the general stage
of the river remains for the greater part of the time at the elevation
of Albemarle Sound, with which it connects.
   The estimate of cost for new work made in 1907, exclusive of
amount expended on previous projects, was $8,000. The latest (1928)
approved estimate of cost for annual maintenance is $2,000.
   The existing project was authorized by the River and Harbor Act
of March 2, 1907 (H. Doc. No. 177, 59th Cong., 1st sess.).
   Recommended modifications of project.-Under date of October 19,
1938, the Chief of Engineers recommended modification of the exist-
ing project, so as to provide for a channel 12 feet deep and generally
80 feet wide from the mouth to a point just downstream from the
Seaboard Air Line Railway bridge at Franklin, Va., a distance of
14.5 miles, including cut-off channels of like dimensions through two
bends at Cherry Grove and Georges Bend, and a turning basin of 3.2
acres at Franklin, Va., at an estimated first cost of $120,000, with
annual maintenance of $3,500; subject to certain conditions of local
cooperation (H. Doc. No. 101, 76th Cong., 1st sess.).
   Terminal facilties.-There is a wharf at Franklin, Va., and three
small wharves and a warehouse between this point and the mouth of
the river. All of these are privately owned but are open to the gen-
eral public on equal terms. The facilities are considered adequate
for existing commerce.
   Operations and results during fiscal year.-Maintenance dredging,
snagging, and bank trimming with U. S. derrick boat Roanoke was
performed between September 23, 1941, and February 27, 1942. There
were removed 32,083 cubic yards of material. The total cost and-
expenditures were $16,000, all for maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1908. The controlling depth at the end of the fiscal year
was about 7 feet. The head of navigation is at Burdette, Va., 25
miles above the mouth. Navigation is practicable throughout the
year.
   The total cost and expenditures under the existing project were
$58,200 of which $2,144.33 was for new work and $56,055.67 for
maintenance.
   Proposed operations.-No funds are available and no operations are
proposed during the fiscal year 1943.
   The sum of $10,000 can be profitably expended during fiscal year
1944 and will be applied to maintenance dredging, snagging, and bank
trimming between the mouth and Franklin with United States derrick
boat, September-November 1943.
458          REPORT OF CHIEF OF ENGINEERS,                                                 U. S. ARMY,                           1942

                                               Cost and financial summary
Cost of new work to June 30, 1942_--_ --- ---------------------- $16, 144. 33
Cost of maintenance to June 30, 1942_______________ ______---56, 055. 67

      Total cost of permanent work to June 30, 1942                                                                                          2, 200. 00
                                                                                                                                            7______________
Net total expenditures--_______------------        _                                                                                        72, 200. 00
Total amount appropriated to June 30, 1942______-_                                                               __        ___              7__-200. 00
                                                                                                                                           72,

    Fiscal year ending June 30                       1938             1939                    1940                        1941                 1942


Cost of new work                                  -----                      .............................
                                                                                     -.................................
Cost of maintenance__ ._                 ..----------------.. ...   $12, 336. 91            $3, 663.09         -----------            __      $16, 000. 00
Total expended     -..................             ___- _       _     9, 909.89               6, 090. 11              -          --            16, 000. 00
Allotted -   .            .------------------$10, 000                12,000.00                    500.00                   $3, 500              6, 000. 00



Balance unexpended July 1, 1941---------------------------     $10,000. 00
Amount allotted from War Department Civil Appropriation Act
  approved May 23, 1941____-   _______--__          -      -__   6, 000. 00

      Amount to be accounted for _--------------------------                                                                               16, 000. 00
Gross amount expended-------------------------------------                                                                                 16, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance       ______________                                                                                            10, 000. 00

                                             20. KNOBBS CREEK, N. C.

   Location.-This creek is a nontidal fresh-water stream emptying
into Pasquotank River from the west, about 18 miles above its mouth
in Albemarle Sound. (See U. S. Coast and Geodetic Survey Chart
No. 1228.)
   Existing project.-This provides for a channel 10 feet deep at mean
low water, from that depth in Pasquotank River to the Norfolk-
Southern Railroad bridge, 100 feet wide in Pasquotank River and
generally 60 feet wide in the creek, with a turning basin in the sharp
bend opposite the plant of the Chesson Manufacturing Co. Being
a branch of Pasquotank River, Knobbs Creek is affected by the wind
tides which influence that stream and Albemarle Sound. In extreme
cases the water rises 4 to 5 feet above mean low water, but the average
fluctuation of the water surface is about 1 foot.
   The estimate of cost for new work, made in 1927, was $79,000. The
latest (1927) approved estimate for annual cost of maintenance is
$500.
   The existing project was adopted by the River and Harbor Act
of July 3, 1930 (H. Doc. No. 102, 70th Cong., 1st sess.). The latest
published map is in the project document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are eight wharves with an aggregate
available frontage of 1,200 or 1,400 linear feet located on Knobbs
Creek. The existing wharves are considered adequate for present
commerce.
   Operations and results during fiscal year.-Maintenance snagging
and bank trimming with United States derrick boat Roanoke was
performed between April 21 and May 28, 1942. The total cost and
expenditures were $4,000, all for maintenance.
                RIVERS AND HARBORS-NORFOLK,                           VA.,       DISTRICT                  459
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The controlling depth in February 1933 was 10 feet.
The head of navigation is the upper Norfolk-Southern Railway
bridge, about 1.4 miles above the mouth. Navigation is practicable
throughout the year.
  The total cost and expenditures were $90,500 of which $80,500 was
for new work and $10,000 was for maintenance.
  Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1943.
   No funds can be profitably expended during the fiscal year 1944
as the present condition of the project will provide for the needs of
navigation until a later date.
                                    Cost and financial summary

Cost of new work to June 30, 1942 ------------------------------ $80, 500
Cost of maintenance to June 30, 1942_______________ ______________ 10, 000
      Total cost of permanent work to June 30, 1942________                                     -_       90, 500
Net total expenditures__-------------------__,                                                           90, 500
Total amount appropriated to June 30, 1942__                  -_ -                -----                  90, 500


   Fiscal year ending June 30           1938         1939            1940            1941                1942

Cost of new work .
Cost of maintenance----------....   ----------------------------       $6, 000                              $4,000
Total expended...-------------        -------------------               6,000             -                     4,000
Allotted---------------------- --------------          $6, 000 --------------         $10, 000             - 6, 000



Balance unexpended July 1, 1941_______________---------                               -                  $10, 000
Deductions on account of revocation of allotment__-                               ------                     , 000
                                                                                                           6_____--

      Net amount to be accounted for _____  __ -     -                                        -___ __-     4, 000
Gross amount expended___-_____--      _________-__-___                                                     4, 000

    21. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

   The cost of the work during the fiscal year was $76,493.66 and the
expenditure was $84,963.95. The unexpended balance and accounts re-
ceivable June 30, 1942, $18,648.69, will be applied as needed during the
fiscal year 1943 to payment of expenses to be incurred under this head-
ing. The additional sum of $90,000 can be profitably expended during
the fiscal year 1944.
                                    Cost and financial summary


-Cost
Cost of new work to June 30, 1942        ________
     of maintenance to June 30, 1942----_______________________                                  $666, 219. 67
      Total cost of permanent work to June 30, 1942.          ___---666, 219. 67
Plus accounts receivable June 30, 1942_-_________--__-                 2, 035. 44
      Gross total costs to June 30, 1942___ ______-----------        668, 255. 11

Net total expenditures ----------------------                                                    1668, 255. 11
Unexpended balance June 30, 1942_____-_____-                         __--.       ________          18, 648. 69

           Total amount appropriated to June 30, 1942                              686, 903. 80
                                                                           - - .-----
   1 In   addition, $912.50 contributed funds expended on beach erosion study.
460             REPORT OF CHIEF OF ENGINEERS,                                      U. S. ARMY,                        1942


       Fiscal year ending June 30                 1938            1939                1940                    1941                1942


Cost of new work------------                         --------------            --------       ----------------------------
                   .....---
Cost of maintenance__       _-'"$55,                 115.99     $45, 119. 68       $52, 429.97            $68, 216.57            $76, 493.66
Total expended--...........-------------.....    53, 759. 01     43, 296. 33        57, 851. 11              59, 681.81           84, 963.95
Allotted.----------------------                  95, 000.00      72, 500. 00        45,000. 00             104, 700. 00-


Balance unexpended July 1, 1941--       -----------------                                                                    $103, 612. 64
Gross amount expended    -------------------------------------                                                                 84, 963. 95

      Balance unexpended June 30, 1942----------------------_                                                                  18, 648. 69
Outstanding liabilities June 30, 1942________________ ______                                                                    1, 815. 00

            Balance available June 30, 1942_ _______________________                                                         316, 833. 69

Amount that can be profitably expended in fiscal                    year ending June
                               - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
30, 1944, for maintenance 2                                                                                                   90, 000. 00
2Exclusive of available funds.
SExclusive of $2,035.44, accounts receivable June 30, 1942.

22. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED

                                                                  For last         Cost and expenditures    Estimated
                        Name of project                          full report          to June 30, 1942       amount
                                                                see annual -                -          --- required to
                                                                report for-       New work Maintenance complete

1. Channel from Phoebus, Va., to deep water in                      1941           $11, 500. 00 .......--           ....           (2)
        Hampton Roads.'
2. Lafayette River, Va.___-___-
3. Deep Creek, Va.
                                  ______        -_ 1940
                         ----------------------- 1941
                                                                                     12,048.19
                                                                                     25, 637. 45
                                                                                                     -.-... 3   $282. 66
                                                                                                                                   (2)
                                                                                                                                     $5, 600
4. York River, Va. -----------------------                          1941           180, 904. 20         4173, 354. 65                128, 000
5. Channel connecting York River, Va., with                         1938            14,854.71       --------------                 (2)
        Back Creek to Slaight's Wharf.'
6. Horn Harbor, Va.' ----------------------                         1937             11, 486.79 -------------                      (2)
7. Nandua Creek, Va.'--------------------                           1932              6, 987.81-----------                         (2)
8. Little Machipongo River, Va..--.-.-...-.-...                     1931             15, 000.00                                    (2)


   1 Channels adequate for commerce.
   2 Completed.
   a Expended for miscellaneous surveys during fiscal year, $282.66.
   4 Expended for miscellaneous surveys during fiscal year, $405.56.

                      23. PLANT ALLOTMENT, NORFOLK, VA., DISTRICT

                                                Cost and financial summary

Undistributed costs June 30, 1942                               --------------------------                                  $157, 982. 30

Net total cost to June 30, 1942-------------------------------157, 982. 30
Plus accounts receivable June 30, 1942------------------------ 420, 865. 17

      Gross total costs to June 30, 1942-----------------------578, 847. 47
Minus accounts payable June 30, 1942-------------------------100, 593. 95
     Net total expenditures-   -- ---------------------------                                                                 478, 253. 52
Unexpended balance June 30, 1942   ---------------------------                                                                493, 450. 21
             Total amount appropriated to June 30, 1942---------------                                                        971, 703. 73

       Fiscal year ending June 30                  1938            1939               1940                      1941               1942

Total expended--...........                     $61,133. 79    $443, 172. 40     -$11,089. 42            $144, 924. 75        -$338, 407. 18
Allotted._,_-. ------------------ --             75, 262. 05    469, 514. 56        45, 944. 27           150, 000. 00            38, 070. 53
              RIVERS      AND HARBORS--NORFOLK,                         VA.,        DISTRICT                         461
Balance unexpended July 1, 1941___------ ---------------------- $116, 972. 50
Amount allotted from War Department Civil Appro-
  priation Act approved June 28, 1939-----------               -$66, 858. 01
Amount allotted from War Department Civil Appro-
  priation Act approved June 24, 1940 ----------                  106, 200. 00
Amount allotted from War Department Civil Appro-
  priation Act approved June 23, 1941__ __--------                 25, 000. 00
Amount allotted from Treasury Settlement--------                 -26,271. 46
                                                                                   38, 070. 53
       Amount to be accounted for__------------------------___                    155, 043. 03
Gross amount expended____________------------$2, 399, 721. 87
Less :
    Reimbursements collected -----       $2,704,982. 72
    Receipts from sales____- __       _       33, 146. 33
                                                               2, 738, 129. 05
                                                                                -338, 407. 18
       Balance unexpended June 30, 1942___              ___________-_____         493, 450.21
Outstanding liabilities June 30, 1942_____________               $240, 136. 69
Amount covered by uncompleted contracts--------                    17, 787. 91
                                                                                  257, 924. 60
       Balance available June 30, 1942 __---- -              -      ___      __- 235, 525. 61
Accounts receivable June 30, 1942___________________________                      420, 865. 17
    Unobligated balance available June 30, 1942 ------------------                 58, 390. 78

Status of all investigations for navigation, called for by river and harbor acts
                           and committee resolutions

                                                     Date trans-
          Locality             Authorization act      mitted to           Document No.                      Recommen-
                                                      Congress
                           I                  -                     i



Appomattox River at and in Rivers and Harbors June 15,1942                                                  Unfavorable.
  the vicinity of Petersburg,     Committee resolu-
  Va.                             tion, Dec. 16, 1940.
Bennetts Creek, Va ________Rivers and Harbors
                                  Committee resolu-
                                  tion, Mar. 24, 1942.
Cape Charles City Harbor,       Rivers   and Harbors July 23,1942        (Confidential) _--__ Favorable.
  Va.                             Committee resolu-
                                  tion, Aug. 1, 1941.
Deep Creek, Va___________ Rivers and Harbors ---- - - - - -
                                  Committee resolu-
                                  tion, Mar. 26, 1940.
James River, Va., improve-      Rivers   and Harbors May 22,1942         House, 738, 77th                      Do.
  ment of Richmond Har-           Committee resolu-                       Cong., 2d sess.
  bor.                            tion, Jan. 24, 1939.
James River, Va. (supple- Sec. 6, Rivers and Har-
  mental 308).                    bors Act, Aug. 30,
                                  1935.
Lafayette River, Va_ _....      Rivers and Harbors
                                  Committee resolu-
                                  tion, Mar. 2, 1939.                          ..    ._   _ _ _ _ _ __ _,



Mattaponi River, Va., im- Rivers and Harbors
  provement at West Point,        Committee resolu-
  Va.                             tion, July 18, 1941.
Meherrin River, N. C. and Rivers and Harbors Apr. 22,1942                                                   Unfavorable.
  Va., navigation and flood       Committee resolu-
  control.                        tion, Feb. 15, 1939.
Newport News Creek, Va_.        Rivers and Harbors -- - --. - - -
                                  Committee resolu-
                                  tion, Aug. 13, 1942.
Occohannock Creek, Va...__ Rivers and Harbors - - - - - - - - -
                                  Committee resolu-
                                  tion, Jan. 21, 1942.
Pamunkey River (York Sec. 6, Rivers and Har- - .. .--- - - - -
  River system, Virginia)         bors Act, Aug. 30,
  (supplemental 308).             1935.
Pasquotank River, N. C., Rivers and Harbors
  waterway from Norfolk,          Committee resolu-
  Va., to the Sounds of           lution, Jan. 27, 1937.
  North Carolina.
                   2
               492-4     -- t I1 o         -3            I--
        493202-48-pt. 1, vol. 1-30
462              REPORT OF CHIEF OF ENGINEERS,                                  U. S. ARMY,                  1942

24. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL

   The cost of the work during the fiscal year was $193,405.94, and
the expenditures were $193,428.94. The unexpended balance and ac-
counts receivable, June 30, 1942, $54,142.03, and the sum of $40,000
allotted in August 1942 will be applied to payment of expenses in-
curred under this heading. The additional sum of $36,000 can be
profitably expended during the fiscal year 1944.
                                      Cost and financial summary
Cost of new work to June 30, 1942______ __ -       -__________-----------
Cost of maintenance to June 30, 1942_________________________ $701, 009. 60

      Total cost of permanent work to June 30, 1942_________                                                        701, 009. 60
Undistributed costs June 30, 1942__________________________                                                              -- 2. 27

      Net total cost to June 30, 1942------------_________ -                                                        701, 007. 33
Plus accounts receivable June 30, 1942_.... ____-___-----_____-                                                       -    2. 27

      Gross total costs to June 30, 1942________________                                                            701, 009. 60
Minus accounts payable June 30, 1942                                                                                  2, 599. 36
                                                                                                                     1--------------------------

     Net total expenditures______-________---____                                                                   688, 410. 24
Unexpended balance June 30, 1942-----------------------------                                                        54, 139. 76
               Total amount appropriated to June 30, 1942_______________                                            742, 550. 00

    Fiscal year ending June 30              1938           1939                 1940                  1941               1942


Cost of new work ...........            ..........-
C ost of m aintenance--............ $26,683.03
                                                             .----
                                                        $95, 496. 99
                                                                          - -    -
                                                                          $154, 220. 02
                                                                                       --    ---         -   ----
                                                                                                   $231, 203. 62
                                                                                                                         ----
                                                                                                                       $193, 405. 94
Total expended           ..               24, 843. 05
                              ..----------------         92, 850. 61        146, 177. 55            231, 110. 09        193, 428. 94
A ll ot te d     .- --
                    •                    175, 000. 00   1 18 , 60 0. 00     2 16 , 500. 00          232, 450 .00


Balance unexpended July 1, 1941-_----_------_                                                                       $247, 568. 70
Gross amount expended         --     -----------     $193, 457. 50
Less reimbursements collected-------------------------      28. 56
                                                                                                                    193, 428. 94

      Balance unexpended June 30, 1942_____----                                 __-----------                _        54, 139. 76
Outstanding liabilities June 30, 1942                                                                                  3, 834. 83
                                                                                                                      1___________________

      Balance available June 30, 1942 _____---______----___--                                                        40, 304. 93
Accounts receivable June 30, 1942___ _..__        ...                                                                      2. 27

     Unobligated balance available June 30, 1942----------------                                                     40, 307. 20
Amount allotted in August 1942____ ____------  ----------------                                                      40, 000. 00

               Amount available during the fiscal year 1943_---------                                                80, 307. 20

Amount that can be profitably expended   in fiscal year ending June
                               - ---- --           ---- ---  -
30, 1944, for maintenance 1______________ _                                                                         36, 000. 00
   1 Exclusive of available funds.
           RIVERS AND HARBORS---WILMINGTON,                              N. C., DISTRICT                463
Status of all investigations for flood control, called for by fllood-control acts and
                               committee resolutions

                                                         Date trans-                            Recommenda-
          Locality               Authorization act        mitted to       Document No.              tion
                                                          Congress

Buggs Island Reservoir, Va.,   Flood Control Com-
  interim report on the Roa-    mittee    resolution,
  noke River, Va. and N. C.      Aug. 28, 1940.
James River, Va _----------    Flood Control      Act,
                                 June 22, 1936.
James River, Va. (supple-      Sec. 6, River and Har-
  mental 308).                   bor Act, Aug. 30,
                                 1935.
Meherrin River, N. C. and      Rivers and Harbors        Apr. 22,1942       _                   Unfavorable.
  Va. (navigation and flood      Committee resolu-
  control).                      tion, Feb. 15, 1939.
Pamunkey River (York           Sec. 6, Rivers and
  River System) (supple-         Harbors Act, Aug.
  mental 308).                   30, 1935.
Roapoke River Reservoir,       Sec. 7 of Flood Control
  N. C. (supplemental 308).      Act, June 22, 1936.
Roanoke River, Va. and         Flood Control Com-                       -------------------

  N. C.                          mittee resolution,
                                 Aug. 28, 1940.
    Do_------------------      Rivers and Harbors
                                Committee resolu-
                                 tion, Jan. 26, 1942.                    -- ------------   --



Smith River and tributaries,   Flood Control Act,
Virginia and North Caro-        June 28, 1938.
lina.


   IMPROVEMENT OF RIVERS AND HARBORS IN THE
           WILMINGTON, N. C., DISTRICT
  This district comprises central and eastern North Carolina em-
braced in the drainage basins tributary to the Atlantic Ocean from
the southern boundary of Virginia to Shallotte River, inclusive, with
the exception of the Roanoke River Basin above Weldon, N. C.; the
Meherrin River Basin above Murfreesboro, N. C.; and the Chowan
River Basin above the confluence of the Nottaway and Blackwater
Rivers. It includes the portions of the Intracoastal Waterway from
the northern boundary of North Carolina to Little River, S. C., and
the portion of the waterway from Norfolk, Va., to the sounds of
North Carolina, south of the north shore of Albemarle Sound.
  District engineer: Col. Earl I. Brown, Corps of Engineers, to
February 28, 1942; Lt. Col. R. A. Sharrer, Corps of Engineers, to
May 8, 1942; Lt. Col. W. S. Moore, Corps of Engineers, since that
date.
  Division engineer: Col. J. S. Bragdon, Corps of Engineers.
464      REPORT OF CHIEF OF ENGINEERS,                    U. S. ARMY,     1942

                                        IMPROVEMENTS

               Navigation                Page           Navigation-Continued         Page

1. Inland waterway from Nor-                   19. Intracoastal Waterway, Cape
       folk, Va., to Beaufort In-                      Fear River, N. C., to Win-
       let, N. C____-____-_               452          yah Bay, S. C_____            492
2. Meherrin River, N. C .__              464   20. Morehead City Harbor, N. C_      495
3. Cashie River, N. C        __          466
4. Roanoke River, N. C
5. Manteo (Shallowbag) Bay,
                               -.....     467   21. Cape Fear River, N. C., at
                                                       and below Wilmington ...      498
        N. C.------      --------         469   22. Cape Fear River, N. C.,
6. Belhaven Harbor, N. C____             470          above Wilmington ....         501
7. Far Creek, N. C_                      472   23. Lockwoods      Folly    River,
8. Pamlico and Tar Rivers,                            N. C_                         504
       N. C-------------------
9. Rollinson Channel, N. C
10. Silver Lake Harbor, N. C __
                                 ---      473
                                          476
                                          477
                                                24. Examinations, surveys, and
                                                       contingencies (general)_ -    505
11. Neuse River, N. C___
12. Trent River, N. C-
                        ----       -      478
                                          480
                                                25. Other projects for which no
                                                       estimates are submitted _     506
13. Channel connecting Thor-                    26. Plant allotment_                 506
      oughfare Bay with Cedar
        Bay, N. C.-----------             482               Flood control
14. Drum Inlet, N. C._.......             483
15. Beaufort Harbor, N. C....             484 27. Snagging  and clearing under
                                                    authority of sec. 2 of the
16. Waterway connecting Pam-                        Flood Control Act approv-
      lico Sound and Beaufort
       Harbor, N. C                       486       ed Aug. 28, 1937-                507
17. Channel from Back Sound                   28. Preliminary examinations
      to Lookout Bight, N. C__            488      and surveys       for flood
18. Inland Waterway, Beaufort                       control_ - - - - - - -           509
      to Cape Fear River, N. C.,              29. Other flood-control projects
      including     waterway      to                for which no estimates are
      Jacksonville, N. C ......           490       submitted__.____      ..         509

1. INLAND WATERWAY FROM NORFOLK, VA., TO BEAUFORT INLET,
  N. C. (SECTION EXTENDING FROM THE NORTH CAROLINA-VIRGINIA
   STATE LINE TO BEAUFORT INLET, N. C.)

  For report on this improvement, see page 452,
                               2. MEHERRIN RIVER, N. C.

   Location.--Rises in Lunenburg County, Va., flows in a southeast-
erly direction a distance of about 126 miles, and empties into the
Chowan River, N. C., at a point about 39 miles above Albemarle Sound,
N. C. (See U. S. Geological Survey, Winton quadrangle, N. C.)
   Previous projects.-Adopted by River and Harbor Act of August
2, 1882. For further details, see page 1802 of Annual Report for
1915, and page 483 of Annual Report for 1938.
   Existing project.-This provides for a channel 10 feet deep from
the mouth to the State highway bridge at Murfreesboro, a distance
of about 10.5 miles, with a cut-off channel through Devils Elbow 4
miles above the mouth; 80 feet wide through the cut-off, and 100 feet
wide elsewhere; and a turning basin of the same depth, 300 feet wide
and 500 feet long at Murfreesboro. The entire stream is nontidal
and, except during freshets, its water surface rises and falls according
as the winds raise or lower the water level of Albemarle Sound.
Freshets cause variations of water level of from 3 to 4 feet in the
navigable portion of the river.
   The estimate of cost for new work, revised in 1935, exclusive of
amount expended on previous projects, was $46,000. The latest
 (1935) approved estimate of cost for annual maintenance is $3,500.
             RIVERS AND HARBORS---WILMINGTON,                            N.      C.,     DISTRICT           465

  The existing project was authorized by the following river and
harbor acts:

     Acts                            Work authorized                                    Documents


Mar. 2,1907       Removal of shoals and obstruction to make river H. Doc. No. 137, 59th Cong., 1st sess.
                    safely navigable for vessels of less than 7-foot
                    draft.
Aug. 30, 1935     Present project dimensions.------------------- Rivers and Harbors Committee Doe.
                                                                       No. 43, 74th Cong., 1st sess.        (Con-
                                                                       tains latest published maps.)



   Local cooperation.-Fullycomplied with.
   Terminal facilities.-There are seven private wharves on Meherrin
River, four of which are located at Murfreesboro. All are of timber
construction with pile foundation and plank decking. The total
berthing space at Murfreesboro is approximately 130 feet. Smith-
Douglas Co., fertilizer manufacturers, operate two of the wharves,
with large mixing plant, warehouse, office, and storage facilities.
The Standard Oil Co. has a wharf about 200 yards downstream from
the Smith-Douglas terminal. Storage tanks, with total capacity of
48,000 gallons, are supplied by pipe lines running from the wharf.
The wharfage facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-Miscellaneous surveys
were made. The costs and expenditures were $90.87, all for main-
tenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1938. At the end of the fiscal year the controlling depth
was 10 feet. The total costs and expenditures under the existing
project to June 30, 1942, were $92,345.36, of which $43,149.81 was for
new work and $49,195.55 was for maintenance.
   Proposed operations.-No funds are on hand and no work is pro-
posed during the fiscal year 1943.
   The additional sum of $3,500 can be profitably expended during the
fiscal year 1944, and will be applied to maintenance dredging be-
tween the mouth and Murfreesboro, under contract, during May
1944.
                                       Cost and financial summary
Cost of new work to June 30, 1942--------------------------                $47, 734. 34
Cost of maintenance to June 30, 1942----------              -------------- 49, 195. 55
      Total cost of permanent work to June 30, 1942-----------                                        96, 929. 89
Net total expenditures---------------- ---------------------                                          96, 929. 89
        Total amount appropriated to June 30, 1942-------------                                       96, 929. 89


    Fiscal year ending June 30               1938          1939       1940                1941           1942

Cost of new work .........--------------- $41, 216.93
Cost of maintenance....       ---........-----
                                        .....----------   $2,792.07    $958.4              $532.54          $90.87
Total expended_ ....--------------          41,214.02      2,794.98     958.46              532. 54         90. 87
Allotted---------        -----------        44,000.00     15,000.00   3,500.00         -10,000.00       -6,909.13
466           REPORT OF CHIEF OF ENGINEERS,                           U. S. ARMY,           1942

Balance unexpended July 1, 1941___---- _______-_______----                                     $7, 000. 00
Deductions on account of revocation of allotment_                               __      _       6, 909. 13

      Net amount to be accounted for_-                      ___---- _--------                          90. 87
Gross amount expended _______---    --                      --______                  ---              90. 87

Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance___-_--         --       ---     _-_-___________                             3, 500. 00

                                        3. CASHIE RIVER, N. C.

   Location.-This river, a nontidal stream, rises in Bertie County, near
Kelford, N. C., flows in a general southeasterly direction for about 57
miles to a point where it intersects the thoroughfare (connecting
Cashie and Roanoke Rivers), thence in a northeasterly direction for
approximately 7 miles, and empties into the extreme westerly end of
Albemarle Sound.
   Existing project.-This provides for the removal of logs, snags, and
other obstructions between the mouth of the thoroughfare in Roanoke
River and Windsor, a distance of 20.5 miles; the construction of three
cut-off channels 80 feet wide through sharp bends at points 1, 4, and 5
miles below Windsor, and a turning basin about 1.1 acres in area at
Windsor, all to a depth of 10 feet. The river is not subject to floods
or freshets, but its water surface rises and falls according as the winds
raise or lower the water level in Albemarle Sound. The maximum
fluctuation of the water surface is about 4 or 5 feet.
   The estimate of cost for new work, revised in 1937, was $32,000. The
latest (1937) approved estimate for annual cost of maintenance is
$1,200.
   The existing project was authorized by the following river and
harbor acts:

       Acts                       Work authorized                                  Documents


July     3, 1930   Removal   of obstructions   between   mouth   of   H. Doc. No. 779, 69th Cong., 2d sess.
                    thoroughfare in Roanoke River and Windsor.
Aug. 26, 1937      Construction of 3 cut-off channels and a turning   Rivers and Harbors Committee Doc.
                    basin at Windsor.                                  No. 31, 75th Cong., 1st sess.    (Con-
                                                                       tains latest published map.)



  Local cooperation.-Fullycomplied with.
   Terminal facilities.-There is 1 public wharf and 4 privately owned
wharves at Windsor, N. C., and 12 between this point and the Thor-
oughfare. The facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-The existing project was completed
in 1939. The controlling depth at the end of the fiscal year was 10
feet. The total costs and expenditures under the existing project
to June 30, 1942, were $40,402.73 for new work and $7,404.71 for
maintenance, a total of $47,807.44.
  Proposedoperations.-Thebalance unexpended July 1, 1942, $990.22,
will be applied to maintenance snagging between the mouth of the
               RIVERS            AND HARBORS--WILMINGTON,                                  N.       C.,   DISTRICT              467

thoroughfare in Roanoke River and Windsor with the U. S. derrick-
boat Contentnea during April 1943.
  No work is proposed during the fiscal year 1944 as it is believed that
no maintenance snagging will be necessary.
                         Cost and financial summary
Cost of new work to June 30, 1942_______--------------------------   $40, 402. 73
Cost of maintenance to June 30, 1942______-- __---- ----------------   7, 404. 71
            Total cost of permanent work to June 30, 1942________________                                              47, 807. 44

Net total expenditures--------------                                                                                   47, 807. 44
Unexpended balance June 30, 1942_________________________________                                                          990. 22
            Total amount appropriated to June 30, 1942__________________                                               48, 797. 66

     Fiscal year ending June 30                       1938           1939            1940                 1941            1942

Cost of new work                    ------------                   $33,305.07-------------
Cost of maintenance________----                      $4, 058. 58     3, 136. 35                           $209. 78 -
        Total cost- ...         ....--------------   4, 058. 58     36, 441.42    ------        -          209. 78          -    -
Total expended________________                          796. 66     39, 703.34                             209. 78
Allotted---------------------                        34, 500.00      6, 000.00         $1, 200



Balance unexpended July 1, 1941______________-____                                                                       $990. 22
Balance unexpended June 30, 1942 __________-__________________                                                            990. 22
                                                4. ROANOKE RIVER, N. C.

   Location.-This stream rises in the Blue Bidge Mountains, west of
Roanoke, Va., and flows southeasterly for about 200 miles to Clarks-
ville, Va., where it is joined by Dan River, its principal tributary; and
thence in the same general direction for about 198 miles and empties
into the westerly end of Albemarle Sound, N. C. (See U. S. Coast
and Geodetic Survey Chart No. 1228 and Post Route Map of North
Carolina.)
   Existing project.-This provides for dredging a channel 12 feet
deep and 150 feet wide from the 12-foot contour in Albemarle. Sound
into Roanoke River and thence upstream to a point about 1 mile above
the town of Plymouth, N. C., a distance of 10 miles; thence a channel
10 feet deep and 100 feet wide to Hamilton, a distance of 53 miles;
thence a channel 8 feet deep and 80 feet wide to Palmyra Landing, a
distance of 18 miles, with a cut-off channel of like dimensions about 2
miles above Hamilton; and thence a channel 5 feet deep and 50 feet
wide to Weldon, N. C., a distance of 50 miles, by dredging, snagging,
and regulation. Depths of channels are referred to mean low water.
The rise and fall of the river, resulting from freshets, is from 18 to 33
feet for about 70 miles below Weldon, but this fluctuation diminishes
toward the mouth, the variations in water levels being from 1 to 2
feet in the lower 15 or 20 miles. The total length of channels in-
cluded in the project is 131 miles.
   The estimate of cost for new work, revised in 1938, is $638,500. The
latest (1938) approved estimate for annual cost of maintenance is
$6,000.
468         REPORT OF CHIEF OF ENGINEERS,                       U. S. ARMY,          1942

  The existing project was authorized by the following river and
harbor acts:

    Acts                       Work authorized                                Documents


Mar. 3,1871    Improvement of the river between the mouth S. Doc. No. 23, 42d Cong., 2d sess., and
                 and Weldon.                                      Annual Report, 1872, p. 726.
                                                                                                       1
July 3,1930    Entrance channel 10 feet deep and 150 feet wide__ H. Doc. No. 211, 70th Cong., 1st sess.
June 20,1938   Present project dimensions_ _-----.---.--.---- -H. Doc. No. 694, 75th Cong., 3d sess.

  1 Contains latest published maps.


  Local cooperation.-Fully complied with.
   Termin l facilities.-There are eight wharves at Plymouth. One
mile farther upstream there is a large wharf and bulkhead, a transit
shed, and crane runway for handling wood pulp and pulp materials.
Between this point and Hamilton there are 10 wharves. Between
Hamilton and Halifax there are 13 log landings. These facilities
appear to be adequate for existing commerce.
   Operations and results d'ring fiscal year.-The work consisted of
new work dredging under contract, maintenance snagging and clear-
ing with hired labor, and making miscellaneous surveys. The con-
tract dredge Charleston on new work dredging, between July 1 and
August 16, 1941, removed 214,741 cubic yards of material from the
12-foot channel below Plymouth, completing this section to project
dimensions. From July 1 to 3, 1941, a hired labor crew completed
the clearing of the banks along the cut-off at mile 63.2. The costs
were $25,765.46 for new work and $1,054.36 for maintenance, a total of
$26,819.82. The expenditures were $44,628.26.
   Condition at end of fiscal year.-The existing project has been com-
pleted to the practicable limit. As it is impracticable to obtain and
maintain the project above Palmyra by dredging, snagging, and reg-
ulation, the percentage of completion is uncertain. At the close of the
year the limiting depths at local mean low water were as follows:
Between Albemarle Sound and 1 mile above Plymouth, 12 feet; thence
to Hamilton, 10 feet; thence to Palmyra, 8 feet; and thence to Weldon,
1 foot. The work remaining to be done consists of the completion by
dredging, snagging, and regulation of a channel between Palmyra and
Weldon to a depth of 5 feet and minimum bottom width of 50 feet.
The total costs and expenditures under the existing project to June 30,
1942, were $404.584.34 for new work and $181,205.04 for maintenance,
a total of $585,789.38.
   Proposed operations.-The balance unexpended July 1, 1942, $25,-
391.50, will be applied as follows:
Maintenance:
   Dredging to restore project dimensions in the channel between
        Albemarle Sound and Hamilton under contract, during April
        1943----      ------------------------------------         $22, 391.50
    Snagging with U. S. derrickboat Contentnea during February and
        March 1943     -----------------------------------------     3, 000. 00
           Total for all work.-----------_____              __------------                 25, 391. 50
   The additional sum of $6,000 can be profitably expended during the
fiscal year 1944, and will be applied to maintenance dredging under
contract, during April 1944.
           RIVERS       AND HARBORS--WILMINGTON,                           N.       C.) DISTRICT             469
                                      Cost and financial summary

Cost of new work to June 30, 1942--------------------------                                          $404, 584. 34
Cost of maintenance to June 30, 1942_
                                   -------------------------                                          181, 205. 04

        Total cost of permanent work to June 30, 1942-------------585, 789. 38

Net total expenditures__    _______------                                                             585, 789.38
Unexpended balance June 30, 1942------------------------                                ------         25, 391.50

        Total amount appropriated to June 30, 1942------------                                        611, 180. 88

   Fiscal year ending June 30            1938          1939            1940             1941              1942


Cost of new work ____________--------------             $226. 62      $4, 279.04     $107, 175. 81       $25, 765. 46
Cost of m aintenan ce ........... . $17, 519. 58      20, 406. 56      2, 577. 33      16, 103. 74         1,054. 36

      Total cost-----------------       17, 519. 58   20, 633. 18      6, 856. 37     123, 279. 55        26, 819. 82

Total expended__----------   ------     17, 519. 58   20, 633. 18      6, 847. 62     105, 479.86         44, 628. 26

Allotted_------------------------       38,500.00     338,000.00 -------------       -156,000.00--


Balance unexpended July 1, 1941 ...                                                                   $70, 019. 76
Gross amount expended_ ------------------------------------                                            44, 628. 26
        Balance unexpended June 30, 1942                       -----------------                       25, 391. 50
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance   ---------------------------------                                          6, 000. 00
  1 Exclusive of available funds.

                        5. MANTEO           (SHALLOWBAG)              BAY, N. C.

  Location.-Manteo Bay or Shallowbag Bay, formed by a natural
indentation of the shore line, is situated on the northeastern side of
Roanoke Island, N. C. (See U. S. Coast and Geodetic Survey Chart
No. 1229.)
  Existing project.-This provides for a channel 100 feet wide and
6 feet deep at mean low water from that depth in Roanoke Sound
to the town of Manteo, a distance of about 22/3 miles, and for a con-
necting channel of the same dimensions extending south through
Roanoke and Pamlico Sounds to Oregon Inlet, a distance of about
11 miles. The variations of the water surface are due to winds and
seldom exceed 2 feet above or below mean stage. The extreme range
of wind and tides, determined by 1 year's gage readings at Manteo,
is 5.1 feet. The estimate of cost for new work, revised in 1941, is
$55,503. The latest 1941 approved estimate of cost for annual main-
tenance is $5,000.
  The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                       Documents

                                                                                                                   1
June 25,1910    Channel 6 feet deep and 100 feet wide from Roa-       H. Doc. No. 906, 60th Cong., 1st sess.
                 noke Sound to Manteo.
                                                                                                                   3
Oct. 17,1940    Connecting channel of same dimensions to Ore-         H. Doc. No. 313, 76th Cong., 1st sess
                 gon Inlet.


1Contains latest published maps.
470         REPORT OF CHIEF OF ENGINEERS, U.                                       S. ARMY,               1942

   Terminal facilities.-There are 17 wharves on the portion of this
harbor under improvement. They have a total frontage of 14060 feet.
The existing facilities are considered adequate for present commerce.
   Operations and results during fiscal year.-The work consisted of
new work dredging under contract, and making miscellaneous surveys.
The contract dredge Charleston on new work dredging, between Au-
gust 20 and November 9, 1941, removed 238,341 cubic yards of material
from the channel from Manteo to Oregon Inlet, completing the proj-
ect. The costs and expenditures were $52,880.66 for new work and
$441.23 for maintenance, a total of $53,321.89.
   Conditionat end of fiscal year.-The existing project was completed
in 1941. The controlling mean low water depth in the channels to
Manteo and to Oregon Inlet is 6.0 feet. The total costs and expendi-
tures under the existing project to June 30, 1942, were $63,383.84 for
new work and $46,025.26 for maintenance, a total of $109,409.10.
   Proposed operations.-The balance unexpended July 1, 1942,
$9,428.55, will be applied to maintenance dredging under contract dur-
ing May 1943.
   The additional sum of $10,000 can be profitably expended during the
fiscal year 1944, and will be applied to maintenance dredging under
contract during May 1944.
                                         Cost and financial summary

Cost of new work to June 30, 1942____-- __----- _____----- ____                                                $63, 383. 84
Cost of maintenance to June 30, 1942______________________________                                              46, 025. 26
         Total cost of permanent work to June 30, 1942-                                     ---                109, 409. 10

Net total expenditures_______________--_______-                                                                100, 409. 10
Unexpended balance June 30, 1942_____ _________--______-___                                                      9, 428. 55
         Total amount appropriated to June 30, 1942 __________________ 118, 837. 65

   Fiscal year ending June 30                 1938                1939         1940                1941            1942

Cost of new work __-------------------                                                                            $52, 880. 66
Cost of maintenance___         __                                             $1, 003. 43           $246. 13           441. 23
      Total cost_                   ____....._____          . .
                                                       ___ ______.. . -        1,003.43              246.13        53, 321.89

Total expended _________________...
                         ...                         _______      _              896. 80             352. 76       53, 321. 89
Allotted...---------------------...--------------                  $10, 000                       37, 000.00       17, 000. 00



Balance unexpended July 1, 1941                                __________________            ________          $45, 750. 44
Amount allotted from First Deficiency Appropriation Act, Apr. 1, 1941_                                          17, 000. 00
      Amount to be accounted for_____________________________                                                   62, 750. 44
Gross amount expended_____________________________                                                              53, 321. 89
         Balance unexpended June 30, 1942______---____                                                           9, 428. 55
Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance 1 ____________-_                                                                         10, 000. 00
   1 Exclusive of available funds.

                                    6. BELHAVEN HARBOR, N. C.
  Location.-The town of Belhaven is located at the junction of
Pantego Creek and Pungo River, about 11 miles above the mouth
              RIVERS AND         HARBORS-W-LMINGTtON,                    N.      C., DISTRICT       471
of the latter. The harbor consists of the lower reaches of Pantego
Creek and is about 6,000 feet long. Pungo River forms part of the
inland waterway from Norfolk to Beaufort, Norfolk being 130 miles
north of Belhaven and Beaufort 66 miles south. (See U. S. Coast
and Geodetic Survey Chart No. 1231.)
   Existing project.-This provides for a channel 12 feet deep at mean
low water and 100 feet wide, extending from deep water in Pungo
River to a point about 800 feet east of the highway bridge, with a
turning basin 800 feet long and 300 feet wide at the upper end; and
for the construction of timber breakwaters at the mouth of Pantego
Creek. Pungo River is a nontidal stream with little slope. Variations
in the water surface, due to winds, seldom exceed 2 feet above or -below
mean stage.
   The estimate of cost for new work, revised in 1938, was $106,500.
The latest (1938) approved estimate for annual cost of maintenance
is $7,500.
   The existing project was authorized by the following river and
harbor acts:

       Acts                      Work authorized                                   Documents


                                                                                                         1
July     3, 1930   Present project dimensions of the channel and     H. Doc. No. 778, 69th Cong., 2d sess.
                     turning basin.
                                                                                                             1
June 20,1938       Timber breakwaters at the mouth of Pantego        H. Doc. No. 693, 75th Cong., 3d sess.
                    Creek.


  1Contains latest published maps.

   Local cooperation.-Fully complied with.
   Te ninal facilities.-There are 12 wharves along the town water
front, all of timber construction; 1 is owned by the town and is open
to use by all without charge; 4 have rail connections. The facilities
are considered adequate for existing commerce.
   Operations and results during fiscal year.-None. The costs and
expenditures were $1,376.22, all for new work, in settlement for a claim
for reduction of liquidated damages on the contract for constructing
breakwater.
   Condition at end of fiscal year.-The portion of the existing project
pertaining to channel dredging was completed in 1931, and that per-
taining to breakwaters in 1940. At the close of the fiscal year the con-
trolling mean low-water depth to Bellhaven was 12 feet, and the break-
waters were in good condition. The total costs and expenditures
under the existing project to June 30, 1942, were $128,876.22, of which
$126,687.41 was for new work and $2,188.81 was for maintenance.
   Proposed operations.-No funds are on hand, and no work is pro-
posed during the fiscal year 1943.
   The additional sum of $7,500 can be profitably expended during the
fiscal year 1944 and will be applied to maintenance, as follows:
Dredging under contract during March 1944____________--__-____-___----$5, 000
Repairs to breakwater under contract during June 1944_ --_---  _____ 2, 500
           Total for all work                                            -----
                                                ---------------------------                         7, 500
472        REPORT OF CHIEF OF ENGIEERS,                               U. S. ARMY,             1942

                                    Cost and financial summary
Cost of new work to June 30, 1942-------------________ ---                                          $126, 687. 41
Cost of maintenance to June 30, 1942_----- ---  --
                                               ________-_____                                          2, 188. 81
       Total cost of permanent work to June 30, 1942 ---                             __---           128, 876. 22
Net total expenditures----------                                                                     128, 876. 22
Total amount appropriated to June 30, 1942                                                           128, 876.22

   Fiscal year ending June 30            1938             1939          1940           1941                 1942

Cost of new work----------------------------        $984. 20          $51,911. 51    $18, 915.48            $1,376.22
Cost of maintenance___________ ______________ ______________            1, 714. 12        474. 69       -

      Total cost------------------------------              984. 20    53, 625. 63    19, 390. 17            1, 376. 22
                                                                                                                        '
Total expended.....----------------    --------------       984. 20    37, 342. 23    35, 673. 57            1, 376. 22
Allotted          __------------------- --------------   68, 000.00    13, 500. 00   -5, 500.00              -623.78.



Balance unexpended July 1, 1941_________    ______--_--____                                           $2, 000. 00
Deductions on account of revocation of allotment-___------6-----------                                     23. 78

      Net amount to be accounted for____-..-____--                              --                     1, 376. 22
Gross amount expended_       -    ______------__                                               -       1, 376. 22

Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance_------------------------------------                                            7, 500. 00

                                        7. FAR CREEK, N. C.

   Location.-FarCreek is located in Hyde County, N. C., and flows.
in an easterly direction into Pamlico Sound at a point about 95 miles
south of Norfolk, Va. (See U. S. Coast and Geodetic Survey Chart
No. 1232.)
   Existing project.-This provides for a channel 7 feet deep at mean
low water and 60 feet wide from Pamlico Sound to a point about 200
feet below the highway bridge at Engelhard, with a turning basin at
the head. The total length of channels included in the project is above
2 miles. There is some lunar tide in Pamlico Sound, but the principal
variations in the level of the water surface are due to winds. Ordinary
winds cause a variatioii of about 1 foot, while severe storms will double
or triple this variation.
   The estimate of cost for new work, made in 1929, was $30,000. The
latest (1929) approved estimate for annual cost of maintenance is
$2,000.
   The project was authorized by the River and Harbor Act approved
July 3, 1930 (H. Doc. No. 112, 71st Cong., 1st sess.). The latest pub-
lished map is contained in this document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are five wharves at Engelhard with a
total frontage of about 510 feet, all privately owned. The existing
facilities are considered adequate for present commerce.
   Operationsand results during fiscal year.-None.
   Conditionat end of fiscal year.-The existing project was completed
in 1931. At the close of the year the controlling mean low-water depth
to Engelhard was 6.0 feet. The total costs and expenditures under the
existing project to June 30, 1942, were $34,500 for new work and
$41,633.93 for maintenance, a total of $76,133.93.
             RIVERS AND HIARBORS--WILMINGTON,                                     N. C., DISTRICT                        473
  Proposed operations.-None. The additional sum of $8,000 can be
profitably expended during the fiscal year 1944, and will be applied
to maintenance dredging during July 1943.
                                             Cost and financial summary
Cost of new work to June 30, 1942----------------------------$34, 500. 00
Cost of maintenance to June 30, 1942_ -----------------        41, 633. 93

      Total cost of permanent work to June 30, 1942---------__                                            76, 133. 93
Net total expenditures---------- __-------     -------------------                                        76, 133.93
Total amount appropriated to June 30, 1942---------------------                                           76, 133. 93

    Fiscal year ending June 30                     1938            1939        1940          1941                 1942

Cost of new work __....
Cost of maintenance-_---__         _ ....            $13.00   --------------    $9, 300---           -           --
Total expended..............---------------.11,732.00 --------------             9, 300
Allotted............----------------        ----   -652. 17        $12,000        -700       -$2,   000   ............



Amount allotted from War Department Civil Appropriation Act ap-
  proved Apr. 28, 1942----------             _                                                            $8, 000. 00
Deductions on account of revocation of allotment-------------__                                            8, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance---------------------------------------                                            8, 000. 00

                               8. PAMLICO AND TAR RIVERS, N. C.

   Location.-The two names are applied to the same river, it being
known as the Pamlico below Washington, N. C., and as the Tar above
that point. This stream rises in Person County, flows in a general
southeasterly direction for 217 miles, and empties into Pamlico Sound.
The Pamlico River is 38 miles long. (See U. S. Coast and Geodetic.
Survey Chart No. 537.)
   Previous projects.-Adopted by acts of July 4, 1836, and August 30,
1852. For further details see page 502 of Annual Report for 1938.
   Existing project.-This provides for a channel 12 feet deep at
mean low water and 200 feet wide from the 12-foot contour in the
river below Washington to the Atlantic Coast Line Railroad bridge
at Washington; 12 feet deep and 100 feet wide from Washington to a
turning basin of the same depth, 200 feet wide and 300 feet long in
Hardee Creek, 1,500 feet above its mouth; 6 feet deep and 75 feet
wide to Greenville; 20 inches deep and 60 feet wide to Tarboro;
thence to clear the natural channel above Tarboro to Little Falls.
The length of section under improvement is 97 miles, extending from
a point 14 miles below Washington to Little Falls. The stream is
nontidal; variations in the water surface at Washington, due to pre-
vailing winds, seldom exceed 2 feet. The extreme range of the flood
or freshet stage for the upper section is 34 feet at Tarboro. For
the lower section, the extreme range due to winds is 8.3 feet.
   The estimate of cost for new work, revised in 1937, was $754,000,
exclusive of amount expended on previous project. The latest (1937)
approved estimate for annual cost of maintenance is $66,000.
474           REPORT OF CHIEF OF ENGINEERS, U.                              S. ARMY,         1942

  The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                    Documents


Aug. 14,1876       Channel 9 feet deep and 100 feet wide from the
                     mouth to Washington.
Mar. 3,1879        Clearing the channel to Tarboro_-----------_ ----
                                                                _       H. Doc. No. 68, 45th Cong., 3d sess.,
                                                                          and Annual Report, 1879, p. 700.
Aug. 11, 1888      Clearing the channel between Tarboro and Little      Annual Report, 1889, p. 1130.
                     Falls (Rocky Mount).
Mar.     2,1907    Channel 4 feet deep and 60 feet wide between         H. Doec. No. 342, 59th Cong., 2d sess.
                     Washington and Greenville.
July 25,1912       A 10-foot depth and 200-foot width from the          H. Doec. No. 270, 62d Cong., 2d sess.'
                     mouth to Washington, thence 6-foot depth and
                     75-foot width to Greenville.
July     3, 1930   Present 12-foot project to the Atlantic Coast Line   Rivers and Harbors Committee Doc.
                     R. R. bridge at Washington.                          No. 11, 71st Cong., 1st sess.'
Aug. 26,1937       Present 12-foot project from Washington to a         Rivers and Harbors Committee Doc,
                     turning basin in Hardee Creek.                       No. 22, 75th Cong., 1st sess.t


  1 Contains latest published maps.

   Recommended modifications of project.-The abandonment of this
improvement above Tarboro, N. C., is recommended in House Docu-
ment No. 467, Sixty-ninth Congress, first session.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 54 wharves on the portion of this
river under improvement, of which 34 are along the water front at
Washington, 19 between Washington and the mouth, and only 1 in
usable condition above Washington. They have a total frontage of
3,570 feet. The existing facilities are considered adequate for exist-
ing commerce.
   Operations and results during fiscal year.-The work for the year
consisted of maintenance dredging by contract, snagging with Gov-
ernment plant and hired labor, and making miscellaneous surveys.
The contract dredge Sadye M commenced work on the channel be-
tween Washington and Hardee Creek on March 20, 1942, and con-
tinued to the end of the fiscal year. There were removed 348,132
cubic yards of material. The cost of the work was $55,896.39.
   The U. S. derrick boat Northeast commenced snagging the chan-
nel between Washington and Hardee Creek on December 3, 1941,
and continued to January 7, 1942. There were removed from the
channel 79 snags, 17 stumps, 51 logs, and 103 trees; from the banks
160 trees. The cost of the work was $2,634.77.
   The total costs were $62,131.76, all for maintenance. The expendi-
tures were $43,156.19.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1939. The controlling mean low water depths at the close
of the year were 12 feet to Washington, 12 feet to Hardee Creek,
3.5 feet to Greenville, and 1 foot to the mouth of Fishing Creek.
The total costs under the existing project to June 30, 1942, were
$674,651.38 for new work, and $420,122.62 for maintenance, a total
of $1,094,774.
   Proposed operations.-The balance unexpended July 1, 1942, $38,-
476.50, will be applied to maintenance as follows:
                RIVERS AND HARBORSr---WILMINGTON,                                        N. C., DISTRICT                       475
Completion of maintenance dredging of channel between Washington
  and Hardee Creek under existing contract--------------------     $25,763.27
Dredging the channel between Washington and Hardee Creek, under
  contract, during March 1943 _-----------------------------------  12, 713.23

            Total for all work---------------------                              -----------------                38, 476. 50
  The additional sum of $66,000 can be profitably expended during
the fiscal year 1944, and will be applied to maintenance as follows:
Dredging channel at and below Washington, under contract, during
  June 1944        --------------------------------------------- $17, 000. 00
Dredging channel between Washington and Hardee Creek, under
  contract, during Apr. and May 1944__--------------------------- 44, 000. 00
Snagging between Washington and Hardee Creek with the U. S.
  derrick boat Contentnea and/or tractors between Jan. 1 and Mar.
  31, 1944 -----------------                 ___                   5, 000. 00

            Total for all work_------------------------                                                           66, 000.00
                                             Cost and financial summary
Cost of new work to June 30, 1942_--------------------------                                                  $689, 651. 38
Cost of maintenance to June 30, 1942___________ ___---__---                                                    420, 122. 62
      Total cost of permanent work to June 30, 1942                                    -----------           1, 109, 774. 00
Minus accounts payable June 30, 1942 _______________________                                                     19, 045. 57

     Net total expenditures---------------------------------                                                 1, 090, 728. 43
Unexpended balance June 30, 1942 ----------------                                                                38, 476. 50
             Total amount appropriated to June 30, 1942_-                                                    1, 129, 204. 93

     Fiscal year ending June 30                  1938                1939             1940           1941                  1942

Cost of new work-----__                         $4, 788.13      $2, 361.78         $241,401.08
Cost of maintenance ..           .....   _      45, 038. 70            374. 28        3, 372. 89   $48, 077. 66        $62,131. 76
         Total cost----------------
                     .........                  49, 826.83           2, 736.06      244, 773.97     48, 077. 66            62, 131. 76

Total expended ...-----------------             49. 617. 64          2,746. 20      244, 973. 02    48, 077. 66            43, 156. 19

Allotted .....................                 374, 350.00    -38,     300. 00       19, 000. 00    53, 000.00             18,100.00



Balance unexpended July 1, 1941___    _                                                                           $63, 532. 69
Amount allotted from War Department Civil Appro-
  priation Act approved May 23, 1941____________--$8, 100. 00
Amount allotted from War Department Civil Appro-
  priation Act approved Apr. 28, 1942---------      10, 000. 00
                                                                                                                   18, 100. 00
      Amount to be accounted for                              ___...                    ______                     81, 632. 69
Gross amount expended                                                                                              43, 156. 19

      Balance unexpended June 30, 1942______ _                                                                     38, 476. 50
Outstanding liabilities June 30, 1942________________ $19, 045. 57
Amount covered by uncompleted contracts----------- 6, 717. 70
                                                                                                                   T   ,   1
                                                                                                                            7'l3
                                                                                                                                   G
                                                                                                                                       '27

              Balance available June 30, 1942 __________________-                                                  12, 713. 23
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance ---------------------------------                                                       66, 000. 00
1 Exclusive of available funds.
476            REPORT OF CHIEF OF ENGINEERS,                                                U. S. ARMY,                1942

                                       9. ROLLINSON CHANNEL, N. C.

   Location.-This channel extends from deep water in Pamlico Sound
to a natural inner basin lying north of the village of Hatteras, near
Hatteras Inlet, N. C. (See U. S. Coast and Geodetic Survey Chart No.
1232.)
   Emisting project.-This provides for dredging a channel about 4,300
feet long, 100 feet wide at the bottom, and 6 feet deep at mean low
water. Variation in the water surface due to winds seldom exceeds 1
or 2 feet above or below mean stage. Severe windstorms will double or
triple this variation. The estimate of cost for new work, made in 1932,
is $27,000. The latest (1936) approved estimate for annual cost of
maintenance is $4,270.
   The existing project was adopted by the River and Harbor Act of
August 30, 1935 (H. Doc. No. 218, 72d Cong., 1st sess.) The latest
published map is contained in this document.
   Recommended modifications of project.-Under date of March 15,
1939, the Chief of Engineers recommended that the project be modi-
fied to provide for a channel 100 feet wide and 6 feet deep, extending
from that depth in Pamlico Sound to and including a basin of the same
depth in front of the wharves at Hatteras, at an estimated first cost
of $27,000, with no increase in annual maintenance, subject to certain
conditions of local cooperation (H. Doc. No. 236, 76th Cong., 1st sess.).
   Terminal facilities.-None required.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1936. At the close of the fiscal year the controlling mean
low water depth was 5.0 feet. The total costs and expenditures under
the existing project to June 30, 1942, were $20,125.43 for new work
and $15,100 for maintenance, a total of $35,225.43.
   Proposed operation.-None. The additional sum of $10,000 can be
profitably expended during the fiscal year 1944, and will be applied to
maintenance dredging during July 1943.
                                             Cost and financial summary
Cost of new work to June 30, 1942____---------------------------                                                            $20, 125. 43
Cost of maintenance to June 30, 1942 _____  - __-_______-____.                                                               15, 100. 00
      Total cost of permanent work to June 30, 1942_--------------35, 225. 43
Net total expenditures-________________
                            -_________________-                     35, 225. 43
Total amount appropriated to June 30, 1942_____-________          _ 35, 225. 43

    Fiscal year ending June 30                     1938                   1939                1940              1941            1942

Cost of new work .-------------                .--------------          ..------      . .--- ... ..------   ..... ...... ....... ....
Cost of maintenance------------.............----     ---.......... --------------           $14, 400. 10        $699.90     .     -

Total expended---.................-------------....------------                              14, 400. 10          699. 90
Allotted--------_        ..-----....    .   --------------                 $12, 200           6, 900.00       -4, 000. 00


Amount allotted from War Department Civil Appropriation Act ap-
  proved Apr. 28, 1942__----------------------------------        $10, 000. 00
Amount to be accounted for------------------------------ -------- 10, 000. 00
Deductions on account of revocation of allotment __------------    10, 000. 00
_Amount that can be profitably expended in fiscal year ending June 30,
  1944, for maintenance--_ ---- _--       -          -    -    -   -   10, 000. 00
              RIVERS      AND HARBO0RSr-WILMINGTON,                      N.   C., DISTRICT            477
                               10. SILVER LAKE HARBOR, N. C.

   Location.--Silver Lake Harbor is located at the westerly end of
Ocracoke Island, which is a portion of the barrier separating Pamlico
Sound from the Atlantic Ocean. Beaufort Harbor lies about 50 miles
southwest; Belhaven is about 60 miles northwest. (See U. S. Coast
and Geodetic Survey Chart No. 1232.)
   Existing project.-This provides for a channel 10 feet deep from that
depth in Pamlico Sound to and including an anchorage basin of the
same depth in Silver Lake Harbor, with widths of 100 feet across Big
Foot Slough bar, and 60 feet in thel entrance channel, together with a
training wall 300 feet long to protect the outer end of the entrance
channel from northeast storms. The ordinary range of tide is about 1
foot within the lake and about 21/2 feet at the outer end of the connect-
ing channel. Severe storm tides have been known to raise the water
surface of the lake as much as 5 feet.
   The estimate of cost for new work, revised in 1941, is $71,000. The
latest (1941) approved estimate for annual cost of maintenance is
$4,900.
   The existing project was authorized by the following river and
harbor acts:

       Acts                       Work authorized                                 Documents


July     3, 1930   Entrance channel 5 feet deep and 50 feet wide      Rivers and Harbors Committee Doc.
                    from Pamlico Sound to the 3-foot contour in the     No. 3, 70th Cong., 1st sess.
                    lake and training wall at entrance.
Oct. 17, 1940      Channel 10 feet deep and anchorage basin of same   H. Doc.No. 325, 76th Cong., hlt sess.t
                    depth, 100 feet wide across Big Foot Slough and
                    6)feet wide in entrance.


  1 Contains latest published map.

   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 12 small wharves extending from
the shore to the deeper waters in the lake, and one at the outer
entrance of the channel. These facilities are considered adequate for
the present commerce.
   Operations and results during fiscal year.-The work for the year,
all with regular funds, consisted of maintenance, surveys, and new-
work dredging with Government plant and hired labor. The U. S.
pipe-line dredge Howell commenced work June 10, 1942, and continued
to the end of the year. There was removed from the basin and en-
trance channel 101,000 cubic yards of material, at a cost of $13,081.44.
The total costs and expenditures were $14,196.25, of which $13,956.64
was for new work and $239.61 was for maintenance.
   Condition at end of fiscal year.-At the close of the year the existing
project was about 24 percent completed. The controlling mean low-
water depth in the entrance channel and in the southwestern portion
of the basin was 10 feet. The costs and expenditures under the existing
project to June 30, 1942, were $24,956.64 for new work and $3,216.22
for maintenance, a total of $28,172.86.
          493202-43--pt. 1, vol. 1---31
478              . REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                               1942

     Proposed operations.-The balance unexpended July 1, 1942, $63,-
858.30, will be applied as follows:
New work: Completion of the project by dredging the 10-foot channels
at Big Foot Slough and in Silver Lake Harbor by contract and with
  Government plant during July and August 1942_______           ____ $63, 000. 00
Maintenance: Hired labor surveys-------------------------------858.30

       Total for all work ___----                            6---------------
                                                             63, 858. 30
   The additional sum of $4,900 can be profitably expended during the
fiscal year 1944 and will be applied to maintenance dredging under
contract during June 1944.

                                                        Cost and financial summary
                                               ____--
Cost of new work to June 30, 1942_ ________- -______--                                                                                           $24, 956. 64
Cost of maintenance to June 30, 1942____   __-__-_________                                                                           ___--         3, 216. 22

              Total cost of permanent work to June 30, 1942__-                                                      ___--___-----                 28, 172. 86
Net total expenditures-----------_-------                                                                                                        28, 172. 86
Unexpended balance June 30, 1942__ __                                                     _____             ______                   ___         63, 858. 30

              Total amount appropriated to June 30, 1942                                                     ___-----                ---          92, 031. 16

      Fiscal year ending June 30                           1938                   1939                    1940                      1941             1942

Cost of new work .----------                            ----------------------                  ----------------------------                        $13, 956. 64
Cost of maintenance....-------------..                    $1, 826. 89       __----..__
                                                                               -..                -----------..                .     $4149. 72          239. 61

          Total cost        -----------------
                              ..........                   1, 826. 89 --------------..--------------                                  449.72         14, 196.25
Total expended..----------------...............            1, 826. 89     ..........--------------..--------------                    449. 72        14, 196. 25
Allotted----------------------.......................      -173. 11                  $4, 000 --------------                        57, 000.00        17, 504. 27



Balance unexpended July 1, 1941                                  $60, 550. 28
Amount allotted from War Department Civil Appropriation Act ap-
  proved May 23, 1941      ------------------------------------- 18, 000. 00

     Amount to be accounted for------------------                  78, 550. 28
Deductions on account of revocation of allotment------------------     495. 73
      Net amount to be accounted for __________--                                                                 _ ____--                 __     78, 054. 55
Gross amount expended__________________________-                                                                                                  14, 196. 25
               Balance unexpended June 30, 1942-----------------------63, 858. 30

Amount that can be profitably    expended in fiscal year ending June
30, 1944, for maintenance 1 - ____-                                                                                                               4, 900. 00
1 Exclusive of available funds.
                                                        11. NEUSE RIVER, N. C.

  Location.-Rises in the northerly part of North Carolina and flows
in a southeasterly direction until it reaches Kinston; thence northeast
to mouth of Contentnea Creek; thence southeast to a point 20 miles
below New Bern; thence northeast until it flows into Pamlico Sound.
Its total length is about 300 miles.    (See U. S. Coast and Geodetic
Survey Chart No. 538.)
  Exsting project.-This provides for a channel 300 feet wide and 12
feet deep at mean low water from a point 10 miles below, up to and
              RIVERS         AND HARBORS--WILMINGTON,                       N.   C.,    DISTRICT         479
in front of New Bern; 4 feet deep at dead low water to Kinston, and
during 9 months of the year 3 feet deep at dead low water to Smith-
field, to be obtained by dredging and snagging. Length of the sec-
tion included in the project is about 160 miles. The stream is non-
tidal; variations in the water surface at and below New Bern, due
to prevailing winds, seldom exceed 2 feet above or below mean stage.
The extreme range of flood or freshet stage for the upper section of
the river is 21 feet at Selma. Tide-gage readings at New Bern,
covering 4 years, show the extreme range of wind tides to be 8.3 feet.
   The estimate of cost for new work, revised in 1927, was $417,200.
The latest (1928) approved estimate for annual cost of maintenance is
$12,500.
   The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                     Documents


June 18,1878       An unobstructed channel 5 feet deep at low stage     Annual Report, 1879, p. 708.
                    to Goldsboro and 3 feet deep at dead low water
                    to Smithfield.
June 13,1902       Channel 8 feet deep at dead low water and 300 feet   H. Doe. No. 317, 54th Cong., 2d sess.,
                    wide to New Bern, thence 200 feet wide at New        Annual Report, 1897, p. 1427.
                     Bern.
Jan.    21, 1927   Channel 12 feet deep at mean low water and 300       H. Doc. No. 299, 67th Cong., 2d sess.
                    feet wide to and in front of New Bern.


  Latest published map is in Annual Report, 1889, p. 1058.


   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 30 wharves on this stream, of which
2 are below New Bern, 16 at or near New Bern, 3 at Bridgeton, and
9 above New Bern. They have a total frontage of about 2,900
feet. Existing facilities are considered adequate for present needs.
   Operations and results during fiscal year.-Miscellaneous surveys
were made at a cost of $1.65 for maintenance. The expenditures
were $52.05.
   Condition at end of fiscal year.-Except for the width of the chan-
nel in front of New Bern, which is only 200 feet, the project is com-
pleted to the practicable limit. As it is impracticable to obtain and
maintain the project depth above New Bern by snagging and dredg-
ing, the percentage of completion is uncertain. At the close of the
fiscal year a channel 300 feet wide and 12 feet deep was available
from the mouth to New Bern. From New Bern to a point 23 miles
above the controlling depth was 4 feet; thence 2.5 feet to the mouth
of Contentnea Creek, 32 miles above New Bern; thence 1 foot to Seven
Springs, 75 miles above New Bern. The total costs and expenditures
to June 30, 1942, were $691,233.94, of which $403,066.04 was for new
work and $288,167.90 was for maintenance.
   Proposed operations.-None. The additional sum of $12,500 can
be profitably expended during the fiscal year 1944 for maintenance
dredging under contract during May and June 1944.
480            REPORT OF CHIEF OF ENGINEERS,                                U. S. ARMY,                1942

                                             Cost and financial summary
Cost of new work to June 30, 1942--------------       ------------ $403, 066. 04
Cost of maintenance to June 30, 1942___---______________________    288, 167. 90

      Total cost of permanent work to June 30, 1942______________                                            691, 233. 94
Net total expenditures -----------------------                                                               691, 233. 94
Total amount appropriated to June 30, 1942__--------------------                                             691, 233.94

    Fiscal year ending June 30                  1938           1939           1940              1941             1942


Cost of new work .--                                         ----------------
Cost of maintenance ..--____        _         $19, 292.49     $2, 485.38    $25, 075.01    $55, 274. 69                 $1. 65

              -----------------
Total expended....                             19, 292. 49     2, 485. 38    25, 061.01        55, 238. 29              52. 05

Allotted .......------    -         ------     24, 242. 49     9, 985. 38    36, 000. 00       34, 000. 00      -2,148.65


Balance unexpended July 1, 1941 _______----__------                                        _                  $2, 200. 70
Deductions on account of revocation of allotment_________--                                                    2, 148. 65
      Net amount to be accounted for _______________----__----                                                     52. 05
Gross amount expended ______--____-       ---- ______-52.                                                              05
Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance_____----- -----  __     ----------                                                     12, 500. 00
                                             12. TRENT RIVER, N. C.
  Location.-This stream is formed by the junction of Beaver Dam
and Tuckahoe Creeks, in Jones County, N. C. It flows for 80 miles
(about 40 miles in an air line) in an easterly direction through Jones
and Craven Counties, and at New Bern empties into the Neuse River,
being its principal tributary. (See U. S. Geological Survey sheets,
New Bern and Trent River.)
   Previousprojects.-Adopted by the River and Harbor Act approved
March 3, 1879, and modified in 1885, 1887, 1889, and 1896. For further
details see page 1803 of the Annual Report for 1915 and page 514 of the
Annual Report for 1938.
  Existing project.-This provides for a channel 12 feet deep at mean
low water and 300 feet wide in front of New Bern, a channel of 6 feet
depth at dead low water over Foys Flats, and a channel 50 feet wide
and 4 feet deep at low water to Trenton. The length of section
included in the project is 38 miles. Near the mouth the water level
varies about 2 feet under normal conditions, according to prevailing
winds.
   The estimate of cost for new work, revised in 1927, was $41,600, ex-
clusive of amounts expended on previous projects. The latest (1927)
approved estimate for annual cost of maintenance is $2,100.
   The existing project was authorized by the following river and
harbor acts:

     Acts                               Work authorized                                    Documents


June 13,1902        8 feet at dead low water at New Bern__      -- -         H. Doc. No. 121, 56th Cong., 2d sess.
                    Channel 6 feet deep at dead low water over Foys          Joint Resolution No. 22, approved
                         Flats, 4 miles above New Bern.                        Mar. 4, 1907.
June 25,1910        A 4-foot navigable depth to Trenton __._.---             H. Doc. No. 1471, 60th Cong., 2d sess.
Jan. 21,1927        Channel 12 feet deep at mean low water and 300           H. Doc. No. 299, 67th Cong., 2d sess.
                         feet wide in front of New Bern.
  For the latest printed map see Annual Report, 1895, p. 1318.
            RIVERS AND          HARBORS----WILMINGTON,                           N.      C.,   DISTRICT              481

   Recommended modifications of project.-Under date of Septem-
ber 25, 1941, the Chief of Engineers recommended that the project
be modified to provide at New Bern, N. C., a boat basin 600 feet
long and 250 feet wide and a repair basin 300 feet long and 220 feet
wide at the adjacent boat works, with access channels 90 feet wide to
each basin, all to a depth of 8 feet at mean low water, at an esti-
mated first cost of $16,500 with $600 annually for maintenance in
addition to the amount now required; subject to certain conditions
of local cooperation. (H. Doc. 623, 77th Cong., 2d sess.)
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 27 wharves on the portion of this
stream under improvement, of which 21 are at or opposite New Bern,
5 are at or near Polloksville, and 1 at Trenton. They have a total
frontage of about 3,000 feet. The existing facilities are considered
adequate for existing commerce.
   Operations and results during fiscal year.-The work consisted of
maintenance dredging under contract, between July 1 and 5, 1941.
Under authority of section 3 of the River and Harbor Act approved
October 17, 1940, the contract dredge Lehigh removed 12,150 cubic
yards of material from a short extension above' the limits of the fed-
erally improved channel at New Bern, resulting in a side channel 90
feet wide, 8 feet deep, and 750 feet long, leading from the main river
channel to a shipyard at New Bern. The cost was $3,000, all for
maintenance. The expenditures were $5,921.85.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1929. At the close of the fiscal year project depth was
available to Polloksville, 18 miles above the mouth; from thence to
Trenton, 38 miles above the mouth, the controlling depth was 3.5
feet. The total costs and expenditures to June 30, 1942, were
$86,975.83, of which $44,294.05 was for new work and $42,681.78 was
for maintenance.
  Proposed operations.-None. The additional sum of $2,100 can be
profitably expended during the fiscal year 1944 for maintenance snag-
ging between the mouth and Trenton with the U. S. derrick boat
Contentneaduring April and May 1944.
                                     Cost and financial summary
Cost of new work to June 30, 1942 _   -----------            $115, 199. 45
Cost of maintenance to June 30, 1942------------------------   69, 786. 77
      Total cost of permanent work to June 30, 1942_________                                                 184, 986. 21
Net total expenditures    ------------------------------------                                               184, 986. 22
Total amount appropriated to June 30, 1942 _________________                                                 184, 986. 22

   Fiscal year ending June 30             1938                1939            1940              1941             1942

Cost of new work-                                    ----
Cost of maintenance__ ____      ______ ________------------   ---       ___   $403.63          $6, 596.37        $3, 000. 00
Total expended_        _..      ______________          ___         _          403.63           3, 674. 52        5, 921. 85
Allotted_----
        ...._ _.---.            __          $1,000              $2, 900       -400. 00          3, 500. 00        3, 000. 00
482     REPORT OF CHIEF OF ENGINEERS,            U.   S.   ARMY,   1942

Balance unexpended July 1, 1941                                       $2, 921. 85
Amount allotted from War Department Civil Appropriation Act
  approved June 28, 1939-----------------------------------               3, 000. 00
      Amount to be accounted for__--- ------ ____    -5,                     921. 85
Gross amount expended-----   ---------------------------------            5, 921. 85
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance_----       _____-         ________             2,100. 00

  13. CHANNEL CONNECTING          THOROUGHFIARE            BAY WITH   CEDAR
                                 BAY, N. C.

   Location.-Thoroughfare Bay is on the north side of Core Sound,
about 6 miles west of the end of the peninsula at the junction of
Core and Pamlico Sounds. It lies about 30 miles by the boat route
through Core Sound easterly from Beaufort, N. C. (See U. S. Coast
and Geodetic Survey Chart No. 1233.)
   Existing project.-This provides for a channel 5 feet deep and 50
feet wide on bottom to connect Thoroughfare Bay and Cedar Bay.
The length of this channel is about 11/2 miles. There is no lunar tide
in the channel or waterway, variations in the level of the water sur-
face being due entirely to the action of the wind. Ordinary storms
will cause a variation of 1 foot above or below mean stage, while
severe storms may cause a variation of as much as 3 feet.
   The estimate of cost for new work, revised in 1919, was $9,000.
The latest (1928) approved estimate for annual cost of maintenance
is $1,000.
   The existing project was adopted by the River and Harbor Act
of March 2, 1919 (H. Doc. No. 1125, 63d Cong., 2d sess.). The latest
published map is in the project document.
   Recommended modifications of project.-Under date of June 14,
1939, the Chief of Engineers recommended that the project be modi-
fied to provide a depth of 7 feet and for increasing the width at the
bends, at an estimated first cost of $20,000, with no increase in
annual maintenance over that now required, subject to certain condi-
tions of local cooperation (S. Doc. No. 87, 76th Cong., 1st sess.).
   Terminal facilities.-None. Not required.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1921. At the close of the fiscal year the controlling mean
low water depth was 5 feet. The total costs and expenditures under
the existing project to June 30, 1942, were $24,549.01, of which $9,000
was for new work and $15,549.01 was for maintenance.
   Proposed operations.-None. The additional sum of $3,000 can be
profitably expended during the fiscal year 1944 for maintenance
dredging under contract during May 1944.
                         Cost and financial summary

Cost of new work to June 30, 1942_________$______--------------9, 000. 00
Cost of maintenance to June 30, 1942-- --------------------
                                        ___                    15, 549. 01
      Total cost of permanent work to June 30, 1942        ___        24, 549. 01
Net total expenditures_--_----    _
                               ____24,                                    549. 01
Total amount appropriated to June 30, 1942                            24, 549. 01
            RIVER,S       AND HARBORSr--WILMINGTON,                      N.      C., DISTRICT                    483

    Fiscal year ending June 30               1938         1939        1940              1941              1942


Cost of new work-------------             --- -                ..                                         ....    .
Cost of maintenance_______                  $7, 049. 96----------------------------                   -     -

Total expended.......------------------      7, 067.96-                                         -

Allotted ------------------
            _.                     -----     1, 450. 99     $7,000    -$6, 000          -$1, 000_


Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance     ------------------------------------                                      $3, 000. 00

                                           14. DRUM INLET, N. C.
   Location.--Drum Inlet is an opening through the barrier beach
which separates Core Sound from the Atlantic Ocean. It is about
1,100 feet wide and is situated about 35 miles northeast of Beaufort
and opposite the village of Atlantic.
   Existing project.-This provides for a channel 12 feet deep at mean
low water and 200 feet wide from the gorge in the inlet to the fed-
erally improved channel in Core Sound, a distance of about 1 mile.
The mean range of tide is 3.8 feet in the ocean and 0.3 foot in Core
Sound at Atlantic.
   The estimate of cost for new work, made in 1937, was $50,000. The
latest (1937) approved estimate for annual cost of maintenance is
$4,500.
   The existing project was adopted by the River and Harbor Act
of June 20, 1938 (H. Doc. No. 414, 75th Cong., 2d sess.). The latest
published map is contained in this document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-None. Not required.
   Operations and results during fiscal year.-The work consisted of
maintenance dredging and miscellaneous surveys.                                  Between August 4
and September 3, 1941, the contract dredge Reliance removed 123,886
cubic yards of material from the channel to restore project dimensions.
The total costs were $17,291.48, all for maintenance. The expenditures
were $17,307.48.
  Condition at end of fiscal year.-The existing project was completed
in 1940. At the close of the year the controlling mean low water depth
was 5 feet. The total costs and expenditures under the existing project
to June 30, 1941, were $52,828.22 for new work and $23,851.82 for
maintenance, a total of $76,680.04.
    Proposed operations.-The balance unexpended July 1, 1942, $32,-
819.96 will be applied to maintenance dredging under contract during
July and August 1942.
  The additional sum of $10,000 can be profitably expended during
the fiscal year 1944, and will be applied to maintenance dredging
under contract during April 1944.
                                      Cost and financial summary
Cost of new work to June 30, 1942_   _
                                 ---------------------------                                        $52, 828. 22
Cost of maintenance to June 30, 1942 -------------------------                                       23, 851. 82
         Total cost of permanent work to June 30, 1942--------------76, 680. 04

Net total expenditures _------- ------------                                                         76, 680. 04
                                      __32,
Unexpended balance June 30, 1942_----------_ _-                                                          819. 96
         Total amount appropriated to June 30, 1942 ---                       __-----               109, 500. 00
484          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                           1942


   Fiscal year ending June 30             1938            1939              1940          1941             1942

Cost of new work .                                         $164. 35       $52, 663. 87       _...
Cost of maintenance---. . .___       _____________   __________       _     1,760.00     $4, 800. 34      $17, 291.48

      Total cost______---_          _________        -_     164. 35        54, 423. 87    4, 800. 34       17, 291.48

Total expended__--.....-.--....-    __-_____                164. 35        54, 423.87     4, 784.34        17, 307.48

Allotted__               ........_
                -....-..........           .--.-.... 50, 000. 00           11, 500. 00   38,000.00         10,000. 00



Balance unexpended July 1, 1941_______________________________                                         $40,127. 44
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942______________________________                                                   10, 000. 00
      Amount to be accounted for_____________ __________--__50,127. 44
Gross amount expended----- -------------------------------    17, 307. 48
        Balance unexpended June 30, 1942 __________                                      ____-          32, 819. 96

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1 _________               -
                                                            _    _                                      10,000. 00
  1 Exclusive of available funds.

                                   15. BEAUFORT HARBOR, N. C.

   Location.-This harbor is located just inside Beaufort Inlet adja-
cent to Morehead City Harbor. New Bern, N. C., the nearest harbor
of importance, is about 43 miles by inland waterway to the northwest.
 (See U. S. Coast and Geodetic Survey Chart No. 420.)
   Previous projects.-Adopted by River and Harbor Act of July 4,
1836. The total cost and expenditure was $5,000 for new work. For
further details see page 1803 of Annual Report for 1915.
   Existing project.-This provides for the stopping of erosion at the
inlet by jetties and sand fences at Fort Macon and Shackleford Points
and other shore protection; for a channel 100 feet wide and 12 feet
deep at mean low water in Bulkhead Channel and Gallants Channel
and the same depth, with width varying from 200 to 400 feet, in front
of the tbwn of Beaufort; and the construction of a stone bulkhead
extending from Town Marsh across Bird Shoal to the westerly end
of Carrot Island. The distance from the inlet to the upper end of
Gallants Channel is about 5 miles. The average rise of tide is 21/2
feet at Beaufort and 31/2 feet at the inlet. The extreme range of tides
is 5. feet.
   The estimate of cost for new work, revised in 1930, exclusive of
amount expended on previous projects, was $262,800. The latest
 (1930) approved estimate for annual cost of maintenance is $17,500.
   The existing project was authorized by the following river and
harbor acts:
               RIVERS     AND HARBORSr--WILMINGTON,                        N.    C., DISTRICT            485


       Acts                       Work authorized                                    Documents


Mar. 3,1881       9-foot channel 200 feet wide through Bulkhead        Annual Report, 1881, p. 1013.
                     Channel to Beaufort; a 6-foot channel 100 feet
                     wide to North River and Core Sound; and the
                     construction of jetties on Shakleford Point.
                  Reduced channel 100 feet wide and 7 feet deep        Annual Report, 1890, p. 1134.
                    through Bulkhead Channel to Beaufort.
Mar. 2,1907       Repairs to Fort Macon jetties and additional         Specified in act.
                    jetties and shore protection.
June 25,1910      10-foot channel 60 feet wide from Beaufort through   H. Doc. No. 511, 61st Cong., 2d sess.
                    Gallants Channel to the inland waterway.
Mar. 2,1919       Turning and anchorage basin 10 feet deep in front    H. Doc. No. 1108, 63d Cong., 2d sess.
                    of Beaufort.
Mar. 3,1925       Bulkhead across Bird Shoal_'------------------       Rivers and Harbors Committee Doc.
                                                                                                    1
                                                                         No. 8, 68th Cong., 2d sess.
                                                                                                            1
July     3,1930   Increase in depth to 12 feet in Bulkhead Channel,    H. Doc. No. 776, 69th Cong., 2d sess.
                    Gallants Channel, and in front of Beaufort.


  1 Contain latest published maps.

   Recommended modifications of project.-Under date of May 25,
1939, the Chief of Engineers recommended that the project be modi-
fied to provide for extension of the existing basin eastward to the
easterly side of Marsh Street, and for increase in width of the entire
basin to 600 feet, all to a depth of 12 feet, at an estimated first cost
of $54,000, with annual maintenance of $2,700 in addition to that
now required, subject to certain conditions of local cooperation
 (H. Doc. No. 334, 76th Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 40 wharves contiguous to this har-
bor. They have a total frontage of about 1,400 feet. The existing
facilities are considered adequate for present commerce.
   Operations and results during fiscal year.-The work consisted of
hired labor surveys and preparing specifications for maintenance
dredging under contract of an extension of Gallants Channel. The
total costs for the year, all for maintenance, were $1,429.11. The
expenditures were $3,424.42.
   Condition at end of fiscal year.-The existing project was completed
in 1931. At the close of the fiscal year the controlling mean low
water depth was 12 feet in the Bulkhead and Gallants Channels and
in the harbor in front of Beaufort. The stone jetties and training
walls were in fair condition. The total costs and expenditures under
the existing project to June 30, 1942, were $269,667.38 for new work,
and $246,902.19 for maintenance, a total of $516,569.57.
   Proposed operations.-The balance unexpended July 1, 1942, $25,-
822.38, will be applied to maintenance as follows:
Dredging Gallants Channel extension under existing contract during
August 1942-------------------------------------------------      $8, 570. 20
Dredging under contract in the Bulkhead and Gallants Channels and
  in front of Beaufort during May 1943--------------------___ 17, 252. 18

              Total for all work------------------------------------                       ----- 25, 822. 38
  The additional sum of $12,500 can be profitably expended during
the fiscal year 1944 and will be applied to maintenance dredging
under contract during March 1944.
486             REPORT OF CHIEF OF ENGINEERS,                                                 U.    S.      ARMY,           1942

                                                Cost and financial summary
Cost of new work to June 30, 1942_ _1_
                                     _1__1_-------                                                                                $274, 667. 38
Cost of maintenance to June 30, 1942_-------------                                                        --------
                                                                                                              _                    246, 902. 10

           Total cost of permanent work to June 30, 1942-------------521, 569. 57

Net total expenditures---------------------------------                                                                            521, 569. 57
Unexpended balance June 30, 1942- ------------------                                                                ---             25, 822. 38

           Total amount appropriated to June 30, 1942 ------------                                                                 547, 391. 95

    Fiscal year ending June 30                       1938                  1939                 1940                 1941                1942

C o s t of new w ork - -
Cost of maintenance
                              - -    - -    - -   - -    - -
                               ........------------ $20, 250. 21
                                                                   - -   - -   - -
                                                                         $6, 864. 77
                                                                                        - -   - -   - -
                                                                                               $7,160. 16
                                                                                                             . .     ----.
                                                                                                                   $25, 238.20
                                                                                                                                     .   . . .    .
                                                                                                                                         $1, 429. 11

Total expended................--------------.      20, 250. 21             6, 864. 77           7, 160. 16          23, 242. 89           3, 424. 42

Allotted      .......                                 5, 000. 00
                            ..........--------------------                20, 014. 62          10, 000.00           21, 500. 00          10, 000.00


Balance unexpended July 1, 1941-__        _ _               ___                                                                   $19, 246.80
Amount allotted from War Department Civil Appropriation Act ap-
  proved Apr. 28, 1942 -------------------------------------                                                                        10, 000. 00

      Amount to be accounted for----------------------------                                                                        29, 246. 80,
Gross amount expended_                                                                                                               3, 424. 42
     Balance unexpended June 30, 1942----------------------25, 822.38
Amount covered by uncompleted contracts-----------------------8, 570. 20

           Balance available June 30, 1942-------------------------                                                                 17, 252. 18
Amount that can be profitably expended in fiscal year ending June
June 30, 1944, for maintenance 1----------------------------                                                                      12, 500. 00
    1   Exclusive of available funds.


        16. WATERWAY CONNECTING PAMLICO SOUND AND BEAUFORT
                           HARBOR, N. C.

   Location.-This waterway begins at the southeast corner of Pam-
lico Sound, passing southwesterly through Wainwright Slough, Core
Sound, The Straits, and Taylors Creek to Beaufort Harbor, a total
length of 36.5 miles. (See U. S. Coast and Geodetic Survey Chart
No. 1233.)
   Previous projects.-No previous project exists for this waterway
as a whole. The River and Harbor Act of March 4, 1913, authorized
a channel 23/4 miles long connecting Core Sound and Beaufort Har-
bor. For further details see page 520 of the Annual Report for 1938.
   Existing project.-This provides for a channel 7 feet deep at mean
low water, with bottom width of 75 feet, extending from Pamlico
Sound by way of Wainwright Channel and Core Sound to Beaufort
Harbor, a distance of 36.5 miles, and for a channel 7 feet deep and
75 feet wide from the main channel in Core Sound to the town of
Atlantic. There are no lunar tides in the northern portion of Core
Sound. Ordinary storms cause a variation of 1 foot above or below
mean stages, increasing to as much as 3 feet during severe storms.
The mean tidal range at Beaufort is 21/2 feet, gradually diminishing
toward the upper end of Core Sound.
            RIVERS       AND HARBORSr---WILMINGTON,                         N.   C.,    DISTRICT          487

  The estimate of cost for new work, revised in 1937, was $84,400,
exclusive of amounts expended on previous projects. The latest
(1937) approved estimate for annual cost of maintenance is $11,750.
  The existing project was authorized by the following river and
harbor acts:

     Acts                         Work authorized                                      Documents I


Sept. 22, 1922   A 7-foot channel 75 feet wide from Core Sound to       H. Doc. No. 88, 67th Cong., 1st sess.
                   Beaufort Harbor.
Aug. 30, 1935 2 A 7-foot channel 75 feet wide from Pamlico Sound        H. Doc. No. 485, 72d Cong., 2d sess.
                   to Beaufort Harbor via Wainwright Channel.
Aug. 26,1937     A 7-foot side channel 75 feet wide to Atlantic------   Rivers and Harbors Committee Doc.
                                                                          No. 92, 74th Cong., 2d sess.


  1These documents contain the latest published maps.
  2 Included in the Public Works Administration program Jan. 3, 1934.


  Recommended modifications of project.-Under date of November
7, 1940, the Chief of Engineers recommended that the project be
modified to provide for channels 7 feet deep and 75 feet wide, located
near the east and west ends of Harkers Island, respectively, and for
a side channel 75 feet wide and 5 feet deep to and including a basin
of the same depth 150 feet long and 130 feet in mean width at Davis,
at an estimated first cost of $35,000, with $1,500 annually for mainte-
nance in addition to the amounts now required, subject to certain
conditions of local cooperation. (H. Doc. No. 99, 77th Cong., 1st
sess.).
   Further modifications were recommended by the Chief of Engi-
neers in a report requested by resolution of the, Committee on Com-
merce, U. S. Senate, adopted Nov. 4, 1941, and transmitted to Congress
by the Secretary of War July 20, 1942.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 5 wharves on the portion of the
waterway connecting Core Sound with Beaufort Harbor. Between
the eastern end of this portion of the waterway and Pamlico Sound
there are 12 small wharves. Additional wharves are needed at several
of the communities along Core Sound.
   Operations and results during fiscal year.-The work consisted of
maintenance dredging and miscellaneous surveys. Between July 12
and August 2, and between September 4 and 16, 1941, the contract
dredge Reliance removed 73,251 cubic yards of material from the
channel to restore project dimensions. The costs were $20,088.42,
all for maintenance. The expenditures were $21,346.08.
   Condition at end of fiscal year.-The portion of the existing project
providing for a through waterway from Pamlico Sound to Beaufort
was completed in 1934 and the side channel to Atlantic in 1937. At
the close of the year the controlling low water depth was 6 feet. The
total costs and expenditures for the through waterway to June 30,
1942, including $40,000 of Public Works funds for new work, were
$134,686.95, of which $27,655.04 was for new work and $107,031.91
was for maintenance. The total cost of the side channel to Atlantic,
488          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                        1942

all for new work, was $18,584.53, of which $13,171.72 was from Works
Progress Administration funds, and $5,412.81 was from funds con-
tributed by local interests.
   Proposed operations.-The balance unexpended July 1, 1942,
$15,425.20 will be applied to maintenance dredging under contract
during June 1943.
   The additional sum of $11,750 can be profitably expended during
the fiscal year 1944, and will be applied to maintenance dredging
under contract during April 1944.
                                              Cost and financial summary
Cost of new work to June 30, 1942--------------------------                                                        $87, 655. 04
Cost of maintenance to June 30, 1942-------------------- --                                                         119,885. 72

           Total cost of permanent work to June 30, 1942------------207, 540. 76

                       -
Net total expenditures__ -----------------------------------                                                       207, 540. 76
Unexpended balance June 30, 1942------ ----               ----------------                                          15, 425. 20

           Total amount appropriated to June 30, 1942---------------                                               222, 965. 96
   1 In addition, $10,000 contributed funds expended on new work under previous projects.


    Fiscal year ending June 30                      1938             1939            1940              1941            1942

Cost of new work--       -
Cost of maintenance____--..
                                  -      --
                                      .....
                                              -
                                                  $9, 398. 31
                                                             -       - -
                                                       --------------------    --------
                                                                     ____________
                                                                                            -----
                                                                                        $32,-
                                                                                        $32,000
                                                                                                         --- --
                                                                                                      $9,486. 38
                                                                                                                   --$20,-- --
                                                                                                                          088. 42
Total expended- ....          -        ----         9, 398.31         ...               32, 000        8,228.72        21, 346.08
Allotted    _------------------                   -2, 530. 76         $21, 000          21, 000       24, 000.00       11, 000.00


Balance unexpended July 1, 1941         -----------------------------                                              $25, 771. 28
Amount allotted from War Department Civil Appropriation Act ap-
proved Apr. 28, 1942 --------------------------------------                                                        11, 000. 00
      Amount to be accounted for-----------------------------36, 771. 28
Gross amount expended------------------------------------21, 346. 08

           Balance unexpended June 30, 1942------------------------15, 425.20

Amount that can be profitably expended in fiscal year ending June 30,
                                 -
  1944, for maintenance 2-----                                  --          ----            -------                 11, 750. 00
  2Exclusive of available funds.

      17. CHANNEL FROM BACK SOUND TO LOOKOUT BIGHT, N. C.

   Location.-This channel extends from a point near the eastern end
of Harkers Island, about 8 miles east of Beaufort, through the shallow
waters of Back Sound and Lighthouse Bay, to and through Shackle-
ford Banks, and into the Atlantic Ocean at Lookout Bight, and is
about 4 miles long. (See U. S. Coast and Geodetic Survey Chart
No. 421.)
   Existing project.-The project provides for a channel 50 feet wide
and 5 feet deep at mean low water from deep water in Back Sound,
through Shackleford Banks to deep water in Lookout Bight. The
mean range of tide is 3.8 feet in Lookout Bight and 1.3 feet in Back
Sound, and the extreme range is 8.2 feet in Lookout Bight and 3.8
feet in Back Sound.
             RIVERS         AND HARBORS--WILMINGTON,                              N.      C., DISTRICT            489


   The estimate of cost for new work, made in 1937, was $50,000. The
latest (1937) approved estimate for annual cost of maintenance is
$11,000.
   The existing project was authorized by the River and Harbor Act
of August 26, 1937 (H. Doc. No. 251, 75th Cong., 1st sess.). The latest
published map is in the project document.
   Recommended modifications of project.-Under date of February
16, 1942, the Chief of Engineers recommended modification of the
existing project so as to provide for a dredged channel 7 feet deep and:
100 feet wide from deep water in the sound to deep water in the ocean
at an estimated cost of $50,000 with $12,000 annually for maintenance
of the modified project; subject to certain conditions of local coopera-
tion (H. Doc. No. 746, 77th Cong., 2d sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-None. Not required.
   Operations and results during fiscal year.-The work consisted of
maintenance dredging under contract, and making miscellaneous sur-
veys. The contract dredge Reliance, between July 1 and 11, 1941,
removed 26,982 cubic yards of material from the channel, restoring
project dimensions. The costs were $6,963.97, all for maintenance.
The expenditures were $16,825.82.
   Condition at end of fiscal year.-The existing project was completed
in 1938. At the close of the year the controlling depth at mean low
water was 3.5 feet. The total costs and expenditures under the exist-
ing project to June 30, 1942, were $84,147.04, of which $24,676.08
was for new work and $59,470.96 was for maintenance.
   Proposed operations.-The balance unexpended July 1, 1942,
$32,352.96, will be applied to maintenance dredging under contract
during September and October 1942.
   The additional sum of $11,000 can be profitably expended during the
fiscal year 1944 for maintenance dredging under contract during
May 1944.
                                           Cost and financial summary
Cost of new work to June 30, 1942_______________________________                                          $24, 676. 08
Cost of maintenance to June 30, 1942--_____________-____   ______                                          59, 470. 96
         Total cost of permanent work to June 30, 1942_-------------                                       84,147. 04

Net total expenditures___________________ __     -     -__                                                84, 147. 04
Unexpended balance June 30, 1942 ______________-----____                                                  32, 352. 96
         Total amount appropriated to June 30, 1942-------------                                          116, 500. 00

   Fiscal year ending June 30                  1938           1939           1940            1941             1942

Cost of new work -------------
                             _                     $6. 25   $24, 669. 83 ----------- --......... .......... --------
Cost of maintenance _          ---        --------------     21, 906. 03    $18, 417. 89   $12, 183.07    $6, 963. 97
      Total cost--.---_--- - -------               .6.25     46, 575. 86    18, 417. 89     12, 183.07         6, 963. 97
Total expended                         .------------------
                                             --..._        46, 582. 11      18, 417. 89      2, 321. 22       16, 825. 82
Allotted -----------------------              50, 000.00     11,000. 00     14, 000.00      31, 500. 00       10, 000. 0
490      REPORT OF CHIEF OF ENGINEERS,                U. S. ARMY,   1942

Balance unexpended July 1, 1941------------- ----------------- $39, 178. 78
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942------------------------------------ 10, 000. 00

      Amount to be accounted for_---- --             -
                                          _________----  -___          49, 178. 78
Gross amount expended     -----------------------------------          16, 825. 82
       Balance unexpended June 30, 1942----------------------          32, 352. 96

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1--__________________   __------------      11, 000. 00
  1 Exclusive of available funds.

18. INLAND WATERWAY, BEAUFORT TO CAPE FEAR RIVER,                          N.   C.,
         INCLUDING WATERWAY TO JACKSONVILLE, N. C.

   Location.-This waterway begins at Beaufort Harbor and follows
the general line of the coast, passing through Bogue Sound and the
sounds and marine marshes to the south, to a point in Myrtle Sound
just north of Carolina Beach, crossing the mainland at this point into
Cape Fear River, which it enters about 16 miles below Wilming-
ton. (See U. S. Coast and Geodetic Survey Charts Nos. 1234 and
1235.)
   Previous projects.-Adopted by River and Harbor Acts of July 4,
1836; March 3, 1837; July 7, 1838; August 2, 1882; August 5, 1886;
September 19, 1890; March 3, 1905; June 25, 1910; and August 8, 1917.
For further details see page 1803 of Annual Report for 1915, and
page 585 (for New River), page 587 (for waterway between New
River and Swansboro), page 589 (for waterway between Beaufort
Harbor and New River--that is, portion between Beaufort and Swans-
boro)-Annual Report for 1917; Annual Report for 1926, page 532;
and Annual Report for 1938, page 523.
   Existing project.-This provides for a waterway 12 feet deep at
mean low water with a bottom width of 90 feet, extending along the
coast from Beaufort, N. C., to the Cape Fear River, a distance of
93.5 miles, with such modifications in routing as the Chief of Engi-
neers may find desirable and economical, and including the provision
of a tidal lock near the Cape Fear end and a highway bridge in its
vicinity. The project also provides for a channel 10 feet deep at
mean low water and 90 feet wide in New River to the Atlantic Coast
Line Railroad bridge at Jacksonville, N. C., a distance of 21 miles;
for a side channel 12 feet deep and 90 feet wide to a turning basin of
the same depth, 200 feet wide and 350 feet long, opposite the principal
wharves at Swansboro; and for an entrance channel 6 feet deep and
90 feet wide at New River Inlet with connecting channel of the same
dimensions to the Inland Waterway near the mouth of New River.
    The tidal range varies from 31/2 feet at the inlets to 1 foot at points
between. The tidal range for New River varies from 31/2 feet at New
River Inlet to 1 foot at the head of the marshes, and nothing at Tar
Landing, 31 miles above. At the Beaufort end of this waterway the
extreme range of tide is 5.0 feet. At the various inlets between Beau-
fort Inlet and New River Inlet the extreme range of tides is probably
from 4.5 to 5 feet. At the Cape Fear River end the mean range is
3.8 feet.
    The estimate of cost for new work, revised in 1938, was $2,402,000,
  exclusive of amounts expended on previous projects. The latest
              RIVERS AND          HARBORSr--WILMVIINGTON,                 N.   C.,    DISTRICT           491

(1938) approved estimate for annual cost of maintenance is $161,000.
  The existing project was authorized by the following river and
harbor acts:

       Acts                       Work authorized                                    Documents


Aug.     8,1917   A 3-foot channel 100 feet wide from Beaufort to     H. Doc. No. 1775, 64th Cong., 2d sess.
                    Swansboro, thence 40 feet wide to Jacksonville.
                                                                                                               1
Jan.    21,1927   A 12-foot channel 90 feet wide from Beaufort to     H. Doc. No. 450, 69th Cong., 1st sess.
                    Cape Fear River, N. C.
Aug. 30,1935      A 10-foot channel 90 feet wide in New River from    H. Doc. No. 67, 74th Cong., 1st sess.1
                    the Inland Waterway to Jacksonville.
Aug. 26, 1937     A 12-foot side channel 90 feet wide to Swansboro_   Rivers and Harbors Committee Doc.
                                                                        No. 16, 75th Cong., 1st sess.l
June 20,1938      A 6-foot channel 90 feet wide from New River        H. Doc. No. 691, 75th Cong., 3d sess.1
                    Inlet to the Inland Waterway.


1 Contain latest published maps.


   Recommended modifications of project.--Under date of February
27, 1940, the Chief of Engineers recommended that the existing
project be modified to provide for the construction of six mooring
basins at various locations along the waterway, at an estimated cost
of $24,000 for new work and $600 annually for maintenance in addi-
tion to that now required (H. Doc. 660, 76th Cong., 3d sess.).
   Under date of June 3, 1941, the Chief of Engineers recommended
further modification of the existing project so as to provide a chan-
nel 8 feet deep and 90 feet wide, extending from the waterway via
Motte and Banks Channels to a point just within Masonboro Inlet
at Wrightsville Beach, N. C., at an estimated cost of $9,000, with
$500 annually for maintenance in addition to that now required;
subject to certain conditions of local cooperation (H. Doc. 346, 77th
Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-The north end of this waterway is in Beau-
fort Harbor and harbor at Morehead City, the terminal facilities of
which are described in the reports for those improvements in this
report. There are 16 wharves between Morehead City and Swans-
boro, 10 at or near Swansboro, 9 on New River, of which 5 are at or
near Jacksonville, and 16 between New River and Cape Fear River.
The facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-The work consisted of
maintenance dredging by Government plant and hired labor, and
miscellaneous surveys. The U. S. dredge Howell, between July 1
and November 17, 1941, and between March 16 and June 2, 1942,
removed 97,629 cubic yards from section I, 89,284 cubic yards from
section II, 380,576 cubic yards from section III, 278,287 cubic yards
from section IV, and 44,478 cubic yards from section V, a total of
890,254 cubic yards. The total costs were $115,997.92, all for main-
tenance. The total expenditures were $116,094.93.
   Condition at end of fiscal year--The existing project was com-
pleted in 1940. At the close of the year the controlling mean low
water depths were as follows: 12 feet between Beaufort and, the
Cape Fear River, and in the side channel to Swansboro,:9.5 feet in
492           REPORT OF CHIEF OF ENGINEERS,                                 U. S. ARMY,             1942

New River to Jacksonville, and 3.5 feet on the bar at New River
Inlet. The total costs and expenditures of the existing project to
June 30, 1942, were $2,361,331.39 for new work and $715,542.89 for
maintenance, a total of $3,076,874.28.
    Proposed             operations.-The                  balance         unexpended          July         1,     1942,
$111,747.97, will be applied to maintenance as follows:
Dredging to ease passage at bends, to reduce currents at tidal cross-
  ings, and to restore project dimensions in the waterway Beaufort
  to Cape Fear River, in the waterway to Jacksonville, in the side
channel to Swansboro, and in the New River Inlet channel, with
  Government plant and hired labor, as needed, between July 1,
  1942, and June 30, 1943---------------------------------            $111, 747. 97

                                                 --------
          Total for all work----------------------      _ 111, 747. 97
  The additional sum of $161,000 can be profitably expended during
the fiscal year 1944, and will be applied to maintenance dredging
with Government plant and hired labor between July 1, 1943, and
June 30, 1944.
                                          Cost and financial summary

Cost of new work to June 30, 1942   ------------------------- $2, 560, 038. 31
Cost of maintenance to June 30, 1942--------------------------823, 176. 83

          Total cost of permanent work to June 30, 1942-----------3, 383, 215. 14

Net total expenditures-----------     --------------------                                           3, 383, 215. 14
Unexpended balance June 30, 1942_-----------------__                                                    111, 747. 97
          Total amount appropriated to June 30, 1942-------------3, 494, 963. 11

    Fiscal year ending June 30               1938            1939             1940           1941                1942

Cost of new work                                            $4, 820. 54    $113, 003.03         _
Cost of maintenance.------------           $43, 923. 76     52, 226. 96      59, 347. 82   $71, 932. 00     $115, 997. 92
       Total cost----------------           43, 923. 76     57, 047. 50     172, 350. 85    71, 932. 00         115, 997. 92

Total expended----------------              43, 923. 76     56,997. 26      161, 645. 52    82, 590. 56         116, 094. 93
Allotted ........--------------------..    130, 000. 00    206, 000. 00      64, 000. 00    84, 000. 00         95, 000. 00



Balance unexpended July 1, 1941------------------------------ $132, 842. 90
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942----------------- -------------------   95, 000.00
      Amount to be accounted for-----------------------                                                   227, 842. 90
Gross amount expended-----------------------                                     $116, 968. 12
Less reimbursements collected ---------------------                                    873. 19
                                                                                                          116, 094. 93

          Balance unexpended June 30, 1942----------------------111,                                             747.97
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1---------------------------------161,                                                000. 00
1 Exclusive of available funds.

19. INTRACOASTAL WATERWAY FROM CAPE FEAR RIVER, N. C., TO
                     WINYAH BAY, S. C.
  Location.-This waterway begins at Southport, N. C., and follows
in general a route from the Cape Fear River up Elizabeth River 6.7
miles to a point near its headwaters; thence through high ground
              RIVERS       AND HARBORS--WILMINGTON,                        N.   C.,    DISTRICT          493
2.6 miles to the headwaters of Davis Creek; thence down Davis
Creek to the sounds and salt marshes and through the latter to Little
River, S. C., a distance of 24.2 miles; thence up Little River 5.7
miles to its headwaters; thence through high ground 21.8 miles to
the head of Socastee Creek; thence down Socastee Creek 6.5 miles
to the Waccamaw River, and down the latter 27 miles to Winyah
Bay; a total distance of 94.5 miles. (See U. S. Coast and Geodetic
Survey Charts Nos. 1236 and 1237.)
   Existing project.-This provides for a waterway 12 feet deep at
mean low water with a bottom width of not less than 90 feet, between
Cape Fear River, N. C., and Winyah Bay, S. C., a distance of ap-
proximately 94.5 miles; for the construction of three bridges cross-
ing the waterway in Horry County, S. C.; and for a yacht basin 230
feet wide, 450 feet long, and 12 feet deep near the town of South-
port, connected with the Intracoastal Waterway by a suitable channel
of the same depth. The mean range of tide on Cape Fear bar is 4.7
feet; at inlets 4 feet, varying to 2 feet at points midway between
inlets and in Winyah Bay, at Georgetown, 3.3 feet.
   The estimate of cost for new work, revised in 1938, is $6,431,500.
The latest (1938) approved estimate for annual cost of maintenance
is $62,100.
   The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                    Documents


July     3, 1930   A waterway 8 feet deep and 75 feet wide from Cape   H. Doc. No. 41, 71st Cong., 1st sess.
                    Fear River to Winyah Bay.
Aug. 30, 19351     Construction of bridges across the waterway in      Rivers and Harbors Committee Doc.
                     Horry County, S. C.                                 No. 14, 72d Cong., 1st sess.
Aug. 26, 1937      Increasing dimensions of waterway to 12 feet deep   Rivers and Harbors Committee Doe.
                     and 90 feet wide.                                   No. 6, 75th Cong., 1st sess.a
                                                                                                             2
June 20,1938       To provide a yacht basin near Southport, 12 feet    H. Doc. No. 549, 75th Cong., 3d sess.
                     deep, 230 feet wide, and 450 feet long, with
                     connecting channel.


  1 Included in Public Works Administration program Sept. 6, 1933.
  2 Contain latest published maps.

  Recommended modifications of project.-Under date of May 25,
1939, the Chief of Engineers recommended modification of the existing
project so as to provide near Myrtle Beach, S. C., an anchorage basin
125 feet wide, 335 feet long, and 12 feet deep, at an estimated first cost
of $11,000, with annual maintenance of $200, in addition to that now
required; subject to certain conditions of local cooperation (H. Doc.
No. 327, 76th Cong., 1st sess.).
  Local cooperation.-Fully complied with.
  Terminal facilities.-There are numerous wharves and landings
along the present waterways which are used mostly for shipping agri-
cultural and timber products. These wharves are of the open-pile
and timber type. The facilities are considered adequate for existing
commerce.

          493202-43-pt. 1, vol. 1-           32
494     REPORT OF CHIEF OF ENGINE.ERS,              U. S. ARMY,      1942

   Operations and results during fiscal year.-The work for the year,
all with regular funds, consisted of maintenance dredging and snag-
ging with Government plant and hired labor, and miscellaneous
surveys.
   The work under the Wilmington, N. C., district, covering the sec-
tion from Cape Fear River, N. C., to Little River, S. C., was as
follows: The U. S. dredge Howell between February 2 and 28, 1942,
removed 10,048 cubic yards from section I, and 84,886 cubic yards
from section II, a total of 94,934 cubic yards. The total costs and
expenditures, all for maintenance, were $17,048.97.
   The work under the Charleston, S. C., district, covering the section
from Little River to Winyah Bay, S. C., was as follows: The U. S.
snagboat Wateree removed 2,960 cubic yards of material from 3 shoals
at the mouths of spillway ditches entering the canal at a cost of
$1,293.85. The cost of surveys and supervision was $3,713.53. The
total cost for the year was $7,054.22, all for maintenance. The expendi-
tures were $7,001.59.
   The total costs for the year for the Wilmington and Charleston dis-
tricts were $24,103.19. The expenditures were $24,050.56.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1940. The 8-foot waterway, including construction of three
bridges, was completed in 1936. The enlargement of the previous 8-
foot project to the existing 12-foot project and dredging the yacht
basin at Southport were completed in 1940. At the close of the fiscal
year the controlling mean low-water depths were 11.4 feet from
Cape Fear River, N. C., to Little River, S. C.; thence 11.1 feet to
Socastee Bridge; thence 12 feet to Winyah Bay, S. C. The total
costs under the existing project to June 30, 1942, were $6,375,369.20, of
which $3,948,184.92 was from regular funds and $2,065,436.94 from
Public Works funds, a total of $6,013,621.86 was for new work, and
$361,747.34 for maintenance. The total expenditures were $6,377,-
253.30, of which $4,311,816.36 was from regular funds, and $2,065,-
436.94 from Public Works funds.
   Proposed operations.-The balance unexpended July 1, 1942, $130,-
192.05, will be applied to maintenance, as follows:
Accounts payable July 1, 1942__..---------------------------------        $552. 63
Dredging the waterway to ease passage at bends, to reduce currents at
  tidal crossings, and to restore project dimensions, with Government
plant and hired labor, as needed between July 1, 1942, and June 30,
  1943 :
     Section from Cape Fear River, N. C., to Little River, S. C-------- 73, 085. 49
     Section from Little River to Winyah Bay, S. C---___________-       54, 803. 93
Clearing the channel from Little River to Winyah Bay of stumps, logs,
  and floating debris as may be required, by hired labor, Apr. 1 to 15,
  1943----------------------           ----------------------------      2, 250. 00
      Total for all work___----------- -_------__                    - 130, 192. 05
   The additional sum of $62,100 can be profitably expended during the
fiscal year 1944 and will be applied to maintenance, as follows:
Dredging to restore project dimensions between Cape Fear River, N. C.,
  and Winyah Bay, S. C., with Government plant and hired labor, as
  needed between July 1, 1943, and June 30, 1944:
    Section from Cape Fear River, N. C., to Little River, S. C---------- $28, 600
    Section from Little River to Winyah Bay, S. C ---------------- ~-- 33,500

      Total for all work- ----------------------                 -          62,100
            RIVERS AND HARBORS---WILMINGTON,                                            N. C., DISTRICT                     495
                                           Cost and financial summary
Cost of new work to June 30, 1942__  ________-------            __$6, 013, 621. 86
Cost of maintenance to June 30, 1942-----------------------------     361, 747. 34
      Total cost of permanent work to June 30, 1942___________                                               6, 375, 369. 20
Undistributed costs June 30, 1942--______----      ---------                                                        1,
                                                                                                                     936. 73
                                                                                                                  1-----
      Net total cost to June 30, 1942 ----------                                                  __--6,          377, 305. 93
Minus accounts payable June 30, 1942--------------------                                                                52, 63

     Net total expenditures-______________---------                                                          6, 377. 253. 30
Unexpended balance June 30, 1942___                                            ---                               30, 192.05
        Total amount appropriated to June 30, 1942___-----___-
                                                           -                                                 6, 507, 445. 35

   Fiscal year ending June 30                   1938              1939               1940            1941                1942


Cost of new work    ---                       $7, 481. 51    $443, 756. 17     $794, 532. 32       $60,137.48
Cost of maintenance--            - -          56, 951. 99      23, 416. 95       27, 575. 52        45, 478. 54      $22, 056. 35
      Total cost          --                  64, 433. 50      467, 173. 12     822, 107. 84       105, 616. 02          22, 056. 35

Total expended                  -      -      61, 337. 52      344, 622. 39     909, 979. 58       153, 194. 66          24, 050. 56
Allotted_                                  1, 851, 800. 00   1, 479, 800. 00   -134, 162. 60        66, 400. 00          58, 000. 00



Balance unexpended July 1, 1941__  -----------------------------                                                  $96, 242.61
Amount allotted from War Department Civil Ap-
  propriation Act approved May 23, 1941________ $23, 000.00
Amount allotted from War Department Civil Ap-
  propriation Act approved Apr. 28, 1942_____    ____ 35, 000. 00
                                                                                                                   58, 000. 00
    Amount to be accounted for______-------------                                                                 154, 242. 61
Gross amount expended_________________________                                              $26, 957. 82
Less reimbursements collected_ -________ -                                                    2, 907. 26
                                                                                                                   24, 050. 56

    Balance unexpended June 30, 1942__...___                                                                   130,192. 05
Outstanding liabilities June 30, 1942______________________                                             -    - --   52. 63

      Balance available June 30, 1942 _______________                                             ___             130, 139. 42

Amount that can be profitably expended in fiscal year ending
                                 --
June 30, 1944, for maintenance 1___ ______________---   ___                                                      62, 100. 00
1 Exclusive of available funds.


                               20. MOREHEAD CITY HARBOR, N. C.

  Location.-This harbor is situated on the northern shore of Bogue
Sound, adjacent to Beaufort Harbor and Inlet. New Bern, N. C.,
the nearest city of importance, is about 43 miles by inland waterway
to the northwest. (See U. S. Coast and Geodetic Survey Chart
No. 420.)
  Previous project.-The channel across the ocean bar was formerly
improved under the title of Beaufort Inlet, N. C. The project was
adopted by the River and Harbor Act of March 3, 1905 (H. Doc.
No. 563, 58th Cong., 2d sess.). For further details, see page 470 of
Annual Report for 1935.
  Existing project.-This provides for a channel 30 feet deep and
400 feet wide across the ocean bar at Beaufort Inlet, thence same
496           REPORT OF CHIEF OF ENGINEERS,                            U.   S. ARMY,       1942


depth and 300 feet wide to the marine terminals at Morehead City,
enlarged to 600 feet to form a turning basin at that point, and for
construction of jetties at the inlet; for a channel 12 feet deep and
100 feet wide from the 30-foot channel to Sixth Street, Morehead
City, thence same depth and 200 to 400 feet wide to Tenth Street,
thence 6 feet deep and 75 feet wide to deep water in Bogue Sound.
The average rise of the tide is about 21/2 feet at Morehead City and
3 feet at the inlet. Observations made in 1907 showed an extreme
range of tide of 4.8 feet.
   The estimate of cost of new work, revised in 1936, is $1,610,000.
The latest (1936) approved estimate for annual cost of maintenance
is $89,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                       Work authorized                                   Documents


June 25,1910       Channel 10 feet deep and 100 feet wide to the       H. Doc. No. 649, 61st Cong., 2d sess.
                    wharves at Morehead City, thence 200 feet wide
                    in front of the wharves.
July     3, 1930   Channel 12 feet deep and 100 feet wide from the     H. Doc. No. 105, 70th Cong., 1st sess.t
                    outer harbor to 6th St. in Morehead City, thence
                    200 to 400 feet wide to 10th St., and a channel
                    6 feet deep and 75 feet wide connecting with
                    Bogue Sound.
Aug. 26, 1937 2    Channel 30 feet deep and 400 feet wide across the   Senate committee print, 74th Cong.,
                    bar at Beaufort Inlet, thence 30 feet deep and       1st sess.
                    300 feet wide to the marine terminals at Mole-
                    head City.


  1Contains the latest published map.
  2 Included in Public Works Administration program, July 5, 1934, under the National Industrial Re-
covery Act of 1933.


   Local cooperation.-The project provides that local interests fur-
nish, free of cost to the United States, spoil-disposal areas as required
for new work and for future maintenance and all other lands needed
for the improvement, and to the further condition that local interests
give assurances satisfactory to the Secretary of War that an adequate
terminal open to the public on uniform terms will be available by the
time the channel is completed. Terminals have been completed and
spoil-disposal areas for new work furnished. Lands needed in con-
nection with the construction of jetties have not been furnished.
   Terminal facilities.-There are 37 wharves along the main water
front of the town, with a total frontage of about 1,182 feet. The
marine terminals provide 1,350 feet of berthing space with a depth
alongside of 27 feet at mean low water, and facilities for transfer of
cargoes between rail and water carriers. The existing facilities are
considered adequate for existing and prospective commerce.
   Operations and results during fiscal year.-The work consisted of
making miscellaneous surveys, and maintenance dredging with Gov-
ernment plant and hired labor. The U. S. dredge San Pablo com-
menced work on the ocean bar channel on May 11, 1942, and continued
to the end of the year, removing 299,214 cubic yards, at a cost of
          RIVERS AND HARBORS--WILMINGTON,                                   N. C., DISTRICT                   497

$34,044.12. The total costs for the year, all for maintenance, were
$36,255.83. The expenditures were $36,900.16.
   Condition at end of fiscal year.-The existing project was 40 per-
cent completed. The portion of the existing project providing for a
12-foot channel to Morehead City and a 6-foot channel to Bogue
Sound was completed in 1931, and the portion providing for a 30-
foot channel to the terminals in 1936. No work has been done on the
jetties proposed for Beaufort Inlet. At the close of the year the
limiting depths at mean low water were as follows: 29.5 feet in the
Beaufort Inlet channel; thence 26 feet to the terminals; thence 12
feet to Morehead City, and 6 feet to Bogue Sound. The total costs
and expenditures, under the existing project to June 30, 1942, were
$855,202.78, of which $613,106.40 (including $553,475.86 from Public
Works funds) was for new work and $242,096.38 was for maintenance.
   Proposed operations.-The balance unexpended July 1, 1942,
$91,021.23, will be applied to maintenance as follows:
Dredging the harbor in front of Morehead City and the approach
  channels, under contract, during February 1943---------------$6, 021. 23
Dredging the 30-foot channels from a point just inside the inlet to the
  Marine Terminal and the turning basin at the terminal, under con-
  tract, during January 1943                    -------------------------------
                                                                              25, 000. 00
Dredging the channel through the inlet and the channel just inside the
  inlet with Government plant and hired labor, during September and
  October 1942-------------------------------------------                      0, 000. 00
        Total for all work_--------------------------------------                                      91, 021. 23
  The additional sum of $89,000 can be profitably expended during
the fiscal year 1944, and will be applied to maintenance, as follows:
Dredging the harbor in front of Morehead City and the approach
  channels, under contract, during February 1944_ __-------------------$4,000
Dredging the 30-foot channel from a point just inside the inlet to the
  Marine Terminal and the turning basin at the terminal, under con-
  tract, during January 1944_________          ____________------------- 25,000
Dredging the channel through the inlet and the channel just inside the
  inlet with Government plant and hired labor, during September and
  October 1943---------------------------------------------------        60, 000

        Total for all work--------------------------------                                         -      89, 000

                                       Cost and financial summary
Cost of new work to June 30, 1942_________-------------                      $657, 590. 64
Cost of maintenance to June 30, 1942------              ------- ------------ 526, 653. 82
        Total cost of permanent work to June 30, 1942________..---                            1, 184,'244. 46

Net total expenditures------------------_                      1, 184, 244. 46
Unexpended balance June 30, 1942------------------------------     91,021.23

        Total amount appropriated to June 30, 1942                                            1, 275, 265. 69

   Fiscal year ending June 30             1938           1939           1940          1941                1942

Cost of new work                         $2, 838. 96
Cost of maintenance                      29, 813. 83   $51, 536. 75   $96, 469. 26   $9, 216. 93         $36, 255. 83

     Total cost       -        -         32, 652. 79    51, 536. 75    96, 469. 26    9, 216. 93          36, 255. 83

Total expended ..     .   ..       .     32, 652. 79    51, 536. 75    96, 469. 26    8, 572. 60          36, 900. 16
Allotted__    __69,                         719. 58     89, 000. 00    60, 000. 00   30, 500. 00          55, 000. 00
498         REPORT        OF CHIEF OF ENGINEERS,                      U.   S. ARMY,             1942

Balance unexpended July 1, 1941_---------------------                                             $72, 921.39
Amount allotted from War Department Civil Appropriation Act
  approved April 28, 1942-----------------------------------55,                                         000. 00

      Amount to be accounted for---------------------------127,                                         921. 39
Gross amount expended------------------------------------                                           36, 900. 16

         Balance unexpended June 30, 1942 -----------------------                                  91, 021.23

Amount (estimated) required to be appropriated for completion of
   existing project                                                                                000, 000. 00
                                                                                                1,--------------,
Amount that can be profitably expended in fiscal yeai ending                          June
                           1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
30, 1944, for maintenance                                                                         89, 000. 00
   1 Exclusive of available funds.

     21. CAPE FEAR RIVER, N. C., AT AND BELOW WILMINGTON
   Location.-This river is formed by the confluence at Moncure, N. C.,
in Chatham County, of the Deep and Haw Rivers. It flows in a
southeasterly direction and empties into the Atlantic Ocean, at Cape
Fear, near the southern extremity of the State. (See U. S. Coast
and Geodetic Survey Charts Nos. 424 and 425.)
   Previous projects.-Authorized by River and Harbor Acts of
March 2, 1829; July 22, 1854; July 11, 1870; March 3, 1873; June 23,
1874; September 19, 1890; June 13, 1902; and March 2, 1907. For
further details, see page 1804 of Annual Report for 1915 and page 533
of Annual Report for 1938.
   Existing project.-This provides for a channel across the bar 30
feet deep and 400 feet wide from Baldhead Point in a southwesterly
direction; thence 30 feet deep and 300 feet wide in the river up to
Wilmington, with increased width at bends; and for an anchorage
basin of the same depth at Wilmington 2,000 feet long, 900 feet wide
at the upper end, and 1,100 feet at the lower end, with approaches
1,500 feet long at both ends, and for a turning basin 30 feet deep at
Wilmington, 1,000 feet long and 600 feet wide, with approaches 500
feet long at both ends, located opposite the principal terminals. The
plane of reference is mean low water. The length of the section
under improvement is about 30 miles, the upper limit being at Hilton
Bridge (Atlantic Coast Line and Seaboard Air Line Railroads) on
Northeast Cape Fear River, 11/4 miles above its mouth. The average
rise of the tide is 4.7 feet at the ocean bar, 3.6 feet at Keg Island, and
3.4 feet at Wilmington. The extreme range of tides is about 8.5 feet
at the ocean bar, 7.3 feet at Orton Cove, and 6.4 feet at Wilmington.
   The estimated cost for new work, revised in 1930, was $1,745,700,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $225,000.
   The existing project was authorized by the following river and
harbor acts:
              RIVERS      AND HARBORSr--WILMINGTON,                        N.   C., DISTRICT             499


       Acts                       Work authorized                                    Documents


July 25,1912      Channel 26 feet deep and 400 feet wide across the    H. Doc. No. 287, 62d Cong., 2d sess.
                   bar, thence same depth and 300 feet wide, in-
                   creased at bends, to Wilmington.
Mar.     2,1919   Channel 30 feet deep and 400 feet wide, across the   H. Doc. No. 746,, 65th Cong., 2d sess.
                    ocean bar.   (No work was done on this project.)
Sept. 22, 1922    A new channel across the ocean bar 30 feet deep      H. Doc. No. 94, 67th Cong., 1st sess.
                    and 400 feet wide from Baldhead Point.
July     3,1930   Present 30-foot ploject to Hilton Bridge at Wil-     Rivers and Harbors Committee Doc.
                    mington, and a turning basin.                        No. 39, 71st Cong., 2d sess.


  Latest published maps are in Annual Report, 1914, p. 2018, and H. Doc. No. 615, 70th Cong., 2d sess.


   Recommended modifications of project.--Under date of December
28, 1938, the Chief of Engineers recommended that the project be
modified to provide for increasing the width of the authorized 30-foot
channel between the inner end of the ocean bar channel and Wil-
mington from 300 to 400 feet, with increased width at bends; for
increasing the width of the authorized 30-foot turning basin at Wil-
mington from 600 to 800 feet with suitably lengthened approaches at
both ends; and for a channel 12 feet deep and 100 feet wide in the
Cape Fear River, extending from a point near the eastern entrance of
the inland waterway to a connection with the main river channel, at
a point about 3 miles above; at a total estimated first cost of $675,000
with annual maintenance of $50,000 in addition to that now required;
subject to certain conditions of local cooperation (H. Doc. No. 131,
76th Cong., 1st sess.).
   Under date of May 25, 1939, the Chief of Engineers recommended
that the project be further modified to provide for an increase in the
length of the southerly approach to the anchorage basin from 1,500
feet to 4,500 feet, and for a depth of 32 feet in the channel between
the outer end of the ocean bar channel and Wilmington, and in the
turning basin, with widths as previously recommended, at an addi-
tional estimated first cost of $790,000, with annual maintenance of
$25,000 in addition to the amounts now required and previously
recommended; subject to certain conditions of local cooperation (S.
Doc. No. 83, 76th Cong., 1st sess.).
   Under date of February 27, 1940, the Chief of Engineers recom-
mended that the project be further modified to provide for a channel
25 feet deep and 200 feet wide, with increased width at bends, ex-
tending from Hilton Bridge to and including a turning basin of the
same depth and 600 feet wide, at a point 11/4 miles above, at an
estimated first cost of $73,000, with annual maintenance of $3,000
in addition to that now required; subject to certain conditions of
local cooperation (S. Doc. No. 170, 76th Cong., 3d sess.).
   Terminal facilities.-There are 53 wharves of all classes at Wil-
mington, with a combined berthing space of 18,229 linear feet, and
depths of water alongside from 10 to 30 feet at mean low water. It
is believed that the terminals at Wilmington are adequate at the
present time for the commerce through this port. Below Wilming-
ton there are 27 wharves, which are considered adequate for present
needs. For further details see Port Series No. 33, revised 1940, Corps
of Engineers.
500      REPORT OF CHIEF OF ENGINEERS,                U. S. ARMY,           1942

   Operations and results during fiscal year.-The work consisted of
surveys, maintenance dredging and repairs, all with Government
plant and hired labor. Between July 1 and November 9, 1941,
134 tons of rock and 379 cubic yards of concrete were placed in New
Inlet and swash defense dams at a cost of $12,767.51. Between
November 18 and 27, 1941, the dredge Howell removed 28,687 cubic
yards of material from the turning basin at Wilmington at a cost
of $4,483.99. Between April 13 and May 9, 1942, the dredge San
Pablo removed 214,493 cubic yards of material from the ocean bar
channel at a cost of $24,853.12. Repairs were made to the dredging
ranges for the ocean bar and river channels, and to the Engineer
Department wharf at Southport. The total costs were $49,520.89, all
for maintenance. The total expenditures were $51,059.31.
   Condition at end of fiscal year.-The existing project was completed
in 1932. At the close of the fiscal year the controlling mean low-
water depths were 30 feet in the ocean bar channel, 27.4 feet in the
river channel up to Wilmington, 25 to 30 feet in the anchorage basin
and 30 feet in the turning basin at Wilmington. New Inlet and
swash defense dams are in good condition. The total costs and ex-
penditures under the existing project to June 30, 1942, were $2,033,-
982.47 for new work and $4,243,513.67 for maintenance, a total
of $6,277,496.14.
   Proposed operations.-The balance unexpended July 1, 1942, $275,-
898.02, will be applied to maintenance, as follows:
Dredging the ocean bar channel with Government plant and hired
labor during April and May 1943--____- __________--________-___ $100, 000. 00
Dredging the river channels up to Wilmington and the anchorage
and turning basins at Wilmington, with Government plant and
hired labor during December 1942 and January and February
1943------------------------------------------------                      160,000. 00
Repairing New Inlet and swash defense dams with hired labor dur-
  ing May and June 1943-------____                               ______--_
                                                      _____---------        15, 898. 02
      Total for all work_________________________________               _      275,898. 02
  The additional sum of $225,000 can be profitably expended during
the fiscal year 1944 and will be applied to maintenance, as follows:
Dredging the ocean bar channel with Government plant and hired labor
  during April and May 1944------------------------------------            $60, 000
Dredging the river channels up to Wilmington and the anchorage and
  turning basins at Wilmington, with Government plant and hired     labor,
  between Oct. 1 and Dec. 31, 1943, and Apr. 1 and June 30, 1944_------- 155, 000
Repairing New Inlet and swash defense dams with hired labor during
  May and June 1944-----         ----------------------------------         10, 000

      Total for all work        --------------------------------------             225, 000

                           Cost and financial summary
Cost of new work to June 30, 1942--------------------------                 $6, 659, 597. 14
Cost of maintenance to June 30, 1942-------------------------                4, 846, 127. 92
       Total cost of permanent work to June 30, 1942 ----          _-       11, 505, 725. 06

Net total expenditures----__-_-_________-_                    ___- 11, 505, 725. 06
Unexpended balance June 30, 1942___--_--_---------------------         275, 898. 02

      Total amount appropriated to June 30, 1942 -------                    11, 781, 623. 08
            RIVEiRS AND                        HARBORS---WILMINGTON,                              N.      C.,     DISTRICT                501

   Fiscal year ending June 30                          1938                 1939               1940                  1941              1942


C ost of new work - -          - -       - -   - -    - - - - - - - - - - . - - - - - .- - - - - . . . . . .
Cost of maintenance        -         -               $215, 064. 83 $152, 004. 36 $88, 885. 30 $237, 626. 60 $49, 520. 89

Total expended_                                      214, 966. 17       152, 045. 25       88, 943. 07          236, 088. 18           51, 059. 31

Allotted    ----------------------                   359, 000.00        165, 000.00        111, 000. 00         174, 000. 00          175, 000. 00



Balance unexpended July 1, 1941____________                           ______------------$151, 957.33
Amount allotted from War Department Civil Appropriation Act
  approved April 28, 1942__________________________------------------                    175, 000. 00

      Amount to be accounted for_ ------------------------------                                                                326, 957. 33
Gross amount expended_________________________--      $54, 754. 67
Less reimbursements collected___________---______-_     3, 695. 36
                                                                                                                                    51, 059. 31

           Balance unexpended June 30, 1942_____________________ -275,                                                                 898. 02

Amount that can be profitably expended in fiscal year ending June
   30, 1944, for maintenance 1___-------______                                                                                  2-------
                                                                                                                                  25, 000.00
  1 Exclusive of available funds.

                  22. CAPE FEAR RIVER, N. C., ABOVE WILMINGTON
   Location.-Forlocation of river see preceding report on Cape Fear
River, N. C., at and below Wilmington.
   Previous projects.-Adopted by acts of March 3, 1881, and June 13,
1902. For further details see page 1805 of Annual Report for 1915
and page 535 of Annual Report for 1938.
   Existing project.-This provides for a navigable depth of 8 feet
at low water from Navassa to the head of navigation at Fayetteville,
115 miles above Wilmington, by the construction of three locks and
dams and by dredging of river shoals between Navassa and Fayette-
ville, and for a dredged channel from Wilmington to Navassa (4
miles), 25 feet deep and generally 200 feet wide, with a cut-off across
Horseshoe Bend and a turning basin approximately 550 feet long and
400 feet in average width at its head. Data regarding locks and
dams are as follows:

                                                                                     Distance         Distance        Maximum
         Lock and dam                                    Location                   from Wil-          above           available          Lift
                                                 *                                   mington           mouth          dimensions


                                                                                       Miles           Miles                 Feet         Feet
No. 1_                                         Kings Blufft-                                39                  69      200 by 40                11
No. 2                                          Browns Landing                               71              101         200 by 40                9
No. 3              -                           Tolars Landing                               95              125         300 by 40                9


                                     Available
                                     depth on Character Kid of                                                              Year of     Actual
     Lock and dam                    miter sills of foun- dam                        Type of construction                   comple-       cost
                                      at low      dation                                                                      tion
                                      water


                                          Feet
No. 1_                                           9    Sand-...       Fixed___      Concrete lock timber crib                 1916      1 $565, 856
                                                                                    dam, rock filled.
No. 2                  -                        12      do   --___    do   -.      Concrete lock, dam rock                   1917       2 909, 633
                                                                                    filled.
No. 3         -                                  9      do .          do           Concrete lock, concrete                   1935         660, 930
                                                                                    dam.

  1Includes $96,184 for increasing lift.
  2 Includes $356,443 for reconstruction and repairs.
502           REPORT OF CHIEF OF ENGINEERS, U.                           S. ARMY,       1942

   The tide ranges from 3.4 feet at Wilmington to 1 foot at lock No.
1, Kings Bluff, N. C., 39 miles above. The extreme range of lunar
tides is 6.4 feet at Wilmington and 1.5 feet at Kings Bluff. The
maximum variation due to floods ranges from 70 feet at Fayetteville
to 5 feet at Wilmington.
   The estimate of cost for new work, revised in 1937, is $2,700,700,
exclusive of amount expended on previous projects. The latest (1937)
approved estimate for annual cost of maintenance is $43,600, including
$14,000 for operation and care of locks and dams.
   The existing project was authorized by the following river and
harbor acts:

       Acts                      Work authorized                                  Documents


June 25, 1910     The 8-foot channel and construction of 2 locks     H. Doc. No. 890, 60th Cong., 1st sess.
                   and dams.
July     3,1930   Channel 22 feet deep to Navassa. (No work was      Rivers and Harbors Committee Doe.
                   done on this project.)                             No. 39, 71St Cong., 2d sess.
June 26, 19341    Operation and care of locks and dams provided
                   for with funds from War Department appro-
                   priations for rivers and harbors.
                                                                                                             3
Aug. 30, 1935 2   Construction of lock and dam No. 3, and repairs    H. Doc. No. 786, 71st Cong., 3d sess.
                   and alterations to locks and dams Nos. 1 and 2.
Aug. 26,1937      Present project dimensions from Wilmington to      Rivers and Harbors Committee Doe.
                   Navassa with cut-off across Horseshoe Bend,         No. 17, 75th Cong., 1st sess.8
                   and a turning basin.


  1 Permanent Appropriations Repeal Act.
  2 Included in Public Works Administration program Sept. 27, 1933.
  3   Contains latest published maps.

   Local cooperation.-Fully complied with.
   Terminal facilities.-There are six wharves between Wilmington
and Fayetteville, including the public terminal at that point. They
have a total frontage of about 700 feet. The terminals appear to be
adequate for existing commerce.
   Operations and results during fiscal year.-The work consisted of
maintenance snagging, repairs to fender systems at locks Nos. 1 and
3, and: miscellaneous surveys. The derrick boats Contentnea and
Northeast, working intermittently between Nvember 27, 1941, and
April 23, 1942, between mile boards 16 and 115, removed 245 snags,
219 stumps, 57 logs, and 1,118 trees from the channel, and 987 trees
from the banks, at a cost of $9,200.51.
   The 3 locks and dams were operated and maintained throughout the
year at a total cost of $34,056.86, of which $21,112.85 was for operation,
$12,178.27 for maintenance and repairs, and $765.74 for improvements
and reconstruction. The total cost for the year was $46,002.53, all for
maintenance. The expenditures were $46,361.58.
   Condition at end of fiscal year.-The existing project was completed
in 1935 with the exception of the 25-foot project to Navassa, which was
completed in 1939. The controlling low-water depths are 25 feet from
Wilmington to Navassa 4 miles, thence 22 feet to a point 9 miles above
Wilmington, thence 8 feet to Fayetteville. The total costs under the
existing project to June 30, 1942, were $2,942,203.07, of which $2,339,-
797.63, including $1,104,390.72 Public Works funds, was for new work,
           RIVERS AND HARBORSr---WILMINGTON,                               N. C., DISTRICT                   503
$454,615.33 for maintenance, and $147,790.11 for operating and care.
The total expenditures were $2,942,203.07, of which the sum of $1,837,-
812.35 was from regular funds and $1,104,390.72 from Public Works
funds. In addition, the sum of $175,825.56 was expended between
November 1, 1916, and June 30, 1935, on the operating and care of the
works of improvement under the provisions of the permanent indefi-
nite appropriation for such purposes.
  Proposed operations.-The balance unexpended July 1, 1942, $56,-
436.13 will be applied as follows:
Accounts payable__ -------------------------------------------           $85. 00
Dredging the river channel between Navassa and Fayetteville with
  leased plant, during August and September 1942--------------22, 251. 13
Snagging between Wilmington and Fayetteville with U. S. derrick
  boat Northeast between Aug. 1 and Oct. 31, 1942-----------------    4, 500. 00
Operating and care of locks and dams:
     Operating locks and dams Nos. 1, 2, and 3, July 1, 1942, to June
       30, 1943, including protective measures------------------ 26, 000. 00
Maintenance and repairs to three locks and dams-----------------3, 600. 00
        Total for all work --------------                                                             56,436. 13
  The additional sum of $43,600 can be profitably expended during
the fiscal year 1944 and will be applied to maintenance as follows:
Dredging the river channel between Navassa and Fayetteville with
  leased plant, during August and September 1943---------------$23, 200
Snagging between Wilmington and Fayetteville with U. S. derrick
  boat Northeast, Aug. 1 to Oct. 31, 1943------------------_        4, 500
Operating locks and dams Nos. 1, 2, and 3, July 1, 1943, to June
  30, 1944 ------------------------------------------------------- 12, 000
Maintenance and repairs to three locks and dams------------------- 3, 900
        Total for all work-----              -----------------------------------                         43, 600

                                   Cost and financial summary
Cost of new work to June 30, 1942------------------------$2, 488, 916. 82
Cost of maintenance to June 30, 1942------------------------- 786, 408. 67
        Total cost of permanent work to June 30, 1942----------                                   3, 275, 325. 49

Net total expenditures ----------------------------------                                         3, 275, 325. 49
Unexpended balance June 30, 1942-           _            __ -              _                          56, 436. 13
        Total amount appropriated to June 30, 1942-------------3, 331, 761. 62

   Fiscal year ending June 30         1938           1939           1940                   1941          1942

Cost of new work_                                  $51, 279.91                   -     -
Cost of maintenance                 $52, 841. 59    44, 839. 88   $70, 361. 44       $82, 223. 91       $46, 002. 53
     Total cost- -52,.-                 841. 59     96, 119. 79    70, 361.44         82, 223. 91        46, 002. 53
Total expended            - - --     57, 174. 63    86, 521. 70    80, 427. 68        81, 874. 96        46, 361. 58
Allotted-_                _         125, 600. 00   125, 200. 00    44, 006. 35        94, 000. 00        51, 325. 00
504      REPORT OF CHIEF OF ENGINEERS,           U.   S. ARMY,      1942

Balance unexpended July 1, 1941----------------------------           $51, 472. 71
Amount allotted from War Department Civil Appro-
priation Act approved June 24, 1940------------- $14, 500. 00
Amount allotted from War Department Civil Appro-
priation Act approved Apr. 28, 1942-----------     36, 825. 00
                                                                       51, 325. 00
      Amount to be accounted for---------_--------------              102, 797. 71
Gross amount expended_--             _
                            _-------------------------_                46, 361. 58
     Balance unexpended June.30, 1942_________________                 56, 436. 13
Amount covered by uncompleted contracts       __                            85. 00

       Balance available June 30, 1942_-------------------------
                                                          __56,            351. 13
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance_______       __------------------    _      43, 600.00
  1 Exclusive of available funds.

                      23. LOCKWOODS FOLLY RIVER, N. C.

   Location.--Lockwoods Folly River is a small stream about 50 miles
long lying wholly in Brunswick County, which empties into the
Atlantic Ocean at a point 12 miles west of the mouth of the Cape
Fear River. Supply, 19 miles above the mouth, is the practical head
of navigation. (See U. S. Coast and Geodetic Survey Chart No.
1236 and U. S. Geological Survey map of North Carolina.
   Existing project.-This provides for a channel 100 feet wide and
6 feet deep at low water from the ocean to the bridge at Supply, 19
miles above, to be secured by dredging through the oyster rocks and
mud flats. The average rise of the tide is about 41/2 feet near the
inlet and 2 feet at Supply.
   The estimate of cost for new work, made in 1892, was $60,000. The
latest (1896) estimate for annual cost of maintenance is $500.
   The existing .project was authorized by the River and Harbor Act
approved September 19, 1890 (Annual Report for 1887, p. 1099).
The latest published maps are included in this report.
   Terminal facilities.-There are no wharves on this river. Natural
landings are used for loading and are considered adequate for existing
commerce.
   Operations and results during fiscal year.-The work consisted of
maintenance dredging with Government plant and hired labor. Be-
tween March 1 and 15, 1942, the U. S. dredge Howell removed 58,583
cubic yards of material from that portion of the channel lying between
Genoes Point and the Intracoastal Waterway, restoring project dimen-
sions in this section. The total costs and expenditures for the year,
all for maintenance, were $7,000.
   Condition at end of iscal year.--Prior to the fiscal year 1940 no
work had been done on this project since 1897, when the project
was approximately 33 percent completed. At the close of the year,
between the Intracoastal Waterway and Genoes Point, the controlling
mean low water depth was 6 feet, thence 5 feet to Supply, 21 miles
above the mouth, the head of navigation. The total costs and expendi-
tures under the existing project to June 30, 1942, were $28,981.10, of
which $17,818.50 was for new work, and $11,162.60 was for mainte-
nance.
           RIVERS AND HARBORS--WILMINGTON,                                           N. C., DISTRICT                    505

  Proposed operations.-No funds are on hand and no work is pro-
posed during the fiscal years 1943 and 1944 as it is believed that no
maintenance dredging will be required.
                                         Cost and financial summary
Cost of new work to June 30, 1942----------------------------                                                 $17, 818. 50
Cost of maintenance to June 30, 1942___-__------------ --                                                      11, 162. 60
      Total cost of permanent work to June 30, 1942________________                                            28, 981. 10
Net total expenditures____-- ____  ___-------                                                                  28, 981. 10
Total amount appropriated to June 30, 1942 __________________    __                                            28, 981. 10


   Fiscal year ending June 30               1938                 1939           1940             1941                1942


Cost of new work_ -
Cost of maintenance                                                            $4, 162. 60                              $7, 000
Total expended          __                                                      4, 162. 60                                  7, 000
Allotted              ---                                                       4, 162. 60         $7, 000



Balance unexpended July 1, 1941                                                                                $7, 000. 00
Gross amount expended------------------------------------------                                                 7, 000. 00

   24. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                    (GENERAL)

  The cost of the work during the year amounted to $13,416.17. The
expenditures were $12,930.47. The balance unexpended July 1, 1942,
$13,329.38 will be applied as needed during the fiscal year 1943 to
payment of expenses incurred under this heading. The additional
sum of $5,000 can be profitably expended during the fiscal year 1944.
                                         Cost and financial summary
Cost of new work to June 30, 1942
Cost of maintenance to June 30, 1942_____________________________ $275, 662. 83
       Total cost of permanent work to June 30, 1942_____________ 275, 662. 83

Net total expenditures                                   ----------------                                     275, 662. 83
Unexpended balance June 30, 1942 ___________________________                                                   13, 329. 38
     Total amount appropriated to June 30, 1942________________                                               288, 992. 21

   Fiscal year ending June 30               1938                  1939           1940            1941                1942

Cost of new work .           .       ,                   ,. .     . . . - ..    . . .       . . . . . . .       .    . . .
Cost of maintenance                       $36, 687. 42          $43, 108. 81   $24, 734. 38     $27, 282. 09        $13, 416. 17
Total expended__                 _         36, 769. 93           47, 632. 79    20, 390. 80     27, 778. 45          12, 930. 47
Allotted- - -----__                        61, 100. 00           56, 000. 00   40, 000. 00       6, 000. 00         -5, 000. 00


Balance unexpended July 1, 1941_--____-     ____-______________ $31, 259. 85
Deductions on account of revocation of allotment   _____________     5, 000. 00
      Net amount to be accounted for__________________________      26, 259. 85
Gross amount expended__ ______        ______________ $15, 950. 88
Less receipts from sales------- _____    ____________    3, 020. 41
                                                                    12, 930. 47
      Balance unexpended June 30, 1942______________________        13, 329. 38
Amount that can be profitably expended in fiscal year ending June
                                       -      -      -
30, 1944, for maintenance '_                              _ __                                                 5, 000. 00
   1 Exclusive of available funds.
506            REPORT OF CHIEF OF ENGINEERS,                                      U. S. ARMY,                       1942

25. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED

                                                                 For last       Cost and expenditures to                 Estimated
                                                               full report            June 30, 1942                      Estimated
                     Name of project                           see Annual                                                 amount
                                                                    Report                                              required to
                                                                     for-       New work          Maintenance              complete


1.   Mackay Creek, N. C.1_____------ -------------                  1938        $13, 374.   60         $4, 773. 03            (2)
2.   Newbegun Creek, N. C.3 ____________                       _    1928          4, 802.   08             246. 58            (2)
3.   Perquimans River, N. C.3                                       1910         13, 750.   00   _                            (2)
4.   Edenton Harbor, N. C.3_________________ ____                   1941         73, 750.   00          2, 970. 84            (2)
5.   Scuppernong River, N. C._______________                        1941         81, 163.   63         54, 865. 81            (2)
6.   Waterway connecting Swan Quarter Bay
        with Deep Bay, N. C.3 _.-.............               .       1940           8, 550.98          10, 433. 40             (2)
7.   Fishing Creek, N. C.1 .._______________---.              __    1931          22, 715. 10          8, 632. 85             (2)
8.   South River, N. C.3__ _ _.................                     1936          12, 452. 02         21, 469. 88             (2)
9.   Bay River, N. C.3____________________________                  1941          44, 381. 56         49, 518. 44             (2)
10.   Smiths Creek (Pamlico County), N. C.3            ______        1941          14, 471.80           6, 957.80              (2)
11.   Swift Creek, N. C.3 -.........................                 1940           1,600. 00           5, 422. 00            (2)
12.   C on ten tnea C reek, N . C.3 ......         _-----_..
                                                     . . . .         1941          64, 394. 56         81, 850. 32            (2)
13.   Harbor of Refuge at Cape Lookout, N. C.3 __                    1934      1, 368, 798. 72         32, 853. 75      $1, 160, 000.
14.   Smiths Creek (Wilmington), N. C.3----------                    1941           8, 507.45               17. 61            (2)
15.   Northeast (Cape Fear River), N. C.3.........                   1941        410, 687. 96          59, 201. 87           25, 375.
16.   Black River, N. C.3______-                __       ___          g-
                                                                     1941        4 12, 358. 40         36, 071. 85            (2)
17.   Shallotte River, N. C.3 _                                      1933          18, 181. 37          6, 467. 81            (2)


  1 No commerce reported.                                           3 Channels adequate for commerce.
  2 Completed.                                                      4Revoked during fiscal year $1,500.
                26. PLANT ALLOTMENT, WILMINGTON, N. C., DISTRICT
                                            Cost and financial summary
Undistributed costs June 30, 1942_ _-- _-------                                     __ ____-___ _                     $848, 129. 89

Net total cost to June 30, 1942_-------------------------------_                                                       848, 129. 89
Plus accounts receivable June 30, 1942____________ ____                                           __-__                146, 260. 42
      Gross total costs to June 30, 1942__                                                                             994, 390. 31
Minus accounts payable June 30, 1942 ________________                                                  __       _      113, 272. 80
     Net total expenditures ------------          ___-_                                                                881, 117. 51
Unexpended balance June 30, 1942___________________________                                                             92, 586. 92
            Total amount appropriated to June 30, 1942                                    -_____-__                    973, 704. 43

      Fiscal year ending June 30                1938                1939           1940                  1941                  1942


Total expended-------          --------      $121, 725.06       $39, 410. 56     $57, 712.06          $187, 475. 75     -$128, 925. 88

Allotted_ .........---------------- -----      78, 486. 23                       288, 755. 73           50, 000. 00          -98, 100. 00


Balance unexpended July 1, 1941 ______________-____________        _                                                   $61, 761.04
Deductions on account of revocation of allotment -----------------                                                      98,100. 00

                                       -
      Net amount to be accounted for_-____         ____________      _                                                -- 36, 338.96
Gross amount expended _--___    ______---_------         $853, 185. 34
Less:
    Reimbursements collected ----- __ $978, 715. 14
    Receipts from sales ------     __-        3, 396, 08
                                                          982, 111. 22
                                                                                                                     -128,     925. 88

      Balance unexpended June 30, 1942_____-____------                                                                  92, 586. 92
Outstanding liabilities June 30, 1942____________--    $113, 272. 80
Amount covered by uncompleted contracts------------81, 331. 60
                                                                                                                       194, 604. 40
     Balance available June 30, 1942_ --------                                                                      -102, 017.48
Accounts receivable June 30, 1942____--- _---------                                                                   146, 280. 42

           Unobligated balance available June 30, 1942 -------------                                                    44, 262. 94
             RIVERS AND HARBORS-WILMINGTON,                                                 N. C., DISTRICT             507
Status of all investigations for navigation called for by river and harboracts and
                               committee resolutions

                                                                      Date trans-
            Locality                    Authorization act              mitted to           Document number     Recommenda-
                                                                       Congress                                    tion
                  ___   -
_______________________________- -I.               -   -        -I.                    I
Back Sound to          Lookout         Rivers and Harbors             May 27,1942          House 746, 77th     Favorable.
Bight, N. C.                            Committee resolu-                                  Cong., 2d sess.
                                        tion, Aug. 6, 1941.
Beaufolt, N. C., to Cape               Rivers and Harbors             Aug.   4,1941        House 346, 77th        Do.
Fear River, Intracoastal                Committee resolu-                                  Cong., 1st sess.
  Waterway,       channel      to       tion, May 29, 1940.
  Banks     Channel at
  Wrightsville Beach, and
  thence via Masonboro
  Inlet to the ocean.
Bogue Inlet, N. C...._....__           Rivers and Harbors             Aug.   8, 1941                           Unfavorable.
                                         Committee resolu-
                                         tion, Mar. 26, 1940.
Cape Fear River           above        Rivers and Harbors             Dec. 22, 1941                               Do.
  Wilmington, N. C.                      Committee resolu-
                                         tion, Oct. 8, 1937.
Neuse River, N. C., be-                River    and Harbor            July 21,1941         House 327, 77th     Favorable.
  tween Johnson County                   Act, Aug. 26, 1937.                                Cong., 1st sess.
  line and New Bern, im-
  provement for navigation
  and flood control.
Pamlico Sound to Beaufort              Commerce Commit-               July 20,1942                             Unfavorable.
   Harbor, N. C., via Core              tee resolution, Nov.
  Sound, improvement of                 4, 1941.
  side channel and basin at
   Sealevel, N. C.
Tar River, N. C., including            Rivers and Harbors
  Fishing, Otter, Swift, and             Committee resolu-
  Town Creeks, navigation               tion, Feb. 1, 1939.
  and flood control.
Trent River, N. C., im-                Rivers and Harbors             Feb.   9,1942        House 623, 77th     Favorable.
   provement at New Bern.                Committee resolu-                                  Cong., 2d sess.
                                         tion, Feb. 11, 1941.



27. SNAGGING AND CLEARING UNDER AUTHORITY OF SECTION 2 OF THE
     FLOOD CONTROL ACT APPROVED AUGUST 28, 1937, AS AMENDED

   The Flood Control Act approved August 28, 1937, as amended by
the Flood Control Acts approved August 11, 1939, and August 18,
1941, authorized the allotment of not to exceed $500,000 from the
flood-control appropriations for any one fiscal year in the removal
of accumulated snags and other debris from, and clearing and
straightening of channels in navigable streams and tributaries there-
of when such work is advisable in the interest of flood control; pro-
vided that not more than $25,000 shall be allotted for this purpose
for any single tributary from the appropriations for any one fiscal
year.
   On Contentnea Creek, N. C., snagging operations in progress at the
beginning of the fiscal year in conjunction with the Work Projects
Administration were continued with funds from prior allotments.
An additional allotment of $8,100 received during the year was
applied to the continuation of snagging operations with hired labor
and tractors. There were removed a total of 18,569 snags, 4,350
stumps, 4,067 logs, and 8,511 trees from the channel and 6,350 trees
from the banks. The work was done at various points between the
mouth and a point 42 miles above. The cost of this work from
regular funds was $15,788.83 and the expenditures were $16,254.96.
The cost from Work Projects Administration funds was $11,070.26.
508          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                              1942

   On Tar River and tributaries, North Carolina, snagging operations
in conjunction with the Work Projects Administration with funds
from prior allotments commenced on November 27, 1941. An addi-
tional allotment of $5,500 received during the year was applied to the
continuation of snagging operations with tractors and hired labor.
Between Hardee Creek and Dupree Landing, 17 and 35 miles above
Washington, respectively, there were removed a total of 6,485 snags,
1,270 stumps, 3,930 logs, and 3,764 trees from the channel; and 4,368
snags, 976 stumps, 4,005 logs, and 5,891 trees from the banks. The
cost of the work from regular funds was $8,555.58. The expenditures
were $6,719.40. The cost from Work Projects Administration funds
was $6,609.88.
   The total costs to the sponsor for both projects for the year were
$24,344.41. The total expenditures were $22,974.36.
   The balance unexpended at the end of the fiscal year, $6,687.36, will
be applied as needed to payment of expenses incurred under this head-
ing during the fiscal year.
                                        Cost and financial summary

Cost of new work to June 30, 1942_                                                                        $63, 927. 59
Cost of maintenance to June 30, 1942_______________
      Total cost of permanent work to June 30, 1942_______________                                         63, 927. 59
Minus accounts payable June 30, 1942_________________-__-____                                               2, 549. 02

      Net total expenditures-------__     --------------                                                  61, 378. 57
Unexpended balance June 30, 1942______________ _______________                                             6, 687. 36

         Total amount appropriated to June 30, 1942 __________-___                                        68, 065.93

   Fiscal year ending June 30                 1938           1939            1940            1941             1942


Cost of new work                     -------------
                           .---------------                   $13, 000     $25, 000. 00     $1, 583. 18      $24, 344. 41
Cost of maintenance------------         --------------........---------------------------------------      -------------
Total expended-----------------------------                    13, 000      24, 936. 12        468. 09        22, 974. 36
Allotted--...........----------------------------------        13, 000      25, 000. 00     16, 465. 93       .13, 600. 00



Balance unexpended July 1, 1941______________--------------     $16, 061. 72
Amount allotted from War Department Civil Appropriation Act ap-
proved May 23, 1941    -----------------------------------      13, 600. 00

      Amount to be accounted for________________________________                                          29, 606. 72
Gross amount expended_________-----------------                                                           22, 974. 36

      Balance unexpended June 30, 1942_________________________                                             6, 687. 36
Outstanding liabilities June 30, 1912________________2 $2, 545. 36
Amount covered by uncompleted contracts--_____------        22. 52
                                                                                                            2, 567. 88

          Unobligated balance available June 30, 1942 ----------------                                      4, 119. 48
           RIVERS AND HARBORS---WILMINGTON,                                                N. C., DISTRICT                      509
28. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL
   The cost of work during the fiscal year was $1,550.59; the expendi-
tures were $1,261.14. The balance unexpended on June 30, 1942, $18,-
738.86, will be applied during the fiscal year 1943 to the payment of
expenses incurred under this heading.
                         Cost and finanoial summary
Cost of new work to June 30, 1942___
Cost of maintenance to June 30, 1942-----------------------------$9, 450. 59
                                                                                                                   ------
      Total cost of permanent work to June 30, 1942_-                                                   _                 9, 450. 59
Minus accounts payable June 30, 1942-       -        -                                                                       239. 45
     Net total expenditures      -                          -                                                             9, 161. 14
Unexpended balance June 30, 1942 ---                                   -           --                                    18, 738. 86

         Total amount appropriated to June 30, 1942_                                                -                    27, 900. 00

   Fiscal year ending June 30            1938               1939                 1940                   1941                 1942

Cost of new work_      -
Cost of maintenance_                                                              $7, 647. 88               $252. 12        $1, 550. 59
Total expended                                                                         7, 647. 88            252. 12          1,261.14
Allotted ___                                                     $3, 000               4, 900. 00                           20, 000. 00


Balance unexpended July 1, 1941_______________________________                                                                      --
Amount allotted from War Department Civil Appropriation Act ap-
proved May 23, 1941--------------------------------------      $20, 000. 00
Gross amount expended------------------                                        -----                                      1, 261. 14

         Balance unexpended June 30, 1942---___                                                                          18, 738. 86
Outstanding liabilities June 30, 1942___________________________                                                             289. 45

         Unobligated balance available June 30, 1942_                                                                    18, 449. 41
29. OTHER FLOOD-CONTROL PROJECTS FOR WHICH NO ESTIMATES
                      ARE SUBMITTED

                                                           For last        Cost and expenditures to                      Estimated
                 Name of project                       Name
                                                        full of
                                                             report
                                                                project
                                                        see Annual
                                                                                 June 30, 1942
                                                                                  --- -----
                                                                                                                           amount
                                                                                                                         required to
                                                       Report for-         New work Maintenance                           complete

1. Tar River, N. C ____    _____________________            1939                $81, 265. 61                                 (1)
2. Goldsboro, Neuse River, N. C                             1941           _             __-                                  $40, 000

  1Completed.
Status of all investigations for flood control called for by flood-control acts and
                              committee resolutions
                                                                 Date trans-
          Locality                 Authorization act              mitted to                Document No.                Recommenda-
                                                                  Congress


Neuse River, N. C., between     River and Harbor                July 21,1941             House 327, 77th               Favorable.
Johnson County line and          Act, Aug. 26, 1937.                                     Cong., 1st sess.
New Bern, -improvement
for navigation and flood
control.
Tar River, N. C., including     Rivers and      Harbors      .
Fishing, Otter, Swift, and      Committee       resolu-
Town Creeks, navigation         tion, Feb. 1, 1939.
and flood control.

        493202-43-pt. 1, vol. 1-           33
510    REPORT OF CHIEF OF ENGINEERS,               U. S. ARMY,    1942

  IMPROVEMENT OF RIVERS AND HARBORS IN THE
           CHARLESTON, S. C., DISTRICT
  This district comprises a very small portion of southwestern Vir-
ginia, western central North Carolina, and all of South Carolina ex-
cept the western portion embraced in the drainage basins tributary to
the Atlantic Ocean between Little River and the Beaufort-St. Helena
Bridge at Beaufort, S. C. It includes the Intracoastal Waterway in
the same reach.
  District engineer: Col. Reading Wilkinson, Corps of Engineers, to
April 1, 1942; and Lt. Col. D. W. Griffiths, Corps of Engineers, since
that date.
  Division engineer, Col. J. S. Bragdon, Corps of Engineers.
                                  IMPROVEMENTS

            Navigation                           Navigation-Continued
                                   Page                                     Page
1. Intracoastal Waterway, Cape            10. Ashley River, S. C---------   529
     Fear River, N. C., to Win-           11. Shipyard River, S. C ------   532
     yah Bay, S. C. (Wilming-             12. Waterway from Charleston
     ton, N. C. Dist.)              492         to Beaufort, S. C--------   534
2. Winyah Bay, S. C                 510   13. Examinations, surveys, and
3. Waccamaw River, N. C. and                    contingencies (general)__   537
     S. C--------------------       513   14. Other projects for which no
4. Great Pee Dee River, S. C__      515         estimates are submitted__   538
5. Mingo Creek, S. C---------       517                       ----------
                                          15. Plant allotment--             538
6. Waterway from Winyah Bay                             Flood control
     to Charleston, S. C-------     518
7. Santee River, S. C---------      520 16. Preliminary examinations
8. Congaree River, S. C-------      522       and surveys for flood con-
9. Charleston Harbor, S. C.         525       trol --------------------     53

1. INTRACOASTAL WATERWAY FROM CAPE FEAR RIVER, N. C., TO
     WINYAH BAY, S. C.-SECTION SOUTH OF LITTLE RIVER, S. C.

  For report on this improvement see page 492.
                         2. WINYAH BAY, S. C.
   Location.-This bay lies on the coast of South Carolina, 50 miles
northeast of Charleston Harbor and 90 miles southwest of the en-
trance to Cape Fear River, N. C. (See U. S. Coast and Geodetic
Survey Chart No. 787.)
   Previous projects.-Adopted by River and Harbor Acts of' Au-
gust 2, 1882, and August 5, 1886. For further details see page 1806
of Annual Report for 1915, and page 549 of Annual Report for 1938.
   Existing project.-This provides for a channel 400 feet wide and
18 feet deep at mean low water from the entrance of Winyah Bay,
following the western shore as far as may be necessary, to a point on
the Sampit River 1 mile above the limits of the city of Georgetown,
to be secured and maintained (a) by the construction of two jetties
springing, respectively, from North and South Islands and converg-
ing to give an opening 4,800 feet wide at the 18-foot curve on the
seaward side of the bar, the jetties to be of stone on brush mattresses,
the north jetty having a length of 11,139 feet and the south jetty
21,051 feet; (b) by dredging across the bar to the 18-foot curve indi-
cated; (c) by construction of an earthen dike 14,300 feet long to pro-
tect the shore line of South Island at the southerly side of the bay;
           RIVERS       AND HARBORS-CHARLESTON,                          S. C.,    DISTRICT           511
 (d) by dredging in the bay proper, following the southwestern shore
for a distance of about 6 miles opposite Mud Bay; (e) by dredging
a channel between Eastern and Western Channels from Frazier's
Point to Mosquito Point; and (f) by dredging in Sampit River op-
posite the city of Georgetown and across the bar at the mouth of the.
river. The mean range of tide at Georgetown is 3.3 feet, while the
spring tides have a mean rise and fall of 3.9 feet.
   The estimate of cost for new work, revised in 1935, was $817,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $46,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                      Work authorized                                     Documents



Aug.   5,1886   Jetties and earthen dike to protect south jetty _     H. Ex. Doc. No. 258, 48th Cong., 2d
                                                                        sess., and Annual Report, 1885, pp.
                                                                        1154-1170, and H. Ex. Doc. No. 117,
                                                                        50th Cong., 2d sess., and Annual Re-
                                                                        port, 1889, pp. 1110-1115.
June 25,1910    Present project channel dimensions and training       H. Doe. No. 398, 58th Cong., 2d sess,
                 wall.                                                  and Annual Report, 1904, pp. 1591-
                                                                        1609.


  For the latest published map see Annual Report for 1915, p. 2394.


   Recommnended modification of project.--Under date of February
24, 1939, the Chief of Engineers recommended modification of the
existing project so as toprovide for a channel 27 feet deep from that
depth in the Atlantic Ocean to and including a. turning basin in
Sampit River, with a width of 600 feet across the outer bar and in
the gorge and 400 feet thence to the turning basin, widened at the
bends, at an estimated cost of $1,260,000 for new work, with annual
maintenance of $6,000 in addition to the amounts now required, sub-
ject to certain conditions of local cooperation (H. Doc. No. 211, 76th
Cong., 1st sess.).
   Terminal facilities.-The terminal facilities at the port of George-
town served by this improvement consist of four wharves of ordinary
timber construction, one of creosoted timber construction, suitable
for oceangoing vessels, and a number of smaller wharves and landing
places. These are considered adequate for the present commerce of
the port.
   Operations and results during fiscal year.-The U. S. pipe-line
dredge Creighton and hired labor removed 38,179 cubic yards of
material in restoring project depth for a width of 200 feet in the
entrance channel of Sampit River at a cost of $6,267.62. The cost
of surveys and supervision was $938.19. The total cost during the
year was $7,205.81, for maintenance. The expenditures were $7,387.82.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1937 with the completion of Eastern Channel, the new
direct channel from Frazier Point to Mosquito Point. The jetties.
were completed in 1903-4. The crest elevations range from 8 to
-4 feet and are as much as 12 feet below their original heights.
Dikes of various forms have been built to protect the South Island
512      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                    1942

beach and the shore end of the south jetty. An earthen dike has
been constructed approximately 3,010 feet long, east of the Eastern
Channel, largely from original channel excavation to assist in main-
tenance of the channel. The Sampit River entrance is protected
on the eastern side by a timber and brush training wall 2,000 feet
long.
   A survey made during June 1941 showed that project dimensions
obtain in the entrance and in Eastern Channel. A survey made in
Sampit River during March 1942 showed that shoaling which has
occurred at the mouth of the river subsequent to the last maintenance
dredging in July and August 1941 now limits the controlling center
line depth in the entrance reach to 16 feet and the controlling central
width at this depth to approximately 150 feet.
   The costs of the existing project have been $858,217.30 for new work
and $1,340,842.05 for maintenance, a total of $2,199,059.35. The
expenditures have been $2,199,240.74.
   Proposed operations.-The balance unexpended July 1, 1942
($48,565.65), and accounts receivable ($202.39), a total of $48,768,04,
will be applied as follows:
Accounts payable July 1, 1942 ___-------------      ______________               $21. 00
Maintenance :
    Dredging as may be required to restore project dimen-
      sions in Sampit River from the mouth, including
      the entrance bar, to the head of the project with
      U. S. pipe-line dredge Morgan and hired labor, Sept.
       16 to Oct. 16, 1942---------------_____                $24, 597.04
    Dredging by contract to restore project dimensions in
      Eastern Channel and to build up the east dike with
      spoil to prevent shoaling in the upper end of the
       channel, May 1 to 31, 1943 _____________________        21, 000. 00
    Snagging as may be required in Sampit River from the
      mouth to the head of the project with U. S. snag boat
      Wateree and hired labor Oct. 10 to 31, 1942_ ____-_       3, 150. 00
                                                                             43, 747. 04

      Total for all work                                                         76S. 04
                                                                             48--------------------------
  The additional sum of $46,000 can be profitably expended during
the fiscal year ending June 30, 1944, as follows:
Maintenance :
    Dredging to restore project dimensions in the entrance channel of
      Winyah Bay with U. S. hopper dredge Comstock and hired labor,
      Oct. 1 to 31, 1943 ____________________________-____ -                   $30, 030
    Dredging to restore project dimensions in Sampit River from the
      mouth, including the entrance bar, to the head of the project, as
      may be required, with U. S. pipe-line dredge Colonel G. P. Howell
      and hired labor, Nov. 16 to Dec. 15, 1943                                 16, 000
         Total for all work-----------------------------------------            46, 000

                               Cost and financial summary
Cost of new work to June 30, 1942          __       ---              $3, 304, 069. 15
Cost of maintenance to June 30, 1942_-------------------------1, 455, 398. 42
      Total cost of permanent work to June 30, 1942------------       4, 759, 467. 57
Plus accounts receivable June 30, 1942__ _______________-_____--              202. 39
      Gross total costs to June 30, 1942_-----------------------      4, 759, 669. 96
Minus accounts payable June 30, 1942__-_                                       21. 00
      Net total expenditures__-----------_                  -    -    4, 759, 648. 96
Unexpended balance June 30, 1942- _............----                -      48, 565. 65
      Total amount appropriated to June 30, 1942--                    4,808, 214. 61
               RIVERS          AND HARBORS-CHARLESTON,                             S. C.,    DISTRICT              513


   Fiscal year ending June 30                 1938            1939             1940           1941             1942

(-ost of new work-------
( ost of m aintenance-.............        $137, 743. 25   $132, 638. 00     $19, 810. 16   $48, 962. 37       $7, 205.81

'Iotal expended.-                           120, 608. 38    149, 186. 62      20, 365. 42    48, 961. 75        7, 387. 82

Allotted-          -     -        --        193, 000. 00    140, 800. 00      40, 000. 00     _                15, 600. 00



Balance unexpended July 1, 1941_____---------------                                                        $40, 353. 47
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942-                                                                                    15, 600. 00

      Amount to be accounted for______________________                                                     55, 953. 47
Gross amount expended ----------        __-_______ $7, 996. 59
Less reimbursements collected                          608. 77
                                                                                                             7, 387. 82
      Balance unexpended June 30, 1942___                                                                   48, 565. 65
Outstanding liabilities June 30, 1942 __________________________                                                 21. 00

            Balance available June 30, 1942 ________________________                                        48, 544. 65
Accounts receivable June 30, 1942_________                                 ____ ___________                     202. 39

          Unobligated balance available June 30, 1942______________                                         48, 747.04

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1_____-____________--                                                            46,000. 00
   1 Exclusive of available funds.

                              3. WACCAMAW RIVER, N. C. AND S. C.
   Location.-This river rises at Lake Waccamaw, N. C., and flows
southwest 139.9 miles into Winyah Bay, near Georgetown, S. C. (See
U. S. Geological Survey map of North and South Carolina, 1929.)
  Existing project.-This provides for a channel 12 feet deep at low
water, with 80 feet bottom width, from the mouth of the river to
Conway, 41.5 miles; thence a channel 4 feet deep at low water and
50 feet wide to Red Bluff, 25.5 miles above Conway; thence a cleared
channel to Lake Waccamaw. The usual seasonal variation in water
surface is about 7.5 feet at Conway and about 12 feet at Star Bluff,
80 miles above the mouth. The tidal variation in Winyah Bay is
3.3 feet and at Conway at low river stage it is 1.6 feet.
   The estimate of cost for new work, revised in 1930, was $262,800.
The latest (1930) approved estimate for annual cost of maintenance is
$4,500.
   The existing project was authorized by the following river and
harbor acts:

       Acts                            Work authorized                                      Documents


June 14,1880           Channel 12 feet deep to Conway and cleared chan-S. Ex. Doc. No. 117, 46th Cong., 2d
                        nel, Conway to Lake Waccamaw.                    sess., and Annual Report, 1880, p.
                                                                         848.
July     3, 1930       Channel 4 feet deep from Conway to Red Bluff___ H. Doc. No. 82, 70th Cong., 1st sess.
                                                                         (Contains latest published map.)



Recommended modifications of project.-Recommendation was
made to Congress in 1926 that the project be curtailed by eliminating
514         REPORT OF CHIEF OF ENGINEERS,                                                U.     S. ARMY,           1942

all work between Star Bluff and Lake Waccamaw (H. Doc. No. 467,
69th Cong., 1st sess.).
   Terminal facilities.-At Conway there is a wharf and warehouse
,which are free and open to all carriers. At intermediate landings
there are privately owned free wharves and a number of recently con-
structed landings for the handling of pulpwood. These terminals are
considered adequate for existing commerce.
   Operations and results during fiscal year.-The U. S. snag boat
Wateree removed 460 snags, stumps, logs, and overhanging trees in
clearing the channel of the most serious obstructions from Enterprise,
S. C., mile 27, to Red Bluff, S. C., mile 67, at a cost of $2,417.39. The
total cost during the year was $2,417.39, for maintenance. The ex-
penditures were $2,485.23.
   Condition at end of fiscal year.-The 12-foot channel to Conway,
mile 41.5, was completed in 1924 and obtains for most of the distance.
Shoals have formed, however, at several places and the controlling
depth at these points is 11.3 feet for a width of approximately 40 feet.
In the 4-foot channel from Conway to Red Bluff project dimensions
obtain to Sessions Landing, mile 54; thence to Red Bluff sand bars
have formed limiting the controlling depth to 2.8 feet at low water
for a width of 30 feet. Above Red Bluff, no work having been done
for several years, the channel is obstructed by logs and snags and
cannot be navigated safely.
   The costs to the end of the fiscal year have been $262,813.58 for new
work and $154,472.63 for maintenance, a total of $417,286.21. The
expenditures have been $417,354.
   Proposed operations.-The balance unexpended July 1, 1942
 ($5,672.87) and accounts receivable ($67.79) a total of $5,740.66, will
be applied to maintenance snagging and possibly the removal of
sand bars, as may be required, from Enterprise, mile 27, to Red Bluff,
mile 67, with U. S. snag boat Wateree and hired labor January 13 to
February 18, 1943.
   The additional sum of $4,500 can be profitably expended during
the fiscal year ending June 30, 1944, in maintenance snagging as may
be required from Enterpsrise, mile 27, to Red Bluff, mile 67, with
U. S. snag boat Wateree and hired labor, December 15, 1943, to
January 15, 1944.
                                         Cost and financial summary
Cost of new work to June 30, 1942 _-_                            $262, 813. 58
Cost of maintenance to June 30, 1942______                  ____ 1_____________
                                                                   54, 472. 63
      Total cost of permanent work to June 30, 1942               417, 286. 21
Plus accounts receivable June 30, 1942 ________________________         67. 79
         Gross total costs to June 30, 1942_________ ___                                                _______          417, 354. 00
Net total expenditures_____________________________                                                                      417, 354. 00
Unexpended balance June 30, 1942___________________------__                                                                5, 672. 87
      Total amount appropriated to June 30, 1942______________                                                           423, 026. 87

   Fiscal year ending June 30                  1938                     1939              1940              1941             1942

C ost of n ew w ork                --...--------.... ... .. ...   ...       - .. .._ .    . . . . .     . . . . . .      _
'Cost of maintenance                           $4, 430. 61               $582. 46        $5, 979. 51       $1, 939. 21       $2, 417. 39

Total expended ...           _ _...            4, 457. 94                 627. 11         6, 032. 10        1, 998. 79        2, 485. 23
Allotted_ ._   -       _,_                     7, 800. 00           4, 500. 00                500. 00       4, 500.00         3, 000. 00
           RIVERS        AND   HIARBORS-CHARLESTON,                   S. C.,    DISTRICT           515

Balance unexpended July 1, 1941_____                                                         $5, 158. 10
Amount allotted from War Department Civil Appropriation Act
  approved April 28, 1942_________________________                                            3, 000. 00
      Amount to be accounted for _______________----_---_--                                   8, 158. 10
Gross amount expended______________________           __ $3, 672. 64
Less reimbursements collected__________-------------_     1, 187. 41
                                                                                             2, 485. 23
     Balance unexpended June 30, 1942_-_________------                                        5, 672. 87
Accounts receivable June 30, 1942_ ___                                                            67. 79
        Unobligated balance available June 30, 1942_ --____-____--                       -    5, 740. 66
Amount that can be profitably expended in fiscal year ending June
  30, 1944, for maintenance 1_________-______                                      ___        4, 500. 00
  1 Exclusive of available funds.

                            4. GREAT PEEDEE RIVER, S. C.'
   Location.-Great Peedee (Pee Dee) River rises in the mountains
of North Carolina and flows generally southeast for 435 miles into
Winyah Bay, near Georgetown, S. C. Above the Uharie River, 233
miles from the mouth, it is called the Yadkin. (See U. S. Geological
Survey map of South Carolina, 1929.)
   Existing project.-This provides for a cleared 9-foot channel from
Waccamaw River, via Bull Creek, to Smiths Mills and thence a 31/2-
foot channel to Cheraw at all stages of water. The tidal variation
at low-water stage is 2.3 feet at Waccamaw River and 3 inches 16
miles above. The ordinary flood stage is 18 feet above the low-water
stage at Smiths Mills, 17 feet at Atlantic Coast Line Railroad bridge,
and 27 feet at Cheraw Bridge, respectively, 55, 105, and 174.5 miles
from the mouth.
   The estimated cost for new work, revised in 1900, was $235,345.
The latest (1900) approved estimate for annual cost of maintenance
is $5,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                       Work authorized                                 Documents


June 14,1880    Removal of obstructions to secure a navigable      S. Ex. Doe. No. 117, 46th Cong., 2d
                 depth of 9 feet to Smiths Mills and 31/ feet to     sess., and Annual Report, 1880, p.
                 Cheraw.                                             844.
June 13, 1902   To secure a 36 foot channel between Cheraw and     H. Doe. No. 124, 56th Cong., 2d sess.
                 Atlantic Coast Line R. R. bridge by dredging,
                 snagging, and constructing timber and pile
                 dams.


  For map see Annual Report for 1889, p. 1180.

   Recommended modifications of project.-Recommendation was
made to Congress in 1926 that the project be curtailed by elimina-
tion of all work between Jeffreys Creek and Cheraw (H. Doc. No.
467, 69th Cong., 1st sess.).
   Terminal facilities.-Located at various places along the stream
are landings for the handling of pulpwood. There are practically
516        REPORT OF CHIE:F OF ENGINEERS,                                         U. S. ARMY,              1942

no other terminal facilities, except small sheds constructed at a few
landings as a protection to freight. They are privately owned.
   Operations and results during fiscal year.-The U. S. snagboat
Wateree removed 721 snags, stumps, logs, and overhanging trees and
cleared the channel of the most serious obstructions from the head
of Bull Creek at Great Peedee River, mile 32.5, to Smiths Mills, mile
55, at a cost of $3,716.52. The total cost during the year was $3,716.52,
for maintenance. The expenditures were $3,843.48.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1909. There exists from Waccamaw River via Bull Creek
to Smiths Mills, mile 55, a cleared channel 9.0 feet deep, thence 3.0 feet
to Jeffreys Creek, mile 91; thence 2.0 feet to Mars Bluff, mile 105;
thence less than 1.0 foot to Cheraw, mile 174.5.
  The costs and expenditures to the end of the fiscal year have been
$183,712.41 for new work and $219,135.27 for maintenance, a total
of $402,847.68. The expenditures have been $402,974.64.
  Proposed operations.--The balance unexpended July 1, 1942,
($6,410.83) and accounts receivable ($126.96) a total of $6,537.79
will be applied to maintenance snagging and the removal of sand
bars, as may be required, from the mouth of Bull Creek at Wacca-
maw River, mile 29.5, to Smiths Mills, mile 55, with U. S. snag
boat Wateree and hired labor, December 1, 1942, to January 12, 1943.
  The additional sum of $5,000 can be profitably expended during
the fiscal year ending June 30, 1944, in maintenance snagging from
the mouth of Bull Creek at Waccamaw River, mile 29.5 to Smiths
Mills, mile 55, with U. S. snag boat Wateree and hired labor, No-
vember 8 to December 14, 1943.
                        Cost and financial summary
Cost of new work to June 30, 1942_ _ _-_____-                                                                    $183, 712. 41
Cost of maintenance to June 30, 1942---                                                               -                 135. 27
                                                                                                                  2---------------
                                                                                                                  219,

      Total cost of permanent work to June 30, 1942 ___________-                                                  402, 847. 68
Plus accounts receivable June 30, 1942 ________-___________-__-                                                        126. 96

        Gross total costs to June 30, 1942 _____--- ---                                 _____-__                  402, 974. 64

Net total expenditures_      __-----------  ---------                                                             402, 974. 64
Unexpended balance June 30, 1942-----------------------------                                                       6, 410. 83

        Total amount appropriated to June 30, 1942________________                                                409, 385. 47

   Fiscal year ending June 30                     1938              1939            1940            1941               1942


Cost of new work- .   .      .      .    .   .      .    .     ..-----.       .    .
                                                                           . --------------
                                                               -------------.               ---
Cost of maintenance       _...........           $7, 012. 05      $2, 947. 62     $5, 222. 98      $5, 609. 94         $3, 716. 52

Total expended-----------------                  9, 094. 00        2, 947. 62       5, 222. 98      5, 609. 94          3, 843. 48
                      _
Allotted------.------------ -                    9, 200. 00        5, 000. 00       4, 000. 00      5, 000. 00          5, 000. 00


Balance unexpended July 1, 1941    _____ _______----                                                               $5, 254. 31
Amount allotted from War Department Civil Appropriation Act
  approved April 28, 1942-----------------------------------                                                         5, 000.00

      Amount to be accounted for                                  -------------------------                        10, 254.31
Gross amount expended_-_ _      _                                 ______        _______ $4, 535. 83
Less reimbursements collected---_                               ___ ____------__-          -      692. 35
                                                                                                                     3, 843. 48
        Balance unexpended June 30, 1942__ ____-----------------                                                     6, 410. 83
          RIVERS AND .HFARBORS-CHARLESTON,                            S. C.,   DISTRICT         517

Accounts receivable June 30, 1942_____________________--------------------------__________$126.96
        Unobligated balance available June 30, 1942________________                        6, 537. 79

Amount that can be profitably expended in fiscal year ending June
  30, 1944, for maintenance 1________________________________------                        5, 000. 00
  1Exclusive of available funds.

                                  5. MINGO CREEK, S. C.
   Location.-This stream rises in the northern part of Williamsburg
County, S. C., about 12 miles east of Kingstree, flows in a south-
easterly direction about 45 miles in Williamsburg and Georgetown
Counties and enters Black River at a point approximately 25 miles
above the mouth of the latter and about 30 miles by water from
Georgetown, S. C. The head of navigation is regarded as being 31
miles above the mouth. (See U. S. Geological Survey Map of South
Carolina, 1929.)
   Previous projects.--The original project was adopted by the River
and Harbor Act of August 11, 1888. For scope of previous projects,
see page 1807, Annual Report for 1915.
   Existing project.-This provides for a channel 60 feet wide and 8
feet deep at mean low water, from the mouth to Hemingway Bridge,
11 miles, by making four short cut-offs. The rise of tide is 2 feet and
freshet rise 41/2 feet.
   The estimate of cost for new work, made in 1910, was $22,000. The
latest (1928) approved estimate for annual cost of maintenance is
$400.
   The existing project was adopted by the River and Harbor Act
of July 25, 1912 (H. Doc. No. 782, 61st Cong., 2d sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-Several landings for loading pulpwood are
located along the creek. These facilities are considered sufficient for
present and prospective commerce.
   Operations and results during fiscal year.-There were no opera-
tions or expenditures during the fiscal year.
   Condition at end of fiscal year.-The existing project was completed
in 1913. The creek was last cleared of obstructions during October
and November 1939, after which time project dimensions obtained.
   The costs and expenditures of the existing project have been $12,050
for new work and $3,750 for maintenance, a total of $15,800.
   Proposed operations.-The balance unexpended July 1, 1942
 ($1,500) will be applied to clearing the channel of obstructions in the
form of snags, overhanging trees, and logs, as may be required from
the mouth to the Hemingway Bridge, mile 11, with U. S. snag boat
Wateree and hired labor, February 19 to 28, 1943.
   It is not expected that maintenance funds will be required during
the fiscal year 1944.
                                Cost and financial summary
Cost of new work to June 30, 1942__________--__________________-_ $29, 050
Cost of maintenance to June 30, 1942________________
                                                   ______________   4, 350
        Total cost of permanent work to June 30, 1942__---------                  ______     33, 400

Net total expenditures -------------------------                                              33,400
Unexpended balance June 30, 1942-_-_________----------_
                                .   ..                                                         1, 500
        Total amount appropriated to June 30, 1942_ ........--                         -     34, 900
518           REPORT OF CHIEF OF ENGINEERS,                               U.     S. ARMY,          1942


      Fiscal year ending June 30             1938        1939              1940             1941                  1942


Cost ofnew work__
Cost of maintenance__                                     $143.04         $2, 856. 96
Total expended         _                                                   3, 000. 00
Allotted__                   -     -                     3, 000. 00   _                                              $1, 500



Amount allotted from War Department Civil Appropriation Act ap-
  proved April 28, 1942    ------------------------------------                                                     , 500
                                                                                                                  $--
Balance unexpended June 30, 1942_-----             ---- ____------------                                           1, 500
           6: WATERWAY FROM WINYAH BAY TO CHARLESTON, S. C.

  Location.-The route of the waterway follows creeks, sounds, rivers,
bays, and extensive marshland cuts beginning at a point 8 miles below
Georgetown in Winyah Bay to Charleston Harbor. The route is tidal
throughout and is sheltered from the sea. The distances from
Charleston to McClellanville, Winyah Bay, and Georgetown are 37
miles, 57 miles, and 65 miles, respectively. (See U. S. Coast and Geo-
detic Survey Charts, Nos. 836 and 837.)
   Existing project.-This provides for a channel 12 feet deep at mean
low water and 90 feet wide at bottom between Charleston Harbor and
Winyah Bay, 62.8 miles, with a branch channel of the same dimen-
sions to McClellanville. The mean tidal range is 3.3 to 5.1 feet,
according to locality.
   The estimate of cost for new work, revised in 1937, was $2.326,000,
and the latest (1937) approved estimate for annual cost of main-
tenance is $57,500.
   The existing project was authorized by the following river and
harbor acts:

       Acts                            Work authorized                                    Documents



Sept. 19, 1890    Channel from Minim Creek to Winyah Bay .----Annual Report, 1889, p. 1184.
June 13,1902      Channel from Charleston to a point opposite              Hi. Doc. No. 84, 56th Cong., 1st sess.,
                   McClellanville.                                           and Annual Report, 1900, p.1908.
Mar. 2,1907       Branch channel to McClellanville__                       Annual Report, 1903, p. 1133.
Mar.     2,1919   Extending the channel to Minim Creek, thence             H. Doc. No. 178, 63d Cong., 1st sess.
                    through the Estherville-Minim Creek Canal to
                    Winyah Bay.
Mar. 3,1925       Cut across the Santee Delta at Four Mile Creek__         H. Doc. No. 237, 68th Cong., 1st sess.
Aug. 30,19351     Enlarging the channel from Winyah Bay to                 Rivers and Harbors Committee Doc.
                    Charleston, including the branch channel to             No. 11, 72d Cong., 1st sess.2
                    McClellanville, to depth of 10 feet and bottom
                   width of 90 feet.
Aug. 26,1937      For present project dimensions_ ______-        --        Rivers and Harbors Committee Doc.
                                                                                                              2
                                                                               No. 6, 75th Cong., 1st sess.


  I Included in Public Works Administration program Sept. 6, 1933.
  2   Contains latest published maps.

  Local cooperation.--Fully complied with.
   Terminal facilities.-Several small landings are located along the
waterway and creeks and bays connecting with it. At McClellan-
ville, on the branch channel, are located six wharves used for han-
dling pulpwood and miscellaneous commodities. The facilities are
sufficient for present commerce.
         RIVERS     AND     HARBORS-CHARLESTON,         S. C.,   DISTRICT       519

   Operations and results during fiscal year.-Maintenance.-TheU.
S. pipeline dredge Creighton and hired labor removed 74,684 cubic
yards of material in restoring project dimensions at the northerly
end of the Estherville-Minim Creek Canal, and completing dredging
along the westerly shore of Winyah Bay across the mouth of this
Canal to increase the effectiveness of the permeable dikes in reducing
shoaling in the canal, at a cost of $8,601.91. The U. S. pipe-line
dredges Morgan and Congaree commenced dredging to restore safe
12-foot navigation the full length of the project on June 10 and
June 20, respectively, and during the remainder of the fiscal year
removed 99,451 cubic yards at a cost of $23,212.16. The cost of sur-
veys and supervision was $1,719.52. The total cost during the year
was $33,533.59, chargeable to maintenance. The expenditures were
$29,565.83.
   Condition at end of fiscal year.-The project was completed in 1940.
An examination made during June 1942 showed that shoaling at
intermittent reaches in the through channel now limits the controlling
depth at project width to 9.0 feet at two reaches within 5 miles south
of McClellanville. A survey made during January 1942 shows there
is a controlling depth of 8.1 feet for a central width of 55 feet in the
branch channel to McClellanville.
   The costs to the end of the fiscal year for new work have been
$874,270.91 from regular funds and $1,193,857.08 from Public Works
funds, a total of $2,068,127.99. The costs to the end of the fiscal year
for maintenance have been $1,052,936.68 from regular funds, $13,-
308.01 from Public Works funds, and $54,915.78 from Emergency
Relief funds, a total of $1,121,160.47. The total costs for all work
have been $3,189,288.46. The expenditures have been $1,921,442.06
from regular funds, $1,207,165.09 from Public Works funds, and
$54,915.78 from Emergency Relief funds, a total of $3,183,522.93.
   Proposed operations.-The balance unexpended July 1, 1942;,
$68,746.61, together with $314,320 allotted during September 1942, a
total of $383,066.61, will be applied as follows:
Accounts payable July 1, 1942__--------_____________-                     $5, 765. 53
Maintenance:
    Dredging to restore project dimensions throughout
      the project except the branch channel to McClel-
      lanville, and to widen the channel at the Winyah
      Bay end of the Estherville-Minim Creek Canal,
      and at the crossings of Minim, Toomer, Conch,
      Inlet, and Swinton Creeks, and at the approaches
      to Cove bridge, with United States pipe-line
      dredges and hired labor as follows: Morgan, July 1
      to Sept. 15, 1942; Con garee, July 1 to 15,
      1942; Henry Bacon, July 4 to 17, 1942; 1 leased,
      contract pipe-line dredge, July 13 to 28, 1942 ...  $119, 981. 55
   Driving guide dolphins by contract at the Cove high-
      way bridge, July 1 to 15, 1942__      _____________    8, 000. 00
    Dredging to maintain project dimensions from Win-
      yah Bay to Charleston, including the branch chan-
      nel to McClellanville, as may be required through-
      out the remainder of the fiscal year, with a United
      States Government pipe-line dredge and hired
      labor, Sept. 15, 1942 to June 30, 1943_______--      249, 319. 53
                                                                          377, 301. 08

         Total for all work_----__                                 ___---_ 383, 066.61
520             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                 1942

     The additional sum of $57,500 can be profitably expended during
the fiscal year ending June 30, 1944, as follows:
Maintenance: Dredging by contract to restore project dimensions as
may be required from Winyah Bay to Charleston, S. C., including the
branch channel to McClellanville, Sept. 1 to Oct. 13, 1943; and Mar. 1
to Apr. 20, 1944-----   -------------------------------------          $57, 500

                                                Cost and financial summary
Cost of new work to June 30, 1942_--------------------------_ $2, 068, 127. 99
Cost of maintenance to June 30, 1942------------------------1, 121, 160. 47
      Total cost of permanent work to June 30, 1942-------      3, 189, 288. 46
Minus accounts payable June 30, 1942---------------------------      5, 765. 53

     Net total expenditures------------------------------ 3, 183, 522. 93
Unexpended balance June 30, 1942----------------------------  68, 746. 61

             Total amount appropriated to June 30, 1942--------------3,                                         252, 269. 54


     Fiscal year ending June 30                     1938           1939            1940            1941                 1942


Cost of new work....___________.. __                _ . .....     $8, 774. 61   $219, 637. 70   $212, 849. 69
Cost of maintenance -.-.     .    .               $46, 765. 44    88, 963. 98     12, 900. 95     41, 094. 12          $33, 533. 59
        Total cost_            ----                46, 765. 44    97, 738. 59    232, 538. 65    253, 943. 81           33, 533. 59
Total expended__                      -------      43, 112. 84    59, 787. 13    174, 091. 08    320, 014. 36           29, 565. 83
Allotted...._-____..-------------           .     101, 000. 00   530, 000. 00     35, 600. 00   -45,000. 00             57, 500. 00


Balance unexpended July 1, 1941______                                                                           $40, 812. 44
Amount allotted from War Department Civil Appro-
  priation Act approved May 23, 1941$__$_____     -$30, 000. 00
Amount allotted from War Department Civil Appro-
  priation Act approved April 28, 1942 __   -__---- 27, 500. 00
                                                                                                                 57, 500. 00

       Amount to be accounted for_                                                                               98, 312. 44
Gross amount expended----------------                                                     $30, 861. 65
Less reimbursements collected------   ----------                                            1, 295. 82
                                                                                                                 29 565
                                                                                                                 6v,746.
                                                                                                                       ...
                                                                                                                           83

            Balance unexpended June 30, 1942___                                                                  68, 746. 61
Outstanding liabilities June 30, 1942-                                                                            5, 828. 39
            Balance available June 30, 1942 _____________________--_                                             62, 918. 22

Amount that can be profitably expended in fiscal year ending June
                                     _
30, 1944, for maintenance 1______      _    __________     _                                                    57, 500. 00
    I Exclusive of available funds.


                                                 7. SANTEE RIVER, S. C.

     Location.--This river is formed by the confluence of the Congaree
and Wateree Rivers, about 29 miles southeast of Columbia, S. C. It
flows generally southeast for 143 miles and enters the Atlantic Ocean
about 45 miles northeast of Charleston Harbor. (See U. S. Coast
and Geodetic Survey Chart No. 1238 and U. S. Geological Survey map
of South Carolina, 1929.)
       RIVERS AND    HARBORS--CHARLESTON,       S.   C.,   DISTRICT   521

   Previous projects.-Adopted by River and Harbor Act of March
3, 1881. For further details of previous projects see page 1808 of
Annual Report for 1915, and page 558 of Annual Report for 1938.
   Emisting project.-This provides for snagging the entire river.
The plane of reference for the lower river is mean low water, the
mean tidal range at the mouth being 4.5 feet. Tidal action extends
to Lenuds Ferry, 38 miles above the mouth. During June 1941 the
river was closed to navigation at Wilsons Landing, 87 miles above the
mouth, by the construction of the Santee Dam by the South Carolina
Public Service Authority. Upon completion of the Santee-Cooper
project navigation will be restored above the Santee Dam via Cooper
River and the Santee-Cooper project. There is no approved estimate
of cost for annual maintenance.
   The existing project was adopted by the River and Harbor Act
approved September 19, 1890 (Annual Report for 1889, p. 1184).
   Terminal facilities.-There are no terminal facilities. However,
there are several landings for handling pulpwood which are considered
adequate for existing commerce.
   Operations and results during fiscal year.-There were no opera-
tions or expenditures during the fiscal year.
   Condition at end of fiscal year.-On June 18, 1941, the river was
closed to navigation at Wilsons Landing, mile 87, by the construction
of the Santee Dam of the Santee-Cooper hydro project. The control-
ling depth from this dam down to tidewater at Lenuds Ferry, approxi-
mately 31 miles above the crossing of the Intracoastal Waterway, has
been reduced to probably no more than 2.0 feet and possibly less
by the diversion of the waters to the Pinopolis Reservoir and Cooper
River. The flow passing the dam has on occasions been reduced to 500
cubic feet per second, the minimum flow permitted under the terms of
the Federal Power Commission license. The controlling depth from
the crossing of the Intracoastal Waterway to 12 miles above is 9.0 feet
and thence 4.0 feet to the head of the tidal reach at Lenuds Ferry, 31
miles above this crossing. Upon completion of the tail canal of thte
Santee-Cooper project navigation from the seacoast at Charleston to
points on Santee River above the dam will probably be restored via the
Cooper River and the Santee-Cooper project.
   The costs and expenditures of the existing project have been $173,-
667.65, chargeable to maintenance.
   Proposed operations.-The balance unexpended July 1, 1942
 ($4,024.42), will be applied to maintenance snagging and possibly the
removal of sand bars as may be required from the crossing of the
Intracoastal Waterway, .mile 7, to the head of the tidal reach at Lenuds
Ferry, mile 38, with U. S. snag boat Wateree and hired labor, March 1,
to 26, 1943.
   The additional sum of $4,500 can be profitably expended during the
fiscal year ending June 30, 1944, in maintenance snagging as may be
required from near the head of the Santee pool and the head of the
stream with U. S. snag boat Wateree and hired labor, September 4 to
October 4, 1943.
522          REPORT OF CHIEF OF ENGINEERS,                                       U. S. ARMY,              1942

                                           Cost and financial summary

                                                                                                                $99, 750. 00
           new work to June 30, 1942------------------------
'Cost ofof maintenance
(Cost
                       to June 30, 1942--------------------------                                               173, 667. 65

           Total cost of permanent work to June 30, 1942------------273, 417. 65

Net total expenditures----   --------------------------------                                                   273, 417. 65
Unexpended balance June 30, 1942 -------------------                                                              4, 024. 02

           Total amount appropriated to June 30, 1942----__                                                     277, 441. 67

   Fiscal year ending June 30                   1938               1939            1940            1941                1942


Cost of new work . .              .    . -----.--------
                                            .     .     .-.------------
                                                               ..--          ------------------                 ----
Cost of maintenance           ________ _____             ---..------------        $3, 951. 08     $3, 642. 77           --....
                              __------
Total expended ...............-
                          -----                             --------------        3, 951. 08       3, 642. 77

Allotted    _---.   -------      .    .-          $3, 850                         3, 000. 00       4, 600. 00



Balance unexpended July 1, 1941-----------------------------                                                     $4, 024. 02
Balance unexpended June 30, 1942_ __      _____---------- _                                                       4,024. 02

Amount that can be profitably expended in fiscal year ending June 30,
                            --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
  1944, for maintenance 1                                                                                          4, 500. 00
 ' Exclusive of available funds.

                                           8. CONGAREE RIVER, S. C.

    Location.-This river is formed by the confluence of the Broad and
Saluda Rivers at Columbia, S. C., and flows southeasterly 50 miles,
there uniting with the Wateree River to form the Santee River. (See
T.. S. Geological Survey map of South Carolina, 1929.)
   Existing project.-This provides for a 4-foot navigable channel over
the lower 49 miles of the river, to be secured by dredging and bank
protection, and for the construction of a lock and dam to extend deep
water to Gervais Street Bridge, Columbia, S. C. The variation in
water surface due to freshets is about 24 feet at the mouth of the river
and is about 33 feet at Columbia, the plane of reference being ordinary
low water.
   The estimate of cost of new work, revised in 1925, is $514,000. The
latest (1928) approved estimate of annual cost of maintenance is $5,200,
including $200 for operation and care of the lock and dam.
   Data concerning the lock and dam are as follows:
  Location, 2 miles below Gervais Street, Columbia, S. C., 47 miles above mouth
of river.
                                                                           Feet
      Length between miter sills                       -- __ -------------                                                    170
    'Clear width---     ----------------------------------------                               55
    Lift - Lit-------------------------------------------1          -----------------------    10
    Depth of miter sills at low water                                                           6---------------
Character of foundation, ledge granite.
Kind of dam, movable. Chanoine wickets.
Original structure completed, 1904; alterations, 1914.
Cost to date:
    Original structure-------                          ----------------------           $225, 000
    Alterations---------- -----------------------------------------                       56, 000

           Total--                       -------------                                                                 281, 000
   Completed, 1914.
              RIVERS      AND HARBORS-CHARLESTON,                    S.   C.,   DISTRICT           523
  The existing project was authorized by the following river and
harbor acts:

       Acts                       Work authorized                               Documents


Aug.     5,1886   Improvement of the lower 49 miles      -       H. Ex. Doc. No. 254, 48th Cong., 2d
                                                                   sess., and Annual Report, 1885, p.
                                                                   1140.
Mar.     3,1899   Construction of a lock and dam_                H. Ex. Doc. No. 66, 53d Cong., 2d sess.,
                                                                   and Annual Report, 1896, p. 1183.
June 25,1910 Rebuilding the dam and raising the crest-------     H. Doc. No. 608, 61st Cong., 2d sess.
Aug. 8,1917 Bank protection_                                     IH. Doc. No. 702, 63d Cong., 2d sess.
June 26,1934 1 Operating and care of lock and dam provided for
                   with funds from War Department appropri-
                   ations for rivers and harbors.


  1 Permanent Appropriations Repeal Act.


   Terminal facilities.-There are no public terminals on the river.
The Gulf Oil Corporation has leased the Government reservation at
the lock and dam site, near Columbia, and has constructed an oil
terminal thereon for their use, but the movement of petroleum prod-
ucts to this terminus has been temporarily discontinued.
   Operations and results during fiscal year.-There were no opera-
tions during the fiscal year.
   Operating and care of lock and dam across Congaree River near
Columbia, S. C.-Ordinary repairs were made during the year by
hired labor for maintenance and preservation of property at a cost
of $126.12, for maintenance. The costs during the. year were $126.12
for operating and care. The expenditures were $140.40.
   Condition at end of fiscal year.-That portion of the existing proj-
ect which covers dredging and bank protection was approximately 71
percent completed; the remaining work consists of revetting approxi-
mately 20,000 feet of banks in the vicinity of Congaree and Gill
Creeks, beginning about 5 miles below Columbia. Snagging opera-
tions during August and September 1939, removed the most objec-
tionable snags, stumps, sunken logs and overhanging trees. Surveys
made during April 1940 show that the controlling depth is 4.0
feet except during the low-water stage resulting from the week-end
closing of upstream power plants. Since there is no commerce on
the stream no recent surveys have been made.
   The portion of the project covering the lock and dam has been com-
pleted, as described in paragraph "Existing project." The lock and
dam were placed out of commission in August 1920, and the buildings
and grounds are being leased.
   The costs to the end of the fiscal year have been $364,823.87 for
new work, $1,786.44 for operating and care, and $390,559.51 for
maintenance, a total of $757,169.82.         The expenditures were
$757,184.10.
   In addition the sum of $109,833.10 was expended between August
7, 1906, and June 30, 1935, on the operation and care of the works of
524        REPORT OF CHIEF OF ENGINEERS, U. S. ARMIY,                                                    1942

improvement under the provision of the permanent and indefinite
appropriation for such purposes.
  Proposed operations.-The balance unexpended July 1, 1942,
($5,516.54) and accounts receivable ($14.28), a total of $5,530.82, will
be applied as follows:
Maintenance: Clearing the channel of obstructions in the form of
snags, overhanging trees, logs, and possibly sand bars, as may
be required, from the mouth of the river to the lock and dam
near Columbia, S. C., mile 49, with U. S. snag boat Wateree,
Nov. 1 to 30, 1942   ---------------------------------------       $5, 330. 82
Maintenance (operating and care): Maintenance and protection of
property at lock and dam July 1, 1942, to June 30, 1943_----------     200. 00

        Total for all work -------------                              ----------------------                      5, 530. 82
  The additional sum of $154,200 can be profitably expended during
the fiscal year ending June 30, 1944, as follows:
New work: Constructing by contract, training wall and spur dikes for
bank protection and channel control, Oct. 1, 1943, to June 30, 1944___ $149, 000
Maintenance: Removal of snags, overhanging trees, logs, and pos-
sibly sand bars as may be required from the mouth of the river
to the lock and dam near Columbia, S. C., mile 49, with U. S. snag
boat Wateree and hired labor, Oct. 5 to Nov. 7, 1943__________--_         5, 000
Maintenance (operating and care): Maintenance and protection of
property at lock and dam July 1, 1943, to June 30, 1944                      200              -----------
                                 -
        Total for all work ________-                                   ---------------------                       154, 200

                                      Cost and financial summary
Cost of new work to June 30, 1942                                                                              $364, 823. 87
Cost of maintenance to June 30, 1942______ -____-________                                                       502, 179. 05
      Total cost of permanent work to June 30, 1942 ------                                                     867, 002. 92
Plus accounts receivable June 30, 1942______-- ____------                                                            14. 28

       Gross total costs to June 30, 1942___--______ --                                          ____           867,017. 20
Net total expenditures __________--
                              ---    _________--______                                                         867, 017.20
Unexpended balance June 30, 1942----------------------------_                                                    5, 516. 54
       Total amount appropriated to June 30, 1942______________                                                872. 533.74

   Fiscal year ending June 30              1938                1939              1940             1941              1942

Cost of new work.   ---..............       -......................        ..........................................
Cost of maintenance ._-__....-
                           -              $1, 782. 18    --------------        $5, 877. 79         $107. 90           $126.12
Total expended---      _     _ __          1,782. 18       -      __            5, 874. 11          111.58             140. 40
Allotted-----         ......------------------..
                                            7, 000. 00          $500. 00         5, 200. 00              500


Balance unexpended July 1, 1941___________________-______-__                                                     $5, 656. 94
Gross amount expended --------------                                                                                 140. 40
      Balance unexpended June 30, 1942-------------------------5, 516. 54
Accounts receivable June 30, 1942--------------------------------- 14.28
        Unobligated balance available June 30, 1942_-----------------                                             5, 530. 82
Amount     (estimated)        required to be appropriated for completion of
  existing project 1              - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
                                                                                                                149, 000. 00

  1 Exclusive of available funds.
         RIVERS      AND HARBORS-CHARLESTON,         S. C.,      DISTRICT    525

Amount that can be profitably expended in fiscal year ending June
30, 1944 :
   For new work ----------------------------------------          $149, 000. 00
   For maintenance 1--        ___-------------------            _    5, 200.00

       Total 1,---------------------------------              ------   154,200.00
  1 Exclusive of available funds.

                          9. CHARLESTON HARBOR, S. C.

   Location.-This harbor is on the coast of South Carolina, about 15
miles southerly of the middle point of the coast line, 50 miles south-
west of Winyah Bay, S. C., and 80 miles northeast of the mouth of
the Savannah River. (See U. S. Coast and Geodetic Survey Charts
Nos. 1239 and 470.)
   Previous projects.-Adopted by River and Harbor Acts of August
30, 1852; June 18, 1878; August 11, 1888; March 3, 1899; June 25, 1910;
August 8, 1917; and July 18, 1918.
   For further details see page 1808, Annual Report for 1915; page 579,
Annual Report for 1926; page 562, Annual Report for 1938.
   Existing project.-This provides for commercial purposes a channel
35 feet deep, 1,000 feet wide from the sea to the inner end of the jetties,
thence 600 feet wide to Town Creek, thence 500 feet wide through Town
Creek, thence 600 feet wide to the navy yard, and thence 400 feet wide
to Goose Creek, with a turning basin 700 feet wide at the Port Ter-
minals, together with a channel 30 feet deep, 600 feet wide in Cooper
River around the east and north sides of Drum Island; also a channel
in Shem Creek 10 feet deep and 110 feet wide from a flared entrance
from Hog Island channel to and including a turning basin 130 feet
wide and 400 feet long with the upper end 250 feet upstream of the
Mount Pleasant public wharf.
   The estimate of cost for new work, revised in 1942, is $1,212,000
exclusive of amounts expended under previous projects. The latest
 (1941) approved estimate of cost for annual maintenance is $85,000.
   The existing project includes the maintenance of, two entrance
jetties completed in 1895 under previous projects. These jetties are
of stone on log-mattress foundation, the north jetty 15,443 feet long
and the south jetty 19,104 feet long; the distance between their axes
at the outer end is 2,900 feet. The height as originally built, except
the submerged inner portions and the gap left in the south jetty,
was 12 feet above mean low water for the greater part of their length.
    The project also provides for a 40-foot channel 1,000 feet wide
from the sea to the inner ends of the jetties,              fJa1         ,,
   a north jetty h ving a length of 15,443 f.et, thence 600 feet wide to
the south pier at the navy yard, and thence 1,000 feet wide to the com-
mandant's wharf, at an estimated first cost of $3,603,000 and $250,000
annually for maintenance, both figures being additional to the esti-
mates for the commercial project given above, and that it be con-
sidered as a national defense rather than a commercial measure and
be prosecuted only as found necessary in the interest of national
defense.
    The mean tidal range is 5.2 feet, though this is increased to 7 or 8
feet under the influence of northeast winds or storms of long dura-
tion.
       493202-43-pt. 1, vol. 1--34
526           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                             1942

  The existing project was authorized by the following river and
harbor acts:

       Acts                          Work authorized                                         Documents



June 18, 1878      2 jetties 1 . _      ____      _     -_-. - - - - - - - --   Annual Report, 1878, pp. 553-572.
Aug. 8,1917        Increase in depth to 30 feet with width of 500 feet          H. Doc. No. 288, 62d Cong., 2d sess.
                     between the jetties and 1,000 feet seaward there-
                     of.
July 18, 1918      The 40-foot channel to the navy yard. (Act pro-              H. Doc. No. 1946, 64th Cong., 2d sess.,
                    vided that the 40-foot channel should not be                  pt. I, pp. 21-29, 57, 58, and 64-68.
                     undertaken "until the proposed new drydocks
                     at this navy yard, carrying a depth of 40 feet of
                     water over the blocks, has been authorized."
                     This dock was authorized in the Naval Appro-
                     priation Act approved July 1, 1918 (40 Stat.
                     L. 725).)
Jan.    21, 1927   Present project dimensions of the channels for               H. Doc. No. 249, 69th Cong., 1st sess.
                     commercial purposes, and for the present proj-               (Contains latest published maps.)
                     ect widths of the 40-foot channel which was
                     authorized as a national-defense measure.
Oct. 17,1940       The 35-foot channel depth from the sea to the                H. Doc. No. 259, 76th Cong., 1st sess.
                     head of the project via Cooper River and Town
                      Creek, also a channel in Shem Creek to Mount
                     Pleasant, 110 feet wide and 10 feet deep, includ-
                     ing a turning basin at the upper end.

       Completed under previous projects.

   Re'commended modifications of project.-Under date of January 23,
1941, the Chief of Engineers recommended the modification of the
existing national defense project to provide an anchorage area 30 feet
deep in the water area between Castle, Pinckney and Fort Moultrie,
at an estimated first cost of $1,820,000, with $12,500 annually for
maintenance in addition to the amounts now authorized. (IH. Doc.
156, 77th Cong., 1st sess.)
   Local cooperation.-The project authorized in the River and Harbor
Act of October 17, 1940 (H. Doc. No. 259, 76th Cong., 1st sess.), is
subject to the requirements that local interests furnish, free of cost to
the United States, suitable spoil-disposal areas as and when required
for initial work and for subsequent maintenance. All prior require-
ments have been fully complied with.
   Terminal facilities.-Piersand slips extend for about 1 mile along
the eastern water front of the city of Charleston, and an additional
mile is covered by marginal wharves. The Port Utilities Commission
of the City of Charleston owns the terminals at Columbus Street, a
large pier near Market Street, and two piers at Tradd Street. It also
owns and operates the belt-line, railway serving all wharves and ware-
houses and connecting with trunk lines entering the city. Its wharves
are open to the public on a charge basis. Modern facilities exist also at
the coal pier of the Southern Railway and at the wharves of the
Standard Oil Co., the Charleston Shipbuilding & Dry Dock Co., the
Clyde Steamship Co., the Seaboard Air Line Railway Co., the South-
ern Railway Co., and the Concentration Warehouse & Compress Co.
   On Cooper River above the navy yard a compress and warehouse
company has a marginal wharf 750 feet long; and the Texas Corpora-
tion, the Sinclair Refining Co., and the Davison Chemical Co. main-
       RIVERS   AND   HARBORS-CHARLESTON,        S. C.,   DISTRICT       527
rain piers at their property. The facilities are considered adequate
for existing commerce. For further details see Port Series No. 9,
revised 1940, Corps of Engineers.
   Operations and results during fiscal year.-The U. S. hopper
dredges Culebra and Marshall, and the U. S. pipe-line dredge Henry
Bacon continued dredging operations in the entrance channel of the
35-foot project and removed 3,122,813 cubic yards of material at a
cost of $584,594.59, chargeable to new work. The dredge Henry
Bacon removed 1,557,957 cubic yards of material in the Cooper River
and Tom Creek channels of the 35-foot project at a cost of $230,-
899.44, chargeable to new work and 36,610 cubic yards from a shoal
in Cooper River at the port terminal which formed subsequent to
the enlargement of the project, at a cost of $10,862.18, chargeable to
maintenance.
   The cost of the surveys and supervision was $2,777.49, chargeable
to maintenance. The costs during the year were $829,133.70, of which
 $815,494.03 was for new work and $13,639.67 for maintenance. The
expenditures were $861,051.99.
   Condition at end of fiscal year.--The jetties protecting the entrance
channel across the bar were completed in 1895. These           jettiesare
described in the "Existing project" paragraph.
   Surveys made in April and May 1942 show that in the entrance
channel in the ocean and between the jetties 35.0 feet depth obtains for
600 feet width from the 35-foot contour in the ocean to the inner
end of the jetty channel at the intersection of the Mount Pleasant
Channel range, except in a 1,500-foot reach 3/4 of a mile inside the
ends of the jetties, where the controlling width is 550 feet; and at
two points approximately 1/4 mile east and 1/4 mile west of the inner
end of the jetty channel where 450 feet and 350 feet widths, re-
spectively, obtain. At the latter shoal 35.0 feet depth obtains for
600 feet width extending 250 feet outside of the north line of the
channel. Thence continuing inland 35.0 feet depth for 600 feet width
can be carried through to the south channel by the bypass channel
in deep water around the natural 30-foot depth at the intersection
of Mount Pleasant and south channel ranges; and for 500 . feet
width thence through the south channel to deep water in Cooper
River off the lower end of the city of Charleston. Thence project
dimensions obtain to the head of the project except in Town Creek
where 35.0 feet depth has been dredged for 250 feet width only
along the west or city side of the channel; and near the head of the
project where shoaling limits the width at project depth to 200 feet
in the westerly portion of the channel at the Port Terminal and to
a central width of 280 feet for 34.5 feet depth along the lower 450
feet at the Ordnance depot wharf with a central width of 180 feet
for 30 feet depth to the head of the project.
    To complete the existing commercial project requires the dredging
of a channel in Shem Creek to 10-foot depth and further dredging in
Cooper River and Town Creek to 35-foot depth.
    In the 30-foot channel in-Cooper River east and north of Drum
Island shoaling on the south side of the channel at the north end
of Drum Island has reduced the controlling width at project depth
to 200 feet as shown by a survey made in May 1942.
528      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                        1942

   The cost of the existing project has been $1,256,222.07 from
regular funds and $57,813.37 from Public Works funds a total of
$1,314,035.44 for new work, and $676,422.57 from regular funds and
$56,086.63 from Public Works funds, a total of $732,509.20 for main-
tenance, a grand total of $2,046,544.64. The expenditures have been
$1,955,021.59 from regular funds and $113,900 from Public Works
funds, a total of $2,068,921.59. In addition $600 was expended from
contributed funds for maintenance.
  Proposed operations.-The balance unexpended July 1, 1942 ($214,-
386.50) and accounts receivable ($22,489.23), together with $141,000
allotted during July 1942, a total of $377,875.73, will be applied as
follows:
Accounts payable July 1, 1942-_---------------------__                             $595.18
New work:
    Completion of dredging to 35 feet depth for 600
      feet width at the inner end of the jetty channel
      with U. S. hopper dredge San Pablo and hired
      labor, July 20 to Aug. 20, 1942-_ __     __--------___ _ $36, 000. 00
    Completion of dredging to 35.0 feet depth in
      Cooper River and Town Creek channels with
      U. S. pipe-line dredge Henry Bacon and hired
      labor, Oct. 20 to Nov. 20, 1942___ -----------------      40, 280. 55
    Dredging channel in Cooper River north and east of
      Drum Island, 35 feet deep and 600 feet wide,
      widened at the upper end, with dredge Bacon
      July 20 to Aug. 20, and leased dredge Admiral,
      Aug. 20 to Oct. 3, 1942---------------------141,000.00
Maintenance:
    Dredging to restore project dimensions, as may be
      required in the 35-foot project in Town Creek
      and Cooper River channels with U. S. pipe-line
      dredge Henry Bacon and hired labor, Nov. 21,
      1942, to Feb. 20, 1943------------------          ------ 90, 000. 00
    Dredging to restore 35 feet depth for 600 feet
      width as may be required, in the entrance chan-
      nel with U. S. hopper dredge Culebra and hired
      labor, or other United States hopper dredge of
      similar capacity, May 1 to June 30, 1943-------- 70, 000. 00
                                                                               377, 280. 55
           Total for all work-----------------------------                    $377, 875. 73
  The additional sum of $85,000 can be profitably expended during
the fiscal year ending June 30, 1944, as follows:
Maintenance:
   Dredging by contract to restore project dimensions, as may be re-
      quired, in Town Creek and Copper River channels, Jan. 1 to
      Feb. 28, 1944      ----------------------------------------    $50,000
   Dredging to restore 35.0 feet depth for 600 feet width, as may be
      required, in the entrance channel with U. S. hopper dredge
      Culebra and hired labor, or other United States hopper dredge
      of similar capacity, May 1 to 30, 1944-------------------- 35,000
           Total for all work----------------------------------                    85, 000
             RIVERS AND HARBORS-CHARLESTON,                                               S." C.,     DISTRICT              529
                                               Cost and financial summary
Cost of new work to June 30, 1942--------------------------- $7, 900, 490. 55
Cost of maintenance to June 30, 1942_---------------------- 11, 134, 498. 70
      Total cost of permanent work to June 30, 1942-----------_                                                9, 034, 989. 25
Undistributed costs June 30, 1942_ ____------- -----------                                                             482.90

      Net total cost to June 30, 1942_--------------                                                           9,035,472. 15
Plus accounts receivable June 30, 1942------------------------                                                    22, 489. 23

     Gross total costs to June 30, 1942_---------------------- 9, 057, 961. 38
Minus accounts payable June 30, 1942------------- -----------          595. 18

     Net total expenditures-------- ------------ -------- 19, 057, 366. 20
Unexpected balance June 30, 1942----------------------------  214, 386. 50

          Total amount appropriated to June 30, 1942-------------                                              9, 271, 752. 70


   Fiscal year ending June 30                         1938             1939           1940             1941              1942


Cost of new work- .                   ...-------------- $8, 500 00                                  $136, 280. 72      $815, 494. 03
Cost of maintenance__                 -_- _ _         105, 838. 06   $83, 191.80    $26, 204. 92       1, 554. 62        13, 639. 67

      Total cost----------------                   114, 338. 06       83, 191.80     26, 204. 92     137, 835. 34      829, 133. 70

Total expended    ----------------                 115, 541. 43       63, 918. 94    49, 684. 62     123, 750. 67      861, 051.99

Allotted_------    ----------------                168, 000. 00       85, 000. 00    30, 400. 00     441, 000. 00       679, 300. 00



Balance unexpended July 1, 1941-------------------------------$396, 138.49
Amount allotted from War Department Civil Appropri-
  ation Act approved Apr. 28, 1942                      00. 00
                                                    $------------------.$85,
Amount allotted from First Deficiency Act of 1941,
  Apr. 1, 1941-----------------------------------594, 300. 00
                                                                  679, 300. 00
       Amount to be accounted for---------------------------                                                   1, 075, 438. 49
Gross amount expended ___$912,732.27
Less reimbursements collected-----------------------51, 680. 28
                                                                                                                    861, 051. 99

      Balance unexpended June 30, 1942-----------------------                                                       214, 386. 50
Outstanding liabilities June 30, 1942 ----------------------------                                                       964. 83

     Balance available June 30, 1942--------------------                                                            213, 421.67
Accounts receivable June 30, 1942------------------------------                                                      22, 489. 23

          Unobligated balance available June 30, 1942--------------                                                 235, 910. 90

Amount that can be profitably expended in fiscal year ending
                                 - - -- -- -------- ---------------
June 30, 1944, for maintenance 2                                                                                    85, 000. 00
   1 In addition, $600 expended from contributed funds for maintenance.
     Exclusive of available funds.
                                                10. ASHLEY RIVER, S. C.
  Location.-Rises near Ridgeville, S. C., and flows southeasterly 40
miles uniting with the Cooper River to form the harbor of Charles-
ton, . C. (See U. S. Coast and Geodetic Survey Charts Nos. 1239
and 470.)
  Previous projects.-The original project was adopted by the River
and Harbor Act of June 14, 1880. For further details see page 1809,
Annual Report for 1915, and page 566, Annual Report for 1938.
  Existing project.-This provides for a channel 30 feet deep at mean
low water and 300 feet wide from the mouth to the Standard Wharf, a
530         REPORT OF CHIEF OF ENGINEERS,                         U. S. ARMY,        1942

distance of 7.8 miles, suitably widened at bends and at the head
of the improvement; and for maintenance, to a depth of 12 feet and
a width of 100 feet, of the approach channel to the Municipal Yacht
Basin. The mean tidal variation is about 5.2 feet.
  The estimate of cost for new work, revised in 1937, was $391,150,
exclusive of the amount expended on previous projects. The latest
(1937) approved estimate for annual cost of maintenance is $26,000.
   The existing project was authorized by the following river and
harbor acts:

     Acts                      Work authorized                                Documents



July 25, 1912   Channel 20 feet deep and 240 feet wide up to      Rivers and Harbors Committee Doc.
                 Standard wharf.                                    No. 4, 62d Cong., 2d sess.
Aug. 26, 1937   Enlarging channel to present project dimensions   Rivers and Harbors Committee Doc.
                 and for maintenance of entrance channel to         No. 449, 74th Cong., 2d sess. (Con-
                 Municipal Yacht Basin.                             tains latest published map.)



   Local cooperation.-Fully complied with.
   Terminal facilities.-The facilities extend 51/2 miles above the
United States lighthouse wharf adjacent to Tradd Street and include
the wharves of the American Agricultural Chemical Co., Planters
Fertilizer & Phosphate Co., Wood Preserving Corporation, and the
Virginia-Carolina Chemical Co. The fertilizer company wharves are
equipped with mechariical unloading devices. These terminals are
considered adequate for existing commerce. There are located at the
Municipal Yacht Basin three docks of creosoted timber construction
for the accommodation of local and transit yachts. For further details
see Port Series No. 9, revised 1940, Corps of Engineers.
   Operations and results during fiscal year.-The privately owned
pipe-line dredge Cherokee removed 36,666 cubic yards of material at
a cost of $5,913.12, chargeable to maintenance in restoring project
dimensions in the entrance channel to the Municipal Yacht Basin.
The cost of surveys and supervision was $486.83, chargeable to
maintenance.
   The total cost during the year was $6,399.95, chargeable to mainte-
nance. The expenditures were $6,515.98.
   Conditionat end of fiscal year.-The existing project was completed
in 1940. Surveys made during February 1942 show that the center-
line depth has been reduced to 28.8 feet in the crossing shoal above
the Seaboard Air Line Railway bridge and in a reach just below this
bridge, and to 27.8 feet in a reach just below the Coast Guard wharf.
   A survey of the entrance channel to the Municipal Yacht Basin in
December 1941 showed that project dimensions of 12.0 feet depth for
a bottom width of 100 feet obtained.
   The cost of the existing project to the end of the fiscal year has
been $255,496.41 for new work and $80,232.41 for maintenance, a total
of $335,728.82. Expenditures have been $335,802.61. In addition,
$700 was expended from contributed funds for maintenance.
   Proposed operations.-The balance unexpended July 1, 1942 ($29,-
166.64) and accounts receivable ($73.79), a total of $29,240.43, will be
applied as follows:
             RIVERS AND HARBORS-CHARLESTON,                                         S. C.,     DISTRICT                 531
Maintenance:
    Dredging by contract to restore project dimensions in the entrance
      channel to the Municipal Yacht Basin Dec. 20 to 31, 1942---- $5, 340. 43
   Dredging by contract to restore project dimensions as may be re-
      quired from the mouth of the river to the head of the project in-
      cluding the turning basin at the latter point, Jan. 1 to Feb. 12,
      1943 ----------------- -----------------------------------        23, 900. 00
             Total for all work ----------------                                                                  29, 240. 43
   The additional sum of $26,000 can be profitably expended during the
fiscal year ending June 30, 1944, as follows:
Maintenance:
   Dredging by contract to restore project dimensions in the entrance
      channel to the Municipal Yacht Basin, Dec. 1 to 12, 1943_     _                                                $6, 000
    Dredging by contract to restore project dimensions as may be re-
      quired, from the mouth of the river to the head of the project
      including the turning basin at the latter point, Mar. 1 to 31,
      1944 -------------------------------------------------------                                                   20, 000
             Total for all work-----------------                                                                     26, 000

                                            Cost and financial summary
Cost of new work to June 30, 1942_________________ ________                                                   $260, 996. 41
Cost of maintenance to June 30, 1942      ____                                                                 180, 232. 41
      Total cost of permanent work to June 30, 1942__________                                                  341, 228. 82
Plus accounts receivable June 30, 1942__________-                                                                      73. 79

          Gross total costs to June 30, 1942                           --                                     341, 302. 61

Net total expenditures                      _________________________                                        1341, 302. 61
Unexpended balance June 30, 1942 _________________________                                                        29, 168. 64

          Total amount appropriated to June 30, 1942__                                               _____370, 469.25


    Fiscal year ending June 30                   1938           1939            1940             1941         1      1942

aCostof new work ____.                    .......................
                                                         $71,540.49          $132, 805. 92 --------------.------------.
Cost of maintenance--_-_
                       ------       _         $1,000. 00   5, 385. 56           8, 420. 02     $14, 062. 63     $6, 399. 95
        Total cost..    -----........
                               ..     1, 000.00                76, 926.05     141, 225.94       14, 062. 63           6, 399.95

Total expended           ....-----------------   1, 000. 00    46, 793. 67    171, 347. 42      14, 031. 29           6, 515.98

Allotted ........................                3, 500. 00   366, 000. )0   -111, 145.00        2, 000.00            8, 500.00



Balance unexpended July 1, 1941--------------------------------                                                   27, 182. 62
Amount allotted from War Department Civil Appropriation Act ap-
proved Apr. 28, 1942------------------------------------------                                                    8, 500. 00
          Amount to be accounted for-------------------------------                                               35, 682. 62
Gross amount expended------------------------------                                          $7,152.80
Less reimbursements collected_--_                                                                636.82            6, 515. 98

     Balance unexpended June 30, 1942------------------------ 29, 166. 64
Accounts receivable June 30, 1942--------------------------------  73. 79
           Unobligated balance available June 30, 1942                               --               _---        29, 240. 43

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 26, 000. 00
   1 In addition $700 was expended from contributed funds for maintenance.
   2 Exclusive of available funds.
532           REPORT OF CHIEF OF ENGINEERS,                             U. S. ARMY,             1942

                                     11. SHIPYARD RIVER, S. C.

   Location.-This waterway is a salt-water tidal tributary of Charles-
ton Harbor, S. C. It has its source about one-half mile below the
United States navy yard, whence it flows in a southerly direction for
about 3 miles and empties into Cooper River about three-fourths of a
mile above Drum Island. (See U. S. Coast and Geodetic Survey
Chart No. 470.)
   Previous projects.-Adopted by River and Harbor Acts of July
25, 1912, and March 3, 1925.
   For further details of previous projects, see page 610, Annual Re-
port for 1932.
   Existing project.-This provides for a channel 30 feet deep at mean
low water and 200 feet wide, widened to 670 feet at the entrance
from deep water in Cooper River, to a point 100 feet above the Gulf
Oil Corporation's terminal, with a turning basin 30 feet deep at
the latter point, and for an extension of this channel 20 feet deep
and 100 feet wide, widened at bends, to a point 50 feet above the
remains of the former Tuxbury Lumber Co.'s wharf (now the prop-
erty of the Pittsburgh Metallurgical Co.). The mean tidal variation
is 5.2 feet.
   The estimate of cost of new work, revised in 1937, exclusive of
amounts expended on previous project, was $100,000. The latest (1937)
approved estimate of cost for annual maintenance is $25,000.
  The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                  Documents


July     3, 1930   Channel depths of 12 and 20 feet   -.--
                                                        -___--...       Rivers and Harbors       Committee Doc.
                                                                          No. 13, 71st Cong.,   2d sess.
Aug. 30, 1935      28-foot channel from Cooper River to the Gulf Oil    Rivers and Harbors       Committee Doc.
                     Corporation's terminal, and the deepening of         No. 43, 73d Cong.,    2d sess.
                     the channel above that point to 20 feet from the
                     depth of 12 feet previously authorized without
                     local cooperation.
Aug. 26, 1937 J Enlargement of the channel to a depth of 30 feet        Rivers and Harbors Committee Doc.
                 and a width of 200 feet up to the Gulf Oil Cor-          No. 38, 75th Cong., 1st sess. (Con-
                     poration's terminal with a turning basin 30 feet     tains latest published map.)
                     deep at the latter point.


1Included in Emergency Relief Administration program May 28, 1935.

  Recommended modifications of project.-Modification of the exist-
ing project for Shipyard River, S. C., was recommended by the Chief
of Engineers in a report requested by Rivers and Harbors Committee
Resolution adopted June 20, 1941, and transmitted to Congress by the
Secretary of War June 15, 1942.
  Local cooperation.--Fullycomplied with.
  Terminal facilities.-In the lower three-quarter mile, on the 30-foot
channel, are located the large marginal wharves of the Gulf Oil Cor-
poration and the Shipyard River Terminal Co., the latter handling
         RIVERS      AND HARBORS-CHARLESTON,                   S. C.,   DISTRICT      533
chiefly fertilizer and fertilizer materials. These wharves accommodate
deep-draft, oceangoing vessels. On the 20-foot channel are located the
North State Lumber Co.'s wharf and one small privately owned
wharf. For further details see Port Series No. 9, revised 1940, Corps
of Engineers.
   Operations and results duringfiscal year.-Project dimensions were
restored under contract by the removal of 177,663 cubic yards of ma-
terial from the 20-foot channel at a cost of $17,119.80, and 243,825
cubic yards of material from the 30-foot channel at a cost of $26,577.97,
all chargeable to maintenance. Project dimensions were again restored
in the 30-foot channel, except the upper end of the turning basin, with
the U. S. pipe-line dredge Henry Bacon, by the removal of 182,062
cubic yards of material at a cost of $14,615.03, chargeable to mainte-
nance.
   The cost of surveys and supervision was $282, chargeable to mainte-
nance. The costs during the year were $58,594.80, chargeable to
maintenance. The expenditures were $58,956.33.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1939. Project dimensions obtain from Cooper River to the
head of the 30-foot channel except along the northerly edge of the
turning basin. A survey made in December 1941 in the 20-foot chan-
nel showed a controlling depth of 12.0 feet to within 800 feet of the
head of the project, thence a controlling depth of 8.0 feet for the
remainder of the channel.
   The costs of the existing project have been $81,260.39 from regular
funds and $31,563.71 from emergency relief funds, a total of $112,824.10
for new work and $192,386.57 from regular funds for maintenance, a
total of $305,210.67. The expenditures have been $274,049.39 from reg-
ular funds and $31,563.71 from emergency relief funds, a total of
$305,613.10.
   Proposed operations.-The balance unexpended July 1, 1942 ($21,-
274.87), arid accounts receivable ($362.77), a total of $21,637.64, will be
applied as follows:
Accounts payable July 1, 1942-----------------------         -------               $216. 22
Maintenance :
    Completion of dredging to restore project dimensions
      from the mouth of the river to the head of the 30-foot
     project, including the turning basin, with U. S. pipe
     line dredge Henry Bacon and hired labor, July 1 to
     3, 1942------------------------------------             $3, 921. 42
    Dredging by contract to restore project dimensions
      from the mouth of the river to the head of the 30-foot
      project, including the turning basin at the latter
     point, Mar. 1 to 31, 1943-----------------------17, 500. 00
                                                                               21, 421. 42

         Total for all work---------------------------------                   21, 637. 64
   The additional sum of $25,000 can be profitably expended during the
fiscal year ending June 30, 1944, as follows:
Maintenance: Dredging by contract to restore project dimensions from
the mouth of the river to the head of the 30-foot project, including the
turning basin at the latter point, Sept. 23 to Oct. 13, 1943, and Apr. 21
to May 10, 1944_ _______--------------                                    $25, 000
534          REPORT OF CHIEF OF ENGINEERS,                                                U. S. ARMY,             1942

                                                 Cost and financial summary
Cost of new work to June 30, 1942_____-----        _
                                            _________         $116, 974. 10
Cost of maintenance to June 30, 1942-------------------------- 192, 386. 57

      Total cost of permanent work to June 30, 1942------------- 309, 360. 67
Undistributed costs June 30, 1942____-----------------------    ---   255. 88

      Net total cost to June 30, 1942______________________-----   309, 616. 55
Plus accounts receivable June 30, 1942----------------------------      362. 77

      Gross total costs to June 30, 1942________________________  309, 979. 32
Minus accounts payable June 30, 1942------------------------------     216. 22

     Net total expenditures____------__-------------__------     309, 763. 10
Unexpended balance June 30, 1942--------------------------------  21, 274. 87

           Total amount appropriated to June 30, 1942________________                                                   331, 037. 97

   Fiscal year ending June 30                          1938              1939               1940           1941             1942

Cost of new work--         -----------------------                     $58, 507. 36   -
Cost of maintenance- _ .--....
                            -                        $31, 226. 41   --------------        $31, 632. 23   $23, 182. 67      $58, 594.80
      Total cost----..........-          ...          31, 226. 41       58, 507. 36        31, 632. 23    23, 182. 67       58, 594. 80
Total expended--................                      34, 692. 53       55, 041. 24        31, 133. 82    23, 721. 98       58, 956. 33
Allotted        --........................            85, 000. 00       35, 000. 00        22, 000.00     50, 000. 00       31, 600. 00


Balance unexpended July 1, 1941 .__.___, _ -___-                                                                        $48, 631.20
Amount allotted from War Department Civil Appropriation Act
  approved April 28, 1942________________-___                                                                            31, 600. 00
      Amount to be accounted for_                                      ____    __-____               ____-___            80, 231.20
Gross amount expended ----                                                ____   __-- --            $78,397. 13
Less reimbursements collected -- ___                                     ______------
                                                                                  -19,                  440. 80
                                                                                                                         58, 956. 33

      Balance unexpended June 30, 1942_____-----                                                ___- ___--         _     21, 274. 87
Outstanding liabilities June 30, 1942                                  _____- ____-_________--
                                                                                   --                                     3, 605. 16

     Balance available June 30, 1942__                 -___-------- 17, 669. 71
Accounts receivable June 30, 1942 --------------------------------      362. 77

           Unobligated balance available June 30, 1942___________                                             __         18, 032. 48

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1    ___---------------- ---  ____---                                                         25, 000. 00
  1 Exclusive of available funds.

            12. WATERWAY FROM CHARLESTON TO BEAUFORT, S. C.

  Location.-The waterway begins at the Ashley River entrance of
Wappoo Creek; passes through Wappoo Creek, Stono, Wadmalaw,
and Dawho Rivers, North Creek, Watts Cut, and South Edisto River,
Fenwicks Island Cut, Ashepoo River, Ashepoo-Coosaw Cut, Coosaw
River, Brickyard Creek, and Beaufort River to Beaufort, S. C. The
distances from Charleston to Yonges Island, Martins Point, and Beau-
              RIVERS      AND HARBORS-CHARLESTON,                       S. C.,    DISTRICT           535
fort are 23 miles, 25 miles, and 68.5 miles, respectively. (See U. S.
Coast and Geodetic Survey Charts Nos. 837 and 838.)
   Previous projects.-Adopted by River and Harbor Acts of March
3, 1881, and June 13, 1902. For further details see page 613, Annual
Report for 1932.
   Existing project.-This provides for a waterway 12 feet deep at
mean low water and not less than 90 feet wide from Charleston to
Beaufort, S. C., with cut-offs in Wappoo Creek from Church Flats
in Stono River to Wadmalaw Sound, from Dawho to South Edisto
River and from Ashepoo to Coosaw River.
   The mean tidal range is 5.2 feet at Charleston and 7.4 feet at
Beaufort.
   The estimate of cost for new work, revised in 1937, was $653,000,
exclusive of amounts expended on previous projects. The latest (1937)
approved estimate for annual cost of maintenance is $17,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                      Work authorized                            Documents



Mar.     3,1925   Widening and deepening the waterway from          S. Doc. No. 178, 68th Cong., 2d sess.
                   Charleston to Beaufort.
Aug. 30, 1935'    Cut-off between Ashepoo and Coosaw Rivers         H. Doc. No. 129, 72d Cong., 1st sess.
Aug. 26,1937      Enlarging the channel from Charleston to Beau-    Rivers and Harbors Committee Doe.
                   fort, including a cut-off between Church Flats     No. 6, 75th Cong., 1st sess. (Con-
                   of Stono River and Wadmalaw Sound.                 tains latest published map.)


  1 Included in Emergency Relief Administration program May 28, 1935.


   Local cooperation.-Fully complied with.
   Termninal facilities.-There are wharves and landings at various
points along this waterway and tributaries thereto for handling
pulpwood, fresh vegetables, and miscellaneous commodities. These
are considered sufficient for present commerce.
   Operations and results during fiscal year.-The U. S. pipe line
dredge Congaree removed 95,473 cubic yards of material from shoals
in Wappoo and North Creeks in restoring safe 12-foot navigation
at a cost of $21,210.25. The cost of surveys and supervision was
$1,687.30. The total cost during the year was $22,897.555 chargeable
to maintenance. The expenditures were $22,185.30.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1940. A survey made during June 1942 showed that safe
12-foot navigation obtains throughout the project.
   The cost of the existing project has been $669,785.80, from regular
funds and $74,642.87, from emergency relief funds, a total of $744,-
428.67 for new work; and $252,880.56, from regular funds for main-
tenance; a total of $997,309.23. The expenditures have been $921,-
928.32 from regular funds and $74,642.87 from emergency relief
funds, a total of $996,571.19.
536              REPORT OF CHIEF OF ENGINEERS,                            U. S. ARMY,                 1942

   Proposed operations.-The balance unexpended July 1, 1942
($58,374.81), together with $197,550 allotted during September 1942,
a total of $255,924.81, will be applied as follows:
Accounts payable July 1, 1942 -------------------------------                                                   $738. 04
Maintenance:
    Constructing by contract guide dolphins at 5
      drawbridges, July 1 to Aug. 31, 1942_ __ __--__                                $40, 000. 00
    Dredging to widen the channel to provide a
      stilling basin in the south approach to Dawho
      highway bridge, with a leased pipe-line dredge,
             Aug. 1 to 15, 1942__-----------------------                                  12, 000. 00
        Dredging in Stono River and in North Creek to
          restore full project dimensions with a leased
             pipe-line dredge, Aug. 16 to 31, 1942 _ _                     --             12, 000. 00
        Dredging a pilot cut to divert and decrease tidal
          currents in the south approach to Dawho
          highway bridge, with a leased dragline-bucket
          dredge and attendant plant, July 22 to
          Aug. 22, 1942___--------------------------__      8, 000. 00
        Dredging as may be required to maintain full
          project dimensions throughout the remainder
          of the fiscal year with a United States pipe-
          line dredge and hired labor, Sept. 1, 1942,
          to June 30, 1943-------------------------       183,186.77
                                                                                                             255, 186. 77

                        Total for all work        ___ __        -----------------------
                                                                  __                   255, 924.                        81
   The additional sum of $17,000 can be profitably expended during
the fiscal year ending June 30, 1944, in maintaining project dimen-
sions as may be required from Charleston to Beaufort, S. C., with
United States pipe-line dredge Colonel G. P. Howell and hired labor,
December 16, 1943, to January 15, 1944.
                                      Cost and finanoial summary
Cost of new work to June 30, 1942---------_ ------------------                                              $853, 918. 31
Cost of maintenance to June 30, 1942 -----------------------                                                 276, 630. 14

      Total cost of permanent work to June 30, 1942                                                        130, 548. 45
                                                                                                        1-----------,
Minus accounts payable June 30, 1942 -----------------------------                                               738. 04

     Net total expenditures     -----------------                                                       1, 129, 810. 41
Unexpended balance June 30, 1942---------------------------                                                 58, 374. 81

             Total amount appropriated to June 30, 1942-------------_                                   1, 188, 185. 22

     Fiscal year ending June 30           1938.             1939             1940              1941              1942

Cost of new work ____________..      ______________    $45, 162. 01      $450, 213. 46       $78, 819. 92
Cost of maintenance ...--------         $17, 315. 03    13, 356. 13          2, 506. 74       26, 444. 50        22, 897. 55
         Total cost       -              17, 315. 03       58, 518. 14    452, 720. 20       105, 264. 42        22, 897. 55
Total expended.                          17, 598. 71       57, 057. 91    366, 162. 05       193, 210. 98        22, 185. 30
Allotted.............                    24, 000. 00   571, 300. 00        15, 000. 00        37, 000. 00        62, 600. 00
               RIVERS     AND HEARBORS-CHARLESTON,                                     S. C.,         DISTRICT                  537
Balance unexpended July 1, 1941_______                                                                                $17, 960. 11
Amount allotted from War Department Civil Appro-
   priation Act approved May 23, 1941 ________-___ $50, 000. 00
Amount allotted from War Department Civil Appro-
   priation Act approved April 28, 1942________--____ 12, 600. 00
                                                                                                                        62, 600. 00

         Amount to be accounted for_____                                                     ____                       80, 560. 11
Gross amount expended __________________________                                      $22, 223. 45
Less reimbursements collected_______                                                        38. 15
                                                                                                                        22  185
                                                                                                                        vu, - .-
                                                                                                                              , v
                                                                                                                                 30      .


       Balance unexpended June 30, 1942_                                                                                58, 374. 81
Outstanding liabilities June 30, 1942___________                                                                           738. 04

         Balance available June 30, 1942__                                                                              57, 636. 77

Amount that can be profitably expended in fiscal year ending June
  30, 1944, for maintenance 1__ ___-___   _        ___     __   ___                                                     17, 090. 09
   1 Exclusive of available funds.

     13. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)
   The cost of work during the year was $148,637.16 from regular funds.
The expenditures were $169,519.63. The balance unexpended on July
1, 1942, minus $25,900.72, exclusive of $26,000 accounts receivable, to-
gether with $41,900 allotted during July and Aug ust 1942, v'ill be
applied during the fiscal year to accounts payable and the payment of
expenses to be incurred under this heading. The additional sum
of $30,000 can be profitably expended during the fiscal year em  lidng
June 30, 1944.
                                       Cost and financial summary
Cost of new work to June 30, 1942_______
Cost of maintenance to June 30, 1942_                                                                          1$652, 690. 08

       Total cost of permanent work to June 30, 1942______________
Undis tributed costs June 30, 1942_______________________________
                                                                                                                       652, 690.
                                                                                                                            646. 36
                                                                                                                                   0S
      Net total cost to June 30, 1942 __________ ___.___________                                                       653, 336. 44
Plus accounts receivable June 30, 1942_____________________                                                             26, 000. 00

      Gross total costs to June 30, 1942--------------------------                                                     679, 336. 44
Minuss accounts payable June 30, 1942_________________                                                                   6, 230. 87

         Net total expenditures_______ ____-----------                                                             673, 105. 57
Unexi pended balance June 30, 1942 -------------------------
                                        _                                                        _                 -25, 900. 72

         Total amount appropriated to June 30, 1942_______________                                                     647, 204. 85


   Fiscal year ending June 30             1938               1939               1940                  1941                 1942


Cost of new work ......... _ .                                                $97, 348. 66
Cost of maintenance---    -             $54, 804. 66       $95, 965. 87       $97, 348. 66       $29,719.95              $148, 637. 16
                                                       i                                                           i
                                                       i                  i                  i


Total expended_                          54, 669.97         85, 872.31        106, 086. 68           30, 650. 40          169, 519. 63

Allotted____                      .
                     .--------------     69, 000. 00       129, 500.00        79, 000.00             21, 000.00           114, 525. 0)


   1 In addition $738 was expended from contributed funds.
538         REPORT OF CHIEF OF ENGINEERS, U, S. ARMY,                                             1942

Balance unexpended July 1, 1941_______------    __      _________                                       $29, 093. 91
Amount allotted from War Department Civil Appro-
  priation Act approved June 24, 1940__--------    ___ $44, 000. 00
Amount allotted from War Department Civil Appro-
  priation Act approved May 23, 1941--------___          70, 525. 00
                                                                                                        114, 525. 00
      Amount to be accounted for ------------
                                           ________--____                                               143, 618. 91
Gross amount expended__---------------        _     $178, 875. 41
Less reimbursements collected__--------------------    9, 355. 78
                                                                                                        169, 519. 63

      Balance unexpended June 30, 1942_______________________                                          -- 25, 900. 72
Outstanding liabilities June 30, 1942_________________________                                             6, 230. 87
      Balance available June 30, 1942_________---                                                   -32, 131. 59
                                                                                                  -____
Accounts receivable June 30, 1942_ -________                                   ____                   26, 000. 00

         Unobligated balance available June 30, 1942 __________-__                                      -6,131. 59

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 2____________________________________                                         30, 000. 00
  2   Exclusive of available funds.

14. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED

                                                      For last      Cost and expenditures to              Estimated
                                                     full report          June 30, 1942                    amount
                  Name of project                    see Annual                                          required to
                                                       Reportcplete
                                                         fort       New work          Maintenance         complete

1. Yadkin River, N.C.1                                  1892        $102, 808. 91                            $4, 191. 00
2. Salkahatchie River, S C.1                            1896          15, 840. 73           -                 (2)
3. Lumber River, N. C. and S. C.1                       1897          19, 000. 00                            16, 000. 00
4. Lynch River and Clark Creek, S. C.1 ...              1910            9, 500. 00                            (2)
5. Little Peedee River, S. C.1                          1919          19, 549. 99       $25, 650. 01         30, 450. 01
6. Edisto River, S. C.1- --    -                        1938          33, 102. 65            900. 00          (2)
7. Wateree River, S. C.1_________________________       1940          60, 000. 00       151, 783. 83          (2)

  1 No commerce reported.
  2 Completed.


              15. PLANT ALLOTMENT, CHARLESTON, S. C., DISTRICT

                                     Cost and financial summary
Undistributed costs June 30, 1942____________-$213,                                                          867. 65
Net total cost to June 30, 1942_______________________________                                         213, 867. 65
Plus accounts receivable June 30, 1942________________________                                         435, 287. 47
      Gross total costs to June 30, 1942_______ ______________                                          649, 155. 12
Minus accounts payable June 30, 1942____________
                                              -     _______                                             143, 990. 85
      Net total expenditures__.                                                                       505, 164. 27
Unexpended balance June 30, 1942___________________________                                        -- 208, 082.26
         Total amount appropriated to June 30, 1942______-- __------                                   297, 082.01

   Fiscal year ending June 30           1938           1939             1940               1941              1942

Total expended   ----                 $32, 216. 11    $8, 224. 67   -$38, 509. 01     -$11, 213. 96        $329, 786. 08
Allotted ...-------- _......   _._     11, 247. 67                    47, 545. 00      -                     44, 983. 92
           RIVERS       AND      HARBORS-CHARLESTON,                          S.    C.,     DISTRICT         539

Balance unexpended July 1, 1941_ ___      __       _ _______                                         $76, 719.90
Amount allotted from War Department Civil Appropriation Act
  approved June 28, 1939--------------------------------------                                        44, 983. 92

      Amount to be accounted for----------------------------                                         121, 703. 82
Gross amount expended----------------------- -$2,  565, 139. 19
Less:
     Reimbursements collected_              --        $2, 212, 983. 50
     Receipts from sales-              __                  22, 369. 61
                                                                              2, 235, 353. 11
                                                                                                     329, 786. 08

      Balance unexpended June 30, 1942__                        -- 208, 082. 26
Outstanding liabilities June 30, 1942 -------------------------- 298, 365. 14
        Balance available June 30, 1942                          ---               ------          -506,   447. 40
Accounts     receivable June 30, 1942-----------------------------                                   435, 287.47

        Unobligated balance available June 30, 1942                      --                    _    -71,   159. 93
Status of all investigations for navigation called for by river and harboracts and
                               committee resolutions

                                                           Date trans-
          Locality                Authorization act        mitted to           Document No.         Recommenda-
                                                                                                        tion
                                                            Congress


Cape Fear River, N. C., to      Rivers and Harbors
  Winyah Bay, S. C., In-          Committee resolu-
  tracoastal Waterway, im-       tion, June 20, 1940.
  provement at and near
  Singleton Swash.
Edisto River, S. C., for        Commerce Commit-
  navigation, flood control,     tee resolution, Mar.
  and power.                     28, 1939.
Little River, N. C. and         Rivers and Harbors
  S. C.                           Committee resolu-
                                 tion, Apr. 30, 1940.
Pee Dee River, S. C ..---       Rivers and Harbors        Oct.    8, 1941                           Unfavorable.
                                  Committee resolu-
                                 tion, Mar. 26, 1940.
Pee Dee (Great) River,          Rivers and Harbors
  S. C., improvement be-          Committee resolu-
  tween Georgetown and           tion, Apr. 1, 1937.
  Cheraw, S. C.
Santee and Congaree Riv-        Commerce Commit-
  ers, S. C., to provide nav-    tee resolution, Oct.
  igation to Columbia,           24, 1938.
  S. C., and development
  of hydroelectric power.
Santee River, N. C. and         Commerce Commit-
  S. C., salt-water intru-       tee resolution, Apr.
  sion, and diversion of         2, 1941.
  water into Cooper River.
Shipyard River, S. C______      Rivers and Harbors        June 15, 1942       (Confidential)         Favorable.
                                  Committee resolu-
                                  tion, June 20, 1941.
Wateree River, S. C., from      Commerce Commit-
junction of Santee to            tee resolution, Nov.
Camden, S. C. (naviga-           17, 1938.
tion and hydroelectric
power).
Yadkin-Pee    Dee    River,     Commerce Commit-
N. C. and S. C., to pro-        tee resolution, Nov.
vide navigation to Che-         1, 1938.
raw, S. C., and for hydro-
electric power.


16. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL
  The cost of the work during the year amounted to $69,725.86. The
expenditures were $43,814.71. The balance unexpended on June 30,
1942, $30,361.06, and accounts receivable, $634.70, a total of $30,995.76,
plus the sum of $10,000 allotted in July 1942, will be applied during
the fiscal year to payment of expenses to be incurred under this
heading.
540          REPORT OF CHIEiF OF ENGINEERS, U. S. ARMY,                                                          1942

                                      Cost and financial summary
Cost of new work to June 30, 1942__
Cost of maintenance to June 30, 1942                                ---------------_________ $159,044.83

      Total cost of permanent work to June 30, 1942____________                                                        159, 044. 83
Plus accounts receivable June 30, 1942 ._ ____________-    -   -                                                        - 634. 70

      Gross total costs to June 30, 1942 ---------------------                                                         159, 679. 53
Minus accounts payable June 30, 1942______ _____________-__-                                                            27, 065. 59
                                          .
      Net total expenditures ------               ------------------                                                   132, 613. 94
Unexpended balance June 30, 1942_________--------- ---                                                  ______          30, 361. 06

           Total amount appropriated to June 30, 1942------------                                                      162, 975. 00

   Fiscal year ending June 30                 1938                1939               1940                1941               1942


Cost of new work ----------- -------------- --------------                         -------         ----- --
Cost of maintenance -.... -.----......--- - -- - $45, 868. 25                      $32, 366. 71       $11, 084. 01         $69, 725. 86

Total expended                          - -                      44, 601. 30        33, 373. 51         10, 824. 42         43, 814. 71

Allotted      ..---      ------                $52, 000          15, 300. 00        18, 500. 00          8, 700. 00         68, 475. 00


Balance unexpended July 1, 1941_______________________________                                                          $5, 700. 77
Amount allotted from War Department Civil Appropriation Act
  approved May 23, 1941 ---------       -------------                                                                   68, 475. 00

      Amount to be accounted for __-------------------                                                                  74, 175. 77
                                                                                                                      -___
                       -------
Gross amount expended_____        ------------------                                                                    43, 814. 71

      Balance unexpended June 30, 1942_       __       ___                                                              30, 361. 06
Outstanding liabilities June 30, 1942______ ________________                                                            27, 065. 59

     Balance available June 30, 1942_________________________                                                            3,295. 47
Accounts receivable June 30, 1942_____________________________                                                             634. 70

     Unobligated balance available June 30, 1942 ______________                                                          3, 930. 17
Amount allotted in July 1942    -----------------------------                                                           10, 000. 00

           Amount available during the fiscal year 1943----------------13,                                                  930. 17
Status of all investigations for flood control called for by flood-control acts and
                              committee resolutions
                                                                     Date trans-
            Locality                Authorization act                 mitted to              Document No.             Recommenda-
                                                                      Congress                                            tion

Big Bull Creek, S. C _-_          Flood Control Com-                Mar. 23, 1942 ...................                 Unfavorable.
                                    mittee resolution,
                                    Oct. 4, 1940.
Edisto River, S. C., for          Commerce Commit-
navigation, flood control,         tee resolution, Mar.
and power.                         28, 1939.
Lumber River and tribu-           Commerce Commit- Nov. 27, 1941                                            - -           Do.
taries, North Carolina             tee resolution, Apr.
and South Carolina.                11, 1939.
   Do_-----                       Flood Control Act, _   do                                                  -            Do.
                                    Aug. 11, 1939.
Reedy River, S. C----_            Flood Control Com-
                                    mittee resolution,
                                    May 2, 1939.
Rocky River (Loves Ford           Sec. 7 of Flood Control                      -         -
and Crumps Ford, N. C.)            Act, June 22, 1936.
 (supplemental 308 report).
Waccamaw River, N. C.             Flood Control           Act,      Dec. 10, 1941                                         Do.
and S. C.                         June 28, 1938.
Wilkesboro Dam, Yadkin            Sec. 7 of Flood Control
River, N. C., (supple-             Act, June 22, 1936.
mental 308 report).
             RIVERS    AND HARBOR.S-SAVANNAH,              GA.,   DISTRICT         541
  IMPROVEMENT OF RIVERS AND HARBORS IN THE
           SAVANNAH, GA., DISTRICT
   This district comprises a very small portion of southwestern North
Carolina, western South Carolina, eastern Georgia, and a small
portion of northeastern Florida embraced in the drainage basins
tributary to the Atlantic Ocean between the Beaufort-St. Helena
bridge at Beaufort, S. C., and the harbor at Fernandina, Fla., in-
clusive. It includes the Intracoastal Waterway between these points
 (Beaufort to Cumberland Sound section).
   District engineer: Col. F. W. Altstaetter, Corps of Engineers, to
January 19, 1942, and Lt. Col. P. A. Feringa, Corps of Engineers,
since that date.
   Division engineer: Col. J. S. Bragdon, Corps of Engineers.
                                      IMPROVEMENTS

               Navigation                             Navigation-Continued
                                       Page                                        Page
1. Savannah Harbor, Ga......            541   8. Fernandina Harbor, Fla    ----    560
2. Savannah River below Au-                  9. Examinations, surveys, and
     gusta, Ga___----------------       545        contingencies (general) ___     562
3. Waterway between Beaufort,               10. Other projects for which no
     S. C., and St. Johns River,                   estimates are submitted_        563
     Fla. (Beaufort, S. C., to              11. Plant allotment    ------------    563
     Cumberland     Sound sec-
     tion)       --------               548                Flood control
4. Altamaha, Oconee, and Oc-
       mulgee Rivers, Ga--------       552    12. Preliminary examinations and
5. Brunswick Harbor, Ga------          554          surveys for flood control___   564
6. Satilla River, Ga------------       557    13. Other flood-control projects
7. St. Marys River, Ga. and                        for which no estimates are
       Fla ----------------------
           _                            559         submitted_ _     --------      565

                            1. SAVANNAH HARBOR, GA.

   Location.-The entrance is 75 statute miles south of Charleston
Harbor, S. C., and 70 statute miles north of Brunswick Harbor, Ga.
 (See U. S. Coast and Geodetic Survey Chart No. 440.)
   Previous projects.-Adopted by specific acts of Congress May 18,
1826; March 3, 1855; August 7, 1856; and by River and Harbor Acts
of March 3, 1873; June 23, 1874; September 19, 1890; June 3, 1896;
and June 13, 1902. For further details, see page 1810 of Annual
Report for 1915, and page 578 of Annual Report for 1938.
   Existing project.-This consists of eliminating the regulating dam
across South Channel, the relocation of the inland waterway in the
vicinity, and the further extension of training walls and revetments
and jetties and providing for-
   (a) Channels of the following dimensions: 30 feet deep and gener-
ally 500 feet wide from the 30-foot contour in the ocean to the old
quarantine station, 10.2 miles; thence 30 feet deep and generally 409
feet wide to the Seaboard Air Line Railway bridge, 16 miles; thence
26 feet deep and 300 feet wide to the foot of Kings Island, 1.3 miles;
thence 26 feet deep and 200 feet wide to the vicinity of the terminal
of the Atlantic Creosoting Co., 2.1 miles; a total length of 29.6 miles.
   (b) Enlargement of contracted portions of the channel and such
     493202-43-pt. 1, vol. 1-    35
542         REPORT        OF CHIEF         OF    ENGINEERS,                 U.   S.   ARMY,       1942


enlargements of the channel as may be necessary to smooth out abrupt
changes and for otherwise improving the hydraulic conditions with
a view to reducing shoaling.
   (c) A turning basin near the upper end of the harbor to be formed
by widening the 26-foot channel to 600 feet for a length of 600 feet
and providing proper approaches.
   (d) The maintenance of the channels, anchorage basins, enlarge-
ments at Drakies Cut, Kings Island, West Broad and Barnard Streets,
mooring dolphins near Fort Oglethorpe, and the existing training
walls and jetties.
  The plane of reference is mean low water, which varies for differ-
ent parts of the harbor. The mean range of tide is 7.7 feet at the
upper end of the harbor, and 7.1 feet at the lower end. Extreme
ranges are about 10.5 feet and 11.0 feet, respectively. The mean tidal
range has been increased by the improvement about 2.8 feet at the
upper end.
  The estimate of cost for new work, revised in 1935, was $5,600.000,
exclusive of amounts expended on previous projects. The latest (1935)
approved estimate for annual cost of maintenance is $500,000.
  The existing project was authorized by the following river and
harbor acts:

    Acts                         Work authorized                                          Documents
                                                                        I

June 23, 1874    Regulating works ....     .......     ..--
                                                    ........-.- _ .          Annual Report 1873, p. 747.
Mar. 2, 1907     Tentative provision for a 26-foot channel from the          H. Doc. No. 181, 59th Cong., 1st sess.
                   quarantine station to the Seaboard Air Line Ry.
                   bridge.
June 25, 1910 D efinite provision for the 26-foot channel ........
July 25, 1912    A 21-foot channel from the Seaboard Air Line Ry.            H. Doc. 563, 62d Cong., 2d sess.
                   bridge to the foot of Kings Island.
Aug. 8,1917 A 30-foot depth from the sea to the quarantine                   H. Doc. No. 1471, 64th Cong., 2d sess.
                   station.
Jan. 21, 1927 A 21-foot channel above Kings Island              _....        H. Doc. No. 261, 69th Cong., 1st sess.
  Do -.    _---- Channel 30 feet deep, with general width 500 feet,          H. Doc. No. 262, 69th Cong., 1st sess.
                   from the ocean to the quarantine station, thence
                   26 feet deep, general width 400 feet, to the Sea-
                   board Air Line Ry. bridge; thence 21 feet deep
                   and 300 feet wide to Kings Island.
                 Widening at West Broad and Barnard Sts.;
                   anchorage basin; mooring dolphins; regulating
                   dam across South Channel; relocation of the
                   inland waterway; dredging Drakies Cut to 13
                   feet; widening to 525 feet at Kings Island;
                   extension of training walls, revetments and
                   jetties. Consolidation of projects relating to
                   Savannah Harbor.
July 3, 1930 Channel 26 feet deep and 300 feet wide from the                 S. Doc. No. 39, 71st Cong., 1st sess.
                   Seaboard Air Line Ry. bridge to the foot of
                   Kings Island.
Aug. 30, 1935 Authorizes the present project and the elimina-                H. Doc. No. 276, 73d Cong., 2d sess.
                   tion from the project of (a) the regulating dam             (Contains the latest published
                   across South Channel; (b) the relocation of the             maps.)
                   inland waterway; and (c) the further extension
                   of training walls, revetments, and jetties.
         RIVERS   AND HARBORS-SAVANNAH,         GA.,   DISTRICT    543
   Recommended modifications of project.-Under date of April 20,
1939, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for widening the present channel in the
vicinity of the Atlantic Coast Line Railway terminals from 400 feet
to a maximum of 550 feet for a length of 5,000 feet, and for deepen-
ing the present authorized channels and turning basin above the
Seaboard Air Line Railway bridge from 26 to 30 feet at mean low
water, with no change in width, all at an estimated cost of $281,000
for new work and without increase in the annual cost of maintenance;
subject to certain conditions of local cooperation (H. Doc. No. 283,
76th Cong., 1st sess.).
   Local cooperation.-The River and Harbor Act approved August
30, 1935, imposes the condition that local interests shall furnish, with-
out cost to the United States, suitable disposal areas for the dredged
material if and when needed, both for new work and for mainte-
nance. By resolution adopted March 13, 1929, the city of Savannah
made available certain lands necessary for improvement and the
future maintenance of the harbor at Kings Island, and binds itself to
furnish, when required, such dumping ground as may be needed in
the future improvement and maintenance of Savannah Harbor. The
city of Savannah has secured for the United States practically all of
the dumping privileges required for improvement under the existing
project.
   Terminal facilities.-This improvement serves numerous wharves
and piers owned by individuals and corporations, a municipal wharf,
and the terminals of three trunk-line railways and two ocean steam-
ship companies. For further details see Port Series No. 10, Corps of
Engineers (revised 1940).
   Operations and results during fiscal year--Maintenance.-Govern-
ment plant and hired labor operated on the harbor between the sea
and Kings Island, removing 6,098,844 cubic yards of material (includ-
ing 1,641,065 cubic yards removed by agitation) at a cost of $431,560.
Engineering studies and surveys were made at a cost of $17,843.
   The total cost was $449,403 for maintenance. The total expenditure
was $447,814.02.
   Conditionat end of fiscal year.-The existing project was completed
in 1937. The 30-foot channel from the sea to Old Quarantine Sta-
tion was completed in 1930, and the remaining part of the channel
in 1937. That part of the 26-foot channel from the Seaboard Air
Line Railway bridge to the foot of Kings Island was completed in
1931, and the remaining part from the foot of Kings Island to the
Atlantic Creosoting Co.'s wharf, including the turning basin near
the upper end of the harbor, in 1937. Cross-tides channel was closed
with a hydraulic fill in 1937. The anchorage basin and mooring
dolphins near Fort Oglethorpe were completed in 1926. The enlarge-
ments at Drakies Cut, Kings Island, and at West Broad and Bar-
nard Streets were completed in 1931, 1929, and 1924, respectively.
Whitehall Channel training wall was completed in 1929 and was
replaced by three spur dikes in 1937. Fig Island training wall was
raised and extended in 1940. Long Island training wall fill was
completed in 1931, and other training walls and jetties prior to 1929.
Controlling depths in midchannel for half project width at mean
low water, as determined in June 1942 were: 26.5 feet from the sea
544            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                               1942

to Fort Jackson; 25.7 feet from Fort Jackson to the Seaboard Air
Line Railway bridge; 25.2 feet from the Seaboard Air Line, Railway
bridge to the upper end of the harbor. The turning basin at the
upper end of the harbor had a controlling depth of 26 feet for a width
of 500 feet.
   The costs under thi existing project to June, 30, 1942, have been
$5,177,678.13 for new work and $12,791,436.02 for maintenance,
a total of $17,969,114.15. The total expenditures have been
$17,964,946.53.
  Proposed operations.-The balance unexpended July 1, 1942, $501,-
808.50, will be applied as follows:
Accounts payable, July 1, 1942--------     ---------------------                                              $4, 167. 62
Maintenance:
    Dredging with United States pipe-line dredge in 26- and 30-foot
      channels between South Channel and upper end of harbor, 10
      months between July 1, 1942, and June 30, 1943_____________                                            266, 000. 00
    Dredging with United States hopper dredge in 30-foot channel
      between South Channel and outer end of bar, 61/2 months be-
      tween July 1 and Oct. 31, 1942; and between Apr. 15 and
      June 30, 1943---------------------------------------                                                   231, 640. 88

               Total for all work-------------------------------                                            $501, 808. 50
  The additional sum of $841,000 can be profitably expended during
the fiscal year 1944, as follows:
Maintenance:
   Dredging with United States pipe-line dredge in 26- and 30-foot
      channels between South Channel and upper end of harbor, 11
      months between July 1, 1943, and June 30, 1944 _____________- $308, 000
   Dredging with United States hopper dredge in 30-foot channel
      between South Channel and outer end of bar, 8 months between
      July 1, and Dec. 31, 1943; Apr. 1, and June 30, 1944---------- 280, 000
   Bank protection by contract, on right bank between stations
      158+700 and 164+100 (upper limits of harbor at station
      89+000), between Sept. 1, 1943, and June 30, 1944_ ____- __--253, 000

               Total for all work ----------------------------------                                           $841, 000

                                                Cost and financial summary

Cost of new work to June 30, 1942___________________________                                          $12, 438, 062. 11
Cost of maintenance to June 30, 1942_________________________                                          13, 090, 330. 28
     Total cost of permanent work to June 30, 1942----------25,                                              528, 392. 39
Minus accounts payable June 30, 1942 _______________________                                                   4,167. 62

     Net total expenditures-----------------------------     25, 524, 224. 77
Unexpended balance June 30, 1942----------------------------501,      808. 50

          Total amount appropriated to June 30, 1942_____--------                                      26, 026, 033. 27

    Fiscal year ending June 30                1938             1939            1940            1941              1942

Cost of new work_     --------------$147, 022. 49
Cost of maintenance .............    420, 128. 36           $471, 284. 71   $625, 971. 33   $455, 437. 35      $449, 403. 00
       Total cost-.............._           567, 150. 85     471,284.71      625, 971. 33    455, 437. 35       449, 403. 00
Total expended.......... - -        - .     673, 873. 37     415, 007. 79    679, 170. 32    476, 587. 38       447, 814. 02
Allotted-...      ...   .   .   - - -     1, 006, 000. 00    527, 700. 00    595, 500. 00    450, 000. 00       425, 800. 00
             RIVERS AND HARBORS-SAVANNAH,                     GA.,   DISTRICT          545
Balance unexpended July 1, 1941___________________- ____-                      $523, 822. 52
Amount allotted from War Department Civil Appropriation
Act approved April 28, 1942_______-- __------------------                      478, 000. 00

      Amount to be accounted for --------------------------- 1, 001, 822. 52
Deductions on account of revocation of allotment ______-- __ -   52, 200. 00

      Net amount to be accounted for____-------------------                     949, 622. 52
Gross amount expended______________------------   ---------                     447, 814. 02

      Balance unexpended June 30, 1942__    -------------------                 501, 808. 50
Outstanding liabilities June 30, 1942_ _____---_--------------                    4, 167. 62

       Balance    available June 30, 1942_ _-------------------                 497, 640. 88

Amount that can be profitably expended in fiscal year ending
   June 30, 1944, for maintenance 1____________------                          841, 000. 00
   1 Exclusive of available funds.

                 2. SAVANNAH RIVER BELOW AUGUSTA, GA.
   Location.-This river (see U. S. Geological Survey maps of South
Carolina and Georgia) is formed by the confluence of the Tugaloo
and Seneca Rivers on the northwestern part of the South Carolina-
Georgia boundary line. It flows southeast for 314 miles, forming the
boundary line, and empties into the Atlantic Ocean 16.6 miles below
Savannah, Ga.
   Previous project.-Adopted by the River and Harbor Act of
March 3, 1881. A subdivision between new work and maintenance is
not possible. For further details see page 1813 of Annual Report for
1915 and page 581 of Annual Report for 1938.
   Existing project.-This provides for a channel 6 feet deep and 75
feet wide (at ordinary summer flow, which corresponds to a dis-
charge of 4,000 second-feet at Augusta, Ga.), from the upper end of
Savannah Harbor to the head of navigation at Augusta, 3.0 miles
above Fifth Street Bridge, a distance of approximately 199 miles.
The improvement is to be obtained by the construction of one lock
and dam at New Savannah Bluff, the use of contraction works, the
closure of cut-offs, bank protection, removal of snags, overhanging
trees, and wrecks, and the dredging of troublesome bars. The mean
tidal variation at the mouth of the river is 7.1 feet. The freshet vari-
ation above the normal pool level (elevation 114.5, mean sea level) of
the New Savannah Bluff lock and dam at the head of the improve-
ment is approximately 13 feet ordinarily, with an extreme of 34 feet.
The pertinent data for the lock and dam are given in the following
table:
                       Lock and dam at New Savannah Bluff

  Nearest railroad station, Augusta, Ga., 13 miles.
  Distance above Bull Street, Savannah, Ga., 188 miles.
  Lock dimensions, 56 by 360 feet.
  Lift of lock, 15 feet.
  Depth on lower miter sill at low water, 10 feet.
  Depth on upper miter sill at normal pool level, 13.5 feet.
  Character of foundations-piles   in sand, clay, and gravel.
                       1
  Kind of dam, fixed.
  Type of construction, concrete.
  Completed, 1937.
  Total cost, $1,473,812.10.
  1 Five steel vertical lift crest-control gates, set between concrete piers and resting on
concrete sill.
546           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                   1942

   The estimate of cost for new work, revised in 1935, is $3,340,000,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance and opera-
tion is $75,000 for the first 3 years and $50,000 annually thereafter,
of which $15,000 is for operating and care of lock and dam.
   The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                Documents


Sept. 19, 1890     For a 5-foot channel__                            H. Doc. No. 255, 51st Cong., 2d sess.,
                                                                       and Annual Report, 1890, p. 1328.
       1910 Special improvement by bank protection work of
June 25,                                                             H. Doc. No. 962, 60th Cong., 1st sess.
             20 or 25 miles of the river immediately below
             Augusta.
July     3, 1930   The present 6-foot channel project and the lock   H. Doc. No. 101, 70th Cong., 1st sess.
                    and dam.
Aug. 30, 19351     Provision made for locating the lock and dam at Senate committee print, 73d Cong.,
                     New Savannah Bluff.                              2d sess.2
Aug. 26, 1937      Conditions of local cooperation modified--_ _ ___ Rivers and Harbors Committee Doc.
                                                                       No. 39, 75th Cong., 1st sess.


1 Included in the Public Works Administration program, Sept. 27, 1933.
s Contains the latest published maps.

   Recommended modifications of project.-Under date of February
21, 1939, the Chief of Engineers recommended modification of the
existing project so as to provide for construction of the Clark Hill
Reservoir for the regulation of stream flow in the interests of naviga-
tion and for the development of hydroelectric power, at an estimated
first cost of $28,000,000 (S. Doc. No. 66, 76th Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-The only water terminals served by this im-
provement are at Augusta and at or near Savannah. The City of
Augusta owns and operates, on equal terms to all, a wharf and ware-
house; a short distance below this terminal the Pure Oil Co. has a
terminal (storage capacity of 27,500 barrels) for berthing and dis-
charging oil barges; and just outside of the eastern city limits is the
Merry Bros. Brick & Tile Co.'s terminal. At Savannah there is one
municipal wharf, suitable for berths for river steamers, open to the
public on equal terms. In addition, there are extensive facilities
at Savannah, privately owned, for ocean-going and smaller vessels.
Along the river there are numerous natural landings without wharves
or railway connections. The terminal facilities on this improvement
are considered ample for existing commerce.
   Operations and results during fiscal year--Maintenance.-Govern-
ment plant and hired labor removed 3,388 snags, sunken logs, and
similar obstructions between mile 20 and mile 188, at a cost of
$31,668.20; and removed 15,155 cubic yards of material by dredging
between mile 184 and mile 188, at a cost of $6,556.69. Surveys and
engineering studies were made at a cost of $2,228.64, which includes
$149.23, cost of surveys at MacEvoy Shipbuilding Corporation.
   Maintenance (operating and care).-The lock and dam at New
Savannah Bluff was operated and ordinary repairs, improvements,
                 RIVERS AND    HARBORS-SAVANNAH,                   GA.,       DISTRICT                 547
and reconstructions to the structure and appurtenant works were
made at a cost of $26,124.24.
   The total cost, all from regular funds, was $86,577.77 for mainte-
nance, including $26,124.24 for operating and care of the lock and
dam. The total expenditure was $69,406.92.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1939. Construction of the lock and dam at New Savannah
Bluff was completed in 1937 and the open-channel work in 1939.
All open-channel works are in good repair. The controlling depth
at ordinary summer water was 6 feet or greater for about 60 percent
of the fiscal year. This depth corresponds to a height of 4.6 feet
on the Butler Creek gage, and to a discharge of 4,000 second-feet at
Augusta.
  The costs and expenditures on the existing project to June 30, 1942,
'were as follows:
                                                                        Public works
                                                    Regular funds          funds                Total


New work_________________                           $1, 117, 237. 02       $1, 634, 562. 24   $2. 751, 799. 26
Maintenance            -                             1, 361, 803. 63   _                       1, 361, 803. 63
Operating and care_-_-                                  113, 015.99                               113, 015. 99

     Total                         -                 2, 592, 056. 64        1, 634, 562. 24    4, 226, 618. 88
Expenditures .                                       2, 591, 223. 21        1, 634, 562. 24    4, 225, 785. 45



  Proposed operations.-The balance unexpended July 1, 1942, $66,-
532.86 plus $4,000 contributed by MacEvoy Shipbuilding Co., or a
total of $70,532.86, will be applied as follows:
Accounts payable, July 1, 1942__-_________ __ _              _ ____ _- _      - $833. 43
Maintenance:
    Snagging and dredging with U. S. Snagboat Macon, 61/ months
      between July 1, and Nov. 15, 1942; and between May 1 and June
      30, 1943-------.---                                                          32, 848. 66
    Dredging at MacEvoy Shipbuilding Co. with United States pipe
      line dredge 1/4 month in August 1942                ___                       6, 850. 77
    Operation and care, lock and dam at New Savannah Bluff:
         Operation        -------------------------------            $26, 000. 00
         Ordinary repairs ...........---                               3, 000. 00
         Emergencies                                                   1, 000. 00
                                                                                  30, 000. 00

           Total for all work------------------- ------------ 70, 532. 86
  The additional sum of $75,400 can be profitably expended during
the fiscal year 1944 as follows:
Maintenance:
   Snagging and dredging with U. S. snagboat Macon, 8 months, be-
      tween July 1 and Dec. 31, 1943; and between May 1 and June
      30, 1944_     --------------------------------------------- $38, 400
   Repairs, with hired labor, to open channel works (pile dikes and
      bank revetment) between mile 47.5 and mile 187.0 (zero mile at
      Bull Street, Savannah, Ga.) between Aug. 1 and Oct. 31, 1943-----   7, 000
   Operation and care, lock and dam at New Savannah Bluff:
        Operation      ----------------------------------       $26, 000
        Ordinary repairs------------------------------            3,000
        Emergencies -----------------           -1--- ----        1, 000
                                                                         30, 000

             Total for all work         ----------------------------------- 75, 400
548         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                 1942

                                         Cost and financial summary

Cost of new work to June 30, 1942                                                                         845, 279. 35
                                                                                                      $-------------------------2,
Cost of maintenance to June 30, 1942----------                                ---------                1, 474, 819. 62

      Total cost of permanent work to June 30, 1942-----------4, 320, 098.97
Minus accounts payable June 30, 1942    -------------------------     833. 43

      Net total expenditures------------------------------                                             4, 319, 265. 54
Unexpended balance June 30, 1942__
                                ----------------------------                                               66, 532. 86

         Total amount appropriated to June 30, 1942------------4, 385, 798. 40

   Fiscal year ending June 30                 1938              1939            1940           1941             1942


C ost of new work _     ..----- .......$134,709.49           $247, 127.34
Cost of maintenance      .......         75, 881. 51           81,797. 97    $162, 539. 54   $81, 874. 40      $66,577.77
      Total cost _------------              210, 591. 00      328, 925. 31    162, 539. 54    81, 874. 40       66, 577. 77
Total expended    .    ......---------------- 254, 225. 77    345, 514. 89    168, 104. 59    80,816. 75        69, 406. 92

Allotted-.....------......
                     --------------         524, 500. 00      175, 500. 00     75, 006. 00    66, 000. 00       61, 800. 00



Balance unexpended July 1, 1941-------------------------------                                              $74, 139. 78
Amount allotted from War Department Civil Ap-
  propriation Act approved June 24, 1940_-         $10, 600. 00
Amount allotted from War Department Civil Ap-
  propriation Act approved Apr. 28, 1942 ........    56, 000. 00
                                                                                                             66, 600. 00

     Amount to be accounted for_ _                         --                                               140, 739. 78
Deductions on account of revocation of allotment---------------                                               4,800. 00

      Net amount to be accounted for -----------------                                                      135, 939. 78
Gross amount expended------------------------------------                                                    69, 406. 92
      Balance unexpended June 30, 1942------------------------                                               66, 532. 86
Outstanding liabilities June 30, 1942----------------------------                                                833. 43

         Balance available June 30, 1942 -------------------                                                 65, 699. 43

Amount that can be profitably expended in fiscal year ending June
30, 1944 for maintenance ---------------------------------                                                  75, 400. 00
   1Exclusive of available funds.

3. WATERWAY BETWEEN BEAUFORT, S. C., AND ST. JOHNS RIVER,
      FLA. (BEAUFORT, S. C., TO CUMtBERLAND SOUND SECTION)
  Location.-This section of the waterway connects Beaufort, S. C.,
with Fernandina, Fla. (See U. S. Coast and Geodetic Survey Charts
Nos. 838-841, inclusive.) For Cumberland Sound to St. Johns River
section see page 566.
  Previous projects-Between Savannah, Ga., and Fernandina,Fla.-
Previous improvements in this section were authorized by River and
Harbor Acts of August 2, 1882, August 11, 1888, July 13, 1892, and
March 3, 1905.
  For further details see pages 1814, 1821-1823 of the Annual Report
for 1915, and page 585 of the Annual Report for 1938.
  Existing project.-This provides for a waterway 12 feet deep, at
mean low water, and not less than 90 feet wide, between Beaufort, S. C.,
and Savannah, Ga., via Beaufort River and Port Royal Sound; for
a waterway 12 feet deep, at mean low water, with widths of 90 feet in
land cuts and narrow streams and 150 feet in open waters, between
                  RIVERS AND HARBORS-SAVANNAH,                              GA.,   DISTRICT               549
Savannah, Ga., and Fernandina, Fla., to follow in general the aline-
ment of the existing waterway, except for such cut-offs or other
changes in the route as may be foufnd desirable and justified by the
resultant benefits to navigation; and for a suitable anchorage basin at
Thunderbolt, Ga. The total distance from Beaufort, S. C., to Fer-
nandina, Fla., is 184.2 miles. The project also provides for the follow-
ing: (1) Removing logs and snags from Generals Cut, Ga.; (2) an
alternate and more protected route, 7 feet deep at mean low water
from Doboy Sound to Brunswick Harbor, via Darien River. Three
Mile Cut, Altamaha River, One Mile Cut, lButtermilk Sound, Mackay
River, Back River, Clubb Creek, and Plantation Creek; (3) a pro-
tected channel 7 feet deep at mean low water and 75 feet around St.
Andrew Sound extending from the main route of the waterway in
Jekyll Creek through Jekyll Sound, Little Satilla River, Umbrella
Cut, Umbrella Creek, and its south branch, through Dover Cut to
Dover Creek, thence up Dover Creek and through a narrow neck of
land to Satilla River, thence through a land cut south of Todd Creek
and through Floyd Creek to the main route of the waterway in Cum-
berland River; (4) a channel 5 feet deep at mean low water and 50
feet wide to connect Baileys Cut to Satilla River and Dover Creek,
Ga.; (5) a loop 8 feet deep at mean low water to reach the wharves
at the southern end of Cumberland Sound. In general, the work is
to be accomplished by dredging, supplemented by training walls, as
necessary.
   The mean tidal range between Beaufort, S. C., and Fernandina,
Fla., is from 6 to 8 feet, with fluctuations from 11/2 to 21/2 feet, due to
winds and lunar phases.
   The estimated cost of new work, revised in 1938, is $961,600, exclusive
of amounts expended under previous projects. The latest (1938) ap-
proved estimate for annual cost of maintenance is $112,000.
   The existing project was authorized by the' following river and
harbor acts:

      Acts                        Work authorized                                    Documents


                  BEAUFORT,    S. C., TO SAVANNAH,    GA.,    SECTION


June     3,1896   Route No. 2 adopted_______________________            H. Doe. No. 295, 53d Cong., 3d sess.
Mar. 3, 1899      Route No. 1 adopted_____________________________         Do.
July 25, 1912     Provided for Archer Creek_---_-------                 H. Doc. No. 513, 62d Cong., 2d sess.
                    (This route now abandoned.)

                  SAVANNAH,    GA., TO FERNANDINA,    FLA.,   SECTION


July 13,1892      Original 7-foot channel     ----------------------
                                                  .                     H. Doe. No. 41, 52d Cong., 1st sess.
Mar. 3,1905       Provided for Skidaway Narrows_--------------          H. Doc. No. 450, 58th Cong., 2d sess.t
July 25,1912      Incorporated alternate routes previously im-          H. Doe. No. 1236, 60th Cong., 2d sess.,
                    proved as separate projects and the auxiliary
                    channels.

                      CUMBERLAND     SOUND,    GA. AND FLA., TO
                          ST. JOHNS RIVER, FLA.,    SECTION


Mar. 4,1913       For a channel 7 feet deep and 100 feet wide .. __._   H. Doec. No. 898, 62d Cong., 2d sess.
Aug. 8,1917       Consolidation of the three sections, shown above,
                   into "Waterway between Beaufort, S. C., and
                   St. Johns River, Fla."
  i   Contains latest published maps.
550            REPORT        OF CHIEF OF ENGINEERS,                     U.   S. ARMY,       1942



       Acts                        Work authorized                                   Documents


                    BEAUFORT, S. C., TO CUMBERLAND      SOUND, GA.
                                  AND FLA., SECTION


Mar. 2,1919         Removing logs and snags from Generals Cut .____ H. Doc. No. 581, 63d Cong., 2d sess.'
   Do--.......      Improving Back River to provide a channel 7 H. Doc. No. 1391, 62d Cong., 3d sess.
                      feet deep and 150 feet wide.
Mar. 3,1925         Channel 75 feet wide between Beaufort, S. C.,       S. Doc. No. 178, 68th Cong., 2d sess.
                     and Savannah, Ga.
July 3,1930         Channel from Baileys Cut to Dover Creek .....       S. Doc. No. 43, 71st Cong., 2d sess.'
Aug. 26,1937        A 7-foot protected channel around St. Andrew        Senate committee print, 74th Cong.,
                                                                                     1
                     Sound.                                                1st sess.
       Do_-......   A 12-foot channel between Beaufort, S. C., and      Rivers and Harbors Committee Doe.
                     Savannah, Ga., via Beaufort River and Port            No. 6, 75th Cong., 1st sess.
                     Royal Sound.
June 20,1938        A 12-foot channel between Savannah, Ga., and        H. Doc. No. 618, 75th Cong., 3d sess.
                      Fernandina, Fla.; various cut-offs; and anchor-
                     age basin at Thunderbolt, Ga.

   1   Contain latest published maps.

  Recommended modifications of project.-Under date of December
16, 1940, the Chief of Engineers recommended modification of the
existing project so as to provide for an alternate route 9 feet deep
and 150 feet wide in that part of Frederica River, Ga., not now
traversed by the main route, at no additional cost to the United
States (H. Doc. No. 114, 77th Cong., 1st sess.).
  Local cooperation.-Fully complied with.
   Terminal facilities.-Exclusive of terminal facilities at the ports
of entry, this improvement serves numerous wharves, some of which
are open to the public on equal terms. These facilities are con-
sidered ample for existing commerce.
   Operations and results during fiscal year.-Government plant and
hired labor operated on maintenance dredging at various localities
between Walls Cut, S. C., and Cumberland Dividings, Ga., removing
a total of 1,381,311 cubic yards of material, at a cost of $119,603.95.
Surveys and engineering studies were made at a cost of $2,400.95.
Mileage and direction signs were repaired, at a cost of $26.19.
   Total cost was $122,031.09 for maintenance. The total expendi-
tures were $141,763.63.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1941 by dredging to provide a 12-foot channel. The pro-
tected route around St. Andrew Sound was completed in 1939. The
training walls and closure dams were completed in 1912 and are in
satisfactory condition. All other improvements were completed in
1932.
   The main route had controlling depths, at mean low water, of 11.
feet or greater except for shoals in Fields Cut, South Channel and
Wilmington River, near Savannah, Ga., where the controlling depth
was 10 feet, as determined from surveys made in May, June, and
July, 1942.
   The costs under the existing project to June 30, 1942, were $763,-
599.20 for new work and $1,684,124.21 for maintenance, a total of
$2,447,723.41. The total expenditures were $2,446,290.72.
                  RIVERS AND HARBORS-SAVANNAH,                                   GA.,   DISTRICT                 551

  Proposed operations.-The balance unexpended July 1, 1942,
$93,229.63, plus an allotment of $160,000 made during July 1942, or a
total of $253,229.63 will be applied as follows:
Accounts payable, July 1, 1942     -------------------------------     $1,432. 69
Maintenance :
   Dredging with U. S. pipe-line dredge Creighton between Beau-
      fort, S. C., and Cumberland Sound, 11 months between July 1,
      1942, and June 30, 1943                             --------
                                             __-----------------   _  155,796.94
    Dredging with U. S. pipe-line dredge DeWitt Clinton in South
      Channel and St. Augustine Crossing 2 months between July
      1 and Sept. 1, 1942_ --------      -------------------------- 83, 000. 00
   Hired labor maintenance dredging by agitation method with U. S.
      snagboat Macon in waterway in South Channel, 2 months
      between July 1 and Sept. 30, 1942_------------------------ 10, 000. 00
   Hired labor removal of obstructions with U. S. snagboat Macon
      in waterway at mouth of South Channel, one-half month be-
      tween July 1 and 31, 1942---      ----------------------------    2, 500. 00
   Repairs to speed and directional markers along waterway from
      Beaufort, S. C., to Fernandina, Fla., 1 month, October 1942____      500. 00

                Total for all work.--------------------------------- 253, 229. 63
  The additional sum of $311,500 can be profitably expended during
the fiscal year 1944 as follows:
Maintenance :
    Dredging with U. S. pipe-line dredge Morgan between Beaufort,
      S. C., and Cumberland Sound, 6 months between July 1, 1943,
      and June 30, 1944___--------   -----------------------------                                          155,000
    Dredging with U. S. pipe-line dredge Creighton between Beaufort,
      S. C., and Cumberland Sound, 11 months between July 1, 1943,
            and June 30, 1944 _______------                            _______-----      ------             155, 000
        Repairs to speed and directional markers along waterway from
          Beaufort, S. C., to Fernandina, Fla., 1 month between July 1, 1943,
          and June 30, 1944__-----------------------------------          ----                                      500

                                  _
                Total for all work----- ---------                          -----
                                                                       -_------                             311, 500

                                      Cost and financial summary
Cost of new work to June 30, 1942---------------------------$958, 096. 16
Cost of maintenance to June 30, 1942__----------------------  1,818, 921. 84

      Total cost of permanent work to June 30, 1942__________ 2, 777, 018. 00
Minus accounts payable June 30, 1942---------------------------    1,432. 69

      Net total expenditures----_-------------------------                                         2, 775, 585. 31
Unexpended balance June 30, 1942______________------------                                   _         93, 229. 63

            Total amount appropriated to June 30, 1942--------------2,                                  868, 814. 94

    Fiscal year ending June 30               1938         1939            1940              1941             1942


Cost of new work____------------.......--------------    $8, 542. 93   $113, 358.53                     1
                                                                                        $413, 142. 62 ----
Cost of maintenance ..----- ----- $106, 910. 16          92, 176. 65     48, 575.96       54, 827.08       $122,031. 09

        Total cost...         . .-
                        .-- ..-.         106, 910.16    100, 719. 58    161, 934. 49     467, 969. 70       122, 031. 09

Total expended....-------------          117, 481. 12    85, 357. 11    173, 610.92      450, 490. 51       141, 763. 63

Allotted--.-.       ----- _-_---     -193,     000.00   787, 000. 00   -97, 548.20        40, 000.00        127, 000. 0O
552      REPORT      OF CHIEF O-F- ENGINEERS,      U.   S. ARMY,    1942

Balance unexpended July 1, 1941__________ __-___      -      ______  $107, 993.26
Amount allotted from War Department Civil Appropri-
  ation Act approved June 24, 1940---------------       $12, 000. 00
Amount allotted from War Department Civil Appropria-
  tion Act approved May 23, 1941 _______________         25, 000. 00
Amount allotted from War Department Civil Appropria-
  tion Act approved April 28, 1942 ___    ____________ 90, 000. 00
                                                                      127, 000. 00
      Amount to be accounted for_       --- ___-----_____--____        234, 99. 26
Gross amount expended__________          _______________________-      141, 763.63

      Balance unexpended June 30, 1942                                   3, 229. 63
                                                                        9___________________
Outstanding liabilities June 30, 1942_ _--------_--____--      ____      1, 432. 69

       Balance available June 30, 1942____                              9__________________
                                                                         1, 796. 94

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1 ____--------------------____              311, 500. 00
  1 Exclusive of available funds.

         4. ALTAMAHA,          OCONEE, AND OCMULGEE         RIVERS, GA.

   Location.-These rivers are located entirely within the State of
Georgia. (See U. S. Geological Survey map of Georgia.) For full
description of these rivers, see page 636, Annual Report for 1932.
   Prelious projects.-Prior to the present one, projects had been
adopted and expenditures made under them for the Altamaha River
by River and Harbor Acts of March 3, 1881, and September 19, 1890;
for the Oconee River by River and Harbor Acts of June 18, 1878,
September 19, 1890, and March 3, 1905, for the Ocmulgee River, August
14, 1876, and September 19, 1890.
   For further details, see page 1815 of Annual Report for 1915, and
page 589 of Annual Report for 1938.
   Existing project.-This contemplates an appropriation of $40,000
annually for the Altamaha, Oconee, and Ocmulgee Rivers, to be ap-
plied, following in general the methods which had been carried on
under the previous projects, to maintenance of 3-foot depth during
ordinary summer low water and to the gradual increase of channel
depth, so far as practicable, without sacrificing the maintenance work.
These methods are the removal of rock shoals, snags, overhanging
trees, and other obstructions; the closing of incipient cut-offs; the
revetting of caving banks; and the use of spur dikes and training
walls. The width of channel was not specified, but it should vary
from 60 to 100 feet, according to locality. This project covers the
entire Altamaha River (including a channel between the river and
Darien, Ga.), a length of 137 miles, the lower 145 miles of the Oconee
River, and the lower 205 miles of the Ocmulgee River. The Altamaha
River has a mean tidal range of 6.4 feet at its mouth, which gradually
decreases to mile 33 above, where there is no perceptible tidal effect.
At Doctortown, mile 59, ordinary floods attain a height of about 10
feet above low water, and extreme floods a height of about 15 feet above
low water.
   On the Oconee River at Dublin the ordinary fluctuations attain a
height of 22 feet, and the extreme fluctuations a height of 32 feet
above low water. On the Ocmulgee River at Macon the ordinary
fluctuations attain a height of 15 feet, and the extreme fluctuations a
            RIVERS AND HARBORS-SAVANNAH,                   GA.,   DISTRICT          553

height of 25 feet above low water. There is no approved estimated
cost for improvement or for maintenance.
   The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 443, 62d Cong., 2d sess.). The latest pub-
lished maps of these rivers are in the following documents: Altamaha
River, House Executive Document No. 283, Fifty-first Congress, second
session; Oconee River, House Executive Document No. 211, Fifty-first
Congress, first session; and Ocmulgee River, House Executive Docu-
ment No. 215, Fifty-first Congress, first session.
   Terminal facilities.-Along these rivers there are numerous natural
shore landings. These are considered ample for existing commerce.
   Operations and results during fiscal year.-U. S. snag-boats No. 1
and No. 2, operated periodically on maintenance snagging, removing
1,432 obstructions from the Altamaha River between mile 23 and the
Forks, mile 137, and 1,387 obstructions from the Ocmulgee River,
between the Forks and Macon, mile 205. The total cost of snagging
operations was $22,997.62. Surveys and inspections were made at a
cost of $20.95.
   The total cost was $23,018.57, all for maintenance. The total
expenditure was $23,029.13.
   Condition at end of fiscal year.-The existing project is of such a
nature that the percentage of completion cannot be stated. Channel
depths have been increased by the excavation of rock shoals and sand
bars, by the construction of contraction and bank-protection works,
and by the closing of cut-offs. Navigation has been rendered safer
by removal of obstructions. Many of the closing dams and contrac-
tion and bank-protection works need repairs.
   For about 9 months of the fiscal year 1942, the controlling depths
were equal to or greater than the following :
                                                                                     Feet
    Mouth to mile 75-----------------------                   ------------------      4. 5
    Mile 75 to Forks (mile 137)                                                       3.0
Oconee River:
    Forks to Dublin (mile 78)------------------------------------                     2.5
    Dublin to Milledgeville (mile 145) -----------------------------                  1. O
Ocmulgee River:
    Forks to mile 73-----------------------------------                               2.0
    Mile 73 to Macon (mile 205)---------------------------------                      1. O
  The low water period usually occurs between August and November, during
which time controlling depths are from 1/2 to 1                feet less than those given
above.
  To June 30, 1942, the costs under the existing project were
$60,847.16 for new work and $816,705.85 for maintenance, a total of
$877,553.01. The total expenditures were $876,965.88.
  Proposed operations.-The balance unexpended July 1, 1942,
$17,797.53 will be applied as follows:
Accounts payable, July 1, 1942___-------------------------------        $587.13
Maintenance: Snagging with U. S. snag boat No. 1 on the Altamaha
  River between mouth and mile 137; and on the Oconee River
between mile 0 and mile 88; and on Ocmulgee River between mile 0
  and mile 70, 7 months between July 1, 1942 and June 30, 1943-_____ 17, 210. 40
       Total for all work_------------__-__       -         -___
                                                               -- _______     17, 797. 53
554           REPORT OF CHIEiF OF ENGINEERS,                       U. S. ARMY,             1942

   The additional sum of $22,000 can be profitably expended during
fiscal year 1944 as follows:
Snagging with U. S. snag boat No. 1 on the lower reaches of Oconee
  and Ocmulgee River, 3 months between July 1 and Sept. 1, 1943;
  and 5 months on Altamaha River between Sept. 1 and Nov. 30, 1943;
  and May 1 and June 30, 1944---------------------------                                            $22, 000

                                     Cost and financial summary
Cost of new work to June 30, 1942___-----------------                             ---         $821, 457. 42
Cost of maintenance to June 30, 1942_------------------                                        928, 656. 17

     Total cost of permanent work to June 30, 1942----------                                1, 750, 113. 59
Minus accounts payable June 30, 1942__---------------------------                                   587. 13

     Net total expenditures__-----------------------------                                  1, 749, 526.46
Unexpended balance June 30, 1942_ . - -_                                                        17, 797. 53

            Total amount appropriated to June 30, 19421_______________                        , 767, 323. 99

       Fiscal year ending June 30       1938          1939           1940           1941             1942

Cost ofnew work .---------- -     -    -       -      -       -      -        -                 -     -
Cost of maintenance-----------      97
                  ............$25,076.   $24, 740. 98   $32, 583. 57   $32, 663. 14                    018. 57
                                                                                                    $23,
                            _
Total expended .----------------       24, 915. 83   19, 691. 75    32, 757. 88   38, 433. 40        23, 029. 13
Allotted ---.--- -------------- --     42, 000. 00   40, 700. 00   35, 000. 00    21,000.00          15, 500. 00


Balance unexpended July 1, 1941                                                                 $25, 326. 66
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942-   -----------------------------------                                  17, 500. 00
      Amount to be accounted for____________________________                                     42, 826. 66
Deductions on account of revocation of allotment __-______   .___                                 2, 000. 00
     Net amount to be accounted for----__________                                               40, 826. 66
Gross amount expended ---__-...   __________________- ___                                       23,029. 13
      Balance unexpended June 30, 1942___ __--____      ____                                     17, 797.53
Outstanding liabilities June 30, 1942 ---
                                      _____-  -______ __   __-                                       587. 13
            Balance available June 30, 1942---------___------____                               17, 210. 40
Amount that can be profitably expended                        in fiscal     year ending
  June 30, 1944 for maintenance 122,                                                                 000. 00
   1   Exclusive of available funds.

                                    5. BRUNSWICK HARBOR, GA.

   Location.---The harbor entrance is 70 statute miles south of en-
trance to Savannah Harbor, Ga., and 25 statute miles north of
entrance to Fernandina Harbor, Fla. (See U. S. Coast and Geo-
detic Survey Chart No. 447.)
   Previous projects.--Adopted by River and Harbor Acts of July
4, 1836; August 5, 1886; June 3, 1896; and June 13, 1902. For
further details see page 1818 of Annual Report for 1915 and page
591 of Annual Report for 1938.
   Existing project.-This provides for a stone jetty 4,350 feet long
at the entrance to East River and for the following channels:
                   RIVERS     AND     HARBORS-SAVANNAH,                   GA.,    DISTRICT                555

  30 feet deep and 500 feet wide through the bar;
  27 feet deep and 400 feet wide at Brunswick Point;
  27 feet deep and 350 feet wide in East River;
  27 feet deep and 300 feet wide in Turtle River;
  24 feet deep and 150 feet wide in Academy Creek; and
  A cut from Academy Creek to Turtle River, if later decided advisable.
  A channel in Back River 20 feet deep and 150 feet wide from St. Simons
Sound to the mouth of Mill Creek.
  A channel in Terry Creek 10 feet deep and 80 feet wide from its mouth to a
point immediately above the wharf of the Glynn Canning Co.
  The channels provided for extend from the 30-foot contour in the
ocean across the bar through St. Simons Sound, Brunswick River
and Turtle River to the upper end of the Atlantic Refining Co.'s
wharf, 20.4 miles; from Brunswick River through East River
to the upper end of the project in Academy Creek, 2.7 miles; from
St. Simons Sound through Back River to Mill Creek, the upper end
of Back River improvement, 2.9 miles; from Back River through
Terry Creek to the upper end of the Glynn Canning Co.'s wharf,
1.8 miles; a total distance of 27.8 miles.
   All depths refer to mean low water. The mean tidal range on
the bar is 6.5 feet, at the city of Brunswick 7.3 feet, and at the
upper end of the harbor 7.6 feet, with minor fluctuations due to wind
and lunar effects.
   The estimated cost of new work, revised in 1938 (exclusive of
amounts expended on previous projects), is $2,242,800, including
$10,000 contributed by local interests. The latest (1938) approved
estimate for annual cost of maintenance is $156,700.
   The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                   Documents


Mar.     3,1879    Construction of East River jetty--------------      Annual Report 1880, p. 959.
Mar.     2, 1907   For channels in the inner and outer harbors of      H. DocNo. 407, 59th Cong., 1st sess.
                    30-foot depth at mean high water, with widths
                    varying from 150 feet in Academy Creek to 400
                    feet across the outer bar, extension of training
                    wall in East River, and construction of two
                    spur dikes.
Mar. 2,1919        Channels 27Ieet deep at mean low water over the     H. Doc. No. 393, 64th Cong., 1st sess.
                     bar anst   Brunswick Point; and 24 feet deep at
                     mean low water in the inner harbor, and pro-
                     vides for a cut from Academy Creek to Turtle
                     River, if deemed advisable.
                                                                                                            1
July     3, 1930   A channel in Back River 20 feet deep and 150 feet   S. Doc. No. 57, 71st Cong., 2d sess.
                     wide.
   Do..____        Increased channel dimensions of the bar, Bruns-     S. I)oc. No. 132, 71st Cong., 2d sess.l
                    wick Point, East River, and Turtle River, as
                     given in the existing project.
June 20, 1938      A 10-foot channel in Terry Creek------------ -- H. Doc. No. 690, 75th Cong., 3d sess.


1 Contain the latest published maps.


  Local Cooperation.-Fully complied with.
  Terminal facilities.-This improvement is served by 25 wharves
and piers (20 in East River, 2 in Turtle River and 3 in Terry Creek)
having a total berthing space of 9,191 feet. Four wharves are owned
556          REPORT      OF CHIEF OF ENGINEERS,                       U.     S. ARMY,              1942

by railroads and one is a small public wharf. The remainder are
privately owned. In a majority of cases the structures are of a pile
and timber construction. These facilities are considered ample for
existing commerce. (For further details see Port Series No. 10, Corps
of Engineers, revised 1940.)
   Operations and results during fiscal year.-U. S. pipe line dredge
Creighton operated on maintenance dredging of Terry Creek re-
moving 13,655 cubic yards of material at a cost of $1,795.36. Miscel-
laneous surveys were made at a cost of $4,633.08.
   The total cost was $6,428.44 all for maintenance. The total ex-
penditure was $6,262.59.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1939. Academy Creek was completed in 1926. Upper and
Lower Turtle River and Back River were completed in 1931. Bruns-
wick Point and East River were completed in 1932. Brunswick Bar
was completed in 1936. Terry Creek was completed in 1939. East
River training wall and spur dike are in satisfactory condition.
   The controlling depths, at mean low water, were as follows:

                                                                Project depth             Controlling             Date de-
                            Locality                               mean low             depth on center          termined
                                                                      water                  range

                                                                           Feet                  Feet
Bar --------------------------------------------------------                    30.0                    27.9     March 1942
Brunswick River:
    Cedar Hammock Range ...                   ...-------------- ---             27.0                    24.4     March    1942
    Brunswick Point Cut Range .........................                         27. 0                   27. 8    March    1942
East River----------             --         -                                   27.0                    22.5     March    1942
Academy Creek -----          -....--------------------                          24.0                    12. 5    July     1942
Lower Turtle River-------------------                                           27. 0                   26. 2    July     1942
Upper Turtle River---------              --------------------------             27. 0                   25. 3    March    1942
Back River ----------------------------------------------                       20.0                    10.4     July     1942
Terry Creek_ .... _ --------------------------
                                        ..                                      10.0                     4. 9    July     1942



  The costs and expenditures on the existing project to June 30
1942, were as follows:

                                                           Regular funds              funds orks
                                                                                   Public                        Total
                                                                                                                 Total


New work          __                                         $2, 123, 600. 29            $97, 520. 95          $2, 221, 121. 24
Maintenance-_-                                                2, 020, 491. 15              4, 995. 08           2, 025, 486. 23
      Total                            -       -             4, 144, 091. 44             102, 516. 03           4, 246, 607. 47
Expenditures---                                              4, 143, 391. 02             102, 516. 03           4, 245, 907. 05



  In addition, the total cost and expenditure from contributed funds
was $10,000 for new work.
  Proposed operations.- The balancd unexpended July 1, 1942,
$132,522.43 will be applied as follows:
                RIVERS              AND HARBORS-SAVANNAH,                            GA.1 DISTRICT                   557
Accounts payable July 1, 1942_  ----------------------------------      $700. 42
Maintenance:
    Dredging with U. S. hopper dredge Culebra in inner and outer
      harbor, 4 months between Nov. 1, 1942, and Feb. 28, 1943----- 129, 722. 01
    Dredging with U. S. pipe line dredge Creighton in Terry Creek,
      1/g month between July 1, 1942, and June 30, 1943------------- 2, 100. 00
             Total for all work-------------------------------------                                         132, 522. 43
  The additional sum of $115,000 can be profitably expended during
the fiscal year 1944 as follows:
      Dredging with U. S. hopper dredge Culebra in inner and outer
       harbor, 3 months between Jan. 1 and Apr. 1, 1944 ___----_         $112, 500
      Dredging with U. S. pipe line dredge Creighton in Terry Creek, 1/5
       month between July 1, 1943, and June 30, 1944----------------        2, 500

             Total for all work---------------------------------------                                          115, 000

                                                Cost and financial summary
Cost of new work to June 30, 1942------------------------- 1 $2, 864, 586. 42
Cost of maintenance to June 30, 1942----------------------- 2,079, 900. 30
     Total cost of permanent work to June 30, 1942----------                                              4, 944, 486. 72
Minus accounts payable June 30, 1942-------------------------                                                     700. 42
     Net total expenditures_-------------------------_                                         --      14,   943, 786.30
Unexpended balance June 30, 1942--------------- ---                                                          132, 522. 43
           Total amount appropriated to June 30, 1942-------------                                     15,076, 308. 73

   Fiscal year ending June 30                      1938           1939           1940           1941              1942


Cost ofnew workr_                                                              $23, 339. 42
Cost of maintenance                             $131,779.12         944.27
                                                                $101,           69, 253. 48   $55, 655. 50       $6, 428. 44

      Total cost           --           -        131, 779. 12   101, 944. 27    92, 592. 90    55, 655. 50        6, 428. 44

Total expended .      -.            -            120, 896. 30   101, 944. 27    92, 592. 90    55, 120. 93        6, 262. 59

Allotted                        -           -    223, 000. 00   140, 000.00     49, 339. 42    45,000.00         52,000.00



Balance unexpended July 1, 1941_                                                                             $86, 785. 02
Amount allotted from War Department Civil Appropriation Act
  app roved April 28, 1942__________________________--_                                                       52, 000, 00

      Amount to be accounted for__________-____________                                             -__      138, 785. 02
Gross amount expended_____________                                                                             6, 262. 59
       Balance unexpended June 30, 1942--        ______________                                              132, 522. 43
Outstlanding liabilities June 30, 1942_______________________ _                                                   700. 42
           Balance available June 30, 1942__ __________________--131, 822. 01

Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance 2---                                                                         115, 000. 00
  I2 InExclusive
          addition $10,000 contributed funds expended for new work.
                 of available funds.

                                                6. SATILLA RIVER, GA.

  Location.-This river has its headwaters in southern and south-
eastern Georgia, flows in a generally southeasterly direction, and
empties into the 4tlantic Ocean through St. Andrew Sound. (See
U. S. Geological Survey map of Georgia.)
           493202-43-pt. 1, vol. 1                     36
558           REPORT OF CHIEF OF ENGINEERS,                      U.   S. ARMY,         1942

    Existing project.-This provides for the removal of snags and
:similar obstructions from the mouth to Burnt Fort, a distance of 52
miles, and the removal of obstructions and the closing of incipient
cut-offs from Burnt Fort to Waycross, a distance of 114 miles. The
mean tidal range is 6.6 feet at the mouth and 3.2 feet at Burnt Fort,
with minor fluctuations due to wind and lunar effects. The freshet
variation at Waycross is about 12 feet.
    The original and latest approved estimate of cost, made in 1912,
was $20,000, divided equally between the two portions of the river.
The latest (1928) approved estimate for annual cost of maintenance
is $2,000.
    The existing project was authorized by the following river and
harbor acts:

       Acts                    Work authorized                                  Documents


.July 25, 1912    Improvement of river from the mouth to Burnt    H. Doc. No. 41, 62d Cong., 1st sess.
                    Fort.
Mar.     4,1913   Improvement of river from Burnt Fort to Way-    H. Doc. No. 1113, ,62d Cong., 3d sess.'
                   cross.



  1 Contains the latest published map of the upper section of the river. The latest published map of the
lower section of the river is the U. S. Coast and Geodetic Survey Chart No. 450.


   Terminal facilities.-Small wharves are located at five main load-
ing points, and in addition there are numerous natural landings
along the river. These facilities are considered .sufficient:'for exist-
ing commerce.
    Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1914. The controlling depths, as determined by a survey
made in June 1939, were as follows: The mouth to Owens Ferry,
.8.8 feet; Owens Ferry to Burnt Fort, 4.5 feet; thence to Waycross.
the head of navigation, about 1 foot. These depths are at ordinary
summer low water except in the tidal section from the mouth to
Owens Ferry, where the depth refers to mean low water. These
depths are practicable throughout the year.
    The costs and expenditures under the existing project to June 30,
1942, were $9,451.59-for new work and $33,939.81 for maintenance, a
total of $43,390.90.
   Proposed operations.-The balance unexpended July 1, 1942,
 (2,500) w ill be applied to snagging with U. S. snag boat No. 1, as
needed.
   It is not anticipated that any funds can be profitably expended
during fiscal year 1944.
                                  Cost and financial summary
,Cost of new work to June 30, 1942_ .-. _______ _____-__--__-                                $9, 451. 59
Cost of maintenance to June 30, 1942________________  __---_---                              33, 939. 31

          Total cost of permanent work to June 30, 1942-______------43,                           390. 90
Tet  total expenditures- _-_______-__-_______    _                                           43,390. 90
.Unexpended balance June 30, 1942_ ________________-----------                                2,500. 00
          Total amount appropriated to June 30, 1942-----------                              45, 890. 90
              RIVERS               AND HARBORS-SAVANNAH,                         GA.,       DISTRICT       559

   Fiscal year ending June 30             1938                1939            1940            1941     1942


Cost of new work---------------     -
Cost of maintenance ________________________            _ ______     __.     $3, 879. 76       --      -      -

Total expended   ---------------        .- ....-   --                         3, 879. 76-
Allotted                                                           $3, 900     -20. 24                     $2, 500


Amount" allotted from War Department Civil Appropriation Act
  approved April 28, 1942___________--------------------------------------- $2, 500.00
Balance unexpended June 30, 1942___------------ ------------------ 2, 500.00

                              7. ST. MARYS RIVER, GA. AND FLA.

   Location.-This river has its source in the Okefenokee Swamp and
flows, first in a southeasterly direction and then due north, thence in
a southeasterly direction, and empties into Cumberland Sound about
3 miles north of Fernandina, Fla. (See U. S. Geological Survey map
of Georgia.)
   Existing project.-This provides for a channel 17 feet deep at mean
low water with a width of 200 feet from the mouth to Crandall, 12.5
miles, and for clearing the channel of snags to Kings Ferry, 37 miles
above the mouth, and as much farther as may be practicable, for a
:sum of $5,000. The upper limit reached by this expenditure was
'Traders Hill, 59 miles above the mouth. The mean tidal ranges are
:as follows: At the mouth, 5.8 feet; at the Atlantic Coast Line Rail-
-way    bridge, 55 miles above the mouth, 1.4 feet, with minor fluc-
tuations due to wind and lunar effects. Freshet fluctuations on the
upper portions are about 10 feet.
    The original and latest approved estimate of cost of new work,
made in 1912, was $19,450. The latest (1915) approved estimate of
.cost for annual maintenance is $2,500.
    The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 697, 62d Cong., 2d sess.). The latest
published map is in the project document.
    Recommended modifications of project.-Reduction of project
depth from 17 to 14 feet from St. Marys to Crandall, is recommended
in House Document No. 467, Sixty-ninth Congress, first session.
    Terminal facilities.-At St. Marys, Ga., there is a 50-foot municipal
-wharf and several privately owned wharves, together with 446 feet
of wharf frontage in North River. Above St. Marys there are a
number of privately owned wharves and shore landings. These
facilities are considered ample for existing commerce.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1914. The controlling depths at mean low water, as de-
termined by a survey made in June 1939, were as follows: The mouth
to St. Marys (determined in July 1942), 15.1 feet; St. Marys to Kings
Ferry, 11.3 feet; Kings Ferry to the Atlantic Coast Line Railroad
bridge, mile 55, 5.6 feet; and Atlantic Coast Line bridge to Traders
Hill, mile 59 (the head of navigation), 4 feet. These depths are
practicable throughout the year.
    The costs and expenditures under the existing project to June 30,
1942, were $15,688.36 for new work and $52,765.46 for maintenance,
.a total of $68,453.82.
560       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                 1942

  Proposed operations.--The balance unexpended July 1, 1942, $2,500,
will be applied to snagging with U. S. snagboat No.1, as needed.

                                 Cost and financial summary
Cost of new work to June 30, 1942_----- _____---------------     $15, 688. 36
Cost of maintenance to June 30, 1942---------------------------- 52, 765. 46
        Total cost of permanent work to June 30, 1942______________                    68, 453. 82

Net total expenditures___
                        ----------------    --           _                             68, 453. 82
Unexpended balance June 30, 1942_  -----------------------------                        2, 500. 00
        Total amount appropriated to June 30, 1942______________                       70, 953. 82

   Fiscal year ending June 30       1938         1939        1940            1941          1942

Cost of new work
Cost of maintenance ---                                       629. 02--
                                                            $3,
Total expended------_
                  --       -__--- __ ---    --     --   _    3, 629.02-                           --

Allotted--------------------- --------------      $3, 900    -270. 98..$2,


Amount allotted from War Department Civil Appropriation Act
                        ------------
  approved April 28, 1942_              ----------------------                         $2, 500. 00
Balance unexpended June 30, 1942___________________________ _                           2, 500.00

                            8. FERNANDINA HARBOR, FLA.

   Location.-The harbor entrance is 221/2 statute miles north of the
entrance to Jacksonville Harbor, Fla., and 95 statute miles south of
the entrance to Savannah Harbor, Ga. (See U. S. Coast and Geodetic
Survey Chart No. 453.)
   Existing project.-This provides for two stone jetties at the harbor
entrance, the north jetty 19,150 feet long and the south jetty 11,200
feet long; for a channel 28 feet deep at mean low water from the
deep water in the Atlantic Ocean to deep water at the junction of
Lanceford Creek with Amelia River, with widths of 400 feet below
Calhoun Street in the city of Fernandina, and 300 feet above; and
for widening the channel at the first bend below Lanceford Creek to
1,000 feet to form a turning basin. The length of the section in-
cluded in the project is about 7 miles. The mean tidal range on the
bar is 5.8 feet and in the inner harbor 6 feet, with minor fluctuations
due to wind and lunar effects.
   The estimated cost of new work, revised in 1938, is $3,326,900. The
latest (1938) approved estimate for annual cost of maintenance is
$31,000.
   The existing project was authorized by the following river and
harbor acts:
                  RIVERS      AND HARBORS-SAVANNAH,                           GA.,    DISTRICT             561

       Act                         Work authorized                                      Documents



.June 14, 1880    Entrance jetties_ ___________________ _____________      Annual Report, 1879, p. 792.
July 13,1892      Raising and extending jetties so as to provide for       Annual Report, 1891, pp. 1565-1598;
                    19-foot depth.                                           Annual Report, 1896, p. 1289.
Mar.    2, 1907   Improvement of inner harbor to obtain depths of          H. Doc. No. 388, 59th Cong., 1st sess.
                    20 to 24 feet and channel widths of 400 to 600 feet.
June 25,1910      Combining improvement of Fernandina Harbor
                   and Cumberland Sound under the general head-
                   ing of "Fernandina Harbor."
Mar.    3, 1925   Provided for the 26-foot channel___         __           H. Doc. No. 227, 68th Cong., 1st sess.
June 20, 1938     Provided for the 28-foot channel and turning basin_ H. Doc. No. 548, 75th Cong., 3d sess.
                                                                       (Contains the latest published maps.)



  Recommended modifications of project.-Under date of March 20,
1941, the Chief of Engineers recommended modification of the existing
project so as to provide for reducing the maximum width of the turn-
ing basin -from 1,000 feet to 800 feet, shifting the southerly channel
line in this vicinity 50 feet northwesterly, and for including in the
authorized project at no additional cost the small area dredged by
Rayonier Inc. (H. Doc. 284, 77th Cong., 1st sess.).
  Local cooperation.-Fully complied with.
   Terminal facilities.-There are 16 wharves and piers (including a
nmunicipal wharf) having a total berthing space of 4,973 feet located
along the 2 miles of water frontage. The present facilities are con-
sidered ample for existing commerce. (For further details, see Port
and Terminal Facilities at the Ports of Fernandina, Fort Pierce
Harbor, Palm Beach, Fort Everglades, Miami, Key West, and Tampa,
Fla., 1941 Edition, Corps of Engineers).
   Operations and results during fiscal year.-A survey of the harbor
was made at a cost of $653.83. The total cost and expenditures were
$653.83.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1940. The two stone jetties were completed in 1905 and are
in need of repairs. The 28-foot channel in the outer harbor and in
the inner harbor and the turning basin were completed in 1940. Con-
trolling depths at mean low water, as determined in March and April
1942, were, 27.8 feet over the outer harbor, 30 feet over the inner har-
bor, and 26.2 feet in the turning basin.
   The costs and expenditures under the existing project to June 30,
1942, were $3,286,818.06 for new work and $751,586.44 for mainte-
nance, a total of $4,038,404.50.
   Proposed operations.-The balance unexpended July 1, 1942, $16,-
346.17, will be applied to maintenance dredging with U. S. hopper
dredge Culebra in the 28-foot channel of outer harbor, 1/2 month
during March 1943.
   It is not anticipated that any funds can be profitably expended
during fiscal year 1944.
562         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                        1942

                                      Cost and financial summary

Cost of new work to June 30, 1942_ ---    ___- _-      -                                          -___$3,           286, 818. 06
Cost of maintenance to June 30, 1942______--------______                                            ___-            751, 586. 44

         Total cost of permanent work to June 30, 1942_ ......                                         __     4, 038, 404. 50

Net total -expenditures------- -------------------------                                                      4, 038, 404. 50
Unexpended balance June 30, 1942    ________                                                                      16, 346. 17
         Total amount appropriated to June 30, 1942 _______-______                                            4, 054, 750. 67

    Fiscal year ending June 30             1938              1939                1940                 1941              1942


Cost ofnew work ....         .                                                 $97, 925. 91
Cost of maintenance              ___ __________         ______________              347. 33          $2, 500. 00          $653. 83
      Total cost._____     ____________________ _________           ___         98, 273. 24           2, 500.00            653. 83
Total expended______________________________                                    98, 273. 24           2, 500.00            653.83
Allotted ...........................--------------
          -------------------                                $138,000                         -    -20, 226. 76



Balance unexpended July 1,1941______________ __________                                                             $17, 000.       00
Gross amount expended-----_______-6________________-                                                                     653. 83
         Balance unexpended June 30, 1942_                               ___            ________-16, 346. 17

     9. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

   The cost of work during the year amounted to $34,670.56. The ex-
penditures were $32,827.21. The balance unexpended June 30, 1942,
$72,126.75, together with an additional allotment of $20,000, which has
been requested, will be applied as needed during the fiscal year 1943
to payment of expenses incurred under this heading. The additional
sum of $30,000 can be profitably expended during the fiscal year ending
June 30, 1944.
                                      Cost and financial summary
Cost of new work to June 30, 1942__
Cost of maintenance to June 30, 1942_________________________                                                      $420, 927. 22
      Total cost of permanent work to June 30, 1942______________                                                   420, 927. 22
Minus accounts payable June 30, 1942 _______________________                                                          3, 730. 32'
      Net total expenditures  --------------------------------                                                      417, 196. 90
Unexpended balance June 30, 1942_______________________________                                                      72, 126. 75

         Total amount appropriated to June 30, 1942----------------489,                                                 323. 65

   Fiscal year ending June 30              1938              1939                1940                 1941              1942

Cost ofnew work                       -
Cost of maintenance-     __._._...
                             .     $30, 747. 93           $35, 216. 15         $38, 218. 29         $71, 128. 12       $34, 670. 56
Total expended.----.--     ------         28, 653. 17      34, 670. 10          42, 052. 83          68, 871. 58        32, 827. 21
Allotted----------------------53, 000. 00                  38, 100. 00         169, 300. 00          17, 500. 00               --

   1 In addition, $1,800 contributed funds expended for beach-erosion study at St. Simon
Island.
                  RIVERS AND HARBORS-SAVANNAH,                                    GA.,      DISTRICT                      563
Balance unexpended July 1, 1941------------------------------_                                                   $104, 953.96.
Gross amount expended_ _--           -__-_ -___--           ---                            _____ --                32, 827. 21
      Balance unexpended June 30, 1942------------------------                                                      2, 126. 75
Outstanding liabilities June 30, 1942_----------------------                                                        3, 730. 32

          Balance available June 30, 1942___                                                                       6----------------------------
                                                                                                                    8, 396. 43

Amount that can be profitably expended in fiscal year ending June 30,
1944 for maintenance 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -       -
                                                                                                                   30, 000. 00
     2 Exclusive of available       funds.

10. OTHER PROJECT'S FOR WHICH NO ESTIMATES ARE SUBMITTED

                                                             For last      Expenditures to June 30,                Estimated
                                                           full report              1942                             amount
                     Name of project                      see Annual
                                                                                                                   required to
                                                             Report                                                 com
                                                              for-        New work          Maintenance             complete


1.   Savannah River at Augusta, Ga.l                          1929       2 $200, 556. 30          $17, 443. 70     Completed.
2.   Savannah River above Augusta, Ga.l 3_.......             1929           69, 599. 99            5, 870.01      (4).
3.   Sapelo Harbor, Ga.l3 3                                   1929           17, 905. 73           17, 094. 27     Completed.
4.   Darien Harbor, Ga.                                       1929        6 199, 722. 65           42, 343. 28        * Do.
5.   Fancy Bluff Creek, Ga.*6-                 -              1935            8, 000. 00            4, 200. 00          Do.

   1 Project recommended for abandonment in H. Doc. No. 467, 69th Cong., 1st sess.
  2 In addition, $185,000 was expended from contributed funds: $172,150.72 for new work and $12,849.28
for maintenance.
  3 No commerce reported.
  4 About 84 percent completed. Owing to construction of 2 power dams which have submerged much of
the work under the present and former projects, this improvement cannot be completed as originally
planned.
  6 Channel adequate for commerce.
  6 Includes $54,929.44 expended on Doboy Bar.

                  11. PLANT ALLOTMENT, SAVANNAH, GA., DISTRICT

                                       Cost and financial summary

Undistributed costs June 30, 1942-------------------------------                                                 $793, 430. 31

Net total cost to June 30, 1942----------------------             793, 430. 31
Plus accounts receivable June 30, 1942--------------------------307, 835. 42

     Gross total costs to June 30, 1942----------------------   1, 101, 265. 73
Minus accounts payable June 30, 1942---------------------------     58, 065. 61

     Net total expenditures                                                                                  , 043, 200. 12
                                                                                                            1----------------------------------
Unexpended balance June 30, 1942 ------------------------------                                               -48, 844. 32
          Total amount appropriated to June 30, 1942                                        ---                   994, 355. 80

     Fiscal year ending June 30              1938            1939             1940                  1941               1942

Total expended----------------$80, 959. 76 -$501,604. 78                  $235, 296. 00      $167, 904.01           $124,092. 66
Allotted_-    --------   _92,                  392. 82   -544, 079. 59     157, 564. 47           175, 369. 30         21,874. 09
564            REPORT OF CHIEF OF ENGINEERS,                                 U. S. ARMY,                    1942

Balance unexpended July 1, 1941 -.    _._____                                                                       $53, 374. 25
Amount allotted from War Department Civil Appropriation Act
  approved June 28, 1939 _______-  --                                                                                66, 858. 01

      Amount to be accounted for-----------__   ---------------                                                    120, 232. 26
Deductions on account of revocation of allotment-----------------                                                   44, 983. 92

      Net amount to be accounted for ----------                                                                      75, 248. 34
Gross amount expended .........-                                                  $1,553,801.93
Less reimbursements collected----------------                                      1, 429, 709. 27
                                                                                                                   124. 092. 66

      Balance unexpended June 30, 1942_________                                          S-   --                  -48,   8, 4.32
Outstanding liabilities June 30, 1942_____________                                                 _ _- _           193, 658. 83

      Balance available June 30, 1942_                                             -_-_-_-              -_        -242,503.15
Accounts receivable June 30, 1942    _______                                                                       307, 835. 42

          Unobligated balance available June 30, 1942                                                ----            65,332.27
Status of all investigations for navigation called for by river and harbor acts and
                               committee resolutions'

                                                                 Date trans-                                       Recommenda-
             Locality                     Authorization act      mitted to             Document
                                                                  Congress               No.                           tion
       ---- ----        ----    ,   --       ----    ----




Altamaha (lower) River                   Rivers and Harbors      Feb.   4, 1942   House 610, 77th                  Favorable.
  and Darien Harbor, Ga.,                  Committee resolu-                       Cong., 2d sess.
  improvement of Rifle Cut.               tion, Feb. 28, 1941.
Charleston, S. C., to St.                Rivers and Harbors      Dec.   9, 1941     - -- - - - - - - - - -         Unfavorable.
  Johns River, Fla., Intra-                Committee resolu-
  coastal Waterway, con-                  tion, May 8, 1939.
  struction of anchorage
  basin at Beaufort, S. C.
St. Marys River, Ga. and             Sec. 1 of River and
  Fla., for navigation, flood          Harbor Act, Jan.
  control, power and irriga-           21, 1927.
  tion (308 report).
Savannah Harbor, Ga- -....           Rivers and Harbors
                                       Committee resolu-
                                       tion, Nov. 4, 1939.
Savannah River, Ga., from            Rivers and Harbors
  Kings Island to the Coast-           Committee resolu-
  al Highway Bridge.                   tion, Oct. 28, 1937.
Savannah River, Ga. (sup-            Sec. 6 of River and
  plemental 308 report).               Harbor Act, Aug.
                                       30, 1935.



12. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL

     The cost of work during the fiscal year was $79,927.98; the expendi-
tures were $43,777.33. The balance unexpended June 30, 1942, $99,-
467.65 plus the sums of $30,000 allotted in July 1942 and $700 allotted
in August 1942 will be applied to payment of expenses incurred under
this heading.
                                            Cost and financial summary
Cost of new work to June 30, 1942_____________-----------
Cost of maintenance to June 30, 1942 __._____       -
                                                    ____----- -                                                   $143, 678. 15
      Total cost of permanent work to June 30, 1942__--__--_---   143, 678. 15
Minus accounts payable June 30, 1942   -------------------------- 39, 345. 80
     Net total expenditures___          ____  _____----__                                                    _-    104, 332. 35
Unexpended balance June 30, 1942 _.....__________--_----                                                            99, 467. 65
         Total amount appropriated to June 30, 1942 ____-                                _____         __          203, 800. 00
                RIVERS        AND HARBORS-SAVANNAH,                                  GA.,       DISTRICT                             565,

    Fiscal year ending June 30             1938              1939                 1940                     1941                   1942


C ost of new work- - - - - - - -         - - - - - - - - - - . - - - - - . - - -- - .                                      . .      . . .
Cost of m aintenances _....... .          $5, 055. 12 $15, 317. 73 $22, 387. 10 $20, 990. 22                                     $79, 927. 98

Total expended_------------------4, 775. 34                 15, 272. 66          19, 531. 46             20, 975. 56              43, 777. 33

Allotted__________________-___            29, 200. 00       53, 000.00      --                           19, 100. 00             102, 500. 00



Balance unexpended July 1, 1941--------------------------------                                                          $40, 744. 98
Amount allotted from War Department Civil Appropriation Act ap-
  proved May 23, 1941__ ____ ______-                     -___                                                            102, 500. 00'

      Amount to be accounted for                                                                                          43, 244. 98,
                                                                                                                         1------------------------------
Gross amount expended    ____    __--------                                                                               43, 777.33

      Balance unexpended June 30, 1942__---------------------                                                             99, 467. 65
Outstanding liabilities June 30, 1942___-___-__-- ______-----                                                             39, 345. 80

     Unobligated balance available June 30, 1942__                                                             -          6_______----
                                                                                                                          60, 121. 85
Amount allotted in July and August 1942 ___________---                                           _____               -    30, 700. 00

         Amount available during the fiscal year 1943----------------                                                     90, 821.85

13. OTHER FLOOD-CONTROL PROJECTS FOR WHICH NO ESTIMATES
                      ARE SUBMITTED

                                                         For last full      Cost and expenditures to                       Estimated
                                                        report see An-           June 30, 1942                              amount
                 Name of project                         nual Report                                                      required to
                                                            for-            New work            Maintenance                 complete


1. Clark Hill project on the Savannah River,
     Ga. and S. C.     _-. .  .    .      .             .     .       .      .     .       ..        .............          1 $1, 700, 000
2. Augusta, Savannah River, Ga     ----------                1941            $642, 646. 88                                      (2)


  1 For reimbursement to local interests for lands and damages. Authorized by Flood Control Act approved
June 28, 1938. No requests for reimbursement have yet been made by local interests.
  2Completed.

Status of all investigations for flood control called for by flood-control acts and
                              committee resolutions

                                                                          Date trans-          Document
              Locality                     Authorization act               mitted to             No.                 Recommendation
                                                                           Congress

Altamaha River, Ga_____________          Flood Control Act,
                                           June 22, 1936.
Ogeechee River, Ga _-          ...           do ..          --.-                      -        ---
St. Marys River, Ga. and Fla., for       Sec. 1 of tsiver and
  navigation, flood control, power         Harbor Act, Jan. 21,
  and irrigation (308 report).             1927.
Savannah River, Ga       ______.......   Flood Control Act,
                                           June 22, 1936.
Savannah River, Ga.         (supple-     Sec. 6 of River and
  mental 308 report).                      Harbor Act, Aug. 30,
                                           1935.
566       REPORT OF CHIEF OF ENGINEERS,                  U.   S. ARMY,    1942

   IMPROVEMENT OF RIVERS AND HARBORS IN THE
          JACKSONVILLE, FLA., DISTRICT
   This district comprises a portion of central southern Georgia and
all of Florida except the northwestern part and a small northeastern
portion embracing the watersheds tributary to the Atlantic Ocean
and the Gulf of Mexico from the harbor at Fernandina, Fla., ex-
clusive, to and including the Aucilla River. It includes the sections
of the Intracoastal Waterway from Fernandina (Cumberland Sound
to St. Johns River section) to Florida Bay, and the waterway across
southern Florida via St. Lucie River and Canal, Lake Okeechobee, and
the Caloosahatchee Canal and River.
   District engineer : Col. W. C. Weeks, Corps of Engineers, to October
1, 1941; Lt. Col. A. G. Viney, Corps of Engineers, acting district engi-
neer to November 18, 1941, and district engineer since that date.
   Division engineer: Col. J. S. Bragdon, Corps of Engineers.
                                         IMPROVEMENTS

                Navigation                              Navigation-Continued
                                          Page                                       Page
1. Waterway between Beaufort,                 13. Charlotte Harbor, Fla ____         607
       S. C., and St. Johns River,             14. Tampa Harbor, Fla_______           609
      Fla. (Cumberland Sound to                15. St. Petersburg IHarbor, Fla__      614
      St. Johns River section) ___         566 16. Withlacoochee River, Fla__....     616
2. St. Johns River, Fla., Jack-
                                           569 17.
      sonville to the ocean__ ..                   Removing the water hyacinth
3. St. Johns River, Fla., Palatka                    from navigable waters in
      to Lake Harney_                      573        the State of Florida __ .       618
4. Cross-Florida barge canal___           575 18. Examinations, surveys, and
5. Oklawaha River, Fla .......            576        contingencies (general) __      621
6. Intracoastal Waterway from                 19. Other projects for which no
      Jacksonville, Fla., to Miami,                   estimates are submitted___      622
      Fla ------------------               579 20. Plant allotment ___ _____          623
7. St. Augustine Harbor, Fla___           584
8. Fort Pierce Harbor, Fla ....           588               Flood control
9. Lake Worth Inlet, Fla__ .              590
10. Hollywood Harbor (Port Ev-                 21. Snagging and clearing under
      erglades), Fla_____n.....            593
11. Miami Harbor             (Biscayne                authority of sec. 2 of the
      Bay), Fla ...............            595        Flood Control Act approved
12. Caloosahatchee River and                          Aug. 28, 1937, as amended_      625
      Lake Okeechobee drainage                 22. Preliminary examinations and
      areas, Fla___--_-----                598        surveys for flood control___    626

1. WATERWAY BETWEEN BEAUFORT,. S. C., AND ST. JOHNS RIVER,
    FLA. (CUMBERLAND SOUND TO ST. JOHNS RIVER SECTION)

   Location.-This section includes that portion of the Intracoastal
Waterway between the southerly limit of Fernandina Harbor, Fla.,
at the junction of Lanceford Creek and Amelia River, and the St.
Johns River, Fla. (See U. S. Coast and Geodetic Survey Charts
Nos. 841, 842, and 577.) (For Beaufort, S. C., to Cumberland Sound
section, see p. 548.)
   Previous projects.-The first project for the improvement of this
section of the waterway was authorized by the River and Harbor
Act of May 23, 1828, and modified by River and Harbor Act of June
23, 1874. For further details see Annual Report for 1915, page 1823,
and Annual Report for 1938, page 605.
           RIVERS AND HARBORS-JACKSONVILLE,                               FLA.,     DISTRICT          567
    Existing project.-This provides for dredging and maintaining a
channel 12 feet deep, with widths of 90 feet in land-cuts and narrow
streams and 150 feet in open waters, following in general the aline-
ment of the existing waterway from Fernandina Harbor to St. Johns
River, a distance of about 25 miles, and with a cut-off in Kingsley
,Creek just north of the Seaboard Air Line Railway bridge, with
such additional cut-offs or other changes in the adopted route as may
be found desirable and justified by the resultant benefits to naviga-
tion. The mean range of tide is 6 feet at Fernandina and 4 feet in
the St. Johns River, with fluctuations from 1.5 to 2.5 feet, due to
winds and lunar phases.
    The estimate of cost of new work, revised in 1938, is $261,000,
exclusive of amounts expended under previous projects. The latest
 (1938) approved estimate for annual cost of maintenance is $13,000.
    The existing project was authorized by the following river and
harbor acts:

    Acts                      Work authorized                                    Documents


Mar. 4,1913    For a channel 100 feet wide and 7 feet deep.-...     H. Doc. No. 898, 62d Cong., 2d sess.
June 20,1938   For a channel 12 feet deep with present authorized   H. Doc. No. 618, 75th Cong., 3d sess.t
                widths and including a cut-off in Kingsley
                 Creek, subject to the provision of additional
                cut-offs or changes in routing upon the approval
                of the Secretary of War.


  1Contains the latest published maps.

   Local cooperation.-Fully complied with.
   Terminal facilities.-Exclusive of terminal facilities reported for
Fernandina Harbor, there are no terminals along this waterway.
   Operations and results during fiscal year.-Dredging by contract
to deepen the waterway to 12 feet, 90 feet wide in approximately 18,130
linear feet of land cuts and narrow streams and 150 feet wide in about
.54,260 linear feet of open waters, which was in progress at the begin-
ning of the fiscal year, was completed September 17, 1941. During
the period 789,054 cubic yards of material were removed.. Special
surveys and inspections of oyster leases were made by hired labor in
connection with dredging operations with a view to keeping the dam-
ages that might result to oyster beds to a minimum, and to determine
the extent of such damages if any. The costs were $60,501.25 for new
work. Periodic examinations to determine the condition of the chan-
nel were made by hired labor at a cost of $276.67 for maintenance.
The total cost was $60,777.92. The expenditures were $83,077.40.
   Condition at end of fiscal year.-The existing project was completed
in 1941. The waterway was last examined at the intersection with
St. Johns River in June 1942, and throughout in April 1942. A chan-
nel 12 feet deep and 90 feet wide existed throughout, except at a shoal
located 850 feet north of Sisters Creek Bridge where a depth of 12
feet was available in the westerly 75 feet of the 150-foot channel. The
costs of the existing project have been $264,283.45 for new work and
$46,634.44 for maintenance, a total of $310,917.89. The expenditures
have been $310,847.37.
568         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                        1942

  Proposed operations.-The balance unexpended on July 1, 1942
($291.48), together with allotments of $80,000 received during July
1942, a total of $80,291.48, will be applied as follows:
Accounts payable June 30, 1942______---------_-------___---- __         - $70. 52
Maintenance:
    Reconstruction, during July and August 1942, of east approaches,
      by hired labor and U. S. derrickboat D-1, in collaboration
      with the owners of railway and highway bridges over Kingsley
      Creek, to permit widening of waterway to reduce velocity of
      tidal currents at navigation passes-----------------------25,       220. 96
    Dredging, by contract, during September and October 1942, to pro-
      vide overdepth at critical locations and easing of bends as re-
                                              ---- __-------
      quired to improve navigation conditions__      _---_            55, 000. 00

            Total for maintenance_ _----                    ____-----_          ________-___-                        80, 291. 48
  The additional sum of $18,000 can be profitably expended during
the fiscal year 1944 in maintenance dredging during July 1943 with the
U. S. dredge Congaree, removing shoals throughout the project as
required.
                                       Cost and financial summary
Cost of new work to June 30, 1942____-- ----    -------                                                            $361, 849. 00
Cost of maintenance to June 30, 1942--------------------------                                                       46, 634.44
      Total cost of permanent work to June 30, 1942                                 -------------                  408, 483. 44
Minus accounts payable June 30, 1942._____________________-___                                                           70. 52
     Net total expenditures___   -------------------------------                                                    408, 412. 92
Unexpended balance June 30, 1942_ _-_    --               -----                                                          291. 48

         Total amount appropriated to June 30, 1942-_____--                                          ___--          408, 704. 40f

   Fiscal year ending June 30               1938                 1939              1940               1941               1942


Cost of new work      .               ___ ________    _ .. __________       _   $14, 459:85         $88, 541. 27        $60, 501. 25,
Cost of maintenance --------         --------        - - -------        - ---    -276.                                            67
      Total cost ..___      ________ __          . ... _.... .
                                          ___________              . . ..         14, 459.85         88, 541.27          60, 777.92"

Total expended ....       _____                                                   14, 378. 79        66, 252. 33         83, 077. 40

Allotted............------------------------                     $160, 000      -75, 000. 00         60, 000. 00         19, 000. 00'



Balance unexpended July 1, 1941--    -------------------------   $64, 3(8. 88
Amount allotted from War Department Civil Appropriation Act ap-
  proved June 24, 1940--------------       ---------------------  28, 00. 00

      Amount to be accounted for_           _-----------------------                                                 92, 368. 88
Deductions on account of revocation of allotment__________________                                                    9, 000. 00

      Net amount to be accounted for-      -                                         -            -         _        83, 368. 88
Gross amount expended__--------------------------                                               $83, 365. 61
Less reimbursements collected_------------------------                                               288. 21
                                                                                                                     83, 077. 40

      Balance unexpended June 30, 1942__________---------                                                                291. 48
Outstanding liabilities June 30, 1942____________------------------------------                                           70. 52
         Balance available June 30, 1942----------------------------                                                     220. 96
Amount that can be profitably expended in fiscal year ending June 30,
                                         _
   1944, for maintenance        _____                               __ __                                     _ 18, 000. 00
  ' Exclusive of available funds.
        RIVERS   AND HARBORS-JACKSONVILLE,         FLA.,   DISTRICT   569
      2. ST. JOHNS RIVER, FLA., JACKSONVILLE TO THE OCEAN

   Location.-This river rises in the marshes of Brevard County, Fla.,
near the east coast, and flows northwestwardly to Jacksonville, thence
eastwardly into the Atlantic Ocean, 122 miles south of Savannah
River. Its total length is about 285 miles. (See U. S. Coast and
Geodetic Survey Charts Nos. 577 and 1243.)
   Previous projects.-Six appropriations for surveys and experimental
'dredging on the bar were made from 1852 to 1878. The first project
for permanent improvement was adopted by the River and Harbor
Acts of June 14, 1880, and June 3, 1896. For further details, see page
1823, Annual Report for 1915, and page 607, Annual Report for 1938.
   Existing project.-This provides for a channel 30 feet deep at local
mean low water from the ocean to Jacksonville, the width to be in
general 300 feet in the straight reaches, increasing to as much as 600
feet at the bends and through jetties, 1,200 feet at Dames Point, and
400 feet in Drummond Creek Cut, Trout Creek Cut, and Long Branch
(formerly Six Mile Creek) Cut, with greater easing of the bends be-
tween these three cuts. The project also provides for an anchorage
basin at Mayport (33/4 miles from the entrance) 800 feet in width be-
yond the channel limits; for a channel 400 feet wide and 30 feet deep
along the terminals on the west bank of the river between Commodore
Point and deep water just above Long Branch Cut; for a depth of 24
feet at mean low water between the 24-foot curve and the pierhead
line at Jacksonville, from the Florida East Coast Railway bridge to
Hogan Creek; and for the construction of training walls and revet-
ments.
   Two converging rubblestone jetties built at the entrance under a
previous project, are maintained under the existing project. The
north jetty is 14,300 feet long and the south jetty is 11,183 feet long.
The jetties are parallel and 1,600 feet apart for a distance of 4,022
feet from the sea ends. Stone training walls have been built at seven
localities, involving about 7 miles of this class of structure. Stone
revetments at five localities provide about 3.5 miles of shore protec-
tion. The training walls and revetments are located between Dames
Point and Wards Bank, near the inner ends of the jetties.
   The length of section included in the project is 28 miles. The mean
tidal range is 5.3 feet on the bar, 4.5 feet at Mayport, 2.6 feet at Dames
Point (14 miles above the entrance), and 1.1 feet at Jacksonville. The
:spring range is about 7.4 feet on the bar, 5.3 feet at Mayport, 3.0 feet
at Dames Point, and 1.3 feet at Jacksonville (Newnan Street). Strong
northeasterly winds raise the water level about 2 feet at Mayport and
Jacksonville. Strong southwesterly winds lower the water about 11/2
feet at Mayport and 1 foot at Jacksonville.
   The estimate of cost for new work, revised in 1937, was $5,270,000,
exclusive of amounts expended on previous projects. The latest (1942)
approved estimate for annual cost of maintenance is $365,000.
570           REPORT OF CHIEF OF ENGINEERS,                             U. S. ARMY,         1942

  The existing project was authorized by the following river and
harbor acts:

       Acts                       Work authorized                                     Documents


Mar. 2,1907       A depth of 24 feet at mean low water between the      H. Doe. No. 663, 59th Cong., 1st sess.
                   24-foot curve and the pierhead line at Jackson-
                   ville.
June 25,1910      Main channel, 30 feet deep at mean low water, and     H. Doc. No. 611, 61st Cong., 2d sess.
                   in general 300 feet wide, the anchorage basin op-
                   posite Mayport, and training walls and revet-
                   ments, all subject to modification in detail by
                   the Chief of Engineers.
June     5,1920   Present project effected by the consolidation of      Specified in act.
                   former projects.
July 3, 1930      Widening the bend at Dames Point-------------
                                                         __             H. Doec. No. 483, 70th Cong., 2d sess.
Aug. 30,1935      Widening Drummond Creek, Trout Creek, and             Senate committee print, 74th Cong.,
                   Six Mile Creek cuts to 400 feet, and a channel         1st sess. (Contains latest published
                   30 feet deep and 400 feet wide along the terminals     maps.)
                   at Jacksonville.



   Recommended modifications of project.-Under date of April 25,
1941, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for maintenance of channel widths as
they now exist, and, subject to the revision of harbor lines proposed
by the division engineer, for further improvement as follows: (a)
Widen Terminal Channel between its present westerly edge and the
new pierhead-bulkhead line to a depth of 30 feet; (b) dredge to a
depth of 28 feet the area between the foot of Laura Street and the
Duval County Highway Bridge; (c) dredge a navigation and flood-
way channel 200 feet wide and 26 feet deep along the south side of
the Commodore Point Terminals, terminating in deep water at each
end; and (d) dredge an approach and mooring basin 20 feet deep,
1,300 feet long at the 20-foot-depth contour, and 600 feet long at the
pierhead line in front of the Naval Reserve Armory in South Jack-
sonville; all substantially in accordance with the plan contained in
the report of the division engineer, at an estimated first cost of
$725,000, with $8,000 annually for maintenance, in addition to the
amount now required, subject to certain conditions of local coopera-
tion (H. Doc. No. 322, 77th Cong., 1st sess.).
   Terminal facilities.-There are 56 piers and wharves to serve the
water-borne commerce of the port. These piers have a combined
berthing space of approximately 41,700 feet, with depths varying
from 31 feet at the larger terminals to a few feet at the inner ends
of the slips and barge berths. The Jacksonville Municipal Terminals
at Talleyrand Avenue consist of three piers. There are 30 other piers
and wharves for handling general freight and private commodities,
7 of which are open to the public. All have railway and highway
connections except 17 of the privately owned piers, which have high-
way connections only. Of the remaining piers, 8 are used in con-
nection with shipyards and marine repair plants, 6 for moorings,
including 2 for recreational craft, and 11 for various commercial pur-
poses. The facilities are considered adequate for existing commerce.
 (See Port Series No. 8, pt. 1, revised 1936, Corps of Engineers.)
           RIVERS AND               HABORS--JACKSONVILLE,                            FLA.,        DISTRICT        571
   Operations and results during fiscal year.-Maintenance dredging
by contract for restoration of project dimensions between the upper
end of Drummond Creek Cut and the inner end of Bar Cut was com-
menced February 16 and temporarily suspended May 21, 1942, in
order to perform urgent dredging at another locality for the United
States Maritime Commission. The work was approximately 59 per-
cent completed at the close of the fiscal year. There were removed
1,545,700 cubic yards of material at a cost of $243,713.37.
   The U. S. hopper dredge San Pablo was engaged in maintenance
dredging to a depth of 30 feet in Bar Cut and in Terminal Channel
from July 31 to October 11, 1941, when work was discontinued. There
were removed 325,106 cubic yards, place measurement, of material,
at a cost of $57,179.85. Periodic examinations and surveys by hired
labor to determine the condition of the improvement cost $10,546.58.
   The costs for the year were $311,439.80 for maintenance. The ex-
penditures were $290,690.84.
   Condition at end of fiscal year.-The existing project was completed
in 1937. The jetties, completed in 1904 under a previous project, have
been maintained under the existing project. All training walls and
revetments at present considered necessary were completed in 1927.
The inner end of the north jetty has been capped with concrete for a
distance of about 3,555 linear feet, and the easterly end of the Wards
Bank training wall has been revetted with granite riprap. Material
dredged in the vicinity of the westerly end of Bar Cut and deposited
adjacent to and on the north side of the north jetty, in the vicinity of
the Fort George Inlet encroachment, has effectively protected this
structure. The jetties are in good condition except at isolated loca-
tions where capstone has been displaced by sea action and that erosion
at the inner end of the north jetty, shoreward of the existing mono-
lithic concrete capping, has become so pronounced that extension of the
capping shoreward about 800 feet is desirable, in order to prevent the
wave-washed sand through the eroded section of the jetty from enter-
ing the adjacent ship channel. Revetments and training walls are in
good condition except as follows: The Browns Creek revetment is in
poor condition; the Dames Point training wall is in fair condition;
the revetment at Wards Bank training wall is in fair condition except
that the seaward end has been undermined and that the inner end
needs to be extended about 1,600 feet upstream.
   Project depth of 30 feet at local mean low water, with bottom widths
of 400 feet or more, existed in June 1942, except at the localities listed
below which had controlling dimensions as follows:

                                            Locality                                                   Depth     Width

                                                                                                        Feet      Feet
Bar Cut ...............        _._........_                             ..                 -29.             1       1450
W hite Shells Cut------     -- -------      ----------       -   ----                                    28.3          100
Fulton Cut --------- -----.--                       ------               . .   .-.                --     30.0         100
Drummond Creek Cut         ..--------   _- _ --------------
                                                        _-_-_           _                                30.0         350
Long Branch Cut                          _----_-_-__                                                     30.0         200
Arlington Cut -------- -           .--- ----------- ---- __ _                        ---                 27. 5        100
Terminal Channel ... .. .      .      . . . . ..--.----------------
                                                                 _- ...                                  28.0         200

  1 Southerly 450 feet of the 800-foot channel.


  The project depth of 24 feet between the 24-foot contour and the
pierhead line from the Florida East Coast Railway bridge through
572             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                  1942

Hogan Creek exists. The total cost of the existing project to June
30, 1942, all funds, has been $14,390,603.58, of which $5,259,724.45,
including $290,013.37 Public Works funds, was for new work, and
$9,130,879.13 for maintenance. The expenditures have been $14,371,-
047.29, including $290,013.37 Public Works funds.
  Proposed operations.-The balance unexpended and accounts re-
ceivable on July 1, 1942 ($299,142.64), will be applied as follows:
Accounts payable June 30, 1942 ------------------------------- $26, 898. 36
:Maintenance:
    Completion, under an existing contract, about Nov.
       1, 1942, dredging to restore project dimensions
       between upper end of Drummond Creek Cut
       and inner end of Bar Cut________________ __ $217, 000. 00
    Dredging, with U. S. hopper dredge San Pablo, to
       remove shoals in Bar Cut between the jetties,
       2 months, October and November 1942 ..... __-- 40, 700. 00
    Miscellaneous    surveys, inspections, and    con-
       tingencieS_-- -------------------------         14, 544. 28
                                                                                                                 272, 244. 28

                Total for maintenance-----------------------------                                               299, 142. 64
   The additional sum of $177,000 can be profitably expended during
the fiscal year 1944 as follows:
-Dredging, with U. S. hopper dredge San Pablo, at entrance and removal
  of spot shoals, throughout the project, 6 months, July 1943 to De-
  cember 1943__-----        --------------------------------------     $132, 000
-Repair, by extending shoreward between stations 5030 and 4230 mono-
  lithic concrete cap at inner end of north jetty. Work to be executed
  by leased plant and hired labor during July to September 194 ___-.      45, 000

            Total for maintenance-___ ___-_-____                                                   __------         177, 000

                                                   Cost and financial summary
-Costof new work to June 30, 1942-----------------------$8,   779, 861. 84
Cost of maintenance to June 30, 1942____________------_     9,674, 277. 65

      Total cost of permanent work to June 30, 1942                                                         8, 454, 139. 49
                                                                                                           1----------
Plus accounts receivable June 30, 1942 _____    ____------------                                            -     7, 342. 07

       Gross total costs to June 30, 1942--______                                                        461, 481. 56
                                                                                                     1----------18,
2Minus accounts payable June 30, 1942.       _______                                          ____-----26, 898. 36

     Net total expenditures_-----------------------------                                                  18, 434, 583. 20
Unexpended balance June 30, 1942----------------        -----                                                  291, 800. 57

             Total amount appropriated to June 30, 1942----------                                          18, 726,383. 77

        Fiscal year ending June 30                    1938            1939           1940           1941             1942

Cost of new work_                                   $53,783.45
Cost of maintenance-.............                   131, 090. 43   $218,484.45    $130,588.77     $182,302.41      $311,439.80
          Total cost          -   -        -        184, 873.88    218, 484.45    130, 588. 77    182, 302. 41      311, 439.80
Total expended-----------___                        294, 358. 06   209, 793. 68   132, 640. 58    181, 146. 52      290, 690. 84
Allotted _-      .-- ----------       --       -    292, 000. 00   200, 000. 00    195, 552. 41    68, 000. 00      455,000. 00
         RIVERS AND HARBORS-JACKSONVILLE,                 FLA.,   DISTRICT      573
Balance unexpended July 1, 1941_----------------------                  $127, 491. 41
Amount allotted from War Department Civil Appro-
  priation Act approved June 28, 1939--------------       $9, 963. 28
Amount allotted from War Department Civil ,Appro-
  priation Act approved June 24, 1940-_                  277, 024. 94
Amount allotted from War Department Civil Appro-
  priation Act approved May 23, 1941_________               011. 78
                                                          558,
Amount allotted from War Department Civil Appro-
  priation Act approved Apr. 28, 1942_____________       110, 000.00
                                                                         455, 000. 00

      Amount to be accounted for------------------------------582, 491. 41
                                     -
Gross amount expended_ _________-------   -    -  $449, 650.90
Less reimbursements collected--------------------  158, 960. 06
                                                                290, 690. 84

      Balance unexpended June 30, 1942------------------------           291, 800. 57
Outstanding liabilities June 30, 1942--_______-------- $26, 898. 36
Amount covered by uncompleted contracts-----------210, 104.98
                                                                         237, 003. 34

     Balance available June 30, 1942-______________ -             __      54, 797. 23
Accounts receivable June 30, 1942______-________ __   -__           _      7,342. 07

       Unobligated balance available June 30, 1942________ ---            62, 139. 30
Amount that can be profitably expended in fiscal year ending June
                                                      -  -
30, 1944, for maintenance 1_________ ___________            __ - _      177, 000. 00
  1 Exclusive of available funds.

          3. ST. JOHNS RIVER. FLA.. PALATKA TO LAKE HARNEY

   Location.-Forlocation of the St. Johns River, see page 569. (See
U. S. Coast and Geodetic Survey Charts No. 686, 687, and 688.)
   Previous projects.-Adopted by River and Harbor Acts of June 14,
1880, and July 5, 1884. For further details see page 1824, Annual
Report for 1915, and page 611, Annual Report for 1938.
   Existinll project.--This provides for a channel 8 feet deep at local
mean low water and 100 feet wide from Palatka to Sanford (91.4
miles) an'i 5 feet deep at local mean low water and 100 feet wide from
Sanford o Lake Harney (22.6 miles). This project is an enlarge-
ment and extension of previous projects and embraces two mattress
and stone jetties and two lines of guide piles at Volusia Bar, at the
head of Lake George, built under previous projects; and dredging
and making cut-offs and easing bends in the river. The length of the
section included in the project is 114 miles, and it begins 83 miles above
the entrance to the river. At Palatka the mean tidal range is 1.2 feet
and the spring range about 1.4 feet. At low-water stages tidal effect
is perceptible in Lake George, 40 miles above Palatka. Strong north-
erly and northeasterly winds raise the water level at Palatka about 1
foot, and strong southerly and southwesterly winds lower it about the
same amount under ordinary conditions. The flood stages in the river
usually occur during the fall months and are normally about 2 feet
above ordinary low-water level at Palatka, 3 feet at Lake George, 5
feet at Sanford, and 6.5 feet at Lake Harney. Considerably higher
stages are sometimes experienced.
   The estimate of cost for new work, revised in 1942, is $190,500, ex-
clusive of amounts expended on previous projects. The latest (1920)
approved estimate for annual cost of maintenance is $10,000.
       493202-43-pt. 1, vol. 1--37
574           REPORT OF CHIEF OF ENGINEERS,                           U. S.   ARMY,        1942


  The existing project was authorized by the following river and har-
bor acts:

       Acts                       Work authorized                                  Documents


June 25, 1910      A channel 100 feet wide, 8 feet deep at mean low   H. Doc. No. 1111, 60th Cong., 2d sess.'
                    water from Palatka to Sanford, thence 5 feet
                     deep to Lake Harney.
July     3, 1930   Inclusion of cut-offs at Butcher Bend, Snake       H. Doc. No. 691, 69th Cong., 2d sess.'
                    Creek, and Starks, and easing bends at other
                    points.


  1 Contains latest published maps.

   Recommended modifications of project.-Under date of January 11,
1940, the Chief of Engineers recommended modification of the existing
project so as to provide for a channel 100 feet wide and 10 feet deep
at local mean low water from Palatka to Sanford, with a side channel
of like dimensions to Enterprise, and for cut-offs and easing of bends,
at an estimated first cost of $290,000, with $6,000 annually for mainte-
nance, in addition to that now required; subject to certain conditions
of local cooperation (H. Doc. No. 603, 76th Cong., 3d sess.).
  Local cooperation.-Fully complied with.
   Terminal facilities.-These consist of 8 piers open to public use, hav-
ing a total frontage of about 1,000 feet, including a municipal con-
crete recreation pier with boat basin adjoining at Sanford and a
municipal wharf at Palatka. All piers have highway connections and
one at Palatka has railway connections. At Palatka, privately owned
facilities have been constructed for unloading and storing gasoline and
light fuel oil, and at Sanford similar facilities have been constructed
for unloading and storing gasoline, kerosene, and fuel oil. In addition,
there are a number of small privately owned wharves at various points
along the river. The facilities are considered adequate for existing
commerce.
   Operationsand results during fiscal year.-Snaggingoperations were
in progress with U. S. derrick boat D-5, from February 13 to March
18, 1942. There were removed and placed on banks 673 obstructions
to navigation, consisting of logs, snags, and overhanging trees, includ-
ing 3 logs removed with hand tools during December 1941. The cost
was $2,228.48. Periodic surveys and inspections to determine the con-
dition of the improvement, and mapping in connection with proposed
maintenance dredging, cost $967.29. The costs for the year were
$3,195.77 for maintenance. The expenditures were $4,283.28.
   Condition at end of fiscal year.-The existing project was about 98
percent completed. The section from Sanford to Lake Harney was
completed in 1912. The modified project for the section from Palatka
to Sanford was completed in 193'5 except for the easing of several bends.
The project depth of 8 feet for a width of 100 feet existed from Palatka
to Sanford in June 1941, except at eight localities having a limiting
depth of 6.2 feet for a width of 50 feet located at Snake Creek Cut-off,
and the controlling depth from Sanford to Lake Harney was 3.5 feet
in May 1939. The costs and expenditures under the existing project
                RIVERS AND HARBORS-JACKSONVILLE,                                        FLA.,   DISTRICT               575

have been $180,493.66 for new work and $241,770.76 for maintenance, a
total of $422,264.42.
  Proposed operations.-The balance unexpended on July 1, 1942
($26,487.13), will be applied to maintenance dredging, by contract,
during the period March to May 1943, to restore project dimensions
throughout the project.
   No funds can be profitably expended during the fiscal year 1944, as
the condition of the project is expected to meet the needs of commerce
during the next 2 years.
                                    Cost and financial summary

Cost of new work to June 30, 1942-------------------------------                                              $210, 059. 92
Cost of maintenance to June 30, 1942--------------------------                                                 267, 608. 76
           Total cost of permanent work to June 30, 1942---------___                                           477, 668. 68

Net total expenditures                                                                                              668. 6&
                                                                                                               47----------------------------
Unexpended balance June 30, 1942                                   -----------                                  26, 487. 13

           Total amount appropriated to June 30, 1942--------------_                                           504, 155. 81

     Fiscal year ending June 30          1938             1939                   1940            1941               1942


Cost of new work .    . . ..---------------- -
Cost of maintenance___________ _ -----------           $12, 138. 34         $3, 260. 66         $2, 918.10          $3, 195. 77
Total expended_______________________________            12, 634. 84             2, 481. 60      2, 113. 15          4, 283. 28
Allotted_----                                            16, 500. 00        17, 500. 00         14, 000. 00



Balance unexpended July 1, 1941---------------------------------                                               $30, 770. 41
Gross amount expended------------------------------ $4, 284. 60
Less reimbursements collected------------------------       1. 32
                                                                                                                 4, 283. 28
           Balance unexpended June 30, 1942--------------------------26, 487. 13

Amount (estimated) required to be appropriated for completion of
   existing project -___ _------__               -----------                                                    10, 000. 00
   1 Exclusive of available funds.

                             4. CROSS-FLORIDA BARGE CANAL

  Location.-The proposed canal extends from the St. Johns River,
past Palatka, thence up the valley of the Oklawaha River; across the
divide, and down the valley of the Withlacoochee River to the Gulf of
Mexico, at a point about 95 miles north of Tampa, Florida.
   Existing project.--This provides for a lock canal with project depth
of 12 feet and minimum bottom width of 150 feet, with locks 75 feet
wide, 600 feet long, and 13 feet deep over the sills. The project pro-
vides for the construction of five locks. The estimated cost of new
work, made in 1942, is $44,000,000, with $323,000 annually for main-
tenance and operation.
   The project was authorized in Public Law No. 675, Seventy-seventh
Congress, approved July 23, 1942.
   Local cooperation.-The project provides that local interests fur-
nish without cost to the United States, all lands, easements, and
rights-of-way necessary for the construction of the canal; hold and
576    REPORT    OF CHIEF OF ENGINEERS,         U.   S. ARMY,   1942

save the United States free from damages due to the construction
works and take over, maintain, and operate all highway bridges and
roadways built in connection with the project.
  Proposed operations.-No funds are available.
                        Cost and financial summary
Amount (estimated) required to be appropriated for completion of
the project-------------     ------------------------------ $44, 000,000

                       5. OKLAWAHA RIVER, FLA.

  Location.-This river has its source in the system of large lakes in
the central part of the peninsula of Florida and flows in a general
northerly direction, then eastwardly, emptying into the St. Johns
River 22 miles above Palatka. The extreme head of the system may
be taken as Lake Apopka, 120 miles above the mouth of the river.
  Previous projects.-The first improvement was authorized by an
act of Congress approved February 24, 1835. For further details
see page 1825, Annual Report for 1915, and page 613, Annual Report
for 1938.
  Existing project.--This provides for deepening the channel to 6 feet
at mean low water from the mouth to the head of Silver Springs Run,
a distance of 58 miles; for clearing the channel of obstructions from
Silver Springs Run to Lake Griffin, including the Kyle and Young
Canal and its extension to Morrisons Landing and the J. D. Young
Canal from Morrisons Landing to Starkes Ferry (clear title to the
canals and sufficient land adjacent thereto to provide for future widen-
ing has been conveyed to the United States) and maintaining the dikes
with a view to obtaining a navigable depth of about 4 feet to Leesburg,
86.5 miles above the mouth. The work embraces dredging, snagging,
cut-offs at sharp bends, removal of overhanging trees and obstructive
aquatic vegetation, and the construction of a lock and dam at Moss
Bluff to retain the water level in Lake Griffin.
                         Lock and dam at Moss Bluff
  Distance to nearest town: 20 miles by canals.
  Name of nearest town: Leesburg, Fla.
  Distance above mouth of river: 66.3 miles by canals.
  Distance above mouth of Silver Springs Run: 13.7 miles.
  Width of lock chamber: 30 feet.
  Greatest available length for full width : 125 feet.
  Lift above low water: 11.5 feet.
  Depth on upper miter sill at normal pool level: 7 feet.
  Depth on lower miter sill at low water: 7 feet.
  Character of foundation: Piles in sand and clay.
  Character of construction: Concrete, with timber gates.
  Kind of dam: Movable.
  Type of dam: Needle.
  Completed in 1925.
  Total cost: $161,000.
   The river is nontidal except for a short distance above the mouth at
the St. Johns River, where a mean range at low-water stage of about
0.5 foot is found. The mean fluctuation due to rainfall is about 2 feet
at the mouth, about 3 feet at the mouth of Silver Springs Run, and
about 21/2 feet at Lake Griffin. The extreme fluctuation is about 3 feet
at the mouth, 5 feet at Silver Springs Run, and about 41/2 feet at Lake
Griffin.
            RIVERS AND           H-ARBORS-JACKSONVILLE,                         FLA.,     DISTRICT          577
  The estimated cost of the work proposed, revised in 1929, is $351,000,
exclusive of amount expended on previous projects. The latest (1942)
approved estimate of cost for annual maintenance is $12,500, including
$5,000 for operation and care of lock and dam.
   The existing project was authorized by the following river and
harbor acts:

    Acts                         Work authorized                                        Documents


Sept. 19, 1890   Clearing the river of obstructions with a view to        Annual Report for 1889, pp. 1360-1364.
                   obtaining a navigable channel about 4 feet deep
                   from the mouth to Leesburg.
Mar. 2,1907      Deepening the channel to 6 feet at mean low water        H. Doc. No. 782, 59th Cong., 1st sess.
                  from the mouth of the river to the head of Silver
                   Springs Run.
June 25,1910     Maintenance of levels in the lakes at the head of        Specified in act.
July 25,1912       the river.                                         J
July 27,1916     Acceptance of certain artificial waterways and               Do.
                  extensions thereof between Heather Island and
                  Lake Griffin as part of the waterway in lieu of
                  portions of the natural bed of the river.
      (1)        Operation and care of the lock and dam provided
                  for with funds from War Department appro-
                  priations for rivers and harbors.


  1Permanent     Appropriation Repeal Act of June 26, 1934.


   The latest published maps may be found in House Document No.
514, Sixty-third Congress, second session, and Annual Report for
1891, page 1626.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are numerous privately owned landings
along this river, more or less out of repair; no charges for wharfage.
One wharf at Leesburg has railway connection. The facilities are
considered adequate for existing commerce.
   Operations and results during fiscal year-Maintenance.-Snagging
operations were in progress with a launch and hand tools intermit-
tently from July through November 1941, and with U. S. derrickboat
D-5 from January 13 to February 10, 1942. There were removed
and placed on banks or in small creeks 1,750 obstructions to navigation,
consisting of logs, snags, overhanging trees, limbs, and stumps, at a
cost of $2,125.21. Weekly inspections of the upper river and gages,
and periodic inspections of the lower river were made, and marine
grass and bonnets growing in the waterway were cut, at a cost of
$1,128.41.
   Operatingand care.-The lock was operated and buildings, grounds,
lock, dam, and equipment cared for with United States plant and
hired labor. A chain-link type theft-proof fence was constructed
at the reservation by contract from March 23 to April 9, 1942. Addi-
tional lights were installed on the lock structure and a floating boom
was constructed and installed above the lock during January 1942.
The costs were $6,116.20 for operation, $62.17 for ordinary repairs,
$1,507.06 for improvement and reconstruction, and $443.44 for emer-
gencies.
578      REPORT OF CHIEF OF ENGINEERS,                 U. S. ARMY,          1942

   The costs for the year were $3,253.62 for maintenance and $8,128.87
for operating and care, a total of $11,382.49. The expenditures were
$10,756.57.
   Condition at end of fiscal year.-The existing project was about
89 percent completed. By dredging, making cut-offs, and snagging,
a channel with a depth of about 5 feet at ordinary stages has been
obtained from the St. Johns River to the head of Silver Springs Run,
58 miles above the mouth. A channel 30 feet wide and 4 feet deep
at low-water stages, between Silver Springs Run and the lock at Moss
Bluff, was completed in 1929. The lock and dam were completed in
1925. For further details relative to this lock see paragraph "Existing
project." The United States reservation comprises 13.14 acres of
land, a dwelling, and a storehouse. Much of the original dredging of
the canal between Moss Bluff lock and Starkes Ferry was done by
private interests; the widening and deepening of that canal to provide
for the control of Lake Griffin was completed in 1930; and the dike
on the east side was repaired and improved in 1936. At the close of
the fiscal year the river below the Moss Bluff lock was in fair condi-
tion and was passable with an open channel 20 to 60 feet wide; the
lock and dam were in good condition; and the canals and dikes above
the lock were in fair condition. The controlling depths at ordinary
low stages were approximately as follows: Mouth of the river to
Silver Springs Run, 6 feet; Silver Springs Run, 5 feet; Silver Springs
Run to Moss Bluff lock, 4 feet; thence to Leesburg, 4 feet. The work
remaining to be done to complete the project is the easing of several
sharp bends and the obtaining of project dimensions in the section
between the mouth of the river and the mouth of Silver Springs
Run, which is not considered necessary at this time.
   The costs of the existing project have been $311,352.45 for new work,
$298,634.50 for maintenance, and $42,271.15 for operating and care,
a total of $652,258.10. The total expenditures have been $651,435.74.
In addition, the sum of $11,414.41 was expended between August 1,
1929, and June 30, 1935, on the operation and care of the works of
improvement under the provisions of the permanent indefinite appro-
priation for such purposes.
   Proposed operations.-The balance unexpended on July 1, 1942
 ($13,267.23), will be applied as follows:
Accounts payable June 30, 1942_----      ----------------------------                $822.36
Maintenance:
    Construction by contract, of a locktender's house on
      the Moss Bluff lock reservation, July 1 to Oct. 1, 1942_ $4, 500. 00
    Miscellaneous surveys and investigations___-           ___     444. 87
                                                                                    4, 944.87
Maintenance (operating and care of lock and dam at Moss
Bluff, Fla.) :
    Operation ----    -------------------------------                 7, 000.00
    Ordinary maintenance and repair- ---------------                     300. 00
    Emergencies-----------------------------------                       200. 00
                                                                                    7,500. 00

      Total for maintenance_-__-----           --------------------                13, 267. 23
   The additional sum of $10,500 can be profitably expended during the
fiscal year 1944, as follows:
              RIVERS AND HARBORS-JACKSONVILLE,                                           FLA., DISTRICT                       579
Maintenance :
    Snagging, by hired labor and U. S. derrick boat D-5, as required
      throughout the project     _____       __---------------------------------- $2, 500
    Miscellaneous surveys and investigations-------------------------                 500
    Operating and care of lock and dam at Moss Bluff, Fla___ _-----7,                 500

           Total for maintenance_________--------                       _----                                              10, 500
   No funds can be profitably expended for new work during the
fiscal year 1944, as the completion of the project is not considered
essential at this time.
                                     Cost and financial summary

Cost of new work to June 30, 1942___ ________----------                                                         $315, 264. 40
Cost of maintenance to June 30, 1942_ _______-______--------                                                     352, 320. 06

                                                       -
      Total cost of permanent work to June 30, 1942_____---- --                                                     667, 584. 46
Minus accounts payable June 30, 1942________________________---                                                          822.36

     Net total expenditures-----------------------------------_              666, 762. 10
Unexpended balance June 30, 1942___                                               267. 23
                                                                              1_______
                                                               ____________--13,
                                                                  --
           Total amount appropriated to June 30, 1942_______________                                                680, 029. 33

   Fiscal year ending June 30               1938                 1939            1940                  1941                1942


C ost of n ew w ork
Cost of maintenance   -
                                -    ---    --   ---
                                           $6, 734. 08
                                                       ---.---    ---.--.--
                                                             $6, 537. 97
                                                                                   .. . .. . .
                                                                                -- ---
                                                                      $18, 075. 40
                                                                                         --.   ---..
                                                                                     $5, 541. 86
                                                                                                                    ..   . . .. .
                                                                                                                          $11, 382. 49

Total expended            __                6, 841. 67           5, 807. 24     19, 105. 31            5, 300. 67          10, 756. 57

Allotted      _                            20, 700. 00           9, 000.00      4, 500. 00             6, 000. 00          18, 700. 00



Balance       unexpended        July       1, 1941____________________________                                       $5, 323. 80
Amount allotted from                War      Department Civil Appro-
priation Act approved              May       23, 1941 _   -_          $8, 500. 00
Amount allotted from                War      Department Civil Appro-
priation Act approved              Apr.     28, 1942-----------------  10,200.00
                                                                                                                     18, 700. 00
      Amount to be accounted for_________________________                                                            24, 023. 80
Gross amount expended ------   __-________--_----_ $11, 113. 68
Less reimbursements collected_ ______________________   357. 11
                                                                                                                     10, 756. 57

      Balance unexpended June 30, 1942__________
                                               -------                                                               13, 267. 23
Outstanding liabilities June 30, 1942 _______.... ______..____                                             __            822. 36
     Balance available June 30, 1942_________________ ____                                                           12, 444. 87
Amount (estimated) required to be appropriated for completion
of existing project 1_ ______________________________                                                               39, 600. 00
Amount that can be profitably expended in fiscal year ending
   June 30,       1944, for     maintenance 1_- __________________ _                                                 10, 500. 00
   1 Exclusive of available funds.

6. INTRACOASTAL WATERWAY FROM JACKSONVILLE TO MIAMI, FLA.

   Location.-The waterway extends from Jacksonville to Miami,
Fla., following the St. Johns River to the mouth of Pablo Creek,
23 miles, and thence following in general the line of a canal con-
structed by the Florida Coast Line Canal & Transportation Co.
(See U. S. Coast and Geodetic Survey Charts Nos. 842, 843, 844, 845,
846, and 847.)
580           REPORT OF CHIEF OF ENGINEERS,                            U. S.   ARMY,       1942

   Previous projects.-Adopted by River and Harbor Acts of June
15, 1844, July 13, 1892, August 18, 1894, and Deficiency Act of Feb-
ruary 26, 1896. For further details, see page 1825, Annual Report for
1915; page 655, Annual Report for 1926; and page 618, Annual
Report for 1938.
   Existing project.-This provides for an inland waterway in gen-
eral 100 feet wide and 8 feet deep at local mean low water from
Jacksonville to Miami, Fla., a distance of 372 miles, following the
coastal route, and for a turning basin 8 feet deep, 400 feet wide,
and 800 feet long in the vicinity of Jacksonville Beach, Fla. Depths
in excess of those called for under this project already existed in the
St. Johns River from Jacksonville to a point 23 miles east and
also for a total of about 74 miles between the St. Johns River and
Miami, or about 25 percent of the total length of the project. The
project also includes the operation and maintenance of the bridge
near Palm Valley, the title to which was passed to the United States,
along with all other property of the Florida Coast Line Canal &
Transportation Co., under the conditions of local cooperation.
   The mean range of tide is 3.8 feet at the St. Johns River, 0.7
foot in the Indian River at Fort Pierce, 1.8 feet in Lake Worth at
the port of Palm Beach terminals, 2.3 feet at the Port Everglades
terminals, and 2.0 feet in Biscayne Bay. The extreme range is about
7.5 feet at the St. Johns River, 3 feet at Fort Pierce, and 4.5 feet in
Biscayne Bay. Tidal effect is imperceptible at points along the
waterway distant from inlets.
   The estimate of cost for new work, revised in 1937, was $7,271,500,
exclusive of amounts expended on previous projects. The latest
(1942) approved estimate for annual cost of maintenance is $165,000,
including $5,000 for the operation and care of the bridge near Palm
Valley.
   The existing project was authorized by the following river and
harbor acts:

       Acts                       Work authorized                                   Documents



Jan. 21,1.927      For a channel 8 feet deep and 75 feet wide from     H. Doc. No. 586, 69th Cong., 2d sess.
                    Jacksonville to Miami.
July     3. 1930   For a width of 100 feet __ ..-.................
                                                    .....              S. Doc. No. 71, 71st Cong., 2d sess.
       (1)         Operation and care of the bridge near Palm Valley
                    provided for with funds from War Department
                    appropriations for rivers and harbors.
Aug. 26.1937       Turning basin in the vicinity of Jacksonville       H. Doec. No. 180, 75th Cong., 1st sess.z
                    Beach.


  1 Contains latest published maps.
  s Permanent Appropriation Repeal Act of June 26, 1934.


   Recommended modifications of project.-Under date of May 25,
1939, the Chief of Engineers recommended modification of the existing
project so as to provide at Sebastian, Fla., an entrance channel 100 feet
wide and 8 feet deep from the Intracoastal Waterway to and including
a turning basin of the same depth, 600 feet long and 300 feet wide, in
front of the town, at an estimated first cost of $19,000, with annual
maintenance of $500, subject to certain conditions of local cooperation
 (H. Doc. No. 336, 76th Cong., 1st sess.).
        RIVERS AND HARBORS-JACKSONVILLE,         FLA.,   DISTRICT   581

   Local cooperation.-The work authorized by the River and Harbor
Act of August 26, 1937, is subject to the condition that local interests
provide, free of cost to the United States, all lands and rights-of-way
necessary for the improvement and for its subsequent maintenance
when and as required, and to the further condition that local interests
provide, without cost to the United States, suitable highway connec-
tions and a bulkhead along the south side of the basin on plans ap-
proved by the Chief of Engineers, and agree to maintain said bulkhead
and the land approaches thereto as a public terminal open to all on
equal terms.
   The lands needed for rights-of-way and spoil disposal have been
furnished. Early in 1939 the city of Jacksonville Beach, authorized a,
project providing for the construction of the required facilities, and
has submitted this project to the Work Projects Administration in
Washington, but work has not been initiated. All prior requirements
of local cooperation have been complied with except that the provision
of spoil areas in perpetuity for maintenance has not been completed.
The Florida Inland Navigation District, an agency created by the
Florida State Legislature for the purpose of meeting local cooperation
requirements, is actively engaged in securing these areas. The land
required for construction purposes under local cooperation applies to
a total of approximately 124 miles, about one-third the length of the
waterway.
  Terminal facilities.-Extensive terminals with railway and street
connections are available in connection with the harbors at Jackson-
ville and Miami. Terminals, with railway and highway connections,
for coastwise vessels have been constructed at Fort Pierce (Indian
River), Riviera (Lake Worth), and Port Everglades (Hollywood
Harbor). Municipal piers or wharves have been constructed at Titus-
ville, Cocoa, Melbourne, and Vero Beach for handling general freight
and at St. Augustine, Daytona Beach, New Smyrna, Eau Gallie, West
Palm Beach, and Miami for the use of recreational craft. At Daytona
Beach, Titusville, Eau Gallie, and Fort Pierce yacht basins open to
the public have been provided, connected with the Intracoastal Water-
way by channels 6 to 8 feet deep and 80 to 100 feet wide. At Fort
Pierce a channel 6 feet deep and 80 feet wide has been dredged by the
United States from the Intracoastal Waterway to and up Taylor
Creek to the United States Lighthouse Service buoy depot. There
are also a number of privately owned piers, wharves, and landings
at various points along the waterway. The facilities are considered
adequate in general for the existing commerce. (For further details
on facilities at Jacksonville and Miami, see Port Series No. 8, revised
1936, Corps of Engineers.)
   Operations and results during fiscal year-Maintenance.-The
leased pipe-line dredge Superior, from July 25 to September 10,
1941, removed 46,858 cubic yards of material from 4 shoals between
Bakers Haulover Cut and a point immediately north of Fort Pierce
Bridge, at a cost of $17,949.50. Dredging to restore project dimen-
sions at 16 shoals between Matanzas Inlet and Melbourne, including
advance maintenance at several troublesome localities, and at about
46 shoals between Sebastian and Miami, was in progress under 2 con-
tracts from November 18, 1941 to March 10, 1942, and from April 24,
1942, to the close of the fiscal year, at which time dredging in the
582        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                               1942

latter reach was in progress. There were removed 431,372 cubic
yards of material at a cost of $82,746.26.
   The U. S. pipe-line dredge Congaree, from August 22 to Decem-
ber 12, 1941, and from April 9 to May 2, 1942, removed 571,381 cubic
yards of material from 11 shoals located between St. Johns River
and Sebastian, at a cost of $82,486.80. Trees were planted by hired
labor on the dikes extending into Indian River and Mosquito Lagoon
at the Haulover Canal at a cost of $106.35. Periodic surveys and
inspections to determine the condition of improvement were made
at a cost of $28,670.43. Cancelation of accounts payable to the Board
of County Commissioners of St. Johns County, covering operation
of the Palm Valley Bridge from May 15, 1930, to October 15, 1933,
reduced the cost of maintenance $4,620.
   Operating and care.-The steel and concrete double-leaf bascule
highway bridge near Palm Valley was operated and maintained. A
lighting system was installed by hired labor to provide illumination
for the structure and for fender lights and highway barrier lights.
The costs were $6,451.07 for operation, $160.96 for ordinary repairs,
$812.49 for improvement and reconstruction, and $210.05 for emer-
gencies, a total of $7,634.57.
   Summary.-The costs for the year were $207,339.34 for mainte-
nance and $7,634.57 for operating and care, a total of $214,973.91.
The expenditures were $213,260.85.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1935 except for the provision of a turning basin in the vi-
cinity of Jacksonville Beach. The construction of a steel and con-
crete double-leaf bascule highway bridge near Palm Valley, Fla., to
replace the temporary pontoon bridge at that locality was completed
in 1937. When the several reaches of the waterway were last exam-
ined at different times, from October 1941 to June 1942, project depth
of 8 feet, except as limited by bridges, existed except at isolated
shoals in the reaches listed below, having limiting dimensions as
follows: Sebastian to Vero Beach, 7.5 feet in the easterly 70 feet
of channel located 1 mile north of Wabasso Bridge; Vero Beach to
Fort Pierce, 8 feet for a width of 50 feet located about 3 miles south
of Vero Beach; St. Lucie Inlet to Lake Worth Inlet, 7.4 feet for a
width of 100 feet located south of highway bridge, 2.5 miles north
of Lake Park; Lake Worth Inlet to Miami, 8 feet for a width of 50
feet located about 1/3 mile north of Lake Worth Bridge. Project
width of 100 feet is reduced at 52 localities by bridges, with a limit-
ing horizontal clearance of 45.7 feet at the Seabreeze Bridge at Day-
tona Beach.
   The total costs under the existing project to June 30, 1942, have
been as follows:

                                                   New work          Maintenance        Operating             Total

Regular funds .________________________________   $5, 052, 153. 72   $2, 066, 676. 88   $32, 635. 74       $7, 151, 466. 34
Public Works funds____________________________     2, 199, 841.72    _____     ____           _____..       2,199, 841.72
     Total, United States funds                    7, 251, 995. 44    2, 066, 676. 88       32, 635. 74    9, 351, 308.06
Contributed funds__________________________            _____               5, 500.00    -              .        5, 500.00
      Total, all funds   __--------_               7, 251, 995. 44    2, 072, 176. 88       32, 635. 74     9, 356, 808.06
            RIVERS AND HARBORS-JACKSONVILLE,                                 FLA., DISTRICT                    583

  The expenditures have been $9,343,671.67, United States funds, in-
cluding $2,199,841.72 Public Works funds, and $5,500 contributed
funds, a total of $9,349,171.67. In addition, the sum of $3,179.07 was
expended between July 1, 1934, and June 30, 1935, on the operating
and care of the works of improvement under the provision of the
permanent indefinite appropriation for such purposes.
   Proposed operations.--The balance unexpended on July 1, 1942
($170,634.61), will be applied as follows:
Accounts payable June 30, 1942_----------------------------------                                   $7, 636. 39
Maintenance:
    Complete, under existing contract, during October
      1942, dredging to restore project dimensions be-
      tween the vicinity of Sebastian and Miami---- $142, 000. 00
    Miscellaneous surveys, inspections, and contingen-
     cies___------------------------------------------    9, 498. 22
                                                                                                   151, 498. 22
Maintenance (operating and care of highway bridge
over waterway at Palm Valley) :
   Operation_------------------------------------_                                 9, 900. 00
   Ordinary repairs                                                                         00
                                                                                      6---------------------------------00.
    Improvement and reconstruction-------------------                                 800. 00
    Emergencies-------------------------------------                                  200. 00
                                                                                                  11, 500. 00
        Total for maintenance-----------------------------------                                   170, 634. 61
  The additional sum of $165,000 can be profitably expended during
the fiscal year 1944, as follows:
New work: Execute, by contract, during the period February to April
  1944, the dredging of an approach channel and turning basin in the
  vicinity of Jacksonville Beach, Fla------------------------------     $20, 000
Maintenance: Dredging, by contract, 8 months, August 1943 to March
  1944, removing shoals throughout the project as required               39, 500
                                                                        1________
Maintenance (operating and care of highway bridge over waterway
  at Palm Valley) :
    Operation___ --------------------------------------------- $4, 900
    Ordinary repairs---------------_
                          ....                                      400
    Emergencies ---------------------------------------------       200
                                                                          5, 500

        Total for all work          ------------------------------------------                        165, 000

                                    Cost and financial summary
Cost of new work to June 30, 1942-----------------------------    $7, 346, 770. 69
Cost of maintenance to June 30, 1942____------------------------- 12, 315, 713. 94
      Total cost of permanent work to June 30, 1942                    662, 484. 63
                                                                    9-------------,
Minus accounts payable June 30, 1942---------------------                 7, 636. 39
      Net total expenditures --------------------------------       9, 654, 848. 24
Unexpended balance June 30, 1942                                        70, 634. 61
                                                                       1------------------------------
      Total amount appropriated to June 30, 1942-------------- 19,825,482. 85

   Fiscal year ending June 30          1938            1939           1940            1941             1942

Cost of new work ---------------                                       $547. 73                        -   -
Cost of maintenance-.............   $111,144.67     $122,205.99     150, 980. 62    $81, 588. 88         973.91
                                                                                                     $214,
     Total cost                      111,144.67     122, 205. 99    151, 528. 35     81, 588. 88      214, 973. 91
Total expended           ___         125, 955. 59    109, 377. 40   147, 497. 75     97, 918. 54      213, 260. 85
Allotted_ _-_     ---------          193, 000. 00    129, 500. 00   131, 947. 84     91, 700. 00      284, 300. 00

  1 In addition, $5,500 contributed funds expended for maintenance under authority of act
of March 4, 1915.
584           REPORT      OF CHIEF OF ENGINEERS,                     U.   S. ARMY,           1942

Balance unexpended July 1, 1941___ _-________                                                  $99, 595. 46
Amount allotted from War Department Civil Appro-
  priation Act approved June 24, 1940---______- _ $12, 000. 00
Amount allotted from War Department Civil Appro-
  priation Act approved May 23, 1941--------------- 183, 000. 00
Amount allotted from War Department Civil Appro-
  priation Adt approved April 28, 1942 ______-_
                                       ---           89, 300. 00
                                                                                               284 300. 00

      Amount to be accounted for_                                                              383, 895. 46
Gross amount expended__________-----------                         -__    $213, 512. 36
Less reimbursements collected------------                      --------         251. 51
                                                                                               213, 260. 85
       Balance unexpended June 30, 1942_______________________                                 170, 634. 61
Outstanding liabilities June 30, 1942---------        $7, 636. 39
Amount covered by uncompleted contracts- ________-    85, 773. 89
                                                                                                Q
                                                                                                Bl,
                                                                                                      410 233
                                                                                                      a, v.


        Balance available June 30, 1942____                                  __     __           7, 224. 33
                                                                                                7______
Amount (estimated) required to be appropriated for completion of
existing project 2____________________                                                         20, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1944:  --      - -- --                               - --- -- -- --- -- --- -
   For new work 2_                                                                              20, 000. 00
   For maintenance 2 - - - - - - - - - - - - - - - - - - - - -                                 145, 000. 00

               Total 2 - - - -   --- --- -- -- --- -- -- --- -- -- -- --- -- -- --- -- ---
          /                                                                                    165, 000. 00
  * Exclusive of available funds.

                            7. ST. AUGUSTINE                HARBOR, FLA.

  'Location.-Located on the east coast of Florida, about 33 miles
south of the entrance to St. Johns River and about 180 miles north
of Fort Pierce Harbor. (See U. S. Coast and Geodetic Survey
Charts Nos. 842 and 1243.)
   Previous projects.-Appropriations were made by the acts ap-
proved March 2, 1829, and June 27, 1834, for a survey of the harbor
and the bar at the entrance. The River and Harbor Act approved
August 11, 1888, authorized the improvement of the harbor subject
to a subsequent report of a board of engineers. For further de-
tails see page 284, Annual Report for 1904, and page 623, Annual
Report for 1938.
   Existing project.-This provides for an entrance channel 200 feet
wide and 27 feet deep at mean low water to be dredged from the
ocean across North Point to deep water in Tolomato River opposite
the mouth of Matanzas River and protected at its outer end by a
steel-sheet-pile sand trap extending from the coast north of and
parallel to the cut. The length of the channel is approximately
4,500 feet from the 27-foot contour in the ocean to North Point and
thence 3,550 feet through the cut across the land point to the 20-foot
depth contour in the Tolomato River. The mean range of tide at
the existing inlet is about 4.5 feet, with storm tides as much as 7
feet.
   The estimate of cost of new work, made in 1937, is $275,000, ex-
clusive of amount expended on previous projects but including $137,-
500 contributed by local interests. The latest (1937) approved esti-
       RIVERS   AID HARBORS-JACKSONVILLE,        FLA.,   DISTRICT   585

mate for annual cost of maintenance is $25,000. The existing project
was adopted by the River and Harbor Act approved June 20, 1938
 (H. Doc. No. 555, 75th Cong., 3d sess.). The latest published map
is in the project document.
   Local cooperation.-Fully complied with.
    Terminal facilities.-There are four timber docks on the Matan-
zas water front of St. Augustine, one being the municipal yacht dock
south of the highway bridge, one a fish dock, and two private docks.
The principal terminals are the numerous shrimp docks located in
the San Sebastian River which flows southward through the city into
the Matanzas River below the bridge; these consist of timber
wharves, with frame and corrugated-iron warehouses erected on
them. The present terminals have highway connections, and several
of the shrimp docks have rail connections. They are considered ade-
quate for existing commerce and yacht traffic, but there are no ter-
minals suitable for an extensive general commerce.
    Operations and results during fiscal year.-The construction of a
granite, native rock, and creosoted timber sand-trap groin 1,580 feet
long and 740 feet north of the north side of and parallel to the new
200-foot cut across North Point, which was in progress under contract
at the beginning of the fiscal year, was completed August 23, 1941,
thereby completing the existing project. During the period 1,991.25
tons of native limestone one-man rock and 10,552.65 tons of granite
were placed in the structure and 100 linear feet of additional timber
core wall was constructed at the shore end requiring the excavation
of 436 cubic yards of material. The native rock was to form a foun-
dation mat and to fill the voids of the larger stone. The granite in-
cluded 7,776.70 tons of 5- to 10-ton stone and 2,775.95 tons of 3- to
6-ton stone. The cost was $101,156.34 for new work. A total of
601.9 tons of one-man granite was placed by hired labor on the south-
erly side of the inner 150 feet of the groin from January 19 to 28,
1942. The cost was $4,182.31 for maintenance.
    The U. S. hopper dredge Absecon was employed in maintenance
dredging in attempting to secure a depth of 20 feet below mean low
water in the new entrance channel from October 25 to December 16,
1941, when work was discontinued due to continued unsatisfactory
weather. There were removed 173,597 cubic yards, place measure-
ment, of material at a cost of $47,781.82. Periodic surveys and in-
spections to determine the condition of the improvement were made
by hired labor at a cost of $8,785.87 for maintenance.
    The costs for the year were $161,906.34, of which $70,238.49 United
States funds and $30,917.85 contributed funds, a total of $101,156.34
was for new work, and $60,750 United States funds for maintenance.
The expenditures were $230,161.24 United States funds and $30,917.85
contributed funds, a total of $261,079.09.
    Condition at end of fiscal year.-The existing project was completed
in 1941. The dredging was completed in 1940 and the granite native
rock and creosoted timber sand-trap groin extending from the coast
line into the ocean was completed in 1941. The groin is in good condi-
tion except that the shoreward end has been flanked by sea action.
The controlling mean low water depth in May 1942 was 4 feet for
a width of 100 feet, located 1,800 feet seaward of the seaward end of
the sand-trap groin. The total cost of the existing project has been
586          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                               1942

$605,000.72, of which $392,787.72 United States funds and $137,500
contributed funds, a total of $530,287.72 was for new work and $74,713
United States funds for maintenance. The expenditures have been
$467,188.07 United States funds and $137,500 contributed funds, a
total of $604,688.07.
    Proposed operations.-The balance unexpended on July 1, 1942
($6,311.93), will be applied as follows:
Accounts payable June 30, 1942_ ---------------------------------       $312. 65
Maintenance: Periodic surveys and the supervision of the project ..... 5,999. 28
          Total for 'maintenance -----------                             -------                ----          ---           6, 311. 93
   The additional sum of $25,000 can be profitably expended during the
fiscal year 1944 in maintenance dredging with a United States hopper
dredge, in entrance channel during August 1943.
                                          Cost and financial summary
                                                UNITED STATES FUNDS

Cost of new work to June 30, 1942____________  ______-___                                                              $464, 090. 56
Cost of maintenance to June 30, 1942--------------------------                                                           74, 713. 00
      Total cost of permanent work to June 30, 1942__________  __                                                        538, 803. 56
Minus accounts payable June 30, 1942----------------------------                                                              312. 65
      Net total expenditures ----------------                                                        -    -              538, 490. 91
Unexpended balance June 30, 1942--------------                                      ----------------                       6, 311. 93
          Total amount appropriated to June 30, 1942_____-___                                                        .___ 544, 802. 84

    Fiscal year ending June 30                 1938               1939                   1940                 1941            1942

Cost of new work ___________
                      ....            . _____________....
                                              .                                    $109, 975. 88         $212,573.35         $70, 238. 49
Cost of maintenance______               _____________ _ ________            __        2, 109.42            11, 853. 58        60, 750. 00
      Total cost_____________                                                       112, 085. 30          224, 426. 93       130, 988. 49
Total expended___________              ____________          _____________          101, 179.39           135, 847. 44       230, 161.24
Allotted .................-------------------------
                                             _____________        $137, 500          -           -        277, 000. 00        59, 000. 00



Balance unexpended July 1, 1941___________-__--__________ $177, 473. 17
Amount allotted from War Department Civil Appropriation Act ap-
  proved June 24, 1940-------------------------------------     59, 000. 00
      Amount to be accounted for__-__________-___________       236, 473. 17
Gross amount expended------------------------- $262, 951. 97
Less reimbursements collected____________________   32, 790. 73
                                                                230, 161.24
      Balance unexpended June 30, 1942-------------------------                                                             6, 311.93
Outstanding liabilities June 30, 1942_---_____-- -- ______________                                                             312. 65
          Balance available June 30, 1942______                                ______---                 _______            5, 999. 28
Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                            25, 000. 00
   1 Exclusive of available funds.
               RIVERS AND HARBORS-JACKSONVILLE,                                                                 FLA., DISTRICT                   587

                                                             CONTRIBUTED FUNDS

Cost of new work to June 30, 1942__________________________                                                                        $137, 500. 00
Cost of maintenance to June 30, 1942
            Total cost of permanent work to June 30, 1942____________                                                                  137, 500. 00
Net total expenditures_______                                                ---------------                                           137, 500. 00
Total amount contributed to June 30, 1942_____________---------                                                                        137, 500. 00

     Fiscal year ending June 30                         1938                       1939                 1940             1941                1942

                 ....
Cost of new work________________
                        .........             . ..   _. _..    _.... ..                                   $78, 000     $28, 582. 15        $30, 917. 85
Cost of maintenance -- -          -- - - ----- -------- ------        --                           - ------------    --------

Total expended _____________________________________________                                              78, 000       28, 582. 15          30, 917. 85
Contributed .............-                -   .    -.-I_____                                              137, 500



Balance unexpended July 1, 1941  ___________                                                                                            $30, 917. 85
Gross amount expended -----------------------                                                                                            30, 917. 85
        CONSOLIDATED COST AND FINANCIAL SUMMARY FOR ST. AUGUSTINE HARBOR, FLA.

Cost of new work to June 30, 1942___________________________                                                                           $601, 590. 56
Cost of maintenance to June 30, 1942-------- --------------                                                                              74, 713. 00

      Total cost of permanent work to June 30, 1942____________                                                                        676, 303. 56
Minus accounts payable June 30, 1942                                                                                                               65
                                                                                                                                        -312.3----------------___
     Net total expenditures --_____---------6---------                                                                      675, 990. 91
Unexpended balance June 30, 1942                                                                            -_______________ 6, 311.93
             Total amount appropriated and contributed to June 30, 1942__                                                               682, 302. 84

     Fiscal year ending June 30                             1938                    1939                 1940             1941               1942


Cost of new work                                                                               $187, 975. 88      $241, 155. 50
                                                                                    ......-_________________...........                    $101, 156. 34
                                        .
C o s t o f m a i n t e n a n c e _______..       _. __. _. .            . . . . . . .. .
                                                                   . _ __..                       2 , 10 9 . 4 2      11, 85 3 . 5 8         6 0, 7 50. 00

         Total cost ______............            .......                         __________           190, 085.30     253, 009. 08         161, 906. 34

Total expended                       -.                 ...-------------
                                                                  .      .          .          .       179, 179.39     164, 429. 59         261, 079.09

Allotted and contributed                           __                               $137, 500          137, 500.00     277, 000.00           59,000.00



Balance unexpended July 1, 1941 --------   ----        ----     $208, 391. 02
Amount allotted from War Department Civil Appropriation Act ap-
proved June 24, 1940                                              9, 000. 00
                                                                  5----------------------------

             Amount to be accounted for_-_______---_____---                                                        -
                                                                                                                ___--                   267, 391. 02
Gross amount expended_____----___----__-----------                                                         $293, 869. 82
Less reimbursements collected--------------                                                        -------   32, 790. 73
                                                                                                                                        261, 079. 00

      Balance unexpended June 30, 1942--------    -----------                                                                             6, 311. 93
Outstanding liabilities June 30, 1942___________--__----_______                                                                              312. 65

             Balance available June 30, 1942-- ----------                                                      ------------               5, 999. 28

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance -----------------------------------                                                                           25, 000. 00
     aExclusive          of available funds.
588       REPORT OF CHIEF OF ENGINEERS,                          U.    S. ARMY,        1942

                            8. FORT PIERCE HARBOR, FLA.

   Location.-Located on the east coast of Florida, about 213 miles
south of the entrance to St. Johns River and about 124 miles north
of the entrance to Miami Harbor. (See U. S. Coast and Geodetic
Survey Charts Nos. 1247, 582, and 845.)
  Existing project.-This provides for the maintenance and amplifi-
cation of the project developed by private interests to provide a chan-
nel 350 feet wide at the 27-foot contour in the ocean, tapering to 200
feet wide at station 100, near the westerly side of the inlet, thence 200
feet wide across Indian River to station 30, thence flaring to a turning
basin 750 feet wide, the depth to be 25 feet in the basin and in the
channel to station 130, and thence 27 feet to the 27-foot contour in the
ocean. The entrance, as constructed by local interests, is protected by
two parallel rubberstone jetties with revetment extensions at their
inner ends 900 feet apart, the north jetty and revetment being about
3,500 feet long, and the south jetty and revetment about 3,200 feet
long. The mean range of tide is about 2.6 feet at the entrance and 0.7
foot at the terminal, with-northeast storm tides as high as 5 feet above
mean low water.
   The estimate of cost for new work, revised in 1937, was $322,000.
The latest (1935) approved estimate of cost for annual maintenance is
$250,000 for initial restoration, $50,000 per year for a period of 4
years, and $30,000 a year thereafter.
   The existing project was authorized by the following river and
narbor acts:

              Acts                           Work authorized                       Documents


Deficiency Act of Mar. 4, 1931___ The expenditure of $20,000 for dredging    Specified in act.
                                    the channel, provided that local in-
                                   terests agree to maintain said channel.
War Department       Appropria-   The expenditure of up to $30,000 for           Do.
tion Act, Mar. 4, 1933.            dredging the channel.
Aug. 30, 1935 (maintenance in-    For maintaining the channels, jetties,     H. Doc. No. 252, 72d Cong.,
eluded in Public Works Ad-         and revetments, and the enlargement       1st sess.
ministration program Sept. 6,      of the channels and turning basin to     Rivers and Harbors Com-
1933).                             the existing project dimensions.           mittee Doc. No. 21, 74th
                                                                               Cong., 1st sess. (Contains
                                                                               latest published maps.)



   Local cooperation.-Fully complied with.
   Terminal facilities.-These consist of two earth-filled piers retained
by steel sheet piling and enclosing a slip 200 feet wide by 330 to 350
feet long with bulkhead wharf at inner end. These facilities afford
a berthing space of about 1,653 feet. The south pier and the bulkhead
wharf are municipally owned, the pier having a berthing space of 524
feet, with depths of 25.5 to 18 feet. The bulkhead is used for tie-up
of Government vessels. A warehouse 75 by 280 feet, is situated on the
municipal pier, and a precooling plant 102 by 365 feet, occupies the
north pier, just landward of which is another warehouse, 50 by 100 feet.
A fruit-packing house 170 by 225 feet is located at the west end of the
slip. The north pier is served by railway and both piers by highway
connections. North of the turning basin there is a bulkhead wharf
with a depth of 15 to 12 feet and with tank storage in the rear for
               RIVERS AND HARBORS--JACKSONVILLE,                            FLA.,     DISTRICT            589
petroleum products. The facilities are considered adequate for exist-
ing commerce.
   Operations and results during fiscal year.-The U. S. hopper dredge
San Pablo was employed in maintenance dredging to a depth of 27
feet in Outer Bar Cut and to a depth of 25 feet in the channel across
Indian River from July 11 to 30, 1941, when the work was substan-
tially completed. There were removed 58,686 cubic yards, place meas-
urement, of material, resulting in the restoration of project dimen-
sions except for a few small shoals. The cost was $18,554.53. Peri-
odic surveys to determine the condition of the improvement cost
$2,153.89. The costs for the year were $20,708.42 for maintenance.
The expenditures were $21,413.94.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1938; the rehabilitation of the jetties, constructed by local
interests, was completed in 1934; and both jetties and the south revet-
ment are in good condition. The north revetment is in fair condition,
numerous stones having fallen into the land cut, leaving the structure
ragged along the water side. The controlling mean low-water depths
in June 1942 were as follows: Outer Bar Cut, 27 feet except for a
small shoal having a least depth of 21 feet and extending from the
southerly edge of the channel to within 50 feet of its center line, and
except for shoaling near the edges of the channel; channel between
land revetments, 24 feet for a limiting width of 120 feet; channel
across Indian River, 19.9 feet located about 700 feet from the easterly
end of the cut, and thence to the turning basin, 25 feet except for
shoaling along the southerly edge of the channel; turning basin, 24.8
feet in the central 600 feet, with a least depth of 22.9 feet in the re-
mainder of the basin except for shoaling along the edges.
  The total costs and expenditures, all funds, have been $829,839.96,
of which $337,182.67 was for - new work and $492,657.29, including
$250,000 Public Works funds, for maintenance.
  Proposed operations.-No funds are available.
  The additional sum of $40,000 can be profitably expended during
the fiscal year 1944 in maintenance dredging with a United States
hopper dredge in Bar Cut, in channel between the jetties and across
Indian River, and in turning basin, during November and December
1943.
                                    Cost and financial summary
Cost of new work to June 30, 1942_ _________------               $337, 182. 67
Cost of maintenance to June 30, 1942 ---------------------------- 492, 657. 29
      Total cost of permanent work to June 30, 1942                                                29, 839. 96
                                                                                                  8______________
Net total expenditures         -   -______________
                                             _______-                                             829, 839. 96
Total amount appropriated to June 30, 1942-----------------------                                 829, 839. 96

   Fiscal year ending June 30          1938           1939           1940            1941             1942


Cost of new work--      -----       $140, 138. 23
Cost of maintenance-- ---------        1, 581. 43   $50, 035.07    $46, 357.80      $1, 573. 42      $20, 708. 42
      Total cost ----------   ---    141, 719. 66    50, 035.07    46, 357. 80        , 573. 42       20, 708. 42

Total expended                       104, 139. 69    89, 742. 47   46, 255. 19         970. 51        21, 413. 94
Allotted_ .-                          30, 000.00     65, 000.00    20,000.00        20, 500.00      -24, 000.00


        493202-43-pt. 1, vol. 1--38
590         REPORT OF CHIEF OF ENGINEERS,                              U. S. ARMY,           1942
                                                _
Balance unexpended July 1, 1941__
                               ------------------------- -------- $45, 413. 94
Deductions on account of revocation of allotment-----------------    24, 000. 00
      Net amount to be accounted for-----------------------------    21, 413. 94
Gross amount expended----------------$------------21,        814. 97
Less reimbursements collected------------------------        401. 03
                                                                     21, 413.94
Amount that can be profitably expended in fiscal year ending June
                             1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
30, 1944, for maintenance                                                                    _   40, 000. 00
1Exclusive of available funds.
                                9. LAKE WORTH INLET, FLA.
    Location.-Locatedon the east coast of Florida about 71 miles north
of the entrance to Miami Harbor and is the entrance channel to the
Port of Palm Beach. (See U. S. Coast and Geodetic Survey Charts
Nos. 1248 and 846.)
    Existing project.-This provides for the maintenance and amplifica-
tion of the improvements constructed by local interests to provide a
channel 20 feet deep and 300 feet wide from deep water in the ocean
to station 69+00, thence reducing to a width of 200 feet at station
65 + 00, near the westerly side of the inlet, thence 200 feet wide across
Lake Worth to station 33 + 23, thence flaring to a turning basin of the
same depth, 700 feet square; for the removal of the obstructive point
on the south side of the inlet; for the revetment of the banks of the
inlet; and for restoration of the existing jetties. The jetties con-
structed at the entrance by local interests consist of two parallel rub-
blestone structures 800 feet apart, the north jetty and revetment being
about 1,800 feet long and the south jetty 1,700 feet long. The mean
range of tide is 2.8 feet at the inlet and 1.8 feet at the Port of Palm
-Beach terminals.
    The estimate of cost for new work, made in 1935, was $548,000. The
latest (1935) approved estimate of cost for annual maintenance is
:$30,000.
    The existing project was authorized as follows:

     Acts                        Work authorized                                     Documents


     (1)        Maintenance of improvement          previously con-    H. Doc. No. 185, 73d Cong., 2d sess.
                 structed by local interests.
     (2)        Deepening of channels and turning basin, as con-       Rteommended by Chief of Engineers
                  structed by local interests, to 20 feet.              to Public Works Administration
                                                                        Oct. 17, 1934.
Aug. 30, 1935   Authorized the work previously approved by             H. Doc. No. 185, 73d cong., 2d sess.,
                  Public Works Administration, and for widening          and Rivers and Harbors Committee
                  of the channels to existing project dimensions,        Doc. No. 42, 74th Cong., 1st sess.
                  enlargement of turning basin, removal of ob-           (Contains latest published maps.)
                  structive point on south side of the inlet, revet-
                  ment of the banks of the inlet, and restoration of
                  existing jetties.

  1 Public Works Administration program Mar. 13, 1934.
2 Public Works Administration program Dec. 10, 1934.



   Local cooperation.-The authorized work is subject to the condi-
tion that local interests furnish, free of cost to the United States,
all lands needed for the disposal of dredged material and for the
improvement, including title to the jetties and easements over strips
,of land adjacent to the channel through the inlet, which lie channel-
        RIVERS AND HARBORS-JACKSONVILLE,          FLA.,   DISTRICT   591
ward of due east and west lines passing approximately 100 feet
landward of the shore ends of the jetties. It is also stipulated that
they shall provide a suitable site at the terminals for a Government
depot for use in the maintenance of the waterways in the locality.
Spoil areas have been provided as required. All other requirements
have been complied with except that perpetual easements of access
to the north and south easement areas have not been furnished.
    Terminal facilities.-These consist of a slip 690 feet long, 210 feet
wide, and 22.5 feet deep, with a wharf on either side and a bulkhead
at the inner end, and two additional shore wharves. These facilities
afford a total berthing space of 2,092 feet, with depths ranging from
26 to 17 feet. All except one are owned by the Port of Palm Beach
Commission. A steel warehouse 70 by 620 feet has been constructed on
the north side of the slip. A precooling plant 36 by 124 feet has been
constructed north of the steel warehouse. Two nearby storage depots
for petroleum products are connected with the terminals by pipe lines.
Rail and highway connections, water supply, and other facilities have
been provided to the warehouse and shipside. The facilities are con-
sidered adequate for existing commerce.
    Operations and results during fiscal year.-The removal of ledge
rock, rock pinnacles, boulders, and other material to a depth of 22 feet
mean low water, Atlantic Ocean, in the entrance channel between the
land points and between the jetties, which was in progress by contract
at the beginning of the fiscal year, was completed September 18, 1941.
There were removed 1,402 cubic yards of material at a cost of $36,-
513.14. The removal of rock and other material to a depth of 22 feet
in the channel across Lake Worth and in the turning basin, which
was in progress under contract at the beginning of the fiscal year,
was completed September 13, 1941. There were removed 17,737 cubic
yards of material at a cost of $45,563.24. Periodic examinations and
surveys to determine the condition of improvement were made by
hired labor at a cost of $4,574.53. The costs for the year were $86,-
650.91 for maintenance. The expenditures were $148,338.35.
    Conditionat end of fiscal year.-The existing project was completed
in 1938. The enlargement and deepening of the entrance channel and
turning basin originally constructed by local interests was completed
in 1937, and the rehabilitation of the stone jetties and revetments and
the removal of the obstructive land point on the south side of the inlet
were completed in 1938. As reconstructed, the north jetty and revet-
ment are, respectively, 950 and 1,500 feet long; the jetty has been
capped with concrete for a distance of 850 feet extending from the
shoreward end, and the voids in the granite enrockment forming the
sea end of the structure have been filled with asphaltic concrete. The
south jetty and revetment are, respectively, 1,890 and 420 feet long;
the jetty has been capped with concrete for a distance of 1,790 feet
from the shoreward end. Asphaltic concrete was not placed in the
voids of the granite enrockment at the sea end of this jetty. The
turning basin is 700 feet wide for a distance of 700 feet and thence,
in a distance of about 850 feet, converges to a width of 200 feet at
its junction with the channel. Both jetties and revetments are in
good condition except that the north revetment extending westward
from the west end of the north jetty is in bad condition, having been
broken down by wave action. The controlling depths, for project
widths, mean low water Atlantic Ocean, when last ascertained, were
592             REPORT OF CHIEF OF ENGINEERS,                                           U. S. ARMY,               1942

as follows: Outer bar, 21.5 feet in December 1941; between land
revetments and across Lake Worth, 22 feet in September 1941;
and turning basin, 22 feet throughout in July 1941.
   The total costs and expenditures to June 30, 1942, have been as fol-
lows:

                                                                      New work        Maintenance         Total          Expenditures

Regular funds .--    .           ..-----        .. _.---------        $573, 664. 91    $318, 682. 11   $892, 347.02        $892, 345. 47
Public Works funds___-                         .____ _            _     80, 000.00       30, 000.00     110, 000.00         110, 000.00
         Total ----------- ----                   ------          _    653, 664. 91     348, 682.11    1, 002, 347.02     1, 002, 345. 47



   Proposed operations.---The balance unexpended on July 1, 1942
 ($3,284.99), will be applied as follows:
Accounts payable June 30, 1942--------------------------------------     $1. 55
Maintenance: Care and preservation of the depot and reservation at
  Riviera, and miscellaneous surveys and investigations--------------3, 283. 44
            Total for maintenance_--------------------------------------3,                                                   284. 99
   The additional sum of $30,000 can be profitably expended during the
fiscal year 1944, in maintenance dredging with a United States hopper
dredge in the bar cut and in the channel across Lake Worth during
January 1944.
                                                Cost and financial summary

Cost of new work to June 30, 1942-------------------              $653, 664. 91
Cost of maintenance to June 30, 1942--- ----------------------     348, 682. 11
      Total cost of permanent work to June 30, 1942-------------1, 002, 347. 02
Minus accounts payable June 30, 1942                                         1. 55
      Net total expenditures----------------------------------    , 002,345.47
Unexpended balance June 30, 1942-------------------------------       3, 284.99
      Total amount appropriated to June 30, 1942                    005, 630. 46
                                                                 1----------------,

     Fiscal year ending June 30                       1938               1939             1940            1941               1942

Cost of new work----....--------- $256, 678. 42                       $18, 190. 74
Cost of maintenance..-------------5, 173. 21                           14, 816. 42     $26, 247. 92    $100, 724. 62       $86, 650. 91
        Total cost----------.......-       .       261,851. 63         33, 007. 16      26, 247. 92     100, 724. 62         86, 650. 91
Total expended....----------------325, 334.06                          49, 805. 38      48, 662. 53      39, 549. 24        148, 338. 35
Allotted........-------   -------   ------         120, 000. 00        15, 000.00       25, 000.00      182, 000.00        -25., 200. 00


Balance unexpended July 1, 1941--------------------------------                                                        $176, 823. 34
Amount allotted from War Department Civil Appiopriation Act ap-
  proved Apr. 28, 1942-------------------------------------                                                               4, 800. 00
      Amount to be accounted for-------------------_   -----------                                                      181, 623. 34
Deductions on account of revocation of allotment ----------------                                                        30, 000. 00
      Net amount to be accounted for---------------------------                                                         151, 623. 34
Gross amount expended---------------------------      $148, 366. 00
Less reimbursements collected __-------------------          27. 65
                                                                                                                        148, 338. 35
      Balance unexpended June 30, 1942------------------------                                                            3, 284. 99
Outstanding liabilities June 30, 1942----------------------------                                                              1. 55
      Balance available June 30, 1942_-----------------------                                                             3, 283. 44
Amount that can be profitably expended in fiscal year ending June
                                     - - - - - -
30, 1944, for maintenance 1________                _- - -                                                               30, 000. 00
xExclusive of available funds.
              RIVERS AND            HARBORS--JACKSONVILLE,                     FLA.,     DISTRICT           593
                  10. HOLLYWOOD HARBOR (PORT EVERGLADES), FLA.

   Location.-Located on the east coast of Florida, about 23 miles north
of Miami and about 48 miles south of Lake Worth Inlet (Port of Palm
Beach). The site of the harbor is in Lake Mabel. (See U. S. Coast
and Geodetic Survey Charts Nos. 546, 847, and 1248.)
   Existing project.-This authorizes the maintenance and amplifica-
tion of the improvement constructed by local interests to provide: A
channel 35 feet deep, 500 feet wide at its seaward end, converging to
400 feet at the jetty entrance, thence converging to 300 feet at a point
1,000 feet within the jetty entrance, and thence 300 feet wide to the
existing turning basin; and for the completion to a depth of 35 feet,
and the extension northward, of the turning basin to provide a basin
1,200 feet long, 1,550 feet wide over the westerly 750 feet of its length,
and thence reducing to a width of 1,200 feet at the easterly side. The
entrance channel is approximately 7,300 feet long and is protected by
two converging, angular stone jetties constructed at the entrance, 500
feet apart at the outer ends and 1,200 feet apart and parallel for a
distance of 800 feet at the shore ends. The north jetty is about 1,450
feet and the south jetty 1,250 feet in length. Both jetties were built
to 6 feet above mean low water with top widths of 6 feet at the
shore ends and 12 feet at the sea ends, and with side slopes 1 on 11/2.
Two parallel steel sheet piling bulkheads, 800 feet apart, protect the
land points from erosion. The mean range of tide is 2.6 feet at the
entrance and 2.3 feet at the terminals; the extreme range under storm
conditions is about 6.5 feet at the entrance.
   The estimate of cost of new work, revised in 1938, was $1,769,000.
The latest (1938) approved estimate of cost of annual maintenance is
$37,500.
   The existing project was authorized by the following river and
harbor acts:

    Acts                           Work authorized                                    Documents


.July   3, 1930    Maintenance of the harbor as constructed by local     H. Doc. No. 357, 71st Cong., 2d sess.
                    interests.
Aug. 30,1935       For enlarging the entrance channel to existing        Rivers and Harbors Committee Doe.
                                                                                                        1
                    project dimensions and completing the turning          No. 25, 74th Cong., 1st sess.
                    basin to 1,200 feet square.
                                                                                                                 l
June 20,1938       For enlarging the turning basin to provide existing   H. Doc. No. 545, 75th Cong., 3d sess.
                    project dimensions by adding a trapezoidal area
                    350 feet wide on the north side.


a Contain latest published maps.

  Local cooperation.-The River and Harbor Act approved June 20,
1938, imposed the condition that local interests furnish, free of cost to
the United States, the necessary lands for the enlargement of the basin,
and suitable spoil-disposal areas for new work, and for subsequent
maintenance as required, and agree to provide the slips, piers, and
other terminal facilities necessary for the full utilization of the im-
provement. Temporary grants for spoil-disposal areas during new-
work operations for the enlargement of the turning basin were
approved by the Chief of Engineers August 19, 1939.
594    REPORT OF CHIEF OF ENGINEERS,          U.   S.   ARMY,   1942


   A resolution adopted January 26, 1939, by the Broward County
Port Authority, agreeing to provide suitable and sufficient slips, piers,
and other terminal facilities necessary for the full utilization of the
improvement, was accepted by the Chief of Engineers February 20,
1939, as satisfactory assurance of compliance with that part of the
required local cooperation. In partial compliance with the conditions,
the port authority has provided, north of the original slip, the second
slip described below under "Terminal facilities." All prior require-
ments have been fully complied with.
   Terminal facilities.-These consist of three piers, one bulkhead, and
one mooring constructed around two slips off the turning basin, all
owned by the Broward County Port Authority. The docking facili-
ties provide 5,270 feet of berthing, with depths from 35 to 25 feet.
Slip No. 1 is 1,200 feet long and 300 feet wide, with steel bulkheads at
the end and both sides and a depth of 35 feet. Slip No. 2 is 700 feet
long, 300 feet wide, and 25 feet deep, with steel sheet-pile bulkheads'
along its sides, so constructed that it can later be extended to 1,200 feet
long and deepened to 35 feet. A steel warehouse 1,120 by 75 feet and
a precooling plant have been built, with railway and highway connec-
tions. Equipment for the transfer of railroad freight cars to and
from car ferries has been installed. Three nearby tank storage depots;
for petroleum products are connected with the terminals by pipe lines.
The facilities are considered inadequate for present needs.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was completed
in 1940. Local interests dredged an entrance channel 210 feet wide,
35 feet deep, and about 6,900 feet long leading from the ocean to a
partially completed turning basin 1,200 feet square, and constructed
two converging angular stone jetties to protect the entrance channel.
The United States has enlarged the entrance channel and turning
basin to project dimensions. Both jetties are in good condition, but
the steel sheet-pile bulkhead at the inner end of the south jetty is in
poor condition. The controlling mean low water depths when last
ascertained at the seaward end of the entrance channel in May 1942
and elsewhere in July 1941 were as follows: Entrance channel seaward
of the jetty entrance, 35 feet except for an isolated shoal having
a least depth of 34.6 feet located 90 feet south of the center line of
the channel and 150 feet east of the jetty entrance, and for shoaling
near the edges of the channel; from jetty entrance to turning basin,
35 feet except for a spot shoal in the center of the channel having a
least depth of 34.5 feet; turning basin, 35 feet for a width of about
600 feet centered between the entrance channel and slip No. 1, and a
least depth of 32 feet throughout the remainder of the basin except
for shoaling along the edges.
   The costs and expenditures under the existing project have been
$1,436,853.83 for new work and $239,848.93 for maintenance, a total
of $1,676,702.76.
   Proposed operations.-No funds are available, and no operations:
are proposed during the fiscal year 1943.
   The sum of $75,000 can be profitably expended during the fiscal year
1944 as follows:
            RIVERS AND HARBORS-JACKSONVILLE,                                     FLA.,         DISTRICT                   595
Maintenance:
   Dredging, with U. S. hopper dredge San Pablo, during January 1944 _ $30, 000
   Repair, by contract, during April and May 1944, the south bulk-
      head protecting the barrier land strip at the inner end of the
      jetties -----------------------------------------------           45, 000

            Total for maintenance___--------------------                    ------------------ 75, 000
                                      Cost and financial summary
Cost of new work to June 30, 1942__$1-------------------------                                          $, 436, 853. 83
Cost of maintenance to June 30, 1942___
                                    -----------------                                                      239, 848. 93

      Total cost of permanent work to June 30, 1942------------- 1, 676, 702. 76
Net total expenditures__---------------------------------------1, 676, 702. 76
Total amount appropriated to June 30, 1942_ -------------------- 1, 676, 702. 76

   Fiscal year ending June 30            1938            1939             1940                1941                     1942


Cost of new work                  _   $240, 596. 92   $767, 704. 87    $181, 429. 16   .............................
Cost of maintenance_                                     3, 132. 73      33, 540. 75    $110, 708. 82
      Total cost                       240, 596. 92    770, 837. 60     214, 969. 91      110, 708.82
Total expended_________________        186, 751. 72    839, 030. 27     237, 837. 52      140, 004. 89

Allotted _ _ -_    -   -930,               000. 00     604, 000.00    -205,000. 00       -10, 754.05



Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1_----------------------------------                                                  $75, 000. 00
   1 Exclusive of available funds.

                   11. MIAMI HARBOR                   (BISCAYNE            BAY), FLA.

   Location.-Biscayne Bay is a large, shallow, salt-water sound lying
between the Florida Keys and the mainland on the east coast of Florida
near the southern extremity of the peninsula. (See U. S. Coast and
Geodetic Survey Charts Nos. 547, 847, and 1248.)
   Existing project.-This provides for a channel 30 feet deep at
mean low water and 500 feet wide from that depth in the ocean to near
the outer end of the north jetty, thence 300 feet wide through the
entrance and across Biscayne Bay to the turning basin in front of the-
municipal terminals at Miami, enlarging the turning basin, the south-
erly boundary of which is to be in prolongation of the south edge of the
30-foot slip dredged by the city of Miami, and for two parallel rubble-
stone jetties, 1,000 feet apart, the north to be 3,000 feet long and the
south 2,750 feet long. The present approved dimensions for the turn-
ing basin are 1,400 feet from the west end of Biscayne Bay Channel
to the terminals, and 1,350 feet wide. The total length of the water-
way under improvement is about 6 miles.
   The mean tidal variation is 2.5 feet at the entrance and 2 feet
in the bay. The extreme variation is about 4.5 feet at the entrance.
Strong easterly winds raise the water level about 1.5 feet at the entrance
and 1 foot in the bay. Strong westerly winds lower the water level
about 1 foot at the entrance and about 0.5 foot in the bay.
   The estimate of cost for new work, revised in 1937, was $7,004,000.
The latest (1937) approved estimate for annual cost of maintenance
is $80,000.
596           REPORT       OF CHIEF OF ENGINEERS,                      U.    S. ARMY,        1942

  The existing, project was authorized by the following river and
harbor acts:

       Acts                       Work authorized                                     Documents


June 13,1902      An 18-foot channel in a land cut across the penin-   H.    Doc. No. 662, 56th Cong., 1st sess.
                   sula and construction of the north jetty.                (Annual Report, 1900, p. 1987.)
Mar. 2,1907       Construction of the south jetty and for a channel    Specified in act.
                   width of 100 feet.
July 25, 1912     Enlarging the channel to 20-foot depth and 300-      H. Doe. No. 554, 62d Cong., 2d sess.
                   foot width, and extending the jetties.
Mar. 3,1925       Deepening the channels to 25 feet, mean low water,   H. Doc. No. 516, 67th Cong., 4th sess.
                   with present project widths at the entrance and
                   a width of 200 feet across Biscayne Bay.
July    3, 1930   A channel width of 300 feet across the bay and       Rivers and Harbors Committee Doc.
                   enlarging the municipal turning basin, with           No. 15, 71st Cong., 2d sess.
                   expenditures thereon limited to $200,000.
Aug. 30, 19351    A depth of 30 feet from the ocean to and in the      Senate Committee Print, 73d Cong.,
                                                                                  2
                   turning basin, with the existing authorized           2d sess.
                   project widths, including the 300-foot width in
                    the channel across the bay.
Aug. 26, 1937     Extending the turning basin 200 feet to the south-   Rivers and Harbors Committee Doe.
                   ward.                                                No. 86, 74th Cong., 2d sess.2


  1 Included in the Public Works Administration program Jan. 3, 1934.
  2 Contains latest published maps.


   Recommended modifications of project.-Under date of July 29,
1939, the Chief of Engineers recommended modification of the exist-
ing project so as to provide an approach channel and turning basin
at an estimated first cost of $3,275,000, with annual maintenance of
$30,000, in addition to that now required; subject to certain condi-
tions of local cooperation (H. Doc. No. 470, 76th Cong., 1st sess.).
   Further modification of the existing project was recommended by
the Chief of Engineers in a report requested by Rivers and Harbors
Committee resolution adopted March 26, 1940, and transmitted to
Congress by the Secretary of War June 2, 1942.
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-These consist of 14 piers and wharves located
in Biscayne Bay, with an aggregate berthing space of about 13,555 feet,
with depths of 31 to 18 feet. All facilities have highway connections
except 1 located on Fisher Island, which can be reached only by water.
A municipal yacht anchorage with a depth of 16 feet, and a municipal
yacht basin have been constructed for the use of recreational craft.
One of the municipal piers, the municipal open wharf, 1 private pier,
and the municipal yacht facilities are open to the public. In addition,
there are 6 piers and wharves located on Miami River, which are used
by smaller vessels serving the port. There are also numerous bulk-
head wharves and slips on this river which are used for mooring recre-
ational craft. The facilities are considered inadequate for present
needs. (See Port Series No. 8, Part 2, revised 1936, Corps of Engi-
neers. )
   Operations and results during fscal year.-The costs of periodic
surveys and inspections to determine the condition of the improve-
ment, and of the care and preservation of the United States reservation
at Miami Beach were $17,552 for maintenance. The expenditures
were $19,967.45.
            RIVERS AND                  HARBORS--JACKSONVILLE,                         FLA.,           DISTRICT           597
  Condition at end of fiscal year.-The existing project was completed
in 1939. The two stone jetties were completed during the calendar
year 1929, and the dredging was completed during the calendar year
1939. The total length of the north jetty and revetment is 4,688 feet,,
and that of the south jetty and revetment, 3,850 feet. The two jetties
and revetments are in fair condition. The controlling mean low wa-
ter depths when last ascertained in July 1941 were as follows: En-
trance channel, 30 feet except for a spot shoal along the southerly side
of the 300-foot channel across Biscayne Bay, having a least depth
of 29.6 feet located about 25 feet inside the channel line and 2,350
feet west of Causeway Terminal channel; and .turning basin, 29.6
feet for a width of 1,300 feet.
  The total cost, all funds, has been $7,891,080.50, of which $6,570,-
769.47, including $2,202,126.04 Public Works funds, was for new work,
and $1,320,311.03 for maintenance. The total expenditures have been
$7,897,914.31, including $2,202,126.04 Public Works funds.
  Proposed operations.-The balance unexpended and accounts re-
ceivable on July 1, 1942 ($19,084.81), will be applied as follows:
Accounts payable June 30, 1942                      _        -------                        ------                    $65. 45
Maintenance :
   Care and preservation of the reservation---------- $15, 000. 00
   Periodic and miscellaneous surveys-----------__      4 019. 36
                                                                                                                   19, 019. 36.
        Total for maintenance- _--                                                                                 19, 084. 81

   The additional sum of $80,000 can be profitably expended during the
fiscal year 1944 as follows:
Maintenance :
    Repair, by contract, during July and August 1943, the damaged por-
      tions of the jetties-----------------------------------------    $40, 000
   Dredging, with U. S. hopper dredge San Pablo, throughout the chan-
      nels of the project as required, February 1944------------------30, 000
   Care and preservation of the reservation--------------------         10, 000

        Total for maintenance---------------------------------------80,                                                      000-

                                         Cost and financial summary
Cost of new work to June 30, 1942-------------------------                                                   $6, 570, 769. 47
Cost of maintenance to June 30, 1942-------------------------                                                 1, 320, 311. 03
        Total cost of permanent work to June 30, 1942                                   ____..                7, 891, 080. 50
Plus accounts receivable   June 30, 1942--      --------                                                           6, 899. 26

      Gross total costs to June 30, 1942 -______-_________                                                    7, 897, 979. 7t6
Minus accounts payable June 30, 1942_________________________                                                          65. 41i

     Net total expenditures-------- -------------------------                                                 7, 897, 914. 31
Unexpended balance June 30, 1942---------------------------                                                       12, 185. 55
        Total amount appropriated to June 30, 1942_--------------                                             7, 910, 099. 86

   Fiscal year ending June 30                1938            1939              1940                   1941            1942

Cost of new work                          $555, 795. 31   $111, 049. 43 .-              .            ..                      -
Cost of maintenance_.         ._
                             _____...        7, 448. 12     10, 464. 48      $38, 034. 42       $11, 933. 32         $17, 552. 09

     Total cost ..-...   _ _____....       563, 243. 43    121, 513. 91       38; 034. 42            11, 933. 32      17, 552. 00
Total expended                 _           569, 020. 10    114, 124. 44       11,941. 67             13, 419. 98      19, 967. 45
Allotted----_            ----------- 597, 300. 00           91,000. 00        20, 804. 36             7,000.00        24, 400. 00
598      REPORT OF CHIEF            OF ENGINEERS,        U.    S. ARMY,       1942

Balance unexpended July 1, 1941  .-----------------------------                  $7, 753.00
Amount allotted from War Department Civil Appro-
  priation Act approved May 23, 1941__ --- _______              $5, 000. 00
Amount allotted from War .Department Civil Appro-
priation Act approved April 28, 1942______________ 19,400. 00
                                                                                 24, 400. 00
      Amount to be accounted for__________________________--   _                 32, 153. 00
Gross amount expended_______                        $167, 317.98
Less reimbursements collected---------     _____ 147, 350. 53
                                                                                 19, 967. 45
      Balance unexpended June 30, 1942________________________                   12, 185. 55
Outstanding liabilities June 30, 1942___                 $65. 45
Amount covered by uncompleted contracts______________ 4, 658. 41
                                                                                     4, 723. 86

       Balance available June 30, 1942---------------------_                         7, 461. 69
Accounts receivable June 30, 1942_____________________________                       6, 899. 26

       Unobligated balance available June 30, 1942 _____________                 14, 360. 95
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1--_ ------                _     _80,
                                                   _------------___                    000. 00
  1 Exclusive of available funds.

12. CALOOSAHATCHEE            RIVER AND LAKE              OKEECHOBEE           DRAINAGE
                                  AREAS, FLA.

   Location.--The Caloosahatchee River has its source in Lake Okee-
chobee and flows in a general southwesterly direction, emptying into
the Gulf of Mexico through San Carlos Bay, about 30 miles south of
the entrance to Charlotte Harbor. (See U. S. Coast and Geodetic
Survey Charts Nos. 473 and 1255.)
   Lake Okeechobee is a large, fresh-water lake located in south-central
Florida. (See U. S. Coast and Geodetic Survey Charts Nos. 804 and
805.)
   St. Lucie Canal was constructed by the Everglades Drainage Dis-
trict as a control canal for Lake Okeechobee. It begins at about the
middle of the east shore of Lake Okeechobee and empties into the
south branch of the St. Lucie River at St. Lucie lock. The length of
the canal is 23.8 miles.
   St. Lucie River, south branch, flows north from the entrance of the
St. Lucie Canal for about 7.7 miles to Stuart, where it joins the north-
west branch forming the St. Lucie River; thence east, southeast, and
east about 7.5 miles, emptying into the Indian River opposite St. Lucie
Inlet. (See U. S. Coast and Geodetic Survey Chart No. 1247.)
   Taylor Creek is formed by the junction of several small creeks that
have their headwaters in Allapattah Flats and flows generally in a
southeasterly direction, emptying into Lake Okeechobee at its most
northernly extremity. (See U. S. Coast and Geodetic Survey Chart
No. 804.)
   (For description of above waterways see p. 705, Annual Report for
1932.)
   Previous projects.--Adopted by River and Harbor Acts of August
2, 1882, and August 11, 1888. For further details see page 707, Annual
lReport for 1932.
   Existing project.--The project for lower Caloosahatchee River pro-
Yides for a channel 200 feet wide and 12 feet deep at mean low water
             RIVERS     AND HARBORS-JACKSONVILLE,                                     FLA.,       DISTRICT           599
from the Gulf of Mexico to Punta Rasa, a distance of about 3.5 miles,
thence 100 feet wide and 10 feet deep at mean low water to Fort Myers
  (Edison Memorial Bridge), a distance of about 16.2 miles, with a turn-
ing basin at that point. The project for Caloosahatchee River and
Lake Okeechobee drainage areas provides for improving the Caloosa-
'hatchee River and Canal from Lake Okeechobee to the Gulf of Mexico
by straightening and by dredging a channel which will provide a dis-
charge outlet capacity of 2,500 cubic feet per second from Lake Okee-
chobee and a navigation channel at least 6 feet deep and 80 feet wide,
including necessary control works (Lake Okeechobee to Fort Myers,
 .56.1 miles); Improving Taylor Creek by providing a channel 6 feet
deep, when the lake is at elevation 14, and 60 feet wide from Okeechobee
City into Lake Okeechobee, a distance of about 4.0 miles; providing a
levee and a navigation channel 80 feet wide and 6 feet deep when the
lake is at elevation 14, following in general the south shore of the lake
  for a distance of about 58 miles, and a north shore levee about 16 miles
long; providing for replacing existing locks Nos. 1 and 2, St. Lucie
Canal, with a single new lock with a usable width of 50 feet and a
usable length of 250 feet, a depth of not less than 8 feet over the sills
and a new weir structure; providing for the protection of the St. Lucie
Canal from erosion and silting, and improving St. Lucie River to pro-
vide a channel 6 feet deep at local mean low water and 80 feet wide
from St. Lucie Canal to Indian River, a distance of about 15 miles.
    The following tables show the principal features of the locks and
dams and protective works included in the project based on the mini-
mum water elevations as follows:
                                                                                                                Elevation
St. Lucie River-Indian River (Intracoastal Waterway) to St. Lucie lock
  No. 2_-----------__-----------------                                     0.0
St. Lucie Canal-St. Lucie lock No. 2 to St. Lucie lock No. 1                  9
                                                                          1----------------2.
Lake Okeechobee__---_                                                         0
                                                                          1-------------4.
Caloosahatchee Canal-Lock No. 1, Moore Haven, to lock No. 2, Ortona---... 11. 5
Caloosahatchee River-Lock No. 2, Ortona, to the Gulf of Mexico_-- ----     0. 0

                                                 Locks and dams

                                                 ST. LUCIE CANAL

                                                                                   Width of
              Distance                                                             chamber        Lift with         wiver
                                                                                                               Depthills
Lock No.k    from Lake
     and dam Okeechobee                     Nearest town               Distance
                                                                         ieest     andlength
                                                                                       great-    the  above
                                                                                                 minimum       theabove
                                                                                                               m
     No.     Okeechobee                                                (miles)     available     water ele-    minmum
               (miles)                                                              for full       vation      water ele-
                                                                                  width (feet)                   vation


1   ..   .....         0. 3       Port Mayaca, Fla _-___           _       0. 5    130 by 30__         1.1     Lower 6.4.

2 ___________         23.8        Stuart, Fla_______           _           8.0     130 by 30__        12.9     Uper 12.6.
                                                                                                              {power 4.7.
St. Lucie lock 2      23. 8   .      .do_                                   8. O0 250 by 50__         14.0           12.4.
                                                                                                                 pLower


                                            CALOOSAHATCHEE RIVER


1 __________           0.0    Moore Haven, Fla __________                 0.75     50 by 250__         2. 5 LUper 11.0.
                                                                                                            81Upper 12.0.
2___,__________       15. 5       La Belle, Fla_           _   _           8.0     50 by 250          11.5 Lowe r 11.0.


    See footnotes at end of table.
600               REPORT OF CHIEF OF ENGINEERS,                                U.   S. ARMY,            1942

                                              Locks and dams-Continued
                                                   ST. LUCIE CANAL


Lock and dam              Character                                  Type of construction           Date of Actual cost
     No.                  of founda-      Kind of dam      --                                   -    com-     of lock
                              tion
                             No.                                Lock                Dam             pletion  and dam


1------------ Rock .....Needle-controlled           Concrete__ Concrete, needle con-                    1925    $127,448.98
                                 spillway.                      trolled.
2-----------     Pile ..--- ----   do             -    do - ...   do         _                          1925      419, 546. 94
St. Lucie lock_ -.. do----- Spillway, tainter          do      Concrete, tainter gate               .           1------
                                                                                                               41,774,000.00
                                 gate controlled.               controlled.


                                              CALOOSAHATCHEE               RIVER


1-----------__            Pile---      None    _ _--        Concrete-      None-----_--       -         1935    $556, 849. 92
2 ........-------------       do       Spillway, tainter   ...--do     -   Concrete, tainter gate       1937     856, 904. 15
                                         gate control.                      control.

  1 Constructed by Everglades- Drainage District. -These locks are provided with bypasses, each 50 feet
wide, that at lock No. 2 being 250 feet long and that at lock No. 1 of unlimited length and with a minimum
depth of 8.5 feet on the bypass sill. Old lock No. 2 and its bypass have been temporarily decommissioned
by construction operations and the bypass will be permanently obsolete after the completion of the new
dam.
  2 New lock and dam under construction to supplement existing lock No. 2 and eliminate existing lock
No. 1. The new lock structure and machinery installation was completed in 1941. The dam is now under
construction.
  3 Combined hurricane gate and lock (no spillway).
  4 Cost estimated.
                                                    Hurricane gates

  Hurri-                                           Dis-    Width of chamber and greatest       Lift at lake    Depth over
    cane
    cane                   Nearest town           tance     length available for full width     elevation      sills
                                                                                                               sills at lake
                                                                                                                     at lake
    No.                                          (miles)    (feet)                               14.0 feet       14.0 feetion


                                                                                                                    Feet
           2      Clewiston, Fla .........._        0     50 feet wide, length unlimited___          None                  10.0
           3      Lake Harbor, Fla- _. .              .5 -     do          -                         None                  10.0
           4      Belle Glade, Fla       .          4. 0 . .do                                       None                  10. 0
           5      Canal Point, Fla ..........       0     - dodo     --                              None                  10. 0
           6      Okeechobee, Fla .-                6. 0       do            __                      None                   7. 0


  Hurri-
   cane           Character of                                                                Date com-
   gate           foundation               Type of construction             Type of gate        pleted         Actual cost
   No.


           2      Pile     ----.
                            -     Concrete ___             - --             Steel sector---. Feb. 26, 1935      $309,748.18,
           3      Rock ----    _
                               _----- do- -.....
                                               -                                do ---.          do              316, 938. 28.
           4      -...--             . do .do                                      .do            o . -do        350, 025.30
           5     ..... do ....        . do                                   ___do . . . .. .do------            262,464.60
           6      Pile ....--     Concrete, with automatic culvert              do           Dec. 11, 1936       373,273. 30
                                      controlled spillway.



   The mean range of tide at Punta Rasa is 1.7 feet. The spring
range is 2.1 feet. Tidal influence is perceptible at the Ortona lock,
57 miles above Punta Rasa, at low-river stage. The mean range of
tide at St. Lucie Inlet is 2.6 feet. The spring range is about 3 feet.
Tidal effect is perceptible to lock No. 2.
   The estimate of cost for new work, revised in 1942, exclusive of
amounts expended on previous projects, is $18,636,450, of which
$500,000 was contributed by local interests. The latest (1942) ap-
proved estimate for annual cost of maintenance is $305,000, includ-
ing $110,000 for operating and care of locks and dams and protective
works.
               RIVERS       AND HARBORS              JACKSONVILLE,            FLA.,      DISTRICT         601
  The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                     Documents



June 25,1910       For improving the Caloosahatchee River from Fort       Rivers and Harbors Committee Doe.
                    Myers to the Gulf of Mexico.                            No. 8, 61st Cong., 2d sess.
July     3, 1930   For the Caloosahatchee River and Lake Okeecho-         S. Doc. No. 115, 71st Cong., 2d sess.'
                    bee drainage areas project, subject to the condi-
                    tion that local interests contribute $2,000,000
                    toward the cost and agree to maintain all works
                    and channels within the Everglades Drainage
                    District.
Aug. 30,1935       For the United States to maintain all project works    Specified in act.
                    when completed and to bear the cost of all drain-
                    age structures heretofore or hereafter constructed
                    in connection with the project, and for the total
                     cash contributon required of local interests to be
                     $500,000.
Aug. 26, 1937      The construction of a new lock and weir structure      Rivers and Harbors Committee Doe.
                    in St. Lucie Canal.                                     No. 28, 75th Cong., 1st sess.


  1 Contains the latest published map of the lake.        The latest published maps of the remainder of the
project are in H. Doe. No. 215, 70th Cong., 1st sess.


    Recommended modifications of project.-Under date of July 24,
1939, the Chief of Engineers recommended modification .of the exist-
ing project so as to provide for raising and enlarging sections of the
Lake Okeechobee levees in division No. 9, at an estimated cost of
 $3,960,000, subject to certain conditions of local cooperation (H. Doc.
No. 469, 76th Cong., 1st sess.).
    Under date of April 10, 1940, the Chief of Engineers recommended
modification of the existing project so as to provide for a channel 8
feet deep from Fort Myers to the Intracoastal Waterway near Stuart,
with widths of 90 feet from Fort Myers to Moore Haven, 80 feet in the
existing channel along the southerly shore of the lake to the hurricane-
,gate structure at Clewiston, 100 feet wide; thence along a relocated
channel to deep water on the south side of the lake, 100 feet from
,deep water on the east side of the lake to St. Lucie lock No. 2, and
thence 80 feet to the Intracoastal Waterways; all at an estimated
first cost of $208,000, with annual maintenance of $1,500 in addition to
that now required, subject to certain conditions of local cooperation
  (H. Doc. No. 696, 76th Cong., 3d sess.).
    Local cooperation.-The requirements imposed by the River and
Harbor Act approved August 26, 1937, have been fully complied with.
Compliance with all prior requirements has been substantially com-
pleted.
    Terminal facilities.-In the vicinity of Fort Myers on the Caloosa-
hatchee River these consist of three freight piers, one railroad ter-
minal pier, one municipal recreation pier, four privately owned piers,
and a municipal yacht basin. A mooring basin has been provided at
La Belle. There are numerous small wooden-pile landings along the
upper Caloosahatchee River, along the lake shore, in St. Lucie Canal,
and on St. Lucie River, including one railroad terminal pier, a munici-
pal pier, and a pier for handling petroleum products at Stuart. A
602    REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1942

marginal wharf 30 feet long and other limited facilities with highway
and railway connections are available on Taylor Creek at the town of
Okeechobee. The facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year--New work.-The con-
struction and installation of operating machinery and electrical sys-
tem for the new St. Lucie lock, which was in progress by contract at
the beginning of the fiscal year, was completed August 20, 1941, at a
cost of $38,704.05. The construction, under contract, of a new spill-
way and protective dike at the new St. Lucie lock was commenced
September 9, 1941, and at the close of the fiscal year was 31 percent
completed at a cost of $211,004.81. Engineering and contingencies
preliminary to the construction of the new lock and spillway cost
$2,271.24.
   Maintenance.-Maintenance, by hired labor, of the completed levees,
including filling rain washes and wave erosion, rolling surface, mow-
ing, care and cultivation of trees previously set on the berm and fore-
shore areas along approximately 45 miles of levee, repair of ramp
roads on levee, repair of ramp and cattle fences, and work preliminary
to the proposed repair of rock riprap and concrete revetment along
berm and channel slopes in divisions 1 and 2, cost $71,248.99.
   U. S. derrick boat D-1 and hired labor were employed from Janu-
ary 26 to March 26, and intermittently from May 11 to 31, 1942, in the
removal and disposal of snags, overhanging trees and other obstruc-
tions from the St. Lucie Canal and River between Port Mayaca and
open waters near Stuart, and from the Caloosahatchee Canal and
River between Moore Haven and Beautiful Island. Work in the latter
reach was 49 percent completed at the close of the fiscal year. A total
of 18,661 obstructions was removed. Old range piling and other ob-
structions to navigation in Lake Okeechobee between Observation
Island and Fisheating Creek floodway channel were removed by
United States plant and hired labor. The total cost of snagging oper-
ations was $21,298.34. Maintenance dredging in the Liberty Point
floodway channel to remove side shoaling, with United States drag-
line and hired labor, was 32 percent completed in June 1942, by the
removal of 750 cubic yards of material at a cost of $321.51.
   Maintenance and operation of meteorological instruments and the
compilation of meteorological data cost $11,188.40. Periodic surveys
and inspections, and surveys preliminary to proposed maintenance
dredging in the Caloosahatchee River, cost $14,854.73. Preparation
of plans and specifications for the proposed construction of an all-
steel meteorological tower station in Lake Okeechobee near the mouth
of Indian Prairie Canal cost $351.06.
   Operating and care.-Locks Nos. 1 (Moore Haven) and 2 (Ortona)
on the Caloosahatchee Canal, lock No. 1 and the new St. Lucie lock,
supplemented by old lock No. 2 on the St. Lucie Canal, 5 hurricane
gates on Lake Okeechobee, 16 drainage structures on the west, south,
and east shores, and 4 on the north shore of Lake Okeechobee, 16 drain-
age spillways on the St. Lucie waterway and an intercommunicating
radio-telephone network of 6 stations were operated, maintained, and
safeguarded. Routine maintenance of grounds at all structures and
repair of rainwash erosion was effected by hired labor. Sodding of
the newly constructed protective dike at the new St. L}cie lock was
effected by contract. The dewatering, cleaning, and repanting of the
        RIVERS AND HARBORS-JACKSONVILLE,          FLA.,   DISTRICT   603

underwater metal portions at hurricane gates Nos. 5 and 6 were
effected during March 1942. The replacement of deteriorated wooden
pile fender system at Moore Haven lock and at old St. Lucie lock
No. 1 was completed and the removal of deteriorated wooden pile
system at hurricane gate No. 6 was effected without replacement. The
costs were $64,136.64 for operation, $34,826.94 for ordinary repairs,
$22,703.36 for improvement and reconstruction, and $1,310.77 for
emergencies. Floating booms were constructed by U. S. derrick boat
D-1 and hired labor at the Moore Haven and Ortona locks and at the
new St. Lucie lock, at a total cost of $9,885.11. Design and erection
of 1,500 linear feet of theft-proof fences at the reservation at Moore
Haven lock, 1,485 linear feet at Ortona lock, 1,080 linear feet at new
St. Lucie lock, and the installation of projection panels at all hurri-
cane gates cost $10,302.25. The construction, by contract and hired
labor, of additional lighting facilities at Moore Haven and Ortona
locks and at St. Lucie lock No. 1, and the new St. Lucie lock was com-
menced April 1942 and at the close of fiscal year was 18 percent com-
pleted at a cost of $513.56.
   Su'mmary.-The costs for the year were $251,980.10 for new work,
$119,263.03 for maintenance, and $143,678.63 for operating and care,
a total of $514,921.76. The expenditures were $541,645.38.
   Condition at end of fiscal year.-The existing project was about 97
percent completed. The project for the Caloosahatchee River below
Fort Myers was completed in 1913. Essential features of the Caloosa-
hatchee River and Lake Okeechobee drainage areas project have been
accomplished as follows: Dredging 56.1 miles of floodway and navi-
gation channel in the Caloosahatchee River and Canal from Moore
Haven to Fort Myers, having a minimum bottom width of 90 feet and a
depth of at least 7 feet, and the riprap protection of all drainage open-
ings and bridges between Moore Haven and Citrus Center; dredging
58.3 miles of navigation channel, having a depth of at least 6 feet and
a bottom width of at least 80 feet, in Lake Okeechobee along the south
shore levee from the Fisheating Creek auxiliary floodway channel to
St. Lucie Canal; dredging a channel at least 6 feet deep and 60 feet
wide in Taylor Creek from Okeechobee City into Lake Okeechobee, a
distance of approximately 4 miles; dredging five auxiliary floodway
channels extending into Lake Okeechobee at the mouth of the Clewis-
ton Industrial Canal, in the vicinity of Liberty Point, near the mouth
of Fisheating Creek, at the mouth of Kissimmee River, and at the
mouth of Taylor Creek; dredging a channel 6 feet deep and 80 feet
wide in St. Lucie River, completed in 1931; constructing 67.8 miles of
continuous levee on the west, south, and east shores of Lake Okeecho-
bee, and 15.74 miles of levee on the north shore; constructing a new
lock and spillway near Ortona, a combined lock and hurricane gate at
Moore Haven, a new lock and new spillway in the lower end of the St.
Lucie Canal near Stuart, with the spillway and protective works 31 per-
cent completed; constructing four hurricane gates through the levee
at the entrances to canals at Clewiston, Lake Harbor, South Bay, and
Canal Point, and a combined hurricane gate and culvert spillway
through the north shore levee at Taylor Creek; constructing 16 metal
pipe drainage culverts with concrete headwalls through the west,
south, and east shore levee and 4 similar culverts through the north
shore levee; constructing 16 drainage spillways at drainage openings
 604         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                            1942

  in the banks of the St. Lucie Canal; levee enlargement and construc-
  tion of a protective beach along approximately 14.4 miles of the east
shore levee between Bacom Point and Port Mayaca; and the extension
  of levee toe along 1.2 miles of levee on north shore between Nubbin
  Slough and Kissimmee River. For information relative to locks and
hurricane gates see table in the paragraph "Existing project." The
controlling depths at mean low water, when last ascertained, were as
follows, less than project dimensions being due to isolated shoals: Gulf
of Mexico to Punta Rasa, 12 feet for a width of 200 feet, and thence
to Fort Myers, 10 feet for a width of 100 feet, in January 1940; Fort
Myers to Lake Okeechobee at Moore Haven, 5.5 feet for a width of 50
feet, in May 1942; Lake Okeechobee from Moore Haven to St. Lucie
'Canal via south shore levee channel, 7 feet for a width of 50 feet, and
via Liberty Point floodway channel, 6.5 feet for a width of 60 feet, in
.June 1942; St. Lucie Canal and River to Intracoastal Waterway, 6 feet
for a width of 80 feet, in May 1942; Taylor Creek from Okeechobee
'City to Lake Okeechobee, 6 feet for a width of 60 feet, in May 1942.
    The work remaining to be done to complete the project is the comple-
tion of the new spillway at the new St. Lucie lock and the removal of
•old lock No. 1 after completion of pertinent works at the new lock.
    The costs of the existing project to June 30, 1942, have been as
follows:

                                                        New work              Maintenance         Operating              Total


Regular funds          _
                  ----------------- _-                 $7, 646, 827.76        $4,811,346.78       $545, 864. 79                33
                                                                                                                    $13,004,039.
iPublic Works funds...--              ----
                                   __....         ..    7, 694, 360. 74   -       ...       ..      .--               7, 694, 360. 74
Emergency Relief funds..------------------              2, 170, 253.00                  747.00   -------------        2, 171,000. 00

      Total United States funds .   ..---------17, 511, 441. 50               4,812,093. 78     545, 864. 79         22,869,400.07
Contributed funds-------_  --------------          500, 000. 00                   1,000. 00 --------------              501,000. 06

      Total, all funds-.----         _--- -----
                                            --         18, 011,441.50         4, 813,093. 78       545, 864. 79      23, 370, 400. 07



   The expenditures have been $12,913,466.03 regular funds, $7,694,-
360.74 Public Works funds, and $2,171,000 Emergency Relief funds,
a total of $22,778,826.77 from United States funds. In addition,
-$501,000 was expended from contributed funds for new work and
maintenance as indicated above.
   Proposed operations.-Thebalance unexpended and accounts receiv-
able on July 1, 1942 ($873,182.17), will be applied as follows:
Accounts payable June 30, 1942---------------------------------- $99, 080. 29
New work: Complete, under contract, during March 1943, the par-
  tial construction of new spillway for new St. Lucie lock and pro-
  vision of a protective dike extending upstream therefrom_ -- __- 460, 000. 00
Maintenance :
     Maintenance of levee slopes in divisions 1. 2, 3, 4,
       and 9, by hired labor, July 1, 1942, to June 30,
         193--__--------------------------------------
     Dredging to restore project dimensions in the navi-
                                                          $87, 000. 00

       gation channel of Caloosahatchee Canal and River
       between Ortona lock and Fort Myers, with leased
       plant, July to August 1942---------------- _ __     25, 000. 00
    lRepair, by hired labor, of existing rock riprap and
       concrete revetment along levee berm and channel
       slope in divisions 1 and 2, January to March 1943. 35, 500. 00
          RIVERS AND HARBORS-JACKSONVILLE,                        FLA.,     DISTRICT        605
Maintenance--Continued.
   Complete with U. S. derrick boat D-1, removal and
     disposal of menaces to navigation from the banks
     of Caloosahatchee Canal and River between Moore
     Haven and Beautiful Island, Nov. 1 to Dec. 31,
     1942-_-------___---------------------                          $7,   000. 00
   Care and repair of Clewiston office building, ware-
     house buildings, grounds, and reservation, by
     hired labor, July 1, 1942, to June 30, 1943-------             10, 000. 00
   Compilation of meteorological data and maintenance
     and operation of weather instruments, July 1,
     1942, to June 30, 1943__-_________                             10, 000. 00
   Periodic and miscellaneous surveys_---------------                9, 601. 88
                                                                                    $184, 101. 88
Maintenance (operating and care of locks, spillways,
hurricane gates, and drainage culverts), between
July 1, 1942, and June 30, 1943:
    Operation -------------------                 ----             $60, 000. 00
    Ordinary repairs                    -----------                 35, 000. 00
    Improvement and reconstruction------------------ 20, 000. 00
    Emergencies         -------------                               15, 000. 00
                                                                                     130. 000. 00
       Total for all work ---------                                                  873, 182. 17
  The additional sum of $470,000 can be profitably expended during
the fiscal year 1944 as follows:
New work :
   Begin, under contract during March 1944, the completion of new
     spillway for new St. Lucie lock involving the provision of seven
     Taintor gates and other appurtenant features__--                  $125, 000
   Begin removal, by contract, during June 1944, of old lock No. 1 and
     spillway at Port Mayaca, St. Lucie Canal----------------------- 40, 000

        Total for new work     ---------------------------------------     165, 000
Maintenance :
    Maintenance of levee slopes in divisions 1, 2, 3, 4, and 9, by
      hired labor, between July 1, 1943, and June 30, 1944- -- $103, 000
    Dredging, with U. S. dredge Congaree and hired labor, in
      St. Lucie River and Canal between Lake Okeechobee and
      the Intracoastal Waterway, during March and April 1944_      30, 000
   Dredging, with U. S. dredge Congaree and hired labor, in
      Caloosahatchee River and Canal between Moore Haven
      and Fort Myers, Fla., during May and June 1944 ______        30, 000
   Care and repair of Clewiston office building, warehouse
      buildings, grounds, and reservation, between July 1, 1943,
       and June 30, 1944__ ___________________-------
                                              -          ------                10, 000
    Compilation of meteorological data, maintenance and opera-
      tion of weather instruments, by hired labor, between
      July 1, 1943, and June 30, 1944 -------------------------                12, 000
    Periodic and miscellaneous surveys----------------------  _                10, 000
                                                                                         195, 000
Maintenance (operating and care of locks, spillways, hurricane
gates, and drainage culverts), between July 1, 1943, and
June 30, 1944:
   Operation---------------------------------------------                      40, 000
    Ordinary repairs ----------------------------------                        30, 000
    Improvement and reconstruction----------------------                       20, 000
   Emergencies ---   ---------------------------------                         20, 00
                                                                                         110, 000

       Total for all work------------------------------------------ 470. 000



       493202-43-pt. 1, vol. 1-         39
606         REPORT OF CHIEF OF ENGINEERS, U.                                     S. ARMY,             1942

                                   Cost and financial summary
Cost of new work to June 30, 1942----------------------------   $17, 538, 891. 26
Cost of maintenance to June 30, 1942- -------------------------   5, 480, 094. 57
      Total cost of permanent work to June 30, 1942-----------                                     123, 018, 985. 83
Undistributed costs June 30, 1942----------                                                               4, 378. 62
      Net total cost to June 30, 1942----------------------------23, 023, 364.45
Plus accounts receivable June 30, 1942----,-------------------        4, 128. 37
      Gross total costs to June 30, 1942------------------------23,                                          027, 492. 82
Minus accounts payable June 30, 1942----------------------------                                              99, 080. 29
     Net total expenditures--------------------------------                                           22, 928, 412. 53
Unexpended balance June 30, 1942-----------------------------                                             869, 053.80
         Total amount appropriated to June 30, 1942--------------- 123, 797, 466. 33

   Fiscal year ending June 30           1938               1939              1940              1941               1942

Cost of new work           __       $522, 052. 21      $131, 724. 89     $654, 355. 98     $410, 063. 76        $251, 980. 10
Cost of maintenance ._..........     321, 184. 42     1, 022, 649. 21   1, 848, 984. 85   1,181, 770.04          262, 941.66
      Total cost---------------      843, 236. 63     1, 154, 374.10    2, 503, 340. 83   1, 591, 833.80         514, 921.76
Total expended-----------          1,050, 649. 68     1, 157, 335. 46   2, 367, 787. 10   1, 557, 568. 25        541, 645. 38
Allotted ----------------------    1, 377, 000. 00    1, 28, 275. 20    3, 302, 296. 17     523, 234. 75         553, 000 00



Balance unexpended July 1, 1941------------------------------                                               $857, 699. 18
Amount allotted from War Department Civil Appro-
 ,priation Act approved June 28, 1939------------- $73, 898. 27
Amount allotted from War Department Civil Appro-
  priation Act approved June 24, 1940                      -----------
                                                    211, 342. 27
Amount allotted from War Department Civil 'Appro-
  priation Act approved April 28, 1942------------- 330, 000. 00
Amount allotted from War Department Civil Appro-
  priation Act approved June 11, 1938-------------   24, 759. 46
                                                                                                          640, 000. 00
      Amount to be accounted for                                                                       1-----------------------------,
                                                                                                          497, 699. 18
Deductions on account of revocation of allotment---------------                                            87, 000. 00
      Net amount to be accounted for                                                                    , 410, 639. 18
                                                                                                       1-------------------------
Gross amount expended-------------------------$729, 661. 63
Less reimbursements collected--------------------188, 016. 25
                                                                                                             541, 645. 38
      Balance unexpended June 30, 1942---------------------                                                  869, 053. 80
Outstanding liabilities June 30, 1942--------------- $99, 080. 29
Amount covered by uncompleted contracts --------- 479, 640. 23
                                                                                                             578, 720. 52
     Balance available June 30, 1942-------------------------                                                290, 333. 28
Accounts receivable June 30, 1942___------------------------------                                             4, 128. 37
         Unobligated balance available June 30, 1942                                  _                      294, 461. 65
Amount (estimated) required to be appropriated for completion
   of existing project 2-_                              ______________------                                 165, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1944:
      For new work 2-_____________________                                                                   165, 000. 00
                                  _
      For maintenance _______                        _____________________                                   305, 000. 00
        Total ____          ___,_      ________________          __      470,000.00
   1 In addition $500,000 expended for new work and $1,000 for maintenance from con-
tributed funds.
   2 Exclusive of available funds.
              RIVERS AND HARBORS-JACKSONVILLE,                                 FLA.,    DISTRICT          607

                                 13. CHARLOTTE HARBOR, FLA.

   Location.-This harbor is a large bay on the west coast of Florida.
The entrance is 70 miles south of the entrance to Tampa Bay and 150
miles north of Key West. Pine Island Sound is an arm of Charlotte
Harbor extending southward to connect with San Carlos Bay at the
mouth of the Caloosahatchee River. (See U. S. Coast and Geodetic
Survey Charts Nos. 474 and 1255.)
   Previous projects.-Appropriationsfor removing obstructions were
made in 1881, 1882, and 1886. Improvement of Charlotte Harbor and
Peace Creek was authorized by acts of September 19, 1890, and June 13,
1902. For further details see page 152, Annual Report for 1890; page
1828, Annual Report for 1915; page 291, Annual Report for 1904; and
page 658, Annual Report for 1938.
   Existing project.-This provides for a channel 7 feet deep at mean
low water and 100 feet wide in Pine Island Sound from Punta Rasa
to Charlotte Harbor, and for a channel 30 feet deep at mean low water
and 300 feet wide, increased to 700 feet wide at the bend, from the Gulf
of Mexico to South Boca Grande, just inside the entrance, thence 10
feet deep and 100 feet wide from deep water at Boca Grande to the end
of the municipal terminal at Maud Street, Punta Gorda, with a turn-
ing basin 200 feet square at the outer end of the terminal. The mean
range of tide is 1 foot at South Boca Grande and 1.4 feet at Punta
Gorda. The extreme range is about 2 feet. Strong southwesterly
winds raise the water level about 11/2 feet. Strong northerly and east-
erly winds lower the water level about 1 foot.
   The estimate of cost for new work, revised in 1937, exclusive of
amount expended on previous projects, and exclusive of $15,562 con-
tributed by local interests, was $151,600. The latest (1937) approved
estimate of cost for annual maintenance is $29,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                      Work authorized                                    Documents



June 13,1902      A channel 7 feet deep end 100 feet wide in Pine     H. Doc. No. 286, 56th Cong., 1st sess.
                     Island Sound from Punta Rasa to Charlotte
                     Harbor. (New work completed under previ-
                    ous projects.)
July 25, 1912     A 24-foot channel 300 feet wide from the Gulf of    H. Doe. No. 699, 62d Cong., 2d sess.
                     Mexico through the Boca Grande entrance.
Mar.     3,1925   A depth of 27 feet at the entrance and a width of   H. Doc. No. 113, 66th Cong., 1st sess.
                    500 feet at the bend.
July    3, 1930   The 10-foot depth to Punta Gorda and the turn-      Rivers and Harbors Committee Doe.
                    ing basin at that point.                           No. 1, 70th Cong., 1st sess.1
Aug. 26, 1937     The 30-foot depth at the entrance and the 700-      Rivers and Harbors Committee Doc.
                    foot width at the bend.                            No. 95, 74th Cong., 2d sess.'


1Contain latest published     maps.

   Local cooperation-Fullycomplied with.
   Terminal facilities.-These consist, of a phosphate wharf at South
Boca Grande and a municipal earth-fill pier about 850 feet long, re-
tained by steel-sheet piling, at Punta Gorda. Both wharves are open
to the public. Railway connections are available at South Boca
608          REPORT OF CHIEF OF ENGINEERS,                            U.    S.       ARMY,       1942


Grande, and highway and railway connections are available at Punta
Gorda. The facilities are considered adequate for existing commerce.
 (For further details see Port Series No. 8, Corps of Engineers.)
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was completed
in 1939. The 7-foot-depth channel through Pine Island Sound was
completed in 1903, and the 10-foot depth channel to Punta Gorda and
the turning basin at that point were completed in 1931. When last
ascertained the controlling depths were as follows: Entrance channel
to South Boca Grande, 28 feet for a width of 250 feet, January 1942;
channel from South Boca Grande to and including the turning basin
at Punta Gorda, 9 feet for a width of 100 feet, October 1941; and
channel through Pine Island Sound, 6 feet for a width of 100 feet in
February 1940. The costs and expenditures under the existing proj-
ect, including $6,000 for the 7-foot-depth channel in Pine Island Sound
included in previous projects prior to 1940, have been $199,964.76 for
new work and $386,997.53 for maintenance, a total of $586,962.29. In
addition, $15,562.78 was expended from contributed funds for new
work in the Boca Grande entrance channel.
  Proposed operations.-No funds are available, and no operations
are proposed during the fiscal year 1943.
   The sum of $58,000 can be profitably expended during the fiscal year
1944 in maintenance dredging in the Boca Grande entrance channel,
with a United States hopper dredge, during May and June 1944.

                                          Cost and financial summary

Cost of new work to June 30, 1942_ _                 ___----------                           -   ' $312, 964. 76
Cost of maintenance to June 30, 1942 ----------------------------                                      386, 997. 53
        Total cost of permanent work to June 30, 1942__                              _                 699, 962. 29
Net total expenditures_________                                                                       '699, 962. 29
Total amount appropriated to June 30, 1942----------------------                                       699, 962. 29


   Fiscal year ending June 30                 1938        1939          1940             1941              1942


Cost of new work          --------    -                $75, 836. 21   $25, 596. 75                         - -
Cost of maintenance                                         _____      39, 256. 80        $244. 07 -
      Total cost--    --------        --      --        75, 836. 21    64,853.55           244. 07
Total expended -                                        61, 009. 90    79, 679. 86         244. 07     1
Allotted-   ----.     -      -       ____--             84, 000.00     57, 000.00         -66.   17               --




Amount that can be profitably expended in fiscal year ending June
30, 1.944, for maintenance-------------------------------------$58, 000. 00
  1 In addition $15,562.78 expended from contributed funds for new work.
        RIVERS   AND HARBORS-JACKSONVILLE,        FLA.,   DISTRICT   609
                       14. TAMPA HARBOR, FLA.
   Location.-This harbor is a large natural indentation of the Gulf
of Mexico approximately midway of the western coast of the penin-
sula of Florida. The entrance is about 220 miles north of Key West,
about 330 miles from Pensacola, 360 miles from Mobile, and 512 miles
from New Orleans. (See U. S. Coast and Geodetic Survey Charts
Nos. 586, 587, and 1257.)
   Previous projects.-Adopted by the following river and harbor
acts: For Tampa Bay, acts of June 14, 1880, and August 11, 1888; for
Tampa and Hillsboro Bays, acts of June 14, 1880, March 3, 1899, and
March 3, 1905; for Hillsboro River, act of June 14, 1880. For further
details see pages 1829, 1830, and 1831 of the Annual Report for 1915,
and page 665, Annual Report for 1938.
   Existing project.-This provides for a depth of 32 feet at mean low
water and a width of 600 feet on Egmont Bar; a depth of 30 feet in
all other project channels and basins, except in Hillsboro River, with
widths of 400 feet in Mullet Key Cut and in Ybor Channel and
300 feet in all other channels, and including the widening at the
bend between Sparkman Channel and Cut D of Hillsboro Bay Channel
by 250 feet; turning basins at the mouth of Hillsboro River (west
end of Garrison Channel), at the entrance to Ybor Channel and at
the entrance to the Port Tampa terminals, the latter to be 2,000 feet
long and 550 feet in maximum width; and for securing and main-
taining by dredging a channel 2,400 feet long, 200 feet wide, and
12 feet deep at mean low water in Hillsboro River from a point 100
feet south of the Lafayette Street Bridge to the turning basin at
the mouth of the river. It also provides for the construction of a
breakwater of dredged material at Peter O. Knight Field, Davis
Islands, maintenance to be assumed by local interests. The approved
plans for the turning basin at the mouth of Hillsboro River provide
for a basin of irregular shape, roughly about 900 feet square, and
involve a land cut of about 300 feet at the northwest corner of Seddon
Island. The basin at the entrance to Ybor Channel is to be obtained
by widening the bend between Ybor and Garrison Channels by about
200 feet and by cutting back the point at the junction between Garrison
and Sparkman Channels by about 710 feet. The breakwater at the
Peter O. Knight Field will be roughly 2,000 feet long and will pro-
vide a partially enclosed landing basin for seaplanes.
   The mean range of tide is 1.3 feet at the lower end of the bay, 1.6
feet at Port Tampa, and 1.8 feet at Tampa. The spring range is
1.6 feet at the lower end of the bay and 2.3 feet at Tampa and Port
Tampa. Strong southwesterly winds raise the water level about 1.5
feet. Strong northerly winds, which usually occur in the winter
months, lower the water level about 2 feet.
   The estimate of cost of new work, revised in 1941, is $8,858,700, ex-
clusive of amounts expended on previous projects. The latest (1938)
estimate of cost of annual maintenance, exclusive of the breakwater
at Peter O. Knight Field, is $127,500.
610           REPORT        OF    CHIEF      OF ENGINEERS,               U.   S.   ARMY,       1942


  The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                     Documents



                                      TAMPA BAY


Mar.     3, 1899   Improving Tampa Bay from its entrance into the H. Doc. No. 52, 55th Cong., 3d sess.,
                     Gulf of Mexico to Port Tampa.                        and Annual Report, 1899, p. 282.
Mar. 3,1905        For a channel depth of 26 feet with sufficient width_ Specified in act.

                             TAMPA AND HILLSBORO BAYS


June 25,1910       For a depth of 24 feet in Hillsboro Bay_ ____.     -H.    Doc. No. 634, 61st Cong., 2d sess.
                                                                                                                  1

Aug. 8,1917        For a 27-foot depth from Gulf of Mexico up to          H. Doc. No. 1345, 64th Cong., 1st sess.t
                     and in the several channels of Hillsboro Bay,
                     the widths to be 500 feet on the bar, 300 feet in
                     Tampa Bay, Ybor and Garrison Chagnels, and
                     200 feeti n Hillsboro Bay, Sparkman and Seddon
                     Channels, with turning basins at the mouth of
                     Hillsboro River and at Ybor Estuary.

                                   HILLSBORO RIVER


Mar. 3,1899        For a 12-foot project under the title "Improving       H. Doe. No. 545, 55th Cong., 2d sess.,
                     Hillsboro Bay, Fla."                                   and Annual Report for 1898, pp. 1357-
                                                                            1360.
Sept. 22, 1922     Consolidation of the above projects to form a
                    single project for Tampa Harbor.




July     3, 1930Ilcreasing the depth of Egmont Channel to 29              H. Doc. No. 100, 70th Cong., 1st sess.
                  feet and the width of Sparkman Channel to
                  300 feet.
Aug. 30, 1935 2 For a depth of 32 feet and a width of 600 feet on         S. Doc. No. 22, 72d Cong., 1st sess.
                  Egmont Bar; a depth of 30 feet and a width of
                  400 feet in Mullet Key Cut; and a depth of 30
                  feet and a width of 300 feet in all other project
                  channels in Tampa Harbor except in Hillsboro
                  River; a turning basin 2,000 feet long and 550
                  feet in maximum width at the entrance to the
                  Port Tampa terminals.
June 20, 1938 For widening the bend between Sparkman Chan-                S. Doc. No. 164, 75th Cong., 3d sess.
                  nel and Cut D of Hillsboro Bay Channel by
                  250 feet; widening Ybor Channel 50 feet on each
                  side to a total width of 400 feet; and extending
                  the turning basin at the west end of Garrison
                  Channel (mouth of Hillsboro River) for a dis-
                  tance of 300 feet in an easterly direction.
   Do . .....   For construction of a breakwater at Peter O.              Senate Committee Print, 76th Cong.,
                  Knight Field, Davis Islands, its maintenance              1st sess.'
                  to be assumed by local interests.


  1 Contain latest published maps.
  2 Included in the Public Works Administration program, Sept. 6, 1933.


   Recommended modifications of project.-Under date of November
7, 1940, the Chief of Engineers recommended modification of the exist-
ing project so as to provide in Hillsboro River a channel 9 feet deep
and 100 feet wide from the upper end of the existing project to a point
2,000,feet upstream from the Michigan Avenue Bridge, and for re-
        RIVERS AND   HARBORS-JACKSONVILLE,        FLA.,   DISTRICT   611
moval of snags, wrecks, and piling thence to the Florida Avenue
Bridge, at an estimated first cost of $60,000, with annual maintenance
of $1,000, in addition to that now required, subject to certain condi-
tions of local cooperation (H. Doc. No. 119, 77th Cong., 1st sess.).
   Under date of December 5, 1940, the Chief of Engineers recom-
mended modification of the existing project so as to provide for a chan-
nel 25 feet deep and 150 feet wide from the ship channel in Hillsboro
Bay to and including a turning basin in the Alafia River, 600 feet wide
and 1,025 feet long, at an estimated cost of $189,000 for new work and
$5,000 annually for maintenance, in addition to the amount now
required, subject to certain conditions of local cooperation (S. Doc.
No. 16, 77th Cong., 1st sess.).
   Local cooperation.-The River and Harbor Act approved June 20,
1938, in authorizing certain channel improvements in upper Tampa
Harbor, imposed the condition that local interests furnish, free of cost
to the United States, necessary rights-of-way and suitable spoil-dis-
posal areas for new work and for subsequent maintenance as required,
and move and reconstruct all bulkheads, wharves, buildings, roads,
railroad tracks, and all other structures as may be necessary. These
requirements have not been complied with.
   The requirements imposed by the same river and harbor act in
authorizing the construction of a breakwater at the Peter O. Knight
Municipal Airport have been fully complied with. All prior require-
ments have been complied with except that the municipal belt-line
railroad and adequate paved street facilities to meet present day needs
have not been extended to the east side of Ybor Channel as required
by the River and Harbor Act approved August 8, 1917. Under date
of June 13, 1938, the Acting Secretary of War requested that the city
of Tampa immediately undertake the extension of the municipal belt-
line railroad across the north end and along the entire length of the
east side of Ybor Channel, and the provision of the additional paved
streets. A paved street was completed on the north side of Ybor
Channel in 1942 and the city is endeavoring to secure Federal aid to
provide an additional north and south street to serve the area on the
east side. On December 2, 1941, and April 14, 1942, the Secretary
of War again requested that the city of Tampa proceed immediately
with the construction of the belt-line railroad across the north end
and along the east side of Ybor Channel.
   Terminal facilities.-There are 51 piers and wharves at Tampa, in-
cluding 13 on Hillsboro River, and a like number at Port Tampa.
The municipal terminal consists of a slip 778 feet long, 250 feet wide,
and 29 to 30 feet deep. The city of Tampa also owns a shore wharf
located on Hillsboro River, and another on Garrison Channel.
Thirty-eight of the facilities, including the municipal slip, have rail-
way connections and all, excepting 4 located on Seddon Island, have
highway connections. The municipal terminals, one city wharf and
10 private terminals, are open to the public.
   On the east shore of Hillsboro Bay there is a large phosphate plant
providing about 1,000 feet of berthing space with a privately dredged
channel 23 feet deep connecting with the Hillsboro Bay Channel of
the Tampa Harbor project. The facilities will be adequate for the
existing commerce when the municipal belt-line railroad is extended
to the east side of Ybor Channel and additional paved-street facilities
612          REPORT OF CHIEF OF ENGINEERS,                                                 U.        S. ARMY,               1942

are provided to meet present-day needs. (See Port Series No. 8, pt.
2, revised 1936, Corps of Engineers.)
   Operations and results during fiscal year.-The cost of hired labor,
surveys, plans and specifications preliminary to proposed dredging
in upper Tampa Harbor was $1,784.80 for new work and the cost of
periodic surveys and inspections to determine the condition of the
improvement was $7,655.93 for maintenance. The total cost for the
year was $9,440.73. The expenditures were $19,359.18.
   Condition at end of fiscal year.-The existing project was about
98.6 percent completed. The Hillsboro River project was completed
in 1905. Egmont Relocation Channel to replace the old channel
alinement on Egmont Bar was completed in 1939. The breakwater
of dredged material at Peter O. Knight Municipal Airport was com-
pleted in 1941, and the city of Tampa has formally assumed responsi-
bility for its care, preservation, and maintenance. Channels with
project dimensions have been completed from the entrance to and
including the several channels of upper Tampa Harbor, except in the
bend between Sparkman Channel and cut D, Hillsboro Bay Channel,
and in Ybor Channel, which is only 300 feet wide. The turning
basin at the entrance to Ybor Channel has been completed and that
at the west end of Garrison Channel (mouth of Hillsboro River)
partially completed. The turning basin at Port Tampa has been
extended to a total length of 2,750 feet by a widening on the westerly
side of the Port Tampa Channel at its junction with the basin.
   Controlling mean low water dimensions, when last ascertained,
were as follows:

                                          Channel                                                    Depth          Width             Date
                                                                                                                                   ascertained


                                                                                                      Feet           Feet
Egmont relocation channel                       ---------------                                           32. 0         550       January 1942.
M ullet K ey Cut--- -- --- -- --- -- --- -- --- -- --- -- --- -- --                                       30. 0         400           Do.
Tampa Bay channel, cut A_                                                                                 29. 9         200       April 1942.
Tampa Bay channel, cuts B to F_                                                                           30. 0         250           Do.
Port Tampa channel .----                                   --------                                       30. 0         300           Do.
Port Tampa turning basin ----------                                                                       30. 0         450           Do.
Hillsboro Bay channel --------------------------------                                                    27. 0         225       M arch 1942.
Seddon Channel_                                         --------------                                    29. 5         225           Do.
Y bor Channel _ - -- - -- - -- - -- - - -- - -- - -- - -- - -- -                                          30.0          225           Do.
Sparkman Channel -----              -------------
                               -------                     ----------------                               29. 3         225           Do.
Garrison Channel ---         ------- - --
                         ------                       -      --------------   -                           30.0          225           Do.
Hillsboro River Channel---..      -     - -- -            -------           _                    .         9.4          100       January 1940.



  The work remaining to be done to complete the project is as follows:
Widening the bend at lower end of Sparkman Channel by 250 feet;
widening Ybor Channel 50 feet on each side to a total width of 400
feet; and enlarging the turning basin at the west end of Garrison Chan-
nel by 300 feet in an easterly direction.
  The total costs and expenditures under the existing project to
June 30, 1942, have been as follows:

                                                                    New work           Maintenance                  Total          Expenditures

Regular funds .......------------------------.. 5, 942, 724. 66                        $1, 682, 753. 42        $7, 625, 478. 08     $7, 640, 183. 34
Public W orks funds. _.          __.... ._      1, 329, 300.47                        ---------------           1,329,300.47         1, 329, 300. 47
Emergency Relief funds              .               ---..........   1, 463,000.00-        _---        -           1,463,000.00       1,463, 000.00
       Total    ... .........----       . -----..........           8, 735, 025. 13     1, 682, 753. 42        10, 417, 778. 55     10. 432, 483. 81
             RIVERS AND HARBORS-JACKSONVILLE, FLA., DISTRICT                                          613

   Proposed operations.-The balance unexpended and accounts re-
ceivable on July 1, 1942, $161,463.24, will be applied as follows:
Accounts payable June 30, 1942___________________--------------------------    __$143.73
Maintenance :
    Dredging, with U. S. hopper dredge San Pablo, 5
      months, October 1942 to February 1943, removing
      shoals throughout the project as required----                  $105, 000. 00
    Miscellaneous inspections, surveys, and contin-
      gencies-------------------------- --------------                  20, 319. 51
                                                                                    125, 319. 51
    Balance available-------------------------------                                 36, 000. 00

           Total for all work--------------------------------------                             161,463.24
   The additional sum of $265,500 can be profitably expended during
the fiscal year 1944 as follows:
New work: Begin, during October 1943, by contract and complete dur-
ing January 1944, the dredging required to widen bend at lower end
of Sparkman Channel, the widening of Ybor Channel 50 feet on each
  side, and for extending the turning basin at west end of Garrison
  Channel for a distance of 300 feet in an easterly direction--------- $125, 500
Maintenance :
    Dredging, with U. S. hopper dredge San Pablo, 4 months,
       March to June 1944, removing shoals throughout the
       project as required---------------------------------     $80, 000
    Dredging with a U. S. hopper dredge in Egmont Channel,
       2. months, March and April 1944_-..__--    ___-------      60, 000
                                                                          140, 000

             Total for all work ---------------------------------------                           265, 500

                                 Cost and financiaZ summary

Cost of new work to June 30, 1942_---------------------------                             $9, 588, 075. 59
Cost of maintenance to June 30, 1942-__------    --------                                  1, 699, 860. 66

      Total cost of permanent work to June 30, 1942------------ 11, 287, 936. 25
Plus accounts receivable June 30, 1942 _____   ______  __--_         14, 848. 99

      Gross total costs to June 30, 1942---------------------- 11, 302, 785. 24
Minus accounts payable June 30, 1942________- ___--- __-_____           143.73

     Net total expenditures------------------- -------------   11, 302, 641. 51
Unexpended balance June 30, 1942 -------------------- --------     146, 614. 25

           Total amount appropriated to June 30, 1942_                    ______ 11,449, 255.76

   Fiscal year ending June 30       1938            1939           1940            1941            1942


Cost of new work    ___ __ _ _    $86, 221.91    $432, 800. 83   $12, 633.03    $317, 083. 32      $1, 784. 80
Cost of maintenance __ _ ___       53, 499. 01    145, 341. 55    91, 491. 38      2, 885. 03       7, 655. 93

      Total cost_                 139, 720. 92    578, 142. 38   104, 124. 41    319, 968. 35       9,440.73
Total expended--       -- -       138, 547. 93    593, 279. 32    95, 735. 56    321, 038. 09      19, 359. 18

Allotted                          416, 000.00     571, 467.23      2,855.92      126, 000.00       140,000.00
614       REPORT OF CHIEF OF ENGINEERS,                          U. S. ARMY,          1942

Balance unexpended July 1, 1941-------------------------------                          $25, 973. 43
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942 --------------------------------------                         140, 000. 00
      Amount to be accounted for...---------------------------                          165, 973. 43
Gross amount expended--------------------------- $141, 514. 62
Less reimbursements collected --------------------- 122, 155. 44
                                                                                         19, 359. 18

      Balance unexpended June 30, 1942------------ ------------                         146, 614. 23
Outstanding liabilities June 30, 1942-                   $143. 73
Amount covered by uncompleted contracts-------------5, 239. 26
                                                                                             5, 382. 99

      Balance available June 30, 1942----------------------                             141, 231. 26
Accounts receivable June 30, 1942------------------------- ---                           14, 848. 99

       Unobligated balance available June 30, 1942---------------                       156, 080. 25
Amount (estimated)          required to be appropriated for completion
  of existing project                        ----------------                           125, 500. 00

Amount that can be profitably expended in fiscal year ending June
30, 1944:
   For new work -------------------------------------------                             125, 500. 00
   For maintenance 1-----------------------------------------                           140, 000. 00
       Total 1 - -   --- -- --- - - --- --- -- --- -- -- --- -- --- -- -   - --- --
                                                                                        265, 500. 00
  1 Exclusive of available funds.

                          15. ST. PETERSBURG HARBOR, FLA.

   Location.-St. Petersburg is situated on the west shore of Tampa
Bay, about 17 miles from the entrance to Tampa Bay, 21 miles from
Tampa, and 83/4 miles from Port Tampa. The entrance to Tampa Bay,
known as Egmont Channel, is on the west coast of Florida, about 220
miles north of Key West. (See U. S. Coast and Geodetic Survey
Charts No. 587 and 1257.)
   Previous projects.-Adopted by River and Harbor Acts of July 25,
1912, and August 8, 1917. For further details see p. 769, Annual
Report for 1929, and p. 671, Annual Report for 1938.
   Existing project.-This provides for a channel 250 feet wide, 19
feet deep, leading westward from that depth in Tampa Bay to the
basin at the Port of St. Petersburg, a distance of about 1 mile, and
for a depth of 21 feet, 1,400 to 1,700 feet long and 900 feet wide, in
the Port of St. Petersburg, and for a straight channel 20 feet deep
and 200 feet wide extending southward from the easterly end of the
above entrance channel to deep water in Tampa Bay. The Deficiency
Act of March 4, 1929, authorized the expenditure of $17,000 for dredg-
ing a channel 16 feet deep and approximately 200 feet wide on the
easterly side of Point Pinellas lighted beacon in a direction approxi-
mately 328 ° true, the westerly boundary of the channel to be dredged
as close to the said beacon as practicable. The plane of reference is
mean low water. The mean range of tide is 1.5 feet. The spring range
is 1.9 feet. Strong southwesterly winds raise the water level about 1.5
feet. Strong northerly winds, which occur mostly during the winter
months, lower the water level about 2 feet.
   The estimate of cost for new work, revised in 1937, was $184,300,
exclusive of amounts expended on previous projects, but including
              RIVERS AND H ARBORS-JACKSONVILLE,                              FLA.,    DISTRICT          615
$17,000 for the Point Pinellas Channel. The latest (1937) approved
estimate for annual cost of maintenance is $6,500.
  The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                 Documents I


July     3, 1930   For the 19-foot entrance channel and the basin at   S. Doe. No. 229, 70th Cong., 2d sess.
                    the Port of St. Petersburg.
Aug. 26, 1937      For the 20-foot channel leading southward to deep   Rivers and Harbors Committee Doc.
                    water in Tampa Bay.                                  No. 71, 74th Cong. 2d sess.


  ' These documents contain the latest published maps.

    Local cooperation.-Fullycomplied with.
    Terminal facilities.-In Bayboro Harbor are nine privately owned
marginal wharves having a total length of 515 feet. A concrete
municipal quay 800 feet long faces Bayboro Harbor along its north-
east side and a spur of the municipal electric railway has been ex-
tended to this quay. A concrete wharf 1,500 feet long, constructed
by the city of St. Petersburg, extends along the north side of the
dredged basin known as the Port of St. Petersburg. The facilities
are considered adequate for existing commerce.
    Operations and results during fiscal year.-Maintenance dredging
to restore project dimensions in the 19-foot deep entrance channel
and the 21-foot deep Port of St. Petersburg basin, in progress with
U. S. hopper dredge San Pablo at the beginning of the fiscal year, was
completed July 5, 1941. There were removed 17,611 cubic yards, place
measurement, of material, at a cost of $4,996.09. The expenditures
were $24,484.57.
    Condition at end of fiscal year.-The existing project was completed
in 1939. The 21-foot deep Port of St. Petersburg turning basin and
the 19-foot deep entrance channel were completed in 1931. In 1929-30
the Point Pinellas channel was dredged 6,200 feet long and 200 feet
wide, with a controlling depth of 14 feet. The controlling mean low
water depths when last ascertained, were as follows: 20 feet for a width
of 200 feet in north-south channel in April 1940; 19 feet for a width of
'250 feet in east-west channel; 21 feet throughout the Port of St.
Petersburg basin in July 1941; and 14.5 feet for a width of 200 feet
in the Point Pinellas channel in May 1938.
    The costs under the existing project have been $188,889.69 for new
work, including $17,000 for the Point Pinellas channel, and $46,165.16
  for maintenance, a total of $235,054.85. The expenditures have been
 $235,054.85.
    Proposed operations.-No funds are available and no operations
  are proposed during the fiscal year 1943.
    No funds can be profitably expended during the fiscal year 1944, as
  the condition of the project is expected to meet the needs of commerce
  during the next 2 years.
616           REPORT OF CHIEF OF ENGINEERS,                                          U. S. ARMY,             1942

                                              Coot and financial summary
Cost of new work to June 30, 1942_ __------------------------                                                  $221, 578. 31
Cost of maintenance to June 30, 1942__--------------------------                                                 66, 696. 79

       Total cost of permanent work to June 30, 1942-----------                                                    288, 275. 10
Net total expenditures-----------------                        ---                                                 288, 275. 10
Total amount appropriated to June 30, 1942------- ------------                                                     288, 275. 10

  Fiscal year ending June 30                             1938           1939           1940           1941             1942

Cost of new work ____...                   .........       . ....    $105, 191.54    $22,451.25 ----------------..
                                                                                                           .   .   .          .
Cost of maintenance---............                  .... ----.
                                                   ---                  5, 822. 59      863. 62     $19, 594. 14       $4, 996.09

                                 -l______
       Total cost .... _---.........---                         __    111, 014. 13   23, 314. 87     19, 594. 14        4,996.09

Total expended....._________.- .              ____________.._          91, 500. 24   42, 828. 76         105. 66       24, 484. 57

          .
Allotted_____-      -...-
                      ........            __...
                                            ........--          ..    135, 000.00      -671.00       25, 000.00         -409. 77



Balance unexpended July 1, 1941________________________--_--
                                             -_                                                                    $24, 894. 34
Deductions on account of revocation of allotment-------------                                                           409. 77

      Net amount to be accounted for-----------------------       24, 484. 57
Gross amount expended______________________________ $24,493.25
Less reimbursements collected __________________------      8. 68
                                                                   24, 484. 57

                                   16. WITHLACOOCHEE RIVER, FLA.

    Location.-Rises in central part of the peninsula of Florida and
flows in a general northwesterly and westerly direction, emptying
into the Gulf of Mexico about 20 miles southeast of Cedar Keys, Fla.,
and 95 miles north of the entrance to Tampa Bay.
and Geodetic Survey Chart No. 179.)
                                                             U. S. Coast                           '(See
    Previous projects.-A project for the improvement of the entrance
was adopted by the River and Harbor Act of June 13, 1902. For
further details see page 1832 of the Annual Report for 1915, and page
523 of Annual Report for 1934.
    Existing project.-This provides for securing and maintaining a
channel 100 feet wide and 10 feet deep at mean low water from the
10-foot contour in the Gulf of Mexico to Port Inglis, just within the
river entrance, by dredging and rock excavation, and for removing
snags, overhanging trees, and loose rock, and cutting through shoals
in the upper river, with a view to making a draft of 2 feet available
for about half the year as far as Pembertons Ferry (Croom), 85
miles above the mouth. The lengths of the sections included in the
project are 4.1 miles from the Gulf to Port Inglis and 85 miles to Pem-
bertons Ferry (Croom). The mean tidal range at the mouth is 2.8
feet and the spring range is about 3.5 feet. The effect of the tide is
perceptible for about 11 miles above the mouth. Strong southwest-
erly winds raise the water level at the mouth about 1 foot, and strong
northerly winds, which usually occur during the winter, lower the
water level about 11/2 feet. Freshets raise the water level in the upper
river from 4 to 6 feet and at the mouth about 1 foot.
    The estimate of cost for new work, revised in 1925, is $385,000, ex-
clusive of amounts expended on previous projects. The latest (1942)
approved estimate for annual cost of maintenance is $4,500.
              RIVERS AND          HARBORS-JACKSONVILLE,                     FLA.,     DISTRICT          617
   The existing project was authorized by the following river and
harbor acts:

       Acts                       Work authorized                                   Documents


Mar. 3,1881       For improvement of river from mouth to Hays         Annual Report, 1880, pp. 1110-1119.
                   Ferry, 79 miles.
Aug.    5,18861   For extending improvement         to   Pembertons   Annual Report, 1885, pp. 1277-.1278.
                   Ferry, 6 miles above Hays Ferry.
Mar.     2,1907   For a depth of 10 feet mean low water from the      H. Doec. No. 483, 59th Cong., 2d Sess.3
                   Gulf to Port Inglis.


  1 Modified in accordance with recommendations in Annual Report for 1885.          (See also Annual Report
for 1887, p. 1248.)
  2 The latest published map of the river to Pembertons Ferry is in H. Doc. No. 199, 55th Cong., 2d sess.
  a Contains latest published map of the entrance.

    Terminal facilities.-These consist of one small timber dock at
Inglis with shore facilities for fuel-oil storage, and one dock at
Yankeetown with shore facilities for gasoline storage; two small
docks for handling fish-one each at Yankeetown and Inglis; one
small dock at Panasoffkee open to public use; and privately owned
landing docks scattered along the river. The facilities are considered
ample for existing commerce.
    Operations and results during fiscal year.-United States plant
and hired labor removed 57 snags, trees, and other obstructions to
navigation from the upper river from July 23 to 31, 1941, at a cost
of $1,231.28. The cost of a survey to determine the condition of
the 10-foot entrance channel from the Gulf to Port Inglis was
 $1,517.90. The costs for the year were $2,749.18 for maintenance,-and
the expenditures were $2,868.
    Condition at end of fiscal year.-The existing project as a whole
was about 74 percent completed. The project for the entrance was
about 85 percent completed. The channel from the 10-foot contour
in the Gulf to Port Inglis was completed in the fiscal year 1915 to
a depth of 10 feet at mean low water and a width of 85 feet. The
removal of snags, overhanging trees, sunken logs, loose rocks and
boulders, and some rock ledges from the upper river to enable light-
draft boats to ascend the river to Croom, except at low stages, was
practically completed in 1892. Under permit granted by the Secre-
tary of War on April 16, 1904, a power dam and a lock 134 feet by
36 feet, now owned and operated by the Florida Power Corporation,
were built about 11.4 miles above the mouth of the river. The dam
creates a pool extending nearly to Dunnellon, 241/2 miles above the
mouth. The lock, which had been inoperative since the completion
of the installation of the gates in 1916 except for about 7 months
during 1926, was restored to operating conditions in January 1942.
The river is now fairly clear of obstructions. The controlling depth
from the Gulf to Port Inglis was 9.0 feet for a width of about 60
feet in April 1942. Above Port Inglis the controlling depths when
last ascertained in May 1940 were about as follows: From Port Inglis
to Inglis, 6 feet; thence to the Florida Power Corporation's dam,
4 feet; thence to Stokes Ferry, 4 feet; thence to the head of navigation
at Croom, about 2 feet, which prevails during about half the year.
618        REPORT OF CHIEF OF ENGINEERS,                                             U. S. ARMY,                    1942

with 1 foot during low stages. The depths referred to are mean
low .water, Gulf datum, from the entrance to the dam and to local
low-water stage of the river above that point. The work remaining
to be done to complete the project is the 15-foot widening of the en-
trance channel to Port Inglis. The costs under the existing project
have been $285,085.29 for new work and $74,953.82 for maintenance,
a total of $360,039.11. The expenditures have been $359,984.35.
   Proposed operations.--The balance unexpended on July 1, 1942
 ($1,671.17), will be applied as follows:
Accounts payable June 30, 1942 -                            _-_______________                           --
                                                                                                   _ __--_              _         $54. 76
Maintenance: Miscellaneous surveys and supervision of the project___                                                            1, 616. 41
        Total for maintenance ____________------------__                                                                        1,671. 17
  No funds can be profitably expended for new work or maintenance
during the fiscal year 1944, for the reasons that the commerce using the
entrance does not justify the cost of completing the 15-foot widening
and the condition of the project is expected to meet the needs of com-
merce during the next 2 years.
                                          Cost and financial summary

Cost of new work to June 30, 1942_________                                                                              $315, 085.29
Cost of maintenance to June 30, 1942------------------------_                                                       _        74,953. 82

        Total cost of permanent work to June 30, 1942-                                   _            __-                   390, 039. 11
Minus accounts payable June 30, 1942-----------------------------                                                                      54. 76

Net total expenditures--_----------------------                                                                             389, 984. 35
Unexpended balance June 30, 1942__--                                       -------                              -               1, 671. 17

        Total amount appropriated to June 30, 1942                                       _--------------                    391, 655. 52

   Fiscal year ending June 30                   1938               1939               1940             1941                       1942


C ost of new w ork -                      ,- ------------          I -    .-  -       -            ..... .  I               .     --
Cost of maintenance ________      _        .__-_             ___........... $21, 755. 39                   $879. 02               $2, 749. 18
Total expended ......
               _________              _                                              20, 085. 22       2, 375. 60                  2, 868.00
Allotted------   --------------           --------------         $14,000. 00         13, 000.00



Balance unexpended July 1, 1941  ___--------                  ---                                                            $4, 539. 17
Gross amount expended------------------------------     $2, 869. 72
Less reimbursements collected--------------------------       1. 72
                                                                                                                                2, 868. 00

      Balance unexpended June 30, 1942                                                                                           ,671. 17
                                                                                                                                1--------------------_
Outstanding liabilities June 30, 1942----------------------------__                                                                 54. 76
        Balance available June 30, 1942__________________----------1,                                                             616. 41

Amount (estimated)             required to be appropriated for completion of
  existing project                                   ------------------                                                     100, 000. 00
  1Exclusive of available funds.

17. REMOVING THE WATER HYACINTH FROM NAVIGABLE WATERS IN
                   THE STATE OF FLORIDA

  Location.-The water hyacinth is found in the fresh-water streams
and lakes in various parts of the district.
              RIVERS        AND     HARBORS-JACKSONVILLE,                       FLA.,         DISTRICT   619
  Existing project.-The existing project provides for the destruction
or removal of the water hyacinth in the navigable waters of the State
so far as they constitute an obstruction to commerce, using any me-
chanical, chemical, or other means not injurious to cattle. The use of
log booms to close sloughs and backwaters as an auxiliary means was
contemplated. No estimate of the final cost of the work has been made.
The latest (1940) approved estimate of annual cost of maintenance is
$75,000.
  The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                     Documents



Mar.    3.1899     For the construction and operation of a suitable       H. Doc. No. 91, 55th Cong., 3d sess.,
                    vessel, and for the use of log booms as adjuncts to     and Annual Report, 1899, pp. 1613-
                    the operation of the vessel, for the removal of         1623.
                    water hy-einths in the navigable waters of the
                    State of Florida.
June 13,1902       For the extermination and removal of water hya-        Specified in act.
                     cinths by any mechanical, chemical, or other
                     means.
Mar.     3, 1905   Prohibited the use of any chemical process in-             Do.
                     jurious to cattle.



   Operations and results during fiscal year.-Work under a contract
for construction of a hyacinth trap about 9.7 miles below Palatka was
commenced June 17, 1942, and was about 4 percent completed at the
close of the fiscal year. The cost was $2,086.88. Ten United States
hyacinth destruction boats, 1 hyacinth conveyor to place trapped
hyacinths on shore, and hired labor were employed as required on
St. Johns River and tributaries south of Jacksonville. Employees
were stationed at strategic points in order to maintain traps and to
keep waterways in a navigable condition. Wire-net booms for trap-
ping hyacinths were installed on 3 bridges over tributaries and on
piling in Black Creek and 480 obstructions preventing the free move-
ment of hyacinths from Wekiva River into St. Johns River were
removed. Approximately 11,307 acres of hyacinths were destroyed
or removed by mechanical or other means and 2,004 acres were as-
sisted seaward by drifting operations. Two hyacinth destruction
boats and hired labor were employed as needed on the Caloosahatchee
River and Lake Okeechobee drainage areas system. Approximately
2,218 acres of hyacinths were destroyed or removed. Hired labor
employed on Withlacoochee River from July 1 to December 11, 1942,
and in March 1942, drifted 1,282 acres of hyacinths seaward and
,cut 50 acres of marine grass. About 20 acres of hyacinths in Hills-
boro River were drifted seaward by hired labor during August
1941. The total cost of hired labor operations was $94,827.17.
   The costs for the year were $96,914.05 for maintenance. The ex-
penditures were $95,289.78.
   Condition at end of fiscal year.-The project is for maintenance.
Most of the work accomplished prior to the fiscal year 1939 was done
by breaking up jams and drifting. Later operations have consisted
principally of the control of hyacinths by the construction of tem-
620             REPORT OF CHIEF OF ENGINEERS,                                               U.    S.       ARMY,       1942

porary and permanent traps at strategic points, the shredding of
hyacinths, or their removal.
  At the close of the fiscal year all waterway channels were open to
navigation. Heavy rains on the upper St. Johns River have resulted
in increased currents, and hyacinths were drifting into Lake George
in considerable quantities. Some escape from the lake at George-
town and are being carried down to Palatka where they accumulate
and are being destroyed as rapidly as possible. The river is in fairly
good condition from Jacksonville to Racey Point. Recent high water
has caused the hyacinths growing along the banks of the river to
become dislodged and has resulted in considerable small bunches drift-
ing free in the vicinity of the Jacksonville Naval Air Station and at
Jacksonville. Steps are being taken to eliminate this menace.
   The total cost has been $695,084.74 for maintenance. The expendi-
tures have been $690,915.83.
  Proposed operations.-The balance unexpended on July 1, 1942
($80,090.91), will be applied as follows:
Accounts payable June 30, 1942___________-____________________                                                                $4, 168. 91
Maintenance:
    Completion, under existing contract, during August
      1942, of construction of hyacinth trapping fence
      across the St. Johns River approximately 9 miles
            north from               Palatka___________________________                                    $47,380. 00
        Removal, by hired labor, of water hyacinth conges-
          tions in the St. Johns River and tributary streams
          downstream of the hyacinth trap near Palatka,
          July 1, 1942, to June 30, 1943-----     __-____                                                   23, 542. 00
        Removal, by hired labor, of hyacinth congestions in
          other navigable waterways as may become
          necessary --------------------------------------                                                   5, 000. 00
                                                                                                                              75, 922. 00

                Total for maintenance__________________________                                                               80, 090. 91
   The additional sum of $75,000 can be profitably expended during the
fiscal year 1944 for the removal of water hyacinths, by hired labor, as
necessary from the various navigable waterways in the district.
                                                  Cost and financial summary
Cost of new work to June 30, 1942___     ________  ____     _________
Cost of maintenance to June 30, 1942___________________________ $695, 084. 74
      Total cost of permanent work to June 30, 1942______________                                                            695, 084. 74
Minus accounts payable June 30, 1942___                                                                                        4, 168. 91
            Net total expenditures _________________________ __________                                                      690, 915. 83
Unexpended balance June 30, 192_ _                                                         ________________                   80, 090. 91

           Total amount appropriated to June 30, 1942                                         _______             __         771, 006. 74

     Fiscal year ending June 30                          1938                  1939           1940              1941             1942

Cost of new work ....................................................................
Cost of maintenance .- ..-...                         $18, 249.07           $63, 171.71    $170, 182. 20      $57, 467. 69      $96, 914.05
Total expended....
              ----------------                         18, 754. 68           47, 201.48     183, 273. 37       58, 330. 40       95, 289. 78
Allotted ---------------------..             ..        33, 000. 00          105, 000. 00    186, 400. 00       66, 000. 00       88, 500. 00
              RIVERS AND HARBORS--JACKSONVILLE,                                        FLA.,        DISTRICT               621
Balance unexpended July 1, 1941_________ _________-______-_                                                     $86, 880. 69
Amount allotted from War Department Civil Appro-
  priation Act approved May 23, 1941---------- ---    $12, 000. 00
Amount allotted from War Department Civil Appro-
  priation Act approved Apr. 28; 1942________________ 76, 500. 00
                                                                                                                 88. 50
                                                                                                                 vv,     vv.
                                                                                                                               00.
                                                                                                                               vv




      Amount to be accounted for__                                                                              175, 380. 69
Gross amount expended _---      _____-$______--95, 623. 49
Less reimbursements collected ________----- ------- 333. 71
                                                                                                                 95, 289. 78

      Balance unexpended June 30, 1942___________________ __                                                     80, 090. 91
Outstanding liabilities June 30, 1942__________________ $4, 168. 91
Amount covered by uncompleted contracts_______ __-  -   38, 342. 52
                                                                                                                 42, 511.43

           Balance available June 30, 1942__________________________                                             37, 579. 48
Amount that can be profitably expended in fiscal year ending June
   30, 1944, for maintenance 1_                  _        -------                                                75, 000. 00
   1 Exclusive of available funds.

       18. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)
    The cost of work during the year was $189,492.24; the expenditures
were $169,654.54.                    The balance unexpended and accounts receivable
on June 30, 1942, together with an allotment of $33,000 received dur-
ing July 1942 ($34,680.26), will be applied as needed during the
fiscal year 1943 to the payment of expenses incurred under this head-
ing.       The additional sum of $100,000 can be profitably expended
during the fiscal year 1944.

                                         Cost and financial summary

Cost of new work to June 30, 1942______________
Cost of maintenance to June 30, 1942_______________                                                       $1,955, 596.04

      Total cost of permanent work to June 30, 1942_                                                       1, 955, 596. 04
Plus accounts receivable June 30, 1942________ ____________                                                        797. 31

           Gross total costs to June 30, 1942__________________                                            1, 956, 393. 35
Minus accounts payable June 30, 1942_______________________                                                    23, 786. 15

           Net total expenditures _____                                                                    1, 932, 607. 20
Unexpended balance June 30, 1942_                                                                                  882. 95

           Total amount appropriated to June 30, 1942_                                   -- --      -      1, 933, 490. 15

    Fiscal year ending June 30               1938                   1939        1940               1941                 1942


Cost of new work ------------------------------
Cost of maintenance-.....----..       $154,732.34           $146, 743.98     $196, 651.86                69
                                                                                                 $195,571.         $189,492. 24

Total expended . - - - - - - - - -         131, 296. 97       144, 489.00     185, 986. 82       206, 713. 55          169, 654. 54

Allotted                  ----       -     221, 200.00        148, 000. 00    215, 000. 00       165, 000. 00           70, 000. 00




           493202-43-pt. 1, vol. 1---40
622            REPORT         OF     CHIEF         OF ENGINEERS,                 U.       S.   ARMY,              1942


Balance unexpended July 1, 1941 --------------------------------                                                        $100, 537. 49
Amount allotted from War Department Civil Appropriation Act ap-
  proved May 23, 1941 -----------------------------------------                                                           70, 000. 00

           Amount to be accounted for------------------------------                                                      170, 537. 49
Gross amount expended---------------------------                                          $189, 445. 53
Less reimbursements collected --------------------                                             19, 790. 99
                                                                                                                         169, 654. 54

      Balance unexpended June 30, 1942                                     -       --__            -      -                   882. 95
Outstanding liabilities June 30, 1942 _-----------                                                                        23, 786. 15

           Balance available June 30, 1942-                                ----------                                   -22,     903. 20
                                 -------------------------------
Accounts receivable June 30, 1942_                                                                                               797. 31

           Unobligated balance available June 30, 1942_ __-- __-_                                             _         -22,     105. 89

Amount that can be profitably expended in fiscal year- - ending                 June
                                                                         --- - --- --- -
                            1- - - - - - - - - - - - - - - - - - - - - -
30, 1944, for maintenance                                                                                               100, 000. 00
    1 Exclusive of available funds.


19. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED

                                                                 For last    Cost and expenditures to
                                                               full report         June 30, 1942                           Estimated
                     Name of project                           see Annual                                                   amquired to
                                                                 Reporticomplete
                                                                  for-       New work Maintenance                              complete


1. St. Johns River, Jacksonville, Fla., to
      Palatka 1--------------------------------                    1933      $205, 698. 47         $116, 328. 46                   $13, 300
2. Lake Crescent and Dunns Creek,   3    -Fla.
                                             --    1 2....         1931         10, 276. 25           5, 723. 75                    53, 800
3. Atlantic-Gulf Ship Canal, Fla. ...__        .       . __       1939     5, 099, 152. 55
4. C ourtenay C ha nel, F la.1 _      . . ..--------
                                             .95-                  1940         22, 845. 70                                       (4)
5. Eau Gallie Harbor, Fla.'1 ......                       .       1940           9, 626. 78                                      (4)
6. Melbourne Harbor, Fla.                                         1939          17, 696. 27                                      (4)
7. St. Lucie Inlet, Fla.6............                             1932          26, 688. 51                                     1,410, 000
8. Palm Beach Fla., side channel and basin 8____                  1941                                                           ' 114, 000
9. Miagni River, Fla.1                                            1935        646, 915. 17              3, 000. 00               (4)
10. Intracoastal Waterway from Miami to
      Florida Bay, Fla..---------------------.                      1939      201, 362. 73                  282. 12               (4)
11. Key West Harbor, Fla.1                                          1941   1, 040, 408. 75             238, 742. 96                956, 300
12. Channel from   Naples,    Fla.   to   Big    Marco
      Pass, Fla..' - ......            ..    .....------------------1940        37, 524. 85              2, 724. 76               (4)
13. Orange River, Fla.' 8________________________
                            1                                       1937         2, 000. 00              8, 574. 27               (4)
14. Kissimmee River, Fla.' _                                        1931        23, 479. 18             25, 202. 14               (4)
15. Caseys Pass (Venice Inlet), Fla.'.        .........             1941       153, 970. 19            187, 141.02                (4)
16. Sarasota Bay, Fla. 1 9__________               ______           1940       249, 632. 22            134, 165. 66                  54, 000
17. Manatee River, Fla. ----------------                            1938       123, 349.56             101, 214.04                   14, 400
18. Channel from Clearwater Harbor through
      Boca Ciega Bay to Tampa Bay, Fla.' 9-----1940                            105, 877.01             111, 963. 72               (4)
19. Anclote River, Fla.' 101                                        1939       178, 427. 04             75, 305. 37               (4)
20. Homosassa River, Fla. _.........                                1937       113, 998. 64                                       (4)
21. Crystal River Fla._______                                       1941        25, 000. 00             19, 993.   12             (4)
22. Cedar Keys htrbor, Fla.' -                                      1932       147, 020. 98             30, 000.   00                 3, 500
23. Suwannee River, Fla. 1 12-                                      1940        76, 417. 96             37, 394.   06              200, 000
24. Steinhatchee River, Fla.' _                                     1940       135, 053. 37                 395.   28             (4)

   1 Channels adequate for commerce.
   2 Awaiting local cooperation.
   3 Modification recommended Apr. 1, 1937, in H. Doc. No. 194, 75th Cong., 1st sess.
  4 Completed.
   5 Modification recommended July 1, 1941, in H. Doc. No. 391, 77th Cong., 1st sess.
   6 No funds available.
   7 In addition, $114,000 to be contributed by local interests.
   8 No commerce reported.
  - Included in project recommended for adoption June 14, 1939, in H.  Doc. No. 371, 76th Cong., 1st sess.
   10Modification recommended Mar. 15, 1939, in H. Doc. No. 243, 76th Cong., 1st sess.
  11In addition, $1,000 expended from contributed funds.
   12 Curtailment of existing project recommended in H. Doc. No. 467, 69th Cong., 1st sess.
             RIVERS AND HARBORS-JACKSONVILLE,                                    FLA.,     DISTRICT                623
           20. PLANT ALLOTMENT,                     JACKSONVILLE,                FLA., DISTRICT

                                  Cost and financial summary
Undistributed costs June 30, 1942----------------------                                           $1, 338, 937. 06

Net total cost to June 30, 1942__________________    _____                                         1, 338, 937. 06
Plus accounts receivable June 30, 1942-------- ----------------                                       781, 948. 35

      Gross total costs to June 30, 1942---------------------                                      2, 120, 885. 41
Minus accounts payable June 30, 1942_                                                                 191, 699. 31

       Net total expenditures___ _-___ _                --------                                   1, 929, 186. 10
Unexpanded balance June 30, 1942_------------------------------                                    -458,       666. 64

           Total amount appropriated to June 30, 1942---------------1, 470, 519. 46


   Fiscal year ending June 30          1938              1939             1940             1941               1942


Total expended___                   $130, 227. 31    -$35, 505. 28    $177, 034. 59   $260, 990. 69         $347, 389. 12

Allotted     _     _                 108, 320. 52      114, 526. 32    143, 988. 32      111, 765. 25       -79,   228. 54



Balance unexpended July 1, 1941_________________                                                   -- $32, 048. 98
Amount allotted from War Department Civil Appropriation Act
approved May 23, 1941_---------------------------------------                                           26, 271. 46

      Amount to be accounted for-----------------------------                                           -5, 777. 52
Deductions on account of revocation of allotment------------                                            105, 500. 00

        Net amount to be accounted for----------------------------111, 277. 52
Gross amount expended-------------------------       $3, 682, 233.86
:Less :
     Reimbursements collected -- __ $3, 326, 611. 84
     Receipts from sales ...........      8, 232.90
                                                      3, 334, 844. 74
                                                                      347, 389. 12
      Balance unexpended June 30, 1942------------------------458, 666. 64
Outstanding liabilities June 30, 1942--------------_ $191, 699. 31
Amount covered by uncompleted contracts ........      335, 053. 02
                                                                   526, 752. 33

      Balance available June 30, 1942----------------------                                         -- 985, 418. 97
Accounts receivable June 30, 1942-------------------------------                                       781, 948. 35
           Unobligated balance available June 30, 1942---------------                               -203,      470. 62

Status of all investigations for navigation called for by river and harbor acts
                           and committee resolutions

                                                            Date trans-
            Locality             Authorization act           mitted to      Document number         I Recommenda-
                                                             Congress


Anclote River to St. Marks,     Commerce Commit-
  Fla., Intracoastal Water-      tee resolution Feb.
way,     and     connection     6, 1940.
across Florida with St.
  Johns River.
Atlantic Ocean to Gulf of       Commerce Commit-
  Mexico, waterway across        tee resolution June
  Florida, via the St. Lucie     17, 1942.
  River and Canal, Lake
  Okeechobee, and Caloosa-
hatchee Canal and River
  (war emergency).
624         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                            1942

Status of all investigations for navigation called for by river and harbor acts
                     and committee resolutions-Continued

                                                              Date trans-
           Locality                Authorization act          mitted to                         Document number      ecommenda-
                                                               Congress                                                 tion

Atlantic-Gulf Barge Canal,       Rivers and Harbors        July 31, 1942                        (Confidential)      Favorable.
  Fla.                             Committee resolu-
                                   tion Mar. 27, 1942.
Boca Ciega Bay, Fla., to         Rivers and Harbors        Oct.             7, 1941                                 Unfavorable.
  Gulf of Mexico, channel          Committee resolu-
via Johns Pass, Fla.             tion May 29, 1940.
Caloosahatchee River, Fla.,      Rivers and Harbors
from Fort Myers to Gulf          Committee resolu-
  of Mexico.                     tion Apr. 30, 1935.
Caloosahatchee River and         Rivers and Harbors
  Lake Okeechobee drain-           Committee resolu-
age areas, Florida, modify       tion Jan. 24, 1939.
existing project (final re-
port).
Caloosahatchee River and         Rivers and Harbors
  Lake Okeechobee drain-           Committee resolu-
age areas, Florida con-          tion Feb. 20, 1940.
struction of side channels.
    Do--------------------       Rivers and Harbors
                                   Committee resolu-
                                   tion Oct. 5, 1940.
Canaveral Harbor, Fla _...       River and Harbor          Aug. 27, 1941                        House 367, 77th     Favorable.
                                   Act Aug. 26, 1937.                                             Cong. 1st sess.
Crescent Lake, Fla., to              Do .... .......      ...................................
  Flagler Beach, Fla., water-
way via Haw Creek to
  Bunnell, thence via land
cut.
Deleon Springs to St. Johns      Rivers and Harbors
  River, Fla., waterway.          committee     resolu-
                                  tion, Apr. 13, 1939.
Eau Gallie, Fla., to the At-     Rivers and Harbors       Aug.              8, 1941                                 Unfavorable.
lantic Ocean, channel.            Committee resolu-
                                  tion, Mar. 25, 1938.    ...............
Eau Gallie Inlet, Fla_----..     Rivers and Harbors
                                   Committee resolu-
                                  tion, Sept. 17, 1941.
Hillsboro Inlet, Fla -_- ----    Rivers and Harbors        Aug.             4, 1941                                     Do.
                                   Committee resolu-
                                  tion, Mar. 26, 1940.
Hollywood Harbor (Port           Commerce Committee
  Everglades), Fla., reim-        resolution, Feb. 14,
  bursement for dredging          1938.
  and jetty work.
Jacksonville, Fla., to Mi-       Rivers and Harbors
  ami, Fla., Intracoastal          Committee resolu-
  Waterway, to modify ex-          tion, June 8, 1938.
  isting project.
Jacksonville, Fla., to Miami,    River and Harbor
  Fla., Intracoastal Water-        Act, June 20, 1938.
  way.
Jacksonville, Fla., to Miami,    Rivers and Harbors
   Fla., Intracoastal Water-       Committee resolu-
  way (war emergency).             tion, June 17, 1942.
L ake W orth Inlet, F la .....   Rivers and Harbors
                                   Committee resolu-
                                   tion, Apr. 20, 1937.
Manatee River, Fla ........      Rivers and Harbors        Oct. 15, 1941
                                                                                                                        Do.
                                   Committee resolu-
                                   tion, Apr. 17, 1940.
Miami Harbor, Fla     -.....     Commerce Committee
                                   resolution, Aug. 6,
                                   1941.
Miami River, Fla- .-......       Rivers and Harbors       June              2, 19421 (Confidential)---.             Favorable.
                                   Committee resolu-
                                   tion, Mar. 26, 1940.
Miami to Key West, Fla.,         Rivers and Harbors
waterway in interest of           Committee resolu-
commerce, navigation, and         tion Aug. 1, 1940.
national defense.
Okeechobee-West Palm             Commerce Commit-
Beach Canal, Fla.                 tee resolution Feb.
                                   1, 1940.
Pahokee, Fla., on Lake           River    and Harbor
  Okeechobee, Yacht Basin.         Acts Aug. 26, 1937,
                                   and June 20, 1938.
Pirates Cove Channel in          Commerce Commit-
  Sacarma Bay, Pirates             tee resolution May
  Cove, and Johnsons Pass,         27, 1936.
  Fla.
           RIVERS      AND     HARBORS-TJACKSONVILLE,                       FLA.,     DISTRICT           625
Status of all investigations for navigation called for by river and harbor acts
                      and committee resolutions-Continued

                                                        Date trans-                            Recommenda-
          Locality             Authorization act         mitted to       Document number           tion
                                                         Congress

Ponce de Leon Inlet, Fla __    Rivers and Harbors
                                 Committee resolu-
                                 tion Mar. 25, 1938.
St. Augustine Harbor, Fla_ _ Rivers and Harbors
                                 Committee resolu-
                                 tion June 10, 1941.
St. Johns River, Fla., Jack- Rivers and Harbors         July 18, 1941    House, 322, 77th      Favorable.
  sonville to the ocean.         Committee resolu-                        Cong., 1st sess.
                                 tion June 9, 1937.
St. Johns River, Fla., im-     Rivers and Harbors         _do ..         _- do_.    ........   Unfavorable.
  provement in vicinity of       Committee resolu-
  Dames Point and New            tion Mar. 16, 1939.
  Berlin.
St. Johns River to Kissim-     River and       Harbor
  mee River, Fla., and           Act Aug. 30, 1935.
  thence to Okeechobee-
  Cross-Florida Canal.
St. Johns River to Indian      Rivers and Harbors
  River, Fla., channel from      Committee resolu-
  Sanford to near Titusville.    tion Jan. 27, 1937.
St. Johns River, Fla., San- Rivers and Harbors
  ford to Lake Harney.           Committee resolu-
                                 tion May 20, 1941.
St. Lucie River, Fla ...       Rivers and .Harbors      Sept. 17, 1941   House 391, 77th       Favorable.
                                 Committee resolu-                        Cong., 1st sess.
                                 tion Jan. 26, 1940.
St. Lucie, West Palm Beach,    Rivers and Harbors
  Hillsboro, North       New     Committee resolu-
  River, and Miami Canals,       tion Mar. 26, 1940.
  Fla., navigation and flood
  control.
St. Petersburg Harbor, Fla__ Rivers and Harbors         Nov. 25, 1941                          Unfavorable.
                                 Committee resolu-
                                 tion Apr. 17, 1940.
Sebastian Inlet, Fla ..-...... Rivers   and Harbors     Aug.   5, 1941                             Do.
                                 Committee resolu-
                                 tion Apr. 20, 1937.
     Do                        Rivers and Harbors
                                 Committee resolu-
                                 tion Aug 8, 1941.
Suwannee River, Fla. and       Sec. 1 of River and
  Ga., for navigation, flood     Harbor Act Jan. 21,
  control, power, and irriga-    1927.
  tion (308 report).
Tampa Harbor, Fla ........     Commerce Commit-
                                 tee resolution Nov.
                                 14, 1939.
Waldo, Fla., canal from,       Rivers and Harbors       Mar. 13, 1942                              Do.
  into Lake Alto and from        Committee resolu-
  Lake Alto to Little Lake       tion Oct. 5, 1940.
  Santa Fe.
Withlacoochee River, Fla., Sec. 1 of River and
  for navigation, flood con-     Harbor Act Jan. 21,
  trol, power, and irrigation    1927.
  (308 report).
Withlacoochee River, Fla___ Rivers and Harbors
                                  Committee resolu-
                                 tion May 20, 1942.



21. SNAGGING AND CLEARING UNDER AUTHORITY OF SECTION 2 OF
THE FLOOD CONTROL ACT APPROVED AUGUST 28, 1937, AS AMENDED

   The Flood Control Act approved August 28, 1937, as amended by
the Flood Control Acts approved August 11, 1939, and August 18,
1941, authorized the allotment of not to exceed $500,000 from the
flood-control appropriations for any one fiscal year for the removal
of accumulated snags and other debris from, and the clearing and
straightening of channels in navigable streams and tributaries thereof
when such work is advisable in the interest of flood control; provided
that not more than $25,000 shall be allotted for this purpose for any
single tributary from the appropriations for any one fiscal year.
626            REPORT                OF CHIEF OF ENGINEERS,                                         U.     S.    ARMY,        1942

  An allotment was made during March 1942 for the removal of
snags and other debris from the channels of Orange Creek and con-
necting canals, Fla., with a view to reducing overflows of Orange
Lake. From April 20 to June 30, 1942, a grass cutter, hyacinth
destroyer, and explosives were employed as required to clear a channel
through marine vegetation, and to destroy floating islands in Shands
Canal to open waters in Orange Lake, a distance of about 9 miles.
A total of 99 acres of aquatic growth was destroyed by cutting. The
costs were $1,792.82 for new work. There were no expenditures. The
balance unexpended on June 30, 1942, amounting to $2,500, will be
applied during the fiscal year 1943 to payment of expenses incurred
under this heading.
                                                         Cost and financial summary
Cost of new work to June 30, 1942 ______________         -____________ $11, 792.82
Cost of maintenance to June 30, 1942______________________________

     Total cost of permanent work to June 30, 1942 _________.__._                                                                 11, 792. 82
Minus accounts payable June 30, 1942--------------------------                                                                     1, 792. 82
     Net total expenditures ----------------------------------     10, 000. 00
Unexpended balance June 30, 1942--------------------------------2,     500. 00
           Total amount appropriated to June 30, 1942                                                    _________---____         12, 500. 00

    Fiscal year ending June 30                                    1938             1939                  1940          1941              1942

Cost of new work- . -....................                                    _____________               $10, 000                          $1,792. 82
C ost of m aintenance    _           _        --                          .-------------...----...-.-.-.-..........
                                                            ------------ -------------.                                          .............
Total expended__                    -    -                                                                10,000
                                                                                                          10, 000-.-             ...
Allotted ......... _   _-..........................................                                        10, 000                        2, 500. 00



Balance unexpended July 1, 1941__________                                                                                        ----
Amount allotted from War Department Civil Appropriation Act ap-
proved June 24, 1940_------------------------------------------                                                                  $2, 500. 00
      Balance unexpended June 30, 1942__________________________                                                                       2, 500. 00
Outstanding liabilities June 30, 1942________________________                                                                          1, 792. 82

           Unobligated balance available June 30, 1942___--- ----                                                                        707. 18

       22. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD
                             CONTROL

   The cost of the work during the year was $69,720.58; the expendi-
tures were $63,249.06. The balance unexpended on June 30, 1942,
$29,141.50, plus the sum of $15,750 allotted in August 1942 will be
applied during the fiscal year 1943 to the payment of expenses incurred
under this heading. The additional sum of $25,000 can be profitably
expended during the fiscal year 1944.
             RIVERS AND HARBORS-JACKSONVILLE,                                                                FLA.,         DISTRICT             627
                                              Cost and financial summary

Cost of new work to June 30, 1942
Cost of maintenance to June 30, 1942_---------------------------                                                                        $101, 479. 73
     Total cost of permanent work to June 30, 1942--------------- 101, 479. 73
Minus accounts payable June 30, 1942--------------------------      7, 371. 23

      Net total expenditures_-----------------------------                                                                               94, 108. 50
Unexpended balance June 30, 1942---------------------                                                                                    29, 141. 50

           Total amount appropriated to June 30, 1942_-----------_                                                                       123, 250. 00

   Fiscal year ending June 30                          1938                     1939                  1940                 1941              1942
Cost of new work..--------------- --------------                          -----------------------                           --------                  -
Cost of mainteriance                                                           $2, 165. 67          $10, 984. 33         $18, 609. 15       $69, 720. 58
Total expended                                                                  1,636. 79            11,513. 21           17, 709. 44        63, 249. 06
Allotted                                                    $5, 000                                  14, 150. 00          99, 600. 00         4, 500. 00


Balance unexpended July 1, 1941__$-------------------------------                                                                         87, 890. 56
Amount allotted from War Department Civil Appropriation Act
   approved May 23, 1941_--.                                  -
                                                             ___-_-__             --                                                       4, 500. 00
      Amount to be accounted for------------------------------                                                                            92, 390. 56
Gross amount expended---------------------     -      $64, 955. 18
Less reimbursements collected--                                          ------          _   _                      1, 706. 12
                                                                                                                                          63, 249. 06
      Balance unexpended June 30, 1942-__                                                                                  _              29, 141. 50
Outstanding liabilities June 30, 1942---------------                                                               $7,   371. 23
Amount covered by uncompleted contracts---                                                                          2, 714. 59
                                                                                                                                          10, 085. 82
           Unobligated balance available June 30, 1942 ----------------                                                                   19, 055. 68
Amount allotted in August 1942 ___________                                                   ________________                             15, 750. 00
      Amount available during the fiscal year 1943---                                                                                     34, 805. 68
Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance '__________________-                                                                                               25, 000. 00
                                                                                                                                          2------
   I   Exclusive of available funds.

Status of all investigations for flood control, called for by flood-control acts and
                               committee resolutions

                                                                                       Date trans-                                      Recommenda-
            Locality                     Authorization act                              mitted to        Document number                    tion
                                                                                        Congress
                ._
                 _ _..-        I   -      -    -   -    -       -   -




Broward County, Fla., In-              Flood Control                    Act,
tracoastal Waterway                     June 22, 1936.
throughout.
   Do.                                 Flood Control Act,
                                        June 26, 1936.
Caloosahatchee River and               Rivers and Harbors
Lake Okeechobee drain-                  Committee resolu-
age areas, Fla., protection            tion May 29, 1940.
of Kreamer, Ritta, and
Torry Islands in Lake
Okeechobee.
Estero    River,    Imperial           Flood Control                    Act,
River, Corkscrew River                  Aug. 28, 1937.
 (Horse Creek), Gordon
River, Rock Creek, Hen-
dry Creek, Mulock Creek,
and Six Mile Cypress
Slough, Fla.
Hillsboro River, Fla       Flood Control                                Act,
                             June 22, 1936.
Indian River and tributar- Flood Control                                Act,
  ies, Florida.              Aug. 18, 1941.
Kissimmee River and its -      do --
                                  .    -.
  tributaries, Florida.
628         REPORT OF CHIEF OF ENGINEERS,                                 U. S. ARMY,                   1942

Status of all investigations for flood control, called for by flood control acts and
                        committee resolutions-Continued

                                                         Date trans-
          Locality               Authorization act        mitted to         Document number               Recomn
                                                          Congress

Kissimnee River, Fla., in-     Flood Control      Act,
cluding regulation and          Aug. 11, 1939.
stabilization of water lev-
els.
Kissimmee River Valley         Flood   Control    Act,
  and tributaries, Florida.     Aug. 28, 1937.
St. Johns River (upper) and   Flood Control Act,         --                                  -
  Marsh, and tributaries,       Aug. 18, 1941.
  Florida.
St.    Lucie,    West Palm Rivers and Harbors                                                      --
  Beach, Hillsboro, North       Committee resolu-
  New River, and Miami          tion Mar. 26, 1940.
  Canals, Fla., navigation
  and flood control.
St. Lucie River, North        Flood Control Act,                      -      -           -
   Fork, and tributaries,       Aug. 18, 1941.
  Florida.
Suwannee River, Fla., from    Flood Control Act,                            --
   Florida-Georgia State line   Apr. 10, 1936.
  to Gulf of Mexico.
Suwannee River, Fla. and Sec. 1 of River and                      -                          - -
  Ga., for navigation, flood    Harbor Act, Jan.
  control, power, and irriga-   21, 1927.
  tion (308-report).
Withlacoochee River, Fla.,    Sec. 1 of River and             -                  - - -       -
  for navigation, flood con-    Harbor Act, Jan.
  trol, power, and irrigation   21, 1927.
   (308 report).
Withlacoochee River, Fla___ Flood Control Act,                    -
                                June 22, 1936.



   IMPROVEMENT OF RIVERS AND HARBORS IN THE
             MOBILE, ALA., DISTRICT
  This district comprises a small portion of southeastern Tennessee,
western Georgia, western Florida, all of Alabama south of the Ten-
nessee River Basin,. eastern Mississippi, and a small portion of south-
eastern Louisiana embraced in the drainage basins tributary to the
Gulf of Mexico, west of the Aucilla River Basin, to and including the
Pearl River Basin. It includes the sections of the Intracoastal Water-
way from St. Marks River, Fla., to Long Point Light in Lake Borgne,
La.
  District engineer: Col. L. D. Worsham, Corps of Engineeers, to
May 2, 1942; and Lt. Col. D. Gullatt, Corps of Engineers, since that
date.
  Division engineer: Col. J. S. Bragdon, Corps of Engineers.
                                            IMPROVEMENTS

                     Navigation                                   Navigation-Continued
                                                  Page                                                             Page
1. Gulf Intracoastal Waterway.                   629    5. Intracoastal Waterway from
2. Channel from Apalachicola                                  Pensacola Bay, Fla,. to
      River to St. Andrews Bay,                                Mobile Bay, Ala_ _-.....                            636
        Fla __--                                  630    6. Intracoastal Waterway from
3. Waterway from Choctawhat-                                  Mobile Bay, Ala., to New
      chee Bay to West Bay,                                    Orleans, La_____________                            638
      Fla _________ __                            632    7. St. Marks River, Fla --.-..                            640
4. Intracoastal Waterway from                           8. Carrabelle Bar and Harbor,
      Choctawhatchee Bay to                                    Fla_----------------                                641
      Pensacola Bay, Fla ____                     634    9. Apalachicola Bay, Fla_____                             643
             RIVERS    AND HARBORS-                 MOBILE,     ALA.,      DISTRICT      629
     Navigation-Continued                               Navigation-Continued
                                             Page                                         Page
10. Apalachicola River, Fla., the                 29. Biloxi Harbor, Miss _.....          689
     Cutoff, Lee Slough, and                      30. Gulfport Harbor and Ship
      Lower Chipola River ....                645       Island Pass, Miss __--..           691
11. Flint River, Ga__________                 647 31. Wolf and Jordan Rivers,
12. Chattahoochee     River,      Ga.                    Miss         _-                   693
      and Ala   -                     --      649 32. Pearl River, Miss. and La__          694
13. St. Josephs Bay, Fla ......               652 33. Examinations, surveys, and
14. St. Andrews Bay, Fla .....                654       contingencies (general)___         696
15. Choctawhatchee River, Fla.                    34. Other projects for which no
       and Ala _ _ _                          656       estimates are submitted _         697
16. LaGrange Bayou, Fla ---                   658 35. Plant allotment_                    697
17. East Pass Channel from the
      Gulf of Mexico into Choc-                                  Flood control
      tawhatchee Bay, Fla     -               659
18. Pensacola Harbor, Fla ...                 660 36. Allatoona Reservoir, Coosa
19. Blackwater River, Fla    ---              663       River Basin, Ga_ _ _-__            699
20. Escambia and Conecuh Riv-                     37. Prattville, Autauga Creek,
      ers, Fla. and Ala --....                664       Ala_--------------------           701
21. Mobile Harbor, Ala _.....                 665 38. Snagging and clearing under
22. Removing the water hya-                             authority of section 2 of the
      cinth, Mobile River, Ala.,                        Flood Control Act ap-
      tributaries                     - -     669       proved Aug. 28, 1937, as
23. Chickasaw Creek, Ala         -.           671       amended---------------            703
24. Alabama River, Ala _.                     673 39. Preliminary examinations
25. Coosa River, Ga. and Ala___               675       and surveys for flood con-
26. Black Warrior, Warrior, and                          trol_-----                        704
      Tombigbee Riveis, Ala___                679 40. Other flood-control projects
27. Bayou LaBatre, Ala ..-.-..                685      for which no estimates are
28. Pascagoula Harbor, Miss___                686      submitted_--------------            705

                    1. GULF INTRACOASTAL WATERWAY

  Location.-This provides for a waterway from Ajpalachee Bay,
Fla., to the Mexican border, following in general the route of the
existing 9-foot waterway to Corpus Christi, Tex., and for its extension
to the Mexican border in the vicinity of Brownsville, Tex.
  Existing project.-This provides for a waterway 12 feet deep and
125 feet wide, except in the section between Mobile, Ala., and New
Orleans, La., where the width is to be 150 feet, from the, vicinity of
Apalachee Bay, Fla., to the Mexican border, in the vicinity of
Brownsville, Tex. The project also provides for the construction of a
double leaf bascule 4-lane highway bridge with approaches at State
Highway No. 61, Louisiana; for the construction of bulkheads or
jetties at Lake Borgne and Chef Menteur, La.; and for annual pay-
ments to the board of commisisoners of the port of New Orleans,
pending acquisition of permanent control of a portion of the inner
harbor navigation        canal.             The estimate       of cost of new         work is
$21,150,000.
  The project was authorized in Public Law No. 675, Seventy-seventh
Congress, approved July 23, 1942.
  Local cooperation.-The conditions of local cooperation affecting
the 12-foot waterway are the same as those applying to the various
sections of the 9-foot waterway between St. Marks River, Fla., and
Corpus Christi, Tex.
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-No work has been done on the
12-foot project.
630      REPORT OF CHIEF OF ENGINEERS,                             U.   S. ARMY,   1942

  Proposed operations.-Public Law No. 763, Seventy-seventh Con-
gress, approved October 26, 1942, provided that any unobligated bal-
ances of existing appropriations heretofore made for improvement
and maintenance of authorized river and harbor projects, might be
applied to the prosecution of work of enlargement of the present
Intracoastal Waterway from Apalachee Bay, Fla., to Corpus Christi,
Tex. Under this authorization, funds in the amount of $6,485,000
have been made available for prosecution of work on the section of
the waterway between Carrabelle, Fla., and Corpus Christi, Tex., as
follows :
Completion of section between Carrabelle, Fla., and Apalachicola
Bay, Fla-------------------------                                            -  $270, 000
Completion of section between Apalachicola Bay, Fla., and Mobile
Bay, Ala------------------------                                               2, 160, 000
Completion of section between Mobile Bay, Ala., and New Orleans,
  La ---------------------------------------------------------- 1, 785, 000
Partial completion of section between the Mississippi River and the
  Sabine River, Tex--------------                    ------------------------- 1, 510, 000
Partial completion of section between the Sabine River and Corpus
Christi, Tex     ----------------------------------------------                   760, 000
       Total       ---------------------------------------------                      6, 485, 000
  Additional funds in the amount of $5,895,000 can be profitably
expended during the fiscal year ending June 30, 1944, as follows:
Completion of section of the waterway between the Mississippi
  River and the Sabine River, Tex., to full project dimensions___ $3, 180,000
Continue work on the section of the waterway between the Sabine
River and Corpus Christi, Tex       ------------------------
                                                        _        _ 2, 715, 000
       Total     ----------------------------------------------                       5, 895, 000

                               Cost and financial summary
Total amount appropriated to date--------------------------       $6, 485, 000
Total expenditures to date-------              __
Amount (estimated) required to be appropriated for completion
  of existing project_____- _____________---____            _     14, 665, 000
Amount that can be profitably expended in fiscal year ending June
30, 1944, for new work .......-                                   5, 895, 000
  1 Funds made available during November 1942.

      2. CHANNEL FROM APALACHICOLA RIVER TO ST. ANDREWS
                           BAY, FLA.

  Location.--This waterway, 48 miles in length, extends from a point
6 miles above the mouth of the Apalachicola River in a northwest-
erly direction through Lake Wimico, thence to East Bay, an arm
of St. Andrews Bay, Fla. (See U. S. Coast and Geodetic Survey
Chart No. 184.)
  Existing project.-This provides for a channel 9 feet deep and
100 feet wide with three cut-offs from Apalachicola River to St.
Andrews Bay, Fla., by way of the natural waterways indicated
above. The mean range of tide is 2 feet and the extreme range,
except during storms, 3 feet.
  The estimated cost of new work, revised in 1935, was $845,900
with $4,000 for annual maintenance.
  The existing project was authorized by the following river and
harbor acts:
                RIVERS AND HARBORS-MOBILE,                                      ALA.,       DISTRICT                   631

                Acts                                Work authorized                                 Documents


June 25, 1910 __.--------------------. A channel 5 feet deep at mean                   H. Doc. No. 670, 61st Cong., 2d
                                        low water and 65 feet wide at                   sess.
                                        the bottom.
Emergency Relief Administration           Present project dimensions .. --- Rivers and Harbors Committee
Act, dated May 28, 1935, and River                                           Doc. No. 52, 72d Cong., 2d
and Harbor Act, Aug. 30, 1935.                                               sess. (Contains latest pub-
                                                                              lished map.)

  For report on the 12-foot Gulf Intracoastal Waterway project, see
page 629.
  Recommended modifications of project.-Under date of April 5,
1939, the Chief of Engineers recommended modification of the proj-
ect for the channel from Apalachicola River to St. Andrews Bay, Fla.,
to provide for taking over the existing canal connecting that water-
way and St. Josephs Bay, and for enlarging the canal to a depth of
9 feet and a width of 100 feet, at an estimated first cost of $81,000,
with $10,000 annually for maintenance in addition to that now re-
quired; subject to certain conditions of local cooperation. (H. Doc.
No. ,257; 76th Cong., 1st sess.)
  Local cooperation.-Fully complied with.
   Terminal facilities.-No terminal facilities are located on this water-
way; however, there are wharves at Panama City and Apalachicola,
which are considered adequate for existing commerce.
   Operations and results during fiscal year.-The U. S. hydraulic
pipe-line dredge Blackwater, operating in the channel from June 15
to 30, 1942, removed 21,193 cubic yards of material at a cost of $5,-
251.85. The U. S. snag boat Albany, operating in the channel from
March 13 to 31, 1942, removed 669 obstructions and cut 219 overhang-
ing trees from the bank, at a cost of $5,054.98. The cost of miscel-
laneous investigations and surveys was $345.96. The total cost was
$10,652.79, for maintenance. The expenditures were $15,306.19.
   Condition at end of fiscal year.-The existing project was completed
in 1937. The controlling depth at the end of the fiscal year was 9
feet.
   The total costs and expenditures for the existing project to June
30, 1942, were as follows:

                                                                               Costs
                                                                        S     ---               -               Expendi-
                                                                                                                 tures
                                                        New work             Mainte-             Total
                                                                               nance

Regular funds                             _______       $508, 822. 15       $161, 032. 88     $669, 855. 03      $674, 396. 13
Emergency relief funds___
                       ...                               340, 000.00                                              340, 000.00
      Total _                                            848, 822. 15        161, 032. 88    1, 009, 855. 03    1, 014, 396. 13

   Proposed operations.-The balance unexpended at the end of the
fiscal year, $31,185.18, including accounts receivable, will be applied as
follows :
Maintenance dredging to restore project dimensions with a hydraulic
pipe-line dredge, about 1/ months during May and June 1943_ _ $27, 705. 18
Maintenance snagging operations with the U. S. snag boat Albany,
about /2 month during November, 1942_ ___--_              ___-_-_-- _ 3, 480. 00
        Total                _______-----------------                                                          31, 185. 18
632            REPORT OF CHIEF OF ENGINEERS,                                        U. S. ARMY,               1942

   The additional sum of $30,000 can be profitably expended during the
fiscal year 1944, as follows:
Maintenance dredging to restore project dimensions with a hydraulic
pipe-line dredge, about 1 month_ _---_-------- ---                  __$22, 000
Maintenance snagging operations with the U. S. snag boat Albany, about
11/4 months                      ----------------------------------     8, 000
           Total------------                                      ------------------------------                       30, 000
                                              Cost and financial summary
Cost of new work to June 30, 1942_--------------------------------                                                $848, 822. 15
Cost of maintenance to June 30, 1942_____-_______-------------                                                     161, 032. 88
      Total cost of permanent work to June 30, 1942                                       -------------       1, 009, 855. 03
Plus accounts receivable June 30, 1942________________                                             ___             4, 541. 10

           Gross total costs to June 30, 1942-----------------------                                          1, 014, 396. 13
Net total expenditures___ ____ _____                              _                                           1--1,
                                                                                                                 014, 396. 13
Unexpended balance June 30, 1942___ _________________                                              __               26, 644.08

           Total amount appropriated to June 30, 1942 ____------1,                                                 041, 040. 21

    Fiscal year ending June 30                      1938               1939              1940        1941              1942

C ost of new w ork      ___
                   ...........................................                      ..
Cost of maintenance-..._. .....                    $10, 290. 50   $13, 535. 21      $12, 368. 73   $11, 982. 59       $10, 652. 79
Total expended--           -.... -- - -            10, 299. 76        13, 537. 57    12, 381. 96    11, 870. 29        15, 306. 19
Allotted       -    _.. ---
                         _        __ .             20, 000. 00        16, 347. 67    14, 000. 00    20, 070. 85        17, 000. 00



Balance unexpended July 1, 1941_-------------------------------                                                    $24, 950. 27
Amount allotted from War Department Civil Appropriation Act
    approved Apr. 28, 1942                       __---------------------            --              _ _             17, 000. 00

      Amount to be accounted for-----------------------------         41, 950. 27
Gross amount expended_..._______                       -            -15, 306. 19
                                                              ____________
                                                            ____

      Balance unexpended June 30, 1942 ---------------------                                              _         26, 644. 08
Accounts receivable June 30, 1942--------------------------_                                              _          4, 541. 10
           Unobligated balance available June 30, 1942-                                            __     _         31, 185. 18
Amount that can be profitably expended in fiscal year ending June
    30, 1944, for maintenance' 1_____________________                                               ___             30, 000. 00
   1Exclusive of available funds.

3. WATERWAY FROM CHOCTAWHATCHEE                                                     BAY TO WEST BAY, FLA.

  Location.-This waterway extends westward from West Bay, an
arm of St. Andrews Bay, Fla., through West Bay Creek, thence
westward by a land cut, entering Choctawhatchee Bay in the vicinity
of Point Washington, Fla., approximately 2 miles south of the mouth
of the Choctawhatchee River, a total distance of 26 miles.
             RIVERS AND HARBORS-MOBILE,                ALA.,   DISTRICT          633
   Existing project.-This provides for a channel 100 feet wide and
9 feet deep at mean low water from Choctawhatchee Bay to West
Bay, Fla. The mean range of tide in the two bays is about 1.4 feet.
   The estimate of cost for new work made in 1935 was $1,770,000 with
$10,000 for annual maintenance.
   The existing project was adopted by the River and Harbor Act ap-
proved August 30, 1935 (H. Doc. No. 259, 72d Cong., 1st sess.). The
latest published map is in the project document.
   For report on the 12-foot Gulf Intracoastal Waterway project, see
page 629.
   Local cooperation.-Fully complied with.
   Terminal facilities.-No terminal facilities are located on this
waterway as it is a connecting channel; however, there are wharves at
Panama City which are considered adequate for existing commerce.
   Operations and results during fiscal year.-The U. S. hydraulic
pipe-line dredge Black water, operating in the channel from February
24 to March 6, and March 28 to April 17, 1942, removed 91,762 cubic
yards of material. The U. S. dragline excavator No. 2, under emer-
gency operations from July 19 to August 13, 1941, removed 5,667 cubic
yards of material from the channel. The total cost of the dredging
was $20,657.16. The following work with Government plant and
hired labor was performed in connection with erosion protective
works, from July 19 to October 30, 1941, and May 16 to June 30,
1942, at a total cost of $6,939.97: Placed 9,760 cubic yards of embank-
ment in dam at station 745+00; dressed 53,000 square feet of face
of dams; and placed 3,486 cubic yards of embankment in levees.
The cost of miscellaneous investigations and surveys was $1,096.60.
The total cost was $28,693.73, for maintenance. The expenditures
were $28,272.97.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1938. The controlling depth at the end of the fiscal year
was 9 feet. Included in the total cost of maintenance is an item of
$977.06 for dredging in Indian Bayou, and an item of $964.54 for
dredging in Joes Bayou during the fiscal year 1939, under the provi-
sions of section 3 of the River and Harbor Act of July 3, 1930. The
total cost was $1,839,856.89, of which $1,466,605.95 was for new
work and $373,250.94 for maintenance.           The expenditures were
$1,838,842.23.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $40,128.15, including accounts receivable, will be applied
as follows:
Accounts payable, June 30, 1942---------------------------------
                                                    _                     $1, 016. 51
Maintenance dredging to restore project dimensions with
  a hydraulic pipe-line dredge about 4 month during
  December 1942 and January 1943--------------------_        $19, 500. 00
Hired labor emergency dredging with U. S. dragline excava-
  tor No. 2, removing shoals after heavy rains, as needed__    4, 500. 00
Maintenance of dikes, ditches, and outlet control structures
  of erosion protective works system by hired labor, as
  necessary during the fiscal year 1943-----------------      15, 111. 64
                                                                          39, 111. 64
       Total--------------------------------------------------             40, 128. 15
634          REPORT OF CHIEF OF ENGINEERS,                              U. S. ARMY,             1942

  The additional sum of $36,000 can be profitably expended during
the fiscal year 1944, as follows:
Maintenance dredging to restore project dimensions with a hydraulic
pipe-line dredge, for a period of 1 month-------------------------- $24, 000
Maintenance of dikes, ditches, and other protective works, by hired
labor----1----------------------------------------                    2, 000
         Total                  --------------                                                               36, 000

                                    Cost and ftnancial summary

Cost of new work to June 30, 1942---------------------------                                    $1,466, 605. 95
Cost of maintenance to June 30, 1942----------------------------                                   373, 250. 94
      Total cost of permanent work to June 30, 1942                        ------------               , 839, 856. 89
Plus accounts receivable June 30, 1942                                                                            85
                                                                                                               1--------------------

      Gross total costs to June 30, 1942-------------------------                                1, 839, 858. 74
Minus accounts payable June 30, 1942                                                                     016. 51
                                                                                                      1,--------------------------

      Net total expenditures ---------------------------------- 1, 838, 842. 23
Unexpended balance June 30, 1942__------------------------------    40, 126.30
         Total amount appropriated to June 30, 1942-------------                                 1. 878, 968. 53

   Fiscal year ending June 30               1938          1939           1940            1941               1942

Cost of new work                       $745, 634. 28
Cost of maintenance .            .............. $37, 274. 57
                         ...........                                   $165,640.14    $141,642.50          $28, 693. 73
Total expended-    ---      -            902, 827. 87    37, 958. 03   165, 851. 80    141, 210. 85         28, 272. 97
Allotted_-                             570, 000.00      -1, 721. 20    260, 196. 60     22, 493. 13         28,000.00



Balance unexpended July 1, 1941------------------------------                                          $40, 399. 27
Amount allotted from War Department Civil Appropriation Act
  approved !Apr.28, 1942________________------------------------------- _                                28,000. 00
      Amount to be accounted for ---------------------------                                            68, 399. 27
Gross amount expended----------------------------    $28, 280. 35
Less reimbursements collected-----------------    __        7.38
                                                                                                        28, 272. 97
      Balance unexpended June 30, 1942------------------------                                          40, 126. 30
Outstanding liabilities June 30, 1942 ---------------------------                                         1,016. 51
      Balance available June 30, 1942-------------------------                                          39, 109. 79
Accounts receivable June 30, 1942_----------------------_                                                     1. 85

         Unobligated balance available June 30, 1942_______________                                     39, 111. 64

Amount that can be profitably                      expended in fiscal year ending
   June 30, 1944, for maintenance                     -1_
                                                        ______- ________--- _--__                       36, 000. 00
  1 Exclusive of available funds.

   4. INTRACOASTAL WATERWAY FROM CHOCTAWHATCHEE BAY TO
                     PENSACOLA BAY, FLA.

  Location.-This waterway, about 47 miles in length, extends from
Choctawhatchee Bay through Santa Rosa Sound to Pensacola Bay,
Fla. (See U. S. Coast and Geodetic Survey Chart No. 186.)
  Existing project.-This provides for a channel 100 feet wide and
9 feet deep at mean low water from Choctawhatchee Bay to Pensa-
                 RIVERS      AND HARBORS-MOBILE,                  ALA., DISTRICT                   635
cola Bay, Fla., through Santa Rosa Sound. The mean range of tide
in the sound is 1.2 feet. The extreme range, except during storms,
is about 3 feet.
   The estimated cost of new work, revised in 1935, was $39,000. The
latest (1935) approved estimate for annual cost of maintenance is
$7,000.
   The existing project was authorized by the following river and
harbor acts:

     Acts                       Work authorized                                Documents



June 25, 1910_ A channel 6 feet deep at mean low water, with no   H. Doc. No. 565, 61st Cong., 2d sess.
                   reference to width.
Aug. 30, 1935_   Present project dimensions   ..   _ _   __ _     Rivers and Harbors Committee Doc.
                                                                    No. 42, 73d Cong., 2d sess. (Con-
                                                                    tains latest published map.)



   For report on the 12-foot Gulf Intracoastal Waterway project see
page 629.
   Terminal facilities.-This is a connecting channel and no terminal
facilities are available except several small-boat landings which are
used by fishing boats and trading launches which are considered
adequate for existing commerce.
   Operations and results during fiscal year.-None. The cost was
$526.66, for miscellaneous investigations and surveys, charged to
maintenance. The expenditures were $824.57.
   Condition at the end of fiscal year.-The existing project was com-
pleted in 1937. The controlling depth at the end of the fiscal year was
9 feet. The total cost was $148,096.91, of which $36,789.06 was for
new work and $111,307.85 for maintenance. The expenditures were
$148,123.86.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $24,489.50, including accounts receivable, will be applied
to maintenance dredging, removing shoals, with a pipe-line dredge
for a period of about 1 month during December 1942 and March 1943.
   The additional sum of $24,000 can be profitably expended during
the fiscal year 1944 for maintenance dredging, removing shoals, with
a hydraulic pipe-line dredge for a period of about 1 month.
                                   Cost and financial summary
Cost of new work to June 30, 1942 _______________________________                          $36, 789. 06
Cost of maintenance to June 30, 1942_____________________________                          111, 307. 85
      Total cost of permanent work to June 30, 1942--------------148, 096. 91
Plus accounts receivable June 30, 1942______________________           26. 95
        Gross total costs to June 30, 1942               ----------------------            148, 123. 86
Net total expenditures____
                      --------------
                                   ----                  -                                 148, 123. 86
Unexpended balance June 30, 1942_                                                           24, 462. 55
        Total amount appropriated to June 30, 1942_                                        172, 586. 41
636             REPORT OF CHIEF OF ENGINEERS,                                        U. S. ARMY,             1942


    Fiscal year ending June 30                      1938               1939            1940           1941             1942

C o st of n ew w ork -- -
Cost of maintenance
                            - - - --....................
                                                     _     _
                                                            ....
                                                                         $25, 200
                                                                                                    $........
                                                                   ..................................................-
                                                                                                     $14, 704. 95      $526. 66
Total expended_..-              _                                        25, 200                    $14, 433. 99           824.57

Allotted   --        -          _-                    $20, 000            7, 000        $13, 200    $14, 721. 11       10, 000. 00



Balance unexpended July 1, 1941--------------------------------- $15, 287. 12
Amount allotted from War Department Civil Appropriation Act ap-
  proved Apr. 28, 1942------------------------------------------- 10, 000. 00

           Amount to be accounted for_------------------------____                                                  25, 287. 12
Gross amount expended_------------- -------------                                                                      824. 57

      Balance unexpended June 30, 1942_________________________                                                     24, 462. 55
Accounts receivable June 30, 1942 ______      ____                                                                       26. 95

           Unobligated balance available June 30, 1942 ____________-____                                            24, 489. 50

Amount that can be profitably     expended in fiscal year ending June
                            - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - -
30, 1944, for maintenance 1                                                                                        24, 000. 00
   1 Exclusive of available funds.

5. INTRACOASTAL                       WATERWAY   FROM PENSACOLA                                      BAY,          FLA.,      TO
                                           MOBILE BAY, ALA.

   Location.-This waterway, 39.2 miles in length, extends from
Pensacola Bay, Fla., through Big Lagoon, Fla., and Old River and
Perdido Bay, Fla. and Ala., Bay LaLanche, Wolf Bay, Portage Creek,
Oyster Bay, Bon Secours River and Bay, Ala., to Mobile Bay, Ala.
 (See U. S. Coast and Geodetic Survey Charts Nos. 1265 and 1266.)
   Existing project.-This provides for a waterway 9 feet deep at
mean low water and 100 feet wide at the bottom from Pensacola Bay
to Mobile Bay through the natural waterways indicated above and
dredging the connecting links between these waterways. The mean
range of tide is about 1.2 feet, and the extreme range, except during
storm, 3 feet.
   The estimate of cost for new work, made in 1929, was $600,000.
The latest (1939) approved estimate of cost for annual maintenance
is $34,000.
   The existing project was authorized by the River and Harbor Act
of July 3, 1930 (H. Doc. No. 42, 71st Cong., 1st sess.).
   For report.on the 12-foot Gulf Intracoastal Waterway project, see
page 629.
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-There are no facilities located on this section
of the waterway except a natural landing and small privately owned
warehouse at Southport, Ala., where State Highway No. 3 crosses
the canal. At Pensacola, Fla., and Mobile, Ala., there are wharves
available for public use. These facilities are considered adequate for
existing commerce.
   Operations and results during fiscal year.-The U. S. pipe-line
dredge Wahalakl, operating in the channel from January 26 to Febru-
ary 22, 1942, removed 161,188 cubic yards of material. The cost was
$24,281.61 for maintenance. The expenditures wero $24,313.35.
                   RIVERS AND HARBORS-MOBILE,                      ALA., DISTRICT                        637
   Condition at end of fiscal year.-The existing project was completed
in 1934. The controlling depth at the end of the fiscal year was 9 feet.
Included in the total cost for maintenance are items of $1,000 for
dredging in Wolf Creek and $1,000 for dredging in Soldier Creek,
Ala., during the fiscal year 1935, and $969.62 for dredging in Perdido
Pass Channel during the-fiscal year 1940, all under section 3 of the
River and Harbor Act of July 3, 1930. The total cost was $771,668.64,
of which $443,455.89 was for new work and $328,212.75 for mainte-
nance. The total expenditures were $771,652.43.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $26,033.36, will be applied as follows:
Accounts payable, June 30, 1942---------- -------------------------  $16. 21
Maintenance dredging, removing shoals, with a hydraulic pipe-line
  dredge for a period of about 1 month, during December 1942 and
  January 1943_----------------       --------------------------- 26,017. 15

          Total -------------------------------------------- ____                                 26, 033.36

   The additional sum of $30,000 can be profitably expended during the
fiscal year 1944 for maintenance dredging, removing shoals, with a
hydraulic pipe-line dredge, for a period of about 11/4 months.
                                  Cost and financial summary

Cost of new work to June 30, 1942_                                         $443, 455. 89
                                               _------------------------------_
Cost of maintenance to June 30, 1942----------------------------328, 212. 75

      Total cost of permanent work to June 30, 1942_____________                                 771, 668. 64
Minus accounts payable June 30, 1942 ________________----- _____-                                      16. 21

     Net total expenditures---------------------------------                                     771, 652. 43
Unexpended balance June 30, 1942----------------                                                  26, 033. 36

          Total amount appropriated to June 30, 1942              ---------                _     797, 685. 79


    Fiscal year ending June 30        1938           1939           1940            1941              1942

Cost of new work .... .-
Cost of maintenance__               $29, 971. 99   $51, 801. 65   $35, 332. 98    $27, 015. 35       $24, 281. 61
Total expended.....                  29, 971. 99    51, 779. 72    35, 354. 91     26, 967. 40        24, 313. 35
Allotted.....
        -----------------------      76, 343. 52    40, 958. 22    29, 921. 99     22, 197. 00        25, 000. 00



Balance unexpended July 1, 1941_________________________-__                                      $25, 346. 71
Amount allotted from War Department Civil Appropriation Act ap-
proved April 28, 1942-----------------------------------------                                   25, 000. 00
           Amount to be accounted for ___________________                        __50,                346. 71
Gross amount expended------------------                     ----------------------                24, 313. 35
      Balance unexpended June 30, 1942------------------------                                    26, 033.36
Outstanding liabilities June 30, 1942 __     -16.                                                         21
           Balance available June 30, 1942---------------------------26, 017. 15

Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance 1------------------------------------                                       30, 000.00
1 Exclusive of available funds.

          493202-43-pt. 1, vol. 1-        41
638           REPORT OF CHIEF OF ENGINEERS,                              U.   S.   ARMY,     1942

         6. INTRACOASTAL WATERWAY, MOBILE BAY, ALA., TO NEW
                            ORLEANS, LA.

   Location.-This waterway, 126 miles in length. extends from the
10-foot contour in Mobile Bay via Mississippi Sound, Lake Borgne,
and Lake Pontchartrain to the State-owned Inner Harbor Navigation
Canal at New Orleans. (See U. S. Coast and Geodetic Survey Charts
Nos. 1266 to 1269.)
   Previous projects.-Lake Pontchartrain Channel was adopted by
the River and Harbor Acts of August 30, 1852, June 25, 1910, and
August 8, 1917.
   Mobile Bay-Mississippi Sound Channel was adopted by the River
and Harbor Acts of May 23, 1828, and July 25, 1912. For further
details, see pages 906 and 962 of the Annual Report for 1930 and
page 706 of the Annual Report for 1938.
   Existing project. This provides for a straight channel 300 feet
wide and 10 feet deep from the 10-foot contour in Mobile Bay to
the 10-foot contour in Mississippi Sound, and a channel 100 feet
wide and 9 feet deep from the 9-foot contour in Grand Island Pass
connecting Lake Borgne with Mississippi Sound through the Rigo-
lets and Middle Ground Channel in Lake Pontchartrain to the 9-foot
contour in Lake Pontchartrain near the end of the Inner Harbor
Navigation Canal. Under ordinary conditions the mean tidal range
is about 13/4 feet, and the extreme tidal range is about 3.4 feet.
   The estimate of cost for new work, revised in 1930, exclusive of
amounts expended on previous projects, was $75,000, of which $55,000
applies to the 10-foot channel and $20,000 to the 9-foot channel.
The latest (1929) approved estimate for annual cost of maintenance
is $21,000, of which $7,000 applies to the 10-foot channel and $14,000
to the 9-foot channel.
   The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                    Documents


July     3, 1930   A channel 300 feet wide and 10 feet deep from the     Rivers and Harbors Committee Doc.
                                                                                                       1
                     10-foot contour in Mobile Bay to the 10-foot con-     No. 4, 71st Cong., 1st sess.
                     tour in Mississippi Sound.
  Do       ..--    A channel 100 feet wide and 9 feet deep from Lake     H. Doc. No. 341, 71st Cong., 2d sess.
                     Pontchartrain to Mississippi Sound.


1 Contains the latest published map of the 10-foot channel.


   For report on the 12-foot Gulf Intracoastal Waterway project,
see page 629.
   Terminal facilities.-Terminal facilities available for public use are
located at Mobile, Dauphin Island, and Bayou LaBatre, Ala., Pasca-
goula, Biloxi, Gulfport, Pass Christian, and Bay St. Louis, Miss., and
Mandeville, La.     The Industrial Canal and New Basin Canal, both
controlled by the State of Louisiana, are the terminals at New Orleans
which are most generally used by the type of traffic on the Intra-
coastal Waterway. These facilities are considered adequate for exist-
ing conmmerce.
                   RIVERS AND HARBORS-MOBILE,                                   ALA., DISTRICT                      639
   Operations and results during fiscal year.--None.                                              The cost was
$796.27 for miscellaneous invdstigations and surveys, charged to main-
tenance.          The expenditures were $767.28.
   Condition at end of fiscal year.-The existing project was completed
in 1933.         The controlling depths at the end of the fiscal year were as
follows: Mobile Bay to 10-foot contour in Mississippi Sound section,
10 feet; Rigolets section, 9 feet. Included in the total cost of main-
tenance is an item of $971.66 for dredging in                                          entrance channel to
Bayou Coden, Ala., during the fiscal year 1940, under section 3 of the
River and Harbor Act approved July 3, 1930.                                            The total cost, under
the existing project was $181,643.63, of which $77,907.70 was for new
work and $103,735.93 for maintenance. The total expenditures were
$185,196.56.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $24,748.10, will be applied as follows:
Accounts payable, June 30, 1942 _______________________________                                                  $27.19
Maintenance dredging, removing shoals, with a hydraulic pipe-line
  dredge for a period of about l1/ months during October 1942 and
  February         1943 ____----------_-__________       ____________                                         24,720.91
           Total ----------------------------------                                                           24,748.10
  The additional sum of $24,000 can be profitably expended during
the fiscal year 1943 for maintenance dredging, removing shoals with
a hydraulic pipe-line dredge, for a period of about 1 month.
                                      Cost and financial summary
Cost of new work to June 30, 1942__                                                                         $179, 884. 51
Cost of maintenance to June 30, 1942-_                                                                      174, 170. 54
      Total cost of permanent work to June 30, 1942-                                                        354, 055. 05
Minus accounts payable June 30, 1942_                                                                             27. 19
     Net total expenditures_---------------         --                                                      354, 027. 86
Unexpended balance June 30, 1942______________________________                                               24, 748. 10
           Total amount appropriated to June 30, 1942_________________                                      378, 775. 96

   Fiscal year ending June 30               1938          1939                  1940           1941              1942


Cost of new work----------------                      ------------     ----
Cost of maintenance             ______---06                      ___          $22, 510________
                                                                              $22,510.              82
                                                                                            $21, 982----                27
                                                                                                                   $79---_-
                                                                                                                      6,8.
Total expended__        _________ ____________________________                22, 541. 56     21, 953. 12           767. 28
Allotted                                                   $22, 500           27, 102. 45     10, 407. 61        10, 000. 00


Balance unexpended July 1, 1941--------------------------------$15,     515. 38
Amount allotted from War Department Civil Appropriation Act
  approved April 28, 1942------------------------- --------------   10, 000. 00
           Amount to be accounted for _________________________                                               25, 515. 38
Gross amount expended-----------------                                 ------               $769. 08
Less reimbursements collected----                                                              1. 80
                                                                                                                 767. 28

      Balance unexpended June 30, 1942___________________        24, 748. 10
Outstanding liabilities June 30, 1942________-__ -        -___________27. 19
           Balance available June 30, 1942 -----------------------                                            24, 720. 91
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance ---------------           ----                                                    24, 000. 00
1Exclusive of available funds.
640           REPORT OF CHIEF OF ENGINEERS,                          U.   S. ARMY,      1942

                                  7. ST. MARKS RIVER, FLA.

   Location.-This river, 17 miles in length, rises about 14 miles south-
east of Tallahassee, Fla., and flows in a southerly direction into the
Gulf of Mexico, 116 miles east from the new entrance to St. Andrews
Bay. (See U. S. Coast and Geodetic Survey Chart No. 182.)
   Previous projects.-Provisionwas made for the removal of obstruc-
tions between 1824 and 1844, but apparently under no definite project.
For further details see page 686, Annual Report for 1938.
   Existing project.-This provides for a channel 10 feet deep and
100 feet wide at mean low water on suitable alinement and with
greater width where necessary at bends, from the 10-foot contour
in Apalachee Bay to the town of St. Marks, with a turning basin
of the same depth and 200 feet square at the latter point, and for the
removal of snags and similar obstructions from the present channel
between St. Marks and Newport. The extreme tidal range, except
during storms, is between 3 and 4 feet. The mean range of tides is 2.4
feet.
   The estimated cost of new work, exclusive of amounts expended on
previous projects, revised in 1937, was $86,000. The latest (1937)
approved estimate of cost for annual maintenance is $1,500.
   The existing project was authorized by the following river and
harbor acts:

       Acts                      Work authorized                                 Documents

July     3,1930   Channel 10 feet deep and a bottom width of 100     H. Doc. No. 453, 70th Cong., 2d sess.
                   feet at mean low water between the mouth of
                   the river and St. Marks, a distance of 6 miles,
                   by dredging.
Aug. 26,1937      Present project dimensions, straightening and       Rivers and Harbors Committee Doc.
                   widening the channel where necessary and re-        No. 77, 74th Cong., 2d sess. (Con.
                   moval of snags and obstructions.                    tains latest published map).


  Recommended modifications of project.-Underdate of June 4, 1941,
the Chief of Engineers recommended modification of the existing
project so as to provide for straightening the channel in the vicinity of
Big Bayou, at an estimated first cost of $71,000, with no increase in
annual cost of maintenance, subject to certain conditions of local
cooperation (H. Doc. No. 345, 77th Cong., 1st sess.).
  Local cooperation.-Fully complied with.
   Terminal facilities.-The terminal facilities on this stream consist
of small wooden wharves and docks at the towns of St. Marks and
Newport. These wharves and docks are used for transferring fish
fron small fishing craft to cold storage, for unloading petroleum
products, for refueling fishing and pleasure craft, and as berths for
the small boats located there. They are owned by local residents and
by petroleum companies. None is publicly owned, but a privately
owned dock with 200 feet of frontage at St. Marks is open to the
public. There are small marine ways at both St. Marks and New-
port. The facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-The U. S. snag boat
Albany, operating in the channel from February 24 to March 12, 1942,
removed 468 obstructions and cut 45 overhanging trees from the bank.
The cost and expenditures were $4,413.90 for maintenance.
                 RIVERS      AND HARBORS-MOBILE,               ALA.,         DISTRICT              641


   Condition at end of fiscal year.-The existing project was completed
in 1940. The controlling depth at the end of the fiscal year was 10 feet.
The total cost and expenditures under the existing project were
$103,686.97, of which $97,880.20 was for new work and $5,806.77 for
maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year $586.10 has been recommended for revocation as no work is
contemplated during the fiscal year 1943.
   The sum of $10,000 can be profitably expended during the fiscal year
1944, as follows:
Maintenance dredging to remove shoaled area in the channel and turning
basin with the U. S. snag boat Albany, for a period of about 2/3month_ _ $5, 000
Maintenance snagging with the U. S. snag boat Albany, for a period of
about 2 month-------------------------------------------------- 5, 000
           Total----------------           ----------------------------------                   10, 000
                                Cost and financial summary

Cost of new work to June 30, 1942------------------------------__  $133, 891. 06
Cost of maintenance to June 30, 1942------------------------------    5, 806. 77
       Total cost of permanent work to June 30, 1942----------      139, 697. 83

Net total expenditures -----------------------------------------                            39, 697. 83
Unexpended balance June 30, 1942__--------------------------------                              586. 10
       Total amount appropriated to June 30, 1942-----------------                          140, 283. 93

   Fiscal year ending June 30       1938         1939           1940            1941            1942

Cost of new work                               $81, 935. 96    $4, 944. 24
Cost of maintenance                         ____________        1, 392. 87                      $4, 413. 90
     Total cost_                                81, 935. 96     6, 337. 11
Total expended        _                         55, 237. 63    33, 035. 44                       4, 413. 90
Allotted                                        94, 849. 30   -6, 576. 23         $5, 000



Balance unexpended July 1, 1941 --------------------              $5, 000. 00
Gross amount expended-----------------------------------------4, 413. 90
      Balance unexpended June 30, 1942----------------- ---------     586. 10
Amount that can be profitably expended in fiscal year ending June
  30, 1944, for maintenance 1              ______________________________                    10, 000. 00
  1 Exclusive of available funds.

                          8. CARRA ELLE BAR AND HARBOR, FLA.

  Location. Carrabelle Bar and Harbor are located on the coast of
northwest Florida about 185 miles east of Pensacola Harbor. (See
U. S. Coast and Geodetic Survey Chart No. 182.)
  Previous projects.-Adopted by the act of June 3, 1896. For fur-
ther details see page 1833 of Annual Report for 1915, and page 687
of Annual Report for 1938.
   Existing project.-This provides for a channel 200 feet wide and
27 feet deep from the Gulf of Mexico to a point west of Dog Island,
thence 150 feet wide and 25 feet deep through St. George Sound
and Carrabelle River to a turning basin 500 feet square and 25 feet
deep at the town of Carrabelle.
642         REPORT OF CHIEF OF ENGINEERS,                            U.    S.   ARMY,      1942

  The estimated cost of new work, revised in 1937, was $346,000, in-
cluding $15,500 for aids to navigation. The latest (1937) approved
estimate of cost for annual maintenance is $24,000.
  The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                     Documents


June 13,1902   Channel at East Pass and the work at Dog Island_       H. Doe. No. 63, 56th Cong., 1st sess.
Mar. 2, 1907   Channel 100 feet wide with a depth of 18 feet from
                the outer harbor to a point about 2,500 feet out-
                side the mouth of the river, with a turning basin,
                thence 10 feet deep to the wharves at Carrabelle,
                 without any prior report having been made
                 thereon.
Aug. 26,1937   Present project dimensions_.._._                       H. Doc. No. 184, 75th Cong., 1st sess.
                                                                          (Contains latest published map.)



   Local cooperation.-Fully complied with.
    Terminal facilities.-The landings, consisting of pile bulkheads and
fills along the water front, are considered adequate for existing com-
merce. However, should the anticipated increase in traffic at this port
occur, as a result of the recent deepening of the Carrabelle Ship Chan-
nel, the terminal facilities above referred to will not be adequate. To
meet this expectant need assurances have been given by local interests
that adequate deep-sea terminal facilities will be provided.
    Operationsand results during fiscal year.-The U. S. hopper dredge
Benyaurd, operating in the entrance channel from September 8 to 21,
1941, removed 113,409 cubic yards of material. The cost and expendi-
tures were $15,084.60 for maintenance.
    Condition at end of fiscal year.-The existing project was completed
in 1939. The controlling depths at the end of the fiscal year were as
follows: Entrance channel, 27 feet; St. George Sound, 23.1 feet; Car-
rabelle River, 25 feet; and turning basin, 25 feet. The total cost and
expenditures under the existing project were $512,054.67, of which
$341,982.30 was for new work and $170,072.37 for maintenance.
    Proposed operations.-The balance unexpended at the end of the
fiscal year, $12,915.40, will be applied to maintenance dredging, remov-
ing shoals in the sound, the river channels and anchorage basin, with
a hydraulic pipe-line dredge for a period of 1/2 month during Sep-
tember 1942.
    The additional sum of $22,000 can be profitably expended during
the fiscal year 1944 for maintenance dredging, removing shoals in the
sound, the river channels and anchorage basin, by the operation of a
hydraulic pipe-line dredge, for a period of about 1 month.
                                    Cost and financial summary
Cost of new work to June 30, 1942---------------- ----                                    -- $363, 686. 38
Cost of maintenance to June 30, 1942_ ____________-_ ___                                      170, 072. 37

           Total cost of permanent work to June 30, 1942 ______________                         533, 758. 75

Net total expenditures___    _------533,                                                               758. 75
Unexpended balance June 30, 1942                                                                  12, 915. 40

           Total amount appropriated to June 30, 1942 ----------------                          546, 674. 15
                     RIVERS AND HARBORS-MOBILE,                                     ALA.,        DISTRICT                 643

   Fiscal year ending June 30                 1938            1939                  1940            1941            1942


Cost of new work__                                        $245, 955.'60                                             - -
Cost of maintenance_.                                         1, 723. 03          $15, 918. 43                     $15, 084. 60

        Total cost                                         247, 678. 63            15, 918. 43                      15, 084. 60

Total expended          _       -247,                            666. 97           15, 930. 09                      15, 084. 60

Allotted_                   -    -            $234, 500       26, 504, 08           2, 592. 98        28, 000



Balance unexpended July 1, 1941_____
                               ----   _--------------------                                                     $28, 000. 00
Gross amount expended ____________________-__-------    -15,                                                         084. 60

          Balance unexpended June 30, 1942________-----------------                                             12, 915. 40

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance ---------------------------------                                                    22, 000. 00
   1 Exclusive of available funds.

                                        9.   APALACHICOLA BAY, FLA.

   Location.-This bay is situated on the coast of northwest Florida,
160 miles east of Pensacola Harbor. (See U. S. Coast and Geodetic
Survey Chart No. 183.)
   Previous projects.-Adopted in the River and Harbor Act of June
14, 1880, and modified by the River and Harbor Act of March 3, 1899.
For further details see page 1833, Annual Report for 1915, and page
689, Annual Report for 1938.
   Existing project. This provides for channels from the Gulf of
Mexico 10 feet deep at mean low water, through West Pass in the Gulf
of Mexico, and Link and Inner Bar Channels in Apalachicola Bay,
with a width of 150 feet in West Pass and Link Channels, and a width
of 100 feet in the Inner Bar Channel. It also provides for a channel
through Bulkhead Shoals, 9 feet deep and 100 feet wide, which serves
as another entrance to Apalachicola Bay through East Pass, the en-
trance channel to Carrabelle) Harbor.
   The mean range of tide throughout this harbor is 2 feet. The ex-
treme range, except during storms, is about 3 feet.
   The estimate of cost of new work, revised in 1927, was $82,144,
exclusive of amounts expended on previous projects. The latest
(1927) approved estimate of annual cost of maintenance is $14,000.
   The existing project was authorized by the following river and har-
bor acts:

       Acts                             Work authorized                                           Documents


Mar.     2,1907   Channel 18 feet deep through West Pass and Link                  H. Doc. No. 422, 59th Cong., 1st sess.
                     Channel, 10 teet deep across the bar, and 9 feet
                    through bulkhead shoals.
Jan.   21, 1927   Present project dimensions         _ ____       - -- -    - -    H. Dbc. No. 106, 69th Cong., 1st sess.
                                                                                      (contains latest published map).



Terminal facilities.-Consist of several marginal pile and timber
wharves. The facilities are considered adequate for existing com-
merce.
644          REPORT OF CHIEF OF ENGINEERS,                                              U. S. AR1VMY,                   1942

   Operations and results during fiscal year.-The U. S. hydraulic
pipe-line dredge Blackwater, operating in the Inner Bar Channel
from February 2 to 23, 1942, removed 214,441 cubic yards of ma-
terial. The cost was $15,763.80 for maintenance. The expenditures
were $15,563.80.
   Condition at end of fiscal year.-The existing project was completed
in 1925. The controlling depths at the end of the fiscal year were as
follows: Inner Bar Channel, 10 feet; St. George Channel, 10 feet;
Link Channel, 10 feet; West Pass, 10 feet; and Bulkhead Shoals,
9 feet. The total cost and expenditures under the existing project
were $674,882.54, of which $82,144.59 was for new work and $592,737.95
for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $20,351.96, will be applied to maintenance dredging to pro-
vide project dimensions in the Inner Bar Channel, with a hydraulic
pipe-line dredge, for a period of about 1 month, during November
1942.
  The additional sum of $30,000 can be profitably expended during
the fiscal year 1944, as follows:
Maintenance dredging to provide project dimensions in the Inner Bar
Channel, with a hydraulic pipe-line dredge, for a period of about
1 month----      ---------------------------------------------        $20, 000
Maintenance dredging to provide project dimensions in the West Pass
Channel, with a United States seagoing dredge, for a period of about
  1/2 month -----       --      -------------------------------------- 10,000
           Total ----------------------------------                                                                             30, 000
                         Cost and financial summary
Cost of new work to June 30, 1942------------------------- $216, 758.09
Cost of maintenance to June 30, 1942 _____________________________ 761, 503. 71
           Total cost of permanent work to June 30, 1942_-                                                                 978, 261. 80

Net total expenditures  -----------------------------------                                                                978, 261. 80
Unexpended balance June 30, 1942  ----------------------------                                                              20, 351. 96

           Total amount appropriated to June 30, 1942-------------_                                                        998, 613. 76

   Fiscal year ending June 30                      1938                  1939             1940                   1941           1942


Cost of new work ---------------             .       ----
                                                   -------..     .           -- -----     ------- -------          -       - - - - - -
Cost of maintenance             ....--
                                 ------          $14, 353. 10        $12, 051. 75       $17, 033. 57        $14, 984. 24       $15, 763. 80
Total expended ....           ............        14, 353. 10         11, 851. 48        17, 154.82          15, 263. 26        15, 563. 80
Allotted     .....----------------------          29. 353. 10            7, 350. 00      18, 916. 39         20, 918. 93        18, 000. 00


Balance unexpended July 1, 1941                                                                                            $17, 915. 76
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942__                   ----------                                                                     18, 000. 00
      Amount to be accounted for-----------------------------                                                               35, 915. 76
Gross amount expended-----------------------------------                                                                    15, 563. 80
           Balance unexpended June 30, 1942------------------------                                                         20, 351. 96
Amount that can be profitably expended in fiscal year ending June
   30, 1944, for maintenance'                                   -_----                            -         --              30, 000. 00
  1   Exclusive of available funds.
                RIVERS AND          HARBORS--MOBILE,               ALA.,     DISTRICT                 645
10. APALACHICOLA              RIVER, FLA., THE CUT-OFF, LEE SLOUGH, AND
                                LOWER CHIPOLA RIVER

   Location.-The Apalachicola River is formed at the southwest
corner of the State of Georgia by the junction of the Chattahoochee
and Flint Rivers and flows south a distance of 112 miles, emptying
into Apalachicola Bay. The Florida River enters the Apalachicola
River from the east, 45.4 miles above its mouth, and the River Styx
also enters from the east, 36.7 miles above its mouth. (See U. S.
Coast and Geodetic Survey Chart No. 183.)
   Previous projects.-Expenditures were made between 1828 and
1831, but apparently under no definite project. In the years 1835
and 1836 appropriations were made for the Chipola River. Work
under existing project was begun in 1875. For further details see
page 690, Annual Report for 1938.
   Existing project.-This provides for a channel in the Apalachicola
River 6 feet deep at low water and 100 feet wide, to be secured by
the removal of snags and overhanging trees and by widening and
straightening Moccasin slough, and for a channel 5 feet deep and
60 feet wide through the cut-off, Lee slough, and lower Chipola
River. Snagging and dredging to a depth of 6 feet of the lower
2,500 feet of the Styx River, a tributary of the Apalachicola River,
is included in the existing project.
   The existing project also includes the improvement of the Florida
River by dredging a new outlet from Florida River, 6 feet deep and
80 feet wide, about 600 feet downstream of its present mouth. Both
the Styx and Florida Rivers are tributaries of the Apalachicola River.
   The mean range of the tide at the mouth of Apalachicola River is
2 feet, and the variation between low and high water is about 30 feet
at the point where the river is formed.
   The estimate of cost for new work, revised in 1938,. was $127,800,
exclusive of amount expended on previous project, but including
$1,250 contributed by local interests to apply on the improvement at
the mouth of Florida River. The latest (1938) approved estimate of
annual cost of maintenance is $16,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                  Documents


June 23, 1874   The channel in the Apalachicola River __------- H. Doc. No. 241, 42d Cong., 2d sess.,
                                                                  and Annual Report, 1873, p. 698. .
June 13,1902    The work in the cut-off, Lee Slough and lower Annual Report, 1889, p. 1416.
              Chipola River.
Jan. 6,19341 Work of snagging and dredging in the Styx River
June 20.1938 Dredging in the Florida River...    -_-_     - -      IH. Doc. No. 575, 75th Cong., 3d sess.
                                                                                                            2




  I Public Works Administration.
  2 Contains the latest published map of Florida River.
  Map of Apalachicola River has been published in H. Doe. No. 342, 76th Cong., 1st sess.     A map of the
cut-off, Lee slough and lower Chipola River will be found in Annual Report, 1891, opposite p. 1696.
646         REPORT OF CHIEF OF ENGINEERS,                              U.    S.   ARMY,        1942

  Recommended modifications of project. Under date of April 20,
1939, the Chief of Engineers recommended that the general plan
presented in the report for the full development of the Apalachicola,
Chattahoochee, and Flint River system in the combined interest of
navigation and power be approved, and that for the initiation and
partial accomplishment of said plan the existing projects for Apa-
lachicola River, Fla., Chattahoochee River, Ga. and Ala., and Flint
River, Ga., be modified to provide for the construction of two of the
locks and dams for the 9-foot project, one at Fort Benning and one at
the junction, supplemented by dredging and contraction works, to
provide a navigable depth of 6 feet to Columbus, Ga., and to Bain-
bridge, Ga.; at an estimated cost for new work of $6,500,000, with
annual maintenance of $200,000 in addition to that now required;
subject to certain conditions of local cooperation (H. Doc. No. 342),
76th Cong., 1st sess.).
   Local cooperation.-Fullcomplied with.
   Terminal facilities.-At Apalachicola, Fla., the facilities consist of
several marginal pile and timber wharves. The landing at Blounts-
town, Fla., is a natural one. The wharf at River Junction, Fla., is
a private one and is used for the handling and storage of sand and
gravel. These facilities are considered adequate for existing com-
merce.
   Operations and results during fiscal year.-The U. S. hydraulic
pipe-line dredge Blackwater, operating in the channel from January
15 to February 1, 1942, removed 109,588 cubic yards of material, at a
cost of $11,391.89. The U. S. snag boat Albany, operating in the Apa-
lachicola River from December 7, 1941, to January 15, 1942, removed
997 obstructions from the channel and cut 472 overhanging trees from
the bank, at a cost of $8,473.42. The cost of miscellaneous investiga-
tions and surveys was $530.40. The total cost was $20,395.71 for
maintenance.. The expenditures were $20,443.02.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1939. Work on the Styx River, a tributary of the Apalachi-
cola River, was completed in 1934. Work on the Florida River, also
a tributary of the Apalachicola River, was completed in 1939. At the
end of the fiscal year the contraction works were in fair condition.
The controlling depths at the end of the fiscal year were as follows:
Apalachicola River, 6 feet; the Cut-off, 5 feet; Lee slough, 5 feet;
Lower Chipola River, 4 feet; Styx River, 3.5 feet; and the mouth of
Florida River, 6 feet. Ordinarily, boats drawing 5 feet can operate
throughout the year at a stage of zero on the River Junction gage.
Greater depths are usually available from January to July of each
year.
   The total cost and expenditures under the existing project to June
30, 1942, were as follows:

                                                                        Costs
                                                                                                      E--xpenditures
                                                     New work        Maintenance        Total


Regular funds _.......                               $114, 234. 27    $353, 154. 13   $467, 388. 40     $467, 388. 40
Public Works funds.      _....   . ..   ..   .   .     14, 335. 12                      14, 335. 12       14, 335. 12
      Total._                                _   _    128, 569. 39     353, 154. 13    481, 723. 52      481, 723. 52
                    RIVERS AND HARBORS-- OBILE,                   ALA.,        DISTRICT                  647

   In addition, $1,923.53 was expended on new work from contributed
funds.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $27,778.27, will be applied as follows:
Maintenance dredging to meet the needs of navigation in the Apalachi-
cola River, with a hydraulic pipe-line dredge, for about 1 month
   during October 1942              ----------------                -              -             $21, 478. 27
Maintenance snagging in the Apalachicola River with the U. S. snag
boat Albany, about 1 month during October and November 1942...
                                                              --                                    6, 300. 00

          Total----------------------------------------------------                               27, 778. 27
  The additional sum of $28,000 can be profitably expended during
the fiscal year 1944, as follows:
Maintenance dredging to meet the needs of navigation in the Apalachi-
                                                                       $21, 000
cola River, with a hydraulic pipe-line dredge for 1 month .------------
Maintenance snagging in the Apalachicola River with the U. S. snag
boat Albany, about 1 month--------------------------------      ------- 7,000

          Total----------------------------------------                         ------------          28, 000

                                 Cost and financial summary
Cost of new work to June 30, 1942_-----------------------------                                 $141, 569. 39
Cost of maintenance to June 30, 1942__ --------------------------                                353, 154. 13
          Total cost of permanent work to June 30, 1942 ----------                     ___       494, 723. 52

Net total expenditures_ ____--    --                 _                                           494, 723. 52
Unexpended balance June 30, 1942-__ --              ______                                        27, 778. 27

           Total amount appropriated to June 30, 1942                                            5----------------
                                                                                               1522,   501. 79
   1 In addition, $1,923.53 expended for new work from contributed funds.


    Fiscal year ending June 30       1938           1939          1940             1941               1942

Cost of new work ............                                    $5, 770. 58
Cost of maintenance ..........    $28, 595. 59    $23, 215. 78   20, 216. 08     $25,620.34          $20.395.71

       Total cost-                  28, 595. 59    23. 215. 78   25, 986. 66      25, 620. 34         20,395.71
Total expended ...............      28, 599. 39    23, 195. 50   25, 511.06       26, 068. 91         20,443.02
Allotted_                           49, 507. 07    27, 245. 46   22, 520. 59      25,810.81           22,000.
                                                                                                            00



Balance unexpended July 1, 1941_________________________-----                                     26, 221. 29
Amount allotted from War Department Civil Appropriation Act ap-
proved Apr. 28, 1942 _                                                                           22, 000. 00
      Amount to be accounted for_                                                                 48, 221. 29
Gross amount expended_                                                                            20, 443. 02
           Balance unexpended June 30, 19:42                                                      27, 778. 27
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 2------- _-----------------                                            28, OCO. 00
   2Exclusive of available funds.

                                    11. FLINT RIVER, GA.

    Location.--This river, 330 miles in length, rises in the west central
part of the State of Georgia, flows in a generally southeasterly direc-
tion to Albany, and thence southwest to the southwest corner of the
648        REPORT OF CHIEF OF ENGINEERS,                             U.   S.   ARMY,     1942

State, where it joins with the Chattahoochee River in forming the
Apalachicola River. (See U. S. Geological Survey charts for south-
west Georgia.)
  Existing project.-This provides for a channel 100 feet wide and 3
feet deep at extreme low water from the mouth of the river to Albany,
a distance of 103 miles, to be obtained by dredging, rock excavations,
building contraction works, and removal of snags; and a channel for
light-draft steamers at moderate stages from Albany to Montezuma,
a distance of 79 miles, to be obtained by the removal of loose rocks,
snags, and overhanging trees. The extreme fluctuation of stage due
to floods was 33 feet, while the average variation between low and
high water is approximately 21.5 feet. The estimated cost of new
work between the mouth and Albany, revised in 1928, is $715,000, and
between Albany and Montezuma, made in 1879, $15,100. The latest
(1928) approved estimate of annual cost of maintenance is $20,000.
   The existing project was authorized by the following river and har-
bor acts:

    Acts                        Work authorized                                   Documents


June 23, 1874   A channel 100 feet wide and 3 feet deep at extreme   Annual Report, 1873, p. 707.
                 low water from the mouth of the river to Albany.
June 14, 1880   Extended the project to Montezuma   -------------    Annual Report, 1879, p. 818.


  The latest published map of Flint River, Ga., may be found in H. Doe. No. 342, 76th Cong., 1st sess.


   Recommended modifications of project.-Under date of July 25,
1917, the Chief of Engineers recommended modification of the project
by eliminating improvement of that portion of the river above Albany
 (H. Doc. No. 302, 65th Cong., 1st sess.).
   Modification of the existing projects for Apalachicola River, Fla.,
Chattahoochee River, Ga. and Ala., and Flint River, Ga., in the com-
bined interest of navigation and power, was recommended by the
Chief of Engineers April 20, 1939. (See recommendations reported
under the project for Apalachicola River, p. 646.)
   Terminal facilities.-The facility at Bainbridge consists of a natural
landing. There is also a natural landing at Albany, Ga. These
facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.--The U. S. snag boat
Albany, operating in the Flint River from February 8 to 23, 1942, re-
moved 296 obstructions from the channel and cut 247 overhanging
trees from the bank. The cost was $3,571.29, for maintenance. The
expenditures were $3,551.04.
   Conditionat end of fiscal year.-The existing project was 98 percent
completed at the end of the fiscal year. Work of improvement has
been carried on from the mouth of Albany Shoals, a distance of 103
miles. The controlling depths at the end of the fiscal year were : Albany
to Bainbridge, 1.5 feet; and Bainbridge to mouth 2.6 feet; however,
greater depths are generally available between the months of Novem-
ber and June of each year. The head of navigation for boat traffic is
Albany, Ga. A zero gage reading at Newton, Ga., indicates that a 3-
foot depth of water is available fcr navigation. The work remaining
                      RIVERS AND HARBORS-MOBILE,                                       ALA.,         DISTRICT                     649

to be done to complete the project to Albany, Ga., consists of widening
various dredged cuts from 70 to 100 feet. The total cost and expendi-
tures were $844,367.38, of which $640,819.77 was for new work and
$203,547.61 for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $3,648.96, will be applied to maintenance snagging and
removal of obstructions to meet the needs of navigation, with the
U. S. snag boat Albany, for a period of about 1/2 month, during October
1942.
   The additional sum of $7,000 can be profitably expended during the
fiscal year 1944 for maintenance snagging and rock removal, with
the U. S. snag boat Albany, for a period of about 1 month.
   No new work is contemplated on this project, as the small amount
of remaining work to complete the project is not needed in view of
the recommended modification of this project contained in House
Document No. 342, Seventy-sixth Congress, first session.
                                                     Cost and financial summary
Cost of new work to June 30, 1942 --------------------------                                                            $640, 819. 77
Cost of maintenance to June 30, 1942-......                                                                              203, 547. 61
            Total cost of permanent work to June 30, 1942                                            __                  844, 367. 38

Net total expenditures----------------                                                                                   844, 367. 38
Unexpended balance June 30, 1942_      __-___                                                                              3, 648. 96
            Total amount appropriated to June 30, 1942_                                                                  848, 016. 34

    Fiscal year ending June 30                         1938          1939               1940               1941                 1942

Cost of new work .
Cost of maintenance ...........
                                                ----- -- -
                                                 ..........
                                                   -        -
                                                                -- - -    ----
                                                                    $4, 937. 41
                                                                                   -
                                                                                       $6, 333. 66
                                                                                                             .      .
                                                                                                          $6, 127. 48
                                                                                                                         -,.,
                                                                                                                            .         .
                                                                                                                                $3, 571. 29
Total expended ..                   -           --                   4, 854. 81         6, 416. 26         6, 147. 73            3, 551.04
Allotted----------------------------------11,                            500. 00        6, 771. 07         3, 347. 73            3, 000. 00



Balance unexpended July 1, 1941___----------                                                                              $4, 200. 00
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942 ----------------------------------------                                                           3, 000. 00
      Amount to be accounted for-----------------------------                                                              7, 200. 00
Gross amount expended----------------------------------------                                                              3, 551. 04
            Balance unexpended June 30, 1942-------------------------                                                      3, 648. 96
Amount (estimated) required to be appropriated for completion of
existing project----------------------------------------------                                                           89, 200. 00
Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance 1- - - - - - - -__________
                                        --- -- --- --- -- --- --- --- --
                                                                                                                           7,0.00
    1 Exclusive of available funds.

                             12. CHATTAHOOCHEE RIVER, GA. AND ALA.
  Location.-This river, 418 miles in length, rises in the north central
part of the State of Georgia and flows in a southwesterly direction
to West Point and thence in a southerly direction to join with the
Flint at the southwest corner of the State of Georgia, forming the
Apalachicola River. (See U. S. Geological Survey charts for north-
west Georgia.)
650     REPORT   OF CHIEF OF ENGINEERS,      U.   S. ARMY,   1942

   Previous projects.-The River and Harbor Act of July 13, 1892,
made an appropriation for the section of river between West Point
and Franklin, Ga., and appropriations therefor were continued until
1899, when they were discontinued. For further details see page 1834
of Annual Report for 1915, and page 696 of Annual Report for 1938.
  Existing   project.-This provides for securing a channel 4 feet deep
at low water and 100 feet wide from the mouth to Columbus, Ga., a
distance of 164 miles, by the removal of timber obstructions, dredg-
ing, contraction works, and shore protection. The variation between
average low and high water is approximately 20 feet. The extreme
fluctuation is 54.7 feet at Columbus.
   The estimated cost of new work, from the mouth to Columbus, Ga.,
revised in 1924, is $1,156,000, exclusive of amounts expended on pre-
vious projects. The latest (1928) approved estimate of annual cost
of maintenance is $60,000.
   The existing project was adopted by the River and Harbor Act
of June 23, 1874 (H. Doc. No. 241, 42d Cong., 2d sess., and Annual
Report for 1873, p. 699). The latest published map of Chattahoochee
River, Ga. and Ala., may be found in H. Doc. No. 342, 76th Cong., 1st
sess.
   Recommended modifications of project.--See recommendations re-
ported under the project for Apalachicola River, page 646.
   Terminal facilities.-The terminals at Columbus and Eufaula, Ala.,
consist of natural landings, and a marginal landing of masonary con-
struction is located at Columbus, Ga. These facilities are considered
adequate for the existing commerce.
   Operations and results during fiscal year.-The U. S. hydraulic
pipe-line dredge Blackwater, operating in the channel from July 1 to
November 26, 1941, and from January 5 to 14, 1942, removed 645,956
cubic yards of material, at a cost of $109,415.04. The U. S: snag
boat Albany, operating in the Chattahoochee River from July 1 to
October 16, November 3 to 8 and 24 to December 6, 1941, and from
January 16 to February 8, 1942, removed 3,265 obstructions from the
channel and cut 1,970 overhanging trees from the bank, at a cost
of $31,366.97. The cost of miscellaneous investigations and surveys
was $105.61. The total cost was $140,887.62 for maintenance. The
expenditures were $118,875.53.
   Condition at end of fiscal year.-The existing project was 94 per-
cent completed in 1931, and operations since that date have consisted
of maintenance. At the end of the fiscal year dredging, open-channel
work and snagging operations had been carried on from the mouth
of the river to a point 164 miles above the mouth. The controlling
depth at the end of the fiscal year at low water was 3.5 feet. Vessels
drawing not more than this may operate on the river throughout the
year, and 5 feet can ordinarily be carried from December to Sep-
tember, inclusive. The head of navigation for boat traffic is Columbus,
Ga. The work remaining to be done to complete the project consists
of the construction of contraction works in the lower 25 miles of the
river. A gage reading of 2.5 feet at Columbus, Ga., normally in-
dicates that the depth of water is adequate for 4 foot navigation.
   The total cost under the existing project was $2,613,813.70, of which
$1,081,084.85 was for new work and $1,532,728.85 for maintenance.
The expenditures were $2,609,836.30.
                 RIVERS             AND HARBORS--MOBILE,                              ALA., DISTRICT                         651
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $87,667.32, will be applied as follows:
Accounts payable June 30, 1942_ __------------------------------- $3, 977. 40
Maintenance dredging to meet the needs of navigation
  with a hydraulic pipe-line dredge for a period of about 3
  months, July, August, and September, 1942------------ $62, 789. 92
Maintenance snagging operations with the U. S. snag boat
  Albany, for a period of about 3 months, July, August, and
  September, 1942------------------------            ---    20,900. 00
                                                                       83, 689. 92
         Total _---------------                                                               ----                    87, 667. 32
   The additional sum of $85,000 can be profitably expended during the
fiscal year 1944, as follows:
Maintenance dredging to meet the needs of navigation with a hydraulic
  pipe-line dredge for a period of 3 months ----------------------                                                   __ $63, 000
Maintenance snagging operations with the U. S. snag boat Albany, for
3 months_---------------------------------------------------22,                                                              000
      Total ______     -______  __________-__                                                                             85, 000
  No new work is contemplated on this project, as the small amount
of remaining work to complete the project is not needed in view of the
recommended modification of this project contained in House Docu-
ment No. 342, Seventy-sixth Congress, first session.
                                               Cost and financial summary

Cost of new work to June 30, 1942_--------------------------                                                   $1, 100,804. 07
Cost of maintenance to June 30, 1942__ ______                                                                      532, 728. 85
                                                                                                                1--------1,
         Total cost of permanent work to June 30, 1942-------------2,                                                633, 532. 92
Minus accounts payable June 30, 1942_ _-_                                   _----------                                3, 977. 40
         Net total expenditures__                        __-- __-_       ------------
                                                                        ___                                     2, 629, 555. 52
Unexpended balance June 30, 1942            ___--
                                         -----------             87, 667. 32
     Total amount appropriated to June 30, 1942--------------2, 717, 222. 84

   Fiscal year ending June 30                     1938               1939              1940             1941              1942

Cost of new work ....
Cost of maintenance -------         ----        $24, 660.89     $67, 737. 35      $153, 338. 70      $136, 828.86      $140, 887. 62
Total expended.-----------------                 24, 939. 05     48, 188. 24        172, 723.04       155, 028. 32       118, 875. 53
Allotted....      ..----------------------       50, 000. 00     68, 620. 93       282, 155. 10       143, 054. 10        60, 000. 00

Balance unexpended July 1, 1941------------------------------                                                    $146, 542. 85
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942--------------------------------------                                                         60, 000. 00
      Amount to be accounted for--------------------------_            206, 542.85
Gross amount expended-------------------------    $118, 894.97
Less reimbursements collected                             9. 44
                                                         1---------------------
                                                                       118, 875. 53
      Balance unexpended June 30, 1942 -----------------------                                                        87, 667. 32
Outstanding liabilities June 30, 1942--------------------------                                                        3, 977. 40
         Balance available June 30, 1942--------------------------                                                    83, 689. 92
Amount (estimated) required to be appropriated for completion
   of existing project                       ---------------------             ----------                             75, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance ---------------                                                                       85, 000.00
  Exclusive of available funds.
652        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                     1942

                                13. ST. JOSEPHS BAY, FLA.

   Location.-St. Josephs Bay is located on the northwest coast of
Florida, 115 miles east of Pensacola Harbor. (See U. S. Coast and
Geodetic Survey Chart No. 184.)
   Existing project.-This provides for a channel 300 feet wide and
29 feet deep at mean low water across the bar at the entrance to the
bay, and a channel 200 feet wide and 27 feet deep from deep water
in St. Josephs Bay to Port St. Joe, with a turning basin approxi-
mately 6 acres in area and 27 feet deep at the proposed municipal
pier at Port St. Joe. The average tidal variation is 1.4 feet. The
extreme range, except during storms, is about 4 feet.
   The estimated cost of new work, revised in 1937, was $124,000, exclu-
sive of $20,000 contributed by local interests. The latest (1937) ap-
proved estimate of cost for maintenance is $15,000 annually for the
first 3 years and $5,000 annually thereafter.
   The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                   Documents


July 25,1912    Project document recommended a width of 350          H. Doc. No. 660, 62d Cong., 2d sess.
                 feet and the act limited the width to 300 feet
                 with a depth of 24 feet across the bar at the en-
                 trance to the bay.
Aug. 26, 1937   The present project dimensions__                     Rivers and Harbors Committee Doc.
                                                                       No. 10, 75th Cong., 1st sess. (Con-
                                                                      tains latest published map.)



   Recommended modifications of project.-Under date of November
19, 1940, the Chief of Engineers recommended modification of the exist-
ing project for St. Josephs Bay, Fla., to include the existing south chan-
nel at its present dimensions, 27 feet deep and 200 feet wide, from the
turning basin at Port St. Joe to the 27-foot contour in the bay, at an
estimated cost of $5,000 annually for maintenance in addition to that
now required; subject to certain conditions of local cooperation
 (S. Doc. No. 17, 77th Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Terminalfacilities.-Consistof a deep sea terminal with a marginal
wharf of bulkhead and fill construction, approximately 3,522 feet in
length, with adequate rail and highway connections. One thousand
feet of this wharf and the warehouse located thereon are controlled by
the City of Port St. Joe, approximately 600 feet by the Gulf Oil Cor-
poration, and the remaining 1,922 feet are owned and used exclusively
by the St. Joe Paper Co. In addition there are several small pri-
vately owned wharves of pile and timber construction, used prin-
cipally by boats engaged in the fishing industry. These facilities are
considered adequate for existing commerce.
   Operations and results during fiscal year.-The U. S. hopper dredge
Benyaurd, operating in the entrance channel from September 22 to
October 5, 1941, removed 176,208 cubic yards of material. The cost
was $16,044.41 for maintenance. The expenditures were $16,032.05.
               RIVERS AND HARBORS-MOBILE,                                          ALA., DISTRICT                      653

   Condition at end of fiscal year.-The existing project was completed
in 1938. The controlling depths at the end of the fiscal year were:
entrance channel, 29 feet; bay channel, 26.3 feet; turning basin, 27
feet. The total cost was $205,484.26, of which $124,105.99 was for
new work and $81,378.27 for maintenance. The expenditures were
$205,471.90. In addition $20,000 was expended from contributed
funds for new work.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $31,90.30, will be applied as follows:
Accounts payable June 30, 1942-_____----------- ------------------        $12. 36
Maintenance dredging to restore project dimensions in the inner chan-
  nel and turning basin with a hydraulic pipe-line dredge, about 11
  months during December 1942 and June 1943-___   ----------------    31, 277. 94

        Total _._._----_-----------------------------                                                            31, 290. 30
   The additional sum of $31,000 can be profitably expended during the
fiscal.year 1944, as follows:
Maintenance dredging to restore project dimensions in the inner channel
and turning basin with a hydraulic pipe-line dredge, about 4/5 month__ $17, 500
Maintenance dredging, removing shoals in the entrance channel, with a
United States seagoing hopper dredge, for a period of about 1/2
month_-------------------------------         -                         13, 500

        Total _____                                        --------------                                            31, 000
                                       Cost and financial summary
Cost of new work to June 30, 1942_                                                                             $124, 105. 99
Cost of maintenance to June 30, 1942_                          ____-----------                  -___             81, 378. 27
      Total cost of permanent work to June 30, 1942____________ 205, 484. 26
Minus accounts payable June 30, 1942---------------------------       12. 36

     Net total expenditures__- ______1------------1205,                                                              471. 90
Unexpended balance June 30, 1942_---------------------------                                                     31, 290. 30
        Total amount appropriated to June 30, 1942____ _____                                       ___         1236, 762. 20
  1 In addition $20,000 expended from contributed funds for new work.

   Fiscal year ending June 30               1938                1939               1940           1941              1942

Cost of new work .--------    ------        $104, 000        $   0...            $15.655. 91    $33.470. 76$16.044. 41
Cost of maintenance_                                                31
                                                             $14,804.            $15,655.91     $33,470.76    $16,044.41
Total expended.........       ..------------------
                                              104, 000         14, 610. 60        15, 712. 88    33, 607. 50        16, 032. 05
Allotted....                 ...-----------------------.
                                              223, 000        104, 000. 00        49, 253. 33    29, 000. 00        18, 000. 00

Balance unexpended July 1, 1941                                                                                 $29, 322. 35
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942_____________      ___-18,                                                                    000. 00
      Amount to be accounted for _____ _______---______---_                                                      47, 322. 35
Gross amount expended -_        -----      ---                                            $16,081.41
Less reimbursements collected     ------              49. 36
                                                                                                                 16, 032. 05

      Balance unexpended June 30, 1942_____--- _________-    _     31, 290. 30
                                                _______
Outstanding liabilities June 30, 1942_______......        -_______      12. 36
        Balance available June 30, 1942                                  __                                      31, 277. 94
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance ------   -----      --                                                           31, 000. 00
  2 Exclusive of available funds.
       493202-43-pt. 1, vol. 1-42
654    REPORT OF CHIEF OF ENGINEERS,        U. S. ARMY,   1942

                     14. ST. ANDREWS BAY, FLA.

   Location.-This bay,is located on the northwest coast of the State
of Florida, 102 miles east of the entrance to Pensacola Harbor. (See
U. S. Coast and Geodetic Survey Chart No. 184.)
   Previous project.-Adopted by the River and Harbor Act of June
25, 1910. For further details see page 541 of Annual Report for 1934
and page 710 of Annual Report for 1938.
   Existing project.-This provides for a channel extending from
deep water in the bay across Lands End to the Gulf of Mexico, 300
feet wide and 27 feet deep in the bay and across Lands End and 450
feet wide and 29 feet deep in the approach channel in the Gulf, and
protected by two jetties, each about 700 feet long. The mean tidal
range is 1.4 feet, and the extreme range, except during storms, is
about 4 feet.
   The estimated cost for new work made in 1933 was $435,000. The
latest (1939) approved estimate for annual cost of maintenance is
$35,000.
   The existing project, including abandonment of the project adopted
by the act of June 25, 1910, was authorized by the River and Harbor
Act approved August 30, 1935 (H. Doc. No. 33, 73d Cong., 1st sess.).
The latest published map of this locality will be found in the project
document. The existing project was also authorized by the Public
Works Administration September 6, 1933.
   Recommended modifications of project.-Under date of December
15, 1939, the Chief of Engineers recommended modification of the
existing project for St. Andrews Bay, Fla., so as to provide a chan-
nel in Watson Bayou 100 feet wide and 10 feet deep from that depth
in St. Andrews Bay to the highway bridge, at an estimated cost of
$1,000 annually for maintenance, in addition to that now required;
subject to certain conditions of local cooperation (H. Doc. No. 555,
76th Cong., 3d sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-Consist of two privately owned oil terminals,
one concrete steel pier and warehouse owned by the Atlanta & St.
Andrews Bay Railway Co., at Panama City, Fla., and wharves of con-
crete and steel construction owned by the municipality of Panama
City, Fla. These wharves afford berthing spaces for five ships. There
are also a number of small privately owned pile and timber wharves
located at Panama City, Fla. These facilities are considered adequate
for existing commerce.
   Operations and results during fiscal year.-The U. S. hopper
dredge Benyaurd, operating in the new entrance channel from Octo-
ber 6 to 19, 1941, and February 19 to March 4, 1942, removed 491,762
cubic yards of material, at a cost of $28,615.80. The U. S. dragline
excavator No. 2 mounted on barge No. 40 from November 3, 1941, to
May 23, 1942, placed 1,379.7 tons of riprap stone and 3,165 tons of
cover stone in the east jetty wing extension; and 635.65 tons of riprap
stone and 2,025.69 tons of cover stone in the west jetty extension, at
a cost of $51,133.21. The cost of miscellaneous investigationis and
surveys was $2,528.13. The total cost was $82,277.14 for maintenance.
The expenditures were $80,162.57.
   Conditionat end of fiscal year.-The existing project was completed
in 1934. The controlling depths at the end of the fiscal year were
                 RIVERS AND HARBORS--MOBILE,                                    ALA.,         DISTRICT                    655

27 feet in the channel from the bay across Lands End, and 29 feet
in the approach channel in the Gulf.
  The total costs and expenditures on the existing project to June 30,
1942, were as follows:

                                                                            Costs
                                                                        -   -- _-                                Expenditures
                                                 New work         Maintenance                   Total

Regular funds                                                     $1,057, 235. 95            $1,057, 235. 95      $1, 056, 932. 35
Public Works funds _                             $581, 958. 86                                  581, 958. 86          581, 958.86
      Total---------       -----------------      581, 958. 86     1, 057, 235. 95            1,639, 194. 81       1, 638, 891. 21


  Proposed operations.-The balance unexpended at the end of the
fiscal year, $56,364.26, including accounts receivable, will be applied as
follows:
Accounts payable June 30, 1942 --------------------------------                                                      $305.46
Maintenance dredging to restore project dimensions in the
new entrance channel, with the U. S. seagoing hopper
  dredge Benyaurd, for a period of about 1/2 month dur-
  ing May 1943---------------------------------                $14, 000.00
Maintenance of jetties at new entrance channel by hired
  labor, April to June 1943          -------------------------  42, 058. 80
                                                                                                                  56, 058. 80

       Total--------                    ----------------------------------                                        56, 364. 26
   The additional sum of $75,000 can be profitably expended during the
fiscal year 1944 as follows:
Maintenance dredging to restore project dimensions in the new entrance
channel with a United States seagoing hopper dredge, for a period
of 1 month----------___----------------------                         $30, 000
Maintenance of jetties at new entrance channel by hired labor---------_45, 000
       Total                -----------------------------------                                                        75, 000
                                      Cost and financial summary
Cost of new work to June 30, 1942-------------------------- $785, 518. 86
Cost of maintenance to June 30, 1942------------------------1, 570, 840. 62
      Total cost of permanent work to June 30, 1942_____________ 2, 356, 359. 48
Plus accounts receivable June 30, 1942 --------------------------          1.86

      Gross total costs to June 30, 1942-------------------------2, 356, 361. 34
Minus accounts payable June 30, 1942----------------------------         305. 46
     Net total expenditures-----------------------------2, 356, 055. 88
Unexpended balance June 30, 1942---------------------------- 56, 362. 40

           Total amount appropriated to June 30, 1942--------------                                            2, 412, 418. 28

   Fiscal year ending June 30             1938             1939                 1940                1941              1942

Cost of new work--------                                       -----------------------
                               ------- --------- - -------------
Cost of maintenance--......            $470, 653. 95     $50, 412.85          $35, 054. 43        $48, 878. 25       $82, 277. 14
Total expended--...                     487, 900. 45      50, 808.99           32, 288. 57         53, 961. 41        80, 162. 57
Allotted                                459, 997. 91      39, 276. 91          88, 154. 37         54, 482. 10        37, 600. 00
656     REPORT OF CHIEF OF ENGINEERS,               U. S. ARMY,         1942

Balance unexpended July 1, 1941_--__      -_----     ----       ---       $98, 924.97
Amount allotted from War Department Civil Appro-
priation Act approved June 24, 1940___-------------      $2, 600. 00
Amount allotted from War Department Civil Appro-
priation Act approved April 28, 1942---------     ____ 35, 000. 00
                                                                           37, 600. 00
      Amount to be accounted for----------------------     ----           136, 524. 97
Gross amount expended                               $82, 338.61
Less reimbursements collected__-__- _____--------    2, 176. 04
                                                                           80, 162. 57
      Balance unexpended June 30, 1942 _.________-___________              56, 362. 40
Outstanding liabilities June 30, 1942 __________-----------305.                     46

      Balance available June 30, 1942___________-_________---              56, 056. 94
Accounts receivable June 30, 1942__________ _________---1.                          86

      Unobligated balance available June 30, 1942___ _________---56, 058. 80
Amount that can be profitably expended in fiscal year ending June
  30, 1944, for maintenance 1________________                              75, 000. 00
  1 Exclusive of available funds.

              15. CHOCTAWHATCHEE RIVER, FLA. AND ALA.

   Location.-Rises in the southeast part of the State of Alabama
and flows in a southerly direction for a distance of about 175 miles
through Alabama and Florida, emptying into the eastern end of
Choctawhatchee Bay, about 64 miles east of Pensacola Harbor. (See
U. S. Coast and Geodetic Survey Chart No. 185.)
   Previous projects.--A project was authorized by the River and
Harbor Act approved May 3, 1881. Work under existing project
was begun in 1874. For further details see page 1834, Annual Re-
port for 1915, and page 463, Annual Report for 1933.
  Existing project.-This provides for improvement of Cypress Top
Outlet, for maintenance of a navigable channel at low water from
the mouth to Geneva, Ala., a distance of 96 miles, by the removal of
snags and overhanging trees, and for a channel for low-water navi-
gation 3 feet deep and 60 feet wide between Geneva and Newton,
Ala., a distance of 44 miles, to be obtained by the removal of hard,
blue-clay obstructions, by rock excavation, and by the removal of
snags and overhanging trees. The mean range of tide at the mouth
is 2 feet, and the extreme range, except during storms, is about 4
feet. The highest stages reached in floods are 36 feet at Newton,
Ala.; 46.1 feet at Geneva, Ala.; and 27.1 feet at Caryville, Fla.
  The estimated cost of new work between the mouth of the river
and Geneva, made in 1872, exclusive of amount expended on previous
project, was $34,332, and between Geneva and Newton, made in 1889,
$57,125. The latest (1928) approved estimate of annual cost of main-
tenance is $12,000.
  The existing project was authorized by the following river and
harbor acts:
                   RIVERS      AND HARBORS-MOBILE,                    ALA.,    DISTRICT                    657

       Acts                       Work authorized                                 Documents



June 23, 1874      Adopted the improvement of that portion of the    S. Doc. No. 63, 42d Cong., 2d sess.
                    stream between the mouth of the river and
                    Geneva, Ala.
Aug.   2, 1882
     and           Provided for work between Geneva and Newton.
Sept. 19, 1890
June 13, 1902      Provided for the improvement of Cypress Top
                     Outlet.



   The latest published map is in House Document No. 242, Seventy-
second Congress, first session.
   Terminal facilities.-The natural landings and small timber
wharves at various locations on the river are considered adequate for
existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1906. Navigation and operations are now confined to that
portion of the river between the mouth and the mouth of Holmes
River, a distance of 271/2 miles, which may be regarded as the head of
navigation, and to the lower 9 miles of East River. The low water
depth in the former portion is 2.6 feet, and in the latter 2 feet. The
controlling depth at Cypress Top Outlet (the mouth of the river)
is 3 feet. The total costs and expenditures under the existing project
were $393,401.29 of which $134,494.02 was for new work and $258,-
907.27 for maintenance.
   Proposed operations.-No funds are available and no operations
are contemplated during the fiscal year 1943.
   The sum of $6,000 can be profitably expended during the fiscal
year 1944 to perform maintenance snagging operations with the U. S.
snag boat Albany for a period of about three-fourths of a month.
                                     Cost and financial summary
Cost of new work to June 30, 1942 ________________________________                              $171, 884. 50
Cost of maintenance to June 30, 1942_______________________                                      258, 907. 27

      Total cost of permanent work to June 30, 1942______________                                430, 791. 77
Net total expenditures___________________________                                                430, 791. 77
Total amount appropriated to June 30, 1942______________________                                 430, 791. 77

    Fiscal year ending June 30           1938         1939            1940          1941                 1942

Cost of new work------------------
                                                 -- -- --- --..
Cost of m aintenance - - - - - - ----------- --- .--                 .--. --...
                                                                          . . . . . . . . . . ... . . . . .
Total expended ..............................................................
Allotted-- -----    -   -        ------------                       ------                 $4, 000       -$4, 000



Balance unexpended July 1, 1941        _       __-___-_                                              $4, 000. 00
Deductions on account of revocation of allotment_----------______                                     4, 000. 00
Amount that can be profitably expended in fiscal year ending June
   30, 1944, for maintenance6---------                       __ _                 _-       -           ,000. 00
658         REPORT        OF CHIEF OF ENGINEERS,                     U.   S.   ARMY,      1942

                                   16. LA GRANGE BAYOU, FLA.

    Location.-This waterway is an arm of Choctawhatchee Bay, Fla.,
located about 70 miles east of Pensacola Harbor and about 46 miles
west of Panama City, Fla. The length of the waterway is 31/ miles
from its mouth through LaGrange Bayou and Four Mile Creek to
the town of Freeport, Fla., which is the head of navigation. (See
U. S. Coast and Geodetic Survey Chart No. 185.)
    Previous project.-Adopted by the River and Harbor Act of March
:3, 1881. For further details see page 869 of the Annual Report for
1931 and page 671 of the Annual Report for 1937.
    Existing project.-This provides for a channel 9 feet deep and 100
feet wide from the 9-foot contour in Choctawhatchee Bay to Freeport,
Fla., a distance of approximately 41/2 miles. The normal tidal range
is about 0.5 foot, and the extreme range, except during storms, is about
3 feet.
   The estimated cost for new work made in 1935 was $75,000 with
$2,000 for annual maintenance.
  The existing project was authorized by the following river and
harbor acts:

     Acts                          Work authorized                                 Documents


Sept. 22, 1922   Channel 6 feet deep, 100 feet wide, and approxi-    HI. Doec. No. 111, 67th Cong., 1st sess.
                  mately 10,700 feet long, extending from near the
                  mouth of La Grange Bayou to the mouth of
                  Four Mile Creek; no work was done under this
                  authorization.
Aug. 30, 1935    Modified the required local cooperation and pro-    Rivers and Harbors Committee Doc.
                  vided for the present channel dimensions, and        No. 49, 74th Cong., 1st sess. (con-
                  the extension of the project to Freeport, Fla.       tains the latest published map).



   Local cooperation.-Fully complied with.
   Terminal facilities.-Consist of small wharves and landings for
small craft. There are also privately owned storage tanks for petro-
leum products and molasses at Freeport, Fla. These facilities are
considered adequate for existing commerce.
   Operations and results during fiscal year.---The U. S. hydraulic
pipe-line dredge Blackwater, operating in the channel from March
18 to 27, 1942, removed 71,600 cubic yards of material. The cost and
expenditures were $6,414.68 for maintenance.
   Condition at end of fiscal year.-The existing project was completed
in 1937. The controlling depth at the end of the fiscal year was 9 feet.
The total cost and expenditures under the existing project were
$70,565.30 of which $64,150.62 was for new work, and $6,414.68 for
maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $3,585.32, has been recommended for revocation as no
work is contemplated during the fiscal year 1943.
   The sum of $12,000 can be profitably expended during the fiscal year
1944 for maintenance dredging, lemoving shoals with a United States
hydraulic pipe-line dredge for about one-half month.
                  RIVERS AND HARBORS--MOBILE,                           ALA., DISTRICT                             659
                                  Cost and financial sumnmary
Cost cof new work to June 30, 1942------------------------------                                         $64, 150. 62
Cost of maintenance to June 30, 1942--------------------     --------                                      8, 575. 48

        Total cost of permanent work to June 30, 1942---------------                                     72, 726. 10

Net t otal expenditures__------------------------------------                          --                 72, 726. 10
UnexIpended balance June 30, 1942----------      ------                                             --     3, 585. 32
                                                 ----------- -----
        Total amount appropriated to June 30, 1942_                                                       76, 311. 42

   Fiscal year ending June 30             1938          1939            1940           1941                  1942

Cost of new work----                        --------------     ---- ----------       -------- --
Cost of maintenance        ---   ------           ---------------- ------------   -------     ---            $,414.68
Total expended_        __        ----------------          ----------                                         6, 414.68
Allotted_ __           -                                                                $10,000                -




Balance unexpended July 1, 1941_________________________                                    ____         $10, 0000.00
Gross amount expended_       ______  _   _ ________                                         -   _          6, 414. 68

        Balance unexpended June 30, 1942__________________                                                 3, 585. 32

Amount that can be profitably expended in fiscal year ending June 30,
  1944, for maintenance 1____________________________                                                     12, 000.00
  1 Exclusive of available funds.

17. EAST PASS CHANNEL FROM THE GULF OF MEXICO INTO CHOCTAW-
                      HATCHEE BAY, FLA.

   Location.-This is the entrance from the Gulf of Mexico into Choc-
tawhatchee Bay at the eastern end of Santa Rosa Island. It is 41 miles
east from the west pass entrance into Pensacola Bay and 49 miles west
from the new entrance to St. Andrews Bay. (See U. S. Coast and
Geodetic Survey Chart No. 185.)
   Existing project.-This provides for the maintenance of a channel
not less than 6 feet deep and 100 feet wide from Choctawhatchee Bay
into the Gulf of Mexico, at an estimated annual cost of $600. The
mean range of tide is 1.3 feet. The extreme range, except during
storms, is 2.5 feet. The project was adopted by the River and Harbor
Act approved July 3, 1930 (H. Doc. No. 209, 70th Cong., 1st sess.).
There is no published map of the locality.
   Terminal facilities.-The small privately owned pile and timber
wharves used in connection with the fishing industry in this locality
are considered adequate for existing commerce.
   Operations and results during fiscal year.-The U. S. hydraulic
pipe-line dredge Blackwater, operating in the channel from March 7
to 17, 1942, removed 43,748 cubic yards of material. The cost and
expenditures were $7,358.49, for maintenance.
   Condition at end of fiscal year.-The new (natural) East Pass Chan-
nel to Gulf is 100 feet wide, with controlling depth at end of fiscal
year of 6 feet. The total cost and expenditures under the existing
project were $31,071.56 for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $6,141.51, has been recommended for revocation as no work
is contemplated during the fiscal year 1943.
660          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                 1942

   The sum of $10,000 can be profitably expended during the fiscal year
1944 for maintenance dredging, removing shoals, with a hydraulic
pipe-line dredge, for a period of about one-half month.
                                        Cost and financial summary

Cost of new work to June 30, 1942   __________________________
Cost of maintenance to June 30, 1942______________________________ $31, 071. 56

           Total cost of permanent work to June 30, 1942________________                                     31, 071. 56

Net total expenditures_ ___    _--------                                                        ----         31, 071. 56
Unexpended balance June 30, 1942________ __                          __                                       6, 141. 51

           Total amount appropriated to June 30, 1942 _________________                                      37, 213. 07

   Fiscal year ending June 30              1938          1939                 1940              1941            1942


Cost ofnew work--------------   --- --                          -- ---- ----------
                                                                        ._-        ----
Cost of maintenance-------- _--   $12, 528. 83          $2, 291. 94          -- --    ----------                $7, 358. 49
Total expended_            ______   _     12, 451. 70    2, 369.07   ----------------    ----                    7, 358. 49

Allotted     ----   ----        - --      12, 055.84                      -     -    -           $13, 500



Balance unexpended July 1, 1941_ ___________                                                                $13, 500. 00
Gross amount expended _--__--------------                                                                     7, 358. 49

           Balance unexpended June 30, 1942                                                                     141. 51
                                                                                                              6_________________
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance x        ______------
                                   -________                                                                 10, 000. 00
  1 Exclusive of available funds.


                                    18. PENSACOLA HARBOR, FLA.

   Location.-This harbor is a landlocked bay on the coast of north-
west Florida, about 91 miles by water east of Mobile Harbor. (See
U. S. Coast and Geodetic Survey Chart No. 186.)
   Previous projects.-Authorized by the River and Harbor Act ap-
proved June 18, 1878, amended and modified by acts of August 18,
1894, and March 3, 1899. Work under existing project was begun in
1903. For further details see page 1835, Annual Report for 1915, and
page 714, Annual Report for 1938.
   Existing project. This provides for an entrance channel 32 feet
deep at mean low water and 500 feet wide from the Gulf of Mexico
to deep water in Pensacola Bay, and an inner harbor channel parallel
to the pierhead line and not less than 50 feet therefrom, 500 feet wide
and 30 feet deep, with approach channels 250 feet wide and 30 feet
deep at each end of the inner harbor channel and an approach chan-
nel 250 feet wide and 30 feet deep to the pierhead line south of the
Muscogee wharf; for a channel 100 feet wide and 15 feet deep from
that depth in Pensacola Bay to the mouth of Bayou Chico, thence
75 feet wide, 14 feet deep, and 5,800 feet long in the bayou, terminat-
ing in a basin 14 feet deep and 500 feet square; and also provides
that $150,000 may be used in constructing or purchasing a seagoing
suction dredge. The mean range of tide throughout the harbor is
approximately 1.4 feet near the entrance and about 2 feet at the head
                 RIVERS AND HARBORS-MOBILE,                                     ALA.,    DISTRICT                      661

of the bay. The extreme tidal range, except during storms, is about
3 feet.
   The estimated cost of new work, revised in 1937, was $511,900. The
latest (1937) approved estimate for annual cost of maintenance is
$48,500.
   The existing project was authorized by the following river and
harbor acts:

    Acts                             Work authorized                                         Documents


June 13,1902     A channel 30 feet deep at mean low water and 500              Specified in act.
                   feet wide from the Gulf of Mexico to the dock
                   line at the east end of the city of Pensacola, and
                   also provided that $150,000 may be used in con-
                   structing or purchasing a seagoing suction
                   dredge.
                                                                                                                             2
Aug. 30, 19351   Modified the existing project to provide for the              H. Doc. No. 253, 72d Cong., 1st sess.
                   present inner channels and the deepening of the
                   entrance channel to 32 feet.
Aug. 26, 1937    Improvement of Bayou Chico _.________ _-..                    Rivers and Harbors Committee Doc.
                                                                                                              2
                                                                                 No. 96, 74th Cong., 2d sess.


  1 Public Works Administration, Sept. 6, 1933.
  2 Contains the latest published maps.

  Local cooperation.-Fully complied with.
  Ter inal facilities.-The modern rail-connected terminal facilities
at Pensacola are considered adequate for existing commerce. (See
Port Series No. 3, pt. 2, revised 1937, Corps of Engineers.)
  Operationsand results duringfiscal year.-The U. S. hopper dredge
Benyaurd, operating in the entrance channel from October 20 to 31,
1941, and January 29 to February 18, 1942, removed 509,915 cubic
yards of material. The cost was $35,118.56 for maintenance. The
expenditures were $35,892.62.
  Condition at end of fiscal year.-The existing project was completed
in 1939. The controlling depths at the end of the fiscal year were as
follows: Entrance channel, 31 feet; inner harbor and approach chan-
nels to Frisco Railroad pier No. 2 and Tarragonna Street pier of
Louisville & Nashville Railroad, 30 feet; approach channel to Muscogee
wharf, 29 feet; Bayou Chico inner channel 13 feet and.outer channel
15 feet.
   The total costs and expenditures on the existing project to June 30,
1942, were as follows:

                                                                         Costs
                                                                                                               Expenditures
                                                 New work             Maintenance          Total

Regular funds - ---           -                   $378, 361. 21         $925, 591. 46   $1, 303, 952. 67        $1, 303, 934. 11
Public Works funds_ __     ____...   .____   .     119, 672. 91            . __----__       119, 672. 91            119,672. 91
      Total_--      -                                                                                            1,423,607.02
                                                  498,04.12       1     925   51.46/     1,423   62558     1
662          REPORT OF CHIEF OF ENGINEERS,                                      U. S. ARMY,                      1942

   Proposed operations.-The balance unexpended at the end of the
fiscal year, $26,426.63, including accounts receivable, will be applied
as follows:
Accounts payable, June 30, 1942_ -____ __- _--_______________ __-                                                          $20. 50
Maintenance dredging, removing shoals, to restore project
dimensions in the entrance and inner harbor channels
with the U. S. seagoing hopper dredge Benyaurd, for a
period of about '/2 month during June 1943__              $14, 000. 00
Maintenance dredging, removing shoals, to restore project
dimensions in Bayou Chico, with a hydraulic pipe-line
  dredge, for a period of about / month during January
  1943_ __________         _          ------- -----------_ 12, 406. 13
                                      _--____----_-
                                                                                                                        26, 406. 13

                                              ----------------- 26, 426. 63
           Total_________________ _________---___----
   The additional sum of $30,000 can be profitably expended during the
fiscal year 1944 for maintenance dredging, removing shoals, to restore
project dimensions in the entrance and inner channels, with a United
States seagoing hopper dredge, for a period of about 1 month.
                                         Cost and financial summary
Cost of new work to June 30, 1942                        _______--___-----                                       $1, 092, 722. 67
Cost of maintenance to June 30, 1942_ ____-__---                        _               --        -_1,                 052, 241. 12
       Total cost of permanent work to June 30, 1942 ------------                                                 2, 144, 963. 79
Plus accounts receivable June 30, 1942_ __            _       ----------                                                    1. 94
      Gross total costs to June 30, 1942_--------------------                                                     2, 144, 965. 73
Minus accounts payable June 30, 1942---------------------------                                                            20. 50
       Net total expenditures ----- ___2,                                                                            144, 945. 23
Unexpended balance June 30, 1942_ _ __ __ _                                 _      --------                             26, 424. 69
           Total amount appropriated to June 30, 1942 ...                                     -                   2, 171, 369. 92

   Fiscal year ending June 30               1938               1939              1940                     1941             1942

Cost of new work _....                                       $26, 111.47
Cost of maintenance--...... --.._         $27, 508.48         29,.140. 19    $43, 765. 09            $15, 438. 50         $35, 118. 56

      Total cost_       -                  27, 508. 48        55, 251. 66       43, 765. 09              15, 438. 50       35, 118. 56
Total expended----------------27, 507. 33                     51, 362. 22       47, 655. 68              14, 645. 88       35, 892. 62
Allotted   ..-.             __      --    102, 997. 65        26, 688. 38       43, 955. 09               1, 303. 48       25, 000. 00



Balance unexpended July 1, 1941                                                         $37, 317. 31
Amount allotted from War Department Civil Appropriation Act
  approved April 28, 1942--------------------------------------                           25, 000. 00
       Amount to be accounted for                                                           2, 317. 31
                                                                                          6----------------------------
Gross amount expended ---------------                           $36, 545. 31
Less reimbursements collected                                            6------------------
                                                                         652.  69
                                                                                          35, 892. 62
       Balance unexpended June 30, 1942__------------------------                         26, 424. 69
Outstanding liabilities June 30, 1942----------------------------                               20. 50
       Balance available June 30, 1942-------------------                     _ _         26, 404. 19
Accounts receivable June 30, 1942_       _-----------                                            1. 94
       Unobligated balance available June 30, 1942---------------                         26, 406. 13
Amount that can be profitably expended in fiscal year ending June
  30, 1944, for maintenance 1____---_                 ------------------                  30, 000. 00
   Exclusive of available funds.
                RIVERS       AND HARBORS-MOBILE,                              ALA.,       DISTRICT                           663
                                 19. BLACKWATER RIVER, FLA.

   Location.-This river rises in the south-central part of the State of
Alabama and flows in a southwesterly direction for a distance of 75
miles through the States of Alabama and Florida, emptying into
Blackwater Bay, an arm of Pensacola Bay. (See U. S. Coast and
Geodetic Survey Chart No. 186.)
   Previous projects.-Adopted by the River and Harbor Act of March
3, 1899. Work under existing project was begun in 1906. For further
details see page 1834, Annual Report for.1915, and page 717, Annual
Report for 1938.
   Existing project.-This provides for a channel 9 feet deep at mean
low water and 100 feet wide from the mouth to Milton, a distance of
10 miles, to be secured by dredging at necessary points. The river is
tidal throughout the portion under improvement. The mean range
of tide is 2 feet, and the extreme range, except during storms, is 3
feet.
   The estimated cost of new work made in 1902, exclusive of amount
expended on previous project, was $15,000. The latest (1928) ap-
proved estimate of annual cost of maintenance is $5,000. The exist-
ing project was authorized by the River and Harbor Act of March
3, 1905 (H. Doc. No. 193, 58th Cong., 2d sess). There is no map of
the Blackwater River published in any congressional document or
annual report.
   Terminal facilities.-There is a privately owned pile and timber
wharf at Bagdad, extending to 16 feet of water. This facility is
considered adequate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was completed
in 1916. The controlling depth at the end of the fiscal year was 9 feet.
The total costs and expenditures were $142,732,68, of which $36,649.90
was for new work, and $106,082.78 for maintenance.
  Proposed operations.-No funds available and no operations are
contemplated during the fiscal year 1943.
   The sum of $10,000 can be profitably expended during the fiscal year
1944 for maintenance dredging to restore project dimensions by the
operation of a United States hydraulic pipe-line dredge for a period
of about four-fifths of a month.
                                   Cost and financial summary
Cost of new work to June 30, 1942_ _____________________________                                                  $41, 649. 90
Cost of maintenance to June 30, 1942______________________________                                                106, 082. 78
      Total cost of permanent work to June 30, 1942-      _     _                                                 147, 732. 68
Net total expenditures___----------                                                                               147, 732. 68
        Total amount appropriated to June 30, 1942__________________ 147, 732. 68
   Fiscal year ending June 30              1938          1939                1940                     1941            1942
Cost ofnew work----                 ----          --      ---         - -      -----      ---
Cost of maintenance      _____                                              $9, 310.90          $10, 658. 19
Total expended ______________________________________________                9, 310. 90          10, 658. 19
Allotted_______________________________                $10, 000. 00         14,511.24           -4,     542. 15   I

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance--      -     __-____-.-                   $10, 000. 00
                                                              _--_--------_
664           REPORT OF CHIEF OF ENGINEERS,                       U. S. ARMY,          1942

               20. ESCAMBIA AND CONECUH RIVERS, FLA. AND ALA.

   Location.-One stream, rising in central Alabama below Union
Springs, flows southwesterly to. Florida State line, thence southerly
through Florida to Escambia Bay, an arm of Pensacola Bay. That
part of the stream in Alabama is approximately 168 miles long,
and is known as Conecuh River; and in Florida 651/2 miles long, and
is known as Escambia River. (See U. S. Coast and Geodetic Survey
Charts Nos. 186 and 1265).
   Previous projects.-The sum of $5,000 was appropriated in the
River and Harbor Act of March 2, 1833, for improving the navigation
of the Escambia River. The River and Harbor Act of August 2, 1882,
adopted the original project modified by the act of March 2, 1907.
Work under existing project was begun in 1881. For further details
see page 1837, annual report for 1915.
   Existing project.-This provides for a dredged channel, 2,200 feet
long, 150 feet wide, and 51/2 feet deep at mean low water through
the bar at the mouth of the river, and a navigable channel from the
mouth to Patsaliga Creek, a distance of 147 miles. The channel above
the mouth of the river was to be obtained by the removal of certain
obstructions to navigation and by the construction of dikes, wing dams,
and shore protection to obtain 5 feet to the Florida State line. A
navigable channel in the Conecuh River was to be obtained by the
removal of snags, closing cut-offs, and constructing wing dams. Dikes
and wing dams are of the usual pile and brush type. The mean range
of tide at the mouth of the river is 2 feet and the extreme range, except
during storms, is 3 feet. At the Florida State line the ordinary sea-
sonal fluctuation of stage does not exceed 8 feet. The highest flood
stage attained in the record flood of 1929 was 31.3 feet above low
water at the Florida State line and 50.6 feet at River Falls, Ala.,
144 miles above the mouth.
   The original estimates of cost for new work, exclusive of the amount
expended on previous project, were $25,000 for the Escambia River,
including the bar at the mouth, made in 1879, and $31,000 for the
Conecuh River, made in 1905. The latest (1928) approved estimate
of annual cost of maintenance is $1,500.
   The existing project was authorized by the following river and
harbor acts:

       Acts                     Work authorized                                Documents


June 14. 1880     A channel through the bar at the mouth of the   Annual Report for 1879, p. 852.
                    river and to the Florida State line.
Mar.    2, 1907   Improvement of the Conecuh River       ..--     H. Doc. No. 159, 59th Cong., 1st sess.


A published map of this river will be found in House Document No. 701, 63d Cong., 2d sess.


  Recommended m.odification of project.-The project has been rec-
ommended for abandonment (H. Doc. No. 467, 69th Cong., 1st sess.).
  Terminal facilities.-None i: required other than the natural land-
ings now in use.
  Operations and results during fiscal year.-None.
                    RIVERS AND HARBORS-MOBILE,                                       ALA.,    DISTRICT                    665

   Condition at end of fiscal year.-The existing project was completed
about 1882. Recent operations have been confined to the channel at
mouth of river and to the bar immediately inside mouth. On June 30,
1942, the controlling depths were: On bar at mouth of river, 5.5 feet;
first 10 miles above mouth, 7 feet; from this point to Murder Creek,
depths vary from 3 to 5 feet. Conditions above mouth of Murder
Creek are not known, since no work has been done higher upstream for
many years. The total costs and expenditures under the existing proj-
ect were $156,729.64, of which $47,161.26 was for new work and $109,-
568.38 for maintenance.
   Proposed operations.-No funds are-available and no operations are
contemplated during the fiscal year 1943.
   The sum of $6,000 can be profitably expended during the fiscal year
1944 for maintenance dredging to restore project dimensions by the
operation of a hydraulic pipe-line dredge for a period of about one-
fourth month.
                                                   Cost and financial summary

Cost of new work to June 30, 1942-----------------------------                                                 $118, 336. 26
Cost of maintenance to June 30, 1942-                                   --                                 _    109, 568. 38

           Total cost of permanent work to June 30, 1942--------------                                          227, 904. 64
Net total expenditures                                                                                -        227, 904. 64
                                                                                                           _-------
Total amount appropriated to June 30, 1942-----------------------227, 904. 64

   Fiscal year ending June 30                         1938            1939           1940           1941                1942

C ost of new work .. .                   -     -          . . . . -. . . . . . -----      . . . . . . . . .
                                                                                . . . . ---------               . . .     . . .
Cost of maintenance .. .. .              .          . .
                                             . _.____.      ..   _ _ . . . . _ _$4,. . ..            993. 14

Total expended ... .                                                                               4, 993. 14
Allotted    _------------------------_
                      -----                                                                        4, 993. 14



Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance----------------------------------------        $6, 000. 00
                                              21. MOBILE HARBOR, ALA.

   Location.-This harbor, located along the lower 5 miles of Mobile
River, is in the southwestern part of the State of Alabama, 91 miles
by water from Pensacola Harbor, Fla., on the east and 90 miles from
Gulfport Harbor, Miss., and 144 miles from the mout of the Missis-
sippi River on the west. (See U. S. Coast and Geodetic Survey Chtarts
Nos. 1266 and 1267.)
  Previous projects.-The original project for the bar channel was
adopted by River and Harbor Act of June 13, 1902. The original
project for the bay and river channels was adopted by River and
Harbor Act of May 20, 1826, and subsequent projects adopted by
River and Harbor Acts of July 11, 1870, March 3, 1879, August 11,
1888, March 3, 1899, June 25, 1910, and August 8, 1917. For further
details see page 1840 of Annual Report for 1915, pages 802 and 807
of Annual Report for 1916, page 833 of Annual Report for 1929, and
page 718 of Annual Report for 1938.
   Existing project.-This provides for a channel across Mobile Bar
36 feet deep and 450 feet wide, and about 1.5 miles long, connecting
the 36-foot contours south and north of the bar; for a channel 32 feet
666           REPORT OF CHIEF OF ENGINEERS,                                  U. S. ARMY,               1942

deep and 300 feet wide from deep water in Mobile Bay to a point
at the north edge of the proposed quarantine anchorage basin; for
a channel 32 feet deep and 350 feet wide from the north edge of the
quarantine anchorage basin to the mouth of Mobile River; for an
anchorage basin 32 feet deep extending 1,000 feet south from the north
edge of the present pier of the Mobile quarantine station and 200 feet
west of the west edge of the dredged channel in Mobile Bay; and for a
channel 32 feet deep, with a width of 500 feet, from the mouth of
Mobile River to the highway bridge across Mobile River about 1,000
feet below the mouth of Chickasaw Creek, for easing the bends at the
mouth and about 3,000 feet above the mouth, for the removal of sunken
obstructions and for snagging in Three Mile Creek from Mobile River
to the Industrial Canal, a distance of 0.8 mile; and a channel 125 feet
wide from the Mobile River channel at its mouth, through Garrows
Bend, to and including a turning basin 800 feet long and 250 feet wide,
and from this point a channel continuing through Garrows Bend at a
width of 125 feet to and including a turning basin 800 feet long and 600
feet wide, all 27 feet deep. The plane of reference is mean low water.
Under ordinary conditions the mean tidal range at the lower end of
the improvement is 1.1 feet and at the upper end 1.4 feet, and the
extreme tidal range is 3.4 feet at the lower end and 3.6 feet at the upper
end.
  The estimate of cost for new work revised in 1941 was $730,000,
exclusive of amounts expended on previous projects. The latest (1941)
approved estimate for annual cost of maintenance is $399,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                                   Work authorized                                       Documents I
              -    I--                                                                   I

July     3, 1930         Present project dimensions across the bar and to the mouth          Rivers and Harbors Com-
                          of Mobile River, thence 32 feet deep and 300 feet wide to            mittee Doc. No. 26, 71st
                          the highway bridge; and for the anchorage basin.                     Cong., 2d sess.
Aug. 26, 1937            For improvement of Three Mile Creek by snagging from                Rivers and Harbors Com-
                          Mobile River to the industrial canal.                                mittee Doc. No. 69, 74th
                                                                                               Cong., 1st sess.
       Do ...            To provide a 500-foot channel 32 feet deep from a point about       Rivers and Harbors Com-
                          5,000 feet south of the mouth of Three Mile Creek to the             mittee Doc. No. 44, 75th
                          highway bridge across Mobile River, subject to the pro-              Cong., 1st sess.
                          vision that no dredging be performed within 50 feet of any
                          pierhead line.
Oct. 17,1940             To provide a channel 27 feet deep and 125 feet wide from the        H. Doc. No. 221, 76th Cong.,
                          Mobile River channel at its mouth through Garrows                    1st sess.
                          Bend, to and including a turning basin of the same depth,
                          800 feet long and 250 feet wide.
   Do-__-                Further modified to provide for extension of the channel            H. Doc. No. 282, 76th Cong.,
                          through Garrows Bend 27 feet deep and 125 feet wide, to              1st sess.
                          and including a turning basin of the same depth, 800 feet
                          long and 600 feet wide.


  I Contain latest published maps.
          RIVERS AND HARBORS-MOBILE,          ALA.,   DISTRICT      667
   Local cooperation.-Fully complied with.
   Terminal facilities.-The modern rail-connected terminal facilities
at this port are considered adequate for existing commerce. (See
Port Series No. 3, pt. 1, revised 1937, Corps of Engineers).
   Since the revision of the Port Series No. 3, part 1, Report in 1937
three additional berthing spaces for deep-sea vessels have been pro-
vided at the Alabama State Docks and Terminals by the dredging
of a slip and the construction of a concrete-pile wharf with adequate
trackage and transit sheds at the north side of pier C. There has also
been constructed and placed in operation as an addition to the bulk
material handling plant at the Alabama State Docks and Terminals,
a large fertilizer warehouse with bulk material conveying equipment
to shipside.
   Operations and results during fiscal year-New work.-The U. S.
hydraulic pipe-line dredges Wahalak and Pascagoula, operating in
Garrows Bend Channel from July 1 to August 16, September 22 to
October 24, and November 16 to December 12, 1941, removed 897,193
and 722,839 cubic yards of material, respectively, at a cost of
$103,374.16.
   Maintenance.-The U. S. hopper dredge Benyaurd, operating in
the outer bar and bay entrance channels from August 7 to September
7, and December 18, 1941, to January 6, 1942, removed 350,067 and
244,781 cubic yards of material, respectively, at a cost of $39,985.92.
The contractor, operating in the Mobile Bay Channel with pipe-line
dredge Diesel from July 1 to 17, 1941, and June 25 to 30, 1942, removed
804,076 cubic yards of material, at a cost of $34,158.04. The U. S.
derrickboat J. M. Pratt, operating in the Mobile River channel from
July 23 to August 11, August 16 to September 26, October 1 to 27,
November 1 to 25, December 1 to 14, 1941, and January 18 to Febru-
ary 17 and March 16 to April 9, 1942, removed 2,149 snags; and irt
Three Mile Creek from February 18 to March 15, 1942, removed 398
snags, at a cost of $31,683.95. The cost of miscellaneous investigations
and surveys was $13,199.82. Under authority of section 3 of the
River and Harbor Act of October 17, 1940, the U. S. hydraulic pipe-
line dredge Wahalak, operating in the Access Channel from Mobile
Bay Channel into Dumping Ground south of Pinto Island, Ala., re-
moved 49,565 cubic yards of material, at a cost of $2,918.12. The total
cost was $225,320.01, of which $103,374.16 was for new work and $121,-
945.85 for maintenance. The expenditures were $253,559.32.
   Condition at end of fiscal year.-The existing project was completed
in 1941. The controlling depths at the end of the fiscal year were as
follows: Outer Bar Channel, 36 feet; Mobile Bay Channel, 31 feet;
1Mobile River channel, 28 feet; Garrows Bend Channel, 27 feet. In-
cluded in the total cost of maintenance are items of $997.20 used in
dredging in the channel extending from the east of Arlington pier to
the main ship channel in Mobile Bay, and $777.59 for removing ob-
structions in Conway Creek, Ala., under section 3 of the River and
Harbor Act of July 3, 1930; and items of $1,053.58 for removing
obstructions in Blakely River, Ala., and $2,912.12 for dredging Access
Channel from Mobile Bay Channel into dumping ground south of
Pinto Island, Ala., under section 3 of the River and Harbor Act of
October 17, 1940.
668           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                            1942

  The total costs and expenditures on the existing project to June 30,
1942, were as follows:
                                                                       Costs
                                                                                                         Expenditures
                                              New work            Maintenance            Total

Regular funds- ---..   ...- _   ...----   _   $723, 924. 72       $2, 597, 081. 69   $3, 321,006. 41      $2, 352, 930. 91
Public Works funds                              14, 000. 00   -                           14, 000. 00          14, 000. 00
      Total    _       __-__    ______         737, 924. 72        2, 597, 081. 69    3, 335, 006. 41      2, 366, 930. 91


   Proposed operations.-The balance unexpended at the end of the
fiscal year, $451,999.14, including accounts receivable, will be applied
as follows:
Accounts payable, June 30, 1942 ___________           ____-_-___._                                        $9, 326. 38
Maintenance :
    Dredging to restore project dimensions in the Mobile
      Outer Bar Channel, with the U. S. seagoing hopper
      dredge Benyaurd, for a period of about 1/2 months
      during September 1942 and June 1943---------- $40, 500. 00
    Dredging, by contract, to restore project dimensions
      in the Mobile River Channel and in the Mobile Bay
      Channel from the mouth of Mobile River to deep
      water in the lower end of Mobile Bay, and in the
      Garrows Bend Channel and turning basin, about
      9 months, July to November 1942, February to
      April and June 1943-------------------------- 365, 672. 76
    Snagging in Mobile River with the U. S. derrick boat
      J. M. Pratt, about 6 months, during July to Sep-
      tember 1942 and April to June 1943___________ 32, 000. 00
    Snagging in Three Mile Creek with the U. S. derrick
      boat J. M. Pratt about 1 month during October
      1942 ------------------------------------------       4, 500. 00
                                                                                                         442, 672. 76
           Total -------------------------------------------------                                       451, 999. 14
  The additional sum of $351,000 can be profitably expended during
the fiscal year 1944, as follows:
Maintenance dredging to restore project dimensions in the Mobile Outer
Bar Channel, with a United States seagoing hopper dredge, for a period
of about 11/2 months--------------------------------------------       $40, 000
Maintenance dredging, by contract, to restore project dimensions in the
Mobile River Channel from the mouth of Mobile River to deep water
in the lower end of Mobile Bay, and in the Garrows Bend Channel
and turning basins, about 9 months----------------------------- 274, 000
Maintenance snagging in Mobile River with the U. S. derrick boat
  J. M. Pratt, about 6 months                                     --------------                              32, 000
Maintenance snagging in Three Mile Creek with the U. S. derrick boat
J. M. Pratt, about 11/2 months------------------------------------                                             5, 000
         Total_        ___       ________                                                          ---      351, 000

                                      Cost and financial summary
Cost of new work to June 30, 1942_-----------------------------   $7, 421, 029. 40
Cost of maintenance to June 30, 1942--------------------------     6, 693, 762. 80
      Total cost of permanent work to June 30, 1942-------        14, 114, 792. 20
Plus accounts receivable June 30, 1942-------------------------            711. 68
      Gross total costs to June 30, 1942----------------------- 14, 115, 503.88
Minus accounts payable June 30, 1942_  --------------------------       9, 326. 38
      Net total expenditures_-------------                        14, 106, 177. 50
Unexpended balance June 30, 1942_--   _____----------451,                  287. 46
      Total amount appropriated to June 30, 1942------------      14, 557, 464. 96
                 RIVERS AND             HARBORS--MOBILE,                  ALA.,        DISTRICT                   669

   Fiscal year ending June 30                                              1940            1941               1942


Cost of new work      ___________                       $56, 927. 05______________       $62, 109.68        $103, 374. 16
Cost of maintenance________.____        $129, 258.69    233, 980.34     $222, 595.45     381, 710.16         121, 945. 85
      Total cost____ _           ____    129, 258. 69   290, 907. 39    222, 595. 45     443, 819.84         225, 320.01
Total expended_____                      113, 047.08    286, 573. 76    250, 544. 33     406, 563. 77        253, 559. 32

Allotted___________...._______           381, 997. 20   254, 878. 32    298, 597. 94     439, 947. 52        274, 271. 70



Balance unexpended July 1, 1941_____________________________                                            $430, 575. 08
Amount allotted from War Department Civil Appro-
  priation Act approved June 24, 1940_______________  $5, 800. 00
Amount allotted from War Department Civil Appor-
  priation Act approved April 28, 1942____-- __----  269, 000. 00
                                                                                                         274, 800. 00

      Amount to be accounted for__________________-_---        705, 375. 08
Deductions on account of revocation of allotment ____________----528. 30

         Net amount to be accounted for ____________-704,                                                     846. 78
Gross amount expended____________--------                                     $313, 550. 36
Less reimbursements collected____________                                       59, 991. 04
                                                                                                         253, 559. 32

       Balance unexpended June 30, 1942 _______________------451, 287. 46
Outstanding liabilities June 30, 1942____________-------9,        326. 38

      Balance available June 30, 1942_______--- _______-------441, 961. 08
Accounts receivable June 30, 1942_____________----- -------        711. 68

         Unobligated balance available June 30, 1942_______________                                     442, 672. 76

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1_______                                                                      351, 000. 00
  'Exclusive     of available funds.

     22. REMOVING THE WATER HYACINTH, MOBILE RIVER, ALA.,
                         TRIBUTARIES

   Location.-The water hyacinth is a floating aquatic plant which
infests numerous fresh-water streams tributary to the South Atlantic
and Gulf coasts. It propagates from the seeds and suckers, spreads
quickly in most localities, and may cause entire suspension of naviga-
tion if not removed.
   Existing project.,-This provides for the extermination or removal
of plants from the navigable waters of the States of Florida, Alabanma,
Mississippi, Louisiana, and Texas, so far as they are or may become
an obstruction to navigation, by any mechanical, chemical, or other
means whatsoever; for the construction and operation of boats equipped
with suitable machinery for such removal; and for the construction
and operation of log booms to prevent the drifting of plants from one
stream to another.
   The estimated cost made in 1899 was $25,000 each for two boats,
$10,000 for operation in each district, and $1,000 for the establishment
of booms. The latest (1939) approved estimate for annual cost of
maintenance is $25,000.

        493202-43-pt. 1, vol. 1-               43
670        REPORT OF CHIEF OF ENGINEERS,                            U. S. ARMY,         1942

  The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                  Documents


Mar. 3,1899     Appropriations made for the States of Florida and   H. Doc. No. 91, 55th Cong., 3d sess.
                  Louisiana and provided for the extermination or
                  removal of plants, the building of boats, and
                  the establishment of booms.
June 13,1902    Use of any mechanical, chemical, or other means
                 whatsoever.
Mar. 3,1905     Appropriation made available for the State of
                 Texas.
    Do .......DAppropriations made for Florida, provided that
Mar.    1907    no chemical process injurious to cattle shall be
                  used.
July 25,1912    Appropriation made available for the State of
                 Mississippi, and also made available for use in
                 that State the operating plant pertaining to the
                 work in Louisiana.
July 27, 1916   Appropriation made available for the State of
                 Alabama.


   Terminal facilities.-None.
   Operations and results during fiscal year.--Operationswith United
States plant and hired labor were carried on in Dog River, Three Mile
Creek, Mobile River, Bayou Canot, and Catfish Bayou, Ala., 649,800
square yards of hyacinths being sprayed and removed from July 1,
1941, to June 30, 1942. The cost was $22,165.09 for maintenance. The
expenditures were $22,906.09.
   Condition at end of fiscal year.-The existing project is for main-
tenance. The total cost was $222,072.79 and the total expenditures
were $222,388.46.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $16,852.83, including accounts receivable, will be applied
to the operations of two United States spraying plants and one United
States hyacinth conveyor on the spraying and removal of hyacinths
and other aquatic growths, by mechanical methods, during the fiscal
year in the navigable waterways of the Mobile, Ala., district.
   The additional sum of $22,000 can be profitably expended for main-
tenance during the fiscal year 1944 by the operation of two United
States spraying plants and one United States hyacinth conveyor on
the spraying and removal of hyacinths and other aquatic growths, by
mechanical methods, in the navigable waterways of the Mobile, Ala.,
district.
                                   Cost and financial summary
Cost of new work to June 30, 1942__     ____________________-__--
                                                             -
Cost of maintenance to June 30, 1942_____________________________ $222, 072. 79
      Total cost of permanent work to June 30, 1942____________   222, 072. 79
Plus accounts receivable June 30, 1912---------------------------      315. 67
         Gross total costs to June 30, 1942_________________________                         222, 388. 46
Net total expenditures------                             --------                            222, 388. 46
Unexpended balance June 30, 1942---                                                           16, 537. 16
         Total amount appronriated to June .90, 1942-- -----                                 238, 925. 62
                    RIVERS         AND   HARBORS-MOBILE,                       ALA.,       DISTRICT              671
    Fiscal year ending June 30             1938           1939                 1940            1941           1942

Cost of new work___      -
Cost of maintenance ............         $22, 280. 57   $25, 910. 49         $23, 781.18     $20, 387.32     $22,165. 09
Total expended-----------------           21, 725. 91    25, 292. 71          26, 643.86      20, 029.07     22,906.09

Allotted        ...-------
                   _                      48, 300. 00    24, 975. 95          20,000.00       19,041.81       18, 000.0


Balance unexpended July 1, 1941__-------------------------------  $21, 443. 25
Amount allotted from War Department Civil Appropriation Act ap-
proved April 28, 1942------------------------------------     --  18, 000. 00

      Amount to be accounted for---------------------------                                                39, 443. 25
Gross amount expended----------   ---------------------------                                              22, 906. 09

      Balance unexpended June 30, 1942---------------- ---------- 16, 537. 16
Accounts receivable June 30, 1942_
                                ---------------------------------     315. 67

           Unobligated balance available June 30, 1942---                                                  16, 852. 83

Amount that can be profitably expended in fiscal year ending June
   30, 1944, for maintenance -----------------                         -------------                       22,000.00
   1 Exclusive of available funds.

                                    23. CHICKASAW CREEK, ALA.
  Location.-Chickasaw Creek is a small waterway, about 40 miles in
length, entering Mobile River about 5 miles above the mouth.
  Existing project.-This provides for improvement by snagging and
by dredging a channel 18 feet deep and 150 feet wide from the mouth
to Chickasaw slips, about 21/8 miles above the mouth.
   The estimate of cost for new work, made in 1933, was $42,000, with
$3,000 annually for maintenance.
   The existing project was authorized by the following river and
harbor acts:
      Acts                          Work authorized                                          Documents

May 28, 19351      Existing project authorized_ __
                                                                                                                     2
Aug. 30, 1935      Project adopted by Congress              __________        H. Doc. No. 47, 73d Cong., 1st sess.

  1 Emergency      Relief Act of 1935.
  2 Contains latest published map.

  Local cooperation.-Fully complied with.
   Terminal facilities.-The terminal of the Warrior and Gulf Naviga-
tion Co. is located on Chickasaw Creek about 11/2 miles above its
mouth. The Southern Kraft Corporation owns a terminal on Hog
Bayou, which is used for unloading pulpwood from barges. There
are several other smaller privately owned wharves of pile and timber
construction used in connection with the lumber mills and other
industries located on this stream. These terminals are considered
adequate for existing commerce.
   Operations and results during fiscal year.-The U. S. derrick boat
J. M. Pratt, operating in Chickasaw Creek from December 15, 1941,
to January 18, 1942, removed 899 snags. The cost was $5,242.21 for
maintenance. The expenditures were $5,306.09.
   Condition at end of fiscal year.-The existing project was completed
in 1935. The controlling depth at the end of the fiscal year was 18
feet.
 672          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                               1942

    The total costs and expenditures on the existing project to June 30,
1942, were $41,241.64 Emergency Relief funds for new work, and
 $46,262.03 regular funds for maintenance, a total of $87,503.67. The
expenditures were $87,567.55.
    Proposed operations.-The balance unexpended at the end of the
fiscal year, $17,885.34, including accounts receivable, will be applied
as follows:
Maintenance dredging to restore project dimensions with a hydraulic
  pipe-line dredge, for a period of about 2/3month during November
  1942_                                                                $13,  885. 34
                                                                       $-----------------------------
Maintenance snagging with the U. S. derrick boat J. M. Pratt, about 1
  month during November 1942-----------------------------                4, 000. 00

          Total -----------             -----------------------------------                                 17, 885.34
    The additional sum of $30,000 can be profitably expended during the
fiscal year 1944, as follows:
Maintenance dredging to restore project dimensions with a hydraulic
  pipe-line dredge for a period of about 1 month__ --------          $24, 000
Maintenance snagging with the U. S. derrick boat J. M. Pratt, for a
  period of about 1 month                       -------------------     , 000
                                                                       6-------------------,

         Total         ---                     _-------
                                          -----------                    -------------------------               30, 000

                                      Cost and ftnancial summary

Cost of new work to June 30, 1942---------------------------$41,241.64
Cost of maintenance to June 30, 1942------ --------------------  46, 262. 03

      Total cost of permanent work to June 30, 1942________________ 87, 503. 67
Plus accounts receivable June 30, 1942                ----------------    3. 88
                                                                         6-----------

          Gross total costs to June 30, 1942____________-___-____                                           87, 567. 55

Net total expenditures ----  -------------------                                                            87, 567. 55
Unexpended balance June 30, 1942                                                                                821. 46
                                                                                                            1-------------------------
                                                                                                            17,

         Total amount appropriated to June 30, 1942________________                                        105, 389. 01

    Fiscal year ending June 30           1938                1939              1940           1941              1942


Cost of new work__                                                        .
Cost of maintenance ...------------     $4, 975. 73        $9, 966. 41        $5, 033. 59   $19, 544. 09        $5, 242. 21
Total expended---_    -------------      4,975. 73           9, 966. 41        5,033. 59     19, 544. 09         5, 306.09
         .....
Allotted ----------------------         14, 975. 73          5, 000. 00       15, 000.00      9, 671. 64        18, 000.00


Balance unexpended July 1, 1941                                                                            $5, 127. 55
Amount allotted from War Department Civil Appropriation Act ap-
  proved April 28, 1942                               ----------------                                     18, 000. 00

      Amount to be accounted for____,           __-      __---                        -_                   23, 127. 55
Gross amount expended------------------------------------5,                                                    306. 09
     Balance unexpended June 30, 1942___    ____-- __-----------  17, 821. 46
Accounts receivable June 30, 1942--------------------------------      63. 88

         Unobligated balance available June 30, 1942_ ------                                __- __         17, 885. 34
Amount that can be profitably expended  in fiscal year ending June 30,
                                   --- ---- --- ---- ---
1944, for maintenance L- _______                        --                                                30, 000. 00
    Exclusive of available funds.
                 RIVERS AND HARBORS-MOBILE,                      ALA.,    DISTRICT                673
                                 24. ALABAMA RIVER, ALA.

   Location.-This river is formed 18 miles above Montgomery, Ala.,
by the junction of the Coosa and Tallapoosa Rivers. From this junc-
tion it flows in a southwesterly direction through the State of Ala-
bama for a distance of 318 miles, and unites about 45 miles north of
the city of Mobile, in the southwestern part of the State, with the
Tombigbee River to form the Mobile River. (See U. S. Geological
Survey charts for central and southwest Alabama.)
   Previous projects.-Adopted by River and Harbor Acts of June
18, 1878, and July 13, 1892. Work under existing project was begun
in 1905. For further details, see page 1837, Annual Report for 1915,
and page 725, Annual Report for 1938.
   Existing project.-This provides for securing a channel by open-
channel work not less than 4 feet deep at low water from the mouth
to Wetumpka, Ala., a distance of 331 miles. Under this project,
dredging and construction works were required at various obstructing
shoals, usually consisting of gravel bars distributed over the entire
length of the river. The variation between average high and low
water is 40.4 feet. The extreme variation is 58 feet, at Montgomery.
   The estimate of cost for new work, revised in 1928, is $1,155,000,
exclusive of amount expended on previous projects. The latest (1928)
approved estimate of annual cost of maintenance is $75,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                    Work authorized                               Documents


Mar.    3,1905   A channel from the mouth to Montgomery         H. Doc. No. 378, 59th Cong., 1st sess.
June 25, 1910    A channel from Montgomery to Wetumpka_         H. Doc. No. 1089, 60th Cong., 2d sess.


The latest published map of Alabama River will be found in Annual Report, 1913, p. 2124.


   Recommended modifications of project.-Underdate of October 15,
1941, the Chief of Engineers recommended a general comprehensive
project for the initial and ultimate development of the Alabama-
Coosa River and tributaries for navigation, flood control, power de-
velopment, and other purposes be authorized, and that for the initia-
tion and partial accomplishment of the ultimate plan an expenditure
of $60,000,000 be approved for the construction of navigation and
power dams on the Alabama and Coosa Rivers (H. Doc. No. 414, 77th
Cong., 1st sess.; interim report).
   Terminal facilities.-On the east bank at Montgomery there is a
natural landing connecting with the city streets. The Wofford Oil
Co. has a small wharf about 10 miles below Montgomery equipped
for handling petroleum products.
   There are also various natural landings located along the river.
These facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-The U. S. snag boat
R. C. McCalla, from July 1 to 8, August 4 to September 30, November
6 to 30, 1941, and May 18 to June 30, 1942, removed 1,305 obstructions
from the channel and 3,285 trees from the bank, between mile 290
and mile 218, and mile 0 and mile 218, at a cost of $15,677.02; removed
674        REPORT OF CHIEF           OF ENGINEERS,                    U.     S. ARMY,          1942

250 cubic yards of material from the channel at mile 203.5, at a cost
of $149.15; and made 3,600 tons of rock, salvaged 180 tons, and placed
3,680 tons on jetties at Kings Bar, Hurricane Bar, Upper Evans Bar,
Ohio Bar, and Steins Island, at a cost of $32,884. The cost of mis-
cellaneous investigations and surveys was $475.07. The total cost was
$49,185.24 for maintenance. The expenditures were $48,827.31.
   Condition at end of fiscal year.-The existing project was 62 per-
cent completed. The channel depth has been improved at the shallow-
est bars and shoals between the mouth of the river and Montgomery,
Ala., by dredging and contraction works; between Montgomery and
Wetumpka, Ala., the work has consisted of removing snags. The
controlling depths at the end of the fiscal year were as follows: Mouth
to Selma, 4 feet; Selma to Montgomery, 3.5 feet; Montgomery to
Wetumpka, 3 feet. Boats drawing 3 feet or less can usually operate
throughout the year. Greater depths are usually available from
November to June each year. Zero readings on the gages at Selma
and Millers Ferry, Ala., indicate that a depth of 4 feet is available
for commerce at those locations. A zero reading on the gage at'Mont-
gomery, Ala., indicates that a depth of 31/2 feet is available for navi-
gation. The work remaining to be done to complete the project from
Montgomery, Ala., to mouth is the construction of approximately
800 linear feet of spur dikes. No work has been done or is contem-
plated on that portion of the project from Montgomery to Wetumpka,
Ala. At the end of the fiscal year the channel was in fair condition
only; numerous dikes were badly in need of repair.
   The total costs and expenditures for the existing project to June 30,
1942, were as follows:

                                                                     Costs
                                                          _--         -            -           -         ~Expenditures
                                          New work              Maintenance            Total


Regular fund<_                            $577, 160. 68         $2, 103, 225. 44   $2, 680, 386. 12     $2, 679, 989. 93
Public Works funds___________              139, 989. 87                                139, 989. 87         139, 989. 87
      Total_    _        -                 717, 150. 55          2, 103, 225. 44    2, 820, 375. 99      2, 819, 979. 80



   Proposed operations.-The balance unexpended at the end of the
fiscal year, $59,054.29, will be applied as follows:
                               ---------------------------------
Accounts payable, June 30, 1942_                                 $396. 19
Maintenance (with United States plant and hired labor) :
   Repairs and renewal of contraction works between
      Montgomery, Ala., and the mouth, with the U. S.
      snag boat R. C. McCalla, 3 months, August, Septem-
      ber, and October, 1942--__----------------------    $28,358.10
   Snagging between Montgomery, Ala., and the mouth,
      with the U. S. snag boat R. C. McCalla, about 6
      months, July-September 1942, and April, May, and
      June, 1943_------------ --------------------        $25, 500.00
   Dredging between Montgomery, Ala., and the mouth,
      with the U. S. snag boat R. C. McCalla, 1 month, as
      necessary -----------------------------------         4, 800. 00
                                                                                       __          _-   58, 658. 10

        STotal_-             __-__-___-___----,,-                                              -        59,054.29
  The additional sum of $70,000 can be profitably expended during
the fiscal year 1944 as follows:
                   RIVERS AND HARBORS--MOBILE,                                   ALA., DISTRICT                       675
Maintenance (with United States plant and hired labor) :
   Repairs and renewal of contraction works between Montgomery and
                ---------------------------
      the mouth________                                             $45, 000
    Snagging between Montgomery, Ala., and the mouth ______________ 22, 000
   Dredging between mile 302 and the mouth____________________-       3, 000

        Total ------                     ------          ---------------------------------                         70, 000
The completion of that portion of the project from Montgomery to
Wetumpka, Ala., is not contemplated at the present time as no com-
merce exists on that section of the river.
                                          Cost and financial summary
Cost of new work to June 30, 1942________________----             $1, 117, 571. 12
Cost of maintenance to June 30, 1942__ ____________ ___------      2, 122, 250. 56
       Total cost of permanent work to June 30, 1942_____________ 3, 239, 821. 68
Minus accounts payable June 30, 1942_______________-------                 396. 19
      Net total expenditures __________--__-_
Unexpended balance June 30, 1942______________ ______-----
                                                              _            _______-__-_
                                                                   3, 239, 425. 49
                                                                       59, 054. 29
      Total amount appropriated to June 30, 1942___________--      3, 298, 479. 78

   Fiscal year ending June 30                    1938              1939          1940           1941              1942

Cost of new work                           - -... ..
                                                  .--- . .....    .. . .. .       $555. 41                               --
C ost of m aintenance-   ...........         $46, 548. 30        $52, 330. 02   53, 395. 56   $50, 656. 66       $49, 185. 24
      Total cost                               46, 548. 30        52, 330. 02   53, 950. 97    50, 656. 66        49, 185. 24
Total expended                                 42, 734. 57        56, 838. 83   56, 374. 82    49, 753. 71        48, 827. 31
Allotted. _-               -                  102, 500. 00        50, 000. 00   55, 354. 66    51, 474. 63        52, 000. 00


Balance unexpended July 1, 1941_--____------------_____-----                                                 $55, 881.60
Amount allotted from War Department Civil Appropriation Act
  approved April 28, 1942--------------------------------------                                               52, 000. 00
      Amount to be accounted for------------------------------                                               107, 881. 60
Gross amount expended---------------------------------------                                                  48, 827. 31
        Balance unexpended June 30, 1942_                                  _______________                    59, 054. 29
Outstanding liabilities June 30, 1942_________ ________________                                                  396. 19
      Balance available June 30, 1942---------------------------                                              58, 658. 10
Amount (estimated) required to be appropriated for completion of
existing project "__  _____-      ________________-_____ ------                                             437, 800. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance                    1__________________________
                                                              ____                                            70, 000. 00
  1 Exclusive of available funds.

                                       25. COOSA RIVER, GA. AND ALA.
   Location.-The Coosa River is formed at Rome, Ga., in the north-
west part of the State of Georgia, by the junction of the Oostanaula
and Etowah Rivers, which have their sources in northern Georgia.
From Rome the Coosa River flows in a southwesterly direction
through Georgia and Alabama for a distance of 286 miles and unites
with the Tallapoosa River to form the Alabama River near Mont-
gomery, Ala., at about the center of the State. (See U. S. Geological
Survey charts for northeast Alabama and northwest Georgia.)
   Previous projects.-The River and Harbor Act of August 14, 1876,
adopted the original project, which was modified by the River and
Harbor Act of September 19, 1890. Work under the existing project
was begun in 1877. For further details of previous projects see page
676         REPORT OF CHIEF                  OF     ENGINEERS,              U.     S.    ARMY,       1942


1837 of Annual Report for 1915, and page 728 of Annual Report
for 1938.
   Existing ,project.-This provides for securing from dam No. 5, Ala-
bama, to Rome, Ga., a channel 4 feet deep at extreme low water and
100 feet wide, to be obtained by open-channel work and the con-
struction of locks and dams-one dam without a lock and four locks
and dams located between a point 7 miles below Riverside, Ala., and
Greensport, Ala., and one lock and dam located at Mayos Bar, 7.5
miles below Rome, Ga. The length of the section included in the
project is 169 miles, the lower end being 117 miles above the mouth
of the river. The project also provides for operating and care of
all locks and dams. Certain data relative to the Coosa River dams
are given in the following table:

                                                                                                     Available depth
                                                                   Dimensions of locks               over miter sills
                                                   Miles                                              at low water
  Locks and       Location with reference          from
    dams             to nearest town              mouth
                                                  of river    Greatest
                                                             available      width         Lift       Upper             Lower
                                                               length

                                                                 Feet        Feet         Feet        Feet              Feet
Lock 31 (15)__ Wetumpka, Ala .     -.......            11          280              52     14. 70       8. 00             8. 00
Dam 5_____     Gadsden, Ala., 58 miles__              117                   .10.               00            --
No. 4___       Gadsden, Ala., 48 miles .              127           280            52       8. 00          7. 00            7.   00
No. 3--        Gadsden, Ala., 27 miles___             148           176            40      12. 00          5. 15            4.   00
No. 2 .        Gadsden, Ala., 25% miles_              149%          176            40       5. 57          5. 40            5.   20
No. 1          Gadsden, Ala., 22Y miles-              152%          176            40       5. 33          3.41             3.   25
Mayos bar      Rome, Ga., 712 miles .-----            278%          176            40      12. 00          6. 00            5.   00


                                                                                          Year
  Locks and       Character of foundation      Kind of       Typ of       onstruction      pened Year of

                                                                                          igation

Lock 31 (15)__neiss                                                                                    )          2$228, 511.00
Dam 5     -------   Disintegrated chert and     Fixed        Concrete and cribs ._         _......   1917            397, 834.00
                     limestone.
No. 4 ..________-..     do                    ___do ....     Dry rubble masonry            1914       (3)          2 456, 620. 00
No. 3 --...         Disintegrated chert _____ . do _____     .. do_
No. 2 ._________ Sandstone and slate ---
No. 1_________ Sandstone _______________
                                              -   do
                                                 _do____.
                                                                do________________
                                                             Rock-filled cribs ......
                                                                                           1890
                                                                                           1890
                                                                                           1890
                                                                                                     1890
                                                                                                     1890
                                                                                                     1890
                                                                                                                    110, 744.
                                                                                                                    159, 166.
                                                                                                                    106, 173.
                                                                                                                                 47
                                                                                                                                 00
                                                                                                                                 96
Mayos bar .         Compact shale -     -      -do-....      Dry rubble masonry_           1913      1915           279, 929.    29

  1 50 percent complete.
  2 Estimated cost; no exact record.
  2 Lock is 99 percent complete, and the dam completed.




   The fluctuations of stage are as follows: Rome, Ga., ordinary, 30
feet; extreme, 40 feet. Gadsden, Ala., ordinary, 22 feet; extreme,
38 feet. Lock No. 4, about 4 miles above Riverside, Ala., ordinary, 17
feet; extreme, 24 feet. Wetumpka, Ala., ordinary, 45 feet; extreme,
62 feet.
   The estimate of cost of new work, revised in 1928, is $1,835,000,
exclusive of amounts expended on previous projects. The latest
(1928) approved estimate of annual cost of maintenance is $10,000
for the part of the river between Rome, Ga., and Gadsden, Ala. The
estimate of annual cost of operation and care of locks and dams,
made in 1937, is $3,600.
  The existing project was authorized by the following river and
harbor acts:
                  RIVERS       AND HARBORS-MOBILE,                     ALA.,     DISTRICT              677

     Acts                              Work authorized                                   Documents



Aug. 14, 1876     Open-channel work and locks and dams Nos. 1, 2, and 3 for      Annual Report, 1872, p. 536,
                   that section of the river between the Selma, Rome, and         and Annual Report, 1875,
                   Dalton Railroad bridge near Wilsonville, Ala., and             pt. 2, p. 661.
                   Rome, Ga., at an estimated cost of $470,668 for work
                    between said bridge and Greensport, Ala., and $180,000 for
                    work between Gadsden and Rome, a distance of 107.5 miles.
Sept. 19, 1890    Present channel dimensions, viz, 4 feet deep and 100 feet      H. Doc. No. 94, 51st Cong.
     and            wide, the increase of lock dimensions to 52 feet width        1st sess.
July 13,1892        and 280 feet clear length, and for the improvement of the
                   entire river from Wetumpka, Ala., a distance of 11 miles
                   above the mouth to Rome, Ga.
    Do   -.. _-   Only the walls of lock No. 31 and dam No. 4 were con-
                   structed under this enlarged project, which has been
                   considered as definitely abandoned following report of
                   Jan. 9, 1905 (H. Doc. No. 219, 58th Cong., 3d sess.).
June 25, 1910     Dam No. 5 and the lock in dam No. 4_______________         _ H. Doc. No. 1421, 60th Cong.,
                                                                                   2d sess.
     Do __ ..     Lock and dam at Mayos Bar_ _----------------------             H. Doc. No. 1115,       60th
                                                                                   Cong., 2d sess.
June 26, 19341    Operation and care of locks and dams provided for with
                   funds from War Department appropriations for rivers
                   and harbors.

  1 Permanent Appropriations Repeal Act.

   The latest published maps of the Coosa River will be found in
Annual Report, 1890, page 1644, for that portion of the river from
lock No. 4 to Greensport; Annual Report, 1891, page 1752, for that
portion between Wetumpka and lock No. 4; and Annual Report, 1913,
page 2125, for the upper Coosa.
   Recommended modifications of project.-See recommendation for
the development of Alabama and Coosa Rivers reported under the
project for Alabama River.
   The abandonment for the present of the existing project, except
for the inexpensive care and maintenance of locks and dams, was
recommended under date of December 29, 1920 (H. Doc. No. 1018,
66th Cong., 3d sess.).
   Terminal facilities.-At Rome, Ga., there is one small private wharf
on the left bank of Oostanaula River, and a private wharf on the left
bank of Etowah River used exclusively by the owners. These facili-
ties and the natural landings on the Coosa River are considered ade-
quate for the existing commerce.
   Operations and results during fiscal year.-Only Mayos Bar was
kept in operation during the year. All Government property at the
other locks and dams was protected. The cost was $2,668.49 for
maintenance. The expenditures were $2,621.30.
   Condition at end of fiscal year.-The existing project was 83.5
percent completed. Locks and dams Nos. 1, 2, and 3, the lock and
dam at Mayos Bar, and dam No. 5 have been completed. Lock No. 4
was completed, except about 1 percent of work required on the lock,
which consists of the completion of the backfill and completion of
upper guard wall. (See tabulated statement under Existing project.)
Open-channel work by dredging, rock removal, and construction of
contraction works had been carried on at various shoals between lock
No. 4, Alabama and Rome, Ga. A 4-foot depth at mean low water
obtains at such bar as had been worked over, but no extensive and
678         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                  1942

consecutive length of stream had been completed. At the end of the
fiscal year the controlling depth was 21/2 feet on several of the bars;
from Gadsden, Ala., to Woods Ferry a distance of 37 miles, the con-
trolling depth was 3 feet, certain shoals and the lower sill at lock No. 1
being the controlling points; from Woods Ferry to lock No. 4, a dis-
tance of 9 miles, the controlling depth was 4 feet. These depths are
obtainable throughout the year. Increased drafts are ordinarily ob-
tained between the months of January and June, inclusive. The work
remaining to be done to complete the project consists of a lock at
dam No. 5 and lowering sills at lock No. 1, and completing open-
channel work from Mayos Bar to lock No. 4, a distance of 148 miles.
All locks and dams are in poor condition, and with the exception
of Mayos Bar lock cannot be operated. At lock No. 1 the miter sills
are badly worn and are in need of replacement and the wooden gates
at locks Nos. 2 and 3 are decayed and leak badly. All the dwellings
at the locks are badly in need of repair. At dam No. 5 the timber
section of the dam has decayed and washed out. Repairs are not
contemplated at any of these. Open-channel work which has been
done has, in general, been maintained by the action of the river.
   The total cost under the existing project was $2,348,374.69, of which
$1,608,105.59 was for new work and $740,269.10 for maintenance. The
total expenditures were $1,789,227.76. In addition, the sum of $559,-
145.99 was expended between June 30, 1890, and June 30, 1935, on the
operation and care on the works of improvement under the provision
of the permanent indefinite appropriation for such purposes.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $6,086.23, will be applied as follows:
Accounts payable, June 30, 1942-------------------_                                                                $0. 94
Maintenance:
    Operation of locks and dams-------------------------                                       $3, 200. 00
    Ordinary repairs------------------------------------                                        2, 885. 29
                                                                                                               6, 085.29
          Total-------------------------------------------                                                     6, 086. 23
   The additional sum of $3,500 can be profitably expended during the
fiscal year 1944, as follows:
Maintenance:
    Operation of locks and dams                                                                                      200
                                                                                                                  $---------------
    Ordinary repairs                                                                                                 300
      Total-------------------------------------------------------                                                3, 500

                                               Cost and financial summary
Cost of new work to June 30, 1942--------------                  $2, 574, 911. 97
Cost of maintenance to June 30, 1942----------------------- __       740, 269. 10
       Total cost of permanent work to June 30, 1942------------  3, 315, 181.07
Minus accounts payable June 30, 1942---------------------------.               94
       Net total expenditures----------------------------------   3, 315, 180. 13
Unexpended balance June 30, 1942                                         ------------                          6, 086. 23
         Total amount appropriated to June 30, 1942---------------3,                                         321, 266. 36
    Fiscal year ending June 30                      1938          1939            1940          1941             1942
Cost of new work ....         -
Cost of maintenance ---...---...                   $2, 884. 41   $3, 058. 64     $3, 351. 76   $2, 896. 22       $2, 668. 49
Total expended ._       .....            .          2, 865. 74    3, 079. 41      3, 580. 2*    2,942. 61         2, 621. 30
Allotted----              _- _----   .       -..    8, 385. 18    1, 334. 97      3, 600. 00    3, 509. 84        4, 000. 00
                 RIVERS AND HARBORS-MOBILE,                              ALA.,     DISTRICT              679

Balance unexpended July 1, 1941------------------------------                                     $4, 707. 53
Amount allotted from War Department Civil Appropriation Act
  approved April 28, 1942--------------------------------------                                    4, 000. 00

      Amount to be accounted for                                                                    , 707. 53
                                                                                                   8---------------------------
Gross amount expended---------------------    --                               $2, 624. 43
Less reimbursements collected -----  ----------                                      3. 13
                                                                                                   2, 621.30

      Balance unexpended June 30, 1942_----------------------                                      6, 086. 23
Outstanding liabilities June 30, 1942----------------------                                              .94
        Balance available June 30, 1942                                                             , 085. 29
                                                                                                   6-------------------------

Amount (estimated) required to be appropriated for completion
   of existing project ______________________________----                                        227, 000. 00
Amount that can be profitably   expended in fiscal year ending June
                           1- - - - - - - - - - - -- - - - -- - - - - - - - -- - - - - - - - -
30, 1944, for maintenance                                                                         3, 500. 00
  1 Exclusive of available funds.

    26. BLACK WARRIOR, WARRIOR, AND TOMBIGBEE RIVERS, ALA.
   Location.-The above names apply to what is virtually a single
stream, about 472 miles in length, having its source in northern Ala-
bama, flowing in a general southwesterly direction, and uniting with
the Alabama River to form the Mobile River, 45 miles above Mobile
Bay. (See U. S. Geological Survey map of Alabama.)
   Previous projects.-The original project for the improvement of
Warrior River, now combined with the Black Warrior and Tombig-
bee Rivers, was adopted by act of March 3, 1875. For further details,
see page 1841 of Annual Report for 1915, and page 732 of Annual
Report for 1938.
   Existing project.-This provides for the construction of 15 dams
and 16 locks, the extra lock being at dam No. 17, where the lift of
61 feet is equally divided between 2 locks in tandem, and for such
dredging and clearing of channels by snagging as may be necessary
to secure an all-year channel 9 feet in depth and 200 feet wide, where
practicable, from the mouth of the Tombigbee River 45 miles above
Mobile, to mile 447.6 on the Sipsey Fork, mile 444.6 on the Mulberry
Fork, and mile 420.6 on the Locust Fork, a total distance of 426.6
miles. The project also provides for dredging a cut-off channel 9
feet deep and 150 feet wide approximately 1.4 miles long in the
vicinity of Sunflower Bend, and installing temporary flashboards on
dams 1-9, raising existing dams 13-16 each 1 foot, the construction
of crest gates 12 feet high on dam 17, and the maintenance by snag-
ging operations of Mobile River from the mouth of Chickasaw Creek
to the junction of the Alabama and Tombigbee Rivers, a distance of
42 miles.
   The project also provides for the construction of a new lock and
dam in the vicinity of Tuscaloosa to replace original locks Nos. 10,
11, and 12.
   The maintenance of the section of the Tombigbee River below lock
No. 1 to its mouth, a distance of 56.6 miles, formerly reported under
the title "Tombigbee River, Ala., from mouth to Demopolis (main-
tenance of channel)," authorized by the River and Harbor Acts ap-
proved September 19, 1890, and June 13, 1902, is included in this
project. The last separate report under the above-quoted title is
shown on page 781, Annual Report for 1926.
680          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                            1942

   The project also provides for operation and care of all locks and
dams.
   The following table contains information concerning various fea-
tures of the locks and dams included in the existing project:
                Location and other data for locks and dams in this system

                                                                                                                   Depth
               Distance                                 Dis    Width of chamber and great-                          over
  Lock No.      above          Nearest town              is-    est length available for the         Lift          sills at
               Mobile 1                                 ance    full width (feet)                                    low
                                                                                                                   water

               Miles                                     Miles                                       Feet           Feet
1-.---.-..      101. 6
2--...-.....- 172. 6
                           St. Stephens, Ala
                           Pennington, Ala. -
                                                              3 281.9 by 52________________ _
                                                              6 286 by 52         _
                                                                                                     12. 00
                                                                                                      9. 00
                                                                                                                      2 8. 0
                                                                                                                        8. 5
3 -...------.-  19 4 . 6   O ak c h ia, A l a -----.....      5   ...d o   _ __                      10 . 0 0           8. 5
4____________   221. 6     Demopolis, Ala ______              1 285.6 by 52_                         10. 00             8. 5
5-......-...- 236. 6       Cedarville, Ala_______             5 ____do___                            10. 00             8. 5
6-.-........-   257. 1     Sawyerville, Ala._____             5 ____do _                             10. 00             8. 5
7__             272. 6     Wedgeworth, Ala ___.               5 284.7 by 52_______________           10. 00             8. 5
8-..-.......- 288. 6       Akron, Ala ...........             3 284.7 by 51.65-__                    10. 00             8. 5
9--.........- 305. 6       Powers, Ala___________             4 284.7 by 52_________________         11. 00             8. 5
Tuscaloosa_     351. 35    Tuscaloosa, Ala_______________ 95 by 460                                  30. 00            10. 8
13___________   360. 6     Tidewater, Ala________________ 285.5 by 52_                               11. 00            10. 6
14-..-....-.    364. 1     Searles, Ala-..........            8 282.1 by 52_                         14. 00             9. 5
15-.......-.
16-----------
                370. 6
                377.1
                           Kellerman, Ala ......
                               do
                                                              6       do   _______ __________
                                                             14 285. 5 by 52
                                                                                                     14. 00
                                                                                                     21.00
                                                                                                                        9. 5
                                                                                                                        9. 5
17 3........    378. 6         do _            _     _       14       d..-do
                                                                         .                           72. 00             8. 5
                                                                      Total lift                   254. 00


                                               Type of construction         Date                            Actual cost
  Lock        Character of      Kind of                                   o            Date opened          of lock and
  No.         foundation         dam                                      ofc         to navigation          f lock and
                                              Lock             Dam        pletion     to navigation             dam


1------- Soft rock-.........Fixed_         Concrete__ Concrete ...._        1909      Sept.    6, 1908          $560, 290.02
2--.....-Hard clay ............-
                              do      --...do......   Timber crib,          1915      Nov.     1, 1914           560, 114. 09
                                                        stone filled.
        . . . do ........ ___ do __ .do ...... _- do .....
3 ________..                                                                1915      Sept. 21, 1914             609, 622. 80
4____________ do _____________ _do ____do _____           do .....          1908      Dec. 1, 1908               479, 000. 00
5 ________..
        ..   . do .do               . .     _______-..
                                           ___do     .    do-........       1908      Sept. 1, 1908              501, 000. 00
6________ Piles _____________    do .....do ............- do-........       1908      Oct.   1,1908              443, 000. 00
7________..
        . . . do .do                --... do .. . . .do-.....               1903      Nov. 7, 1903               225, 600. 00
          -- -.......
8________ .    do              .do .     .do. .           do-               1903      Jan.   1, 1903             212, 400. 00
9 .. . ... .do . .. . . . .do.               do . .. . ..do .               1902      .   .do. . .               202, 440. 00
Tusca- Hard blue shale ---..          do ______do-______ Concrete --        1940      Aug. 29,1939          4, 450,873.50
   loos.
13_______ Hard sandstone         -___ do_                       ___
                                             Stone_____ Stone ._..           1905     July     4, 1905        203, 700. 00
14 -- ___ ___--do____                 do__ Concrete      Concrete____        1910 ,   Mar.    29, 1910        414, 714.89
15------ - ---- do - ------         -do --... do---        . do              1910     M ay     2, 1910         430, 233.87
16              _do______
                    ..          _     do_      do            do....          1915     Jan.     1,1915          520, 853. 68
17 3---__ _____do           .----- do_ ___do-----__ _____do___ -.          4 1915     May     13,1915       3,424,858.98


  1 Mileage from foot of Government St., Mobile, Ala.
  2 River is tidal below this lock and daily gage readings show that on an average of only 2 days per year
i the depth over the sill less than 8 feet, the minimum being 6.9 feet.
  3 Double lock.
  4 Now 99 percent completed; the remaining 1 percent covers cost of submerged land.
    Does not include $1,435,635.76 estimated cost of land submerged, damage to structures, and cost of clearing.

   The tidal influence extends from Mobile 101.6 miles to lock No. 1,
where the tidal effect is apparent only at low stages of river. At
Mobile the mean and extreme tidal ranges are 1.4 and 3.6 feet, re-
spectively. These are at times slightly increased by the effect of
winds. The greatest fluctuation of river stages is at Demopolis, Ala.,
the maximum at this point being 59.7 feet. The maximum fluctua-
tions at other points are 40 feet at lock No. 1, 101.6 miles from
Mobile; 57.8 feet at Tuscaloosa, Ala., 352.6 miles from Mobile; 13
feet at Port Birmingham, 409.6 miles from Mobile; and 27 .feet at
Cordova, 429.6 miles from Mobile. The ordinary fluctuations at
these points are at lock No. 1, 20 feet; at Demopolis, 35 feet; at
Tuscaloosa, 40 feet; at Port Birmingham, 4 feet; and at Cordova,
                   RIVERS AND          HARBORS-MOBILE,                   ALA.,    DISTRICT                681
7 feet. The works of improvement have reduced the amount of fluc-
tuations at different points from 3 to 10 feet.
   The estimated cost of new work, revised in 1939, is $16,200,000,
exclusive of amounts expended on previous projects. The latest
 (1936) approved estimate for annual cost of maintenance is $574,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                    Documents



July     5, 1884   Original appropriation for improving Black War-
                    rior River.
                   Original project for slack-water improvement          Annual Report, 1887, pt. 2, p. 1302.
                    authorized by Secretary of War Apr. 19, 1887.
Mar.     3,1899    Construction of the first locks between Tuscaloosa
                    and Demopolis.
                   Maintenance of the section of Tombigbee River
Sept. 19, 1890
                    below lock No. 1 to its mouth (66 miles) included
June 13,1902
                    in the existing project.
    Do-...---      Construction of locks and dams Nos. 1, 2, and 3.      H. Doc. No. 178, 56th Cong., 2d sess.,
                    Merging of the individual projects for the Black       and Annual Report, 1901, pt. 3, p.
                    Warrior and Warrior Rivers and the Tombigbee           1858.
                    River below Demopolis.                               H. Doc. No. 165, 57th Cong., 1st sess.,
                                                                           and Annual Report, 1902, p. 1293.
Mar.     2,1907 Construction of locks and dams Nos. 14, 15, 16, and
                  17.
Aug. 22, 1911   Lift of lock No. 17, changed to 63 feet, and construc-   H. Doc. No. 72, 62d Cong., 1st sess.
                  tion of locks and dams Nos. 18 and 19 eliminated
                 from the project. Extension of slack-water im-
                 provement to Sanders Ferry pn Mulberry Fork
                  and Nichols Shoal on Locust Fork.
Mar. 2, 1919    Raising of various dams 2 feet and raising the lock      Annual Report, 1918, p. 876.
                  walls 2 feet at lock No. 1 to provide a minimum
                  depth of 8 feet at low water, widening the chan-
                  nel to 150 feet where practicable.
Aug. 30, 1935   For snagging Mobile River from the mouth of              H. Doc. No. 728, 71st Cong., 3d sess.
                  Chickasaw Creek to the junction of the Alabama
                  and Tombigbee Rivers.
                                                                                                                1
    Do .----    Extension of the project to its present limits and       H. Doc. No. 56, 73d Cong., 1st sess.
                  channel dimensions.
   Do .... Construction of a lock and dam below Tuscaloosa               Rivers and Harbors Committee Doc.
                  to replace existing locks and dams Nos. 10, 11,          No. 26, 74th Cong., 1st sess.
                  and 12.
June 26, 1934 2 Operating and care of locks and dams provided for
                  with funds from War Department appropria-
                  tions for rivers and harbors.


  1 Contains latest published maps of the Tombigbee River and tributaries.
  2 Permanent Appropriations Repeal Act.
  For maps of the Warrior and Black Warrior Rivers, see Annual Reports for 1911, p. 1702, and 1913, p. 2144,
respectively.


  Recommended modifcations of project.--Under date of February
28, 1939, the Chief of Engineers recommended the further improve-
ment of the Warrior and Tombigbee Rivers, Ala. and Miss., by the
construction, at this time, and with priority over other locks and
dams proposed for the system, of a dam with normal lift of approxi-
mately 40 feet and with a lock chamber approximately 77 feet wide
and 600 feet long, generally as described in the report of the district
engineer, near Demopolis, Ala., to replace existing dams Nos. 4, 5, 6,
and 7, at an estimated cost of $6,750,000 for construction and for
682         REPORT OF CHIEF OF ENGINEERS,                                  U.   S. ARMY,                     1942

acquisition of necessary lands (H. Doc. No. 276, 76th Cong., 1st sess.).
   Under date of June 20, 1941, the Chief of Engineers recommended
modification of the existing project so as to provide for an increased
spillway capacity at dam No. 1 at an estimated first cost of $115,000,
with no increase in the annual cost of operation and maintenance
above the amount now required (H. Doc. No. 382, 77th Cong., 1st
sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-Facilities comprising loading and transfer
stations, wharves, etc., have been provided, where required along this
waterway. All are privately owned and operated except the termi-
nals at Tuscaloosa which are leased to a private company, but serve
the general public, and the terminals at miles 357.6 and 409.6 which
are owned and operated by the Inland Waterways Corporation, also
serve the general public. These terminals are considered adequate
for the existing commerce.
    Operations and results during fiscal year.-The following work
was accomplished during the fiscal year.
                                                    NEW WORK
                                                                                                                          Cost
Payment for lands submerged                    above dam No. 17 _-__                        ---              _           $168. 48
Payment for damages caused by backwater from crest gates on dam
  No. 17------------_                        --------------------- 16,512.85
                                  __-------------------
      Total for new work-___      -_____ __          -___________  16, 681.33
                                                   MAINTENANCE


             Plant                      Locality                        Date                      Cuebicyards               Cost


U. S. pipe-line dredge WVm.       Warrior and Tom-         July 1 to Nov. 5, 1941, and                1, 987, 095        $130, 977. 72
  L. Guthrie.                      bigbee Rivers.            Apr. 4 to June 30, 1942.
U. S. snag boat Denison.....      Warrior River_____       July 1 to Dec. 13, 1941, and                      8, 393        63, 386. 19
                                                             Jan. 5 to June 30, 1942.                    (1)
U. S. snag boat Montgomery _ Tombigbee River_              July 1 to Dec. 8, 1941, and                    4, 705           56, 217. 20
                                                             Jan. 2 to June 30, 1942.                    (2)
U. S. derrick boat Talla- Warrior River -...               Mar. 22 and 23, 1942 ........                     200               126. 30
  wampa.                                                                                                 (3)
U. S. derrick boat Pearl...........-    do____             Mar. 2 to 4, 1942-___' ....._
Spraying grass and banks at Dam No. 17 pool
  edge of water to eliminate          and Tuscaloosa
                                                           July 1 to Oct. 31, 1941, and
                                                             May 21 to June 30, 1942.
                                                                                                             2, 550
                                                                                                  ------13, 205. 74
                                                                                                            494. 72
  mos:luito breeding.                 lock and dam
                                      pool.
Surveys in connection with Warrior and Tom-                July 1, 1941, to June 30, 1942               __       -   -      5, 763. 39
  dredging operations.                bigbee Rivers.
U. S. towboat Fayetteville ..        Entire system_ __     Miscellaneous investigations                   _                 5, 844. 29
                                                             and dredging surveys dur-
                                                             ing the entire year.
      Total maintenance___                                                                        -     -- -              276, 015. 55

  1 Also 1.3,213 obstructions and 4.600 cords of d'rift.              3 Also 2 obstructions.
2 Also 9,424 obstructions   and 2,485 cords of drift.

   All locks and dams, telephone line of 141 miles, and other equipment
and plants were operated and maintained by United States plant and
hired labor. The total cost of operating and care of locks and dams
was $336,021.52, charged to maintenance.
   The total cost for the fiscal year was $628,718.40, of which $16,681.33
was for new work and $612,037.07 for maintenance. The expenditures
'were $609,191.02.
   Condition at end of fiscal year.-The existing project was about
99 percent completed. Eighteen locks and dams have been built.
Three of these (Nos. 10, 11, and 12) have been removed and replaced
                RIVERS AND                       HARBORS--MOBILE,                       ALA.,       DISTRICT                  683

by the Tuscaloosa Lock and Dam (see table under Existing project).
The channel has been dredged, original snagging completed, and
principal lock houses built at all locks. A dredged channel through
Sunflower Bend cut-off on the Tombigbee River was completed in
1938. A depth of 8 feet over a minimum width of 100 feet obtains
throughout the entire length of the improvement, and all-year naviga-
tion for boats is possible to the extent of the channel dimensions.
Construction of crest gates on dam No. 17, Black Warrior River, was
completed in 1938. Construction of Tuscaloosa Lock and Dam was
completed in 1940. The work remaining to be done to complete the
project consists of payment for damages caused by backwater from
crest gates on dam No. 17, payment of lands submerged by backwater
above original dam No. 17, payment for lands for right-of-way, spoil
area, and cut-off lands at Sunflower Bend.
   The total costs and expenditures for the existing project to June 30,
1942, were as follows:
                                                                                            Costs


                                                            New work           Maintenance           care and
                                                                                                 Operating              Total


Regular funds.       _                     _               $15, 409, 484. 57     $12, 697, 703   $1, 757, 763. 68    $29, 864, 951. 25
Public Works funds                                               79, 219. 93                                               79, 219. 93
Emergency Relief funds ....            _       -____....        607, 307. 56                                              607, 307. 56

      Total    .....-   ............                        16, 096, 012. 06      12, 697, 703      1, 757, 763.68    30, 551, 478. 74



   The total expenditures to June 30, 1942, were $19,847,052.75 of which
$19,160,525.26 were regular funds, $79,219.93 public works funds, and
$607,307.56 emergency relief funds.
   In addition, the sum of $8,932,686.64 was expended between July 1,
1896 and June 30, 1935, on the operation and care of works of improve-
ment under the provision of the permanent indefinite appropriation
for such purposes.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $765,644.01, will be applied as follows:
Accounts payable, June 30, 1942__----- --------------------------- $13, 975. 67
New work :
   Installing temporary flashboards on dams Nos. 2-8,
     inclusive, with Government plant and hired labor_                                              $10, 000. 00
   Payment for lands submerged above dam No. 17....                                                   9, 376. 49
   Payment for lands for rights-of-way, spoil disposal
     area and cut-off at Sunflower Bend--------------                                                  5, 887. 89
   Payment for damages caused by backwater from
     crest gates on dam No. 17----- ____----__   __                                                  37, 469. 44
                                                                                                                      62, 733. 82
Maintenance (with United States plant and hired labor) :
    Dredging in river channel between mile 45 and head
      of navigation with U. S. hydraulic pipe-line
      dredges Guthrie and Pascagoula and U. S. snag
      boats Montgomery and Denison, as necessary, from
      July 1, 1942, through June 30, 1943______________  208, 000. 00
    Snagging in river channel between Chickasaw Creek
      and head of navigation with the U. S. snag boats
      Denison and Montgomery, as necessary, from July
      1, 1942, through June 30, 1943 .________ ____      110, 000. 00
    Miscellaneous work at lock No. 17 and Tuscaloosa
       Lock and Dam pools-------------------------        13, 934. 52
                                                                                                                     331,934. 52
684            REPORT OF CHIEiF OF ENGINEERS,                                        U. S. ARMY,               1942

Maintenance (operating and care) :
    Operation of 15 locks and dams_----------------                                                  $195, 000
    Ordinary repairs-------------------------------                                                    32,000
   Improvement and reconstruction -----------------                                                   130, 100
                                                                                                                     $357, 000. 00
                  Total for all work ------------------------------                                                   765, 644. 01
  The additional sum of $817,000 can be profitably expended during
the fiscal year 1944, as follows:
Maintenance (with United States plant and hired labor) :
    Dredging in river channel between mile 45 and head of naviga-
      tion_------         -----------------------------------            $240, OG0. 00
    Snagging in river channel between Chickasaw Creek and head
      of navigation-------------                ------------------------ 110, 000. 00
    Miscellaneous work at lock No. 17 and Tuscaloosa Lock and
      Dam pools----------,---------------------                 --------- 15,000.00
                                                                          365,000. 00

Maintenance (operating and care) :
    Operation of 15 locks and dams-------------------------  320,000.00
    Ordinary repairs--------------------------------------    22, 000. 00
    Improvement and reconstruction-------------------------110, 000. 00
                                                             452, 000. 00

           Total for all work_______________-------------------817, 000. 00
                                            Cost and financia summary

Cost of new work to June 30, 1942__                       $16, 702, 942. 84
Cost of maintenance to June 30, 1942-__   _________-- ___ 12, 747, 703. 00
      Total cost of permanent work to June 80, 1942_       29, 450, 645. 84
Minus accounts payable June 30, 1942 __________________        -13, 975. 67
      Net total expenditures_______________________        29, 436, 670. 17
Unexpended balance June 30, 1942______________765,                  644. 01
      Total amount appropriated to June 30, 1942           30, 202, 314. 18             -----------
   Fiscal year ending June 30                   1938                 1939               1940            1941              1942

Cost of new work   ..------ -_            $3, 086, 117. 08      $1, 384, 867. 22    $421, 716. 50     $84, 534. 60       $16, 681. 33
Cost of maintenance - .      .                461, 074. 14          544, 229. 02     602, 963. 01     670, 828. 32       612, 037. 07
       Total cost....-------------.        3, 547, 191. 22       1, 929, 096. 24   1, 024, 679. 51    755, 362. 92       628, 718. 40
Total expended_. __---------               3, 085, 940. 88       2, 328, 519. 64   1, 312, 153. 87    765, 624. 95       609, 191.02
Allotted .--.....-----   ......----------.... 4, 332, 173. 27    1,099, 151. 38      736, 183. 49     735,000. 00        714, 430. 00


Balance unexpended July 1, 1941 ----------------------------                                                     $660, 405. 03
Amount allotted from War Department Civil Appro-
priation Act Approved June 24, 1940----------- $100, 000. 00
Amount allotted from War Department Civil Appro-
  priation Act approved Apr. 28, 1942_____ ______ 614, 430. 00
                                                                                                                   714, 430. 00
      Amount to be accounted for___________________________                                                     1, 374, 835. 03
Gross amount expended    ____--- ___ _________   _ $611, 936. 50
Less reimbursements collected ------ ____--- -__      2, 745. 48
                                                                                                                      609, 191. 02
      Balance unexpended June 30, 1942_______________ _____765,                                                            644. 01
Outstanding liabilities June 30, 1942----------------- ---------                                                       72, 027. 78
      Balance available June 30, 1942__ ----------------                                                               93, 616. 23

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance '-------------                        -__                                                  817, 000. 00
   1 Eiclusive of available funds.
           RIVERS AND        HARBORS--MOBILE,   ALA.,   DISTRICT   685
                          27. BAYOU LA BATRE, ALA.
   Location.-This is a tidal stream about 10 miles long, located in
the southwestern part of the State of Alabama, and empties into Mis-
sissippi Sound. It is 45 miles by water from Mobile Harbor, Ala.,
on the east, and 21 miles from Pascagoula Harbor, Miss., on the west.
(See U. S. Coast and Geodetic Survey Chart No. 1267.)
   Existing project.-This provides for a channel 6 feet deep at mean
low water and 100 feet wide across the bar and 6 feet deep and 75
feet wide between the mouth and the county highway bridge, except
where the existing depth is 6 feet or more for a width of at least 50
feet. The length of the channel across the bar is 3,500 feet, and the
section of the bayou included in the project is 21/2 miles in length.
The mean and extreme tidal ranges are 13/4 and 33/4 feet, respectively.
   The estimated cost for new work, made in 1923, was $20,000, with
$5,000 for annual maintenance.
   The existing project was adopted by the River and Harbor Act of
March 3, 1925 (Rivers and Harbors Committee Doc. No. 4, 68th
Cong., 1st sess.). The latest published map is in the project document.
   Recommended modifications of project.-Under date of April 20,
1939, the Chief of Engineers recommended modification of the exist-
ing project for Bayou La Batre, Ala., so as to provide a channel 100
feet wide and 9 feet deep from that depth in Mississippi Sound to
the highway bridge at the town of Bayou La Batre at an estimated
cost of $27,500, with maintenance estimated at $2,000 annually in
addition to the present cost of maintenance; subject to certain con-
ditions of local cooperation (H. Doc. No. 281, 76th Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-Consist of numerous small wooden wharves,
most of which are used in connection with the canning factories
located on the bayou. All of these wharves are privately owned but
available for public use. These facilities are considered adequate for
existing commerce.
   Operations and results during fiscal year.-The U. S. hydraulic
pipe-line dredge Wahalack, operating in the Mississippi Sound Channel
from January 16 to 25, 1942, removed 43,325 cubic yards of material.
The cost was $7, 141.37 for maintenance. The expenditures were
$6,991.37.
   Condition at end of fiscal year.-The existing project was completed
in 1926. The controlling depths at the end of the fiscal year were as
follows: Mississippi Sound Channel, 6 feet; Bayou La Batre Channel,
6 feet. The total cost and expenditures were $79,837.67, of which
$18,631.29 was for new work and $61,206.38 for maintenance.
  Proposed operations.-No funds are available and no operations are
contemplated during the fiscal year 1943.
   The sum of $10,000 can be profitably expended during the fiscal year
1944 for maintenance dredging to restore project dimensions with a
hydraulic pipe-line dredge, for a period of one-half month.




     493202-43--pt. 1, vol. 1--44
686         REPORT OF CHIEF OF ENGINEERS,                                    U. S.          ARMY,         1942

                                        Cost and financial summary

Cost of new work to June 30, 1942__------------------                                                           $18, 681. 29
Cost of maintenance to June 30, 1942-------------------61,                                                           206. 38
       Total cost of permanent work to June 30, 1942 _________ ___                                               79, 837. 67
Net total expenditures----------------                     ----------____                                        79, 837. 67
      Total amount appropriated to June 30, 1942---------------                                                  79, 837. 67

   Fiscal year ending June 30              1938           1939                 1940                1941                 1942

C ost of new w ork -------------- - ------------. ---     -         ----- --------------     -                   -
Cost of maintenance__           -         $9, 482. 98          ..             $6, 473. 68         $5, 358. 63           $7, 141. 37

Total expended--        -   -       -      9, 482. 98   -----------            6, 473. 68          5, 508. 63               6, 991. 37

Allotted----------------------             9, 482. 98         $10, 000        10, 000. 00        -1, 026.32          -2--




Balance unexpended July 1, 1941__________________________________      $6, 991. 37
Gross amount expended-________-_                           $7, 050. 63
Less reimbursements collected_____________________              59. 26
                                                                        6, 991. 37
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance_ _______-___________________           10, 000. 00

                                    28. PASCAGOULA HARBOR, MISS.

   Location.-This harbor, located along the lower 6.8 miles of Pas-
cagoula River and the lower 4 miles of Dog River, is in the south-
eastern part of the State of Mississippi about 61 miles by water
from Mobile Harbor, Ala., on the east, and about 44 miles from Gulf-
port Harbor, Miss., on the west. (See U. S. Coast and Geodetic
Survey Chart No. 1267.)
   Previous projects.-Appropriations were made for Pascagoula
River by River and Harbor Acts of March 2, 1827, May 23, 1828,
and August 30, 1852. The first definite project was adopted by River
and Harbor Act of June 14, 1880. Other projects were adopted by
the River and Harbor Acts of August 5, 1886, August 18, 1894, June
3, 1896, March 3, 1899, June 13, 1902, and June 25, 1910. For further
details see page 1843 of Annual Report for 1915 and page 741 of
Annual Report for 1938.
   Existing project.-This provides for a through channel of the
maximum dimensions that can be secured by the expenditure of
$283,000, but not exceeding a depth of 25 feet and width of 300 feet
across the outer bar at Horn Island Pass, and thence a depth of 22
feet and width of 225 feet to the railroad bridge at Pascagoula, and
thence a depth of 22 feet and width of 150 feet, increased at sharp
bends, to a point on Dog River 4 miles above its mouth. Under ordi-
nary conditions the mean tidal range here is 13/4 feet and the extreme
tidal range is 33/ feet.
   The estimate of cost for new work, revised in 1914, is $283,000, ex-
clusive of amount expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $5,000 for the
outer bar channel at Horn Island Pass and $100,000 for the channels
in the river and through Mississippi Sound.
   The existing project was authorized by the following river and
harbor acts:
                 RIVERS AND          HARBORS-MOBILE,                ALA.,    DISTRICT               687

   Acts                         Work authorized                                  Documents



Mar.   4, 1913   Limiting the channel dimensions subject to local   H. Doc. No. 682, 62d Cong., 2d sess.
                   cooperation.
Mar.   4,1915    Modified the required local cooperation and pro-   Rivers and Harbors Committee Doc.
                   vided present project channel dimensions.          No. 12, 63d Cong., 2d sess.


The latest published map may be found in H. Doc. No. 211, 54th Cong., 2d sess.


   Local cooperation.-Fully complied with.
   Terminal facilities.-The municipal wharf on the east side of Pas-
cagoula River has an available dockage of 1,094 feet. The Louis-
ville & Nashville Railroad Co.'s wharf in the Pascagoula River at
Pasagoula, Miss., just north of their bridge, and the Mississippi
Export Railroad wharf on the Dog River at Moss Point, Miss., have
an available dockage of 60 and 380 feet, respectively. The Farns-
worth Coal Co. has a wharf on the Pascagoula River, located just
north of the Louisville & Nashville Railroad Co.'s wharf. All pri-
vate terminals, together with the municipal wharf, are considered
adequate for existing commerce. (See Port Series, No. 19, revised
1934, Corps of Engineers.)
   Operations and results during fiscal year--iew work.-The U. S.
hydraulic pipe-line dredge Wahalak, operating in the Pascagoula ship
channel from March 7 to May 12, 1942, removed 581,812 cubic yards of
material. The contractor, operating in the Pascagoula ship channel
with pipe-line dredges Diesel and San Diego from March 10 to May 1,
1942, removed 913,699 and 529,672 cubic yards of material, respectively.
The cost of new work dredging was $108,706.55.
   Maintenance.-The U. S. hopper dredge Benyaurd, operating in the
Horn Island Pass channel from July 21 to August 7, 1941, and January
7 to 28, 1942, removed 527,419 cubic yards of material. The U. S.
hydraulic pipe-line dredge Pascagoula,operating in the Pascagoula
ship channel from October 25 to November 15, 1941, removed 533,697
cubic yards of material, and the U. S. hydraulic pipe-line dredge
Wahalak, from March 7 to May 12, 1942, removed 520,567 cubic yards
of material. The contractor, operating in the Pascagoula ship chan-
nel with pipe-line dredges Diesel and San Diego from March 10 to
April 20, 1942, removed 817,519 and 473,917 cubic yards of material,
respectively. The cost for maintenance dredging was $148,406.94.
The cost of miscellaneous investigations and surveys was $3,332.63.
The total cost was $260,446.12, of which $108,706.55 was for new work
and $151,739.57 for maintenance. The expenditures were $260,416.98.
   Condition at end of fiscal year.-The existing project was about 91
percent completed. The controlling depths at the end of the fiscal
year were as follows: Horn Island Pass, 25 feet; Mississippi Sound
channel, 22 feet; Pascagoula River channel, 15 feet. The work re-
maining to be done to complete the project consists of obtaining a
2-foot additional depth in the Pascagoula River channel from the
Louisville and Nashville Railroad bridge to a point on Dog River
4 miles above its mouth. The total cost was $1,323,898.87, of which
 $258,040.11 was for new work and $1,065,858.76 for maintenance. The
expenditures were $1,323,884.51.
688          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                               1942

   Proposed operations.-The balance unexpended at the end of the
fiscal year, $104,275.89, will be applied as follows:
Accounts payable, June 30, 1942__-----------------------                                                        $14. 36
Maintenance dredging with a hydraulic pipe-line
      dredge to provide chanel dimensions adequate to
      meet the needs of navigation in Mississippi Sound
      and River channels, about 31/4 months during
      October and November 1942 and March and June
      1943----------------------------------------      $89, 311. 53
Maintenance dredging to restore project dimensions
      in the Horn Island Pass channel, with the U. S.
      seagoing hopper dredge Beny aurd, for a period of
      about 1/2 month during August 1942___-__-__-       14, 950. 00
                                                                                                           104, 261. 53

          Total------------------------------------------                                                  104, 275. 89
  The additional sum of $100,000 can be profitably expended during
the fiscal year 1944, as follows:
Maintenance :
    Dredging to provide channel dimensions adequate to meet the needs
      of navigation in the Mississippi Sound and River channels, with a
      hydraulic pipe-line dredge, about 3 months---------------------     $70, 000
    Dredging to restore project dimensions in the Horn Island Pass
      channel, with a. United States seagoing hopper dredge, for a period
      of about 1 month-----------------------------------------            80, 000

          Total------------------------------------------------------                                          100, 000
                                       Cost and financial summary

Cost of new work to June 30, 1942-----------------------------                                       $1,162, 481. 72
Cost of maintenance to June 30, 1942________________________                                          1, 478, 482. 91

      Total cost of permanent work to June 30, 1942_____________                                      2, 640, 964. 63
Minus accounts payable June 30, 1942 __________________-_____                                                  14.36

      Net total expenditures__---------------------------------_                                      2, 640, 950. 27
Unexpended balance June 30, 1942            -____________________                                        104, 275. 89

         Total amount appropriated to June 30, 1942_______________                                    2, 745, 226. 16

    Fiscal year ending June 30           1938          1939                1940               1941              1942


Cost of new work____  __  ________----- ------                __         $46,295.69     -     --             $108, 706.55
Cost of maintenance_............ $20, 000            $30, 865. 34         99, 190. 99       $49, 737. 72      151, 739. 57
      Total cost_-                         20, 000    30, 865. 34        145, 486. 68        49, 737. 72       260, 446. 12
Total expended ....                        20, 000    30, 865. 34         77, 223. 38       118, 015.80        260, 416. 98
Allotted.._________        ......
                      ______________       50, 000    33, 583. 18        197. 282. 16        25, 282. 05       304, 650. 00



Balance unexpended July 1, 1941-------------------------------                                             $60, 042. 87
Amount allotted from War Department Civil Appropria-
  tion Act approved June 24, 1940_______________       $5, 650. 00
Amount allotted from War Department Civil Appropria-
  tion Act approved May 23, 1941 ----------------     249, 000. 00
Amount allotted from War Department Civil Appropria-
  tion Act approved Apr. 28, 1942-____ ____     __-- 50, 000. 00
                                                                                                           304, 650. O0
          Amount to be accounted for-------___                      --                                     364, 692. 87
                 RIVERS        AND HARBORS-MOBILE,                      ALA.,     DISTRICT               689
Gross amount expended       ..----------------------                       $265, 656. 83
Less reimbursements collected_---------------------                            5, 239. 85
                                                                                               $ 260, 416. 98

      Balance unexpended June 30, 1942---------------------                                     104, 275. 89
Outstanding liabilities June 30, 1942_---------------------------                                     14. 36

         Balance available June 30, 1942-----------------------                                 104, 261. 53

Amount (estimated)- - required     to be appropriated         for completion of
                      - -- - -- - -- - -- - -- -  - - - - - - - - - - - - - - - -- - - - - -
existing project 1                                                                                25, 000. 00
Amount that can be profitably       expended in fiscal year ending June
                                1
30, 1944, for maintenance --------------------------------                                     100, 000. 00
   1 Exclusive of available funds.

                                   29. BILOXI HARBOR, MISS.

   Location.-Located on the Mississippi Sound in the southeastern
part of the State of Mississippi. It is 32 miles by water from Pasca-
goula Harbor, Miss., on the east, and 14 miles from Gulfport Harbor,
Miss., on the west. (See U. S. Coast and Geodetic Survey Chart No.
1267.)
   Previous projects.-Adopted by River and Harbor Acts of August
2, 1882, and July 5, 1884. For further details see page 1846 of Annual
Report for 1915, page 863 of Annual Report for 1929, and page 744 of
Annual Report for 1938.
   Existing project.-This provides for a channel west of Deer Island
10 feet deep and 150 feet wide from the 10-foot contour in Mississippi
Sound to the south water front of the city of Biloxi, and thence north
to Deer Island to deep water in Back Bay of Biloxi and for a relocated
channel 10 feet deep, 150 feet wide, and 4,600 feet long in front of
East Beach, for discontinuing maintenance of the abandoned portion
of the channel, and for maintenance of the Coast Guard channel to a
depth of 6 feet and a width of 300 feet. Under ordinary conditions,
the mean tidal range is about 13/4 feet.
   The estimate of cost for new work, revised in 1938, was $58,350, ex-
clusive of amounts expended on previous projects but including $5,000
contributed by local interests. The latest (1938) approved estimate
for annual cost of maintenance is $18,500.
   The existing project was authorized by the following river and
harbor acts:

     Acts                         Work authorized                                    Documents 1


July 3, 1930    Present project dimensions                              H. Doe. No. 754, 69th Cong., 2d sess.
June 20,1938    Relocation of channel                                   H. Doc. No. 639, 75th Cong., 3d sess.


  1 Contain latest published maps.

  Recommended, modifications of project.-Under date of April 5,
1939, the Chief of Engineers recommended modification of the existing
project for Biloxi Harbor, Miss., so as to provide an entrance channel
6 feet deep and 50 feet wide into Old Fort Bayou, at an estimated first
cost of $4,000, with annual maintenance of $1.200, in addition to that
now required, subject to certain conditions of local cooperation (H.
Doc. 258, 76th Cong., 1st sess.).
690           REPORT OF CHIEF OF ENGINEERS,                             U. S.     ARMY,       1942

   Under date of May 25, 1939, the Chief of Engineers recommended
further modification of the existing project for Biloxi Harbor, Miss.,
so as to provide an entrance channel 8 feet deep and 100 feet wide
through Cranes Neck into Bayou Bernard, at an estimated first cost
of $6,000, with annual maintenance of $2,000, in addition to that now
required and previously recommended, subject to certain conditions
of local cooperation (H. Doc. 326, 76th Cong., 1st sess.).
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-Consist of a number of light timber wharves
at Biloxi owned by private parties but available to the public. These
are considered adequate for the existing commerce.
   Operations and results during fiscal year.-The U. S. hydraulic
pipe-line dredge Wahalak, operating in the Biloxi channel from De-
cember 15, 1941, to January 16, 1942, removed 577,215 cubic yards of
material. The cost and expenditures were $25,685.37 for maintenance.
   Conditionat end of fiscal year.-The existing project was completed
in 1940. The controlling depth at the end of the fiscal year was 10
feet. Included in the total cost of maintenance is an item of $997.24
used for dredging in Ott Bayou, Miss., during the fiscal year 1938,
under section 3 of the River and Harbor Act of July 3, 1930, and an
item of $2,222.66 for dredging in this bayou during the fiscal year
1941, under section 3 of the River and Harbor Act of October 17, 1940.
   The total costs and expenditures for the existing project to June
30, 1942, were as follows:

                                                                           Costs
                                                                                                        Expendi-
                                                                                                         tures
                                                         New work Maintenance             Total

Regular funds                      ______   ___          $49, 780. 16   $125, 799. 17   $175, 579. 33   $176, 412. 08
Contributed funds _____________        _______      _      5, 000. 00     10, 200. 00     15, 200. 00     15, 200. 00

      Total       -      .. .                     .. _    54, 780. 16    135, 999. 17    190, 779. 33    191, 612. 05


   Proposed operations.-The balance unexpended at the end of the
fiscal year, $17,479.21, will be applied to maintenance dredging to
restore project dimensions in the existing Biloxi Harbor channel with
a hydraulic pipe-line dredge, for a period of about two-thirds month,
during January 1943.
   The additional sum of $22,000 can be profitably expended during
the fiscal year 1944 for maintenance dredging to restore project dimen-
sions, with a hydraulic pipe-line dredge, for a period of about 1
month.
                                  Cost and financial summary

Cost of new work to June 30, 1942____-__-____                             -_
                                                                          _._.______-_              $94, 162. 43
Cost of maintenance to June 30, 1942__ ____-- -_                           __- ___--_               212, 108. 70

        Total cost of permanent work to June 30, 1942___________ 1306, 271. 13

Net total expenditures __.--.--------- .                       1306, 271. 13
Unexpended balance June 30, 1942------------------------------   17, 479. 21
        Total amount appropriated to June 30, 1942 _-----------         323, 750. 34
    In addition, $5,000 for new work and $10,200 for maintenance expended from con-
tributed funds.
                   RIVERS AND HARBORS-MOBILE,                       ALA.,        DISTRICT                   691

   Fiscal year ending June 30         1938           1939           1940             1941              1942


Cost of new work                                                             -      16, 426. 81
                                                                                   $------              -
Cost of maintenance                 $17, 625. 71   $13, 179. 55   $28, 040. 00      11, 128. 50      $25, 685. 37

      Total cost                     17, 625. 71    13, 179. 55    28, 040. 00      27, 555. 31       25, 685. 37

Total expended___--      --          17, 625. 71    11, 179. 62    29, 963.96       27, 631. 28       25, 685. 37

Allotted_   _                        27, 625. 71   39, 000. 00    20, 000. 00       27, 939. 44       15, 000. 00



Balance unexpended July 1, 1941-------------------------- ----                                    $28, 164. 58
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942 __-------------------------------- ------                                 15,000. 00

      Amount to be accounted for_-------------------------------43, 164. 58
Gross amount expended--------------------------------------      25, 685.37

         Balance unexpended June 30, 1942-------------------------                                 17, 479. 21

Amount that can be profitably   expended in fiscal year ending June
30, 1944, for maintenance 2- - - - - - - - - - -- - - - - - - - - - - - - - - - - --              22 000.00
  2 Exclusive of available funds.

            30. GULFPORT HARBOR AND SHIP ISLAND PASS, MISS.

   Location.-Gulfport Harbor is located on Mississippi Sound in the
southeastern part of the State of Mississippi, about 44 and 90 miles
by water from Pascagoula Harbor, Miss., and Mobile Harbor, Ala.,
respectively, on the east, and 78 miles from New Orleans (via the
inside route through Lake Borgne, the Rigolets, Lake Pontchartrain,
and industrial canal) on the west. (See U. S. Coast and Geodetic
Survey Chart No. 1267.)
   Previous projects.-Adopted by the River and Harbor Acts of March
3, 1899 (H. Doc. No. 120, 55th Cong., 3d sess.), March 2, 1907, Febru-
ary 27, 1911, and January 21, 1927. For further details see page 1846,
Annual Report for 1915, page 857, Annual Report for 1929, and page
747, Annual Report for 1938.
   Existing project.-This provides for a channel 27 feet deep and 300
feet wide across Ship Island Bar, a channel 26 feet deep and 220 feet
wide through Mississippi Sound, and a depth of 26 feet in the anchor-
age basin at Gulfport. Under ordinary conditions the mean tidal
range here is about 13/4 feet, and the extreme tidal range is about
31/2 feet.
   The estimate of cost for new work made in 1927 was $200,000, ex-
clusive of amounts expended -on previous projects. The latest (1927)
approved estimate for annual cost of maintenance is $185,000.
   The existing project was adopted by the River and Harbor Act
approved July 3, 1930 (H. Doc. No. 692, 69th Cong., 2d sess.). The
latest published map of this locality is in the project document.
   Terminal facilities.-The modern rail-connected terminal facilities
at this port are considered adequate for existing commerce. (See Port
Series No. 19, revised 1934, Corps of Engineers.)
   Operations and results during fiscal year.-The contractor, oper-
ating in the Gulfport ship channel with pipe-line dredge Diesel from
July 23 to August 16, 1941, and January 21 to March 3, 1942, removed
692         REPORT OF CHIEF OF ENGINEERS,                                            U. S. ARMY,                   1942

3,226,851 cubic yards of material. The cost was $101,147.89 for main-
tenance. The expenditures were $101,072.06.
   Condition at end of fiscal year.-The existing project was completed
in 1934. The controlling depths at the end of the fiscal year were as
follows: Ship Island Bar channel, 27 feet; Mississippi Sound channel,
26 feet; anchorage basin, 26 feet.
   The total cost and expenditures under the existing project to June
30, 1942, were as follows:

                                                                             Costs
                                                                                                              --        Expenditures

                                                     New work         Maintenance                     Total

Regular funds ......                                  $70, 427. 77        $988, 250. 44            $1,058, 678. 21       $1, 077, 989. 36
Public Works funds___________ _                        47,883. 19                                      47, 883. 19           47, 883. 19
      Total-----_      --------------------           118, 310. 96           988, 250. 44           1, 106, 561. 40       1, 125, 872. 55


   Proposed operations.-The balance unexpended at the end of the
fiscal year, $137,445.14, will be applied as follows:
Accounts payable June 30, 1942____-- _                          _----------          -----------                              $30. 55
Maintenance dredging by contract to remove shoals in the Gulfport
ship channel and anchorage basin, about 6 months, August and
September, 1942, January, February, May, and June, 1943_ ____                                                          137, 414. 59

         Total---------------------------------------------------_____________________                                  137, 445.14
  The additional sum of $150,000 can be profitably expended during
the fiscal year 1944 as follows:
Maintenance dredging by contract to remove shoals in the Gulfport
ship channel and anchorage basin, about 6 months______------                                                              $135, 000
Maintenance dredging to restore project dimensions in the Outer
Bar Channel of Ship Island Pass, with the U. S. seagoing hopper
dredge Benyaurd for a period of about 1/2 month_________---__-                                                               15, 000

          Tota__                 _---------------_                          ------------                                    150, 000

                                       Cost and financial summary

Cost of new work to June 30, 1942______________- _____----$387,                                                               328. 88
Cost of maintenance to June 30, 1942________________________                                                          3, 300, 542. 98
     Total cost of permanent work to June 30, 1942------------                                                        3, 687, 871. 86
Minus accounts payable June 30, 1942_________________________                                                                  30. 55

     Net total expenditures ---------------------------------                                                         3, 687, 841. 31
Unexpended balance June 30, 1942-----------------------------                                                            137, 445. 14

         Total amount appropriated to June 30, 1942_____________-                                                     3, 825, 286. 45

   Fiscal year ending June 30                1938              1939                        1940            1941               1942

Cost of new work                                                 -    -
Cost of maintenance            __ _      $101, 532. 91       $94, 395. 40         $121, 198. 30          $78, 884. 28      $101, 147. 89
Total expended _                          101, 105. 79        94, 413. 74           122,092. 75           78, 814. 95       101,072.06
                                          191,950.00         17,69.80                6, 02.9             11,000              60, 000.00
Allotted ___________ _______              191,950.00         177, 692.80             68, 286. 99         114, 000. 00        60, 000. 00
             RIVERS AND HARBORS-MOBILE,                ALA.,   DISTRICT           693
Balance unexpended July 1, 1941__
                                ---------------------                     $178, 517. 20
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942-------------------------------------               80, 000. 00

      Amount to be accounted for________------            ------           258, 517. 20
Deductions on account of revocation of allotment_-----_------               20, 000. 00

      Net amount to be accounted for_     --------------------------       238, 517. 20-
Gross amount expended__-----_----------------------------         -----    101, 072. 06

      Balance unexpended June 30, 1942---------------------                137, 445. 14
Outstanding liabilities June 30, 19421--1--------------1--                       30. 55

      Balance available June 30, 1942_...___--..__-            -
                                                          __-----    _     137, 414. 59

Amount that can be profitably expended
                               - - -
                                          in_ fiscal year ending  June
                                                              - -- -
30, 1944, for maintenance 1 ___  ___ -__                       _    _     150, 00. 00
  1 Exclusive of available funds.

                    31. WOLF AND JORDAN RIVERS, MISS.

   Location.--This improvement, located in the southeastern part of
the State of Mississippi, consists of dredging channels 1.6 and 2 miles
long, at the mouths of Wolf and Jordan Rivers, respectively, tribu-
taries of St. Louis Bay. It is 24 miles by water from Gulfport, Miss.,
on the east and 54 miles from New Orleans, La. (via the inside route
through Lake Borgne, Lake Pontchartrain, and the Industrial Canal),
on the west. (See U. S. Coast and Geodetic Survey Chart No. 1268.)
   Existing project.-This provides for dredging at the mouths of
these streams channels 7 feet deep at mean low water and 100 feet
wide, extending from the 6-foot contour in St. Louis Bay to the 7-foot
contour in each stream. The length of the dredged channel at the
mouth of Wolf River is about 1.6 miles and at the mouth of Jordan
River about 2 miles. Under ordinary conditions, the mean tidal
range here is about 13/4 feet, and the extreme tidal range is about 31/2
feet.
   The estimate of cost for new work, made in 1906, was $30,000. The
latest (1928) approved estimate for annual cost of maintenance is
$2,000.
   The existing project was adopted by the River and Harbor Act of
March 2, 1907 (H. Doc. No. 917, 59th Cong., 1st sess.). The latest pub-
lished map is in the project document.
   Terminal facilities.-There are no terminal facilities and none are
required, as the natural landings along these streams are considered
adequate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was completed
in 1908. The controlling depths at the end of the fiscal year were as
follows: Wolf River, 7 feet; Jordan River, 7 feet. The total costs
and expenditures were $89,775.89, of which $29,195.19 was for new
work and $60,580.70 for maintenance.
   Proposed operations.-No funds are available and no operations are
contemplated during the fiscal year 1943.
   The sum of $6,000 can be profitably expended during the fiscal year
1944 for maintenance dredging to restore project dimensions with a
hydraulic pipe-line dredge for a period of about one-fourth month.
694           REPORT OF CHIEF OF ENGINEERS,                                               U.      S. ARMY,        1942

                                               Cost and financial summary

Cost of new work to June 30, 1942----------------------------                                                        $29, 195. 19
                                    ------
Cost of maintenance to June 30, 1942____________                                                                  __-60, 580. 70

      Total cost of permanent work to June 30, 1942 ___.......                                                          89, 775. 89
Net total expenditures_____--------- ------                                                                             89, 775. 89
Total amount appropriated to June 30, 1942                                                                              89, 775. 89

   Fiscal year ending June 30                     1938               1939                      1940        1941            1942


Cost of new work       -                   -                                      I
Cost of maintenance---                           $9, 586. 41        $9, 205. 59       ------          -   $9, 787. 22

Total expended            __-----------------     9, 586. 41         9, 205. 59       -          ------ 9, 787. 22
Allotted   ---------------------                         599-413.    9, 800. 00            $9, 405. 59     -212. 7



Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance__--------------------------------      $6, 000. 00

                                     32. PEARL RIVER, MISS. AND LA.

   Location.-PearlRiver rises in the east central part of Mississippi
and flows southwest about 172 miles to Jackson, Miss., thence south-
west about 269 miles to the head of its delta, where it divides into
West Pearl and East Pearl Rivers. The former flows about 34 miles
to the Rigolets, a tidal pass connecting Lake Pontchartrain with Lake
Borgne, an arm of the Gulf of Mexico.
   Previous projects.-Adopted by the acts of June 14, 1880, and April
21, 1900. For further details see page 950 of Annual Report for 1922,
and page 750 of Annual Report for 1938.
   Existing project.-This provides for a channel suitable for 6-foot
navigation from the mouth of West Pearl River to Bogalusa, La., by
dredging, snagging, and cut-offs at sharp bends from the mouth of
West Pearl River to a point immediately above Holmes Bayou to
secure a depth of 7 feet at low water; the construction of a lateral
canal 7 feet deep and 80 feet wide extending 20.1 miles from the
mouth of Holmes Bayou to Pools Bluff with three locks of adequate
dimensions; and for the improvement of Pearl River from Pools
Bluff to the mouth of Bogalusa Creek by dredging, snagging, and
easing of bends, with suitable dams or sills in the river channel just
below Pools Bluff and across Bogue Chitto to maintain the levels
in the canal and river.
   The estimated cost of new work, revised in 1941, is $4,110,500.
The latest (1937) approved estimate of cost for annual maintenance
is $57,000.
   The existing project was adopted by the River and Harbor Act
of August 30, 1935, subject to the approval of the Board of Engi-
neers. This approval is contained in House Document No. 408,
Seventy-fifth Congress, second session, which document contains the
latest published map.
   Local cooperation.-Fully complied with.
   Terminal facilities.-A privately owned wharf which is used for
unloading logs is located at the Pearl River highway bridge near
Pearl River Station, La. No other facilities exist except natural
              RIVERS      AND HARBORS--MOBILE,           ALA.,    DISTRICT         695
landings at various locations on the river. These facilities are con-
sidered adequate for existing commerce.
   Operations and results during fiscal year.-The contractor, for con-
struction of canal, levees, and appurtenant works between canal sta-
tions 432+ 50 and 924+00, from July 1 to August 27, 1941, excavated
102,836 cubic yards of material. The contractor, for construction of
canal, levees, and appurtenant works between canal stations 924+00
and 1073+ 65, from July 1, 1941, to April 10, 1942, excavated 1,299,848
cubic yards of material, cleared 122.9 acres, grubbed 37.32 acres, laid
164 lineal feet of 24-inch corroguated-metal pipe and 120 lineal feet of
30-inch corrugated pipe. The cost of the contract work was $130,-
451.74. The cost of preliminary surveys, plans, and specifications in
connection with construction work was $3,101.94. The work of re-
surfacing and planting kudzu on 405 acres of levees) was performed
from January 8 to March 30, 1942, at a cost of $31,488.23. The total
cost was $165,241.91, charged to new work. The expenditures were
$209,090.20.
   Condition at end of fiscal year.-The existing project was about
39.3 percent completed. The controlling depth for all-year naviga-
tion at the end of the fiscal year was 7 feet from mile 0 to the site of
lock No. 1 (approximately mile 30). A depth of 1.5 feet is available
during the low-water season, June to December, inclusive, each year,
along the natural channel between the mouth of Holmes Bayou and
Bogalusa, the present head of navigation for boat traffic. A minimum
depth of 6 feet is usually available over this stretch of the river from
January 1 to June 1 each year; however, due to the presence of numer-
ous logs, stumps, and other obstructions, navigation at the present time
is impracticable. The work remaining to be done to complete the proj-
ect consists of construction of locks Nos. 1, 2, and 3, and the Bogue
Chitto and Pools Bluff sills, clearing of the low-water pools of locks
Nos. 1 and 2, and dredging and snagging the channel of Pearl River
between Pools Bluff and Bogalusa.
   The total cost of the existing project to June 30, 1942, was
$1,520,672.19, all new work. The expenditures were $1,518,484.24.
   Proposed operations.-The balance unexpended at the end of the
fiscal year including accounts receivable is $1,906,363.57; however, no
operations are contemplated during the fiscal year 1943 except the
completion by hired labor of fertilizing and guarding kudzu plants
against livestock during July 1942, at the estimated cost of $1,136.70.
   No operations are contemplated during the fiscal year 1944.
                               Cost and financial summary
Cost of new work to June 30, 1942__________ _______________
                                                --              $1, 665, 115. 50
Cost of maintenance to June 30, 1942 __________________________     168, 171.64
      Total cost of permanent work to June 30, 1942____---_____           1, 833, 287. 14
Plus accounts receivable June 30, 1942___------ _____-      ___                1, 330. 81
      Gross total costs to June 30, 1942--_____________                  1, 834, 617. 95
Minus accounts payable June 30, 1942 ____________________ ____                3, 518. 76
     Net total expenditures_____________________-_____                   1, 831, 099. 19
Unexpended balance June 30, 1942--        ........       ------        - 1,905, 032. 76
       Total amount appropriated to June 30, 1942__
                                                  -----                   3, 736, 131.95
696          REPORT OF CHIEF OF ENGINEERS,                                    U. S. ARMY,                1942


   Fiscal year ending June 30          1938                    1939             1940              1941              1942

Cost of new work         __ _        $77,826.57         $160, 949. 30       $657, 486.76      $459, 167. 65       $165, 241. 91
Cost of maintenance ---- - - - - - - - - - - ---                 ----   - - - - - - -- - - - - - -               -- ----
Total expended-_------------_         66, 210. 51            147, 314. 45    605, 217. 99      490, 651.09         209, 090. 20,
Allotted___---------------------482, 000. 00             832, 500. 00         297, 017. 00   1, 812, 000. 00



Balance unexpended July 1, 1941------------------------------       $2, 114, 122. 96
Gross amount expended ---------------------------     $209, 185. 09
Less reimbursements collected ________-________              94. 89
                                                                        209, 0f0. 20

      Balance unexpended June 30, 1942________________________                                            1,905,032. 76
Outstanding liabilities June 30, 1942_______ ___________________                                              3, 518. 76

     Balance available June 30, 1942-------------------------                                             1, 901, 514.00
Accounts receivable June 30, 1942 _____ ____________--_____                                                    1,330. 81

            Unobligated balance available June 30, 1942______________                                     1, 902, 844. 81
Amount (estimated) required to be appropriated for completion of
  existing project                      _-----------------                                                2, 584, 000. 00
  1 Exclusive of available funds.
    33. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                     (GENERAL)
                                    Cost and financial summary
Cost of new work to June 30, 1942__________
Cost of maintenance to June 30, 1942_____________________----_     $2, 344, 557. 25
       Total cost of permanent work to June 30, 1942_________       2, 344, 557. 25
Minus accounts payable June 30, 1942 _______-__-_____________   -       14,173. 73
       Net total expenditures_----------------------------  ------ 2, 330, 383. 52
Unexpended balance June 30, 1942------------------------------         171, 179. 04
       Total amount appropriated to June 30, 1942______________     2, 501, 562. 56

   Fiscal year ending June 30          1938                    1939            1940               1941              1942


C ost ofnew w ork  - - - - - . - - - - - .- - - - -                         - - - - .. - - - -. .. . . .
Cost of maintenance-.............
                                $614,798.
                                        88 $378, 538. 79                     $168, 288.63 $78,436.67 $303, 017. 80
Total expended           - -    -    633, 087. 25        375, 193. 81        184, 141. 39       74, 332. 96        297, 103. 39
Allotted-        _   -    -          709, 828. 25        395, 115. 03        150, 335. 93       66, 617. 91        350,000. 00



Balance unexpended July 1, 1941________------------                                                            $118, 282. 43
Amount allotted from War Department Civil Appro-
  priation Act approved June 24, 1940______________ $260, 000. 00
Amount allotted from War Department Civil Appro-
  priation Act approved May 23, 1941_____________     90,000. 00
                                                                                                                350, 000.00
      Amount to be accounted for------------------------------                                                  468,282. 43
Gross amount expended---_______-_--_--               $344, 907. 69
Less reimbursements collected --------------    ___    47, 804. 30
                                                                                                                297, 103. 39
      Balance unexpended June 30, 1942--_____-___-                                                              171, 179. 04
Outstanding liabilities June 30, 1942_______ __________________                                                  14,173. 73
      Balance available June 30, 1942_                                                                          157, 005. 31
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance 1__ - - - - _--      - -   - -- -
                                                                                                                100, 000. 00
1Exclusive of available funds.
                 RIVERS AND HARBORS--MOBILE,                                 ALA., DISTRICT                                    697
:34..OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED

                                                           For last       Cost and expenditures to
                                                            full re-            June 30, 1942                        Estimated
                                                           port see                                                    amount
                  Name of project                          Annual                                                    required to
                                                            Report        New work        Maintenance                 complete
                                                             for-


1. Intracoastal Waterway from Apalachicola
      Bay to St. Marks River, Fla.12 .__.__..                 1939        $21, 132.43                     _           $458, 900. 00
2. Ochlockonee (Ochlockney) River, Ga. and
      Fla.3 4                                3
                                                              1900          5,000.00      -_          _                 20, 000. 00
3. Oostenaula and Coosawattee Rivers, Ga. 4_                 1907         32, 656.41           -      .-
                                                                                                       -                 5, 500.00
4. Upper Chipola River, Fla., from Marianna
      to it mouth 3    3                                      1941          36, 781. 12    $63, 193. 43                  4, 200.
                                                                                                                               00
5. Holmes River, Fla.                                        1931           8, 562.05     8 36, 652.41                  (6)
6. Tombigbee River from 7Demopolis, Ala., to
      Walkers Bridge, Miss. __                                1937         197,650.71          234, 330. 73               (6)
7. Cahaba River, Ala.3 4                                     1894          45, 000. 00                                  (8)
8. TallapoosaRiver, Ala.3 4.
                            7                                 1893          43,971.92                                    (10)
9. Pascagoula River, Miss.
                          3                                   1941          15,000.00          126, 321. 51
10. Noxubee River, Miss.       11        3                    1902          47, 527. 52         14, 472. 48               (6)
11. Leaf and Chickasahay
                       3    Rivers, Miss.  _ __               1919          23, 089. 94         42, 676. 26               1,900.00
12. Bluff Creek, Miss. 4     3                                1893           1,000.00                  _-                 (8)
13. Old Town Creek, 3Miss. ____________________               1887           3,000.00                                     7, 000. 00
14. Chitto Bogue, La. 12_ 7                                   1909          14, 912.60          12, 929. 94              30, 000. 00
15. East Pearl River, Miss.'                                  1933          37, 127. 93         34, 144. 18               (6)
16. Pearl River, Miss., Edinburg to Jackson 3....             1911          31, 872. 06         36, 990. 55              31, 600. 00

  1 Awaiting local cooperation.    The funds were revoked and work under this project was suspended due
to the failure of local interests to provide one of the features of local cooperation. Modification of the
project has been recommended in House Doc. No. 442, 76th Cong., 1st sess., to relieve local interests of the
responsibility of furnishing this feature.
  SFor report on the 12-foot Gulf Intracoastal Waterway, see page 629.
  3 No commerce reported.
  4 Abandonment recommended in H. Doc. No. 467, 69th Cong., 1st sess.
  5 Includes $2,160.80 expended for work on La Grange Bayou, Fla.
  6 Completed.
  7 Channel adequate for commerce.
  8 The records indicate that this project has not been completed; however, the sum of $5,000 in excess of
the estimated cost has been expended.
  9 The records indicate that this project has not been completed; however, the sum of $3,846.92 in excess
of the estimated cost has been expended.
  10Maintenance only.
  11That portion of the Noxubee River in Noxubee County, in the State of Mississippi, was declared
nonnavigable on February 24, 1934, Act S. 2337, 73d Cong., 2d sess. (48 Stat. 356).
  12 Considered unworthy.of further improvements.



                  35. PLANT ALLOTMENT, MOBILE, ALA., DISTRICT
                                        Cost and financial summary
Undistributed costs June 30, 1942__-----------------------------                                              $1, 162, 542. 05

      Net total cost to June 30, 1942__________--____-----
                                                   --..                                                        1, 162, 542. 05
Plus accounts receivable June 30, 1942________________________                                                    363, 566. 95
      Gross total costs to June 30, 1942 _________________-------1,                                                 526, 109. 00
Minus accounts payable June 30, 1942____-___________-____---                                                        429, 333. 41
     Net total expenditures __________----____- -------- __                                                    1, 096, 775. 59
Unexpended balance June 30, 1942___________-----__-__-_                                                           685, 134. 91
         Total amount appropriated to June 30, 1942                                                             , 781, 910. 50
                                                                                                               1_____________

Fiscal year ending June 30 .-----...          1938           1939             1940                    1941               1942

Total expended_________              -__-- $130, 054. 67    $3, 448.-74 -$294, 915. 01         $37, 301. 14          -$275, 011. 70
Allotted .__....._----------------       -136,   000. 00   -20, 000. 00   -163, 630. 89        -40,       500. 00       311, 100. 00
698         REPORT        OF CHIEaF        OF   ENGINEERS,            U.   S.    ARMY,      1942


Balance unexpended July 1, 1941______                                           ___             $99, 023.. 21
Amount allotted from War Department Civil Ap-
  propriation Act approved June 24, 1940---------                           $17, 100. 00
Amount allotted from War Department Civil Ap-
  propriation Act approved May 23, 1941                                        4, 000. 00
                                                                            2---------
                                                                                                311, 100. 00
      Amount to be accounted for________________-----------              _                      410, 123. 21
Gross amount expended____------------------              $4, 905,455.38
Less:
    Reimbursements collected--      $5, 178, 088. 87
     Receipts from sales-----------       2, 378. 21
                                                            5, 180, 467. 08
                                                                                              -275, 011. 70

      Balance unexpended June 30, 1942-----------------------                                   685, 134. 91
Outstanding liabilities June 30, 1942    ------------                                           709, 349. 87

      Balance available June 30, 1942_______________________                                   -24, 214. 96
Accounts receivable June 30, 1942----------------------------                                   363, 566. 95

         Unobligated balance available June 30, 1942______ -                                -___339, 351.99

Status of all investigations for navigation called for by river and harbor acts
                            and committee resolutions

           Locality               Authorization act       Date     to
                                                                trans-
                                                           mitted               Document
                                                                                Document       Recommenda-
                                                                                 number            tion
                                                           Congress

Alabama-Coosa branch of         Rivers and Harbors        Oct.. 29. 1941   House 414, 77th     Favorable.
Mobile River system, Ga.          Committee resolu-                        Cong. 1st sess.
and Ala. (interim re'port).      tion Apr. 28, 1936;
                                   Commerce Com-
                                  mittee resolution
                                  Jan. 18, 1939; Rivers
                                  and Harbors Com-
                                  mittee resolution
                                  Apr. 1, 1936.
Alabama-Coosa branch of         Rivers and Harbors
  Mobile River system, Ga.        Committee resolu-
and Ala. (final report).         tion Apr. 28, 1936.
Alabama-Coosa branch of         Commerce Commit-
Mobile River system, and         tee resolution Jan.
tributaries thereof, for         18, 1939.
flood control, navigation,
hydroelectric power, etc.
  (final report).
Apalachicola Bay, Fla _-_       Rivers and Harbors
                                  Committee resolu-
                                  tion Apr. 29, 1937.
Apalachicola River, Fla.,       River and Harbor
  inland waterway to New          Act Mar. 3, 1925.
  Orleans, La., and Apala-
  chicola and Chattahoo-
  chee Rivers to Columbus,
  Ga.
Apalachicola     River and      Sec. 1 of River and
  tributaries, Ga.; Ala., and     Harbor Act Jan. 21,
  Fla., for navigation, flood     1927.
  control, power, and irriga-
  tion (308 report).
Biloxi Harbor, Miss ..-.....    Rivers and Harbors
                                  Committee resolu-
                                 tion Oct. 21, 1938.
Biloxi Harbor, Miss., chan-     Rivers and 'Harbors
  nel from Back Bay to Ott        Committee resolu-
  Bayou.                         tion Feb. 11, 1941.
Biloxi Harbor, Miss., chan-     Rivers and Harbors
nel to deep water in Mis-        Committee rdsolu-
sissippi Sound along east        tion Feb. 11, 1941.
side of Deer Island.
Chattahoochee River, Ga.,       River and Harbor Act,
  and connecting waterways.       July 3, 1930.
Chipola River, Fla., and        Rivers and Harbors
  Ala., for navigation, flood    Committee resolu-
  control, power, and re-        tion, Jan. 21, 1942.
  lated purposes.
                RIVERS AND HARBORS-MOBILE,                                    ALA.,    DISTRICT                  699
Status of all investigations for navigation called for by river and harbor acts and
                          committee resolutions-Continued

                                                               Date trans-          Document            Recommenda-
          Locality                 Authorization act            mitted to            number                 tion
                                                                Congress
                                                          i
                              i



Choctawhatchee    Bay    to       Rivers and Harbors
Pensacola Bay, Fla., In-          Committee resolu-
tracoastal Waterways.             tion, Oct. 5, 1940.
Chunky Creek,       Chicka-       River and Harbor Act,
sawhay River, and Pas-            June 20, 1938.
cagoula  River, Miss., im-
provement for navigation,
flood control and power.
Coden Bayou, Ala______-._         Rivers and Harbors           July 31,1942     House : 824, ... 77th   Favorable.
                                    Committee resolu-                            Cong., 2d sess.
                                    tion, May 29, 1940.
Coosa River, Ga. and Ala.         Rivers and Harbors          --------------...-------------------
  (final report).                   Committee resolu-
                                    tion, Apr. 1, 1936.
East Pass Channel from            River and Harbor Act,  Oct. 1, 1941 ..---------------                 Unfavorable.
   Gulf of Mexico into Choc-        Aug. 26, 1937.
  tawhatchee Bay, Fla.
Gulfport Harbor, Miss .-...      __.- do ---..... -.....
Mississippi Sound in vicin- "Commerce Commit- May 23,1942 Senate 214, 77th                              Favorable.
  ity of Pass Christian, Miss.     tee resolution July                    Cong., 2d sess.
                                   18, 1939.
Mobile Harbor, Ala ........      Rivers and Harbors
                                   Committee resclu-
                                   tion, June 20, 1941.
Pascagoula       Harbor    and   River and Harbor Act,
  Horn Island Pass, Miss.          Aug. 30, 1935.
Pearl River, Miss., to pro- Rivers and Harbors
  vide 9-foot channel up to        Committee resolu-
  Jackson.                         tion, June 6, 1939.
Pensacola Harbor, Fla        -.. Rivers and Harbors
                                   Committee resolu-
                                   tion, June 10, 1941.
St. Marks River, Fla ..--. -     Rivers and Harbors Aug. 1, 1941 House 345, 77th                            Do.
                                   Committee resolu-                      Cong., 1st sess.
                                   tion, Apr. 4, 1939.
St. Marks River, Fla., to        Commerce Commit-
  New Orleans, La., Intra-         tee resolution, Apr.
  coastal Waterway.                2, 1940.
Tombigbee and Tennessee          Rivers and Harbors
  Rivers, waterway con-            Committee resolu-
  necting.      (Warrior River     tion, Feb. 27, 1934.
  route under special board.)
Warrior and Tombigbee            Rivers and Harbors
  Rivers, Ala., and Miss.,         Committee resolu-
  construction of impound-         tion, Mar. 10, 1937.
  ing dam No. 1 on Sipsey
   Fork of Black Warrior
   River,     for navigation,
   flood control, water pow-
  er, irrigation, etc.
Warrior and Tombigbee            Rivers and Harbors Sept. 16, 1941      House 382, 77th                    Do.
   Rivers, Ala., and Miss.,        Committee resolu-                      Cong., 1st sess.
   below Demopolis, and be-        tion, Feb. 28, 1939.
  tween      Demopolis     and
  Tuscaloosa.



            36. ALLATOONA RESERVOIR, COOSA RIVER BASIN, GA.

   Location.-The site of the proposed Allatoona Dam is on the Etowah
River in Bartow County, Ga., approximately 48 miles upstream from
the city of Rome, Ga., about 5 miles due east of the town of Carters-
ville, Ga., and about 2,000 feet downstream from the mouth of Alla-
toona Creek. The reservoir will extend up the Etowah River about
32 miles.
   Existing project.-The existing project provides for the construction
of a reservoir for flood control, regulation of stream flow for navi-
gation, and the development of hydroelectric power. The concrete
gravity type dam will be built to an approximate height of 190 feet
above the river bottom, or from elevation 690 feet to 880 feet mean
sea level with a fixed crest at elevation 835, and will be equipped
'700    REPORT OF CHIEF OF ENGINEERS,                U. S. ARMY,   1942

with nine tainter gates, 40 feet wide and 25 feet high, and two regulat-
ing gates 20 feet wide by 25 feet high, providing an overflow section
having a discharge capacity of 300,000 cubic feet per second with
water surface at elevation 868.8. Two 48-inch diameter sluicing con-
duits with free discharge valves are to be included in the dam. This
dam will create a reservoir covering 20,300 acres with a gross capacity
of 722,000 acre-feet at elevation of 860, the top of the taintor gates.
The estimated cost is $13,644,300, for construction, and $3,755,700 for
lands and damages, including highway, railroad and utilities reloca-
tion, a total of $17,400,000. The estimated cost for annual main-
tenance and operation is $50,000. This project was authorized by the
Flood Control Act of August 18, 1941 (Public 228, 77th Cong., 1st
sess.) as outlined in House Document No. 674, Seventy-sixth Cong.,
third session.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Foundation explora-
tions and preliminary surveys in connection with construction plans
and specifications were carried on during the year. The cost was
$316,951.88, for new work. The expenditures were $272,058.01.
   Condition at end of fiscal year.-No construction work has been
done on this project. The total cost of new work on the existing
project was $316,951.88 for preliminary work in connection with plans
and specifications. The expenditures were $272,058.01.
   Proposed operations.-Partof the balance unexpended at the end
of the fiscal year which amounted to $11,897,941.99, will be applied
as follows:
Accounts payable, June 30, 1942_------------------------------            $60, 141. 44
New work:
    Completion of hired labor preliminary survey
     and work incidental to design of dam, power-
     house and appurtenances__ ___---_-----_---
                                       _$178,                967. 00
    Continuation of contract for engineering serv-
      ices for the preparation of necessary designs,
      plans and specifications for the dam, power-
     house and appurtenances________________-_-         217, 833. 55
    Acquisition of rights-of-way and land----------- 2, 441, 000. 00
                                                                   , 2, 837, 800. 55

       Total------------------------------------------------2,            897, 941. 99
  Subsequent to June 30, 1942, the remainder of the unexpended bal-
ance, amounting to $9,000,000, has been placed in budgetary reserve.
No further expenditures other than those listed above are proposed
for the fiscal years 1943 and 1944.
                          Cost and financial summary
Cost of new work to June 30, 1942 _____________________________--$316, 951. 88
Cost of maintenance to June 30, 1942---                            __

      Total cost of permanent work to June 30, 1942---------              316, 951. 88
Undistributed costs June 30, 1942 __________________-____-____             15, 247. 57
     Net total cost to June 30, 1942________________________- _ 332, 199. 45
Minus accounts payable June 30, 1942_______________--60, 141. 44
     Net total expenditures_-----------------                              272, 058. 01
Unexpended balance June 30, 1942-------------                  -       11, 897, 941. 99
       Total hmount appropriated to June 30, 1942-                     12, 170, 000. 00
                RIVERS AND HARBORS-MOBILE,                                                  ALA.,        DISTRICT                       701

   Fiscal year ending June 30              1938                       1939                   1940               1941                1942


Cost of new work-   -            -   -                - -- -        ------    ---       --- _---- _----_     ------               $316,951.88
Cost of maintenance- ---   -------                -      --    --                   --------     -       ---        -----      -----------
Total expended .....-                I--                              -      ---    -   -                ---      -----           272, 058.01

Allotted---........             ------------------
                                    I                                                                                          12, 170, 000. 00



Amount allotted from War Department Civil Ap-
propriation Act approved Apr. 28, 1942-------- $9, 170, 000. 00
Amount allotted from Third Supplemental Na-
tional Defense Appropriation Act approved Dec.
  17, 1941-__                                    3, 000, 000. 00
                                                                                                                       $12, 170, 000. 00
Gross amount expended-------------------------------------                                                                  272,058.01
      Balance unexpended June 30, 1942--------------------- 11, 897, 941.99
Outstanding liabilities June 30, 1942-------------_ $60, 141. 44
Amount covered by uncompleted contracts---------- 217, 833. 55,
                                                                 277, 974. 99
     Unobligated balance available June 30, 1942-----------_                                                           11, 619, 967.00
Amount (estimated) required to be appropriated for completion
   of existing     project 1________                                 _____________________                                  5, 230, 000. 00
   1 Exclusive of available funds.

                        37. PRATTVILLE, AUTAUGA CREEK, ALA.
   Location.-The project is located at Prattville, Alabama, on Au-
tauga Creek, about 6.5 miles above its junction with the Alabama
River 12 miles below Montgomery, Alabama.
   Existing project.-The existing project provides for raising the
levee which flanks the north end of the power dam owned by private
interests and extending the levee upstream to a total length of about
4,600 feet with a 10-foot crown and side slopes of 1 on 5 and 1 on 3;
alteration of the dam spillways so as to increase their capacity to
approximately 22,000 cubic feet per second at a water elevation of 189;
enlarging and paving the channel, and constructing flood walls on
both sides of the creek for about 800 feet below the dam, reconstruc-
tion of a street bridge and a United States Geological Survey gaging
station in this section; clearing, grubbing, and enlarging the channel
for about 3,400 feet below the end of the flood walls, and lengthening
the highway bridge in this section. This improvement will protect
the town of Prattville against the largest floods of past record. The
existing project was authorized by the Flood Control Act approved
August 18, 1941 (Public 228, 77th Congress, 1st sess.) as outlined in
House Document No. 657, Seventy-sixth Congress, third session. The
estimated Federal cost of the project, revised in 1942, is $639,000. The
estimated cost to local interests is $10,400.
   Local cooperation.-See page 5 for requirements. In addition to
the usual requirements for local cooperation as provided by law, local
interests are required to bear the expense of clearing and grubbing
the channel, or removal of houses, and of alterations to the existing
power dam. Local interests have given assurances that these require-
ments will be complied with.
    O,pcerations and results during fiscal year.-Construction plans and
specifications were in the course of preparation at the end of the
         493202--43--pt. 1, vol. 1---45
702          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                         1942

period. The cost was $15,047.79, charged to new work. The ex-
penditures were $13,851.60.
   Condition at end of fiscal year.-No work has been done on this
project. The total cost under the existing project was $15,047.79 for
preliminary work in connection with the preparation of construction
plans and specifications, charged to new work. The expenditures were
$13,851.60.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $516,148.40, will be applied as follows:
Accounts payable, June 30, 1942---------------------------------                                                                      $1, 196. 19
New work:
    Preliminary work including surveys, designs, and
           plans and specifications, by hired labor .                                  ----.-                    $9, 952. 21
      Construction by contract of levees, flood wally,
       channel paving, and appurtenant works, and ex-
       tension of 2 bridges---------------------------505, 000.00
                                                                                                                                    514, 952. 21
           Total ----               -----------------------------------------------                                                  516, 148. 40

                                                      Cost and financial summary
Cost of new work to June 30, 1942--------------------------------$15, 047. 79
Cost of maintenance to June 30, 1942
      Total cost of permanent work to June 30, 1942                                                      ------------                 15, 047. 79
Minus accounts payable June 30, 1942----------------------------__                                                                     1, 196. 19
      Net total expenditures------------------                                                                                        13, 851.60
Unexpended balance June 30, 1942-------------------------                                                                            516, 148. 40
           Total amount appropriated                                   to June 30, 1942---------------                              530, 000. 00

   Fiscal year ending June 30                                 1938             1939               1940                 1941               1942

Cost of new work          ...............................         _                                                                      $15, 047. 79
Cost of maintenance________                                 ___    ____________
Total expended -..-           - -           ----            --------------
                                                            -------------.. . .-      -...              . .
                                                                                                      -----.     .   . .   .    .         13, 851.60
Allotted     -----------------------------------------------
                                             -                                ....              --------------
                                                                                                          ..                            530, 000.00



Amount allotted from War Department Civil Appropria-
                                           _
tion Act approved April 28, 1942----------------    $330, 000. 00
Amount allotted from Third Supplemental National
  Defense Appropriation Act, December 17, 1941...... 200, 000. 00
                                                                                                                                    $530, 000. 00

      Amount to be accounted for--------------------------------                                                                     530, 000. 00
Gross amount expended-----------------------------------------                                                                        13, 851. 60

           Balance unexpended June 30, 1942-------------------------                                                                516, 148. 40
Outstanding liabilities June 30, 1942                                    --           -------                                          1, 196. 19

           Unobligated balance available June 30, 1942 -----------------                                                             514, 952. 21

Amount (estimated) required to be appropriated for completion of
existing project 1------------------ --------------------------                                                                     10, 000. 00
1 Exclusive of available funds.
                     RIVERS             AND HARBORS-MOBILE,                              ADiA.,      DISTRICT                 703

38. SNAGGING AND CLARING UNDER AUTHORITY OF SECTION 2 OF
  THE FLOOD CONTROL ACT APPROVED AUGUST 28, 1937, AS AMENDED
   The Flood Control Act, approved August 28, 1937, as amended by
the Flood Control Acts approved August 11, 1939, and August 18, 1941,
authorized the allotment of not to exceed $500,000 from the flood-con-
trol appropriations for any one fiscal year for the removal of accumu-
lated snags and other debris from, and the clearing and straightening
of channels in navigable streams and tributaries thereof when such
work is advisable in the interest of flood control; provided that not
more than $25,000 shall be allotted for this purpose for any single
tributary from the appropriations for any one fiscal year.
   Allotments were received during the fiscal year 1942 for snagging
and clearing on the following streams in the Mobile district: Tombig-
bee River, Miss.; Luxapalila River, Ala.; and Tibbee Creek, Miss.
   Channel clearing, consisting of removal of snags and other debris
by hired labor with Government plant, was done on these streams as
follows:
   Tombigbee River, Miss.-No work was performed on this project
during the fiscal year.
   Luxapalila River, Ala. and Miss.-Supervision and equipment were
furnished Work Projects Administration workers for removing 298,540
cubic yards of material from the channel, from July 1, 1941, to Feb-
ruary 7, 1942, and June 16 to 30, 1942.
   Tibbee Creek, Miss.-Supervision and equipment were furnished
Work Projects Administration workers for clearing a total area of
76.9 acres along the banks and snagging 16.3 miles of the channel, from
July 1 to December 31, 1941, and June 10 to 30, 1942.
                              Summary of stream-clearing costs during the year
Luxapalila River, Ala. and Miss_________- __      ...             $23, 230. 17
Tibbee Creek, Miss-----------------------------------------------   7, 373. 28

           Total                   _____----------------------------------------------------                           30, 603.45
  The unexpended balance at the end of the fiscal year, amounting to
$44,152.99 will be applied during the fiscal year 1943 to payment of
expenses incurred under this heading.
                                                Cost and financial summary
Cost of new work to June 30, 1942_______________________________                                                     $178, 644. 86
Cost of maintenance to June 30, 1942

      Total cost of permanent work to June 30, 1942 -_                                                               178, 644. 86
Minus accounts payable June 30, 1942____________________________                                                       2, 531.67

     Net total expenditures____--------------------                                                   __             176, 113. 19
Unexpended balance June 30, 1942--                                                                                    44, 152. 99

           Total amount appropriated to June 30, 1942_________________                                               220,. 266. 18

    Fiscal year ending June 30                          1938              1939           1940           1941              1942

Cost of new work--------------------------                              $43,921.58     $62,371.19     $41,748.64         $30,603.45
Cost of maintenance        - -
Total expended ..                               -        -- ----         39, 614. 70    61, 993.88     42, 960.04         31,544.57
Allotted        -   .. -. .    .    .   .   .       -          .   j-    50, 000. 00    76, 366.18     45, 000. 00        48, 900. 00
704         REPORT OF CHIEF OF ENGINEERS,                                    U. S. ARMY,             1942

Balance unexpended July 1, 1941________---------------------------------                                   $26, 797. 56
Amount allotted from War Department Civil Appropria-
  tion Act approved June 24, 1940--------------------       $10, 000. 00
Amount allotted from War Department Civil Appropria-
                                        -
tion Act approved May 23, 1941______________--          _ 48, 900. 00
                                                                                                            58, 900. 00
      Amount to be accounted for-------------------------------                                             85, 697. 56
Deductions on account of revocation of allotment ...     __                                                 10, 000. 00

      Net amount to be accounted for_ _---------------------                                                75, 697. 56
Gross amount expended------------------------------------                                                   31, 544. 57

      Balance unexpended June 30, 1942------------------- __                                                44, 152. 99
Outstanding liabilities June 30, 1942-------------------------                                               2, 531. 67

         Unobligated balance available June 30, 1942 ----------------                                       41, 621. 32

39. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL
  The cost of work during the year was $87,279.65. The expenditures
were $77,237.87. The balance unexpended at the end of the fiscal
year, $96,998.12, plus the sum of $100,000 allotted in August 1942 will
be applied to payment of expenses incurred under this heading.
  The additional sum of $75,000 can be profitably expended during
the fiscal year 1944.
                                     Cost and financial summary
Cost of new work to June 30, 1942---------------------------------------
Cost of maintenance to June 30, 1942---------------------------  $518, 475. 07

     Total cost of permanent work to June 30, 1942---------------                                          518, 475. 07
Minus accounts payable June 30, 1942__-___                                                                  16, 875.          1%5




     Net total expenditures__-_                            _             ---------                         501, 599. 12
Unexpended balance June 30, 1942_ _                               _     ----------                          96, 998. 12

         Total amount appropriated to June 30, 1942 ______________-                                        598, 597. 24

    Fiscal year ending June 30             1938            1939                    1940       1941                      1942

C o st of n ew w ork --- -- -- -- -- .. - -- -- --- . . -- -- --- -- . . -- --- -- - .. - --- -- -- . ..     ..    ..    ..    ..
Cost of maintenance
               work      ...   ...  _       $1, 713. 08   $99, 862.82    $223, 603. 06   $106, 016. 46            $87, 279. 65
Total expended------------------
                ...                                       93, 512. 18        223, 630. 86   107, 218. 21           77, 237. 87
Allotted_
        ---------------------           131, 600. 00     171, 000. 00        183, 250. 00    72, 747. 24           40, 000. 00


Balance unexpended July 1, 1941  ----                           $134,235.99
Amount allotted from War Department Civil Appropriation Act ap-
   proved May 23, 1941                                                                                      40, 000. 00

      Amount to be accounted for--------------------------------                                           174, 235. 99
Gross amount expended-----------------------------------------                                              77, 237. 87
         Balance unexpended June 30, 1942                               --------                _           96, 998. 12
Outstanding liabilities June 30, 1942-----------------------------16, 875. 95

    Unobligated balance available June 30, 1942----------------80, 122. 17
Amount allotted in August 1942 .______________________________ 100, 000. 00

         Amount available during the fiscal year 1943-__________                                           180, i122. 17

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance ------------ ---------     _ ---    -  -                                         75, 000. 00
1Exclusive of available funds.
                  RIVERS AND             HARBORS-MOBILE,                       ALA.,            DISTRICT                        705
40. OTHER FLOOD-CONTROL PROJECTS FOR WHICH NO ESTIMATES
                      ARE SUBMITTED

                                                          For last     Cost and expenditures to                          Estimated
                                                        full report          June 30, 1942                               amount re-
                  Name of project                       see Annual                                                        quired to
                                                           Report
                                                            for-        New work                   Maintenance            complete


1. Flomaton,
   52        Escambia River, Ala ..............              1938           1 $485. 25            .............               149, 000
2.   Brewton, Conecuh River, Ala                             1938             1487. 10                                       2235, 000
3.   Rome, Coosa River, Ga                                   1941          366, 213. 49                                      (3)
4.   Tombigbee River, Miss. and AJa.......                   1941          134, 801. 39 ..                        ..          150, 000
5.   Collinsville, Ala                                       1940           71, 118. 51                                      (4)
6. Pearl River, Miss. and La., at Jackson, Miss__            1937     _2                                                       10, 000

     1 Cost of plans and designs.
     2 No funds have been allotted and no work has been done on this project.
     3 Completed.
     4 Completed with funds appropriated for the maintenance and improvement of river and harbor works.


Status of all investigations for flood control, called for by flood-control acts and
                                committee resolutions

                                                              Date trans-                                              Recommenda-
             Locality               Authorization act          mitted to            Document No.                           tion
                                                               Congress


Alabama-Coosa branch of            Rivers and Harbors        Oct.   29, 1941     House 414, 77th                       Favorable.
  Mobile River system, Ga.           Committee resolu-                            Cong., 1st sess.
and Ala. (interim report).          tion, Apr. 28, 1936;
                                     Commerce Com-
                                     mittee resolution,
                                     Jan. 18, 1939; Rivers
                                     and Harbors com-
                                     mittee    resolution,
                                     Apr. 1, 1936.
Alabama-Coosa branch of            Rivers and Harbors
  Mobile River       system,         Committee resolu-
  Ga. and Ala. (final re-            tion, Apr. 28, 1936.
port).
Alabama-Coosa branch of            Commerce Commit-
  Mobile River system, and          tee resolution, Jan.                        ....................
tributaries thereof, for           18, 1939.
flood control, navigation,
hydroelectric power, etc.
  (final report).
Apalachicola River and trib-       Sec. 1 of River and
utaries, Ga., Ala., and             Harbor Act, Jan. 21,
  Fla., for navigation, flood        1927.
control, power, and irriga-
tion (308 report).
Buttahatchee River, Ala.           Flood Control Com-
and Miss.                           mittee    resolution,
                                     Feb. 9, 1939.
Buttahatchee River, Miss.          Rivers and Harbors
and Ala.                            Committee resolu-
                                     tion, Feb. 1, 1939.
Chipola River, Fla. and            Rivers and Harbors
Ala., for navigation, flood         Committee resolu-
control, power, and re-             tion, Jan. 21, 1942.
lated purposes.
Chunky Creek, Chickasa-            River and    Harbor
whay River, and Pasca-             Act, June 20, 1938.
goula Rlver, Miss., improve-
ment for navigation, flood
control, and power.
Coosa River and tributaries, Flood Control Act,
Ga. and Ala.                   June 22, 1936.
Coosa River, Ga. and Ala.    Rivers and Harbors
  (final report).               Committee resolu-
                                tion, Apr. 1. 1936.
Hobolochitto River, Miss___  Flood    Control Act,           May 16, 1942                                              Unfavorat 'e.
                                Aug. 11, 1939.
Leaf and Bowie Rivers and     .- do_
  tributaries, Miss.
Luxapalila River, Ala., and  Flood Control Com-
  Miss.                         mittee resolution,
                                Feb. 9, 1939.
     Do-...._______.... .... Rivers and Harbors
                                Committee resolu-
                                tion, Feb. 1, 1939.
706         REPORT        OF CHIEF OF ENGINEERS,                   U.       S. ARMY,       1942

Status of all investigations for flood control, called for by flood-control acts and
                         committee resolutions-Continued

                                                         Date trans-                         Recommenda-
           Locality              Authorization act        mitted to         Document No.         tion
                                                          Congress

Noxubee River, Ala., and        Rivers and Harbors        -
  Miss.                        Committee, Resolu-
                               tion, Feb. 1, 1939.
Pearl River, Miss .. _.------Flood Control Act,               -    -    -     -
                               June 22, 1936.
    Do            _          Flood Control Act,
                               Aug. 18, 1941.
Sipsey River, Ala. and Miss_ Flood Control Com-
                                 mittee    resolution,
                                  Feb. 9, 1939.
    Do_-                        Rivers and Harbors
                                 Committee resolu-
                                 tion, Feb. 2, 1939.
Sucarnoochee Creek, Ala--..     Rivers and Harbors
                                 Committee resolu-
                                  tion, Apr. 13, 1939.
Tombigbee River and trib-       Flood Control Com-
utaries, Miss. and Ala.          mittee   resolution,
                                  May 2, 1939.
Tombigbee River and trib-       Commerce    Commit-
  utaries, Miss.                 tee resolution May,
                                 2, 1939.
Warrior    and     Tombigbee    Rivers and Harbcrs
Rivers, Ala. and Miss.,         Committee resolu-
construction of impound-        tion, Mar. 10, 1937.
ing dam No. I on Sipsey
Fork of Black Warrior
River, for       navigation,
flood control, water power,
irrigation, etc.



IMPROVEMENT OF RIVERS AND HARBORS IN THE NEW
            ORLEANS, LA., DISTRICT
   This district comprises all of southern Louisiana except small east-
ern and western portions, and southwestern Mississippi embraced in
the drainage basins tributary to the Mississippi River and the Gulf of
Mexico east of the easterly watershed line of the Sabine River and
Lake and south of a line from a point near Kurthwood, La., to Boyce,
La., continuing along the south bank of the Red River to the Missis-
sippi River, thence along the west bank of that river to a point west
of Warrenton, Miss., crossing the river to that place and following
southerly along the east bank to the northerly watershed line of Bayou
Pierre, thence to the westerly watershed line of the Pearl River Basin,
following along that line to the north bank of the Rigolets, thence
south of Long Point'and Middle Ground Shoal to the northerly tip
of Chandeleur Islands in Mississippi Sound. It includes the sec-
tions of the Intracoastal Waterway from Long Point Light in Lake
Borgne to the Sabine River, and the Passes of the Mississippi River.
It does not exercise jurisdiction, however, over flood-control work on
the Mississippi River from Warrenton, Miss., to the Head of Passes,
or in the Atchafalaya River Basin, nor over channel maintenance
dredging from Warrenton to Baton Rouge, La. These projects are
under the supervision of the president, Mississippi River Commission.
 (For report on these projects see vol. 2 of this report.)
  .District engineer: Col. C. Kittrell, Corps of Engineers, to January
7, 1942; Col. DeWitt C. Jones, Corps of Engineers, since that date.
   Division engineer: Brig. Gen. M. C. Tyler, Corps of Engineers.
         RIVERS        AND HARBORS-NEW           ORLEANS,     LA.y     DISTRICT      70O

                                     IMPROVEMENTS


                Navigation                           Navigation-Continued
                                       Page                                          Page
1. Southwest Pass and South                23. The Louisiana and Texas
     Pass, Mississippi River,                    Intracoastal     Waterway
     La_-     _     ___                707       from the Mississippi River
2. Mississippi River between                     at or near New Orleans,
     Baton Rouge and New                         La., to Corpus Christi,
     Orleans, La _-                    716       Tex. (New Orleans-Sabine
3. Bayous LaLoutre, St. Malo,                       River section) -           --    752
     and Yscloskey, La . -..           719 24. The inland waterway from
4. Bayou Dupre, La______               721       Franklin to the Mermen-
5. Intracoastal Waterway, Mo-                   tau River, La__                     759
      bile Bay, Ala., to New               25. Petit Anse, Tigre, and Car-
      Orleans, La. (Inner Harbor                 lin Bayous, La                      762
      Navigation Canal in Lake                26. Bayou Vermilion, La    ---         764
      Pontchartrain    to  Long            27. Waterway from White Lake
      Point    Light in    Lake                  to Pecan Island, La .-...           766
      Borgne section)__-               638 28.- Mermentau River, Bayou
6. Bayou Bonfouca, La_       --        723       Nezpique, and Bayou des
7. Bayou Lacombe, La .......          724       Cannes, La___             -         767
8. Chefuncte River and Bogue              29. Bayou Plaquemine Brule,
      Falia, La_______________         726       La                        --        770
9. Tangipahoa Riv r, La...            728 30. Calcasieu River and Pass,
10 Pass Manchac, La __--               729       La                        --        771
11. Tickfaw, Natalbany, Pon-               31. Lake Charles Deep Water
      chatoula, and Blood Ri -                      Channel, La_____________         774
      ers, La _-__                     730 32. Removing the water hya-
12. Amite      River   and   Bayou               cinths, Louisiana ........          775
      Manchac, La______                732 33. Examinations, surveys, and
13. Grand Bayou Pass, La ....          734       contingencies (general)       ---   778
14. Barataria Bay. La -.....           735 34. Other projects for which no
15. Bayou Lafourche, La_ --            737       estimates are submitted -           779
16. Bayou Terrebonne, La-----          739 35. Plant allotment                       779
17. Little Caillou Bayou, La ...       740
18. Waterway from the Intra-                             Flood control
      coastal Waterway to Bayou
      Dulac, La. (Bayous Grand                36. Homochitto River, Miss____         782
       Caillou    and  LeCarpe,               37. Bayou des Glaises, La __           783
      La.) _    -                      742 38. Bayou Teche and Vermilion
19. Bayou Grossetete, La -.-           743       River, La___________                785
20. Bayou Teche, La__                  745 39. Mermentau River, La _____             786
21. Atchafalaya River, Morgan              40. Preliminary     examinations
      City to Gulf of Mexico,                    and surveys for flood con-
      La__--                           749       trol--____-                         787
22. Intracoastal Waterway (5               41. Other flood-control projects
      by 40) Mississippi River                   for which no estimates are
      to Bayou Teche, La_              751       submitted___-                       787

   1. SOUTHWEST PASS AND SOUTH PASS, MISSISSIPPI RIVER, LA.

  Location.-Southwest Pass is the westernmost of the mouths of the
Mississippi River. It. flows in a generally southwesterly direction.
The entrance from the Gulf of Mexico is 114 miles from New Orleans,
La.; 160 miles from Mobile, Ala., on the east; and 330 miles from Gal-
veston, Tex., on the west. South Pass is the central one of the three
main mouths. It flows in a generally southeasterly direction. The
entrance from the Gulf of Mexico is 1071/2 miles from New Orleans,
La.; 141 miles from Mobile, Ala., on the east; and 349 miles from
Galveston, Tex., on the west. (See U. S. Coast and Geodetic Survey
Chart No. 1272 and U. S. Geological Survey maps Cubits Gap, Pass
a Loutre (west), Southwest Pass, South Pass, Burrwood, and Mud
Pan Bayou quadrangles.)
708        REPORT       OF CHIEF OF ENGINEERS,                     U. S. ARMY,            1942

   Previous projects- (a) South'west Pass.-Authorized by River and
Harbor Acts of July 4, 1836, March 3, 1837, August 30, 1852, July 8,
1856, March 2, 1867, and March 3, 1873. For further details, see
page 1847, Annual Report for 1915, and page 767, Annual Report for
1938.
    (b) South Pass.-None.
   Existing project- (a) Southwest Pass.-This provides for a chan-
nel through Southwest Pass, 1,000 feet wide and 35 feet deep. The
general plan of improvement provides for contracting the pass to a
uniform cross section with approximately 1,420-foot surface width by
means of jetties, spur dikes, and bulkheads; for channel improvement
by dredging and retaining the dredged material between the dikes,
bulkheads, and jetties; for dredging a channel through the outer bar
inclining to the left of the jetty axis; for the construction of small
revetted openings through the narrow portions of the banks of the
pass for purpose of strengthening these banks; for closure of minor
outlets not required for maintenance of the banks; for the construc-
tion of sills to prevent the enlargement of The Jump and Cubits Gap;
for dredging to elevation-55 feet in the river at Head of Passes as
far up as Cubits Gap, a distance of 3.5 miles; for repairs to sill across
Pass a Loutre and bank revetment at Head of Passes; for construction
of dikes with a view to reducing the width of the river above Head of
Passes; for the construction of a submerged deflecting dike above the
Head of Passes; and for other minor work. The plane of reference
is mean low water. The east jetty is approximately 4.8 miles in length
and the west jetty 3.8 miles. The jetties are composed of a substruc-
ture of brush mattresses, originally built to about the elevation of
mean low water, surmounted with a superstructure of concrete and
large riprap. Spur dikes are composed, of cribwork of round piling
filled with willows and stone, or with a curtain of round piles along
the upstream face.
   The estimate of cost for new work, revised in 1941, is $18,000,000,
exclusive of amounts expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $415,000 for a
channel width of 500 feet and $680,000 for a width of 1,000 feet.
   The existing project for Southwest Pass was authorized by the
following river and harbor acts:

         Acts                            Work authorized                                 Documents


June 13, 1902   -_-------For a navigable channel of 35-foot depth, the         H. Doc. No. 329, 56th Cong.,
                           details of the work subject to modification at        1st sess., and Annual Re-
                           the discretion of the Secretary of War.              port, 1900, p. 2287.
May 28, 1908-          _ Dredging shoals between Head of Passes and            Specified in act.
                           Cubits Gap.
Mar. 3, 1900           - Provision made for increasing the plant by the            Do.
                           addition of a large dredge.
Authority of Secretary   Further contraction of the lower mile of the jetty    Interim report of board on
of War, Oct. 31, 1934.    channel to a width of 1,420 feet by means of          revised plan for navigation
                           dikes, and removal of the sill across the head of     structures, Cubits Gap to
                           South Pass.                                           the mouths of the Passes,
                                                                                 Oct. 20, 1934.
             RIVERS        AND HARBORS-NEW                    ORLEANS,           LA.      DISTRICT          709

          Acts                              Work authorized                                  Documents
                                                                                 i




Authority of Secretary     Spur dikes at the head of Southwest Pass and the          Second interim report of
of War, Sept. 20, 1935.    construction of new dikes and extension of                 board on revised plan for
                            existing dikes on the east bank of the Mississippi         navigation structures, Cu-
                            River at Pilottown, La.                                    bits Gap to the mouths of
                                                                                       the Passes, July 12, 1935.
Authority of Secretary     Additional spur dikes at the head of Southwest            Final report of board on
of War, July 22, 1936.     Pass and construction of new dikes and exten-              revised plan for navigation
                            sion of existing dikes in the lower jetty channel,         structures, Cubits Gap to
                            Southwest Pass.                                            the mouths of the Passes,
                                                                                       Dec. 20, 1935.
Authority of Secretary     Dredging in Mississippi River between Cubits              Interim report of board of
of War, June 30, 1938.     Gap and Head of Passes to bottom elevation                 officers appointed to de-
                            of -55 feet and construction of bank control               termine what work may
                            structures and channel correction dredging in              be advisable to complete
                            Southwest Pass below mile 10.                              the existing project for
                                                                                       Southwest Pass, Missis-
                                                                                       sippi River * * *,dated
                                                                                       June 10, 1938.


  For latest published map see Annual Report for 1920, p. 2372.


   (b) South Pass.-The existing project authorized James B. Eads
and associates to construct such permanent and sufficient jetties and
auxiliary works as are necessary to secure and maintain for a period
of 20 years through the pass a channel 26 feet in depth and not less
than 200 feet wide at the bottom and having through it a central
depth of 30 feet, without regard to width; at the termination of the
maintenance period the channel to be maintained by the United
States; construction and maintenance of sill and submerged deflecting
dikes across head of South Pass and maintenance of sill across Pass a
Loutre, removal of west dike, and construction of submerged and
spur dikes at Head of Passes; for dredging a channel 35 feet deep,
no width specified, through the shoals in the river between Cubits
Gap and Head of Passes, 31/2 miles; and for a seaward extension of
the west jetty at mouth of pass; removal of false point at the head
of South Pass to elevation minus 45 feet and revetting new bank line.
The east jetty foundation is 12,070 feet long. Inner east jetty is
11,170  feet long. The west jetty is 7,820 feet long. Inner west jetty
is 790 feet long. The jetties are composed of a substructure of brush
mattresses surmounted by a superstructure of concrete. Auxiliary
works are spur dikes and inner jetties, which are composed of a crib-
work of round piling filled with willows and stone.
   The plane of reference is mean low water. Variation of water
surface is 16 inches at the mouths and 10 inches at the heads of the
passes, due to tides. The extreme range of tide at the mouths of
the passes is 28 inches.
   The amount paid James B. Eads and associates was $8,000,000,
being the total cost of new work. The latest (1928) approved esti-
mate for annual cost of maintenance is $150,000.
710         REPORT         OF CHIEF          OF ENGINEERS,               U.   S.    ARMY,     1942


  The existing project for South Pass was authorized by the follow-
ing river and harbor acts:

    Acts                          Work authorized                                      Documents



Mar. 3,1875       Authorized James B. Eads and associates to create
                   and maintain a wide and deep channel.
Mar.   3,1879
June   6, 19001   For maintenance by the United States and the                Do.
                   appropriation of not exceeding $100,000 annually
                   for that purpose.
May 28, 1908      For dredging in the river_                                  Do.
                  Removal of west dike and construction of spur           Report by Board of Engineer officers
                   dikes and bank revetment at Head of Passes.              (Annual Report 1916, pp. 2420-2426).
Authority of      Removal of the sill across the head of South Pass...    Interim report of board on revised
  Secretary of                                                              plans for navigation     structures,
  War, Oct.                                                                 Cubits Gap to the mouths of the
  31, 1934.                                                                 Passes, -Oct. 20, 1934.
June 26,1934      For continuing maintenance operations with              PermanentAppropriations Repeal Act,
                    funds from regular annual War Department
                    appropriations.
Authority of      Improvement at the head of South Pass by re-            Interim report of board of officers ap-
Secretary of       moval of the false point at this locality to a          pointed to determine what work
War, June          bottom elevation of at least minus 45 feet, in-         may be advisable to complete the
30, 1938.          eluding revetment of the new bank line.                 existing project for Southwest Pass,
                                                                            Mississippi River * * *, dated
                                                                            June 10, 1938.


  1 Emergency Act.

  For latest published map see H. Doc. No. 215, 76th Cong., 1st sess.


  Prior to the fiscal year 1936, the projects Southwest Pass, Missis-
sippi River, La., and South Pass Channel, Mississippi River, La.
(Maintenance), were reported upon as separate projects.
  Recomme ed modifcations, of project.-Under date of February
25, 1939, the Chief of Engineers recommended that the existing proj-
ects for Mississippi River, Baton Rouge to New Orleans, and for
Southwest Pass and South Pass, Mississippi River, be modified and
combined, and a project covering the Mississippi River from New
Orleans to the Head of Passes be added thereto, to provide a single
project, Mississippi River, Baton Rouge to the Gulf of Mexico, with
channel dimensions as follows:

                                                                                          Depth
                                                                                        (mean low       Width
                                                                                          Gulf)

                                                                                            Feet         Feet
Baton Rouge to New Orleans -----..                        __   _         -_   _35                             500
Port limits of New Orleans_-                                                                       35      1, 500
New Orleans to Head of Passes__                                                                    40      1,000
Southwest Pass-           -        -                ---                                            40         800
Southwest Pass Bar Channel--                                                                       40         600
South Pass_ _____-_                                                                                30         450
South Pass Bar Channel_--                                                                          30         600



  The estimated cost for new work is $4,200,000, and $250,000 annu-
ally for maintenance, all in addition to amounts now authorized for
existing projects (H. Doc- No. 215, 76th Cong., 1st sess.).
          RIVERS       AND HARBORS-NEW          ORLEANS,   LA.,   DISTRICT       711
   Terminal facilities.-The Board of Commissioners of the Port of
New Orleans owns and operates the majority of the terminal facilities
of the port of New Orleans.
   All public port facilities are served by paved roadways and also
by the Public Belt Railroad, municipally owned and operated, which
connects with all 12 trunk lines entering New Orleans.
   There is one ship-side grain elevator with a total storage capacity
of 2,622,000 bushels.
   The board has constructed an Inner Harbor Navigation Canal.
The canal connects the Mississippi River with Lake Pontchartrain
and has a depth of 30 feet, referred to mean low Gulf level, and
bottom widths of from 125 to 300 feet.
   The dock board has constructed, on the Inner Harbor Navigation
Canal, a quay wharf of reinforced concrete. The wharf is 265 feet
wide by 2,400 feet long and is served on the front and rear by the
Public Belt Railroad and suitable city streets.
   Among other important port facilities at New Orleans may be
mentioned five floating drydocks, the largest having a capacity of
10,000 tons, and the public coal and bulk commodity handling plant.
   There are four railroad terminals on the Mississippi River, with
13,850 linear feet of wharves, of which 11,920 linear feet are covered
with sheds, affording 1,858,065 square feet of area.
   Most of the port's wharves are covered with transit sheds, afford-
ing an area of over 7,500,000 square feet.
   The facilities of the port of New Orleans are considered adequate
for its commerce. (For further details see Port Series No. 5, Corps
of Engineers.)
   Operations and results during fiscal year.-(a) Southwest Pass.-
New work consisted of the dredging of 1,133,285 cubic yards of mate-
rial from a 48- by 400-foot channel between mile 10.5 and mile 20.2, by
contract, for channel alinement.
   Maintenance consisted of the dredging of 915.299 cubic yards of
material by the U. S. hopper dredge Benyaurd from the bar and jetty
channels, and 1,082,565 cubic yards from the Head of Passes; repair
and maintenance by hired labor of existing spur dikes, bulkheads, out-
lets, revetments and banks of the pass, and conducting hydraulic in-
vestigations, channel surveys, and model tests. Stone was reset and
excessive voids were filled with salvaged stone on east jetty. Test piles
were driven and loaded by United States plant and hired labor for the
United States Navy section base.
   Dolphins for United States Coast Guard navigation lights were
erected. Six survey towers were constructed along the bank of Pass
a Loutre.
Costs were as follows:
    New work by contract: Dredging -------------------                  _ $84, 194. 67
    New work by hired labor : Model studies----------------_       __      14, 779. 98
      Total new work------------------------------------------98, 974. 65

Maintenance by hired labor:
    Dredging -154------------------------154,                                 868. 57
    Maintenance and repair of dikes, bulkheads, and other structures_ 20, 761. 81
    Repair of east jetty---------------------_                          1, 605. 88
    Examination and surveys of channels and structures                 51, 032. 37
    Hydraulic surveys and investigations---                            52, 162. 35
      Total maintenance-------------------                            280,430.98
712           REPORT      OF CHIEF OF ENGINEERS,                         U.       S. ARMY,        1942

   Additions and improvements made to Burrwood shore plant and
facilities included the raising of cisterns by United States plant and
hired labor, in connection with the raising of residences by contract;
reroofing the porches of 2 houses; construction of wash sheds for 6
houses; and reroofing 11 residences, all by Government plant and
hired labor.
   (b) South Pass.-Maintenance and repair, by United States plant
and hired labor, of outlets, revetments, and banks of South Pass were
performed during the fiscal year, at a cost of $19,739.72.
   Total costs for the combined project (Southwest Pass and South
Pass) were $399,145.35, of which $98,974.65 was for new work and
$300,170.70 for maintenance; total expenditures were $623,967.43.
   (c) Hydraulic surveys, investigations, and studies begun during the
fiscal year 1938 continued through 1942. Data obtained included com-
plete hydrographic surveys of Southwest Pass and South Pass and
the river below Wilder Flats prior to beginning of flood, at crest of
flood, and at end of flood; slope of water surface at rising and falling
stages from Wilder Flats to the Gulf; continuous water-level records
at lower end of each pass, in the Gulf at end of each pass, at Head of
Passes, at Wilder Flats, and controlling points throughout the passes;
discharge measurements in each of the three main passes, and gagings
of minor outlets; salinity observations on the six minor and three
major passes; investigations of sand movement; soundings by Super-
sonic Depth Finder of four longitudinal ranges; analyses of the ma-
terials at the bottom from samples obtained; and construction and
operation of a model at the United States Waterways Experiment
Station for testing new work plans and studies for reduction of
maintenance. A hydrographic survey was made of Pass a Loutre
and periodic surveys of South and Southwest Pass Bar Channel and
at the head of the main passes.
   Average discharges of each of the three main passes in percentages
of the total discharge of the river at Head of Passes during the flood
cycles are as follows:

                        1933     1934 1     1935      1936      1937    1938 2     1939 2   1940 2    1941 3 .   1942


Southwest Pass .        40. 25    40. 73    39. 96    37. 91   39. 52    38. 57    36. 62    36. 31    38. 03     37. 20
South Pass----
Pass a Loutre_-
                   -    17. 27
                        42. 48
                                  17. 16
                                  42. 11
                                            17. 31
                                            42. 73
                                                      18. 07
                                                      44. 02
                                                               17. 63
                                                               42. 85
                                                                         17. 99
                                                                         43. 44
                                                                                   18. 80
                                                                                   44. 58
                                                                                             17. 29
                                                                                             46. 40
                                                                                                       16. 66
                                                                                                       45. 31
                                                                                                                  17. 04
                                                                                                                  45. 76

      Total   -        100.00    100. 00   100. 00   100. 00   100.00   100.00     100.00   100.00    100.00     100.00

  1 Due to low river stages that existed during the 1934 flood cycle, these observations were probably
influenced by wind and tide to a greater extent than during other years.
  2 Discharge determined simultaneously for all 3 passes.
  3 Data based on 4 discharge observations during flood stages, which lasted only 1 month during the fiscal
year 1941.

   Conditionat end of fiscal year. -(a) Southwest Pass.-The existing
project was 95 percent complete. The jetties were completed to
present length in 1921. East jetty is 25,400 feet long. The upstream
portion is protected by a sand beach so that maintenance is necessary
on only about 10,150 feet on the outer end. West jetty is 19,960 feet
long. The concrete cap is ingood condition, but the outer end is low.
The upper end is protected by accretion formed since its construction,
and maintenance is required on only the outer 14,650 feet. Longitu-
dinal inner bulkheads of creosoted-timber piling were completed in
            RIVERS       AND HARBORS-NEW                     ORLEANS,         LA.,    DISTRICT         713
1923 to lengths of 22,822 feet and 15,080 feet on the east and west sides,
respectively, of the lower jetty channel,
   During the period 1908-23 mattresses were added to the sill at the
head of Pass a Loutre, mattress sills were placed across Cubits Gap
and The Jump, 11 outlet bayous in the pass were closed, the mattress
sill across Southwest Pass was removed, 53 spur dikes were constructed
in the lower 9 miles of the pass, and 5 spur dikes and a submerged de-
flecting dike were built at the head of the passes. During the fiscal
years 1935 to 1940, 26 new spur dikes were constructed and 19 existing
dikes were extended to contract the pass to a uniform width of 1,420
feet from mile 10.15 below Head of Passes to mile 20.09 at the Gulf of
Mexico. In the fiscal years 1936 and 1937, 3 new spur dikes and exten-
sions to 3 existing dikes were constructed on the left (east) bank of the
river near Pilottown at Head of Passes, and 8 short spur dikes were
constructed along the east side of the pass adjacent to the West Head-
land Dike which separates Southwest Pass and South Pass.
   During the fiscal years 1939 and 1940, the east jetty was restored to
effective grade and cross-section over a total length of 4,570 feet after
recent major deterioration due to settlement and to storm action.
However, in May 1942, an explosion, attributed to enemy action, oc-
curred at east jetty, damaging about 100 feet of concrete jetty between
stations 245 + 95 and 246+97, and displacing sections of the concrete
cap approximately 5 feet riverward.
   During the fiscal years 1941 and 1942, dredging of 13,622,582 cubic
yards of material from a 48- by 400-foot channel to correct alinement
between mile 10.5 and mile 20.2 was performed by contract, and
45,834.55 tons of stone were placed in repairing and stabilizing the
east and west jetties of Southwest Pass and the inner east jetty at
South Pass.
   All structures are in good condition with exception of dikes between
bulkheads and jetties, which, are no longer needed; and certain of the
spur dikes which have served the purposes intended and have become
buried in the accretions they were designed to produce; and the dikes,
jetties, and bulkheads which require periodic renewal of unserviceable
piling, and repair and maintenance due to settlement. Channel con-
ditions on June 30, 1942, were as follows:

                                                                             35-foot channel
                                                            Length of     --              ---       Central
                                                             channel     Minimum        Average     depths
                                                                            width        width

                                                             Miles          Feet         Feet        Feet
Entrance channel into head of the pass__-_
                                       .                          1.0          800         1, 200             38
Through pass from head to sea end of jetties   .....-..--        19. 4          525           800             40
Through bar channel at mouth of pass      _                        .8           750        1, 000             40



   Throughout the length of the pass a 35-foot channel with an aver-
age width of 800 feet and a least width generally of not less than 525
feet was maintained during the year. Channel-correction dredging
at the head of Southwest Pass during 1940 opened a new channel
approximately 350 feet wide with depths of 42 to 45 feet on the west
side of the navigation channel and maintenance dredging provided a
navigable channel 650 feet wide with depths of 35 to 45 feet at the head
714    REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1942

of the pass. Channel-correction dredging in Southwest Pass during
the year provided a channel approximately 400 feet wide with a depth
of 50 feet between mile 10.5 and mile 20.2. With the exception of the
lower mile which shoaled to approximately 42 feet, the channel main-
tained itself satisfactorily.
   The work remaining to be done to complete the project consists of
dredging for channel rectification and possible construction of addi-
tional contraction works.
   (b) South Pass.-Improvement begun by James B. Eads in 1875
comprised east and west jetties at the mouth, with lengths of 12,070
and 7,820 feet respectively; 36 spur dikes between the jetties; 2 mat-
tress sills and various dikes at the head of passes; and dredging the
channel. These works were completed on July 8, 1879, when the
20-year period of maintenance by contract was begun. Two side out-
lets were closed and spur dikes were built at 2 locations in South Pass.
Inner east and west jetties, with lengths of 11,170 and 4,710 feet,
respectively, were completed in 1886. The Eads contract ended Janu-
ary 28, 1901.
   Since the latter date the pass has been maintained by the 'United
States. The work done includes a shoreward extension of 872 linear
feet to inner east jetty; placing a mattress sill across the head of
South Pass, which was removed in 1935; an upstream extension 1,300
feet long, of the headland dike between South and Southwest Passes;
sinking of 232,742 square yards of mattress for bank-protection pur-
poses at the head of the Passes; construction of spur dikes along the
left bank above the head of passes; and placing of submerged deflect-
ing dike across the head of Pass a Loutre.
   The inner east jetty was repaired and capped with concrete to
elevation plus 6.0 mean Gulf level in 1939, for a distance of 5,440
feet from its outer end, and the east jetty outer longitudinal dike was
placed in good condition by repairing it for a distance of 4,300 linear
feet from its outer end in the fiscal year 1940. Inner west jetty was
also placed in good condition in 1940 by repairing 2,700 feet from its
outer end. During the fiscal year 1941 work on the inner east jetty
consisted of placing 1,139.85 tons. of stone at the outer end of the
jetty.
   A stable channel in excess of project dimensions was available
throughout the length of the pass during the fiscal year without dredg-
ing or changes in the control works. Controlling channel conditions
on June 30, 1942, were 30 feet deep over a width of 800 feet on the
bar channel at the Gulf entrance to the pass.
   The total cost under the existing combined project (Southwest Pass
and South Pass) to the end of the fiscal year was $43,302,868.84, of
which $8,765,000 was for South Pass and $15,826,225.65 was for South-
west Pass; a total of $24,591,225.65 was for new work and $18,711,643.19
was for maintenance; total expenditures have. been $43,782,856.64.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $1,417,434.79, including accounts receivable, plus undis-
tributed deferred charges of $64,589.42, and less impounded funds of
$45,000, a total of $1,437,024.21, will be applied as follows:
         RIVERS AND HARBORS--NEW ORLEANS,                                   LA.,   DISTRICT           715
Accounts payable June 30, 1942____________________________                                  $14, 796. 48
New work:
    By leased dredge:
        Southwest Pass Channel dredging between
          miles 9.25 and 20.25 below Head of Passes.
          Sept. 1 to Dec. 30, 1942------------------ $345, 800. 00
    Hired labor:
        Completion of model test and Report on
           Passes of the Mississippi River by U.                   S.
          Waterways Experiment Station, July 1 to
          Oct. 30, 194 __________________________                            9, 113. 61
    Contract :
       Extensions to dikes 20.09L, trail dike 20.09L,
          and construction of new dike 20.09R              .---             30, 000. 00
       Construction of permeable pile dikes in Head
           of Passes area _______________-                                 455, 000. 00
        Channel correction dredging in Head of
         Passes area to assist action of proposed pile
           dikes_______________                 ________---__ ____-        169,000.00

                 Total, new work ______________                __________________         1, 008, 913. 61
Maintenance :
    By Government plant and hired labor:
        Dredging by United States hopper dredge
          Benyaurd in lower jetty and bar channel
          Southwest Pass, Bar Channel, South Pass
          and Head of Passes, as required, July 1-31,
          1942, and Dec. 1, 1942, to May 31, 1943_ __ $210, 000. 00
        Raising concrete cap on outer end of west
          jetty, Southwest Pass, July 15 to Nov. 15,
           1942 _         _--------____________                             75, 000. 00
        Repairs to east jetty, Southwest Pass, and
          to dikes, bulkheads, outlets, revetments,
          and other structures, July 1, 1942, to June
           30,    1943 --__ _____-----------_              _                37, 000. 00
         Hydraulic studies and observations and hydro-
           graphic surveys, July 1, 1942, to June
           30, 1943 _____________________-___                               40,000. 00
        Routine channel surveys and miscellaneous
           examinations, July 1, 1942, to June 30,
           1943------------------------------------                         35, 000. 00
    Addition and betterments to Burrwood Reserva-
      tion and shore plant between July 1, 1942, and
      June 30, 1943_--------------------------------                        16, 314. 12

        Total, maintenance-----------------------                                           413, 314. 12
        Total, new work and maintenance                                                      437, 024. 21
                                                                                          1----------------------,
  The additional sum of $4#,5,000 can be profitably expended during
the fiscal year 1944, as follows:
Maintenance :
    By Government plant and hired labor:
        Dredging by U. S. hopper dredge Benyaurd at Southwest Pass,
          lower jetty channel, South Pass Bar and Head of Passes as
          required Dec. 1, 1942, to May 31, 1943_      ___
                                                    -----------------    $180, 000
        Repair and maintenance of banks of passes, jetties, dikes, out-
         lets, revetments and other structures during fiscal year, as
          required_---------------------------------------------- 150, 000
        Examinations, hydrographic and channel surveys, observation
           studies, etc. during fiscal year_____________________________   75, 000
        Additions, betterments, and repairs to Burrwood Reservation
          and shore plant during fiscal year_______________________        20, 000
             Total -------------------------                      ------     -_                  425, 000
716         REPORT OF CHIEF OF ENGINEERS, U.                                               S. ARMY,                 1942

                                       Cost and financial summary
Cost of new work to June 30, 1942_--_--                                    __-    _____--------                  $26,321, 214. 18
Cost of maintenance to June 30, 1942__----                                   -          -__________-1             18, 711, 643. 19

      Total cost of permanent work to June 30, 1942------------                                                     45, 032, 857. 37
Undistributed costs June 30, 1942_------------------                                                                    493, 871.29

      Net total cost to June 30, 1942___
                                       -------------------                                                          45, 526, 728. 66
Plus accounts receivable June 30, 1942------------------------                                                               912.99

      Gross total costs to June 30, 1942------------------------45,                                                       527, 641. 65
Minus accounts payable June 30, 1942-__-------------------                                                                 14, 796. 48

     Net total expenditures______-----------------                                             __                145, 512, 845. 17
Unexpended balance June 30, 1942---                                                                           -       416, 521. 80
                                                                                                                   1------------
                                                                                                                   1,

          Total amount appropriated to June 30, 1942______________                                               146, 929, 366. 97

   Fiscal year ending June 30               1938                    1939                1940                 1941                     1942


Cost of new work                                   ___        $345, 162. 08        $845, 132. 85 $1, 003, 442. 74                $98, 974. 65
Cost of maintenance......_ _            $602, 657. 16          814, 975. 74         704, 863. 67     630, 133. 93                300, 170. 70
       Total cost-----... -----.         602, 657. 16        1, 160, 137. 82      1, 549, 996. 52       1, 633, 576. 67           399, 145. 35
Total expended___       _          _     904, 252. 85        1, 334, 841. 73      1, 453, 085. 99       1, 666, 255. 92           623, 967. 43
Allotted-                              1, 399, 193. 84       2, 359, 713. 84      1, 429, 586. 36       1, 151, 600. 00           916, 728. 21


Balance unexpended July 1, 1941____ ____-_____   _______                                                            $1, 123, 761. 02
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942-------------------------------------                                                             964, 200. 00

      Amount to be accounted for-----------------------------                                                        2, 087, 961. 02
Deductions on account of revocation of allotment-     --                                                                 47, 471. 79

      Net amount to be accounted for--------------------------                                                       2, 040, 489. 23
Gross amount expended ________________________ $624, 046. 93
Less reimbursements collected_--------------------         79. 50
                                                                                                                          623. 967. 43

          Balance unexpended June 30, 1942_______________                                                             1, 416, 521. 80
Outstanding liabilities June 30, 1942____________________                                                                 20, V08. 36

     Balance available June 30, 1942______________                                                                   1, 395, 522. 84
Accounts receivable June 30, 1942    _______                                                                                          912. 99

          Unobligated balance available June 30, 1942____ _                                                           1, 396, 435. 83

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 2_________________________                                                                     425, 000. 00
   1Includes $3,379,675.65 from permanent indefinite appropriations.
  2 Exclusive of available funds.

2. MISSISSIPPI RIVER BETWEEN BATON ROUGE AND NEW ORLEANS, LA.
   Location.-The Mississippi River between Baton Rouge and New
Orleans flows in a general southeasterly direction through the south-
eastern portion of the State of Louisiana. Other data are as follows:
                                                                                         Maximum             Minimum              Average

Width..-.-........... ..............               --------------                feet               4, 700          1, 500                   2, 900
Discharge ----- -------
                    __-_ __--..                                     second-feet__          1, 557, 000 ---.........
                                                                                                               135, 000      - --.           --
Fall of water surface (approximate) -              -          - -   -_      feet__                27. 0             0. 5
Mean velocity (approximate). _ __ _.          __         _     feet per second _                   9. 0             0. 5     -   --
        RIVERS    AND   HARBORS-NEW     ORLEANS,   LA.,   DISTRICT   717

   (See Corps of Engineers, Mississippi River Commission Alluvial
Valley maps, and Donaldsonville, Mount Airy, Bonnet Carre, Span-
ish Fort, Baton Rouge, and White Castle quadrangles, and U. S.
Geological Survey maps, Gonzales, Convent, Thibodaux (northeast),
Lutcher, Garyville, LaPlace, Hahnville (northwest), Hahnville
(northeast), New Orleans (west), New Orleans (east), Chalmette,
and Belle Chasse quadrangles.)
   Previous projects.-Authorized by. the River and Harbor Acts of
June 3, 1896, and January 21, 1927. For further details see page 724
of Annual Report for 1937 and page 775 of Annual Report for 1938.
   Existing project.-This provides within the limits of the port of
New Orleans where that authority has jurisdiction over both banks
of the river, a channel depth of 35 feet and maximum width of 1,500
feet, measured from a line generally 100 feet from the face of the
left-bank wharves, but not closer, than 100 feet to wharves on the
right bank; and from the port of New Orleans to a line one-half mile
below the Louisiana Highway Commission bridge at Baton Rouge, a
distance of 132 miles, a channel depth of 35 feet and width of 500 feet.
   The estimate of cost for new work, made in 1938, was $200,000. The
latest (1938) approved estimate of cost for annual maintenance is
$89,000.
   The existing project was adopted by the River and Harbor Act
approved June 20, 1938 (H. Doc. No. 597, 75th Cong., 3d sess.), to
provide for the present project dimensions. The latest published map
is contained in the latter document.
   Recommended modifications of project.-See page 710 for recom-
mendation of the Chief of Engineers that a single project be provided
for Mississippi River, Baton Rouge to the Gulf of Mexico.
   Terminal facilities.-Modern terminal facilities were installed by
the city of Baton Rouge in 1926. A reinforced concrete dock for
deep-sea vessels 308 feet in length has a covered-shed area of approxi-
mately 20,000 square feet and is equipped with a 12-ton locomotive
crane. Attached to the downstream end of the main wharf is a float-
ing wharf boat 231 by 401/2 feet, of 2,000-ton capacity. The facilities
are served by a transfer boat and municipal terminal, having a capacity
of 40 cars per day.
   The Standard Oil 'Co. of Louisiana owns and maintains a dock
approximately 2 miles above Baton Rouge, which is the highest point
on the Mississippi River at which ocean-going vessels make regular
stops. Facilities are provided for handling oil and petroleum products
to and from vessels.
   Other private terminals for handling oil and other products are
located at points on both sides of the river between New Orleans and
Baton Rouge.
   The port facilities are considered adequate for the existing com-
merce.
   Operations and results during fiscal year.-The United States
pump barge No. 3 removed 41,000 cubic yards of material from the
channel at New Orleans Harbor; and 280,944 cubic yards were re-
moved by contract during the fiscal year for maintenance of the chan-
nel to project dimensions. Signal lights for control of river traffic in
vicinity of Algiers Point were operated during flood stages. Shoal-
     493202-43-pt. 1, vol. 1--46
718     REPORT OF CHIEF OF ENGINEERS,             U.   S.   ARMY,   1942


ing at St. Maurice wharf, New Orleans Harbor, was investigated
and removed during the fiscal year. A survey was made of Red Eye
Crossing. Total costs for the year were $34,607.38, all for mainte-
nance; total expenditures, $34,065.84.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1940. Channel of full project dimensions was dredged at
Red Eye Crossing after the 1939 flood period. Channel was also
dredged to'project dimensions within New Orleans Harbor from the
upstream end of the Bulk Commodity plant wharf to the lower end
of Toulouse Street wharf. Minor deficiencies in project dimensions
at the lower end of Dumaine Street wharf and Governor Nicholls
Street wharf were not corrected because of the presence of revetment
mattresses at these points. Existing depths opposite these locations
are adequate for present and anticipated future commerce. A natural
channel of project dimensions or greater was available throughout
the remainder of the project except within New Orleans Harbor
where maintenance dredging was required to provide project dimen-
sions.
    The normal width of channel between 35-foot contours within the
limits of the port of New Orleans varies from approximately 1,600
feet to approximately 2,400 feet. Maximum depths are approxi-
mately 110 feet. The depth of this portion of the channel varies
considerably due to deposits and scouring during high stages of the
river, and shoals develop frequently at various points during falling
and intermediate stages. Dredging is required to maintain deep
water to the wharves along the banks of the river.
    The total cost under the existing project to the end of the fiscal
year was $382,895.93, of which $184,320.99 was for new work and
$198,574.94 for maintenance; total expenditures, $382,343.24.
    Proposed operation.-The balance unexpended at the end of the
fiscal year, $191,485.87, will be applied as follows:
Accounts payable June 30, 1942____________________________                 $552. 69
Maintenance:
    By leased dredge and contract:
        Dredging in New Orleans Harbor to remove
          flood deposits at critical locations as re-
          quired during falling river stages---------- $156, 000. 00
    By hired labor and government plant:
        Dredging at Red Eye Crossing by United
          States pump barge, May 1 to June 30, 1943__    30, 000. 00
        Operation of traffic lights in New Orleans
          Harbor during high water of fiscal year
          1943 --------------------------       __        3, 000. 00
        Surveys for dredging operations in New Or-
          leans Harbor, Red Eye, and Granada Cross-
          ings, as required during fiscal year 1943___    1, 933. 18
                                                                       190, 933. 18

             Total for project______________________________           191, 485. 87
  The additional sum of $100,000 can be profitably expended during
the fiscal year 1944 as follows:
              RIVERS    AND HARBORS-NEW                     ORLEANS,              LA.,     DISTRICT                719

1Maintenance:
    By contract:
         Dredging in New Orleans Harbor to remove flood deposits at
           critical locations, as required on falling flood stages _____                                       $60, 000
    By hired labor and government plant:
        Dredging by U. S. pump barge at Red Eye Crossing, as re-
           quired on falling river stages__----------                                                           33, 000
         Operation of traffic lights in New Orleans Harbor as re-
           quired during fiscal year 1944___________________________                                             4, 000
         Surveys for dredging operations in New Orleans Harbor, Red
           Eye and Granada Crossings during fiscal year 1943________                                             3,000

                  Total for project_ _______-----------                                    -------- 100, 000

                                 Cost and financial summary

Cost of new work to June 30, 1942___________________________ $184, 320. 99
Cost of maintenance to June 30, 1942---------------------------367,     630. 04
      Total cost of permanent work to June 30, 1942 ____- ______ _551, 951. 03
Minus accounts payable June 30, 1942____- _________________-__          552. 69
      Net total expenditures_______--__   ___________-_           551, 398. 34
Unexpended balance June 30, 1942____________     _______________   191, 485. 87
            Total amount appropriated to June 30, 1942_______________                                       742, 884. 21

   Fiscal year ending June 30         1938           1939                 1940             1941                 1942

Cost of new work ...............                                       $184, 320.99
Cost of maintenance -                $1, 088. 65   $72, 322. 13          23, 977.07      $67, 668. 36          $34, 607. 38
                                                      i
                                                      i
                                                              _ 1 11                                    1
                                                                                                        i


      Total cost_                     1, 088. 65    72, 322. 13         208, 298. 06     67, 668. 36                  38
                                                                                                                34,607.
Total expended_                       1, 228. 31    74, 726. 47         182, 896. 98     90, 715.33             34, 065. 84
Allotted-                            25, 000. 00   283, 580. 39          89, 000. 00      33,684.00            140, 000.00



Balance unexpended July 1, 1941 ____________                                                            $85, 551. 71
Amount allotted from War Department Civil Appropri-
ation Act approved May 23, 1941____________________ $65, 000. 00
Amount allotted from War Department Civil Appropri-
ation Act approved Apr. 28, 1942________________     75, 000. 00
                                                                                                            140, 000. 00
            Amount to be accounted for __________________________                                           225, 551. 71
Gross amount expended_________________________                                     $36, 307. 08
Less reimbursements collected .---.                                          _       2, 241. 24
                                                                                                             34, 065. 84
            Balance unexpended June 30, 1942                             ________________________           191, 485. 87
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1                                                                                100, 000. 00
   1 Exclusive of available funds.

              3. BAYOUS LA LOUTRE, ST. MALO, AND YSCLOSKEY, LA.

  Location.-From their common head at the small settlement of
Yscloskey, Bayou La Loutre flows southeasterly for 29.4 miles to Eloi
Bay, and Bayou Yscloskey northeasterly for 2.2 miles to Lake Borgne.
Bayou St. Malo leaves Bayou La Loutre at mile 19.4, flowing north-
westerly 6.5 miles to Lake Borgne. (See U. S. Coast and Geodetic
Survey Charts Nos. 1270 and 1271, and U. S. Geological Survey Map
Yscloskey, Bayou Biloxi, Bayou Bernard, Lake Eugenie, Lake Eloi,
and Morgan Harbor, quadrangles.)
  Existing project.-This provides for a channel 5 feet deep and 40
feet wide from deep water in Lake Borgne to the shore line at the
720     REPORT     OF CHIEF OF ENGINEERS,                 U.   S. ARMY,   1942

mouth of Bayou Yscloskey; a channel 6 feet deep and 40 feet wide
from deep water in Lake Borgne through Bayous St. Malo, La Loutre,
and Eloi to deep water in Lake Eloi; and the removal of snags and
other obstructions from Bayou La Loutre between Hopedale and
Bayou St. Malo, the total length of the improvements being 30.0 miles.
The normal tidal variation is about 1 foot. Hurricane tides, 6 feet
above normal, have been reported.
   The estimated cost of new work made in 1937 is $48,000. The latest
 (1937) approved estimate for annual cost of maintenance is $8,400.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (H. Doc. No. 275, 75th Cong., 1st sess.). The latest
published map is in the project document.
   Recommended modifications of project.-Under date of June 20,
1941, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for a channel 5 feet deep and 30 feet wide
in Bayou La Loutre between Hopedale and Bayou St. Malo, at an
estimated first cost of $35,000, with $800 annually for maintenance, in
addition to the amount now required, subject to certain conditions of
local cooperation. (S. Doc. No. 116, 77th Cong., 1st sess.)
   Local cooperation.-Fully complied with.
   Terminal facilities.-None.
   Operations and results during fiscal year.-Obstructions were re-
moved from the waterway as required by United States plant and
hired labor, at a total cost of $601.33, all for maintenance. Total ex-
penditures were $600.41.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1940. On June 30, 1942, controlling depth at mean low
Gulf level was 6 feet from deep water in Lake Borgne through
Bayous St. Malo and La Loutre to deep water in Lake Eloi. Con-
trolling depth in Lake Borgne at the mouth of Bayou Yscloskey was
2.5 feet. Depths over the bars at the mouths of the bayous are sub-
ject to rapid shoaling, but navigation is possible throughout their
length.
   Total costs under the existing project have been $44,628.10, of which
$43,619.54 was for new work and $1,008.56 for maintenance. The
total expenditures have been $44,627.18.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $53.59, will be applied to minor investigation of the water-
way.
   The sum of $9,000 can be profitably expended during the fiscal year
1944 on maintenance dredging under contract and the removal of
snags and overhanging trees with hired labor and Government plant,
during the period August-September 1943.
                          Cost and financial summary

Cost of new work to June 30, 1942_-----------------________________     $43, 619. 54
Cost of maintenance to June 30, 1942___________________-------_________   1, 008. 56

     Total cost of permanent work to June 30, 1942______________             44, 628. 10
Minus accounts payable June 30, 1942______  ________________-                        .92
      Net total expenditures--------                                         44, 627. 18
Unexpended balance June 30, 1942        ---------------   __                      53. 59
      Total amount appropriated to June 30, 1942--                           44, 680. 77
             RIVERS         AND HARBORS-NEW                       :ORLEANS,                LA.,   DISTRICT           721

   Fiscal year ending June 30                 1938        1939                      1940          1941            1942


Cost of new work________________ ______________          $4, 647. 13          $38,972. 41
Cost of maintenance               .                    .
                                                      _______--        -   -$407.                        23         $601. 33
Total expended .       .-       -       -.                4, 563. 09           38, 761. 90          701. 78          600. 41

Allotted           -        -       -        ------      38, 000.00             11, 585. 00       2, 841. 77     -7, 746.00


Balance unexpended July 1, 1941-----------------------------                                                   $8, 400. 00
Deductions on account of revocation of allotment_____-----_--                                                   7, 746. 00

      Net amount to be accounted for______----------------                                                        654. 00
Gross amount expended _________---_                        -------                                                600. 41

           Balance unexpended June 30, 1942__________ _____----------                                              53. 59

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance'________________       ____      __                                                  9,000. 00
  1 Exclusive of available funds.

                                             4. BAYOU DUPRE, LA.

   Location.-Bayou Dupre has its head in the marshes 3 miles east of
the Mississippi River levee and extends east and north to its mouth in
Lake Borgne. The Lake Borgne Canal leaves the east bank of the
Mississippi River through a lock at Violet, La., and joins Bayou Dupre
3.6 miles above its mouth. (See U. S. Coast and Geodetic Survey Chart
No. 1269 and U. S. Geological Survey maps Chalmette and Martello
Castle quadrangles.)
   Existing project.-This provides for a channel 6 feet deep from the
highway bridge at Violet, La., to deep water in Lake Borgne with
widths of 80 feet in the canal and bayou and 100 feet in the lake, and a
turning basin 100 feet wide and 200 feet long at Violet, La.; the length
of the improvement being 7.3 miles. The mean range of tide in Lake
Borgne is 1.5 feet, with occasional variations, due to winds, of 2 feet;
hurricane tides of 6 feet have been reported.
   The privately owned lock at Violet has a usable length of 261 feet, a
width of 40 feet, and a depth of 6 feet over the sills. The cost of this
lock and the Lake Borgne Canal is not known.
   The estimated cost of new work made in 1937 is $52,000. The latest
 (1937) approved estimate for cost of maintenance is $5,000 annually
for the first 3 years and $3,500 annually thereafter.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (H. Doc. No. 321, 75th Cong., 1st sess.). The latest
published map is in the project document.
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-Thereis a private wharf at Violet, La., used by
the shrimp and oyster cannery, and a switch track to the Louisiana
Southern Railway. An additional area for a public terminal is set aside
tunder  the provisions of local cooperation. These facilities are con-
sidered adequate for existing commerce.
   Operations and results during fiscal year.-The stream was periodi-.
cally inspected and obstructions were removed as required, and right-
of-way monuments were established on Lake Borgne Canal by United
722          REPORT OF CHIEF OF ENGINEERS,                                 U. S. ARMY,               194:

States plant and hired labor, at a total cost and expenditure of $269.34,
all for maintenance.
   Condition at end of fiscal year.-The existing project was completed
in 1939. On June 30, 1942, there was a channel with a minimum of 6
by 70 feet from the bridge at Violet, La., to the mouth of the bayou,
and a minimum depth of 5 feet over the bar at the mouth of the bayou
at Lake Borgne. The bayou is navigable throughout its length.
   The total costs and expenditures under the existing project have
been $39,610.33, of which $38,915 was for new work and $695.33 for
maintenance.
   Proposed operations.--The balance unexpended at the end of the
fiscal year, $391.42, will be applied to the removal of obstructions by
hired labor and Government plant at such time during the year as is
required.
   The additional sum of $5,000 can be profitably expended during the
fiscal year 1944 on maintenance dredging, under contract, of the bar
channel, and the removal of shoals and obstructions from the bayou by
hired labor and Government plant during the period, November and
December 1943.
                                         Cost and financial summary
Cost of new work to June 30, 1942--------------------------------                                          $38, 915. 00
Cost of maintenance to June 30, 1942-----------------695.                                                            33
         Total cost of permanent work to June 30, 1942----------------                                      39, 610. 33

Net total expenditures-------------------------------------------                                           39, 610. 33
Unexpended balance June 30, 1942----------------                                                                391. 42
         Total amount appropriated to June 30, 1942------------------                                       40, 001. 75

    Fiscal year ending June 30              1938            1939                1940          1941             1942

Cost of new work               ____   _________    $38, 904. 70      $10. 30
Cost of maintenance_____________ ______ __.____ ______________ ______.______                  $425.99             $269. 34
Total expended ...- .. ___
                         .....      ._   -.... -...        38, 969. 57           -54.   57      425. 99            269. 34

Allotted__        -   -                                    50, 000. 00    -6,     085. 00       439. 55        -4, 352. 80



Balance unexpended July 1, 1941 --------------------------- _       _                                       $5, 013. 56
Amount allotted from War Department Civil Appropriation Act, ap-
  proved Apr. 28, 1942---------------------------------------------                                             300. 00
     Amount to be accounted for.                                                                               , 313. 56
                                                                                                             5--------------------------
Deductions on account of revocation of allotment----------------                                             4, 652. 80
         Net amount to be accounted for______ -        -____________--_                                         660. 76
Gross    amount expended -------------------------------------------                                            269. 34
         Balance unexpended June 30, 1942____________-_______--_____                                            391.42
Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -     5, 000. 00
   ' Exclusive of available funds.
        RIVERS AND HARBORS-NEW ORLEANS,              LA.,   DISTRICT   723
5. INTRACOASTAL WATERWAY, MOBILE BAY, ALA., TO NEW ORLEANS,
  LA. (INNER HARBOR NAVIGATION CANAL IN LAKE PONTCHARTRAIN
  TO LONG POINT LIGHT IN LAKE BORGNE SECTION)

  For report on this improvement, see page 638.
                        6. BAYOU BONFOUCA, LA.

    Location.-This stream rises about 5 miles north of Slidell, La., and
empties into Lake Pontchartrain 5 miles west-southwest of that town.
 (See U. S. Coast and Geodetic Survey Chart No. 1268 and Corps of
Engineers, Mississippi River Commission Alluvial Valley maps, and
Slidell and Chef Menteur quadrangles.)
    Existing project.-This provides for dedging a channel 10 feet deep
at mean low water and 60 feet wide on the bottom from Slidell to deep
water in Lake Pontchartrain, a distance of about 9 miles. The average
range of water level, due to tide, is 0.8 foot.
    The estimate of cost for new work, made in 1924, was $22,000, of which
$5,500 was contributed by local interests. The latest (1924) approved
estimate for annual cost of maintenance is $1,200.
    The existing project was adopted by the River and Harbor Act
approved January 21, 1927 (H. Doc. No. 474, 68th Cong., 2d sess.). The
latest published map is in the project document.
    Local cooperation.-Fullycomplied with.
    Terminal facilities.-All terminal facilities are at Slidell and consist
of three loading slips and three wharves, with tram-track connections
and skids for loading timber. There are also marine ways and a
graving dock. All terminal facilities are privately owned and consid-
ered adequate for present commerce.
    Operations and results during fiscal year.-The waterway was
periodically inspected and obstructions were removed, as required,
by United States plant and hired labor. The costs were $454.93,
all for maintenance. The total expenditures have been $446.06.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The controlling depths on June 30, 1942, were 10
feet through the bayou to upper end of the improvement, and 8.0
feet, mean low Gulf, over the bar at the mouth of the bayou. The
channel is in good condition. The head of navigation is at the
town' of Slidell, La., 73/4 miles above the mouth of the bayou.
    The total costs under the existing project have been $36,781.82,
of which $30,997.27 was for new work and $5,784.55 for mainte-
nance. In addition $5,500 was expended from contributed funds for
new work.       The total expenditures have been $36,772.95.
  . Proposed operations.-The balance unexpended at the end of the
fiscal year, $398.94, will be applied to the removal of snags and
overhanging trees with hired labor and Government plant at such
time during the year as is required.
    The additional sum of $5,000 can be profitably expended during
the fiscal year 1944 on maintenance dredging under contract in Lake
Pontchartrain at the mouth of the bayou during the period Febru-
ary and March 1944.
724           REPORT OF CHIEF OF ENGINEERS,                                                         U.      S.    ARMY,              1942

                                                Cost and financial summary

Cost of new work to June 30, 1942________ _________________                                                                             $30, 997. 27
Cost of maintenance to June 30, 1942______________________-                                                                               5, 784. 55

     Total cost of permanent work to June 30, 1942_____________                                                                         36, 781. 82
Minus accounts payable June 30, 1942_________________ ____8.                                                                                     87

     Net total expenditures_______-----__________-_                                                                                    ' 36, 772. 95
Unexpended balance June 30, 1942___________________________--                                                                                398.94

          Total amount appropriated to June 30, 1942 _______________                                                                   137, 171. 89


    Fiscal year ending June 30                           1938                     1939               1940                 1941                1942


Cost of new work ..-                                                             --                                  -
Cost of maintenance ..-------              -    - --------                 --____________
                                                                               .      ..                                   $140. 11
                                                                                                                 -______________               $454. 93
Total expended .        .............      ..            ...............          . .    ...   ..              . .
                                                                                                         . _.__..           140. 11              446.06

                   ---
Allotted- ...-......... - _-_           --------------          __............                            $-
                                                                                                         $500. 00         9, 640. 11         -9, 155. 00



Balance unexpended July 1, 1941--------------------------------$10, 000. 00
Amount allotted from War Department Civil Appropriation Act ap-
proved April 28, 1942___________________------                     300.00

      Amount to be accounted for________------------------                                                                              10, 300. 00
Deductions on account of revocation of allotment-_________-----                                                                          9, 455. 00

      Net amount to be accounted for ________________________-                                                                                845. 00
Gross amount expended__ ________________---__    ___--                                                                           -            446. 06

           Balance unexpended June 30, 1942_____________ ______-__-                                                                           398. 94

Amount that can be profitably     expended in fiscal year ending June 30,
                         2- - - - - - - -
1944, for maintenance ______________                _______      ___                                                                       5, 000. 00
   SIn addition $5,500 expended from contributed funds for new work.
   2 Exclusive of available funds.


                                               7. BAYOU LACOMBE, LA.

  Location.-Bayou Lacombe rises in the southeastern portion of St.
Tammany Parish and flows in a southerly direction into Lake Pont-
chartrain about 12 miles east of the Rigolets. (See U. S. Coast and
Geodetic Survey Chart No. 1269 and Corps of Engineers, Mississippi
River Commission Alluvial Valley maps, and Slidell quadrangle.)
  Existing project.-This provides for a channel 60 feet wide and 8
feet deep through the entrance bar in Lake Pontchartrain and the
removal of snags and overhanging trees from the portion of the bayou
between the mouth and the fish hatchery, located about 8.2 miles above
the mouth. Under ordinary conditions the mean range of tide is 0.8
of a foot. The variation due to winds is from 3 to 6 feet.
  The estimate of cost for new work, revised in 1935, was $5,600 with
$900 annually for maintenance.
  The existing project was adopted by the River and Harbor Act of
August 30, 1935, which provides for dredging and snagging (Rivers
and Harbors Committee Doc. No. 53, 72d Cong., 2d sess.). The latest
published map is in the project document.
  Teminal facilities.-The wharves which were previously used at
the sawmills have deteriorated badly. There are no other terminal
             RIVERS       AND HARBORS-NEW                      ORLEANS,         LA.,   DISTRICT           725
facilities along the bayou; however, the condition of the banks is such
that handling facilities could be constructed at reasonable cost as
required.
   Operations and results during fiscal year.-The waterway was pe-
riodically inspected and obstructions were removed, as required, by
United States plant and hired labor. The total costs were $398.65,
all for maintenance. The total expenditures were $382.58.
   Condition at end of fiscal year.-The existing project was completed
in 1938. From mile 0 at its mouth to mile 8.2 the bayou ranges from
70 to 200 feet in width and 8 to 33 feet in depth. The controlling
depths on June 30, 1942, were 8 feet through the bayou to the end of
the improvements and 5.5 feet mean low Gulf over the bar at its
mouth. The bayou is not navigable above mile 8.2.
   The total costs under the existing project have been $5,409.80, of
which $4,715.91 was for new work and $693.89 for maintenance. The
total expenditures have been $5,393.73.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $117.42, will be applied to removal of obstructions from
the stream by hired labor ind Government plant at such time during
the year as is required.
   The sum of $5,000 can be profitably expended during the fiscal year
1944 on maintenance dredging under contract of the bar channel in
Lake Pontchartrain during August 1943.
                                    Cost and financial summary

Cost of new work to June 30, 1942______________________________                                     $4, 715. 91
Cost of maintenance             to June 30,         1942__________ _______________                     693. 89

      Total cost of permanent work to June 30, 1942______________                                    5, 409. 80
Min'us accounts payable June 30, 1942__________________________                                          16. 07

     Net total expenditures______--- ____ ______-___                                                 5, 393. 73
Unexpended balance June 30, 1942 ----______-    ________-__-__-                                         117.42

           Total amount appropriated to June 30, 1942________________                                5, 511. 15


   Fiscal year ending June 30          1938             1939            1940           1941            1942

Cost of new work_                     $4,715. 91
Cost of maintenance______________                                  ______________       $295. 24         $398. 65
Total expended                         4, 765. 97       -$50. 06                         295. 24          382. 58
Allotted                               5, 600. 00       -884. 09         $500. 00      2, 095. 24     -1, 800. 00


Balance unexpended July 1, 1941_                                                                    $2, 300. 00
Deductions on account of revocation of allotment___------------                                      1, 800. 00

      Net amount to be accounted for______________----------                                           500. 00
Gross amount expended___----- ____-------                                                              382. 58

           Balance unexpended June 30, 1942___ ________----------__--117. 42
Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance 1'------- ------  __---- _------------                                        5, 000. 00
    Exclusive of available funds.
726           REPORT OF CHIEF OF ENGINEERS,                          U.    S. ARMY,       1942

                   8. CHEFUNCTE RIVER AND BOGUE FALIA, LA.

  Location.-The Chefuncte River rises in the upper portions of
Tangipahoa and Washington Parishes, La., and flows southerly into
Lake Pontchartrain, opposite New Orleans. (See U. S. Coast and
Geodetic Survey Chart No. 1269 and Corps of Engineers, Mississippi
River Commission, Alluvial Valley maps, and Covington quadrangle.)
  Previous projects.-Authorized by the River and Harbor Act of
June 10, 1872. For further details of previous projects see page 731,
Annual Report for 1913, and page 783, Annual Report for 1938.
  Existing; project.-This provides for a channel 8 feet deep at mean
Gulf level from that depth in Lake Pontchartrain via Chefuncte River
and Bogue Falia to Washington Street, Covington, La. The total
length of improvement is 14 miles. Under ordinary conditions the
mean range of tide at the mouth is about 10 inches, and near Coving-
ton about 3 inches, and the extreme range about 14 inches and 5 inches,
respectively. The variation of water surface in the upper Chefuncte
River and Bogue Falia, due to floods, is about 8 feet; that in the lower
Chefuncte River at Lake Pontchartrain, due to winds, is about 3 feet.
  The estimate of cost for new work, revised in 1927, was $8,460, ex-
clusive of amounts expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $2,000.
  The existing project was authorized by the following river and
harbor acts:

       Acts                      Work authorized                                    Documents


Mar. 3, 1881      Dredging of bar at mouth of Chefuncte River in     H. Ex. Doc. No. 54, 46th Cong., 2d
                    Lake Pontchartrain and dredging and removal           sess., and Annual Report, 1880, p.
                   of obstructions in Chefuncte River and Bogue           1181.
                    Falia to Covington, La. Width and depth not
                   specified.
July    3, 1930   For a definitely stated project with the present   Rivers  and    Harbors    Committee,
                   project dimensions.                                 Doc. No. 2, 70th Cong., 1st sess.


  For latest published map see Annual Report for 1916, p. 2437.


   Terminal facilities.-There are no terminal facilities on the Bogue
Falia. On the lower Chefuncte, wharves used in connection with the
boat yards have been constructed at Houltonville and Madisonville,
and these, in addition to minor wharves constructed by owners of
pleasure boats, are adequate for navigation needs. On both waterways
additional sites are available if needed.
   Operations and results during fiscal year.-Maintenance dredging
consisted of the removal of 24,207 cubic yards of material from the bar
in Lake Pontchartrain, at the mouth of the Chefuncte River, by con-
tract. Periodic inspections of the waterway were made and obstruc-
tions were removed, as required, by United States plant and hired
labor. Preliminary surveys, investigations, studies, and preparations
for maintenance dredging were made by hired labor forces.
   Total costs for the year were $8,595.81, all for maintenance, of which
$7,785.98 applied to contract work and $809.83 to work by United
States plant and hired labor. The total expenditures have been
$8,644.26.
              RIVERS AND HARBORS-NEW                                    ORLEANS,                 LA.,     DISTRICT             727

   Condition at end of fiscal year.-Due to maintenance work under the
previous project, the work required by the project adopted in 1930 was
completed in 1929. The obstructions in the Chefuncte River and
Bogue Falia were originally removed in 1886, and the channel through
the bar was originally dredged in 1903. The controlling depths on
June 30, 1942, were 9 feet, mean low Gulf, over the bar at the mouth of
the Chefuncte River, 15 feet in the river and in the Bogue Falia to
mile 13, and 2.0 feet from mile 13 to Washington Street, Covington,
La. The channel to mile 13 is in good condition, and from mile 13
to Washington Street, Covington, La., is in poor condition and is
nonnavigable above this point.
   The total costs under the existing project have been $67,369.77, of
which $19,342.24 was for new work and $48,027.53 for maintenance;
the total expenditures were $67,365.12.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $521.77, will be applied to the removal of snags and over-
hanging trees with hired labor and Government plant during March
1943.
   The additional sum of $5,000 can be profitably expended during the
fiscal year 1944 on maintenance dredging under contract of the bar
channel in Lake Pontchartrain during the period July-August 1943.
                                         Cost and financial summary

Cost of new work to June 30, 1942-----------------------------$24y 563. 24
Cost of maintenance to June 30, 1942111 111111111111111   1___   48,027. 53
         Total cost of permanent work to June 30, 1942                                      --          _____          72, 590. 77
Minus accounts payable June 30, 1942------------------------------                                                             4. 65
         Net total expenditures _        _-----------------------------_                                               72, 586. 12
UJnexpended         balance June 30, 1942---------------------------------                                                 521.77
         Total amount appropriated to June 30, 1942                                     ------------------             73, 107. 89

    Fiscal year ending June 30                   1938            1939               1940                  1941            1942

Cost of new work .....                ....       .......       -                    ....         .I-                       -
Cost of maintenance                           ___________ .. _____________   ______________                $474. 13       $8, 595.81
Total expended _ - .                                                                    -. --.               421.03        8,644.26
Allotted --   --   - - -   -..
                             ------      --             -   I-                            $500           18,300. 00      -9, 212. 94


Balance unexpended July 1, 1941-------------------------                                                              $18, 378.97
Amount allotted from War Department Civil Appropriation Act ap-
proved April 28, 1942-------------------------------------------                                                         300. 00
     Amount to be accounted for-------------------------------                                                         18, 678. 97
Deductions on account of revocation of allotment--------------------                                                    9,512. 94
         Net amount to be accounted for _                                    --------                                   9, 166. 03
Gross amount expended-------------                                                                                      8, 644. 26
      Balance unexpended June 30, 1942 --------------------------                                                         521. 77
Outstanding liabilities June 30, 1942-------------------------------                                                      200. 00
         Balance available June 30, 1942_--------------------- ------
                                                                   __                                                     321. 77
Amount that can be profitably expended in fiscal year ending June 30,
1944 for maintenance x-- ----------------------        ----                                                            5, 000. 00
2 Exclusive of available funds.
728        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                  1942

                                9. TANGIPAHOA RIVER, LA.

   Location.-This river has its origin in the State of Mississippi and
flows in a generally southerly direction about 110 miles to Lake Pon-
chartrain, La. (See U. S. Coast and Geodetic Survey Chart No. 1269
and .Corps of Engineers, Mississippi River Commission Alluvial
Valley maps, and Ponchatoula quadrangle.)
   Existing project.-This provides for improvement, without dredg-
ing, by removing overhanging trees, snags, and obstructions for a
distance of 531/2 miles above the mouth. The variation of the water
surface, due to freshets, is from 3 to 20 feet in the upper reaches, from 2
to 5 feet in the lower reaches, and from 2 to 4 feet in the lower reaches
due to tides and winds.
   The estimated cost of new work, made in 1878, was $10,700. There
is no approved estimate of cost for annual maintenance.
   The existing project was authorized by the following river and
harbor acts:

    Acts                       Work authorized                                 Documents

June 10,1872    Improvement without dredging by removing            H. Ex. Doc. No. 54, 46th Cong., 2d
                  overhanging trees, snags, and obstructions to      sess., and Annual Report,       1871,
                  navigation from Wells to the mouth.                p. 553.
June 14, 1880   Present project________________________________     Annual Report, 1879, p. 946.

  For latest published map, see H. Doc. No. 257, 66th Cong., 1st sess.


   Recommended modifications of project.-The project has been rec-
ommended for abandonment (H. Doc. No. 467, 69th Cong., 1st sess.).
   Terminal facilities.-None.
   Operations and results during fiscal year.-Obstructions were re-
moved from the waterway, as required, by United States plant and
hired labor. Total costs for the year were $560.11, all for mainte-
nance; total expenditures, $564.20.
   Condition at end of fiscal year.-This project was completed in 1884.
The controlling depths on June 30, 1942, were: Over the bar at the
mouth, 2 feet; mile 0 to mile 8, 11 feet; mile 8 to mile 9, 5 feet; mile 9
to mile 14, 2 feet; and nonnavigable above this point. Except from
mile 0 to mile 9, the channel is in poor condition.
   The total costs were $22,552.85, of which $11,500 was for new work
and $11,052.85 for maintenance; total expenditures, $22,545.59.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $47.15, will be applied to minor investigation of the water-
way.
   The sum of $1,000 can be profitably expended during the fiscal year
1944 in removing snags and overhanging trees with hired labor and
Government plant during the period September to October 1943.
                                  Cost and financial summary
Cost of new work to June 30, 1942_   _   -----------                                       $11, 500. 00
Cost of maintenance to June 30, 1942                                             __          1,052. 85
                                                                                            1----------------
      Total cost of permanent work to June 30, 1942                       --                22, 552. 85
Minus accounts payable June 30, 1942__--                                                            7. 26
     Net total expenditures_ __    -----        -------                                     22, 545. 59
Unexpended balance June 30, 1942---------------_
                                 .    ..                                                         47. 15
     Total amount appropriated to June 30, 1942--       -----                     ___       22, 592.74
              RIVERS         AND HIARBORS--NEW                              ORLEANS,                  LA.,    DISTRICT          729

    Fiscal year ending June 30                1938                   1939                1940                 1941           1942


C ost of new w ork -               - -
                        -- - --- - --         - - -     -        - -        --                 - ----
                                                                                  - - - - - - --
Cost of maintenance _              -________
                                        _--_____     __________        __        - --
                                                                                 __---          ---          $3,048.01         $560.11
Total expended--------------I-- --                                                                      -     3, 036. 66        564. 20
Allotted_____ _ _....... -   .-                             --   -     -----                    $500         15, 000.00    -11, 851.99



Balance unexpended July 1, 1941                          -----                                                          $12, 463. 34
                                                                                                                     _---------------
Deductions on account of revocation of allotment ___________                                                         _ 11, 851. 99

         Net amount               to be accounted                for __                                          _           611. 35
Gross amount expended_______________________-- $575. 76
Less reimbursements collected________________11. 56
                                                                                                                             564. 20

         Balance unexpended June 30, 1942                                                               _-                    47. 15

Amount that can be profitably expended in fiscal year ending June 30,
   1944, for maintenance 1 ___________________----------------__                                                           1, 000. 00
   1 Exclusive of available funds.

                                          10. PASS MANCHAC, LA.

    Location.-Pass Manchac is a tidal pass or bayou which rises in
Lake Maurepas and flows in a general easterly direction into Lake
Pontchartrain at a point 29 miles from New Orleans. (See U. S. Coast
and Geodetic Survey Chart No. 1269, Corps of Engineers, Mississippi
River Commission Alluvial Valley maps, and Ponchatoula quad-
rangle.)
   Existing project.-This provides for the removal of snags, logs, etc.,
throughout the pass, which is 7 miles long, and from the bars at the
entrance into the pass. Under ordinary conditions the mean range of
tide is about 10 inches and the extreme range about 14 inches. At
times high winds may cause a rise of about 4 feet. The estimate of
cost for new work, made in 1910, was $6,000, and $250 for annual
maintenance.
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 882, 60th Cong., 1st sess.). The latest
published map is printed opposite page 2436 of the Annual Report
for 1916.
   Terminal facilities.-None.
   Operations and results during fiscal year.-An examination survey
was made to determine the condition of the waterway, and obstruc-
tions were removed, as required, by United States plant and hired
labor. Total costs for the year were $262.25, all for maintenance.
The total expenditures have been $258.20.
   Condition at end of fiscal year.-The existing project was completed
in 1912. The controlling depths on June 30, 1942, were 5.5 feet in
the north channel and 7 feet in the south channel over the bar in Lake
Pontchartrain, 30 feet through the pass and 8 feet over the bar in
Lake Maurepas. The channel is in good condition and is navigable
throughout its length.
   The total costs under the existing project to the end of the fiscal
year were $11,148.57, of which $1,374.10 was for new work and
$9,774.47 for maintenance. The total expenditures have been
$11,144.52.
730          REPORT               OF CHIEF OF ENGINEERS,                 U.   S. ARMY,         1942

   Proposed operations.-The balance unexpended at the end of the
fiscal year, $68.80, will be applied to minor investigation of the water-
way.
   The sum of $10,000 can be profitably expended during the fiscal year
1944 on maintenance dredging, under contract, of the bar channels in
Lake Pontchartrain and Lake Maurepas at the ends of the pass, and
removal of obstructions from the channel by hired labor and Govern-
ment plant, during October 1943.
                                               Cost and financial summary

Cost of new work to June 30, 1942__       ___                                     ___               $1, 374. 10
                                     ---
Cost of maintenance to June 30, 1942________________                                      __ -       9, 774. 47
      Total cost of permanent work to June 30, 1942_____________ 11, 148. 57
Minus accounts payable June 30, 1942___ ______________________-4. 05

     Net total expenditures_----------------------------        11, 144. 52
Unexpended balance June 30, 1942-------------------------------      68. 80
         Total amount appropriated to June 30, 1942 ____________                                    11, 213. 32

   Fiscal year ending June 30                    1938       1939           1940         1941            1942


Cost of new work    .-                                             -
Cost of maintenance                                                                                          $262. 25
Total expended ....-                                                                                          258. 20
Allotted ------   -----   -----    -----   -                                             $10, 000      -9,    673. 00




Balance unexpended July 1, 1941       ___________     -
Deductions on account of revocation of allotment___--------_
                                                                                        ___         $10, 000. 00
                                                                                                      9, 673. 00

      Net amount to be accounted for_________-__-- --                                ___------          327. 00
Gross amount expended     __      __-__-                                                                258. 20
         Balance unexpended June 30, 1942___                           ____-_-____                           68. 80
Amount that can be profitably expended in fiscal year ending June 30,
   1944, for maintenance 1 -__________-__                                                            10, 000. 00
   1 Exclusive of available funds.

11. TICKFAW, NATALBANY, PONCHATOULA, AND BLOOD RIVERS, LA.

  Location.-Natalbany and Blood Rivers. are tributaries of Tickfaw
River; Ponchatoula River is a tributary of Natalbany River.
  Tickfaw River rises in the extreme southwestern part of the State
of Mississippi and flows in a southerly direction to Lake Maurepas,
a distance of about 105 miles.
    Natalbany River flows in a generally southerly direction and dis-
charges into Tickfaw River about 2 miles above its mouth.
    Ponchatoula River flows in a southerly and southwesterly direc-
tion and discharges into Natalbany River about 33/4 miles above its
mouth.
    Blood River is a small stream flowing in a southeasterly direction
and discharging into Tickfaw River about 71/2 miles above its mouth.
 (See U. S. Coast and Geodetic Survey Chart No. 1269 and4Corps
of Engineers, Mississippi River Commission Alluvial Valley maps,
,and Springfield and Ponchatoula quadrangles.)
        RIVERS    AND   HIARBORS-NEW       ORLEANS,    LA.,   DISTRICT    731

   Existing project.-This provides for the removal of obstructions in
the Tickfaw River from its mouth to a point 26 miles above, on the
Blood River from its mouth to the head of navigation, about 4 miles,
and on the Natalbany and Ponchatoula'Rivers for a distance of 151/2
miles, the total length of improvements being 451/2 miles. Under
ordinary conditions the mean range of tide is about 10 inches at the
mouth of the Tickfaw River and about 3 inches at the head of naviga-
tion on each stream. The extreme variation of water surface due to
freshets is about 9 feet in the upper reaches of all streams and about
30 inches at the mouth of the Tickfaw River.
   The estimate of cost for new work made in 1881 was $10,230. There
is no approved estimate of cost for annual maintenance.
   The existing project was adopted by the River and Harbor Act of
March 3, 1881 (H. Ex. Doc. No. 54, 46th Cong., 2d sess., and Annual
Report for 1880, p. 1182). The latest published map is printed opposite
page 2439 of the Annual Report for 1916.
   Terminal facilities.-There are a number of small private wharves
on each of these streams, and all the unloading is done by hand.
The terminal facilities are considered adequate for the existing
commerce.
   Operations and results during fiscal year.-An examination survey
to determine the condition of the waterway was made, and obstructions
were removed, as required, by United States plant and hired labor.
Total costs for the year were $1,019.75, all for maintenance. The total
expenditures were $937.98.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1921. The controlling depths, mean low Gulf, on June 30,
1942, were: Tickfaw River, 8 feet on the bar at entrance, 13 feet to
mile 15, 6.5 feet to mile 16, 3 feet to mile 18, and not navigable above
mile 18; Natalbany River, 8 feet to mile 9.5; 6.5 feet to mile 10; Poncha-
toula River, 11 feet to mile 3.5 and 7 feet to mile 4; Blood River, 8 feet
to mile 4. Mile 0 is at the mouth of the river in each case. The
streams are in good condition. Head of navigation on Tickfaw River
is at mile 18, on Natalbany at mile 10, and on Ponchatoula and Blood
Rivers at mile 4.
   The total costs under the existing project have been $33,113.80, of
which $8,115.49 was for new work and $24,998.31 for maintenance.
The total expenditures have been $33,032.03.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $152.02, will be applied to removal of obstructions from the
streams by hired labor and Government plant at such time during the
year as is required.
   The sum of $1,000 can be profitably expended during the fiscal year
1944 on the removal of snags and overhanging trees with hired labor
and Government plant at such time during the year as is required.
                          Cost and financial summary
Cost of new work to June 30, 1942-------------                   $8, 115. 49
Cost of maintenance to June 30, 1942 ___________________________ 24, 998. 31
      Total cost of permanent work to June 30, 1942_____-____--__ 33, 113. 80
Minus accounts payable June 30, 1942                                   8------.
                                                                       81. 77
      Net total expenditures-------      --      ---     --       33,032.03
Unexpended balance June 30, 1942---------------_                      152.02
      Total amount appropriated to June 30, 1942----,_-           33, 184. 05
732         REPORT OF CHIEF OF ENGINEERS,                                            U. S. ARMY,             1942


   Fiscal year ending June 30                1938                     1939            1940            1941            1942


Cost of new work-------                                      -------               ------   -----------
Cost of maintenance----                                     --------------        ---------            $168.61        $1,019.75
Total expended.---           -           -          -            --                    -                168.61           937.98
Allotted ----------    ----------- ---   _---------     -   -------      ------              $500     7, 668.61      -6, 910. 00



Balance unexpected July 1, 1941-----                                                                              $8, 000. 00
Deductions on account of revocation of allotment-------------------6, 910. 00
         Net amount to be accounted for---------------------__                                                      1,090. 00
Gross amount expended-----------------------------------                                                              937.98
      Balance unexpended June 30, 1942---------------------------                                                     152. 02
Outstanding liabilities June 30, 1942--------------------------------                                                  30. 00
         Balance available June 30, 1942                                                                              122. 02
                                                                                                                      1-----------------------

Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance 1--------------                     __--___                                                  1, 000. 00
  1 Exclusive of available funds.

                      12. AMITE RIVER AND BAYOU MANCHAC, LA.
   Location.-Bayou Manchac is a tributary of Amite River. Amite
River has its origin in the State of Mississippi, and flows in a gen-
erally southerly direction about 170 miles to Lake Maurepas, La.
Bayou Manchac has its origin in Iberville Parish, La., and flows
eastwardly about 183/4 miles, discharging into Amite River about 353/4
miles above its mouth. (See U. S. Coast and Geodetic Survey Chart
No. 1269 and Corps of Engineers Mississippi River Commission
Alluvial Valley maps, and Springfield and Denham Springs quad-
rangles.)
   Previous projects.--Adopted by River and Harbor Acts of June 14,
1880, August 11, 1888, and July 13, 1892. For further details see
page 830 of Annual Report for 1926, and page 788 of Annual Report
for 1938.
   Existing project.-This provides for a channel 60 feet wide and 7
feet deep at mean low water, from that depth in Lake Maurepas to
Port Vincent, and for the removal of obstructions between that point
and the bridge of the Louisiana Railway & Navigation Co. across
Bayou Manchac. The total length of improvement is 44 miles.
   Under ordinary conditions the mean range of tide in Amite River is
about 10 inches at the mouth and about 4 inches in Bayou Manchac, the
extreme ranges being about 14 and 6 inches, respectively. A varia-
tion of water surface from 6 to 12 feet sometimes occurs in the upper
Amite and Bayou Manchac, due to freshets. A rise of 30 inches in the
lower Amite is sometimes caused by high winds.
   The estimated cost of new work, made in 1924, was $5,000, exclu-
sive of amounts expended on previous projects, with average annual
maintenance of $1,200.
   The existing project was authorized by the River and Harbor Act
of January 21, 1927 (H. Doc. No. 473, 68th Cong., 2d sess.). The
latest published map is in the project document.
   Terminal facilities.-There is a small warehouse at Clio and one at
Port Vincent, and a small wharf at Maurepas. In the upper reaches,
where the banks are high, landings are made on the bank.
               RIVERS         AND       HARBORS---NEW                            ORLEANS,       LA.,     DISTRICT           733
   The terminals are ponsidered adequate for the existing commerce.
There are no wharves open to the public.
   Operationsand results during fiscal year.-An examination survey
to determine the condition of the waterway was made and obstruc-
tions were removed, as required, by United States plant and hired
labor. Total costs and expenditures for the year were $475.30, all for
maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1928. The controlling depths, mean low Gulf, on June 30,
1942, were: 5 feet on bar at entrance and 9'.0 feet up to mile 35; 5.5 feet
from mile 35 to the entrance of Bayou Manchac; Bayou Manchac, 2
feet on bar at mouth and 6 feet to Ward Creek at mile 8, which is the
head of navigation. Mile 0 is at the mouth of the stream in each case.
The bar at the mouth of Bayou Manchac is prone to re-form after each
freshet, and there are numerous snags in the bayou. With these excep-
tions, the channel conditions are good throughout the project disttnce.
Above the mouth of Bayou Manchac, the Amite River is badly ob-
structed and has fallen into disuse.
   The total costs and expenditures under the existing project to the
end of the fiscal year were $6,754.74, of which $3,332.86 was for new
work and $3,421.88 for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $69.70, will be applied to minor investigation of the water-
way.
   The sum of $5,000 can be profitably expended during the fiscal year
1944 on maintenance dredging, under contract, of the bar channel in
Lake Maurepas and the removal of snags and overhanging trees dur-
ing December 1943.
                                              Cost and financial summary
Cost of new work to June 30, 1942-------__                                --------------------                        $28, 233. 68
Cost of maintenance to June 30, 1942                                      -------------------------- 62,                   664. 90
           Total cost of permanent work to June 30, 1942--------------                                                 90,898. 58

Net total expenditures------------------     -------------------- 90, 898. 58
Unexpended balance June 30, 1942------------------ --------------      69. 70
           Total amount appropriated to June 30, 1942 ----------------                                                 90, 968. 28

    Fiscal year ending June 30                        1938                1939         1940              1941             1942

Cost of new work        ------------..-.
Cost of maintenance----_ _-----------------
                                                      ---------..-----------...---------....
                                                         _
                                                                                                       --..-..-................
                                                                                                          $215.97           $475. 30
Total expended...------ .......------------                                        -                       215.97            475.30
Allotted-.------------------.----             -----          -.- --   -      -                $500       7, 715. 97      -7, 455.00



Balance unexpended July 1, 1941                                  $8, 000. 00
Deductions on account of revocation of allotment-----------------7, 455. 00
      Net amount to be accounted for --------------------------      545. 00
Gross amount expended----------------------                          475. 30
      Balance unexpended June 30, 1942                                 9. 70
                                                                      6----------------------
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance . ----------  -----------------                                                              5, 000. 00
   2Exclusive       of available funds.
         S493202-42-pt. 1, vol. 1------47
734        REPORT OF CHIEF OF ENGINEERS,                          U. S. ARMY,               1942

                                13. GRAND BAYOU PASS, LA.

   Location.-GrantBayou Pass is on the coast of Louisiana, 16 miles
east of Barataria Pass and 30 miles northwest of the entrance to
Southwest Pass of the Mississippi River. (See U. S. Coast and
Geodetic Survey Chart No. 1273 and U. S. Geological Survey quad-
rangle Bastian Bay, La.)
   Existing project.-This provides for a channel 6 feet deep and 60
feet wide through the entrance bar in the Gulf of Mexico by dredg-
ing. The mean range of tide is 16 inches with an extreme range of
40 inches; hurricane tides of 6 feet have been reported.
   The estimate of cost of new work, made in 1938, was $25,000. The
latest (1938) approved estimate for annual cost of maintenance is
$15,000.
   The existing project was adopted by the River and Harbor Act
approved June 20, 1938 (S. Doc. No. 166, 75th Cong., 3d sess.). The
latest published map is in the project document.
   Terminal facilities.-None.
   Operations and results during fiscal year.-Obstructions were re-
moved from the waterway, as required, by United States plant and
hired labor. The total costs were: $410.16, all for maintenance. The
total expenditures were: $444.79.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1939. The controlling depth over the, bar on June 30, 1942,
was 2.5 feet at mean low Gulf level. The pass is navigable through-
out its length. Maintenance dredging over the bar at the mouth of
the pass is required.
   The total costs were: $8,537.68, of which $7,676.34 was for new
work, and $861.34 for maintenance. The total expenditures have
been $8,537.51.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $395.40, will be applied to investigation of the waterway
at such time during the year as is required.
   The sum of $10,000 can be profitably expended during the fiscal
year 1944 for maintenance dredging under contract during the pe-
riod November-December 1943.
                                Cost and financial summary

Cost of new work to June 30, 1942--------------------------- $7, 676. 34
Cost of maintenance to June 30, 1942----------------------------861. 34
      Total cost of permanent work to June 30, 1942__________                                      8, 537. 68
Minus accounts payable June 30, 1942_--------    -------------                                            . 17

     Net total expenditures-----------------------   ----------- 8, 537. 51
Unexpended balance June 30, 1942---------------------------------   395.40

        Total amount appropriated to June 30, 1942 ______--------8,                                  932. 91

   Fiscal year ending June 30         1938           1939          1940              1941            1942


Cost of new work-----------------------         --------------   $7, 676. 34
Cost of maintenance       _-----------------------------------------       ------     $451. 18         $410. 16

Total expended ----- _---..       _-.-------------------
                                 ._           .7,                    620. 30           472. 42          444. 79
Allotted_---------       -------------                $25, 000   -4, 333. 31        10, 000.00     -21, 733. 78
            RIVERS AND HARBORS--NEW ORLEANS,                             LA.,   DISTRICT         735
Balance unexpended July 1, 1941     ---------------------------- t $22, 573. 97
Deductions on account of revocation of allotment------------------- 21, 733. 78
      Net amount to be accounted for----------------------------                              840. 19
Gross amount expended------------- -----------------    ---------                             444. 79
        Balance unexpended June 30, 1942-------------------------                             395. 40

Amount that can be profitably expended in fiscal year ending June 30,
                         - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - -
1944, for maintenance 1                                                                    10, 000. 00
   1 Exclusive of available funds.

                                  14. BARATARIA BAY, LA.

   Location.-This waterway is in Jefferson Parish, La., and extends
about 37 miles in a generally southerly direction from the junction
of Bayou Villars and Big Barataria Bayou, through Big Barataria
Bayou, Bayou Dupont, a canal (Dupre Cut) through the marsh, Bayou.
Cutler, Bayou St. Denis, and Barataria Bay to the east end of Bayou
Rigaud, at Grand Isle, and connects with the Gulf of Mexico through
Barataria Pass. (See U. S. Coast and Geodetic Survey Charts num-
bered 1116 and 1273 and U. S. Geological Survey maps, Barataria, Bay
Dogris, Wilkinson Bay, and Barataria Pass quadrangles.)
   Existing project.-This provides for dredging a channel 5 feet deep
at mean low Gulf level and 50 feet wide on the bottom from the junc-
tion of Bayou Villars and Big Barataria Bayou to Grand Isle, a dis-
tance of about 37 miles. The Secretary of War is authorized, in his
discretion, to change the location of the route and increase the dimen-
sions of the channel if the estimated cost of the improvement to the
United States is not increased thereby. Under ordinary conditions
the mean range of tide is 12 inches at the mouth and zero at the head,
and the extreme range 24 inches and 12 inches, respectively. The
variation of water surface near the mouth, due to hurricanes, has been
as high as 6 feet.
   The estimated cost of new work for a canal 5 by 40 feet along route
No. 6, revised in 1924, was $87,500. The latest (1928) approved esti-
mate for annual cost of maintenance is $5,000.
   The existing project was adopted by the River and Harbor Act of
March 2, 1919 (H. Doc. No. 200, 65th Cong., 1st sess.). The only pub-
lished map is in that document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-Two public wharves, one at Lafitte and one at
Grand Isle, are available to all boats without charge. About 7 miles
below Lafitte there is an extensive oil terminal for transferriig the
production of the Lafitte field to barges. The facilities are considered
adequate for existing commerce.
   Operations and results during fiscal year.--Examination surveys
were made of the waterway, and obstructions were removed, as re-
quired, by United States plant and hired labor. Cross-section surveys
to determine the extent of shoaling in the waterway from the junction
of Bayou Barataria and Bayou Dupont, through Bayou Dupont,,
Dupre Cut, and Bayou Cutler to deep water in Bayou St. Denis were
made by United States hired labor.
   The total costs were $438.31, all for maintenance. The total expend-
itures were $422.24.
736           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                  1042
   Conditionat end of fiscal year.-The existing project was completed
in' 1925. The controling depths at mean low Gulf on June 30, 1942,
were: 4.5 Barataria Bay and Bayou St. Denis; 6 feet in Bayou Cutler;
4.5 in Dupre Cut and 10 feet in Big Barataria Bayou between Bayou
Dupont and the Intracoastal Waterway. The bayous are in good
condition and are navigable throughout their lengths.
   The total costs under the existing project to the end of the fiscal
year were $106,929.36, of which $73,037.11 was for new work, and
$33,892.25 was for maintenance. The total expenditures have been
$106,913.29.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $622.76, will be applied to the removal of snags and over-
hanging trees by hired labor and Government plant at such time
during the year as is required.
   The additional sum of $30,000 can be profitably expended during
the fiscal year 1944 on maintenance dredging, under contract, in
Dupre Cut, at the intersection of Bayou Cutler and Bayou St. Denis
and in Barataria Bay during the period September and October 1943.
                                          Cost and financial summary
Cost of new work to June 30, 1942-------    ---------------------- $73, 037. 11
Cost of maintenance to June 30, 1942------_     ------------------- 33, 892. 25

      Total cost of permanent work to June 30, 1942--------------106, 929. 36
.Minus accounts payable June 30, 1942------------------------------    16. 07

      Net total expenditures------------------------------- 106, 913. 29
Unexpended balance June 30, 1942-----6--------------------------  22. 76

          Total amount appropriated to June 30, 1942---------------- 107, 536. 05

    Fiscal year ending June 30                 1938              1939                1940         1941            1942


Cost of new work----------------...-----------------------------.----------..
Cost of maintenance--......---------      --------------------------                ---..           $61.94          $438.31

Total expended-......----------------              -----------          ---------           --       61.94           422. 24

Allotted----------------------------------------------                        -        $1, 000   25, 061.94     -24,955.00


Balance unexpended July 1, 1941----------------------------- $26, 000. 00
Amount allotted from War Department Civil Appropriation Act ap-
  proved April 28, 1942----------------------------------------   500. 00

     Amount to be accounted for---      ------------------------                                              26, 500. 00
Deductions on account of revocation of allotment----------------                                              25,455.00

          Net amount to be accounted for--------------------------                                              1,045.00
Gross      amount expended ______-__---------------------                                                         422.24

           Balance unexpended June 30, 1942_                                                                       22.76
                                                                                                                  6------------------------

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance ------------------------------------                                               30, 000. 00
    1 Exclusive of available funds.
         RIVERS   AND HARBORS-NEW        ORLEANS,   LA.,   DISTRICT   737
                      15. BAYOU LAFOURCHE, LA.

   Location.-Prior to 1902 Bayou Lafourche was an outlet of the Mis-
sissippi River, its head being at Donaldsonville, La., 80 miles above
New Orleans. It flows in a general southerly direction to the Gulf of
Mexico, a distance of 107 miles. (See U. S. Coast and Geodetic Survey
Charts Nos. 1160 and 1274 and U. S. Geological Survey maps, Thibo-
daux, Lac Des Allemands, Houma, Cut Off, Golden Meadow, Bay
Courant, Mink Bayou, Leeville, and Belle Pass, and Corps of Engi-
neers, Mississippi River Commission Alluvial Valley maps, and Don-
aldsonville, White Castle, and Napoleonville quadrangles.)
   Previous projects.-Authorized by River and Harbor Acts of June
18, 1878, and August 11, 1888. For further details, see page 850 of
Annual Report for 1915, page 833 of Annual Report for 1925, and
page 791 of Annual Report for 1938.
   Existing project.-This provides for the permanent closure of the
head of the bayou, without a lock; for a channel 6 feet deep and 60 feet
wide from Napoleonville to the Intracoastal Waterway at Lockport;
and a channel of same dimensions from the Intracoastal Waterway at
Larose to the Gulf of Mexico via Belle Pass; the closure of Pass Four-
chon and for a jettied entrance at the mouth of Belle Pass. The total
length of improvement is about 79.25 miles. Under ordinary condi-
tions the mean range of tide is about 3 inches at the head and 10 inches
at the mouth of the bayou. Tropical hurricanes have been known to
cause a variation of 10 feet at the mouth and severe rains and overflow
have caused a variation of 3 to 10 feet at the head.
   The estimate of cost for new work, revised in 1941, is $691,000. The
latest (1941) approved estimate of cost for annual maintenance is
$20,000.
   The existing project was adopted by the River and Harbor Act of
August 30, 1935 (H. Doc. No. 45, 73d Cong., 1st sess.). The latest
published map is in the project document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are numerous private warehouses and
wharves and stiff-leg derricks for handling cane along the bayou. At
Thibodaux a large wholesale company has a dock, freight transfer,
and warehouses on the bayou bank. The Gulf Refining Co. also has a
private dock. At Lockport the Barker Barge Line has a large wharf
with covered shed, and the Southern Pacific Railroad maintains a large
wharf with covered shed. At Golden Meadow each of the sea-food
canneries has docking facilities suitable for their needs. Four oil com-
panies have docks at Leeville for transferring the production of the
Leeville oil fields to barges. The terminal facilities are considered
adequate for existing commerce.
   Operations and results duwring fscal year.-Obstructions were re-
moved from the waterway, as required, by United States plant and
hired labor. Preliminary surveys, investigations, studies, prepara-
tion of plans and specifications for maintenance dredging were made
by hired labor.
   The total costs were $15,571.15, all for maintenance. The total
expenditures have been $15,221.73.
   Condition at end of fiscal year.-The existing project was 38 percent
complete. The dredging between Larose, La., and the Gulf of Mexico
was completed in 1939. The breakwaters at the mouth of Belle Pass
738          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                               1942

were completed in 1939, but were subsequently damaged by storm
action, which required the placement of additional stone. Additional
stone was placed adjacent to both sides of the steel sheet pile break-
waters in 1940, and in the repair and extensions of the breakwaters in
1941. The controlling depths on June 30, 1942, referred to mean low
Gulf are as follows: 3 feet through the jetties; 5 feet through Belle
Pass; 6 feet from the junction of Belle Pass and Pass Fourchon to
Larose La.; 9 feet from Larose to Lockport; 6 feet from Lockport to
Thibodaux, La., and 4.5 feet from Thibodaux to Napoleonville, La.
The channel width varies from 30 feet in the upper reaches, which are
in bad condition, to 180 feet at the mouth. Work remaining to be
done under the existing project consists of strengthening the break-
waters and dredging the project channel between Lockport and
Napoleonville, La. The head of navigation is at Napoleonville.
   The total costs under the existing project, to the end of the fiscal
year were $306,664.62, of which $271,088.65 was for new work and
$35,575.97 for maintenance. The total expenditures have been
$305,848.15.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $16,716.82, will be applied to maintenance dredging under
contract between Larose and the Gulf of Mexico during August 1942,
dredging Belle Pass and strengthening rock jetties, and removal of
obstructions at such time during the year as is required.
   The additional sum of $236,000 can be profitably expended during
the fiscal year 1944 as follows:
New work, dredging by contract throughout the fiscal year, Lockport,
  La., - to Napoleonville, La-------------      --------------------- $220, 000
Maintenance dredging by contract in the Larose to Gulf of Mexico
  section during May 1944         ---------------------------------- 1---6,000
           Total-----------------------------------------------                                               236, 000

                                           Cost and financial summary
Cost of new work to June 30, 1942----------------------------$524, 024. 13
Cost of maintenance to June 30, 1942---------------------------51, 021. 35

      Total cost of permanent work to June 30, 1942------------- 575, 045. 48
Minus accounts payable June 30, 1942----------------------------      816. 47

     Net total expenditures--------------------------------                                                574, 229. 01
Unexpended balance June 30, 1942------------- ---------------                                               16, 716. 82

           Total amount appropriated to June 30, 1942----------------590, 945. 83

   Fiscal year ending June 30                 1938             1939            1940           1941             1942

Cost of new work- .------ ___          --    $5, 803. 94   $179, 872. 97     $63, 571. 62   $21, 840. 22               1
tCost of maintenance- .. _.- -..       .      . .--
                                             -------       -          - .-        - - --
                                                                                 ...-        20,004. 82       $15, 571.15
      Total cost----................          5, 803. 94    179, 872.97       63, 571. 62    41, 845. 04       15, 571. 15

Total expended..................              5, 792. 38    145, 430. 62      97, 294. 90    42, 108. 52       15, 221. 73

Allotted    ---------------------           120, 000. 00    150, 000. 00      19, 720. 83    36, 200. 00      -3, 355. 86
            RIVERS AND            HARBORS--NEW                ORLEANS,      LA.,    DISTRICT          739
Balance unexpended July 1, 1941----------------------------                                    $35,294.41
Amount allotted from War Department Civil Appropriation Act ap-
  proved April 28, 1942 ---- ------     ---------------------------                              1, 000. 00
      Amount to be accounted for----------------------------                                    36, 294. 41
  Deductions on account of revocation of allotment---------------                                4, 355. 86
      Net amount to be accounted for-------------------------                                   31, 938. 55
Gross amount expended-------        ------------------- $15, 501. 37
Less reimbursements collected------------------------         279. 64
                                                                                                15, 221. 73
      Balance unexpended June 30, 1942----------------------                                    16, 716. 82
Outstanding liabilities June 30, 1942----------------------------                                   326. 90
      Balance available June 30, 1942--------------------                                       16, 380. 92
Amount (estimated) required to be appropriated for completion of
  existing project 1---------------------------------------                                    420, 000. 00

Amount that can be profitably expended in fiscal year ending June 30,
1944:
   For new work '-----          -------------------------------- 220, 000. 00
   For maintenance         --------------------------------------      16, 000. 00
     Total      _ _ --------------------------------------------      236, 000. 00
  SExclusive of available funds.

                                 16. BAYOU TERREBONNE, LA.

   Location.-Bayou Terrebonne rises in Lafourche Parish, La., and
flows 53 miles in a southerly direction to Terrebonne Bay. (See U. S.
Coast and Geodetic Survey Charts Nos. 1116 and 1274, and U. S.
Geological Survey maps, Thibodaux, Gibson, Houma, Montegut,
Bourbeaux, and Lake LaGraisse quadrangles.)
   Previous projects.-The River and Harbor Act of June 14, 1880,
made the first appropriation, and in 1909 an allotment was made from
the Emergency Appropriation Act of March 3, 1905. For further
details see page 1851 of Annual Report for 1915, and page 793 of
Annual Report for 1938.
   Existing project.-This provides for a channel of suitable width
and a depth of 6 feet at mean low Gulf from Bush Canal, 12.9 miles
from the mouth of the bayou, to the St. Louis Cypress Co.'s bridge at
Houma, La., a distance of 24.1 miles. Under ordinary conditions the
mean range of tide is about 10 inches at the mouth and 4 inches at
Houma, the extreme ranges being about 14 inches and 6 inches, respec-
tively. The variation of water surface in the upper portion is from
3 to 4 feet, due to floods; in the lower portion from 1 to 3 feet, due
to wind and tide.
   The estimate of cost for new work, revised in 1912, was $75,000,
exclusive of amount expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $6,000.
   The existing project was authorized by the following river and
harbor acts:
    Acts                          Work authorized                                  Documents

June 25, 1910   iredging channel 6 feet in depth and of a naviga-    H. Doc. No. 1163, 60th Cong., 2d sess.
                  ble width from Houma, La., to Bush Canal, a
                  distance of 24 miles.
July 25,1912     Amending proviso relative to local cooperation .-
Mar. 4,1913     ._ do ------------------------------

  For latest published map see Annual Report for 1916, p. 2449.
740          REPORT OF CHIEF OF ENGINEERS,                                      U. S. ARMY,               1942

  Local cooperation.-Fully complied with.
  Terminal facilities.-In general, boats land and discharge freight
directly on the bank. An oil terminal and a small private wharf are
located at Montegut, La. There are several small private wharves
at Houma, La., one of which is a covered wharf served by the South-
ern Pacific Railroad, but no public wharves. The terminal facilities
are considered adequate for present commerce.
   Operations and results during fiscal year.-Obstructions were re-
moved from the waterway, as required, by United States plant and
hired labor.
   Total costs for the year were $80.16, all for maintenance. Total
expenditures were $1,249.11.
   Conditionat end of fiscal year.-The existing project was completed
in 1916. The controlling depth on June 30, 1942, was 5 feet from the
mouth at Sea Breeze, La., to the St. Louis Cypress Co. Canal at
Houma, La. The head of navigation is at Bayou Cane.
  The total costs and expenditures under the existing project to the
end of the fiscal year were $215,498.90, of which $73,024.88 was for
new work and $142,474.02 for maintenance.
  Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1943.
   The sum of $6,000 can be profitably expended during the fiscal year
1944 on maintenance dredging under contract and the removal of
obstructions by hired labor and Government plant during April 1944.
                                           Cost and financial summary

Cost of new work to June 30, 1942_____________________________ $120, 088. 71
Cost of maintenance to June 30, 1942__-_________________     __ . 142, 474. 02

      Total cost of permanent work to June 30, 1942_____________                                                262, 562. 73
Net total expenditures_        ___ ----------------------                                                       262, 562. 73
      Total amount appropriated to June 30, 1942 ______________                                                 262, 562. 73

   Fiscal year ending June 30                    1938             1939           1940              1941                 1942


Cost of new work------------                                -------------- --    ----         --------------     --------------
Cost of maintenance       _         _       ..----- _
                                    ..-------------     .   ---..---------        $599. 58       $20, 102. 97              $80. 16

Total expended    ........------------------                    .
                                                            ____________.          6___49
                                                                                   506.           19, 027. 11            1, 249. 11

Allotted_-       ----------------         ----------------------------          21, 000.00 ------ ------        --       -217.29



Balance unexpended July 1, 1941___-------------------------                                                          $1, 466. 40
Deductions on account of revocation of allotment -----------------                                                       217. 29

        Net amount to be accounted for-------------------____                                                         1, 249. 11
Gross amount expended _____________------                                                    $1, 773. 40
Less reimbursements collected------------------------                                            524. 29
                                                                                                                      1, 249. 11

Amount that can be profitably expended in fiscal year ending June
  30, 1944, for maintenance----------------------------------                                                         6,000. 00

                                 17. LITTLE CAILLOU BAYOU, LA.

   Location.-Little Caillou Bayou has its source in Bayou Terre-
bonne, 41/2 miles below Houma, La., and flows 32.8 miles in a south-
erly direction to Terrebonne Bay. (See United States Coast and Ge-
         RIVERS AND HARBORS---NEW            ORLEANS,    LA.,   DISTRICT    741

odetic Survey Chart No. 1116 and United States Geological Survey
maps, Houma, Montegut, Bourbeaux, Lake Quitman, and Cocodrie
quadrangles.)
   Existing project.-This provides for a channel 5 feet deep at mean
low water by 40 feet wide on the bottom from the head of the bayou,
at Bayou Terrebonne, to Robinson Canal, about 20 miles. The nor-
mal fluctuation of tide is 3 to 6 inches, but winds may raise or lower
the water surface about 1 foot.
   The estimate of cost for new work made in 1922 was $85,000, with
$3,000 annually for maintenance.
   The existing project was authorized by the River and Harbor Act
approved January 21, 1927 (Rivers and Harbors Committee Doc. No.
5, 69th Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-Freightis unloaded directly on or from the
banks. This method is considered satisfactory for existing com-
merce.
   Operations and results during fiscal year.-An examination survey
was made to determine the condition of the waterway and obstructions
were removed, as required, by United States plant and hired labor.
Total costs were $361.51, all for maintenance. Total expenditures,
$361.34.
   Condition at end of fiscal year.-In 1928 and 1929 obstructions were
removed and the channel was dredged from the head of the bayou to
Robinson Canal, 20.6 miles, obtaining a channel 5 feet deep at mean
low Gulf by 40 feet wide on the bottom. The controlling depths on
June 30, 1942, were as follows: 3 feet from its mouth to Robinson Canal
and 4.5 feet from Robinson Canal to Bayou Terrebonne. The channel
varies in width from 40 feet at mile 0 to 19 feet at mile 20.6. The bayou
is navigable throughout its length.
   The total costs under the existing project to the end of the fiscal year
were $104,322.63, of which $77,761.04 was for new work and $26,561.59
for maintenance. Total expenditures, $104,322.46.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $74.66, will be applied to minor investigation of the water-
way.
   The sum of $20,000 can be profitably expended during the fiscal year
1944 on maintenance dredging under contract and removal of obstruc-
tions by hired labor and Government plant during December 1943.
                          Cost and financial summary
Cost of new work to June 30, 1942___ __    ____.____-____-
                                                       -   $77, 761.04
Cost of maintenance to June 30, 1942_-___-----__----______  26, 561. 59
      Total cost of permanent work to June 30, 1942--____________ 104, 322. 63
Minus accounts payable June 30, 1942------____---------------___           .17
     Net total expenditures_---_---- --------              -_______ 104, 322.46
Unexpended balance June 30, 1942_ _________-----------------___           74. 66
      Total amount appropriated to June 30, 1942 _------------       104, 397. 12
742       -REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                 1942


   Fiscal year ending Tune 30          1938           1939                1940                1941                 1942

Cost ofnew work    ........ -    I..             I .--........
                                               ----        .
                                                           ----                    _
                                                                                 ....    .------
                                                                                               - ---        ----------........
Cost of maintenance.---------.            __            ----------
                                                  ---------------------   ------- --- ------------                    $361.51
Total expended..------          --__
                ...............---                ---- ----------------                   -     ----                   361. 34
Allotted---------------- -------------------       -----------              $1,000            $16,500           -17, 064.00


Balance unexpended July 1, 1941__                                                                           $17, 500.00
Deductions on account of revocation of allotment--------- ------                                             17, 064. 00
      Net amount to be accounted for__------------------------                                                     436. 00
Gross amount expended ---------------------------         ---                                                      361. 34.
        Balance unexpended June 30, 1942_--- --------                                   __---           -            74. 66

Amount that can be profitably  expended in fiscal year ending June
30, 1944, for maintenance - - - - - - - - - -                                                               20,000. 00
  1 Exclusive of available funds.

18. WATERWAY FROM THE INTRACOASTAL WATERWAY TO BAYOU
     DULAC, LA. (BAYOUS GRAND CAILLOU AND LECARPE, LA.)

   Location.-Bayou LeCarpe is a tidal stream which rises about 1.5
miles southeast of Houma in Terrebonne Parish and flows southerly
into Bayou Pelton, thence into Bayou Grand Caillou, which flows
southwesterly into Caillou Bay, a total distance of about 40 miles.
 (See U. S. Coast and Geodetic Survey Chart No. 1116 and U. S.
Geological Survey maps Houma, Lake Gero, Lake Quitman, Bayou
Sauveur, Dog Lake, and Grand Bayou DuLarge quadrangles.)
   Existing project:--This provides for a waterway 5 feet deep and
40 feet wide from the intracoastal waterway at Houma through
Bayou LeCarpe, Bayou Pelton, and Bayou Grand Caillou to Bayou
Dulac, about 16.3 miles. The normal fluctuation due to tides is 3 to
10 inches, but winds may raise or lower the water level 1 to 3 feet.
   The estimate of cost of new work, revised in 1935, was $56,250.
The latest (1935) approved estimate for annual cost of maintenance
is $3,000.
   The existing project was adopted by the River and Harbor Act
approved August 30, 1935 (H. Doc. No. 206, 72d Cong., 1st sess.).
The project document contains the latest published map.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are several private, wharves and a num-
ber of stiff-leg derricks for handling cane along the banks of the
waterway, which are considered adequate for existing commerce.
   Operations and results during fiscal year.-Obstructions were re-
moved from the waterway, as 'required, by United States plant and
hired labor. Total costs were $470.69, all for maintenance. Total
expenditures were $462.45.
   Condition at end of fiscal year.-The existing project was completed
in 1938. The controlling depths at mean low Gulf level on June 30,
1942, were: 4 feet from the mouth of Bayou Grand Caillou to Dulac,
La.; 4.5 feet from Dulac via Bayous Pelton and LeCarpe to the Intra-
coastal Waterway. The head of navigation of Bayou Grand Caillou is
at Ashland, and of Bayou LeCarpe at the Intracoastal Waterway.
              RIVERS     AND HARBORS -- NEW                          ORLEANS,                LA.,     DISTRICT          743
   The total costs under the existing project to the end of the fiscal year
were $51,750.52, of which $51,279.83 was for new work, and $470.69
for maintenance. Total expenditures were $51,742.28.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $82.55, will be applied to minor investigation of the water-
way.
   The sum of $10,000 can be profitably expended during the fiscal year
1944 on maintenance dredging under contract and the removal of ob-
structions by hired labor and Government plant during February 1944.
                                      Cost and financial summary

Cost of new work to June 30, 1942----------------------------- --                                                $51, 279. 83
Cost of maintenance to June 30, 1942--------  --------------------                                                    470. 09
                                                      ---
     Total cost of permanent work to June 30, 1942______                                                     _    51, 750. 52
Minus accounts payable June 30, 1942_________---- ---                                                                   8. 24

     Net total expenditures____________----  ___-- ____                                                           51, 742. 28
Unexpended balance June 30, 1942----------------------------------                                                     82. 55
            Total amount appropriated to June 30, 1942------------------                                          51, 824. 83

   Fiscal year ending June 30               1938             1939              1940             *    1941            1942

Cost of new work ______________.          $34, 676. 90      $16, 602. 93              ----
Cost of maintenance --.     ..   -      .....      - ---- ------ - _---..-
                                                                         _      --             -------------           $470. 69
Total expended    .                          27, 847. 61
                           ...-----------------             23, 432. 22                         --                      462. 45
Allotted.                                  56, 250. 00     -4, 970. 17                                $10, 000      -9, 455. 00


Balance unexpended July 1, 1941      -----                                                                       $10,000. 00
Deductions on account of revocation of allotment-------------                                                      9, 455. 00

      Net amount to be accounted for_....                                    ______             ______-              545.00
                           __ _----__ --
Gross amount expended___--_--------                                 --                             _                 462.45

            Balance unexpended June 30, 1942_---------                                               -----             82.55

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance      --------------------------------                                                  10, 000. 00
  1 Exclusive of available funds.

                                 19. BAYOU GROSSETETE, LA.

   Location.-This bayou rises in Pointe Coupee Parish, La., and ex-
tends in a generally southeastern direction, entering Bayou Plaque-
mine 8 miles below Plaquemine lock. (See U. S. Coast and Geodetic
Survey Chart No. 1116 and Corps of Engineers, Mississippi River
Commission Alluvial Valley maps, and Fordoche, Osca Bayou, and
Grossetete quadrangles.)
   Existing project.--This provides for improving the stream for a
distance of 29 miles from its mouth to a point 5 miles above Marin-
gouin, La., by removing snags and trees and by dredging a channel
60 feet wide on bottom and 5 feet deep at mean low water. Mean low
water is 2 feet above mean low Gulf level. Under ordinary condi-
tions the mean range of tide is about 3 inches at the mouth and
nothing at the head, and the extreme range about 6 inches at the
744        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                            1942

mouth. The variation of water surface due to flood conditions may
be from 2 to 8 feet.
   The estimate of cost for new work, revised in 1932, is $130,000.
The latest (1912) approved estimate for annual cost of maintenance
is $500.
   The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 348, 62d Cong., 2d sess.). The latest
published map is printed opposite page 2540 of the Annual Report
for 1917.
   Terminal facilities.-There are no wharves on the bayou. The
banks are firm and high. The steamboats and launches operating
on the stream unload their cargoes at any desired point, carrying the
freight by hand into the stores, which are generally on the bank of
the bayou. The facilities are considered adequate for the existing
corhmmerce.
   Operations and results during fiscal year.-Obstructions were re-
moved from the waterway, as required, by United States plant and
hired labor. Total costs for the fiscal year were $516.51, all for
maintenance. Total expenditures were $500.39.
   Condition at end of fiscal year.-The existing project was 15.8 per-
cent complete. A channel 5 feet deep at mean low water, and 60 feet
wide on the bottom was completed in 1914 to mile 10.3, and from that
point to the head of the project a 5- by 40-foot channel was dredged in
1916. To complete the project, that portion of the stream above mile
10.3 is to be dredged 20 feet wider. The controlling depths, at mean
low water, on June 30, 1942, were as follows: 5 feet from mile 0 to
mile 20, 3 feet from mile 20 to mile 26, and 2 feet from mile 26 to mile
29. Channel conditions are good between miles 0 and 26, and poor
between miles 26 and 29. The head of navigation is at mile 29.
   The total costs under the existing project, to the end of the fiscal
year, were $91,715.35, of which $29,392.49 was for new work and $62,-
322.86 for maintenance. Total expenditures have been $91,699.23.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $75.26, will be applied to minor investigation of the water-
way.
   The sum of $10,000 can be profitably expended during the fiscal year
1944 on maintenance dredging under contract and the removal of
obstructions by hired labor and Government plant during August
-1943.
                              Cost and financial summary
'Cost of new work to June 30, 1942_______________________________ $29, 392. 49
Cost of maintenance to June 30, 1942- ------------                   62, 322. 86
                                                                 -____
      Total cost of permanent work to June 30, 1942--                        ____-91,
                                                                              --      715. 35
IMinus accounts payable June 30, 1942     ____________                            '    16. 12
      Net total expenditures_________                                                91, 699. 23
ITnexpended balance June 30, 1942 ____            -__________--       ___-    -___        75. 26
         'Total   amount appropriated to June   30,   1942        --------------     91, 774. 49
           RIVERS         AND         HARBORS---NEW              ORLEANS,          LA.,     DISTRICT            745

   Fiscal year ending June 30            1938             1939          1940                1941           1942

Cost of new work .
Cost ofnaitaw ce------------$1,72.30---                                 :
                                                       ---------------------.--------------
                                                         :-                     _--_-__
                                                                                     ---               -_:__

Total expended      ....-----------     19, 796. 50 ----------------------------------------                    500.39

Allotted_-----------------------        19,628. 57..   -------------------------          $10,000.00      -9, 424. 35



Balance ufiexpended July 1, 1941 ------------------  ____________ $10, 000. 00
Deductions on account of revocation of allotment-----------------   9, 424. 35

      Net amount to be accounted for---------------------------                                            575.65
Gross amount expended- -   -------------------------------------                                           500. 39

        Balance unexpended June 30, 1942.------------------------                                              75. 26

Amount (estimated) required to be appropriated for completion of
existing project 1-------------------------------------              100, 600.00
Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance -----------------------------------             10, 000. 00
  1Exclusive of available funds.

                                       20. BAYOU TECHE, LA.

   Location.-Bayou Teche has its source in Bayou Courtableau, in St.
Landry Parish, and flows in a southeasterly direction, a distance of
125 miles, to where it joins the lower Atchafalaya River, about 101/2
miles above Morgan City, La. (See U. S. Coast and Geodetic Survey
Chart No. 1116 and Corps of Engineers, Mississippi River Commis-
sionmAlluvial Valley maps, and Palmetto, Opelousas, Carencro, Ar-
naudville, St. Martinville, Loreauville, Derouen, Jeanerette, Foster,
and Belle Isle quadrangles.)
   Previous projects.-Authorized by River and Harbor Acts of July
11, 1870, and September 19, 1890. For further details, see page 1851,
Annual Report for 1915, and page 798, Annual Report for 1938.
   Existing project.-This provides for a channel 8 feet deep and 80
feet wide on the bottom from the mouth of the stream to New Iberia,
La., 54.5 miles, thence 6 feet deep and 60 feet wide on the bottom, to
Keystone lock, 18 miles, and thence 6 feet deep and 50 feet wide on
the bottom to Arnaudville, La., 34 miles, to be secured by dredging,
removing snags and overhanging trees, and construction of a lock and
dam and regulating works. The plane of reference is mean low Gulf
level.
                                             Keystone lock
Distance from New Iberia                   ----------------------------18 miles.
Distance from Intracoastal Waterway-------------------                      82.5 miles.
Width of chamber-----------------------------------                         36 feet.
Length available for full width------------------------                     160 feet.
Lift ---        ----------------------------                ---------       8 feet.
Depth on miter sill at mean Gulf level-------------------                        Do.
Character of foundation           --------------      --------------- Timber piles.
Kind of darnm_________-----------        ------------------------- Timber, rock-fill.
Type of construction-------------- ------------------                       Concrete.
Year completed-----------------                        ----                 1913.
Cost-----------------------------------------                         ----- $257,720.48.
  Under ordinary conditions the mean range of tide is about 10 inches
at the mouth, 4 inches just below the lock, and zero above the lock, the
746         REPORT OF CHIEF 0'F" ENGINEERS,                              U. S. ARMY,         1942

extreme range of tide being about 12 inches, 6 inches, and zero, respec-
tively. The variation of the water surface above Keystone lock due
to freshets is from 2 to 7 feet, while just below the lock it has been as
high as 12 or 15 feet and near the mouth about 4 or 5 feet.
   The estimate of cost for new work, revised in 1928, is $850,000, exclu-
sive of amount expended on previous projects. The latest (1936)
approved estimate for annual cost of maintenance from mouth to
Arnaudville is $12,000, including $6,000 for operating and care of the
lock and dam.
   The existing project was authorized by the following river and
harbor acts:

     Acts                           Work authorized                                   Documents


Sept. 19, 1890      Improvement of the stream from its mouth to St.      Annual Report 1889, p. 1532.
                      Martinville by removing obstructions and
                      dredging.
Mar.   2,1907       Construction of lock and darn and the extension of   H. Doe. No. 527, 59th Cong., 1st sess.
                      the improvement to Arnaudville, La.
Mar.   2,1919       Increase of channel dimensions from mouth to         H. Doe. No. 1329, 62d Cong., 3d sess.
                      Keystone lock.
June 26, 1934   1   Operation and care of lock and dam provided for
                     with funds from War Department appropria-
                     tions for rivers and harbors.


  1 Permanent Appropriation Repeal Act.
  For latest published map see H. Doc. No. 288, 66th Cong., 1st sess.

   Recommended modiflcations of project.-Under date of June 23,
1941, the Chief of Engineers recommended modification of the exist-
ing project so as to provide that the pool level above Keystone Dam be
raised 3.0 feet by the installation of movable crest gates on the dam
for the purposes of eliminating present channel deficiencies under
the existing project, and facilitating the diversion of flow to the
Vermilion River via Ruth Canal for irrigation uses; that the project
channel dimensions from its mouth to Arnaudville remain as pro-
vided under the existing project; that the project be extended to
provide a nonnavigable channel of 35 feet bottom width at an ele-
vation varying from -2 to -3 feet mean Gulf level from Bayou
Courtableau to a point approximately 11 miles downstream thereof
for the purposes of increasing flood-flow capacity and providing
additional low-water flow in Bayou Teche for irrigation uses; the
total estimated initial cost to the United States being $81,762 and the
estimated cost of maintenance being $1,643 annually, in addition to
that now required, subject to certain conditions of local cooperation
 (S. Doc. No. 93, 77th Cong., 1st sess.).
   Local cooperation.-Fully complied with.
    Terminal f.acilities.-Small, privately owned wharves are available
at all the towns along the bayou; public landing is permitted without
charge. There are privately owned terminals for transferring crude
oil to barges near the towns of Charenton, Jeanerette,. Olivier, and
St. Martinville. The facilities are considered adequate for existing
commerce.
    Operations and results during fiscal year.-Preliminary surveys,
investigations, studies, preparations of plans and specifications for
        RIVERS AND HARBORS--NEW ORI/EANS,         LA.,   DISTRICT   747
maintenance dredging were made by hired labor forces. Obstruc-
tions were removed from the waterway, as required, by United States
plant and hired labor. The total costs and expenditures were $974.08,
all for maintenance.
    Keystone lock was operated throughout the year except for the
periods September 29, 1941, to October 21, 1941,3 and November 21,
1941, to December 5, 1941, when the lock was closed, firstly to permit
unwatering in order to determine the extent of necessary repairs, and
secondly to perform the required repairs.
    The lock, dam, structures, and grounds were maintained and neces-
sary and routine work thereon was performed. The repair work con-
sisted of the excavation of an area adjacent to the old bulkhead of
the downstream side, the cutting of needle dam recesses, installation
of needle beams at both ends, construction of five bulkheads on the
bayou side, driving of sheet-steel pile cofferdam at the lower end
of the lock, calking of cracks in the sector gates for the upper and
lower emergency dams for the lock, installation of a needle dam at
the upper end of the lock, and the removal of the dams from both
ends of the lock to reopen the lock to navigation until actual repairs
are initiated. Temporary repairs to Keystone Dam were completed
February 5, 1942. The cost of this work was $49,657.50.
    The total costs were $50,631.58, of which $974.08 was for main-
tenance and $49,657.50 for operation and care of the lock. The total
expenditures were $54,953.43.
    Condition at end of fiscal year.-The existing project was about 84
percent completed. Keystone lock and dam were completed in 1913.
The dredging and snagging done in 1916 completed that part of the
existing project for the 6- by 50-foot channel from Arnaudville to
Keystone lock. The contract dredging done in 1918-20 completed that
part of the previous project for a 6- by 50-foot channel from Keystone
lock to mile 39.7 above the mouth. The 8- by 80-foot channel from
New Iberia to the mouth was 98 percent complete. From the mouth
to mile 5.8 a channel 8 by 80 feet, or greater, already existed, and a
new channel has been excavated, 8 by 80 feet from .this point to mile
50.06, about 3.65 miles below New Iberia, and 8 by 60 feet from this
point to New Iberia. The work required to complete the existing proj-
ect is the widening of the channel to a bottom width of 80 feet from
mile 50.06 to New Iberia, and to a bottom width of 60 feet from New
Iberia to Keystone lock. The lock is in fair condition, and Keystone
Dam is in good condition. Work in connection with repairs to Key-
stone lock will be continued at a future date.
   The controlling depths at mean Gulf level on June 30, 1942, were:
Mouth to New Iberia, 8 feet; New Iberia to Keystone lock, 6 feet.
Controlling depth at mean low water above Keystone lock to Arnaud-
ville was 5.5 feet. The head of navigation is at Arnaudville, La.
   The total costs under the existing project to the end of the fiscal
year were $1,113,980.01, of which $708,625.40 was for new work and
$286,585.61 for maintenance, and $118,769 for operation and care of
the lock and dam. The total expenditures were $1,204,857.98, includ-
ing $91,389.25 expended between July 1, 1913, and June 30, 1935, on
the operation and care of the works of improvement under the pro-
visions of the permanent indefinite appropriation for such purposes.
748           REPORT OF CHIEF OF ENGINEERS,                                                       U. S. ARMY,                   1942

   Proposed operations.--The balance unexpended at the end of the
fiscal year, $13,868.53, will be applied to maint atice of the waterway
and the operation and maintenance of Keystone lock, as follows:
Accounts payable June 30, 1942---------------------------------                                                                             $511. 28
Maintenance:
    Hired labor : Investigation of stream throughout the year-------                                                                    1, 357. 25
Operation:
    Hired labor: Operation and maintenance of Keystone
         lock;
              Operation-...--------------------------------- $10, 900
              Ordinary maintenance and repair_------------------ 1, 100
                                                                                                                                      12, 000. 00

          Total maintenance  --------------------------------- 13, 868. 53
   The additional sum of $43,000 can be, profitably expended during the
fiscal year 1944 as follows:
Maintenance:
   Contract: Dredging between Baldwin and New Iberia dur-
      ing the period January to March 1944 ___-----   ___- $30, 000
   Hired labor: Removal of obstructions at such time during
      year as is required-------------------------------     1, 000
                                                                                                                                 -          $31,000
Operation:
   Hired labor: Operation and maintenance of Keystone lock:
        Operation-------------------------------------      10, 000
        Ordinary maintenance and repair------- ------------ 2, 000
                                                                                                                                             12, 000

               Total maintenance                         -----                                      ______                                   43, 000

                                                     Cost and financial summary

Cost of new work to June 30, 1942------------ ---------------- $754, 329. 83
Cost of maintenance to June 30, 1942------------------------496, 743. 86
     Total cost of permanent work to June 30, 1942            , 251, 073. 69
                                                             1------------
Minus accounts payable June 30, 1942-------------------------         511. 28
     Net total expenditures-- ------------------------      1, 250, 562. 41
Unexpended balance June 30, 1942-----------------------------13, 868. 53
         Total amount appropriated to June 30, 1942---------------                                                               1, 264, 430. 94

   Fiscal year ending June 30                           1938                  1939                  1940             1941                    1942

Cost of new work.. ..     ..   ...                      ..    ..   ..    ..   . ..                ..    ..    ..   . ..      ..        ..      .. .
Cost of maintenance-- .......-
                             - _                      $18, 947. 70    $10, 999. 92                 $8, 355. 80     $20, 617. 34             $50, 631. 58
Total expended       .............----------------     18,574. 46           12, 046. 93             7, 662. 73      16, 521. 47             54, 953.43
Allotted ..      ................----------------------
                                                  28, 871. 34              34, 300. 00            -8, 620. 36       77, 500.00          -11, 471. 41


Balance unexpended July 1, 1941__  _      _       ______                                                                             $80, 293. 37
Amount allotted from War Department Civil Appro-
priation Act approved June 24, 1940--------------- $1, 000. 00
Amount allotted from War Department Civil Appro-
priation Act approved May 23, 1941----------------1, 500. 00
Amount allotted from War Departmet Civil Appro-
priation Act approved April 28, 1942-------------12, 000. 00
                                                                                                                                      14, 500.00

         Amount to be accounted for.                             ------------------------------                             .         94. 793. 37
          RIVERS AND HARBORS--NEW          ORLEANS,    LA.,   DISTRICT    749

Deductions on account of revocation of allotment---------------    $25, 971. 41

      Net amount to be accounted for------------------------        68, 821. 96
Gross amount expended------------------------ $56,381.16
Less reimbursements collected--------------------   1, 427. 73
                                                                    54, 953. 43
      Balance unexpended June 30, 1942----------------------        13, 868.53
                                    ----------------------------
Outstanding liabilities June 30, 1942_                                  409. 22

       Balance available June 30, 1942------------------------      13, 459. 31

Amount (estimated) required to be appropriated for completion of
existing project 1----------------------------------------        141, 400. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance ----------------------------        43, 000. 00
  1 Exclusive of available funds.

21. ATCHAFALAYA           RIVER, MORGAN CITY TO THE GULF OF MEXICO,
                                      LA.

   Location.-The Atchafalaya River is an outlet of the Mississippi
as well as of the Red River. It begins at Old River on the northern
boundary of Pointe Coupee Parish and flows generally south a
distance of about 170 miles and empties into Atchafalaya Bay, an
inlet of the Gulf of Mexico. The section under improvement is from
the 20-foot contour in Atchafalaya Bay, 4 miles beyond the mouth
of the Atchafalaya River, to the 20-foot contour in the Gulf of Mex-
ico, a distance of about 153% miles. (See U. S. Coast and Geodetic
Survey Chart No. 1276 and Corps of Engineers, Mississippi River
Commission Alluvial Valley maps and Point au Fer quadrangle,
also navigation maps of Intracoastal Waterway and Atchafalaya
River System.)
   Existing project.-This provides for a channel 20 feet deep and
200 feet wide, extending from the 20-foot contour in Atchafalaya
Bay 4 miles beyond the mouth of the Atchafalaya River to the 20-
foot contour in the Gulf of Mexico, the total length of channel being
153/4 miles. The project depth refers to mean low water. Under
ordinary conditions the mean range of tide is about 10 inches, the
extreme range of tide about 14 inches. During the hurricane of
August 1915 there was a rise of tide of about 10 feet. The estimated
cost of new work, made in 1910, was $500,000. The latest (1916)
approved estimate for annual cost of maintenance is $120,000.
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 669, 61st Cong., 2d sess.). The latest
published map accompanies House Document No. 410, Fifty-sixth
Congress, first session.
   Terminal facilities.-At Morgan City there are several small pri-
vate wharves and two large and three small public wharves open to
the use of all without charge. There are no warehouses needed, as
the business section is on the river front and all freight is trans-
ferred directly from boats to stores. The terminals are considered
adequate for the existing commerce.
   Operations and results during fiscal year.-An examination survey
was made to determine the condition of the waterway, and obstruc-
       493202-43-pt. 1, vol. 1--48
750              REPORT OF CHIEF OF ENGINEERS,                                                 U. S. ARMY,          1942

.tions were removed from the waterway, as required, by United States
plant and hired labor. The total costs were $331.50, all for mainte-
nance. The total expenditures were $308.79.
    Conditionat.end of fiscal year.-The existing project was completed
in 1914. The control-ling depth at mean low Gulf on June 30, 1942,
:was 7.5 feet; the minimum width 160 feet. The river is navigable
throughout the limits of the project.
   The total costs under the existing project to the end of the fiscal
year were $677,278.35, of which $501,963.23 was for new work, and
$175,315.12 for maintenance; total expenditures have been $677,255.64.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $318.21, will be applied to investigations of the waterway
by hired labor. and Government plant at such time during the year
:as is required.
   The additional sum of $30,000 can be profitably expended during
the fiscal year 1944 on maintenance dredging, by contract, of a 10- by
100-foot channel from Eugene Island light to the 10-foot contour in
the Gulf of Mexico and investigations of the waterway by hired labor
and Government plant during May 1944.
                                                     Cost and financial summary

Cost of new work to June 30, 1942    ---------------------------                                                          $501, 963. 23
Cost of maintenance to June 30, 19421111111111111111111                                                             1      175, 315. 12

     Total cost of permanent work to June 30, 1942--------------677, 278. 35
Minus accounts payable June 30, 1942        -__                       22. 71

     Net total expenditures6--------------------------------                                                                77, 255. 64
Unexpended balance June 30, 1942-------------------------------                                                                 318. 21

            Total amount appropriated to June 30, 1942----------------                                                    677, 573. 85

    Fiscal year ending June 30                              1938               1939             1940         1941              1942


Cost of new work -....                               .      ..---- - -----           ----..
Cost of maintenance_ -           --_ _-
                                     --     ......-......                    $18, 797. 82     $3, 262. 89     $157. 77           $331. 50

Total expended_---------                     ----------            ----        1,843. 19      20,164. 96       210. 33            308. 79

Allotted ....--------............--       ..-------------------------         25, 000. 00     -1, 959. 37   25, 177. 85      -25, 373. 00



Balance unexpended July 1, 1941__--       -------     ----                                                                $26, 000. 00
Amount allotted from War Department Civil Appropriation Act
  approved April 28, 1942__------- ------        -- -------------                                                              300. 00

      Amount to be accounted for----------------------------                                                               26, 300. 00
Deductions on account of revocation of allotments----------------                                                          25, 673. 00

      Net amount to be accounted for--------------------------                                                                 627. 00
Gross amount expended-------------- -----------------------                                                                    308. 79

           Balance unexpended June 30, 1942 --------------------------                                                         318. 21

Amount that can be profitably   expended in fiscal year - ending       June
                            - - --- - - -- - -- - -- - - -- - --- ---- --- -
30, 1944, for maintenance                                                                                                 30, 000. 00
   1 Exclusive of available funds.
        RIVERS   AND   HARBORS---NEW    ORLEANS,   LA-.,   DISTRICT   751
   22. INTRACOASTAL WATERWAY, MISSISSIPPI RIVER TO BAYOU
                         TECHE, LA.

   Location.-This waterway extends in a westerly direction from the
Mississippi River, at or near Harvey, La., to Bayou Teche, La., above
Morgan City. This route follows the Harvey Canal No. 1, and Bayou
Barataria from the Mississippi River to Lake Salvador; thence across
Lake Salvador; thence through Harvey Canal No. 2 to Bayou La-
fourche and up this bayou to Lockport; thence through the Company
Canal to Bayou Terrebonne and up this bayou to the vicinity of
Houma; thence through a land cut to Bayou Black; thence along
Bayou Black, Bayou Chene, and Bayou Boeuf to Morgan City; thence
up the Atchafalaya River to the mouth of Bayou Teche, a total dis-
tance of 115 miles. (See U. S. Coast and Geodetic Survey Chart No.
1116 and U. S. Geological Survey maps, New Orleans, Barataria, Cut
Off, Houma, Gibson, and Corps of Engipeers, Mississippi River Com-
mission Alluvial Valley maps, and Morgan City quadrangle, also
navigation maps of Intracoastal Waterway and Atchafalaya River
System.)
   Existing project.-This provides for a waterway from the Mis-
sissippi River to Bayou Teche having a depth of 5 feet below mean
low Gulf level and a bottom width of 40 feet, with appropriate, side
slopes. This project has been largely superseded by the Louisiana
and Texas Intracoastal Waterway from the Mississippi River at or
near New Orleans, La., to Corpus Christi, Tex. (New Orleans-Sabine
River section). Under ordinary conditions the mean range of tide
is about 10 inches, and the extreme range about 14 inches. A severe
storm may cause a high tide of from 6 to 9 feet.
   The estimate of cost for new work revised in 1922 is $875,000. The
latest (1919) approved estimate for annual cost of maintenance is
$20,000. The existing project was adopted by the River and Har-
bor Act of March 2, 1919 (H. Doc. No. 610, 63d Cong., 2d sess.).
The latest published map is printed opposite page 2401 of the
Annual Report for 1920.
   Local cooperation.-FFullycomplied with.
   Terminal facilities.-On Bayou Terrebonne, at Houma, there are
several small privately owned wharves. On the Atchafalaya River at
Morgan City there are two large and three small wharves open to all
without charge; there are several private wharves. The facilities are
considered adequate for existing commerce.
   Operations and results during fiscal year.-An examination survey
was made and the waterway was inspected during the fiscal year, by
hired labor, at a cost of $49.64, all for maintenance. The total expen-
ditures were $2,625.48.
   Conditionat end of fiscal year.-This project has not been completed
and has been superseded for most of its length by the present 9 by
100 foot Intracoastal Waterway which coincides with or parallels it.
Only those sections of the project which are used for navigation are be-
ing maintained. The total costs and expenditures have been $4,056.20,
all for maintenance.
   All costs and expenditures incurred prior to July 1, 1939, are re-
ported under previous projects of the Louisiana-Texas Intracoastal
752         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                        1942

Waterway from the Mississippi River at or near New Orleans, La.,
to Corpus Christi, Tex. (New Orleans-Sabine River section).
   Proposad.oaperations.-The balance unexpended at the end of the
fiscal year, $2,500, will be applied to the removal of obstructions by
hired labor and Government plant at such time during the year as is
required.
   The sum of $1,000 can be profitably expended during the fiscal year
1944 on the removal of snags and overhanging trees by hired labor and
Government plant at such time during the year as is required.
                                       Cost and financial summary

Cost of new work to June 30, 1942___               -__-____                                  _____-               __-------
Cost of maintenance to June 30, 1942 ---------------                                                               $4, 056. 20
         Total cost of permanent work to Jupe 30, 1942__--_,_--__--                                                 4, 056.20

     Net, total expenditures-----        ---    ------                                    -------                    4, 056. 20
Unexpended balance June 30, 1942- .--- ---------------                                                 -
                                                                                                     __--            2, 500. 00
         Total amount appropriated to June 30, 1942__--______-----                                                   6, 556. 20

   Fiscal year ending June 30               1938              1939                 1940               1941             1942


C ost of new w ork -....................... ....................-                 .. ... .. .. .. . . . . . . . . . . . .
                                                                               ----.
Cost of maintenance     ..------.   ---------------
                                      _____________                        _      $1, 344. 96       $2, 661.60            $49. 64

Total expended___________           ____   ___________ _______             _       1, 318. 10           112. 62         2, 625. 48

Allotted.........      ..
                     -----------------       -----------...----------...           6, 996. 46       -1, 644. 00         1, 203. 74



Balance unexpended July 1, 1941-________________
                                -----                 ___-- -___ $3, 921. 74
Amount allotted from War Department Civil Appropriation Act ap-
  proved May 23, 1941--------------------------------------       2, 500. 00
     Amount to be accounted for_----------------------------                                                         6, 421. 74
Deductions on account of revocation of allotment ___________----___                                                  1, 296. 26
      Net amount to be accounted for -------      _---                                                               5, 125. 48
Gross amount expended_______-- __- __-_______________                                                                2, 625.48
         Balance unexpended June 30, 1942_______________ ________                                                    2, 500. 00

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1_______________--___________- ______                                                     1, 000. 00
   1 Exclusive   of available funds.

23. THE LOUISIANA AND TEXAS INTRACOASTAL WATERWAY FROM
   THE MISSISSIPPI RIVER AT OR NEAR NEW ORLEANS, LA., TO COR-
   PUS CHRISTI, TEX. (NEW ORLEANS-SABINE RIVER SECTION)

  Location.-This section of the Intracoastal Waterway extends from
the Mississippi River at or near New Orleans to the Sabine River, La.
and Tex.
   The section from the Mississippi River to Atchafalaya River, La.,
leaves the Mississippi River about 3.5 miles above Canal Street and
follows Harvey Canal No. 1, Bayou Barataria, to Bayou Villars, a
land cut south of Lake Salvador to Harvey Canal No. 2, Harvey Canal
No. 2 to Larose, La., on Bayou Lafourche, up Bayou Lafourche to
Lockport, La., on Company Canal, through Company Canal and a
land cut to Houma, La., thence over a land cut south of Bayou Black
        RIVERS AND    HARBORS---NEW     ORLEANS,   LA.,   DISTRICT   753

to Bayou Cocodrie, thence through Bayou Cocodrie and a land cut to
Bayou Black; thence through Bayou Black, Bayou Chene, and Bayou
Boeuf to the Atchafalaya River'about 0.5 mile south of Morgan City,
La., a total distance of 102 miles.
   Harvey Canal connects with the Mississippi River by Harvey lock
at Harvey, La., opposite New Orleans, about 3.5 miles above Canal
Street.
    The other route follows the Mississippi River to Plaquemine 113
miles, thence by Bayou Plaquemine and Lower Grand River for a dis-
tance of 25 miles; thence through a dredged cut in the East Atchafa-
laya Basin protection levee and the levee borrow pit to Berwick Bay;
thence through Berwick Bay to Morgan City, La., a distance of 56
miles.
   The section from the Atchafalaya River to Vermilion River, La.,
begins at the western end of the Mississippi-Atchafalaya section and
follows the Atchafalaya River about 2.5 miles, portions of Little Wax
Bayou, Possum Bayou, cut-offs, a land cut passing through North
Bend Plantation to Bayou Bartholomew; Bayou Bartholomew to
Little Bay, a land cut skirting the north edge of Cote Blanche Island
and the west edge of Weeks Island to Vermilion River, about 24 miles
below Abbeville, La., a total distance of about 63 miles.
    The section from Vermilion River to Mermentau River, La., begins
at the western end of the Atchafalaya-Vermilion section and follows
Vermilion River 1.3 miles, a part of the Schooner Bayou cut-off canal,
:and a land cut running in a general northwesterly direction to Mer-
mentau River at a point about 0.5 mile albove its entrance into Grand
Lake and about 16 miles below the town of Lake Arthur, La., a total
distance of about 43 miles. Vermilion lock has been constructed about
1.75 miles west of Vermilion River to prevent the ingress of salt water
from Vermilion Bay. Data regarding the lock are given in the para-
:graph "Existing project."
    The section from Mermentau River to Calcasieu River, La., begins
at the western end of the Vermilion-Mermentau section and follows
the Mermentau River upstream for about 1.5 miles, a land cut running
in a west-southwesterly direction to Lake Misere, passing north of the
lake and Bayou Misere, westerly to Sweet Lake, south and west of
Sweet Lake, northwesterly to Bayou Tete Bois, Bayou Tete Bois, Black
Bayou, and cut-offs to a point on Calcasieu River about 16.6 miles below
the city of Lake Charles, La., a total distance of about 38 miles.
    The section from the Calcasieu River to Sabine River, La. and Tex.,
begins at the western end of the Mermentau-Calcasieu section and fol-
lows the Calcasieu River upstream about 1.6 miles, a land cut running
in a southwesterly direction 2.8 miles, thence west 22 miles to Sabine
River at a point about 3 miles below Orange, Tex., a total distance of
about 26 miles. (See U. S. Coast and Geodetic Survey Chart No.
1116 and Corps of Engineers, Mississippi River Commission Alluvial
Valley maps, and Baton Rouge, Grossetete, Chicot Lake, White Castle,
Foster, Napoleonville, Bayou Sale, Jeanerette, Belle Isle, Morgan City,
and Derouen quadrangles, also navigation maps of Intracoastal
Waterway and Atchafalaya River system, and U. S. Geological Survey
maps, New Orleans, Barataria, Cut-off, Houma, Gibson, Abbeville,
Schooner Bayou, Grand Lake East, Latania Lake, Lake Misere, Bou-
754      REPORT OF CHIEF OF ENGINEERS, U., S. ARMY,                  1942

dreaux Lake, Sweet Lake, Lake Charles, Moss Lake, Black Laker
Cameron Farms, and Phoenix Lake quadrangles.)
   Previo projects.-The projects for the different sections of this
improvement were adopted by the following river and harbor acts:
August 11, 1888; March 2, 1907; March 3, 1909; June 25, 1910; Feb-
ruary 27, 1911; July 25, 1912; August 8, 1917; July 18, 1918; March
2, 1919; and September 22, 1922. For further details see pages 878-
895 of Annual Report for 1924.
   Existing project.-This provides for a waterway from the Missis-
sippi River at or near New Orleans, via two routes to Morgan City,
La., thence via one route to the Sabine River, La. and Tex., having
a depth of 9 feet at mean low water and a bottom width of 100 feet
with appropriate side slopes, with such passing places, widening at
bends, locks or guard locks, and railway bridges over artificial cuts
as are necessary, and for the purchase or construction of a pipe-line
dredge. The length of this section of the waterway is 338 miles via
the northerly or Plaquemine route and 272 miles via the southerly or
Harvey Canal route.
   Under ordinary conditions the mean range of tide is about 10 inches
and the extreme range about 14 inches. A severe storm may cause
a high tide of from 6 to 9 feet.
   The estimate of cost for new work of the 9- by 100-foot waterway,
revised in 1927, exclusive of amounts expended on previous projects,
was $9,752,000, including $500,000 for a dredge. The latest (1936)
approved estimate for annual cost of maintenance is $304,000, includ-
ing $119,000 for operation and care of locks and dams.
                                     Harvey lock
Miles from New Orleans, La. (Canal St.) _. 3.5.
Miles from Mississippi River_____-____        0.13.
Width of chamber__- ___--__---      ___--     75 feet.
Length available for full width .--------. 425 feet.
Lift--------      ---------------------       0 to 19.6 feet.
Depth on miter sill at low water              12 feet.
                                        .--------
Character of foundation-_------------. Timber piles.
Kind of dam__                                 None.
Type of construction_________________         Reinforced concrete.
Opened to navigation 1934 and completed
  1935.
Cost (including approaches) ---------_        $1,775,132.24.

                                  Plaquemine lock
Miles from New Orleans, La. (Canal St.)          113.
Miles from Mississippi River___           -_______
                                                0.10.
Width of chamber__           -                   55 feet.
Length available for full width ....      ____  260 feet.
Lift-__---       ---------------------          0 to 28 feet.
Depth on miter sill at low water __.----     -.  10 feet.
Character of foundation- ---    ___------       Timber piles.
Kind of dam      ----------------------         None.
Type of construction-.                           Concrete.
Completed and opened to navigation .....        1909.
Cost, ..........                                $1,302,006.38.
               RIVERS AND HARBORS--NEW ORLEANS, LA., DISTRICT                                        755
                                               Vermilion ock

Miles from Abbeville, La_-------        -----              26.

Miles from Vermilion River----------                       1.75.
Width between abutments------- --------                    56 feet.
Length available for full width ---------                  1,182 feet.
Lift------------------------------------                   0 to 5 feet, either direction.
Depth on gate at mean low Gulf level ---                   12 feet.
Character of foundation---------------                     Timber piles.
Kind of dam      ..-------------------------               Reinforced-concrete spillway d a m,
                                                              vertical cast-steel gates, timber-
                                                              pile foundations.
Type of construction-----------------                      Reinforced concrete.
Opened to navigation 1933 and completed
  1934.
Cost ____---_---      e---w     u-----------$330,765.27.

  The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                Documents


Mar.     3, 1925   Construction of waterway from New Orleans, La.,   H. Doc. No. 238, 68th Cong., 1st sess.
                    to Galveston Bay, Tex.                             (Contains latest published map.)
Jan. 21, 1927      Extension of waterway to Corpus Christi, Tex___      Do.
June 25, 19341     Operation and care of locks and dams provided
                    f3r with funds from War Department appro-
                    priations for rivers and harbors.

  I   Permanent Appropriations Repeal Act.


   For report on the 12-foot Gulf Intracoastal Waterway, see page 629.
   Recommended modifications of project.-Under date of March 15,,
1939, the Chief of Engineers recommended modification of the exist-
ing project so as to provide a channel 12 feet deep with a bottom
width of 125 feet from the Mississippi River through Harvey lock,
near New Orleans, La., to Corpus Christi, Tex., generally following
the route of the existing waterway, subject to such modifications in
cut-offs and other questions of alinement as may be approved by the
Chief of Engineers, at an estimated first cost of $5,200,000, in addi-
tion to that necessary to complete the existing project, and with
annual maintenance of $200,000, in addition to that now required,
subject to certain conditions of local cooperation (H. Doc. No. 230,
76th Cong., 1st sess.).
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-Facilitiesare in general confined to privately
owned piers, wharves, or oil docks. At Morgan City on the Atcha-
falaya River there are two large and three small wharves open to all
without charge. The facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-Maintenance dredging
by contract was performed as follows: 10,283 cubic yards were re-
moved from the forebay at Harvey lock, Louisiana, at a cost of $4,-
609.89; 117,210 cubic yards were removed in completing a bypass
channel by Vermilion lock, Louisiana, at a cost of $9,938.28; removal
of shoal material extending over 61,630 linear feet of channel con-
756    REPORT OF CHIEF OF ENGINEERS,        U. S. ARMY,   1942

sisting of 377,642 cubic yards, in the Mississippi-Atchafalaya section
between Lockport and Larose, La., at a cost of $132,273.04; and re-
moval of shoal material extending over 178,055 linear feet of channel,
consisting of 1,005,796 cubic yards, in the Mississippi-Atchafalaya
section, between miles 2 and 4 and 10 and 55, at a cost of $171,226.52.
Maintenance dredging by Government plant and hired labor was per-
formed as follows: 166,168 cubic yards of shoal material extending
over 23,740 linear feet of channel were removed from Bayou Plaque-
mine, Plaquemine-Morgan City alternate route, at a cost of $58,525.36;
59,146 cubic yards of shoal material, extending over 1,755 linear feet
of channel, were removed at the intersections of the Intracoastal
Waterway, the Atchafalaya River, and Little Wax Bayou, at a cost
of $10,331.X4; 190,043 cubic yards of material, extending over 3,300
linear feet of channel, were removed in the realinement of the channel
in the Mermentau-Calcasieu section at its junction with the Vermilion-
Mermentau section, at a cost of $26,271.30; 82,200 cubic yards of shoal
material, extending over 22,265 linear feet of channel, were removed
from the Intracoastal Waterway in the vicinity of Houma, Mississippi-
Atchafalaya section, at a cost of $37,893.95; 400 cubic yards of shoal
material were removed around the low gates at Harvey lock, Louisi-
ana, at a cost of $894.29. In addition, new mile markers, ferry and
bridge signs were constructed and installed to replace damaged signs,
and minor obstructions were removed. Harvey, Plaquemine, and
Vermilion locks were operated throughout the fiscal year. The bypass
channel by Vermilion lock was closed and the locks, grounds, and
structures were maintained in good condition, and all necessary and
routine maintenance work thereon performed by hired labor. All at
a cost of $139,891.44. Periodic inspections were made of the waterway
and obstructions were removed, as required, by Government plant
and hired labor, at a cost of $6,447.44; engineering studies were made
and plans and specifications were prepared for dredging, by contract,
at a cost of $7,054.46; inspection and repair of tide gages were made
at a cost of $3,043.59.
   The total costs were $608,938.59, of which $469,047.15 was for main-
tenance and $139,891.44 for operation aid care of locks. The total
expenditures were $585,071.86. Included in costs for the fiscal year is
the amount of $537.49, Government costs on contract dredging com-
pleted during the fiscal year 1941, and not previously reported.
   Condition at end of fiscal year.-The existing project was completed
in 1936. Harvey lock was completed in 1935; the reservation com-
prises 3.3 acres. Plaquemine lock was completed in 1909; its reserva-
tion comprises 19 acres. Vermilion lock was completed in 1934; the
ground on which it is constructed is possessed by the United States
under an easement deed to a strip of land 300 feet wide along the
Intracoastal Waterway. Dredging of the canal was completed in
1934.
   The controlling depth at mean low Gulf level on June 30, 1942, was
9 feet from the Mississippi River to the Sabine River via the Harvey
route and 9 feet via the Plaquemine route. Project width is 100 feet
throughout, except from mile 4 to mile 10 (Mississippi-Atchafalaya
section) and mile 175 to mile 200 (Vermilion-Mermentau section), and
          RIVERS AND HARBORS-NEW ORLEANS, LA.,                            DISTRICT       757
mile 230 to mile 238 (Mermentau-Calcasieu section) where the bottom
widths are 80 feet and (Calcasieu-Sabine section) where the con-
trolling depth is 30 feet over a bottom width of approximately 110
feet.
   The total costs under the existing project to the end of the fiscal year
 (all funds) have been $9,683,607.27, of which $7,226,814.17 was for new
work (including $353,541.19 Public Works funds), $1,515,747.55 for
maintenance, and $941,045.55 for operation and care of locks. The
total expenditures have been $10,168,251, which includes $521,484.91
expended between January 1, 1927, and June 30, 1935, on the operation
and care of works of improvement under the provisions of the perma-
nent indefinite appropriation for such purpose.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $438,306.08, including accounts receivable, will be applied
to maintenance of the waterway and operation of Plaquemine, Harvey,
and Vermilion locks as follows:
Accounts payable June 30, 1942-----------------------------              $38, 430. 87
Contract: Maintenance dredging during the period August 1942 to
May 1943 --------------               ------------         ---------- 190, 175.21
Hired labor:
    Constructing entrance structure to Harvey lock-------------           30, 000. 00
    Surveys and inspections---------------------------18,                     000. 00
Operation and maintenance of Plaquemine lock:
    Operation------   -------------------------------           $50, 650
    Ordinary maintenance and repair-------------------3,            150
                                                                                   53,800. 00
Operation and maintenance of Harvey lock:
              ------------
   Operation___                  ----------------------                  63, 500
   Ordinary maintenance and repair-------------------                     5, 400
                                                                                   68, 900. 00
Operation and maintenance of Vermilion lock:
    Operation_-__---------                                 ------        33, 550
    Ordinary maintenance and repair------------------                     5, 450
                                                                                   39, 000. 00

      Total maintenance --------------                     -------------------- 438, 306. 08
  The additional sum of $349,000 can be profitably expended during
the fiscal year 1944 as follows:
Contract: Maintenance dredging during the period August 1943 to
  May 1944----------            -----------------      ------------------ $150, 000
Hired labor:
    Surveys and inspections-----------------------------------              20, 000
    Operation and maintenance of Plaquemine lock:
        Operation__------------___----------                       $47,000
        Ordinary maintenance and repair-------------- ----           7, 000
                                                                            54, 000
    Operation and maintenance of Harvey lock:
        Operation ------------------------------------              63, 000
        Ordinary maintenance and repair------------------ 6, 000
        Improvements and reconstruction_ --------------              5,000
                                                                                      74, 000
    Operation and maintenance of Vermilion lock:
                       _-------------
        Operation ---------------                -------- 33, 000
       Ordinary maintenance and repair_----------------- 6, 000
       Improvements and reconstruction-----------------   12, 000
                                                                                      51, 000

          Total maintenance_     ---------------------..                             349, 000
758            REPORT OF CHIEF OF ENGINEERS,                                 U. S. ARMY,                   1942

                                        Cost and financial summary

Cost of new work to. June 30, 1942-___------ ----                                __- -----               1$11, 217, 872. 80
Cost of maintenance to June 30, 1942 ---------                                  --------                    3, 976, 187.       16
      Total cost of permanent work to June 30, 1942 _____-      15, 194, 059. 96
Undistributed costs to June 30, 1942-- --------------------------        471.69

      Net total cost to June 30, 1942---__- __---------                                                    15, 194, 531. 65
Plus accounts receivable June 30, 1942  -------------                                                -       -1,118.     00

     Gross total costs to June 30, 1942---                                                       _             195, 649. 65
                                                                                                           1--------
                                                                                                           15,
Minus accounts payable June 30, 1942_______________                                    ____ _                   38, 430. 87
     Net total expenditures___--_-------                                                                   15, 157, 218. 78
Unexpended balance June 30, 1942-__                                    --
                                                               - ______________                  _             437, 188. 08

        Total amount appropriated to June 30, 1942 ____                               ______               15, 594, 406. 86


Fiscal year ending June 30 ......          1938            1939               1940               1941                   1942


Cost of new work _ ...            ...                        -          -      -           -         -..
Cost of maintenance...__....
                   ----                 $292, 117. 63   $376, 541.08    $196, 067. 12      $177, 360. 64              $608, 938. 59

Total expended.--------------            295, 337. 92    379, 845. 75       190, 969. 15       181, 640. 73            585, 071.86

Allotted.---    ---------------          595, 050. 00   326, 400. 00        242, 000. 00       210, 000. 00            670, 924. 67



Balance unexpended July 1, 1941                                                                               $351, 335. 27
Amount allotted from War Department Civil Appro-
  priation Act approved June 28, 1939____ ______      $91.43
Amount allotted from War Department Civil Appro-
  priation Act approved June 24, 1940_____-  ____ 17, 158. 92
Amount allotted from War Department Civil Appro-
  priation Act approved May 23, 1941___________ 321, 778.06
Amount allotted from War Department Civil Appro-
  priation Act approved April 28, 1942_________ 330, 600. 00
Amount allotted from War Department Civil Appro-
  priation Act approved June 11, 1938-------       1,296. 2
                                                                                                                 7     09d     R7



      Amount to be accounted for ___- ___-__                              __-    ______                     1, 022, 259. 94
Gross amount expended _______ -- __-       __-                             $598,814.83
Less reimbursements collected --- ----   -                                    13, 742. 97
                                                                        -___---
                                                                                                               Pik ,J 188.
                                                                                                               437,   ,J.
                                                                                                                           08
      Balance unexpended June 30, 1942                                                                         437,     188.   08
Outstanding liabilities June 30, 1942_ _________ $6, 269. 48
Amount covered by uncompleted contracts---------53, 907. 47
                                                                                                                60, 176. 95
     Balance available June 30, 1942----_____________-__                                                       377, 011. 13
Accounts receivable June 30, 1942 _ ___ _ ___    _________                                                       1, 118. 00
        Unobligated balance available June 30, 1942 ----- ____                                                378, 129. 13
Amount that can be profitably expended in fiscal year ending
  June 30, 1944, for maintenance         _____        _______________                                         349, 000.00
  1 In addition $273,266.97 expended from contributed funds for new work.
  s Includes $1,070,432.58 from permanent indefinite appropriation.
 ' Exclusive of available funds.
          RIVERS     AND HARBORS--NEW              ORLEANS,       LA.,   DISTRICT       759

24. THE INLAND WATERWAY FROM FRANKLIN TO THE MERMENTAU
                        RIVER, LA.

    Location.-This canal extends from Hanson lock on Bayou Teche
through Hanson Canal and Bayou Portage to the Intracoastal Water-
way, along the Intracoastal Waterway to its intersection with the
Schooner Bayou cut-off, along this cut-off to Schooner Bayou, thence
through Schooner Bayou and a land cut to White Lake, through
White, Turtle, Alligator, Collicon Lakes and connecting canals to
Grand Lake, and through Grand Lake to the Mermentau River at
its northern entrance into the lake. The total length of the water-
way is 53.6 miles. (See U. S. Coast and Geodetic Survey Chart No.
1116 and Corps of Engineers, Mississippi River Commission Alluvial
Valley maps, and Foster, Bayou Sale, Jeanerette, and Derouen quad-
rangles, also navigation maps of Intracoastal Waterway and Atchafa-
laya River, and United States Geological Survey maps, Abbeville,
Redfish Point, Schooner Bayou, Pecan Island, Constance Bayou,
Grand Lake East, and Latania Lake quadrangles.)
    Existing project.--This project provides for a waterway from Bayou
Teche at or near Franklin, La., to the Mermentau River, having a
depth of 5 feet below mean low Gulf and a bottom width of 40 feet,
with appropriate side slopes; also the purchase of the Hanson Canal
and the construction of a lock and dam in Schooner Bayou. This
project, reported in the Annual Report for 1924 under the head-
ings, Intracoastal Waterway, Franklin to Mermentau, La., and In-
tracoastal Waterway from Vermilion River to Schooner Bayou, La.,
has largely been superseded by the project "Louisiana and Texas
Intracostal Waterway from the Mississippi River at or near New
Orleans, La., to Corpus Christi, Tex." Under ordinary conditions the
mean range of tides is about 10 inches and the extreme range about
14 inches. A.severe storm may cause a high tide of from 6 to 9 feet.
    The estimate of cost for new work, revised in 1920, was $722,000.
The latest (1936) approved estimate for annual cost of maintenance is
$32,000, including $12,000 for operation and care of the locks. The
estimate of cost for the Schooner Bayou cut-off, made in 1913, was
$37,500 for new work and $1,800 for annual maintenance.
    Data regarding the locks are as follows:
                                        Hanson lock

Miles from Franklin, La----------------                 1.5.
Miles from Bayou Teche                                 0.0.----------------
Width of chamber_-------------------                    26.5 feet.
Length available for full width----------- 937 feet.
Lift--------------------------------                    0.5 feet.
Depth on miter sill at low water----------5 feet.
Character of foundation--------------                   Timber piles.
Kind of dam----------------------- --- None.
Type of construction-------------------. Concrete buttresses, wooden miter.
                                                            ing gates, earth-lock chamber.
Completed 1907. Operated by the United
   States since 1923.
Cost ------------                 -------------------- $65,000, including 4.1 miles of canal.
760          REPORT OF CHIEF OF ENGINEERS,                         U. S. ARMY,            1942

                                         Schooner Bayou lock
Miles from Abbeville, La                              32.
                                                 _----------------
Miles from Vermilion River------ -----                 9.
Width of chamber---------------------                  36 feet.
Length available for full width----------             300 feet.
Lift___-------------------------------- 0.3 feet.
Depth on miter sill at low water--,--------- 8 feet.
Character of foundation----------------Timber piles.
Kind of dam-------------------             -----       Timber.
Type of construction           ------------------ Concrete buttresses, wooden gates
                                                          turning on horizontal hinges at
                                                          bottom, earth-lock chamber.
Lock completed and opened to navigation
  1913; dam completed 1914.
Cost -------------------------------- $40,018.10 for lock and $8,500 for
                                                          dam.
  The existing project was authorized by the following river and
harbor acts:

      Acts                            Work authorized                                   Documents 1


Mar. 2, 1907 ___.. The general project_       ---------------------------   H. Doc. No. 640, 59th Cong.,
                                                                             2d sess.
Mar. 3, 1909, and    Authorized the Secretary of War to make such
Feb. 27, 1911.       changes in location of channel as might be de-
                      sirable.
July 25, 1912_____   Authorized the purchase of the oo-called Hanson
                   Canal between Bayou Teche and Cote Blanche
                   Bay, at a cost not to exceed $65,000.
Mar. 2, 1919..... Construction of the Schooner Bayou cut-offt..      _ H. Doc. No. 1336, 62d Cong.,
                                                                        3d sess.
June26,1934(Per- Inclusion of operation and care of locks in project
manentAppro-         provided for with funds from War Department
priations Re-         appropriations for rivers and harbors.
peal Act).

  i Contain latest published maps.

   Local cooperation.-Fully complied with.
   Terminal facilities.-This improvement comprises a system of arti-
ficial canals and natural waterways passing through an isolated marsh
section of the State, and there are no existing facilities for handling
freight along the route.
   Operations and results during fiscal year.-Obstructions were
removed from the waterway, as required, and preliminary surveys,
investigations, and studies were made, by United States plant and
hired labor, at a cost of $861.58. Hanson and Schooner Bayou locks
were operated throughout the fiscal year; the locks, structures, and
grounds were maintained in good condition, and all necessary and
routine maintenance work thereon performed. The total costs were
$16,766.70, of which $973.77 was for maintenance and $15,792.93 for
operation and care of the locks. The total expenditures were
$16,698.35.
   Condition at end of fiscal year.-The existing project is cpmpleted.
The Hanson Canal and lock were acquired on October 16, 1923; the
lockmaster's house was completed in 1924; the United States property
on which the lock is situated is a strip of land 300 feet wide between
         RIVERS    AND HARBORS-NEW         ORLEANS,    LA.,   DISTRICT       761

parallel lines running from Bayou Teche to Bayou Portage, and con-
taining 148 acres. Dredging from Vermilion Bay to the Mermentau
River was completed in 1912. The lock and dam at Schooner Bayou
lock were completed in 1913 and 1914, respectively, and the lock-
master's house in 1917. The United States reservation at Schooner
Bayou lock comprises two acres. The controlling depth on June 30,
1942, was 3.5 feet. The channel is navigable throughout its length.
   The total costs and expenditures to the end of the fiscal year, under
the existing project, were $512,707.89, of which $249,051.81 was for new
work, $117,587.65 for maintenance, and $146,068.43 for operation and
care of locks. The total expenditures have been $677,474.21, including
the sum of $165,298.55 expended under the provisions of the permanent
indefinite appropriation for such purposes.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $7,629.23, will be applied to maintenance of the water-
way and to maintenance of Schooner Bayou and Hanson locks as
follows:
Accounts payable June 30, 1942 - -----------                      $532. 23
Maintenance:
   Hired labor: Removal of obstructions and examinations of the
      waterway as required---------------------------------             1, 097. 00
Operation:
    Operation and maintenance of Schooner Bayou lock: Ordinary
      maintenance and repair--------------------------------3,            500. 00
    Operation and maintenance of Hanson lock: Ordinary main-
      tenance and repair-----------------------------      _            2, 500. 00
      Total   maintenance-------------------       ------------         7, 629. 23
  The additional sum of $17,000 can be profitably expended during
the fiscal year 1944 as follows:
Hired labor :
    Maintenance:
        Removal of obstructions and examinations of the waterway as
          required------------------------------------------              $1, 000
        Operation and maintenance of Schooner Bayou lock:
              Operation ---------------------------------     $9, 500
              Ordinary maintenance and repair---------------1, 000
                                                                          10, 500
        Operation and maintenance of Hanson lock :
            Operation ----------------------------------    4, 500
            Ordinary maintenance and repair---------------1, 000
                                                                           5, 500

               Total maintenance-------------------------------           17, 000
                         Cost amd financial summary

Cost of new work to June 30, 1942------------------------$249, 051. 81
Cost of maintenance to June 30, 1942----------------------- 428, 954. 63
       Total cost of permanent work to June 30, 1942-------------   678, 006. 44
Minus accounts payable June 30, 1942---------------------------         532. 23
     Net total expenditures6--------------------------------77, 474. 21
Unexpended balance June 30, 1942---------------------------- -- 7, 629. 23
      Total amount appropriated to June 30, 1942---------------     685, 103. 44
762               REPORT OF CHIEF OF ENGINEERS,                                          U. S. ARMY,              1942


Fiscal year ending June 30 _.....                              1938          1939         1940             1941            1942


Cost of new w ork ----
                    .. ....----  ..    -----
                                  ----..........
                                               -...-
                                             i .-.           ---..... ....... i-,     i -.             --                      ..
Cost of maintenance--- --- ---- -- $37,536.29      $19, 530.40     $18, 948.69 $15, 619. 78                               $16,16.70
Total expended--.............--------------...                38, 087. 66   19, 351.08   18, 186.43      16, 376. 54       16, 698.35
Allotted            .................----------------------   57400.00      20,000. 00   16, 500. 00    20, 500.00        -2,497.


Balance unexpended July 1, 1941--------------------------------- $26, 825. 11
Amount allotted from War Department Civil Appropriation
  Act approved June 24, 1940-------------------------$2, 000
Amount allotted from War Department Civil Appropriation
  Act approved May 23, 1941                                    500
                                                            1--------------------------,
Amount allotted from War Department Civil Appropriation
  Act approved April 28, 1942--------------- __-    ___---3,000
                                                                                                       --------          6, 500. 00

      Amount to be accounted for    _---------------         --                                                        33, 325. 11
Deductions on account of revocation of allotment-----------------                                                       8, 997. 53

      Net amount to be accounted for_____--------------------                                                          24, 327. 58
                          . .16,
Gross amount expended--__------________--_---        _                                                                     698. 35

      Balance unexpended June 30, 1942_________________________   7, 629. 23
Outstanding liabilities June 30, 1942__________________----------458. 55
             Balance available June 30, 1942--------------------------                                                   7, 170. 68

Amount that can be profitably expended in fiscal year ending June
30, 1044, for maintenance 1_________1__________________________                                                       7, 000.00
   1 Exclusive of available funds.

                        25. PETIT ANSE, TIGRE, AND CARLIN BAYOUS, LA.

   Location.-Bayou Tigre is a tributary of Bayou Carlin; Bayou
Carlin is a tributary of Bayou Petit Anse. Bayou Petit Anse has its
source in Iberia Parish about 5 miles northwest of New Iberia. It
flows in a southwesterly direction for about 15 miles to its intersec-
tion with the Intracoastal Waterway, thence for a distance of about
3 miles to Vermilion Bay. Bayou Tigre has its source in Vermilion
Parish about 6 miles northeast of Abbeville and flows in a southerly
direction for about 7 miles to its junction with Bayou Carlin. Bayou
Carlin has its source in Lake Peigneur in Iberia Parish and flows in
a southerly direction about 7.5 miles to its confluence with Bayou Petit
Anse at a point about 2.3 miles above the Intracoastal Waterway.
(See U. S. Coast and Geodetic Survey Chart No. 1277 and Corps of
Engineers, Mississippi River Commission Alluvial Valley maps, and
Derouen quadrangle, and U. S. Geological Survey map, Abbeville
quadrangle.)
  Existing project.-This provides for dredging a channel in Bayou
Petit Anse 9 feet deep and 80 feet wide from the Intracoastal Water-
way to the north end of Avery Island; a channel 5 feet deep and 40
feet wide from the Intracoastal Waterway via the McIllhenny Canal to
deep water in Vermilion Bay; and a channel 5 feet deep over a bottom
width of 40 feet in Bayou Carlin from Bayou Petit Anse to Lake
Peigneur. The total length of the improvements is 16.1 miles. Under
ordinary conditions the mean range of tide is about 10 inches.
                RIVERS AND HARBORS-NEW                       ORLEANS,          LA.,    DISTRICT         763
  The estimated cost of new work, revised in 1937, was $58,500. The
latet (1940) approved estimate for annual cost of maintenance is
$6,500.
  The existing project was authorized by the following river and
harbor acts :

     Acts                        Work authorized                                      Documents


Aug. 30,19351    A channel in Bayou Petit Anse 60 feet wide and 9      H. Doc. No. 225, 72d Cong., 1st sess.
                   feet deep from the Intracoastal Waterway to a
                   point 3.2 miles.upstream, thence 40 feet wide and
                   5 feet deep to highway bridge at head of Avery
                   Island; and a channel in Bayou Carlin 40 feet
                   wideand 5 feet deep 'fibm Bayou:Petit Anse to
                   Lake Peigneur.
Aug. 26, 1937    A channel in Bayou Petit Anse 9 feet deep and 80      Rivers and Harbors Committee Doc.
                   feet wide from the Intracoastal Waterway to           No. 40, 75th Cong., 1st sess. (Con-
                   the north end of Avery Island and a channel 5         tains latest published map.)
                   feet deep and 40 feet wide from the Intracoastal
                   Waterway to Vermilion Bay by way of the
                   McIlnenny Canal.


  I Included in the Public Works Administration program Sept. 6, 1933.


   Local cooperation.-The work included in the Public Works pro-
gram and adopted by the River and Harbor Act of August 30, 1935, is
subject to the condition that local interests furnish all rights-of-way
and suitable areas for disposal of dredged material, and shall construct
a suitable public terminal at the head of Avery Island and reconstruct
all highway and railroad bridges to provide suitable clearance, all
without cost to the United States. These requirements, excepting the
construction of a public terminal, have been complied with. Under the
provisions of the River and Harbor Act of August 26, 1937, local in-
terests are required to furnish free of cost to the United States, rights-
of-way of not less than 200 feet along the McIlhenny Canal and suit-
able spoil-disposal areas for new work and subsequent maintenance
as required.
   The necessary rights-of-way and spoil areas have been furnished by
local interests and accepted by the Chief of Engineers September 1,
1938.
   Under a permit issued March 24, 1937, the Texas Pipe Line Co. en-
larged the 5- by 40-foot channel in Bayou Petit Anse above mile 3.2 to
a depth of 9 feet and a width of 80 feet at an estimated cost of $30,000.
   Terminal facilities.-There is an extensive oil terminal at the head
of the improvement on Bayou Petit Anse and several private docks
and cane hoists. (Terminal facilities are further described in H. Doc.
No. 225, 72d Cong., 1st sess.) These facilities are considered adequate
for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was completed
in 1939. The controlling depths at mean low Gulf level on June 30,
1942, were as follows: In Bayou Petit Anse from the Intracoastal
Waterway to Avery Island, 9 feet; in Bayou Carlin to Lake Peigneur,
5.5 feet; in channel from Intracoastal Waterway to Vermilion Bay via
764           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,, 1942

Mcilhenny Canal, 4 feet. The channel is in good condition. The
head of navigation on Bayou Petit Anse is the highway bridge north
of Avery Island; and on Bayou Carlin, Lake Peigneur.
   The total costs and*expenditures under the existing project to the
end of the fiscal year were $91,810.12, of which $57,490.29 was for new
work, including $47,858.13, Public Works funds, and $34,319.83 from
regular funds for maintenance.
  Proposed operations.-No funds are available and no work is con-
templated for the fiscal year 1943.
   The sum of $1,000 can be profitably expended during the fiscal year
1944 on removal of obstructions by hired labor and Government plant
at such time during the year as is required.
                                    Cost and financial summary

Cost of new work to June 30, 1942_-----------       --------------- $57,490.29
Cost of maintenance to June 30, 1942---________________---_______    34, 319. 83
       Total cost of permanent work to June 30, 1942---------------91, 810.12
Net total expenditures_---------------------------                   91, 810. 12
Total amount appropriated to June 30, 1942 __----       ---   ___    91, 810. 12

Fiscal year ending June 30--..-        1938           1939              1940     1941                1942

Cost of new work                    ---        --    $9, 632. 16
Cost of maintenance ------------      $13, 411. 26                             $20, 908. 57

Total expended              __        13, 503. 23     9, 540. 19                20, 908. 57   ..

Allotted_------------------------     12, 700. 00     8, 043. 42   --           21, 000.00             -91. 43


Balance unexpended July 1, 1941                                                                      $91. 43
Deductions on account of revocation of allotment _.______--__---                                -     91. 43

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance-----------------------------------                                      1, 000. 00

                                   26. BAYOU VERMILION, LA.

   Location.-Bayou Vermilion, also called Vermilion River, is
formed by the junction of Bayous Fusilier and Bourbeau, west of
Arnaudville, La., and flows in a southwesterly direction to the west-
ern end of Vermilion Bay.        (See U. S. Coast and Geodetic Survey
Charts Nos. 1116 and 1277, Corps of Engineers, Mississippi River
Commission Alluvial Valley maps, and Arnaudville and St. Martin-
ville quadrangles, and United States Geological Survey maps, of
Lafayette, Milton, and Abbeville quadrangles.)
   Previous projects.-Adopted by act of June 14, 1880. For further
details see page 762, Annual Report for 1914, and page 814, Annual
Report for 1938.
   Existing project.-This provides for a channel 51/2 feet deep (no
width specified) at mean low Gulf level from Vermilion Bay to the
Southern Pacific bridge at Lafayette, La., a distance of 51 miles.
Under ordinary conditions the mean range of tide at the mouth is 10
inches and the extreme range 14 inches. The variation of water sur-
face near the mouth, due to hurricanes, and in the upper reaches, due
to floods, is from 8 to 10 feet.
   The estimated cost of new work, adopted in 1892, exclusive of
amount expended on previous project, was $25,000. The latest (1928)
approved estimate for annual cost of maintenance is $2,000.
         RIVERS     AND HARBORS-NEW          ORLEANS,       LA.,    DISTRICT     765

   The existing project was adopted by the River and Harbor Act
of July 13, 1892 (H. Ex. Doc. No. 273, 51st Cong., 2d sess., and
Annual Report for 1891, p. 1855). The latest published map is
printed opposite page 2549 of the Annual Report for 1917.
   Recommended modifications of project.-Under date of June 23,
1941, the Chief of Engineers recommended modification of the exist-
ing project so as provide a navigable channel 8 feet deep by 80
feet wide from the 8-foot depth contour in Vermilion Bay to the
Intracoastal Waterway, thence 9 feet deep by 100 feet wide to Lafay-
ette, La. (Pinhook Bridge); and that the project be extended to pro-
vide a nonnavigable channel from Lafayette, La. (Pinhook Bridge),
to the junction of Bayous Bourbeau and Fusilier of adequate capacity
to carry the flood flows of the upper Vermilion Basin; the total
estimated initial cost to the United States being $1,307,852 and the
estimated cost of maintenance being $2,190 annually, in addition to
that now required; subject to certain conditions of local cooperation
 (S. Doec. No. 93, 77th Cong., 1st sess.).
   Terminal facilities.-Several small, privately owned landings have
been constructed at Bancker, Abbeville, Milton, and Pinhook Bridge.
A public wharf is located at Abbeville. On Kennys Coulee, a tribu-
tary of Bayou Vermilion above Abbeville, there is a privately owned
oil terminal. Facilities are considered adequate for existing com-
merce.
   Operations and results during fiscal year.-Navigation aids were
established by the United States Coast Guard, marking the dredged
channel through Vermilion Bay. An examination survey was made
and obstructions were removed, as required, by United States plant
and hired labor. The total costs were $539.89. Total expenditures
were $539.51.
   Condition at end of fiscal year.-The existing project was completed
in 1896. The controlling depths on June 30, 1942, were: Over the bar
at the mouth, 5 feet, mean low Gulf level; mouth to Abbeville, 11 feet;
Abbeville to Pinhook bridge 4.5 at mean low water. The head of navi-
gation is Pinhook bridge, Lafayette, La., 49 miles above the mouth of
the bayou. The channel is in good condition.
   The total costs under the existing project to the end of the fiscal year
were $225,168.83, of which $25,000 was for new work and $200,168.83
for maintenance. Total expenditures have been $225,168.45.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $5.49, will be applied to minor investigation of the
waterway.
   The sum of $1,000 can be profitably expended during the fiscal year
1944 on the removal of obstructions by hired labor and Government
plant at such time during the year as is required.
                             Cost and financial summary
Cost of new work to June 30, 1942____________________________ $34, 900. 00
Cost of maintenance to June 30, 1942____________________________ 200, 168. 83
      Total cost of permanent work to June 30, 1942-------------235, 068. 83
Minus accounts payable June 30, 1942-.    ._________                     .38
      Net total expenditures- .-- ___________-   ____   -          -____   235, 068. 45
Unexpended balance June 30, 1942__--------------_                                 5. 49
     Total amount appropriated to June 30, 1942---------- ----             235, 073. 94
      493202--43--pt. 1, vol. 1--49
766         REPORT OF CHIEF OF ENGINEERS,                             U. S. ARMY,              1942


Fiscal year ending June 30 .... _       1938             1939           1940    '       1941             1942


                         -------................................................................
Co st of n ew w ork ------
Cost of maintenance   .........        $7, 297. 13        $687. 53       $916. 87     $29, 599. 03         $539. 89

Total expended___-----------------      7, 407. 03         563. 29        931. 21      29, 599.03           539. 51

Allotted._ _----------------------      9, 000. 00   --------------       901. 53      38, 600.00       -9, 455. 97



Balance unexpended July 1, 1941__ ______________--------                                             $10, 000..97
Deductions on account of revocation of allotment__-------------                                        9, 455.9-7

      Net amount to be accounted for --------          --------
                                                     __--                                                545. 00
Gross amount expended,_ ________________--________--                                                     539. 51

        Balance unexpended June 30, 1942 ______ _____----                           ____--_                 5. 49

Amount that can be profitably     expended  in fiscal year ending June 30,
                             -- -   - -- --
1944, for maintenance 1_____________ ____ _______                   _                                 1, 000. 00
1Exclusive of available funds.

        27. WATERWAY FROM WHITE LAKE TO PECAN ISLAND, LA.

   Location.-The waterway from White Lake to Pecan Island is an
artificial canal extending from the 5-foot contour in White Lake al-
most due south for a distance of approximately 1.8 miles to Pecan
Island. (See U. S. Coast and Geodetic Survey Chart No. 1277 and
U. S. Geological Survey map Pecan Island quadrangle.)
   Existing project.-This provides for a channel 40 feet wide and 5
feet deep from that depth in White Lake to Pecan Island via the
existing canal, with suitable protective works at the entrance. The
total length of the improvement is 1.8 miles. The water elevation
in White Lake varies between plus 3.5 and minus 1.5 with an average
of plus 0.9.
   The estimate of cost for new work made in 1942 is $20,000. The
latest (1937) approved estimate for annual cost of maintenance is
$700.
   The existing project was adopted by the River and Harbor Act
approved August 26, 1937 (H. Doc. No. 78, 75th Cong., 1st sess.). The
latest published map is in the project document.
  Local cooperation.--Fully complied with.
   Terminal facilities.-There is a small cattle-loading pen and a ramp
near the head of the canal, which are considered adequate for pro-
spective commerce.
   Operations and results during fiscal year.-Obstructions were re-
moved from the waterway, as required, by United States plant and
hired labor. The total costs and expenditures were $74.54, all for
maintenance.
   Condition at end of fiscal year.-Dredgingof the 5 by 40-foot chan-
nel was completed in 1939. The work remaining to be done is the
construction of suitable protection works in the lake. The controlling
depth at mean low Gulf level on June 30, 1942, was as follows: From
deep water in White Lake to Pecan Island, 4.5 feet. The head of navi-
gation is at Pecan Island, 1.5 miles south of White Lake.
   The total costs and expenditures under the existing project to the
end of the fiscal year were $10,978.37, of which $10,903.83 was for new
work and $74.54 was for maintenance.
              RIVERS          AND HARBORSL--NEW                                    ORLEANS,           LA.,       DISTRICT             767

   Proposed operations.-The balance unexpended at the end of the
fiscal year, $34.46, will be applied to minor investigation of the water-
way.
   The sum of $3,000 can be profitably expended during the fiscal year
1944 on maintenance dredging, under contract, of the bar channel in
White Lake during November 1943.
                                       Cost and financial summary

Cost of new work to June 30, 1942                                    -----------                       ------                  $10, 903. 83
Cost of maintenance to June 30, 1942                                           -------                ---                           74. 54
           Total cost of permanent work to June 30, 1942------------- 10, 978. 37

Net total expenditures               --------                                                                                   10, 978. 37
Unexpended balance June 30, 1942_________                                                                                           34. 46
           Total amount appropriated to June 30, 1942----------------11, 012. 83

   Fiscal year ending June 30                   1938                    1939                   1940              1941              1942


Cost of new work ----------           ..     ..--------------         $7, 982. 18        $2, 799. 57                $122. 08   -__-----
Cost of maintenance ....                           ..-------------
                                                  -..-------                   -----   -----      -             ------------          $74. 54

Total expended---------       __-.   ..---      ---..
                                                   -...                    813. 81         9, 927. 40               162. 62               74. 54

Allotted                                                              19, 000. 00        -7,     771. 77         2, 675. 60       -2, 891. 00



Balance unexpended July 1, 1941--------------------------------$3, 000. 00
Deductions on account of revocation of allotment___              2, 891.00
      Net amount to be accounted for__                                                                                             109. 00
Gross amount expended------------------------------------------                                                                     74. 54
           Balance unexpended June 30, 1942                                  _-                                                     34. 46
Amount (estimated) required to be appropriated for completion
of existing project 1_                                                                                                          9, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1--------------------------------                                                                     3, 000. 00
   SExclusive of available funds.

      28. MERMENTAU                  RIVER, BAYOU NEZPIQUE, AND BAYOU DES
                                            CANNES, LA.

   Location.-Mermentau River is formed by the junction of Bayous
des Cannes and Nezpique, 2.25 miles above Mermentau, La., and
flowing in a southwesterly direction empties into the Gulf of Mexico.
   Bayou Nezpique rises in Evangeline Parish, flows in a southerly
direction, and empties into the Mermentau River.
   Bayou des Cannes rises in Evangeline Parish, flows in a south-
southwesterly direction, and empties into the Mermentau River. (Sea
U. S. Coast and Geodetic Survey Charts Nos. 1116 and 1278, and
U. S. Geological Survey maps, Evangeline Hathaway, Mermentau,
Jennings, Lake Arthur, Gueydan, Thornwell, Latania Lake, Catfish
Lake, Grand Chenier, and Bayou Lebauve quadrangles.)
   Existing project.-The project provides for the removal of obstruc-
tions to navigation to secure the natural channel throughout the
entire Mermentau River, a distance of 71.5 miles, and through Bayou
768        REPORT OF CHIEF OF ENGINEERS,                         U. S. ARMY,        1942

Nezpique from its mouth to 25 miles above, and Bayou des Cannes
from its mouth to Evangeline Bridge (mile 8.5); for improving the
channel in Lower Mud Lake by constructing a brush dam to con-
centrate the action of the current and by dredging; and for remov-
ing a portion of the wrecked dam 7 miles above the mouth; and for
dredging a channel 9 feet deep over a bottom width of 100 feet from
the Intracoastal Waterway to the junction of Bayous Nezpique and
des Cannes.
   Under ordinary conditions the mean range of tide on the Mer-
mentau River near the mouth is 10 inches and near the head about 3
inches, the extreme range being 14 inches and about 5 inches, respec-
tively. The variation of the water surface near the mouth may be as
much as 7 or 8 feet, due to hurricanes on the Gulf, and near the head
from 8 to 12 feet, due to freshets. On Bayou Nezpique, under ordi-
nary conditions, the range of tide is about 3 inches at the mouth and
nothing at the head. On Bayou des Cannes, under ordinary condi-
tions, the range of tide is about 3 inches at the mouth and nothing
at the, head.
   The estimate of cost for new work, revised in 1935, was $53,615;
and that for the removal of the dam, made in 1916, $1,500. The
latest (1935) approved estimate of cost for annual maintenance is
$2,200.
   The existing project was authorized by the following river and
harbor acts:

    Acts                       Work authorized                                Documents


July 13,1892     General project-_-_-__                          Annual Report, 1891, p. 1862.
July 27, 1916    Removal of portion of wrecked dam near mouth    H. Doc. No. 1232, 64th Cong., 1st sess.
                   of Mermentau River.
Mar. 2,1919      Improvement of Bayou Des Cannes                 H. Doc No. 1398, 65th Cong., 3d sess.
Aug. 30, 19351   Channel in Mermentau River 9 feet deep plus 1   Rivers and Harbors Committee, Doc.
                  foot overdepth from Intracoastal Waterway to     No. 36, 72d Cong., 1st sess. (Con-
                  the source at confluence of Bayous Nezpique      tains latest published map.)
                  and Des Cannes.

  1 Included in the Public Works Administration program Mar. 28, 1934.


  Local cooperation.-Fully complied with.
  Terminal facilities.-There are several small, privately owned
wharves at Grand Chenier and a public terminal at the town of Lake
Arthur. At Mermentau, La., the Southern Pacific Railroad owns a
wharf served by a spur track. Privately owned terminals for trans-
ferring crude oil to barges are at the following locations: One on
Lake Arthur near the town, of Lake Arthur; one on the Mermentau
River near the town of Mermentau; two on Bayou Nezpique near
Jennings; and four on Bayou des Cannes, one near Evangeline, one
at Mermentau, and two near Jennings. The facilities are considered
adequate for existing commerce.
   Operations and results during fiscal year.-Obstructions were re-
moved from the waterway, as required, by United States plant and
hired labor. The total costs were $441.28, all for maintenance.
Total expenditures were $509.20.
             RIVERS       AND HARBORS-NEW                           ORLEANS,          LA.,   DISTRICT              769

   Condition at end of fiscal year.-The existing project, except for
the 9- by 100-foot channel was completed in 1917. The 9- by 100-
foot channel was completed in 1935. The controlling depths at
mean low Gulf level on June 30, 1942, were as follows: 2 feet across
the bar at mouth of the Mermentau River; 2 feet through Lower
and Upper Mud Lakes and Lower Grand Lake; 5 feet, Upper Grand
Lake to the Intracoastal Canal; 9 feet from the Intracoastal Canal to
the junction of Bayous .Nezpique and des Cannes; Bayou Nezpique,
8 feet from its mouth to mile 23; and 4.5 feet between mile 23 and
25; Bayou des Cannes, 4.5 feet from its mouth to mile 8.5. The
Mermentau River is navigable throughout; Bayou Nezpique for a
distance of 25 miles; and Bayou des Cannes for a distance of 8.5
miles.
   The total costs (regular funds) under the existing project were
$81,254.65, of which $27,580.35 was for new work and $53,674.30 was
for maintenance. Total expenditures, $81,254.45.
   The total costs and expenditures (Public Works funds) under the
existing project were $29,974.42, all for new work. The total costs,
all funds, have been $111,229.07, of which $57,554.77 was for new
work and $53,674.30 for maintenance. The total expenditures were
$111,228.87.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $103.92, will be applied to removal of obstructions from
the streams by hired labor and Government plant at such time
during the year as is required.
   The sum of $2,000 can be profitably expended during the fiscal
year 1944 on the removal of obstructions by hired labor and Gov-
ernment plant at such time during the year as is required.
                                         Cost and financial summary

Cost of new work to June 30, 1942------------------------------- $57, 554. 77
Cost of maintenance to June 30, 1942---------------------         53, 674. 30
       Total cost of permanent work to June 30, 1942-----------111, 229. 07
Minus accounts payable June 30, 1942---------------------------           .20
       Net total expenditures------------------------------ 111,228. 87
Unexpended balance June 30, 1942------------------------------        103. 92
       Total amount appropriated to June 30, 1942--------------111, 332. 79

   Fiscal year ending June 30                 1938           1939            1940             1941               1942


Cost of new work              -------   ---                 ------------
                                                 -------------                                 $       -------
Cost of maintenance_______                             __-----------------
                                                                       -_      _               $245.00             $441.28
Total expended.----------------------------                         -- -------------             176.88             509. 20
Allotted-------------------      -------------------------------                    $500     13, 000. 00    -12, 710. 00


Balance unexpended July 1, 1941------------------------------      $13, 323. 12
Deductions on account of revocation of allotment -------------__ _  12, 710. 00
      Net amount to be accounted for--------------------------          613. 12
Gross amount expended-----------------------------------------          509.20
      Balance unexpended June 30, 1942 -----------------------          103. 92

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance ------------       -___                                                          2,000. 00
   1 Exclusive of available funds.
770           REPORT OF CHIEF OF ENGINEERS,                                U. S. ARMY,            1942

                            29. BAYOU PLAQUEMINE BRULE, LA.
  Location.-This stream rises in the southwestern part of St. Landry
Parish and flows about 75 miles in a southwesterly direction, discharg-
ing into Bayou des Cannes about 33/4 miles above Mermentau, La.
The section under improvement is from the mouth for a distance of
about 19 miles to near Crowley, La. (See U. S. Coast and Geodetic
Survey Chart No. 1116 and U. S. Geological Survey maps Estherwood
and Mermentau quadrangles.)
  Existing project.-This provides for a channel 6 feet deep at mean
low Gulf and bottom width of 60 feet from the mouth to a point
near Crowley, La., a distance of 19 miles, by dredging and removing
obstructions. Under ordinary conditions the mean range of tide is
about 2 inches at the mouth and nothing at the head, the extreme
range being about 4 inches and nothing, respectively. Due to floods
the variations of water surface are at times about 10 feet. The esti-
mate of cost of new work, revised in 1913, was $33,000. The latest
(1928) approved estimate for annual cost of maintenance is $1,000.
  The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 789, 60th Cong., 1st sess.). There is no
published map.
  Terminal facilities.-The town of Crowley has constructed a feeder
canal from the end of the improvement to Crowley and a warehouse
at Crowley, both of which are open to all carriers without charge.
Along the bayou landings are made on the banks. The facilities are
considered adequate for existing commerce.
   Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1915. The channel is in poor condition. The controlling
depth on June 30, 1942, was 5.5 feet, mean low Gulf, from mile 0 to
mile 19, available throughout the year. The head of navigation is
at mile 19 from the mouth of the bayou.
  The total costs and expenditures under the existing project to the
end of the fiscal year were $61,624.60, of which $32,759.90 was for new
work and $28,864.70 for maintenance.
  Proposed operations.-No funds are available and no work is con-
templated for the fiscal year 1943.
   The sum of $1,000 can be profitably expended during the fiscal year
1944 on the removal of obstructions by hired labor and Government
plant at such time during the year as is required.
                                    Cost and financial summary
Cost of new work to June 30, 1942______________________________                                       $32, 759.90
Cost of maintenance to June 30, 1942 ________-__------___ _                                            28, 864. 70
      Total cost of permanent work to June 30, 1942___________-__61, 624. 60
Net total expenditures---___---_______-----_--_--                 61, 624. GO
Total amount appropriated to June 30, 1942__--                        624. 60
                                                                  6___________________

   Fiscal year ending June 30            1938            1939                1940          1941           1942

Cost of new work.                                       . :. . . : : . ....                        . .:: .
Cost of maintenance    ..
Total expended-----------                                         ---------------------
Allotted __           ----- ------------------. --   -----   --                     $500     - $500


Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance--...--------------                     $1, 000. 00
               RIVERS    AND HARBORS--NEW                 ORLEANS,        LA.,    DISTRICT          771
                          30. CALCASIEU RIVER AND PASS, LA.

   Location.-CalcasieuRiver has its source in southwestern Louisiana,
and flows in a generally southerly direction to the Gulf of Mexico.
About 25 miles from the Gulf it debouches into Calcasieu Lake, which
lake is about 18 miles long. The connection between the lake and the
Gulf, about 7 miles long, is known as Calcasieu Pass. (See U. S. Coast
and Geodetic Survey Charts Nos. 591 and 592 and U. S. Geological
Survey maps, Lake Charles, West Lake, Moss Lake, Hackberry, Sweet
Lake, Browns Lake, Holly Beach, Grand Bayou, and Cameron quad-
rangles.)
   Previous projects.-The original project for this improvement was
adopted by the River and Harbor Act of June 10, 1872. Appropria-
tions were made by the River and Harbor Acts of March 3, 1881,
August 2, 1882, July 5, 1884, and August 11, 1888. The project was
modified by the River and Harbor Acts of September 19, 1890, July
13, 1892, and September 22, 1922. For further details, see Annual
Report for 1936, page 719, and Annual Report for 1938, page 819.
   Existing project.-This provides for a channel 30 feet deep and 250
feet wide from the wharves of the Lake Charles Harbor and Terminal
District by way of Calcasieu River to the head of Choupique cut-off;
thence by a land-and-water cut along the west shore of Calcasieu Lake;
thence to and through Calcasieu Pass by a designated route to the Gulf
of Mexico, subject to such change in alinement as is approved by the
Chief of Engineers; the reconstruction and extension of the existing
jetties initially to the seaward end of the east jetty, and further exten-
sion to the 15-foot depth contour if found advisable to reduce mainte-
nance dredging costs; dredging a channel 30 feet deep and 250 feet
wide between the jetties, and an approach channel 32 feet deep and 400
feet wide from the sea end of the jetties to a depth of 32 feet in the Gulf
of Mexico; also for the improvement of the river from Lake Charles to
Phillips Bluff by removing logs, snags, overhanging trees, and by
dredging. Total length of improvement is 94.7 miles. Under ordinary
conditions, the mean range of tide is 10 inches at the mouth, diminish-
ing to zero at Phillips Bluff, the extreme range being 14 inches and
zero, respectively.
   The estimate of cost for new work, including $3,400,000 for the ex-
tension of the jetties to the 15-foot contour, revised in 1937, is $9,260,-
000. The latest (1937) approved estimate for cost of maintenance is
$250,000 annually for the first 3 years and $190,000 annually thereafter.
   The existing project was authorized by the following river and
harbor acts:

    Acts                       Work authorized                                 Documents


           -    Modification of original project of 1872, dated   H. Ex. Doc. No. 46, 46th Cong., 3d sessa
                 May 12, 1881, provided for general improve-        and A. R. 1881, p. 1301.
                 ment of the river from Phillips Bluff to the
                 mouth by removing logs, snags, and overhang-
                 ing trees, and by dredging.
Aug. 26,1937    Channel 30 feet deep and 250 feet wide from the   H. Doc. No. 299, 75th Cong., 1st sess.
                 Lake Charles docks to the Gulf of Mexico.          (Contains latest published map.)
772    REPORT OF CHIEF OF ENGINEERS,         U. S. ARMY,   1942

   Recommended modifications of project.-Under date of August
22, 1941, the Chief of Engineers recommended modification of the
existing project so as to provide for a channel 30 feet deep and 250
feet wide, suitably widened at bends, around Clooney Island, at an
estimated first cost of $55,000, with $3,000 annually for maintenance,
in addition to the amount now required, subject to certain conditions
of local cooperation (H. Doc. 465, 77th Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Under date of January 5, 1922, a permit was granted by the Assist-
ant Secretary of War to the police jury of Calcasieu Parish to enlarge
this river where necessary between Lake Charles and the eastern end
of the Calcasieu-Sabine section of the Intracoastal Waterway to a
depth of 30 feet over a bottom width of 125 feet.
   Terminal facilities.-Terminalfacilities at the Port of Lake Charles
are owned by the Lake Charles Harbor and Terminal District and
operated by a board of commissioners. In addition to the municipally
owned terminals, there are several privately owned and operated
wharf structures located on the existing ship channel. (For further
details see Port Series No. 31, Corps of Engineers.)
    Operations and results during fiscal year.-New work during the
fiscal year by contract consisted of the procurement of 153,892.56 tons
of stone at a cost of $479,760.84, and the placing of 159,279,625 tons of
stone in repairing the existing rubble mound east jetty at Calcasieu
Pass and extending both the east and west jetties in the Gulf of
Mexico to the 12-foot contour at a cost of $313,718.77.
   Maintenance by Government plant and hired labor consisted of the
operation of gages and salinity observations from Lake Charles, La.,
to the Gulf of Mexico at a cost of $16,161.22, the dredging of 25,016
cubic yards of material by the U. S. pump barge No. 5 from the
Calcasieu River and Pass ship channel between mile 6.5 and the upper
end of the jetty channel at a cost of $6,769.31. In addition $698.66
of Government cost incurred during the fiscal year 1941 in connection
with maintenance dredging, by contract, of the Calcasieu River and
Pass ship channel, was charged to the project.
    The total costs for the year were $817,108.80 of which $793,479.61
was for new work, and $23,629.19 for maintenance. Total expendi-
tures were $1,076,065.13.
    Condition at end of fiscal year.--Dredging in accordance with the
existing project was completed on April 25, 1941.
    The Calcasieu Pass jetties on the previous project were completed
in 1900. The east jetty is 8,620 feet long; of which 7,170 feet have
been built to approximately 6 feet above mean low Gulf level, and is
generally above normal high tide. East jetty extends seaward from
the existing Gulf shore line a distance of 6,820 feet. West jetty is
8,050 feet long; of which 2,570 feet have been built to approximately
4 feet above mean low Gulf level, and is generally above normal high
tide. West jetty extends seaward from the existing Gulf shore line
a distance of 6,795 feet. The jetty extension to the 12-foot contour
is complete.
    The controlling depths at mean low Gulf on June 30, 1942, were
as follows: Over the bar at the mouth of Calcasieu Pass, 32 feet:
through the jetty channel, 30 feet; through Calcasieu Lake, 30 feet;
from Calcasieu Lake to Lake Charles, 30 feet; and from Lake Charles
             RIVERS AND HARBORS-NEW ORLEANS,                                             LA., DISTRICT                773

to Phillips Bluff, the head of navigation, 5 feet. The jetties are in
good condition, and the channel is in good condition as far upstream
as Lake Charles, and in poor condition above Lake Charles.
   The project is now considered complete unless at a later date it is
found necessary to extend the jetties seaward to the 15-foot contour,
as provided in the project document.
   The total costs of the existing project to the end of the fiscal year
were $4,541,452.58, of which $4,245,457.06 was for new work and
$295,995.52 for maintenance. The total expenditures have been
$4,496,094.57.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $267,319.07, will be expended as follows:
Accounts payable June 30, 1941-------       --------------------- $45, 358. 01
Maintenance:
    By contract: Dredging between Lake Charles, La., and the Gulf
      of Mexico, Oct. 1 to Dec. 30, 1942__----------------------- 133, 961. 06
    Hired labor:
        Dredging by United States hopper dredge Benyaurd from
           shore line to -32 contour in Gulf, June 1-30, 1943-------- 30, 000. 00
         Surveys and observations between Lake Charles and the
           -32 foot contour in Gulf---------------------------         5, 000. 00
Balance available----       ------------------------------------- 53, 000. 00
         Total for project--------------                             -------------- -------- 267, 319. 07
  The sum of $245,000 can be profitably expended for maintenance
during the fiscal year 1944 as follows:
Dredging by contract between Lake Charles and the Gulf as required
  during fiscal year ------------ _________             _            $200, 000
Dredging by United States hopper dredge from shore line to -32 foot
  contour in Gulf as required during fiscal year-------------------- 35, 000
Surveys and observations between Lake Charles and the -32 contour
  in Gulf ---------------------------------------------          ---    0, 000
         Total maintenance              -------------------------------------                                    245, 000

                                    Cost and financial swmmary
Cost of new work to June 30, 1942__                                                                   '$4, 741, 370. 69
Cost of maintenance to June 30, 1942_------------------                                                   '490, 846. 40

      Total cost of permanent work to June 30, 1942------------5, 232, 217. 09
Minus accounts payable June 30, 1942--- -----------------------    45, 358. 01

     Net total expenditures------------------------------                                                 5, 186, 859. 08
Unexpended balance June 30, 1942__---------------------                                                      267, 319. 07
         Total amount appropriated to June 30, 1942--------------                                         5, 454, 178. 15

   Fiscal year ending June 30               1938              1939              1940              1941            1942


Cost of new work ______________ _----                   $1, 035, 037. 72 $1,493, 790. 13     1 $923, 149. 60    $793, 479. 61
Cost of maintenance -___-. ___ _____                        __....... ... - __ --.. --- ..    1272, 366. 33
                                                                                              1.......            23, 629. 19

      Total cost                 - _ - _.
                   -......-.-......-               ._    1, 035, 037. 72   1,493, 790. 13    1, 195, 515. 93     817, 108. 80

                ..
Total expended _________________     _______               907, 147. 46    1, 373, 458. 35   1, 139, 423. 63   1, 076, 065. 13
Allotted _   ________________    ___________            3, 525, 000. 00      876, 413. 64      137, 000. 00      225, 000. 00

   1Miscellaneous     surveys, Lake Charles to the Gulf of Mexico costing $10,377.97, previously
carried under new work, now carried under maintenance.
774          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                  1942

Balance unexpended July 1, 1941__.------- _________
                                                ---                                      $1, 118, 384. 20
Amount allotted from War Department Civil Appro-
  priation Act approved June 24, 1940-----------    $250, 000. 00
Amount allotted from War Department Civil Appro-
  priation Act approved April 28, 1942-------------   50, 000. 00
                                                                                             300, 000. 00

     Amount to be accounted for__ -----          ___- __-__--
                                                           -                       -      1, 418, 384. 20
Deductions on account of revocation of allotment______                                        75, 000. 00

      Net amount to be accounted for_                                                       343, 384. 20
                                                                                          1__________________
                                                                                         1,
Gross amount expended--__   ----------------------------                                  1, 076, 065. 13

      Balance unexpended June 30, 1942___________________                                    267, 319. 07
Outstanding liabilities June 30, 1942_________----__     $103. 63
Amount covered by uncompleted contracts--------      218, 070. 63
                                                                                             218, 174. 26

         Balance available June 30, 1942_                                                     49, 144. 81

Amount (estimated) required to be appropriated for completion
of existing project 2_                                                                   3, 400, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 2__                                                               245, 000. 00
  2   Exclusive of available funds.

                 31. LAKE CHARLES DEEP WATER CHANNEL, LA.

   Location.-The Lake Charles Deep Water Channel, 24.9 miles in
length, extends from the Calcasieu River to the Sabine River, follow-
ing the Calcasieu-Sabine section of the Intracoastal Waterway. The
channel has access to deep water through the Sabine River, Sabine-
Neches Canal, Port Arthur Canal, and Sabine Pass to the Gulf of
Mexico. (See U. S. Coast and Geodetic Survey Chart No. 592 and
U. S. Geological Survey maps Moss Lake, Black Lake, Cameron Farms,
and Phoenix Lake quadrangles and Corps of Engineers, Mississippi
River Commission navigation maps of Intracoastal Waterway and
Atchafalaya River System.
   Existing project.-This provides for the maintenance of a channel
30 feet deep, with a bottom width of 125 feet, from Calcasieu River to
the Sabine River. Under ordinary conditions, the mean range of
tide is 2 to 3 inches; variations of 1 to 2 feet may, be experienced due
to high water on the Sabine or Calcasieu River.
   The estimated cost of the work, made in 1931, is $50,000 for the first
initial maintenance and $30,000 annually thereafter.
   The existing project was authorized by the following river and har-
bor acts:

      Acts                      Work authorized                                  Documents


Aug. 30, 19351   Maintenance of channel 30 feet by 125 feet from   H. Doec. No. 172, 72d Cong., 1st sess.
                   Lake Charles, La., to Sabine River.
Aug. 26,1937     Section of Calcasieu River from Intracoastal      H. Doe. No. 299, 75th Cong., 1st sess.
                  Waterway to Lake Charles dropped from exist-      (modifying project for Calcasies
                  ing project.                                      River and Pass).


  1 Included in the P. W. A. program, Jan. 3, 1934.
             RIVERS        AND HARBORS-NEW                   ORLEANS,         LA.,     DISTRICT              775
   Local cooperation.-Fullycomplied with. Under a permit granted
January 5,1922, the police jury of Calcasieu Parish expended $2,630,350
in enlarging the Calcasieu-Sabine River section of the Intracoastal
Waterway to a depth of 30 feet over a bottom width of 125 feet.
   Terminal facilities.-(See project for Calcasieu River and Pass.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The channel was in good condi-
tion throughout its entire length. Controlling depth on June 30, 1942,
was 30 feet in the center of the channel. Depths are somewhat less on
the edges of the channel, due to the, lowering of the side slopes, but
the shoaling is not sufficient to interfere seriously with navigation.
The channel is navigable throughout. The total costs and expendi-
tures at the end of the fiscal year were $238,623.36, including $79,577.63
Public Works funds, all for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $1,000, will be applied to surveys and channel inspection.
   The additional sum of $75,000 can be profitably expended during the
fiscal year 1944 in maintenance dredging in shoal areas of channel as
required.
                                    Cost and financial summary

Cost of new work to June 30, 1942
Cost of maintenance to June 30, 1942-------------------------                                       $238, 623. 36
         Total cost of permanent work to June 30, 1942------------- 238, 623.36

Net total expenditures-----------------------------------------                                      238, 623. 36
Unexpended balance June 30, 1942....                         ----------------------                    1, 000. 00

         Total amount appropriated to June 30, 1942_________________                                 239, 623. 36

   Fiscal year ending June 30           1938          1939           1940              1941               1942

Cost of new work    -...
Cost of maintenance-       -   -_     $66, 869. 76   $3, 090. 69   $89, 085. 28 .
Total expended__-----------------      67, 597. 76    1, 973. 87    89, 474. 10
Allotted -----------------------
             _                         70, 000. 00   80, 000. 00    10, 000. 00      $69, 045. 73       -$69, 000



Balance unexpended July 1, 1941--------------------------------$70,     000. 00
Deductions on account of revocation of allotment------------------  69, 000. 00
      Net amount to be accounted for-------------------------                                          1, 000. 00
Balance unexpended June 30, 1942--------------------------------                                       1, 000. 00
Amount that can be prQfitably expended in fiscal year ending June 30,
1944, for maintenance 1----------------------------------------                                      75, 000. 00
  1 Exclusive of available funds.

             32. REMOVING THE WATER HYACINTH                                (LOUISIANA)

  Location.-Lakes and streams tributary to the Gulf coast.
  Existing project.-This project provides for the extermination or
removal of plants from the navigable waters of the States of Florida,
Alabama, Mississippi, Louisiana, and Texas, so far as they are or may
become an obstruction to navigation, by any mechanical, chemical, or
other means whatsoever; for the construction and operation of boats
776        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                     1942

equipped with suitable machinery for such removal; and for the con-
struction and operation of booms to prevent the drifting of plants from
one stream to another. The latest (1942) approved estimate for annual
cost of maintenance is $200,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                   Documents


Mar. 3,1899   Made appropriations for the States of Florida and      H. Doc. No. 91, 55th Cong., 3d ses,.
                Louisiana and provided for the extermination or
                removal of plants, the building of boats, and the
                establishment of booms.
June 13, 1902 Authorized the use of mechanical, chemical, or
                other means whatsoever.
Mar. 3,1905 Made the appropriation available for the State of
                Texas.
    Do....___ In making appropriations for Florida, provided
Mar. 2,1907     that no chemical process injurious to cattle shall
                be used.
July 25, 1912 Made the appropriation available for the State of
                Mississippi and also made available for use in
                that State the operating plant pertaining to the
                work in Louisiana.
July 27,1916 Made the appropriation available for the State of
                Alabama.



   Terminal facilities.-The terminal facilities of the various streams
from which hyacinths were removed are described in the reports for the
improvement of these streams.
   Operationsand results during fiscal year.-The mechanical hyacinth
plant Kenny destroyed a total of 5,287,508 square yards of hyacinths
and alligator grass in Bayous Alligator, Chaffe, Chene Blanc, Lacas-
sine, Leopard, Misere, Owl, and Penchant, Blind River, and in the
Intracoastal Waterway and Wax Lake Outlet and their feeder areas.
    A total of 15,979,361 square yards of hyacinths and alligator grass
was removed by conveyors from Bayous Black, Blue, Boeuf, Grand
Caillou, Chene Blanc, Cher Amie, Chevreuil, Copassaw, Des Alle-
mands, Desire, Felix, Folse, Goddel, Grand, l'Eau Bleu, l'Ourse, La-
fourche, Leopard, Long, Middle, Milhomme, Penchant, Pierrepart,
Segnette, Sorrel, Stinking, Teche, Turtle, and Verret, Belle, Blind,
Blood, and Tickfaw Rivers, Minors Canal, the Intracoastal and Pla-
quemine Waterways and their feeder areas.
    Hand removal crews, operating where the use of mechanical equip-
ment was not practicable, removed a total of 196,410 square yards of
hyacinths and alligator grass from Bayous Black, Cane, Lafourche,
LeCarpe, and Upper Terrebonne.
    The destruction plant Keny, three small conveyors, and two medium
size side-discharge conveyors were used during the year. At the end
of the fiscal year the Kenny was undergoing repairs and alterations
which included increasing the power of the propelling motors to pro-
vide better control in maneuvering. A contract for the construction
of a third side-discharge conveyor was let and it is expected that de-
livery of this new plant will be made by early fall. Portable gasoline
engine-driven mechanical saws were developed and put into operation
          RIVERS AND HARBORS--NEW ORLEANS,                     LA.,    DISTRICT       777
to speed up the work of cutting the vegetation away from the banks
prior to removal by conveyors. Experiments were continued to im-
prove operation technique and increase efficiency of existing plants.
   An inspection of the barricades and booms constructed last year
showed that some had been damaged, apparently by collision of barges,
but no effort will be made to replace the damaged structures until such
time as funds for this work are again available.
   The total costs were $155,002.76, and the total expenditures were
$153,683.93, all for maintenance.
   Condition at end of fiscal year.--From 1900 to 1902 a boat with suit-
able machinery for removing and crushing the hyacinth was operated.
From that time until 1936 the hyacinths were controlled by spraying
with a solution of arsenic and soda, hand removal, and booms. The
use of arsenic and soda has been abandoned and removal by hand re-
duced to a minimum. Present methods of control are by means of a
crushing plant, power-operated conveyors, and booms. Excellent
results are being obtained.
The total costs were $12538,448.39, and the total expenditures were
$1,533,564.88, all for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $140,126.62, will be applied as follows:
Accounts payable June 30, 1942___-----------                                    $4, 883. 51
Maintenance by hired labor and Government plant:
    Exclusion by structures, July 1, 1942, to June 30, 1943______._____          4, 043. 11
    Mechanical destruction, July 1, 1942, to June 30, 1943--____                28, 000. 00
    Removal by conveyors, July 1, 1942, to June 30, 1943---------___            94, 400. 00
    Removal by hand, July 1, 1942, to June 30, 1943______________ _              6, 400. 00
    Experimental work, July 1, 1942, to June 30, 1943-----         ____             600. 00
    Examinations, surveys, reports, July 1, 1942, to June 30, 1943____           1, 800. 00
       Total maintenance -------------------------------------                 140, 126. 62
  The additional sum of $211,000 can be profitably expended during
the fiscal year 1944 as follows:
Maintenance by hired labor and Government plant:
    Exclusion by structures, July 1, 1943, to June 30, 1944___________   $13, 600
    Mechanical destruction, July 1, 1943, to June 30, 1944--------------  84, 600
    Removal by conveyors, July 1, 1943, to June 30, 1944______________ 102, 00
    Removal by hand, July 1, 1943, to June 30, 1944________________ ___  7, 000
    Experimental work; July 1, 1943, to June 30, 1944________________                1, 000
    Examinations, surveys, reports, July 1, 1943, to June 30, 1944__..               2, 000
       Total ------------------------------                                       211, 000

                            Cost and financial summary

Cost of new work to June 30, 1942_______
Cost of maintenance to June 30, 1942____________________________ $1, 538, 448. 39

     Total cost of permanent work to June 30, 1942 __________                1, 538, 448. 39
Minus accounts payable June 30, 1942___--   ___-- ________
                                                       --                         4, 883.51
     Net total expenditures----------------------------------1,                533, 564. 88
Unexpended balance June 30, 1942------------- ----------- -----                140, 126. 62
       Total amount appropriated to June 30, 1942   --------          ___-   1, 673, 691. 50
778         REPORT OF CHIEF OF ENGINEERS,                                                           U. S. ARMY,                          1942


   Fiscal year ending June 30                        1938                    1939                     1940                    1941                 . 1942


C ost of new w ork .--   -   -     - -     .   -     - -     -    .   - -     -     -      ..   -     -     - -    .   -     - -     -     . . .     .   .   .
                       -
Cost of maintenance _.--
                      ..-           ..             $80, 258.16          $98, 360. 72            $119, 339. 14              $177, 845. 91           $155, 002. 76

Total expended- ...--........                       80, 218. 35             99, 396. 45             113, 080. 55             85, 604. 14            153, 683. 93
Allotted..----- ----------------                   165, 600. 00             98, 000. 00             231, 000. 00            162, 529. 30            100, 360. 00


Balance unexpended July 1, 1941__________------_ ___----                                                                                  $193, 450. 55
Amount allotted from War Department Civil Appropria-
  tion Act approved May 23, 1941     _________        _   $360
Amount allotted from War Department Civil Appropria-
  tion Act approved Apr. 28, 1942_______________----__100, 000
                                                                                                                                            100, 360. 00

      Amount to be accounted for_                                                        -__--
                                                                              -___-__-____--                                                293, 810. 55
Gross amount expended_____     _1------                                       --------------                                                153, 683. 93

      Balance unexpended June 30, 1942                                                                                      ___              40, 126. 62
                                                                                                                                            1________________
Outstanding liabilities June 30, 1942__._____________-                                                                      ___-                 462. 11

         Balance available June 30, 1942____________________-_                                                                              139, 664. 51

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1____---_---------____-----                                                                                      211, 000. 00
   1 Exclusive of available funds.

    33. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                                                   (GENERAL)

  The cost of work during the fiscal year amounted to $137,150.41;
the expenditures were $134,029.60. The balance unexpended June 30,
1942, $10,008.96, will be applied as needed during the fiscal year 1943
in payment of expenses incurred under this heading.
  The additional sum of $124,000 can be profitably expended during
the fiscal year 1944.
                                               Cost and financial summary

Cost of new work to June 30, 1942_____
Cost of maintenance to June 30, 1942----------------------                                                                               $1, 354, 436. 13
     Total cost of permanent work to June 30, 1942___________-                                                                            1, 354, 436. 13
Minus accounts payable June 30, 1942_-------__ ______          _                                                                               5, 319. 92

     Net total expenditures__________________          -                                                                                  1, 349, 116. 21
Unexpended balance June 30, 1942     ----------------------                                                                                   10, 008. 96
          Total amount appropriated to June 30, 1942.--________                                                                           1, 359, 125. 17

    Fiscal year ending June 30                        1938                    1939                        1940                1941                    1942

Cost of new work-            ---
Cost of maintenance------------                    $81, 523.45              $47, 521.19             $82, 818. 82           $127, 911.00            $137, 150.41
Total expended-                    __                85, 560. 98             47, 854. 89             73, 661. 92            134, 850. 99             134, 029. 60
Allotted__________       ____________...           165, 000. 00              75, 000. 00             92,000.00               97, 500. 00              52, 059. 23
             RIVERS AND HARBORS-NEW                                        ORLEANS, LA.,               DISTRICT                   779
Balance unexpended July 1, 1941_      ____________-____________ $91, 979.33
Amount allotted from War Department Civil Appropria-
  tion Act approved June 24, 1940-__________________    $36, 800. 00
Amount allotted from War Department Civil Appropria-
  tion Act approved May 23, 1941_ _____________ -    -15,    259. 23
                                                                                                                       52, 059. 23

      Amount to be accounted for_________________________          144,038.56
Gross amount expended________________                $137, 779. 60
Less reimbursements collected    -         --      __
                                     -- ____________    3, 750. 00
                                                                   134, 029. 60

      Balance unexpended June 30, 1942---------------------                                                            10, 008. 96
Outstanding liabilities June 30, 1942------------------------                                                           4, 781. 54
         Balance available June 30, 1942                           -----------------                                    5, 227. 42

Amount that can be profitably expended
June 30, 1944, for maintenance 1- _
   1Exclusive of available funds.
                                                                   __--    in fiscal year ending
                                                                                --
                                                                              ________    -___   124, 000. 00


34. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED

                                                                  For last    Cost and expenditures to
                                                                  full re-          June 30, 1942                       Estimated
                   Name of project                                port see                                               amount
                                                                  Annual                                                 required
                                                                  Report       New work           Mainte-              to complete
                                                                   for-                           nance

1. Bayou Pierre, Miss.' 2      -        .               .           1888        $5, 000.00       ___        _                   (3)
2. Big Pigeon and Little Pigeon Bayous, La.'_ ...            _      1936     _$37,                        669. 20               (3)
3. Bayou Queue de Tortue, La.'--------- __                       -_ 1924        33, 355. 18            4, 276. 10               (3)
4. Vinton Waterway, La____________               _ _____            1937     __..... __- ...     -.
                                                                                                .____-        .....         4$14, 000
  1 Channels adequate for commerce.
  2 No commerce reported.
  3 Completed.
  4 Due to decline of traffic, local interests are no longer sufficiently interested to provide rights-of-way and
dumping privileges.


            35. PLANT ALLOTMENT, NEW ORLEANS, LA., DISTRICT
                                        Cost and financial summary
Undistributed costs June 30, 1942_ --                        ______---___-_____-$1,                                   301, 448. 32
Net total cost to June 30, 1942__.       _____-__                                          ____-___             1, 301, 448. 32
Plus accounts receivable June 30, 1942--                                                   ------ -                  3, 405. 91
                                                                                                                    1--------
     Gross total costs to June 30, 1942_-       -1___-------__                                                  1, 314, 854. 23
Minus accounts payable June 30, 1942      ___--------                                                               20, 288. 40
     Net total expenditures----_________  ____  -                                                  ---          1, 294, 565. 83
Unexpended balance June 30, 1942_ 1111111111111                                                     ---            159, 530. 93
         Total amount appropriated to June 30, 1942-                                                     __ 1, 454, 096. 76
                                                                                                            1_____-

   Fiscal year ending June 30                    1938             1939              1940               1941                1942

Total expended-----------               -$136,     298. 41   $583, 874. 00       $25, 323. 54 -$382, 347.42               $19, 121.00
Allotted.......----------------------       61, 756. 16       343, 224. 90        31, 299. 48    -32, 600. 00           -301,     194. 47
780         REPORT OF CHIEF OF ENGINEERS,                                U.     S. ARMY,                 1942

Balance unexpended July 1, 1941__   __ __-___ ___--_                                                        $479, 846. 40
Deductions on account of revocation of allotment_-----__-8__                                                 301, 194. 47

      Net amount to be accounted for---------______     _________                                            178, 651. 93
Gross amount expended_ ....    ________----- --     -   $441, 457. 33
Less:
    Reimbursements collected -____---     $371, 090. 86
    Receipts from sales-    __-______        51, 245.47
                                                         422, 336. 33
                                                                                                              19, 121. 00

      Balance unexpended June 30, 1942----------------------                                                 159, 530. 93
Outstanding liabilities June 30, 1942 ______________________-                                                 13, 283. 14

      Balance available June 30, 1942______  1_______ 1                                            1    1__146,     247. 79
Accounts receivable June 30, 1942 _____     _____    __-__                                        -__    -      13, 405. 91

         Unobligated balance available June 30, 1942__                                 ___        __         159, 653. 70

Status of all investigations for navigation called for by river and harbor acts and
                               committee resolutions

                                                           Date trans-
          Locality                 Authorization act       mitted to          Document number                Recommenda-
                                                            Congress

Atchafalaya River and At-        Rivers and Harbors
chafalaya Bay Ship Chan-          Committee resolu-
nel, La.                         tion, Apr. 4, 1938.
Calcasieu River, La., for        Commerce Committee
navigation, flood
                1  control        resolution, Feb. 8,
and irrigation.                   1939; Flood Control
                                   Committee resolu-
                                  tion, Jan. 26, 1939;
                                   Rivers and Harbors
                                   Committee resolu-
                                  tion, Jan. 24, 1939.
Calcasieu River, La., to pro-    Rivers and Harbors       Dec. 12, 1941        House, 465, 77th              Favorable.
vide deep water to Port of        Committee resolu-                            Cong., 1st sess.
Lake Charles.                     tion, Aug. 28, 1940.
Grand Caillou and Le Carpe       Rivers and Harbors
Bayous, La.                       Committee resolu-
                                   tion, Apr. 4, 1938.
Houma-Terrebonne Ship            _--- do    -      -
Canal, La.
Lafourche Bayou, La. (spe-       Commerce Committee       Dec.      8, 1941                                  Unfavorable.
cial board).                      resolution, Mar. 29,
                                   1937.
Lafourche Bayou, La. (spe-       Rivers and Harbors           do
                                                              do-
                                                               ..       .-                                      Do.
cial board).                      Committee resolu-
                                   tion, Mar. 26, 1940.
La Loutre, St. Malo, and         Commerce Committee       Sept. 15, 1941       Senate, 116, 77th             Favorable.
Yscloskey Bayous, La.             resolution, Apr. 15,                          Cong., 1st sess.
                                   1940.
Little Caillou Bayou, La   --    Commerce Committee                            ................
                                   resolution, May 21,
                                   1941.
Louisiana-Texas Intracoastal     Rivers and Harbors       Dec.      8,1941                                   Unfavorable.
  Waterway (interim report)        Committee resolu-
   (special board).                tion, June 8, 1938.
Mermentau River and tribu-       Commerce Committee       July 24, 1941        Senate, 94, 77th              Favorable.
  taries, La., for navigation,     resolution, Feb. 8,                           Cong., 1st sess.
  flood control and irriga-        1939; Flood Control
   tion.                           Committee resolu-
                                   tion, Jan. 26, 1939;
                                   Rivers and Harbors
                                   Committee resolu-
                                   tion, Jan. 24, 1939.
Mermentau River, La., in         Rivers and Harbors                                        Do.
                                                          --..do_._.... ....do ..........---------
                                                                              -----   do------------

interest of navigation and        Committee resolu-
national defense.                 tion, Oct. 28, 1940.
Mermentau River and tribu-       Rivers and Harbors          do .. _--.
                                                          ....                     do.............Do.
                                                                                 ...
taries, La. (salinity).           Committee resolu-
                                   tion, June 23, 1939.
Mississippi River at and be-     Rivers and Harbors
low New Orleans, La.,             Committee resolu-
decrease in salinity.             tion, Apr. 25, 1940.
  1 Combined with report on Red River, La., Ark., Okla., and Tex., and connecting waterways, being
prepared by special board.
            RIVERS       AND HARBORS-NEW                     ORLEANS,             LA.,   DISTRICT            781

   Status of all investigations for navigation called for by river and harber acts and
                           committee resolutions-Continued

                                                         Date trans-
          Locality               Authorization act        mitted to          Document number          tion
                                                          Congress

Mississippi River at and be- Commerce Committee
low New Orleans, La., de-      resolution, Apr. 25,
  crease in salinity.           1940.
Mississippi River at or near  Rivers and Harbors         July 24, 1941       Senate, 94, 77th     Favorable.
  New Orleans, La., to Cor-     Committee resolu-                              Cong., 1st sess.
  pus Christi, Tex. (sa-        tion. June 6, 1939.
  linity).
Mobile, Ala., to New Or- Rivers and Harbors              May 19, 1942        Confidential _--        Do.
  leans, La., Intracoastal      Committee resolu-
  Waterway.                     tion, May 12, 1938.
Mobile, Ala., to New Or- Rivers and Harbors              __-_do     .--      . _. do ............    Do.
  leans, La., Intracoastal      Committee resolu-
  Waterway.                     tion, Jan. 24, 1939.
Morgan City to Mississippi    Commerce Committee         Dec.      8, 1941                        Unfavoralle.
  River at Plaquemine, La.      resolution    July 5,
  (alternate route study on     1938.
  Miss. R. to Corpus Christi,
  Tex., Intracoastal Water-
  way) (special board).
Petit Anse, Carlin, and       Rivers and Harbors
  Tigre Bayous, La., 9-ft.      Committee resolu-
  channel from Gulf of          tion, May 4, 1939.
  Mexico to Erath and Jef-
  ferson Island.
Petit Anse, Carlin, and       Commerce Committee
  Tigre Bayous, La.             resolution, Aug. 30,
                                1940.
Queue de Tortue Bayou,        Commerce Committee
  La., for navigation and       resolution, Dec. 19,
  drainage.                     1940.
Rapides, Boeuf, Cocodrie,     Commerce Committee
  and Cortableau Bayous.        resolution, Feb. 8,
  La., for navigation, flood    1939; Flood Control
  control, and irrigation.'     Committee resolu-
                                tion, Jan. 26, 1939;
                                Rivers and Harbors
                                Committee resolu-
                                tion, Jan. 24, 1939.
Red River, La., Ark., Okla., ......do ___-.. . .. .. .
  and Tex. and connecting
  waterways, singly or to-
  gether,    for navigation,
  flood control and irriga-
  tion. (Report being pre-
  pared by special board).
Teche Bayou, La., upper        River and Harbor Act,     July 24, 1941       Senate, 93, 77th     Favorable.
  portion, improvement for       Aug. 26, 1937.                                Cong.. 1st sess.
  navigation and flood con-
  trol.
Teche-Vermilion Waterway,      River and Harbor Act,     .... do                 do ____-----
                                                                             .--..         ....      Do.
  La., improvement       for     June 20, 1938.
  navigation, flood control,
  and other water uses.
Tigre Bayou to the town of     Rivers and Harbors
  Erath, La.                     Committee resolu-
                                 tion, Apr. 4, 1938.
Vermilion Bayou, La., be-      Commerce Committee July 24, 1941    Senate, 93, 77th      Do.
  tween Abbeville, La. and       resolution, July 19,                Cong., 1st sess.
  Vermilion Bay.                 1940.
Vermilion River and Bayou      Commerce Committee .-- _do             do............. Do.
                                                          ..-. .- .....
  Teche, La. for navigation,     resolution, Feb. 8,
  flood control, and irriga-     1939; Flood Control
  tion.                          Committee resolu-
                                 tion, Jan. 26, 1939;
                                 Rivers and Harbors
                                 Committee resolu-
                                 tion, Jan. 24, 1939.
Violet Canal Route, La ....    River and Harbor Act, May 19, 1942                     Unfavorable.
                                 June 20, 1938.


  1Combined with report on Red River, La., Ark., Okla., and Tex., and connecting waterways, being
prepared by special board.



        493202-43-pt. 1, vol. 1---50
782     REPORT OF CHIEF OF ENGINEERS,             U.   S.   ARMY,   1942

                      36. HOMOCHITTO RIVER, MISS.
    Location.-The project is located along the Hom,ochitto River in
Adams and Wilkinson Counties, Miss. (See Corps of Engineers,
Mississippi River Commission Alluvial Valley maps and Artonish,
Woodville, and Kingston quadrangles.)
    Existing project.-The plan of improvement provides for the con-
struction of a number of cut-offs, aggregating approximately 5.8
miles in length, which will reduce the length of the river from Rosetta,
Miss., to its mouth from 37.7 to 30.6 miles; construction of small earth
dams at points where the new cut-offs leave and reenter the existing
channel; clearing and snagging operations along both banks from
mile 1 to mile 35; and blasting along sides and bottom of the channel
where its development is retarded by stumps or hard nonerodible clay
strata.
    The project will result in clearing the river bed and banks of ob-
-structions, shortening the channel and producing a more uniform
slope, thereby resulting in faster run-off of floodwaters in the basin,
minimizing the damages to crops and highways and making practi-
cable more general use of farm and timberlands which have been
hitherto subject to frequent extended inundation.
    The existing project was authorized by the Flood Control Act ap-
proved June 22, 1936, and modified by the Flood Control Acts ap-
proved June 28, 1938, and August 18, 1941. The estimated cost of
new work, revised in 1941, is $200,000.
    Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
    Operations and results durinq fiscal year--New work.-Acquisition
,of rights-of-way was continued; costs for the fiscal year were $88.76
for new work.
    Maintenance.-Clearing,snagging, and blasting of the channel and
banks were performed by hired labor at a cost of $4,182.37. The ex-
penditures were $4,889.55.
    Condition at end of fiscal year.-The construction of cut-offs be-
tween mile 4 and mile 35 above the mouth of the channel has been
completed. In addition, 28.5 miles of clearing and snagging have
been completed between mile 2 and mile 35. The project is approxi-
mately 75 percent complete. Additional channel improvements and
the completion of acquisition of rights-of-way are needed to complete
the project. Maintenance consisting of clearing, snagging, and blast-
ing has been performed by hired labor between mile 6 and mile 32.
    The total costs to June 30, 1942, have been $166,414.74, of which
"$129,704.74 for new work and $18,000 for maintenance were from
regular funds and $18,710 for new work from Emergency Relief
funds. Total expenditures to June 30, 1942, have been $166,397.60,
of which $147,687.60 were from regular funds and $18,710 from Emer-
gency Relief funds.
    Proposed operations--The balance unexpended at the end of the
fiscal year, $16,602.40, will be applied as follows:
Accounts payable June 30, 1942____________________________                 $17. 14
New work: Completion of acquisition of rights-of-way _ _    ___-_'    1, 585. 26
Maintenance: Clearing of the channel and removal of snags and drift
  jams--___       ______          -____________----___             _ 15, 000.00
      Total-                   --
                       - _______-____________________                16, 602. 40
   The additional sum of $15,000 can be profitably expended during
-the fiscal year 1944 on maintenance of the waterway.
            RIVERS AND HARBORS-NEW ORLEANS,                                              LA.,     DISTRICT             783
                                     Cost and financial summary
Cost Qf new work to June 30, 1942-------------                                                                 $148, 414. 74
Cost of maintenance to June 30, 1942    ---------------------                                                    18, 000. 00
      Total cost of permanent work to June 30, 1942-------------                                           1166, 414. 74
Minus accounts payable June 30, 1942________--__         _____                                                    17. 14

      Net total expenditures________-----------__-                                                         1166, 397. 60
Unexpended balance June 30, 1942 -----------------------                                                     16, 602. 40
         Total amount appropriated to June 30, 1942 --------------                                             183, 000. 00

   Fiscal year ending June 30               1938                1939            1940              1941              1942


Cost of new work ___----------_      $25, 099. 35            $24, 900. 65     $65, 821. 61      $32, 504. 37            $88. 76
Cost of maintenance            __ _____________            _____________    _____________        13, 817. 63         4, 182. 37
      Total cost_                          25, 099. 35        24, 900. 65      65, 821.61        46, 322. 00         4, 271.13

Total expended.....                          24, 295. 77
                            ...-----------------              25, 704. 23      58, 530. 11       52, 977. 94         4, 889. 55
Allotted_ ________          __             50, 000. 00       100, 000. 00           -            18, 000. 00        15, 000. 00


Balance unexpended July 1, 1941_                 _    ________                                                   $6, 491. 95
Amount allotted from War Department Civil Appropriation Act
  approved April 28, 1942 ---------------------------------------                                                15, 000. 00
      Amount .to be accounted for_-------------------------      _                                               21, 491. 95
Gross amount expended-----------------------------$4,906.       31
Less reimbursements collected_________ _______   _____-     16. 76
                                                                                                                  4, 889. 55
      Balance unexpended June 30, 1942______--- ____-_______                                                     16, 602. 40
Outstanding liabilities June 30, 1942----------------------------                                                     41. 00
         Unobligated balance available June 30, 1942 ----------------                                            16, 561. 40
Amount (estimated) required to be appropriated for completion of
                     --  -      -
existing project 2_____                                                                                         50, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance 2                             __                                                 15, 000. 00
   SIncludes $18,710 emergency relief funds.
   2 Exclusive of available funds.

                                  37. BAYOU DES GLAISES, LA.

   Location.-The diversion channel commences at Bayou des Glaises,
near Moreauville, La., and runs in a southeasterly direction for a dis-
tance of approximately 6.1 miles, connecting with the landside borrow
pits of the West Atchafalaya Basin protection levee at a point approx-
imately 31/4 miles south of Hamburg, La., all in Avoyelles Parish.
(See Mississippi River Commission Alluvial Valley maps, and Voor-
hies quadrangle.)
   Existing project.-The plan of improvement provides for a diver-
sion channel between Bayou des Glaises, at Moreauville, and the bor-
row pit of the West Atchafalaya Basin protection levee, a distance
of approximately 6.1 miles. Bottom width for the first 2 miles is 60
feet and for the balance of the channel 100 feet, with an average
depth of 18 feet. The project also provides for the construction
across the channel of one timber, steel, and concrete highway trestle;
one timber road trestle; and one creosoted timber railroad trestle,
784           REPORT OF CHIEF OF ENGINEERS,                                       U.       S. ARMVIY,       1942

and the readjustment of utilities. This project will result in reduced
flood damages and will improve sanitary and, living conditions by
providing needed drainage for an area of approximately 541 square
miles. The channel will relieve backwater conditions in Bayou des
Glaises resultant from closure of the Bordelonville floodgate during
floods. The existing project was authorized by the Flood Control
Act approved June 22, 1936. The estimated cost of new work, re-
vised in 1940, is $147,200 for construction and $50,000 for lands and
damages. The project is adjacent to the Mississippi River Commis-
sion levee system, Mansura to Hamburg, and the West Atchafalaya
protection levee; for further details see annual report, Mississippi
River Commission, for 1940.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operationsand results during fiscal year.-Reimbursement of costs
of rights-of-way for the diversion canal, already acquired by the local
levee board, was made. The cost was $3,502.89, all from regular funds.
The expenditures, all from regular funds, were $32.29.
   Condition at end of fiscal year.-The diversion channel is complete.
The length is 6.09 miles. Total costs to June 30, 1942, have been $183,-
742.25, of which $162,904.38 were from regular funds and $20,837.87
from Emergency Relief funds. The expenditures have been $180,-
271.20, of which $159,433.33 were from regular funds and $20,837.87
from Emergency Relief funds.
   Proposed operations.--The balance unexpended at the end of the
fiscal year, $16,966.67, will be applied to payments for rights-of-way.
   No additional funds can be profitably expended during the fiscal year
1944, as the project will be completed with the available funds.
                                            Cost and financial summary
Cost of new work to June 30, 1942_-----------------------_                                       -------          $183, 742. 25
Cost of maintenance to June 30, 1942
      Total cost of permanent work to June 30, 1942--------------                                                  183, 742. 25
Minus accounts payable June 30, 1942----------------------------                                                     3,471.05

      Net total expenditures--------------------..                                                                180, 271. 20
Unexpended balance June 30, 1942__                                                                                 16, 966. 67

           Total amount appropriated to June 30, 1942-----------------                                            197, 237. 87


      Fiscal year ending June 30               1938           1939                  1940            1941               1942

Cost of new work___                _         $84, 132. 88   $62, 696. 33         $32, 586. 06        $824. 09          $3, 502. 89
Cost of maintenance.........................................----                    ---     --    ---                  -
Total expended-----------------               79, 988. 00    66, 836. 48           32, 690. 31          724. 12               32. 29
Allotted....      ..---------------------    161, 837. 87    35, 400. 00 -........-----                    -        --------


Balance unexpended July 1, 1941__ ___________--__------                                                           $16,998. 96
Gross amount expended_____------ --------------------------                                                            32. 29

      Balapce unexpended June 30, 1942_-----------------------                                                     16, 966. 67
Outstanding liabilities Junie 30, 1942____1_ _______ _     _                                                       16, 643. 13

           Unobligated balance available June 30, 1942 --- -----------                                                 323. f54
  I   Includes $20,837.87 Emergency Relief funds.
        RIVERS   AND HARBORS-NEW        ORLEANS,   LA.,   DISTRICT   785

           38. BAYOU TECHE AND VERMILION RIVER, LA.

   Location.-Bayou Teche has its source in Bayou Courtableau, in St.
Landry Parish, and flows in a southeasterly direction a distance of 125
miles to its confluence with the lower Atchafalaya River, about 101/2
miles above Morgan City, La. Vermilion River, also called Bayou
Vermilion, is formed by the junction of Bayous Fusilier and Bour-
beau, west of Arnaudville, La., and flows in a southwesterly direction
to the western end of Vermilion Bay, a distance of 72 miles. Bayou
Teche is connected with the Vermilion River by Bayou Fusilier at
Arnaudville; and by Ruth Canal, an artificial, privately owned, non-
navigable waterway, constructed for diversion of water from Bayou
Teche to Vermilion River for rice irrigation. (See U. S. Coast and
Geodetic Survey Charts Nos. 1116 and 1277; Corps of Engineers,
Mississippi River Commission Alluvial Valley maps, and U. S. Geo-
logical Survey maps.)
   Ixisting project.-This provides for increasing the pool elevation
in Bayou Teche above Keystone lock by 3 feet, by means of the
installation of movable crest gates on Keystone Dam; the excavation
of a channel with a bottom width of 35 feet at elevations varying
from -2 feet to -3 feet from the head of Bayou Teche at Bayou
Courtableau to a point approximately 11 miles downstream; the exca-
vation of a navigable channel 8 feet deep and 80 feet wide from the
8-foot contour in Vermilion Bay to the Intracoastal Waterway at its
junction with the Vermilion River; the excavation of a channel in
the Vermilion River, 9 feet deep by 100 feet wide, from the Intra-
coastal Waterway to Lafayette, La. (Pinhook Bridge) ; and the exca-
vation of a nonnavigable channel from Lafayette to the junction of
Bayous Bourbeau and Fusilier of adequate capacity to carry flood
flows of the upper Vermilion Basin: The plane of reference is mean
low Gulf level.
   The estimated Federal cost of new work is $1,390,000. The esti-
mated local cost of new work is $94,000.
   The latest approved estimate of Federal cost of annual maintenance
is $4,000, in addition to the maintenance cost authorized for the works
constructed under authorizations for the improvement of rivers and
harbors.
   The existing project was authorized by the Flood Control Act of
August 18, 1941. (See S. Doc. No. 93, 77th Cong., 1st sess., which
also contains the latest published map.)
   Local cooperation.-See page 5 for requirements. In addition to
the usual requirements for local cooperation as provided by law, local
interests are required to give assurances satisfactory to the Secretary
of War that they can and will prosecute all work required for con-
struction, operation, and maintenance of improvements in Ruth
Canal; that they will maintain and operate all bridges, pipe-line
crossings, and other utilities included in or affected by the improve-
ments; and that they will operate the control structure in Ruth Canal
in accordance with regulations prescribed by the Secretary of War.
   Local interests are now doing necessary preparatory work for com-
pliance with these provisions.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on the
project. No costs or expenditures have been incurred to date.
786         REPORT OF CHIEF OF ENGINEERS,                  U. S. ARMY,   1942

  Proposed operations.-The sum of $27,000 allotted in August 1942
will be applied to the preparation of detailed plans.
                                     Cost and financial summary
Cost of new work to June 30, 1942_________________----------------------
Cost of maintenance to June 30, 1942________________------------------
      Net total expenditures----------------------        ------   ----------
Total amount appropriated to June 30, 1942__________-_____________ ___
Amount allotted in August 1942__-------------------------------       $27, 000

    Amount available during the fiscal year 1943_______________                        27, 000
Amount (estimated) required to be appropriated for completion of
  existing project      1_____-__------_----------          ---------           1, 363, 000
  1 Exclusive of available funds.

                                 39. MERMENTAU RIVER, LA.
   Location.-Mermentau River is formed by the junction of Bayous:
des Cannes and Nezpique, 2.25 miles above Mermentau, La., and flow-
ing in a southwesterly direction, empties into the Gulf of Mexico.
   Bayou Nezpique rises in Evangeline Parish, flows in a southerly
direction, and empties into the Mermentau River.
   Bayou des Cannes rises in Evangeline Parish, flows in a south-
southwesterly direction, and empties into the Mermentau River.
 (See U. S. Coast and Geodetic Survey Charts Nos. 1116 and 1278,
and U. S. Geological Survey maps.)
   Existing project.--rfhe plan of improvement provides for enlarge-
ment of the channel of the lower Mermentau River to a depth of 15
feet below mean low Gulf level, over a bottom width of 170 feet from
mile 15 at upper Mud Lake to the Gulf of Mexico in order to elimi-
nate flood damages in the marsh area, and construction of a lock and:
control spillway at Catfish Point, mile 24, to prevent salt-water in-
trusion.
   The estimate of Federal cost for new work is $970,000. The ap-
proved estimate of Federal cost of annual maintenance is $18,000.
   The existing project was authorized by the Flood Control Act of
August 18, 1941. (See S. Doc. No. 94, 77th Cong., 1st sess., which
also contains the latest published map.)
   Local cooperation.-See page 5 for requirements. The cost of
maintenance and operation of the Federal project will be borne by the
United States.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on the
project. No costs or expenditures have been incurred to date.
  Proposed operations.-The sum of $23,000 allotted in August 1942
will be applied to the preparation of detailed plans.
                         Cost and financial summary
Cost of new work to June 30, 1942------------------------------------
Cost of maintenance to June 30, 1942_______________-_____                ___--------

Net total expenditures
Total amount appropriated to June 30, 1942     -____________________-------
Amount allotted in August 1942______________                       $23, 000
Amount available during the fiscal year 1943--------------          23, 000
Amount (estimated) required to be appropriated for completion of exist-
ing project-      -        _----         _--__     _               -_ 947, 000
  1   Exclusive of available funds.
             RIVERS AND            HARBORS--NEW                    ORLEANS,          LA.,     DISTRICT             787

40. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL

  The cost of the work during the fiscal year was $4,503.88; the
expenditures were $4,503.88. No funds are available and no work is.
contemplated for the fiscal year 1943.
                                      Cost and financial summary
Cost of new work to June 30, 1942------------------------- ----   ----------
Cost of maintenance to June 30, 1942----------------------------- $74, 800. 00
      Total cost of permanent work to June 30, 1942---------------                                          74, 800. 00
Net total expenditures---------------------- --------------------                                           74, 800. 00
Total amount appropriated to June 30, 1942____ _-                                     ---------             74, 800. 00

   Fiscal year ending June 30               1938           1939              1940             1941              1942

                          - ---------.- --------..---------.- -----..........
                ....... ..-
Costofnew work -...
Cost of maintenance--..     - ---- -- -------- ----      $7,725.74       $53, 319. 86        $9, 250. 52        $4, 503. 88

Total expended ..--------           --------------         7, 441. 79       51, 824. 89      11, 029. 44         4, 503. 88

Allotted     ..---------------------------------         73, 700. 00        14, 250. 00     -3, 000. 00       -10, 150. 00


Balance unexpended July 1, 1941-----------------------------------                                         $14, 653. 88
Amount allotted from War Department Civil Appropriation Act ap-
  proved May 23, 1941----------     ----------------------------                                             3, 850. 00
       Amount to be accounted for_--------------------------------_                                         18, 503. 88
Deductions on account of revocation of allotment                                                                000. 00
                                                                                                            1-------------------4,
       Net amount to be accounted for------------------------                                                4,503. 88
Gross amount expended__                                             $5, 104. 47
Less reimbursements collected---------------------------                600. 59
                                                                                                             4, 503. 88

41. OTHER FLOOD-CONTROL PROJECTS FOR WHICH NO ESTIMATES.
                      ARE SUBMITTED

                                                                        Cost and expenditures to
                                                       For last full          June 30,1942                   Estimated
                   Name of project                      report see                                                  t
                                                                                                             amounred
                                                      °lAnnual Re-                                           quired to
                                                       Aport for-       New work          Maintenance         complete

Buffalo River, Miss--                          -            1940                                                 1I$40, 000
  1 No work has been done because of the lack of sufficient funds.

Status of all investigations for flood control called for by flood-control acts and
                               committee resolutions

                                                              Date trans-
           Locality                Authorization act          mitted to        Document number             Recommenda-
                                                               Congress
Calcasieu River, La., for       Commerce Commit-
navigation, flood control,      tee resolution, Feb.
and irrigation.'                8, 1939; Flood Con-
                                 trol Committee res-
                                 olution, Jan. 26, 1939;
                                  Rivers and Harbors
                                  Committee resolu-
                                 tion Jan. 24, 1939.
Mermentau River and trib- -.- do_ __ __-__--__-   July 24,1941I Senate, 94, 77th Favorable.
  utaries,   Louisiana, for                                        Cong., 1st sess.
  navigation, flood control,
  and irrigation.
  I Combined with report on Red River, La., Ark., Okla., and Tex., and connecting waterways, being
prepared by special board.
788           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                          1942

    Status of all investigationsfor flood control called for by flood-control acts and
                          committee resolutions-Continued

                                                               Date trans-                            Recommenda.
          Locality                 Authorization act            mitted to    Document number             tion
                                                                Congress

Mississippi River, alluvial      Flood Control Com-
valley, damages from back-       mittee   resolution,
water from Atchafalaya           June 6, 1939.
Basin and Wax Lake Out-
let.
Mississippi River in alluvial    Commerce Commit-            Aug. 14,1941    House, 359, 77th         Favorable
valley and Head of Passes        tee resolution Mar.                          Cong., 1st sess.
to Cape Girardeau, Mo.            12, 1940.
 (Mississippi River Com-
mission).
    Do___ _    ________ _-_-_-   Flood Control Com-          __-- _do             _do___                 Do.
                                  mittee     resoliution,
                                   Aug. 2, 1939.
Pontchartrain Lake, La.,         Flood Control Act,
from the Orleans-Jefferson       Aug. 18, 1941.
Parish line westward
and northward to the vi-
cinity of Frenier.
Queue de Tortue Bayou,           Commerce Commit-
La., for navigation and          tee resolution, Dec.
drainage.                         19, 1940.

Rapides, Boeuf, Cocodrie,        Commerce Commit-
and Cortableau Bayous,           tee resolution, Feb.
La., for navigation, flood       8, 1939; Flood Con-
control, and irrigation.'        trol Committee res-
                                  olution, Jan. 26, 1939;
                                   Rivers and Harbors
                                   Committee resolu-
                                  tion, Jan. 24, 1939.
Rapides, Boeuf, Cocodrie         Flood Control Act,
  Bayous, and watersheds           June 28, 1938.
thereof, from their source
in Rapides Parish to their
outlet in St. Landry Par-
ish, La.'
Red River, La., Ark., Okla.,     Commerce Commit-
and Tex., and connecting           tee resolution, Feb.
waterways, singly or to-          8, 1939; Flood Con-
gether, for navigation,           trol Committee res-
flood control, and irriga-        olution, Jan. 26, 1939;
tion (report being pre-            Rivers and Harbors
pared by special board).           Committee resolu-
                                   tion, Jan. 24, 1939.
Teche Bayou, La., upper          River and Harbor Act,
                                                   July 24, 1941             Senate, 93, 77th            Do.
  portion, improvement for         Aug. 26, 1937.                              Cong., 1st sess.
  navigation and flood con-
  trol.
Teche-Vermilion Waterway, River and Harbor Act, _.. _do . .                  --   do __-_....._..        Do.
  La., improvement for nav-   June 20, 1938.
  igation and flood control
  and other water uses.
Vermilion River and Bayou Commerce Commit- _____do . .                       . ..do ____.____.    .      Do.
  Teche, La., for navigation, tee resolution, Feb.
  flood control, and irriga-  8, 1939; Flood Con-
  tion.                       trol Committee res-
                                   olution, Jan. 26, 1939;
                                    Rivers and Harbors
                                    Committee resolu-
                                   tion, Jan. 24, 1939.


  1Combined with report on Red River, La., Ark., Okla., and Tex., and connecting water-
ways, being prepared by special board.
         RIVERS AND     HARBORS--VICKSBURG,            MISS.,   DISTRICT            789
  IMPROVEMENT OF RIVERS AND HARBORS IN THE
          VICKSBURG, MISS., DISTRICT
  This district comprises a very small portion of southwestern Ten-
nessee, northwestern Mississippi, southern Arkansas, a portion of
northeastern Texas, and northern Louisiana embraced in the drainage
basins of the eastern tributaries of the Mississippi River south of'
Nonconnah Creek to Big Black River, inclusive, and of the western
tributaries south of the Arkansas River to the south bank of the Red
River. It includes the drainage basin of the Red River from Fulton,.
Ark., inclusive, to its mouth, exclusive of that portion south of the
river below Boyce, La.
  District engineer: Col. S. D. Sturgis, Jr., Corps of Engineers.
  Division engineer: Brig. Gen. Max C. Tyler, Corps of Engineers..
                                  IMPROVEMENTS

              Navigation                              Flood control
                                    Page                                            Page,
1. Red River below Fulton, Ark_      789 13. Black Bayou Reservoir, La.__           812'
2. Cypress Bayou and waterway            14. Little Missouri River Basin,
     between Jefferson,    Tex.,                 Ark   __              __--_   --   813
     and Shreveport, La__..          791 15.   Wallace Lake Reservoir, La_          815
3. Ouachita and Black Rivers,            16.   Bayou Pierre, La_                    817
      Ark. and La___         _       794 17.   Bayou Bodcau Reservoir, La_          818.
4. Tensas River and Bayou                18.   Bayou Bodcau, Red Chute
     Macon, La ---------------       798         and Loggy Bayou, La____            820
5. Boeuf River, La____________      800 19.   Natchitoches   Paris,     La ___     820
6. Yazoo River, Miss                802 20.   Pineville, Red River, La____         822
7. Big Sunflower River, Miss__      804 21.   Aloha-Rigolette Area, Grant
8. Mouth of Yazoo River, Miss_      806         and Rapides Parishes, La_          823
9. Removing of snags and                22.   Saline Point, La____________         824
      wrecks from the Mississippi          23. Big Black River, Miss _-_____        825
      River below the mouth of           24. Snagging and clearing under
      Missouri River and from the              authority of section 2 of
      Old and Atchafalaya Riv-                 the Flood Control Act ap-
      ers--_______-____-             807       proved August 28, 1937, as
10. Examinations, surveys, and                   amended __                       827
                                                                       -___________
      contingencies (general) __     809 25. Preliminary        examinations
11. Other projects for which no                and surveys for flood con-
      estimates are submitted___     810       trol....___________-______           828
12. Plant allotment -__________      811 26. Other flood-control projects
                                               for which no estimates are
                                                submitted________------___          829

                  1. RED RIVER BELOW FULTON, ARK.

   Location.-Red River rises in the arid regions of eastern New
Mexico, flows in a general easterly and southeasterly direction for
1,300 miles, and enters the Mississippi River at Red River Landing,
La. (See U. S. Geological Survey State maps and Mississippi River
Commission Alluvial Valley quadrangle maps.)
  Previous projects.-Authorized by River and Harbor Acts of May
23, 1828, June 10, 1872, June 18, 1878, March 3, 1879, August 2, 1882,
July 5, 1884, August 11, 1888, and September 19, 1890. For further
details, see page 1868 of Annual Report for 1915, and page 895 of
Annual Report for 1938.
790     REPORT OF CHIEF OF ENGINEERS, U.          S. ARMY,   1942

    Existing project.-This provides for continuing improvement of
Red River from Fulton, Ark., to the Atchafalaya River, La., 455.6
miles by systematic clearing of the banks, snagging, dredging shoals,
building levees (either alone or in cooperation with riparian States),
closing outlets, revetting caving banks, and preventing injurious
cut-offs. The lower end of the section included in the project is 7.6
miles above the mouth of the river. No proposed channel dimensions
were given.
    Floods ordinarily cause fluctuations of stage between high and low
water of from 30 to 45 feet. Unusual floods occasionally increase
this range about 10 feet.
    The work being continuous, no estimate for completion was made.
The latest (1941) approved estimate for annual cost of maintenance
is $27,000.
    The existing project was adopted by the River and Harbor Act of
July 13, 1892 (Annual Reports for 1890, p. 1829, and for 1891, p.
1957). (For latest published map see H. Doc. No. 378, 74th Cong., 2d
sess.)
    Terminal facilities.-None.
    Operations and results during fiscal year.-During the period August
16 to 30, 1941, the dredge Todd removed 189,159 cubic yards of mate-
rial at Kings Bayou, 35 miles above the mouth. This work is classed
as maintenance and was done with hired labor at a cost of $13,888.49
and expenditure of $13,728.67.
    For operations in connection with levees on the south bank of Red
River below Alexandria, La., see report of the Mississippi River Com-
mission.
    Condition at end of fiscal year.-The work under the existing project
being continuous, and no estimate being made, the date or percentage
of completion cannot be stated. Maintenance in recent years provides
navigation to Shreveport, La., at medium and high stages. The head
of navigation is the Arkansas-Oklahoma State line, to which point
boats may occasionally run during high water if snags, overhanging
trees, or similar obstructions do not interfere. From January to July
the prevailing stage is 6 feet and over, and minimum depths are about 4
feet to Fulton, Ark., 5 feet to Shreveport, La., and 6 feet to Alexandria,
La. During the remainder of the year stages near zero may be ex-
pected, with minimum depths less than 1 foot from Fulton to Shreve-
port, 1 to 2 feet from Shreveport to Alexandria, 4 feet from Alexandria
to mouth of Black River, and 6.5 feet thence to the mouth. The con-
trolling depth at the end of the fiscal year was 32 feet to the mouth of
Black River and about 8 feet from there to Fulton, Ark.
    Total costs under the existing project to June 30, 1942, were $409,-
928.91 for new work and $1,661,604.53 for maintenance. The total
expenditures were $2,071,533.44.
    For operations in connection with levees on the south bank of Red
River below Alexandria, La., see report of the Mississippi River Com-
mission.
    Proposed operations.-The balance unexpended will be applied to
maintenance using Government plant and hired labor, as follows:
                 RIVERS AND HARBORS-VICKSBURG,                                       MISS., DISTRICT                    791
Maintenance :
    Dredging, mouth of Black River to mouth of Red River with
      U. S. pipe-line dredge Todd, 1/2 month (September 1942) _____ $11, 500. 00
    Snagging, mouth of Black River to mouth of Red River, with U. S.
      derrick boat 3701 and U. S. towboat Capt. Eric Bergland, 34
      month (October 1942) --------------------------------------     2, 943.77
             Total for all work-----------------------------------_                                              14, 443. 77
   The additional sum of $27,000 can be profitably expended during the
fiscal year 1944, using Government plant and hired labor, as follows:
Maintenance :
    Dredging, mouth of Black River to mouth of Red River with U. S.
      pipe-line dredge Todd, 1 month (September 1943)                  $23, 000         --------------
    Snagging, mouth of Black River to mouth of Red River with U. S.
      derrick boat 3701 and U. S. towboat Capt. Eric Bergland, 1 month
                                          ___--------
      (October 1943) --------------------------                          4, 000

             Total for all work-----------------------------------------                                            27, 000
                                Cost and financial summary
Cost of new work to June 30, 1942         ---------------------                                          $1, 963, 806. 41
Cost of maintenance to June 30, 1942 -------------------                                                  1, 661, 604. 53
           Total cost of permanent work to June 30, 1942----------3, 625, 410. 94

Net total expenditures --------------              -3,                                                          625, 410. 94
Unexpended balance June 30, 1942___   -------------------------                                                  14, 443. 77

           Total amount appropriated to June 30, 1942-------------3,                                            639, 854. 71

   Fiscal year ending June 30            1938                1939               1940              1941              1942


Cost of new work          __    -_$---          -.-      -          _
Cost of maintenance                      $30, 518. 76   $28, 035. 46         $38, 623. 05   $14, 967. 74           $13, 888. 49

Total expended           ____             30, 518. 76    28, 035.46           38, 623. 05         15, 127. 56       13, 728. 67
Allotted    _-   .   _                    57, 500. 00    12, 500.00           37, 500.00          15, 800.00        12, 500.00



Balance unexpended July 1, 1941__  ------------------------------                                               $15, 672. 44
Amount allotted from War Department Civil Appropriation Act
  approved April 28, 1942---_ _---- ---------------    -------------
                                                             _--                                                 12, 500. 00

      Amount to be accounted for-----------------------------                                                    28, 172. 44
Gross amount expended---------------------------      14, 028. 67
Less reimbursements collected----------------------       300. 00
                                                                                                                 13, 728. 67

                                                              __
           Balance unexpended June 30, 1942 ----------------------                                               14, 443. 77

Amount that can be profitably expended in fiscal year ending
   June 30, 1944 for maintenance 1                                          __----
                                                                    -----------             ---                  27, 000. 00
  1   Exclusive of available funds.

2. CYPRESS BAYOU AND WATERWAY BETWEEN JEFFERSON, TEX., AND
                      SHREVEPORT, LA.
  Location.--This bayou rises in northeast Texas and flows in a south-
easterly direction to Caddo Lake, through this lake to Big Willow
Pass, and through Big and Little Willow Passes, Soda Lake, Twelve
Mile Bayou, the new diversion canal, and Cross Bayou to the Red
River at Shreveport, La., a distance of about 132 miles. (See U. S.
Geological Survey State maps.)
792        REPORT OF CHIEF OF ENGINEERS,                                   U. S. ARMY,          1942

  Strictly speaking, Cypress Bayou proper ends where it enters
Caddo Lake, but the name is frequently applied to the whole water-
way above described.
  Existing project.-This provides for dredging and straightening
the channel, removing obstructions, and clearing the banks in the
lower 66 miles of Cypress Bayou from the Red River at Shreveport,
La., to Jefferson, Tex., and for the construction of a dam without a
lock at the foot of Caddo Lake.
                                              OADDO LAKE DAM
  Location: At foot of Caddo Lake, La. and Tex., about 23 miles above mouth
of Jefferson-Shreveport Waterway.
  Below Mooringsport, La.: 2 miles.
  Length : 3,400 'feet.
  Type: Fixed, on pile foundation.
  Date of completion: December 21, 1914.
  Cost : $100,553.47.
   Below the dam the fluctuations of the water level depend chiefly
upon backwater from the Red River, the maximum being about 10
feet. At the dam the fluctuations are from zero to 14 feet above the
crest of the spillway, and at Jefferson the maximum is 27.5 feet.
   The estimate of cost for new work was $20,000 for open-channel
work (Annual Report, 1872) and $100,000 for the dam (1907). The
latest (1933) approved estimate for annual cost of maintenance is
$1,700.
   The existing project was authorized by the following river and
harbor acts:

    Acts                       Work authorized                                          Documents


June 10,1872   Open channel work_-- ___----     -_---------       -        Annual Report 1872, p. 572.
June 25,1910   Construction of the dam_ -                     __--------   H. Doc. No. 220, 60th Cong., 1st sess.



  The latest published map is in House Document No. 378, Seventy-
fourth Congress, second session.
   Terminalfacilities.-There is one publicly owned brick warehouse, 50
by 150 feet, at Jefferson, Tex. The following terminal facilities are
located at Mooringsport, La.:
   One privately owned covered dock, 60 by 60 feet, open to all small boats.
   One privately owned pipe rack, not decked.
   One privately owned boat ways.
   The warehouse at Jefferson has not been used for several years, since
no commerce has moved in that vicinity. The wharves, docks, and
warehouses at Mooringsport are all owned by oil companies. There are
no terminal facilities at Shreveport. The existing terminal facilities
are considered adequate for present commerce.
   Operations and results during fiscal year.-The work consisted of
caring for Caddo Lake Dam. The work is classed as maintenance and
was done with hired labor at a cost of $1,881.67 and expenditures of
$1,895.35.
   Condition at end of fiscal year.-The dam at the foot of Caddo Lake
was completed in 1914, completing the project. Its construction and
maintenance insure a 4-foot navigable depth at low water from that
              RIVERS        AND            HARBORS-VICKSBURG,                                     MISS.,          DISTRICT                      793

point to Jefferson, the head of navigation, but cuts off all possible navi-
gation to Shreveport except for such light-draft boats as may pass
over the dam at high stages. Below the dam navigation is largely
dependent upon backwater from Red River. A stage of from 15 to 24
feet on the Red River gage at Shreveport, depending on the run-off
from Cypress Bayou drainage area, is necessary to provide a 4-foot
depth up to the dam. Such stages are short in duration and irregular
in occurrence. The controlling depth between the dam and Jefferson,
Tex., was about 4 feet at the end of the year.

                                                                                         United States Contributed                           Total
                                                                                               funds                funds


Cost of new work ----------       ---.--        -----.-----------------...                   $202, 817. 48       -___       _           $202, 817. 48
Cost of maintenance ----.------                      .                .           ..------------------------
                                                                                               246, 503. 85              $50, 000        296, 503.85

       Total cost---------------            -----------------------                          449, 321. 33                 50, 000        499, 321. 33

Total expended......                                                                           449, 364. 57
                                                                                  ..-------------------------------------- 50, 000       499, 364. 57



  Proposed operations.-The balance unexpended plus accounts re-
ceivable at the end of the fiscal year, a total of $4,741.19, will be applied
to maintenance with hired labor, as follows:
Maintenance:
    Salary of dam tender-----------------------------------                                                                           $1, 820. 00
   Repairs to dam---------------------------------------                                                                               3, 421.19
      Total_------------            --------------------------------                                                                   4, 741. 19
   The additional sum of $1,700 can be profitably expended during the
fiscal year 1944, as follows:
Maintenance:
       Salary of dam tender --------                                                                           -------                       $1,320
       Repairs to dam-------------------------------------                                                                            ----           380
            Total_-- --            -----------------------                                                                                     1,, 700

                                            Cost' and financial summary

Cost of new work to June 30, 1942_----------                                                                                      $202, 817. 48
Cost of maintenance to June 30, 1942-------------------------                                                                      246, 503. 85

       Total cost of permanent work to June 30, 1942-------------449, 321.33
Plus accounts receivable June 30, 1942----------------------------    43. 24

           Gross total costs to June 30, 1942-----------------------449, 364. 57
Net total expenditures-------------------------------------  449, 364. 57
Unexpended balance June 30, 1942----------------------------   4, 697. 95

           Total amount appropriated to June 30, 1942---------------                                                                  454, 062. 52

     Fiscal year ending June 30                   1938                     1939                  1940                    1941                 1942

Cost of new work .......          - - -- - - - - .
                                  ---                             --- --- . -- ---. -- .
Cost of maintenance-----          _-- ---- $1, 604. 97                    $1, 637. 70          $1,719. 16            $1, 440.05               $1, 881. 67
Total expended___--------------                  1, 603. 41               1, 702. 81            1, 480. 25              1, 779. 03            1, 895. 35
Allotted-----------------------                   3, 230. 00               1, 700.00             1, 700. 00              1, 700. 00           4, 500. 00
794          REPORT OF CHIEF OF ENGINEERS,                                    U. S. ARMY,             1942

Balance unexpended July 1, 1941_______--
                                    -----____________-----                                                     $2, 093. 30
Amount allotted from War Department Civil Appropriation Act ap-
  proved April 28, 1942____________       ________         _--                                                  4, 500.00

      Amount to be accounted for_--________________________                                                     6, 593. 30
Gross amount expended ______________-____--___-_      $2, 690. 35
Less reimbursements collected------------------------     795. 00
                                                                                                                1, 895. 35

          Balance unexpended June 30, 1942_______________________                                               4, 697. 95
Accounts receivable June 30, 1942                                                                                  43. 24

          Unobligated balance available June 30, 1942______________                                             4, 741. 19

Amount that can be profitably expended in fiscal year ending June 30,
                                           -------            ---------
     1944, for maintenance 1                         ______        __                  __      ___              1, 700. 00
     1 Exclusive of available funds.

                 3. OUACHITA AND BLACK RIVERS, ARK. AND LA.

   Location.-Ouachita River rises in Polk County, Ark., and flows
about 600 miles in a general southeasterly and southerly direction
through Arkansas and Louisiana. It is joined by Tensas and Little
Rivers at Trinity, La. (Jonesville, La.), below which place it is called
Black River, and enters Red River 35.5 miles above its mouth. (See
U. S. Geological Survey State maps and Mississippi River Commission
Alluvial Valley quadrangle maps.)
   Previous projects.-The project was adopted by the River and Har-
bor Acts of March 3, 1871, June 10, 1872, August 14, 1876, and July 5,
1884. A separate project for work in the Ouachita River between
Camden and Arkadelphia was adopted by the River and Harbor Act
of August 11, 1888. For further details, see page 1869 of the Annual
Reportlfor 1915, and page 900 of the Annual Report for 1938.
   Existing project.-This provides for a navigable depth of 6 1/2 feet
at low water from the mouth of Black River, La., to Camden, Ark., a
distance of 351 miles, by the construction of six locks and dams, with
necessary dredging, and to remove logs, wrecks, and overhanging trees,
etc., between mouth of Black River and Arkadelphia, Ark., 417 miles,
and to provide a channel 7 feet deep and of suitable width from the
improved channel of the Ouachita River above dam No. 6 to the vicin-
ity of the railroad bridge over Lake St. Mary, thence a canal of the
same depth and 70 feet in width along the south side of the railroad
embankment to high ground near Felsenthal, a distance of 3,600 feet,
with a suitable turning basin near the inner end.
   The location and description of the locks and dams which are
included in the project are contained in the table following:

                                                                                        Greatest
                                                     Distance     Above      Width     available     Lift at     oDepmithr
                                                       from       mouth      oflock     length        low         sill at
                                                      nearest    of Black               for full
                                                       town       River      chamber   width of      water        normal
                                                                                          lock                   pool level


                                                      Miles       Miles       Feet          Feet      Feet          Feet
2     Harrisonburg, La__                       _        0. 1        73. 3        55          268       14. 4           6. 9
3     Riverton, La _____ __                             2. 0       134. 0        55          268       14. 8           6. 5
4       onroe, La_                                      0. 0       178. 1        55          268        8. 9           6. 5
5     Sterlington Reach, La                               .6       208. 3        55          268        6 9            6. 6
6     Near Felsenthal, Ark.        -...                  3. 3      238. 7        55          268        9. 7           7. 6
8     Near Calion, Ark-       --                        10. 5      297. 5        55          268       13. 5           6. 5
                   RIVERS       AND     HARBORS           VICKSBURG,            MISS.,     DISTRICT             795

                                                                                           Year    Year
                                   Character of    Find of                                opened    of
No.              Location          foundation       dam         Type of construction        to     com-      Cost
                                                                                           navi-   ple-
                                                                                          gation   tion

2      Harrisonburg, La          Piling in clay__ Movable__    Concrete Poiree nee-       1918    1921   $470,394. 69
                                                                  dle dam; steel miter-
                                                                 ing lock gates.
3      Riverton, La______ Piling in sand        ____do__    do      _________             1919    1920    681,072. 84
4      Monroe, La ___________ do ____________do ___________ do                            1915    1915   1641,630.  23
5      Sterlington Reach, Piling in clay _____do__.____ Concrete     Chanoine             1924    1926    901, 096. 17
          La.                                               wicket dam; steel
                                                            mitering gates.
  6     Near Felsenthal,    Piling in sand ___do_______ ____do                             1913    1923   2 914, 844. 67
          Ark.
  8     Near Calion, Ark__ Piling in clay       do ...
                                                doo_         --------------------          1912    1926   3 915, 445. 96

  1 Dam failed Aug. 10, 1917, and was rebuilt under permanent indefinite appropriation for operating and
care of canals. Type of dam now is concrete Poiree needle pass and Chanoine wicket weir.
  2 Includes cost of original structure to June 30, 1919 ($559,539.34), and the cost of modifications to permit
elimination of lock and dam 7 ($355,305.33).'
  3 Includes actual cost of original structure to June 30, 1919 ($592,922.43), and the cost of modifications to
permit elimination of locks and dams 7 and 9 ($322,523.53).


   Floods ordinarily cause fluctuations of stage from 25 to 45 feet
between high and low water. Extreme floods occasionally increase
this range about 10 feet.
   The latest revised estimate of cost of the system of locks and dams,
made in October 1920, as modified by the actual cost of Nos. 2, 3, 4,
and 6, since completed, was $4,576,838.52. The estimate of cost for
construction of the canal to Felsenthal, made in 1936, is $36,000.
The latest (1941) approved estimate for annual cost of maintaining
the improvement by removing obstructions. to navigation between
Camden, Ark., and the mouth of Black River, La., is $130,500. No
estimate for maintenance above Camden has been approved. The
latest (1936) approved estimate of annual cost of maintaining the
canal to Felsenthal is $2,000. The estimate of annual cost of opera-
tion and care, made in 1941, is $136,500.
   The existing project was authorized by the following river and
harbor acts:

       Acts                             Work authorized                                    Documents
         -----      I                                                     I

Mar.      3,1871        Open-channel work from Arkadelphia to the             H. Ex. Doec. No. 60, pt. 4, 41st Cong.,
                         mouth.                                                 3d sess., Annual Report, 1876, p. 336.
July 5, 1884            Extension of open-channel work into Black River.      Annual Report, 1883, p. 1155.
June 13, 1902           Construction of locks and dams Nos. 4 and 6           Specified in act.
                          (canalization work based on report contained
                         in H. Doc. No. 448, 57th Cong., 1st sess.; Annual
                          Report 1902, p. 1435).
Mar.      2, 1907       Construction of locks and dams Nos. 2 and 8;              Do.
                         elimination from the plan of lock and dam No. 1.
June 25, 1910           Obtaining sites for locks and dams Nos. 3 and 7.__       Do.
July 25, 1912           Construction of locks and dams Nos. 3 and 7 .-_..        Do.
Aug. 8, 1917            Construction of lock and dam No. 5 _____---____          Do.
Mar. 2, 1919            Modification of locks and dams Nos. 6 and 8 by        Rivers and Harbors Committee Doc.
                          raising their pool levels, which with dredging       No. 7, 65th Cong., 2d sess.
                          obviates the necessity for constructing locks
                          and dams Nos. 7 and 9.
Aug. 26. 1937           For the 7-foot channel and construction of a canal    Senate committee print, 75th Cong.,
                          3,600 feet long to Felenthal, Ark.                    1st sess.
June 26, 19341          Operating and care of locks and dams provided
                          for with funds from War Department appro-
                          priations for rivers and harbors.

      : Permanent Appropriations Repeal Act.
      The latest published map is in H. Doc. No. 196, 73d Cong., 2d sess.
 g796   REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1942

    Recommended modifications of project.-Under date of August 16,
1938, the Chief of Engineers recommended modification of the existing
project to eliminate the requirement that local interests provide a high-
way at an elevation above that of the 1932 high water from the main
State highway system to the canal terminal near Felsenthal (H. Doc.
No. 104, 76th Cong., 1st sess.).
    Local cooperation.-Local interests contributed $5,000 during the
fiscal year 1929, which was expended in connection with United States
funds in prevention of cut-off near Camden, Ark. The River and
Harbor Act of August 26, 1937, authorized construction of the canal to
Felsenthal, Ark., subject to the condition that local interests furnish,
free of cost to the United States, necessary rights-of-way and suitable
,spoil-disposal areas for new work and for subsequent maintenance as
required, release the United States from all claims for damages attrib-
utable to the work of improvement, and agree to cqnstruct a suitable
warehouse at the canal terminal and to provide a highway at an eleva-
tion above that of the 1932 high water, from the main highway system
to the canal terminal. Local cooperation is not yet assured.
    Terminal facilities.-At Monroe, La., there is one private electric
crane and one private warehouse. At West Monroe there are two
private warehouses with conveyors. At Camden, Ark., there are three
private warehouses. At Champagnolle Landing there is a private dock
for the loading of gasoline into barges. These existing facilities are
  considered adequate for present commerce.
    Operations and results during fiscal year.-During periods from
July 1, 1941, to November 3, 1941, the dredge Todd removed 1,149,086
  cubic yards of material from the channel at various points from the
mouth of Black River, mile 0.0, to Treadway, mile 349.4.
    The United States towboat Capt. Eric Bergland and derrick boat
  3701 removed 15 logs, 7 snags, and 106 trees from the channel between
Camden, Ark., mile 350.0, and Monroe, La., mile 183.0.
    The six locks and dams were operated and maintained in a satis-
  factory condition throughout the year. Guarding the property was
begun in January 1942.
    The work is classed as maintenance and was done by hired labor.
  The costs for the year were $136,023.12 for channel maintenance and
  $121,518.08 for operating and care of locks and dams, a total of
 '$257,541.20 for maintenance. The total expenditures were $253,133.51.
     Condition at end of fiscal year.-The six locks and dams em-
  braced in the existing project for slack-water improvement of the
 *Ouachita River were completed in 1924 and provide navigation to
  Camden, Ark. (See table under existing project.)
     Construction of the canal to Felsenthal, authorized in 1937, has
  not been started. The head of navigation is Arkadelphia, Ark.,
  to which point boats may occasionally run during high water if
  snags, overhanging trees, or similar obstructions do not interfere.
  From January to June the gage at Monroe generally exceeds pool
 :stage (13.3 feet), caused by the river above, and minimum depths
  exceeding 7 feet are usual between the mouth of Black River and
  Camden, Ark., a distance of 350.8 miles. At intervals during this
  period the reading of the Camden gage exceeds 15 feet, and mini-
mum depths of 7 feet may be expected between Camden and Arka-
  delphia. During the remainder of the year the pools furnished by
  the six dams, with moderate dredging in Black and Ouahita Rivers,
         RIVERS AND IHARBORS-VICKSBURG,                  MISS., DISTRICT          797
provide depths of 6.5 feet between the mouth of Black River and
Camden, Ark., and depths of only a few inches may be expected
between Camden and Arkadelphia, Ark.
  The controlling depth at the end of the fiscal year was 36 feet to
lock and dam No. 2, and 6.5 feet from there to Camden, Ark.
Cost of new work under existing project to June 30, 1942----------$4, 574, 551. 31
Cost of maintenance _________-         -    -    -   -
                                                ______   -- _     _ 3, 461, 955. 04

      Total cost ------------------------------------                   8, 036, 506. 35
Total expended-------------------------------------                     8, 036, 214. 44

   In addition, the sum of $2,940,952.07 was expended between Janu-
ary 25, 1913, and June 30, 1936, on operating and care of the works
of improvement under the provisions of the permanent indefinite
appropriation for such purposes.
   For operations in connection with levees and levee walls under
the Mississippi River Commission, see report of the Mississippi
River Commission.
  Proposed operations.-The balance unexpended, plus accounts re-
ceivable at the end of the fiscal year, will be applied to maintenance
using Government plant and hired labor, as follows:
Accounts payable June 30, 1942----------------_                             $2, 381. 90
Maintenance of channel:
    Dredging with U. S. pipe line dredge Todd, 3 months
       (July, August, and November 1942)-------------- $75, 000. 00
    Snagging with U. S. derrick boat 3701 and U. S.
      towboat Capt. Eric Bergland one month (July
      1942) --------------------------------------       4, 000. 00
    Chopping with U. S. quarterboat 3001, one month
      (August 1942)-------------------------             4, 005. C8
                                                                            83, 005. 08
Operating and care of locks and dams:
   Operations-----------------------------------             88, 200. 00
        Ordinry repairs__
   Ordinary                __        ___________
                rpair--------------------------------        24, 000.
                                                             24,      00
                                                                 000. 00
   Improvement and reconstruction_________________           24, 000. 00
   Emergencies ------------------------                       4, 800. 00
                                                                           141, 000. 00

                                                  ---
      Total for all work------------------------------  _ 226, 386 98
  The additional sum of $267,000 can be profitably expended during
the fiscal year 1944, as follows:
Maintenance:
   Dredging with U. S. pipe line dredge Todd, 4/ months
      (July, August, and November 1943, and May and June
      1944)           ------------------------------------ $113, 800
    Snagging with U. S. derrick boat 3701 and U. S. tow-
      boat Capt. Eric Bergland, 1 /2 months (July and August
      1943) ______                         ____ __------      6,100
    Chopping with U. S. quarterboat 3001, 11/2 months (July
      and August 1943) -----------------------------------    6, 100
                                                                             $126, 000
Operating and care of locks and dams:
   Operations-__------------------------------------------88, 200
   Ordinary repairs-------------                            24, 000
   Improvement and reconstruction-----------------------    24, 000
   Emergencies------------------------------------------     4, 800
                                                                              141, 000

       Total for all work------------------------------------------           267, 000
      493202-43-pt. 1, vol. 1-51
798          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                    1942

                                         Cost and financial summary

Cost of new work   to June 30, 1942---------------------------- $5, 248,618.94
Cost of maintenance to June 30, 1942------------------------,       402, 907. 11

      Total cost of permanent work to June 30, 1942-----------11, 651, 526. 05
Undistributed costs June 30, 1942-------------------- --------         -- 6. 58

       Net total cost to June 30, 1942 ___11,                                                                   651, 519. 47
Plus accounts receivable June 30, 1942__--------------------                                                      2, 096. 57

     Gross total costs to June 30, 1942 ---------------------- 11, 653, 616. 04
Minus accounts payable June 30, 1942--------------------------       2, 381. 90

     Net total expenditures-----------------------------11, 651, 234. 14
Unexpended balance June 30, 1942-------------------------_ --- 224, 290. 41

         Total amount appropriated to June 30, 1942-------------11, 875, 524. 55


   Fiscal year ending June 30                 1938             1939              1940              1941              1942


C ost of n ew w ork---------------...------------ ...------------     ...-----------  .... -------.................
Cost of maintenance .-----------......... $284, 501. 80 $314, 349. 34   $260, 526. 72     $245, 362.16              $257, 541.20
Total expended _----------------           284, 404. 79      321, 494. 63      265, 085. 67      275, 033. 72       253, 133.51
Allotted--
        _ -------------------              .578, 950.00      297, 300.00       246, 000.00       267, 000. 00       168, 400. 00


Balance unexpended July 1, 1941---------------------------- $309, 023. 92
Amount allotted from War Department Civil Appropria-
  tion Act approved June 24, 1940------------------ $21, 000. 00
Amount allotted from War Department Civil Appropria-
  tion Act approved April 28, 1942---------------_   147, 400. 00
                                                                  168, 400. 09

      Amount to be accounted for----------------------------                                                    477, 423. 92
Gross amount expended------------------------ $493, 518. 58
Less reimbursements collected---------------------240, 385. 07
                                                                                                                253, 133. 51

      Balance unexpended June 30, 1942------------------__                                                      224, 290. 41
Outstanding liabilities June 30, 1942-------------------                                                          3, 354. 77
      Balance available June 30, 1942-------------------220,                                                         935. 64
Accounts receivable June 30, 1942------------------------------2,                                                    096. 57
          Unobligated balance available June 30, 1942-223,                                                           032. 21
Amount (estimated) required to be appropriated for completion of
existing project 1- - - - - _____________                     ______________                    36, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance      - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
                                                                                                267, 000. 00
   1 Exclusive of available funds.

                        4. TENSAS RIVER AND BAYOU MACON, LA.
   Location.-Tensas River has its source in Lake Providence, East
Carroll Parish, La., flows about 166 miles in a general southerly direc-
tion, and joins Ouachita and Little Rivers at Jonesville, La., in form-
ing Black River. Bayou Macon rises in Desha County, Ark., flows
about 250 miles in a general southerly direction, and enters Tensas
River 42.7 miles above the mouth. (See Mississippi River Commis-
sion map, "Alluvial Valley of the Mississippi River.")
               RIVERS AND              HARBORS-VICKSBURG,               MISS.,    DISTRICT            799
  Previous projects.-The original project was adopted by the River
and Harbor Act approved March 3, 1881. For further details see
page 1871 of Annual Report for 1915, and page 905 of Annual Report
for 1938.
  Existing project.-This provides for the removal of snags, sunken
logs, and overhanging timber on Tensas River from Tendal (formerly
Dallas), La., to the mouth, 137.8 miles, and on Bayou Macon from
Floyd, La., to the mouth, 111.6 miles, and .for dredging the bars be-
tween Chamberlain Bar and Kirk Ferry, in the Tensas River, 10 miles
and 38 miles, respectively, above the mouth to a depth of 4 feet and
width of 60 feet.
   At medium and high stages the channel under improvement in these
streams has an average width of about 150 feet, with minimum depth
of about 8 feet. Floods ordinarily cause fluctuations of stage of about
35 feet between high .and low water. Extreme floods occasionally
increase the range about 10 feet.
   The estimate of cost for new work, revised in 1922, exclusive of
amount expended on previous project, is $48,395, of which $4,200 is to
be contributed by local interests. The latest (1933) approved estimate
for annual cost of maintenance is $2,500.
   The existing project was authorized by the following river and'
harbor acts:

       Acts                           Work authorized                             Documents



July     5, 1884   Removal of snags, etc-----------------------      H. Ex.pDoc. No. 38,46th Cong., 3d sess.
                                                                       (Annual Report 1881, p. 1457.)
Sept. 22,1922      Dredging the channel in Tensas River_______.__.   H. Doc. No. 95, 67th Cong., 1st sess.


  The latest published map is in H. Doc. No. 196, 73d Cong., 2d sess.


   Local cooperation.-The River and Harbor Act of September 22,
1922, required that local interests contribute $4,200 to be used for
dredging bars between Chamberlain and Kirk Ferry. Local interests
have made no progress in complying with this requirement and do
not appear to be interested.
   Terminal facilities.-None.
    Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was about
75 percent completed. Tendal, La., on Tensas River, and Floyd, La.,
on Bayou Macon, are the heads of navigation, but due to the non-
completion of the project above Westwood Place on Tensas River
navigation above this point is limited to small craft and rafted
timber.
   In ordinary seasons a depth of 6 feet or more may usually be ex-
pected from January to June on these streams. During the re-
mainder of the year the depth is usually reduced to 1 foot. A gage
reading of 3.5 feet or more at Delhi, La., is favorable for light-draft;
navigation and 6.5 feet or more for heavy-draft navigation on Bayou
Macon. A gage reading of 20 feet or more at Clayton, La., is favor-
able for light-draft navigation, and 23 feet or more is favorable
for heavy-draft navigation on Tensas River. The controlling depths
800         REPORT OF CHIEF OF ENGINEERS,                                                U. S. ARMY,            1942

at the end of the fiscal year were 12 feet on Tensas River and about
8 feet on Bayou Macon. The work remaining to complete the project
consists of removing the remaining obstructions from Tensas River
between Westwood Place and Tendal (formerly Dallas), and dredg-
ing in that part of the river between Chamberlain and Kirk Ferry,
authorized by the River and Harbor Act approved September 22,
1922.
Cost of new work under ex i.ing project to June 30, 1942                                           ---------          $35, 366. 57
Cost of maintenance_                         -          -----                    ---                         --        85, 352. 16

                  _-----__--____ --------
      Total cost _----_----                                                                                           120, 718. 73
Total expended          ------------------------------------                                                          120, 718. 73
   Proposed operations.-No funds are available and no operations
Lre proposed for the fiscal year 1943.
   The sum of $2,500 can be profitably expended during the fiscal year
1944, to be applied to bank clearing and blasting obstructions between
the mouth of Tensas River and Tendal, La., on Tensas River, and
Delhi, La., on Bayou Macon, with U. S. quarterboat No. 3001, one-
half month (November 1943).
                                            Cost and financial summary

Cost of new work to June 30, 1942_____________                        366. 57
                                                                $--------------------------38,
Cost of maintenance to June 30, 1942___________________________ 85, 352. 16
           Total cost of permanent work to June 30, 1942_____________ 123, 718. 73

Net total expenditures-----___                                         ------------         _                         123, 718. 73
Unexpended balance June 30, 1942                                               --.....
           Total amount appropriated to June 30, 1942--------------123, 718. 73


   Fiscal year ending June 30                    1938                   1939                1940         1941               1942


C ost of new w ork -.-------------.                                               .. . . . . ..     . . . . , .....    ..............
Cost of maintenance .-------- --------------                               ---------                         --------------

Total expended                                                                 __________

Allotted      .....----.--......--------.    -$3, 107. 62       ,...        .-..


Amount that can be profitably expended in fiscal year ending -June
                           1
30, 1944, for maintenance _____________       ______           __                                                     $2, 500. 00
   1 Exclusive of available funds.

                                                 5. BOEUF RIVER, LA.

   Location.-This river rises in Desha County, Ark., flows about 240
miles in a general southerly direction, and enters Ouachita River at
Sicily Island Gorge. (See Mississippi River Commission maps, Allu-
vial Valley of the Mississippi River.)
  Existing project.-This provides for the removal of snags, logs, and
overhanging trees between Wallace Landing and the mouth, a distance
of 166 miles. The project was afterward modified to include the
closure of three outlets near Point Jefferson.
   At medium and high stages the channel has an average width of
about 200 feet, with minimum depth of about 8 feet. Floods ordinarily
            RIVERS         AND     HARBORS-VICKSBURG,                   MVISS.,    DISTRICT            801
cause fluctuations of stages of about 30 feet between high and low
water. Extreme floods occasionally increase this range about 10 feet.
  The estimate of cost for new work for removing snags, etc., made in
1880, is $20,020. The estimate of cost for new work for closing the
outlets, revised in 1928, is $15,000. The latest (1933) approved esti-
mate for annual cost of maintenance is $2,500.
  The existing project was authorized by the following river and
harbor acts:

    Acts                           Work authorized                                 Documents


Mar.   3,1881   Removal of snags, etc_____     _________________---   H. Ex. Doc. No. 38, 46th Cong., 3d sess.
                                                                        (Annual Report 1881, p. 1423.)
Aug. 5, 1886    For   closing outlets                                 H. Ex. Doc. No. 99, 48th Cong., 2d sess.
Aug. 11, 1888    o             u        --     -(Annual                         Report, 1885, p. 1545).


  The latest published map is in H. Doc. No. 196, 73d Cong., 2d sess.


   Recommended modifications of project.--It is recommended that
this project be modified by the elimination of all work above Girard,
La. (The abandonment of the entire project was erroneously recom-
mended in H. Doc. No. 467, 69th Cong., 1st sess.)
   Terminal facilities.-None.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was about 67
percent completed. The head of navigation is Wallace Landing. The
removal of snags was completed in 1896 as far upstream as Port Jeffer-
son, 150.8 miles above the mouth. Navigation above this point is
limited to small craft and rafted timber. The outlets were closed
in 1887-88, but the dams were washed away in 1890. The outlets de-
plete the channel and make navigation more difficult. The work re-
maining to complete the project consists in reclosing the above-men-
tioned outlets and the removal of obstructions from Point Jefferson
to Wallace Landing, a distance of about 15 miles. In ordinary seasons
a depth of 6 feet or more may usually be expected between January
and June from the mouth to Point Jefferson. During the remainder
of the year the depth is' usually reduced to 1 foot. A gage reading
at Girard, La., of 3.5 feet or more is favorable to light-draft naviga-
tion, and 6.5 feet or more is favorable to heavy-draft navigation. The
controlling depth at the end of the fiscal year was 3 feet.
Cost of new work to June 30, 1942------------------------------                                $30, 000. 00
Cost of maintenance---        ----------------------------                                     103, 736. 88
      Total cost----------                      --    ----------------------                   133, 736. 88
Total expended                                                                                 1------------------------------
  Proposed operations.-No funds are available and no operations
are proposed for fiscal year 1943.
  The sum of $2,500 can be profitably expended during the fiscal year
1944, to be applied to maintenance, removing obstructions, and clear-
ing banks between the mouth and Girard, La., with U. S. quarterboat
No. 3001, one-half month (November 1943).
802         REPORT         OF CHIEF OF ENGINERS,                  U.   S. ARMY,        1942

                                    Cost and financial summary
Cost of new work to June 30, 1942_______________________________                               $30, 000. 00
Cost of maintenance to June 30, 1942 _________       -_____----__                              103, 736. 88
      Total cost of permanent work to June 30, 1942____________                                133, 736. 88
Net total expenditures_ ------------------------------------                                   133, 736. 88
Total amount appropriated to June 30, 1942_____________________                                133, 736. 88


   Fiscal year ending June 30          1938                1939    1940         1941               1942

Cost of new work _-                                                -                       -
Cost of maintenance ...-
Total expended----------------- ---           --------------              --------------
Allotted_-----   ----------------   -$2, 350.00----------------------------      -----          ------------


Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance __ _______________________-
                                  --               _       --         $2, 500

                                    6. YAZOO RIVER, MISS.

   Location.-This river is formed by the junction of Tallahatchie
and Yalobusha Rivers in Leflore County, Miss., flows about .189 miles
in a southerly and southwesterly direction, and enters the Mississippi
River at Vicksburg, Miss. (See Mississippi River Commission maps,
Alluvial Valley of the Mississippi River.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of March 3, 1873. For further details see page
1871 of Annual Report for 1915, and page 908 of Annual Report
for 1938.
   Existing project.-This provides for the removal of snags, wrecks,
sunken logs, overhanging trees, and other obstructions throughout
the entire length of the river, a distance of 189 miles.
   The channel under improvement has an average width of about
200 feet and a minimum depth when maintained of 4 feet at all
stages during the entire year. Floods ordinarily cause fluctuations
of stage of about 35 feet between high and low water. Extreme
floods occasionally increase this range about 5 feet.
   The latest approved estimate of cost for new work to be finished
in 4 years, made in 1874, was $120,000 exclusive of amount expended
on previous project. The latest (1914) approved estimate for annual
cost of maintenance is $16,000.
   The existing project was adopted by the River and Harbor Act of
March 3, 1875 (p. 364 of Annual Report for 1874). The latest pub-
lished map is in House Document No. 198, Seventy-third Congress,
second session.
   Terminal facilities.-None.
   Operations and results during fiscal year.-The U. S. combined
dredge and snagboat Sunflower pulled 83 snags, cut 2 shore snags, re-
moved 6 logs from the channel, removed 18 side jams, cut 214 leaning
trees and 5,650 willows and brush, cleared 43.6 miles of bank and cut
up 183 down trees from mile 7.5 to 53.5, mile 79.5 to 135, .and mile 152 to
188.1.
   The work is classed as maintenance and was done by hired lab'or
at a cost and expenditure of $11,816.03.
               RIVERS AND           HARBORS-VICKSBURG,                  MISS.,    DISTRICT                803
   Additional improvements have been made in connection with
the Yazoo Basin flood control project under the Mississippi River
Commission. For operations in connection with channel rectifica-
tion and clearing in Yazoo River, see report of the Mississippi
River Commission.
   Condition at end of fiscal year.-The existing project was completed
in 1888. The river is navigable throughout its length. In ordinary
seasons the gage at Yazoo City usually reads 12 feet or more between
January and June, and depths exceeding 10 feet may be expected
from the mouth to the head of the river. During the remainder of
the year the gage frequently reads as low as 4 feet and depths of 4
feet or more are usually found. The controlling depth at the end
of the fiscal year was 9 feet.
Cost of new work under existing project to June 30, 1942_____---------- $320, 637. 64
                        -------------------------------------- 480, 605. 04
Cost of maintenance________
       Total cost ___------------------------------------_               801, 242. 68
Total expended           _---------------------------------           -- 801,242. 68
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $2,183.97, will be applied to maintenance, the removal of
obstructions, fallen trees, and debris from the channel, using Govern-
ment plant and hired labor, 2 months (October and November 1942).
   The additional sum of $16,000 can be profitably expended during the
fiscal year 1944 using Government plant and hired labor, as follows:
Maintenance:
    Dredging with U. S. combined dredge and snagboat Sunflower, 1
      month (October 1943)          ---------------------------------- $5, 000
    Snagging and chopping with U. S. combined dredge and snagboat Sun-
      flower, 23~4 months (September, October, and November 1943) ____ 11, 000
         Total                                                         1------------------------
                                                                           000

                                    Cost and financial summary
Cost of new work to June 30, 1942---------------------------$359, 660. 70
Cost of maintenance to June 30, 1942-------------------------480, 605. 04
       Total cost of permanent work to June 30, 1942-----------_ 840, 265. 74
Net total expenditures------------    ------------------------                                   840, 265. 74
Unexpended balance June 30, 1942--------           ----------                                      2,183. 97
      Total amount appropriated to June 30, 1942_______________                                  842, 449. 71

   Fiscal year ending June 30           1938           1939          1940           1941              1942

Co stof new w ork----- --- -- -.. -- -- -- ---. . ----- ---..---- -----. .--- -- --- ....... .. ..
Cost of maintenance                   $16, 000. 00   $16, 000. 00   $8, 817. 23   $12, 182. 77       $11. 816. 03
Total expended                  _      15, 989. 38    16, 010. 62    8,817. 23     12, 182. 77        11, 816. 03
Allotted-     _-                       32,000.00      11, 000. 00   10, 000. 00    14, 000. 00   .



Balance unexpended July 1, 1941----------------------------                                      $14, 000. 00
'Gross amount expended__------------------------    $30, 432.65
Less reimbursements collected---------------------- 18, 616. 62
                                                                                                  11, 816. 03
            Balance unexpended June 30, 1942-----------------------                                2, 183.97
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance - - - - - - - - - - - - - - - --
                                                                                                 16, 000. 00
  1
      Exclusive of available funds.
804        REPORT OF CHIEF OF ENGINEERS,                          U. S. ARMY,          1942

                           7. BIG- SUNFLOWER RIVER, MISS.

  Location.-This river has its source in Mud Lake, Coahoma County,
Miss., flows about 240 miles in a southerly direction, and enters
Yazoo River about 44 miles above its mouth. (See Mississippi River
Commission maps, "Alluvial Valley of the Mississippi River.")
  Previous projects.-The original project was authorized by the
River and Harbor Act of March 3, 1879. For further details see
page 1871 of Annual Report for 1915 and page 910 of Annual Report
for 1938.
  Existing project.-This provides for the improvement of the river
from the mouth to Little Callao. Landing, a distance of 62 miles,
by the closure of outlets, the construction of contraction works, and
the removal of snags, sunken logs, leaning trees, and other obstruc-
tions; and from Little Callao Landing to the mouth of the Hush-
puckena, 109.4 miles, by the construction of a lock and dam at Little
Callao Landing and open-channel work, including dredging and
construction work. The principal features of the lock and dam are
as follows:
Number : One.
Location: Little Callao Landing, Miss.
From nearest town: 17 miles.
Above mouth of river: 62 miles.
Lock: Width of lock chamber, 36 feet; greatest available length for full
width of lock, 160 feet; lift at low water, 16.9 feet; depth on miter sill at low
water, 5.1 feet; gates, wooden miter; character of foundation, piling in sand.
  Kind of dam: Movable, Poiree needle.
  Type of construction: Concrete.
  Completed and opened to navigation: 1918.
  Actual cost : $402,288.40.
   Operation and maintenance of the lock and dam has been aban-
doned.
   The project proposes to obtain a channel at low water from the
mouth of Big Sunflower River to the mouth of the Hushpuckena, a
distance of 171.4 miles, with an average width of about 100 feet and
a least available depth of 41/2 feet.
   Floods ordinarily cause fluctuations of stage between high and low
water of about 30 feet. Unusual floods occasionally iicrease this
range about 5 feet.
   Exclusive of amount expended on previous project, the latest ap-
proved estimate of cost for new work for closing outlets, made in
1906, was $75,000; for constructing lock and dam, revised in 1914,
$500,000; and for open-channel work, revised in 1928, $186,700. The
latest (1941) approved estimate for annual cost of maintenance by
removing snags, etc., is $4,000.
   The existing project was authorized by the following river and
harbor acts:
    Acts                       Work autnorized                                  Documents

Mar.   2,1907   For closing outlets, constructing contraction      H. Doc. No. 667, 59th Cong., 1st sess.
                  works, and removing obstructions from tne
                  mouth to Baird.
July 25,1912    Construction cf lock and dam and for open-chan-    Rivers and Harbors Committee Doc.
                 nel work above Baird.                               No. 2, 62d Cong., 2d sess.
Aug. 26, 1937   Abandonment of operation and maintenance of        Specified in act.
                 the lock and dam.

  The latest published map is in H. Doc. No. 198, 73d Cong., 2d sess.
         RIVERS   AND I-IARBORS-VICKSBURG,          MISS.,   DISTRICT         805

   Recommended modifications of project.-It is recommended that
this project be curtailed by the elimination of all work between Pente-
cost and the mouth of the Hushpuckena River. (The abandonment
of the entire project was erroneously recommended in H. Doc. No. 467,
69th Cong., 1st sess.)
   Under date of June 28, 1935, the Chief of Engineers recommended
that the existing project be modified to limit channel maintenance
operations to the portion between the mouth and Woodburn, mile 82.7.
 (Report not printed.)
   Terminal facilities.-None.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The outlets were closed under the
existing project in 1909 and the contraction work completed in 1912.
The single lock and dam was completed in 1918 (see table under "Exist-
ing project") and subsequently abandoned. The open-channel work
above the dam is about 20 percent completed. The mouth of Hush-
puckena River, mile 171.4, is head of navigation. However, due to the
incompletion of the project above Pentecost, mile 124.6, navigation
above that point is limited to small craft and rafted logs. When the
river stages are high, usually from January to June, a minimum depth
of 5 feet may be expected below Pentecost, mile 124.6.
   In that part of the river below the dam a gage reading of 69.5 feet
or more at Holly Bluff, Miss., is favorable for light-draft navigation
and 72.5 feet or more is favorable for heavy-draft navigation. The
controlling depth at the end of the fiscal year was 2 feet. The work
remaining to be done to complete the project consists of dredging the
channel to a minimum depth of 4.5 feet from Pentecost to the mouth
of Hushpuckena River and depositing the soil along the banks to
contract the width of the river and the completion of open-channel
work above Baird, Miss.
Cost of new work under existing project to June 30, 1942---------$494, 026. 65
Cost of maintenance--------------------------------                264, 947. 16
Cost of operating and care _ -_ _    _                               9, 732. 47
      Total cost------------------------------------               768, 706. 28
Total expended ------------------------------------------------    768, 706. 28
   In addition, the sum of $149,010.83 was expended between May 1,
1918, and June 30, 1936, on the operation and care of the works of
improvement under the provisions of the permanent indefinite appro-
priation for such purposes.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $4,865.48, will be applied to maintenance dredging with
U. S. combined dredge and snagboat Sunflower, 1 month (December
1942).
   The additional sum of $4,000 can be profitably expended during the
fiscal year 1944 using Government plant and hired labor, in snagging
and chopping with U. S. combined dredge and snagboat Sunflower
during December 1943.
                          Cost and financial summary
Cost of new work to June 30, 1942-----------------------------     $560,    026. 65
Cost of maintenance to June 30, 1942-------- ------------------      459,   327. 90
      Total cost of permanent work to June 30, 1942               1, 019,   354. 55
Net total expenditures ----------------           -     -1,          019,   354. 55
Unexpended balance June 30, 1942        ___                            4,   865. 48
      Total amount appropriated to June 30, 1942--.....     --    1, 024,   220. 03
806              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                            1942


     Fiscal year ending June 30                            1938               1939          1940               1941               1942


C ost of new w ork __-- - - -                        - - - - -          --   - - - - - - - - -           --   - - - -        - - - - -
                   ...........
Cost of maintenance-----------                           $13, 4f9. 58        $3, 171. 22   $1, 595. 34        $4, 138. 21        --      --


Total expended_..              ----
                                 ____           -.        12, 723. 87         4, 148. 99    1, 595. 34         4, 138. 21----------
Allotted ...----------------------....................    15, 950. 00         2, 500. 00    4, 000. 00         4, 000. 00   ...... .-.....



Balance unexpended July 1, 1941____-______------------------                                                                 $4,865.48
Balance unexpended June 30, 1942-----------------------------                                                                 4, 865.48

Amount that can be profitably expended in fiscal year ending             June
                             - - -- -- -- -- -- -- -- -- - -- -- -- -
30, 1944, for maintenance 1____                                      _______                                                  4, 000. 00
    1 Exclusive of available funds.

                                   8. MOUTH OF THE YAZOO RIVER, MISS.

   Location.-See report for Yazoo River, page 802.
   Existing project.-This provides for opening a new outlet for the
Yazoo River through the wrong end of Old River, across a neck of
lowland to Lake Centennial, around the head of De Soto Island,
and down the east arm of Lake Centennial to the Mississippi River
just below the city of Vicksburg. The total length of the proposed
canal is 9.3 miles, with least width of 98.5 feet, and bottom of canal
prism 6.5 feet below zero on the Vicksburg gage.
   The ordinary fluctuation between high and low water is about 44
feet. Extreme floods occasionally increase this range about 15 feet.
   The latest approved estimate of cost for new work, made in 1893,
was $1,200,000. The latest (1941) approved estimate for annual cost
of maintenance is $5,000.
   The existing project was adopted by the River and Harbor Act
of July 132 1892 (H. Ex. Doc. No. 125, 52d Cong., 1st sess.). The
latest pubhshed map is in House Document No. 198, Seventy-third
Congress, second session.
   Terminal facilities.-At Vicksburg, Miss., there is a paved munici-
pal wharf 375 feet in length, with inclined ramp exits through sea
wall. In addition, at Vicksburg below the mouth of the Yazoo Canal,
there is a Federal barge line transfer terminal with railroad connec-
tion, and a private floating dock for the loading of petroleum prod-
ucts into barges. The present facilities are considered adequate for
existing commerce. Additional data for terminal facilities are con-
tained in Transportation Series No. 2, 1929, Transportation in the
Mississippi and Ohio Valleys.
   Operations and results during fiscal year.-The U. S. combined
dredge and snagboat Sunflower removed 7,325 cubic yards of material
from the channel between miles 1.0 and 2.8. Between miles 2.8 and 6.0,
2,000 willows and brush have been cut. The work is classed as mainte-
nance and was done by hired labor at a cost and expenditure of
$4,460.79.
   Conditionat end of fiscal year.-The existing project was completed
in 1904. The canal is navigable at all times, the minimum depths being
generally about 6 feet greater than the simultaneous readings of the
Vicksburg gage. The controlling depth at the end of the fiscal year
was about 9 feet.
              RIVERS AND HIARBORS--VICKSBURG,                                                MISS.,     DISTRICT                807
Cost of new work under existing project to June 30, 1942---------- $1, 179, 210. 87
Cost of maintenance-------------------------------------------         123, 271. 05
      Total cost                                                                                                       302, 481. 92
                                                                                                                    1---------------------------------
Total expended ----------------------------------------------                                                       1, 302, 481.92:
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $539.21 will be applied to maintenance dredging with the
U. S. combined dredge and snagboat Sunflower during the month of
August 1942.
   The sum of $5,000 can be profitably expended during the fiscal year
1944, using Government plant and hired labor, in dredging with U. S.
combined dredge and snagboat Sunflower, during August 1943.
                                               Cost and financial summary
Cost of new work to June 30, 1942---------------------------- $1, 179, 210. 87
Cost of maintenance to June 30, 1942---------------------------   123, 271. 05
           Total cost of permanent work to June 30, 1942------------                                                1, 302, 481. 92
Net total expenditures------- -------------------------------                                                       1, 302, 481. 92
Unexpended balance June 30, 1942-----------------------------                                                               539. 21
           Total amount appropriated to June 30, 1942-------------                                                  1, 303, 021. 13


   Fiscal year ending June 30                         1938            1939                  1940            1941             1942

Cost of new work - - -            ---
                                 --           - - -          - - -                 - --      -     -   --      - -       - - -      -
Cost of maintenance---       -                   $2, 744. 21         $5,072. 14      -...               $5, 500. 00         $4, 460. 79
Total expended   ---------        -....           2, 744. 21          5, 072. 14            ----            5, 500. 00       4, 460. 79
Allotted    __    ....       ......       .       6, 300. 00          2, 500. 00             $3, 000        5, 000. 00------------


Balance unexpended July 1, 1941------------------------------                                                            $5, 000. 00
Gross amount expended---------------------------$5, 600. 00
Less reimbursements collected_----------------------- 1, 139. 21
                                                                                                                          4, 460. 79

     Balance unexpended June 30, 1942-------------------------                                                               539. 21
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1--_----------------            -----                                                          5, 000. 00
   1Exclusive    of available funds.

9. REMOVING SNAGS AND WRECKS FROM THE MISSISSIPPI RIVER
  BELOW THE MOUTH OF MISSOURI RIVER AND FROM OLD AND
  ATCHAFALAYA RIVERS
   Location.-The stretch of the Mississippi River under jurisdiction
of the Vicksburg Engineer District extends from the mouth of Ar-
kansas River to Vicksburg, Miss. (See Mississippi Commission maps,
Alluvial Valley of the Mississippi River.) The work in the New Or-
leans district on the Mississippi River from Vicksburg to the Passes
and 8 miles of Old River and 30 miles of Atchafalaya River is handled
by that district in connection with flood control, Mississippi River
and tributaries.
   Previous projects.-For the removal of these obstructions general
appropriations were made at regular intervals as early as 1824. For
further details, see page 1880, Annual Report for 1915.
   Existing project.-This is a continuation of the plan adopted in
1879, and provides for the removal and destruction of snags, wrecks,
808           REPORT OF CHIEF OF ENGINEERS,                            U.   S.   ARMY,   1942

drift heaps, and other obstructions to navigation in the Mississippi
River from the mouth of Arkansas River to Vicksburg, Miss.; also
for the felling of large trees on or near caving banks, thereby decreas-
ing the number of snags to be destroyed thereafter. The work is done
by District's steel hull snagboat, C. H. West, built in 1934; and other
plant; all fitted with necessary equipment and appliances and oper-
ated by Government employees.
  The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                 Documents


                    Annual appropriations or allotments made 1879
                 to 1886, inclusive, except in 1883 and 1885.
Aug. 11, 1888 1 Annual expenditure of $100,000 made available
                 each year.
Mar. 3, 1909 Atchafalaya and Old Rivers from their junction
                 with the Mississippi and Red Rivers to Mel-
                     ville, La., included in the project.
Mar. 2, 1919        Appropriation of $50,000 additional to cover in-
                     creased costs due to war conditions.
June 30, 19222
Mar. 2, 1923 2 Allotments of $25,000, $20,000, $17,500, and $13,000,
June     7, 19242    respectively, to cover increased costs.
Apr. 15,19262
June 26,19343 Maintenance provided for with funds appropri-
               ated for the preservation and maintenance of
               rivers and harbors, since June 30, 1935.


  1Sec. 7.
  2 War Department Appropriation Act.
  3 Permanent Appropriations Repeal Act.


  Terminal facilities.-At Greenville, Miss., there is a municipal con-
crete wharf and a municipal floating wharf. At Vicksburg, Miss.,
there is a paved municipal wharf 375 feet in length with inclined
ramp exits through sea wall. In addition, at Vicksburg below mouth
of Yazoo Canal there are a Federal barge line transfer terminal with
railroad connetions and a private floating dock for the loading of
petroleum products into barges.
  In addition, pipe lines from bulk plants to barge landings for
handling petroleum products, and log slips are located on the reach
south of the mouth of Arkansas River. Further details are contained
in the following reports: Transportation Series Report No. 2, 1929,
Transportation in the Mississippi and Ohio Valleys; Transportation
Series Report No. 4, 1936, Transportation Lines on the Mississippi
River System.
  The present facilities are considered adequate for existing com-
merce.
  Operationsand results during fiscal year.-The U. S. snagboat Chas.
H. West made 21 complete trips between the mouth of Arkansas River
and Warrenton, Miss. During these trips 15,956 miles were run and
71 snags were removed from the channel. The work is classed as
maintenance and was done by hired labor at a cost and expenditure
of $25,000.
  Condition at end of fiscal year.-The project being one of contin-
uous maintenance of channel, no estimate of completion and total cost
             RIVERS         AND IHARBORS--VICKSBURG,                            MISS.,        DISTRICT            809

can be made. Each freshet brings down new obstructions, and, con-
stant changes in location of channel uncover old obstructions. This
work is of great benefit to commerce and navigation of the river, and
disasters caused by vessels striking channel obstructions seldom occur.
   Operations provided a channel reasonably free from obstructions
at the end of the fiscal year, and there is sufficient plant available to
take care of future work. Total cost and expenditures of the exist-
ing project in that stretch of the river under the jurisdiction of the
Vicksburg district to June 30, 1942, was $175,000 for' maintenance.
   Proposed operations.-Thiswork is continuous since new obstruc-
tions are brought down by each freshet, though not in such quantity
as formerly. An allotment of $25,000 from regular maintenance and
improvement funds for the fiscal year 1943 will be applied to remov-
ing obstructions to navigation from the mouth of Arkansas River
to Warrenton, Miss., using U. S. snagboat Charles H. West.
   The additional sum of $25,000 can be profitably expended during
the fiscal year 1944, to be applied to removing obstructions to navi-
gation from the mouth of Arkansas River to Warrenton, Miss., using
U. S. snagboat Charles H. West.
                           Cost and financial summary
Cost of new work to June 30, 1942______________--__
Cost of maintenance to June 30, 1942------ -----------------------                                           $175, 01)0
       Total cost of permanent work to June 30, 1942____________                                              175, 000
Net total expenditures--_----------------_-                                                                    175, 000
Unexpended balance June 30, 1942_____-  _________-------------  __                                              25, 000
     Total amount appropriated to June 30, 1942___________________                                             200, 000

   Fiscal year ending June 30               1938             1939              1940              1941           1942


Cost of new work ---------------           ------        ------------ --   -               --------------
Cost of maintenance--...........             $25, 000        $25, 000           $25, 000          $25, 000       $25, 000

      Total cost_-                            25, 000          25, 000           25, 000           25, 000         25, 000

Total expended _                              25, 000          25, 000           25, 000           25, 000         25, 000

Allotted_                                     50, 000          25, 000           25, 000           25, 000         25, 000


Balance unexpended July 1, 1941_____----------------------------                                               $25, 000
Amount allotted from War Department Civil Appropriation Act ap-
  proved April 28, 1942 -------------------------------------------                                             25, 000
      Amount to be accounted for__---------------------------                                                   50, 000
Gross amount expended ---     _____-----------------         $45, 430. 52
Less reimbursements collected -----------------------         20, 430. 52
                                                                                                                25, 000
      Balance unexpended June 30, 1942__________________________                                                25, 000
Amount that can be profitably      expended in fiscal year ending June 30,
1944, for maintenance - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -    25, 000
   1Exclusive of available funds.
     10. EXAMINATIONS,                   SURVEYS, AND CONTINGENCIES,                                    GENERAL
  The cost of work during the fiscal year was $19,141.75. The ex-
penditures were $20,340.51. The balance unexpended June 30, 1942,
$6,239.10, plus a proposed allotment of $19,000, a total of $25,239.10,
will be applied as needed during the fiscal year 1943 to payment of ex-
penses incurred under this heading. The additional sum of $20,000
can be profitably expended during the fiscal year 1944.
810           REPORT           OF     CHIEF        OF ENGINEERS,                       U.    S.       ARMY,        1942


                                             Cost and financial summary

Cost of new work to June 30, 1942______
Cost of maintenance to June 30, 1942 ----------      -    --
                                                     __-___        -__$324, 882. 37
      Total cost of permanent work to June 30, 1942_    -- _____ 324, 882.37
Minus accounts payable June 30, 1942----------_____            -__
                                                             -___       .    295. 79
      Net total expenditures ------------------- ---------------       324, 586. 58
Unexpended balance June 30, 1942--------------__________-______           6, 239. 10
  -   Total amount appropriated to June 30, 1942_ __. ________- _ 330, 825. 68

      Fiscal year ending June 30                1938                  1939               1940               1941             1942

Cost of new work ........      -..........         .    ---    --                  -
Cost of maintenance -....... _         _      $55, 152. 51          $69, 473. 08       $26, 318. 15       $56, 277. 82      $19, 141. 75

Total expended -..- ---...... _                54, 224. 16           70, 955. 61        26, 377. 39        55, 882. 20       20, 340. 51

Allotted_------------------------              95, 199. 79           47, 000. 00        37, 000. 00        45, 000. 00        5, 700. 00


Balance unexpended July 1, 1941 -                   - -_____                _ -                                          $20, 879. 61
Amount allotted from War Department Civil Appropriation Act ap-
  proved May 23, 1941          -------------------------------          _                                                 5, 700. 00
      Amount to be accounted for_____________________________                                                            26, 579. 61
Gross amount expended_____________________--_____                   $45, 905. 99
Less reimbursements collected________----- --                  ____  25, 565. 48
                                                                                               20, 340. 51
      Balance unexpended June 30, 1942______________-___ __                                     6, 239. 10
Outstanding liabilities June 30, 1942___________________________                                 -92. 42
      Balance available June 30, 19426___                -__       -________________6, 146. 68
Amount that can be profitably expended in fiscal year ending June
                                 -- - - - - -- - - - - - - -- -- - - - - - - - - - - - - - - -
30, 1944, for maintenance                                                                     20, 000. 00
      1 Exclusive of available funds.

11. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED

                                                                     For last      Cost and expenditures to               Estimated
                                                                   full report           June 30, 1942                    amount re-
                     Name of project                               see Annual
                                                                      Report                                               quired to
                                                                      Report
                                                                       for-        New work             Maintenance        complete

1. Little Missouri River, Ark-_                                        1873           $19, 991. 94                           (1)
2. Bayou Dorcheat, Loggy Bayou, and Lake
      Bisteneau, La-_ _   _--      -- - --               -- _           1887             5, 000. 00                           (1)
3. Bayou Pierre, La--  -- -------     _-.......          _             1887             8, 600.00                            (1)
4. Little River, La.2                                                  1890             2, 500. 00-------------              (1)
5, Rondeway and Vidal Bayous, La                             __        1892             2, 000. 00                           (1)
6. Cane River, La_                                                     1910             2, 500.00         $1, 999. 50        (1)
7. Little Tallahatchie River, Miss---------------                      1913            19, 000. 00                           (1)
8. Stulphur River, Ark. and Tex.2........                              1919            45, 988. 99                           (1)
9.   Bear Creek, M iss .----------------------- _-                     1920             3, 346. 62         2, 086. 16        (1)
10.   Tchula Lake, Miss_-                 3                             1921            19, 384. 89        26, 585. 08        (1)
11.   Bayou Bartholomew, La. and Ark. 4______                           1931            45, 873. 53        42, 857. 25         (1)
12.   Saline River, Ark.2 4                                             1931            26, 900. 00        12, 791. 67        (1)
13.   Steele and Washington Bayous and Lake
        Washington, Miss.3 4                                            1931            19, 049.   81       8, 000. 00         $40, 000
14.   Yalobusha River, Miss.2 5                                         1937             7, 000.   00      15, 936. 38        (1)
15.   Tallahatchie and Coldwater
                             2     Rivers, Miss.___                     1939            43, 481.   48     173, 066. 02        (1)
16.   Big Black River, Miss. 7                                          1895            15, 000.   00                         (1)
17.   Bayous D'Arbonne and Corney, La. 7.......                         1941            19, 000.   00      37, 803. 88        (1)

  1 Completed.
  2 Abandonment recommended in H. Doc. No. 467, 69th Cong., 1st sess.
  3 Abandonment recommended in H. Doc. No. 1692, 64th Cong., 2d sess., and H. Doc. No. 467, 69th
Cong., 1st sess.
  4 Channels adequate for existing commerce. Abandonment recommended in H. Doc. No. 1694, 64th
Cong., 2d sess., and H. Doc. No. 467, 69th Cong., 1st sess.
  6 See report of Mississippi River Commission for operations in connection with
                                                                                 the Yazoo Basin flood-
control project including channel clearing and rectification and New Grenada Reservoir on Yalobusha
River.
  6 See report of the Mississippi River Commission for operations in connection with the Yazoo Basin flood-
control project, including Sardis Dam and Reservoir on Little Tallahatchie River, Arkabutla Dam and
Reservoir on Coldwater River, and channel clearing on Tallahatchie and Little Tallahatchie Rivers.
  7No commerce reported.
              RIVERS AND ITARBORS-VICKSBURG                                           1MISS.,      DISTRICT               811
              12. PLANT ALLOTMENT, VICKSBURG, MISS., DISTRICT
                                    Cost. and financial summary
Undistributed costs June 30, 1942------------------------------                                                 $256, 427. 60
Net total cost to June 30, 1942________---__--____             256, 427. 60
Plus accounts receivable June 30, 1942 ----------------------- 30, 888. 30
      Gross total costs to June 30, 1942-----------------------287,     315. 90
Minus accounts payable June 30, 1942___---------                _   25, 071.95
      Net total expenditures  -------------------------------   262, 243. 95
Unexpended balance June 30, 1942_--------------------------182,      876. 84
           Total amount appropriated to June 30. 1942- _________-                                            -_ 445, 120. 79

    Fiscal year ending June 30               1938               1939                 1940            1941              1942

Total expended                             $67, 829. 14   -$21, 888. 24      -$54, 198. 68       -$16, 944. 62      -$71, 681. 73

Allotted                                                                     -$15,     000. 00

Balance unexpended July 1, 1941------------------------------         $111, 195. 11
Gross amount expended ------------------------          $466, 424. 27
Less reimbursements collected --------------------       538, 106. 00
                                                                      - 71, 681. 73
      Balance unexpended June 30, 1942____                              1_____________
                                                                       182,  876. 84
Outstanding liabilities June 30, 1942____________________________        19, 044. 72
      Balance available June 30, 1942-_------------------               163, 832. 12
Accounts receivable June 30, 1942______ _________________                30, 888. 30
      Unobligated balance available June 30, 1942______________         194, 720. 42
Status of all investigations for navigation called for by river and harbor acts and
                               committee resolutions
                                                                  Date trans-               Document             Recommenda-
            Locality               Authorization act               mitted to                 num her                 tion
                                                                       Congress


Jefferson-Shreveport water-      River       and     Harbor
  way, Texas and Louisiana,       Act, Aug. 30, 1935.
  enlarging existing project
  and establishing reser
  voirs on Cypress River
  above Jefferson.1
Jefferson-Shreveport water-      River       and     Harbor
  way, Texas and Louisiana,        Act, Aug. 26, 1937.
  thence via Red River to
  Mississippi River, includ-
  ing reservoirs in Cypress
  and Black
          1        Cypress
  Rivers.
Jefferson-Shreveport water       River   and' Harbor
  way, Louisiana and Texas,        Act, June 20, 1938.
  thence via Red River to
  Mississippi River, survey
  for navigation, flood con-
  trol, power, and irriga-
  tion, including water-sup-
  ply reservoirs in Cypress
  and Black Cypress
  Rivers.1
Ouachita River system,           Commerce Commit-
  Louisiana and Arkansas,         tee resolution, Feb.
  and connecting water-           8, 1939; Flood Con-
  ways, singly or together,       trol Committee-
  for navigation, flood2 con-     resolution, Jan. 26,
  trol and irrigation.             1939;      Rivers      and
                                   Harbors Committee
                                   resolution, Jan. 24,
                                1939.
  1 Combined with report on Red River, La., Ark., Okla., and Tex., for navigation, flood control, water
power, and irrigation, requested by resolution of the Committee on Rivers and Harbors, House of
Representatives, adopted Feb. 25, 1938, being prepared by special board.
  2 Combined with report on Red River, La., Ark., Okla., and Tex., and connecting waterways, being pre-
pared by special board.
812          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                  1942

Status of all investigations for navigation called for by river and harbor acts and
                         committee resolutions-Continued

                                                          Date trans-        Document      Recommenda-
            Locality               Authorization act       mitted to          number           tion
                                                           Congress

Ouachita River, La. and           Interim report on Spe- _ .    .        .    .    .
Ark. (interim report).             cial Board 20.
Ouachita River to Huttig,         River and Harbor Oct.         8,1941                     Unfavorable.
                                                                                        -___
  Ark., canal from.                Act, Aug. 26, 1937.
Red River, La., Ark.,             Rivers and Harbors       -        --
Okla., and Tex., for navi-         Committee resolu-
  gation,    flood     control,    tion, Feb. 25, 1938.
  water power, and irriga-
  tion. (Report being pre-
pared by special board.)
Red River, La., Ark.,             Commerce    Commit-
  Okla., and Tex., and con-        tee resolution, Feb.
  necting waterways, singly        8, 1939; Flood Con-
  or together, for naviga-         trol Committee
  tion, flood control, and         resolution, Jan. 26,
  irrigation. (Report being        1939; Rivers and
  prepared      by special         Harbors Committee
  board.)                          resolution, Jan. 24,
                                   1939.
Sulphur River, Tex. and           River and Harbor ..
Ark., improvement for             Act, June 20, 1938.
navigation, flood 2control,
and water power.
Yazoo River, Miss      -.
                        _-        Rivers and Harbors ..
                                    Committee resolu-
                                   tion, May 29, 1940.


  2 Combined with Report on Red River, La., Ark., Okla., and Tex, and connecting waterways, being
prepared by special board.

                              13. BLACK BAYOU RESERVOIR, LA.

   Location.-The work covered by this project is on Black Bayou in
Caddo Parish, La., 40 miles above the mouth of Twelve Mile Bayou,
and about 25 miles northwest of Shreveport, La.
   Existing project.--The plan of improvement provides for the con-
struction of an earth fill dam 1,350 feet long ,at the top, rising 24.8 feet
above the stream bed, with a reservoir providing for the controlled
storage of 26,300 acre-feet, of which 7,500 acre-feet will be utilized as a
conservation pool. The outlet works are located over the present
channel of Black Bayou 260 feet from the right end of the dam, and
an uncontrolled tilting gate spillway 400 feet wide extends from a
point 260 feet from the right end of the dam. The reservoir will
control 220 square miles or about 52 percent of the entire drainage area
of Black Bayou and provides flood storage for the protection of the
population and lands below. The existing project was authorized by
the Flood Control Act approved June 22, 1936. The revised estimate
of cost for construction is $289,000.
  Local cooperation.-See page 5 fof requirements. Assurances that
local interests would assume all land and damage costs were received
by the Department in June 1939.
   Operations and results dwring fiscal year.-None.
   Condition at end of fiscal year.-Work has not been started.
   Proposedoperations.-No funds are available and no operations are
proposed during the fiscal year 1943.
         RIVERS AND HIARBORS-VICKSBURG,                MISS.,    DISTRICT       813

  The sum of $15,000 can be profitably expended during the fiscal
year 1944, for the preparation of detailed plans.
                          Cost and financial summary

Cost of new work to June 30, 1942___
Cost of maintenance to June 30, 1942__           _____--------

      Net total expenditures_.        -      -      __     __________   _____
Total amount appropriated to June 30, 1942-------------___

Amount (estimated) required to be appropriated for completion of
existing project_------
                       __------------------                           $289, 000
Amount that can be profitably expended in fiscal year ending June 30,
1944, for new work __-_____-- __--------------------                   15, 000

                14. LITTLE    MISSOURI RIVER BASIN, ARK.

   Location.-The Little Missouri River rises in the southeastern corner
of Polk County, Ark., on the southern slope of the Missouri Moun-
tains and flows in a southeasterly direction a distance of 147 miles in
a tortuous course to enter the Ouachita River 27.6 miles above Cam-
den, Ark. (See U. S. Geological Survey State Map Scale 1: 500,000.)
   Terre Noire Creek rises in the Athens Plateau, midway between
Arkadelphia and Amity in Clark County, and flows in a general
southeasterly ,direction a distance of about 45 miles to enter Little
Missouri River on the left bank 2 miles above the mouth of the parent
stream.
   Ozan Creek, formed by the junction of North Fork, Middle Fork,
and South Fork near Blevins, in Hempstead County, flows in a general
northeasterly direction a distance of about 25 miles to join Little
Missouri River on the right bank at mile 73.2 above the mouth.
   Existing project.-The Flood Control Act approved August 18,
1941, approved the plan for the Narrows Reservoir for flood control
and other purposes on the Little Missouri River, Arkansas, and for
local flood protection on the main river below Murfreesboro, Ark.,
and on the Terre Noire and Ozan Creeks, as set forth in House Docu-
ment No. 837, Seventy-sixth Congress, third session, and authorized
$3,000,000 for the initiation and partial accomplishment of the project.
   The plan of improvement provides for the construction of the Nar-
rows Reservoir on the Little Missouri River above Murfreesboro, Ark.,
with a gross storage capacity of 410,000 acre-feet and a power plant
at the dam site with an initial installation of hydroelectric generating
facilities having a capacity of 15,000 kilowatts and with provisions
for future enlargement of those facilities; channel clearing and snag-
ging of the Little Missouri River and the excavation of 11 cut-off s
between the mouth and mile 70; on Terre Noire Creek snagging of
the channel between the Missouri Pacific Railroad crossing and the
mouth, the enlargement of 0.9 mile of silted creek channel, the repair
of levee crevasses in the side levees, and the construction of required
drainage ditches; and clearing, snagging, and enlargement of the
channel of Ozan Creek between the lower end of the existing drainage
ditches to the mouth.
    The following is a list of the individual projects considered in the
approved plan:
       493202---43-pt. 1, vol. 1--52
814        REPORT OF CHIEF OF ENGINEERS,                           U.    S. ARMY,         1942


                                                                                    Estimated cost
              Location                       Type of protection
                                                                          Federal       Local         Total

Narrows Reservoir near Murfreesboro,     Reservoir and power plant-      $6, 470, 000 ----------- $6, 470, 000
  Ark.
Little Missouri River, Murfreesboro,     Channel improvement      -.--- 207, 200           $800        208, 000
  Ark., to the mouth.
Terre Noire Creek, Ark __                Channel improvement and             89,000 ------              89, 000
                                           repairs to levees.
.Ozan Creek, Ark . _______________       Channel improvement -               33, 000   --------_.       33, 000

  The latest published map is in H. Doc. No. 837, 76th Cong., 3d sess.


   Local cooperation.-See page 5 for requirements. On Ozan and
"Terre Noire Creeks, drainage districts empowered to act for local in-
terests have signified their willingness to cooperate.
   Operations and results during fiscal year.-Surveys and mapping of
the Narrows Reservoir area were initiated. An expert geologist was
employed to appraise and submit a report on the value of cinnabar
mines and mineral rights in the reservoir area. Under contract, bor-
ings were initiated. Preparation of detailed plans was initiated.
    Costs -during the fiscal year were $10,860.04. Expenditures were
-$8,574.05.
    Condition at end of fiscal year.-Surveys and mapping of the reser-
voir area were in progress. Appraisals and preparation of report on
the value of cinnabar mines and mineral rights in the reservoir area
were in progress. Under contract, boring operations were in progress.
Preparation of detailed plans was in progress.
    Total costs to June 30, 1942, were $10,860.04. Total expenditures
were $8,574.05.
    Proposed operations.-The balance unexpended at the end of the
fiscal year, $91,425.95, plus the spim of $90,000 allotted in August, a
total of $181,425.95, will be applied as follows:
Accounts payable June 30, 1942_____________ _________________                                     $2, 285. 99
New work:
     Completion of-
          Studies, land and mine appraisals, subsurface in-
             vestigations, surveys, and mapping----------$57, 799. 72
          Preliminary plans, designs and estimates -----    46, 340. 24
     Initiation and completion of-
          Surveys for land appraisals-______    __-____      7,000. 00
          Land appraisals----------------------__-           5, 000. 00
          Final design and construction plans ----------- 63, 000. 00
                                                                                                  179, 139. 96

              Total for all work-------------------------------- 181, 425.95
    The additional sum of $15,000 can be profitably expended during the
fiscal year 1944, to be applied to the preparation of detailed plans and
specifications.
                                  Cost and financial summary
Cost of new work to June 30, 1942____________-__-___----          $10, 860.04
Cost of maintenance to June 30, 1942__---------------------      -----------
        Total cost of permanent work to June 30, 1942----------- 10, 860. 04
Minus accounts payable June 30, 1942______________________-- - -    2, 285. 99
      Net total expenditures_- -----------------------                                              8, 574. 05
Unexpended balance June 30, 1942__ _.--------                                                     91,425. 95
      Total amount appropriated to June 30, 1942_----                                     -       100, 000. 00
                     RIVERS                  AND      THARBORS-VICKSBURG,                     M1VISS.,    DISTRICT               815

      Fiscal year ending June 30                              1938            1939           1940             1941            1942


Cost of new work                                     ----            _-- ------------- -------------- -------------          $10, 860. 04
Cost of maintenance                    -----------          --------------         ------------------ -----------
Total expended ..                             .....--------------------------------------------------------------                   05
                                                                                                                               8,574.
Allotted------------------................         ------------               -------                      ---------         100, 000.00



Amount allotted from War Department Civil Appropriation Act
  approved May 23, 1941___ ---------------------------------                                                            $100,000.00
Gross amount expended------- -----------------    $10,574. 05
Less reimbursements collected--------------------   2,000. 00
                                                                                                                            8, 574. 05

      Balance unexpended June 30, 1942------------------------                                                            91, 425. 95
Outstanding liabilities June 30, 1942-----------------------------                                                         5, 441. 00
     Balance available June 30, 1942----                                                                                  85, 984. 89
Amount allotted in August 1942-------------------------------                                                             90, 000. 00
      Amount available during the fiscal year 1943--------------                                                         175, 984. 89
Amount (estimated) required to be appropriated for completion of
existing project 1    _______-              - --                                                                      6, 610, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944,for new work 1---------------------------------                                                                 15,000.00
     1 Exclusive of available funds.

                                             15. WALLACE LAKE RESERVOIR, LA.

   Location.-The work covered by this project is in Red River Basin,
on Cypress Bayou, Caddo and De Soto Parishes, La., 66 miles above
the mouth of Bayou Pierre and about 14 miles southeast of Shreve-
port, La. (See U. S. Geological Survey State Map, scale 1: 500,000.)
   Existing project.-The plan of improvement provides for the con-
struction of an earth-fill dam 4,940 feet long at the top, including 644
feet of spillway and outlet works, rising 48 feet above the stream
bed, with a reservoir providing for the controlled storage of 96,200
acre-feet. Construction will be so arranged that a conservation pool
of 7,600 acre-feet may be created after local interests have cleared
the necessary area and placed riprap that will be required, in which
case the controlled storage.will be reduced to 88,600 acre-feet. The
outlet works and uncontrolled spillway are centered about 1,250 feet
north of the south abutment. The reservoir will control 260 square
miles, or about 20 percent of the total drainage area of Bayou Pierre,
Cypress Bayou, and tributaries combined, and will afford complete
protection against floods for an area of about 90,000 acres of valley
below the dam. The existing project was authorized by the Flood
Control Act approved June 22, 1936 (H. Doc. No. 378, 74th Cong.,
2d sess.). The estimate of cost, revised in 1941, is $1,070,000 for con-
struction and $24,000 for preparation of land titles.
    The latest published map is in House Document No. 378, Seventy-
fourth Congress, second session.
   Local cooperation.-See page 5 for requirements. Local interests
have agreed to furnish necessary lands and flowage rights at a nom-
inal cost to the United States.
   Operations and results during fiscal year.--Acquisition of rights-of-
way was continued. Under contract, construction of the dam was
816     REPORT OF CHIEF OF ENGINEERS,              U.   S.   ARMY,   1942

started August 2, 1942. Two hundred ninety-eight thousand nine
hundred and thirty cubic yards of impervious fill, or 53 percent of the
total, were placed on the main dam embankment. One hundred and
eight thousand nine hundred and sixty-five cubic yards of material,
or 90 percent of the total, were excavated for the spillway. Two hun-
dred and twenty-four thousand eight hundred and twenty-seven cubic
yards of material, or 71 percent of the total, were excavated from
borrow area B. Fourteen thousand three hundred and thirty-five
cubic yards, or 49 percent of the total, of pervious borrow were exca-
vated from borrow area C. Stripping of the main dam foundation was
in progress, and 1,751 cubic yards of material, or 26 percent of the
total, were removed. Twelve thousand three hundred and forty-five
linear feet of battered timber piling, 98,539 linear feet of vertical tim-
ber piling, and 15,409.5 square feet of steel sheet piling were driven,
completing these items. Construction of the spillway weir, consisting
of the placement of 12,518.2 cubic yards of concrete, was completed.
The field office and the grading of access roads were completed. Costs
during the fiscal year were $503,210.93. Expenditures were $466,-
931.16.
   Conditionat end of fiscal year.-Acquisitionof rights-of-way for the
dam site has been completed. Acquisition of rights-of-way in the
reservoir area was in progress, and was 78 percent complete. Under
contract, construction of the dam was in progress. Progress is as
shown under operations and results during fiscal year. Construction
of the dam is 61 percent complete. The entire project is 55 percent
complete.
   Total costs to June 30, 1942, were $580,727.15. Total expenditures
were $544,620.72.
   Proposed operations.-The balance unexpended plus accounts re-
ceivable at the end of the fiscal year will be applied as follows:
Accounts payable June 30, 1942___-- ___________---_____--__--_____ $39, 893. 78
New work:
    Contract:
        Completion of preparation of site, cbnstruction
          of earth fill embankment, excavation for spill-
           way, drainage structures and appurtenances_ $460, 248. 10
        IJailroad stabilization________________________   52, 000. 00
    Hired labor : Completion of land acquisition-------       793. 64
                                                                      513, 041.74
           Total for all work-----------------------------------      552, 935. 52
  No additional funds can be profitably expended during the fiscal
year 1944, as the project will be completed with available funds.
                          Cost and financial summary

Cost of new work to June 30, 1942 ______________                    $580, 727. 15
Cost of maintenance to June 30, 1942 _______________________-------------
       Total cost of permanent work to June 30, 1942                 580, 727. 15
Undistributed costs June 30, 1942___ _________-____-         -___ -       231. 11
       Net total cost to June 30, 1942_____________ __________       580, 958. 26
Plus accounts receivable June 30, 1942 _______________________ -       3, 556. 24
       Gross total costs to June 30, 1942 -____________________      584, 514. 50
Minus accounts payable june 30, 1942 -39,                                 893. 78
                                                                             Q-



     Net total expenditures_--- --------------                       -   544, 620. 72
Unexpended balance June 30, 1942__---------_                             549, 379. 28
     Total amount appropriated to June 30, 1942----              -___ 1, 094, 000. 00
                  RIVERS         AND HARBORS-VICKSBURG,                  MISS.,     DISTRICT               817

    Fiscal year ending June 30             1938         1939           1940           1941              1942

Cost of new work_-                                    $34, 625. 80   $21, 749. 79   $21, 140. 63      $503, 210. 93
Cost of maintenance -.
Total expended _..                   -                 31, 106. 92    24, 505. 96    22, 076. 68       466, 931. 16

Allotted----------------------            ---------   512, 000. 00                  18000.00. 00       400, 000. 00



Balance unexpended July 1, 1941-___------_______-------------                                  $616, 310. 44
Amount allotted from War Department Civil Appropriation Act
approved April 28, 1942-------------------                                                        400, 000. 00
      Amount to be accounted for--      -----  ------------                                   1, 016, 310. 44
Gross amount expended______---------                $505, 846. 82
Less reimbursements collected ---------------------   38, 915. 66
                                                                                                   466, 931. 16
      Balance unexpended June 30, 1942_________________ __-                                        549, 379. 28
Outstanding liabilities June 30, 1942______________  $2, 824. 22
Amount covered by uncompleted contracts ----------  429, 815. 91
                                                                                                   432, 640. 13

      Balance available June 30, 1942--------------------------                                    116, 739.15
Accounts receivable June 30, 1942------------------------------                                      3, 556. 24

             Unobligated balance available June 30, 1942---________                                120, 295. 39

                                         16. BAYOU PIERRE, LA.

   Location.-The work covered by this project is in Red River Basin
below Shreveport, La., along the channel of Bayou Pierre from Bayou
Wincey to the mouth at Grand Ecore, La. (See U. S. Geological Sur-
vey State map, scale 1: 500,000.)
   Existing project.-The plan of improvement provides for the widen-
ing of the channel at intervals from Bayou Wincey, mile 30 to mouth
at Grand Ecore, La., consisting of 12.9 miles of channel widening
with an excavation of 1,538,520 cubic yards of material and 29.7 miles
of snagging. The project will reduce flood damage and improve sani-
tary and living conditions over a wide area. The existing project was
authorized by the Flood Control Act of June 22, 1936 (H. Doc. No. 378,
74th Cong., 2d sess.). The estimate of cost for construction is $300,000.
The estimated annual cost of maintenance is $13,500. The latest pub-
lished map is in House Document No. 378, Seventy-fourth Congress,
second session.
   Local cooperation.-See.page5 for requirements. The requirements
have been fulfilled.
   Operations and results during fiscal year-Maintenance.-Workon
the collection of hydraulic data was in progress by hired labor.
   Costs during the fiscal year were $526.09, and expenditures were
$662.08.
   Condition at end of fiscal year.-New work under the existing project
has been completed.      Maintenance work, consisting of channel clear-
ing and snagging, has been accomplished as needed to assure effective
operation of the project. Collection of hydraulic data was in progress.
   The costs and expenditures to June 30, 1942, were $261.000 from
regular funds and $38,529.13 from Emergency Relief funds, a total of
$299,529.13 for new work, the costs from regular funds for maintenance
were $4,113.44, and the expenditures were $4,249.43.
818          REPORT OF CHIEF OF ENGINEERS,                                               U. S. ARMY,                     1942

   Proposed operations.-The balance unexpended at the end of the
fiscal year, $24,250.57, will be applied to maintenance, channel clear-
ing, and snagging with rented tractors, 4 months (July, August, Sep-
tember, and October 1942).
   The additional sum of $13,500 can be profitably expended during the
fiscal year 1944, to be applied to maintenance, clearing and snagging
with rented tractors, 4 months (July, August, September, and Octo-
ber 1943).
                                              Cost and financial summary

Cost of new work to June 30, 1942_______ _____  _____---1                                                                  $299, 529. 13
Cost of maintenance to June 30, 1942-------------------------                                                                 4, 113. 44

      Total cost of permanent work to June 30, 1942____________                                                            1303, 642. 57
Undistributed costs June 30, 1942--------------------------------                                                                140. 27
      Net total cost to June 30, 1942______________________ __                                                                 303, 782. 84
                                     ......
Minus accounts payable June 30, 194211        111111111111111                                                                    1    4. 28
          Net total expenditures_                                    ------------                                              303, 778. 56
Unexpended balance June 30, 1942_---                                ___---          __        _________                         24, 250. 57
          Total amount appropriated to June 30, 1942                                             -----                     '328,     029. 13

    Fiscal year ending June 30                      1938            1939                  1940                    1941               1942


C ost of new w ork - .    ..   .........          $80, 171. 79   $219, 357. 341     -.       - --                                        -
Cost of maintenance                        ____                       __________________               _         $3, 587. 35             $526. 09

       Total cost ----------------                 80, 171. 79    219, 357. 34                                    3, 587. 35                 526. 09

Total expended ----------------                   116, 114. 01    181, 905. 92           $1, 509. 20              3, 587. 35                 662. 08

Allotted___---------------------                  299, 529. 13                           15, 000. 00             13, 500. 00--.      .        .



Balance unexpended July 1, 1941__---_------------                      $24, 912. 65
Gross amount expended-----------------------------            $962.08
Less reimbursements cdllected -----------------------          300. 00
                                                                      -662.08
                                                                            662. 08
          Unobligated balance available June 30, 1942------------       24, 250. 57

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 2           _____________-----
                                                 -                                                                                13, 500. 00
   1 Includes $38,529.13 Emergency Relief funds.
   2 Exclusive of available funds.

                               17. BAYOU                BODCAU RESERVOIR,                                  LA.

  Location.-The work covered by this project is in Red River Basin
on Bayou Bodcau in Bossier Parish, La., 72 miles above the mouth of
Loggy Bayou and 35 miles northeast of Shreveport, La. (See U. S.
Geological Survey State map, scale 1: 500,000.)
   Existing project.-The plan of improvement provides for the con-
struction of an earth-fill dam 20,335 feet long at the top, rising 76
feet above the stream bed with a reservoir providing for a controlled
storage capacity of 297,900 acre-feet. The outlet works are located in
the south abutment, and an uncontrolled highway spillway 4,200 feet
wide is located 6,000 feet south of the hrill line north of Bayou Bod-
cau. The reservoir will control 656 square miles, or 53 percent of
               RIVERS        AND HARBORS-VICXSBURG,                                        MISS.,      DISTRICT              819,'
the entire drainage area of Bayou Bodcau. The construction of a
floodway for the diversion of Bayou Bodcau and Cypress Bayou
to improve flood protection was authorized by the Flood Control
Act approved June 22, 1936. This authorization was modified by the
Flood Control Act approved June 28, 1938, which authorized the con-
struction of a reservoir and other flood-control works, in lieu of the
construction of a floodway for the diversion of Bayou Bodcau and Cy-
press Bayou, La., to improve flood protection, and further modified by
the War Department Civil Appropriation Act approved June 28,
1939, which provided that the reservoir and other flood-contiiol
works on Bayou Bodcau and Cypress Bayou, La., authorized by the
Flood Control Act approved June 28, 1938, shall be constructed in
accordance with the revised plans and cost estimates in the office,
Chief of Engineers. The revised estimate of cost is $2,752,000 for
construction and $180,000 for lands and damages.
   The latest published map is in House Document No. 378, Seventy-
fourth Congress, second session.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.--Work on plans, designs,
reservoir appraisals, and tract maps was continued.
   Cost of new work during the fiscal year was $1,093.21. Expendi-
tures were $1,501.23.
   Condition at end of fiscal year.-Work on plans, designs, reservoir
tract maps, and appraisals is in progress. Foundation borings, soil
analyses, land appraisals, preparation of tract maps for dam-site area,
and model study of intake have been completed. Preparation of first
draft of specifications has been completed. Cost of new work to June
30, 1942, was $179,112.13, and the expenditures were $179,368.71.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $19,631.29, will be applied to completion of plans, designs,
reservoir appraisals, and tract maps. No operations are proposed dur-
ing fiscal year 1944.
                                            Cost and financial summary
Cost of new work to June 30, 1942______ ________________                                                          $179, 112. 13
Cost of maintenance to June 30, 1942_

      Total cost of permanent work to June 30, 1942__-__ ____-__-179, 112. 13
Undistributed costs June 30, 1942__________________________           292. 55
      Net total cost to June 30, 1942_______________________                                                          179, 404. 68
Minus accounts payable June 30, 1942 ______________-------_                                                                 35. 97

     Net total expenditures-------------------------------                                                            179, 368. 71
Unexpended balance June 30, 1942__-_____-_____------___                                                                19, 631. 29

         Total amount appropriated to June 30, 1942______________                                                     199, 000. 00

   Fiscal year ending June 30                     1938                 1939              1940             1941            1942


Cost of new work ----         _------
                                   ----          ------------        $27,046.55        $87, 164. 91     $63,807.46        $1, 093. 21
Cost of maintenance -         ---     ---    -       -----------       ---             ------- ----------
                                                                                                     -                -
Total expended .        .. . -----------                 --           26, 987. 48       84, 702. 88      66, 177.12        1, 501. 23
Allotted __-                                                    -.   939, 000. 00 __     __-----      -740, 000. 00
820      REPORT      OF CHIEF OF ENGINEERS,         U. S. ARMY,      1942

Balance unexpended July 1, 1941_____--_------------------------          $21, 132. 52
Gross amount expended_________________-----___           $3, 696. 17
Less reimbursemeLts collected___________---------__       2, 194. 94
                                                                            1, 501.23

      Balance unexpended June 30, 1942-----------------                   19, 631.29
Outstanding liabilities June 30, 194211_ ___11111111-----11                4, 209. 90

       Unobligated balance available June 30, 1942________________        15, 421. 39

Amount (estimated) required to be appropriated for completion of
  existing project' 1____-_____-________________                       2, 733, 000. 00
  1 Exclusive of available funds.

        18. BAYOU BODCAU, RED CHUTE, AND LOGGY BAYOU, LA.

   Location.-The work covered by this project is in Red River Basin,
below the site of the proposed Bayou Bodcau Reservoir, on Bayou Bod-
cau, the lower portion of Bayou Bodcau known-locally as Red Chute,
and Loggy Bayou, in Bossier, Bienville, and Red River Parishes, La.
 (See U. S. Geological Survey State Map, scale 1: 500,000.)
   Existing project.-The plan of improvement provides for continu-
ous clearing and snagging on Bayou Bodcau and Red Chute between
miles 14.1 and 57.0 except for bendways at cut-off locations, where
snagging only will be done, the construction of three channel cut-offs
having a total length of 1.36 miles, and enlargement of 1.9 miles of
the channel of Loggy Bayou between mile 3.9 and mile 6.4.
   The existing project was authorized by the Flood Control Act ap-
proved August 18, 1941, which modified the project for the Bayou
Bodeau Reservoir, La., authorized by the act of June 22, 1936, as modi-
fied by the acts of June 28, 1938, and June 28, 1939, to provide for the
channel improvements described above.
   The estimated cost is $198,000 for construction.
   Local cooperation.-See page 5 for requirements.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1943. The sum of $10,000 can be profitably
expended during the fiscal year 1944 for the preparation of detailed
plans.
                              Cost and financial summary

Cost of new work to June 30, 1942_
Cost of maintenance to June 30, 1942____________________

       Net total expenditures___
Total amount appropriated to June 30, 1942------------           __________
Amount (estimated) required to be appropriated for completion of
  existing project -- __------------  ------------------------ $198, 000. 00
Amount 'that can be profitably expended in fiscal year ending June
30, 1944, for new work__________________________-_                         10, 000. 00

                        19.    NATCHITOCHES PARISH, LA.

   Location.-The work covered by this project is on the west side
of Red River in Natchitoches Parish, La. (See U. S. Geological Survey
State map, scale 1: 500,000.)
         RIVERS   AND HIARBORS-VICKSBURG,            MISS.,   DISTRICT        821_

   Existing project.-The plan of improvement provides for the con-
struction of levees on west side of Red River, consisting of the follow-
ing features: About 91,900 feet of earth levee along the west bank of
Red River extending from about mile 203 on Red River to the exist-
ing levee at about mile 178; enlargement of the existing levee 27,690
feet in length, and extension of same to Cane River, about 0.8 mile
above its mouth, 58,690 feet of extension, totaling 150,590 feet of new
levee and 27,690 feet of levee enlargement; construction of an earth-
fill dam 240 feet long at the top rising 52.7 feet above the bed of Cane
River, with a roller-type floodgate 92 feet long at the right end of the
dam connecting the dam and levee; and the construction of drainage,
ditches to give protection to 135,000 acres of land in the Cane Island
area from Red River overflow. The existing project was authorized
by the Flood Control Act approved June 22, 1936 (H. Doc. No. 378i
74th Cong., 2d sess.) The estimate of cost revised in 1941 is $1,069,100,
for construction and $88,100 for lands and damages.
    The latest published map is in House Document No. 378, Seventy-
fourth Congress, second session.
   Local cooperation.-See page 5 for requirements. Requirements
have been fulfilled as needed.
    Operations and results during fiscal year.-Restoration of wave
and rain-washed levees was initiated. Restoration was completed on
84,200 linear feet of levee. Resodding was completed on 800 linear
feet, and restoration on 61,400 linear feet of levee was completed with
the exception of the riverside slope, which was omitted, due to high.
stages of the river.
    The work was done with hired labor at a cost of $10,847.45 and ex-
penditure of $11,509.87.
   Condition at end of fiscal year.-By hired labor, 2,150,500 cubic yards:
of material have been placed in 26.6 miles of levee and under contract,
1,668,363 cubic yards have been placed in 9.6 miles of levee, totaling
3,818,863 cubic yards in 36.2 miles of levee. With hired labor, 388,509
cubic yards of material have been removed in excavating 5.1 miles of
diversion channels. Design of Cane River floodgate has been com-
pleted and construction plans started. Restoration of wave and rain-
washed levees has been completed with the exception of the riverside
slope on 61,400 linear feet of levee.
    The cost of new work to June 30, 1942, under the existing project,
was $734,403.14, $661,661.18 from regular funds and $72,741.96 from
Emergency Relief funds. Total expenditures were $735,065.56.
   Proposed operations.-The balance unexpended plus accounts re-
ceivable at the end of the fiscal year will be applied to new work as
follows :
Accounts payable June 30, 1942_______     _____________________    _      $114. 36
New work:
    Completion of levee restoration__________________ $34, 652. 55
    Initiation and completion of dam and floodgate on
      Cane River by contract-__ ---- __    -___-___      300,020. 79
                                                                       334, 673. 34
     Total for all work-------__________----------------------------   334, 787. 70
  No additional sum can be profitably expended during the fiscal year
1944, as the project will be completed with available funds.
822           REPORT OF CHIEF OF ENGINEERS,                                        U. S. ARMY,              1942

                                           Cost and financial summary
Cost of new work to June 30, 1942   -------------------------                                                 $734, 403. 14
Cost of maintenance to June 30, 1942__------------------                                                -------------
      Total cost of permanent work to June 30, 1942---      __-                                        _      1 734, 403. 14
Plus accounts receivable June 30, 1942______ ________-----____--                                                       776. 78

      Gross total costs to June 30, 1942_____________-    ___--735,                                                    179. 92
Minus accounts payable June 30, 1942 ---------------------------                                                       114. 36
     Net total expenditures                             --                                                     73--------------------
                                                                                                              '75,  065. 56
Unexpended balance June 30, 1942 ____-___________________                                                      334, 010. 92
          Total amount appropriated to June 30, 1942_____________                                           11, 069, 076. 48

    Fiscal year ending June 30                 1938             1939                 1940            1941              1942

Cost of new work ---------------            $94, 023. 03     $344, 948. 38        $276, 737. 37     $7, 846. 91       $10, 847. 45
Cost of maintenance         -          -                 -                    -
'Total expended-- --------------              86, 879. 81     337, 690. 45         291, 059. 70      7, 925. 73        11, 509. 87
Allotted..----                ....-----------------.
                                              935, 000. 00     24, 041. 96   ----------           -27, 065. 48        137, 100. 00


Balance unexpended July 1, 1941___ __    _______---------------                                               $208, 420. 79
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942________________________________                                                          137, 100. 00
      Amount to be accounted for-----------------                                                                 345 520. 79
Gross amount expended------------------------                                             $13, 009. 87
Less reimbursements collected---------------------                                          1, 500. 00
                                                                                                                   11, 509. 87
      Balance unexpended June 30, 1942_ -________----_                                                            334, 010. 92
Outstanding liabilities June 30, 1942 -- --                                                                            126. 87
     Balance available June 30, 1942_____________________--_                                                      333, 884.05
Accounts receivable June 30, 1942___________________________                                                           776. 78

          Unobligated balance available June 30, 1942                                         _                   334, 660. 83
   1 Includes $72,741.96 Emergency Relief funds.

                                   20. PINEVILLE, RED RIVER, LA.

   Location.-The work covered by this project lies on the left bank
of Red River in Rapides Parish between the crossing of the Louisiana
& Arkansas Railroad at mile 122 and the crossing of the Missouri
Pacific Railroad at mile 124. (See Mississippi River Commission
maps, Alluvial Valley of the Mississippi River, scale 1: 250,000, and
quadrangle maps, scale 1: 62,500.)
   Existing project.-The plan of improvement provides for the en-
largement of 0.8 mile of levee on the Pineville city front, the enlarge-
ment of 1,500 feet of the Louisiana & Arkansas bridge approach fill,
the construction of 0.6 mile of new levee, and the construction of one
floodgate. It also provides for the enlargement of 0.5 mile of exist-
ing levee in the Rocky Bayou Loop.
   The existing project was authorized by the Flood Control Act ap-
proved August 18, 1941, which modified the project for Grant Parish
below Colfax, La., as authorized by the Flood Control Act approved
June 28, 1938, to provide for construction of the above-described
works.
            RIVERS   AND HARBORS-VICKSBURG,           MISS.,   DISTRICT         823
  The estimate of cost is $159,100 for construction and $10,900 for
lands and damages.
  Local cooperation.-See page 5 for requirements.
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-No work has been done.
  Proposed operations.-No funds are available and no work is pro-
posed for the fiscal year 1943.
   For the fiscal year 1944, the sum of $5,000 can be profitably ex-
pended, to be applied to the preparation of detailed plans.
                              Cost and financial summary

Cost of new work to June 30, 1942         -
Cost of maintenance to June 30, 1942-
         Net total expenditures--------------
'Total   amount appropriated to June 30, 1942..____            _

Amount (estimated) required to be appropriated for completion of
  existing project     ___-_-__-------                                  $159, 100. 00
Amount that can be profitably expended in fiscal year ending June 30,
1944, for new work---------------------------------------------           5, 000. 00

  21. ALOHA-RIGOLETTE AREA, GRANT AND RAPIDES PARISHES, LA.

   Location.-The work covered by this project lies on the left bank of
Red River in Grant and Rapides Parishes, between miles 125 and 171
above the mouth. (See U. S. Geological Survey State map, scale
1: 500,000.)
   Existing project.-The plan of improvement provides for the en-
largement of the authorized levee along the Red River between miles
171 and 151 above the mouth; extension of the levee along the Red
River from the north bank of Bayou Darrow to the hills on the south
side of Bayou Rigolette, mile 125 above the mouth; construction of a
drainage ditch, two floodgates, and the provision of sump storage areas
at the mouth of Bayou Darrow, mile 141, and at the mouth of Bayou
Rigolette, mile 125; improvement of Bayou Rigolette from the vicinity
of United States Highway No. 71 to the mouth by clearing and snag-
ging of the old channel; and construction of an embankment at the
head of Bayou Darrow, to isolate the Bayou Darrow and Bayou
Rigolette drainage areas.
   The existing project was authorized by the Flood Control Act ap-
proved August 18, 1941, which modified the project for Grant Parish
below Colfax, La., as authorized by the Flood Control Act approved
June 28, 1938, to provide for construction of the above-described
works.
   The estimate of cost is $914,500 for construction and $21,500 for
lands and damages.
  Local cooperation.-See page 5 for requirements.
   Operations and results during fiscal year.-None..
   Conditionat end of fiscal year.-No work has been done.
   Proposed operations.-No funds are available and no operations are
proposed during the fiscal year 1943.
   For the fiscal year 1944, the sum of $35,000 can be profitably ex-
pended on the preparation of detailed plans.
824     REPORT OF CHIEF OF ENGINEERS,                U.   S.   ARMY,   1942

                           Cost and financial summary
Cost of new work to June 30, 1942____------------   __                 __
Cost of maintenance to June 30, 1942________        __
      Net total expenditures_
Total amount appropriated to June 30, 1942______________________         ---

Amount (estimated) required to be appropriated for completion of
existing project-__--_-_-------  -------      ----               $914, 500. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for new work_________________________________            35, 000. 00

                            22. SALINE POINT, LA.

   Location.-The work covered by this project is in the vicinity of
Saline Point on Red River, about 60 miles above the mouth and 8 miles
northeast of Marksville, La. (See Mississippi River Commission
maps, Alluvial Valley of the Mississippi River, scale 1:250,000 and
quadrangle maps, scale 1: 62,500.)
   Existing project.-The plan of improvement provides for the exca-
vation of cut-off channels in Avoyelles and Catahoula Parishes. It
consists of cut-off excavation at Double Eddy, from approximately
mile 54.2 above the mouth of Red River to mile 56.5, with a pilot
channel 1,075' feet long, and excavation of 181,129 cubic yards, and
cut-off channel across Saline Point approximately 5,400 feet long,
from approximately mile 55.4 to mile 65.3 with excavation of 900,000
cubic yards, and levee set-back at the west end of the channel approxi-
mately 2,041 feet long, in which 60,000 cubic yards of material will
be placed. The existing project was authorized by the Flood Control
Act approved June 22, 1936 (H. Doc. No. 378, 74th Cong., 2d sess.).
The estimate of cost is $114,000 for construction and $21,000 for land
and damages. The latest published map is in House Document No.
378, Seventy-Fourth Congress, second session.
   Local cooperation.-Fully complied with.
   Operations and results during fiscal year.-Under contract 38,966
cubic yards of material were placed in the dike across Red River below
Saline Point. The plug was removed, completing the construction of
the project.
   Costs during the fiscal year were $9,292.21. Expenditures were
$9,205.14.
   Condition at end of fiscal year.-Under contract Double Eddy Cut-
off, consisting of 181,129 cubic yards of excavation in 1,075 feet of
channel, has been completed. Under contract 839,220 cubic yards of
material have been excavated from channel of Saline Point Cut-off
completing this item, with the exception of a plug left across the
channel. Under contract, 58,130 cubic yards of material have been
placed in the levee set-back, and 2,070 feet of levee dressed and sodded,
completing this item. Under contract, 61,022 cubic yards of material
have been placed in the dike across the Red River, completing this
item. The plug was removed, completing the project, with the excep-
tion of reimbursing local interests for the acquisition of right-of-way.
   Costs under the existing project to June 30, 1942, were $94,785.93,
and expenditures were $94,762.76.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, which amounts to $35,237.24, will be applied to accounts
             RIVERS            AND HARBORS-VICSBURG,                        MISS.,         DISTRICT                   825

payable, $23.17, and to new work, completion of acquisition of right-
of-way, $35,214.07.
  No additional funds can be profitably expended during the fiscal year
1944, as the project will be completed with the available funds.
                                    Cost and financial summary

Cost of new work to June 30, 1942------------- _                               ---------                  $94, 785. 93
Cost of maintenance to June 30, 1942------------------
      Total cost of permanent work to June 30, 1942________ -                                        -___ 94, 785. 93
Minus accounts payable June 30, 1942 ---------------------------                                               23. 17

      Net total expenditures__---------------_____                                                           94, 762. 76
Unexpended balance June 30, 1942_________ ___-----------                                                     35, 237. 24

           Total amount appropriated to June 30, 1942 __________                                 ____ 130, 000. 00

   Fiscal year ending June 30          1938              1939           1940                  1941              1942

Cost of new work -- ------               $30. 08      $18, 523. 25    $28, 732. 68         $38, 207. 71         $9, 292. 21
Cost of maintenance ---    -----                          --------          - --         - - ---        --    ---        --
Total expended_         ----               27. 45       18, 432. 33    14, 509. 80          52, 588. 04             9, 205. 14
Allotted            -                135, 000. 00 ..------.......       .       .-.- I     - 5,000. 00 ..............


Balance unexpended July 1, 1941--------------------------------       $44, 442. 38
Gross amount expended     --      -        -        -    $10, 905. 14
Less reimbursements collected______________--____          1, 700. 00
                                                                        9, 205. 14
      Balance unexpended June 30, 1942_____________ ----------                                               35, 237. 24
Outstanding liabilities June 30, 1942_                       _                                               21, 010. 08
           Unobligated balance available June 30, 1942 ----------                               -__-         14, 227. 16

                                   23. BIG BLACK RIVER, MISS.

  Location.-The work covered by this project is on Big Black River,
Miss., which flows into the Mississippi River about 25 miles below
Vicksburg, Miss. (See U. S. Geological Survey State Map, scale
1: 500,000.)
  Existing project.-The plan of improvement provides for improve-
ment of the flood channel by means of channel clearing and suitable
cut-offs, from a point between Choctaw and Webster Counties, Miss.,
to the mouth, 325.6 miles, consisting of the following features: 5,156
acres of bank clearing; clearing for cut-offs totaling 237 acres; ex-
cavation for cut-offs totaling 1,136,093 cubic yards of material; con-
struction of a drainage canal between miles 290.3 and 304.1, consisting
of 100 acres of clearing and 246,277 cubic yards of excavation. The
project will lessen the frequency and duration of floods on 180,000
acres of bottom lands. The existing project was authorized by the
Flood Control Act approved June 22, 1936. The estimate of cost is
$850,000 for construction and $60,000 for lands and damages. The
estimate of cost of maintenance is $55,000 for the fiscal year 1943,
$60,000 for the fiscal year 1944, $50,000 annually for the fiscal years
1945 and 1946, and $35,000 annually thereafter.
826         REPORT         OF CHIEF OF ENGINEERS,                          U.     S. ARMY,                 194-2

   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Eighty and two-tenths
miles of channel maintenance were completed. The work consisted of
the removal of trees, drift racks, and other debris from the channel, the
cutting of second growth within the cleared areas of the channel, and
the clearing of timber and brush in immediate danger of caving into
the river.
   Costs during the fiscal year were $192.31 for new work and $28,963.19
for maintenance. Expenditures were $28,925.
   Condition at end of fiscal year.-Snagging has been completed for
325.6 miles, and clearing for 5,156 acres along river banks. Clearing
for 237 acres and excavation of 1,136,093 cubic yards of material for
43 cut-offs have been completed. On the drainage canal between miles
290.3 and 304.1, an area of 100 acres along the banks has been cleared
and 246,277 cubic yards of material have been excavated. The project
has been practically completed.
   Maintenance of the completed project has been undertaken and is in
progress.
   Cost of new work to June 30, 1942, was $910,137.87. Ixpenditures
were $909,676.74.     Cost of maintenance to June 30, 1942, was $58,-
092.70; expenditures were $58,490.39.
   Proposed operations.-The balance unexpended at the end of the
fiscal year will be applied as follows:
Accounts payable June 30, 1942 ___________________________________                                                     $3. 44
Maintenance: Channel clearing and snagging with Government plant
 (tractors) 4 months (August, September, October, November 1942)__ 54, 269. 43

        Total for all work--______________                                   __---------------__                   54, 332. 87
  The additional sum of $60,000 can be profitably expended during
the fiscal year 1944 on maintenance, clearing and snagging with Gov-
ernment plant (tractors) 4 months (August, September, October, and
November 1943).
                                      Cost and financial summary
                                     -----------
Cost of new work to June 30, 1942___-_                 ---                                                       $910, 137. 87
Cost of maintenance to June 30, 1942_____________________________                                                  58, 02. 70

   Total cost of permanent work to June 30, 1942________________                                                  968, 230. 57
Minus accounts payable June 30, 1942_---- ---      _____________                                                        63.44

     Net total expenditures------------------ ------------------                                                  963, 167. 13
Unexpended balance June 30, 1942______________________________                                                     54, 332. 87
         Total amount appropriated to June 30, 1942---------------                                          1, 022, 500. 00

   Fiscal year ending June 30             1938                1939           1940                   1941              1942

                           .
Cost of new work________________.     _ __.......          $540, 101. 43 $324, 474. 26        $45, 369. 87              $192. 31
Cost of maintenance_____________                           ------------- -                     29, 129. 51            28, 963. 19

      Total cost__.   ____________   _ ____ .    .     .    540, 101. 43   324, 474. 26            74, 499. 38        29, 155. 50

Total expended__                                            519, 944. 87   344, 194. 94            75, 102. 32        28, 925. 00

Allotted_________ ____________         $414, 000. 00        496, 000. 00    35, 000. 00            32, 500. 00        45, 000. 00
             RIVERS         AND HARBORS-VICKSBURG,                             MISS.,       DISTRICT           827

Balance unexpended July 1, 1941___   _________                                                           $38, 257.87
Amount allotted from War Department Civil Appropriation Act ap-
  proved April 28, 1942---------------------------------------                                            45,000. 00

      Amount to be accounted for____________                         -------------------                  83, 257. 87
Gross amount expended------------------------ ----    $42, 213. 52
Less reimbursements collected---------------- -------- 13, 288. 52
                                                                                                          28,925.00
      Balance unexpended June 30, 1942 __- ---------------                                                54, 332. 87
Outstanding liabilities June 30, 1942----------------------------                                             567. 54

         Unobligated balance available June 30, 1942____________
                                                     ----                                                 53, 765. 33

Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -     0, 000. 00
   1 Exclusive of available funds.

24. SNAGGING AND CLEARING UNDER AUTHORITY OF SECTION 2 OF THE
    FLOOD CONTROL ACT APPROVED AUGUST 28, 1937, AS AMENDED

   The Flood Control Act approved August 28, 1937, as amended by
the Flood Control Acts approved August 11, 1939, and' August 18,
1941, authorized the allotment of not to exceed $500,000 from the flood-
control appropriations for any one fiscal year for the removal of
accumulated snags and other debris from, and the clearing and straight-
ening of channels in.navigable streams and tributaries thereof when
such work is advisable in the interest of flood control; provided that
not more than $25,000 shall be allotted for this purpose for any single
tributary from the appropriations for any one fiscal year.
   In addition to funds previously allotted for work on Quiver River,
Miss.; Big Black River and tributaries, Miss.; Big Creek, La.; Tensas
Bayou, La.; Cross, Caney, Black, and Kimball Bayous, Carroll Lake
and connecting streams, La.; and Colewa Creek, La.; funds were made
available during the fiscal yea r 1942 for the removal of snags and other
debris from the channels of Bear Creek, Miss.; Little Creek, La.; and
Bayou Galion, La.; and for additional work on Quiver River, Miss.;
and on Yalobusha River and tributaries, Miss.
   The following work was done: On Quiver River, Miss., a total
area of 98 acres along the banks was cleared and 18.8 miles of channel
were snagged. Costs and expenditures during the fiscal year were
$20,154.16.
   On Yalobusha River and tributaries, 16.35 miles of channel on Yalo-
busha river were snagged by hired labor at a cost of $16,614.21 and
expenditure of $15,978.70.
   On Bear Creek, Miss., a total area of 35 acres along the banks was
cleared, and 6.6 miles                wvere
                              snagged. Costs and expenditures during
the fiscal year were $9,069.73.
   Work has not started on Big Creek, La.; Tensas Bayou, La.; Cross,
Caney, Black, and Kimball Bayous, Carroll Lake and connecting
streams, La.; Colewa Creek, La.; Little Creek, La.; and Bayou
Galion, La.
   No work was done on Big Black River and tributaries, Miss.
   The total cost was $46,580.83, and expenditures were $47,058.13.
828          REPORT OF CHIEF OF ENGINEERS,                                  U.    S. ARMY,              1942

   Proposed operations.-The balance unexpended at the end of the
fiscal year, $123,688.97, will be applied to clearing and snagging under
this heading as follows:
New work:
   Quiver River, Miss-------------------------------------                   $4, 845. 84
   Yalobusha River and tributaries, Mississippi ____ -__--_____            _ 22, 316. 00
   Big Black River and tributaries, Mississippi _________----_--              2, 484. 81
   Bear Creek, Miss--------------------------------------                     5, 930. 27
   Cross, Caney, Black and Kimball Bayous, Carroll Lake and
     connecting streams, Louisiana---------------------------                 7, 000. 00
   Colewa Creek, La-------------------------------------                     19, 895. 18
   Little Creek, La--------------------------------------                     3, 000. 00
   Bayou Gallon, La--------------------------------------                    13, 344. 67
   Big Creek, La___-------------------------                                 24, 940. 54
   Tensas Bayou, La---------------                 -----------------------   19, 931. 66

         Total        ---------------------------------------------                                            123, 688. 97

                                        Cost and financial summary

Cost of new work to June 30, 1942___
                                   --------                                 __-___________                    $206, 284. 77
Cost of maintenance to June 30, 1942

      Total cost of permanent work to June 30, 1942____________    206, 284.77
Undistributed costs June 30, 1942____-_________--------         _ ----- 180. 63
     Net total cost to June 30, 1942 ___________.______                                             ___ 206, 104. 14
Minus accounts payable June 30, 1942____________-__-__-- -                                         -____-    164. 77

     Net total expenditures _______--- _______________205,                                                          939. 37
Unexpended balance June 30, 1942 _________________________                                                     123, 688. 97
        Total amount appropriated to June 30, 1942___________                                                  329, 628. 34

   Fiscal year ending June 30                 1938             1939           1940               1941               1942

Cost of new work _ _.....___. _     $2, 656. 62              $34, 720. 18   $53, 780. 77       $68, 546. 37        $46, 580.83
Cost of maintenance- .-----------------------                     -----          --        -

Total expended ..------.....-            .------------ .-     33, 607. 01    57, 550. 47        67, 723.67         47, 058. 13
Allotted .       ..                            24, 900. 00
                        .....----------------------           26, 810. 33    88. 000. 00       111, 573. 34         78, 344.67



Balance unexpended July 1, 1941_________________________ -___                                                  $92, 402. 43
Amount allotted from War Department Civil Appropria-
  tion Act approved June 24, 1940------------------- $5, 344. 67
Amount allotted from War Department Civil Appropria-
  tion Act approved May 23, 1941 __________________ 73, 000. 00
                                                                                                                78, 344. 67

      Amount to be accounted for________________   ____________                                                170, 747. 10
Gross amount expended--_   -----------------------   $71, 438. 71
Less reimbursements collected----------------_____    24, 380. 58
                                                                                                                47, 058. 13

         Balance unexpended June 30, 1942______---- _____-____                                          _      123, 688. 97

25. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL

   The cost of the work during the fiscal year was $81,455.83, with ex-
penditures of $79,616.98. The balance unexpended at the end of the
fiscal year, $23,054.84, plus the sums of $3,000 allotted in July 1942 and
              RIVERS AND IHARBORS-VICXSBURG,                                 MISS.,            DISTRICT                  829

$10,000 in August 1942 will be applied as needed during the fiscal year
1943 to payment of expenses incurred under this heading.
                                     Cost and financial summary

Cost of new work to June 30, 1942--------------         --------
Cost of maintenance to June 30, 1942-----------------------          $418, 540. 76
      Total cost of permanent work to June 30, 1942------------- 418, 540. 76
Undistributed costs June 30, 1942_    ___      ---------
                                              __      --------------        40, 36
       Net total cost to June 30, 1942___----------------------       418, 581. 12
Minus accounts payable June 30, 1942--------------------------          1, 035. 96
      Net total expenditures_-    --------------------                417, 545. 16
Unexpended balance June 30, 1942                                       23, 054, 84
       Total amount appropriated to June 30, 1942_______----_         440, 600. 00

     Fiscal year ending June 30         1938            1939               1940                  1941                 1942


Cost of new work--------------
Cost of maintenance __----------      $11, 000. 00   $188, 799. 29      $109,179. 94           $28, 105. 70          $81, 455.83
Total expended.-----------------       11, 000. 00    183, 664. 95       115, 244. 36           28, 018. 87           79, 616. 98
Allotted_------   ----------------    131, 000.00     181,000.00          26, 500. 00            3, 000.00            99, 100. 00



Balance unexpended July 1, 1941 ________________________   ___                                                     $3, 571. 82
Amount allotted from War Department Civil Appropria-
  tion Act approved June 28, 1939--________________ $4, 000. 00
Amount allotted from War Department Civil Appropria-
  tion Act approved May 23, 1941_____________________ 95, 100. 00
                                                                                                                   99, 100. 00
      Amount to be accounted for _______________________     __                                                   102, 671. 82
Gross amount expended_________________________     $117,479.11
Less reimbursements collected_______ -        -_____ 37, 862. 13
                                                                                                                   79, 616. 98
      Balance unexpended June 30, 1942_       -__________-________                                                 23, 054. 84
Outstanding liabilities June 30, 1942-----------------------------                                                     211. 30
      Unobligated balance available June 30, 1942-    -________-_____                                              22, 843. 54
Amount allotted in July and August 1942 __________________        _                                                13, 000. 00
Amount available during the fiscal year 1943_____________     __                                                   35, 843. 54

26. OTHER          FLOOD-CONTROL PROJECTS FOR WHICH NO ESTIMATES
                               ARE SUBMITTED

                                                     For last full      Cost and expenditures to                   Estimated
                                                      report see               June 30, 1942                          mte
                  Name of project                    Annual Re-                                                    amount re-
                                                      port for-                                                     quired to
                                                                        New work        Maintenance                 complete


1. Colfax, Grant Parish, La----....---....                1938           $70, 348.04    ....                           (1)
2.   Red River Parish, La----------------------           1939           149, 435. 04     -                   _        (2)
3.   Jonesville, La ----------- ---- --- -----            1940                             -                          3-$368, 200
4.   Hempstead County Levee District No. 1, Ark-          1941                88, 005. 78 .                            (2)
5.   Columbia, La---------------------------------        1941              204, 739. 73 .--------------               (2)
6.   Grant Parish below Colfax, La _- --                  1941                38, 808. 89 ..............               (2)
7.   Blakely Mountain Reservoir, Ark ............         1941       -------------------------                        2, 000, 000
8.   Calion, Ouachita River, Ark -----------------        1941                                                            50, 000

  1 Completed under provisions of sec. 7 of the Flood Control Act approved May 15, 1928, as amended by
sec. 9 of the Flood Control Act approved June 15, 1936, and included in report of the Mississippi River
Commission.
2 Completed.
3Awaiting local cooperation.
          493202---43-pt. 1, vol. 1--53
830        REPORT OF CHIEF OF E.NGINEERS,                              U. S. ARMY,               1942

Status of all investigations for flo:,.psto  called for by flood control acts and
                              com fttee resolutions
                                                            Date trans-
          Locality                Authorization act          mitted to         Document No.        Recommenda-
                                                             Congress                                  tion

Bartholomew Bayou, Ash-          Flood Control      Act                     --------------------

  ley, and other counties,         June 28, 1938.
  Arkansas.'                                               ---------
                                                           Aug.  9,1941--
Big Sand Creek in vicinity       Flood Control Com- Aug. 9, 1941            --------------------   Unfavorable.
  of Carrolton, Miss., pre-        mittee resolution,
  vention of bank caving.          Mar. 25, 1940.
Black River, Catahoula,          Flood Control Act, -- - - - - - -          --------------------
  and Concordia Parishes,          Aug. 18, 1941.
  La.
Black River, Catahoula,          Flood Control Act,                         --------------------
  and Concordia Parishes,          Aug. 11, 1939.         -- - - - - - -
  La.'
Boeuf River, in Catahoula,       Flood Control Act,                         --------------------
  Franklin, Caldwell, Rich-        Aug. 28, 1937.
  land, West Carroll, and
  Morehouse Parishes, La.1
Bogue Phalia, Miss--..------     Flood Control Com-
                                   mittee resolution,
                                   Apr. 23, 1942.
Caddo Lake Dam and Jef-
  ferson-Shreveport water-
                                 Flood Control Act,
                                   June 22, 1936.
                                                          --------------- --------------------
  way, Louisiana and Texas,
  on Red River.'
Jefferson-Shreveport water-      River and Harbor
  way, Texas, and Louisi-          Act, Aug. 30, 1935.
  ana, enlarging existing
  project and establishing
  reservoir on Cypress
                   2    River
                                                          --------------- --
  above Jefferson.
Jefferson-Shreveport water-      River and Harbor
  way, Texas and Louisi-           Act, Aug. 26, 1937.
  ana, thence via Red River
  to Mississippi River, in-
  cluding reservoirs in Cyp-
  ress and Black Cypress
  Rivers)
Jefferson-Shreveport water-      River and Harbor
  way, Louisiana and Texas,        Act, June 20, 1938.
  thence via Red River to
  Mississippi River, survey
  for navigation, flood con-
   trol, power and irrigation,
  including water-supply
  reservoirs in Cypress and2
  Black Cypress Rivers.
Little Missouri River, Ark.l'    Flood Control Act,
                                   June 22, 1936.          ------------- ----------------
Macon Bayou in Franklin,
Madison, Richland, East
                                 Flood Control Act,
                                   Aug. 28, 1937.
                                                           -------------- --------------------
Carroll, and West Car-
roll Parishes, La.'
Mississippi River in alluvial    Flood Control Com-        Aug. 14, 1941     House, No.359, 77th   Favorable.
valley and Head of Passes         mittee Resolution,                         Cong., 1st sess.
to Cape Girardeau, Mo.            Aug. 2, 1939.
 (Mississippi River Com-
mission).
   Do---------------------       Commerce Committee       - - ..do .....        do ..........
                                                                            .....                       Do,
                                   resolution, Mar. 12,
                                   1940.
Mississippi River and trib-      Flood Control Com-        Feb. 26,1942                            Unfavorable.
utaries in the alluvial val-      mittee resolution,
ley, levee protection at          Feb. 10, 1938.
Greenville, Miss.
Ouachita River and tribu- - -..   do - ._-
taries, Arkansas and Lou-
isiana.'                                                         ------------------
Ouachita River and tribu- Flood Control Act,
taries, Louisiana.'            Aug. 28, 1937.
Ouachita River, Ark.,         Flood Control Com-
Blakely Dam, for flood        mittee resolution,
control, power, etc. (final    May 11, 1938.
report) .'
Ouachita River and tribu- Flood Control Com-                                --------------------
taries, construction of        mittee resolution,        ---- ---- ----
Blakely Mountain Dam.          May 12, 1941.
Ouachita River near Calion, Flood Control Act,                              --------------------
Ark.'                          June 28, 1938.             --- --- --- --
Ouachita River and tribu- Flood Control Com-                                --------------------
taries, Arkansas and Lou-      mittee resolution,
isiana, for flood protec-      Apr. 13, 1938.
tion at Jonesville, La.'
  See footnotes at end of table.
            RIVERS AND HARBORS-VICKSBURG,                                  MISS., DISTRICT                    831
Status of all investigations for flood control called for by flood control acts and
                       committee resolutions--Continued

                                                           Date trans-
          Locality               Authorization act          mitted to          Document No.            Recomend-
                                                            Congress

Ouachita River system,          Commerce Committee
Louisiana and Arkansas,         resolution, Feb. 8,
for navigation, flood con-      1939; Flood Control
trol, and irrigation.           Committee resolu-
                                 tion, Jan. 26, 1939;
                                 Rivers and Harbors
                                 Committee resolu-
                                 tion, Jan. 24, 1939.
Ouachita River and tribu-       Commerce Commit-
  taries, Arkansas and Lou-      tee resolution, Feb.
  isiana, for flood control on   20, 1942.
  Boeuf and Tensas Rivers
  and Bayou Macon, Ark.
  and La.
Pierre Bayou, La., for flood Commerce Commit-
  control at Shreveport, La.,    tee resolution,; Oct.
  and vicinity.                  28, 1941.
     Do.....            .......Flood Control Com-
                                 mittee resolution,
                                 Nov. 12, 1941.
Red River, Ark.'............ Flood Control Act, --------------- -------------------
                                 June 22, 1936.
      Do.' .................. Flood Control Act,                 -------------- --
                                                          --------------

                                 May 6, 1936.
Red River, La., Ark., Okla., Commerce Commit- --------------- ----------------
  and Tex., and connecting       tee resolution, Feb.
  waterways, singly or to-       8, 1939; Flood Con-
  gether, for navigation,        trol Committee res-
  flood control and irriga-      olution, Jan. 26, 1939;
   tion (report being pre-       Rivers and Harbors
  pared by special board).       Committee resolu-
                                 tion, Jan. 24, 1939.
Red River, La., Ark., Interim report on
   Okla., and Tex. (in-          special board 20.
  terim report on naviga-
   tion).
Red River, La., Ark., Rivers and Harbors
   Okla., and Tex., for nav-     Committee resolu-
  igation, flood control,        tion, Feb. 25, 1938.
  water power, and irri-
  gation (report being pre-
   pared by special board.)
Red River, La., east bank Flood Control Act, _.------------ --          -     -
   of, from hill line at south   June 28, 1938.
   bank of Loggy Bayou,
   thence along south bank
   of Loggy Bayou, and
   along east bank of Red
   River to Coushatta Bay-
   ou, Red River Parish.'
Red River in vicinity of Flood Control Act,                      -------------------
   Shreveport, La., with         Aug. 18, 1941.
   view to determining the
   advisability of providing
   bank protection works.
Saline River, Ark.'_......
Sulphur River, Ark.2........
                               Flood Control Act,
                                  Aug. 28, 1937.
                                Flood Control Act,
                                                          ---------------
                                                                ----------- ----

                                                                                      --------------

    Do.     -------------....
                                  June 22, 1936.
                                Flood Control Act,        ---------------  --------------------

Sulphur River, Tex.-........
                                  Aug. 28, 1937.
                                Flood Control Act,
                                                             ---------     --------------------

    Do.' ....................
                                  June 22, 1936.
                                Flood Control Act,
                                  June 28, 1938.
                                                          -------------              ---------------

Sulphur River, Tex. and         Rivers and Harbors                                 ----------------
  Ark., improvement for           Act, June 20, 1938.
navigation, flood control
and water power.2
Tensas River, in Franklin,      Flood Control      Act,    Apr. 10,1942   I------------------..I       Unfavorable.
  Madison, Tensas, East           June 28, 1938.
  Carroll, Concordia, and
  Catahoula Parishes, La.

  I Combined with report on Red River, La., Ark., Okla., and Tex., and connecting waterways, being pre-
pared by special board.
  2 Combined with report on Red River, La., Ark., Okla., and Tex., for navigation, flood control, water

power, and irrigation, requested by resolution of the Committee on Rivers and Harbors. House of Repre*
sentatives, adopted Feb. 25, 1938, being prepared by special board.
832       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                 1942

IMPROVEMENT OF RIVERS AND HARBORS                                       IN   THE
          MEMPHIS, TENN., DISTRICT
   This district comprises a portion of southeastern Missouri, the west-
ern portions of Kentucky and Tennessee, a small portion of northern
Mississippi, and northeastern Arkansas embraced in the drainage
basins of the eastern tributaries of the Mississippi River south of the
Ohio River Basin to Nonconnah Creek, inclusive, and those of the
western tributaries south of the Little River diversion channel and
Commerce, Mo., to the Arkansas River, inclusive, with the exceptions
of the drainage basins of the Arkansas and its tributaries above mile
120, 3 miles above Pine Bluff, Ark., and of the White River and its
tributaries above Peach Orchard Bluff, mile 168.7.
   District engineer: Lt. Col. James D. Andrews, Jr., Corps of Engi-
neers, to November 30, 1941; Col. Jarvis J. Bain, Corps of Engineers,
since that date.
   Division engineer: Brig. Gen. Max C. Tyler, Corps of Engineers.
                                    IMPROVEMENTS

                Navigation                              Flood control
                                      Page                                     Page
1.   Arkansas River, Ark. and              8. Memphis, Wolf River, and
        Okla. (below Pine Bluff,                Nonconnah Creek, Tenn____      845
        Arg.) -------------------      832  9. North Little Rock to Gillett,
2.   White River, Ark. (below
        Peach Orchard Bluff).  --      835       Ark. (below Plum Bayou) _     848
3.   St. Francis and L'Anguille           10. Augusta to Clarendon, White
        Rivers and Blackfish Bay-               River, Ark_--       _____-     849
        ou, Ark-    -------------      837 11. Snagging and clearing under
4.    Wolf River (Memphis Har-                   authority of sec. 2 of the
        bor), Tenn      -----------    839
                                                 Flood Control Act approved
5.    Removing snags and wrecks
        from the Mississippi River               Aug. 28, 1937, as amended_    850
        below the mouth of the             12. Preliminary      examinations
        Missouri River, and from                 and surveys for flood con-
         the Old and Atchafalaya                 trol-  - --                   851
        Rivers     --------------      842
,6.   Examinations, surveys, and           13. Other flood-control projects
        contingencies (general) ___    844       for which no estimates are
7.   Plant allotment----------        845       submitted ___       ____      852

  1. ARKANSAS RIVER, ARK. AND OKLA. (BELOW PINE BLUFF, ARK.)

   Location.--This river rises in central Colorado and flows 1,460 miles
in a southeasterly direction to the Mississippi River, 25 miles above
Arkansas City, Ark. (See Mississippi River Commission Alluvial
Valley maps, scale 1: 62,500 and scale 1: 500,000 for river from mouth
to vicinity Pine Bluff, Ark., and U. S. Geological Survey State maps,
scale 1: 500,000.)
   This river enters the Memphis district 3 miles north of Pine Bluff,
Ark., and flows 120 miles in a southeasterly direction to the Mississippi
River, 3 miles south of Rosedale, Miss.
   Previous projects.-Adopted by the River and Harbor Acts of
July 3, 1832, August 14, 1876, March 3, 1879, June 14, 1880, July 5,
1884, August 5, 1886, and August 11, 1888.
                RIVERS AND HARBORS-MEMPHIS,                           TENN.,      DISTRICT              833
   For further details see page 1872, Annual Report for 1915, and
page 935, Annual Report for 1938.
   Existing project.-This provides for improving the river from its
mouth to Neosho (Grand) River (465 miles) by snagging and dredg-
ing operations, by contraction works and revetments, and by a levee
near Pine Bluff, Ark. (117 miles above the mouth). The dimensions
of the channel are not specified. The several types of structures used
in the improvement are shown in the Annual Report of the Chief of
Engineers, for 1902, page 1576. The ordinary freshet fluctuation is
about 16 feet throughout the portion of the river covered by the
project. The extreme stage fluctuation is 60 feet at the mouth of the
river, 37 feet at Little Rock, and 33 feet at Neosho (Grand) River.
As the project is indefinite, no estimate of the cost of completion has
been made.
   Operations under the existing project have been confined to the
limits of the present Memphis district since 1928. The latest (1928)
approved estimate for annual cost of maintenance is $40,000.
   The existing project was authorized by the following river and
harbor acts:

     Acts                        Work authorized                                  Documents


June 13, 1902    Open channel work ____     _______________________   Annual Report, 1902, p. 354.
Mar. 2,190.7     Levee near Pine Bluff to prevent a cut-off-   -----
                                                                 _ H. Doec. No.   71, 61st Cong., 1st sess.


  Index to published maps of sections of the river is given on p. 1171, Annual Report of Chief of Engineers
for 1921.


   Terminal facilities.-Other than sand derricks and elevators at
Pine Bluff, there are no terminal facilities. Those mentioned are
adequate for existing commerce.
   Operations and results during fiscal year.-All operations were for
maintenance and snagging by hired labor with Government plant. In
snagging operations during the fiscal year 1942, the snag barge
Stephen Anderson operated over the river from its mouth to Pine
Bluff, Ark., mile 118.6, removing 448 snags, 6 stumps, and felled
1,961 trees on caving or sliding banks. The total cost and expenditure
for maintenance during the year was $15,247.47, for snagging opera-
tions.
   Condition at end of fiscal year.-The construction of permanent
works for general improvement of the river was suspended in 1902,
and completion of the project is not contemplated. Snagging opera-
tions are the only activities now relied upon to benefit navigation.
These operations must be repeated continually due to additional ob-
structions brought into the river by caving banks and shifting chan-
nels. Under average conditions, 4-foot draft vessels can be taken to'
Pine Bluff, Ark., from the first of February to the middle of July.
From the middle of August to the middle of December the draft is
generally limited to about 2 feet. During the past fiscal year, stages
834           REPORT OF CHIEF OF ENGINEERS,                                       U. S. ARMY,            1942

were suitable for existing commerce to Pine Bluff, Ark. The total
costs under the existing project to the end of the fiscal year were:
For new work: Construction of levee opposite Pine Bluff__-----                                                 $55, 200. 00

For maintenance:
       Operating snagboats______                                                                               795, 749.76
       Maintenance of original permanent works, excepting those at
        Pine Bluff, Ark     ___-------------------------                                                        18, 771. 73
       Maintenance of works at Pine Bluff:
           Levee    ---------------------------------- $18, 148. 97
          Revetment---------           ----------------  456, 065. 72
                                                                                                             474, 214. 69
       Hydraulic dredging---------------------                                                               667, 744. 15
        Total cost of maintenance __------________----                                                    1, 956, 480. 33
        Grand total to June 30, 1942                                                                      2, 011, 680. 33
   The total expenditures under the existing project to June 30, 1942,
were $2,011,680.33.
   Proposed operations.-The balance unexpended on July 1, 1942,
$15,173, will be applied to snagging operations by Government plant
and hired labor between the mouth and a point 3 miles above Pine
Bluff, Ark., approximately 4 months' work during the period July to
December 1942.
   The additional sum of $25,000 can be profitably expended during the
fiscal year 1944 for maintenance snagging operations by Government
plant and hired labor between the mouth and a point 3 miles above
Pine Bluff, Ark., about 5 months' work during the period July to
December 1943.
                                              Cost and financial summary
Cost of new work to June 30, 1942 ___-                                  --
                                                                      _________-_____              __-     $380, 966. 95
Cost of maintenance to June 30, 1942 ----                                 _____        ____----2,           898, 724. 66
           Total cost of permanent work to June 30, 1942____________                                      3, 279, 691. 61

Net total expenditures--__----....._______-         -                                                     3, 279, 691. 61
Unexpended balance June 30, 1942 -------- ___________-------                                                  15, 173. 00
            Total amount appropriated to June 30, 1942 ______---3,                                             294, 864. 61

     Fiscal year ending June 30                    1938            1939             1940          1941              1942

Cost ofnew work- ...    _            _                                 -..                       --
Cost of maintenance-----...-              -    $17, 469. 92      $30, 907. 61     $16, 626. 52   $8, 196. 56       $15, 247. 47
Total expended...            ......---------------- 16,959. 35    25, 599. 25       9, 911. 61   20, 704. 10        15, 247. 47
Allotted ----------------------.                 32, 000.00       23, 500. 00      11, 000.00    10, 000.00         15, 000.00


Balance unexpended July 1, 1941______________________--_-------               $15, 420. 47
Amount allotted from War Department Civil Appropriation Act ap-
  proved April 28, 1942-------------------------------------                    15, 000. 00
      Amount to be accounted for ___ ---       ______-____       -___- -        30, 420. 47
Gross amount expended-------------------------$15,               605. 57
Less reimbursements collected                                          10
                                                                 3---------------------
                                                                358.
                                                                                                                15, 247. 47
           Balance unexpended June 30, 1942-------------------                                                  15, 173.00
Amount that can be profitably expended in fiscal year ending June
  30, 1944, for maintenance 1_-  ___  __ -      -
                                              ____  -
                                                   ______ -
                                                             __ - _                                             25, 000. 00
 :1Exclusive of available funds.
               RIVERS AND        HARBORS--MEMPHIS,                TENN.,     DISTRICT           835
       2. WHITE RIVER, ARK. (BELOW PEACH ORCHARD BLUFF)

   Location.-This river rises in northwestern Arkansas and flows 690
miles, first north into Missouri, then southeasterly through Arkansas
to the Mississippi River, 34 miles above Arkansas City, Ark. (See
Mississippi River Commission Alluvial Valley maps, scale 1:62,500
and scale 1: 500,000, for river from mouth to vicinity of Newport,
Ark., and U. S. Geological Survey State map, scale 1: 500,000.)
   The White River enters the Memphis district at the foot of Peach
Orchard Bluff, Ark., and flows 169 miles in a southeasterly direction
to the Mississippi River, 4 miles north of Rosedale, Miss.
   Previous projects.-Adopted by the River and Harbor Acts of
March 3, 1871, June 23, 1874, August 14, 1876, June 14, 1880, July 5,
1884, and March 3, 1899.
   For further details see page 1874, Annual Report for 1915, and
page 938, Annual Report for 1938.
   Existing project.-This provides for channel maintenance between
the mouth of the river and Batesville, 301 miles, by snagging and
dredging and by contraction works. The stream has an ordinary
freshet fluctuation of 15 feet throughout the portion covered by the
project, and an extreme stage fluctuation of 60 feet at the mouth, and
of 36 feet at Clarendon. No estimate of cost has been given, and
since 1899 the work has been prosecuted under annual estimates for
maintenance by snagging and dredging. The latest (1934) approved
estimate for annual cost of maintenance below Peach Orchard Bluff
is $125,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                       Work authorized                               Documents


July 13,1892    Open channel work.__..__ __________. ______-
                                                        .    ____ Annual Report, 1893, p. 2112.
Mar. 3,1899     Improvement of river above Batesville by locks    H. Doc. No. 78, 54th Cong., 2d sess.
                 and dams.1


1 See project for Upper White River, Little Rock district.

   Terminal facilities.-Railway spur tracks are available for transfer
of freights between car and boat at Clarendon. There is a log slip for
use of the owners only at Clarendon. In 1932 a cotton, rice, and gen-
eral merchandise terminal was built at DeValls Bluff. Present facili-
ties are considered adequate for existing commerce.
   Operations and results during fiscal year.--All operations were for
maintenance by hired labor with Government and leased plant and con-
sisted of snagging and dredging operations. The snagging was done
between the mouth of Sibley Chute and Peach Orchard Bluff by the
Government snag boat Tonm Stallings which removed 940 snags and 6
drift racks from the channel and felled 146 trees on caving and sliding
banks. Dredging operations were conducted at various shoals between
Girard Reach and Townsend Mill during the low-water period by the
leased dredge Robert H; 145,897 cubic yards were moved in dredging
shoals to provide 41/2-foot depths between the mouth of Sibley Chute
and Peach Orchard Bluff.
836       REPORT OF CHIEF OF'ENGINEERS,                  U. S. ARMY,       1942

  The costs during the year were for snagging, $31,693.56, and for
dredging, $32,117.46, a total cost of $63,811.02. The expenditures for
the year were for snagging, $27,317.88, and for dredging, $32,117.16,
a total of $59,435.04. (See Annual Report, Mississippi River Com-
mission, for flood-control work.)
   Conditionat end of fiscal year.-The project being for maintenance,
completion is not contemplated. All channels dredged in the section
of the river between its mouth and Peach Orchard Bluff have been
obliterated by high river stages, and there is no increase in channel
depth over shoals in that section of the river. Snagging and dredging
operations have materially improved the condition of the channel from
the mouth as far as Peach Orchard Bluff (169 miles).
  This river is generally spoken of as navigable within the limits of
this district (mouth of White River to Peach Orchard Bluff) by boats
of 3-foot draft at any time. Under ordinary conditions, 6-foot draft
may be taken to Peach Orchard Bluff, from the first of February to the
last of June, and from the middle of November to the end of December.
During the fiscal year ending June 30, 1942, depths were available on
the White River which would permit navigation of vessels of 5-foot
draft from its mouth to DeValls Bluff (125 miles) and 41/2-foot drafts
from DeValls Bluff (125 miles) to Peach Orchard Bluff (169 miles).
During the period August 13 to 15, 1941, navigation into White River
was limited to vessels of 3-foot draft and to vessels of 4-foot draft
during the periods August 20 to 26, 1941, and January 19 to 27,
1942, when Sibley Chute, the navigable entrance into White River,
had shoaled to these depths.
  The total costs under the existing project to June 30, 1942, are:
For maintenance:
    Snagging operations-----------------------------------                    $542, 868. 87
    Dredging operations.              -----------------------------             465, 577. 37
      Total---------------------                       --------------------- 1,008, 446. 24
Specials DeValls Bluff for prevention of cut-off_____________ ___                    883. 36
      Total costs to June 30, 1942                                           1, 009, 329. 60
Total expenditures------------------------------------                       1,004,901. 58
Proposed operations.-The balance unexpended                            July 1,      1942,
amounting to $127,127.33 will be applied as follows:
Accounts payable June 30, 1942_______________________-----------------------  $4, 428. 02
Maintenance:
    Snagging operations by Government plant and hired labor be-
      tween the mouth and Peach Orchard Bluff, Ark., about 7 months'
      work during the periods August to December 1942, and late
      spring of 1943 _   _-------_--_---------  ---------------       __      42,699.31
    Dredging by Government or leased plant and hired labor be-
      tween the mouth and Peach Orchard Bluff, Ark., about 4
      months' work during the period August to December 1942 __          --   80, 000. 00
        Total for maintenance__            ___-   ___------                  127, 127. 33
  The additional sum of $125,000 can be profitably expended during
the fiscal year 1944, as follows:
Maintenance:
    Snagging operations by Government plant and hired labor be-
      between the mouth and Peach Orchard Bluff, Ark., about 10
      months' work during the periods July to December 1943,
      and late spring of 1944__. ________________ ___ ___ _     $45, 000
      Dredging operations by Government or leased plant and hired
        labor between the mouth and Peach Orchard Bluff, Ark., about
        4 months' work during the period August to December 1943 .-   80, 000
          Total for maintenance---                                        000
                                                                     1------------125,
              RIVERS AND                       HARBORS--MEMPHIS,                  TENN.,          DISTRICT                837
                                               Cost and financial summary

Cost of new work to June 30, 1942       _______--__________                                                       $25, 000. 00
Cost of maintenance to June 30, 1942 ----   -------------------                                                1, 009, 329. 60
      Total cost of permanent work to June 30, 1942----------                                                  1, 034, 329, 60
Minus accounts payable June 30, 1942-----------------                                                               4, 428. 02
     Net total expenditures-___                                  ___---- ___-------                            1, 029, 901.58
Unexpended balance June 30, 1942-                               --------------------- -----                       127, 127. 33
           Total amount appropriated to June 30, 1942___-                                      ___ --          1, 157, 028. 91


   Fiscal year ending June 30                      1938           1939            1940                  1941           1942

Cost of new worl. _ _ ...... - ............. ..............                      .........--      ........     .......    ......
Cost of maintenance-------....- $90, 991. 18      $94, 688.90                  $109, 918. 14       $79, 026. 76        $63,811.02
Total expended    .-----------------             90, 202.01      89, 060. 34    116, 458. 84        78, 975. 28        59, 435. 04
Allotted         __........................_     193, 500. 00    96, 500. 00     81, 000.00        101, 500. 00        70, 000. 00



Balance unexpended July 1, 1941------------------------------                                                     $116, 562. 37
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942---------------------------------------                                                     70, 000. 00
      Amount to be accounted for__________ ________ ___                                                            186, 562. 37
Gross amount expended ._     ___________________ $96,369.85
Less reimbursements collected_______-_________    36, 934. 81
                                                                                                                    59, 435. 04
      Balance unexpended June 30, 1942_________--____ -                                                            127, 127. 33
Outstanding liabilities June 30, 1942---------------------------                                                     4, 429. 32
           Balance available June 30, 1942 _____ ._________-__-                                                    122, 698. 01

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1______________                                                                         125, 000. 00
  1 Exclusive of available funds.

3. ST. FRANCIS AND L'ANGUILLE RIVERS AND BLACKFISH BAYOU, ARK.

   Location.-The St. Francis River rises in St. Francis County, Mo.,
and flows in a southerly direction 460 miles to the Mississippi River,
8 miles above Helena, Ark. The L'Anguille River has its source in
the flat lands of Poinsett and Craighead Counties, Ark., whence it
flows 109 miles in a southerly direction, cutting through Crowleys
Ridge and entering the St. Francis Basin at Marianna and flowing
into the St. Francis River 12 miles above the mouth of the latter.
Blackfish Bayou rises in the west-central portion of Crittenden
County, Ark., flows 52 miles in a southwesterly direction, and empties
into the St. Francis River about 38 miles above the latter's mouth.
(See Mississippi River Commission Alluvial Valley maps, scales,
1: 62,500 and 1: 500,000, and U. S. Geological Survey State map, scale
1: 500,000.)
   Previous projects.--The original project for improvement of St.
Francis River was adopted by the River and Harbor Acts of March
3, 1871, June 14, 1880, July 5, 1884, August 11, 1888, and June 13,
1902, the latter adding L'Anguille River to the improvement. The
original project for L'Anguille River was adopted by River and
838    REPORT OF CHIEF OF ENGINEERS,         U.   S. ARMY,   1942

Harbor Act of June 18, 1878. The original project for Blackfish
Bayou was adopted by River and Harbor Act of June 25, 1910 (I..
Doc. No. 73, 61st Cong., 1st sess.). For further details see pages 1878
and 1879, Annual Report for 1915, page 1147, Annual Report for 1918,
and page 941, Annual Report for 1938.
   Existing project.-This provides for the removal of snags in St.
Francis River from its mouth to Marked Tree, in L'Anguille River
from its mouth to Marianna, and in Blackfish Bayou from its mouth
to Fifteen Mile Bayou, with the object of maintaining the channels
clear of snags and similar obstructions at the lowest navigable stage.
The latest (1928) approved estimate for annual cost of maintenance
is $8,500.
   Within the limits of the project the St. Francis River has an ordi-
nary freshet fluctuation of about 12 feet when not affected by back-
water from the Mississippi River. The extreme stage fluctuation is
about 26 feet at Marked Tree, gradually increasing to 60 feet at the
mouth. These extreme stage fluctuations are produced by overflow
and backwater from the Mississippi River. When not influenced by
the flood stages of that river the maximum stage fluctuation of the St.
Francis below Marked Tree does not exceed 20 feet. The ordinary
freshet fluctuation of L'Anguille River is about 6 feet and extreme
stage range 50 feet at Marianna; this latter, however, is due to back-
water from the Mississippi River. L'Anguille River, when uninflu-
enced by the Mississippi River, never has a fluctuation exceeding 12
feet. The fluctuation of stage in Blackfish Bayou is about 48 feet,
due entirely to backwater from, the Mississipppi River.
   The existing project was adopted by the River and Harbor Act
of March 2, 1919 (H. Doc. No. 60, 64th Cong., 1st sess.). A published
map of these streams is in that document.
   Terminal facilities.-Log slips or chain conveyors for the use of
the individuals owning them exist at the several mills along the river.
The present terminal facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-All operations were for
maintenance by hired labor and Government plant. The truck skid-
der rigs, mounted on a small pontoon, worked on the St. Francis
River between the mouth and 10 miles above Marked Tree, Ark. (158
miles). The result of these operations was the removal from the
channel of 2,820 snags, 97 logs, 116 stumps, and 139 drift racks, and
cutting of 58 trees on caving or sliding banks.
   The total costs and expenditures were $8,075.98, all for maintenance.
 (See Annual Report, Mississippi River Commission, for St. Francis
Basin flood-control project.)
   Condition at end of fiscal year.-Snagging operations have been the
only activities under existing or previous projects. The channels
within the limits of the project are in good condition for navigation
during medium and higher stages. At low stages, snags are the
principal obstruction. Under average conditions, boats of 4-foot draft
can navigate the St. Francis River to Marked Tree, Ark., from the
first of February to the middle of July, and boats of 2-foot draft
until the latter part of August each year. During periods of lowest
water, which generally occur in October and November, channel depths
do not exceed from 12 to 16 inches over some shoals. The low-water
               RIVERS       AND HARBORS-MEMPHIS,                            TENN.,       DISTRICT               839

depths over some shoals in Blackfish Bayou to Fifteen Mile Bayou
and the L'Anguille River to Marianna, Ark., are but from 8 to 10
inches. The navigation periods on these streams are controlled in
main by backwater stages from the Mississippi River.
   The total costs and expenditures under the existing project to June
30, 1942, were $209,664.52 for maintenance.
   Proposed opeirations.-The unexpended balance on July 1, 1942,
$13,085.94, will be applied for maintenance of the channel of the three
streams by snagging operations by Government plant and hired labor
on the St. Francis below the navigation lock (about 10 miles above
Marked Tree, Ark.) about 4 months' work during the period July to
December 1942, including 10 days' snagging each on the L'Anguille
River and Blackfish Bayou.
   The additional sum of $13,000 can be profitably expended during
the fiscal year 1944 for maintenance snagging operations by Govern-
ment plant and hired labor on the St. Francis River below the navi-
gation lock (about 10 miles above Marked Tree, Ark.), approximately
4 months' work during the period July to December 1943, including
10 days' snagging each on L'Anguille River and Blackfish Bayou.
                                           Cost and financial summary

Cost of new work to June 30, 1942----------------------------$92, 000. 34
Cost of maintenance to June 30, 1942-------------------------  300, 009. 67
         Total cost of permanent work to June 30, 1942-------------392, 010. 01

Net total expenditures  ------------------------------------ 392, 010. 01
Unexpended balance June 30, 1942----------------------------13, 085. 94
         Total amount appropriated to June 30, 1942---------------                                      405, 095.95

   Fiscal year ending June 30                 1938           1939           1940           1941             1942


Cost of new work---         ----.          ----       --    ------------------------------
Cost of maintenance---- ---..       ....     $9, 792. 28   $16, 241.66    $11, 235. 34   $10, 225. 14       $8. 075. 98

                ....---.---..
Total expended----                            9. 220. 00    13, 630. 75    13, 839. 49    10, 225. 14        8, 075. 98

Allotted ..-      -    --...............     21, 800. 00    14, 000. 00    11,300. 00     10, 000. 00        9,300.00


Balance unexpended July 1, 1941--    ------------------------- $11, 861.92
Amount allotted from War Department Civil Appropriation Act
  approved April 28, 1942    ----------------------------------- 9, 300. 00

      Amount to be accounted for---------------------------21,                                              161. 92
Gross anount expended-------------------------- $8, 304. 54
Less reimbursements collected-----------------------           228. 56
                                                                                                          8, 075. 98

        Balance unexpended June 30, 1942------------------------                                         13, 085. 94

Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance ---------------------------------------                                           13, 000. 00
  1Exclusive of available funds.

                      4. WOLF RIVER (MEMPHIS HARBOR), TENN.

  Locatio.-Wolf River rises in Benton County, Miss., and flows
generally northwesterly about 100 miles, through Shelby County,
840    REPORT OF CHIEF OF ENGINEERS,        U. S. ARMY,    1942

Tenn., emptying into the Mississippi River within the corporate limits
of the city of Memphis, Tenn. (See Mississippi River Commission
Alluvial Valley Map, scale 1: 62,500 and scale 1: 500,000.)
   Previous projects.--The River and Harbor Act of August 18, 1894,
authorized dredging at the mouth of Wolf River as an item in the
improvement of Memphis Harbor, the work being carried out under the
supervision of the Mississippi River Commission.
   Emisting project.-This provides for a channel 9 feet deep at low
water (71/2 feet below zero on the Memphis gage) from its mouth to
North Second Street Road with bottom widths of 250 feet from the
mouth to Keel Avenue and 200 feet from Keel Avenue to North Second
Street Road, and thence 125 feet wide and 7.5 feet below zero of the
Memphis Beal Street gage from North Second Street Road to Hind-
man Ferry Road.
   The estimate of cost for new work, revised in 1935, is $1,185,000.
The latest (1935) approved estimate of cost for annual maintenance is
$104,000.
   The work of improvement under the existing project up to Second
Street Bridge was authorized September 6, 1933, by the Public Works
Administration, and the existing project was adopted by the River
and Harbor Act approved August 30, 1935 (Rivers and Harbors Com-
mittee Does. No. 26, 72d Cong., 1st sess., and No. 45, 74th Cong., 1st
sess.). Sketch maps are printed in the project documents.
   ,Localcooperation.-The work under the existing project is subject
to the condition that local interests shall furnish, free of cost to the
United States, all rights-of-way required for channel enlargement and
straightening, and suitable areas with retaining levees where needed
for disposal of dredged material during initial construction and
future maintenance as and when needed, and shall furnish assurance
satisfactory to the Secretary of War saving the United States free from
damages resulting from the work. The work is also subject to the
provision that no work shall be undertaken on any section of the
channel through or above any bridge until such bridge has.been altered
in a manner satisfactory to the Secretary of War, without cost to the
United States. The conditions as pertaining to the improvement up
to Second Street Bridge have been complied with. Conditions above
that point have not been complied with.
    Terminal facilities.-There are 36 terminals, including 1 small ma-
rine ways available for public use, operating in the port of Memphis,
12 being located on the Mississippi River front, 5 on Tennessee Chute
and 19 on Wolf River. Of the 36 terminals, 4, including a grain ele-
vator, are publicly owned, 2 are operated by contract with transporta-
tion companies and 3 are operated by common carriers; the balance
:are privately owned and operated. Present facilities are considered
:adequate for existing commerce.
    Operations and results during fiscal year.-Maintenance dredging
was conducted with hired labor and Government and leased plant,
dredge Burgess and leased dredge Robert H., moving a total of 275,027
cubic yards of material in maintaining a channel of project dimen-
Sions.
    Total costs for the year were $50,995.44, and total expenditures
 $51,073.22.
                 RIVERS        AND HARBORS---MEMPHIS,                                     TENN., DISTRICT                        841
  Condition at end of fiseal year.-The existing project was about 50
percent complete. At the end of the fiscal year there was a channel
9 feet in depth and of project width to 900 feet above Hall Street.
From-this point to beyond Second Street Road there were depths of
from 1 to 2 feet during the low-water season. The work remaining
to be done to complete the project is extending the channel from North
Second Street Road to Hindman Ferry Road, as authorized by the
River and Harbor Act of 1935.
  Exclusive of maintenance dredging done during the fiscal year 1936
with Mississippi River funds which were included in the annual report
of the Mississippi River Commission for that year under the caption
"Dredges and dredging," the total costs on the existing project to
June 30, 1942, were $834,650.70, of which $586,500 from Public Works
funds was for new work and $248,150.70 regular funds for mainte-
nance. The total expenditures were $834,650.70, including $586,500
Public Works funds. To cover the cost of retaining levees required
of local interests, there have also been costs and expenditures charged
to contributed funds amounting to $17,500.
  Proposed operations.-The balance unexpended on July 1, 1942,
$61,035.20, will be applied as follows:
Maintenance:
    Dredging by Government plant and hired labor in Wolf River
      between its mouth and a point approximately 1,200 feet above
      its mouth, approximately 1 month's dredging operations-____ $31, 035. 20
    Dredging by leased plant in Wolf River between a point ap-
      proximately 1,200 feet above its mouth and a point approxi-
      mately 3,000 feet below Second Street Road, approximately
      2 months' dredging operations_______________________      __ 30,000. 00
                Total maintenance__----------------_                                                                  _-- 61, 035. 20
   The additional sum of $60,000 can be profitably expended during the
fiscal year 1944 for maintenance dredging by Government plant and
hired labor or leased plant, from the mouth of Wolf River to a point
3,000 feet below Second Street Road, approximately 21/2 months"
dredging operations.
                                             Cost and financial summary
Cost of new work to June 30, 1942------     --------------------                                                        $586, 500. 00
Cost of maintenance to June 30, 1942__________________________                                                           248, 150. 70
           Total cost of permanent work to June 30, 1942 ---------                                                       834, 650. 70
Net total expenditures_ _________________________________    1834, 650. 70
Unexpended balance June 30, 1942----------------------------   61, 035. 20

           Total amount appropriated to June 30, 1942--___-----_____
                                                              --                                                         895, 685. 90
  1 In addition, $17,500 contributed funds expended for new work.


   Fiscal year ending June 30                  1938                  1939                 1940                 1941           1942


Cost   of new   work--------------       -          -       ------
                                                              ----              -------          ---   -----                    --.--.....
                                                                                                                         -----------....
Cost of mai
          n et nan ce             _____ $54, 439.22
                            ________                            $50, 457. 31               $881.29      $31, 285. 11         $50, 995. 44
Total expended
           . .          . .     .    .        34, 956. 34         50, 914. 12         20, 040. 83         31, 286. 43         51, 073. 22
Allotted..........                            _ _              -13, 814. 10               5, 000. 00      40, 000. 00         40, 000. 00
 842              REPORT OF CHIEF OF ENGINEERS,                                      U. S. ARMY,               1942

Balance unexpended July 1, 1941 --    --         -------                                                           $72,108. 42
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942 ------------------------------------                                                         40, 000. 00
       Amount to be accounted for___-- ----------------------               112, 108.42
Gross amount expended------ ------------------        $52,867.06
Less reimbursements collecte                              , 793. 84
                                                          1---------------------
                                                                             51, 073. 22
                Balance unexpended June 30, 1942                         ------------------------                     61, 035. 20

Amount (estimated) required to be appropriated for completion of
  existing project 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -             -
                                                                                                                    598, 500. 00
Amount that can be profitably      expended         in fiscal year ending June
  30, 1944, for maintenance 2
                                -- -- -      ------- - - - - - - - - ----- ---
                                                                                                       --             60, 000.00
    2 Exclusive of available funds.

5. REMOVING SNAGS AND WRECKS FROM THE MISSISSIPPI RIVER
     BELOW THE MOUTH OF MISSOURI RIVER AND FROM OLD AND
     ATCHAFALAYA RIVERS

  Reports on work done under this title were formerly submitted by
the St. Louis engineer district. Beginning June 30, 1940, reports alre
submitted by districts receiving allotments for work under the project.
  Location.-The Mississippi River from its confluence with the Ohio
River to the mouth of the Arkansas River.
  Previous projects.-General appropriations were made at irregular
intervals as early as 1824. For further details see page 1880, Annual
Report for 1915.
  Existing project.--This is a continuation of the plan adopted in 1879,
and provides for the removal and destruction of snags, wrecks, drift
heaps, and other obstructions to navigation in the Mississippi River
between the mouth of the Ohio River and the mouth of the Arkansas
River; also for the felling of large trees on or near caving banks,
thereby decreasing the number of snags to be destroyed thereafter.
The work is done by the district's steel hull snag boat Arkansas II,
built in 1940, and other plant, all fitted with the necessary equipment
and appliances and operated by Government employees.
  The existing project was authorized by the following river and
harbor acts:

      Acts                                                  Work authorized                                           Documents


                     Annual appropriations or allotments made 1879 to 1886, incluive, except in
                      1883 and 1885------------------
Aug. 11, 18881       Annual expenditure of $100,000 made available each year          ______________
Mar. 3,1909          Atchafalaya and Old Rivers from their junction with the Mississippi and Red
                      Rivers to Melville, La., included in the project
Mar.       2, 1919   Appropriation of $50,000 additional to cover increased costs due to war condi-
                      tions                  -------------------------------------
June 30, 1922 2
Mar. 2, 1923 2 Allotments of $25,000, $20,000, $17,500, and $13,000, respectively, to cover in-                       1
June 7, 19242    creased costs           ---      ---------------------------------          -
Apr. 15, 1926 2
June 26, 1934 3 Maintenance provided for with funds appropriated for the preservation and
                         maintenance of rivers and harbors, since June 30, 1935...


  1 Sec.   7.        2   War   Department   Appropriation       Act.          3   Permanent   Appropriations       Repeal   Act.
             RIVERS AND HARBORS--MEMPHIS,                          TENN.,       DISTRICT             843
   Terminal facilities.-Exclusive of terminal facilities at Memphis,
Tenn., and Helena, Ark., there are several privately owned and oper-
ated barge to bank sand and gravel plants, pipe lines from bulk plants
to barge landings for handling petroleum products, and log slips.
   At Helena, Ark., there is a river and rail terminal operated by the
Federal Barge Line that is available for public use, and a grain ele-
vator. (For facilities on port of Memphis see report on Wolf River,
Memphis Harbor, Tenn.). The present facilities are considered ade-
quate for existing commerce.
   Operations and results during fiscal year.-All operations were for
maintenance by hired labor with Government plant and consisted of
removal of snags from the channel between Cairo, Ill. (0'mile), and
the mouth of the Arkansas River (399 miles) with snag boat Arkansas
II. The result of these operations was the removal from the channel
of 1,013 snags.
   The costs were $21,430.98 and expenditures were $19,364.35, all for
maintenance.
   Condition at end of fiscal year.-The project being one of continuous
maintenance of channel, no estimate of completion and total cost can
be made. Each freshet brings down new obstructions, and changes in
location of channel, which are constantly going on, uncover old obstruc-
tions. Operations provide a channel reasonably free from snags at
the end of the fiscal year, and there is sufficient plant available to take
care of future work.
   The total costs under the existing project to June 30, 1942, were
$220,572 and the total expenditures were $218,505.37, all for main-
tenance.
   Proposed operations.-The balance unexpended on July 1, 1942,
$61,694.63, will be applied as follows:
Accounts payable June 30, 1942________________--------------------------      $2, 066. 63
Maintenance: Removal of snags and wrecks, as required, from the Mis-
sissippi River between the mouth of the Ohio River and the mouth of
the Arkansas River____----------------------- -------                   -59,     628. 00
   The additional sum of $50,000 can be profitably expended during the
fiscal year 1944 for maintenance in removing snags and wrecks from
the Mississippi River from the mouth of the Ohio River to the mouth
of the Arkansas River.
                                   Cost and financial summary
Cost of new work to June 30, 1942_____----------
Cost of maintenance to June 30, 1942______ -      -____--_________ $220, 572.00
     Total cost of permanent work to June 30, 1942__--___________ 220, 572. 00
Minus accounts payable June 30, 1942-------              __   -_____ 2, 066. 63
     Net total expenditures_----    __-____-----------              218, 505. 37
Unexpended balance June 30, 1942- ---    __ ------------------       61, 694. 63
      Total amount appropriated to June 30, 1942_______________ 280, 200. 00

   Fiscal year ending June 30         1938           1939           1940          1941            1942


-Cost of new work          --       ------------ -------------     ------        -------------           --
Cost of maintenance------------    $22, 663. 73  $29, 016. 69    $58, 254.56   $38, 463.96      $21, 430. 98
Total expended _______--_                918. 68
                                       ,24,         22, 102. 63    65, 168.62    38, 463. 96      19, 364. 35
Allotted    __    _______            46, 200. 00    25, 000.00     60, 000.00    47, 000.00       45, 000. 00
844           REPORT OF CHIEF OF ENGINEERS,                                  U. S. ARMY,              1942

Balance unexpended July 1, 1941 __-...                 -     -__________-_____
                                                                             $36, 058. 98
Amount allotted from War Department Civil ApprQpriation Act ap-
proved April 28, 1942 -------------------------------------                  45, 000. 00
      Amount to be accounted for---- -----------------------                                                 81, 058. 98
Gross amount expended-------------------------- $28, 609.97
Less reimbursements collected_ _-_-----.-----                9, 245. 62
                                                                                                             19, 364. 35

      Balance unexpended June 30, 1942                                    _____            ___-------61, 694. 63
Outstanding liabilities June 30, 1942 ------------                                 ____         __     2, 066. 63
          Balance available June 30, 1942                      -----------------------                       59, 628.00
Amount that can be profitably expended in fiscal year ending June
                                                                                    -- - -- -
    , 1944, for maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - -                          50, 000. 00
1 Exclusive of available funds.
      6. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

  The cost of work during the year amounted to $13,342.62; the ex-
penditures were $14,198.47. The balance unexpended on June 30, 1942,
$5,833.76, will be applied as needed during the fiscal year 1943 to pay-
ment of expenses to be incurred under this heading. The additional
sum of $15,000 can be profitably expended during the fiscal year ending
June 30, 1944.
                                        Cost and flnancial summary
Cost of new work to June 30, 1942
Cost of maintenance to June 30, 1942_____11                               1___               1________$190, 462. 31

      Total cost of permanent work to June 30, 1942 ____-                                     _____         190, 462. 31
Minus accounts payable June 30, 1942__  __--------------- -                                     __-              204. 04

     Net total expenditures--------------------------------                                                 190, 258. 27
Unexpended balance June 30, 1942_---     __------------                                                       5, 833. 76

          Total amount appropriated to June 30, 1942----------------                                        196, 092. 03

    Fiscal year ending June 30              1938             1939                1940          1941             1942


Cost of new work-------       ---   ------------- --     ------------------------------      --------------------
Cost of maintenance---....----.           $75, 821.37      $15, 731.60    $17,132. 95        $22, 962. 39  $13, 342. 62

Total expended ....------------     .      76, 273. 45      15, 426.01       16, 411. 89      23, 062. 11       14,198. 47
Allotted --- --------------------          26, 700. 00      16, 000. 00      13, 000. 00      16, 000.00


Balance unexpended July 1, 1941-----------------------------                                                $20, 032. 23
Gross amount expended____-____----------------       $14, 481. 17
Less reimbursements collected-----------------------      282. 70
                                                                                                             14, 198. 47
      Balance unexpended June 30, 1942________----------------                                                5, 833. 76
Outstanding liabilities June 30, 1942_ ----------------------------                                             230.04

          Balance available June 30, 1942__-----------------                                  -----           5, 603. 72

Amount that can be profitably     expended   in fiscal year ending June 30,
                             -- -  ------ - -- - -- -- - --- - - ---- ----- --- -
1944 for maintenance                                                                                       15, 000.00
1 Exclusive of available funds.
              RIVERS AND HIARBORS----MEMPHIS,                                        TEN., DISTRICT                               845
               7. PLANT ALLOTMENT, MEMPHIS, TENN., DISTRICT
                                        Cost and             financial summary
Undistributed costs June 30, 1942---------------------------                                                          $208, 987. 06

Net total cost to June 30, 1942------------------------------- 208, 987. 06
Plus accounts receivable June 30, 1942___-       -   ___- -----    12, 879. 47
      Gross total costs to June 30, 1942-----------------------221, 866. 53
Minus accounts payable June 30, 1942                                 , 249. 67
                                                                    7--------------------------
      Net total expenditures-------------------------------       214, 616. 86
Unexpended balance June 30, 1942      ---------------------------  58, 806. 96
      Total amount appropriated to June 30, 1942 ________----273, 423. 82

   Fiscal year ending June 30                  1938                    1939          1940                     1941             1942


Total expended-.-----------                 $18, 208.68             $10, 957.54   $164, 117.86        -$19,     853. 54     -$16, 052. 64

Allotted                                       143, 674. 61 --------------
                   ...........----------------------...                             20, 000. 00   .


Balance unexpended July 1, 1941    ----------------------------                                                            $42, 754. 32
Gross amount expended------------------               $101, 809. 15
Less:
    Reimbursements collected----------$114, 861. 79
    Receipts from sales-_--------          3, 000. 00
                                                       117, 861. 79
                                                                                                                          -16, 052. 64
      Balance unexpended June 30, 1942____----------          58, 806. 96
Outstanding liabilities June 30, 1942                           7, 572. 79
      Balance available June 30,                          -1942-----------------------
                                                              51,234. 17
Accounts receivable June 30, 1942________ ____________-_____-12, 879. 47
           Unobligated balance available June 30, 1942________                                                __-          64, 113. 64
           8. MEMPHIS, WOLF RIVER, AND NONCONNAH CREEK, TENN.
   Location.-The work covered by this project lies within and ad-
jacent to the city of Memphis in Shelby County, Tenn., on the left
bank of Wolf River and the right bank of Nonconnah Creek from the
confluence of these streams with the Mississippi River upstream for
approximate distances of 10 and 4 miles, respectively. (See U. S.
Geological Survey map of Tennessee, scale 1: 500,000, and Mississippi
River Commission Alluvial Valley maps, scale 1:62,500 and scale
1:500,000.)
   Existing project.-The plan of improvement provides for the con-
struction of a system of levees, flood walls, and bank protection, con-
sisting of the following features: About 22,200 feet of earth levee and
two concrete railroad floodgates along the right bank of Nonconnah
Creek, extending from high ground near Tennessee Chute south of
Riverside Park to high ground at Bodley Avenue east of Prospect
Street; about 14,200 feet of concrete flood wall and 32,050 feet of earth
levee along the left bank of Wolf River, extending from downtown
Memphis to high ground near Douglass Park; construction of six new
pumping stations and eight storage reservoirs with appurtenant works
for the disposal of interior drainage; the construction of a culvert
under North Bellevue Boulevard near Cypress Creek for the enlarge-
ment of the Cypress Ceek Reservoir. The project will provide pro-
tection, with 3 feet freeboard, for the city of Memphis and adjacent
areas against a Mississippi River flood of 54.5 feet stage, or 4.1 feet
       493202-43-pt. 1, vol. 1-54
846     REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1942

higher than the maximum flood of record, which occurred in February
1937. The project was adopted by the Flood Control Act approved
August 28, 1937, and so modified by the War Department Civil Ap-
propriation Act approved June 28, 1939, that the cost of providing
pumping stations and outlet works for interior drainage shall be borne
by the United States. The estimated cost of construction is $9,000,000.
    Local cooperation. See page 5 for requirements. General assur-
ances given by the city of Memphis and Shelby County, Tenn., were
approved by the Secretary of War on August 2, 1938. The rights-of-
way for flood-protection works along Nonconnah Creek were accepted
on March 29, 1939. The rights-of-way for the section 4 levee, Cypress
Creek pumping station and Cypress Creek Reservoir were accepted on
August 27, 1940; and for section 2, Wolf River levee, and section 3,
Wolf River flood wall, were accepted on December 4, 1941. Local
interests are now engaged in securing the balance of the rights-of-way
along Wolf River.
    Operations and results during fiscal year.-Planningand designing
was completed during the year for sections of the project not under
construction.
    The superstructure, mechanical installation, and approximately 95
percent of the electrical installation for the Nonconnah pumping sta-
tion was completed during the year. Construction of the Nonconnah
Reservoir, and closing of gaps in the Nonconnah levee were completed,
except for a small amount of work in cleaning the reservoir drainage
ditches.
   The substructure and superstructure for the Cypress Creek pump-
ing station were completed. Practically all mechanical and electrical
equipment for this pumping station has been fabricated ready for
installation upon completion of the superstructure.
   Section 4 earth levee along Wolf River from Thomas Street to Maury
Street was completed; approximately 727,000 cubic yards of hydraulic
fill and 1,127,000 cubic yards of dry fill were placed. Plans and speci-
fications for the construction of section 3 flood wall along Wolf River
from the vicinity of the Fisher Memphis aircraft division plant to
Thomas Street were completed but the construction of that section
has been deferred to conserve critical materials.
   The total quantity of earth placed in levee embankment this fiscal
year was 362,304 cubic yards.
   The costs for the year were $1,099,416.84, and the expenditures were
$1,313,280.52, all new work.
   Condition at end of fiscal year.-Plans and specifications were com-
plete for all work under contract and for sections 2 and 3 levees. Some
contract drawings were prepared for other parts of the project, and
preliminary drawings for all parts of the project were prepared.
   Section 8 levee was complete and the Nonconnah Reservoir was
practically complete. The Nonconnah pumping station superstruc-
ture was complete and the mechanical equipment installed. The elec-
trical installation was 95 percent complete.
   The North Bellevue Boulevard culvert was complete.
   The Cypress Creek pumping station superstructure was complete
and practically all of the mechanical and electrical equipment was on
hand. The electrical installation was under way, and the plans for
the mechanical installation were being prepared.
   Section 4 levee was complete.
                    RIVERS AND HAIRBORS-MEMPIIS,                                             TENN., DISTRICT                         847
   The total costs to June 30, 1942, have been $3,039,808.22 and the total
expenditures have been $3,188,998.57.
   Proposed operations.-The balance unexpended on June 30, 1942,
$2,641,301.43, and accounts receivable, $90.72, a total of $2,641,392.15,
will be applied as follows:
Accounts payable June 30, 1942___-------------------------          $81, 770.                                                            82
New work:
                                             ---
    Preparation of plans and specifications-_____ _-----------      175, 000.                                                            00
    Complete construction of Nonconnah Creek and Cypress
      Creek pumping stations__-----------------------------         180, 000.                                                            00
    Construct sections 2 and 6 levees------------------------       500, 000.                                                            00
    Construction of additional units of the project_------------ 1, 704, 621.                                                            33
      Total for new work------------------------------           2, 559, 621.                                                            33

             Total for all work---                            -----------------------------                             2, 641, 392. 15

                                                        Cost and. financia
                                                                        l  summary
Cost of new work to June 30, 1942----------------------                 $3, 039,808. 22
Cost of maintenance to June 30, 1942------------------                 ------------
      Total cost of permanent work to June 30, 1942______---3,               039, 808. 22
Undistributed costs June 30, 1942_____            -------    __--___-        230, 870, 45
      Net total cost to June 30, 1942_______              ______---------3, 270, 678. 67
Plus accounts receivable June 30, 1942_____------------                            90. 72
      Gross total costs to June 30, 1942 .. _______ ___ -                 3, 270, 769. 39
Minus accounts payable June 30, 1942__________________ ____                   81, 770, 82
      Net total expenditures ____-----------------__                      3, 188, 998. 57
Unexpended balance June 30, 1942________________________                  2, 641, 301.43
      Total amount appropriated to June 30, 1942 __-______                5, 830, 300. 00

     Fiscal year ending June 30                            1938             1939              1940              1941             1942


Cost of new work------------_ $18, 817. 13  $112, 605.81 $677, 322. 21 $1, 131, 646. 23                                      $1, 099, 416.84
Cost of maintenance----------------        ----------- ------------------
Total expended...-----------------                        17, 713. 03     104, 278.88       671, 507. 37   1, 082, 218. 77    1, 313, 280. 52
Allotted.......................----------------------     20, 000. 00   3, 888, 300.00      750, 000.00      897, 000. 00       275, 000. 00



Balance unexpended July 1, 1941      -------------------------- $3, 679, 581. 95
Amount allotted from War Department Civil Appropriation Act ap-
  proved April 28, 1942-__- -------   ___------ -------------             300, 000. 00
      Amount to be accounted for___ _--_                               3, 979, 581. 95
Deductions on account of revocation of allotment --------------            25, 000. 00
      Net amount to be accounted for         ---------------------- 3, 954, 581. 95
Gross amount expended __-________-_____ $1, 341, 650.91
Less reimbursements collected _______---         _____     28, 370. 39
                                                                       1, 313, 280. 52
       Balance unexpended June 30, 1942 ________            ________ 2, 641, 301. 43
Outstanding liabilities June 30, 1942___ _______-        $71, 021. 12
Amount covered by uncompleted contracts--------          125, 810. 22
                                                                          196, 831. 34
      Balance available June 30, 1942____________----           -__    2, 444, 470. 09
Accounts receivable June 30, 1942        ------------------------------         90. 72
      Unobligated balance available June 30, 1942-------------2, 444, 560. 81
Amount (estimated) required to be appropriated for completion of
     existing project 1 ----------                                                   ----                      _        3, 169, 700. 00
       Exclusive of available funds.
848        REPORT OF CHIEF OF ENGINEES, U. S. ARMY,                   1942

      9. NORTH LITTLE ROCK TO GILLETT, ARK. (BELOW PLUM BAYOU)

   Lgqation.-The work covered by this project is on the left bank of
the Arkansas River, between Sherrill and Gillett, Ark. (See Missis-
sippi River Commission Alluvial Valley maps, scale 1: 62,500 and scale
1:500,000.)
   Existing project.--The plan of improvement provides for the con-
struction of approximately 47.5 miles of new levee and enlargement
of existing levees along the north bank of the Arkansas River between
Sherrill and Gillett, Ark., to provide protection from the floodwaters
of the Arkansas River and backwaters of the Mississippi River for
agricultural lands and communities lying north of the Arkansas River.
This improvement comprises the lower portion of the more compre-
hensive project of flood control, extending from North Little Rock to
Gillett. The work involves the handling of approximately 5,925,000
cubic yards of earthwork and the construction of approximately 19
drainage structures through the levee. The project grade of the levee
is 3 feet below that of the opposite levee on the south bank of the
Arkansas River, which protects the entire Tensas Basin. This project
will greatly reduce the frequency of inundations of lands on the-north
bank of the Arkansas River. The existing project was authorized by
the Flood Control Act approved June 22, 1936. The estimated cost of
construction, as authorized, for the whole project from North Little
Rock to Gillett, was $2,424,400, of which $1,404,400 was the amount
estimated for the construction below Plum Bayou (Sherrill to Gillett).
The estimated cost of construction, revised in 1940, is $1,021,100.
   Local cooperation.--See page 5 for requirements. Full require-
ments of local cooperation have been fulfilled down to Bayou Meto.
Below Bayou Meto the Farelly Lake levee district has provided pre-
liminary assurances but no rights-of-way.
   Operations and results during fiscal year.-Surveys were carried
on during the year at a cost of $1,829.35; expenditures were $1,829.35.
   Condition at end of fiscal year.-At the end of the fiscal year the
project was about 91 percent complete. The work remaining to com-
plete the project is the completion of the levees below Bayou Meto.
The cost and expenditures to June 30, 1942, were $845,481.02, of which
$805,391.56 were from regular funds, and $40,089.46 from Emergency
Relief funds.
   Proposed operations.--The unexpended balance of $29,608.44 on
June 30, 1942, will be applied to stabilization of Big Bayou Meto
floodgate outlet channel; to the restoration of levee subsidence; and
to mapping, surveys, and the completion of plans for the remainder of
the project.
                            Cost and financial summary

Cost of new work to June 30, 1942 -------------------------    $845, 481. 02
Cost of maintenance to June 30, 1942_                       __

         Total cost of permanent work to June 30, 1942 _______    _    1845,   481. 02
Net total expenditures-----------------------------------1845, 481. 02
tUnexpended balance June 30, 1942___--_________-___ -    -   29, 608. 44
          Total amount appropriated to June 30, 1942-_---_-   -         875, 089. 46
  I   Includes $40,089.46 Emergency Relief funds.
               RIVERS            AND          HARBORS-MEMPHIS,                         TENN.,             DISTRICT                 849



    Fiscal year ending June 30                       1938            1939               1940                     1941            1942


Cost of new work--___--------                    $82, 898.13      $348, 911.63      $409,070. 40            $2, 771. 51         $1, 8290.35
C ost of m ainten an ce_ .              _       ------------.-.------------..-------------..----- ..................
                                               __---------.-.

Total expended         ...-----------------         69,140.06      345,999.10         425,666.87                 2, 845.64       1, 829. 35

Allotted--------       ------------            1,151,000.00        -4,910. 54     -125,000.00            -171, 000.00            25,000.00



Balance unexpended July 1, 1941--------                                                                  -----               $6, 437. 79
Amount allotted from War Department Civil Appropriation Act ap-
   proved June 24, 1940----------------                                                                                      25, 000.00

      Amount to be accounted for- ----     ------------------
                                             -                                                                               31, 437. 79
Gross amount expended---------------                 $1, 905. 79
Less reimbursements collected-----------------------      76. 44
                                                                                                                               1, 829. 35

Unobligated balance available June 30, 1942                                         ---------                                29, 608. 44
Amount (estimated) required to be appropriated -for           completion
                         - - -- - -- - -- -- - -- - -- -- -- -- - - --
of existing project 2                                       ____ --                                                         146, 000.00
   2 Exclusive of available funds.

                 10.   AUGUSTA                 TO     CLARENDON,              WHITE             RIVER,            ARK.


   Location.-The works covered by this project are principally on the
left (east) bank of the White River, between the towns of Augusta
and Clarendon, in Arkansas. A small part of these works, however,
is located at the town of Georgetown, on the right (west) bank of the
White River, for the purpose of providing local flood protection at
that point. (See Mississippi River Commission Alluvial Valley maps,
scale 1: 62,500 and scale 1: 500,000.)
   Eisting project.-The plan of improvement provides for the con-
struction of approximately 40.3 miles of new levee and enlargement of
existing levees along the east bank of the White River between Greg-
ory Point and Clarendon, Ark., to provide protection from the flood
waters of the White River for agricultural lands and communities
lying in Woodruff, Prairie and Monroe Counties, east of that stream.
It also provides for the construction of a local protection levee at
Georgetown, on the west bank of White River, and the construction
of a pumping plant at that point, and drainage outlet structures both
at Georgetown and in the east bank levee. The estimated total cost of
construction of the project is $2,800,000, of which amount $36,500
is for the work at Georgetown. The estimated cost of lands and dam-
ages is $710,000. The existing project was authorized by the Flood
Control Act approved Aug. 18, 1941 (H. Doc. 98, 76th Cong., 1st sess.).
   Local cooperation.-See page 5 for requirements. Local interests
state that they expect to be able fully to meet all the stipulated require-
ments of local cooperation.
   Operations and results during fiscal year.-None.
   Conditionat end of fiscal year.-Work has not been started.
   Proposed operations.-No funds are available, and no operations
are proposed during the fiscal year 1943.
   The sum of $100,000 can be profitably expended during the fiscal
year 1944 on the preparation of detailed plans.
850         REPORT OF CHIEF OF ENGINEERS,                                      U.' S. ARMIVIY, 194-2

                                        Cost and financial summary
Cost of new work to June 30, 1942-------------------------                                                 -----------
Cost of maintenance to June 30, 1942-----------------------                                              -------------
Net total expenditures      __-------------------------------

         Total amount appropriated to June 30, 1942---------                                             -------------

Amount (estimated) required to be appropriated for completion of
existing project--                                                800, 000. 00
                                                                 $--------------------

Amount that can be profitably expended in fiscal year ending June
30, 1944, for new work--------                                                                               100,  000. 00
                                                                                                              1---------------------------

11. SNAGGING AND CLEARING UNDER AUTHORITY OF SECTION 2 OF THE
     FLOOD CONTROL ACT APPROVED AUGUST 28, 1937, AS AMENDED

   The Flood Control Act approved August 28, 1937, as amended by
the Flood Control Acts approved August 11, 1939, and August 18,
1941, authorized the allotment of not to exceed $500,000 from the
flood-control appropriations for any one fiscal year for the removal of
accumulated snags and 'other debris from, and the clearing and
straightening of channels in navigable streams and tributaries thereof
when such work is advisable in the interest of flood control; provided
that not more than $25,000 shall be allotted for this purpose for any
single tributary from the appropriations for any one fiscal year.
   Funds were made available during the fiscal year 1942 for snagging
and clearing on the following streams in the Memphis District: Obion
River and tributaries, Tennessee, and Hatchie River and tributaries,
Mississippi and Tennessee.
   Channel clearance consisting of removal of snags, drift, and other
debris by hired labor with Government plant was done on two streams
as follows: Hatchie River (and its tributaries) over a distance of
3.4 miles in Tennessee and 9.2 miles in Mississippi; Obion River (and
its tributaries) 13.3 miles cleared by hired labor snagging operations,
and 2.9 miles excavated by Government-owned dragline on the South
Fork of the Forked Deer River (a tributary of the Obion), for which
53.8 acres of right-of-way were cleared.
                      Summary of stream-clearing cost and expenditures

                                                                                                       Fiscal year 1942
                                           Stream
                                                                                                      Cost        Expendi-
                                                                                                                   tures

Obion River and tributaries......------------------------------------------$15, 744. 88                           $13, 423. 04
Hatchie River and tributaries-.... ....       . . ..----------------------------------- 9, 480. 99                 11, 121. 89
      Total...............................-------------------------------------------------------   25, 225. 87    24, 544. 93



  The balance unexpended at the end of the fiscal year, amounting to
$28,309.30, will be applied during the fiscal year 1943 to the payment
of expenses incurred under this heading.
                RIVERS AND                 HIARBORS-MEMPHIS,                       TENN.,         DISTRICT                  851
                                            Cost and financial summary
Cost of new work to June 30, 1942 ____________________      ___-                                                  1$247, 380. 32
Cost of maintenance to June 30, 1942____________________________

      Total cost of permanent work to June 30, 1942 ___-- ______-                                                  1247, 380. 32
Minus accounts payable June 30, 1942________________-________                                                         2, 777. 53
      Net total expenditures----------------------------------                                                     1244, 602. 79
Unexpended balance June 30, 1942________
                                 .        __.______________                                                   _      28, 309. 30
           Total amount appropriated to June 30, 1942________________                                              1272, 912. 09

    Fiscal year ending June 30                    1938              1939           1940                1941              1942

Cost of new work ---------------               $90, 322. 77       $45, 812. 03   $47, 711. 34     $38, 308. 31          $25, 225. 87
C ost of m aintenance-------------..
                             -------------..
                                        -------------..-------------..-----------..........
Total expended ._--         ... .....           86, 480. 92        49, 431. 17    46, 494. 61         37, 651.16         24, 544. 93
Allotted,_
       ----------------------                  100, 000. 00        36, 480. 92    49, 431. 17         45, 000. 00        42, 000. 00



Balance unexpended July 1, 1941__                      __                                                           $10, 854. 23
Amount allotted from War Department Civil Appropriation Act
  approved May 23, 1941__                                                                                            42, 000. 00
      Amount to be accounted for---------------------------                                                          52, 854. 23
Gross amount expended_ -   ---------                   $24,918.14
Less reimbursements collected----    ------                 373. 21
                                                                                                                     24, 544. 93

      Balance unexpended June 30, 1942-----------------------   28, 309. 30
Outstanding liabilities June 30, 1942___ _____________--_____--5, 847.26

           Unobligated balance available June 30, 1942 --                                       ___      __          22, 462. 04
    IIncludes $40,000 Emergency Relief funds.

       12. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD
                             CONTROL

  There were no costs or expenditures during the fiscal year.                                                               The
balance unexpended on June 30, 1941, was revoked.
                                            Cost and financial summary

Cost of new work to June 30, 1942__          __   ____________
Cost of maintenance to June 30, 1942 __...__---_______--                                                            $31, 390. 53
       Total cost of permanent work to June 30, 1942-----------------31, 390. 53
Net total expenditures___    _____-------__     _                      31, 390. 53
Total amount appropriated to June 30, 1942_______________________      31, 390. 53

   Fiscal year ending June 30                     1938              1939           1940                1941              1942

Cost of new work___----
                 .    .                     ..-----------------
Cost of maintenance___   __
                    ..........          ___----- ------            $1,498. 05    $29, 688. 06           $204.42
Total expended           ......------------------------------         433. 90     30. 39. 23             558. 40
Allotted
   Be      ----------------------               $1, 500. 00       38, 500. 00      3,500.00              _-           -$12,109. 47



Balance unexpended July 1, 1941-_------ --------
                                              _____--__
                                                      ----                                                          $12, 109. 47
Deductions on account of revocation of allotment----                                                     ___-        12, 109. 47
852          REPORT OF CHIEF OF ENGINE-ERS,                                     U. S. ARMY,               1942

13. OTHER FLOOD-CONTROL PROJECTS FOR WHICH NO ESTIMATES
                      ARE SUBMITTED

                                                         For ltthll           Cost a;ir'expendites to             Estli"tl
                                                              report see           June 30, 1942                   amount
                   Name of project                             Annual
                                                               Report                                            requiredto
                                                                 for-         New work            Maintenance     complete


1. Clarendon to Laconia Circle, White River
     Basin, Ark ------------------------------
                         _                                      1937       ----------------------------              $8, 960,000
2. Big Creek and L'Anguille River, White River
     Basin, Ark - ...__ ... .               ...- -.-.......
                                                     . .         1937                         --------------
                                                                                       _--------------               -       86, 400
3. Tiptonville to Obion River, Tenn ..                   .       1941         $608, 434. 27__--_-----_____                     (1)
4. De Valls Bluff, White River, Ark- _--......                   1941-----             _----------47,                           500

  1 Completed; $4,565.73 unexpended funds at end of fiscal year 1941 were revoked during the fiscal year 1942.

Status of all investigations for flood control called for by flood-control acts and
                              committee resolutions

                                                                   Date trans-
            Locality                Authorization Act               mitted to           Document No.               dation
                                                                    Coiess                                         dation

Cache River, Ark. and Mo._         Flood Control Com-            Mar. 23,1942 -_...............                 Unfavorable
                                     mittee    resolution,
                                     Apr. 14, 1937.
Hatchie River and tribu-           Flood Control Act,            Mar. 10,1942 --------                     -        Do.
taries, Mississippi and             Aug. 11, 1939.
Tennessee.
Meto Bayou, Ark .....--...         Flood Control Act,
                                    Aug. 28, 1937.
St. Francis River, below lati-     Commerce Committee            July 31,1941        Senate 106, 77th           Favorable.
  tude of Oak Donnick, Ark.         resolution, Apr. 18,                               Cong., 1st sess.
  (under Mississippi River          1940.
  Commission).



   IMPROVEMENT OF RIVERS AND HARBORS IN THE
            GALVESTON, TEX., DISTRICT
  This district comprises all of Texas south of the Red River drainage
basin exclusive of the drainage basin of the Rio Grande and its tribu-
taries above and including the Pecos River; that portion of western
Louisiana in the Sabine River and Lake drainage system, exclusive
of the Louisiana section of the Louisiana-Texas Intracoastal Water-
way and tributary waterways; and the portion of eastern New Mexico
embraced in the drainage basins of the Brazos and Colorado Rivers.
It includes the Intracoastal Waterway in Texas from the Sabine
River to Corpus Christi.
  District engineer: Col. L. H. Hewitt, Corps of Engineers.
  Division engineer: Col. S. L. Scott, Corps of Engineers.
                                                  IMPROVEMENTS

                   Navigation                                               Navigation--Continued
                                                     Page                                                                    Page
1. Sabine-Neches    Waterway,                                    3.    Galveston Harbor, Tex .__                              869
      Tex _ __ _________ ___                          853         4.    Galveston Channel, Tex ___                             872
2. The Louisiana and Texas In-                                   5.    Channel from Galveston Har-
      tracoastal Waterway from                                            bor to Texas City, Tex -_                            875
      the Mississippi River at                                    6.    Channel to Port Bolivar,
      or near New Orleans, La.,                                           Tex_____-                                            878
      to Corpus Christi, Tex.                                     7.    Houston Ship Channel, Tex-                             880
       (Sabine River-Corpus                                       8.    Double Bayou, Tex .......                              884
      Christi section)----                            859         9.    Anahuac Channel, Tex ...                               885
           RIVERS    AND    HARBORS---GALVESTON,      TEX.,   DISTRICT         853
          Navigation-Continued                       Flood control
                                   Page                                        Page
10.   Trinity River, Tex __----     887 22. Buffalo Bayou, Tex_                912'
11. Cedar Bayou, Tex________        889 23. Whitney Reservoir, Brazos
12. Clear Creek, Tex-               891       River, Tex__                     917
13. Dickinson Bayou, Tex .....      892 24. Eagle Lake to Matagorda,
14. Freeport Harbor, Tex .....      893       Colorado River, Tex ___          919
15. Channel from Pass Cavallo           25. Columbus, Colorado River,
       to Port Lavaca, Tex ._..     897       Tex______                        920
16. Port Aransas-Corpus Christi         26. Brady, Brady Creek, Tex___         920
       Waterway, Tex _              899 27. Pecan Bayou, Tex -_ .---           921
                                        28. North Concho River, Tex___         922:
17. Corpus Christi, Tex., Chan-         29. Snagging and clearing under
       nel to and including a                 authority of section 2 of
       turning basin at Navy                  Flood Control Act ap-
       seaplane base,    Encinal              proved August 28, 1937, as
       Peninsula______    _         904       amended_        e                924
18. Brazos Island Harbor, Tex__     906 30. Preliminary    examinations
19. Examinations, surveys, and                and surveys for flood con-
       contingencies (general) -    909       trol_ __       ____-_        _   925
20. Other projects for which no         31. Other flood-control projects
       estimates are submitted -    910       for which no estimates are
21. Plant allotment-_-              911       submitted_--      -_._____-_     926

                     1. SABINE-NECHES WATERWAY, TEX.

  Location.-This is a consolidation of the old improvements of "Har-
bor at Sabine Pass and Port Arthur Canal" and "Sabine-Neches Canal,
including Sabine River to Orange and Neches River to Beaumont,
Tex." Sabine Pass is on the Gulf of Mexico, approximately 58 miles
east of Galveston and 280 miles west of Southwest Pass, Mississippi
River. It connects Sabine Lake with the Gulf of Mexico. The Port
Arthur Canal extends from near the upper end of Sabine Pass to the
Port Arthur docks at the mouth of Taylors Bayou, a distance of 7
miles. Near its upper end the Sabine-Neches Canal joins and extends
to the mouths of the Neches and Sabine Rivers. The waterway next
extends up the Neches River to Beaumont and up thle Sabine River
to Orange. (See U. S. Coast and Geodetic Survey Charts Nos. 517
and 533.)
  Previous projects.-The original project for improvement of Sabine
Pass was adopted by River and Harbor Act of March 3, 1875, and sub-
sequent projects and modifications by River and Harbor Acts of Au-
gust 2, 1882, June 3, 1896, June 13, 1902, and June 19, 1906. The Port
Arthur Canal was conveyed to the United States free of cost in 1906,
and the River and Harbor Act of July 25, 1912, incorporated it in the
project. The Sabine and Neches Rivers were first improved under the
River and Harbor Acts of June 18, 1878, and March 3, 1899, and the
Sabine-Neches Canal was first improved under the River and Harbor
Acts of March 3, 1905, and March 2, 1907. The project was enlarged
by the River and Harbor Acts of February 27, 1911, July 25, 1912,
March 2, 1919, and September 22, 1922.
   For further details, see page 1863 of Annual Report for 1915 for
the Sabine arid Neches Rivers, Sabine Pass, and Port Arthur Canal,
and page 985 of the report for 1916 for Sabine-Neches Canal. (See
also pp. 1100 and 1105 of Annual Report for 1921 and p. 874 of Annual
Report for 1926.)
854         REPORT OF CHIEF OF ENGINEERS,                              U. S. ARMY,           1942

   Existing project.-The existing project dimensions provided for
in the various channels and basins comprising the waterway are shown
in the following tabulation:

                                                                             Adopted project dimensions


            Section of Sabine-Neches Waterway, Tex.                                                    Depthbein
                                                                           Bottom width in feet        low mean
                                                                                                        low Gulf
                                                                                                          level


Sabine Pass outer bar-_ __     --       --.---
                                          .--.-
                                      _____                            800_._...---------------....     .        36
Sabine Pass jetty channel     -------------------------------          500 at inner end, increasing          (1)
                                                                         to 800 at outer end.
Sabine Pass ...-----------------------------------------
                   ..                                                  500....--------------------------         34
Sabine Pass anchorage basin __.   ____        ___-__ -__-______        800 by 3,000 long, exclusive              34
                                                                         of channel.
Port Arthur Canal ................---------------- --------------------400---..---------------      -------- 34
Port Arthur:
    East turning basin_    --------------------------------- 420 by 1,800 lbong              ----                34
    West turning basin               .
                            ---------------------------------          325 by 1,700 long -                       34
Channel from Port Arthur west turning basin to Taylors Bayou 250--------------------------                       34
  turning basin.
Taylors Bayou turning basin .....----------------------------- 150 to 1,000 by 2,900 long --                     34
Sabine-Neches Canal:
    Port Arthur Canal to mouth of Neches River _ ________ 350--------------------------                          34
    Mouth of Neches River to mouth of Sabine River .---...             125_______________ _______30
Neches River, mouth to lower end of Smiths Bluff cut-off_ __ 350-                      --------                  34
Neches River, lower end of Smiths Bluff cut-off to Beaumont 300---- --------------------                         34
  turning basin, including cut-offs.
Beaumont turning basin--------
                           _                ------------------------ 500 by 1,500 long ----.....                 34
Beaumont turning-basin extension _                      ---   - -- -   350 by 2,000 long - ..........            34
Sabine River, mouth to cut-off near Orange__________________            25--------------------------
                                                                       1_                                        30
Sabine River to Orange municipal wharf__ ___________ ___             _ 200 by 3,000 long          ............ 30
Sabine River cut-off to highway bridge --------------------- 150------------------                  --------     25


  134 at inner end, increasing to 36 at outer end.

  The project also provides for two stone jetties at the Sabine Pass
entrance from the Gulf of Mexico, the western jetty to be 21,860 feet
long and the eastern jetty to be 25,270 feet long. The project further
provides for the removal of the guard lock in the Sabine-Neches Canal
and the construction of suitable permanent protective works along
the Sabine Lake frontage owned by the city of Port Arthur to prevent
dredged material from entering Sabine Lake and to prevent the erosion
of the material deposited.
  The mean tidal variation at the entrance is about 1:1/ feet, at Port
Arthur about 1 foot, and at Orange and Beaumont about five-tenths
foot. The effect of the wind is often greater than that of the tide.
  The estimate of cost for new work, revised in 1941, exclusive of
amounts expended on previous projects, is $11,980,000, made up as
follows: $8,624,500 for dredging work, of which $385,500 has been
contributed in cash and useful work performed; $2,755,500 for jetty
work; and not to exceed $600,000 for the construction of suitable per-
manent protective work in Sabine Lake along Port Arthur. The
latest (1938) approved estimate for annual cost of maintenance dredg-
ingis $740,000.
  The existing project was authorized by the following river and
harbor acts:
               RIVERS AND         HaTRBORS-GALVESTON,                   TECX.,     DISTRICT            855


        Acts                    Work authorized                                    Documents

July 25,1912   Existing project dimensions of jetties, a 26-foot;    H. Doc. No. 773, 61st Cong., 2d sess.
                channel through Sabine Pass, Pot Arthur
                Canal, and Port Arthur turning basin; a new
                turning basin at Port Arthur 26 feet deep, 600
                feet wide, and 1,700 feet long; a 25-foot depth in
                 Sabine-Neches Canal, Neches River to Beau-
                mont and Sabine River to Orange, including
                cut-offs and widening of the channels as recom-
                mended by the Chief of Engineers and approved
                by the Secretary of War; and purchase of a new
                dredge.
Sept. 22, 1922 Deepening the channels to 30 feet from the Gulf to    H. Dec. No. 975, 66th Cong., 3d sess.
                 Beaumont, with increased widths and an an-
                chorage basin in Sabine Pass 32 feet deep over an
                area of about 2,000 by 1,000 feet.
    Do....... Deepening the Port Arthur turning basins and           S. Doc. No. 152, 67th Cong., 2d sess.
                connecting channels thereto to 30 feet.        For
                 taking over and deepening Taylors Bayou turn-
                ing basin and connecting channel to 30 feet. For
                 a 30-foot depth in the{ channel from the mouth
                of Neches River to cut-off in Sabine River near
                 Orange.
Mar. 3,1925    Removal of guard lock in Sabine-Neches Canal___       H. Doec. No. 234, 68th Cong., 1st sess.
Jan. 21,1927 Increased widths of channels as follows: Sabine         H. Doc. No. 287, 69th Cong., 1st sess.
                 Pass jetty channel and Sabine Pass to 300 feet;
                 Port Arthur Canal to 200 feet; Sabine-Neches
                 Canal, from Port Arthur Canal to mouth of
                 Neches River, to 150 feet. For dredging 2
                 passing places in Sabine-Neches Canal, easing
                of bends, removal and reconstructing Port
                 Arthur field office, extending Beaumont turning
                 basin upstream 200 feet above the new city
                 wharves, and for an anchorage basin in Sabine
                 Pass 4,500 feet long, 800 feet wide, and 30 feet
                 deep.
Aug. 30,1935 1 A depth of 32 feet in the channels from the Gulf      Rivers and Harbors Committee Dec.
                 to the Beaumont turning basin, including all          No. 27, 72d Cong., 1st sess.
                 turning basins at Port Arthur.
    Do- ..... Deepening the channels to 34 feet with increased       Rivers and Harbors Committee Dec.
                 widths from the Gulf to the Beaumont turning          No. 12, 74th Cong., 1st sess.
                 basin, including all turning basins at Port
                 Arthur.
    Do------- Construction of suitable permanent protective          Specified in act,
                 works along the Sabine Lake frontage owned
                 by the city of Port Arthur.
Aug. 26,1937 Taking over and maintaining channel from Sabine         Rivers and Harbors Committee Doc.
                 River to Orange municipal wharf.                      No. 3, 75th Cong., 1st sess.
    Do--.....--Dredging 500 feet from the eastern end of Harbor      Rivers and Harbors Committee Doc.
                 Island and for abandonment of the channel             No. 20, 75th Cong., 1st sess.
                 south and west of Harbor Island.
June 20,1938 Increased widths of channels from the Gulf to the       H. Doc. No. 581, 75th Cong., 3d sess.
                 Beaumont turning basin and channel connect-
                 ing Port Arthur west turning basin and Taylors
                 Bayou turning basin; deepening the Beaumont
                 turning basin and Beaumont turning basin
                 extension to 34 feet; and for dredging a new cut-
                 off from Smiths Bluff cut-off to McFaddin
                 Bend.
-Oct. 17, 1940 Abandonment of the Orange turning basin;              S. Doec. No. 14, 77th Cong., 1st sess.
                 dredge a channel 25 feet deep, 150 feet wide,         (Contains the latest published map.)
                 suitably widened on bends, to the highway
                 bridge and dredge a cut-off channel opposite
                  Orange 25 feet deep and 200 feet wide, approxi-
                 mately 2,400 feet long.
   1 Previously authorized Sept. 6, 1933, by Public Works Administration.
856     REPORT OF CHIEF OF ENGINEERS,          U. S. ARMY,    1942

   The project is subject to the condition that no dredging shall be
done by the United States within 50 feet of existing pierheads or
established pierhead lines.
   Recommended modifications of project.-Under date of March 21,
1940, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for extension of the Beaumont turning
basin upstream 300 feet, thus forming a turning basin 350 by 2,300
feet, at an estimated first cost of $10,000 in addition to that now
required to complete the existing project, with no increase in the
annual cost of maintenance; provided that no dredging shall be done
by the United States closer than 50 feet to existing pierheads or estab-
lished pierhead lines; subject to certain conditions of local cooperation
 (H. Doc. No. 685, 76th Cong., 3d sess.).
    Under date of November 20, 1940, the Chief of Engineers recom-
mended modification of the existing project so as to provide for
widening the Port Arthur west turning basin to 600 feet for a dis-
tance of 900 feet from the east end, suitably flared at the entrance,
thence tapering a distance of 800 to 325 feet at the west end at a
depth of 34 feet, at an estimated first cost of $18,000, in addition to that
now required to complete the existing project, with no increase in the
present approved estimated annual cost of maintenance; provided that
no dredging shall be done by the United States closer than 50 feet to
existing pierheads or established pierhead lines; subject to certain
conditions of local cooperation (S. Doc. No. 60, 77th Cong., 1st sess.).
    Further modification of the existing project was recommended by
the Chief of Engineers July 16, 1941, in a report requested by a reso-
lution of the Committee on Commerce adopted November 16, 1940, and
transmitted to Congress by the Secretary of War October 31, 1941.
    Local cooperation.-The cooperation required by the River and
Harbor Acts of June 20, 1938, and October 17, 1940, provides that
local interests shall furnish free of cost to the United.States, rights-
of-way and spoil-disposal areas for initial work and for subsequent
maintenance as may be required, and release the United States from
any claims for damages resulting from the proposed dredging or
disposal of excavated material. All requirements under prior acts
have been fully complied with. The local cooperation yet to be met
consists of furnishing rights-of-way, spoil-disposal areas, and releases
from damage liability along the channel from Port Arthur west turn-
ing basin to Taylors Bayou turning basin and Sabine River in the
vicinity of Orange, Tex. The United States at the request of local
interests has instigated condemnation proceedings in Federal Court
for rights-of-way and spoil-disposal areas along the Sabine River in
the vicinity of Orange, Tex. Local interests have been unable to ob-
tain all rights-of-way for widening the channel to project dimensions
from the Port Arthur west turning basin to Taylors Bayou turning
basin.
    Terminal facilities.--Modern terminal facilities adequate for pres-
ent commerce exist. (See pp. 839 and 840, Annual Report for 1938,
and Port Series No. 14, Corps of Engineers.)
    Operationsand results during fiscal year--New workc.-Preliminary
surveys, preparation of plans, and specifications for work proposed
during fiscal year 1943 was made at a cost of $4,149.12. A total of
9,005,704 cubic yards of material was removed from a total channel
           RIVERS AND HARBORS--GALVE'STON,                                 TEX.,        DISTRICT                     857
length of 89,416.5 feet under contracts at a cost of $682,594.09, as
follows:

                                                                                Cubic      Linear feet
                Location                               Period                   yards      of channel              Cost
                                                                           removed           dredged


Neches River channel and Beaumont           July 1 to Aug. 16, 1941_.-      1, 049, 677           26, 200        $81, 490.43
turning basins.
Sabine River channel extension and a        July 1 to Sept. 20, 1941 .-         874, 607           8, 450         58, 221.57
new cut-off.
Sabine Pass channel and inner end of        Dec. 11, 1941, to May 12,       1, 178, 660           22, 300        120, 460. 19
  Sabine Pass jetty channel.                  1942.
Port Arthur Canal ------------------        Dec. 29, 1941, to June 30,      5,902,760             32, 466. 5     422, 421.90
                                              1942.



   Maintenance.--Miscellaneous survey work was done, and the Port
Arthur field office was maintained. A levee was constructed around a
spoil disposal area near the Port Arthur turning basins with a United
States dragline at a cost of $4,501.04. Miscellaneous surveys and in-
spections were made at a cost of $10,894.99. Preliminary surveys were
made and plans and specifications prepared for work proposed during
fiscal year 1943 at a cost of $2,125.
   The following dredging work was done:

                                                                                    Cubic            Linear
  Government plant               Location                       Period              yards             feet of       Cost
                                                                                  removed           channel
                                                                                                    dredged
                                                                                                                    Cost


U. S. pipeline dredge      Sabine River at cut-      Feb. 13 to Apr. 6, 1942         273, 563           2, 900 $39, 297.80
  Sam Houston.              off   near    Orange
                             municipal wharves.
U. S. hopper dredge        Sabine Pass outer bar     July 1 to 13, 1941; Apr.     1 2, 493, 504        28, 000    63, 508.83
  Galveston.                 and jetty channels.       1 to May 31, 1942.

  1Bin measurement.

   A total of 2,767,067 cubic yards was removed from a total of 30,900
linear feet of channels and basins at a cost of $102,806.63.
   The total cost of all work for the year was $807,070.87, of which
$686,743.21 was for new work and $120,327.66 for maintenance. The
total expenditures were $787,705.21.
   Condition at end of fiscal year.-The Sabine Pass jetties are com-
pleted to full project dimensions. The existing project for dredging
was about 85 percent completed. The work remaining to be done con-
sists of enlarging the channel connecting Port Arthur west turning
basin with Taylors Bayou turning basin, the Sabine-Neches Canal, and
the Sabine Pass Channel.
   The controlling depths below mean low tide in the various channels
and basins were as follows: Sabine Pass outer bar and jetty channels,
36.0 feet; Sabine Pass Channel, 34.0 feet; Sabine Pass anchorage basin,
30.0 feet; Port Arthur Canal, 36.0 feet; Port Arthur east and west
turning basins, 30.0 feet; channel from Port Arthur west turning basin
to Taylors Bayou turning basin, 32.0 feet; Taylors Bayou turning
basin, 33.0 feet; Sabine-Neches Canal, from head of Port Arthur Canal
to mouth of Neches River, 33.0 feet; Neches River, mouth to and in-
cluding Beaumont turning basin, 34.0 feet; Beaumont turning basin
extension 33.0 feet; Sabine-Neches Canal from mouth of Neches
River to mouth of Sabine River, 30.0 feet; Sabine River, mouth to cut-
off near Orange, Tex., 30.0 feet; Sabine River to Orange municipal
858              REPORT OF CHIEP OF ENGINEERS,                                                  U. S. ARMY,               1942

wharf, 29.0 feet; Sabine River, cut-off to highway bridge at Orange,
Tex., 24.0 feet.
  Thetatalcost of the existing project to June 30, 1942, was as follows:

                                                                                        New work            Maintenance              Total

Regular funds.......................--------------.............--------------------    $8, 342, 770. 40     $6, 751, 149. 89     $15,093,920.29
Public Works funds......................------------------------------............      1, 363, 652. 47                            1, 363, 652. 47
         Total, United States funds ..--------------------                              9, 706, 422. 87      6, 751, 149. 89      16, 457, 572. 76
Contributed funds (existing project)----------------- --                                   353, 500.00 --                            353, 500.00
         Total (all funds)----------------------------------                           10, 059, 922. 87      6, 751, 149. 89      16, 811, 072. 76



   The total expenditures were $16,369,230.88 of which $1i,005,578.41
was from; regulary funds, including; $1,965.49 for Mississippi River
flood-relief work and $1,363,652.47 from Public Works funds. In ad-
dition $353,500 was expended from contributed funds for new work.
   Proposed operations.--The balance unexpended at the end of the
fiscal year, $2,325,651.14, including accounts receivable, will be applied
as follows:
Accounts payable June 30, 1942_ ____             ______________-______ -   $93, 634. 43
New work:
    Complete an existing contract for dredging the
      Port Arthur Canal to project dimensions
      (July 1942) ------------------------------            $58, 771. 09
   Complete an existing contract for dredging Sa-
      bine Pass Channel and inner end. of jetty
      channel to project dimensions (July to Octo-
      ber 1942) ------------------------------              180, 686. 02
   Complete an existing contract for dredging the
      channel connecting Port Arthur west turn-
      ing basin with Taylors Bayou turning basin to
      a bottom width of 200 feet (July to October
      1942)                                                  49, 929. 56
   Dredge Sabine-Neches Canal (Port Arthur Canal
      to mouth of Neches River section) to project
      dimensions (July 1942 to June 1943)                1, 425, 000. 00              --------
         Total for new work_____-----------------------           ----- 1, 714, 386. 67
Maintenance:
    Complete an existing contract for dredging the
      Sabine-Neches Canal and Port Arthur east and
      west turning basins (July to October 1942)__ $160, 000. 00
    Dredge Sabine Pass outer bar and jetty channels
      with United States seagoing hopper dredge
       (November to December 1942) _-------__ -              65, 000. 00
    Dredge inland channels where. necessary by con-
      tract (July 1942 to June 1943) ---------------        292, 630. 04
                 Total for maintenance-----------------------------                                                               517, 630. 04
                 Total for all work______---------------------------                                                           2, 325, 651. 14
   The additional sum of $990,000 can be profitably expended during the
fiscal year 1944, as follows:
Maintenance:
   Dredge inland channels where necessary by contract (July 1943 to
      June 1944) --------------   -----------------------------     $600, 000
   Dredge Sabine Pass outer bar and jetty channels with United
           States seagoing hopper dredge (August, September, October
           1943)- ----        ------------                    --- - --                                                                90,000
         Repair Sabine Pass east jetty by contract (July 1943 to June 1944)                                                          300, 000
          Total -------------------------               ----------------                                                             990, 000
              RIVERS AND               HARBORS--GALVE'STON,                      TEX., DISTRICT                       859

                                       Cost and financial summary

Cost of new work- to June 30, 194---$---------------------                                          114,      887, 254. 38
Cost of maintenance to June 30, 1942-- ---------------------                                               9, 130, 826. 67
      Total cost of permanent work to June 30, 1942-----------24, 018, 081. 05
Undistributed costs June 30, 1942__ ___-_________------------       1,109. 94

      Net total cost to June 30, 1942________   _____24,                                                     019, 190. 99
Plus accounts receivable June 30, 1942-----------------------                                                  4, 182. 61

      gross total costs to June 30, 1942--------------------                                           24, 023, 373. 60
                                            --------------
Minus accounts payable June 30, 1942________-                                                               93, 634. 43

     Net total expenditures_________-------------------                                              123, 929, 739. 17
Unexpended balance June 30, 1942__----------------------                                     ----          2, 321, 468. 53

        Total amount appropriated to June 30, 1942------------            26, 251, 207. 70
  1 In addition, $931,006.78 was expended from contributed funds for new work.

   Fiscal year ending June 30                1938             1939             1940             1941               1942

Cost of new work  __              $1, 005, 719. 95        $849, 185. 05     $348, 656. 45   $321, 377. 23       $686, 743. 21
Cost of m aintenance--...........     222, 970. 90         225, 209. 96      331, 132. 74    496, 281. 62        120, 327. 66

        Total cost-        -       -    1, 228,690.85     1,074, 395. 01     679, 789. 19    817, 658.85          807, 070. 87
Total expended....             -        1, 185, 064. 26   1, 214, 690. 01    664, 626. 88     778, 273. 95        787, 705. 21

Allotted_------------------             1, 911, 200. 00     846, 800. 00     819, 500. 00   1,023, 000. 00      1, 543, 015. 73


Balance unexpended July 1, 1941_________________       __11                                            $1, 566, 158: 01
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942-.....--   -------------------                                                      1, 710. 000. 00
      Amount to be accounted for ______-____--__                                                         3, 276, 158. 01
Deductions on account of revocation of allotment--- ----                                               -166,1__--984. 27

      Net amount to be accounted for--_. ------------                                           _          3, 109, 173. 74
Gross amount expended--_____-----________-__                                                   _-             787, 705. 21

      Balance unexpended June 30, 1942_                           2, 321, 468. 53
                                                            ________-_------
Outstanding liabilities June 30, 1942________         $24. 10
Amount covered by uncompleted contracts -------- 553, 912. 18
                                                                     553, 936. 28

                                             --   -
     Balance available June 30, 1942_- ___________--                                    -       _          1, 767, 532.25
Accounts receivable June 30, 1942_____---_-___-.                                                                4, 182. 61

           Unobligated balance available June 30, 1942 ------------                                        1, 771, 714. 86
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance 2 ------------                                 ________                      990, 000. 00
   2   Exclusive of available funds.

2. THE LOUISIANA AND TEXAS INTRACOASTAL WATERWAY FROM THE
  MISSISSIPPI RIVER AT OR NEAR. NEW ORLEANS, LA., TO CORPUS
   CHRISTI, TEX. (SABINE RIVER--CORPUS CHRISTI SECTION)

  Location.--This section of the Intracoastal Waterway extends from
a point on the Sabine River about 3 miles below Orange, Tex., to
Corpus Christi, Tex., a distance of about 2931/2 miles; with a flood-
discharge channel, about 7 miles in length, in the Colorado River,
extending from Matagorda, Tex., to the Gulf of Mexico; a tributary
,860   REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,            1942

channel in the San Bernard River, extending from the Intracoastal
Waterway crossing to the State highway bridge some 30 miles above
the crossing; a tributary channel, in the Colorado River, extending
from the Intracoastal Waterway upstream a distance of 17 miles; a
tributary channel about 9 miles in length extending from the Intra-
coastal Waterway to Palacios, Tex.; a tributary channel about 2
miles in length extending from the Intracoastal Waterway to Rock-
port, Tex.; and a tributary channel about 6 miles in length extending
from the Intracoastal Waterway near Port Aransas, Tex., to the town
of Aransas Pass, Tex. (See U. S. Coast and Geodetic Survey Charts
Nos. 1116, 1117, 592, 533, 1279, 1280, 1282, 1283, 1284, 1285, and 1286.)
   Previous projects--Sabine River-Galveston Bay section.-None.
   (1) West Galveston Bay and Brazos River Canal, Tex., River and
Harbor Acts of July 13, 1892, July 8, 1896, and June 13, 1902, the
latter providing for the purchase of the Galveston and Brazos River
Canal, and the act of March 2, 1907.
   (2) Channel between Brazos River and MatagordaBay, Tex., River
and Harbor Acts of June 25, 1910, and March 2, 1919. The act of
July 25, 1912, provided for the construction of highway bridges at
points where the waterway intersected existing county roads.
   (3) Channel from Pass Cavallo to Aransas Pass, Tex., River and
Harbor Acts of March 2, 1907, and July 25, 1912.
   For further details see pages 941, 944, and 947 of Annual Report for
1926, and page 845 of Annual Report for 1938.
   Existing project.-The existing project provides for a channel 9
feet deep at mean low water over a bottom width of 100 feet, with
such passing places, widening at bends, locks or guard locks, and
railway bridges over artificial cuts as are necessary from the Sabine
River to Corpus Christi, Tex.; for the purchase or construction of a
20-inch pipe-line dredge; for the maintenance of a suitable flood dis-
charge channel in the Colorado River from Matagorda, Tex., to the
Gulf of Mexico; for a tributary channel 9 feet deep and 100 feet
wide in the San Bernard River, extending from the main channel
to the State highway bridge some 31 miles above the mouth of the
:stream for a tributary channel in the Colorado River 9 feet deep
and 100 feet wide, extending from the main channel upstream a dis-
tance of 17 miles, with a turning basin of the same depth, 400 feet
wide and 500 feet long at the head of the improvement; for a tributary
channel 9 feet deep and 100 feet wide from Palacios, Tex., through
Trespalacios and Matagorda Bays to the main channel; for a tributary
channel 9 feet deep and 200 feet wide from the main channel to
the harbor at Rockport, Tex., and improvement of that harbor to
,a depth of 9 feet; for a tributary channel 6 feet deep and 100 feet
wide from the main channel near Port Aransas, Tex., to the town
of Aransas Pass, Tex., ending in a basin of the same depth, 300 feet
wide and 700 feet long; and for operating and care of the waterway.
From the Sabine River (3 miles below Orange, Tex.) to the Port
Arthur Canal, from Port Bolivar to the west end of Galveston Channel,
and from Aransas Pass to Corpus Christi, the waterway follows deep
water channels improved under other projects.
   The mean tidal variation is 0.5 foot at Orange, 1 foot at Port
Arthur, 1 foot in Galveston Bay, 1.8 feet at Freeport, 1 foot in
Matagorda Bay, and 1 foot at Corpus Christi. The extreme ranges
                 RIVERS      AND HARBORS--GALVEST'ON,                     TEX.,     DISTRICT           861

of tide under ordinary conditions are 1 foot at Orange, 1.5 feet at
Port Arthur, 2.3 feet in Galveston Bay, 2.5 feet at Freeport, 1.5 feet
in Matagorda Bay, and 1.5 feet at Corpus Christi. The height of tides
is dependent largely on the wind. Strong north winds have depressed
the water as much as 2 feet below mean low tide.
   The 9-foot tributary channel in the Colorado River is subject to
the provision that no dredging shall be done by the United States
within 50 feet of any wharf or structure excepting the highway
bridge which crosses the river at mile 8.3.
   The 9-foot tributary channel from Palacios, Tex., through Tres-
palacios and Matagorda Bays is subject to the provision that no
dredging shall be done by the United States within 50 feet of any
wharf or structure.
  The estimate of cost of new work revised in 1942 is $8,360,000, ex-
clusive of amounts expended on previous projects. The latest (1938)
approved estimate for annual cost of maintenance is $637,500, includ-
ing $12,000 for operating and care of bridges.
  The existing project was authorized by the following river and
harbor acts:

    Acts                           Work authorized                                   Documents


Mar. 3,1925        Channel 9 feet deep and 100 feet wide, from Sabine   H. Doc. No. 238, 68th Cong., 1st sess.
                    River to Galveston Bay, and for a 20-inch pipe-
                    line dredge.
Jan. 21,1927       Channel 9 feet deep and 100 feet wide, from Gal-        Do.
                    veston Bay to Corpus Christi.
Aug. 26, 1937      Maintenance of a flood-discharge channel in the      Senate committee print, 75th Cong.,
                    Colorado River.                                       1st sess.
June 20,1938       Channel 9 feet deep and 100 feet wide in San Ber-    H. Doc. No. 640, 75th Cong., 3d sess.
                    nard River, Tex.
    Do .-.....     Channel in the Colorado River, 9 feet deep and       H. Doc. No. 642, 75th Cong., 3d sess.
                    100 feet wide, with a turning basin.
    Do -.-..       Channel 9 feet deep and 100 feet wide from           H. Doc. No. 564, 75th Cong., 3d sess.
                    Palacios through Trespalacios and Matagorda
                    Bays.
    Do --        . Channel 9 feet deep and 200 feet wide from the       H. Doc. No. 641, 75th Cong., 3d sess.
                    main channel to the harbor at Rockport, and
                    improvement of that harbor to a depth of 9
                    feet.
    Do-.-...       Channel 6 feet deep and 100 feet wide from the       H. Doc. No. 643, 75th Cong., 3d sess.
                    main channel to Aransas Pass, Tex.


  The project documents and H. Doc. No. 230, 76th Cong., 1st sess., contain the latest published maps.

   Operating and care of the waterway was included in the project
July 1, 1935, under the provisions of the Permanent Appropriations
Repeal Act approved June 26, 1934.
   For report on the 12-foot Gulf Intracoastal Waterway, see page 629.
   Recommended modifications of project.-The following modifica-
tions of the existing project for the Louisiana-Texas Intracoastal
Waterway were recommended by the Chief of Engineers on the dates
shown-
   (a) March 15, 1939. To provide a channel 12 feet deep with a bottom
width of 125 feet from the Mississippi River through Harvey Lock,
         493202-43--pt 1 vol. 1 -55
862    REPORT   OF CHIEF OF    ENGINEERS,    U.   S. ARMY,   1942

near New Orleans, La., to Corpus Christi, Tex., generally following
the route of the existing waterway, subject to such modifications in
cut-offs and other questions of alinement as may be approved by the
Chief of Engineers, at an estimated first cost of $5,200,000, in addition
to that necessary to complete the existing project, and with an annual
maintenance of $200,000, in addition to that now required, subject to
certain conditions of local cooperation (H. Doc. No. 230, 76th Cong.,
1st sess.).
   (b) July 5, 1939. To provide a branch channel 6 feet deep and 60
feet wide, from a point on the waterway near Port O'Connor, Tex., into
Barroom Bay, Tex., at an estimated first cost of $6,300, with annual
maintenance of $1,000, in addition to that now required, subject to
certain conditions of local cooperation (H. Doc. No. 428, 76th Cong.,
1st sess.).
   (c) June 19, 1941. To provide a channel 9 feet deep and 100 feet
wide from the Intracoastal Waterway at Port Aransas, Tex., extend-
ing approximately 6.1 miles to a turning basin of the same depth and
300 feet wide by 700 feet long at Aransas Pass, Tex., at an estimated
first cost of $48,000, with no increase in the approved annual cost of
maintenance, subject to certain conditions of local cooperation (H.
Doc. No. 383, 77th Cong., 1st sess.).
   (d) September 15, 1941. To provide a channel 9 feet deep and 100
feet wide from Corpus Christi to Port Isabel via Laguna Madre and a
channel 9 feet deep and 100 feet wide from this waterway to the vicin-
ity of Harlingen via Arroyo Colorado with turning basin 9 feet deep,
400 feet wide, and 500 feet long at the upper end, all at an estimated
first cost of $2,500,000, with $250,000 annually for maintenance in addi-
tion to that now required, subject to certain conditions of local cooper-
ation (H. Doc. No. 402, 77th Cong., 1st sess.).
   Local cooperation.-The main channel from the Sabine River to
Corpus Christi, Tex., was authorized subject to the provisions that
local interests defray the cost of constructing or remodeling all high-
way bridges, together with their subsequent maintenance and opera-
tion, and furnish, without cost to the United States, all rights-of-way
and necessary spoil-disposal areas; that work on the Sabine River-
Galveston Bay section not be commenced prior to the receiving by the
Secretary of War of satisfactory assurances relative to the availabil-
ity, by the date of its completion, of adequate vessels, terminals, and
auxiliary equipment for the economical handling of at least 400,000
tons annually; that the general carrier service required for the New
Orleans-Sabine River section be extended to terminals on Galveston
Bay, and at Houston; and that work on the Galveston Bay-Corpus
Christi section not be commenced prior to the receiving by the Secre-
tary of War of satisfactory assurances relative to the availability, by
the date of its completion, of adequate vessels, terminals, and auxili-
ary equipment for the economical handling of at least 300,000 tons
annually.
   Local interests have complied with all of the above requirements.
   The tributary channel in the San Bernard River was authorized
subject to the provisions that work not be undertaken without assur-
ance of extension of the Intracoastal Waterway to the river, and that
local interests furnish, free of cost to the United States, all lands,
easements, rights-of-way, and spoil-disposal areas for initial work
             RIVERS   AND HARBORS-GALVESTON,   TEX.,   DISTRICT    863
and for subsequent maintenance, hold and save the United States
free from any damages resulting from the improvement, and agree
to provide suitable terminal facilities, including turning basins,
wharves, etc., and to maintain an adequate portion thereof open to
the general public on equal terms to all (H. Doc. No. 640, 75th Cong.,
3d sess.).
   The tributary channel in the Colorado River was authorized sub-
ject to the provision that local interests provide, without cost to the
United States, all lands, easements, rights-of-way, and spoil-disposal
areas for initial work and for subsequent maintenance, give assurances
satisfactory to the Secretary of War relative to the provision of nec-
essary terminal and transfer facilities, including a highway connec-
tion, and hold and save the United States free from any damage
resulting from the execution and maintenance of the improvement
 (H. Doc. No. 642, 75th Cong. 3d sess.)'.
   The tributary channel to Palacios, Tex., was authorized subject to
the provision that local interests provide and maintain a suitable har-
bor basin and furnish, free of cost to the United States, all rights-of-
way and suitable spoil-disposal areas for initial work and for subse-
quent maintenance (H. Doc. No. 564, 75th Cong., 3d sess.).
   The tributary channed to Rockport, Tex., was authorized subject
to the provision that local interests furnish, free of cost to the
United States, necessary rights-of-way and suitable spoil-disposal
areas for initial work and for subsequent maintenance, and hold and
save the United States free from any damages resulting from the
improvement (H. Doc. No. 641, 75th Cong., 3d sess.).
   The tributary channed to Aransas Pass, Tex., was authorized sub-
ject to the provision that local interests furnish, free of cost to the
United States, necessary rights-of-way and spoil-disposal areas for
initial work and for subsequent maintenance, and hold and save the
United States free from any damages resulting from the execution
and maintenance of the improvement (H. Doc. No. 643, 75th Cong.,
3d sess.).
   Local interests have complied with all of the above requirements
except those pertaining to the tributary channel in the Colorado
River, none of which has been complied with.
   Terminal facilities.-There are terminal facilities at Orange, Port
Arthur, Galveston, Freeport, Port Aransas, and Corpus Christi,
where this waterway follows channels improved under other projects.
(See Port Series, Nos. 6 and 14, Corps of Engineers.) There are
privately owned piers and wharves at Palacios, Rockport, and Aran-
sas Pass, and a municipal pier at Palacios and Aransas Pass. The
facilities are adequate for existing commerce.
   Operations and results during fiscal year--New work.-Work of
preparing plans and specifications for floodgates for the Brazos and
Colorado Rivers crossings was performed at a cost of $26,811.17.
From July 1 to September 30, 1941, work of constructing log booms
at the Brazos and Colorado River crossings was performed at a
cost of $1,187.33. Preliminary surveys chargeable to dredging the
tributary channels in the San Bernard and Colorado.Rivers were
made at a cost of $3,688.98. From January 12 to March 20, 1942,
a temporary removable dam was constructed across the waterway
on the east side of the Brazos River under contract at a cost of
$47.588.94. From January 25 to June 30, 1942, under a contract
864             REPORT OF CHIE'               OF   ENGINEERS,             U.         S.   ARMY,           1942

for constructing two floodgate structures at the Brazos River cross-
ing, 75,020 cubic yards of material were excavated from the flood-
gate sites, 30,690 cubic yards of material were placed in fills, 130.31
linear feet of protection levee were constructed, 843 linear feet of
timber piles and 18,458 square feet of steel sheet piles were driven,
access roads involving 48,000 cubic yards of earthwork and 3,024
cubic yards of shell surfacing were constructed, and miscellaneous
work was performed at a total cost of $185,926.95. From April 27
to June 16, 1942, two power lines, totaling approximately 24,000
linear feet in length, were constructed to the sites of the floodgates
at the Brazos River crossing, under a contract, at a cost of $5,814.
A total of 4,078,095 cubic yards of material was removed from a total
length of channel of 82,579 feet under contracts at a cost of
$200,622.86, as follows:

                                                                                        i"    Linear feet
                Location                               Period                      Cubicyards   channel
                                                                                    removed ofdredged                  Cost
                                                                                                     dredged




Freeport Harbor to Caney Creek_ July 1 to Nov. 18, 1941 ...                   ._     2, 111, 604        48, 480      $90, 169.06
Caney Creek to Colorado River__ July 1 to Nov. 17, 1941-....                       -_1, 807, 231        30, 949       88, 270. 83
Tributary channel to Rockport,  July 25 to Oct. 16, 1941-..---            _          -159, 260           3, 150       22, 182.97
     Tex.


   Maintenance.-Miscellaneous surveys were made at a cost of
$35,187.10. Preliminary surveys chargeable to constructing two jet-
ties at the mouth of the Colorado River were made at a cost of $527.65.
Work of reestablishing reference lines and erecting signs along the
waterway between Port Arthur and Port Aransas, Tex., was per-
formed at a cost of $4,466.96. From July 1 to September 10, 1941,
under a contract for constructing a concrete spillway and an earth
dike adjacent to the waterway in the Aransas Migratory Waterfowl
Refuge in Aransas County, 333 cubic yards of shell concrete were
placed in the spillway and 35,899 cubic yards of material were placed
in the earth dike at a cost of $10,732.67. From August 15 to Septem-
ber 30, 1941, under a contract for constructing mooring dolphins at
two passing places between Port Arthur and Port Bolivar, Tex., 5,595
linear feet of timber piles were driven at a cost of $7,429.73. A total
of 9,698,263 cubic yards of material was removed from a total length
of channel of 418,346 feet at a cost of $884,096.01, as follows:

                                                                                                    Linear
Government plant                   Location                     Period                 yards re- rchannel
                                                                                                    feet of             Cost
   or contract                                                                          moved
                                                                                                   dredged

U. S. pipe-line            Colorado River to Gulf,       July 1 to Dec. 16,            1,375,477          40, 795 $118,476.80
dredge   Sam               Tex.                           1941.
     Houston.
Contract ---------.        Galveston    Channel to       Aug. 4, 1941, to June         2, 351,506         59, 408    128, 794.35
                             Bastrop Bayou.               30, 1942.
      Do---.........       Freeport Harbor to San        Sept. 20 to Dec. 8,           1,485, 828         52, 613    110, 208. 92
                             Bernard River.                1941.
      Do---...........     East shore of San Antonio     Oct. 20, 1941, to             1, 724, 476      118, 000     146, 401. 17
                             Bay to Aransas Bay.           Mar. 24, 1942.
      Do-...--........     Colorado River to Pala-       Nov. 15, 1941, to             1, 470, 010        74, 800    155, 579. 72
                            cios Point.                    Mar. 2, 1942.
U.     S.   pipe-line      East of Brazos River __       Dec. 1 to 24, 1941.__             13, 064             200    10, 244. 93
     dredge Omega.
       Do...-........- West of Brazos River_ _           Dec. 25 to 31, 1941___            16, 146           235      10, 270. 12
       Do ----------- Between Gulf, Tex., and            Jan. 1 to 27, 1942.....          136, 158         7,000      20, 583. 76
                        Big Boggy Bayou.
                   RIVERS         AND HARBORS-GALVESTON,                              TEX.,     DISTRICT             865


Government plant                       Location                     Period
                                                                                        Cubic
                                                                                       yards re-
                                                                                                    feet
                                                                                                     Linear
                                                                                                         of
                                                                                                    channel        Cost
    or contract                                                                                                    Cost
                                                                                        moved       dredged


U. S. pipe-line                  Colorado River to Shell      Jan. 28 to Mar. 15,       207, 501      16, 370    $39,172. 32
  dredge Omega.                   Island Reef.                  1942.
    Do-- _ _      .. -          Vicinity of Brazos River___   Mar. 16 to 22, 1942__      23, 778      1, 420       4, 851. 33
    Do ..........               Vicinity of Port O'Connor,    Mar. 23 to Apr. 10,        51, 019      2, 400      13, 201.82
                                  Tex.                          1942.
     Do------                -_ In Aransas Bay south of       Apr. 11 to 13, 1942__.       1,667           300     4, 442. 73
                                  Rockport, Tex.
     Do--------_                Vicinity       of Colo-       Apr. 14 to May 8,          133, 886      7, 352     31, 968. 84
                                rado River.                     1942, and June 3 to
                                                                17, 1942.
     Do....._          ___    Between Brazos River            May 9 to June 2,          226, 254      10, 740     16, 364.06
                               and San Bernard River.           1942.
   Do.............            Colorado River crossing-__      June 18 to 30, 1942___     28, 989          438     10, 442. 48
U. S. pipe-line               East of Brazos River......      Apr. 7 to 17, 1942 .__     26, 491       5, 050      9, 644. 41
  dredge Sam Hous-
  ton.
     Do........-----     -    Between Freeport Harbor         May 1 to 20, 1942 ...      105, 281      5, 300     14, 320. 51
                                and Brazos River.
     Do..___-____             Between Brazos River            May 21 to June 30,        320,732       15,925      39,127.74
                               and San Bernard River.          1942.



   Operating and care.-The Mud Bayou railway bridge, near High
Island, Tex., was operated and maintained by hired labor at a cost of
$13,370.44. Log booms at the Brazos and Colorado Rivers were oper-
ated at a cost of $1,835.29. From March 20 to June 30, 1942, a tempo-
rary removable dam at the Brazos River crossing was operated at a
cost of $7,890.49. From April 4 to June 30, 1942, the U. S. derrick
boat No. 8 drove 440 linear feet of timber piles in the construction of
fenders at the'temporary removable dam at the Brazos River crossing
at a cost of $860.38. From July 1 to October 31, 1941, the Caney
Creek highway bridge, near Sargent, Tex., was operated and was then
abandoned and sold, resulting in a credit of $406.37.
   The total cost of all work during the fiscal year was $1,437,630.58,
of which $471,640.23 was for new work, $942,440.12 for maintenance,
and $23,550.23 for operating and care. The total expenditures were
$1,467,837.45.
   Condition at end of fiscal year.-The existing project was about 55
percent completed. The dredging of the main channel from the Sabine
River to Corpus Christi, Tex., was completed except for necessary re-
alinement of the waterway at the Brazos and Colorado River crossings
so it will conform to the locations of the floodgates to be constructed
at these crossings. The dredging of the tributary channels to Pala-
cios, Rockport, and Aransas Pass, Tex., was completed. Construc-
tion of a railway bridge near High Island, Tex., was completed. Con-
struction of two floodgate structures at the Brazos River crossing was
about 16-percent completed. The work remaining to be done consisted
of dredging the tributary channels in the San Bernard and Colorado
Rivers, completing the floodgates and appurtenant structures at the
Brazos River crossing, constructing floodgates at the Colorado River
crossing, and changing the alinement of the waterway at the Brazos
and Colorado River crossings so it will conform to the locations of the
floodgates to be constructed at these crossings.
   The controlling depths at mean low water were 9 feet from the
Sabine River to Galveston, Tex.; 71/ feet from Galveston to Freeport
Harbor; 7 feet from Freeport Harbor to the Colorado River; 7 feet
866     REPORT OF CHIEF OF ENGINEERS,               U. S. ARMY,         1942

from the Colorado River to Port O'Connor, Tex.; 7 feet from Port
O'Connor to Corpus Christi, Tex.; 5 feet in the flood-discharge channel
in the Colorado River; 7 feet in the lower 26-mile reach and 31/2 feet
in the upper reach of the tributary channel in the San Bernard River;
6 feet in the lower 8-mile reach, and from 0 to 2 feet in the upper
reach of the tributary channel in the Colorado River; 6 feet in the
tributary channel to Palacios, Tex., 8 feet in the tributary channel to
Rockport, Tex., and 5 feet in the tributary channel to Aransas Pass,
Tex.
   The total cost of the existing project to June 30, 1942, was $6,488,-
683.12, of which $4,015,530.08 was for new work, $1,834,250.87 for
maintenance, and $172,425.59 for operating and care from regular
funds, and $466,476.58 for new work from Public Works funds. The
total expenditures were $6,441,836.82, of which $5,975,360.24 was from
regular funds and $466,476.58 from Public Works funds. In addition,
$33,172.98 was expended between July 1, 1934, and June 30, 1935, for
operating and care of the works of improvement under the provision
of the permanent indefinite appropriation for such purposes.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $2,469,507.05, together with an allotment of
$1,000,000 made on July 2, 1942, a total of $3,469,507.05, will be ap-
plied as follows:
Accounts payable June 30, 1942_______________________________       _      $46, 846. 30
New work:
    Complete plans and specifications for buildings at floodgate
      sites at Brazos River crossing (July to September 1942) __                 500. 00
    Complete plans and specifications for floodgates and appurte-
      nant structures at Colorado River crossing (July to De-
       cember 1942)-                                                        12, 842.95
    Complete construction of two floodgate structures and ap-
      purtenant structures at Brazos River crossing, under exist-
      ing contract (July 1942 to March 1943) _______________             1, 294, 000. 00
    Dredge tributary channel in San Bernard River from main
      channel upstream a distance of 291/2 miles, by contract
       (October 1942 to April 1943) ______________________-__-             180, 000. 00
    Preliminary surveys for dredging tributary channel in Colo-
      rado River (July 1942 to June 1943) __---_--------     - -               2, 400. 00
    Construct 2 water wells at floodgate sites at Brazos River
      crossing, by contract (January and February 1943)      __......          6,000.00
    Perform work under a continuing contract for constructing 2
      floodgate structures and appurtenant structures at the
      Colorado River crossing (September 1942 to June 1943)____          1, 000, 000. 00

        Total for new work------------------------------                 2, 495, 742. 95
Maintenance:
    Complete dredging between Galveston Channel and Bastrop
      Bayou, under existing contract (July and August 1942)       -         25, 300. 00
    Complete dredging in Aransas Bay between Rockport and
      Aransas Pass, Tex., by United States pipe-line dredge (Au-
      gust to October 1942)----------------------------                     38, 500. 00
   Complete dredging from Brazos River to San Bernard River,
      by United States pipe-line dredges (July and September
      1942) --    ---------------     -----------------------               25, 000. 00
    Dredge where necessary between Galveston and Freeport
      Harbor, by United States pipe-line dredge (January 1943)_             25, 000. 00
    Dredge where necessary between Freeport Harbor and San
      Bernard River, by United States pipe-line dredges (Feb-
      ruary to April 1943)------       ---------------------               120, 000. 00
    Dredge where necessary between San Bernard River and
      Palacios Point, by United States pipe-line dredges (July to
      September 1942 and April to June 1943) ------------------            150, 000. 00
          RIVERS       AND HARBORS-GALVESTON,                         TEX.,       DISTRICT             867
Maintenance -Continued.
   Dredge where necessary between Port O'Connor and Port
      Aransas, Tex., by United States pipe-line dredges (August
      to December 1942)   _________-_____           -____________                             $120, 000. 00
   Dredge across San Antonio Bay and in Aransas Bay from the
      east shore to deep water, by contract (August 1942 to
       February 1943) -----------------
                            __                                                                 271, 725. 00
   Dredge temporary by-pass channel at site for floodgates at
      Colorado River crossing, by contract (August to October
       1942)                                                                                    60, 000. 00
    Reestablish reference lines and erect signs along waterway
     from Port Arthur to Port Aransas, Tex. (July 1942 to
     June 1943)-----------------------------------------                                        10, 883.85

        Total for ordinary maintenance--______
                                        -                            ______           __       846, 408. 85

Maintenance (operating and care) :
   Mud Bayou Bridge :
        Operation (July 1942 to June 1943)  --                                                  14, 600. 00
        Ordinary maintenance and repairs (July 1942 to June
           1943)                 --       -        --                                            4, 200. 00
    Log booms at Brazos and Colorado River crossings:
        Operation       (July 1942 to June 1943)_________                                        3, 700. 00
       Ordinary maintenance and repairs (July 1942 to June
         1943)_____-__________ ___ ___-____--                                                    1,400.00
    Temporary removable dam at Brazos River crossing:
       Operation (July 1942 to March 1943) -----------------                                    24, 600. 00
       Ordinary maintenance and repairs (July 1942 to March
             ,__-__-____
           1943)__     _--_     ______                                                           1, 000. 00
        Improvement and reconstruction (July 1942 to March
          1943)__ _     ____
                         -_  _-_ ___ _____________-                                              6, 000. 00
    Floodgates at Brazos River crossing:
        Operation (January to June 1943) _--_--------                                           17, 500. 00
        Ordinary maintenance and repairs (January to June
           1943)__ _--        _______________           ________)_
                                                            --                                  4,200. 00
    Improvement and reconstruction (January to June 1943)__-                                    3, 308. 95

          Total for operating and care                  ----------             ----             80, 508. 95

          Total for all work__           __________-------           __3,                     469, 507. 05
  The additional sum of $1,606,200 can be profitably expended during
the fiscal year 1944, as follows:
New work:
   Complete construction of 2 floodgate structures and appurtenant
     structures at Colorado River crossing under continuing contract
     (July to October 1943) ------------------                                                   $500, 000
   Construct buildings at sites of floodgates at Brazos River cross-
     ing, by contract (July to October 1943) -------------------                                   40, 000
   Construct buildings at sites of floodgates at Colorado River cross-
     ing by contract (July to October 1943) ___--------_                                           40, 000
   Dredge permanent channel to replace temporary by-pass channel
     at sites of floodgates at Brazos River crossing, by contract
     (July to September 1943) -----------------------                                             100, 000
   Dredge permanent channel to replace temporary by-pass channel
     at sites of floodgates at Colorado River crossing, by contract
     (September 1943) _-                                                                           30, 000

          Total for new work___                      --
                                                  - _____            __--___          ___--    -710,   000

Maintenance:
   Dredge where necessary between Port Arthur and Port Bolivar,
     Tex., by contract (December 1943 to March 1944)       --          ----                       100, 000
   Dredge where necessary between Galveston, Tex., and Freeport
     Harbor, by contract (August 1943 to January 1944)_                                           150, 000
   Dredge where necessary between Freeport Harbor and deep
     water in Matagorda Bay near Palacios Point, by United States
     pipe line dredge (July 1943 to January 1944)_-                                              175, 000
868          REPORT OF CHIEF OF ENGINEE'RS,                                         U. S. ARMY,                1942

Maintenance-Continued.
   Dredge where necessary between Port O'Connor and Port
     Aransas, Tex., by United States pipe line dredge (January to
     June 1944) ------------------------------------------                                                            $150. 000
   Dredge flood-discharge channel in Colorado River between Mata-
     gorda, Tex., and Gulf of Mexico, by contract (August to
     December 1943) --------------------------------------                                                             150, 000
   Dredge tributary channel to Palacios, Tex., where necessary, by
     contract (September 1943) _--------------------------------                                                         30, 000
   Dredge tributary channel to Aransas Pass, Tex., where necessary,
     by contract (October and November 1943)                                        -----------------                    30, 000

         Total for ordinary maintenance__-------------------------                                                      785, 000

Maintenance (operating and care)
   Mud Bayou Bridge:
        Operation (July 1943 to June 1944)------------------                                                              15, 000
        Ordinary maintenance and repairs (July 1943 to June 1944) __                                                       5, 000
        Improvement and reconstruction (July 1943 to June 1944)_                                                           5, 000
   Log booms at Brazos and Colorado River crossings:
        Operation (July 1943 to June 1944) _________-_________                                                              1, 200
        Ordinary maintenance and repairs (July 1943 to June 1944)_                                                          1, 000
   Floodgates at Brazos River crossing:
        Operation (July 1943 to June 1944) --------------------                                                           30, 000
        Ordinary maintenance and repairs (July 1943 to June 1944)_                                                         8, 000
        Improvement and reconstruction (July 1943 to June 1944).                                                          10, 000
   Floodgates at Colorado River crossing:
        Operation (October 1943 to June 1944)                           __        -------------------                     22, 500
        Ordinary maintenance and repairs (October 1943 to June
          1944)                        -------------------------------- __                                                  6, 000
        Improvement and reconstruction (October 1943 to June
           1944) ---------------------------------------------                                                              7, 500
                 Total for operating and care-------------------------111,                                                       200
                 Total for all work___--------------------------                                                      1,606, 200

                                                Cost and financia summary

Cost of new work to June 30, 1942_______________--___--___                                                     $5, 016, 168. 36
Cost of maintenance to June 30, 1942________________________                                                    3, 460, 313. 34
     Total cost of permanent work to June 30, 1942-----------8, 476, 481. TO
Minus accounts payable June 30, 1942__--____________________     46, 846. 30
     Net total expenditures_________________________                                                            8,429, 635. 40
Unexpended balance June 30, 1942       --------------                                                           2,469, 507. 05
         Total amount appropriated to June 30, 1942_____________ 10, 899, 142. 45

   Fiscal year ending June 30                      1938              1939              1940             1941              1942

Cost of new work---------___                     $21, 205.11     $525, 944. 84 $1, 072, 745. 73      $689, 998.40      $471, 640. 23
                           .
Cost of maintenance .-__---_                     228, 573. 00     205, 579. 18     186, 255. 31       146, 657. 03      965, 990. 35
      Total cost..............---------------    249, 778. 11     731, 524. 02    1, 259, 001. 04     836, 655. 43    1, 437, 630. 58
                           _
Total expended-............-....226, 798. 97                      605, 879. 28    1, 325, 058. 79     845, 919. 26     1, 467, 837. 45

                             1,306, 000. 00
Allotted-.........................                              2, 108, 000. 00     367,000.00      1, 369, 000. 00   1, 785, 455. 80
          RIVERS AND HARBORS-GALVESTON,                      TEX.,   DISTRICT             869
Balance unexpended July 1, 1941_ ________ ____     _ _ _______    $2, 151, 888. 70
Amount allotted from War Department Civil Appro-
  priation Act approved June 28, 1939-------------   $14, 572. 39
Amount allotted from War Department Civil Appro-
  priation Act approved June 24, 1940___ _____       346, 088. 54
Amount allotted from War Department Civil Appro-
  priation Act approved May 23, 1941 _________                 394, 794. 87
Amount allotted from War Department Civil Appro-
priation Act approved April 28, 1942________------- 882, 000. 00
Amount allotted from First Deficiency Appropriation
Act of 1941, April 1, 1941------------------------ 148, 000. 00
                                                                                1, 785, 455. 80

       Amount to be accounted for_____________ __-----------_                   3, 937, 344. 50
Gross amount expended________         ___          $1, 468, 820. 54
Less :
    Reimbursements collected------------    $0. 54
    Receipts from sales___----_--      __- 982. 55
                                                            983. 09
                                                                                1, 467, 837. 45

      Balance unexpended June 30, 1942________---- __----__-_                   2, 469, 507. 05
Otustanding liabilities June 30, 1942__               $14, 128. 86
Amount covered by uncompleted contracts         ---------
                                                   1, 351, 271. 23
                                                                                1, 365, 400. 09

      Balance available June 30, 1942 _________________                _        1, 104, 106. 96

Amount (estimated) required to be appropriated for completion
  of existing project _____________                                             1, 380, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1944:
   For new work 1----------------------------------------                         710, 000. 00
   For maintenance 1_ ___---                                                      896, 200. 00

      Total _------------------------------------------------                   1, 606, 200. 00
  1Exclusive   of available funds including $1,000,000 allotted July 2, 1942.

                           3. GALVESTON HARBOR, TEX.

  Location.--The entrance to this harbor is situated on the Gulf of
Mexico, on the northern portion of the coast of Texas, 328 miles west
of Southwest Pass of the Mississippi River and 278 miles northeast
from the mouth of the Rio Grande. (See U. S. Coast and Geodetic
Survey Chart No. 520.)
  Previous projects.-Adopted by River and Harbor Acts approved
June 23, 1874, June 14, 1880, and August 5, 1886. For further details
see page 1854, Annual Report for 1915, and page 851, Annual Report
for 1938.
  Existing project.-This provides for two rubblestone jetties extend-
ing from Galveston Island (on the south) and Bolivar Peninsula (on
the north) into the Gulf of Mexico (the south jetty being 35,900 feet
long and the north jetty 25,907 feet long), and for a channel 800 feet
wide and 36 feet deep from deep water in the Gulf to a point between
the jetties 2 miles west of the seaward end of the north jetty, thence
800 feet wide and 34 feet deep to Bolivar Roads. The project also
provides for the maintenance by the United States of existing chan-
nels channelward of the harbor lines, 12 feet deep and 100 feet wide,
to the highway-ferry landings on Galveston Island and Bolivar Pen-
870         REPORT          OF CHIEF OF ENGINEERS,                     U.   S. ARMY,      1942

insula, and for the construction of 13 groins to protect the sea wall
along the Gulf shore from about Twelfth to Sixty-first Street, Gal-
veston, Tex.
   Under ordinary conditions the mean tidal range is 2 feet on the
outer bar and 1.64 feet on the inner bar. The extreme ranges are
2.76 and 2.27 feet, respectively. The height of the tides is dependent
largely on the wind, and during strong northers in the winter season
the water surface may be depressed 2 feet below mean low tide.
   The estimated cost of new work, revised in 1938, was $2,872,000, ex-
clusive of amounts expended under previous projects.
   The latest (1935) approved estimate of cost of annual maintenance
is $187,500, of which $7,500 is for channels leading to ferry landings.
The existing project was authorized by the following river and
harbor acts:

    Acts                          Work authorized                                  Documents


Aug.   5,1886    Construction of 2 rubblestone jetties----------   -   H. Doc. No. 85, 49th Cong., 1st sess.,
                                                                         and Annual Report 1886, p. 1311.
Mar.   2, 1907   Extension of the jetties to present project length    H. Doc. No. 340, 59th Cong., 2d sess.,
                  and construction and operation of a dredge.            and Rivers and Harbors Committee
                                                                         Doc. No. 11, 59th Cong., 2d sess.
July 18, 1918    Deepening channel to 35 feet with 800-foot width      H. Doc. No. 758, 65th Cong., 2d sess.
                  for experimental period of 2 years.
Jan. 21,1927     Maintenance of channels .800 feet wide, 35 feet       H. Doc. No. 307, 69th Cong., 1st sess.
                  deep on outer bar and 34 feet on inner bar.
Aug. 30, 19351   Maintenance of channels 12 feet deep, 100 feet        Rivers and Harbors Committee Doe.
                  wide leading to State highway ferry landings.          No. 31, 72d Cong., 1st sess.
   Do-.._ _ __   Construction of 13 groins along Gulf shore from       H. Doec. No. 400, 73d Cong., 2d sess.
                  12th to 61st Sts. in the city of Galveston, at a
                  limit of cost of $234,000 (10 groins were con-
                  structed under this limitation).
Apr. 4, 1938 2 Completion of the project for construction of 13             Do.
                  groins.
Aug. 30, 1935    Deepening channel to 36 feet from the Gulf to a       Rivers and Harbors Committee Doe.
                  point 2 miles west of seaward end of north jetty.     No. 57, 74th Cong., 1st sess. (Con-
                                                                        tains latest published map.)


  1 Previously authorized Sept. 6, 1933, by Public Works Administration.
  2 Public, No. 463, 75th Cong.




   Terminal facilities.-There are no terminals on Galveston Harbor,
but it is the entrance channel leading to extensive terminal facilities
located on Galveston Channel, Texas City Channel, and Houston Ship
Channel. (See Port Series No. 6, pt. I, Corps of Engineers.)
   Operationsand results during fiscal year---Maintenance.-The south
jetty was repaired with concrete and stone under contract from July
1, 1941, to March 30, 1942, by placing 605 tons of riprap, 1,045.3 cubic
yards of seal course concrete and 1,558.9 cubic yards of cap concrete at
a cost of $48,381.66. The north and south jetties were repaired with
stone under a contract from July 22 to November 17, 1941, by placing
848.16 tons of core stone and 5,115.9 tons of new cover stone and picking
up and replacing 198 pieces of existing cover stone on the north jetty;
and by placing 6,988.14 tons of new cover stone on the south jetty, at a
cost of $110,705.61. The north jetty was repaired with stone under
contract from April 27 to June 18, 1942, by placing 708.9 tons of core
          RIVERS         AND HIARBORS-GALVESTON,                       TEX.,   DISTRICT        871

stone and 5,514 tons of new cover stone and by picking up and replac-
ing 218 pieces of existing cover stone at a cost of $64,516.95. The U. S.
seagoing hopper dredge Galveston from December 18, 1941, to March
10, 1942, removed 375,627 cubic yards from the inner bar channel and
790,038 cubic yards from the outer bar channel (bin measurement) at
a cost of $70,605.53. There were additional costs of $4,971.51 for
miscellaneous surveys and inspections and for surveys of groins. The
cost for all work during the fiscal year was $299,181.26, all for main-
tenance. The total expenditures were $264,104.40.
   Condition at end of fiscal year.-The existing project was completed
in 1939. The jetties were completed in 1910. The 35-foot channel was
completed in 1922. The 36-foot depth in the outer channel was com-
pleted in 1938. The groins along the Gulf side of the Galveston sea
wall were completed in 1939. The tidal scour, assisted by dredging,
had previously formed a channel between the jetties 32.5 feet deep at
mean low tide, and 1,450 feet wide between the 30-foot contours.
   The controlling depths below mean low tide were about 34 feet in
the inner-bar channel, 34 feet in the outer-bar channel, and 10 feet in
the highway ferry channel.
   The total cost of the existing project to June 30, 1942, was $6,617,-
776.36, of which $2,8'67,886.03 was for new work and $3,749,890.33 for
maintenance, including $13,121.45 from Public Works funds. The
total expenditures were $6,575,855.25 including $13,121.45 Public
Works funds.
   Proposed operations.-The unexpended balance including accounts
receivable at the end of the fiscal year, $135,701.56, will be applied as
follows :
Accounts payable June 30, 1942____._____________________ $42, 628. 50
Maintenance: Dredge inner and outer bar channels with an available
  United States seagoing hopper dredge (September and October
  1942) ___________           __      _----------------                                   93,073.06

      Total----------------        --------               -----   --    -------------   135, 701.56
  The additional sum of $120,000 can be profitably expended during
the fiscal year 1944, as follows:
Maintenance: Dredge inner and outer bar channels with an available
United States seagoing hopper dredge (January, February, April, and
May 1944) --------------------------------------------------- $120,000

                              Cost and financial summnary

Cost of new work to June 30, 1942_--        -------------       $11, 289, 882. 60
Cost of maintenance to June 30, 1942- -------------------------- 3, 836, 017. 05
      Total cost of permanent work to June 30, 1942----------- 15, 125, 899. 65
Plus accounts receivable June 30, 1942-------------------------         707. 39

      Gross total costs to June 30, 1942------------------------15, 126, 607. 04
Minus accounts payable June 30, 1942--------------------------       42, 628. 50

     Net total expenditures -------------------------------- 15, 083, 978. 54
Unexpended balance June 30, 1942-----------------------------    134, 994. 17

      Total amount appropriated to June 30. 1942                                        218, 972. 71
                                                                                    1--------------5,
872          REPORT OF          CHIEF       OF ENGINEERS,             U.    S. ARMY,                   1942


   Fiscal year ending June 30            1938           1939            1940                    1941              1942


Cost of new work         ___          $173,131.08     $81, 769. 69
Cost of maintenance -107,                  616. 25    101, 983. 07   $105, 325. 52           $207, 022. 08      $299, 181. 26
      Total cost   -   -- -            280, 747. 33   183, 752. 76    105, 325. 52            207, 022. 08       299, 181. 26

Total expended     ----------------    292, 082. 72   182, 292. 51     96, 343. 89            210, 889. 06       264, 104. 40

Allotted    ---------------------
                    _                  278, 000. 00   146, 000. 00    371, 500. 00             86, 000. 00        90, 000. 00



Balance unexpended July 1, 1941__________________________                                                   $309, 098. 57
Amount allotted from War Department Civil Appropriation Act
appsroved Apr. 28, 1942_1__ ____1______________---                                                           90, 000. 00
      Amount to be accounted for -------------------                                                         399, 098. 57
Gross amount expended--------------------------------                                                        264, 104. 40

      Balance unexpended June 30, 19421______________-___--134, 994. 17
Amou nt covered by uncompleted contracts _______-- -_____--   42, 628. 50

                                                        -
           Balance available June 30, 1942______ _____-_------                       -           _            92, 365. 67
Accou nts receivable June 30, 1942__________-____---                                                              707. 39

           Unobligated balance available June 30, 1942_-----                             -             -_     93, 073. 06

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1_____-                                                                           120, 000. 00
  1 Exclusive of available funds.

                               4. GALVESTON CHANNEL, TEX.

   Location.-This channel extends from a point in Galveston Har-
bor between Bolivar Peninsula and Fort Point across the former
inner bar to and along the wharf front of Galveston, and has a length
of about 5 miles and a width of 1,200 feet. (See U. S. Coast and
Geodetic Survey Chart No. 520.)
   Existing project.-This provides for a channel 34 feet deep at mean
low tide and 1,200 feet wide from Bolivar Roads (outer end of the
old inner bar near Fort Point) to Forty-third Street, thence to
Fifty-first Street with a width of 1,200 feet and 32 feet deep, in the
city of Galveston, and for its extension, when the interests of navi-
gation and commerce require it, with a width of 1,000 feet and depth
of 32 feet at mean low tide, to Fifty-seventh Street in the city of
Galveston, and for an extension of the sea wall, which lies along the
Gulf front of Galveston, from its angle at Sixth Street and Broadway
to the south jetty, with protection at its junction with the south
jetty, this extension of the sea wall being for the purpose of protect-
ing the outer end of the channel from the effects of hurricanes.
   Under ordinary conditions the mean tidal range is about 1.1 feet
and the extreme range about 1.6 feet. The height of tide is de-
pendent largely on the wind, and during strong north winds in the
winter season the water surface may be depressed 2 feet below mean
low tide.
   The estimated cost of new work on the channel, revised in 1942, is
$3,100,000, and of the sea-wall extension, revised in 1922, $2,986,000.
The latest (1935) approved estimate for annual cost of maintenance
of the channel is $260,000.
             RIVERS        AND HARBORS-GALVESTON,                        TEX.,     DISTRICT             873
  The existing project was authorized by the following river and
harbor acts:

    Acts                         Work authorized                                   Documents


June 13, 1902    A channel 1,200 feet wide and 30 feet deep from       H. Doc. No. 264, 56th Cong., 2d sess.
                  outer end of the inner bar to 51st St.
Mar.   3, 1905   Purchase or construction of a hydraulic pipe-line
                  dredge.
Mar.   2, 1907   Extension of the channel from 51st St. to 56th St.,   H. Doc. No. 768, 59th Cong., 2d sess.
                  with depth of 30 feet and width of 700 feet.
June 25, 1910    Conditional extension of the channel with a width     H. Doc. No. 328, 61st Cong., 2d sess.
                  of 1,00 feet and depth of 30 feet between 51st and
                  57th Sts.
July 27, 1916    Extension of the sea wall from angle at 6th St. and   H. Doc. No. 1390, 62d Cong., 3d sess.
                   Broadway to a point abreast of the nearest
                   battery at Fort San Jacinto.
Sept. 22, 1922   Further extension of the sea wall to junction with    H. Doc. No. 693, 66th Cong., 2d sess.
                  south jetty and protection of this junction and
                  :for repairing the sea wall in front of the Fort
                   Crockett Reservation.
Jan. 21, 1927    Deepening the channel to 32 feet                      H. Doc. No. 307, 69th Cong., 1st sess.
Aug. 30, 1935    Deepening the channel to 34 feet from Bolivar         Rivers and Harbors Committee Doc.
                   Road to 43d St.                                       No. 61, 74th Cong., 1st sess. (Con-
                                                                         tains latest published map.)



   Local eooperation.-Fully complied with.
   Terminal facilities.-The terminal facilities at Galveston are located
almost entirely on the south side of the channel. The principal
wharves are owned by the city of Galveston and extend from Tenth
Street to Forty-first Street, occupying a total channel frontage of
12,400 feet with a berthing capacity of 31,152 linear feet. Immedi-
ately west of the above wharves there are three privately owned piers
and two slips having a berthing capacity for seven average-size ships.
Two privately owned oil docks having a berthing space of 7,580 linear
feet are located at the foot of Fourth and Fifth Streets, respectively.
A privately owned railroad ferry landing is located at the foot of
Ninth Street, and a highway ferry landing owned by the State of
Texas is located near the outer end of the channel on Fort San Jacinto
Military Reservation. A privately owned floating drydock and marine
railway are located on Pelican Spit opposite Twenty-fourth Street.
The terminal facilities at Galveston are considered adequate for exist-
ing commerce. (For further details see Port Series No. 6, pt. I, Corps
of Engineers.)
   Operations and results during fiscal year--Maintenance.-Thesea-
wall extension was repaired by placing a 1-inch-thick asphalt topping
over the brick pavement by contract from July 1 to 25, 1941; 61,781.96
square yards of tack coat and 78,600.96 square yards of asphalt
topping being placed at a cost of $20,655.43. A small force was em-
ployed occasionally on maintenance of the sea-wall extension rear slope
and brick pavement at a cost of $2,703.42. There were additional
costs of $5,996.08 for miscellaneous surveys and inspection and $2,097.37
for surveys, plans, and specifications for dredging. The total cost for
the fiscal year was $31,452.30 all for maintenance. The total expendi-
tures were $36,390.90.
874          REPORT         OF CHIEiF OF ENGINEERS,                       U.     S. ARMY,            1942

   Condition at end of fiscal year.-At the end of the fiscal year the
channel dredging was about 65 percent completed and the entire project
was about 88 percent completed. The sea-wall extension, with fill and
paving, was completed in 1926. The channel was completed to a depth
of 34 feet from the outer end of the old inner bar at Fort Point Light
to Forty-third Street in the fiscal year 1938. The work remaining to
be done to complete the project is the dredging of the channel to a
depth of 32 feet from Forty-third Street to Fifty-seventh Street with
1,200 feet width from Forty-third Street to Fifty-first Street and 1,000
feet width from Fifty-first Street to Fifty-seventh Street, the work
on this last-named section being contingent on the development of the
water-front facilities on the Chicago, Rock Island & Gulf Railway
and adjacent properties.
   The controlling depth in the channel was 301/2 feet at mean low tide
over a least bottom width of 925 feet.
   The total cost of the existing project to June 30, 1942, was as follows:
                                                                  New work            Maintenance            Total

United States funds:
     Channel---- .------ ------------------------------..         $1, 670, 874. 19     $3, 828, 325. 65   $5, 499, 199. 84
     Sea wall-_----------------  -----------------------           2, 289, 213. 54         143, 948. 56    2, 433, 162. 10

      Total United States funds--_---------                        3, 960, 087. 73     3, 972, 274. 21      7, 932, 361.94
Contributed funds .     -    ........................----------       710, 274. 77   ----------------          710, 274. 77

      Total...--------....------------------------------           4, 670, 362. 50      3, 972, 274. 21     8, 642, 636. 71


  The total expenditures were $7,932,664.27. In addition, $710,274.77
was expended from contributed funds for sea-wall construction.
  Proposed operations.--The unexpended balance including accounts
receivable at the end of the fiscal year, $289,896.42, will be applied as
follows:
Accounts payable June 30, 1941-__-------------------------------    $162. 85
Maintenance :
    Complete an existing contract for dredging the channel (July
      1942 to February 1.943) ------------------------------ 286, 133. 57
    Maintenance of sea-wall extension slope and pavement---------- 3, 600. 00
      Total --------------------------------------------- 289, 896. 42
  The additional sum of $210,000 can be profitably expended during
the fiscal year 1944 as follows:
Maintenance :
   Dredge the channel by contract (May to October 1944)              $----------200,
                                                                          000
    Maintenance of sea-wall extension slope and pavement (July 1943
      to June 1944)    ---------------------------------------------  10, 000
        Total---------------      -------------------------------    210, 000
                                        Cost and financial summary
Cost of new work to June 30, 1942__ ______    _______-__                                       __-- $3, 960, 087. 73
Cost of maintenance to June 30, 1942__ ___________------3,                                              972, 274. 21

      Total cost of permanent work to June 30, 1942------------7, 932, 361. 94
Plus accounts receivable June 30, 1942______    -_______-------465.          18
      Gross total costs to June 30, 1942_   -___________-----_7, 932, 827. 12
Minus accounts payable June 30, 1942________________-------            162. 85
     Net total expenditures--___._----........_                                                       ' 7, 932, 664. 27
Unexpended balance June 30, 1942_-
                                 ....--------                                                              289, 431. 24
     Total amount appropriated to June 30, 1942--                                                       8, 222, 095. 51
   1In addition, $710,274.77 was expended from contributed funds for new work.
               RIVERS      AND HARBORS---GALVESTON,                       TEX.,     DISTRICT               875


      Fiscal year ending June 30        1938           1939             1940          1941              1942

Cost of new work_                     $48, 340. 04
Cost of maintenance_ .-.....          193, 782. 82   $66, 807. 42   $169, 879. 70   $12, 701. 39       $31, 452. 30
        Total cost_ -                 242, 122. 86    66, 807. 42    169, 879. 70    12, 701. 39        31, 452. 30
Total expended                        234, 490. 37    59, 334. 77    177, 717. 39     8, 293. 53        36, 390. 90
Allotted ------------------------      97, 682. 30   195, 000. 00     12, 500. 00   265, 000. 00        20, 000. 00



Balance unexpended July 1, 1941    _______------------$305,                                             822. 14
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942 --------------------------------------                                     20, 000. 00

      Amount to be accounted for ________________-----------325, 822. 14
Gross amount expended_______________________________          36, 390. 90
      Balance unexpended June 30, 1942------------------                                           289, 431. 24
Outstanding liabilities June 30, 1942 _____________--$168. 85
Amount covered by uncompleted contracts---------249, 597. 20
                                                                                                   249, 766. 05
      Balance available June 30, 1942_________________--___--39, 665. 19
Accounts receivable June 30, 1942 ___                            465. 18

          Unobligated balance available June 30, 1942 __________                                    40, 130. 37
Amount (estimated) required to be appropriated for completion
  of existing project 2__________________________                                            1, 430, 000. 00
Amount that can be profitably expended in fiscal year ending
                                 -           -
June 30, 1944 for maintenance2___________     _____  ______                                       210, 000. 00
  2   Exclusive of available funds.

       5. CHANNEL FROM GALVESTON HARBOR TO TEXAS CITY, TEX.

   Location.-Texas City is on the mainland of Texas on the west
side of Galveston Bay, about 10 miles northwest of the city of Gal-
veston. (See U. S. Coast and Geodetic Survey Charts Nos. 520 and
1282.)
   Previous projects.-Adopted by River and Harbor Act approved
March 3, 1899, and enlarged by River and Harbor Act approved
June 25, 1910 (H. Doc. No. 328, 61st Cong., 2d sess.). For further
details see page 1856, Annual Report for 1915, and page 858, Annual
Report for 1938.
   Existing project.-This provides for a channel 34 feet deep at
mean low tide and 300 feet wide on bottom from deep water in Gal-
veston Harbor to the harbor at Texas City, a distance of about 61/2
miles, with a pile dike on its north side 28,200 feet long covered with
clay and other material dredged from the channel, with a harbor
800 feet wide on bottom and 34 feet deep at mean low tide extending
approximately 4,250 feet to the southward of the south property line
of the Texas Sugar Refining Co., and for the construction of a
rubble-mound dike a short distance south of the existing pile dike
and extending between stations - 1+600 (the shore) and 26+000,
a distance of 27,600 feet. Under ordinary conditions the mean tidal
range is about 11/4 feet and the extreme range is about 112 feet. The
height of tide is dependent largely on the wind, and during strong
"northers" in the winter season the water surface may be depressed
2 feet below mean low tide.
876               REPORT OF CHIE F            OF ENGINEERS,              U.     S. ARMY,         1942

  The estimate of cost for new work, revised in 1938, is $2,429,000,
exclusive of amounts expended on previous projects but inclusive of
$28,740.68 contributed by local interests. The latest (1937) approved
estimate of cost of annual maintenance of the channel and dike is
$144,500.
  The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                       Documents


Mar. 4, 1913_ A channel 300 feet wide and 30 feet deep and con-          H. Doc. No. 1390, 62d Cong., 3d sess,
                struction of a pile dike 28,200 feet long north of
                channel.
July     3,1930_    For a harbor 800 feet wide and 30 feet deep at       H. Doc. No. 107, 71st Cong., 1st sess.
                      Texas City and the construction of a rubble
                      mound dike.
Aug. 30,19351 Extension of rubble mound dike to the shore line._         Rivers and Harbors Committee Doc.
                                                                              No. 4, 73d Cong., 1st sess.
    Do------...     Deepening the channel and harbor to 32 feet......    Rivers and Harbors Committee Doc.
                                                                              No. 46, 73d Cong., 2d sess.
    Do   -------    Deepening the channel and harbor to 34 feet .....    Rivers and Harbors Committee Doc.
                                                                              No. 62, 74th Cong., 1st sess.
Aug. 26, 1937_ An extension to the harbor, 1,000 feet southward,         Rivers and Harbors Committee Doc.
                      800 feet wide and 34 feet deep, provided that no        No. 47, 75th Cong., 1st sess.   (Con-
                      dredging be done by the United States within            tains latest published map.)
                      75 feet of any pierhead line or structure.


  1 Previously authorized Sept. 6, 1933, by P. W. A.


   Local cooperation.--Underthe provisions of the River and Harbor
Act of August 26, 1937, local interests are required to furnish free of
cost to the United States necessary rights-of-way and suitable spoil-
disposal areas for new work and for subsequent maintenance as re-
quired and release the United States from claims for damages attrib-
utable to the work of improvement and furnish assurance satisfactory
to the Secretary of War that they will construct a common-carrier
oil terminal substantially as proposed. None of these conditions has
been complied with. All prior requirements have been fully complied
with.
   Terminal facilities.-Modern terminal facilities privately owned,
are located on the mainland at the inner end of this channel and are
considered adequate for existing commerce. (See Port Series No. 6,
pt. 3, revised 1935, Corps of Engineers.) A seatrain terminal, pri-
vately owned, was completed in 1940.
   Operations and results during fiscal year-Maintenance.-The
channel was dredged under contract from March 27 to May 20 and
from June 17 to 30, 1942, 1,973,041 cubic yards of material being re-
moved from channel length of 26,561 feet, at a cost of $133,626.74.
The Texas City rubble-mound dike and clay-fill dike were repaired
under contract from August 19 to October 14, 1941, by picking up and
replacing 361 displaced cover stone, placing 1,452.95 tons of riprap
core and apron stone on the rubble-mound dike and placing 1,141.90
tons of riprap shore protection on the north edge of the clay fill at a
cost of $12,167.46. There were additional costs amounting to $7,319.60
for miscellaneous surveys and inspections. The total cost for the fiscal
             RIVERS      AND HARBORS-GALVESTON,                            TEX.,           DISTRICT             877

year was $153,113.80 all for maintenance. The total expenditures were
$112,837.05.
   Condition at end of fiscal year.-The existing project was 95 per-
cent completed. The work remaining to be done is the extension of
the Texas City, Tex., harbor 1,000 feet southward, as authorized by
the River and Harbor Act of August 26, 1937. The channel and the
harbor basin, except the authorized extension referred to above, were
completed in 1936. The pile dike was completed in 1915; the rubble-
mound dike in 1934. The controlling depth in the completed portion
of the project channel and basin was 35 feet at mean low tide. The
total cost of the existing project to June 30, 1942, was as follows:

                                                            New work             Maintenance            Total

Regular funds                                           _   $2, 151, 680. 52      $3, 396, 301. 73      $5, 547, 982. 25
Public Works funds-_ -                                          136, 295.78                                 136, 295. 78
      Total United States funds _________________________    2, 287, 976. 30       3, 396, 301. 73       5, 684, 278. 03
Contributed funds ....                                            28, 740. 68                                28, 740. 68
      Total all funds___________________________________     2, 316, 716. 98       3, 396, 301. 73       5, 713, 018. 71


   The total expenditures were $5,644,407.49, of which $5,508,111.71 was
from regular funds and $136,295.78 from Public Works funds. In
addition $28,740.68 was expended from contributed funds for new
work.
   Proposed operations.-The unexpended balance at the end of the
fiscal year amounting to $91,315.07 including accounts receivable will
be applied as follows:
Accounts payable June 30, 1942 --------------------------------_ $42, 001. 05
Maintenance:
    Complete an existing contract for dredging the channel (July
         1942)---------------------------
               __                                                                                       12, 965. 50
      Complete an existing contract for repairing the rubber-mound
       dike (July to September 1942)                             __                                     36, 348. 52
           Total -------------------------------------------                                            91, 315. 07
  The additional sum of $141,500 can be profitably expended during
the fiscal year 1944 for removal of shoaling from the channel and turn-
ing basin by contract (March to June 1944).
  No funds have been requested for new work for the fiscal year 1944
because it is not expected that local interests will furnish the required
cooperation by that time.
                                    Cost and financial summary
Cost of new work to June 30, 1942----------------------------                                   $2, 654, 798. 78
Cost of maintenance to June 30, 1942--------------------------                                   3, 591, 384. 94
      Total cost of permanent work to June 30, 1942 .....--.                                         6, 246, 183. 72
Plus accounts receivable June 30, 1942 .----                                          --                  2, 130. 51
      Gross total costs to June 30, 1942------------------------                                     6, 248, 314. 23
Minus accounts payable June 30, 1942-          -         __   _                                          42, 001. 05
         Net total expenditures_                                                                16, 206, 313. 18
Unexpended balance June 30, 1942                              ----------                                89, 184. 56

          Total amount appropriated to June 30, 1942-_                          ___         _    16, 295, 497. 74
   1In   addition, $28,740.68 was expended from contributed funds for new work.
          403202--43--pt. 1, vol. 1--56
;878        REPORT      OF CHIEF OF ENGINEERS,                           U.    S. ARMY,          1942


   Fiscal year ending June 30              1938            1939            1940           1941              1942

Cost ofnew work___
;Cost of maintenance_   _.. - -         $18, 776. 31     $82, 012. 80   $150, 952. 29   $57, 057. 62      $153, 113.80

Total expended -----------------           9, 771.45      87, 167.99     131, 057. 42    81, 208. 37       112, 837. 05

.Allotted---------        ..------------. 194, 200. 00    15, 100. 00     75, 000. 00   205, 000. 00        20, 000. 00



Balance unexpended July 1, 1941 --___---- _________     ___---                                      $182, 021. 61
Amount allotted from War Department Civil Appropriation Act
approved April 28, 1942-----------------------------------                                             20, 000. 00

      Amount to be accounted for                         ---------------------                         202, 021. 61
Gross amount expended__---_-----------__                  --------             ____                    112, 837. 05

     Balance unexpended June 30, 1942-----------------------                                            89, 184. 56
.Amount covered by uncompleted contracts---------------------                                           89,975. 30

      Balance available June 30, 1942 ___-  -_____---------790.                                                  74
Accounts receivable June 30, 1942-----------------------------                                           2, 130. 51

     Unobligated balance available June 30, 1942------------                                             1, 339. 77
Amount (estiinated) required to be appropriated for completion
                    a
   of existing project _                 _________----------------                                     112, 000. 00
Amount that can be profitably expended
                                   -- - -
                                          in fiscal year ending
June 30, 1944, for maintenance 2___ ______                                                            141, 500.00
   a Exclusive of available funds.

                         6. CHANNEL TO PORT BOLIVAR, TEX.

   Location.-Port Bolivar is at the end of Bolivar Peninsula and 4
miles north of the city of Galveston. The channel connects the port
with the channel in Galveston Harbor. (See U. S. Coast and Geodetic
Survey Chart No. 520.)
   Previous projects.-Adopted by the River and Harbor Act of March
2, 1907. For further details see page 1856, Annual Report for 1915,
and page 860, Annual Report for 1938.
   Existing project.--This provides for a channel 30 feet deep at mean
low tide and 200 feet wide on bottom, beginning at deep water in
Galveston Harbor and extending to a turning basin 1,600 feet long,
with an average width of about 750 feet and 30 feet deep at mean low
tide in front of the wharves. Under ordinary conditions the mean
tidal range is about 1.7 feet and the extreme range about 2.3 feet. The
height of tides is dependent largely on the wind, and during strong

,2
"northers" in the winter season the water surface may be depressed
   feet below mean low tide.
   The estimated cost of new work, revised in 1928, is $187,000, exclu-
sive of amount expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance of the channel and
turning basin is $20,000, which provides for a depth of 20 feet in the
channel and 20 feet in the turning basin, 500 feet square, these dimen-
sions being sufficient to accommodate existing commerce which con-
sists of the operation of a railway ferry.
   The existing project was authorized by the following river and
harbor acts:
                 RIVERS     AND HARBORS--GALVESTON,                      TEX.,     DISTRICT             879

       Acts                       Work authorized                                   Documents


June 25, 1910-    Excavation of a channel 30 feet deep and 200 feet    H. Doc. No. 328, 61st Cong., 2d sess.
                    wide, with turning basin 1,000 feet square.
Mar.     2, 1919_ Increase length of turning basin to 1,600 feet and   H. Doc. No. 1122, 65th Cong., 2d sess.l
                    decrease width to about 750 feet.


  I Contains the latest published map.


    Recommended modifications of project.-Under date of June 24,
1926, the Chief of Engineers recommended that the project be cur-
tailed by providing for a channel depth of 20 feet, 200 feet wide, with
a turning basin of the same depth 500 feet square (H. Doc. No. 467,
-69th  Cong., 1st sess.).
    Terminal facilities.-The terminals consist of two privately owned
piers, one 400 feet wide by 1,200 feet long, and the other 1,200 feet long
by 210 feet wide. The facilities are considered adequate for the
.existing commerce.
    A highway ferry landing is now being constructed by the State of
Texas at the south end of the turning basin.
    Operationsand results during fiscal year-Maintenance.-A portion
of the turning basin approximately 500 feet square at the entrance to
slip No. 3 and a small area in front of the proposed highway ferry
landing were dredged under a contract from August 12 to September
-, 1941; 179,653 cubic yards of material being removed at a cost of
 $18,655.55. There were additional costs amounting to 399.78 for mis-
cellaneous surveys and inspections. The total cost for the fiscal year
was $19,055.33, all for maintenance. The total expenditures were
 $18,978.75.
    Condition at end of fiscal year.-The existing project was about 90
percent completed. The channel, 200 feet wide, and turning basin
1,000 feet square, were completed in 1912. To complete the project
the turning basin must be enlarged to project dimensions. Constant
shoaling occurs and project dimensions have not been maintained as
lesser dimensions are sufficient to accommodate existing commerce.
    The controlling depths at mean low tide were 22 feet in the channel
and 18 feet over the area being maintained in the turning basin at the
entrance to slip No. 3.
    The total cost of the existing project to June 30, 1942, was $623,121.88,
of which $85,213.85 was for new work and $537,908.03 for maintenance.
The total expenditures were $623,045.16.
    Proposed operations.-The unexpended balance at the end of the
fiscal year, $38,210.32, will be applied as follows:
Accounts payable June 30, 1942---------------------------------         $76. 72
Maintenance :
    Dredge a portion of the turning basin by contract (October and
      November 1942) -----------       -------------------------- 22, 000. 00
    Dredge a portion of the turning basin (June 1943) ------------- 16, 133. 60
                Toa--------------------------------------------                                  3,21.2
              Total_______,____                                                                  38,210.32
   The additional sum of $20,000 can be profitably expended during
the fiscal year 1944 in maintenance dredging of the turning basin dur-
ing April and May 1944.
880           REPORT OF                 CHIEF OF E'NGINEE:RS,                             U.     S.       ARMY,          1942

  Full project dimensions will not be maintained for the reason that
lesser depth and width are sufficient for commerce at this port.
                                               Cost and financial summary

Cost of new work to June 30, 1942_______________--------------    $133,                                                               924.   60
Cost of maintenance to June 30, 1942_-------------------------- 584,                                                                  008.   78
      Total cost of permanent work to June 30, 1942_______-------717,                                                                 933.   38
Minus accounts payable June 30, 1942_________________                                                                                  76.   72
                                  _-----
                                    ________717,
      Net total expenditures____------- ----                                                                                          856. 66
Unexpended balance June 30, 1942_______________--------------       38,                                                               210. 32
           Total amount appropriated to June 30, 1942 -------------                                                            756, 066. 98

       Fiscal year ending June 30                    1938                1939               1940                  1941                1942


C ost o f ne w work . -.-------------         ...------------   ...----------   ...............-           - -     - - -. .      .     .     .
Cost of maintenance --          -                  $14, 166. 66      $15, 311. 67          $11, 702. 90            $583. 57          $19, 055. 33

Total expended_                 -       - -         14, 128. 63        15, 550. 02         11, 682. 90              603. 43           18, 978. 75

Allotted_    -----------------------                 8, 000. 00        25, 000. 00         17, 500. 00           13, 500. 00          20, 000. 00



Balance unexpended July 1, 19411111                           $37, 189. 07
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942 ------------------------------------  20, 000. 00
      Amount to be accounted for__--------------------------   57, 189. 07
Gross amount expended------------------------------------18, 978. 75
      Balance unexpended June 30, 1942_____________________         38,210. 32
Outstanding liabilities June 30, 1942_-----------------------------      76. 72
      Balance available June 30, 1942 _________________________     38, 133. 60
Amount (estimated) required to be appropriated for completion
of existing project ---_ ___________                              102, 000. 00
Amount that can be profitably expended in fiscal year ending June
   30, 1944, for maintenance                        1   -------            _--------------_--_        _                        20, 000. 00
   1Exclusive of available funds.

                                    7. HOUSTON SHIP CHANNEL, TEX.

   Location.-The channel connects Galveston Harbor, at a point op-
posite Port Bolivar, with the city of Houston, Tex., extending 50
miles in a northwesterly direction across Galveston Bay through the
San Jacinto River and Buffalo Bayou to a turning basin at the head
of Long Reach with a light-draft channel 7 miles long from the turn-
ing basin to Main Street, Houston. (See U. S. Coast and Geodetic
Survey Charts Nos. 1282 and 532.)
   Previous projects.-Authorized by River and Harbor Act of June
10, 1872, modified in 1877, and by River and Harbor Acts of March
3, 1879; March 3, 1899; February 20, 1900; March 3, 1905; and March
4, 1913. For further details see page 1856 of the Annual Report for
1.915 and page 862 of the Annual Report for 1938.
   Existing. project.-This provides for a channel 34 feet deep at
mean low tide from deep water in Galveston Bay to and including
the Houston turning basin, with a width of 400 feet through Galves-
ton Bay, 300 feet in the cut through Morgan Point, 300 feet thence
to a point 5,000 feet above Baytown, thence 250 feet to Norsworthy,
and 200 feet thence to the turning basin (about 1,000 feet wide) with
suitable widening of the bends at Lynchburg, Norsworthy, Man-
chester and Harrisburg. The project also provides for suitable
                    RIVERS    AND     HARBORS-GALVESTON,                    TEX.,     DISTRICT            881

-widening of the channel in front of the wharf at Manchester, for
certain cut-offs and easing of sharp bends, for the construction of a
dike 26,000 feet long to protect the channel in upper Galveston Bay,
and for a light-draft extension of the channel, 10 feet deep at mean
low water and 60 feet wide, without easing the bends, through Buf-
falo Bayou from the turning basin to the mouth of White Oak
Bayou in Houston, Tex.
   The mean tidal range under ordinary conditions is about 1.3 feet
in the lower part of Galveston Bay, 0.6 foot in the upper bay, and
less than 0.5 foot in the San Jacinto River and Buffalo Bayou. The
extreme ranges under ordinary conditions are about 1.6 feet, 1.3
feet, and 1 foot, respectively. Freshets sometimes cause rises of over
12 feet in Buffalo Bayou. The height of the tides, however, is de-
pendent largely on the wind, and during strong northers in the win-
ter season the water surface may be depressed 2 feet below mean
low tide.
   The estimate of cost for new work, revised in 1942, is $10,535,535,
,,exclusive of amounts expended on previous projects, but inclusive
"of $1,365,000 contributed by local interests. The latest (1935) ap-
proved estimate for annual cost of maintenance is $800,000.
   The existing project was authorized by the following river and
harbor acts:

        Acts                        Work authorized                                   Documents


Mar.      3, 1905    Easing or cutting off of sharp bends and con-       Rivers and Harbors Committee Doc.
                      struction of a pile dike.                           No. 35, 61st Cong., 2d sess.
Mar.      2,1919     A channel 30 feet deep, widening bend at Man-       H. Doc. No. 1632, 65th Cong., 3d sess.
                      chester, and existing project dimensions of the
                      turning basin.
Mar.      3, 1925    A light-draft extension of the channel to the       H. Doc. No. 93, 67th Cong., 1st sess.
                      mouth of White Oak Bayou.
.July     3, 1930    Widening the channel through Morgan Point           H. Doc. No. 13, 71st Cong., 1st sess.
                      and to a point 4,000 feet above Baytown and
                      widening certain bends.
Aug. 30, 19351       Deepening to 32 feet in the main channel and        Rivers and Harbors Committee -Doc.
                      turning basin, and for a 400-foot width through     No. 28, 72d Cong., 1st sess.
                       Galveston Bay.
Aug. 30, 1935        Existing project dimensions of the main channel__   Rivers and Harbors Committee Doc.
                                                                          No. 58, 74th Cong., 1st sess. (Con-
                                                                           tains latest published map.)


  1 Previously authorized Sept. 6, 1933, by Public Works Administration.


  Recommended modifications of project.-Under date of March 4,
1939, the Chief of Engineers recommended modification of the exist-
project so as to provide for a branch channel 10 feet deep and 60
feet wide in the old channel of Buffalo Bayou behind Brady Island
at an estimated cost of $21,300 for new work and $3,000 annually
for maintenance, provided that no dredging be done by the United
States within 15 feet of any wharf or structure; subject to certain
conditions of local cooperation (H. Doc. No. 226, 76th Cong., 1st
sess.).
  Under date of April 18, 1939, the Chief of Engineers recommended
further modification of the existing project so as to provide a chan-
nel 34 feet deep from the entrance at Bolivar Roads to and includ-
882    REPORT OF CHIEF OF ENGINEERS,        U. S. ARMY,    1942

ing the turning basin at Houston and two intermediate turning
basins, one at mouth of Hunting Bayou and one at lower end of
Brady Island, the channel widths to be as follows: 400 feet from
Bolivar Roads to a point 5,000 feet above Baytown, 350 feet thence
to mouth of Boggy Bayou, 300 feet thence to lower end of Fidelity
Island, 250 feet thence to the turning basin at the port of Houston,
at a total estimated cost of $3,675,000 for new work, in addition to
the cost of completing the existing project, and an increase in cost of
annual maintenance of $60,000; subject to certain conditions of local
cooperation (H. Doc. No. 256, 76th Cong., 1st sess.).
   Local coopera'tion.-The work authorized by the River and Har-
bor Act of August 30, 1935, is subject to the provisions that local
interests shall furnish, free of cost to the United States, necessary
rights-of-way for the widening of the channel and suitable areas for
the disposal of dredged material during the initial construction and
for future maintenance as and when needed, and release the United
States from all claims for damages to private or municipal property
due to the improvement and its maintenance.
   Cooperation required by the above act has been complied with except
that suitable areas for spoil disposal for future maintenance are to be
furnished as and when needed.
   Terminal facilities.-The city of Houston and the Harris County
Houston Ship Channel navigation district have constructed modern
terminals which supplement privately owned wharves. The exist-
ing. facilities are considered adequate for existing commerce. (See
Port Series No. 6, pt. 2, Corps of Engineers.)
   Operations and results during fiscal year-Maintenance.-The U. S.
pipe-line dredge Raymond dredged in the bayou section from August
                                                        +
14 to October 6, 1941, between stations 805 +00 and 765 00, removing
317,799 cubic yards of material at a cost of $46,500.01; and from
June 17 to 30, 1942, between stations 266 +00 and 236 + 00, removing
74,111 cubic yards of material at a cost of $14,997.08, and from April
15 to June 16, 1942, removing 257,594 cubic yards of material from
the turning basin at a cost of $70,247.82; and in the bay section from
October 7, 1941, to March 24, 1942, between stations 69+200 and
43+ 000, removing 2,200,816 cubic yards of material at a cost of $142,-
220.48. The U. S. seagoing hopper dredge Galveston dredged in the:
bay section from August 14 to October 12, 1941, between stations
107+000 and 138+500, removing 652,236 cubic yards (bin measure-
ment) at a cost of $50,135.82; and from June 1 to 30, 1942, between sta-
tions 73 + 400 and 102 + 100 removing 279,942 cubic yards (bin measure-
ment) at a cost of $29,437.25. The U. S. derrick boat No. 8 removed
snags and other obstructions from the channel from September 6 to
October 12, 1941, and from January 21 to February 4, 1942, at a cost
of $5,456.01. There were additional costs of $5,629.57 for miscel-
laneous surveys and inspections; $5,553.72 for surveys for repairing
channel reference lines; $4,495.90 for preparing dumping grounds and
$1,440.49 for surveys, plans, and specifications for dredging under
contract. The total cost for the fiscal year was $376,114.15, all for
maintenance. The total expenditures were $386,220.53.
   Condition at the end of fiscal year.-The existing project was about
96 percent completed. The channel from Bolivar Roads to and includ-
ing the turning basin has been dredged to project dimensions.
             RIVERS     AND HARBORS-GALVESTON,                       TEX., DISTRICT                   883
   To complete the existing project would require dredging the light
draft extension of the channel above the turning basin and the con-
struction of a dike 26,000 feet long to protect the completed channel
in upper Galveston Bay.
   A side or tributary channel 10 to 12 feet deep and 3,700 feet long
has been dredged from the ship channel to the mouth of Goose Creek.
   The controlling depths at mean low tide along the center line of
the channel were as follows: Through Galveston Bay, 33 feet; thence to
Vinces Bayou, 33 feet; thence to turning basin, 33 feet; in the turning
basin, 34 feet; thence to Houston, 7 feet. The controlling depth in
the channel to the mouth of Goose Creek was about 6 feet.
   The total cost of the existing project to June 30, 1942, was as follows:
                                                  New work            Maintenance             Total


Regular funds _    ___________________        _   $7, 319, 603. 01     $8, 559, 379. 73   $15, 878, 982. 74
Public Works funds_ _ ________________________     2, 612, 931. 98                          2, 612, 931. 98
     Total                                         9, 932, 534. 99      8, 559, 379. 73    18, 491, 914. 72

  The total expenditures were $18,495,273.57, of which $15,882,341.59
was from regular funds and $2,612,931.98 from Public Works funds.
In addition $1,365,000 was expended from contributed funds for new
work.
  Proposed operations.-The unexpended balance including accounts
receivable, at the end of the fiscal year, $711,081.65, will be applied as
follows:
Accounts payable June 30, 1942_------------------------------------                               $4. 35
Maintenance:
    Complete an existing contract for dredging (August to December
        1942)                                                                             261, 677. 30
     Removal of shoals from the channel with United States pipe-line
      dredge (July 1942 to June 1943) ---------------------------    340,000. 00
     Removal of shoaling from the lower bay section of the channel
       with an available United States seagoing hopper dredge (July
        and August 1942) -------------------                                 --            64, 000. 00
     Removal of shoals from light draft channel with United States
       plant and hired labor (April to June 1943) ______-______                            24, 000. 00
     Removal of trees and stumps from the channel by United States
       plant and hired labor as needed during the fiscal year 1943____                        9, 000. 00
     Building levees and preparing dumping grounds with United
       States plant and hired labor (July 1942 to June 1943) __-----                      -1.2, 400. 00
             Total_------- --------------------------------                               711, 081.65
  The additional sum of $583,000 can be profitably expended during
the fiscal year 1944 as follows:
Maintenance:
    Remove shoaling in the channel with United States pipe-line dredge
      (July 1943 to June 1944)_ ----------------------------------      $340, 000
    Removal of shoaling from lower bay section of channel with an
      available United States seagoing hopper dredge (February and
      March 1944) -----            ---------------------------------
                                        _----------                       60, 000
   Remove shoaling in the channel by contract (January to April
      1944) ----------------------------------------------------- 145, 000
    Remove obstruction from the light draft channel by United States
      plant and hired labor as needed during the fiscal year 1944....     20, 000
   Remove trees and stumps from the channel by United States plants
      and hired labor as needed during the fiscal year 1944-...........    8, 000
    Building levees and preparing dumping ground with United States
      plant and hired labor (July 1943 to June 1944) --------             10, 000
        Total --------------------------------                           583, 000
884          REPORT OF CHIEF OF ENGINEERS,                                    U. S. ARMY, .1942

                                     Cost and financial summary
Cost of new work to June 30, 1942___------------------------ $14, 037, 691. 86
Cost of maintenance to June 30, 1942-----------------------9, 772, 522. 13
       Total cost of permanent work to June 30, 1942---------123, 810, 213. 99
Plus accounts receivable June 30, 1942--------------------------    3, 363 .20

Gross total costs to June 30, 1942_----------------------------_                                      23, 813, 577. 19
Minus accounts payable June 30, 1942 --------------------------                                                  4. 35
     Net total expenditures __--1---                                     --                        123, 813, 572. 84
Unexpended balance June 30, 1942_ _---------                               ----------                   707, 718. 45

           Total amount appropriated to June 30, 1942 ---------- __                                124, 521, 291. 29
  1 In addition, expenditures from contributed funds were $1,209,178.78 for new work and
$200,000 for maintenance on previous projects and $1,365,000 for new work on existng
project.


   Fiscal year ending June 30             1938             1939                 1940           1941               1942


Cost of new work___                  $437, 089. 96      $506,082.83          $501,099. 39    $333,671.15 ..............
Cost of maintenance ______      __    336, 335. 70       226, 079. 68         354, 671. 42    308, 259. 26 $376. 114. 15

      Total cost_ _-                   773, 425. 66      732, 162. 51         855, 770. 81   641, 930. 41        376, 114. 16

Total expended_ -_                     750,025. 06       665, 888. 12         845, 616. 91   738, 039. 36        386,220.53

Allotted       -                     1, 561, 069. 52   1, 071, 500. 00        844. 500. 00   159, 000. 00        433, 000. 00



Balance unexpended July 1, 1941___                                                                          $660, 938. 98
Amount allotted from War Department Civil Appropriation Act
   approved April 28, 1942 --------------                                   -------                         453, 000. 00

     Amount to be accounted for               -----              1, 113, 938. 98
Deductions on account of revocation of allotment----------------     20, 000. 00

      Net amount to be accounted for__-----------------------1, 093, 938. 98
Gross amount expended__ ______       ---------                  386, 220. 53

      Balance unexpended June 30, 1942                                                                       707, 718. 45
Outstanding liabilities June 30, 1942_-                  $4. 35
Amount covered by uncompleted contracts----------- 243, 887.46
                                                                                                             243, 891. 81

     Balance available June 30, 1942---------------------------                                              463, 826. 64
Accounts receivable June 30, 1942___
                                 -----------------------------                                                 3, 363. 20

           Unobligated balance available June 30, 1942---------------                                        467,189. 84

Amount (estimated) required to be appropriated for completion
of existing project 2____________ _________                __--           _                                 603, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance
                              - -- - - -- - -- - - -- - -- - -- - - -- - -- -- -                      --     583, 000. 00
   2 Exclusive of available funds.

                                     8. DOUBLE BAYOU, TEX.

  Location.-This bayou enters upper Galveston Bay on the east side,
about 30 miles north of Galveston and about 81/4 miles south of Ana-
huac. (See U. S. Coast and Geodetic Survey Chart No. 1282.)
  Existing project.-The existing project provides for a channel 6
feet deep at mean low tide and 100 feet wide through the bar at the
mouth of Double Bayou. Under ordinary conditions the mean tidal
            RIVERS        AND HARBORS                    GALVESTON,    TEX., DISTRICT                         885

range is about 0.7 foot and the extreme range is about 0.9 foot. The -
height of tides is dependent largely on the wind, and, during strong:
"northers" in the winter season, the water surface may be depressed-
1 /2 feet below mean low tide.
   The estimate of cost for new work revised in 1928 was $12,500. Thee
latest (1928) approved estimate for annual cost of maintenance is;
$10,000.
   The existing project was authorized by the River and Harbor Act
approved March 3, 1899 (H. Doc. No. 387, 55th Cong., 2d sess.). The
latest published map is contained in the project document.
   Terminal facilities.-The terminal facilities on this waterway are
confined to small wharves for local use. They are considered adequate
for the present commerce.
    Operations and results during fiscal year.-The U. S. pipe-line
dredge Omega, from September 27 to October 8, 1941, removed 117,538
cubic yards of material, of which 43,489 cubic yards was new work
at a cost of $3,356.55 and 74,049 cubic yards was for maintenance
at a cost of $5,713.33. Miscellaneous surveys were made at a cost of
$360. The total costs and expenditures for the fiscal year were
$9,429.88, of which $3,356.55 was for new work and $6,073.33 was for
maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1941. The controlling depth was 6 feet at mean low tide.
The total costs and expenditures on the existing project to June
30, 1942, were $128,556.55, of which $10,309.75 was for new work and
$118,246.80 for maintenance.
   Proposed operations.-No funds are available for fiscal year 1943
and none are requested for work in fiscal year 1944.
                                    Cost and financial summary
Cost of new work to June 30, 1942-------------------------------                                       $10, 309. 75
Cost of maintenance to June 30, 1942                             _--          ------                   118, 246. 80

      Total cost of permanent work to June 30, 1942.    ----
                                                          _     128, 556. 55
Net total expenditures_---------------------------------------- 128, 556. 55
Total amount appropriated to June 30, 1942--------------------128, 556. 55

   Fiscal year ending June 30            1938             1939         1940                1941            1942

Cost of new work .......-                                                -                - -              $3.356. 55
Cost of maintenance_-_ _--                      . -   --...                         ---      -              6, 073. 33
      Total cost-           _         -- ---
                                     -..          - --                          _                           9, 429. 88
Total expended ----- -   -------                                                                            9,429.88
Allotted_    _      --              .-                                                       $15,000       -5,570.12



Balance unexpended July 1, 1941 -             -----------                                              $15, 000. 00
Deductions on account of revocation of allotment__-------                                                5, 570. 12

      Net amount to be accounted for-------------------------                                            9,429. 88
Gross amount expended------------------------------------------                                          9, 429. 88:

                                   9. ANAHUAC CHANNEL, TEX.

Location.-The town of Anahuac is on the northeast side of upper
Galveston or Trinity Bay, opposite the mouth of the Trinity River,
886      REPORT OF CHIEF OF            ENGINEE!RS,      U.   S. ARMY,      1942

38 miles north of Galveston and 25 miles northeast of Seabrook. (See
U. S. Coast and Geodetic Survey Chart No. 1282.)
   Existing project.-There is no definite project for this channel.
The River and Harbor Act approved March 3, 1905, contained an item
for "Improving West Galveston Bay Channel, Double Bayou, and
mouths of adjacent streams, including Trinity River, Anahuac Chan-
nel, and Cedar Bayou," but at the time of the appropriation no recom-
mendation of definite channel dimensions had been made to Congress.
A channel 6 feet deep at mean low tide and 80 feet wide was dredged
in 1905 from Galveston Bay to the wharves at Anahuac, a distance
of 16,000 feet. Under ordinary conditions the mean tidal range is
about 0.7 foot and the extreme range is about 0.9 foot. The height
of tide is dependent largely on the wind, and during strong "northers"
in the winter season the water surface may be depressed 11/2 feet below
mean low tide.
   The latest (1928) approved estimate for annual cost of maintenance
is $12,500. The latest published map is contained in House Document
No. 440, Fifty-sixth Congress, first session.
   Terminal facilities.-The terminal facilities are at Anahuac and
consist of several small privately owned wharves and slips for local
use. They are considered adequate for existing commerce.
   Operationsand results during fiscal year-Maintenance.-Thechan-
nel was dredged under a contract from July 1 to 23, 1941, removing
243,449 cubic yards of material at a cost of $21,831.30. The U. S.
derrick boat No. 8 from July 7 to September 5, 1941, removed 3,467
obstructions from the channel at a cost of $6,260.95 and from Novem-
ber 4 to 26, 1941, removed 471 obstructions from the channel at a cost
of $2,365.13. Miscellaneous surveys were made at a cost of $1,884.02.
The total cost for the fiscal year was $32,341.40, all for maintenance.
The total expenditures were $32,634.02.
   Condition at end of fiscal year.-The existing project was completed
in 1911. The controlling depth was 3.5 feet at mean low tide.
   The total cost to June 30, 1942 was $334,487.82, of which $5,975.10
was for new work and $328,512.72 for maintenance. The total ex-
penditures were $334,526.55.
   Proposed operations.-The unexpended balance, including accounts
receivable, at the end of the fiscal year, $24,365.98, will be applied as
follows:
Maintenance:
   Remove shoaling from the channel by contract (October and No-
       vember 1942)                                    ---
                                                   -____________-
                                                           -_ _   ---   $17, 365. 98
                                                                   _ ----
      Removal of logs and snags from the channel with United States
        plant and hired labor as required during the fiscal year_ ___             7, 000. 00

         Total __________----___-----------------                               24, 365. 98
  The additional sum of $25,000 can be profitably expended during
the fiscal year 1944 as follows :
Maintenance :
   Removal of shoaling from the channel by contract (January and
      February 1944)                                                          $20, 000
                                                       ___---------------------------------------
   Removal of logs and snags from the channel by United States plant
      and hired labor as needed during the fiscal year 1944-------- ---          5, 000

         Total --.----    ---------------------------------------                   25, 000
             RIVERS AND HARBORS-GALVESTON,                                       TEX., DISTRICT                    887

                                         Cost and financial summary

Cost of new work to June 30, 1942_____________________________                                             $5, 975. 10
Cost of maintenance to June 30, 1942--------------------------_                                           328, 512. 72
      Total cost of permanent work to Jdne 30, 1942                                                       334, 487. 82
Plus accounts receivable June 30, 1942_                    _______
                                               -________-______-                                                38. 73
         Gross total costs to June 30, 1942                            _______                            334, 526. 55

Net total expenditures___________________________                                                         334, 526. 55
Unexpended balance June 30, 1942 -                             ---                                          24, 327. 25

         Total amount appropriated to June 30, 1942_________________                                      358, 853. 80

   Fiscal year ending June 30                  1938            1939            1940          1941              1942

Cost of new work ... ..   ..   ...   .. ..    .. ... .. .. .. ... .. .. .. ... .. .. ..       --        -
Cost of maintenance                          $30, 585. 16     $2, 080. 53   $19, 082. 57   $17, 646. 62       $32, 341. 40
Total expended                                30, 629. 77      2, 073. 34    19, 477. 12    17, 152. 72        32, 634. 02

Allotted________                              33, 500. 00     37, 000. 00    25, 000. 00    10, 000. 00        18, 837. 04



Balance unexpended July 1, 1941                                                                           $38, 124. 23
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942___________________________________                                                  20, 000. 00
         Amount to be accounted for______________________                                                   58, 124. 23
      Deductions on account of revocation of allotment__                                                     1, 162. 96
      Net amount to be accounted for______________         _                                        _       56, 961. 27
Gross amount expended-----------------------------------------                                              32, 634. 02

     Balance unexpended June 30, 1942_____________________                                                  24, 327. 25
Accounts receivable June 30, 1942_______________________--------                                                 38. 73

         Unobligated balance available June 30, 1942__                                 __________           24, 365. 98

Amount that can be profitably expended in fiscal year ending June 30,
                          - - - - - - - - - - - - - - - - - - - - - - -- -
1944 for maintenance - __                                                                                  25, 000. 00
  a Exclusive of available funds.


                                        10. TRINITY RIVER, TEX.

  Location.--This river rises in north-central Texas and flows south-
easterly about 760 miles, discharging into Galveston Bay, 37 miles
northeasterly from Galveston.
  Previous projects.-The project outlined in House Document No.
409, Fifty-sixth Congress, first session, was adopted in part by the
River and Harbor Acts of June 13, 1902, March 3, 1905, March 2,
1907, June 25, 1910, July 25, 1912, March 4, 1913, and July 27, 1916,
each of which acts authorized the construction of certain-named locks
and dams. The provisions of all of these acts for this improvement,
so far as they related to lock and dam construction, were repealed by
the River and Harbor Act of September 22, 1922. For further details,
see page 1113 of Annual Report for 1921, and page 986 of Annual
Report for 1932.
  Existing project.-This provides for a channel 6 feet deep and of
navigable width from the mouth to Liberty, 41.4 miles above the mouth.
At low water tidal influence extends about 50 miles above the mouth,
888     REPORT OF CHIEF OF ENGINEE:RS,             U.   S. ARMY,   1942

the mean tidal range at the mouth being about one-half foot. The
ordinary variation between high and low water at Liberty is 14 feet,
extreme 26.3 feet.
   The estimate of cost, made in 1920, exclusive of amounts expended
on previous projects, was $72,000 for new work and $20,000 annually
for maintenance.
   The River and Harbor Act of September 22, 1922, having directed
the abandonment of the improvement of the Trinity River from Lib-
erty to Dallas (H. Doc. No. 989, 66th Cong., 3d sess.), the improve-
ment of the remainder, from Liberty to the mouth, continues as pro-
vided for by the River and Harbor Act of July 25, 1912. The latest
published map is in House Document No. 409, Fifty-sixth Congress,
first session.
   Recommended modifications of project.-Under date of September
4, 1941, the Chief of Engineers, recommended approval of a compre-
hensive plan of improvement as outlined in the district engineer's
report and construction, at this time, of Benbrook, Little Elm, and
Grapevine Reservoirs, the modification of Garza Dam, and the im-
provement of levees and floodways at Fort Worth and Dallas, for flood
protection and water conservation in the Trinity River Basin, and pro-
vision of a navigable channel from Houston Ship Channel to Liberty,.
with a project depth of 9 feet, 200 feet wide in Galveston Bay and 150
feet wide in the river section, and with a turning basin at Liberty, Tex.;
at an estimated Federal cost of $15,000,000 for construction and $155,-
000 annually for maintenance and operation; subject to certain condi-
tions of local cooperation (House Doc. No. 403, 77th Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-The only wharves on this river are all in the
first 20 miles above the mouth. They are four in number and range
from 10 to 20 feet in length. All are privately owned, and usage
is free at all except one. One has a hand derrick; the other three
have no freight-handling facilities. They have no physical connection
with any railroad. They are adequate for the existing commerce, and
there is ample room for future enlargement.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing'project was completed
in 1925. The ruling depth at low water was 6 feet between the mouth
and mile 29 and 4 feet thence to Liberty. The total cost and expendi-
tures under the existing project to June 30, 1942, were $264,946 of
which $112,255.72 was for new work and $152,690.28 was for mainte-
nance.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $59,921.81, will be applied as follows:
Maintenance: Removal of trees and snags from the channel with
United States plant and hired labor, as required during the fiscal
year 1943 -------------------------                                $11,961.8
Balance available ----------------------------------------------     47, 960. 00
      Total ----------------------------------------------------      59, 921.81
   The additional sum of $10,000 can be profitably expended during the
fiscal year 1944, for removal of trees and snags from the channel with
United States plant and hired labor, as required during the fiscal year
1944.
              RIVERS        AND HARBORS-GALVESTON,                              TEX.,       DISTRICT                   889
                                          Cost and financial summary
'Cost of new work to June 30, 1942---------------------------   $2, 002, 661.37
Cost of maintenance to June 30, 1942_--------------------------   2696, 352. 59
           Total cost of permanent work to June 30, 1942                     ------------             2, 699, 013. 96

Net total expenditures----------------------                                                       12 2, 699, 013.96
Unexpended balance June 30, 1942--------------------------                                                59, 921. 81
           Total amount appropriated to June 30, 1942-------                                       12 2, 758, 935. 77

   Fiscal year ending June 30                1938            1939             1940            1941                1942


C ost of new w ork --   -   - -   -        - - -    ---    - - -    -     - - - - -   -   - - -   - - -         -- -       -- -
Cost of maintenance __________________________                               20, 504. 22
                                                                            $______________ $70, 507. 55   -     -----
                ...
Total expended _____________________________                                 20, 412:24      70, 599. 53               -

Allotted      _   -         -         -                   $100, 000. 00       5,000. 00      26, 933. 58         $19, 000. 00



Balance unexpended July 1, 1941__------------------------------                                            $40, 921. 81
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942--------------------------------------                                             19, 000. 00

      Amount to be accounted for -----------------------------                                                 59, 921. 81
Balance unexpended June 30, 1942-----------------------------                                                  59, 921. 81

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance ----------------------------------_                                                 10,000.00
  1 In addition, $66,000 was expended from contributed funds for new work.
  2 Includes $252,6,59.92 from permanent indefinite appropriation, 1984.-1909.
  : Exclusive of available funds.

                                          11. CEDAR BAYOU, TEX.

   Location.-This bayou is about 30 miles long. It flows to the south
and empties into the northwest corner of upper Galveston Bay, about
1 /2 miles below the mouth of San Jacinto River and about 281/2 miles
north of Galveston, Tex. (See U. S. Coast and Geodetic Survey Chart
No. 1282.)
   Previous projects.-Adopted by the River and Harbor Acts of Sep-
tember 19, 1890, and July 13, 1892. For further details see page 869,
Annual Report for 1938.
   Existing project.-This provides for a channel 10 feet deep at mean
low tide and 100 feet wide from the Houston Ship Channel to a point
on the bayou, 11 miles above the mouth. The project also includes the
jetties at the mouth of the bayou provided for under the previous
project. Under ordinary conditions the mean tidal range is about 0.6
foot and the extreme range 1.3 feet. The height of tides is dependent
largely on the wind, and during strong "northers" in the winter season
the water surface may be depressed 2 feet below mean low tide.
   The estimate of cost for new work made in 1930, exclusive of amounts
expended on previous projects, is $50,000, of which $25,000 is to be con-
tributed by local interests. The latest (1930) approved estimate for
annual cost of maintenance is $20,000.
   The existing project was adopted by the River and Harbor Act of
.July 3, 1930 (S.Doc. Ng, 107, 71st Cong., 2d sess.). The latest pub-
lished map is in this document.
   Local cooperation.--The River and Harbor Act, approved July 3,
1930, provides that local interests shall contribute 50 percent of the
890         REPORT        OF CHIEF OF     ENGINEERS,        U.    S. ARMY,         1942

estimated first cost of the improvement, but not to exceed $25,000, and
shall furnish, without cost to the United States, all necessary easements,
rights-of-way, and dumping grounds.
   These conditions have not been completely met, but local interests
have complied with all the necessary requirements to complete the
channel to the first bend in Cedar Bayou above the mouth.
   Terminal facilities.-The terminal facilities consist of a few small
wharves, privately owned, for local use located at various places along
Cedar Bayou, an oil-loading wharf owned by the Atlantic Pipe Line
Co. located one-half mile above the mouth of the bayou, and an oil-
loading wharf owned by the Sinclair-Prairie Oil Co. located 11 miles
above the mouth of the bayou. The present facilities are considered
adequate for existing commerce.
   Operationsand results during fiscal year--Maintenance.--TheU. S.
pipe-line dredge Omega, from October 8 to November 10, 1941, removed
322,133 cubic yards of material at a cost of $25,479.80. Miscellaneous
surveys were made at a cost of $650. The total cost and expenditure
for the fiscal year was $26,129.80, all for maintenance.
   Condition at end of fiscal y ear.-The existing project was about 50
percent completed. The channel has been completed to project dimen-
sions from the Houston Ship Channel to the first bend in Cedar Bayou
above the mouth. Two brush and stone jetties have been constructed
at the mouth of Cedar Bayou. To complete the project the bayou must
be dredged to project dimensions from the first bend above the mouth
to a point 11 miles above the mouth. The controlling depths at mean
low tide were 10 feet from the Houston Ship Channel to the first bend
in Cedar Bayou above the mouth and 7.5 feet thence to a point in the
bayou 11 miles above the mouth. The total cost of the existing project
to June 30, 1942, was $169,284, of which $25,151.13 was for new work
 (consisting of $12,575.56 United States funds and $12,575.57 con-
tributed funds) and $144,132.87 for maintenance. The total expendi-
tures were $169,284, of which $156,708.43 were United States funds
and $12,575.57 contributed funds.
   Proposed operations.-Nofunds are available and no work required
during fiscal year 1943.
   The additional sum of $25,000 can be profitably expended during the
fiscal year 1944 in removal of shoals from the channel by contract
 (November and December 1943).
                                Cost and financial summary

Cost of new work to June 30, 1942-------------------------------- $51, 662. 71
Cost of maintenance to June 30, 1942_______________________ ____ 213, 917. 00
           Total cost of permanent work to June 30, 1942______________                  265, 579. 71
Net total expenditures___________----------------                                    265, 579. 71
Total amount appropriated to June 30, 1942___________________                       1265, 579. 71

   Fiscal year ending June 30      1938       1939            1940          1941            1942

Cost of new work .-
Cost of maintenance         -                               $24, 548. 81     $35. 87       $26, 129. 80
Total expended ._ .....                                      24, 530. 69       53. 99       26, 129. 80
Allotted                                    $1.......$40,
                                                 090000                    22 00. 00       - 11, 285. 52
              RIVERS AND HARBORS-GALVESTON,                                     TEX.,      DISTRICT            891
Balance unexpended July 1, 1941________-------------- ---------                                         $37, 415. 32
Deductions on account of revocation of allotment-----------------                                        11, 285. 52

       Net amount to be accounted for___-------_---------26,                                                 129. 80
Gross amount expended---------                                                           -----           26, 129. 80
Amount (estimated)       required to be appropriated for completion of
                   2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
  existing project                                                                                       12, 500. 00
Amount that can lie profitably expended in fiscal year ending June
  30, 1944, for maintenance---------------------------------_                                            25, 000. 00
   1 In addition, $12,575.57 was expended from contributed funds for new work.
   2 In   addition, $12,424 to be contributed by local interests.

                                        12. CLEAR CREEK, TEX.

  Location.-ClearCreek has its source about 13 miles south of Hous-
ton, Tex., and flows southeast for a distance of about 25 miles, empty-
ing into the west side of upper Galveston Bay at a point 24 miles
northwest of Galveston, Tex. (See U. S. Coast and Geodetic Survey
Chart No. 1282.)
  Existing project.-This provides for a channel 6 feet deep at mean
low tide and 60 feet wide from deep water in Galveston Bay to the
bridges 1 mile above the mouth of Clear Creek. Under ordinary
conditions the mean tidal range is about 0.6 foot and the extreme
range 1.3 feet. The height of tides is dependent largely on the wind,
and during strong "northers" in the winter season the water surface
may be depressed 2 feet below mean low tide. The original estimate
of cost for new work, made in 1900, was $10,000.
   The latest (1935) approved estimate for annual cost of mainte-
nance is $6,000.
   The existing project was authorized by the following river and
harbor acts:

      Acts                           Work authorized                                        Documents


June 13, 1902__   A channel 4 feet deep and 50 feet wide _ __                H. Doc. No. 449, 56th Cong., 1st sess.
Aug. 30, 1935__   Enlargement of the channel to depth of 6 feet and          H. Doc. No. 264, 73d Cong., 2d sess.
                    width of 60 feet.                                          (Contains latest published map.)



   Recommended modifications of project.-Under date of July 11,
1941, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for a channel 7 feet deep and 75 feet
wide from deep water in Galveston Bay to a new entrance to Clear
Creek, and a channel 7 feet deep and 60 feet wide in Clear Creek
and Clear Lake to the county highway bridge at League City at an
estimated cost of $30,000 for new work with $4,000 annually for
maintenance in addition to that now required; subject to certain
conditions of local cooperation (H. Doc. No. 319, 77th Cong., 1st sess.)
    Terminal facilities.-The terminal facilities consist of small, pri-
vately owned wharves for local use located at the town of Seabrook,
at the mouth of the creek, and at various points along the length of
the waterway. They are considered adequate for existing commerce.
    Operationsand results during fiscal year.-Maintenance.-The U. S.
pipe line dredge Omega, from November 11 to 24, 1941, removed
92,568 cubic yards of material from the channel, at a cost of
892       REPORT OF CHIEF OF ENGINE.ERS, U. S. ARMY,                                                                 1942

$10,955.23. Miscellaneous surveys were made at a cost of $597.44.
The total cost and expenditure for the fiscal year was $11,552.67, all
for maintenance.
   Condition at end of fiscal year.-The existing project was completed
in 1936. The controlling depth at mean low tide was 6 feet. The
total cost and expenditure to June 30, 1942, was $95,444.67 of which
$14,290.95 was for new work and $81,153.72 for maintenance.
   Proposed operations.-There are no funds available and no work
required during fiscal year 1943.
   The additional sum of $12,000 can be profitably expended during
the fiscal year 1944 in the removal of shoals in the channel by con-
tract as required during the fiscal year 1944.
                                        Cost and financial summary

Cost of new work to June 30, 1942______________________________ $14, 290. 95
Cost of maintenance to June 30, 1942___________________________  81, 153. 72
       Total. cost of permanent work to June 30, 1942_____________                                                         95, 444: 67
Net total expenditures____________-________                                                                                95, 444. 67
Total amount appropriated to June 30, 1942                                       ----------                                95, 444. 67

   Fiscal year ending June 30                  1938                   1939              1940                  1941            1942


Cost ofnew work-.... .             .       .     .          .     .     .    .      .     .     .         .      .     .    .     .
Cost of maintenance_______              _____________           ______________          $447. 33 -                           $11, 552.
                                                                                                                                     67
Total expended   ____________________.................___                                447. 33     --                       11, 552. 67
Allotted-.................       -
                      -....... ...                                 $12,0 000
                                                                           0


Balance unexpended July 1,1941                              -----------------------------                              $11, 552. 67
Gross amount expended_ _______-_____                                             -__________-___-              __       11, 552. 67
Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance_ .___________      ____-- _____        -___                                                         12, 000. 00

                                    13. DICKINSON BAYOU, TEX.

   Location.-This bayou enters Galveston Bay on the west side about
20 miles northwest of Galveston. (See U. S. Coast and Geodetic
Survey Chart No. 1282.)
   Existing project.-This provides for a channel 6 feet deep and 60
feet wide at mean low tide along the present route from the natural
6-foot depth in Galveston Bay through Dickinson Bay and Dickinson
Bayou to the Galveston, Houston & Henderson Railroad bridge at
Dickinson. Under ordinary conditions the mean tidal range is about
0.9 foot and the extreme range about 1.6 feet. The height of tides is
dependent largely on the wind, and during strong north winds in the
winter season the water surface may be depressed 21/2 feet below mean
low tide.
   The estimated cost for new work, revised in 1938, was $42,000. The
latest (1938) approved estimate for annual cost of maintenance is
$12,500.
   For an explanation for the authority of the original dimensions
(4 feet by 50 feet) of this channel, see page 1093 of Annual Report
for 1931. The River and Harbor Act approved June 20, 1938, author-
              RIVERS            AND HARBORS-GALVESTON,                                       TEX.,       DISTRICT              893
ized the present project dimensions (H. Doc. No. 568, 75th Cong.,
3d sess.). The latest published map is in this document.
   Local cooperation.-The work authorized by the River and Harbor
Act approved June 20, 1938, is subject o the provisions that local
interests shall furnish, without cost to the United States, all lands,
easements, and rights-of-way and spoil-disposal areas for the initial
work and for subsequent maintenance as required. These conditions
have not been complied with since no rights-of-way and spoil-disposal
areas were needed for initial construction.
   Terminal facilities.-The terminal facilities consist of small pri-
vately owned wharves for local use. They are considered adequate
for the existing commerce.
   Operations and results during fiscal year.-Miscellaneous sur-
veys were made at a total cost and expenditure of $600, all for mainte-
nance.
   Condition at end of fiscal year.-The existing project was completed
in 1940. The controlling depth was 6 feet at mean low tide.
   The total cost and expenditure to June 30, 1942, was $90,096.20, of
which $33,942.37 was for new work and $56,153.83 for maintenance.
   Proposed operations.-No funds are available and no work required
during fiscal year 1943. The sum of $15,000 can be profitably expended
in maintenance dredging of the channel by contract as required during
the fiscal year 1944.
                                          Cost and financial s111um1ry

Cost of new work to June 30, 1942___                                                                                     $33, 942. 37
Cost of maintenance to June 30, 1942                                                                                      56, 153. 83

           Total cost of permanent work to June 30, 1942__                                                                90, 096. 20
Net total expenditures------------------                                                                                  90, 096. 20
Total amount appropriated to June 30, 1942________________________                                                        90, 096. 20

   Fiscal year ending June 30                    1938                    139              1940              1941             1942


Cost of new work     --------    ___      -------------         --------------          $24, 881. 98      $2, 773. 11
Cost of maintenance ...            . ..     -----         -     -------------- --------------          ----------                   $600
Total expended ------------------                             -------------
                                                                        -                15, 531.86        12, 123. 23               600

Allotted              - -                 -                               $35, 000            -            4, 255. 09         -11,000



Balance unexpended                 July 1, 1941__---------                                                               $11, 600.00
Deductions on account of revocation of allotment_--                                                        --             11, 000. 00

      Net amount to be accounted for-----------------------                                                                  600. 00
Gross amount expended-----------------------------------------                                                               600. 00

Amount that can be profitably expended in fiscal year ending June
   30, 1944, for maintenance----                                                 ---------------------                    15, 000. 00

                                       14. FREEPORT HARBOR, TEX.

  Location.-This harbor is formed by the improvement of the
Brazos River, Tex., from the mouth to Freeport, about 6 miles above.
(See U. S. Coast and Geodetic Survey Chart No. 525.)
  The mouth of the Brazos River is about 47 miles southwest of
Galveston Harbor entrance and about 137 miles northeast of Aransas
Pass (Port Aransas).
           493202-43-pt. 1, vol. 1-57
 894           REPORT OF CHIEF OF ENGINEE.RS,                       U.   S.   ARMY, 1942

     Previous projects.-Authorized by River and Harbor Act of June
  14, 1880. For further details see page 1860 of Annual Report for
  1915, and page 872 of Annual Report for 1938.
    ,Existing project.--This provides for a channel 32 feet deep from
  deep water in the Gulf of Mexico to a point about one-half mile
  below the Stauffer chemical plant with two turning basins, one 700
  by 700 feet at Brazosport and one 600 by 600 feet at the upper end
  of the channel, the channel to have a width of 300 feet seaward of
  the jettied entrance, 200 feet from jettied entrance to the Brazos-
port turning basin, widened at the bend, and averaging 375 feet,
thence to the upper turning basin; the widths in the approaches to
the turning basins to converge within a distance of 800 feet from the
width of the turning basin to the width of the channel; and provides
also for the extension of the channel with a depth of 30 feet and a
width of 200 feet to and including the turning basin near the Stauf-
fer chemical plant at Freeport at a cost of $18,000 when required in
the interests of commerce and navigation. The work to be accom-
plished as may be found desirable, by dredging, by jetties at the
mouth of the harbor, and by a diversion dam in the Brazos River, a
diversion channel, and necessary auxiliary works in general accord-
ance with plan No. 6, as proposed by the district engineer, together
with a lock in the diversion dam, approximately 200 feet long, 55 feet
wide and 121/2 feet deep over the miter sills. The River and Har-
bor Act of July 3, 1930, modified the act of March 3, 1925, so as to
provide that when local interests shall have furnished assurances sat-
isfactory to the Secretary of War that they will maintain the diver-
sion channel, the United States shall assume the cost of maintenance
of the navigable channel, estimated at $75,000 annually, including
care and operation of the lock, if provided (Rivers and Harbors
Committee Doc. No. 18, 70th Cong., 1st sess).
    Under ordinary conditions the mean tidal range is about 1.8 feet
and the extreme range about 21/2 feet. Freshets in the river, except
under extreme conditions, do not cause a greater variation in the
water surface than the tidal action.
    The estimated cost of new work, revised in 1935, is $2,504,000,
including $1,334,500 to be provided by local interests.
    The latest (1935) approved estimate of cost of annual mainte-
nance is $115,000 for 2 years after completion of the project and
$100,000 thereafter.
    The existing project was authorized by the following river and
harbor acts:

    Acts                       Work authorized                                   Documents


Mar. 3,1899     Dredging and such other work as may be deemed'     Specified in act.
                 most effective in the judgment of the Secretary
                 of War in improving and developing the harbor;
                 for taking over the jetties and other privately
                 built works at the mouth of the river.
Mar. 2,1907     Examination authorized. The work was subse-        H. Doc. No. 1087, 60th Cong., 2d seass.
                 quently confined to maintenance of the jetties.
Feb. 27,1911    Repairs to jetties and dredging_ _ _-_       __    Specified in act.
Mar. 4,1913     Construction of a seagoing hopper dredge, one-        Do.
                 half the cost to be charged to this improvement
                 and one-half to Aransas Pass.
                    RIVERS    AND HARBORS              GALVESTON,           TEX., DISTRICT                 895

        Acts                        Work authorized                                   Documents


Aug.     8,1917     Purchase of one 15-inch pipe-line dredge and        H. Doc. No. 1469, 63d Cong., 3d sess.
                      equipment, its operation for an experimental
                      period of 3 years, the operation of the seagoing
                      dredge 4 time for 3 years, and repairs to the
                      jetties.
Mar.     3, 1925    Diversion dam, diversion channel, and necessary     Rivers and Harbors Committee Doc.
                      auxiliary works.                                     No. 10, 68th Cong., 2d sess.
July      3, 1930    Maintenance of the diversion channel at the ex-     Rivers and Harbors Committee Doc.
                      pense of local interests.                            No. 18, 70th Cong., 1st.sess.
Aug. 30,19351        Dredging the channels and turning basins to         Rivers and Harbors Committee Doc.
                      greater depths.. (Project completed to within        No. 15, 72d Cong., 1st sess.
                      J4 mile of the upper limit of the channel with
                      Public Works Administration funds and con-
                      tributed funds.)
    Do-----          Maintenance of the present project dimensions       Rivers and Harbors Committee Does.
                      of the channels and turning basins at Federal       Nos. 15, 72d Cong., 1st sess., and 29,'
                      expense.                                            73d Cong., 2d sess.


  I Included in Public Works Administration program, Sept. 6, 1933.
  2 Contains latest published maps.


    Local cooperation.-All required local cooperation has been fully
complied with, except the 50-percent contribution toward the cost of
the extension of the channel to Freeport, which has not been requested.
    Terminal facilities.-The terminal facilities are, located at the town
of Freeport at the upper end of this improvement and at a point
about a mile above the inner ends of the jetties. The facilities at
Freeport consist of a small wharf, privately owned, and one free
public wharf owned by the municipality of Freeport. The facilities
just inside the mouth of the river consist of one sulfur-loading dock,
about 250 feet long and one oil dock. The existing facilities are con-
sidered adequate for the commerce that exists.
    Operationsand results during fiscal year-Maintenance.-The U. S.
seagoing hopper dredge Galveston redredged the sea bar and jetty
channels from March 11, 1942, to March 31, 1942, removing 251,466
cubic yards (bin measurement) from a channel length of 6,000 feet at
a cost of $17,366.53. The U. S. pipe-line dredge Raynmond redredged
the Brazosport turning basin, approach channel and turning basin
near the United States Coast Guard Station from July 1 to August 13,
1941, removing 743,642 cubic yards from a channel length of 3,100
feet at a cost of $38,723.88. Under a contract for repairing the north-
east jetty by placing thereon a concrete cap from July 1 to August 22,
1941, there were placed 1,711.91 cubic yards of concrete over a jetty
length of 1,600 feet at a cost of $28,614.37. There were additional
costs of $2,103.39 for miscellaneous surveys and inspections.
   The total cost of all work during the year was $86,808.17, all for
maintenance. The total expenditures were $95,228.37.
   Condition at end of fiscal year.-The existing project was about 85
percent completed. The work remaining to be done consists of dredg-
ing the extension of the channel to and including a turning basin near
the Stauffer Chemical plant at Freeport, Tex., and constructing a
lock in the diversion dam in the Brazos River.
   The controlling depths at mean low tide along the center line of
the various channels and turning basins were as follows: From deep
896         REPORT OF CHIEF OF ENGINEERS,                                  U. S. ARMY,             1942

water in the Gulf of Mexico to the jettied entrance 31.0 feet; seaward
end of jetty to Brazosport turning basin 31.0 feet; Brazosport turning
basin 32.0 feet; Brazosport turning basin to upper turning basin 21.0
feet; upper turning basin 30.0 feet; upper turning basin to turning
basin at Stauffer Chemical plant 18.5 feet; turning basin at Stauffer
Chemical plant 20.0 feet.
  The total costs of the existing project to June 30, 1942, were as
follows:

                                                               New work              Maintenance             Total


Regular funds                                ._______________ $1, 101,061. 89
                            .__.__________________                                   $2, 225, 953. 17      $3, 327, 015. 06
Public Works funds_                                               116, 574. 74                                 116, 574. 74
      Total United States funds                                 1, 217, 636. 63       2, 225, 953. 17       3, 443, 589. 80
Contributed funds (includes $225,000 contributed under
sec. 4, River and Harbor Act of Mar. 4, 1915)_________               758, 302. 79                            758, 302. 79
       Total all funds       ___                                1, 975, 939. 42       2, 225, 953. 17       4, 201, 892. 59


   The total expenditures were $3,443,539.41, of which $3,326,964.67 was
from regular funds and $116,574.74 from Public Works funds. In
addition $758,302.79 was expended from contributed funds.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $114,887.77, will be applied as follows:
Accounts payable June 30, 1942-___            ___     _________      ___      $50. 39
Maintenance :
    Dredge sea bar and a portion of the jetty channel with an available
      United States seagoing hopper dredge during October 1942 -- _       30, 000. 00
    Dredge a portion of the jetty channel and inland channels and
      basins as required, by contract (November 1942 to March 1943)_ 82, 837. 38
    Purchase a small tract of land for a field office site and make minor
      improvements with hired labor (September to December 1942)           2, 000. 00

             Total --                               ---------------                                        114, 887. 77
  The additional sum of $100,000 can be profitably expended during
the fiscal year 1944 as follows:
Maintenance:
   Dredge the sea bar and jetty channels with an available United
          States seagoing hopper dredge (July 1943)                              _____-------__                $28, 000
       Dredge Brazosport turning basin and inner end of jetty channel, by
         contract (August to October 1943) --------                                                              54, 000
       Construct field office building, warehouse, garage, and wharf at Free-
         port, by contract (July to September 1943) ---------------------                                        18, 000

             Total---                               _       ___                                                1________
                                                                                                               100, 000

                                   Cost and financial summary
Cost of new work to June 30, 1942---------------------------                                       1    $1, 364, 735. 06
Cost of maintenance to June 30, 1942----     --                                                          2, 225, 953. 17
       Total cost of permanent work to June 30, 1942      _                                              3, 590, 688. 23
Minus accounts payable June 30, 1942 --------------------------                                                  50. 39
      Net total expenditures__-----------------------_ ---------                                        3, 590, 637. 84
Unexpended balance June 30, 1942_ ------------------------                                                114, 887. 77
           Total amount appropriated to June 30, 1942----__               - 3, 705, 525. 61
   1   In addition, $758,302.79 was expended from contributed funds for new work.
               RIVERS         AND HARBORS---GALVESTON,                               TEX.,     DISTRICT                897

    Fiscal year ending June 30                1938             1939               1940            1941              1942

Cost of new work--............
Cost of maintenance- _.....              $88, 797.04         $44, 570. 80    $56, 698 73       $129, 326. 85       $86, 808. 17
Total expended_------------                  64, 841. 05      69, 217. 22        56, 827. 78    120, 998. 22       95, 228. 37
Allotted     -.......
                 _ -------
                        --               175, 000. 00         55, 609. 02        46, 000. 00    165, 000. 00        72. 500. 00


Balance unexpended July 1, 1941_ ___--  -                                                                      1137, 616. 14
Amount allotted from War Department Civil Ap propriation Act
  approved Apr. 28, 1942..__       __.       _- - -- - -- -                                                     90, 000. 00

     Amount to be accounted for ____ _ -_                                                                      227, 616. 14
Deductions on account of revocation of allotment__________                                                      17, 500. 00
      Net amount to be accounted for______                                                                     210, 116. 14
Gross amount expended_     __-------                                                                            95, 228. 37
      Balance unexpended June 30, 1942_                                                                        114, 887. 77
Outstanding liabilities June 30, 1942_________                                                                       50. 39

           Balance available June 30, 1942:                                                                    114, 837. 38

Amount (estimated) -required to be appropriated for completion
   of existing project           2   -----                                                                       9, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 2_____________________                                                              100, 000. 00
   2 Exclusive of available funds.

       15. CHANNEL             FROM          PASS          CAVALLO          TO PORT LAVACA,                     TEX.

   Location.-The bar at Pass Cavallo is 125 miles southwest of Gal-
veston entrance and 54 miles north of Aransas Pass. Port Lavaca lies
26 miles to the northwest of the pass, across Matagorda and Lavaca
Bays. (See U. S. Coast and Geodetic Survey Chart No. 1117.)
   Existing project.-This provides for a depth of 9 feet and a width
of 100 feet from Lynns Bayou at Port Lavaca, Tex., to deep water in
Matagorda Bay near Port O'Connor, Tex., a distance of about 11
miles. Under ordinary conditions the mean tidal range is about
1 foot and the extreme range about 2 feet. The height of tide is
dependent largely on the wind, and during strong "northers" in the
winter season the water surface may be depressed 2 feet below mean
low tide.
   The estimate of cost for new work, revised in 1937, is $138,874.
The latest (1937) approved estimate of cost for annual maintenance
is $15,000.
   The existing project was authorized by the following river and
harbor acts:

      Acts                           Work authorized                                            Documents


June 25, 1910        Channel to Port Lavaca, Tex., 7 feet deep and 80             H. Doc. No. 1082, 60th Cong., 2d sess.
                      feet bottom width.
Aug. 30, 193.5       Extension of 7-foot channel to the shore line of             Rivers and Harbors Committee Doc.
                      Lavaca Bay at the mouth of Lynns Bayou.                       No. 28, 74th Cong., 1st sess.
Aug. 26, 1937        Deepen and widen channel to present project                  Rivers and Harbors Committee Doc.
                       dimensions.                                                  No. 37, 75th Cong., 1st sess. (Con-
                                                                                    tains latest published map.)
                 I                                                           I
 '898           REPORT OF CHIEF OF              ENGINEERS,            U.    S.      ARMY,      1942

   Recommended modification of project.-Under date of May 25,
1939, the Chief of Engineers recommended modification of the exist-
ing project so as to provide a channel 100 feet wide and 6 feet deep
from Port Lavaca by way of Lavaca Bay and Lavaca River to about
mile 3 on the Navidad River, a total distance of 20 miles, at an
estimated first cost of $85,000, with annual maintenance of $10,000, in
addition to that now required; subject to certain conditions of local
cooperation (H. Doc. No. 314, 76th Cong., 1st sess.).
   Local cooperation.-Fully complied with.
    Terminal facilities.-The terminal facilities consist of several pri-
vately owned piers and two privately owned slips at Port Lavaca,
and a municipally owned wharf, turning basin, and refrigerated sea-
food processing and packing plant at the mouth of Lynns Bayou.
The municipally owned facilities are open to the general public and
are adequate for existing commerce.
     Operations and results during                    fiscal       year.--Miscellaneous surveys
were made at a cost of $1,177.51. The total cost of work during the
fiscal year was $1,177.51, all for maintenance. The total expenditures
were $1,088.32.
    Condition at end of fiscal ear.-The existing project was completed
in 1939. The controlling depth at mean low water was 7 feet.
    The total cost of the project to June 30, 1942, was $169,202.80, of
which $111,494.49 was for new work and $57,708.31 was for main-
tenance. The total expenditures were $169,055.25.
    Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $15,349.74, will be applied as follows:
Accounts payable June 30, 1942------  ------------------       _   $147. 55
Maintenance: Dredge channel where necessary, by contract (Janu-
ary 1943) ---------------------------------------------         15, 202. 19

            Total                                                                                  15, 349. 74
                                                                                         __--------------------------------------

     The additional sum of $15,000 can be profitably expended during the
fiscal year 1944 for maintenance dredging where necessary, by con-
tract, about January 1944.

                                   Cost and financial summary

Cost of new work to June 30, 1942-----------------------------                                       $111, 494. 49
Cost of maintenance to June 30, 1942 _......         _                                                 57, 708. 31
      Total cost of permanent work to June 30, 1942 -------------- 169, 202. 80
Minus accounts payable June 30, 1942----------------------------        147. 55

      Net total expenditures---------------------------------                                         169, 055. 25
Tnexpended balance June 30, 1942_---------------------------                                           15, 349. 74

           Total amount appropriated to June 30, 1942_____-------____                                 184, 404. 99

    Fiscal year ending June 30        1938            1939             1940             1941              1942

Cost of new work___                  $507.03     $89.803.71
'Cost of maintenance __ _.___...        $507.
                                           0.     .       3.          $1,624.41       $45,060. 15         $1,177.51

Total expended -__                      15.00      89,088.68           2,830.16        45,003. 10          1,088.32
Allotted ----.....          _
                     ...........    116,875.00        5, 000. 00      12, 500. 00      17, 500. 00         1,500. 00
                RIVERS        AND HARBORS-GALVESTON,                              TEX.,   DISTRICT           899

Balance unexpended July 1, 1941-------------------------------$14,938.06
Amount allotted from War Department Civil Appropriation Act ap-
  proved Apr. 28, 1942--------------       ----------------------            15, 000. 00
       Amount to be accounted for_-------------------------------            29, 938. 06
Deductions on account of revocation of allotment------------------- 13, 500. 00
       Net amount to be accounted for----------------------------            16, 438. 06
Gross amount expended-----------------            --------       ----------          32               1088.
       Balance unexpended June 30, 1942-------------------_                                        _ __ 15,349. 74
Outstanding liabilities June 30, 1942_-------------------------------                                      147. 55
       Balance available June 30, 1942----------------------------15, 202. 19
Amount that can be profitably      expended in fiscal year ending June 30,
                           - - - - - -- - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - -
  1944, for maintenance 1                                                                               15, 000.00
   1 Exclusive of available funds.
               16. PORT ARANSAS-CORPUS CHRISTI WATERWAY, TEX.
   Location.-This is a consolidation of the old improvements of
Port Aransas, Tex., and the channel from Aransas Pass to Corpus
Christi, Tex. Aransas Pass is on the southern portion of the coast
of Texas, 180 miles southwest of Galveston and 132 miles north of
the mouth of the Rio Grande. Aransas Pass connects Corpus Christi
Bay and Aransas Bay with the Gulf of Mexico. The waterway ex-
tends from deep water in the Gulf through the Aransas Pass jettied
entrance, thence westerly 203/4 miles to and including a turning basin
at Corpus Christi, thence westerly 13/4 miles through the Industrial
Canal to and including the turning basin at Avery Point, thence
westerly 41/4 miles to and including a turning basin near Tule Lake.
(See U. S. Coast and Geodetic Survey Charts Nos. 1285 and 1286.)
  Previous projects.-The original project for improvement of
Aransas Pass (Port Aransas) was authorized by the River and Har-
bor Act of March 3, 1879. The improvement was taken over by the
Aransas Pass Harbor Co. on June 30, 1890, under authority of the
act of May 12, 1890. This company relinquished its rights to the
United States on March 27, 1899. The channel from Aransas Pass
to Corpus Christi was first improved under the River and Harbor
Acts of March 2, 1907, and June 25, 1910.
  For further details see page 1861 of Annual Report for 1915 and
page 877 of Annual Report for 1938.
  Eristing project.--he modified project dimensions provided for
in the various channels and.basins comprising this waterway are
shown in the following tabulation:
                                                                        Adopted project dimensions
  Section of the Port Aransas-Corpus Christi                                                           Depth in
                Waterway, Tex.                                     Bottom width in feet                feet below
                                                                                                       mean low
                                                                                                       Gulf level

A ransas Pass outer bar - - -     - - - - - - - - - - 700 -- - - -- - - - -- - - -- - - - -- - - -37
Aransas Pass jetty channel                              600 from inner end to opposite station 90,         (1)
                                                          north jetty, thence increasing to 700 at
                                                          outer end of jetty.
Inner basin at Harbor Island .- -------                 650by 3,000 long                                         30
Inner basin at Clines Point to west end Humble          400 at east end decreasing to 300 at west                35
  Oil & Refining Co. basin,                               end.
Channel to town of Port Aransas-                        100 ---                                                  12
Channel from Port Aransas to Corpus Christi             200 ....    -------------------                          32
  turning basin.
Corpus Christi turning basin..........                  1,000 by 5,500long (includes approach to                 32
                                                          turning basin).
Industrial Canal .-.                                    150                                                      32
Turning basin at Avery Point .                          800 by 1,200 long .                                      32
Channel to vicinity of Tule Lake                        150..                                                    32
Turning basin near Tule Lake                            900 by 1,000 long                                        32
  135 feet   from inner end to opposite station 90, north jetty, increasing to 37 feet at outer end of jetty.
900        REPORT       OF    CHIEF      OF    ENGINEERS,             U.   S.    ARMY,     1942


   The project also provides for two rubblestone jetties at Aransas
Pass entrance, extending into the Gulf from St. Joseph and Mustang
Islands, the project lengths of which are 11,190 and 8,650 feet, re-
spectively. The project further provides for a stone dike on St.
Joseph Island about 19,100 feet long connecting with the north jetty
and extending up this island to prevent a channel being cut around
the jetty.
   Under ordinary conditions the mean tidal range at Aransas Pass
is about 1.1 feet and the extreme range about 2 feet, and at Corpus
Christi the mean range about 1 foot and the extreme about 11/2 feet.
The heights of tides are dependent largely on the strength and direc-
tion of winds, and during strong north winds in the winter season
the water surface may be depressed as much as 3 feet below mean low
Gulf level.
   The estimated cost for new work, revised in 1941, exclusive of
amounts expended on previous projects is $11,000,000. The latest
 (1938) approved estimate for annual cost of maintenance is $624,000.
   The existing project was adopted by the following river and harbor
acts:

    Acts                        Work authorized                                      Documents


Mar.   3,1899  Acquisition of the old curved portion of the north      Specified in act.
                jetty previously constructed by private parties.
June 13,1902 Completion of north jetty in accordance with the              Do.
Mar. 3, 1905    plans of its builders.
Mar. 2,1907 Connection of old curved jetty to St. Joseph Is-           Rivers and Harbors Committee Doc.
                land, and construction of south jetty.                   No. 5, 59th Cong., 2d sess.
Feb. 27, 1911  Dredging roadstead in Harbor Island Basin to            H. Doc. No. 1094, 61st Cong., 3d sess.
                depth of 20 feet and construction of 10,000 linear
                feet of the stone dike on St. Joseph Island.
Mar. 4,1913 Deepening of channel between jetties and the Har-          H. Doc. No. 1125, 62d Cong., 3d sess.
                bor Island Basin to depth of 25 feet, extension of
                jetties seaward, extension of dike on St. Joseph
                Island 9,100 feet, and dredging the approach
                channel 12 feet deep to town of Port Aransas.
Sept. 22, 1922 Dredging channel from Aransas Pass to Corpus            H. Doc. 321, 67th Cong., 2d sess.
                Christi, 25 feet deep, 200 feet bottom width.
                                                                                                                t
July 3,1930 Deepening entrance channel from Gulf of Mexico             H. Doc. No. 214, 70th Cong., 1st sess.
                to Harbor Island and provision of an inner basin.
                at Harbor Island of reduced area but greater
                depth.
    Do ._-_-- Aransas Pass to Corpus Christi Channel with              Rivers and Harbors Committee Doc.
                depth of 30 feet.                                        No. 9, 71st Cong., 1st sess.
Aug. 30 1935 2 Enlarging all channels from the Gulf to the west-       Rivers and Harbors Committee Doc.
                                                                                                       1
                ern end of basin dredged by Humble Oil & Re-             Nos. 35, 72d Cong., 1st sess., and 40,
                                                                                             1
                fining Co. at its docks on Harbor Island, with           73d Cong., 2d sess.
                Public Works Administration funds.
    Do      -
           -.. Maintenance of channel and maneuvering basin            H. Doc. No. 130, 72d Cong., 1st sess.
                between breakwater and western shore line of
                Corpus Christi Bay.
    Do ..._._ Maintenance to 30 feet depth, except on strips           Rivers and Harbors Committee Doc.
                                                                                                       1
                lying 50 feet channelward of any established             No. 13, 74th Cong., 1st sess.
                pierhead lines or within 50 feet of the foot of any
                wharf or structure of the approach channel,
                turning basin at Corpus Christi, Industrial
                 Canal and turning basin at Avery Point.

  1Contain the latest published maps.
  2Included in Public Works Administration      program Sept. 6, 1933, and Feb. 16, 1935.
                RIVERS     AND HARBORS-GALVESTON,                         TEX.,    DISTRICT            901

    Acts                          Work authorized                           .      Documents


Aug. 30, 1935_   Maintenance and deepening to 32 feet of the chan-     Rivers and Harbors Committee Doe.
                  nel from deep water at Port Aransas to and in-         No. 63, 74th Cong., 1st sess.'
                  cluding the turning basin at Corpus Christi.
June 20, 1938    Extend the main turning basin at Corpus Christi       H. Doc. No. 574, 75th Cong., 3d sess.l
                  westward 2,500 feet at its present width and
                  depth, deepen the existing Industrial Canal and
                  turning basin to 32 feet and for the extension of
                  this canal at a depth of 32 feet and general width
                  of 150 feet, westward along Nueces Bay shore to
                  a turning basin 32 feet deep, 900 feet wide, and
                  1,000 feet long near Tule Lake.


1 Contain   the latest published maps.

   Local cooperation.-Under provisions of River and Harbor Act of
June 20, 1938, local interests are required to furnish, free of cost to
the United States, necessary lands, rights-of-way, and spoil-disposal
areas for initial work and for subsequent maintenance as may be re-
quired, and release the United States from all claims for damages
attributable to the work of improvement; and provided further, that
deepening of the existing Industrial Canal with its turning basin and
construction of the proposed extension thereto and new turning basin
near Tule Lake shall not be undertaken until and unless the Nueces
County navigation district furnishes assurances satisfactory to the
Secretary of War that bona fide arrangements have been made with
various industries so as to guarantee additional tonnage sufficient to
warrant the construction and maintenance of the extension of the In-
dustrial Canal to any point up to and including the proposed turning
basin near Tule Lake. All prior requirements fully complied with.
   Terminal facilities.-Terminal facilities located on Harbor Island
at the head of Aransas Pass, Ingleside, Corpus Christi, and Avery
Point are considered adequate for existing commerce. (See Port
Series No. 6, pt. 3, Corps of Engineers.)
   Operations and results during fiscal year-Maintenance.-Under
a contract for redredging the Avery Point turning basin, Industrial
Canal, east half of the Corpus Christi turning basin, and channel
eastward to station 720 + 00, between May 27 and June 30, 1942, 337,036
cubic yards were removed from a channel length of 6,510 feet at a
cost of $28,661.43. Under a contract for repairing the north jetty
with stone between July 30, 1941, and June 30, 1942, there were
placed over a jetty length of 400 feet 723.1 tons of cover stone, 7,905.97
tons of core stone and 63 large stones were picked up and replaced
over a jetty length of 300 linear feet at a total cost of $7 0, 4 6 2.8 .
Under a contract for repairing the south jetty with stone and gravel
between May 9 and June 30, 1942, there were placed over a jetty
length of 350 feet 1,689.65 tons of cover stone, 1,304.9 tons of core
stone and 361.83 tons of gravel over a jetty length of 400 linear
feet at a total cost of $38,669.82.
   There were additional costs of $8,043.88 for miscellaneous surveys
and inspections, and $1,451.95 for preliminary surveys for dredging
with a United States seagoing hopper dredge.
902         REPORT OF CHIEF OF ENGINEERS,                             U.       S. ARMY,         1942

   The total cost of all work during the year was $147,289.91 all for
maintenance. The total expenditures were $102,236.14.
   Condition at end of fiscal year.-The existing project was about
47 percent completed. The two jetties have been built to partial proj-
ect lengths, the north jetty being 9,240 feet long and the south
jetty 7,385 feet long. A stone dike connecting with the north jetty
has been constructed on St. Joseph Island, its total length being
20,991 feet; this part of the project was completed in 1916. The chan-
nel between the jetties form the Harbor Island Basin to the Gulf
has been dredged to 35 feet at mean low tide inside and 37 feet deep
at the Gulf end. Harbor Island Basin has been deepened to 30 feet
at mean low tide over an area 650 feet wide and about 1,000 feet
long at the lower end adjacent to the dock.
   The approach channel from Harbor Island Basin to the town of
Port Aransas was completed in 1914. The channel to Corpus Christi,
including a turning basin approximately 1,000 feet wide and 5,500
feet long, and the approach channel was completed in 1940. The in-
dustrial canal and turning basin at Avery Point have been dredged
to 30 feet depth.
   The work required to complete the existing project consists of
extension of the jetties at an estimated cost of $5,000,000, enlargement
of Harbor Island Basin at an estimated cost of $120,000, deepening
the Industrial Canal and turning basin at Avery Point, and dredging
the channel from the Avery Point turning basin to and including
a turning basin near Tule Lake at an estimated cost of $742,000. These
items of work are not required at the present time.
   The controlling depths along the center line of various sections of
the channels and turning basins were as follows:
                                                                                                    Depth in feet
                                                                                                     below mean
                                                                                                       low tide
Deep water in the Gulf of Mexico to station 90 on north jetty----------- 38. 5
                                          ---------------------------- 31. 7
Station 90 on north jetty to Clines Point__
Clines Point to westward end of Humble Basin --                                    -------                    36. O0
Inner basin at Harbor Island----------------------------------------     36. 8
Channel to Port Aransas--------------------------------------------11.0
Channel, Port Aransas to Corpus Christi turning basin------------------28. 4
Turning basin at Corpus Christi-------------------------------------     28. 9
Industrial Canal--------------- ------------------------------------.    33. 9
Turning basin at Avery Point___.----------------------------------------33. 8
  The total costs of the existing project to June 30, 1942, were as
follows:

                                                             New work            Maintenance            Total

Regular funds__________________________________________     $4, 811, 471. 32     $6, 326, 901. 04   $11, 138, 372. 36
Public works funds_                                             324, 287. 14                             324, 287. 14
     Total United States funds __                            5, 135, 758. 46      6, 326, 901. 04    11, 462, 659. 50
Contributed funds__ ____________________________________   _______________           152, 555. 09        152, 555. 09
     Total all funds___                                      5, 135, 758. 46      6, 479, 456. 13    11, 615, 214. 59



  The total expenditures were $11,418,011.77, of which $11,093,724.63
was from regular funds and $324,287.14 from Public Works funds. In
addition, $152,555.09 was expended from contributed funds for
maintenance.
               RIVERS      AND HARBORS-GALVESTON,                            TEX.,    DISTRICT                   903
    Proposed operations.-The unexpended balance' at the end of the,
fiscal year, amounting to $917,252.11, including accounts receivable,
will be applied as follows:
Accounts payable June 30, 1942 __-               -               --
                                                          ______________             _______          $46, 847. 86,
Maintenance :
    Complete an existing contract for repairing the north jetty (July
       1 to Dec. 1, 1942) ________-____________----------                262,347.66
    Complete existing contract for repairing the south jetty (July
       1942) ---------------------------------------------------          18,945. 21
    Complete an existing contract for dredging the Avery Point
       turning basin, Industrial Canal, east half of Corpus Christi
       turning basin and channel eastward to station 720+00 (July 1
       to Sept. 1, 1942) ---------------------------  __-_     _    __- 177,350.88
    Dredge the sea bar and jetty channels with an available United
       States seagoing hopper dredge (August and September 1942)_ 56, 000. 00
    Dredge sea bar and jetty channel with an available United
       States seagoing hopper dredge (March and April 1943) _._____       56, 000. 00
    Dredge to project dimensions the channel eastward from station
       720+00 to Port Aransas, the inner basin at Port Aransas, and
       the channel to and the turning basin at Port Aransas by
       contract (February to June 1943) _______________         __
                                                               _-___    299, 760. 50

                                                __
              Total----------------------------------------                              ---          917,252. 11
  The additional sum of $520,000 can be profitably expended during
the fiscal year 1944 as follows:
Maintenance:
    Dredge the entire waterway inside the jetties where required
       including all basins by contract (December 1943 through
         April 1944) _-_                                             _       -_                     $300, 000. 00
      Dredge the jetty and sea bar channels with an available
        United States seagoing hopper dredge (April, May, and
       June, 1944) ---------------------------------------------- 90, 000. 00
      Repair the north jetty by placing thereon a concrete cap,
        by contract (January through June 1944)          --       130, 000. 00

              Total_-___                                                                              520, 000. 00

                                  Cost and financial summary

Cost of new work to June 30, 1942____________________________                                   $6, 508, 292. 89
Cost of maintenance to June 30, 1942__________________ _______                                 '6, 389, 352. 90
      Total cost of permanent work to June 30, 1942___________                                 12, 897, 645. 79
Plus accounts receivable June 30, 1942   ________________                                            2, 200. 13
      Gross total costs to June 30, 1942_______ _________  ___                                 12, 899, 845. 92
Minus accounts payable June 30, 1942_________________________                                       46, 847. 86
     Net total expenditures____________________________                                       112, 852, 998. 06
Unexpended balance June 30, 1942_                                                                  915, 051. 98
         Total amount appropriated to June 30, 1942____________                               113, 768, 050. 04


   Fiscal year ending June 30        1938               1939             1940          1941               1942

Cost of new work_                                      $1, 769. 00   $228, 408.95    $11, 529. 05..
Cost of maintenance_ ____  __ _   $271, 361. 11       149, 495. 36    284, 298. 49   241, 730. 89       $147, 289. 91
      Total cost_                  271, 361. 11       151, 264. 36    512, 707. 44   253, 259. 94        147, 289. 91
Total expended                     273, 871. 04       119, 104. 51    443, 399. 49   357, 153. 57        102, 236. 14
Allotted---                        488, 000. 00       788, 500. 00    300, 200. 00   450, 000. 00        172, 724. 12


  1 In addition, $152,555.09 was expended from contributed funds for maintenance.
904      REPORT      OF CHIEF OF ENGINEERS,            U.         S. ARMY,            1942

Balance unexpended July 1, 1941 ________________________                               $844, 564. 00
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942________________________________.                                300, 000. 00

       Amount to be accounted for--_ __-------------_----------                        1, 144, 564. 00
Deductions on account of revocation of allotment___ ________--_127,                           275. 88

      Net amount to be accounted for___-----      ______-------                        1, 017, 288. 12
Gross amount expended____________.__._._____           $102,237.54
Less reimbursements collected ___-----------                    1.40
                                                                                         102, 236. 14

       Balance unexpended June 30, 1942___         -         --    ------         _      915, 051. 98
Outstanding liabilities June 30, 1942 ______________               $70. 07
Amount covered by uncompleted contracts------- --             505, 058. 42
                                                                                         505. 128. 49

     Balance available June 30, 1942_          ___________            _     _--          409, 923. 49
Accounts receivable June 30, 1942______        -__________                                   2, 200.13

       Unobligated balance available June 30, 1942______________                         412, 123. 62

Amount (estimated) 2required to be appropriated     for completion
                                   --- -- -- --- -- --- -- --
of existing project ____________                             -                        5, 862, 000. 00
Amount ,that can be profitably expended in fiscal year ending
  June 30, 1944, for maintenance 2______________________-                                520,000.00
  2 Exclusive of available funds.

17. CORPUS CHRISTI, TEX.-CHANNEL TO AND INCLUDING A TURNING
          BASIN AT NAVY SEAPLANE BASE, ENCINAL PENINSULA

   Location.-This improvement is an extension to the Port Aransas-
Corpus Christi Waterway, Tex. The channel extends in a south-
westerly direction from the Port Aransas-Corpus Christi waterway
opposite McGloins Bluff, to the western shore of Corpus Christi Bay at
Encinal Peninsula, a distance of 8.7 miles, including a turning basin
2,000 feet square. For the entrance from the Gulf and channel to the
turn off point see "Location" under the Port Aransas-Corpus Christi
waterway, Texas.
   Existing project.-This provides for a channel 30 feet deep and
200 feet wide and for a turning basin at the southwest end, 30 feet
deep'and 2,000 feet square.
   Under ordinary conditions the mean tidal range at Encinal Penin-
sula is about 1 foot, and the extreme about 11/2 feet. The height of
tides is dependent largely on the strength and direction of winds.
During strong north winds in the winter season the water surface may
be depressed as much as 3 feet below mean low Gulf level.
   The estimate of cost for new work, made in 1940, was $1,500,000.
The approved (1940) estimate of anual cost of maintenance is $300,000.
   The existing project was authorized by the River and Harbor Act
of October 17, 1940, and in accordance with the report on file in the
Office, Chief of Engineers.
   Terminal facilities.-Those constructed, and to be constructed are
owned by the United States Navy and will not be open to the public.
   Operationsand results during fiscal year-New work.-Under a con-
tract for dredging a channel from the Port Aransas-Corpus Christi
waterway to and including a turning basin at the United States Navy
air base on Encinal Peninsula, there were removed 6,198,305 cubic
               RIVERS AND HARBORS-GALVESTON,                                                TEX.,     DISTRICT                        905
yards from July 1 to December 10, 1941, over a channel length of
16,966 feet at a cost of $638,312.80.                                       There were additional costs of
$5,446.59 for miscellaneous surveys and inspections.
    The total cost of all work during the year was $643,759.39, for new
work. The total expenditures were $1,020,462.81.
  Condition at end of fiscal year.-The existing project was com-
pleted December 10, 1941.                            The controlling depth at mean low tide
along the center line of the channel was 29.2 feet and in the turning
basin 30.2 feet.
   The total cost of the existing project to June 30, 1942, was $1,194,-
344.69. The total expenditures were $1,194,344.60.
   Proposed operations.---The unexpended balance at the end of the
fiscal year amounting to $200,298.98 will be applied as follows:
Accounts payable June 30, 1942_____________     --
                                               ____._-____-             $0. 09
Maintenance: Dredge to project dimensions the channel and turning
  basin, by contract (February through June 1943) _______________ 200, 298. 89
            Total                                                      --           ---                    _--         200, 298. 98

  The additional sum of $300,000 can be profitably expended during
the fiscal year 1944 in redredging the entire channel and turning basin
by contract (January through June 1944).
                                         Cost and financial summary
Cost of new work to June 30, 1942_                                                                              $1, 194, 344. 69
Cost of maintenance to June 30, 1942                            _

      Total cost of permanent work to June 30, 1942_                                                              1,194, 314. 69
Minus accounts payable June 30, 1942_                                                                             --.                  09


     Net total expenditures_________________                                                                      1, 194, 344. 60
Unexpended balance June 30, 1942_                                                                                     200, 298. 98

            Total amount appropriated to June 30, 1942-                                                           1, 394, 643. 58


    Fiscal year ending June 30                1938                  1939                  1940           1941                  1942


C ost of n ew w ork ____   _______ .   _ _______ . ____. .   ______        ______    . ______ __     $550, 585. 30           $643, 759. 39
Cost of maintenance                    -----------           ------------ ------------- ---------
Total expended _... .. _ ..-------.....
                              _---                 __----- -
                                             ......--           -     --                    --        173, 881. 79       1, 020, 462.81
Allotted-                                                                                           1, 500, 000. 00      -105, 356. 42


Balance unexpended July 1, 1941_                             $1, 326, 118. 21
Amount allotted from War Department Civil ALppropriation Act
  approved April 28, 1942 ____________________                   200, 000. 00
      Amount to be accounted for_____________                                                                    1,526, 118. 21
Deductions on account of revocations of allotment_                                                                 305, 356. 42
      Net amount to be accounted for___                                                                          1,   220,     761.    79

Gross amount expended_                                                                                           1, 020, 462. 81
      Balance unexpended June 30, 1942_                                                                               200, 298. 98
Outstanding liabilities June 30, 1942_________._____                                                                           .09

         Balance available June 30, 1942____________                                                                  200,298. 89

Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance 1--_____- _-
   IExclusive of available funds.
                                                                                                                      300, 000. 00
 906          REPORT OF CHIEF OF ENGINEERS,                              U.   S.   ARMY,     1942

                              18. BRAZOS ISLAND HARBOR, TEX.

    Locatiorn.-This harbor is at the extreme south end of the coast of
Texas, about 7 miles north of the mouth of the Rio Grande, and
about 125 miles south of Port Aransas. The harbor is at the inner
end of Brazos Santiago Pass, which lies between Brazos and Padre
Islands, and is the natural outlet from the Laguna Madre to the
 <Gulf of Mexico. (See U. S. Coast and Geodetic Survey Chart No.
  1288.)
    Previous projects.-Authorized by River and Harbor Acts of June
18, 1878, March 3, 1881, and March 2, 1919. For further details see
page 1017, Annual Report for 1932 and page 882, Annual Report for
1938.
    Existing project.-This provides'for a channel 31 feet deep and
300 feet wide through Brazos Santiago Pass; for a channel 28 feet
deep and 100 feet wide from the pass. to a point on the westerly side
of Long Island; for a channel 28 feet deep and 100 feet wide from
the end of Brazos Santiago Pass-Long Island Channel to and in-
cluding a turning basin 600 feet wide by 700 feet long at Point
Isabel; for a channel 28 feet deep and 100 feet wide from the end of
Brazos Santiago Pass-Long Island Channel to and including a turn-
ing basin 1,300 feet long and 1,000 feet wide in the vicinity of
Brownsville and for the easement of bends and curves. The project
 :also provides for two jetties at the Brazos Santiago Pass entrance.
The project further provides that all inside channels and turning
basins may be widened with the approval of the Chief of Engineers
provided local interests bear the entire cost. Under ordinary condi-
tions the mean tidal range is about 1/2 feet and the extreme range
:about 2 feet. The height of the tides is dependent, to some extent,
hon the wind, and during strong "northers" in the winter season the
water surface in the southern end of the Laguna Madre may be raised
4 feet or more above the mean low tide in the Gulf.
    The estimate of cost for new work, revised in 1938, was $5,185,000,
inclusive of $2,425,000 contributed by local interests, but exclusive
of amounts expended on previous projects. The latest (1937) ap-
proved estimate of annual cost of maintenance is $150,000.
    The existing project was authorized by the following river and
harbor acts:

       Acts                       Work authorized                                    Documents


July     3,1930   Jetty channel, all inside channels and turning         Rivers and Harbors Committee Doc.
                    basins, and 2 rubble mound jetties.                    No. 16, 71st Cong., 2d sess.
May 24, 1934      Local cooperation requirements modified to pro-        Rivers and Harbors Committee Doc.
 (P. W. A.)         vide for the contribution of sufficient funds to      No. 10, 72d Cong., 1st sess.
Aug. 30,1935        cover the entire cost of the original dredging of
                   all inside channels and turning basins.
.Aug. 26, 1937    Deepening the jetty channel to 31 feet and all inner   Rivers and Harbors Committee Doc.
                   channels and the Brownsville and Point Isabel           No. 32, 75th Cong., 1st sess. (Con-
                   turning basins to 28 feet, provided no dredging         tains latest published map.)
                   will be done at public expense within 50 feet of
                   any established pierhead line, wharf, or other
                   structure.
        RIVERS   AND   HARBORS-GALVESTON,       TEX.,   DISTRICT    907
    Recommended modifications of project.-Under date of May 25,
1939, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for the enlargement of the turning basin
at Port Isabel, Texas, to 1,300 feet in length and 1,000 feet in width,
with a flared entrance, at an estimated first cost of $127,500, with
annual maintenance of $5,000 in addition to that now required, sub-
ject to certain conditions of local cooperation (H. Doc. No. 335, 76th
Cong., 1st sess.).
    Under date of May 6, 1941, the Chief of Engineers recommended
further modification of the existing project to provide for deepening
the channel through Brazos Santiago Pass to 35 feet from deep water
in the Gulf of Mexico to station 0+000; deepening and widening the
bay channel to 33 by 200 feet from station 0+000 to station 15+525;
deepening the Brownsville Channel to 32 feet from station 15+ 525 to
station 82+890; deeping the Port Isabel Channel and turning basin
to 32 feet; extending the north side of the Brownsville turning basin
5,140 feet to the east and deepening the basin to 32 feet; and dredging
the shallow-draft channel from the railroad bridge around the south
part of Port Isabel to the shore line to Laguna Madre and the
shallow-draft channel connecting with the Port Isabel turning basin
to provide a depth of 6 feet and a width of 60 feet; at an estimated
first cost of $635,000 with $22,000 annually for maintenance in addi-
tion to that now required; subject to certain conditions of local coop-
eration (H. Doc. No. 347,77th Cong., 1st sess.).
   Local cooperation.-Fully complied with.
    Terminal facilities.-On the westerly side of the turning basin at
Point Isabel there is a steel-sheet pile wharf about 550 feet long, pro-
vided with a sheet-metal transit shed 100 feet wide and 350 feet
long and a precooling plant of approximately 24 cars capacity each
8 hours. Westward, about 70 feet back of the warehouse on the
dock, is a sheet-metal warehouse 100 feet wide and 200 feet long.
Along the north side of the turning basin, distinctly separate from
other structures, is an oil dock 300 feet long equipped for receiving
and loading oil cargoes. All the facilities above mentioned are owned
by the Port Isabel, San Benito navigation district. An oil refinery
and storage tanks, served by pipe line, all privately owned, are lo-
cated near the Point Isabel turning basin. This refinery has a maxi-
mum daily capacity of 7,500 barrels of refined products and a tank
storage capacity of 360,000 barrels. The entire terminal system has
railroad and highway connections and is open to all on equal terms.
All docks and wharves are equipped with facilities for bunkering
ships and servicing with fresh water and electric currents.
   The Brownsville navigation district has constructed along the north
side of the Brownsville turning basin three concrete wharves, each
approximately 400 feet long, provided with sheet-metal-covered tran-
sit sheds, each approximately 80 feet wide and 400 feet long. Along
the west side of the turning basin is a concrete wharf about 400 feet
long provided with a sheet-metal-covered transit shed enclosing a
precooling plant of 100 cars daily capacity. To the north of the
general cargo terminal is a high-density cotton compress, privately
owned, with storage sheds for about 25,000 bales of cotton. All docks
and wharves are equipped with facilities for servicing ships with fresh
water and electric current. There are no bunkering facilities at this
terminal. To the eastward of the general cargo terminal is a creo-
908        REPORT       OF CHIEF OF            ENGINEERS,      U.     S. ARMY,             1942


soted-pile oil dock owned by the Brownsville navigation district for
unloading refined-oil cargoes into nearby privately owned storage
tanks of approximately 15,000 barrels capacity. This terminal has
railroad and highway connections and is open to all on equal terms.
   The terminals, as provided at Point Isabel and Brownsville, are
sufficient for existing and prospective commerce.
  Operations and results during fiscal year.-The U. S. seagoing hop-
per dredge Galveston redredged the jetty and sea bar channels from
July 14 to August 13, 1941, removing 480,750 cubic yards (bin measure-
ment) from a channel length of 7,000 feet at a cost of $28,873.50.
  The U. S. seagoing hopper dredge Galveston redredged the Point
Isabel and Brownsville Channels from October 13 to November 18,
1941, removing 441,558 cubic yards (bin measurement) from a channel
length of 35,000 feet at a cost of $32,627.32.
  There were additional costs of $8,022.98 for miscellaneous surveys
and inspections and $7.02 for resurveying and remapping the entire
waterway including improvements thereon.
   The total cost of all work for the year was $69,530.82, all for main-
tenance. The total expenditures were $69,029.66.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1940. The 25-foot project channels and jetties were com-
pleted in 1936. The sea bar and jetty channels and the channel from
inside the pass to a point opposite Long Island, and thence to the
turning basins at Point Isabel and Brownsville were deepened to the
new project dimensions in 1940.
   The controlling depths along the center line of the various channels
and turning basins were as follows: Deep water in the Gulf of Mexico
to jettied entrance, 31.5 feet; jetty channel to inside the pass, 27.0 feet;
channel inside the pass to Long Island, 28.0 feet; channel from Long
Island to Point Isabel turning basin, 30.5 feet; Point Isabel turning
basin, 30.0 feet; channel from Long Island to Brownsville turning
basin, 26.5 feet; Brownsville turning basin, 31.0 feet.
   The total cost of the existing project to June 30, 1942, was as follows:

                                                       New work           Maintenance              Total

Regular funds_                                           $710, 071. 15         $969, 724. 31    $1,679,795.46
Public Works funds                                      2, 848, 560. 03                           2, 848, 560. 03
     Total United States funds _                        3, 558, 631. 18         969, 724. 31      4, 528, 355. 49
Contributed funds                                       1, 683, 257. 70                           1, 683, 257. 70
      Total all funds              - --                 5, 241, 888. 88         969, 724. 31      6, 211, 613. 19


   The total expenditures were $4,527,575.18 of which $1,679,015.15
was from regular funds and $2,848,560.03 from Public Works funds.
In addition $1,683,257.70 was expended from contributed funds for
new work.
  Proposed operations.-The unexpended balance at the end of the
fiscal year, $115,675, will be applied as follows:
Accounts payable June 30, 1942________________________                                  -____       $780. 31
Maintenance :
    Dredge the sea bar and jetty channels with an available United
      States seagoing hopper dredge (November and December 1942)_                                57, 000. 00
    Dredge inside channels and turning basins with an available
      United States seagoing hopper dredge (May and June 1943)___                                57, 894. 69

        Total---__--     ---              --      --   _---_
                                                          --              --                    115, 675. 00
                  RIVERS AND HARBORS-GALVESTON,                                               TEX.,      DISTRICT                909
  The additional sum of $256,000 can be profitably expended during
the fiscal year 1944 to be applied as follows:
Maintenance :
    Dredge the sea bar and jetty channels with an available seagoing
      United States hopper dredge (November and December 1943)__ $56, 000
    Dredge all inland channels and basins by contract (August to De-
      cember 1943) ---------------------------------------           200, 000
           Total-------------------------------------                                                          -             256, 000

                                                   Cost and financial summary

Cost of new work to June 30, 1942 .__.                                          ------                             1 $4, 234, 486. 48
Cost of maintenance to June 30, 1942_--__                                                        --
                                                                                    -____________-                       969, 724. 31

      Total cost of permanent work to June 30, 1942_________                                                         5, 204, 210. 79
                                           --
Minus accounts payable June 30, 1942 _______________________                                                                 780. 31

           Net total expenditures_--                               ___                       ________                 5, 203, 430. 48
Unexp)ended balance June 30, 1942 ----------------------------                                                            115, 675. 00

           Total amount appropriated to June 30, 1942______________                                                 15, 319, 105. 48

    Fiscal year ending June 30                        1938               1939               1940            1941              1942


Cost of new work................................                     $88, 263. 21        $554, 092. 93
Cost of maintenance .............                  $123, 714. 15      25, 016. 38          53, 400. 06   $162, 263. 19       $69, 530. 82

        Total cost                                  123, 714. 15     113, 279. 59         607, 492. 99    162, 263. 19        69, 530. 82

Total expended                _                     105, 672. 28     107, 554. 21         624, 304. 45    178, 835. 94        69, 029. 66
Allotted                                    --      186, 000. 00     725, 400. 00         150, 000. 00     32, 156. 19        76, 077. 99



Balance unexpended July 1, 1941______________                                                                            $108, 626. 67
Amount allotted from War Department Civil Appropriation Act
  approved April 28, 1942_                    --------------                                                              110, 000. 00

      Amount to be accounted for_______________________                                                                   218, 626. 67
Deductions on account of revocation of allotment__________ ___                                                             33, 922. 01
            Net amount to be accounted for____                                                                            184, 704. 66
Gross amount expended_________                                       ______________                                        69, 029. 66
             Balance unexpended June 30, 1942_______________________                                                      115, 675. 00
Outstanding liabilities June 30, 1942_________________________                                                                 780. 31
            Balance available June 30, 1942_______                                       __________                       114, 894. 69
Amount that can be profitably expended in fiscal year ending June
                                 ---------------
30, 1944, for maintenance __________________________________                                                             256, 000. 00
   1 In addition, $1,806,619.37 was expended from contributed funds for new work.
   2 Exclusive of available funds.

      19. EXAMINATIONS,                            SURVEYS, AND CONTINGENCIES (GENERAL)

   The cost of work during the year amounted to $71,384.87, and the
expenditures were $105,044.88. The balance unexpended at the end
of the fiscal year, $150,881.25, including accounts receivable, plus
allotments to be made during the year will be applied as needed in pay-
ment of expenses incurred under this heading during the fiscal year
1943. The additional sum of $150,000 can be profitably expended dur-
ing the fiscal year 1944.
            493202-43-pt. 1, vol. 1--58
910             REPORT OF CHIEF OF ENGINEE'RS,                                 U. S. ARMY,                    1942

                                       Cost and financial summary


,Cost
Cost of new work to June 30,1942______
     of maintenance to June 30, 1942__----
                                                                          __
                                                                         _________-----            --
                                                                                                              -------------
                                                                                                              $1, 501, 879. 15

      Total cost of permanent work to June 30, 1942                                                           501, 879. 15
                                                                                                        -1,1--------
Plus accounts receivable June 30, 1942_____________---------                                                   30, 282. 09

      Gross total costs to June 30, 1942    ________                                                           1,532, 161. 24
Minus accounts payable June 30, 1942--------------------------                                                        127. 98

     Net total expenditures__
                            -----------------------------                                                         , 532, 033. 26
Unexpended balance June 30, 1942---------------------------                                                         120, 599. 16

           Total amount appropriated to June 30, 1942-------------1, 652, 632. 42

      Fiscal year ending June 30            1938           1939                   1940             1941                    1942


Cost of new work-          -       -    -     --   -   -                 -- ---------------                   -        -          -
Cost of maintenance__
                    .......            $191, 238. 48   $581, 747. 52         $109,917. 85       $113, 078. 99           $71, 384. 87
'Total expended     _.... . _           165, 925. 04    571, 305. 60           150, 122. 51      106, 538. 03           105, 044. 88

Allotted ___________ ____________       321, 500.00     558,000. 00            186,900. 00       140,000.00


Balance unexpended July 1, 1941_____________--
                                          --------------                                                          $225, 644. 04
Gross amount expended-----------------------------------                                                           105, 044. 88

      Balance unexpended June 30, 1942                                                                              20, 599. 16
                                                                                                                   1----------------------
Outstanding liabilities June 30, 1942____-------_                                                                        127. 98

     Balance available June 30, 1942___------------                                 ----                           120, 471. 18
Accounts receivable June 30, 1942_                                                                                  30, 282. 09

          Unobligated balance available June 30, 1942                                                               50, 753. 27
                                                                                                                   1----------------
Amount that can be profitably expended in fiscal year ending June
                               - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - -               -
30, 1944, for maintenance 1                                                                                       150, 000. 00
       Exclusive of available funds.


20. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED


                                                            For last           Cost and expenditures to                Estimated
                                                            full re-                 June 30, 1942                      amount
                     Name ofproject                         port see                                                    required
                                                            Annual                                                       to com-
                                                             Report            New work         Maintenance                plete
                                                              for-

1. Johnsons Bayou, La. l_______________ ______________            1933            $2, 261. 35      $54, 042. 26             (2)
2. Mputh of Trinity River, Tex.' -                                1928            79, 540. 44       10, 870. 95             (2)
3. Chocolate Bayou, Tex.' 3__________________________             1922             6, 512. 12       33, 248. 17              $8, 500
4. Bastrop Bayou, Tex. 3____________________________              1931             9, 920. 22       27, 129. 21              10, 000
5. Brazos River, Tex., from Velasco to old Washing-
     ton 1                                                        1924           216, 989. 48      223, 010.      52        (2)
6. Guadalupe River to Victoria, Tex.' 4                           1922           172, 547. 28      106, 100.      36        (2)
7. East Bay Bayou (Hanna
                     2       Reef), Tex.' 5-_       _....         1922             2, 476. 02           847.      80           7, 500
8. Oyster Creek, Tex.S_      __   _- __-                          1922             6, 942. 24        7, 556.      73        (2)

     1Channeladequate for commerce.
  2 Completed.
  3 Under date of May 25, 1939, the Chief of Engineers recommended modification of existing project in
H. Doc. No. 337, 76th Cong., 1st sess.
  4 Under date of Feb. 24, 1939, the Chief of Engineers recommended modification of the existing project
in H. I)oc. No. 247, 76th Cong., 1st sess.
  * No commerce reported.
               RIVERS AND HARBORS--GALVESTON,                                       TEX.,        DISTRICT                   911
                21. PLANT ALLOTMENT, GALVESTON, TEX., DISTRICT
                                   Cost and financial summary
Undistributed costs June 30, 1942__________---------------__                                                $2, 102, 483. 44

Net total cost to June 30, 1942 ______________-_____________                                          _     2, 102, 483. 44
                                            ------------------
Plus accounts receivable June 30, 1942_______                                                                   54, 061. 18
      Gross total costs to June 30, 1942_------ ----                                -------                  2, 156, 544. 62
Minus accounts payable June 30, 1942_________                                  _____________                    231, 276. 34
      Net total expenditures  ____________--------_                                                          1, 925, 268. 28
Unexpended balance June 30, 1942__________________________                                                      430, 976. 84
            Total amount appropriated to June 30, 1942_______________                                        2, 356, 245. 12

   Fiscal year ending June 30          1938             1939                   1940                 1941                1942


Total expended ...                  $257, 292. 26    $81, 166. 48       -$76, 796. 63         . $246, 274. 53       -$158, 382. 99
Allotted_       _399,                     848. 18    -69, 809. 08        148, 000. 00             126, 000. 00 _                .


Balance unexpended July 1, 1941-------            _----_                                                          $272, 5!3. 85
Gross amount expended__        -____________-_--      $4, 074, 309. 36
Less :
     Reimbursements collected----    $4, 223, 274.97
      Receipts from sales__ ___                              9, 417. 38
                                                                                    4, 232, 692. 35
                                                                                                                   -158, 32. 99

      Balance unexpended June 30, 1942_________                                                                    430, 97I'. 84
Outstanding liabilities June 30, 1942_ __ ________                                  $426, 745.05
Amount covered by uncompleted contracts --...                                         20, 376. 06
                                                                                                                   447, 121. 11

      Balance available June 30, 1942______________________  _                                                -- 16, 144. 27
Account receivable June 30, 1942______________________________                                                   54, 061. 18
            Unobligated balance available June 30, 1942______________                                               37, 916. 91
Status of all investigations for navigation called for by river and harbor acts
                           and committee resolutions

                                                             Date trans-
             Locality            Authorization act           mitted to                   Document No.             Recommenda-
                                                              Congress                                                tion
                                                                                                              i
                                                        -i                      i



Allens Creek, tributary of      River and Harbor
  Brazos River, Austin           Act, Aug. 26, 1937.
  County, Tex., for naviga-
  tion and flood control.
Aransas Pass, Tex., chan-       Rivers and Harbors           Sept. 17, 1941         House, 383, 77th               Favorable.
  nel to Intracoastal Water-     Committee resolu-                                   Cong., 1st sess.
  way.                           tion, July 25, 1940.
Arroyo Colorado, Tex.,          River and Harbor             Sept. 30, 1941         House, 402, 77th                  Do.
  from Llano Grande Lake         Act, Aug. 30, 1935.                                 Cong., 1st sess.
  to its mouth.
Arroyo Colorado, Tex.,          River and Harbor                 do     ----         -    . do ----------             Do.
  channel from a point at        Act, Aug. 26, 1937.
  or near Mercedes, Tex.,
  to its mouth, thence south
  to Port Isabel via Laguna
  Madre.
Brazos Island Harbor, Tex__     Rivers and Harbors           Aug.     4,1941        House, 347, 77th                  Do.
                                 Committee resolu-                                   Cong., 1st sess.
                                 tion, Oct. 24, 1939.
Brazos Island Harbor, Tex.,     Rivers and Harbors
  improvement at and near        Committee resolu-
  Port Isabel.                   tion, Feb. 11, 1941.
Brazos River, Tex., compre-     River and Harbor
  hensive survey for naviga-     Act, Aug. 26, 1937.
  tion, flood control, and
  other water uses.
912           REPORT OF CHIEF OF ENGINEERS,                                            U. S. ARMY,                 1942
Status of all investigations for navigation called for by river and harbor acts and
                         commi'ttee resolutions-Continued

                                                                   Date trans-
             Locality              Authorization act               mitted to                    Document No.         Recommenda-
                                                                    Congress                                             tion


Clear Creek and Clear Lake,      Rivers and Harbors             July 15, 1941                House, 319, 77th        Favorable.
  Tex.                             Committee resolu-                                           Cong., 1st sess.
                                  tion, Oct. 24, 1939.
Colorado River, Tex., for        Commerce Commit-              ...............              ....................
navigation and flood con-        tee resolution, Aug.
trol.                            4, 1936.
Colorado River and tribu-        River and Harbor              ---------------              ....................
taries, Texas, improve-          Act, Aug. 26, 1937.
ment for navigation and
flood control.
Corpus Christi, Tex., con-       _- do__       ----   --        May 20, 1942                                         Unfavorable.
struction of breakwaters,
                                                                                            ....................
sea walls, or jetties.
Guadalupe River, Tex., im-       Rivers and Harbors            ---------------
provement for navigation,         Committee resolu-
flood control, power, and         tion, Apr. 8, 1938.
irrigation (final report).
Houston Ship Channel, Tex:       Rivers and Harbors
                                   Committee resolu-
                                   tion, Apr. 24, 1941.
Laguna Madre to the Gulf         River and Harbor               Dec. 10, 1941                                             Do.
  of Mexico, channel across        Act, Aug. 26, 1937.
  Padre Island, Tex.
Lavaca River, Tex., in inter-     _--do__
                                   -                            Mar.              2, 1942   House, 659, 77th         Favorable.
  est of navigation and flood                                                                 Cong., 2d sess.
  control.
Lavaca and Navidad Rivers,       Rivers and Harbors            -----      do ....... .....
                                                                                         d o..........                    Do.
  for navigation and flood         Committee resolu-
  control.                         tion, Aug. 1, 1940.
Louisiana and Texas Intra-       Rivers and Harbors             Sept. 30, 1941              House, 402, 77th              Do.
  coastal Waterway, from           Committee resolu-                                          Cong., 1st sess.
  Corpus Christi, Tex., to        tion, Apr. 1, 1935.
  the Rio Grande Valley.
Louisiana-Texas Intra-           Rivers and Harbors             Oct.             15, 1941                            Unfavorable.
  coastal Waterway to              Committee resolu-
  modify section at and           tion, Oct. 5, 1940.
  near Port O'Connor, Tex.
Mill Creek, a tributary of       River and Harbor
  Brazos River in Austin          Act, Aug. 26, 1937.
  County, Tex., for naviga-
  tion and flood control.
Navidad River, Tex., for               do -_               -    Mar.              2,1942    House, 659, 77th         Favorable.
  navigation and flood con-                                                                  Cong., 2d sess.
  trol.
Pass Cavallo, Tex ..   _-- ---   Rivers and Harbors
                                    Committee resolu-
                                   tion, May 24, 1939.
Pass Cavallo to Port Lavaca,     Rivers and Harbors
  Tex., channel.                   Committee resolu-
                                   tion, Jan. 21, 1942.
Sabine-Neches Waterway,          Commerce Commit-               Oct.             31,1941    Senate, 158, 77th             Do.
  Tex., extension of project       tee resolution, Nov.                                       Cong., 1st sess.
  from Beaumont Turning            16, 1940.
  Basin upstream above
  Kirby Canal.
Sabine-Neches Waterway,          Rivers and Harbors
  Tex., removal of Harbor          Committee resolu-
  Island in Sabine River.          tion, Sept. 12, 1941.
San Antonio River, Tex.,         River and Harbor
  improvement for naviga-          Act, June 20, 1938.
  tion, flood control, power,
  and prevention of erosion.
Trinity River, Tex .........     Commerce Commit-               Oct.              1,1941    House, 403, 77th              Do.
                                  tee resolution, Dec.                                       Cong., 1st sess.
                                  10, 1929.
    Do ---                       River and Harbor              .-        do_                        _do__                 Do.
                                  Act, July 3, 1930.


                                   22. BUFFALO BAYOU, TEX.
  Location.-This project covers the improvement for flood control of
Buffalo Bayou and tributaries upstream from the Houston Ship Chan-
nel turning basin at Houston, Tex. The streams and watershed in-
volved are located in and immediately northwest of Houston, Tex.
  Existing project.-This provides for the improvement of Buffalo
Bayou and its tributaries above the turning basin (Houston) of the
         RIVERS   AND   HARBORS-GALVESTON,      TEX.,   DISTRICT     913
Houston Ship Channel to provide for the control of floods, the pro-
tection of the city of Houston from flood damages, and the prevention
of the deposit of silt in the turning basin of the Houston Ship Channel
by means of detention reservoirs, enlargement and rectifications of
channels, the construction of control works, and any diversions which
may be found advisable. The authorized cost of Federal participation
for construction is limited to $9,000,000. The total estimated cost of
the project is $31,995,400. Of this sum the Federal cost is estimated at
$9,000,000 for construction and $9,751,700 for lands and damages. The
estimated cost to local interests is $13,243,700.
   The existing project was authorized by the River and Harbor Act
approved June 20, 1938 (H. Doc. No. 456, 75th Cong., 2d sess.) and
the Flood Control Act approved August 11, 1939.
   Local cooperation.-See page 5 for requirements. The require-
ments are being complied with. The offer of the Harris County flood-
control district to advance the sum of $2,500,000 to the Department for
prosecution of the Buffalo Bayou project was accepted by the Secre-
tary of War on December 18, 1940.
   Operations and results during fiscal year-New work.-The opera-
tions during the fiscal year consisted of work preparatory to the acqui-
sition of lands, topographic and detailed surveys, soils explorations
and tests, studies and design, preparation of plans and specifications
and acquisition of lands required for the construction of Barker Dam
and the rectification of Buffalo Bayou below the Barker Dam outlet
works. A contract for the construction of Barker Dam and the recti-
fication of Buffalo Bayou below the Barker Dam outlet works has been
entered into, and contract work was initiated on February 2, 1942.
The costs during the fiscal year were $662,601.37, all for new work, of
which $438,799.18 were from funds advanced by local interests, and
$223,802.19 were from Federal flood-control funds. The expenditures
were $606,145.01, including $393,569.59 from funds advanced by local
interests and $212,575.42 from Federal flood-control funds.
   Condition at end of fiscal year.-Topographic surveys have been
completed on North Canal, Barker Reservoir, Addicks Reservoir, and
White Oak Reservoir. Tract surveys have been completed for all of
the North Canal and for Barker and Addicks Reservoirs. Record
searching and preparation of ownership maps have been completed for
the North Canal and for Barker and Addicks Reservoirs. Tract ap-
praisals along North Canal are about 10 percent complete. The pro-
curement of abstracts of title covering approximately 50 percent of
the North Canal area and all of the Barker Reservoir and Addicks
Reservoir areas and the Buffalo Bayou channel rectification area have
been accomplished. Soil explorations and tests are about 82 percent
complete. The work of designing and preparing contract drawings
and specifications for the construction of Addicks Dam is about 85
percent complete. The construction of Barker Dam and appurtenant
outlet works, channel rectification, and drainage ditches is 22.5 percent
complete. No work has been done on the second stage of development
which includes the construction of the South Canal and its appurte-
nant interception dam and rectification work. To'complete the proj-
ect, surveys, explorations, and detailed design must be completed, the
construction of the Barker Dam must be continued to completion, and
the construction of the remaining units of the authorized project must
be accomplished.
914            REPORT OF CHIEF OF ENGINEERS, U.                                          S. ARMY,               1942

   The total costs to the end of the fiscal year were $1,295,476.24, of
which $326,027.61 were from Federal funds for rivers and harbors;
$476,130.55 from funds advanced by local interests, and $493,318.08
from Federal flood-control funds. Total expenditures were $1,226,-
828.82, including $323,027.61 from Federal funds for rivers and har-
bors, $426,949.02 from funds advanced by local interests, and $473,-
852.19 from Federal flood-control funds.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $4,199,198.79, including $2,126,147.81 of Fed-
eral flood-control funds, and $2,073,050.98 of funds advanced by local
interests, will be applied as follows:
Accounts payable June 30, 1942, from flood-control funds $19,465.89
    and from advanced funds $49,181.53____________                                     _____-_ ___                      $'8,647. 42
New work:
   Designing and preparing plans and specifications for partial
     construction of earth section of Addicks Dam, for channel
     rectification and drainage ditches, and for the reconstruction
     and relocation of bridges, roads, ditches, and utilities affected
     by this construction (July to December 1942)_____________                                                           32, 000. 00
   Constructing Barker Dam and appurtenant outlet works by con-
            tract (July 1942 to June 1943) ___________------------                                                1, C67, 827. 60
         Constructing sections of Addicks Dam and appurtenant drain-
           age ditches, by contract (December 1942 to June 1943) _____                                                  400, 000. 00
         Rectifying South Mayde Creek from the Addicks outlet works
           to Buffalo Bayou, by contract (December 1942 to June 1943) _                                                 130, 000. 00
         Reconstructing and relocating bridges, roads, drainage ditches,
           and utilities affected by the construction of Addicks Dam
            (December 1942 to June 1943) _____________       ________                                                   150, 000. 00
         Acquiring lands, easements, and rights-of-way for Addicks Dam,
           and for rectification of South Mayde Creek, and partial acqui-
           sition of lands for Addicks Reservoir (July 1942 to June
           1943)_--------------------      -        _                      650, 723. 77
          Acquiring lands, easements, and rights-of-way for Barker Res-
           ervoir (July 1942 to June 1943)__________                    1, foo, 000. 00
               Total_         --       _              __   _                      ----------                      4, 199, 198. 79
  The additional sum of $200,000 can be profitably expended during
the fiscal year 1944 for the acquisition of lands.
                                            Cost and financial summary

                                           FLOOD) CONTROL, GEN'RAL,               FUNDS

Cost of new work to June 30, 1912__.                                                                                  $493, 318. 08
Cost of maintenance to June 30, 1942_
      Total cost of permanent work to June 30, 1942_____________                                                        493, 318. 08
Minus accounts payable June 30, 1942__________________________                                                           19, 465. 89

     Net total expenditures__ ----------------------                                                                    473, 852. 19
Unexpended balance June 30, 1942__ _________________                                                              2, 126, 147. 81

            Total amount appropriated to June 30, 1942__                                          -               2. 690, 000. 00

        Fiscal year ending June 30             1938                  1939            1940                1941                1942


Cost of new work_________              _ __________            _   ------------ - ----------          $269. 515. 89        $223,802.19
Cost of maintenance-                                       I_-                                   --     - --     ----       -- -- -
Total     expended____ ___   ___________
                                       ____                        _________________                   261, 276. 77         212, 575. 42

Allotted-__-----                   _                                         --      $300, 000         900,000.00         1,400,000.00
                RIVERS      AND HARBORS-GALVESTON,                              TEX.,     DISTRICT                           915
Balance unexpended July 1, 1941_________________________                                                $938, 723. 23
Amount allotted from War Department Civil Appropriation Act
   approved Apr. 28, 1942_        _______                                                               1, 400, 000. 00
       Amount to be accounted for                                                                       2, 338, 723. 23
Gross amount expended_____________________                              _      $213, 254. 15
Less:
     Reimbursements collected                                        $3. 73
        Receipts from sales ______________                          675. 00
                                                                                        678. 73
                                                                                                          212, 575. 42
            Balance unexpended June 30, 1942______________________                                     2, 126,147. 81
Outstanding liabilities June 30, 1942_________________________                                                22, 051. 99
       Unobligated balance available June 30, 1942______________                                        2, 104, 095. 82

Amount (estimated) required to be appropriated for completion of
    existing project        ____-----                                    ----                          15, 825, 700. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for new work 1 _                                                                          200, 000. 00
   1 Exclusive of available funds.

                                        RIVERS AND HARBORS FUNDS

Cost of new work to June 30, 1942 __________                                                            $326, 027. 61
Cost of maintenance to June 30, 1942__________________
      Total cost of permanent work to June 30, 1942__                                                     326, 027. 61
Net total expenditures__________________________                                                          326, 027. 61
Total amount appropriated to June 30, 1942_____________                                                   326, 027. 61


    Fiscal year ending June 30            1938          1939                 1940           1941                      1942

                                                                                            .   . ..       -    - -       - - -
                                                                                                                       - ..-      -
Cost of new work .. __________                                         $326, 027. 61
Cost of maintenance ............
Total expended___                        _ _        _          --       324, 314.84       $1,712. 77       .     .......

Allotted________________________                        $500, 000     -- 160, 000. 00                          -$13,972. 39



Balance unexpended            July 1, 1941______________________________                                  $13, 972. 39
Deductions on account of revocation of allotment____________----                                           13, 972. 39
        CONSOLIDATED COST AND FINANCIAL                 SUMMARY        FOR UNITED STATES                 FUNDS


Cost of new work to June 30, 1942____________                      $819, 345. 69
Cost of maintenance to June 30, 1942______________------------------------

     Total cost of permanent work to June 30, 1942____________                                           819, 345. 69
Minus accounts payable June 30, 1942____---__-------  -------                                             19, 465. 89
     Net total expenditures____________________________                                                  799, 879. 80
Unexpended balance June 30, 1942    ________--
                                            ____--------__                                             2, 126, 147. 81

            Total amount appropriated to June 30, 1942______________                                   2, 926, 027. 61

    Fiscal year ending June 30           1938           1939              1940             1941                       1942

Cost of new work
              ::  .-  -------- _ -----------
C ost of maintenance -- - - - - - - - - - -
                                                 -______________
                                                    -- - - - -
                                                                      $326, 027.61 $269, 515. 89 $223, 802. 19
                                                                     -- - - - - - - - - - - - - - - - -
Total expended ______________________________________________          324,314.84        262,989.54              212, 575.42
Allotted_              __                               $500, 000       140, 000. 00     900, 000. 00          1, 386, 027. 61
916          REPORT OF CHIE'                     OF' ENGINEERS,                  U. S. ARMIY,              1942

Balance unexpended July 1, 1941___                                                                               $952, 695. 62,
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942______________________________________                                               1, 400, 000. 00
     Amount to be accounted for______      __________                                                        2, 352, 695. 62
Deductions on account of revocation of allotment_                                                                13, 972. 39
         Net amount to be accounted for _________________--_-                                                2, 338, 723. 23
Gross amount expended_ _    ..--                   - $213, 254. 15
Less:
     Reimbursements collected_                                            $ 3. 73
    Receipts from sales_____                                             67 00 5.C



                                                                                                678.73
                                                                                                                     212, 575. 42

      Balance unexpended June 30, 1942_______                                                                2, 126, 147. 81
Outstanding liabilities June 30, 1942__                                                                          22, 051. 99
                                                                                                   ---------------

         Unobligated balance available June 30, 1942                                               ______
                                                                                                      _ 2, 104, 095. 82
Amount (estimated) required to be appropriated for completion of
existing project 1-____________________________________
                       --                                         15, 825, 700. 00
Amount that can be profitably expended in fiscal year ending June
   30, 1944, for new work 1-- -----------                                                                            200, 000. 00
   1 Exclusive of available funds.


                                                 ADVANCED           FUNDS


Cost of new work to June 30, 1942____________                                                                    $476, 130.55
Cost of maintenance to June 30, 1942___________________                                            __

     Total cost of permanent work to June 30, 1942__                                                                 476, 130. 55
Minus accounts payable June 30, 1942__________________________                                                        49, 181. 53

     Net total expenditures_                                                                                     426, 949. 02
Unexpended balance June 30, 1942__                                                                            2, 073, 050. 98

         Total amount appropriated to June 30, 1942_____________                                             2, 500, 000.00

   Fiscal year ending June 30               1938               1939                  1940          1941                     1942

Cost of new work ..-----------       -----------. ----------------- -------------      $37, 331. 37                       $438, 799. 18
Cost of maintenance.        .    .   --------------
                                        .     .      ..- -  --- -----------    ------- --------------
Total expended              -------------
                                     -      --        -----------      .. ..    ---------- _-     33, 379. 43              393, 569. 59
Allotted_                                                                                         97, 715. 00          2, 402, 285. 00



Balance unexpended July 1, 1941_______________                                                                       $64, 335. 57
Amount advanced under authorizing act of Oct. 15, 1940_                                                      2, 402, 285. 00

      Amount to be accounted for______                                                                       2        A
                                                                                                                     46     6205~7
Gross amount expended_                                                                  $393, 570. 84
Less reimbursements collected______ __                                                          1. 25
                                                                                                                     393, 569. 59

          Balance unexpended June 30, 1942 ________________________                                           2, 073, 050. 98
Outstanding liabilities June 30, 1942 ______________ $2, 525. 80
Amount covered by uncompleted contracts -----.- 1, 716, 897. 44
                                                                                                             1, 719, 423. 24

          Unobligated balance available June 30, 1942__-________-                                                    353, 627. 74
              RIVERS AND HARBORS--GALVESTON,                               TEX., DISTRICT                               917
           CONSOLIDATED COST AND FINANCIAL            SUMMARY FOR BUFFALO                   BAYOU,         TEX.


Cost of new work to June 30, 1942____________________                                   ___ $1, 295, 476. 24
Cost of maintenance to June 30, 1942___       --                                                -- --   --

      Total cost of permanent work to June 30, 1942_                                  __              1, 295, 476. 24
Minus accounts payable June 30, 1942_______________                                                       68, 647. 42

      Net total expenditures__                                                                        1, 226, 828. 82
Unexpended balance June 30, 1942___                                                          _        4, 199, 198. 79

           Total amount appropriated to June 30, 1942-_                                               5, 426, 027.61

   Fiscal year ending June 30           1938           1939            1940                 1941                    1942


Cost of new work..............        .______...                $326, 027. 61  $306, 847. 26                      $662, 601. 37
C ost of m aintenance          ----
                                ....- ... ... ... .... ... ... ... ...     ......
Total expended____________                      _ ______________     324, 314. 84     296, 368. 97                 606, 145. 01

Allotted     _-                                        $500, 000     140, 000. 00     997, 715. 00           3, 788, 312. 61


Balance unexpended July 1, 1941___                                                                   $1,   017,      031..19


Amount allotted from War Department Civil Ap-
  propriation Act approved Apr. 28, 1942_________ $1, 400, 000. 00
Amount advanced under authorizing act of Oct.
   15, 1940 _ _ _---   --                                                  2, 402, 285. 00
                                                                                                      3, 802, 285. 00
      Amount to be accounted for_                                                     ---        -    4, 819, 316. 19
Deductions on account of revocation of allotmen t__                                                         13, 972. 39

      Net amount to be accounted for___                                               -               4, 805, 343. 80
Gross amount expended_                                                      $606, 824. 99
Less reimbursements collected__                                    $4.98
Less receipts from sales  __                                   675.00
                                                                                    679. 98
                                                                                                           -606,145.01

           Balance unexpended June 30, 1942________________________                                   4, 199, 198. 79
Outstanding liabilities June 30, 1942______________ $24, 577. 79
Amount covered by uncompleted contracts---------1, 716,897. 44
                                                                                                      1, 741, 475. 23

           Unobligated balance available June 30, 1942______________                                  2, 457, 723. 56
Amount (estimated) required to be appropriated for completion
   of existing project 1---------------                                                              15, 825, 700. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for new work 1 ______________________________                                              200, 000. 00
   1 Exclusive of available funds.

                  23. WHITNEY RESERVOIR, BRAZOS RIVER, TEX.

  Location.-The site of the Whitney Dam is on the Brazos River,
Tex., about 442 miles above the mouth of the river, 5.5 miles southwest
of Whitney, Tex., and about 38 miles upstream from the city of Waco,
Tex.         (See U.         S.   Geological Survey sheets: Waco, Cleburne,                                              and
Grandbury, scale 1: 125,000, and Whitney, Blum, and Morgan, scale
1: 62,500.)
  Existing project.-The plan of improvement provides for a con-
crete dam about 1,870 feet long at the top, including a 1,200-foot
spillway section, and an earth embankment about 1,490 feet long.
 918         REPORT OF CHIEF OF                        ENGINEERS,           U.     S.   ARMY,     1942

The top of the dam will be about 116 feet above the river bed. The
reservoir will have a gross storage capacity of 721,000 acre-feet, in-
cluding 491,000 acre-feet of flood-control storage, 129,000 acre-feet of
power storage, and 101,000 acre-feet of dead storage. A powerhouse
will be located immediately downstream from the nonoverflow sec-
tion of the dam. The capacity of the initial installation of hydro-
electric generating facilities will be 30,000 kilowatts. The project
will afford substantial flood protection for the city of Waco, Tex., and
the lower Brazos River Valley and will provide for generation of
hydroelectric power, and for other beneficial water uses.
   The cost of the project, estimated in 1939, is $8,166,000 for con-
struction and $1,984,000 for land and damages, including railway
relocations, a total of $10,150,000.
   The estimated cost of annual maintenance, made in 1939, is $70,000
for maintenance and operation, including the power plant.
   The Flood Control Act, approved August 18, 1941, approved the
existing project in accordance with the recommendation of the Chief
of Engineers in House Document No. 390, Seventy-sixth Congress, first
session, which contains the latest published maps, and authorized
$5,000,000 for the initiation and partial accomplishment of the project.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-The operations during
the fiscal year consisted of preparation of detailed plans.
   The costs during the fiscal year were $28,802.41, all for new work.
There were no expenditures.
   Condition at end of fiscal year.-Detailedplans have been completed.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $100,000, and an allotment of $75,000 received
in August 1942, a total of $175,000, will be applied as follows:
Accounts payable---------------------------------------------                                       $28, 802. 41
Preparation of contract plans and specifications during fiscal year
   1943_                                  -------------------                                       146, 197. 59

             Total-----------------------------------------------                                   175, 000. 00
                                     Cost and financial summary

Cost of new work to June 30, 1942___________-________________                                       $28, 802. 41
Cost of maintenance to June 30, 1942__    ____

      Total cost of permanent work to June 30, 1942___-______-_                                      28, 802. 41
Minus accounts payable June 30, 1942_       --
                                         _________                                                   28, 802. 41

      Net total expenditures_
Unexpended balance June 30, 1942------------------------------                                      100, 000. 00
         Total amount appropriated to June 30, 1942____________---                                  100, 000. 00

   Fiscal year ending June 30            1938                   1939        1940           1941           1942

Cost of new work-      -        -         -              -        -    --                    -           $28, 802. 41
Cost of maintenance        -                                                                                     -
Total expended.
Allotted _                           _                                              -                    100, 000. 00
                                    __
             RIVERS     AND HARBORS--GALVESTON,                            TEX., DISTRICT       919
Amount allotted from War Department Civil Appropriation Act
approved May 23, 1941-------------------__-------------------                          100, 000.00
Outstanding liabilities June 30, 1942________-----------             ----- ---           28, 802. 41
      Balance available June 30, 1942______--------------------                          71, 197. 59
Amount allotted in August 1942 ---------             -----------------                   75, 000. 00
      Amount available during fiscal year 1943__----------------                        146, 197. 59
Amount (estimated) required to be appropriated for completion of
  existing project 1____                    -     --     ---------------
                                                 _-----_--                            9, 975, 000. 00
  1 Exclusive of available funds.

        24. EAGLE LAKE TO MATAGORDA, COLORADO RIVER, TEX.
   Location.-Along the Colorado River, Tex., between the town of
Matagorda and the town of Eagle Lake, extending from 6.5 to 115
miles above the mouth of the river. (See U. S. Geological Survey base
map, Texas, scale 1: 500,000.)
   Existing project.-The plan of improvement provides for a system
of parallel levees along the river, with the following features: About
82.2 miles of earth levee along the left bank of the river from mile 6.5 to
mile 115 above the mouth; about 53.9 miles of earth levee along the right
bank from mile 15 to mile 87; suitable drainage structures and appur-
tenant works; a cut-off channel 14,100 feet long at the town of Wharton
between mile 63 and mile 70.5; channel improvement near Glen Flora
between mile 75.6 and mile 77; construction of a new highway and a
new railroad bridge across the cut-off at Wharton; and alterations
of two highway and two railroad bridges across the floodway. The
project will provide protection to about 421,000 acres of agricultural
land and six towns against major floods reasonably to be contemplated.
   The Federal cost of the project, estimated in 1939, is $6,150,000. The
local cost including bridge alterations is estimated at $672,000.
   The existing project was authorized by the Flood Control Act ap-
proved August 18, 1941 (H. Doc. No. 312, 76th Cong., 1st sess., which
contains the latest published maps).
   Local cooperation.-See page 5 for requirements. In addition to
the usual requirements for local cooperation, as provided by law, local
interests are required to bear the expense of necessary bridge altera-
tions and to maintain and operate the two new bridges across the
cut-off at Wharton.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on this
project.
   Proposed operations.-No funds are available for operations during
the fiscal year ending June 30, 1943.
   The sum of $50,000 can be profitably expended during the fiscal
year ending June 30, 1944, on the preparation of detailed plans.
                                  Cost and financial summary
Cost of new work to June 30, 1942___
Cost of maintenance to June 30, 1942-----------------------------
       Net   total   expenditures---------------------------------                     ---
Total amount appropriated to June 30, 1942
Amount (estimated) required to be appropriated for completion of
existing project  __-- --------------------------------          $6, 150, 000
Amount that can be profitably expended in fiscal year ending June
30, 1944, for new work ---------------..-   -------------   -         50, 000
920     REPORT    OF CHIEF OF ENGINEERS,         U.   S.   ARMY,   1942

                 25. COLUMBUS, COLORADO RIVER, TEX.

   Location.-On the right bank of the Colorado River, about 135
miles above the mouth, at the city of Columbus in Colorado County,
Tex. (See U. S. Geological Survey base map, Texas, scale 1: 500,000.)
   Existing project.-The plan of improvement provides for an earth
levee about 28,500 feet long, around the city of Columbus, with suit-
able drainage structures and bank protection where necessary. The
improvements will protect the city of Columbus against major floods
reasonably to be contemplated.
   The cost of the improvement, estimated in 1939, is $250,000 for
construction and $18,000 for land and damages.
   The existing project was authorized by the Flood Control Act ap-
proved August 18, 1911 (H. Doc. No. 312, 76th Cong., 1st sess., which
contains the latest published maps).
   Local cooperation.-See page 5 for requirements.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on this
project.
   Proposed operations.-No funds are available for operations during
the fiscal year ending June 30, 1943.
   The sum of $20,000 can be profitably expended during the fiscal
year ending June 30, 1944, on the preparation of detailed plans.
                         Cost and financial summary
Cost of new work to June 30, 1942___
Cost of maintenance to June 30, 19429       __

      Net total expenditures___________________________            __--
Total amount appropriated to June 30, 1942________________________

Amount (estimated) required to be appropriated for completion of
existing project_                                                    $250, 000
Amount that can be profitably expended in fiscal year ending June 30,
1944. for new work________________________________________             20, 000

                    26. BRADY, BRADY CREEK, TEX.

   Location.-On Brady Creek, between 28.6 and 30.4 miles above
the mouth, in the city of Brady, McCulloch County, Tex. (See U. S.
Geological Survey sheet Brady, Tex., scale 1: 125,000.)
   Existing project.-The plan of improvement provides for an im-
proved floodway for Brady Creek and levees and floodwalls in the
city of Brady consisting of the following features: Approximately
9,700 feet of channel enlargement, 6,935 feet of earth levee, 345 feet
of concrete floodwall, alteration of two State highway bridges and
one railroad bridge, and the necessary drainage structures. The proj-
ect provides for the protection of the city of Brady from floods with
a peak discharge 2.4 times as great as that of the maximum flood of
record which occurred in July 1938.
   The Federal cost of the improvement, estimated in 1939, is $825,000
for construction. The local cost for lands and damages, including
bridge replacements and alterations, is $348,003.
   The existing project was authorized by the Flood Control Act ap-
proved August 18, 1941 (H. Doc. No. 441, 76th Cong., 1st sess., which
contains the latest published maps).
            RIVERS       AND HARBORS-GALVESTON,                       TEX.,        DISTRICT             921
  Local cooperation.-See page 5 for requirements. In addition to
the usual requirements for local cooperation as provided by law,
local interests are required to bear the expense of the necessary bridge
alterations.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on this
project.
   Proposed operations.-No funds are available for operations dur-
ing the fiscal year ending June 30, 1943.
   The sum of $30,000 can be profitably expended during the fiscal
year ending June 30, 1944, on the preparation of detailed plans.
                                   Cost and financial summary

Cost of new work to June 30, 1942_______________________                                  ________
Cost of maintenance to June 30, 1942                -                                         -
        Net total expenditures - - -                                           -   --           -           --
Total amount appropriated to June 30, 1942__---

Amount      (estimated)      required to be appropriated for completion of
  existing project-------                  --           -                                           $825,        00
Amount that can be profitably expended in fiscal year ending Ju ,e"0,
1944, for new work_                                                                                   0,000

                                   27. PECAN BAYOU, TEX.

   Location.- These improvements are located on Pecan Bayou and
its tributary, Hords Creek, in the State of Texas. Definite locations
of the individual items are given in the following paragraph. (See
U. S. Geological Survey sheets, Brownwood, Coleman, and Ballinger,
scale 1: 125,000, and Grosvenor and Zephyr, scale 1: 62,500.)
   Existing project.-The Flood Control Act approved August 18,
1941, authorized the plan of improvement for flood control and other
purposes on Pecan Bayou and tributaries as set forth in House Docu-
ment No. 370, Seventy-sixth Congress, first session, and authorized
$1,400,000 for initiation and partial accomplishment of the project,
including $460,000 for the Hords Creek Reservoir. The plan of im-
provement provides for the enlargement of the existing Lake Brown-
wood Reservoir and for the construction of the Hords Creek Reser-
voir.    The following tabulation gives descriptive data on these
reservoirs.
                                         Dams and Reservoirs

                     Name                                   Lake Brownwood                 Hords Creek

Nearest city-                 ---------------------
                                ............    Brownwood, Tex.---------- Coleman, Tex.
Distance above mouth (miles) ---                    __ 57.1 on Pecan Bayou-.....        27.8 on Hords Creek.
Height of dam-_                                        135 feet --__.....--             74 feet.
Type of dam                         -_          -      Earth fill ...... ----.-----     Earth fill.
Reservoir capacity ---------------------------------- 768,000 acre-feet- - ------
                                                                            --          21,200 acre-feet.
Estimated cost:
   Construction--__-                                                     $1, 678, 000                 $522, 000
   Lands and damages_ - -                                                    822, 000                   38, 000
      Total---------------------------------                            1 2, 500, 000                      000
                                                                                                        560,

  1Estimated first cost of enlarging Lake Brownwood Dam and Reservoir.        The estimated investment in
existing Lake Brownwood Dam and Reservoir is $1,500,000.
922      REPORT OF CHIEF       OF ENGINEERS,       U.   S.   ARMY,   1942

    The Hords Creek Reservoir will afford substantial flood protection
to the city of Coleman, Tex., and to other extensive areas in the Hords
Creek Valley, and will provide municipal water supply for the city
of Coleman.
    The Lake Brownwood Reservoir will afford substantial flood pro-
tection in the valleys of Pecan Bayou and the lower Colorado River,
including the city of Brownwood, Tex., and will also provide addi-
tional conservation storage.
   Local cooperation.-This project was adopted subject to the follow-
ing conditions: (a) That local interests contribute the sum of $100,000
toward the first cost of the Hords Creek Reservoir; and (b) that the
local agency owning and controlling Lake Brownwood permit the
United States to utilize, without cost, the existing dam, reservoir, and
appurtenant works, and any of its lands needed for the construction
and operation of the enlarged dam and spillway, and maintain and
operate the enlarged reservoir upon completion in accordance with
regulations prescribed by the Secretary of War.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on this
project.
   Proposed operations.-No funds are, available for operations during
the fiscal year ending June 30, 1943.
   Tht sum of $25,000 can be profitably expended during the fiscal
year ending June 30, 1944, on the preparation of detailed plans.
                          Cost and financial summary

Cost of new work to June 30, 1942____
Cost of maintenance to June 30, 1942____________________________

      Net total expenditures_
Total amount appropriated to June 30, 1942----------------           --

Amount (estimated) required to be appropriated for completion of
existing project____-----------------------------------          -- $2, 960, 000
Amount that can be profitably expended in fiscal year ending June 30,
1944, for new work --------------------------------          -           25, 000

                     28. NORTH CONCHO RIVER, TEX.

  Location.-These improvements are located on the North Concho
River, a tributary of the Concho River, in the vicinity of the city of
San Angelo, Tex. Definite locations of the individual items are given
in the following paragraphs. (See U. S. Geological Survey base map,
Texas, scale 1: 500,000, and sheet Wall, scale 1: 62,500.)
  LExisting project.-The Flood Control Act approved August 18,
1941, authorized the plan of improvement for flood control on the
North Concho River, Tex., as set forth in House Document No. 315,
Seventy-sixth Congress, first session, and authorized $2,000,000 for the
initiation and partial accomplishment of the project. The plan of
improvement provides for the construction of the San Angelo Reser-
voir on the North Concho River upstream from San Angelo and for
the construction of a floodway, levees, and floodwalls in the city of
San Angelo.
  The San Angelo Reservoir will be located about 6.7 miles above the
mouth of the North Concho River, near the town of San Angelo, Tex.
           RIVERS   AND   HARBORS-GALVESTON,           TEX.,   DISTRICT       923
The dam will be of the earth-filled type with a gate-controlled concrete
spillway located in the channel. An emergency overflow spillway will
be located in a draw to the south of the dam. The maximum height
of the dam will be 90 feet above the valley floor. The upstream slope,
when the height of the dam exceeds 30 feet, is to be protected by rip-
rap 18 inches thick laid on a 6-inch gravel blanket, and a rock drain is
provided at the toe of the dam. The reservoir will have a gross storage
capacity of 364,900 acre-feet. The estimated cost of construction is
$5,489,000 and of lands and damages is $542,000.
   The local protection works in the city of San Angelo provide for
constructing levees and floodwalls along vulnerable sections of the
city, filling in low-lying areas adjacent to the river, removing existing
channel obstructions, altering existing bridges, and improving the
carrying capacity of the channel over a reach from mile 0.9 to 3.5. En-
largement of the channel will be accomplished by excavating 1,057,000
cubic yards of material which, in turn, will be used to fill in the low-
lying areas along the south bank of the river in order to reclaim these
areas. Five highway bridges which restrict the waterway opening
will be reconstructed. Three low-water dams, two of which are located
adjacent to bridges and present serious obstruction to the free dis-
charge of the river, will be removed. The levees and floodwalls will
consist of about 9,270 feet of earthen embankment and 2,000 feet of
reinforced concrete wall. Two pumping stations and appurtenant
drainage structures, to handle interior drainage, will be constructed.
The estimated cost of construction is $769,000, and of lands and dam-
ages is $600,000.
   The reservoir will provide substantial flood protection in the val-
leys of the lower Concho and Colorado Rivers, and, supplemented by
the local protection works at San Angelo, it will afford protection to
that city from floods with a discharge one and one-half times as great
as that of the maximum flood of record, which occurred in September
1936.
  Local cooperation.-See page 5 for requirements.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done on this
project.
  Proposedoperations.-No funds are available for operations during
the fiscal year ending June 30, 1943.
  The sum of $70,000 can be profitably expended during the fiscal
year ending June 30, 1944, on the preparation of detailed plans.
                           Cost and financial summary

Cost of new work to June 30, 1942___
Cost of maintenance to June 30, 1942_

      Net total expenditures_
Total amount appropriated to June 30, 1942        ______________________

Amount (estimated) required to be appropriated for completion of
existing project---------------------------------------              $6, 800, 000
Amount that can be profitably expended in fiscal year ending June 30,
1944, for new work-----------------------------------------               70, 000
924      REPORT OF CHIEF OF ENGINEERS,               U.   S. ARMY,    1942

29. SNAGGING AND CLEARING UNDER AUTHORITY OF SECTION 2 OF
  THE FLOOD CONTROL ACT APPROVED AUGUST 28, 1937, AS AMENDED

   The Flood Control Act approved August 28, 1937, as amended by
the Flood Control Acts approved August 11, 1939, and August 18,
1941, authorized the allotment of not to exceed $500,000 from the flood-
control appropriations for any one fiscal year in the removal of ac-
cumulated snags and other debris from, and the clearing and straight-
ening of channels in navigable streams and tributaries thereof when
such work is advisable in the interest of flood control; provided that
not more than $25,000 shall be allotted for this purpose for any single
tributary from the appropriations for any one fiscal year.
   Funds were made available during the fiscal year 1941 for snagging
and clearing on the Trinity River and tributaries, Texas, and on the
Lavaca River and tributaries, Texas, in Lavaca County near Halletts-
ville, Tex., in the Galveston district. Additional funds were allotted
for the Trinity River and the Lavaca River in Jackson County during
the fiscal year 1942.
   The work to be done on the Trinity River consists of the removal of
snags and other debris from the river channel between mile 38 near
Liberty, Tex., to about mile 70. During the fiscal year no work was
done on the Trinity River because of unfavorable river stages. The
cost during the fiscal year was $60.74; the expenditures were $60.83.
   Snagging and clearing and removal of debris from channels of the
Lavaca River and tributaries was supplemented by a Work Projects
Administration project which involved the provision of relief labor
by that agency. The supervision of the relief labor and equipment,
materials, and supplies for the work were provided from regular flood-
control funds for snagging.
   The work of removing snags, trees, and other debris from the sec-
tion of the channel of the Lavaca River in Lavaca County near Hal-
lettsville, Tex., was completed from July 1 to October 31, 1941, and
December 31, 1941, to May 30, 1942. Clearing of approximately 24.8
miles of the river was completed during the fiscal year. The cost
during the fiscal year was $17,295.51.
   The work of removing snags, trees, and other debris from the sec-
tion of the channel of the Lavaca River in Jackson County, near
Edna, Tex., has not been started because of a shortage of labor in
that locality. The cost during the fiscal year for preliminary work
of this section was $789.67; the expenditures on the two sections of
the Lavaca River clearing project were $20,322.07.
   The total cost was $26,156.85. The total expenditures were $25,-
891.47. The balance unexpended on June 30, 1942, amounting to
$49,108.53, will be applied during the fiscal year 1943 to payment of
expenses incurred under this heading.
                           Cost and financial summary
Cost of new work to June 30, 1942 _____________--______----
                                                  ---                 _ $26, 156. 85
Cost of maintenance to June 30, 1942_______________-___           -------         -
      Total cost of permanent work to June 30, 1942_______________        26, 156. 85
Minus accounts payable June 30, 1942___________ ___--------------             265.38
      Net total expenditures     -         -      -                -_     25, 891. 47
Unexpended balance June 30, 1942 --                                       49,108. 53
      Total amount appropriated to June 30, 1942 _---      ------         75, 000. 00
                  RIVERS            AND HARBORS--GALVESTON,                                         TEX., DISTRICT                        925

    Fiscal year ending June 30                            1938                 1939               1940              1941               1942


                   .       .
Cost of new work _________________.                 ______.          _$8,                                              010. 93        $18, 145. 92
C ost of m aintenance                 -          - .-.-                     ----.                     . . . . . .. . . . .
                                                                                        - . --. -.. ---.-..
Total expended               _____________....------------.-                                                        5, 508. 57         20, 382. 90

Allotted .......----------            ------------------------                             --------------          45, 000. 00         30, 000. 00

Balance unexpended July 1, 1941_-------------------------------- $39, 491. 43
Amount allotted from War Department Civil Appropriation Act
  approved May 23, 1941----------------------------------------   30,000. 00
             Amount to be accounted for.._____                                      ___________                                     69, 491.43
Gross amount expended ----------------------------------------                                                                      20,382.90
      Balance unexpended June 30, 1942______________----   -------                                                                  49, 108. 53
Outstanding liabilities June 30, 1942_-__    ___-__-__- __ ------                                                                       265. 38
      Unobligated balance available June 30, 1942_------------------                                                                48, 843. 15
30. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD                                                                                CONTROL
   The cost of the work during the fiscal year amounted to $131,842.95,
and the expenditures were $130,735.47. The balance unexpended at the
end of the fiscal year, amounting to $89,751.87, plus the sum of $73,000
allotted in August 1942, will be applied as needed during the fiscal
year 1943 in payment of expenses incurred under this heading. The
additional sum of $150,000 can be profitably expended during the fiscal
year 1944.
                                                  Cost and financial summary
Cost of new work to June 30, 1942_________________-----------------
Cost of maintenance to June 30, 1942_________ __---------   __$1, 009, 210. 02
      Total cost of permanent work to June 30, 1942             1, 009, 210. 02                               -
Minus accounts payable June 30, 1942 --------------------------      5, 361. 89
       Net total expenditures _________________-___-_           1, 003, 848. 13
Unexpended balance June 30, 1942____ -       __________________
                                                  -_                89, 751. 87
       Total amount appropriated to June 30, 1942               1, 093, 600. 00

     Fiscal year ending June 30                           1938                  1939              1940               1941              1942

Cost of new work-$100                                       ___      , 32i. 2
                                                          196..34.$269.......                 3          0.       $ 9                 11.--
                                                                                                                                       -
Cost of maintenance-.......               _-..      $100, 196. 34   $269, 321.25             $358, 620. 12        $149, 229. 36      $131, 842. 95
Total expended----------------                        94, 986. 10           262, 490. 03      355, 095. 88         160, 540. 65       130, 735. 47
Allotted......----------------------                  385, 500. 00          270, 000. 00      298, 100. 00         140, 000. 00

Balance unexpended July 1, 1941--------------------------------                                                                   $220, 487. 34
Amount allotted from War Department Civil Appropriation Act
  approved May 23, 1941--------------------------------------                                                                        5, 500.00
       Amount to be accounted for__ _________________                                                                              225, 987. 34
Deductions on account of revocation of allotment____________---                                                                      5, 500. 00
      Net amount to be accounted for__     __--_------------                                                                       220, 487. 34
Gross amount expended __________------     _ ___ --          $130, 760. 12
Less reimbursements collected-------- ------------                  24. 65
                                                                                                                                   130, 735. 47
       Balance unexpended June 30, 1942____________             _____                                                               89, 751. 87
Outstanding liabilities June 30, 1942_____________--------------                                                                    5,361. 89
              Unobligated balance available June 30, 1942-___
Amount allotted in August 1942_______-- _________---------------
                                                                                                                  -_                84, 389.98
                                                                                                                                    73, 000. 00
      Amount available during the fiscal year 1943-__                                                                              157, 389. 98
Amount that can be profitably expended in fiscal year ending
  June 30, 1944, for maintenance          ___-----------------                                                                     150, 000. 00
     493202-43-pt. 1, vol. 1--59
926         REPORT OF CHIEF OF ENGINEERS,                                          U. S. ARMY,            1942

31. OTHER FLOOD-CONTROL PROJECTS FOR WHICH NO ESTIMATES
                      ARE SUBMITTED


                                                                   For last           Cost and expenditure to
                                                                  full report              June 30, 1942          Estimated
                      Name of project                             see Annual                                           re
                                                                                                                  amount

                                                                                   New wo
                                                                        Report for-New work          Mainte-
                                                                                                      nance        complete


1. La Grange, Colorado River, Tex__--
2. Alamogordo Dam and Reservoir, Pecos River,
                                                   1941
                                              -_________
                                                   1941
                                                                                  ------------____..__.....          $100, 000
     N. Mex.


Status of all investigations for flood control called for by flood-control acts and
                               committee resolutions


                                                                    Date trans-                                Recommenda-
           Locality                       Authorisation act          mitted to            Document No.             tion
                                                                     Congress

Aliens Creek, tributary of River and Harbor Act,
  Brazos     River, Austin     Aug. 26, 1937.
   County, Tex., for naviga-
  tion and flood control.
Brazos River, Tex., compre-      do_--
                                  ---


  hensive survey for naviga-
  tion, flood control and
  other water uses.
Brazos River and tributar- Flood Control Act,
  ies, Texas.                  Aug. 28, 1937.
Colorado (lower) River, Tex_ Flood Control Act,
                                          June 22, 1936.
Colorado River and tribu-               River and Harbor
  taries, Texas, improve-                 Act, Aug. 26, 1937.
  ment for navigation and
  flood control.
Colorado River, Tex., im-               Commerce Committee
  provement for navigation                resolution, Aug. 4,
  and flood control.                      1936.
Colorado River, Tex., above             Flood Control Act,
  county line between Coke                June 22, 1936.
  and Runnels Counties.
Guadalupe River, Tex., im-              Rivers and Harbors
  provement for navigation,               Committee resolu-
  flood control, power and                tion, Apr. 8, 1938.
  irrigation (final report).
Lavaca and Navidad River,               Rivers and Harbors       Mar. 2,1942            House, 659, 77th       Favorable.
  Tex., for navigation and                Committee resolu-                               Cong., 2d sess.
flood control.                          tion, Aug. 1, 1940.
Lavaca River, Tex, in in-               River and Harbor        .   -      do .......   -..-do ...
                                                                                                 _ ......         Do.
  terest of navigation and                Act, Aug. 26, 1937.
flood control.
Lavaca River, Tex      -- _-_--         Flood Control Act,          _      do ..--.        -do
                                                                                        .---     _     . --
                                                                                                     ..-.         Do.
                                         June 28, 1938.
Leon River, Tex .. __-----              Flood Control Act,        M..2,..1942..
                                         June 22, 1936.
Mill Creek, a tributary of              River and Harbor        ...............
  Brazos River in Austin                 Act, Aug. 26, 1937.
  County, Tex., for naviga-
tion and flood control.
Navidad River, Tex., for                River and Harbor         Mar. 2, 1942           House, 659, 77th          Do.
navigation and flood con-               Act, Aug. 26, 1937.                             Cong., 2d sess.
trol.
Neches River and tributar-              Flood Control Act,      ........ ......
ies, Texas.                              June 22, 1936.
Neches River and tributar-              Flood Control Act,
ies, Texas and Louisiana.                May 15, 1936.
Nueces River and tributar-              Flood Control Act,
ies, Texas.                              June 4, 1936.
    Do__            ____                Flood Control Act,
                                          June 22, 1936.
Sabine River and tributar-              Flood Control Act,
  ies, Texas and Louisiana.
Sabine River, Tex     -...---.            May 15, 1936.
                                        Flood Control Act,
                                          June 22, 1936.
San Antonio River, Tex.,                River and Harbor
  improvement for naviga-                 Act, June 20, 1938.
  tion, flood control, power,
  and prevention of erosion.
               RIVERS AND HARBORS-DENISON,                                            TEX., DISTRICT                           927
Status of all investigations for flood control called for by flood-control acts and
                         committee resolutions--Continued

                                                                   Date trans-                                      Recommenda-
          Locality                Authorization act                 mitted to               Document No.                tion
                                                                    Congress

San Jacinto River and tribu-    Flood Control       Act,
  taries in Montgomery,           Aug. 28, 1937.
  Walker,    San Jacinto,
  Grimes, Waller, Liberty,
  and Harris Counties, Tex.
Santa Isabel Creek, north-      Flood Control        Act,              ..               -
  west of Laredo, Webb            June 28, 1938.
  County, Tex.
Trinity River and tributar-     River   and    Harbor          Oct.         1, 1941     House, 403, 77th             Favorable.
ies, Texas.                      Act, July 27, 1916.                             Cong., 1st sess.
Trinity River, Tex __-_.-_      Flood Control Act,             _---Ado-----...do-----o.                                  Do.
                                  May 31, 1924.
   Do_____
      ---------------      .    Flood   Control     Act,       _      do     ...      .....   do-........       .    -Do.
                                  June 22, 1936.


IMPROVEMENT                     OF RIVERS AND HARBORS                                                               IN      THE
                               DENISON, TEX., DISTRICT
   This district comprises a portion of western Arkansas, northern
Texas, southern Oklahoma, and a small portion of eastern New
Mexico embraced in the drainage basin of the Red River and its
tributaries above Fulton, Ark.
   District engineer: Maj. Gordon E. Textor, Corps of Engineers, to
July 29, 1941, and Lt. Col. William W. Wanamaker, Corps of En-
gineers, since that date.
   Division engineer: Col. Stanley L. Scott, Corps of Engineers.
                                              IMPROVEMENTS

                     Navigation                            I                             Flood control
                                                   Page                                                                        Page
1. Examinations,         surveys,       and                    3. Denison Reservoir, Red River,
      contingencies      (general) ____            927                 Tex.        and Okla ____________                       928
2. Other projects for which no                         4. Lugert-Altus Reservoir, North
     estimates are submitted __.                   928      Fork of Red River, Okla_ __                                        932
                                                       5. Preliminary examinations and
                                                            surveys for flood control-__                                       933

    1. EXAMINATIONS,               SURVEYS, AND CONTINGENCIES (GENERAL)

   The cost of work during the year was $13,165.41; the expenditures
were $13,117.21. The balance unexpended at the end of the fiscal
year, $57,968.61, will be applied as needed during the fiscal year
1943 to payment of expense incurred under this heading. No addi-
tional funds will be required for the fiscal year ending June 30,
1944.
                         Cost and financial summary
Cost of new work to June 30, 1942_____________________________
Cost of maintenance to June 30, 1942___________________________                                                 1$562, 107. 03
     Total cost of permanent work to June 30, 1942__-________.
                                                        .                                                           562, 107. 03
Minus accounts payable June 30, 1942....                                                                             53, 418. 66
     Net total expenditures---
                           .........                                     _ -_ _                                     508, 688. 37
Unexpended balance June 30, 1942-----_-                                - - _ _--              -      -      -        57, 968. 61
        Total amount appropriated to June 30, 1942__----_                                                           566, 656. 98
  1 Reduced to $305.24, adjusted costs, fiscal year 1941.
928          REPORT        OF   CHIEF       OF        ENGINEERS,           U.     S.      ARMY,       1942



   Fiscal year ending June 30            1938             1939               1940              1941              1942


Cost of new work------------   --      --   ------------------              ----     -- ------
Cost of m aintenance-............      $26,564.59        $450,005.78   2   $47, 520. 78     $24,850.47          $13, 165.41

Total expended            __            27, 529. 89     385, 336. 85        60, 449. 48       22, 254. 94        13, 117, 21

Allotted_    ___----27,                    529. 89      515,127. 09         11, 000. 00       13, 000. 00



Balance unexpended July 1, 1941____----          _____________----_ $71, 085. 82
Gross amount expended __------------------------______     $19, 212. 76
Less reimbursements collected__________________              6, 095. 55
                                                                        13, 117. 21

      Balance unexpended June 30, 1942_______________________                                                57, 968. 61
Outstanding liabilities June 30, 1942----------------------------                                            52, 853. 12

            Balance available June 30, 1942..                    ---       --------                           5,115. 49
   2Adjusted       cost fiscal year 1940, $4,250.00.


   2. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED

                                                          For last     Cost and expenditures to
                                                          full re-           June 30, 1942                    Estimated
                                                           portofsee
                                                         Name         ________________
                                                                  project                                     amount re-
                     Name of project                      Annual                                              quired to
                                                          Report       New work            Maintenance        complete
                                                            for-

Red River from Fulton, Ark., to mouth of Washita             1924      $378, 573. 82        $182, 157. 05    Maintenance
  River, Okla.'                                                                                                only.

  1 Curtailment of project recommended in H. Doc. No. 947, 64th Cong., 1st sess.


Status of all investigations for navigation called for by river and harbor acts
                           and committee resolutions

                                                             Date trans-
             Locality             Authorization act           mitted to               Document No.          Recommenda-
                                                              Congress                                          tion

Red River, La., Ark., Okla.,     Rivers and Harbors
and Tex., for navigation,         Committee resolu-
flood control, water power,       tion, Feb. 25, 1938.
and irrigation (report be-
ing prepared by Special
  Board).
Red River, La., Ark., Okla.,     CommerceCommittee
and Tex., and connecting         resolution, Feb. 8,
waterways, singly or to-         1939; Flood Control
gether,   for navigation,        Committee resolu-
flood control, and irriga-       tion, Jan. 26, 1939;
tion (report being pre-          Rivers and Harbors
pared by Special Board).         Committee resolu-
                                  tion, Jan. 24, 1939.



             3. DENISON RESERVOIR,                     RED RIVER,               TEX. AND OKLA.


   Location.-Denison Reservoir is located on Red River, 751 miles
above the mouth of the river and 5 miles northwest of Denison, Tex.
 (See U. S. Geological Survey Maps for Denison, Tex., and Tisho-
mingo, Okla., quadrangles; scale 1: 125,000.)
   Existing project.-The plan of improvement provides for the con-
struction of a roll-filled dam 15,200 feet long, rising 165 feet above
the stream bed with a reservoir providing 2,745,000 acre-feet of
flood-control storage, 2,060,000 acre-feet of power storage, and 1,020,-
          RIVERS AND HARBORS-DENISON,         TEX.,   DISTRICT     929
000 acre-feet for accumulation of silt. The outlet works, consisting
of a gate-control house and eight conduits, each 20 feet in diameter,
and the powerhouse, are located on the right abutment. A chute-
type spillway located in a saddle on the right bank will discharge
through a creek to a point 1 mile below the dam. The project pro-
vides for flood protection to lands in Texas, Oklahoma, Arkansas,
and Louisiana, the generation of power, the improvement of naviga-
tion facilities, the regulation of the flow of the Red River, and other
beneficial uses. The existing project was authorized by the Flood
Control Act approved June 28, 1938, and amended by section 4,
Public, No. 868, Seventy-sixth Congress, third session, approved Octo-
ber 17, 1940. (See H. Doc. No. 541, 75th Cong., 3d sess., which
contains the latest published maps.) The estimated cost of the project
is $32,723,725 for construction and $15,566,275 for lands, damages,
and relocations.
   In addition to the above work, surveys and studies for a dam on
Red River, Tex., pursuant to provisions of the Emergency Relief
Appropriation Act of April 8, 1935, were undertaken at a cost of
$433,539.25 from appropriations contained in that act.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Constructionof the out-
let works was completed. Work under a continuing contract for the
construction of the main dam embankment and excavation for the
spillway was continued and a total of 6,673,000 cubic yards of common
and rock excavation was executed and a total of 4,484,628 cubic yards
of random, pervious and impervious fill was placed. Clearing of the
land in the reservoir area by hired labor and contract was continued
and a total of 4,179 acres was cleared. Appraisal and negotiations for
purchase of lands were carried on by hired labor and 46,467 acres of
land were acquired. Continuing contracts for the relocation of the
St. Louis-San Francisco Railroad and construction of the spillway
were awarded and preliminary construction operations started. Con-
tracts for furnishing and installing powerhouse generators, turbines,
governors, cranes, penstocks, and miscellaneous powerhouse equip-
ment were awarded and fabrication of same started. Plans and speci-
fications for the relocation of United States Highway No. 70 were
completed. Design of the powerhouse and switchyard studies were
continued. The costs during the fiscal year were $5,390,175.84 for new
work. The expenditures were $5,365,578.23. All expenditures were
from regular funds.
   Condition at end of fiscal year.-Constructionof the outlet works is
complete. Construction of the main dam embankment is 51 percent
complete. Construction of substructures for relocation of St. Louis-
San Francisco Railway is 84 percent complete. Relocation of the
St. Louis-San Francisco Railway is 5 percent complete. Construction
of the spillway has been started. Contracts for the fabrication of
powerhouse equipment have been awarded. The total cost of the
existing project to the end of fiscal year, all for new work, was $16,-
152,337.36. all from regular funds. Total expenditures were $15,631,-
240.84 all from regular funds.
   The work remaining to be done consists of completing the work
now in progress; design and construction of the powerhouse; and the
relocation of roads, railroads and utilities.
930       REPORT OF CHIEF OF ENGINEERS,                        U. S. ARMY,   1942

  Proposed operations.-The balance unexpended on June 30, 1942,
$16,907,080.20, and accounts receivable, $677,323.18, a total of $17,584,-
403.38, will be applied as follows:
Accounts payable----------------------------------------                       $882, 095. 46
New work:
    Engineering and administrative: Engineering and office
      studies (by hired labor), including material, July 1, 1942,
      to June 30, 1943----------------------------------                        175, 000. 00
    Land acquisition: Acquisition of land for reservoir area (by
      hired labor), July 1, 1942, to June 30, 1943_--------                   2, 500, 000. 00
    Clearing: Clearing reservoir area (by hired labor and con-
      tract), including material, July 1, 1942, to June 30, 1943__              980, 000. 00
    Service railroad to dam: Operation agreement for service
      railroad to dam (by contract), July 1, 1942, to June 30, 1943_             30, 000. 00
    Dam structures: Continue the construction (by contract), in-
      cluding material, of dam embankment and spillway exca-
      vation, July 1, 1942, to June 30, 1943--_-----------                    2, 000, 000. 00
    Construction (by hired labor), including material, of slope
       protection for the main dam embankment, July 1, 1942,
        to June 30, 1943 ____ _________________-------------                     71,900.00
      Continue the construction of spillway (by contract), includ-
        ing material furnished by Government, July 1, 1942, to
        June 30, 1943-_ ------
                            _.      _----_-----------      ----------  1, 394, 800. 00
      Construction of powerhouse and additional equipment (by
        contract), including material, July 1, 1942, to June 30, 1943_ 1, 750, 000. 00
      Purchase of powerhouse equipment, July 1, 1942, to June 30,
        1943 ----------------------------------------------------         921, 300. 00
      Relocations:
          Complete the construction (by contract), .including ma-
             terial, of the substructures for the Washita River and
             Rock Creek Bridges for the relocation of the St. Louis-
             San Francisco Railway, Liggett to Platter and Lake-
             side to Mead. Okla., July 1 to Sept. 1, 1942_----------_     107, 000. 00
           Continue the relocation of St. Louis-San Francisco Rail-
             way, Liggett to Platter and Lakeside to Mead, Okla.,
             (by contract), including material, July 1, 1942, to June
             30,   1943                    _           --           -    -________________
                                                                              1, 808, 000. 00
          Relocation of United States Highway No. 70, Madill to
            Marietta, Okla. (by contract), including material, July
             1, 1942, to June 30, 1943 -                                      1, 450, 707. 92
          Relocation Oklahoma State Highway No. 99 (by contract),
            including material,' Aug. 1, 1942, to June 30, 1943 --- _           300, 000. 00
          Relocation, St. Louis-San Francisco Railway, Randolph
            to Ravia (by contract), including material, Aug. 1,
            1942, to June 30, 1943_-_                 _ ______        _         250, 000. 00
          Relocation, Missouri-Kansas-Texas Railroad, Pottsboro
            to Sadler (by contract), including material, Nov. 1,
             1942, to June 30, 1943----__-----------                _ ____      205, 400. 00
          Relocation of power transmission lines (by contract),
            including material, July 1. 1942, to June 30, 1943-----..            74, 200. 00
          Relocation of Southwestern Bell telephone line, July 1,
            1942, to June 30, T943 -                --                           69, 400. 00
          Relocation of pipe lines (by contract), including mate-
            rial, July 1, 1942, to June 30, 1943_   _
                                                 ------------------              50, 000. 00
          Relocation of cemeteries (by contract), including mate-
            rial July 1, 1942, to June 30, 1943_ _-                              30, 000. 00
          Agreement with the State of Oklahoma for relocation
            of highway, July 1, 1942, to June 30, 1943------------              916, 400. 00
          Agreement with the State of Texas for relocation of
            highways, July 1, 1942, to June 30, 1943_ _-                        618, 200. 00
          Remedial construction to mineral rights (Cumberland
            oil field) Aug. 1, 1942, to June 30, 1943--------------           1, 000, 000. 00
               Total proposed operations for the fiscal year 1943_ _ 17, 584, 403. 38
  With this expenditure of funds it is estimated that the project
will be 67 percent complete at the end of fiscal year 1943.
                 RIVERS AND HARBORS-DENISON,                                               TEX., DISTRICT                          931
   The additional sum of $10,000,000 can be profitably expended dur-
ing the fiscal year 1944 as follows:
New work:
   Engineering studies and explorations________________________      $100, 000
   Acquisition and clearing land for reservoir area ___________-      309, 100
   Embankment construction, spillway excavation, and slope
     protection ------------       ------------------------------ 2, 694. 800
   Spillway construction ---------                                1, 840, 000
   Construction of powerhouse---------------------------          2, 054, 800
   Powerhouse equipment----------------------------------          1, 437, 100
   Relocations                                                      , 564, 200
                                                                  1-----------------------------
     Total for all work, fiscal year 1944_______________________ 10, 000, 000
  With this expenditure of funds it is estimated that the dam and
powerhouse will be substantially complete and the project as a whole
will be about 90 percent complete at the end of the fiscal year 1944.
                                          Cost and financial summary
Cost of new work to June 30, 1942------------------------$16,      152, 337. 36
Cost of maintenance to June 30, 1942_______________________
       Total cost of permanent work to June 30, 1942----------16, 152, 337. 36
Undistributed costs June 30, 1942______________---______         -316, 324. 24
      Net total cost to June 30, 1942________ __- -____-___                                                          15, 836, 013. 12
Plus accounts receivable June 30, 1942__    __-_____________---                                                          677, 323. 18
     Gross total costs to June 30, 1942_____________________                                                         16, 513, 336. 30
Minus accounts payable June 30, 1942______________________                                                               882, 095. 46
     Net total expenditures _-----------                                                                            15, 631, 240. 84
Unexpended balance June 30, 1942         ------------------------                                                    16, 907, 080.20
     Total amount appropriated to June 30, 1942------------                                                         32, 538, 321. 04

   Fiscal year ending June 30                    1938                 1939              1940                 1941             1942

Cost of new work                       - - - - - __ $133, 039. 45 $2, 863, 331. 32 $7, 765, 790. 75
                       _______-__-__-_____                                                                                $5, 390,175.84
Cost of maintenance-      -- - -     -- -         -- --     -   -    --      -     --- -    -       -     ---------
Total expended     _         - -- -----     --    --    -- --       162, 462. 26   2,665, 118.09        7, 438, 082. 26    5, 365, 578. 23

Allotted------                -------------
                                       --          -
                                            - -.-.--
                                               -                5,863. 373.09      7, 224, 947.95       8, 500, 000.00    10, 950,000.00


Balance unexpended July 1, 1941__    __------------------------    $11, 322, 658. 43
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942_ ___-----------------------------          10, 950, 000. 00
       Amount to be accounted for-----------------------__          22, 272, 658. 43
Gross amount expended---------------------$7,         280, 718. 03
Less :
    Reimbursements collected--- $1,903, 537. 10
    Receipts from sales----------     11, 602. 70
                                                                                        1, 915, 139. 80
                                                                                                                      5, 365, 578. 23
      Balance unexpended June 30, 1942__ --      __-_____        _                                                  16, 907, 080. 20
Outstanding liabilities June 30, 1942____________ $2, 314, 925. 77
Amount covered by uncompleted contracts-------- 7, 154, 214. 49
                                                                                                                      9, 469, 140. 26
Balance available June 30, 1942      -----------------------                                                          7, 437, 939. 94
Accounts receivable June 30, 1942_----------------------------                                                            77, 323. 18
      Unobligated balance available June 30, 1942_...........                                                         8, 115, 263. 12
Amount (estimated) required to be appropriated for completion
                    1 - - - -- - -
                                - - - - - - -- - - - -   - - - -
of existing project                                                                                                15, 751, 678. 96
Amount that can be profitably expended in fiscal year ending June
30, 1944, for new work ---------                      -  - --                                                      10, 000,000. 00
1Exclusive of available funds.
932    REPORT OF CHIEF OF ENGINEERS, U. S. ARMVIY,              1942

4. LUGERT-ALTUS RESERVOIR, NORTH FORK OF RED RIVER, OKLA.

   Location.-Lugert-Altus Reservoir is located on the North Fork of
Red River near Altus, Okla. (See sectional aeronautical chart, Okla-
homa City sheet, scale 1: 500,000.)
   Existing project.-The Flood Control Act approved June 28, 1938,
authorized the construction of the Lugert-Altus flood control and
reclamation reservoir on the North Fork of the Red River in Okla-
homa at an estimated cost of $2,497,000 on the following basis as to
division of the cost of construction:
    (a) The Chief of Engineers shall report to the President on or
before November 1, 1938, the value of said Lugert Reservoir as a
flood-control works, and the value so reported shall be the maximum
amount authorized to be appropriated as a charge against any funds
appropriated and available for the construction for flood-control
projects.
    (b) The remainder of the estimated cost of such Lugert Reservoir,
namely, the estimated total cost of the reservoir, less the amount
reported by the Chief of Engineers as the value of said reservoir as a
flood-control project, is also authorized to be appropriated out of the
special fund in the Treasury of the United States created by the act
of June 17, 1902, and therein designated "the reclamation fund" for
the construction of said Lugert Reservoir for reclamation and irriga-
tion as reported in Senate Document No. 153, Seventy-fifth Congress,
third session, and as further authorized by the last paragraph on page
37 of Public Act No. 497, Seventy-fifth Congress, third session, pro-
viding that the construction of said Lugert Reservoir and Altus rec-
lamation project shall not be undertaken until the Chief of Engineers
and the Secretary of the Interior join in an agreement as to the division
of cost of the construction of the said reservoir.
    Operations and results during fiscal year.-The Lugert-Altus
project is being constructed by the U. S. Bureau of Reclamation with
financial cooperation from the War Department to provide for the
flood-control features of the project. The value of the Lugert-Altus
project for flood control, $1,130,000, has been reported to the President
by the Chief of Engineers. The amount of $630,000 allotted from
flood-control appropriations was transferred during the fiscal year to
the U. S. Bureau of Reclamation completing the participation by this
Department in the financing of the Lugert-Altus project.
    Condition at end of fiscal year.-The total amount of $1,130,000
representing the value of the Lugert-Altus project for flood control
has been transferred from flood-control appropriations to the U. S.
Bureau of Reclamation.
    Proposedoperations.-None, since the participation by this Depart-
ment in the financing of the Lugert-Altus project has been completed.
                        Cost and financial summary
Cost of new work to June 30, 1942_ ________-_--        $1, 130, 000. 00
Cost of maintenance to June 30, 1942__________________------

      Total cost of permanent work to June 30, 1942_____-____    1, 130, 000. 00
Net total expenditures____________ -      _              -..     1, 130, 000. 00
      Total amount appropriated to June 30, 1942----___          1, 130, 000. 00
                  RIVERS AND HARBORS-DENISON, TEX., DISTRICT                                                                                933

   Fiscal year ending June 30                       1938             1939                  1940                   1941                   1942


Cost of new work__________________________________                                 $500, 000.00                                        $630, 000. 00
Cost of maintenance_
Total expended __________________                       _____________               500, 000.00         _________                       630, 000. 00

Allotted______________           ___                              $500,000. 00    --------------         $450,000.00                    180, 000. 00



Balance unexpended July 1, 1941__________ -------                                                                             $450, 000. 00
Amount allotted from War Department Civil Appropriation Act ap-
proved April 28, 1942-----------------------------------                                                                       180, 000. 00

      Amount to be accounted for                                                                                                     000. 00
                                                                                                                                6____________30,
Gross amount expended----------------------------------                                                                         630, 000. 00

5. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL.

  The cost of work during the year was $22,234.87; the expenditures
were $19,832.44. The balance unexpended at the end of the fiscal year,
$32,105.24, will be applied as needed during the fiscal year 1943 to pay-
ment of expenses incurred under this heading.
                                                  Cost and financial summary

Cost of new work to June 30, 1942____________-_________________
                                               --       _ $114, 772. 86
Cost of maintenance to June 30, 1942 ______________________--

      Total cost of permanent work to June 30, 1942-                                                         --                     114, 772 86
Minus accounts payable June 30, 1942--------------------                                                                              4, 974. 69

     Net total expenditures___________________________                                                                              109, 798. 17
Unexpended balance June 30, 1942_________________________                                                                            32, 105. 24

          Total amount appropriated to June 30, 1942____________                                                                    141, 903. 41

   Fiscal year ending June 30                        1938               1939               1940                   1941                   1942
Cost of new work-.         .        .   .. ----                                            ..                             ...-.--

Cost of maintenance ...........              _      $3, 752. 93    $33, 150. 48      $46, 617. 34             $9, 017. 24               $22, 234. 87
Total expended------------------                     3, 752. 93     30, 802. 55           46, 361.90              9, 048. 35             19, 832. 44
Allotted ------      _--       ...---                3, 752. 93    103, 150. 48    ....           .      .                      .
                                                                                                                  ....--------------     35, 000. 00



Balance unexpended July 1, 1941                               -----      $16, 937. 68
                                                                __------------------
Amount allotted from War Department Civil Appropria-
  tion Act approved June 28, 1939________________----    $10, 000. 00
Amount allotted from War Department Civil Appropria-
  tion Act approved May 23, 1941--------------        -_
                                                      _   25, 000. 00
                                                                           35, 000. 00

      Amount to be accounted for--___--------------                                                -_                                51, 937. 68
Gross amount expended--------- -----                                                                                                 19, 832. 44

      Balance unexpended June 30, 1942-----------           --- _ 32, 105. 24
Outstanding liabilities June 30, 1942------------------------------ 8, 655. 27

          Unobligated balance available June 30, 1942______________                                                                  23, 449. 97
934       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                        1942

Status of all investigations for flood control called for by flood-control acts and
                              committee resolutions

                                                         Date trans-                          Recommen-
         Locality                Authorization act        mitted to     Document     No.
                                                                                                dation
                                                          Congress
                             i                       i----------


Altus project, Oklahoma _.       Flood Control Com- _ .                --------------------

                                   mittee resolution,
                                   Apr. 13, 1938.
Cossatot River, Ark.'_ _-        Flood Control Act, - --               --------------------
                                   June 22, 1936.
Cossatot River, Sevier Flood Control Act,                              --------------------
  County, Ark.'                    May 6, 1936.
Eagletown Reservoir, Okla.'_ Flood Control Act,                        --------------------
                                   June 22, 1936.
Kiamichi River, Okla.' .         Flood Control Act, -                  --------------------
                                   June 28, 1938.
Little River, Ark.'1       -__--
                             -   Flood Control Act,                    --------------------
                                   May 6, 1936.
     D o.'1    ..       __-.-
                        --
                       _---      Flood Control Act,                    --------------------
                                   June 22, 1936.
Mangum-Salt Fork, Greer Flood Control Act,                             --------------------

  County, Okla.'                   Aug. 11, 1939.
Pease River
          t   and tributaries, Flood Control Act,                      --------------------
  Texas.                           June 22, 1936.
Purdy Reservoir on Rush Flood Control Act,                             --------------------

  Creek, Okla.'                    Aug. 11, 1939.
Red River, La., Ark., Okla., Rivers and Harbors
  and Tex. for navigation, Committee resolu-                           --------------------




  flood control, water power,      tion, Feb. 25, 1938.
  and irrigation (report be-
  ing prepared by special
  board).
Red River, La., Ark., Okla., Commerce Commit-                          --------------------
  and Tex. and connecting          tee resolution, Feb. 8,
  waterways, singly or to-         1939; Flood Control
  gether, for navigation,          Committee resolu-
  flood cozntrol, and irriga-      tion, Jan. 26, 1939;
  tion (report being pre- Rivers and Harbors
  pared by special board).         Committee resolu-
                                   tion, Jan. 24, 1939.
Salt Fork of Red River and Flood Control Act,                          --------------------
  tributaries, Oklahoma.'          June 28, 1938.
Walnut Bayou, Little River Flood Control Act,                          --------------------

   County, Ark.'                   Aug. 28, 1937.
Walnut Creek, Love and Flood Control Act,                              --------------------

   Carter Counties, Okla.          Aug. 18, 1941.
Washita River, Okla. __ _--      Flood Control Act,        - ---       --------------------
                                   Aug. 28, 1937.
Washita River, Okla., in- Commerce Committee ...............           --------------------
  terim report on Red River        resolution, Feb. 8,
  survey (special board 20).       1939; Flood Control
                                   Committee resolu-
                                   tion, Jan. 26, 1939;
                                   Rivers and Harbors
                                   Committee resolu-
                                   tion, Jan. 24, 1939.
Washita Valley, Okla.'- ...      Flood Control Com-
                                   mittee resolution,
                                    Apr. 14, 1937.

  1 Combined with report on Red River, La., Ark., Okla., and Tex., for navigation, flood control, water
power, and irrigation, requested by resolution of the Committee on Rivers and Harbors, House of Repre-
sentatives, adopted Feb. 25, 1938, being prepared by special board.

IMPROVEMENT OF RIVERS AND HARBORS                                                             IN THE
        ALBUQUERQUE, N. MEX., DISTRICT
   The district comprises the watershed of the South Canadian River
and tributaries entering the same west of the Texas-New Mexico
State line; the watershed of the Arkansas River and tributaries en-
tering the same west of and including Walnut Creek, Kans., except
that portion of the watershed of the Arkansas River and tributaries
above La Junta, Colo.; the watershed of the Rio Grande and tribu-
taries entering the same west of and including the Pecos River and
its tributaries; and the watershed of the Mimbres River and its
tributaries in New Mexico.
     RIVERS AND HARBORS-ALBUQUERUE,RQUE              N.   MEX.,   DISTRICT    935

   District engineer: Maj. James H. Stratton, Corps of Engineers, to
December 1, 1941, and Maj. Lyle Rosenberg, Corps of Engineers,
since that date.
   Division engineer: Col. S. L. Scott, Corps of Engineers.
                                  IMPROVEMENTS


            Flood control                        Flood control,-Continued      Page
                                    Page 3. Emergency repairs and rescue
1. Conchas Dam and Reservoir,                work under authority of sec-
     South Canadian River, near               tion 5 of the Flood Control
    Tucumcari, N. Mex--     --.     935      Act    approved   August   18,
                                             1941 ----------------              939
2. John Martin Reservoir, Ar-           4. Preliminary examinations and
     kansas River, Colo. (for-               surveys for flood control ___      941
     merly Caddoa Reservoir)___     937 5. Plant allotment_____--------- __     942

1. CONCHAS DAM AND RESERVOIR, SOUTH CANADIAN RIVER, NEAR
                   TUCUMCARI, N. MEX.

   Location.-The dam is located in San Miguel County, N. Mex., on
the South Canadian River approximately one-fourth mile down-
stream of the confluence of the South Canadian and Conchas Rivers.
It is approximately 30 miles northwest of Tucumcari, N. Mex., and
744 miles above the mouth of the South Canadian River. The South
Canadian River has a total length of approximately 906 miles, rises
in the northeastern part of New Mexico, and flows south and east
to the Arkansas River in the vicinity of Webbers Falls, Okla.                 (See
U. S. Geological Survey State map of New Mexico, scale 1: 500,000,
and U. S. Geological Survey topographic map, Tucumcari quadrangle;
scale 1: 125,000.)
   Existing project.- The existing project provided for the construc-
tion of a flood-control dam and reservoir which will also be used for
irrigation and water-supply purposes. The dam consists of a con-
crete gravity main section 235 feet high and 1,250 feet long located
in the South Canadian River Canyon, together with earth dikes on
each side having an over-all length of about 4 miles. The main sec-
tion contains conduits located in its base capable of releasing water
to maintain low-water flow and for drainage of the reservoir, and an
overflow spillway 300 feet in length. The earth dikes are of varying
heights up to 100 feet, and the north dike contains a concrete ogee
type emergency spillway 3,000 feet long. The project involved about
836,000 cubic yards of concrete, 3,600,000 cubic yards of fill, and
1,300,000 cubic yards of excavation. The reservoir has a gross
storage capacity of 600,000 acre-feet, consisting of 300,000 acre-feet
for water conservation and irrigation, 200,000 acre-feet for flood
control, and 100,000 acre-feet dead storage. The total cost was
$15,451,855.03, including $2,279,325.70, the cost of initiating construc-
tion of the project under authority of the Emergency Relief Appro-
priation Act of 1935. The estimated annual cost of maintenance and
operation is $50,000.
   The project is based on the report on the South Canadian River,
N. Mex., Tex., and Okla., dated June 1, 1931, made in compliance
with House Document No. 308, Sixty-ninth Congress, first session,
936      REPORT          OF CHIEF OF ENGINEERS,                 U.   S.      ARMY,          1942

and approved by the President, July 29, 1935, under the provisions
of the Emergency Relief Appropriation Act of 1935, and adopted by
Congress in the Flood Control Act of June 2, 1936 (H. Doc. No.
308, 74th Cong., 1st sess.).
   Local cooperation.--See page 5. Under the sponsorship of the
New Mexico State Park Commission, the National Park Service is
developing and constructing permanent recreational facilities at
Conchas Dam. At the completion of the development and construc-
tion work the facilities will be taken over by the New Mexico State
Park Commission for operation and maintenance.
   Operations and results during fiscal year.-Miscellaneous minor re-
pairs were made and the structures were operated and maintained
in a serviceable condition throughout the year. The reservoir was
filled and maintained at approximately spillway level throughout
the entire year.
   The costs for the year were $40,515.39 for maintenance. The ex-
penditures were $39,939.01.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1940. The reservoir and appurtenances were in good con-
dition and in operation at the end of the fiscal year. The costs to
the end of the fiscal year, regular funds, were $12,302,551.58 for new
work, and $92,424.66 for maintenance. The expenditures were $12,-
393,340.84.
   The costs to the end of the fiscal year, Emergency Relief funds,
were $869,977.75 for new work. The expenditures were $869,977.75.
   The total costs to the end of the fiscal year for all funds from
departmental appropriations were $13,172,529.33 for new work, and
$92,424.66 for maintenance. The total expenditures were $13,263,-
318.59. In addition, the costs and expenditures for work accom-
plished in initiating the project under the provisions of the Emer-
gency Relief Appropriation Act of 1935 were $2,279,325.70.
   Proposed operations.-The unexpended balance, amounting at the
end of the fiscal year to $52,543.08, will be applied as follows:
Accounts        payable---------------------                                                     $1, 635.40
Operation_ -_---                                                              $22, 907. 68
Ordinary repairs-------------------                                                4, 000. 00
Improvement        and   reconstruction-             ---                           4, 000. 00
Emergencies      ------------------------------------------                       20, 000. 00
                                                                                                 50, 907. 68
       Total_                              -   ---         --         ----                      52, 543. 08

  It is anticipated that the additional sum of $50,000 can be profit-
ably expended during the fiscal year 1944, for operation and
maintenance.
                               Cost and financial summary
Cost of new work to June 30, 1942__
Cost of maintenance to June 30, 1942
                                                ___                                   1$13, 172, 529. 33
                                                 ___                                            92, 424. 66
     Total cost of permanent work to June 30, 1942-----------                           1   13, 264, 953. 99
Minus accounts payable June 30, 1942--------------------                                          1, 635. 40
     Net total expenditures____                                                         113, 263, 318. 59
Unexpended balance June 30, 1942-..----.                                                      52, 543. 08
       Total amount appropriated to June 30, 1942__                          __             13, 315, 861. 67
  1 Includes $3,492,695.92 maintenance anid improvement funds and $869,977.75 Emergency
Relief funds, but does not include $2,279,325.70, the cost of initiating the project under
authority of the Emergency Relief Appropriation Act of 1935.
        RIVERS AND HARBORS-ALBUQUERQUE                                          N.    MEX.,         DISTRICT           937

   Fiscal year ending June 30             1938               1939             1940                1941              1942


Cost of new work__                  $5, 498, 245. 35 $5, 214, 448. 87      $496, 609. 17   .   ..           . ..
                                                                                                     .. _______     ......-.
Cost of maintenance________ ____    ______________ _________                 24, 332. 34       $27, 576. 93      $40, 515. 39

      Total cost---------            5, 498, 245.35     5, 214, 448. 87     520, 941. 51        27, 576. 93         40, 515. 39
Total expended..                -    4, 649, 973. 43    5,305, 208. 36      783, 646. 74        27, 472. 04         39, 939. 01
Allotted_________   ______________10, 370, 000. 00       -46, 603. 17     -466,182. 54         -95, 352. 62         54, 000. 00



Balance unexpended July 1, 1941_____-      __-______________                                                  $38, 482. 09
Amount allotted from War Department Civil Appro-
  priation Act approved May 23, 1941______________ $4, 000.                                    60
Amount allotted from War Department Civil Appro-
  priation Act approved Apr. 28, 1942_______________ 50, 000. 00
                                                                                                               54, 000. 00

      Amount to be accounted for _____________________ _                                                       92, 482. 09
Gross amount expended_________________________ $40, 459. 57
Less reimbursements collected _______-- ___  __     520. 56
                                                                                                               39, 939. 01
      Balance unexpended June 30, 1942 ___________________                                                     52, 543. 08
Outstanding liabilities June 30, 1942                     -                                                    1,  635. 40
                                                                                                                1__________________
        Unobligated balance available June 30, 1942 ___________                                                50, 907. 68

Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance 2 "           _
                                            ___-   ___   _                                                     50, 000. 00
  2 Exclusive of available funds.

2. JOHN MARTIN RESERVOIR,                              ARKANSAS RIVER, COLO.                             (FORMERLY
                                       CADDOA RESERVOIR)

   Location.--JohnMartin Reservoir is located on the Arkansas River
1,155 miles above its mouth, 295 miles below its source, and in Bent
County, about 18 miles above the city of Lamar, Colo. (See U. S.
Geological Survey maps for Lamar and Las Animas (Colo.) quad-
rangles, scale 1: 125,000.)
   Existing project.-The existing project provides for construction
of a dam and reservoir for flood control and water conservation in
Colorado and Kansas. The dam will be a concrete and earth fill
structure approximately 130 feet high with an overflow gated spillway
1,174 feet long. The earth section extending to the abutments will
flank the concrete gravity section in the valley and earth dikes on each
abutment in continuation of the earth section will extend to high
ground, making the over-all length of the structure approximately 2.6
miles. The reservoir, which is one unit of a comprehensive reservoir
plan for flood control in the Arkansas River Basin, will have a storage
capacity of 270,000 acre-feet for flood control, and 385,000 acre-feet for
conservation.
   The project will involve about 560,000 cubic yards of concrete,
5,800,000 cubic yards of fill, and 1,300,000 cubic yards of excavation.
   The estimated costs revised in 1941 are $10,700,000 for construction
and $3,500,000 for lands and damages.
   The existing project was authorized by the Flood Control Act
approved June 22, 1936, under the title "Caddoa Reservoir, near
Lamar in Colorado." (See H. Doc. No. 308, 74th Cong., 1st sess.,
938      REPORT OF CHIEF             OF ENGINEERS,       U.   S. ARMY,       1942

which contains the latest published maps.) The War Department
Civil Appropriation Act approved June 24, 1940, provided that from
and after the approval of that act, the Caddoa Reservoir project for
flood contr1l and water conservation in Colorado and Kansas should
be known and designated on the public records as the John Martin
Reservoir project.
    Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
    Operations and results Auring fiscal year.-Surveys, explorations,
and design studies were continued. Land acquisition was continued.
Soil stabilization for the relocation of the Atchison, Topeka & Santa
Fe Railway by hired labor was continued.
    Construction by continuing contract of the dam and appurtenant
works commenced August 23, 1940, was continued during the fiscal
year. A total of 421,000 cubic yards of concrete and 2,826,000 cubic
yards of embankment was placed. A total of 1,784,000 pounds of
reinforcing and structural steel, and a total of 120,000 pounds of steel
sheet piling were placed.
    The design of the protective works for the Fort Lyon veterans'
facility was completed.
    The costs during the fiscal year were $4,444,639.72 for new work and
none for maintenance. The expenditures were $4,503,806.54.
    Condition at end of fiscal year.-Surveys exploration, and design
are 90.7 percent complete. Land acquisition is 91.2 percent complete.
The construction for the relocation of the Atchison, Topeka & Santa
Fe Railway and salvage of the abandoned railroad is completed.
    The construction of the dam and appurtenant works is 72.5 percent
complete.
  "The project as a whole is 77.0 percent complete.
    The total costs to the end of the fiscal year were $10,388,417.24 for
new work and none for maintenance. The total expenditures were
$9,901,255.71.
   Proposed operations.-The balance unexpended on June 30, 1942,
$3,608,032.21, and accounts receivable, $5,471.36, a total of $3,-
613, 503.57, will be applied to new work as follows:
Accounts payable June 30, 1942------------           -                        $492, 770. 11
Surveys, explorations, and design by hired labor, July 1, 1942, to
  June 30, 1943      ---------                                                  45, 766. 20
Land acquisition, July 1, 1942, to June 30, 1943------------------              35, 523. 28
Soil stabilization for relocation of Atchison, Topeka & Santa Fe
  Ry. by hired labor, July 1, 1942, to June 30, 1943    ------------------      27, 275. 31
Clearing reservoir below elevation 3840 by contract, July 1 to
  Aug. 12, 1942      ___----------
                    -__--                                                       48, 177. 60
Relocation of telephone lines of Mountain States Telephone & Tele-
  graph Co. by contract, July 1 to Aug. 15, 1942_                         5,108.78
Purchase of cement for dam construction by contract, July 1 to Sept.
30, 1942_ _                  _ ____-                      ------        87, 177. 51
Completion of dam by contract, July 1, 1942, to Jan. 1, 1943-------- 2, 400, 316. 77
Construction of appurtenant works by contract-------------------        471, 388. 01
      Total for all work__           __---_------------ ---------------      3, 613, 503. 57
  With this expenditure of funds, it is estimated that the project will
be 96.53 percent complete at the end of the fiscal year 1943. No op-
erations are proposed during the fiscal year 1944.
  It is anticipated that the additional sum of $50,000 can be profitably
expended during the fiscal year 1944 for operation and maintenance.
          RIVERS AND HARBORS--ALBUQUERQUE,                                            N. MEX., DISTRICT                    939
                                          Cost and financial summary

Cost of new work to June 30, 1942--------------                                      __-------            $10, 388, 417. 24
Cost of maintenance to June 30, 1942

      Total cost of permanent work to June 30, 1942_________                                                10, 388, 417. 24
Undistributed costs June 30, 1942.-___________------------___                                                        137. 22
      Net total cost to June 30, 1942 --------------------                                                  10, 388, 554. 46
Plus accounts receivable June 30, 1942-------------------                                                         5, 471. 36

      Gross total costs to June 30, 1942___________
                                          -----     -10,      394, 025. 82
Minus accounts payable June 30, 1942 _______________________-492, 770. 11

     Net total expenditures---------------     ---- ----------                                               9, 901, 255. 71
Unexpended balance June 30, 1942_________________________                                                    3, 608, 032. 21

          Total amount appropriated to June 30, 1942-____________                                           13, 509, 287. 92

    Fiscal year ending June 30                    1938             1939             1940             1941              1942


Cost of new work_                                  $156. 60    $168, 599. 82 $1, 314, 247. 33 $4, 460, 773. 77    $4, 444, 639. 72
Cost of maintenance         ________ __   _                                 ---------------------
Total expended .              ____
                              ------....------------            167, 015. 16     969, 211.56     4, 261, 222.45    4, 503, 806. 54

           ...--------...
Allotted-------               -- _            150, 000. 00    3, 603, 100. 00   3, 130, 000.00   3,826, 187.92     2, 800, 000. 00



Balance unexpended July 1, 1941 _____________________________                                               $5, 311, 838. 75
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942                                                                                      2, 800, 000. 00
      Amount to be accounted for-__                           _                                              8, 111, 838. 75
Gross amount expended----------------__           $4, 940, 689. 62
Less:
    Reimbursements collected -----  $432, 680. 54
    Receipts from sales__---------     4, 202. 54
                                                      436, 883. 08
                                                                                                             4, 503, 806. 54

          Balance unexpended June 30, 1942 __________                                                        3, 608, 032.21
Outstanding liabilities June 30, 1942__-- _---- .                                    $492, 770. 11
Amount covered by uncompleted contracts--------                                     2,483, 037. 03
                                                                                                              2, 975, 807. 14

      Balance available June 30, 1942                                                                              32, 225. 07
                                                                                                                  6____________________
Accounts receivable June 30, 1942_________----_____                                                                 5, 471.36

          Unobligated balance available June 30, 1942 ______-_ ----                                               637, 696. 43
Amount (estimated) required to be appropriated for completion
   of existing project            1___---________-                                                                690, 700. 00
Amount that can be profitably expended in fiscal year ending June
                                              1
   30, 1944, for maintenance                      _______________________                   _____----              50, 000. 00
   1 Exclusive      of available funds.

3. EMERGENCY REPAIRS AND RESCUE WORK UNDER AUTHORITY OF
   SECTION 5 OF THE FLOOD CONTROL ACT APPROVED AUGUST 18, 1941

   The Flood Control Act approved August 18, 1941, authorized the
allotment from flood-control appropriations of not to exceed $1,000,000
for any one fiscal year to be expended in rescue work or in the repair or
maintenance of any flood-control work threatened or destroyed by
flood.
940        REPORT OF CHI-F OF ENGINEERS,                              U. S. ARMY,          1942

   The sum of $50,000 was allotted during the fiscal year for emergency
repairs and rescue work in the Middle Rio Grande Conservancy Dis-
trict, New Mexico, in the Albuquerque district.
   The Middle Rio Grande Conservancy District, a local agency au-
thorized by and operating under the laws of the State of New
Mexico, has constructed levees in the Middle Rio Grande Valley, that
portion of the flood plain of the Rio Grande in central New Mexico
extending upstream about 165 miles from Elephant Butte Reservoir
 (river mile 1418.5) to the mouth of White Rock Canyon near the
Pena Blanca (river mile 1582.2), in order to protect from inundation
during periods of high water the cities of Albuquerque, Belen, and
Socorro, and numerous villages and Indian pueblos built on the flood
plain of the valley.
   Actual operations began on April 23, 1942, with the hiring of 20
trucks with drivers, and they were concluded on June 6, 1942. A
maximum of fifty trucks was hired during the heaviest part of the
emergency work. -Routine operations consisted of: (1) Hauling ap-
proximately 10,000 cubic yards of fill material to raise levees at
Veguita, San Antonio Heading, Chadwick, Abeytas, and Tome,
which were endangered by near overtopping during the peak flow
of 19,600 second-feet on April 25, 1942; (2) construction of brush
and log mats for protection of levees at critical bends in the river
and placement of new mats at more than 50 scattered localities; and
 (3) hauling and placing of rock to ballast brush protection mats and
to protect irrigation heading structures.
   The costs during the fiscal year were $29,946.47 for emergency
maintenance and repairs; the expenditures were $30,200.68.
   The balance unexpended on June 30, 1942, amounting to $19,799.32,
will be applied to outstanding liabilities, amounting to $4,200.94, and
the sum of $15,852.59 will be revoked.
                                   Cost and financial summary

Cast of new work to June 30, 1942_________________________________
Cost of maintenance to June 30, 1942_----________________                                        $29, 946. 47

      Total cost of permanent work to June 30, 1942______________                                  29, 946. 47
Plus accounts receivable June 30, 1942________________________                                         254. 21
        Gross total costs to June 30, 1942 _________________________                               30, 200. 68

Net total expenditures_______                       ___________                                    30, 200. 68
Unexpended balance June 30, 1942________________________________                                   19, 799. 32

        Total amount appropriated to June 30, 1942_________________                                50, 000. 00

   Fiscal year ending June 30          1938              1939          1940         1941              1942

Cost ofnew work .-
Cost of maintenance________ ________________ _ ________________
                                                      . . . ___..
                                                                . . .         ._ ___$29,946.47
Total expended------------------   -------    -----------------   _                ..                 30, 200.68
Allotted ---------------        ..--------------------------                               -....      50, 000.00
        RIVERS AND HARBORS-ALBUQUERQUE,                                    N. MEX., DISTRICT                     941
Amount allotted from War Department Civil Appropriation Act ap-
proved May 23, 1941---------------------------------------     $50, 000.00
Gross amount expended----------------------------------------    30, 200.68

      Balance unexpended June 30, 1942__________--------------                                            19,799.32
Outstanding liabilities June 30, 1942____________-------------------------_                                4,200. 94

     Balance available June 30, 1942_ _- ------------                                                     15, 598. 38
Accounts receivable June 30, 1942--------------------------------                                             254. 21

        Unobligated balance available June 30, 1942________________                                       15, 852. 59

4. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL

   The cost of the work during the year was $18,274.96; the expendi-
tures were $14,410.29.
   The balance unexpended at the end of the fiscal year, amounting to
$12,089.71, plus the sum of $80,400 allotted subsequent to June 30,
1942, will be applied as needed during the fiscal year 1943 to the pay-
ment of expenses to be incurred under this heading.
   The additional sum of $80,000 can be profitably expended during
the fiscal year ending June 30, 1944.
                                   Cost and financial summary

Cost of new work to June 30, 1942___                                    ____
Cost of maintenance to June 30, 1942____________________________ $110, 794. 69

      Total cost of permanent work to June 30, 1942                                                      110, 794. 69
Minus accounts payable June 30, 1942 ...-                                                                  3, 864. 67
     Net total expenditures                            -------------                                     106, 930. 0,
Unexpended balance June 30, 1942___ _-                           --               -                       12, 089. 71

        Total amount appropriated to June 30, 1942                      -.            - -                119, 019. 73

   Fiscal year ending June 30          1938           1939               1940               1941             1942

Cost ofnew work -                  - ---- -----..............................................
Cost of maintenance   -.   ..        $10, 927. 32   $42, 861. 29       $31, 361. 33     $7, 369. 79         $18, 274. 96
Total expended         -    --        10, 927. 32    42, 861. 29        31, 361. 33         7, 369. 79       14, 410. 29
Allotted-   _              -_-__      10, 927. 32    73, 427. 71        24, 000. 00    -15, 835. 30          26, 500. 00


Balance unexpended July 1, 1941_______________
Amount allotted from War Department Civil Appropriation Act
  approved May 23, 1941----------------------------------------                                          $26, 500. 00
Gross amount expended -------
                           ______________      ____------                                                 14, 410. 29

      Balance unexpended June 30, 1942------------------------                                            12, 089. 71
Outstanding liabilities June 30, 1942________________________-                                             3,864. 67

     Unobligated balance available June 30, 1942___________                                                8,225. 04
Amount allotted in July, August, and October 1942                                                         80, 400. 00
        Amount available during the fiscal year 1943--------------                                        88, 625. 04
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance ------                                                                         80, 000. 00
1 Exclusive of available funds.

        493202---43-pt. 1, vol. 1------60
942          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                       1942

      5. PLANT ALLOTMENT, ALBUQUERQUE, NEW MEXICO, DISTRICT
                                            Cost and financial summary
Undistributed costs June 30, 1942------- ----------                                                               $586, 928. 85
Plus accounts receivable June 30, 1942______-----------                                                           266, 252. 90

      Gross total costs to June 30, 1942                                                     -----------------------
                                                                                                            320, 675. 95
Minus accounts payable June 30, 1942______---                                   ________-----                      293, 177. 61

      Net total expenditures_________-_______________- _    -613, 853. 56
Unexpended balance June 30, 1942        -                 ______
                                             -____________-_-875,065. 90
         Total amount appropriated to June 30, 1942 ___________----261, 212. 34

    Fiscal year ending June 30                     1938             1939              1940            1941             1942


Cost of new work ___ ___________ _______________ ____     $156, 960. 13 -$165, 865. 86 -$578, 023. 12
Cost of m aintenance -    - -.- - - - -- - - - - - - - - - - - - - - - - - - -- - - - - - -
Total expended------------------_________________                  __             130, 964. 42    -166, 914. 17      -577,903. 81
Allotted.......        ...----------------------------------               -      361, 212. 34    -100, 000. 00


Balance unexpended July 1, 1941__ -        ____-_____________ -                                               $297, 162.09
Gross amount expended --------------------               $2, 320, 696. 23
Less :
     Reimbursements collected --- __ $2,874, 358. 04
     Receipts from sales ----------          24, 242. 00
                                                           2, 898, 600. 04
                                                                                                              -577, 903. 81
      Ballance unexpended June 30, 1942-____- _                                               -                    875, 065. 90
Outstanding liabilities June 30, 1942------- ----                                                                  293,177. 61
     Balance available June 30, 1942 ___-                                        _______-___581, 888. 29
Accounts receivable June 30, 1942____-____                                     __________ __-__ 266, 252. 90
         Unobligated balance available June 30, 1942                                          -_______-___
                                                                                                     -   848, 141. 19

Status of all investigations for flood control called for by flood-control acts
                           and committee resolutions

                                                                        Date trans-
          Locality                        Authorization act              mitted to       Document No.             Recommenda-
                                                                         Congress                                     tion
                                 i                                 1              -1-




Alamogordo Dam and Res-               Sec. 7 of Flood Control
  ervoir, Pecos River, N.               Act, Aug. 11, 1939.
  Mex., flood control, irriga-
  tion, and other uses.
Fountaine      Que    Bouille         Flood Control         Act,
  (Fountain) River and                  Aug. 28, 1937.
  tributaries, Colorado.
Fountaine Qui Vouille River,          Flood     Control     Act,
  Colo.                                   June 28, 1938.
Longs Canyon, Colo. (Las             --     do__
  Animas County, tribu-
  tary of Purgatoire River).
Mimbres River and tribu-              Flood Control         Act,
  taries, N. Mex.                       Aug. 18, 1941.
Pecos River and tributaries,          Flood Control         Act,
  Texas and New Mexico.                 June 28, 1938.
Purgatoire (Picket Wire)              Flood Control Act,
  River, Colo. (tributary of            June 22, 1936.
  Arkansas River).
Rio Grande and tributaries,           Flood Control Act,
  New Mexico.                           Aug. 18, 1941.
Rio Grande and tributaries,           Commerce Committee
  flood control in vicinity of            resolution, July 22,
  Creede, Colo.                        1941.
Rio Grande and tributaries            Commerce Committee
  in vicinity of Alamosa,              resolution, Oct. 28,
  Colo.                                1941.
         RIVERS     AND HARBORS-LITTLE               ROCK,   ARK.,   DISTRICT       943

   IMPROVEMENT OF RIVERS AND HARBORS IN THE
                 LITTLE ROCK, ARK., DISTRICT
   This district comprises the northern and western portions of Arkan-
sas, a portion of southern Missouri, and a small portion of eastern
Oklahoma embraced in the drainage basins of the Arkansas River and
tributaries above and exclusive of Pine Bluff, Ark., and below the
mouth of Poteau River, near Fort Smith, Ark., and of the White
River and tributaries above Peach Orchard Bluff, Ark.
   District engineer: Col. Thomas F. Kern, Corps of Engineers, to
April 2, 1942; Col. Alexander M. Neilson, Corps of Engineers, since
that date.
   Division engineer: Col. Stanley L. Scott, Corps of Engineers.
                                      IMPROVEMENTS

                Navigation                             Flood control-Continued
                                          Page                                      Page
1. White River, Ark. (above                      8. Nimrod Reservoir, Arkansas
      Peach Orchard Bluff) .__             943         River Basin, Ark---------     956
2. Black River, Ark. and Mo__             946    9. Arkansas River Basin, Little
3. Upper White River, Ark____             947         Rock District------------     958
4. Examinations, surveys, and                   10. Clearwater Reservoir, White
      contingenciles (general) __          951         River Basin, Mo---------      959
5. Other projects for which no                  11. Norfolk Reservoir,     White
      estimates are submitted__            952         River Basin, Ark              961
                                                 12. White River Basin, Little
                                                       Rock District------------     963
              Flood control                      13. Preliminary     examinations
                                                       and surveys for flood con-
6. North Little Rock, Arkansas                        trol        ------------      965
      River, Ark___--_________             952   14. Other flood-control projects
7. Blue Mountain        Reservoir,                    for which no estimates are
      Arkansas    River         Basin,                 submitted---------------      966
       Ark       _9--------------------     54   15. Plant allotment--------         967

     1. WHITE RIVER, ARK.                 (ABOVE PEACH ORCHARD BLUFF)
  Location.-This river rises in northwestern Arkansas and flows 720
miles, first north into Missouri, then southeasterly through Arkansas
to the Mississippi River, 45 miles above Arkansas City, Ark. The
portion of the river within the limits of this district extends from
the headwaters downstream to Peach Orchard Bluff, Ark. (169 miles
above the mouth), at which point the river enters the Memphis En-
gineer district.   (See Mississippi River Commission Alluvial Val-
ley maps, scale 1: 62,500 and scale 1: 500,000, for river from Peach
Orchard Bluff to vicinity of Newport, Ark., and U. S. Geological
Survey State map, scale 1: 500,000.)
   Previous projects.-Adopted by the River and Harbor Acts of
March 3, 1871, June 23, 1874, August 14, 1876, June 14, 1880, July 5,
1884, and March 3, 1899.
   For further details see page 1874 of Annual Report for 1915, and
page 963 of Annual Report for 1938.
  Existing project.-This provides for channel maintenance between
the mouth of the river and Batesville, 301 miles, by snagging and
dredging and by contraction works. The stream has an ordinary
freshet fluctuation of 15 feet throughout the portion covered by the
project and an extreme stage fluctuation of 36 feet at Newport and
Batesville. No estimate of cost has been given, and since 1899 the
work has been prosecuted under annual estimates for maintenance by
944     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                      1942

snagging and dredging. The latest (1934) approved estimate for
annual cost of maintenance above Peach Orchard Bluff is $20,000.
   The existing project was authorized by the River and Harbor Act
of July 13, 1892, which made appropriation for completion of prior.
project for improving the river from its mouth to Forsyth, Mo., and
provided that the additional sum appropriated should be expended
in the discretion of the Secretary of War. The River and Harbor
Act of March 3, 1899, adopted a project for the improvement of the
river above Batesville by locks and dams, thereby making that place
the head of the open-river improvement project.
   Terminal facilities.--Railway spur tracks are available for transfer
of freights between car and boat at Newport. There are log slips for
use of the owners only at Newport and Augusta. These terminal
facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-All operations were for
maintenance by hired labor with Government plant, and consisted of
dredging and snagging. Dredging operations were carried on be-
tween lock and dam No. 1 at Batesville and Mouth Black River, a
distance of 35.6 miles. The U. S. dipper dredge No,. 3301, operating
during the period July 1 to August 22, 1941, removed 48,310 cubic
yards of material from seven crossings as follows: Prairie Beach;
Fallen Ash; Magness; Cross Log; Blue Wing; Hungry John; and
Black Island.
   The U. S. snag barge Harve Goodwin snagged 129.4 miles on the
White River during the periods September 1 to November 30, 1941,
and February 13 to February 19 and June 30, 1942, between George-
town and lock and dam No. 1, and from there to the mouth of
Black River. During these operations 924 snags, 62 logs, and 21
stumps were removed; 5 drifts were broken and 5,192 trees were cut.
   The costs during the year were $6,412.63 for dredging, and
$8,870.80 for snagging, a total of $15,283.43. The expenditures were
$19,180.34, all for maintenance.
   Condition at end of fiscal year.-The existing project being for
maintenance, completion is not contemplated. Snagging and dredg-
ing operations have materially improved the condition of the channel
from Peach Orchard Bluff to lock No. 1 at Batesville. As a result
of the work described above, a minimum navigable depth of 5 feet is
now maintained from Peach Orchard Bluff to the mouth of Black
River, and 31/2 feet from there to lock No. 1 during period of extreme
low water.
   The total costs under the existing project to June 30, 1942, are:
For maintenance:
    Snagging operations-------------------             --   $423, 738. 31
    Dredging operations_------------------        --         167, 241. 38

            Total _ _________-----_------------                     $590, 979. 69
Specials:
    Augusta, for prevention of cut-off__   -               $314. 84
    Augusta Narrows, levee and revetment------          50, 620. 16
    Augusta Narrows, set-back levee----------------5, 407.38
    Little Red River snagging:
          1914 __--------------------------------------     500. 00
          1935 --------------------------------------       358. 80
        1940       ________         _______                      886. 83
                                                                             58, 088. 01
          Total costs to June 30, 1942-- - _         ___--__
                                                 ----------            _    649,067. 70
               RIVERS AND HARBORS-LITTLE ROCK, ARK., DISTRICT                                                          945
  The total expenditures were $989,662.25 (excluding $60,613.63 for
operating and care reported under upper White River). In addition
$3,291.44 contributed funds were expended for maintenance at Augusta
Narrows.
  Proposed operations. The balance unexpended June 30, 1942,
$34,311.96, including accounts receivable, will be applied to channel
maintenance as follows:
Accounts payable June 30, 1942 ___________  __--__      ____                                                      $405. 45
Snagging operations between Peach Orchard Bluff and lock No. 1,
  about 4 months with Government snag barge and hired labor in
      period August 1942 to March 1943----------------------                                                    11, 302. 25
Dredging between Peach Orchard Bluff and lock No. 1, about 5 months
  with Government dredge and hired labor in period July 1942 to
      June 1943 --_________ _________________                                                                   22, 604.26
          Total for all work     _ _______                    _._____                _        _______           34, 311. 96
  The additional sum of $30,000 can be profitably expended during
the fiscal year 1944 as follows:
Maintenance:
   Snagging operations between Peach Orchard Bluff and lock No. 1
      about 4 months with Government snag barge and hired labor in
           period July 1943 to June 1944__-__                                            --    _____              $12, 000
        Dredging operations between Peach Orchard Bluff and lock No. 1,
          about 5 months with Government dredge and hired labor in
           period July 1943 to June 1944__-_                                                                        18, 000
             Total for all work     _                               -------                                         30, 000

                                     Cost and financial summary
Cost of new work to June 30, 1942                    _____                                                    $337,801. 57
Cost of maintenance to June 30, 1942 _________________                                                   12 652, 266. 13
      Total cost of permanent work to June 30, 1942___                                                         990, 067. 70
Minus accounts payable June 30, 1942_____ _____________                                                 __          405. 45
           Net total expenditures__________________________                                                    989, 662. 25
Unexpended balance June 30, 1942 _____________________                                                       34, 311.96
     Total amount appropriated to June 30, 1942______                                                    1, 023, 974. 21

      Fiscal year ending June 30        1938           1939                   1940               1941              1942

Cost of new work .............
Cost of maintenance ....               $7, 928. 33   $23,429.03         $36, 387. 36           $28, 993. 67       $15, 283. 43

Total expended            _            46, 131. 45    19, 689.20          35, 588. 55           25, 490. 12        19,180.34
Allotted                ----------     71, 000. 00    17, 391. 62         41, 000. 00           26,000.00          25, 000. 00



Balance unexpended July 1, 1941-------------------------------$28,       492. 30
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942--------------------------------------      25, 000. 00
      Amount to be accounted for-----------                         53, 492. 30
Gross amount expended--------------------------        $19, 246. 76
Less reimbursements collected---------------------           66. 42
                                                                     19, 180. 34
      Balance unexpended June 30, 1942----------------------        34, 311. 96
Outstanding liabilities June 30, 1942_------------------ $405. 45
Amount covered by uncompleted contracts------ ----          100.00
                                                                         505. 45
      Balance available June 30, 1942-- ---------------------- 33, 806. 51
Amount that can be profitably expended in fiscal year ending
  June 30, 1944, for maintenance -------------------------------    30, 000. 00
  SIncludes $358.80 Little Red River and excludes $60,613.63 Upper White River cost.
  SIn addition, $3,291.44 contributed funds expended for maintenance at Augusta Narrows.
  3   Exclusive of available funds.
946    REPORT   OF CHIEF OF ENGINEERS,      U.   S. ARMY,   1942

                    2. BLACK RIVER, ARK. AND MO.

   Location.-This river rises in Iron County, Mo., and flows in a
southerly direction 300 miles to White River, at Jacksonport, Ark.
 (See Mississippi River Commission Alluvial Valley maps, scales,
1: 62,500 and 1: 500,000; and U. S. Geological Survey State maps,
scale 1: 500,000.)
   Previous projects.-Adopted by the River and Harbor Act of
March 3, 1871. It is not practicable to state the amount expended
under the project; however, it is known to have been very small.
For further details see page 1877, Annual Report for 1915.
   Existing project.-Improvement of the river below Poplar Bluff,
Mo., 211 miles, by snagging operations, by deepening the water on
shoals by wing dams, and by concentrating the water into one main
channel by the closure of secondary channels.
    The stream has an ordinary freshet fluctuation of 10 feet at Poplar
Bluff, 4 feet near Corning, Ark., and 15 feet at the mouth. Its ex-
treme stage fluctuations are 19 feet at Poplar Bluff, 11 feet near
Corning, Ark., and 36 feet at the mouth. The original estimate was
$80,800, to be expended in two working seasons (Annual Report
for 1880, p. 1326). The River and Harbor Act of September 19,
1890, appropriated an amount to complete the estimate and author-
ized maintenance of the improvement. While dredging is not men-
tioned in the project, it is necessary as a means of maintenance and
has been authorized. The latest (1928) approved estimate for annual
cost of maintenance is $18,000.
    The existing project was adopted by the River and Harbor Acts
of June 14, 1880, and March 3, 1881. (Annual Report for 1880. p.
1325.) The approximate location and course of the navigable por-
tion of this'stream are shown in sketch map printed in Annual Report
for 1911, opposite page 1877.
    Terminal facilities.-Privately owned log slips or chain conveyors
for the use of the owners are maintained at the several saw and stave
mills. The facilities are considered adequate for the existing com-
merce.
    Operations and results during fiscal year.-All operations were for
maintenance by hired labor and Government plant. Snagging opera-
tions were performed by the U. S. snag barge Harve Goodwin during
the periods July 1 to August 18, 1941, between McCains Field (mile
170.9) and Hogg Place (mile 204.7), and December 1, 1941, to Febru-
ary 10, 1942, between the mouth of Black River and the mouth of
Current River, a total distance of 130.2 miles. During these opera-
tions, 1,617 snags, 301 logs, and 171 stumps were removed; 115 drifts
were broken; and 3,455 trees were cut.
    The costs during the year were $9,597.68, and the expenditures were
 $13,043.02, all for maintenance.
    Condition at end of fiscal year.-The project being for mainte-
nance, completion is not contemplated. Snagging operations have
materially improved conditions and made navigation possible to
Poplar Bluff (211 miles) by boats of 18-inch draft and to Current
River (96 miles) by boats of 3.0-foot draft during periods of lowest
water.
           RIVERS AND HARBORS-LITTLE                             ROCK, ARK., DISTRICT                   947
   The period of 3-foot or greater navigation to Poplar Bluff was con-
tinuous from October 4 to December 31, 1941; from January 1 to April
21, 1942; and from June 1 to June 30, 1942.
   The total costs were $80,000 for new work and $576,553.21 for mainte-
nance, a total of $656,553.21. The total expenditures were $658,726.52.
   Proposed operations.-The balance unexpended June 30, 1942,
$16,365.44, including accounts receivable, will be applied to channel
maintenance as follows:
Accounts payable June 30, 1942______    --------------------                $1, 040. 22
Snagging operations between the mouth and Poplar Bluff, Mo., about
  5 months with Government snag barge and hired labor in period July
  1942 to June 1943_--------------           ------------------------------ 15, 325. 22
      Total for all work-----------------------------------                 16, 365. 44
  The additional sum of $10,000 can be profitably expended during
the fiscal year 1944 in snagging operations between the mouth and
Poplar Bluff, Mo.
                                   Cost and financial summary
Cost of new work to June 30, 1942- --------------------------          $80, 000. 00
Cost of maintenance to June 30, 1942_____________________           __ 576, 553. 21
       Total cost of permanent work to June 30, 1942----      ________656, 553. 21
Undistributed costs June 30, 1942------------------------------2,           022. 71
       Net total cost to June 30, 1942___________________________ 658, 575. 92
Plus accounts receivable June 30, 1942-------------------                1, 190. 82
       Gross total costs to June 30, 1942__                             59, 766. 74
                                                                       6____________________
Minus accounts payable June 30, 1942------------- -----------            1, 040. 22
       Net total expenditures-------------------------------           658, 726. 52
Unexpended balance June 30, 1942_ ---------------------------           15, 174. 62
       Total amount appropriated to June 30, 1942--------------673, 901. 14

   Fiscal year ending June 30         1938           1939            1940           1941            1942

Cost of new work___
Cost of maintenance_.......----     $20, 009.09    $20, 692.86     $12, 278. 92   $13, 736. 63      $9, 597. 68
Total expended-     --..             19, 376. 36   21, 213. 61      11, 293. 11    12, 560. 35      13, 043.02
Allotted_ ----------------------     40, 200. 00    19, 500.00       5, 000.00     13, 500.00       10, 000. 00


Balance unexpended July 1, 1941_    ________---         -_$18,                                       217. 64
Amount allotted from War Department Civil Appropriation Act ap-
  proved Apr. 28, 1942---------------         -----------                                        10, 000.00
      Amount to be accounted for                    --------                                     28, 217. 64
Gross amount expended--                                   $22,489. 85
Less reimbursements collected------------------------       9, 446. 83
                                                                                                 13, 043. 02
       Balance unexpended June 30, 1942.                                                         15, 174. 62
Outstanding liabilities June 30, 1942-               - -     -                                    1, 040. 22
       Balance available June 30, 1942___                                                        14, 134.40
Accounts receivable June 30, 1942___                                                              1, 190. 82
       Unobligated balance available June 30, 1942                                                5, 325. 22
                                                                                                 1_________________
Amount that can be profitably expended in fiscal year ending June
  30, 1944, for maintenance' - - - - - - - - - - - -                                             10, 000. 00
  1 Exclusive of available funds.

                                3. UPPER WHITE RIVER, ARK.

   Location.-These works are on the White River, Ark., lock and
dam No. 1 being 1 mile below Batesville, Ark., and Nos. 2 and 3 being
7.8 and 19.7 miles, respectively, above that city. (See Mississippi
948        REPORT         OF   CHIEF      OF    ENGINEERS,             U.    S.   ARMY,       1942


River Commission Alluvial Valley map, scale 1: 500,000, and U. S.
Geological Survey map, scale 1: 500,000.)
   Previous projects.-See previous projects for White River, page
1874, Annual Report for 1915.
   Existing project.-This provides for the construction of 10 fixed
dams with concrete locks to give 4-foot navigation the year around.
The River and Harbor Act of March 2, 1907, after providing for the
completion of the third lock and dam, abandoned further construc-
tion work, its language fixing the appropriation carried therein as
the final one. The stream is nontidal, with an ordinary freshet fluc-
tuation of 16 to 18 feet, and with an extreme stage fluctuation of 38
feet just below lock No. 1 and of 51 feet at Calico Rock, 39 miles above
lock No. 3.
   The estimated cost for the 10 locks and dams originally projected
was $1,600,000. The estimate of annual cost of operation and care
of the 3 locks and dams, made in 1936, is $42,500.
   The existing project was adopted by the following River and
Harbor Acts:

    Acts                         Work authorized                                     Documents



Mar.   3,1899    Existing project adopted__         _           __      H. Doc. No. 78, 54th Cong., 2d sess.,
                                                                          Annual Report, 1897, p. 1992.
Mar. 2, 1907     Abandonment of further new work on the project_        H. Doc.No. 150, 59th Cong., 1st sess.
June 26, 19341   Operating and care of locks and dams provided
                  for with funds from War Department appro-
                  priations for rivers and harbors.


  1 Permanent Appropriations Repeal Act.

  The locations, dimensions, etc., of the three completed locks and
dams are as follows:

                                         Lock No. 1                  Lock No. 2                 Lock No. 3


Location..______________________ Batesville                Earnharts .-........
                                                   .....-.....                           Walls Ferry.
Distance from mouth of river_ _ 300.6 miles ............-  309.4 miles      ------------
                                                                                   321. 3 miles.
Dimensions oflocks:
    Length available             147 feet ..........       147 feet                      147 feet.
    W idth available ........... 36 feet                 . 36 feet .. ___- _-
                                              . ... . . -...                       __    36 feet.
    Depth on lower sill at mean 4. 3 feet_______________
       low water (open river).
    Depth on lower sill at nor-                            6.5 feet                      4.7 feet.
        ial pool.
    Depth on upper sill at nor-  7.1 feet                  5.3 feet                      5.2 feet.
       mal pool.
    Lift at mean low water and   15.6 feet__________________________________
      normal pool.
    Lift at normal pools                                   12.8 feet         _           14.5 feet.
    Foundations_                 Bedrock_______..          Bedrock                   _   Bedrock.
Dams:
    Kind of-_                    Fixed--                   Fixed------------------       Fixed.
    Type of construction ------  Timber crib filled        Timber        crib filled     Timber crib filled with
                                    with stone.               with stone.                  stone.
    Length_                      660.5 feet_-              658 feet                      750.7 feet.
Date opened to navigation...        1904        ___          1905                        1908.
Date of completion_                 1904..                   1905                        1908.
Cost of construction _ ...          $278,587.56 --. ....     $297,627.94 ..... ...        $236,981.31.
       RIVERS    AND HARBORS--LITTLE! ROCK,           ARK.,   DISTRICT         949
   All dams are with concrete caps.
   The approximate location of these locks and dams is shown on
district map (sketch) printed in Annual Report for 1911, opposite
page 1877.
    Terminal facilities.--Log slips, derricks, and conveyors exist at the
several woodworking establishments, all for the individual use of the
owners. The terminal facilities are considered adequate for the pres-
ent commerce.
    Operations and results during fiscal year.--All work was for main-
tenance with hired labor and Government plant at locks and dams
Nos. 1, 2, and 3. Work during the year consisted of operation of the
locks, routine maintenance of appurtenant river structures, buildings,
and grounds, and the installation of new upper steel miter gates at
locks Nos. 2 and 3.
    The U. S. dipper dredge No. 3301, during the periods August 22
to September 26, 1941,'and June 18 to June 30, 1942, removed 40,904
cubic yards of material from the channel at the following crossings:
Cornwall; Maxwell; McClelland; Highway Bridge, and lock No. 1.
    The U. S. derrick boat No. 2001, during September 1941, removed
1,650 cubic yards of material from Jeffry Sand & Gravel Company
Landing and Highway Bridge.
    The U. S. snag barge Harve Goodwin operated during the period
June 22 to June 27, 1942, between lock and dam No. 1, and Wilf Haws
 (Guion) Shoal, a distance of 33 miles. During these operations, 36
snags, 3 stumps, and 9 logs weie removed; 1 drift broken; and 156
trees were cut on caving or sliding banks.
    The new upper steel miter gates, replacing the wooden gates at
locks Nos. 2 and 3, were installed during the period July and August
1941, with Government plant and hired labor.
    The costs during the fiscal year were $30,341.01, and the expendi-
tures were $46,875.52, all for maintenance.
    Condition at end of fiscal year.-The new work accomplished to the
end of the fiscal year is the construction of three locks and dams men-
tioned under paragraph "Existing project." The project as amended
is complete. These works, by aid of dredging, give all-year slack
water navigation for 4-foot draft from 1 mile below Batesville to
Guion, which is 33 miles upstream therefrom.
    The total costs to the end of the fiscal year were:
For new work (construction of locks and dams) --        _             $813, 196. 81
For maintenance (operation and care) (includes $60,613.63 not cov-
  ered by cost and financial summary for White River, Ark__-------      253, 014. 71
      Total cost to June 30, 1942                                    1, 066, 211. 52
  The total expenditures to the end of the fiscal year were:
For new work (construction of locks and dams)                          813, 196. 81
For maintenance (operation and care) ---------------------------       276, 273. 58
      Total expenditures to June 30, 1942   -                      .-- 1, 089, 470. 39
   In addition, the sum of $1,187,282.59 was expended between January
16, 1904, and June 30, 1935, on the operations and care of the works
of improvement under the provisions of the permanent indefinite ap-
propriation for such purposes.
   Proposed operations.-The balance unexpended June 30, 1942,
$56,348.46, including accounts receivable, will be applied to operation
 50          REPORT OF CHIEF OF ENGINEEIS,                           U. S. ARMY,             1942

and maintenance of the three locks and dams during the fiscal year
1943 under approximate distribution as follows:
Accounts payable June 30, 1942_______---------------------------            $2,                      763. 39
Maintenance of channel:
    Dredging pools, approaches, and landings about 3 months with
      Government plant and hired labor in period July 1942 to No-
      vember 1942------------                  --------- ------------------ 16,                      000. 00
    Snagging operations with Government plant and hired labor about
      6 weeks during period July 1942 to September 1942-----                 8,                      585. 07
Maintenance (operating and care) :
    Operations-       ___------------------------------------               15,                      000. 00
    Ordinary repairs--------------------------------                         6,                      000. 00
    Improvement and reconstruction____--------------------------8,                                   000. 00

         Total for all work------------------
                            _____56,          ------                                                 348. 46
   The additional sum of $40,000 can be profitably expended during the
fiscal year 1944, as follows:
Maintenance of channel: Dredging and snagging pools and approaches,
  about 2 months with Government plant and hired labor in period
July to December 1943___ ____-____-_-__-   -                       $12, 000
Maintenance (operating and care) :
    Operations   ----------------------------------------------      14, 000
    Ordinary repairs     ------------------------------------------   6, 000
    Improvement and reconstruction------------------------------      8, 000

         Total for all work           --------------------------------------                         40, 000

                                     Cost and financial summary
Cost of new work to June 30, 1942-------------------------------                               $813, 196. 81
Cost of maintenance to June 30, 1942-------------------------                                 1, 440, 297. 30
      Total cost of permanent work to June 30, 1942----------                                 2,253, 494. 11
Undistributed costs June 30, 1942____  _______________-----                                      25, 622. 23

      Net total cost to June 30, 1942------------------------     2, 279, 116. 34
Plus accounts receivable June 30, 1942---------------------------         400. 03

      Gross total costs to June 30, 1942___----------------                                   2, 279, 516. 37
Minus accounts payable June 30, 1942   ---------------------                                       2, 763. 39

     Net total expenditures_-------------------------------  2, 276, 752. 98
Unexpended balance June 30, 1942----------------------------     55, 948. 43

         Total amount appropriated to June 30, 1942___________ 2, 332, 701. 41

   Fiscal year ending June 30              1938         1939           1940           1941           1942

Cost of new work ...............
Cost of maintenance .............      $38, 696. 28   $37, 759. 09   $46, 999. 61   $30, 301. 37    $30, 341. 01
Total expended             -     -------               42, 179. 15    50, 808. 02    28, 797. 26     46, 875. 52
Allotted-_           _ -   -~-- --      38, 000. 00    68, 608. 38    34, 000. 00    45, 000. 00     39, 000.00
              RIVERS AND HIARBO:RS-LITTLE                             ROCK, ARK., DISTRICT                      951
Balance unexpended July 1, 1941--------------------------------- $63, 823. 95
Amount allotted from War Department Civil Appropriations Act
  approved Apr. 28, 1942     -------------------------------      39, 000. 00

       Amount to be accounted for-------------------------------       102, 823. 95
Gross amount expended-----------------------------        $69, 404.97
Less reimbursements collected_--------------------__       22, 529. 45
                                                                                                         46, 875. 52

      Balance unexpended June 30, 1942-------------------- ----- 55, 948.43
Outstanding liabilities June 30, 1942--------------------$2, 763. 39
Amount covered by uncompleted contract-....___             2, 083. 68
                                                                      4, 847. 07

Balance available June 30, 1942____                                                                      51, 101. 36
Accounts receivable June 30, 1942----------------------------------                                          400. 03

          Unobligated balance available June 30, 1942 -----------------                                  51, 501.39

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1______________     __ ________      _ 40, 000. 00
   1 Exclusive of available funds.

    4. EXAMINATIONS,                 SURVEYS, AND CONTINGENCIES                             (GENERAL)

    The cost of work during year was $173,983.38; the expenditures
were $73,992.83.
    The balance unexpended June 30, 1942, $170,668.49, will be applied
as needed during the fiscal year 1943 to payment of expenses to be
incurred under this heading. The additional sum of $5,000 can be
profitably expended during the fiscal year ending June 30, 1944.
                                     Cost and financial summary

Cost of new work to June 30, 1942___
Cost of maintenance to June 30, 1942_-_                                                                $843, 084. 13
      Total cost of permanent work to June 30, 1942                              ---.........           843, 084. 13
Undistributed costs June 30, 1942..--                                                                          8. 72
          Net total cost to June 30, 1942-                                                              843, 092.85
Minus accounts payable June 30, 1942----------------------------                                          4, 383. 82

     Net total expenditures-------------_ ----------------------                                        838, 709. 03
Unexpended balance June 30, 1942_------------------------------                                         170, 668. 49
          Total amount appropriated to June 30, 1942---------------                               1, 009, 377. 52

    Fiscal year ending June 30           1938             1939            1940            1941               1942

C ost of new w ork ------------                - -------------- ------ -------    ------------.
Cost of maintenance- - - - - -         $90, 113.77     $78, 505.75    $151, 443. 59    $214, 750. 62       $173, 983. 38
Total expended             - -----      69, 651. 98     98, 245. 30     152, 803. 00    310, 064. 97         73, 992. 83
Allotted .-.....   - .-.      -        367, 584.88    -137, 735. 96     255, 000. 00    388, 000. 00    ---         -
952            REPORT OF CHIEF OF ENGINEERS,                           U.         S. ARMY,         1942

Balance unexpended July 1, 1941________                                             -----------        $244, 661. 32
Gross amount expended--      -     _____                                                109.01                  -$183,
Less reimbursements collected___________                                           109, 116. 18
                                                                                                             73, 992. 83
      Balance unexpended June 30, 1942__.__--                                --        --                170, 668.49
Outstanding liabilities June 30, 1942____                                           $4, 383. 82
Amount covered by uncompleted contracts -2,                                              287. 27
                                                                                                             6, 671. 09

            B,alance available June 30, 1942____           -    _--   -__-         __------              163, 997.40

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1_____-------___________-------_______                                             5, 000. 00
     I   Exclusive of available funds.

5.       OTHER      PROJECTS           FOR   WHICH        NO      ESTIMATES                 ARE     SUBMITTED



                                                          For last      Cost and expenditures to
                                                          full re-            June 30, 1942             Estimated
                     Name of project                      port see                                      amount re-
                                                          Annual                                         quired to
                                                          Report        New work            Maintenance
                                                                                                         complete
                                                           for-


1. Arkansas River, Ark. and. Okla. (above Pine
    Bluff, Ark.)                       _                       1938     $614, 254. 98        $482, 168. 29        (1)
2. Current River, Ark. and Mo_                                 1937       17, 000. 00         119, 962. 53         (2)



  1 Channels adequate for existing local commerce. Completion not contemplated.
  2Existing commerce does not warrant additional expenditures.

Status of all investigations for navigation caled for by river and harbor (cts
                            and committee resolutions

                                                           Date trans-                                  Recommenda-
              Locality             Authorization act        mitted to             Document No.              tion
                                                            Congress

Arkansas River, Ark. and River and Harbor Act,
  Okla. (under Division          Aug. 30, 1935.
Board).
White River, Ark --       .......
                              ---- d o .. ----- -------
White River, Ark. and Mo.,     Rivers and Harbors
improvement for naviga-         Committee resolu-
tion, flood control, and        tion, Jan. 24, 1939.
irrigation.
    Do _-- - - -    -   -      Commerce Committee
                                 resolution, Feb. 8,
                                 1939.
White River, Ark., improve- Rivers and Harbors
  ment at lock and dam           Committee resolu-
  No. 1, near Batesville,        tion, Apr. 17, 1940.
  Ark.



                    6. NORTH LITTLE ROCK, ARKANSAS RIVER, ARK.

  Location.-On the left bank of the Arkansas River, 165 miles above
the mouth, at North Little Rock, Pulaski County, Ark. (See Geo-
logical Survey map for Little Rock (Ark.) quadrangle.)
  Existing project.-The plan of improvement provides for the con-
struction of levees, concrete flood wall, and a pumping plant, con-
sisting of the following primncia    features: Approximately 2 miles
of earthen levees with two concrete drainage structures, and 1 mile
of concrete flood wall, extending from the bluffs at Fort Roots down-
       RIVERS     AND HARBORS--LITTLE          ROCK,       ARK.,    DISTRICT       953
stream to the Cotton Belt shops; bank protection and dike restoration
in the vicinity of Pine and Locust Streets, and a pumping plant. The
project provides for the protection of the city of North Little Rock,
Ark., with a crest grade elevation of 3 feet above the confined height
of the 1927 flood.
   The existing project was authorized by the Flood Control Act ap-
proved June 22, 1936, and was modified by the War Department Civil
Appropriation Act approved June 24, 1940, to include provision for
pumping facilities at Federal expense. (See H. Doc. No. 308, 74th
Cong., 1st sess., which includes the latest published maps.)
   The estimated construction cost of the project, revised in 1941, is
$515,000.
   Local cooperation.-See page 5 for requirements, which have been
fully complied with.
    Operationsand results during fiscal year.-Constructionof the three
pumping stations located on Main, Hickory, and Cedar Streets was
carried to substantial completion.
   The costs during the fiscal year were $111,408.61, and the expendi-
tures were $93,698.56, all for new work.
    Condition at end of fiscal year.-The construction of the pumping
stations is practically complete. The remainder of the project which
involved the construction of 10,219 linear feet of levee embankment
 (145,521 cubic yards), 2 concrete box culverts, 5,360 linear feet of rein-
forced concrete flood wall, and the restoration of an existing rock dike
with the necessary bank protection, is complete with the exception of
a small amount of resodding, which will be completed about July 14,
1912. The project as a whole is practically complete.
    The total costs of the project to the end of the fiscal year were
 $484,477.92. Costs from regular funds were $449,477.92, for new work.
The total expenditures were $460,057.35. Expenditures from regular
funds were $425,057.35. Costs and expenditures from Emergency
Relief funds were $35,000, all for new work.
    Proposed operations.-The balance unexpended on July 1, 1942,
 $54,942.65, will be applied as follows:
Accounts payable June 30, 1942              -----------                    $24, 420. 57
New work:
   Complete construction of the pumping stations by contract__ _            27, 522. 08
   Resodding approximately 2,500 linear feet of levee with hired
     labor July 1 to July 14, 1942--------------------------------             3, 000. 00
        Total for all work---------------------------------------_          54, 942. 65
   No funds can be expended profitably during the fiscal year 1944,
as the project will be completed.
                            Cost and financial summary

Cost of new work to June 30, 1942_      _--            -     ---         '$484, 477. 92
Cost of maintenance to June 30, 1942_--

      Total cost of permanent work to June 30, 1942        -_-_           1484, 477. 92
Minus accounts payable June 30, 1942 ---------------------------            24, 420. 57
      Net total expenditures____                                           460, 057. 35
Unexpended balance June 30, 1942__                __           _            54, 942. 65
        Total amount appropriated to June 30, 1942-_          ---    -     515, 000. 00
  'Includes $35,000 Emergency Relief funds.
954           REPORT                OF CHIE'F OF ENGINEERS,                   U.        S.   ARMY,       1942


    Fiscal year ending June 30                   '1938            1939             1940              1941            1942

Cost of new work           -.....        _     $26, 942. 07    $318, 253.99             $599.26    $27, 273. 99    $111, 408. 61
Cost of maintenance                           --------        -                     -

Total expended                                  24, 229. 75     320, 871.82              693. 75    20, 563.47       93, 698.   56
Allotted.....-----------------.....    ----    350, 00000       22,000.00     -20,000.00           163,000. 00
Balance unexpended July 1, 1941-------------------------------                                              $148, 641. 21
Gross amount expended________ ____________          _ $95, 423.93
Less reimbursements collected---------------------      1, 725. 37
                                                                                                                  93, 698. 56

      Balance unexpended June 30, 1942        _ _--_ _ ---    _------                                             54, 942. 65
Outstanding liabilities June 30, 1942_________________ $24, 420. 57
Amount covered by uncompleted contracts                    24, 417. 12
                                                                                                                  48, 837. 69

Unobligated balance available June 30, 1942 _______-__________                                                     6, 104. 96
     7. BLUE MOUNTAIN RESERVOIR, ARKANSAS RIVER BASIN, ARK.
   Location.-The site of the Blue Mountain Dam is located in Yell
County, Ark., on the Petit Jean River about 76 miles above its con-
fluence with the Arkansas River, and about 12 miles south of Paris,
Logan County, Ark. Blue Mountain Reservoir will extend westward
from the dam into Logan County. (See U. S. Geological Survey map
for Magazine, Ark., quadrangle, scale 1: 125,000.)
   Existing project.-The plan of improvement provides for the con-
struction of an earth fill dam about 2,800 feet long at the top and about
115 feet in height above the stream bed. Outlet works will consist of
a gate-controlled, concrete-lined tunnel through the right abutment,
and discharges will be directed back into the Petit Jean River about
3,000 feet below the dam. An uncontrolled saddle spillway will be
located on the left abutment about 1,200 feet downstream from the
dam axis. The reservoir, which is one unit of a comprehensive plan
for flood control and other purposes in the Arkansas River Basin, will
control approximately 46 percent of the total drainage area of the
Petit Jean River. It will provide storage capacity of about 233,000
acre-feet for flood control, and a permanent pool of about 25,000 acre-
feet for recreational purposes and as a wildlife refuge. The existing
project was authorized by the Flood Control Act approved June 28,
1938. The estimated cost of the project, revised in 1941, is $3,117,000
for construction and $583,000 for lands and damages.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
    Operationsand results during fiscal year.-Construction of the out-
let works was completed on May 31, 1942, under contract and involved
the removal of 12,290 cubic yards of material from the intake, outlet,
and tunnel areas; and the placing of 18,050 cubic yards of concrete
in the intake area and tunnel section. Construction of the spillway
and embankment under continuing contract was continued through-
out the year. Work performed included the following: 1,414,853
cubic yards of stripping and common excavation; 5,110 cubic yards
of rock excavation; and the placing of 842,486 cubic yards of rolled
earth fill, and 23,625 cubic yards of sand and gravel for filters and
backing. Under separate contract, 1,679 acres of the reservoir were
cleared, bringing the clearing to elevation 375 mean sea level. Acquisi-
tion of lands by hired labor was well advanced.
               RIVERS AND HARBORS-LITTLE                                            ROCK, ARK., DISTRICT                        955
   The costs during the fiscal year were $1,428,169.13, and the expendi-
tures were $1,363,683.22, all for new work.
   Condition at end of fiscal year.-Construction of the outlet works
by contract is completed. Satisfactory progress has been made under
continuing contract for construction of the spillway and embankment
and at the end of the year was 52 percent completed. Initial clearing
of the reservoir by contract is completed. Ninety-one tracts of land,
or 45 percent of the total required, have been purchased.
   The total costs to the end of the fiscal year were $2,205,077.39, and
the expenditures were $2,064,866.20; all for new work.
   Proposed operations.-The balance unexpended June 30, 1942, in-
cluding accounts receivable, $1,169,260.05, will be applied to accounts
payable, June 30, 1942, in the amount of $145,840.28, and to the con-
tinuation of construction of the project up to the point where it can
be safely suspended for the duration of the existing war emergency.
                                                 Cost and financial summary

Cost of new work to June 30, 1942_        ________________      $2, 205, 077. 39
Cost of maintenance to June 30, 1942
      Total cost of permanent work to June 30, 1942----------2, 205, 077. 39
Undistributed costs June 30, 1942____ _______________-__-__           4, 900. 81
      Net total cost to June 30, 1942______ ___________________ 2, 209, 978. 20
Plus accounts receivable June 30, 1942 __________---__                   728. 28
      Gross total costs to June 30, 1942_______________________  2, 210, 706. 48
Minus accounts payable June 30, 1942                                145, 840. 28
      Net total expenditures _--                                 2, 064, 866. 20
Unexpended balance June 30, 1942_------------------------1,         168, 531. 77
      Total amount appropriated to June 30, 1942______________ 3, 233. 397. 97

    Fiscal year ending June 30                          1938           1939              1940              1941             1942

Cost of new work___                                                  $20, 538. 75    $190, 742. 43      $565, 627. 08 $1, 428. 169. 13
Cost of maintenance                                  ---- --- ----       ------------     -       --   ------------- -----      -

Total expended            .....--------------   --------------        17, 693. 27     218, 393. 79      465, 095. 92     1, 363, 683.22

Allotted ...........------------------          ---------------      430, 000. 00     510, 000. 00     1,963,
                                                                                                            397.97         330,000.00



Balance unexpended July 1, 1941------------------------------             $2, 202, 214. 99
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942_
                        -------------------            ---------------        500, 000. 00
      Amount to be accounted for            -------------------------      2, 702, 214. 99
Deductions on account of revocation of allotment____-------                   170, 000. 00
      Net amount to be accounted for ---------------------- 2, 532, 214. 99
Gross amount expended---------------------               $1, 393, 972. 36
Less reimbursements collected- -----------------              30, 289. 14
                                                                           1, 363, 683. 22
      Balance unexpended June 30, 1942_______________________ 1, 168, 531. 77
Outstanding liabilities June 30, 1942----__                                                 $145,840. 28
Amount covered by uncompleted contracts---------902, 919. 51
                                                                                                                  1, 048, 759. 79
      Balance available June 30, 1942 __________________--_                                                          119, 771. 98
Accounts receivable June 30, 1942 ------------------------------                                                          728. 28
     Unobligated balance available June 30, 1942-------------                                                        120, 500. 26

Amount (estimated)     required to be appropriated for completion of
existing project 1 _--_--------------------                                                                           466, 600. 00.
1Exclusive of available funds.
956    REPORT   OF CHIE:F OF   ENGINEEIRS,   U.   S. ARMY,   1942

       8. NIMROD RESERVOIR, ARKANSAS RIVER BASIN, ARK.

   Location.-The site of the Nimrod Dam is located in Perry County,
Ark., on the Fourche La Fave River, 60 miles above its confluence
with the Arkansas River, and about 19 miles southeast of Danville,
Yell County, Ark. (See U. S. Geological Survey map for Hot
Springs, Ark., quadrangle, scale 1:62,500.) Nimrod Reservoir will
extend westward from the dam into Yell Counfy.
  Existing project. The plan of improvement provides for the con-
struction of a concrete gravity type dam. 986 feet long at the top and
about 97 feet in maximum height. It will consist of a spillway sec-
tion 198 feet long located above the present river channel, and two
nonoverflow sections contiguous thereto and extending into the abut-
ments. Seven gate-controlled conduits for regulating and discharg-
ing flood flows will be located through the base of the, spillway
section. In addition, two smaller, valve-controlled conduits will be
provided through the spillway section for regulating low flows. Pen-
stocks and provisions for future spillway gates will be installed to
provide for future power generation. The reservoir, which is one
unit of a comprehensive plan for flood control and other purposes in
the Arkansas River Basin, will control approximately 60 percent of
the entire drainage area of the Fourche La Fave River. It will
provide storage capacity of about 305,000 acre-feet for flood control,
and a permanent pool of about 30,000 acre-feet for recreational pur-
poses and as a wildlife refuge. The existing project was authorized
by the Flood Control Act approved June 28, 1938. The estimated
cost of the project, revised in 1941, is $2,580,000 for construction and
$920,000 for lands and damages.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operationsand results during fiscal year.-Constructionof the dam
and appurtenant works for flood-control reservoir on the Fourche La
Fave River was completed January 21, 1942, by continuing contract.
Work performed included the followino: Common excavation, 4,631
cubic yards; rock excavation (all classes , 2,746 cubic yards; concrete,
14,978 cubic yards; reinforcing steel, 248,684 pounds. Plans and
specifications for final clearing were prepared and clearing opera-
tions, begun August 5, 1941, were completed May 9, 1942, 4,642 acres
of the reservoir being cleared, and bringing the clearing to elevation
348 mean sea level. Construction of operators' quarters and comfort
station under contract was initiated February 27, 1942, and is sched-
uled for completion in July 1942. Under separate contracts, con-
struction of the Plainview-Boggs Corner road and bridges was com-
menced March 29, 1942. Acquisition of lands by hired labor was well
advanced.
   The costs during the fiscal year were $866,920.75, and the expendi-
tures were $974,683.10, all for new work.
   Condition at end of fscal year.-Construction of the dam and ap-
purtenant works is completed. Final clearing of the reservoir area
is completed. Construction of the operators' quarters and comfort
station is 86 percent complete at the end of the fiscal year. Satis-
factory progress has been made under the contracts for construction
of the Plainview-Boggs Corner road and bridges, and the contracts
are 32 percent and 4 percent, respectively, complete. Land acquisi-
         RIVERS AND HARBORS-LITTLE                               ROCK, ARK., DISTRICT         957
tion of 231 tracts, or 86 percent of the total required, has been consum-
mated.
   The total costs of the existing project to the end of the fiscal year
were $2,948,769.00, and the total expenditures were $2,936,130.25, all
for new work.
   Proposed operations.-The balance unexpended on July 1, 1942, in-
cluding accounts receivable, $605,836.37, of which the sum $575,836.37
is for new work, and the sum, $30,000.00 is for maintenance, will be
applied as follows:
Accounts payable June 30, 1942 _____    ____     ______________                        $37, 445. 16
New work:
    Complete engineering incidental with construction
     with hired labor July to November 1942_______ $100, 000. 00
    Complete relocations by contract July to Novem-
     ber 1942     ----  ----------                     173, 391. 21
   Complete construction of operators' quarters and
     comfort station by contract in July 1942--------   15, 000. 00
    Complete land acquisition and damages with hired
     labor, July to October 1942 _____-------__--      175, 000. 00
    General clean-up, landscaping, etc., by contract,
     September to November 1942___ ____ ____-_          75, 000. 00

      Subtotal -------         ----------------------------------                     538, 391. 21
Maintenance (operating and care) :
   Operation--    --- ----------------------------            10, 000. 00
   Ordinary repairs ------------                     ___----_  5, 000. 00
   Improvement and reconstructionl____o__          - -10, _-      000. 00
   Emergencies __                                              5,000. 00

       Subtotal -------------------------------------------                             30, 000. 00
       Total for all work----------------------------------                           605, 836. 37
  With this expenditure of funds, it is estimated that construction of
the project will be complete by November 1942.
  The additional sum of $30,000 can be profitably expended during
the fiscal year 1944, as follows:
Maintenance (operating and care) :
   Operations _     --------------------------------------------- $10, 000
   Ordinary repairs----------------------------------------         5, 000
   Improvement and reconstruction                                      000
                                                                   lo_____________---
   Emergencies -------------------------------------------          5, 000

       Total        ------------------------------------------------                       30, 000

                                   Cost and financial summary
Cost of new work to June 30, 1942________________---------                         $2, 948, 769. 00
Cost of maintenance to June 30, 1942.       _______        ...                 .       _______

      Total cost of permanent work to June 30, 1942____________                     2, 948. 769. 00
Undistributed costs June 30, 1942__--_________  -------------                           12. 839. 79

      Net total cost to June 30, 1942_ ...........  ____ -                    _     2, 961, 698. 79
Plus accounts receivable June 30, 1942_______________________                           11, 966. 62

      Gross total costs to June 30, 1942__.._____- __-------                        2, 973. 575. 41
Minus accounts payable June 30, 1942-------------------------                           37, 445. 16

      Net total expendituresb---------------------------2, 936, 130. 25
Unexpended balance June 30, 1942-------                                               593. 869. 75
       Total amount       appropriated to June 30, 1942--------------               3, 530, 000. 00
      493202-43-pt. 1, vol. 1              61
958        REPORT OFCHIIEU OF ENGINEERS, U. S. ARMY,                                          1942


   Fiscal year ending June 30          1938          1939             1940             1941              1942


Cost of new work --------------------------
                         .....                     $69, 161.26    $289, 338. 50 $1, 723, 348. 49       $866, 920. 75
Cost ofmaintenance..--------------------------------                ---------------------------------
                               ______ .. ..
Total expended-.....................                62, 180. 34     266, 606. 79   1, 632, 660. 02      974, 683. 10

Allotted....----------   ----------------------. 766, 000. 00     1,900, 000. 00     800, 000. 00        64, 000.00


Balance unexpended July 1, 1941-------------------------    $1,504, 552. 85
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942-----------------------------------      4, 000. 00

      Amount to be accounted for-------------------------                                      1, 568, 552. 85
Gross amount expended-------------------            $1,003, 165. 73
Less:
    Reimbursements collected__-- --  - $28, 466. 13
    Receipts from sales-------------         16. 50
                                                        28, 482. 63
                                                                                                     974, 683. 10
      Balance unexpended June 30, 1942         -___________--------                                  593, 869. 75
Outstanding liabilities June 30, 1942-------------     $37, 445. 16
Amount covered by uncompleted contracts---------325, 441. 97
                                                                                                     362, 887. 13

      Balance available June 30, 1942__..           __________----                                   230, 982. 62
Accounts receivable June 30, 1942   _____------------  --------------                                 11, 966. 62

         Unobligated balance available June 30, 1942 ________---_                                    242, 949. 24

Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance -------------
                                      ____30,                                                            000. 00
   1 Exclusive of available funds.

             9. ARKANSAS RIVER BASIN, LITTLE ROCK DISTRICT

   Location.--These improvements are located on tributaries of the
Arkansas River and are in the States of Arkansas and Oklahoma.
More definite locations of the individual items are given in the fol-
lowing paragraph.
   Existing project.-The Flood Control Act approved June 28, 1938,
approved the general comprehensive plan for flood control and other
purposes in the Arkansas River Basin, as set forth in Flood Control
Committee Document No. 1, Seventy-fifth Congress, first session, with
such modifications thereof as in the discretion of the Secretary of
War and the Chief of Engineers may be advisable, and authorized
the sum of $21,000,000 for reservoirs, for the initiation and partial
accomplishment of the plan, the reservoirs to be selected and approved
by the Chief of Engineers, subject to the provision that the authori-
zation shall include the Canton Reservoir on the North Canadian
River in Oklahoma, as set forth in House Document No. 569, Sev-
enty-fifth Congress, third session. The Flood Control Act approved
August 18, 1941, modified the general comprehensive plan to include
the reservoirs in the Grand (Neosho) River Basin in Oklahoma and
Missouri, and in the Verdigris River Basin in Kansas, in accordance
with the recommendations of the Chief of Engineers in House Docu-
ments Nos. 107 and 440 of the Seventy-sixth Congress, first session,
and, in addition to previous authorizations, the latter act authorized
          RIVERS      AND     HARBORS-LITTLE              ROCK,     ARK.,    DISTRICT           959
to be appropriated the sum of $29,000,000 for the prosecution of the
comprehensive plan. The reservoirs within the Little Rock District
included in the comprehensive plan are listed below:

  Reservoir                                    Location                                    mated cost


Blue M oun-     On Petit Jean River (mile 76 above the mouth) near Blue Mountain, Ark___    $3, 700,
                                                                                                   000
tain.
Nimrod    ....- On Fourche La Fave River (mile 60 above the mouth) near Nimrod, Ark__.       3, 500, 000



   Blue Mountain and Nimrod Reservoirs have been selected and
approved for construction by the Chief of Engineers in accordance
with the above authorization, and individual reports on the two res-
ervoirs have been given in the preceding pages. All operations pre-
viously reported under the heading "Arkansas River Basin, Little
Rock District" for those two projects are now contained in the in-
dividual reports, and previous costs and expenditures have also been
transferred to those reports.
         10. CLEARWATER RESERVOIR, WHITE                         RIVER BASIN, MO.

   Location.-Clearwater Dam is located in Wayne and Reynolds
Counties, Mo., on the Black River, 257 miles above its confluence with
the White River, 6 miles southwest of Piedmont. Mo., and 32 miles
northwest of Poplar Bluff, Mo. (See U. S. Geological Survey map
for Piedmont, Mo., quadrangle, scale 1: 62,500). From the dam, the
reservoir will extend northward and westward in Reynolds County.
   Existing project.-The plan of improvement provides for an earth-
fill dam about 4,225 feet long at the top and about 143 feet in height
above the flood plain. Outlet works consisting of a gate-controlled,
concrete-lined tunnel will be located in the right abutment and will
discharge into the river below the dam. An uncontrolled, concrete-
type ogee spillway will be located on the right abutment with over-
flow discharging into Webb Creek and thence reentering the river
about 1 mile downstream from the dam. The reservoir, which is
one unit of a comprehensive plan for flood control and other pur-
poses in the White River Basin, will control the run-off from an area
of approximately 898 square miles. It will provide storage capacity
of about 391,000 acre-feet for flood control, and a permanent pool of
about 22,000 acre-feet for recreational purposes and as a wildlife
refuge. The existing project was authorized by the Flood Control
Act approved June 28, 1938. The estimated cost of the project, as
revised in 1941, is $7,509,000 for construction and $991,000 for lands
and damages.
   Local cooperation.-Section 2 of the Flood Control Act, approved
June 28, 1938, applies.
    Operations and results during fiscal year.-Construction of the out-
let works was completed on March 14, 1942, under contract, and in-
volved the removal of 7,964 cubic yards of material from the inlet,
tunnel, and outlet areas; 45,561 pounds of steel liner plates and ribs
were placed in the tunnel; 1,013,670 pounds of reinforcing steel and
35,521 cubic yards of concrete were placed in the outlet works. Con-
struction of the spillway and embankment under continuing contract
960          REPORT OF CHIEF OF ENGINEERS,                               U. S. ARMY,               1942

involved the excavation of 2,313,037 cubic yards of stripping and com-
mon excavation; 22,167 cubic yards of rock excavation; and the plac-
ing of 491,668 cubic yards of rolled earth fill, and 4,796 cubic yards of
sand and gravel for filters and backing. Under separate contract,
clearing operations began on January 3, 1942, and were completed
June 23, 1942, 512 acres of the reservoir being cleared, and bringing the
clearing to elevation 475 mi.s. 1. Acquisition of lands by hired labor
was well advanced.
   The costs during the fiscal year were $1,679,848.13, and the expendi-
tures were $1,585,909.89, all for new work.
   Condition at end of fiscal year.--Constructionof the outlet works by
contract is completed. Satisfactory progress has been made under
continuing contract for construction of the spillway and embankment
which was 28 percent complete at the end of the year. Initial clearing
of the reservoir by contract for diversion purposes is completed.
Fifty-four tracts of land, or 33 percent of the total required, have been
purchased.
   The total costs to the end of the fiscal year were $3,230,305.79, and
the expenditures were $3,072,026.22, all for new work.
   Proposed operations.-The balance unexpended, including accounts
receivable, on June 30, 1942, $3,484,568.77, will be applied to accounts
payable, June 30, 1942, in the amount of $155,536.05, and to the con-
tinuation of construction of the project up to the point where it can
be safely suspended for the duration of the existing war emergency.
                                     Cost and financial summary

Cost of new work to June 30, 1942     _________-__------------   $3, 230, 305. 79
Cost of maintenance to June 30, 1942-      ---------------------------

      Total cost of permanent work to June 30, 1942 __________                                         3, 230, 305. 79
Undistributed costs June 30, 1942-----_-----------------                                                  -4, 078. 35
      Net total cost to June 30, 1942------                                                            3, 226, 227. 44
Plus accounts receivable June 30, 1942-     ------
                                              __---___                                          ----        1,334. 83
     Gross total costs to June 30, 1942 --------------------- 3, 227, 562. 27
Minus accounts payable June 30, 1942 ____________---------    - 155, 536. 05

     Net total expenditures------------------------------                                              3, 072, 026. 22
Unexpended balance June 30, 1942--__-----------------------                                            3, 483, 233. 94
           Total amount appropriated to June 30, 1942_____________                                     6, 555, 260. 16

  Fiscal year ending June 30             1938            1939              1940             1941              1942

Cost of new work..-----     .
                           -_  _____      .    .       $74, 420. 05  $450. 515. 14 $1, 025, 522. 47 $1, 679, 848. 13
C ost of m aintenance .........- I.---- --- -- --   ---------- - - - - - - ...
                                                                            -     -
                                                                                ...
                                                                                 - I.       .      .----     ------

Total expended ...         ....__-__                    68, 998. 94     465, 364. 95      951, 752. 44     1, 585,909.89
Allotted    --- ------------------------               796, 200. 00   2, 000, 000. 00   1, 789, 060. 16    1,970, 000. 00
           RIVERS AND HARBORS-            LITTLE, ROCK,   ARK.,       DISTRICT       961
Balance unexpended July 1, 1941-------------------          $3, 099, 143. 83
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942-------------------------             2, 100, 000. 00

     Amount to be accounted for          -_-                   -___ 5, 199, 143. 83

Deductions on account of revocation of allotment----------------       130, 000. 00

        Net amount to be accounted for--------------------------          5, 069, 143. 83
Gross amount expended------------------------- $1, 620, 457. 68
Less reimbursements collected-------------------          34, 547. 79
                                                                          1, 585, 909. 89
      Balance unexpended June 30, 1942-----------------_                  3, 483, 233. 94
Outstanding liabilities June 30, 1942--------------$155, 536. 05
Amount covered by uncompleted contracts----------2, 608, 858. 32
                                                                          2, 764, 394. 37

      Balance available June 30, 1942-----------------            _         718, 839. 57
Accounts receivable June 30, 1942                                               , 334. 83
                                                                              1-------------------------
        Unobligated balance available June 30, 1942---------- ----          720, 174. 40
Amount (estimated) required to be appropriated for completion
  of existing project 1---------------                                    1, 944, 700. 00
  1 Exclusive of available funds.

            11. NORFORK RESERVOIR, WHITE RIVER BASIN, ARK.

    Location.-The site of the Norfork Dam is located on the North
Fork River about 4.8 miles above its confluence with the White River,
near Norfork, Baxter County, Ark. (See U. S. Geological Survey
map for Mountain Home, Ark., quadrangle, scale 1: 125,000.) Nor-
fork Reservoir will extend northward from the dam across Baxter
County, Ark., into the southern part of Ozark County, Mo.
    Existing project.-The plan of improvement provides for construc-
tion of a concrete gravity-type dam about 2,624 feet long at the top
and about 220 feet in maximum height. It will consist of a spillway
section 568 feet long located above the existing river channel and two
nonoverflow sections contiguous thereto and extending into the abut-
ments. Gate-controlled conduits through the base of the spillway
section will provide for regulating and discharging flood flows. Pen-
stocks and provisions for power generation include an initial installa-
tion of 2 generating units having a capacity of 35,000 kilowatts each.
The reservoir, which is one unit of a comprehensive plan for flood
control and other purposes in the White River Basin, will control
practically the entire drainage area of the North Fork River. It will
have a storage capacity of about 732,000 acre-feet for flood control
and will provide storage of about 1,251,000 acre-feet for generation
of power and stream-flow regulation. The existing project was au-
thorized by the Flood Control Act approved June 28, 1938, as amended
by the Flood Control Act approved August 18, 1941. The estimated
cost of the project, revised in 1941, is $24,400,000 for construction and
$3,100,000 for lands and damages.
    Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Construction plans and
specifications for first addition, GovernmentVillage, were prepared
and construction by contract was completed during the year. Land
962     REPORT OF CHIE.F OF ENGINEERS,                 U. S. ARMY,   1942

acquisition by hired labor was well advanced. Operations with reg-
ular funds consisted of the construction of the project by continuing
contract throughout the year. Work performed included the fol-
lowing: Construction of stream 'diversion works; common excavation,
174,732 cubic yards; rock excavation (all classes), 353,654 cubic yards;
concrete, 351,543 cubic yards; reinforcing steel, 842,882 pounds. Under
separate contract 1,093 acres of the reservoir were cleared, bringing
the clearing to elevation 410 m. s. 1. Detailed inventory appraisals and
investigations necessary to consummate purchase of land were con-
tinued and substantially advanced by hired labor.
   The costs during the fiscal year were $5,322,366.55, and the expendi-
tures were $4,918,187.46, all for new work.
   Conditionat end o fiscal year.-The first addition, Government Vil-
lage, is complete. Construction of the dam is 41 percent complete at
the end of the year. Twenty-five tracts of land in the reservoir area,
or 5 percent of the total required, have been purchased.
   The total costs to the end of the fiscal year were $7,075,856.11, and
the expenditures were $6,250,297.29, all for new work.
   Proposed operations.-The balance unexpended, including accounts
receivable on June 30, 1942, $14,836,599.35, will be applied as follows:
Accounts payable June 30, 1942________________________________      $956, 700. 42
New work:
    Continue construction of the dam by continuing contract, July
      1942 to June 1943_______________ ____________               10, 379, 898. 93
    Clearing of reservoir area by contract, September 1942 to
      May 1943--------------------                                  1,250, 000. 00
    Lands, damages, and relocations by hired labor, July 1942 to
      June 1943-------------------------------------               2, 250, 000. 00

        Total for all work______--              -----------
                                      _______-------                 14, 836, 599. 35
   The additional sum of $6,415,650 can be profitably expended during
the fiscal year 1944, as follows:
New work:
   Continue construction of the dam by continuing contract ------- $5, 000, 000
   Lands, damages, and relocation-------------     --------------   1, 415, 650

      Total for all work__--------------                                  6,415, 650
  With this expenditure of funds, it is estimated that the project will
be 100 percent complete at the end of the fiscal year 1944.
                          Cost and financial summary

Cost of new work to June 30, 1942 _______-_______________ $7, 075, 856. 11
Cost of maintenance to June 30, 1942___  .________

      Total cost of permanent work to June 30, 1942 .. ___------      7, 075, 856. 11
Undistributed costs June 30, 1942----------------------------            128, 594. 96

      Net total cost to June 30, 1942 ------    ----------------      7, 204, 451. 02
Plus accounts receivable June 30, 1942_________________-___                2,546. 62

      Gross total costs to June 30, 1942--___----- __-----------      7, 206, 997. 69
Minus accounts payable June 30, 1942-------______------------            956, 700. 42

      Net total expenditures_------ ----------                        6, 250, 297. 27
Unexpended balance June 30, 1942_. _        --------                 14, 834, 052. 73
      Total amount appropriated to June 30, 1942__-----              21, 084, 350. 00
            RIVER,.S AND HARBORS--LITTL                                     ROCK, ARK., DISTRICT                           963


   Fiscal year ending June 30                   1938               1939             1940              1941             1942

Cost of new work-_______                         ...
                                        ____________             $35, 355. 73   $261, 744. 36 $1, 456, 389.47 $5, 322, 366. 55
Cost of maintenance__              _____ ________         ____      -       ---------- ------------           --------------
Total expended.........            ..______ _____       ____      29,914. 01     266,923. 26     1,035, 272. 54     4,918, 187.46
Allotted-.....   .   .........-.        .    ........      _     434, 500. 00   1, 449, 850.00   3, 300, 000. 00   15, 900, 000.00



Balance unexpended July 1, 1941 ___     _____                    $3, 852, 240. 19
Amount allotted from War Department Civil Ap-
propriation Act approved May 23, 1941_______     $300, 000. 00
Amount allotted from War Department Civil Ap-
propriation Act approved April 28, 1942        10, 600, 000. 00
Amount allotted from Third Supplemental Na-
tional Defense Appropriation Act, approved De-
cember 17, 1941_1             -
                     ________-----  -5,             000, 000. 00
                                                                 15, 900, 000. 00
      Amount to be accounted for__---......                                                  __------   19, 752, 240. 19
Gross amount expended__ __________-------$4,                                               971,499. 80
Less reimbursements collected    _______-------53,                                              312. 34
                                                                                                         4, 918, 187. 46

      Balance unexpended June 30, 1942_---------------             14, 834, 052. 73
Outstanding liabilities June 30, 1942 ___________   $956, 700. 42
Amount covered by uncompleted contracts -------   10, 081, 503. 85
                                                                   11, 038, 204. 27
     Balance available June 30, 1942 __________________-_                                                    3, 795, 848. 46
Accounts receivable June 30, 1942___________    ___                                                               2, 546. 62

         Unobligated balance available June 30, 1942__________                                               3, 798, 395. 08
Amount (estimated) required to be appropriated for completion
of existing project 1------------------------------          , 6, 415, 650. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for new work 1------------------------          6, 415, 650. 00
  1Exclusive of available funds.

                 12. WHITE RIVER BASIN, LITTLE ROCK DISTRICT

   Location.-These improvements are located on tributaries of the
White River and are in the States of Arkansas and Missouri. More
definite locations of the individual items are given in the following
paragraph.
   Existing project.-The Flood Control Act of June 28, 1938, ap-
proved the general comprehensive plan for flood control and other
purposes in the White River Basin, as set forth in Flood Control
Committee Document No. 1, Seventy-fifth Congress, first session,
with such modifications thereof as in the discretion of the Secretary
of War and the Chief of Engineers may be advisable, and author-
ized the sum of $25,000,000 for reservoirs, for the initiation and par-
tial accomplishment of the plan, the reservoirs to be selected and
approved by the Chief of Engineers. The Flood Control Act ap-
proved August 18, 1941, authorized to be appropriated the sum of
$24,000,000, in addition to previous authorizations, for the prosecu-
tion of the comprehensive plan approved in the Act of June 28, 1938,
for the White River Basin in Missouri and Arkansas, including the
projects for flood control and other purposes recommended by the
Chief of Engineers in House Document No. 917, Seventy-sixth Con-
964        REPORT OF            CHIIF       OF ~ENG1IN'ERS,          U. S. ARMY,       1942

gress, third session, and the modifications in the Norfork Reservoir
project recommended by the Chief of Engineers in House Document
No. 290, Seventy-seventh Congress, first session. The reservoirs in-.
cluded in the comprehensive plan are listed below:

                                                                                                 Total
   Reservoir                                        Location                                    estimated
                                                                                                   cost

Clearwater 1        On Black River (mile 257 above the mouth) near Clearwater, Mo      -------- $8, 500, 000
Water Valley.       On   Eleven Point River (mile 13 above the mouth) near Water Valley, Ark_    7, 600, 000
Bell Foley_______   On   Strawberry River (mile 24 above the mouth) near Bell Foley, Ark_____
                                                                                          ...    5, 363, 000
Norfork 1--------   On   North Fork River (mile 4.8 above the mouth) near Norfork, Ark---       27, 500, 000
Lone Rock .....     On   Buffalo River (mile 3.6 above the mouth) near Lone Rock, Ark -... _    11, 422, 000
Greers Ferry ...    On   Little Red River (mile 77 above the mouth) near Greers Ferry, Ark___    7,179, 000
Bull Shoals         On   White River (mile 420 above the mouth) near Amos, Ark -        .       47, 000, 000
Table Rock          On   White River (mile 528 above the mouth) near Branson, Mo _......---     37, 000, 000


  1 See individual report for details of project.


   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Reservoir mapping,
stream gaging, field surveys, foundation explorations, compilation of
land-ownership data, and studies in connection with the development
of the general comprehensive plan were continued with hired labor
during the fiscal year.
   The costs of operations during the fiscal year were $212,960.84, and
the expenditures were $217,377.61, all for new work.
   Condition at end of ftscal year.-Surveys, studies, and detailed
plans are well advanced for development of the general comprehensive
plan for flood control and other purposes in the White River Basin.
The construction progress of projects selected for construction under
this authorization is given in individual reports.
   The total costs to the end of the fiscal year were $636,700.07, and the
expenditures were $638,333.03, all for new work.
   Proposed operations.-The balance unexpended, including accounts
receivable on June 30, 1942, $575,485.18, will be applied to surveys,
foundation investigations, and the preparation of detailed plans.
   The additional sum of $327,500 can be profitably expended during
the fiscal year 1944 for continuation of the development of the com-
prehensive plan for flood control in the'White River Basin.
                                     Cost and financial summary

Cost of new work to June 30, 1942-__ _____
                                      ---                      _______________           $636, 700. 07
Cost of maintenance to June 30, 1942

      Total cost of permanent work to June 30, 1942--------------                          636, 700. 07
Undistributed costs June 30, 1942 ____      ____  ____       ___                            13, 415. 52
      Net total cost to June 30, 1942   --------------------------                         650, 115. 59
Plus accounts receivable June 30, 1942----------------------------                              118. 21

      Gross total costs to June 30, 1942_ -__----__--650,                                        233. 80
Minus accounts payable June 30, 1942____________        __-----                              11, 900. 77
        Net total expenditures--- -----                     ------                         638, 333. 03,
Unexpended balance June 30, 1942 .-                     -                        --        5----------
                                                                                          575,  366.97
        Total amount appropriated to June 30, 1942---------                             1, 213, 700. 00
             RIVERS AND HARBORS-LITTL                                    ROCK, ARK., DISTRICT                              965

    Fiscal year ending June 30                  1938        1939                1940                1941                 1942


Cost of new work_ -_                               _     $29, 162. 98        $234, 203. 12       $160, 373. 13      $212, 960. 84
Cost of maintenance .------------------------          ------        -----                                         -..
Total expended .------            --------------           28, 134. 74        230, 935. 10        161, 885. 58       217, 377. 61
Allotted .....                                             34,675 00          554, 025. 00   -                       625, 000.00


Balance unexpended July 1, 1941                        ----------------------------
                                                                    $167, 744. 58
Amount allotted from War Department Civil Appro-
  priation Act approved May 23, 1941________------_   $310, 000. 00
Amount allotted from War Department Civil Appro-
  priation Act approved Apr. 28, 1942__________--____ 315, 000. 00
                                                                     625, 000. 00

      Amount to be accounted for---------------------------                                                      792, 744. 58
Gross amount expended -_______- ________--__         __ $238, 776. 58
Less reimbursements collected________------ __------      21, 398. 97
                                                                                                                 217, 377. 61
      Balance unexpended June 30, 1942----------------------575,                                                         366. 97
Outstanding liabilities June 30, 1942___
                                    --     __-   ____--$11, 900. 77
Amount covered by uncompleted" contracts___________--    1, 037. 91
                                                                                                                  12, 938. 68

      Balance available June 30, 1942 -----------------------                                                    562, 428. 29
Accounts receivable June 30, 1942-------------------------------                                                      118. 21

          Unobligated balance available June 30, 1942---------------562,                                                 546. 50

Amount (estimated)- - -required       to be appropriated        for completion of
                                                      - -- - -- -- - -- -- - -- - -- - --
                         -- - - - - - - - - - - - - -
existing project 1                                                                                              11, 786,300
Amount that can be profitably expended in fiscal year ending June
30, 1944, for new work ----------------------------------                                                       327, 500. 00
1Exclusive of available funds.

13. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL

   The cost of work during the year was $259,028.21; the expenditures
were $362,834.46. The balance unexpended, including accounts receiv-
able on June 30, 1942, $67,554.77, plus the sum of $100,000 which was
allotted in August 1942, will be applied as needed during the fiscal
year 1943 to payment of expenses to be incurred under this heading.
The additional sum of $27,500 can be profitably expended during the
fiscal year ending June 30, 1944.
                                         Cost and financial summary
Cost of new work to June 30, 1942
Cost of maintenance to June 30, 1942_---------------------                                                 $1, 139, 689. 57

      Total cost of permanent work to June 30, 1942_--- -------- , 139, 689. 57
Plus accounts receivable June 30, 1942--------------------------         83. 72

      Gross total costs to June 30, 1942----------------------                                              1, 139, 773. 29
Minus accounts payable June 30, 1942     -----        -----                                                     28, 315. 80
     Net total expenditures                                                                                    111, 457. 49
                                                                                                            1------------------------------,
Unexpended balance June 30, 1942____-                                     ________________                      6__ 471.05
                                                                                                                67,

          Total amount appropriated to June 30, 1942-----                                                  - 1, 178, 928. 54
966                REPORT OF CHIEF OF ENGINELERS, U. S. ARMIY,                                                                              1942


       Fiscal year ending June 30                               1938                          1939               1940                1941                   1942

Cost of new work ---------    --------------                                       ----------               ----------        --------                 --------------
Cost of maintenance------.-----   $18, 282.85                                       $110, 907.85             $265, 898. 53     $485, 572. 13              $259, 028.21
Total expended----------------
             ................--                                12, 490. 50                92, 967.27          256, 854. 61         386, 310. 65            362, 834.46
Allotted....------------------..                            239, 680.94               230, 247.60             319,000.00           400, 000. 00           -10, 000. 00

Balance unexpended July 1, 1941 ____   ____   _____-----$440,                                                                                               305. 51
Deductions on account of revocation of allotment -- _--------                                                                               -           10, 000. 00
      Net amount to be accounted for--------------__-  -__----                                                                                         430, 305. 51
Gross amount expended ________--- -- -$388,
                                       ___-___--      276. 25
Less reimbursements collected -- ______________--25, 441. 79
                                                                                                                                                       362, 834. 46

      Balance unexpended June 30, 1942 ______________-----_                                                                                             67, 471. 05
Outstanding liabilities June 30, 1942_____-_____ _ $28, 315. 80
Amount covered by uncompleted contracts-----------17, 265. 55
                                                                                                                                                        45, 581. 35

      Balance available June 30, 1942_______ ________-          -_ 21, 889. 70
Accounts receivable June 30, 1942__------------------------------       83. 72

     Unobligated balance available June 30, 1942 _________ _                                                                                            21, 973. 42
Amount allotted in August 1942------------------- ----------                                                                                           100, 000. 00
Amount available during the fiscal year 1943__                                                                   -___-----                             121, 973. 42

Amount that can be profitably expended in fiscal year ending
  June 30, 1944, for maintenance --------------                                                                                                         27, 500. 00
1 Exclusive of available funds.
14. OTHER FLOOD-CONTROL PROJECTS FOR WHICH NO ESTIMATES
                      ARE SUBMITTED

                                                                                      For last full          Cost and expenditures to                    Estimated
                                                                                      report see                   June 30, 1942                         amount re-
                              Name of project                                          Annual                                                             quired to
                                                                                                                                                          quired to
                                                                                        Report
                                                                                         for-                New work         Maintenance                 complete

                                                 -- - - - - - - - - - - - - - - - - - - -
'1.    West of Morrilton,    1- - Ark..................
                                  - - - -- - - -       - - - - -- - - - - - - - - - .                1937 --------------------------                      $603, 000.00
  2.   Clarksville, Ark.                                                           -                 1937 ..---------------------------                     70,000.00
  3.   Little Rock, Arkansas River, Ark._ . 2 ...                                                    1939     $2, 304.89 _____________                     132, 195. 11
4.    Near Dardanelle, Arkansas River, Ark. - ..                                                    1939         475. 89                                  113, 774. 11
  5.   East Poplar Bluff and Poplar Bluff, Mo.s                           --         _               1937                 ___                              546, 800.00
  6.   Little Black River, in Butler and; Ripley
         Counties, Mo.,2 and in Clay and Randolph
         Counties, Ark. 2 - - ...                - - - - - . - ..-----
                                     - - -...- - .....             - - - - - .....
                                                                               -- -- --   -          1937 -     -______----                                754, 900. 00
7.    Big Bottom, Ark.               ....              ..                           .               1937 ------                                           128, 700.00
8.    Faulkner County, Arkansas River, Ark------                                                    1941     99, 510. 65      -                   _         (3)
9.    From North Little Rock to Gillett, Ark.
         (above Plum Bayou)                                ._--             ..                       1941      840, 914. 32   .____.---       --              (3)
10.    Black River, Poplar Bluff, Mo., to Knobel,
         Ark-............---                                  ---          --- -                     1941      445, 584. 54   -----------                     (3)
11. Skaggs Ferry, Black River, East of Pocahon-
     tas, Ark---------------------------------                                                       1941       81,023. 32          -----                     (3)
12. Newport, White River, Ark_______________
13. Village Creek, White River, and Mayberry
                                                                                                     1941      314, 276. 28   -------------                   ()
      Districts, Ark ___ -- ______________         -                                            1941
                                                                                          -_______             532, 310. 17   __ ....--     ...               (3)
14. Crawford County levee district, Arkansas
      River, Ark ____--... . .           ._..-------                                                 1941   --------------           ---                   284,000.00
15. Little Rock to Pine Bluff, Arkansas River,
      Ark ---                              ...      .                                                1941 ------------               ---------             641,000.00
16. Snagging and clearing under authority of sec.
      2 of the Flood Control Act approved Aug.
      28, 1937, as amended .____________-------__                                              -     1941        2, 823. 73 --------------                    (3)

   1Awaiting          local cooperation.
   2 Conditions of local cooperation not likely to be fulfilled.
   3   Completed.
              RIVERS AND HARBORS-LITTLE                                      ROCK, ARK., DISTRICT               967
              15. PLANT ALLOTMENT, LITTLE ROCK, ARK., DISTRICT

  All plant formerly owned by the appropriation for Maintenance
and Improvement of River and Harbor Works was transferred during
the fiscal year to the appropriation for Flood Control, General. The
funds available for the plant account under the appropriation for
Maintenance and Improvement of River and Harbor Works were
revoked during the fiscal year 1942.
                                              Cost and financial summary
Undistributed costs June 30, 1942__________________________ -- $133, 096. 57

Net total cost to June 30, 1942_. ---------                     -133,                                        096. 57
Plus accounts receivable June 30, 1942------------------------362,                                           474. 09

      Gross total costs to June 30, 1942_________-__________                                             229, 377. 52
Minus accounts payable June 30, 1942______________ ______                                                 27, 051. 96
     Net total expenditures_____________                                                202, 325. 56
Unexpended balance June 30, 1942_ ...                             ________ _--____-----104, 674. 44
           Total amount appropriated to June 30, 1942__                                                  307, 000. 00

    Fiscal year ending June 30                      1938             1939
                                                              i



Total expended ...............-        -

Allotted          ............................
               .....


Amount allotted from War Department Civil Appropriation Act
  approved May 23, 1941_____--_____                                                                     $307, 000. 00
Gross amount expended----------------------$901,         156. 02
Less reimbursements collected-------- $698, 156. 41
Less receipts from sales--------------      674. 05
                                                    698, 830. 46
                                                                                                         202, 325. 56

           Unobligated balance available June 30, 1942_                             --------------       104, 674. 44

Status of all investigations for flood control called for by flood-control acts and
                              committee resolutions

                                                                       Date trans-
             Locality                        Authorization act          mitted to        Document No.   Recommenda-
                                                                        Congress                            tion
                                  -   iI                            i--




Arkansas River and tribu-                  Rivers and Harbors
taries, Arkansas, hydro-                    Committee resolu-
electric potentialities                    tion, Jan. 24, 1939.
  (under Division Board).
Arkansas River and tribu-                  Commerce Committee
  taries, Oklahoma, hydro-                  resolution, Oct. 12,
electric potentialities                    1938.
  (under Division Board).
Arkansas River, Ark., Con-                 Flood Control Comn-
way County levee dis-                      mittee resolution,
  tricts Nos. 1 and 8.                       May 14, 1941.
Arkansas River, Ark., Con-                 Flood Control Com-
  way County Levee dis-                     mittee resolution,
  tricts Nos. 2 and 6.                       Nov. 12, 1941.
Arkansas River and tribu-                  Flood Control Com- .
  taries, flood control in Cy-               mittee resolution,
  press drainage district,                   Apr. 23, 1942.
  Perry and Conway Coun-
  ties, Ark.
Black River, Mo. and Ark -                 Flood Control Act, ..............
                                             June 28, 1938.
Cadron Creek, Ark......... ...                 do--------------.......... Feb. 26,1942                   Unfavorable.
968         REPORT OF CHIEF OF ENGINERS,                           U. S. ARMY,                1942

   Status of all investigationsfor flood control called for by flood-control acts and
                          committee resolutions-Continued

                                                        Date trans-                              Recommenda-
          Locality               Authorization act       mitted to          Document No.             tion
                                                         Congress
                                                                       -I                      1----------


Fourche Bayou, Ark........      Flood Control Com-     -------------.
                                  mittee resolution,
                                  Nov. 19, 1940.
Little Red River, Ark., con-    Flood Control Com-
  struction of multiple-pur-      mittee resolution,
  pose reservoir in the vi-       Apr. 5, 1940.
  cinity of Greers Ferry,
  Ark. (flood control and
  irrigation).
Jlaumelle River and tribu-      Flood Control Com-     May 10, 1942          ______
                                                                             .....    .....    I Unfavorable.
  taries, Arkansas.               mittee resolution,
                                  Aug. 2, 1939.
Palarm Creek, a tributary of    Flood Control Act,     Mar. 10, 1942                                     Do.
  Arkansas River, Faulkner        Aug. 28, 1937.
  and Pulaski Counties,
  Ark.
Petit Jean River in Scott and    Flood Control Act, May 6,1942 ... __.............                       Do.
  Logan Counties, Ark.             May 6, 1936.
Petit Jean River, Ark -.-        Flood Control Act,                                                      Do.
                                   June 22, 1936.
Point Remove Creek, Ark__ Flood Control Act,
                                   June 22, 1936.
Six Mile Creek, Logan Flood Control Act, Apr. 24, 1942 House 717, 77th                            Favorable.
  County, Ark.                     June 28, 1938.                  Cong., 2d sess.
White River, Ark. and Mo., Rivers and Harbors ---.----....---
  improvement for naviga-          Committee resolu-
  tion, flood control, and irri-   tion, Jan. 24, 1939.
  gation.
White River, Ark. and Mo., Commerce Committee -----.---.-.-..
  improvement for naviga-          resolution, Feb. 8,
  tion, flood control, and irri-   1939.
  gation.


IMPROVEMENT                       OF RIVERS AND HARBORS                                         IN THE
                                TULSA, OKLA., DISTRICT
  This district comprises southern Kansas, small portions of south-
western Missouri and western Arkansas, northern Oklahoma, the
northern portion of the Texas Panhandle, and small portions of
northeastern New Mexico and southeastern Colorado, embraced in
the drainage basin of the Arkansas River and tributaries above the
mouth of the Poteau River, inclusive, and below the mouth of Wal-
nut Creek, near Great Bend, Kans., exclusive of that portion of the
watershed of the South Canadian River and its tributaries west of
the Texas-New Mexico State line.
  District engineer: Col. H. A. Montgomery, Corps of Engineers.
  Division engineer: Col. S. L. Scott, Corps of Engineers.
                                            IMPROVEMENTS

                     Navigation                                 Flood control-- Continued
                                              Page                                                             Page
  1. Examinations, surveys, and                         5. Cherokee, Salt Fork of Ar-
      contingencies (general) -___             969          kansas River, Okla_____                            974
2. Other projects for which no                         6. Great Salt Plains Reservoir,
     estimates are submitted_--                909           Salt Fork of Arkansas
                                                             River, Okla---------------                        975
                 Flood control                          7. Hulah Reservoir, C a ne y
                                                             River, Okla_____                                  978
3. Fort Supply Reservoir, North                        8. Tulsa and West Tulsa, Ar-
     Canadian River, Okla__.                   970           kansas River, Okla .......                        979
4. Canton Reservoir, Arkansas                          9. Pensacola Reservoir, Arkan-
      River Basin, Okla___..                   972           sas River Basin, Okla__.                          980
                 RIVERS       AND HARBORS-TULSA,                                   OKLA.,          DISTRICT                              969

                                      IMPROVE1ENTs-Continued

         Flood control-Continued                                             Flood control-Continued
                                                     Page                                                                                 Pare
10. Markham Ferry Reservoir,                             13. Preliminary     examinations
     Arkansas River Basin,                                     and surveys for flood con-
      Okla---------------------                      982       trol -------------------
11. Fort Gibson Reservoir, Ar-                           14. Other flood-control projects
     kansas River Basin, Okla__                      984       for which no estimates are
12. Arkansas River Basin, Tulsa                                submitted                          ---------------                          990
     district-------------------                     985 15. Plant allotment -----------                                                   990

    1. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                              (GENERALl)

   The cost of work during the year was $4,095.46; the expenditures
were $4,575. The balance unexpended at the end of the fiscal year,
$226.35, together with an allotment of $4,000 to be made during fiscal
year 1943, a total of $4,226.35, will be applied as needed during fiscal
year 1943 to payment of expenses to be incurred under this heading.
The additional sum of $4,000 can be profitably expended during the
fiscal year ending June 30, 1944.
                                     Cost and financial summary
Cost of new work to June 30, 1942---------------------------------------
Cost of maintenance to June 30, 1942---------------------------- $131, 183. 77
      Total cost of permanent work to June 30, 1942_              131, 183. 77
Minus accounts payable June 30, 1942---------------------------        126. 2
        Net total expenditures .                                                                             -          1 31, 057. 49
Unexpeinded balance June 30, 1942-------------------------------                                                             226. 35
      Total amount appropriated to June 30, 1942-___                                                                    131, 283. 84

   Fiscal year ending June 30           1938                  1939                    1940                1941                     1942

Cost of new work          --------
                               -      ------   - -      . .               ..----
                                                                        -----        -    -   -              -
                                                                                                    -----------          -        - - - - -
Cost of maintenance___                $33, 199. 45      $65, 249.67                $11, 252. 75         $9, 051. 72                $4, 095. 4
Total expended       __               $33, 199. 45          65, 249. 67              11,082. 49           8, 616. 16                4, 575. 00
Allotted- _                            3- 199. 45           65,249 67               20,000,00             4, 500. 00-         -




Balance unexpended July 1, 1941_                                                                                         $4, 801. 35
Gross amount expended-------------------------- --------------                                                            4, 575.00
      Balance unexpended June 30, 1942-------------------------                                                              226. 35
Outstanding liabilities June 30, 1942------------------------------                                                          126. 28
      Balance available June 30, 1942 ---------------------------                                                            100. 07
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1- - - - - - - -- - - - - - - -- - - - -- - - - - -                                               4, 000. 00
  1Exclusive of available funds.
2. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTEID
                   [Commercial statistics for these projects are given in pt. 2 of report]

                                                            For last          Cost and expenditures to
                                                             full re-                    Jtiune 30, 1942                  Estimated
                                                            port see                                                     amount re-
                 Name of project                            Annual                                                        quired to
                                                             Report           New work             Maintenance            complete
                                                              for-

Arkansas River, Okla., above Ft. Smith, Ark. ___              1938                 $23, 290. 00       $80, 758. 06                 (1)


  I Channels adequate for existing local commerce.          Completion is not contemplated.
970        REPORT OF CHIEF OF ENGINEERS,                             U. S. ARMY,          1942

Status of all investigations for navigation called for by river and harbor acts
                           and committee resolutions

                                                         Date trans-
          Locality                Authorization act      mitted to         Document No.        Recommenda-
                                                          Congress                                 tion

Arkansas River, Ark. and        River   and   Harbor
Okla.    (under     division     Act, Aug. 30, 1935.
  board).
South Canadian River, N.        Rivers and Harbors       Dec.   8, 1941   House, 455, 77th     Favorable.
  Mex., Tex., and Okla.,          Committee resolu-                         Cong., 1st sess.
  improvement for naviga-         tion, June 15, 1938.
  tion, flood control, water
  power, and irrigation, and
  construction of dams on
  upper section.


    3. FORT SUPPLY RESERVOIR, NORTH CANADIAN                                         RIVER, OKLA.

   Location. Fort Supply Reservoir is located on Wolf Creek, a
tributary of the North Canadian River, about 12 miles northwest of
Woodward, Woodward County, Okla. (See Sectional Aeronautical
Chart, Wichita sheet, scale 1: 500,000.)
   Existing project.--The plan of improvement provides for flood
control in a portion of the North Canadian River Basin, in the
Arkansas River watershed in Oklahoma, by the construction of an
earth-fill dam 11,325 feet long at the top, rising 81.5 feet above the
stream bed, with a reservoir providing for the storage of 102,000
acre-feet for flood control and 16,000 acre-feet for a permanent pool
for recreation and preservation of wildlife. The outlet works, con-
sisting of an egg-shaped conduit with an area approximately equiva-
lent to a circular section 17.7 feet in diameter, controlled by three
71/2- by 16-foot vertical-lift gates, and a stilling basin, are located in
the left abutment. A concrete chute-type spillway, approximately
800 feet long and 540 feet wide, controlled by a concrete weir at the
upstream end and terminating in a stilling basin, will provide for
the passage of flood flows around the left end of the dam into the
river valley below. The reservoir will control practically the entire
drainage area of Wolf Creek and will be operated as a unit of the
coordinated reservoir system for flood control in the Arkansas River
Basin.
   The estimated costs, revised in 1942, are $7,493,000 for construction,
and $217,000 for lands and damages, a total of $7,710,000.
   The existing project was authorized by the Flood Control Act
approved June 22, 1936. (See H. Doc. No. 308, 74th Cong., 1st sess.)
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operationsand results during fiscal year.-The continuing contract
for the completion of the embankment, spillway, and outlet works was
substantially completed during the fiscal year, by the accomplishment
of the following work: Spillway excavation, 310,164 cubic yards; im-
pervious fill, 260,529 cubic yards; pervious fill, 52,269 cubic yards;
riprap placed on the dam, 64,856 cubic yards; and 73,968 cubic yards
of reinforced concrete. 'These operations ;completed the embank-
ment and a major portion of the spillway excavation to be accomplished
under this contract. Acquisition of lands and relocation of utilities
were continued by hired labor. Contracts were awarded in June 1942
              RIVERS AND         HARBORS---TULSA,            OKLA.,     DISTRICT              971
for the construction of the permanent buildings and the installation
of a flood-lighting system. These contracts will be completed by
October 1942. Piezometer tubes were installed in the structure during
the fiscal year by hired labor.
   The cost during the fiscal year was $2,054,697.26; the expenditures
were $2,295,985.33 for all new work.
   Condition at end of fiscal year.--The project as a whole is 96 per-
cent complete, with 100 percent of the embankment, practically all of
the excavation, 100 percent of the spillway, and practically all of the
outlet works complete. The work remaining to complete the project
consists of completion of the outlet works, completion of land acqui-
sition, completion of construction of permanent buildings and land-
scaping, installation of floodlighting system, clearing of the reservoir,
and demobilization and demolition of the construction camp.
   The total cost to the end of the fiscal year was $7,143,203.52, of which
$7,055,165.81 was from regular funds and $87,037.71 from Emergency
Relief funds, all for new work. The expenditures were $7,052,337.48
regular funds and $87,037.71 Emergency Relief funds, a total of
$7,139,375.19.
   Proposed operations.---The balance unexpended on June 30, 1942,
$890,567.52, and accounts receivable, $7,454.05, together with funds
advanced to overhead in the amount of $145,000, a total of $1,043,021.57,
less funds revoked in July 1942, $289,942.71, a total of $753,078.86,
will be applied as follows:
Accounts payable June 30, 1942                                                 $156, 779. 26
New work:
    Engineering, design, and studies by hired labor, July to De-
      cember 1942----------------------------------------18,                         969. 69
    Completion of construction of spillway, embankment, and out-
      let works by present continuing contract, July to August 1942_ 421, 359. 30
    Completion of land acquisition and utility relocations by hired
      labor, July to December 1942---------------------------                    13, 865. 38
    Completion of construction of permanent buildings for opera-
      tion and maintenance by present continuing contract, July
      to September 1942 -----------                          -----------------   60,675. 80
    Landscaping, maintenance of construction camp, demobilization
      and demolition of construction camp, and contingencies by
      hired labor July to December 1942 ..----------------------                 51,429. 43
         Total new work---              ------------------------------ 723, 078. 86

Maintenance by hired labor:
    Operation of completed project_..             ____         ______------       ..    11, 100. 00
                                                                                         6, 100. 00
   Ordinary repairs---------------------------------------
    Siltation surveys---------------------------------------1,                              500.00
    Maintenance of stream gages--------------                      --------------        6, 000. 00
    Measures for safeguarding structures___ _- --                        --- _           5, 300..00
        Total maintenance-__--------------------__                                _     30, 000. 00

        Total for all work-          ------------          -----------                 753, 078. 86

  With the expenditure of these funds, the project will be completed
and placed in operation. The additional sum of $30,000 can be profit-
ably expended during the fiscal year 1944 as follows:
Maintenance by hired labor:
    Operation of completed project-------$,-----------------------                         $7,500
    Ordinary repairs------------           ---------------------------                     12, 500
    Maintenance of stream gages-------------------------------                             10, 000

        Total for all work---------------------------.--------                  -----      30, 000
972          REPORT OF CHIEF OF ENGINE'RS, U. S. ARMY,                                                                   1942

                                             Cost and financial summary

Cost of new work to June 30, 1942   ------------------------                                                             $7, 143, 203. 52
Cost of maintenance to June 30, 1942_

      Total cost of permanent work to June 30; 1942                                            -----------               17,     143, 203. 52
Undistributed costs June 30, 1942__----------------------------                                                                  145, 496. 88
      Net total cost to June 30, 1942_-----------------------                                                             7, 288. 700. 40
Plus accounts receivable June 30, 1942-------------------------                                                                7, 454. 05

      Gross total costs to June 30, 1942---------------------                                                             7, 296, 154. 45
Minus accounts payable June 30, 1942_ ----------   __       ----                                                 ___         156, 779. 26

     Net total expenditures____ _-- __----- ----------      '7, 139, 375. 19
Unexpended balance June 30, 1942---------------------------     890; 567. 52

         Total amount appropriated to June 30, 1942-                                                       -__           1 8, 029, 942. 71

   Fiscal year ending June 30                       1938                   1939                1940               1941                1942


Cost of new work                  - -            $310, 923. 58 $1, 433, 018. 38 $1, 742, 291. 75 $1, 602, 272. 55                 $2, 054, 697. 26
Cost of maintenance --       --         -   --      -      -      -        -   --       ----                               ---         ---

Total   expended ......--------------             378. 043. 42        1, 332, 195. 29    1, 748, 355. 58    1, 384, 795. 57        2, 295, 985. 33
Allotted _         _-------------------_     1, 789, 430. 00          1, 997, 037. 71    2, 663, 000. 00    1, 509, 975. 00           70, 500. 00


Balance unexpended July 1, 1941---------------------------$3, 116, 052. 85
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942 ______-                                              70, 500. 00
      Amount to be accounted for---------------------------               3, 186, 552. 85
Gross amount expended_________--_________ $2, 320, 033. 92
Less:
    Reimbursements collected-- .---  _ $22, 108. 59
    Receipts from sales-------------1, 940. 00
                                                           24, 048. 59
                                                                         2, 295, 985. 33
      Balance unexpended June 30, 1942       _____---___---890,                   567. 52
Outstanding liabilities June 30, 1942------------$156, 779. 26
Amount covered by uncompleted contracts..--------- 429, 986. 69
                                                                             586, 765. 95
      Balance available June 30, 1942---... ----------------                 303, 801. 57
Accounts receivable June 30, 1942 _________-______-              -____         7, 454. 05
      Unobligated balance available June 30, 1942______________              311, 255. 62
Amount revoked in July 1942 ------                     __         -    -______
                                                                             289, 942. 71
      Amount available for fiscal year 1943_______________                    21, 312. 91
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance "____________     ___                                                                             30, 000. 00
  1 Includes $87.037.71 Emergency Relief funds.
  2 Exclusive of available funds.


        4. CANTON                 RESERVOIR,                     ARKANSAS                 RIVER BASIN,                    OKLA.

   Location.--Canton Reservoir is located on the North Canadian
River about 393 miles above its mouth and about 3 miles north of
Canton, Blaine County, Okla. (See Sectional Aeronautical Chart,
Wichita sheet, scale 1: 500,000.)
    Emisting project.-The plan of improvement provides for flood
control in a portion of the North Canadian River Basin, in the
Arkansas River watershed in Oklahoma, by construction of an earth-
fill dam 15,100 feet long at the top, rising 68 feet above the valley
           RIVERS    AND HARBORS--TULSA,         OKLA.,   DISTRICT         973

floor, with a reservoir providing for the storage of 240,000 acre-feet
for flood control and 150,000 acre-feet for conservation of water and
siltation reserve.    Of the conservation storage, 40,000 acre-feet is
allocated as a reserve for the abatement of pollution downstream
from the project. The outlet works will consist of three 7- by 12-foot
gated sluices through the spillway weir. A concrete spillway, con-
trolled by sixteen 40- by 25-foot gates on the weir crest, will pro-
vide for the passage of flood flows around the right end of the dam
into the river valley below. The reservoir will be operated as a unit
of the coordinated reservoir system for flood control in the Arkansas
River Basin.
   The estimated costs, revised in 1940, are $13,220,000 for construction
and $650,000 for lands, damages, and relocations, a total of $13,870,000.
   The existing project was authorized by the Flood Control Act
approved June 28, 1938. (See H. Doc. No. 569, 75th Cong., 3d sess.)
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operationsand results during fiscal year.-The following work was
accomplished under the continuing contract for the construction of
the embankment and excavation of the spillway during the fiscal year:
Spillway excavation, 2,373,350 cubic yards; impervious fill, 2,039,506
cubic yards; pervious fill, 47,826 cubic yards; acquisition of lands and
rights-of-way for the reservoir area, and preparation of plans and
specifications for construction of spillway and completion of embank-
ment were continued by hired labor.
   The dost during the fiscal year was $973,542; the expenditures were
$1,075,506.18, all for new work.
   Conditionat end of fiscal year.-The project as a whole is 19 percent
complete. Under the present contract, 75 percent of the spillway
excavation and 71.9 percent of the embankment are complete. The
work remaining to complete the project consists of completion of em-
bankment, spillway and control works, completion of the acquisition
of lands and rights-of-way in the reservoir area, relocation of high-
ways and utilities, construction of operator's quarters, clearing and
landscaping.
   The total cost of new work to the end of the fiscal year was $1,634,-
030.61; the expenditures were $1,733,632.73, all for new work.
   Proposed operations.-The balance unexpended June 30, 1942,
$3,920,342.27, and accounts receivable, $499.70, a total of $3,920,841.97,
will be applied as follows:
Accounts payable June 30, 1942-----------------------------$126, 123. 92
New work :
    Engineering, design, and studies by hired labor, July 1942 to
      June 1943---       --------------------------------------    125, 285. 97
    Complete construction of major portion of embankment and
      rough excavation of spillway by present continuing contract,
      July to September 1942_---------           -------------     460, 525. 04
    Initiate construction of spillway and completion of embank-
      ment by continuing contract, August 1942 to June 1943--- 2, 891, 000. 00
    Land acquisition, damages, and relocations by hired labor,
      July 1942 to June 1943_------------------------------- 295, 186. 44
    Camp operation, maintenance, and contingencies, by hired
      labor, July 1942 to June 1943---------------------------      22, 720. 60

        Total for all work ---------------------             _    3, 920, 841.97
  No operations are proposed for the fiscal year 1944.
     493202-43-pt. 1, vol. 1-62
974           REPORT OF CHIEF OF ENGINEERS,                                       U. S. ARMY,                   1942

                                       Cost and financial summary

Cost of new work to June 30, 1942-------------------------- $1,634, 030. 61
Cost of maintenance to June 30, 1942------------               -         -----------
       Total cost of permanent work to June 30, 1942                               -----------
                                                                         1, 634, 030. 61
Undistributed costs June 30, 1942_----------------------------              225, 226. 34
      Net total cost to June 30, 1942 -------------------                1, 859, 256. 95
Plus accounts receivable June 30, 1942--------------------                        499. 70
      Gross total costs to June 30, 1942 --           ----------------- 1, 859, 756. 65
Minus accounts payable June 30, 1942-------------------------               126, 123. 92
      Net total expenditures---      --------------------------- 1, 733, 632. 73
Unexpended balance June 30, 1942_--------------------------             3, 920, 342.27
      Total amount appropriated to June 30, 1942--------------          5, 653, 975. 00

    Fiscal year ending June 30                1938          1939                  1940                   1941             1942


Cost of new work---------
                 ........----------------              $28, 007. 35        $115, 728. 49              $516, 752. 77    $973, 542. 00
Cost of maintenance--------- --.--------------         - ----------
                                                              -         -------          -----   -   --------------------
Total expended---------------         --------------      27, 219. 41         108, 986. 54             521, 920. 60   1, 075, 506. 18

             ----------------- --------------
Allotted.........................                      444, 000. 00      1, 400, 000. 00             1,009, 975. 00   2, 800, 000. 00



Balance unexpended July 1, 1941--------------------------                $2, 195, 848. 45
Amount allotted from War Department Civil Appropriation Act
  approved April 28, 1942-       -------------------------------- 2, 800 000. 00
      Amount to be accounted for--------------------------                4, 995, 848. 45
Gross amount expended---------------------- $1,142,426. 70
Less:
    Reimbursements collected------- $66, 869. 41
    Receipts from sales --------------             51. 11
                                                             66, 920. 52
                                                                          1, 075, 506. 18
      Balance unexpended June 30, 1942          --------------------- 3, 920, 342. 27
Outstanding liabilities June 30, 1942-.......              $126, 123. 92
Amount covered by uncompleted contracts---------- 548, 142. 44
                                                                             674, 266. 36
      Balance available June 30, 1942-----------------------3, 246, 075. 91
Accounts receivable June 30, 1942 ---                                            499. 70
      Unobligated balance available June 30, 1942--------------3, 246, 575. 61
Amount (estimated) required to be appropriated for completion
  of existing project --------   -       ----------                                                             8, 216, 025. 00
 'Exclusive of available funds.
            5. CHEROKEE, SALT FORK OF ARKANSAS RIVER, OKLA.

   Location.-The work covered by this project is located on Cotton-
wood Canyon, a tributary of the Salt Fork of the Arkansas River, in
the immediate vicinity of Cherokee, Okla. (See Sectional Aeronauti-
cal Chart, Wichita Sheet, scale 1: 500,000.)
   Existing project.-The plan of improvement provides for levees and
other work in connection with a floodway which will divert flows of
Cottonwood Canyon away from Cherokee. The south wing levee will
begin on the right bank of Cottonwood Canyon, at mile 7, above its
mouth, and will extend to mile 4, where it will approach the shorter
north wing levee and the floodway will begin. The floodway, 3.6 miles
in length, and varying from 165 to 290 feet in width, will carry flood
flows east to the Great Salt Plains. The total length of levees pro-
          RIVERS   AND   HARBORS--TULSA,       OKLA.,   DISTRICT          975
posed is 11.1 miles, with a grade elevation for the south levee varying
from 6 feet to 1 foot above the height of the confined flow of the maxi-
rium flood of record on Cottonwood Canyon. The grade elevation of
the north levee, through its entire length, is 1 foot above the height of
this flood. The project provides for the protection of approximately
4,650 acres of rural and urban areas.
    The estimated Federal cost, approved in 1939, is $800,000. The
total cost for lands and damages is $60,000.
    The existing project was authorized by the Flood Control Act ap-
proved August 18, 1941. (See H. Doc. No. 480, 76th Cong., 2d sess.,
which contains the latest published maps.)
    Local cooperation.-See page 5 for requirements. In addition to
the usual requirements for local cooperation as provided by law, local
interests are required to bear the expense of necessary changes to the
county road, including a bridge across the diversion channel, and of
required relocation of telephone and power lines. To date these con-
ditions have not been met, either in whole or in part, but at a public
hearing held at Cherokee, Okla., and subsequent thereto, local interests
have asserted their willingness to meet all these conditions.
    Operations and results during fiscal year.-There were no opera-
tions during the fiscal year, and there were no costs or expenditures
during the fiscal year.
    Condition at the end of fscal year.-Construction had not been
initiated at the end of the fiscal year, and no funds have been ex-
pended under this project.
    Proposed operations.-No operations are proposed on this project
during fiscal year 1943. The sum of $35,000 can be profitably ex-
pended for new work during the fiscal year 1944 for the preparation
of detailed plans and estimates and engineering studies.
                         Cost and financial summary
Cost of new work to June 30, 1942__
Cost of maintenance to June 30, 1942

      Net total expenditures___
Total amount appropriated to June 30, 1942_____________      ______--------

Amount (estimated) required to be appropriated for completion of
existing project--_____----------------------                --        800, 000
Amount that can be profitably expended in fiscal year ending June 30,
1944, for new work--------------------------------------------35,            000
6. GREAT SALT PLAINS RESERVOIR, SALT FORK OF ARKANSAS RIVER,
                           OKLA.
  Location.---GreatSalt Plains Reservoir is located on the Salt Fork
of the Arkansas River 93.5 miles above its mouth, and about 12 miles
east of Cherokee, Alfalfa County, Okla. (See Sectional Aeronautical
Chart, Wichita sheet, scale 1: 500,000.)
  Existing project.-The plan of improvement provides for flood con-
trol in the Salt Fork Valley in the Arkansas River watershed in
Oklahoma, by construction of an earth-fill dam 5,700 feet long, rising
68.5 feet above the valley floor, with a reservoir providing for the
storage of 259,000 acre-feet for flood control and 58,000 acre-feet for
siltation, recreation, and preservation of wildlife. A concrete cas-
cade-type spillway approximately 800 feet long and 338 feet wide,
containing three gravity-type concrete weirs, will provide for the
976      REPORT OF CHIEF OF ENGINEERS,                     U. S. ARMY,   1942

passage of flood flows around the right end of the dam into the river
valley below. The outlet works will consist of four ungated 10- by
12-foot conduits through the center section of the upper weir. The
reservoir will be operated as a unit of the coordinated reservoir
system for flood control in the Arkansas River Basin.
   The estimated costs, revised in 1942, are $4,059,000 for construction
and $426,000 for lands and damages, a total of $4,485,000.
   The existing project was authorized by the Flood Control Act ap-
proved June 22, 1936. (See H. Doc. No. 308, 74th Cong., 1st sess.,
which contains the latest published maps.)
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during the fiscal year.-Contracts for the
construction of permanent buildings and grading and utilities for
permanent buildings were initiated and completed during the fiscal
year. A contract for the installation of a protective floodlighting sys-
tem was initiated and was 5.8 percent complete at the end of the fiscal
year. Acquisition of lands and relocations of utilities were substan-
tially completed by hired labor.
   The cost during the fiscal year was $121,028.29 for new work and
$11,220.29 for maintenance; the expenditures were $266,384.89 for new
work and $11,685.28 maintenance.
   Condition at end of fiscal year.-The project as a whole is substan-
tially complete. The work remaining to complete the project con-
sists of completion of the protective floodlighting system, relocation
of railroad, landscaping, and completion of final steps for land acquisi-
tion.
   The total cost for new work to the end of the fiscal year was $4,-
203,787.50, of which $4,179,043.91 was from regular funds and $24,-
743.59 from Emergency Relief funds. The total cost for maintenance
to the end of the fiscal year was $11,220.29 from regular funds. The
expenditures for new work were $4,182,826.37 regular funds and $24,-
743.59 Emergency Relief funds, a total of $4,207,569.96, while the ex-
penditure for maintenance was $11,685.28, all from regular funds.
   Proposed operations.-Thebalance unexpended June 30, 1942, $336,-
358.35, and accounts receivable, $8,779.51, a total of $345,137.86, less
funds in the amount of $15,113.59 revoked in July 1942, a total of
$330,024.27, will be applied as follows:
Accounts payable June 30, 1942______---------------------------------- $4, 942.32
New work:
    Completion of land acquisition and relocations by hired labor,
     July to September 1942_ __._                _    __     ____      216, 660. 65
   Installation of protective floodlighting system by existing con-
     tract, July to August 1942--------------------------------- 7, 134. 97
   Construction of well system for control of seepage downstream
     from dam by hired labor, July to September 1942-------------- 62, 341. 89

         Total new work---------------------------------------   26,137. 51
Maintenance by hired labor:
    Operation of completed project----_                             8, 409. 67
    Ordinary repairs                                              15, 842. 62
    Siltation surveys-------------------------------------------   3,000. 00
    Maintenance of stream gages                                   10,  000. 00
                                                                  1--_____
    Measures for safeguarding structures -........                 6,550. 00
      Total maintenance -------------------                                43, 786. 76
      Total for all work- -------             ----------                  330, 024. 27
                     RIVERS AND HARBORS-TULSA,                                              OKLA., DISTRICT                              977
  The additional sum of $30,000. 00 can be profitably expended during
the fiscal year 1944, as follows:
Maintenance by hired labor:
    Operation of completed project_-------------------------                                                                  $7,500. 00
   Ordinary repairs---                                                                                                        12, 500. 00
                                                                                                                           __--------------------
    Maintenance of stream gages___ _______-____-------____                                                                    10, 000. 00
            Total for all work---                           ---------------------------------                                    30, 000. 00

                                                 Cost and ftnancial ummary
Cost of new work to June 30, 1.942------------------------                                                            1 $4, 203, 787. 50
Cost of maintenance to June 30, 1942_ __ _------------------                                                                 11, 220. 29

      Total cost of permanent work to June 30, 1942---------- 14, 215, 007. 79
Undistributed costs June 30, 1942____________-----                              410. 26
      Net total cost to June 30, 1942______--------------------------   4, 215, 418. 05
Plus accounts receivable June 30, 1942____________
                                           ---          -8,                     779. 51
      Gross total costs to June 30, 1942 __________________-----4, 224, 197. 56
Minus accounts payable June 30, 1942_______________________                  4, 942. 32
      Net total expenditures___________________________               14, 219, 255. 24
Unexpended balance June 30, 1942____.____--         -     -__- ____        336, 358. 35
      Total amount appropriated to June 30, 1942 ________-__- 14, 555, 613. 59

    Fiscal year ending June 30                           1938               1939                1940              1941                1942

Cost of new work    -                                $135, 097. 15      $748., 225. 89 $1, 483, 219. 91 $1, 716, 216. 26          $121, 028. 29
Cost of maintenance .           .        .   .   .      .    .     .    .     .    .    .   .    .    ..         __11,                  220. 29
        Total cost                   _                135, 097. 15       748, 225. 89     1, 483, 219. 91    1, 716, 216. 26       132, 248. 58
Total expended ..            ........---------------- 127, 830. 14       718, 428. 70     1, 352, 567. 01    1, 742, 359. 22       278, 070. 17
Allotted- ---------------------...               1, 130, 070. 00       2, 228, 243. 59    1, 200, 000. 00        67, 300. 00      -70,   000. 00



Balance unexpended July 1, 1941_--                                                                                             $684, 428. 52
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942 -----------------------      ------------                                                              30,   000.   00
      Amount to be accounted for     __________--_                                                                             714,   428.   52
Deductions on account of revocation of allotment--------------                                                                 100,   000.   00
      Net amount to be accounted for_____________          -                                                                   614,   428.   52
Gross amount expended
Less:
                                             ____________________
                                                     $288,927. 24
    Reimbursements collected--------    $10, 317. 47
    Receipts from sales-___-_____-_          539. 60
                                                       10, 857. 07
                                                                                                                                278, 070.17
      Balance unexpended June 30, 1942___---__----_--_                                                                          336, 358. 35
Outstanding liabilities June 30, 1942__________ $4, 942. 32
Amount covered by uncompleted contracts-------- 32, 350. 86
                                                                                                                                37, 293. 18
      Balance available June 30, 1942__ ---      ________-- ___-                                                               299, 065. 17
Accounts receivable June 30, 1942_                                                                                               8, 779. 51
      Unobligated balance available June 30, 1942________---                                                                   307, 844. 68
Amount revoked in July 1942_--_--- -------                                                                                      15, 113. 59
Amount available for fiscal year 1943---.....                                                                                  292, 731. 09
Amount that can be profitably expended in fiscal year ending
   June 30, 1944, for maintenance .                                                ....                     _-    .   -          30, 000. 00
   1 Includes $24,743.59 Emergency Relief funds.
   1 Exclusive of available funds.
978     REPORT OF CHIEF OF ENGINEERS,           U. S.     ARMY,   1942


             7. HULAH RESERVOIR, CANEY RIVER, OKLA.

   Location.-Hulah Reservoir is located on Caney River 78 miles above
its confluence with the Verdigris River and is about 15 miles north-
west of Bartlesville, near Hulah, Osage County, Okla. (See U. S.
Geological Survey Maps for Pawhuska and Sedan (Okla.) quad-
rangles, scale 1: 125,000.)
   Existing project.-The plan of improvement'provides for flood con-
trol in the Caney River Valley in the Verdigris River Basin, Arkan-
sas River' watershed, by construction of an earth-fill dam 5,500 feet
long and rising 72 feet above the valley floor, with a reservoir provid-
ing for the storage of 280,000 acre-feet for flood control and 15,000
acre-feet for siltation, recreation, and preservation of wildlife. A
concrete uncontrolled spillway will provide for the passage of flood
flows through a saddle in the right abutment of the dam. The outlet
works will consist of three 7- by 12-foot gated sluices through the spill-
way. The reservoir will be operated as a unit of the coordinated reser-
voir system for flood control in the Arkansas River Basin.
    The estimated costs, revised in 1940, are $7,165,000 for construction
and $1,675,000 for lands, damages, and relocations, a total of $8,840,000.
    The existing project was authorized by the Flood Control Act ap-
proved June 22, 1936. (See H. Doc. 308, 74th Cong., 1st sess.)
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
    Operations and results during fiscal year.-Operations during the
fiscal year consisted of preliminary steps toward land acquisition.
The cost of new work during the fiscal year was $20,807.85, and the
expenditures were $20,184.23.
    Condition at end of fiscal year.-Preparationof construction plans
and specifications is complete. The work remaining to be done to
complete the project consists of acquisition of lands, relocation of
highways and utilities, and construction of the dam and appurtenant
works.
    The total cost of new work to the end of the fiscal year was $191,-
383.95, and the expenditures were $188,671.32.
    Proposed operations.-The balance unexpended June 30, 1942, $264,-
467.97, will be applied to accounts payable June 30, 1942, $2,712.63,
and to new work, land acquisition and utility relocations, July 1942
to June 1943, and to engineering, design, and studies by hired labor,
July 1942 to June 1943, $261,755.34. No further construction opera-
tions are proposed for the duration of the existing war emergency.
                        Cost and financial sumntary

Cost of new work to June 30, 1942____-___________________             $191, 383. 95
Cost of maintenance to June 30, 1942

     Total cost of permanent work to June 30, 1942 __________          191, 383. 95
Minus accounts payable June 30, 1942-_______    -                        2, 712. 63
     Net total expenditures__--------------------                 -188,     671. 32
Unexpended balance June 30, 1942 ____.______-__           ________     264, 467. 97
      Total amount appropriated to June 30, 1942-......      -       - 453,139. 29
                       RIVERS AND                 HARBORS-TULSA,                      OKLA.,         DISTRICT                   979

    Fiscal year ending June 30                        1938               1939           1940              1941               1942


Cost of new work _...............                  $14, 000. 00     $24, 778.69       $57, 322. 47      $74, 474. 94        $20,807. 85
Cost of maintenance- .-         --------                     --    --     -------------------        -------------- --------------
Total expended__ .....
                    -                 __...          14, 000. 00        23, 220. 96    58, 546.75        72, 719.38          20,184.23

Allotted----........    __.     ........             14, 000.00         24, 889.29    400, 000. 00       14, 250. 00    .



Balance unexpended July 1, 1941______-------------------------- $284, 652. 20
Gross amount expended___----_                               154. 14
                                                      $----------------------24,
                              _-
Less reimbursements collected_-_------------------       3,969. 91
                                                                                                                        20, 184. 23

      Balance unexpended June 30, 1942            _________---------------                                             264, 467. 97
Outstanding liabilities June 30, 1942________--------            ----------                                              2, 712. 63

           Unobligated balance available June 30, 1942_________ -__                                                    261, 755. 34

Amount (estimated) required to be appropriated for completion of
   existing project 1                         ___---------                                                       8, 386, 860. 71
   1 Exclusive of available funds.

               8. TULSA AND WEST TULSA, ARKANSAS RIVER, OKLA.

   Location.-The work covered by this project is located on the Ar-
kansas River at Tulsa and West Tulsa, Okla. (See U. S. Coast and
Geodetic Survey maps, Hominy, Okla., and Claremore, Okla., quad-
rangles, scale 1: 125,000.)
   Existing project.-The plan of improvement provides for raising
the existing left bank levee, connecting the discontinuous portions of
the levee and constructing a leveed floodway up Black Boy Creek
with levees and diversion ditches eastward and westward thereof,
and raising the existing right bank levee to the proposed grade and
constructing the necessary appurtenances thereto. The left bank
levee begins at mile 531.5 above the mouth of the Arkansas River and
ends at mile 524.5. The right bank levee begins at mile 526.5 and
ends at mile 521.5. The project provides for the protection of 3,510
acres of highly developed industrial, urban, and agricultural land,
with grade elevation allowing a 3-foot freeboard above the flow of
the maximum probable flood.
   The estimated costs, approved in 1941, are $513,000 for construction.
   The existing project was authorized by the Flood Control Act ap-
proved August 18, 1941. (See H. Doc. No. 157, 77th Cong., 1st sess.,
which contains the latest published maps.)
   Local cooperation.-See page 5 for requirements. In addition to
the usual requirements for local cooperation as provided by law, the
State of Oklahoma is required by appropriate legislation to assure
that the construction of bridges or other works which might adversely
affect the flood-carrying capacity of the channel at the locality will
not be permitted. To date these conditions have been met in part,
and at a public hearing held at Tulsa, Okla., and subsequent thereto,
local interests have asserted their willingness to meet all these con-
ditions.
   Operations and results during fiscal year.--Preparationof detailed
plans was initiated.
980             REPORT OF CHIEf                                 OF ENGINEERS,                U. S. ARMY,               1942

  The cost during the fiscal year was $5,202.79; the expenditures were
$5,202.79, all for new work.
  Condition at end of the fiscal year.-Preparationof detailed plans
was initiated.
  The total cost to the end of the fiscal year was $5,202.79, and the
expenditures were $5,202.79.
  Proposed operations.-The sum of $25,000, which was allotted in
September 1942, will be expended during the fiscal year 1943 for the
completion of detailed plans and engineering studies.
                                                  Cost and financial summary
Cost of new work to June 30, 1942___________________________                                                                     $5, 202. 79
Cost of maintenance to June 30, 1942__   ________--___________                                                              -----------
      Total cost of permanent work to June 30, 1942___________                                                                    5, 202. 79
Net total expenditures______--------------------   _                                                                              5, 202. 79
Total amount appropriated to June 30, 1942 .____    _____-- ____                                                                  5, 202. 79

    Fiscal year ending June 30                           1938                  1939            1940             1941                 1942

Cost of new work------                        - ------......-    --..---    ------------- -------------- ----------         -        $5, 202. 79
Cost of maintenance- ...---------------------- ---------------------------
                                                                    ---    -----------                                                       --
             .....................-------------------------
Total expended---------                                                                  ----------------------------....             5, 202. 79
                                            ..-------..-------------..----
                                                ..--------------..
Allotted......................---------------..------------                                                                          5, 202. 79


Amount allotted from Third Supplemental National Defense Ap-
  propriation Act, approved Dec. 17, 1941__--------------------- $300, 000. 00
Deductions on account of revocation of allotment -----------  _-  294, 797. 21

      Net amount to be accounted for _____-__-____--------5,                                                                         202. 79
Gross amount expended__      __-----------------                                                                                  5, 202. 79

Amount allotted in September 1942----------------------------_                                                                   25, 000. 00
Amount available during the fiscal year 1943______-------__                                                                      25, 000. 00

Amount (estimated)                       required to be appropriated for completion of
   existing project 1-- -----                                    _-------                                                       482, 797. 21
   1 Exclusive of available funds.

           9. PENSACOLA RESERVOIR, ARKANSAS RIVER BASIN, OKLA.

   Location.-Pensacola Reservoir is located on the Grand (Neosho)
River, 77 miles above its mouth, and adjacent to the town of Disney,
Mayes County, Okla. (See U. S. Geological Survey maps for Pryor,
Wyandotte, Vinita (Okla.), and Siloam Springs (Ark), quadrangles,
scale 1: 125,000).
   Existing project.-During the fiscal year 1941 the Grand River
Dam Authority, an agency of the State of Oklahoma, under a license
dated July 26, 1939, issued by the Federal Power Commission, com-
pleted the construction of a reservoir for flood control and hydroelec-
tric power at the Pensacola site in the Arkansas River Basin. The
dam is of the concrete multiple arch type, 6,565 feet long and 147 feet
above the stream bed. The existing dam and reservoir provides 2,-
155,000 acre-feet of power storage and 245,000 acre-feet of flood-control
storage. The flood-control storage lies between elevations 745 and
750.
                      RIVERS            AND HAR.BORS-T--ULSA,                                OKLA.,           DISTRICT                    981
                                                                                                                                          9

   The Flood Control Act approved August 18, 1941, modified the gen-
eral comprehensive plan for flood control and other purposes for the
Arkansas River Basin to include the Pensacola, Markham Ferry, and
Fort Gibson Reservoirs in the Grand (Neosho) River Basin in Okla-
homa and Missouri, in accordance with the recommendations of the
Chief of Engineers in House Document No. 107, Seventy-sixth Con-
gress, first session. The improvements recommended in that docu-
ment included a reservoir for flood control at the Pensacola site which
provided for 960,000 acre-feet of flood-control storage.
   The existing project now provides for making available 295,000
acre-feet of flood-control storage between elevations 750 and 755, in
addition to the storage provided in the project as constructed by the
Grand River Dam Authority. This additional flood-control storage
requires the acquisition and partial clearing of additional lands at an
estimated cost of $2,000,000.
   Local cooperation.-Section 2 of the Flood ControlAct approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Preliminary steps for
the acquisition of land in the reservoir were initiated by hired labor.
The cost during the fiscal year was $3,070.99; the expenditures were
$5,089.03, all for new work.
   Condition at end of fiscal year.--The acquisition of the lands
required for the additional flood control storage has not been started.
The work remaining to complete the project consists of acquisition and
partial clearing of lands in the reservoir area to permit storage of
floodwaters to elevation 755.
   The total costs of new work to the end of the fiscal year were
$3,070.99; the expenditures were $5,089.03, all for new work.
   Proposed operations.-The balance unexpended June 30, 1942,
$40,502.25, will be applied to accounts payable June 30, 1942, $2,598.57,
and to preliminary work for the acquisition of land to permit storage
of floodwaters to elevation 755.
                                                  Cost and financial summary
Cost of new work to June 30, 1912_ ____                                         _          ----------                               $3, 070. 99
Cost of maintenance to June 30, 1942                                                                                               --------
      Total cost of permanent work to June 30, 1942_______________                                                                   3, 070. 99
Undistributed costs June 30, 1942_____________----_-------_                                                                          4, 616. 61

            Net total cost to June 30, 1942___________________________                                                               7, 687. 60
Minus accounts payable June 30, 1942____                                                ______                    ___                2, 598. 57

     Net total expenditures------------      -- ________  _____                                                                      5, 089. 02
Unexpended balance June 30, 1942__-------------------------                                                                         40, 502. 25
            Total amount appropriated to June 30, 1942__--------------                                                              45, 591. 28

    Fiscal year ending June 30                              1938             1939                 1940                1941              1942


Cost of new work                                               --                        _      ..---       - -----                     $3, 070.99
Cost of maintenance            .-------------------------                                                      ----------
Total expended------.......-------------                       ------     ----------      ----------------------------                   5,089.03

Allotted............----------------..-----------............--------------.........------------..............--------------....       45, 591.28
982      REPORT OF CHIEF OF ENGINEERS,            U. S. ARMY,     1942

Amount allotted from War Department Civil Appropriation Act ap-
  proved June 24, 1940        ------------------------------------- $45, 591. 28
Gross amount expended ___________--____-----$5, 094. 48
Less reimbursements collected_______-----------------           5. 45
                                                                         0,089. 03
      Balance unexpended June 30, 1942------------------ ------ 40, 502. 25
Outstanding liabilities June 30, 1942--------------------------- 2, 598. 57

       Balance available June 30, 1942,_-----------------------       37, 903. 68

Amount (estimated) required to be appropriated for completion of
existing project 1  _     _                                          1, 955, 000
  1 Exclusive of available funds.

  10. MARKHAM FERRY RESERVOIR, ARKANSAS RIVER BASIN, OKLA.
   Location.-Markham Ferry Reservoir is located on the Grand
 (Neosho) River, 46.7 miles above its mouth, and 2.5 miles north and
west of Locust Grove, Mayes County, Okla. (See U. S. Geological
Survey maps for Pryor and Vinita (Okla.) quadrangles, scale
1: 125,000).
   Existing project.-The plan of improvement provides for combined
flood control and hydroelectric power in this portion of the Grand
 (Neosho) River Basin, in the Arkansas River watershed in Oklahoma,
by construction of a concrete gravity type dam and earth-fill embank-
ment structure 10,600 feet in total length along the crest, rising 90
feet above the stream bed, with a reservoir providing for the storage
of 239,000 acre-feet for flood control and 213,000 acre-feet for power
storage. The project will include a powerhouse structure housing the
hydroelectric generating equipment, a gate-controlled spillway, and
two nonoverflow abutment sections. A concrete gravity nonoverflow
section will form the left abutment of the structure and the right abut-
ment will be an earth-fill embankment. The powerhouse structure
will be located on the left bank with the spillway structure extending
across the existing river channel. The entire dam structure will be
topped by a roadway. The reservoir will be operated as a unit of the
three-reservoir system for dual-purpose flood control and hydroelectric
power on the lower Grand (Neosho) River, and as one unit in the
comprehensive plan for flood control of the Arkansas River Basin.
   The estimated cost, revised in 1942, is $12,153,000 for construction
and $3,257,000 for lands and damages, a total of $15,410,000.
   The existing project was authorized by the Flood Control Act ap-
proved August 18, 1941. (See H. Doc. No. 107, 76th Cong., 1st sess.,
which contains the latest published maps.)
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Operations during the
fiscal year consisted of preparing detailed plans and conducting
studies of foundation conditions in abutments and flood plain areas.
The cost during the fiscal year was $98,510.94; the expenditures were
$96,931.31, all for new work.
   Condition at end of fiscal year.-The preparation of detailed plans
was approximately 95 percent complete and special studies of foun-
dation conditions m abutment and flood plain area were approximately
10 percent complete at the end of the fiscal year. The cost to the
end of the fiscal year was $98,510.94; the expenditures were $96,931.31.
               RIVERS AND HARBORS-TULSA,                              OKLA., DISTRICT                    983
  Proposed operations.-The balance unexpended on June 30, 1942,
$18,525.42, will be applied to accounts payable June 30,1942, $1,579.63,
and to preparation of detailed plans, and studies of foundation con-
ditions in abutments and flood plain area. The additional sum of
$200,000 can be profitably expended during the fiscal year 1944 for
the preparation of construction plans and specifications and prelim-
inary steps toward land acquisition.
                                  Cost and financial summary
Cost of new work to June 30, 1942__________________________
                                                          --                                     $98, 510. 94
Cost of maintenance to June 30, 1942
      Total cost of permanent work to June 30, 1942------------                                   98, 510. 94
Minus accounts payable June 30, 1942_ ___....__________- -__-                                      1, 579. 63
      Net total expenditures---      ---
                             ____________---   __      _____                                      96,931. 31
Unexpended balance June 30, 1942----------------------------                                      18, 525. 42
      Total amount appropriated to June 30, 1942 __-_______--                                    115, 456. 73
  Fiscal year ending June 30           1938               1939         1940            1941           1942
Cost of new work_- ..............
                             l..............
                                        I........... ...... I                         .....          $98, 510. 94
                                               I .. . . . . . . . . . . . ..- .--
C ost of m aintenance ........... I..............                                                         ...-.
Total expended -------------- -------------                                                           96, 931.31
Allotted-                                 -73--                                                      115 456
Amount allotted from War Department Civil Ap-
propriation Act approved June 28, 1939                    ---------
                                                  $5, 000. 00
Amount allotted from War Department Civil Ap-
propriation Act approved May 23, 1941                    ----------
                                                 105, 000. 00
Amount allotted from Third Supplemental National
Defense Appropriation Act 1942, approved Dec.
17, 1941-------------------------------------1, 500,000. 00
                                                                                              $1, 610, 000. 00
Amount to be accounted for_____________________                                                1, 610, 000. 00
Deductions on account of revocation of allottment____-_____                                    1, 494, 543. 27
      Net amount to be accounted for------------------------                                     115, 456. 73
Gross amount expended __---__            -_____-   - 97,819. 71
Less reimbursements collected----------- $887.00
Less receipts from sales_..._____..   --      1.40
                                                        888. 40
                                                                                                  96,931.31
      Balance unexpended June 30, 1942__ ________-------18,                                            525. 42
Outstanding liabilities June 30,- 1942              --------------
                                                         1, 579. 63
Amount covered by uncompleted contracts--------         1,043. 52
                                                                                                    2, 623.15
         Unobligated balance available June 30, 1942--                            __----15,            902. 27
Amount (estimated) required to be appropriated for completion of
   existing project              _--------------------._-----_
                                               )--               --     --------             215, 294, 500.00

Amount that can be profitably expended 1in     fiscal
                                         - _- - - - - - - - -                 ---- ----- -
year ending June 30, 1944, for new work                                                         200, 000. 00
   1 Exclusive of available funds.
   ' Includes additional authorization of $8,764,500 needed to complete project.

   11.   FORT GIBSON RESERVOIR, ARKANSAS RIVER BASIN, OKLA.

  Location.-FortGibson Reservoir is located on the Grand (Neosho)
River, 7.7 miles above its mouth, and about 5 miles north and east
of Fort Gibson, Muskogee County, Okla. (See U. S. Geological
Survey maps for Muskogee and Pryor (Okla.) quadrangles, scale
1: 125,000.)
984     REPORT OF CHIEF OF ENGINEERS, U.                     S. ARMY,   1942

   Existing project.-The plan of improvement provides for com-
bined flood control and hydroelectric power development in the por-
tion of the Grand (Neosho) River Basin, in the Arkansas River
watershed in Oklahoma, by construction of a concrete gravity-type
dam 2,900 feet long at the top, rising 110 feet above the stream bed,
with a reservoir providing for the storage of 922,000 acre-feet for
flood control and 365,000 acre-feet for power storage. The project
will include a powerhouse structure housing the hydroelectric generat-
ing equipment, a gate-controlled spillway, and two nonoverflow abut-
ment sections. The powerhouse structure will be located on the left
bank of the existing river channel with the spillway structure ex-
tending across the river channel and a major portion of the right
bank flood plain. The entire dam structure will be topped by a road-
way. The reservoir will be operated as a unit of the three-reservoir
system for dual-purpose flood control and hydroelectric power on the
lower Grand (Neosho) River, and as one unit in the comprehensive
plan for flood control of the Arkansas River Basin.
   The estimated costs, revised in 1942, are $16,250,000 for construc-
tion and $3,185,000 for lands and damages, a total of $21,435,000.
   The existing project was authorized by the Flood Control Act ap-
proved August 18, 1941. (See H. Doc. No. 107, 76th Cong., 1st sess.,
which contains the latest published maps.)
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Preliminary foundation
explorations and the preparation of construction plans and specifica-
tions and work incidental thereto were substantially completed. The
costs during the fiscal year were $388,633.41, and the expenditures were
$368,827.38, for all new work.
   Condition at end of fiscal year.---Work is complete on preparation
of construction plans for main dam and intake structure. Prelim-
inary work for the acquisition of land was in progress.
   The total costs of the project to the end of the fiscal year were, $388,-
633.41, and the expenditures were $368,827.38, all for new work.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $8,056,172.62, and accounts receivable, $2,959.55, amounted
to a total of $8,059,132.17. Part of this sum will be applied as follows:
Accounts payable, June 30, 1942-------------------                         $22, 765. 58
New work:
    Engineering, design, and studies by hired labor,
      July 1942 to June 1943------------------        $311, 456. 26
    Land acquisition and relocations by hired labor,
      July 1942 to June 1943-------------------      1, 724, 910. 33
                                                                         2, 036, 366. 59
        Total---------------            -----------------------          2, 059, 132. 17
Subsequent to June 30, 1942, the remainder of the unexpended bal-
ance, amounting to $6,000,000, has been placed in budgetary reserve.
No further expenditures other than those listed above are therefore
proposed for the fiscal years 1943 and 1944.
                 RIVERS AND HARBORS-TULSA,                                   OKLA., DISTRICT                                   985
                                     Cost and financial sunmary
Cost of new work to June 30, 1942-----------------------------  $388, 633. 41
Cost of maintenance to June 30, 1942___________________________------------

      Total cost of permanent work to June 30, 1942 ------------                                                  388, 633. 41
Plus accounts receivable June 30, 1942--------------------------                                                    2,959. 55
      Gross total costs to June 30, 1942 -------------------------                                                391, 592. 96
Minus accounts payable June 30, 1942---------------------------                                                    22, 765. 58

     Net total expenditures_,-----------------------------------                                                 368, 827. 38
Unexpended balance June 30, 1942-----------------------------                                                  8,056, 172. 62

        Total amount appropriated to June 30, 1942---------------                                              8,425, 000. 00

   Fiscal year ending June 30             1938                 1939             1940                   1941               1942


Cost of new work ----------- ------------            .... ....---------------------------        --------------        $388, 633.41
Cost of maintenance-     _--------------                 ----------     ---------------------------                -------------

Total expended-----       .. _       -   -       --.--------                                     -   _- ......          368,827.38
Allotted.
Allotted.    .   ..---------------   ---------------------------------------------------                            8,425,000.00
                                                                                                                    8,425,000.00



Amount allotted from War Department Civil Appropriation Act
approved May 23, 1941--------------------------------------$90, 000. 00
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942-                                          000, 000. 00
                                                               6---------------------------------
Amount allotted from Third Supplemental National Defense Ap-
propriation Act approved Dec. 17, 1941-----------------------2, 335, 000. 00

                                                                                                               8, 425, 000. 00
Gross amount expended--------------------------$372, 178. 84
Less:
    Reimbursements collected-----------$3, 329. 83
    Receipts from sales-----------------   21. 63
                                                   3, 351. 46
                                                                                                                  368, 827. 38
      Balance unexpended June 30, 1942------------------------__                                               8, 056, 172. 62
Outstanding liabilities June 30, 1942---------------$22, 765. 58
Amount covered by uncompleted contracts----------397, 282. 24
                                                                                                                  420, 047. 82
     Balance available June 30, 1942-----------_________________________                                       7, 636, 124. 80
Accounts receivable June 30, 1942____________________________                                                       2, 959. 55
        Unobligated balance available June 30, 1942---------------                                             7, 639, 084. 35
Amount (estimated) required to be appropriated for completion
   of existing project           -------------------------                                  --       --       13, 010, 000. 00
   1 Exclusive of available funds.

                  12. ARKANSAS RIVER BASIN, TULSA DISTRICT

  Location.-These improvements are located on tributaries of the
Arkansas River and are in the States of Kansas and Oklahoma. More
definite locations of the individual items are given in the following
paragraph.
986    REPORT OF CHIEIF OF ENGINEERS,        U. S. ARMY,    1942

   Existing project.-The Flood Control Act approved June 28, 1938,
approved the general comprehensive plan for flood-control and other
purposes in the Arkansas River Basin, as set forth in Flood Control
Committee Document No. 1 (75th Cong., 1st sess.), with such modi-
fications thereof as in the discretion of the Secretary of War and the
Chief of Engineers may be advisable, and authorized the sum of $21,-
000,000 for reservoirs, for the initiation and partial accomplishment
of the plan, the reservoirs to be selected and approved by the Chief of
Engineers, subject to the provision that the authorization shall include
the Canton Reservoir on the North Canadian River in Oklahoma, as
set forth in House Document No. 569 (75th Cong., 3d sess). The Flood
Control Act approved August 18, 1941, modified the general compre-
hensive plan for the Arkansas River Basin to include the reservoirs
in the Grand (Neosho) River Basin in Oklahoma and Missouri and
in the Verdigris River Basin in Kansas, in accordance with the recom-
mendations of the Chief of Engineers in House Documents Nos. 107
and 440 (76th Cong., 1st sess.), and in addition to previous amounts, au-
thorized to be appropriated the sum of $29,000,000 for the prosecution
of the comprehensive plan. The reservoirs included in the compre-
hensive plan within the limits of the Tulsa district are listed below:
                                                                                                                                                                               Estimated cost
                                                         Distance                                                                                         Power
           Reservoir                      River           above            Nearest town           Maximum height of dam and type             caservoir   develop-                   Lands,
                                                          mouth                                                                              capacity       ent      Construe-     damages,      Total
                                                                                                                                                                       tion        and relo-
                                                                                                                                                                                    cations     _d


                                                             Miles                                                                            Acre-feet Kilowatts
Canton 1_______North                      Canadian_             393   Canton, Okla .....-..   68 feet--earth-fill_----------------- 390,000                (2)    $13, 220,000      $650,000 $13,870,000
Mannford _________________- Cimarron... ..                       20   Mannford, Okla ......120 feet--earth-fill_                                600, 000   (2)      6,100, 000     1,800, 000 7,900, 000
         .---------
Toronto_______               -. Verdigris ......                271   Toronto, Kans -..... 85 feet-earth-fill-_                       --- _     195, 000   (2)      4, 815, 000    3, 287, 000 8, 102, 000
Fall River_ ..-------             Fall River ..                  54   Fall River, Kans..... 94 feet-earth-fill_       _           _             263, 000   (2)      8, 335, 000    1,130, 000   9, 465, 000
Oologah     ---       ----        Verdigris .....                87   Oologah, Okla .... .. 100 feet--earth-fill-------                         815,  000  (3)      4, 745, 000    3, 600, 000  8, 345, 000
Tenkiller Ferry                   Illinois .-----
                          ._________-                      _     13   Vian, Okla_.---- __--   160 feet--earth-fill ________________             650, 000   (3)      8, 090, 000    1, 700, 000  9, 790, 000
        ____________________
Wister........              ..     Poteau .--                    61   Wister, Okla __..     _ 83 feet-earth-fill_ __--------------              430,000    (2)      4,900,000      1,690,000    6, 630, 000
Neodesha___________               Verdigris-------........      223                                                   ---
                                                                      Neodesha, Kans_______ 35 feet--earth-fill---_______    --         ____      90, 000  (2)       3,785,000     1,372,000    5, 157, 000
Elk City (Table Mound) --          Elk _.......                   9   Independence, Kans      55 feet-earth-fill_-_            -      -         250, 000   (2)       6, 836, 000   2, 479, 000  9, 315, 000
Pensacola 14 _        _           Grand (Neosho)_                77   Disney, Okla _ -...-    147 feet-concrete-multiple-arch- ..... 2,400, 000            (2)           (4)        4 965, 000   4 965, 000
Markham Ferry 1..do------                  .......... 46              Locust Grove, Okla__- 90 feet--concrete earth...                          452, 000
                                                                                                                                 ...---------------       40, 000 12, 153, 000     3, 257, 000 15, 410, 000   O
Fort Gibson 1-_---            - _ -_ _do .......... 7.7               Ft. Gibson, Okla...... 110 feet-concrete gravity...-                    I__
                                                                                                                                              1,287,  000 45,000 16,   250,000     5,185,000 21,435, 000

    1 For details of this project, see individual report.
    2 None.
     3 Includes provision for future power installation.
    4 Pensacola Dam has been constructed as a dual purpose hydroelectric and flood-control structure by the Grand River Dam Authority, an agency created by legislative enactment
of the State of Oklahoma. The amount shown above provides for additional flood-control storage between elevations 750 and 755.




                                                                                                                                                                                                              CD



                                                                                                                                                                                                              H3
988         REPORT OF CHIE F OF ENGINEERS, U.                           S. ARMY,             1942

  Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Operations by hired
labor during the fiscal year consisted of the preparation of preliminary
plans and estimates, foundation investigations, and engiheering studies
in connection with the general comprehensive plan.
   The cost during the fiscal year was $11,841.36, and the expenditures
were $14,117.60, all for new work.
   Condition at end of fiscal year.-The preparation of detailed reser-
voir plans was well advanced at the end of the fiscal year.
   The total cost to the end of the fiscal year was $418,754.10, and the
expenditures were $418,384.96, all for new work.
   Proposed operations.-The balance unexpended on June 30, 1942,
plus the sum of $250,000 allotted in August 1942, will be applied to
surveys and preparation of detailed plans for the development of the
comprehensive plan for flood control in the Arkansas River Basin.
   The additional sum of $320,000 can be profitably expended during
the fiscal year 1944 for the development of the comprehensive plan for
flood control in the Arkansas River Basin.
                                    Cost and financial summary

Cost of new work to June 30, 1942--- -----------------------                                   $418, 754. 10
Cost of maintenance to June 30, 1942-----
      Total cost of permanent work to June 30, 1942---------
                                                           _ __                                    418, 754. 10
Plus accounts receivable June 30, 1942_-- ____---- _______-___
                                                       --                                                43. 50

      Gross total costs to June 30, 1942- -  __         __---
                                                   __-----                                         418, 797. 60
Minus accounts payable June 30, 1942 ______________----__--__                                           412. 64
     Net total expenditures ______- _______  ____-___--418,      384. 96
Unexpended balance June 30, 1942-----------------------------44, 115. 04
          Total amount appropriated to June 30, 1942__---------------                              462, 500. 00

   Fiscal year ending June 30           1938          1939           1940             1941              1942


                                                       -----
                                                    -------
Cost of new work..-------------------------$34, 630. 10
Cost of maintenance---------- - -   --
                                                           $271, 011. 50
                                                        --------
                                                                                   $101, 271. 14      $11, 841. 36

Total expended--...------......   ------------       34, 568. 24   279, 729. 51      89, 969. 61        14, 117. 60
Allotted.........--------------------------------   390, 375. 00   317, 125. 00   -240, 000. 00        -5, 000. 00


Balance unexpended July 1, 1941----------------------------$63, 232. 64
Deductions on account of revocation of allotment_____________--                                      5, 000. 00

          Net amount to be accounted for                  __                                        58, 232. 64
Gross amount expended--------------------------- $15,477. 18
Less:
    Reimbursements collected----------- $1, 357. 78
    Receipts from sales                       1. 80
                                              1------------------
                                                         1, 359. 58
                                                                                                    14, 117. 60

       Balance unexpended June 30, 1942--------------------------44,                                    115. 04
Outstanding liabilities June 30, 1942-------------------  $412. 64
Amount covered by uncompleted contracts---___-                                    1, 749. 40
                                                                                                     2, 162. 04
           Balance available June 30, 1942 ---------------------------                              41, 953. 00
                RIVERS AND HARBORS-TULSA, OKLA., DISTRICT                                                               989
Accounts receivable June 30, 1942-__--                             -         -___-____         -________              43. 50
     Unobligated balance available June 30, 1942                                                            ___....__-
                                                                                                             _ 41, 996. 50
Amount allotted in August 1942 _____-__________________                                                      _ 250,000. 00
           Amount available during the fiscal year 1943________________ 291, 996. 50

Amount that can be profitably expended in fiscal year ending June
30, 1944, for new work 1    -- -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
                                                                                               320, 000. 00
   1 Exclusive of available funds.

13. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL
  The cost of work during the year was $30,449.69; the expenditures
were $28,426.60. The balance unexpended at the end of the fiscal
year, $45,002.79, and accounts receivable $1,113.52, a total of $46,116.31,
will be applied as needed during the fiscal year 1943 to payment of
expenses to be incurred under this heading.
                                              Cost and financial summary
Cost of new work to June 30, 1942_____________________
Cost of maintenance to June 30, 1942____________________ __ $536, 334. 30
      Total cost of permanent work to June 30, 1942____________                                                  536, 334. 30
Undistributed costs June 30, 1942________________ ____________-                                                        61. 59

      Net total cost to June 30, 1942_______________-_______                                                     536, 395. 89
Plus accounts receivable June 30, 1942________________________                                                     1, 113. 52

      Gross total costs to June 30, 1942_________________________                                                537, 509. 41
Minus accounts payable June 30, 1942_________________________                                                      1, 199. 18

     Net total expenditures_---------------------------                                                          536, 310. 23
Unexpended balance June 30, 1942______- _______--- ______                                                   _      45, 002.79

           Total amount appropriated to June 30, 1942_______________                                             581, 313. 02

   Fiscal year ending June 30                    1938           1939              1940            1941               1942


Cost of new work
Cost of maintenance--_------                   $25, 638.81   $130,174. 21      $268, 775. 85    $81, 295. 74        $30, 449. 69
Total expended-----------------                 25, 638.81    130, 174. 21      269, 526. 11     82, 544. 50         28, 426. 60

Allotted         ....----------------------     25, 638.81    369, 674. 21      158, 000. 00         -10,               000.00


Balance unexpended July 1, 1941      _____$63,                                                                       429. 39
Amount allotted from War Department Civil Appropriation Act ap-
  proved May 23, 1941--------------------------------------                                                       10, 000. 00

       Amount to be accounted for--   --------------------------                                                  73, 429. 39
Gross amount expended______-----------------------        $30, 508.33
Less :
    Reimbursements collected------------ $1, 997. 89
    Receipts from sales-------------------         83. 84
                                                            2, 081. 73
                                                                                                                  28, 426. 60

      Balance unexpended June 30, 1942_____________________                                                       45, 002. 79
Outstanding liabilities June 30, 1942____________-_______-_____                                                    1, 199. 18
           Balance available June 30, 1942-                                                                       43, 803. 01
Accounts receivable June 30, 1942 -------                                      -_-----              -       --     1, 113. 52
           Unobligated balance available June 30, 1942-_--,_-_,                                                   44, 917. 13
           493202-43--pt. 1, vol. 1--63
990                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                                              1942

14. OTHER FLOOD-CONTROL PROJECTS FOR WHICH NO ESTIMATES
                       ARE SUBMITTED

                                                                                         For last             Expenditures to June 30,
                                                                                         full re-                      1942                                      Estimated
                            Name of project                                              port see                                                                amount re-
                                                                                         Annual                                                                   quired to
                                                                                         Report               New work                           Mainte-          complete
                                                                                          for 1-                                                  nance


         ARKANSAS          RIVER, MAIN STEM AND MINOR
                              TRIBUTARIES
1.    Kaw, Okla -------------------                                                         1937                                                                       $32, 500
2.    Near Fort Gibson. 2in Muskogee County, Okla2.                                         1937       -------------- --------------                                    33, 600
3.    Hutchinson, Kans. ._........... ... __                                                1937       -------------- --------------                                1, 050, 000
4.
5.
       Wichita and Valley Center, Kans.'S.
       Big Slough to Belle Plaine, Kans.2
                                                                                             1937
                                                                                             1937
                                                                                                        -------------- --------------
                                                                                                        --------------                                               2,603, 100
                                                                                                                                                                     1, 650, 200
6.    Augusta, Kans.3...............................                                        1938                                                                     (4)
7.    Winfield, Kans.3s-....                                                                1937                                                                     (4)
8.    Optima Reservoir, North Canadian River, Okla_                                         1938                                                                    6, 700, 000
                       GRAND (NEOSHO) RIVER

  9.   Florence, Kans.2____......................._____
                                              2                                              1937       -     . -- - -- -                                               17,000
10.   Cottonwood Falls, Kans ..... -                                .. _       . .          1937       -   - -    -     -    -     -    -                               7, 200
11.   Emporia, Kans. .2______ ________........                          __ ..               1937       - . -- - -- -                                                   22, 700
12.   Neosho Rapids, Lyon2 County, Kans.2 ........                                          1937        . . - -- -- -                                                  38, 900
13.   Lyon County, Kans. ..........................                                         1937                                                                      237, 100
14.   Hartford, Kans.2..-.---..-.__-_______.__.
                                2                                                            1937                                                                       43,200
15.   Burlington, Kans.
                      2
                                   .........................                                 1937                                                                       27, 000
16.   Leroy, Kans. z_.............                           ........... 2                  1937
                                                                                                        .....            . . ....
                                                                                                                                                                         9, 600
'17.   Neosho Falls, Woodson    2            County, Kans. ........                          1937                                                                       32, 400
18.   Humboldt, Kans. _______                                     _______ __                1937                 $20,       989.       80   -
                                                                                                                                                                        19, 300
19.   Chetopa, Kans.2 ...               .... 2 ... . .. ... ....              ...           1937                                                                       28, 600
20.    Cherokee County, Kans. .                           ...________.___.. .                1937                                                                      234, 000
21.   Iola, Kans .........................---.....---                                       1939                                                                     (4)

                            VERDIGRIS RIVER
                                                                                2
22.    Verdigris River from mouth to Madison, Kans.                          _               1938                                                                     (5)
23.    West of Fredonia, Wilson County, Kans. 2
                                                                   2
                                                                         ......              1937
                                                                                                                         --------
                                                                                                                             --------------                            189, 900
24.    West of Benedict, Wilson County, Kans.                            ......
                                                                           2                 1937
                                                                                                                          ----------------------                       195, 000
25.    West of Elk City, Montgomery County, Kans. _                                          1937                                                                       81, 400
26.    Caney Creek, Washington County, Okla., and
        Chautauqua and Montgomery Counties,
        Kans.     -----------------------------...........................                   1937                                                                      157, 600
            SALT FORK OF THE ARKANSAS RIVER

27. Blackwell, Okla.2-                                                                       1937                                                                           50, 000

  1 In 1937 the projects were reported by the Memphis district; in 1938 and 1939 by the Little Rock district.
  2 Awaiting local cooperation.
  8 Project completed by Kansas Works Progress Administration.
  4Complete.
  a Some work on this project was done by Wilson County (Kans.) Civil Works Administration in 1933
and 1934.

                          15. PLANT ALLOTMENT, TULSA, OKLA., DISTRICT
                                                        Cost and financial summary
                                            ----
Undistributed costs June 30, 1942 ____ ________                                                                                   ________             1-$362, 783. 19
Net total cost to June 30, 1942____________________________                                                                                                -362,     783. 19
Plus accounts receivable June 30, 1942__________________--___                                                                                                 444,   344. 63
      Gross total costs to June 30, 1942-------------------------__                                                                                            81,   561. 44
Minus accounts payable June 30, 1942________________________                                                                                                  167,   859. 98
      Net total expenditures _______________________--_         ___                                                                                         -- 86,   298. 54
Unexpended balance June 30, 1942 __________________________                                                                                                   271,   298. 54
      Total amount appropriated to June 30, 1942___ _________                                                                                                  185, 000. 00

       Fiscal year ending June 30                             1938                     1939                            1940                        1941              1942

Total expended--------------------
                                .........                            _          _     ....          _              $2, 929. 19                   $20, 441.86    -$109, 669. 59
Allotted                                          -----------------------------..               .                 185, 000. 00-

      1 Includes advances to this allotment for overhead in the sum of $370,000.
               RIVERS AND              HARBORS-TULSA,                             OKLA., DISTRICT                        991
Balance unexpended July 1, 1941__------------------------                                                      $161, 628. 95
Gross amount expended___----       _-------___     ___ $2,250, 264. 42
Less:
     Reimbursements collected __      $2, 357,327. 51
     Receipts from sales ---------           2, 606. 50
                                                          2, 359, 934. 01
                                                                                                              -109, 669. 59

        Balance unexpended June 30, 1942__----------------_                                                     271, 298. 54
Outstanding liabilities June 30, 1942__--_-----                        ---             $167, 859. 98
Amount covered by uncompleted contracts_                                                  8, 755. 36
                                                                                                                176, 615. 34

        Balance available June 30, 1942_
                                       ----------------------                                                    94, 683. 20
Accounts     receivable      June 30,           ---- _-_-----
                                           1942___       _------__                                              444, 344. 63

        Unobligated balance available June 30, 1942 __-___-___                                                  5391, 027. 83

Status of all investigations for flood control called for by flood-control acts and
                                          committee resolutions

                                                                Date trans-
          Locality                Authorization act              mitted to                 Document No.        Recommenda-
                                                                 Congress                                          tion


Arkansas River and tribu-       Rivers and Harbors          ...............            ...................-
taries, Ark., hydroelectric      Committee resolu-
potentialities (under Divi-     tion, Jan. 24, 1939.
sion Board).
Arkansas River and tribu-       Commerce Committee
taries, Okla., hydroelec-       resolution, Oct. 12,
tric potentialities (under      1938.
  Division Board).
Arkansas River and tribu-       Flood Control Com-
taries, flsod control on         mittee    resolution,
  Lightning, Labette, and         Apr. 13, 1938.            ---------------
  Flat Rock Creeks, Kans.
Beaver River, Okla ...... _-    Flood    Control     Act,
                                  Aug.   28, 1937.
Cimarron   (Dry) River,         Flood    Control     Act,
  Union County, N. Mex.           June   22, 1936.
Cimarron River, Okla. and       Flood    Control     Act,
  Kans.                           Aug.   28, 1937.
Cow Creek, Kans ...   _---...   Flood    Control     Act,     Oct.            7,1941                            Unfavorable.
                                  June   22, 1936.
Dirty Creek,      Muskogee      Flood    Control     Act,
  County, Okla.                   Aug.   11, 1939.
Dogy and Clear Creeks,          Flood    Control     Act,
tributaries of Arkansas          Aug.   18, 1941.
  River, Okla.
Eufaula Reservoir, Okla.,       Flood    Control     Act,
on South Canadian River.         June   22, 1936.
Fairfax-Kaw City, Osage         Flood    Control     Act,     May 10,1942                                          Do.
  County, Okla., on Arkan-        Aug.   11, 1939.
  sas River.
Grand (Neosho) River aind       Flood Control        Act,
  tributaries, Okla., Kans.,      Aug. 28, 1937.
  Mo. and Ark.
Grand     (Neosho)    River,    Flood Control        Act,
  Morris County, Kans.            June 22, 1936.
Kenton Reservoir, Cimar-         _----do_
  ron River, Okla.
Mannford Reservoir, Cim-          .
                                 -.   do .. . .   . . . .
  arron River, Okla.
North     Canadian    River,    Flood Control Act,
  Okla. and Tex.                  Aug. 28, 1937.
Oologah Reservoir, Verdi-       Flood Control Act,
  gris River, Okla.               June 22, 1936.
Polecat Creek, Creek Coun-      Flood Control Com-
  ty, Okla., tributary of         mittee    resolution,
  Arkansas River.                 July 23, 1941.
Polecat Creek, Creek Coun-      Flood Control Act,
  ty, Okla.                       Aug. 18, 1941.
Poteau River, Ark ------        Flood Control Act,
                                  June 22, 1936.
      Do --     -    -   -      Flood Control Act,
                                  Aug. 28, 1937.
992         REPORT OF CHIEF OF ENGINE'E'RS, U. S. ARMY,                                                1.942

    Status of all investigations for flood control called for by flood-control acts and
                           committee resolutions-Continued

                                                               Date trans-                                Recommenda-
           Locality                Authorization act           mitted to               Document No.           tion
                                                                Congress

Poteau River, Le        Flore    Flood Control Com-                            .....................
County, Okla.                     mittee    resolution,
                                   Feb. 10, 1938.
Salt Creek of Arkansas           Flood      Control Act,
  River and      tributaries,'     Aug. 18, 1941.
  Osage County, Okla.
South    Canadian     River,     Flood Control Act,
  Okla.                            Aug. 28, 1937.
South Canadian River, N.         Rivers and Harbors           Dec.   8, 1941       House 455, 77th        Favorable.
  Mex., Tex., and Okla.,           Committee        resolu-                         Cong., 1st sess.
improvement for naviga-           tion, June 15, 1938.
tion, flood control, water
power, and irrigation, and
construction of dams on
upper section.
Tenkiller Ferry Reservoir        Flood Control Act,
on Illinois River, Okla.          June 22, 1936.
Verdigris River, Kans. and       Flood Control Com-
  Okla.                            mittee     resolution,
                                   Apr. 23, 1942.
Verdigris River, Kans., con-     Commerce Committee           May    7,1942      .___--__                Unfavorable.
trol of flood waters of          resolution, Mar. 12,
Thayer Lake, Neosho and           1940.
Wilson Counties.
Wister Reservoir on Poteau       Flood Control        Act,
River, Okla.                      June 22, 1936.



   IMPROVEMENT OF RIVERS AND HARBORS IN THE
          ST. LOUIS, MISSOURI, DISTRICT
   This district comprises those portions of southwestern Illinois and
eastern Missouri embraced in the drainage basin of the Mississippi
River and its western tributaries, exclusive of the Missouri River,
between the mouth of the Ohio River and mile 300 above the same,
and of its eastern tributaries to Hamburg Bay at mile 261 on the left
bank, exclusive of the tributary basin of the Illinois Waterway up-
stream of the new La Grange Lock and Dam at mile 80.15 above the
confluence of the Illinois and Mississippi Rivers. The district also
includes the drainage basin in Missouri tributary to the Little River
Diversion Channel. Report on Mississippi River between the Mis-
souri River and mile 300 is included in the report of Mississippi River
between Missouri River and Minneapolis, Minn. Report on that por-
tion of the Illinois River downstream of the new La Grange Lock
and Dam is included in report on Illinois Waterway, Ill., contained
in the report of the district engineer, Chicago, Ill.
   District engineer: Col. Roy W. Grower, Corps of Engineers.
   Division engineer: Col. Malcolm Elliott, Corps of Engineers. Col.
Roy W. Grower, Corps of Engineers, acting division engineer May 18-
24, 1942.
            RIVERS     AND HARBORS--ST.          LOUIS,   MO.,   DISTRICT          993
                                      IMPROVEMENTS

               Navigation                            Flood control-Continued
                                        Page                                       Page
1. Mississippi River between               10. Kaskaskia Island drainage
       the Ohio and Missouri                      and levee district, Illinois_    1005
       Rivers_-______________           993 11. Columbia drainage and levee
2. Mississippi River between                     district No. 3, Illinois -_      1007
       the Missouri River and               12. Wilson and Wenkel and
        Minneapolis, Minn. (St.                   Prairie du Pont drainage
       Louis district) -- --           1018       and levee districts, Illinois_   1008
3. Illinois Waterway, Ill. (St.            13. East St. Louis and vicinity,
       Louis district)--------         1451       Illinois _ _ _ _        --       1010
4. Examinations, surveys and               14. Wood River drainage and
      contingencies (general)   ---    1000       levee district, Illinois -_-     1011
5. Other projects for which no             15. Seahorn drainage and levee
      estimates are submitted _        1001       district, Illinois___--          1013
6. Plant allotment_                   1001 16. Meredosia Lake and Willow
                                                  Creek drainage and levee
              Flood control                       districts, Illinois River,
                                                   Illinois _    __ __ _   -       1013
7. East Cape Girardeau and                 17. Upper Mississippi River Ba-
      Clear Creek drainage dis-                   sin, St. Louis district-...      1015
      trict, Illinois                  1002 18. Preliminaryexaminationsand
8. North Alexander drainage                      surveys for flood control__      1016
      and levee district, Illinois_    1003 19. Other flood-control projects
9. Clear Creek drainage and                      for which no estimates are
      levee district, Illinois__ --    1004       submitted__________--- _         1017

  1. MISSISSIPPI RIVER BETWEEN THE OHIO AND MISSOURI RIVERS

   Location.-The Mississippi River rises above Lake Itasca, Minn.,
and, from that lake, flows in a southerly direction about 2,450 miles,
and empties into the Gulf of Mexico. The portion included in this
report embraces the 195-mile section known as the middle Mississippi,
between the tributary Ohio and Missouri Rivers, about 1,081 to 1,276
miles from the Gulf.
   Previous projects.-The original project for the improvement of
the Mississippi River between the Ohio and Missouri Rivers was
recommended by a Board of Engineers in a report, dated April 13.
1872, and concurred in by the Chief of Engineers. For further details
see page 1879 of the Annual Report for 1915 and page 1014 of the
Annual Report for 1938.
   Eisting project.-This provides for obtaining and maintaining a
minimum channel depth of not less than 9 feet, a minimum width of
not less than 300 feet at low water, with additional width in bends
from the mouth of the Ohio River (about 1,081 miles from the Gulf)
to the northern boundary of the city of St. Louis, 191 miles; thence
200 feet wide, with additional width in bends to the mouth of the Mis-
souri River, 4 miles; all to be obtained by regulating works and
dredging: First, by regulating works, for closing sloughs and sec-
ondary channels, and narrowing the river; by building new banks
where the natural width is excessive and protecting new and old
banks from erosion where necessary to secure permanency. Second,,
by dredging or other temporary expedients to maintain channels of*
project dimensions.
   The estimated cost of new work, revised in 1934, is $43,000,000,
with $1,300,000 for annual mai}tenance.
994            REPORT         OF CHIEF OF ENGINEERS,                       U.    S. ARMY,        1942

   The existing project was authorized by the following river and
harbor acts:

        Acts                          Work authorized                                     Documents


                -   Project for regulating works adopted in 1881.   (To    Annual Report, 1881, p. 1536.
                     obtain a minimum depth of 8 feet.)
June      3,1896
June 13,1902        Dredging introduced as part of the project ......
Mar. 2, 1907
                    These acts practically abrogated that part of the
Mar. 2, 1907         project for the middle Mississippi which pro-
                      posed regulating works.
June 25, 1910       Regulating works restored to the project and ap-       H.     Doc. No. 50, 61st Cong., 1st sess.
                      propriations begun with a view to the comple-             and H. Doc. No. 168, 58th Cong.,
                      tion of the improvement between the Ohio and              2d sess.
                      Missouri Rivers within 12 years at an estimated
                      cost of $21,000,000, exclusive of amounts previ-
                      ously expended.
Jan. 21, 1927      For a depth of 9 feet and width of 300 feet from the    Rivers and Harbors Committee Doc.
                      Ohio River to the northern boundary of the city         No. 9, 69th Cong., 2d sess.
                      of St. Louis, with the estimated cost of mainte-
                      nance increased to $900,000 annually.
July     3, 1930   Project between the northern boundary of the city       Rivers and Harbors Committee Doc.
                      of St. Louis and Grafton (mouth of Illinois             No. 12, 70th Cong., 1st sess.
                      River) modified to provide for a channel 9 feet
                      deep and generally 200 feet wide with additional
                      width around bends, at an estimated cost of
                      $1,500,000,   with $125,000   annually for main-
                      tenance.


   I Also joint resolution, June 29, 1906.


    See House Document No. 669 (76th Cong., 3d sess.) for report of
  Chief of Engineers dated February 27, 1940, containing a general
plan for improvement of the Mississippi River between Coon Rapids
Dam and the mouth of the Ohio River for purposes of navigation,
power development, the control of floods, and the needs of irrigation.
    Recommended wodifcations of project.-Under date of March 15,
1939, the Chief of Engineers recommended modifications of the exist-
  ing project to approve a comprehensive plan for development of the
Mississippi River at Chain of Rocks so as to provide for construction
  of a lateral canal at an estimated first cost to the United States of
  approximately $10,290,000, with annual maintenance and operation
  costs of $70,000, subject to such modification as the Chief of Engi-
• neers may find necessary when the project is undertaken; and to au-
  thorize the relocation of the river channel and reclamation of the
  area in Sawyer Bend for airport, park, recreational, and similar pur-
  poses at a cost to local interests of approximately $17,555,000; pro-
  vided that any modification of the present river channel required by
  the civic development be deferred until completion of the lateral
  canal in the interest of navigation and that the river diversion work
  connected with such civic development be under the supervision of
  the Chief of Engineers in order to insure that the interests of inter-
  state and foreign commerce be properly protected; and further pro-
  vided that local interests hold and save the United States free from
  any claims for damages that might be incurred due to the construction,
                  RIVERS AND HARBORS-ST.                                                    LOUIS,                MO.,           DISTRICT                       995

maintenance, or operation of such civic development or any part
thereof (H. Doc. No. 231, 76th Cong., 1st sess.).
  Terminal facilities.-The water terminal and transfer facilities of
the district are fully described as of December 31, 1918, in House
Document No. 652, Sixty-sixth Congress, second session, pages 1211-
1239. Additional data for terminal facilities are also contained in
Transportation Series No. 2, 1929, Transportation in the Mississippi
and Ohio Valleys.
  Operations and results during fiscal year.-River stages were favor-
able to construction work, which was carried pn extensively by con-
tract and hired labor with Government plant during the fall of 1941;
river conditions were unfavorable during the spring of 1942 and work
was carried on only intermittently. A stage of 34.22 feet was recorded
on the St. Louis (Market Street) gage on June 30. Regulating works
were maintained and project dimensions of channels were secured by
dredging. The district's standard specifications for construction work
were used. Location, quantities, and costs of open river regulating
works follow:
                                                                                                      Miles                               Dikes (hurdles)
                                                                                                      above
                      Class of work and locality                                                     mouth
                                                                                                     of Ohio             Number              Linear          Cost
                                                                                                      River                                   feet


New work by contract:
   Missouri    Sister Island-Thompson     Towhead-Brooks
     Point -_                                     -                                                             18                   2            1, 160   $39, 459. 50
   Price Towhead-Goose Island ____________________________                                                      34                   4            1, 685    65, 970. 48
   Seventy Six 1              -  --  -    -         -                                                           85       -....       2. .-    .        .     1,886. 33
   Seventy Six-Liberty_                                                                                        100                   2               630    21,409.19
   Ste. Genevieve, Mo                                                                                          118                   7            2, 220    53, 570.03
   Establishment Island-Fish Bend-Fort Chartres .-......                                                       134                   6            2, 010    86, 420. 31
   Calico Island-Cornice Island 1_-
                                  -_______...........                                                          149                   2            1, 095    30,145. 61

     Total ............
                      _ .............................                                      ...       .-- -                         23             8, 800   298. 861.45
New work by United States plant and hired labor:
   Greenfield Bend -- - -- -- -- - ---
                                    -- -- - ----- --                                                             1                   2              610     16, 825. 00
   Cairo Protection_                                                                                             6                   1              600     16, 470.67
   Brooks Point .                    -.-                                                                        24                   1              340      7, 994. 26
   Graysboro _                                                                                                  42                   1              435     11, 691.82
   Willard    -                             --                                       ---                        63                   3            1,035     31,120.12
   Wilkinson    - -                                                                                             86                   2              225      7,173. 54
   Crain Island                                                     -    ----                                  106                   2              700     23,199. 86
   Ste. Genevieve, Ill_______________                                                                          123                   2              270      9,281.90
   Cornice Island              -                                                                               153                   2            1,010     32,158.12
   Horsetail, East ....          -                                                                             167                   3            1,310     24, 928.07
     Total ..         -----------------------------------                                            S    .....                     19            6,535    180, 843.36
Maintenance by United States plant and hired labor                                  -_....                                                        18,735 12261,899.98

                                                                                                    Bank protection (revetments)

                                                        Miles
                                                        above                                 Squares (100
     Class of work and locality                         mouth                  Linear         square feet)     Toe piles
                                                       of Ohio          Num- feet bank                       bank pro-                                       Cost
                                                                             protectiontection
                                                                            River
                                                                                protection Mat-          ing linear feet
                                                                                             tress Paving

New work by contract:
    Cairo Protection         ---                                1                           --- - - --    --   - - ---           -.----
                                                                                                                                                            $1,059.68
    Price Landing-Goose Island ...-                         31-35                                1, 955        2, 462            883                        67, 704.02
    Willard.     _       -   -                                 92                                   515           515            184                         9, 720. 96
    Ste. Genevieve, Ill_____                                  126                           .......--------        --------                                     543.00
     Total ...............                  .....                               5            2, 470            2, 977         1,067                         79, 027. 66
Maintenance by United States plant
and hired labor_                                              4, 193 2, 707 I 7,164                                                              5 310    170, 528. 15
1 Pile and crib dikes.
2 Includes cost of screening 24,950 linear feet of dikes with lumber mattress.
996    REPORT OF CHIEF OF ENGINEE'RS,        U. S. ARMY,   1942

   New work.-Nineteen dikes, totaling 6,535 feet in length, were
built by hired labor with Government plant, at a cost of $180,843.36;
23 dikes, totaling 8,800 feet in length, were built under contract at
a cost of $298,861.45. Five revetments, totaling 2,470 feet in length,
consisting of 2,977 squares of mattress and 1,067 squares of paving
were built under contract at a cost of $79,027.66. In addition to
completed work there was under construction by contract, 20 dikes
to total about 9,870 linear feet and 2 revetments totaling about 2,000
linear feet, and by hired labor, 3 dikes to total about 885 linear feet.
The total cost of new w-ork was $558,732.47 from regular funds.
   Maintenance.-Dikes and revetments were repaired at a cost of
$432,428.13. There were 3,094 cubic yards of rock removed at Beaver
Dam, mile 38.4, at a cost of $22,056.03. The required 9-foot channel
was maintained, except for the short periods needed to move a dredge
to the shoal, by 4 United States hydraulic dredges. During the year
36 shoals developed of which 32 were dredged once and 1 was dredged
4 times. There were 4,252,588 cubic yards of sand and gravel removed
by these dredges from the channels through 36 bars; 670,440 cubic
yards of material was removed in outside-the-channel dredging. The
channels dredged had a combined length of 18 miles, an average
width of 315 feet, and an average gain in depth of 4.7 feet. The
total cost of maintenance dredging was $263,233.25.
   Hydrographic surveys were made covering 105 miles of river, cost-
ing $77,794.91. Other miscellaneous costs were: Snagging, $18,766.37;
aids to navigation, $19,576.78; studies at Chain of Rocks, $1,200.20;
cooperative stream gaging, $8,810.27; and gages, $5,403.53; flood
relief, $24,811.95; defense lighting at service base, $17,034.92, and at
Cape Girardeau fleet, $11.59, all charged to maintenance. The total
cost of all maintenance was $891,127.93. The costs during the year
were $558,732.47 from regular funds for new work and $891,127.93
for maintenance, a total of $1,449,860.40. The expenditures were
 $1,594,454.40 from regular funds.
    Condition at end of fiscal year.-Open river regulating works are
about 82 percent completed. The quantities required to complete the
project are estimated at 60 dikes, 45,000 linear feet, and 35 revet-
ments, 147,000 linear feet. Dikes and revetments are now in good
repair and the channel has been greatly improved by the work that
has been done. Dredging is required at low stages to remove tem-
porary shoals and maintain the required channel depths.
   In recent years, notwithstanding the unusual low water that has
prevailed, the project dimensions of channels have generally been
maintained throughout the navigation season. The navigation season
formerly extended from the middle of February to the middle of
December, the river being generally closed by ice the remainder of
the year. However, in recent years navigation has continued through-
out the winter, except when the river is actually blocked by heavy
running ice or gorges. The river is generally above the 10-foot stage,
St. Louis gage (period of record, 81 years) for 51/2 months of the
year, latter part of February to middle of August, during which
time project channel depths generally prevail without dredging. The
mean stage of river for the fiscal year 1941 was 4.84 feet, St. Louis
gage. The mean stage of river for the fiscal year 1942 was 13.60 feet.
               RIVERS        AND       HARBORS--ST.                    LOUIS,        MO.,         DISTRICT                  997

  The following table gives condition of the channel during the fiscal
year 1942:
                                                                    Channel affording 1

                           Length                                                                                           Ctrol-
        Section             of sec-   9 feet or more Less than 9 feet              7 feet or less       6 feet or less      ling
                                                                                                                            ling
                             tion                                                                                          depth
                                      Length Period Length Period Length Period Length Period


Ohio River to Com-          Miles     Miles      Days      Miles        Days     Miles        Days      Miles     Days      Feet
  mercial Point .......      32. 7     30.8       359        1.9           6       0.4           1          0        0        7
Commercial Point to
  Commerce_________            6.7       5. 9      362            .8        3        0              0         0        0        8
Commerce to Grays
  Point_         --            6.6       6.6       365        0             0        0              0         0        0       10/
Grays Point to Grand
  Tower         _             33.7      30.8       348        2. 9         17            .4         1         0        0        7
Grand Tower to Fort
  Gage                        36.3      36.3       365        0             0        0             0          0        0        9
Fort Gage to Little
  Rock_                        9.5       9.1       364            .4        1        0              0         0        0        8
Little Rock to River
  des Peres_____________      46.5      44.5       358        2.0           7        0             0          0        0        7!
River des Peres to
  Merchants Bridge___         11. 2     11.2       365        0             0        0             0          0        0        9
Merchants Bridge to
  northern boundary
  city of St. Louis ....       8.0       5. 7      359        2.3           6            .4         1        0         0        7
Northern boundary to
  mouth2 of Missouri
  River _______________        3.8       3.8       365        0             0        0              0         0        0        9

  1 Project width is 300 feet from Ohio River to northern boundary of St. Louis and 200 feet from that point
to Missouri River, with additional width in bends throughout.
  2 This is known as the Chain of Rocks Reach.


  The costs and expenditures under the existing project to June 30,
1942, have been as follows:

                                                                           Costs
             Kind of funds                                                          --                            Expenditures
                                                  New work             Maintenance                Total

Regular_                                        $30, 916, 645. 92      $24, 750,652.61        $55, 667, 298. 53   1$55, 821, 445.65
Public works__________________________            3, 462, 154.46                                3, 462, 154. 46      3, 462,154. 46
Emergency Relief                                     996, 747.95                                                        996, 747. 95
      Total _____________ ______________         35, 375, 548.33        24, 750, 652.61        60, 126, 200. 94     60, 280, 348.06

  1 Includes $193,380.34 transferred from previous project costs and expenditures.


  Proposed operations.-The unexpended balance, including $200,000
advanced to the plant allotment, will be applied as follows:
Accounts payable June 30, 1942 ----------------     ------                                                         $45, 852. 88
New work:
    By contract (completion of existing contracts),
     July 1 to Sept. 30, 1942:
        Piling dikes:
             Missouri Sister Island-Thompson Tow-
               head-Brooks Point----------------     $194, 890. 00
             Price Towhead-Goose Island---------      152, 575. 00
             Establishment Island - Fish Bend- Fort
              Chartres-------------------------       122,091.00
             Crib dikes: Seventy-Six---------------     72 620. 00
             Bank protection:
                  Cairo protection-----------------     40, 476. 00
                       Price Landing-Goose Island -----                                       40, 958. 00
                       Ste. Genevieve, Ill---------   -----                                   31, 063. 00
998      REPORT OF CHIEF OF ENGINEERS,                     U, S. ARMY,    1942

New work-Continued.
   By hired labor with United States plant (comple-
     tion of existing job), July 1 to July 25, 1942:
        Piling dikes : Wilkinson -------------            $ 39, 826. 00
   By contract, July 1, 1942, to June 30, 1943:
        Piling dikes:
             Schenimann-Willard ----------------            77, 280. 00
             Seventy-Six-Liberty ----------               128, 060. 00
        Crib dikes: Danby Landing _---------         ----   79, 300. 00
        Bank protection:
             Cape Girardeau---------------------- 148, 500. 00
             Wilkinson__--------------------------157, 500. 00
   By hired labor with United States plant, July 1,
     1942, to June 30, 1943:
        Piling dikes:
             Cairo protection----------------------40, 800. 00
             Dogtooth Bend----------------------            16, 500. 00
             Price Landing-----------------------           20, 400. 00
             Goose Island------------------------           33, 600. 00
             Giboney Island----------------------           41, 000. 00
             Cornice Island---------------         __       23, 040. 00
             Calico Island-- ----------------------          7, 650. 00
        Solid dikes: Seventy-Six------                      17, 250. 00
        Bank protection :
             Giboney Island_--------------------            26, 000. 00
             Willard----------------------------            24, 00. 00
             St. Louis Harbor ---------------               46, 800. 00

               Total for new work _-------------- ----------          1, 582,179. 00
Maintenance:
    By hired labor with United States plant, July 1,
      1942, to June 30, 1943:
        Dikes and bank protection_______--_______ $233, 250. 00
        Project channel dredging----------------         618, 500. 00
        Snagging -----------------------       ---------   7, 720. 00
         Surveys, gages, and studies ----------------     44, 030. 00
        Aids to navigation--_---------------------        42,160. 00
         Safeguarding structures____------- ----          23, 220. 00
        Cooperative stream gaging-----------------        19, 400. 00
            Total maintenance         __------------988,                             280. 00

           Total for all work ------------------------------ 2, 616, 311.88
Unallocated balance------------------------------------------        200. 83

                                                                              2, 616, 512. 71
  The sum of $2,300,000 can be profitably expended during the fiscal
year 1944, as follows:
New work:
   By contract, July 1, 1943, to June 30, 1944:
       Dikes_--     --------------------------------                $200, 000
       Bank protection _________________________                     500, 000
   By hired labor:
       Dikes-- _    ---------------------------                      1--- 000
                                                                    150,
       Bank protection__ ________                ______------150,         000

          Total for new work------------------                          $1, 000, 000
Maintenance :
   By hired labor with United States plant:
        Dikes and bank protection         ------------------- $580, 000
        Project channel dredging----------------------         580, 000
        Cooperative stream gaging --------------                20, 000
          Surveys and studies -------              --------------    120, 000
            Total maintenance ----------------                                   1, 300, 000
            Total for all work--- -------------------                    --      2, 300, 000
                 RIVERS           AND IARBORS-ST. LOUIS,                                MO.,      DISTRICT                   999
  It is expected that, with the proposed expenditures, the project will
be about 86 percent complete.
                                           Cost and financial summary

Cost of new work to June 30, 1942--------------------------
Cost of mainteriance to June 30, 1942___---------------1__                                            __   130,
                                                                                                           $36, 792, 167. 99
                                                                                                                011, 257. 44
      Total cost of permanent work to June 30, 1942-----------                                                66, 803, 425. 43
Undistributed costs June 30, 1942________--------------                                                           200, 000.00

     Net total cost to June 30, 1942_________-___----------                                                   67, 003, 425. 43
Minus accounts payable June 30, 1942 ------------------------                                                      45, 852. 88

     Net total expenditures__ ____-------------------                                                      166, 957, 572. 55
Unexpended balance June 30, 1942__----------------------------                                               2, 416, 512. 71

         Total amount appropriated to June 30, 1942                                                            9, 374, 085. 26
                                                                                                              6-------------

    Fiscal year ending June 30                  1938                  1939           1940              1941              1942

Cost of new work....                        $865, 664. 99    $1, 143, 569. 24    $686, 655. 23     $990, 722. 54       $558, 732.47
Cost of maintenance_                       1, 227, 420.75     1, 037, 999. 09   1, 092, 307. 96     725, 050. 95        891, 127. 93
      Total cost   -----------------       2, 093, 085. 74    2, 181, 568. 33   1, 778, 963. 19   1, 715, 773.49      1, 449, 860.40
Total expended     -------                 2, 138, 338. 29    2, 113, 011. 73   2, 071,684. 96    1, 568, 360. 93     1, 594, 454.40
Allotted ________.. ______        ______   3,745,000.00       1, 872, 707. 95   2,009,040.00      1,750,000.00        2,034, 400.00



Balance unexpended July 1,                   1941__________     ______                                        $1, 976, 567. 11
Amount allotted from War                     Department Civil Ap-
  propriation Act approved                   May 23, 1941_.. ___     $24, 400. 00
Amount allotted from War                     Department Civil Ap-
propriation Act approved                    Apr. 28, 1942__--- 2. 010. 000. 00
                                                                                                               2, 034, 400. 00
      Amount to be accounted for--------------------------                                                     4, 010, 967. 11
Gross amount expended..________________      $1, 621, 480. 31
Less reimbursements collected __________-27,          025. 91
                                                                                                               1, 594, 454. 40
      Balance unexpended June 30, 1942___________________                                                      2, 416, 512. 71
Outstanding liabilities June 30, 1942 _________ __$24, 030. 43
Amount covered by uncompleted contracts--------- 508,427. 88
                                                                                                                    532, 458. 31
     Balance available June 30, 1942___________________-__                                                     1, 884, 054. 40
Amount (estimated) required to be appropriated for completion
   of existing project             2                                                                           6___________________
                                                                                                               6, 050, 000.00

Amount that can be profitably expended in fiscal year ending
June 30, 1944:
   For new work 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -             1, 000, 000. 00
   For maintenance 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                1, 300, 000.00
          Total    2 ----------                              ------                     ------                 2, 300, 000.00
   1 Includes $5,260,604.83 from permanent indefinite appropriation.
   2 Exclusive of available funds.



2. MISSISSIPPI RIVER BETWEEN MOUTH OF MISSOURI RIVER AND
            MINNEAPOLIS, MINN. (ST. LOUIS DISTRICT)

See report, "Mississippi River between the Missouri River and
Minneapolis, Minn.," page 1018.
1000        REPORT OF CHIE                  OF ENGINEERS, U. S. ARMY,                                 1942

          3. ILLINOIS WATERWAY, ILLINOIS (ST. LOUIS DISTRICT)

   See report, "Illinois Waterway, Illinois," page 1451.
    4. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                  (GENERAL)

   The cost of the work during the year was $34,042.03 and the expendi-
tures were $35,189.84. The balance unexpended, $8,279.88, including
accounts receivable at end of fiscal year, plus $20,000 allotted since
June 30, 1942, will be applied as needed during the fiscal year 1943
to payment of expenses incurred under this heading. The additional
sum of $30,000 can be profitably expended during the fiscal year
ending June 30, 1944.
                                       Cost and financial summary

Cost of new work to June 30, 1942______________
Cost of maintenance to June 30, 1942----------------------                                                  $420, 443. 53

      Total cost of permanent work to June 30, 1942___ ________      420, 443.53
Plus accounts receivable June 30, 1942- --- __    ____--     -_____- -618.    94

         Gross total costs to June 30, 1942 _____                           ___________           ___        421, 062. 47

Net total expenditures----------------------------------421,                                                      062. 47
Unexpended balance June 30, 1942_                                                                              7, 660. 94
         Total amount appropriated                    to June 30, 1942------------                           428, 723. 41

   Fiscal year ending June 30             1938             1939               1940             1941               1942

C ost of new work -- - - - - - - .- - - - -     ..- - - - -             -
                                                                 . .-- - -       .          ..--
Cost of maintenance_        _ _     $71, 464.26     $52, 914. 25     $47, 138.39             $28, 661. 28        $34, 042.03

Total expended....      __    -.         57,645. 65       73, 089. 29        45, 112. 42      24, 365. 15         35, 189.84
                       -
Allotted _____- _______---         _     90, 000.00       95, 000.00         25, 000. 00      15, 000.00          17, 500.00


Balance unexpended July 1, 1941 __--------                                                                   $25, 350. 78
Amount allotted from War Department Civil Appropriation Act
approved May 23, 1941 ----------       ---------------------                                                 17, 500. 00

         Amount to be accounted for--                    ---------------------------                          42, 850. 78
Gross amount expended__-------------------------$37, 316. 65
Less reimbursements collected______-------__                                         -     2, 126. 81
                                                                                                              35, 189. 84

     Balance unexpended June 30, 1942---_----_____                                                             7, 660. 94
Accounts receivable June 30, 1942--------------------------------                                                 618. 94

         Unobligated balance available June 30, 1942--________                                                 8, 279. 88

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance ------------------------------                                                     30, 000. 00
   1 Exclusive of available funds.
                  RIVERS AND HARBORS--ST.                                LOUIS,      MO.1 DISTRICT                        1001
5. OTHER PROJECTS FOR WHICH NO ESTIMATES                                                           ARE SUBMITTED

                                                   For last        Cost and expenditures to
                                                 full report             June 30, 1942                 Estimated amount
              Name ofproject                    see Annual                                            required to complete
                                                 Report for        New work         Maintenance

Cuivre River 1                     _      -           1883           $12,000.00                       I-------------nactive.
Kaskaskia River 2 3------                             1896            10, 460. 80                     Completed; Inactive.

  1 River declared nonnavigable by act of Mar. 23, 1900.
  2 N6 commerce reported.
  3 By authority of the Chief of Engineers, dated Dec. 12, 1895, this work was dropped from' the duties in
charge of the St. Louis, Mo., district (A. R., C. of E., 1896, p. 1761).

                   6. PLANT ALLOTMENT, ST. LOUIS, MO., DISTRICT
                                       Cost and financial summary
Undistributed costs June 30, 1942-----------------------------                                              $2, 671, 551. 55
Net total cost to June 30, 1942______________________________                                                2, 671, 551. 55
Plus accounts receivable June 30, 1942_________________________                                                 352, 387. 82.
      Gross total costs to June 30, 1942_______________________                                              3, 023, 939. 37
Minus accounts payable June 30, 1942___________       __________                                              . 190, 846. 82
     Net total expenditures.   -.----       ---                                             ----             2, 833, 092. 55
Unexpended balance June 30, 1942_---------------------                                                  _       283, 648. 10

           Total amount appropriated to June 30, 1942_______________                                         3, 116, 740. 65

      Fiscal year ending June 30               1938               1939              1940             1941                1942

Total expended--------------- $-42, 026. 93                  $-119, 466. 38   -$193, 995. 36        $7, 178. 41     -$45, 228. 17
Allotted           _   .    _          -120,     000.00       -150, 000.00     -150,000.00     -------------            $10, 000.00



Balance unexpended July 1, 1941_____ ________-____________                                                     $248, 419. 93
Deductions on account of revocation of allotment____________ _                                                   10, 000. 00
      Net amount to be accounted for ______________________-- _                                                   238, 419. 93
Gross amount expended______ ______--______ $3, 715, 338. 79
Less:
    Reimbursements collected       $3, 730, 014. 12
        Receipts from sales-----------                            30, 552. 84
                                                                                     3, 760, 566. 96
                                                                                                               -5_d22    998 17

      Balance unexpended June 30, 1°42 _           _                                     ______ _                 283, 648. 10
Outstanding liabilities June 30, 1942--___________                                     457, 601. 23
Amount covered by uncompleted contracts--------                                          5, 425. 00
              *                                                                                                   463, 026. 23

     Balance available June 30, 1942______________________-_                                                -179, 378. 13
Accounts receivable June 30, 1942____________ -    -_____
                                                      ______                                                  352, 387. 82
           Unobligated balance available June 30, 1942_                                    _________              173; 009. 69
1002       REPORT OF CHIEF OF ENGINEERS,                              U.   S. ARMY,           1942

Status of all investigations for navigation called for by river and harbor acts
                           and committee resolutions

                                                           Date trans-Recommenda-
          Locality                 Authorization act        mitted to   Document number              tion
                                                            Congress

Illinois River,   Ill.,   reim-   Rivers and Harbors       Apr. 22, 1942   House, 711,   77th   Favorable.
burse levee districts for         Committee resolu-                        Cong., 2d sess.
seepage, backwater, etc.          tion, Feb. 10, 1937.
Mississippi River between         Rivers and Harbors       _____________
  Ohio River and Alton, Ill.       Committee     resolu-
                                   tion, Feb. 28, 1938.


7. EAST CAPE GIRARDEAU AND CLEAR CREEK DRAINAGE DISTRICT,
                           ILL.

   Location.-This project is in the north end of Alexander County,
Ill., on the left bank of the Mississippi River between river miles 46
and 57 above Ohio River, and includes the bottom lands between the
river on the west and south, Clear Creek on the north, and the Illinois
Central Railroad on the east.
   Existing project.--This provides for raising and enlarging the
existing levee system by the reconstruction of approximately 10.2
miles of river-front levee and 0.8 mile of back levee, involving the
placing of 1,858,500 cubic yards of earthwork and the construction
of one gravity drainage structure and one stop-log structure. The
project, wheh completed, will not in itself afford complete protection
to this district; but upon completion of authorized work in the North
Alexander, Clear Creek, Miller Pond, and Preston drainage and levee
districts, protection will have been provided this and the other dis-
tricts named against a flood of about 50-year frequency. The con-
struction cost, revised in 1940, is $360,,000 and estimated cost of lands
and damages is $12,000. The project was authorized by the Flood
Control Act approved June 22, 1936.
   Local cooperation.-Fully complied with.
   Operations and results during fiscal year.-A total of 342,822 cubic.
yards of material was placed by contract as a cost of $96,625.72. The
total costs were $97,362.17 from regular funds for new work. The
expenditures were $102,324.86.
   Condition at end of fiscal year.-Work on the existing project is
about 90 percent complete. The estimated work required to complete
the project is the placing of about 21,300 cubic yards of material under
existing contract. The total costs to June 30, 1942, were $281,140.97
from regular funds for new work; and the total expenditures were
$269,294.31.
   Proposed operations.-The unexpended balance at the end of the
fiscal year will be applied as follows:
      Accounts payable-------------------__-----------------------$11, 846 66
      New work: By contract (completion of existing contract), raising
        and enlarging existing river-front and back levees, July 1 to
        November 1, 1942                                               ,-------------------
                                                                           859. 03
              Total for all work ------------------------------------
                                           ___________                                           65, 705. 69
    With the proposed expenditures, the project will be completed.
              RIVERS      AND HARBORS--ST.                   LOUIS,     MO.,     DISTRICT                1003
                                   Cost and financial summary
Cost of new work to June 30, 1942 __________--____________-                                   $281, 140. 97
Cost of maintenance to June 30, 1942____       ____________                                   ---
     Total cost of permanent work to June 30, 1942______________                                   281,140. 97
Minus accounts payable June 30, 1942 ______       _____------_                                      11, 846.66
      Net total expenditures--- _____-___-__-___
                                     --                     269,294.31
Unexpended balance June 30, 1942.__ ___________-------------65, 705. 69

        Total amount appropriated to June 30, 1942_______________                                  335, 000. 00

   Fiscal year ending June 30            1938         1939            1940           1941               1942

Cost of new work _______________   ______________ ___________.    $18, 484. 91   $165,293.89           $97, 362. 17
Cost of maintenance                                                      __      -------
Total expended....--------------------                             17, 164. 62     149, 804. 83        102, 324.86
Allotted----------------------                                     25,000.00      310, 000.00      ........



Balance unexpended July 1, 1941_______________________________                                    $168, 030. 55
Gross amount expended---------------- -          ___                                               102, 324. 86
     Balance unexpended June 30, 1942                                                                5, 705.69
                                                                                                    6___________________
Amount covered by uncompleted contracts -----                      __------------                   34, 754.48

        Unobligated balance available June 30, 1942______________--                                 30, 951.21

      8. NORTH ALEXANDER DRAINAGE AND LEVEE DISTRICT, ILL.

   Location.--This project is in the north end of Alexander County,
Ill., along the Mississippi River, and includes the bottoms between
McClure, Ill., and the bluffs, between river miles 51 and 58 above
Ohio River, and is almost due east of Cape Girardeau, Mo.
   Existing project.- This provides for raising and enlarging the
existing levee system by the reconstruction of approximately 5.2 miles
of back levee, involving the placing of 1,615,000 cubic yards of earth-
work and construction of two gravity drainage structures. The proj-
ect, when completed, will not in itself afford complete protection to
this district; but upon completion of authorized work in the East
Cape Girardeau and Clear Creek drainage district, and in Clear
Creek, Miller Pond and Preston drainage and levee districts, protec-
tion will have been provided this and the other districts named against
a flood of about 50-year frequency. The estimated construction cost,
revised in 1939, is $316,000 and estimated cost of lands and damages
is $14,000. The project was authorizel by the Flood Control Act of
June 22, 1936.
   Local cooperation.-Fullycomplied with.
   Operations and results during fiscal year.--A total of 132,499 cubic
yards of earthwork was placed by contract at a cost of $37,828.06.
The total costs were $38,283.98 from regular funds for new work.
The total expenditures were $84,803.02.
   Condition at end of fiscal year.--The existing project is completed
and was turned over to the levee commissioners for maintenance Nov.
17, 1941. The total costs and expenditures on the existing project to
June 30, 1942, were $295,482.55 from regular funds for new work.
   Proposed operations.-None. The project is complete.
1004       REPORT OF CHIEF OF ENGINEERS,                                         U. S. ARMY,              1942

                                      Cost and financial summary

Cost of new work to June 30, 1942_----------                                        ____---------- _     $295, 482. 55
Cost of maintenance to June 30, 1942___----                                              --
                                                                             ---__________           ____-----------

      Total cost of permanent work to June 30, 1942-____--------                                                295, 482. 55
Net total expenditures------------- -           ------------                                                    295, 482. 55
Total amount appropriated to June 30, 1942--_--       ___-- __-------                                           295, 482. 55


   Fiscal year ending June 30           1938                  1939                 1940            1941                1942

Cost of new work      ..-----------      ......--------------...
                                                              $19, 717. 94       $34, 357. 14   $203, 123. 49      $38, 283.98
Cost of maintenance------------          -         --------------             -----------------------------------------
Total expended --- _.---------.----------------             18, 240. 13           33, 832.45     158, 606. 95          84, 803.02

Allotted_--------- -----------------------------           271,000.00             45, 000.00     -5, COO.00        -15, 517.45



Balance unexpended July 1, 1941 _ _________                                                                 $100, 320. 47
Deductions on account of revocation of allotment                                                                 15,
                                                                                                                  517. 45
                                                                                                              1___------

      Net amount to be accounted for___ ____________-______--                                                    84, 803. 02
Gross amount expended-__--     ___-_-- __________           _                                                    84, 803. 02

          9. CLEAR CREEK DRAINAGE AND LEVEE DISTRICT, ILL.

   Location.-This project is in Union and Alexander Counties, Ill., on
the left bank of Mississippi River and between river miles 57 and 66
above Ohio River and, except for some lowlands and islands along the
river, includes practically all the bottoms between the river and the
bluffs and between Ware, Ill., on the north and McClure, Ill., on the
south.
   Existing project.-This provides for raising and enlarging the ex-
isting levee system by reconstructing approximately 10.8 miles of river-
front levee and 10.3 miles of back levee, involving the placing of 3,-
695,000 cubic yards of earthwork and the construction of seven grav-
ity-drainage structures. The project, when completed, will not in
itself afford complete protection to this district; but upon completion
of authorized work in the East Cape Girardeau and Clear Creek drain-
age district and in North Alexander, Miller Pond, and Preston drain-
age and levee districts, protection will have been provided this and
the other districts named against a flood of about 50-year frequency.
The estimated construction cost, revised in 1940, is $943,000 and esti-
mated cost of lands and damages is $29,000. The project was au-
thorized by the Flood Control Act of June 22, 1936.
   Local cooperation.-Fully complied with.
   Operationsand results during fiscal year.--A total of 700,822 cubic
yards of material was placed by contract at a cost of $171,462.84. The
total costs were $182,665.63 for new work from regular funds. The
expenditures were $196,881.45.
   Condition at end of fiscal year.-Work under the existing project is
about 45 percent complete. The estimated work required to complete
the project is the placing of about 22,600 cubic yards of material under
existing contract for back levees, and 1,979,000 cubic yards of earth-
work in river front levees. The total costs to June 30, 1942, were
$436,647.66 from regular funds for new work; and the total expendi-
tures were $416,510.55.
                RIVERS AND HARBORS-ST.                               LOUIS, MO.,              DISTRICT                    1005
   Proposed operations.-The unexpended balance at the end of the
fiscal year will be applied as follows:
Accounts payable June 30, 1942________________     ______-----          $20, 137. 11
New work :
    By contract (completion of existing contract), raising and en-
     larging existing back levee, July 1 to Aug. 15, 1942____________     5, 091. 72
    By contract, raising and enlarging of portion of river front levee_ 264, 278. 07
         Total for all work--___________                       __          -------------------
                                                                                          _                       289, 506. 90
   No operations are proposed during the fiscal year 1944.
                                       Cost and financial summary

Cost of new work to June 30, 1942--------------------------------                                                $436, 647. 66
Cost of maintenance to June 30, 1942_.....___..__----       ---                                            ----
      Total cost of permanent work to June 30, 1942 ______ ______ 436, 647. 66
Minus accounts payable June 30, 1942__ ____________________-__-20, 137. 11
     Net total expenditures__________________________                                                            416, 510. 55
Unexpended balance June 30, 1942___ __________-__--__________                                                    289, 506. 90
         Total amount appropriated to June 30, 1942_____                                         _____            706, 017. 45

    Fiscal year ending June 30               1938             1939                1940              1941              1942

Cost of new work ________---_____- ___--- ..     .           $29, 717. 66     $19, 921. 12       $204, 343. 25      $182, 665. 63
Cost of maintenance ....      ...---------------        ......--      ---. .-- ---    .           --                 --      --

                 ...      ..
Total expended _____________________________                 26, 327. 17         22, 751.10       170, 550. 83       196, 881.45
Allotted................-------------------
                                         ..--------------   363, 000.00        140, 000.00       -35, 000.00         238, 017.45


Balance unexpended July 1, 1941 ____________________________ $248, 370. 90
Amount allotted from War Department Civil Appropri-
  ation Act approved June 28, 19________________     $15, 517.45
Amount allotted from War Department Civil Appropri-
  ation Act approved June 24, 1940 ------------------ 22, 500. 00
Amount allotted from War Department Civil Appropri-
ation Act approved Apr. 28, 1942------------------- 200, 000. 00
                                                                  238, 017.45

      Amount to be accounted for_----------486,388.35
Gross amount expended ------------------------------------                                                       196, 881. 45
      Balance unexpended June 30, 1942__________________________                                                  289, 506. 90
Outstanding liabilities June 30, 1942--________-------- $4, 737. 81
Amount covered by uncompleted contracts__ ________--31, 100. 10
                                                                                                                   35, 837. 91

         Unobligated balance available June 30, 1942________--_____                                               253, 668. 99
Amount        (estimated)           required tq be appropriated for completion
                                _
   of existing project 1 --------- _--------------------                                                          237, 000. 00
   1Exclusive of available funds.

     10. KASKASKIA ISLAND DRAINAGE AND LEVEE DISTRICT, ILL.

   Location.-This project, in Randolph County, Ill., lies on the right
bank of the Mississippi River, between river miles 111 and 116 above
Ohio River, includes all of the high ground on Kaskaskia Island, and
is bounded by the Mississippi River and the old channel of the river.
         493202--43--pt. 1, vol. 1--64
1006        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                         1942

   Existing project.-This provides for raising and enlarging the ex-
isting levee system by the reconstruction of about 15 miles of levee,
.and involves the placing of about 1,936,000 cubic yards of earthwork
and the construction of 7 gravity drainage structures. The project,
when completed, will afford protection to this district against a flood
of about 50-year frequency. The construction cost, estimated in 1940,
is $345,000 and estimated cost of lands and damages is $30,000. The
project was selected and approved by the Chief of Engineers for con-
struction under the general authorization contained in the Flood
Control Act approved June 28, 1938.
   Local cooperation.-Fullycomplied with.
    Operations and results during fiscal year.-A total of 852,731 cubic
,yardsof material was placed by contract at a cost of $148,168.11. The
total costs were $150,985.18 from regular funds for new work. The
,expenditures were $151,713.75.
    Condition at end of fiscal year.--The existing project is about 85
percent complete. The estimated work required to complete the project
is the placing of about 74,490 cubic yards of material under existing
contract. The total costs to June 30, 1942, were $292,011.49 from regu-
lar funds for new work; and the total expenditures were $280,514.16.
    Proposed operations.-The unexpended balance at the end of the
fiscal year will be applied as follows:
Accounts payable, June 30, 1942_________---------------------------  $11, 497. 33
New work: By contract (completion of existing contract), raising
  and enlarging existing levees (July 1 to Sept. 15, 1942) --       _ 52, 9'8. 51

         Total for all work____ __--- ___----------__
                                              _----- _                 ____                           64, 485. 84
  It is expected that, with the proposed expenditures, the project will
be completed.
                                       Cost and financial summary
,Costof new work to June 30, 1942------------------------------                                     $292, 011. 49
Cost of maintenance to June 30, 1942

       Total cost of permanent work to June 30, 1942.----------                                      292, 011. 49
IMinus accounts payable June 30, 1942.    --------------------
                                                            _                                         11, 497. 33
       Net total expenditures --------------------------------                                       280, 514. 16
JUnexpended balance June 30, 1942____________________-----__                                         64,485. 84
         Total amount appropriated to June 30, 1942_______________                                   345, 000. 00

    Fiscal year ending June 30           1938          1939           1940             1941              1942

Cost of new work .-----------    ---   - --------     $1,161.66     $26,266.77     $113,597.88         $150,985.18
Cost ofmaintenance___
'Total expended-. ...................                  1, 106. 01    25. 303. 01     102, 391. 39       151, 713. 75
Allotted...._---------------------     -----------   320, 000. 00   145, 000. 00   -120,000. 00



Balance unexpended July 1, 1941        ________                                                     $216, 199. 59
Gross amount expended__-----------------------____----                                               151, 713. 75
     Balance unexpended June 30, 1942________________-______                                          64, 485. 84
Amount covered by uncompleted contracts--   -----------                                               18, 807. 88

         Unobligated balance available June 30, 1942 -----                            -               45, 677. 96
          RIVERS AND HARBORS-ST.            LOUIS,   MO.,   DISTRICT        1007

   11. COLUMBIA DRAINAGE AND LEVEE DISTRICT NO. 3, ILLINOIS

   Location.-This project, in Monroe County, Ill., lies on the left
bank of Mississippi River between river miles 157 and 167 above Ohio
River, and embraces most of the bottoms between the river and the
bluffs and between Fountain Creek on the south and Columbia Creek
on the north.
   Existing project.-'This provides for raising and enlarging the ex-
isting levee system by the reconstruction of about 10.6 miles of river-
front levee and 9.0 miles of flank levee, and involves the placing of
about 3,576,000 cubic yards of earthwork, and the construction of 8
gravity drainage structures. The project, when completed, will af-
ford protection to this district against a flood of about 50-year fre-
quency. The construction cost, estimated in 1940, is $726,000 and esti-
mated cost of lands and damages is $80,000. The project was author-
ized by the Flood Control Act approved June 22, 1936.
   Local cooperation.-See page 5. Assurance of local cooperation,
approved by the county court of Monroe County, Ill., was approved
by the Secretary of War, June 9, 1938. Right-of-way data for all
the upper flank levee and about 60 percent of the river-front levee were
approved July 7, 1938. Right-of-way data for the remainder of the
district were approved October 17, 1941, except two agreements which
were approved on December 3, 1941, and February 19, 1942, respec-
tively. All requirements of local cooperation have been complied
with.
   Operations and results during fiscal year.-A total of 492,640
cubic yards of earthwork was placed by contract at a cost of $71,-
238.84. Preparation of plans and specifications for the balance of
work in the district, and surveys and foundation investigations were
completed by hired labor at a cost of $10,046.13. The total costs were
$81,284.97 from regular funds for new work. The total expenditures
were $72,863.88.
   Condition at end of fiscal year.-The existing project is about 40
percent complete.     Contract for work under items I and II is com-
pleted. The estimated quantities required to complete the project
are placing of about 1,757,360 cubic yards of earthwork and con-
struction of 8 gravity drainage structures. The total costs to June
30, 1942, were $290,331.72 from regular funds for new work; and
the total expenditures were $280,662.47.
  Proposed operations.-The unexpended balance at the'end of the
fiscal year will be applied as follows:
Accounts payable, June 30, 1942______-----------------------------   $9, 669.25
New work: By contract (completion of existing contract), raising
  and enlarging lower flank and lower portion of river-front levees,
  July 1, 1942 to June 30, 1943 ___________________________ 435, 668.28
      Total for all work ___-----_______________________               445, 337.53
  It is anticipated that, with the proposed expenditures, the project
will be completed.
1008         REPORT OF CHIEF OF ENGINEERS,                                     U. S. ARMY,                 1942

                                         Cost and financial summary
Cost of new work to June 30, 1942_____--------------------------                                             $290, 331. 72
Cost of maintenance to June 30, 1942
     Total cost of permanent work to June 30, 1942---------                                                      290, 331 72
Minus accounts payable June 30, 1942-------------------------                                                      9, 669.25

      Net total expenditures__     __---                                                     __--                280,66. 47
                                 ----------
Unexpended balance June 30, 1942_________________                                                                445, 337. 53

                                                      --------
          Total amount appropriated to June 30. 1942_-__                                                   -726,          000. 00

    Fiscal year ending June 30               1938              1939             1940                1941                 1942


Cost of new work - - - - - - -- - -- - -   $21, 489. 58     $175, 165. 01      $7, 878. 12    $4, 514. 04               $81, 284. 97
Cost of maintenance ---          ---------       --       --------------    --------------------------            -
Total expended         ----- ---------      12, 657. 43      171, 242. 51      20, 431. 48          3, 467. 17           72, 863. 88

Allotted----- ----      ------------       546, 000.00    -----------         180, 000. 00    ..........         - --



Balance unexpended July 1, 1941______________________--__---$518, 201.41
Gross amount expended---_-----------------------    $73, 974.52
Less reimbursenients collected------------------___     , 110. 64
                                                                  72, 863. 88

      Balance unexpended June 30, 1942______________________                                                     445, 337.53
Outstanding liabilities June 30, 1942______________     $305. 92
Amount covered by uncompleted contracts___           354, 905. 76
                                                                                                                 355, 211. 68

          Unobligated balance available June 30, 1942______----                                 ___-_                 90, 125. 85

12. WILSON AND WENKEL AND PRAIRIE DU PONT DRAINAGE AND
                 LEVEE DISTRICTS, ILLINOIS

   Location.-This project lies in Monroe and St. Clair Counties, Ill.,
on the left bank of Mississippi River between river miles 168 and 175
above Ohio River, and includes the bottoms between the river and the.
bluffs and extends from about opposite the lower end of Jefferson
Barracks, Mo., north to Prairie du Pont Creek. The district is now
known as the Prairie du Pont drainage and levee district.
   Existing project.--This provides for raising and enlarging the exist-
ing levee system by the reconstruction of about 8.7 miles of river-
front levee' and 4.5 miles of flank levee, and involves the placing of
about 2,603,000 cubic yards of earthwork and the construction of 8
gravity drainage structures and two floodgate structures and the ex-
tension of four proposed gravity-drainage structures under proposed
embankment of Illinois State Highway No. 132. The project, when
cornpleted, will afford protection to this district against the maximum
flood of record (1844) confined. The construction cost, estimated in
1942, is $785,000 and the estimated cost of lands and damages is
$100,000. The project was authorized by the Flood Control Act ap-
proved June 22, 1936.
   Local cooperation.-See page 5. Assurance of local cooperation,
approved by the county court of St. Clair County, Ill., was approved
by the Secretary of War November 14, 1939. Right-of-way data for
3.6 miles of upper-flank levee of the project were approved April 26,
                 RIVERS AND HARBORS--ST.                        LOUIS, MO.,               DISTRICT                   1009

1940. Right-of-way data for the remainder of the project are being
prepared.
  Operations and results during fiscal year.-Work on preparation of
plans and specifications, and surveys and foundation investigations for
the balance of the work in the district were continued by hired labor
at a cost of $3,011.29 from regular funds for new work. The total
expenditures were $3,634.61.
   Condition at end of fiscal year.-The existing project is about 35
percent completed. The estimated quantities required to complete the
project are the placing of about 1,716,000 cubic yards of earthwork,
construction of seven gravity drainage structures and one floodgate
structure, and the extension of four proposed gravity drainage struc-
tures under the proposed embankment of Illinois State Highway No.
132.       The total costs to June 30, 1942, were $277,057.18 from regular
funds for new work; and the total expenditures were $276,996.85.
  Proposed operations.-The unexpended balance at the end of the
fiscal year will be applied as follows:
Accounts payable, June 30, 1942 _____________________---------            $60. 33
New work: By contract, raising and enlarging remainder of upper
  flank levee, Sept. 1, 1942, to June 30, 1943-___ _____------------ 262, 942. 82

           Total for all work_________________-------------------                                              263, 003. 15
   No operations are proposed during the fiscal year 1944.
                                     Cost and financial summary
Cost of new work to June 30, 1942__________________---------                                       -          $277, 057. 18
'Cost of maintenance to June 30, 1942_
     Total cost of permanent work to June 30, 1942__-__-------                                                 277, 057. 18
Minus accounts payable June 30, 1942____________________-----_                                                       60. 33

     Net total expenditures__---__-__-----------------                                                         276, 996. 85
Unexpended balance June 30, 1942____                                                                           263,003. 15
           Total amount appropriated to June 30, 1942_________________                                         540, 000. 00

   Fiscal year ending June 30             1938           1939                1940                1941               1942

Cost of new work_                      $15, 535. 23    $8, 279. 60        $47,528.82       $202, 702. 24            $3,011. 29
Cost of m aintenance . . . . . . ------------
                                   . . . ..- - - --------            - --                 --            -       -
Total expended --------------            15, 383. 40     7,590.
                                                              52            41, 917. 52        208, 470. 80               61
                                                                                                                     3,634.
Allotted   -          -                 207, 000. 00     000. 00
                                                       25,                    000. 00
                                                                            70.                218, 000. 00         20, 000. 00


Balance unexpended July 1, 1941_____________________________ $246, 637. 76
Amount allotted from War Department Civil Appropriation Act ap-
  proved Apr. 28, 1942 __________- ___________________________  20, 000. 00
      Amount to be accounted for____________________________                                                  266, 637. 76
Gross amount expended----------__                                                                               3, 634. 61
      Balance unexpended June 30, 1942___.____________       ___                                               263, 003. 15
Outstanding liabilities June 30, 1942_-___________-______________                                                    60. 33
           Unobligated balance available June 30, 1942________________                                         262, 942. 82
Amount (estimated) required to be appropriated for completion of
  existing project 1 -------                            -             -             --                        245, 000. 00
  SExclusive of available funds.
1010    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                 1942

              13. EAST ST. LOUIS AND VICINITY, ILLINOIS

    Location.-This project is in St. Clair and Madison Counties, Ill.,
on left bank of Mississippi River between river miles 175 and 195
above Ohio River and, with the exception of Chouteau, Nameoki, and
Venice, and Chouteau Island levee and drainage districts, and some
islands and low-lying lands along the river bank, includes all that part
of the alluvial valley between the river and the bluffs and between
Cahokia Diversion Channel on the north and the village of Prairie du
Pont on the south and is known as the East Side levee and sanitary
district.
    Existing project.-This provides for raising and enlarging the exist-
ing levee system by the reconstruction of about 20.6 miles of river-front
levee, 4.1 miles of upper flank levee, and 6.9 miles of lower flank levee,
and involves the placing of about 3,520,000 cubic yards of earthwork,
and construction of 3 stop-log gates, 11 gravity drainage structures, and
600 linear feet of levee wall. The project, when completed, will afford
protection to the district against the maximum flood of record (1844)
confined. The construction cost, estimated in 1936, is $1,158,000 and
the estimated cost of lands and damages is $260,000. The project was
authorized by the Flood Control Act approved June 22, 1936.
    Local cooperation.-See page 5. Assurance of local cooperation for
the entire project was approved by the Secretary of War March 24,
1937. Right-of-way data for the flank levees were approved November
27, 1937, and August 7, 1940. Additional right-of-way data for future
work are being prepared.
    Operations and results during fiscal year.-A total of 80,492 cubic
yards of material was placed in the subsided portion of lower flank
levee by contract at a cost of $38,225.72, completing that portion of the
work. Preparations of plans and specifications, foundation investi-
gations, and surveys for additional work in this district were con-
tinued by hired labor at a cost of $5,158.17.        The total costs were
 $43,383.89 from regular funds for new work. The total expenditures;
were $50,995.06.
    Conditionat end of fiscal year.-The existing project is about 39 per-
cent complete. The estimated quantities required to complete the
project are placing of about 2,006,000 cubic yards of earthwork and
construction of about 600 linear feet of levee wall, 3 stop log structures
and 11 gravity drainage structures. The total costs to June 30, 1942,
were $444,232.86 from regular funds and $2,900 from Emergency Re-
lief funds for new work. The total expenditures were $443,786.53 from
regular funds and $2,900 from Emergency Relief funds.
    Proposed operations.-The unexpended balance at the end of the
fiscal year will be applied as follows:
Accounts payable, June 30, 1942-          _______                      $446. 3
New work:
   By contract, raising and enlarging existing lower river front
     levees, September 1, 1942, to June 30, 1943------------------- 690, 867. 14
    By hired labor, making construction surveys and plans, July 1,
      1942, to June 30, 1943-----______________________________      20, 000. 00
          Total for all work-----------------------------------      711, 313. 47
  It is expected that, with the proposed expenditures, the project will
be completed.
                 RIVERS AND              HARBORS-ST. LOUIS, MO.,                         DISTRICT               1011
                                         Cost and financial summary

Cost of new work to June 30, 1942_______________-------------------1                                     $447, 132.86:
Cost of maintenance to June 30, 1942_____________-----------

     Total cost of permanent work to June 30, 1942_____________ 1447, 132. 86
Minus accounts payable June 30, 1942_-------
                                      _      --------------------     446. 33.

     Net total expenditures ________________                                                         1446, 686.53:
Unexpended balance June 30, 1942________________--__                                    ___---        711, 313. 47

          Total amount appropriated to June 30, 1942______________                                  1, 158, 000. 00

    Fiscal year ending June 30              1938            1939            1940            1941              1942


Cost of new work     ----     ---    -    $58, 236. 95   $225, 209. 01   $37,676.09      $82,626.92          $43, 383.89
Cost of maintenance.------------ --------- --- - ----.           .-- --. .----------------------
Total expended....-----------------        45, 567. 32    213, 401.83     56, 257. 90      80. 464. 42        50, 995.06

Allotted_---------   -------------        377, 900. 00    355. 000. 00   -45, 000. 00     447, 000. 00               00
                                                                                                              23, 1CO.



Balance unexpended July 1, 1941-------------------------------$739,     208. 53
Amount allotted from War Department Civil Appropriation Act ap-
proved Apr. 28, 1942 -------------------------------------         23, 100. 00
      Amount to be accounted for __--------------                                                         762, 308. 53
Gross amount expended_______________--------------------------                                             50, 995. 06
      Balance unexpended June 30, 1942_ -______------------                                              711, 313. 47
Outstanding liabilities June 30, 1942___________________    $446. 33
Amount covered by uncompleted contracts----      ______-1, 689. 25
                                                                                                            2, 135. 58

          Unobligated balance available June 30, 1942___                 ---------------                  709,177. 89,
   1 Includes $2,900 Emergency Relief funds.

        14. WOOD RIVER DRAINAGE AND LEVEE DISTRICT, ILLINOIS

   Location.-The project lies in Madison County, Ill., on the left
bank of the Mississippi River between river miles 196 and 203, and
includes the bottoms between the river and the bluffs and extends from
the southern city limits of Hartford, Ill., to Alton, Ill. The small
industrial cities of Hartford, Wood River, and East Alton lie within
the district.
   Existing project.-This provides for raising and enlarging about
5.5 miles of the existing levee system along Wood River and con-
structing approximately 11.3 miles of new levee to provide protection
from the Mississippi River, and involves the placing of about 3,000,000
cubic yards of earthwork, the construction of 1 stop-log structure,
20 gravity drainage structures, 3 pump houses, 1 spillway dam in
Wood River, and sewer repairs and alterations. The project when
completed will afford protectionl to this district against the maximum
flood of record (1844) confined. The construction cost, estimated in
1942, is $1,452,000, and the estimated cost of lands and damages is
$135,000. The project was selected and approved by the Chief of Engi-
neers for construction under the general authorization for the upper
Mississippi River Basin contained in the Flood Control Act approved
June 28, 1938.
1012        REPORT OF CHIEF OF ENGINEERS,                               U. S. ARMY,                1942

   Local cooperation.-See page 5. Assurance of local cooperation
has not yet been furnished, but the local district has expressed a desire
to cooperate.
   Operationsand results during fiscal year.-The work done consisted
of surveys and preparation of detailed plans by hired labor at a cost
of $6,910.63 from regular funds for new work. The expenditures were
$7,154.91.
   Condition at end of fiscal year.-No construction work has been
started. The estimated work required for the project is the placing
of about 3,000,000 cubic yards of earthwork, the construction of 1 stop-
log structure, 20 gravity drainage structures, 3 pump houses, 1 spill-
way dam in Wood River, and sewer repairs and alterations. The total
costs to June 30, 1942, were $19,562.09 from regular funds for new
work. The total expenditures were $19,531.72.
   Proposed operations.-The unexpended balance at the end of the
fiscal year and the sum of $20,000 allotted in August 1942 will be
applied as follows:
Accounts payable June 30, 1942_____ ______________-_______-            -    $30. 37
New work: by hired labor, making construction surveys and plans for
  flank levees along Wood River, July 1, 1942, to June 30, 1943_------- 65, 437. 91

        Total for all work----------------------                                -------------- 65, 468. 28
   No operations are proposed during the fiscal year 1944.
                                    Cost and financial summary
Cost of new work to June 30, 1942______________________________     $19, 562. 09
Cost of maintenance to June 30, 1942__________                   ____-______
       Total cost of permanent work to June 30, 1942                 19, 562. 09
Minus accounts payable June 30, 1942 ---------------------------          30. 37
       Net total expenditures--------------------------------        19, 531. 72
Unexpended balance June 30, 1942-----------------------------        45, 468. 28
       Total amount appropriated to June 30, 1942______________      65, 000. 00

   Fiscal year ending June 30              1938           1939           1940               1941               1942
Cost of new work            ._____________
                               -__ .-.
                                   ___________...                  . .     . . .          $12, 651.46         $6, 910. 63
C ostof m aintenan ce .---------- . ........... I..              ... ... .. ...-      -                  ..............
Total expended-------------......                                                          12, 376. 81          7,154.91
Allotted -----------            -    -            .$25,                         000       350. 000. 00      -310,000.00


Balance unexpended July 1, 1941 ----------------------------      $362, 623. 19
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942________         ______________      -      40, 000. 00
      Amount to be accounted for-------------------------          402, 623. 19
Deductions on account of revocation of allotment--                 350, 000. 00
      Net amount to be accounted for____________-_______            52, 623. 19
Gross amount expended -------------------------------------          7, 154. 91
      Balance unexpended June 30, 1942 _______________-___-45, 468.28
Outstanding liabilities June 30, 1942 ---------------------------         30. 37
      Balance available June 30, 1942------------------------       45, 437.91
Amount allotted in August 1942_-------------------------------      20, 000. 00
      Amount available during the fiscal year 1943-----------       65,437. 91
Amount (estimated) required to be appropriated for completion
   of existing project 1---              _ --                                                       1, 367, 000. 00
   1Exclusive of available funds.
              RIVERS AND HARBORS---ST. LOUIS, MO.,                                   DISTRICT               1013
        15. SEAHORN DRAINAGE AND LEVEE DISTRICT, ILLINOIS

   Location.-This project, in Fulton County, Ill., lies on the right
bank of Illinois River between river miles 111 and 115 above the
mouth, and is bounded by Kerton Creek, Otter Creek, and the bluffs.
   Existing project.-This provides for raising and enlarging the
existing levee system by the reconstruction of about 1.3 miles of
levee, and involves the placing of about 200,000 cubic yards of earth-
work and construction of one drainage structure. The project, when
completed, will afford protection to the district against a flood
equivalent to that of 1904 (the maximum discharge of record) con-
fined. The construction cost, estimated in 1936, is $32,000 and the
estimated cost of lands and damages is $2,000. The project was
authorized by the Flood Control Act approved June 22, 1936.
   Local cooperation.-Fully complied with.
   Operationsand results during fiscal year.-No work was done on the
project.
   Condition at end of fiscal year.-The existing project is practically
completed. The work required to complete the project is the repair of
a concrete discharge box. The total costs and expenditures to June
30, 1942, were $25,839.56 from regular funds and $5,200 from emer-
gency relief funds for new work.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $960.44, will be applied to the repair of concrete discharge
box by contract, July 1, 1942, to June 30, 1943.
   With the proposed expenditures, the project will be completed.
                                     Cost and financial summary

Cost of new work to June 30, 1942__                                                                 1$31, 039. 56
Cost of maintenance to June 30, 1942_--__                                                         __

        Total cost of permanent work to June 30, 1942______-- ______                                    31, 039. 56

Net total expenditures_-- _--_--_-------_-----_---                                                      '31, 039. 56
Unexpended balance June 30, 1942______________________________                                               960. 44

        Total amount appropriated to June 30, 1942________________                                      32, 000. 00


   Fiscal year ending June 30           1938             1939          1940                1941             1942


Cost of new work_       -              $3, 842. 78     $23, 315. 14   $3, 739. 80            $141. 84
Cost of maintenance                         --------------                              -----.
                                                                                    .--.-----------
Total expended---------------           3, 433. 98      22, 709. 75    4, 753. 99            141. 84
Allotted-   _ -_ .--.           -.   -32, 000. 00


Balance unexpended July 1, 1941_____________ __---___-__-____                                              $960. 44
Unobligated balance available June 30, 1942______________________                                           960. 44
  1 Includes $5,200 Emergency Relief funds.

16. MEREDOSIA LAKE AND WILLOW CREEK DRAINAGE AND LEVEE:
                DISTRICTS, ILLINOIS RIVER, ILL.

  Location.-This project is in Morgan and Cass Counties, Ill., on
the left or east bank of Illinois River, between miles 73.0 and 78.8,
above its mouth and north of the village of Meredosia, Ill.
1014     REPORT OF CHIEF OF ENGINEERS,               U. S. ARMY,         1942

   Existing project.-This provides for the reconstruction of about 1.4
miles of river-front levee and 1.1 miles of flank levee along Indian
Creek, and the construction of about 4.0 miles of new river-front levee
and 4.3 miles of new flank levee along Willow Creek, involving the
construction of 11 gravity drains, extension of 1 gravity drain at the
pumping station, and removal by local interests of an existing power
line from the levee right-of-way. Additional flood protection will be
provided for approximately 4,200 acres of highly productive farm
land and improvements and their attendant population. The esti-
mated construction cost, revised in 1940, is $300,000; lands and dam-
ages, and alterations by local interests, $24,425. The existing project
was selected for construction by the Chief of Engineers in accordance
with the general authorization for the upper Mississippi River Basin
contained in the Flood Control Act approved June 28, 1938, and is
described in House Document No. 182, Seventy-second Congress, first
session.
   Local cooperation.-See page 5. Assurances of local cooperation
from the Meredosia Lake and Willow Creek drainage and levee dis-
tricts were approved by the Secretary of War on March 28 and
April 4, 1941, respectively. Ninety-five percent of the right-of-way
data for the Meredosia Lake district has been furnished and was
approved on April 23 and June 19, 1941. The remaining data were
approved on June 24 and July 7, 1941. Right-of-way data for the
Willow Creek district were approved on May 28, 1941.
   Operationsand results during fiscal year.-A total of 1,241,962 cubic
yards of earthwork was placed by contract at a cost of $137,727.28.
The total costs were $144,651.48 from regular funds for new work.
The expenditures were $130,399.52.
   Condition at end of fiscal year.-The existing project is about 55
percent complete. The estimated work required to complete the
project is the placing of about 620,000 cubic yards of material under
existing contract. The total costs to June 30, 1942, were $154,028.33
from regular funds for new work; and the total expenditures were
$138,628.35.
   Proposed operations.-The unexpended balance at the end of the
fiscal year will be applied as follows:
Accounts payable June 30, 1942              _____________------------      $15, 399. 98
New work: By contract (completion of existing contract), raising
and enlarging existing levee system, July 1, 1942, to Mar. 31, 1943._ 134, 671. 67

       Total for all work__          ---------------------------
                                   _____                                   150, 071. 65
  It is expected that, with the proposed expenditures, the project will
be completed.
                          Cost and financial summary
Cost of new work to June 30, 1942_________________________     $154, 028. 33
Cost of maintenance to June 30, 1942____________________________------------

      Total cost of permanent work to June 30, 1942                        154, 028. 33
Minus accounts payable June 20, 1942_                                       15, 399. 98
     Net total expenditures-----------_            _ _---------------------
                                                                       138, 628. 35
Unexpended balance June 30, 1942---------------------------            150, 071. 65
       Total amount appropriated to June 30, 1942-......           ---     288, 700. 00
                 RIVERS             AND HARBORS-ST.                               LOUIS,         MO.,       DISTRICT                1015

    Fiscal year ending June 30                          1938               1939                1940              1941             1942


Cost of new work _______________                ..___________ _        $1,798.65              $4, 077. 91       $3, 500. 29,    $144, 651.48
Cost of maintenance                 ------          -          ---------            -- ---      --------     ---------- --------
'Total expended _____________....               _   _     _.               1,747. 90           3, 956.85         2, 524.08       130, 399.52

Allotted    ---------------------------------                         288, 700.00



Balance unexpended July 1, 1941_______________----------------$280, 471. 17
Gross amount expended____________-------------------            130, 399. 52

      Balance unexpended June 30, 1942__,_____----------------                                                               150, 071. 65
Outstanding liabilities June 30, 1942_-------------------       $890. 41
Amount covered by uncompleted contracts--------              118,293. 05
                                                                                                                             119, 183. 46

           Unobligated balance available June 30, 1942__ _________ _--                                                         30, 888. 19

           17. UPPER MISSISSIPPI RIVER BASIN, ST. LOUIS DISTRICT

   Location.-The Mississippi River Basin above the Ohio River, ex-
clusive of the Missouri River Basin, in the St. Louis district.
   Existing project.-The Flood Control Act of June 28, 1938, approved
the general comprehensive plan for flood control and other purposes in
the upper Mississippi River Basin described in the Flood Control Com-
mittee Document No. 1, Seventy-fifth Congress, first session, with such
modifications thereof as in the discretion of the Secretary of War and
the Chief of Engineers may be advisable, and authorized $6,600,000
for reservoirs and $2.700,000 for local flood-protection works on the
upper Mississippi and Illinois Rivers; the reservoirs and local protec-
tion projects to be selected and approved by the Chief of Engineers.
The act specifically provides that the authorization shall include the
enlargement and extension of a system of levees located on the south
side of the Sangamon River east of Chandlerville, Ill., as set forth in
House Document No. 604, Seventy-fifth Congress, third session. The
following individual projects located in the St. Louis district were
considered in the comprehensive plan:
                                                                 Reservoirs

                              Name                                          Tributary basin                    State            mated ecost


Meramec________________________________..       ..        Meramec -_.-. Missouri ...-.-... $12,440,000
Big River ....         ____..             ..     ..--------  do -......        do- .    -    86,647,000
Carlyle ... .. .... . . .            ..... ....           Kaskaskia -   . Illinois --       10, 805, 000
Joanna       ------------------------------------                          Salt------------            Missouri ----------        4, 918, 000


                                       Estimated construction cost of levees

Mississippi River:
      Wood River levee project, Illinois                             1__________                  ______________             $1,452. 000
      Stringtown-Fort Chartres and Ivy Landing, Ill ___________---185, 000
      Kaskaskia Island levee project, Illinois                                                ---------                          345, 000
      Grand Tower levee project, Illinois----------------------------                                                            320, 000
      Miller Pond levee project, Illinois 1--_________________---                                                                 48, 000
Kaskaskia River, Ill.: Levees between New Athens and Carlyle, Ill.,
in conjunction with Carlyle Reservoir _....     -________...... 2, 624, 000
1 See individual report for details of project.
1016       REPORT OF CHIEF OF ENGINEERS,                              U. S. ARMY,               1942

   Local cooperation.-See page 5 for requirements.
   Operations and results during fiscal year.-All work during the fis-
cal year is applicable to and described under the individual project
reports. The expenditures were $191.85.
   Condition at end of fiscal year.-The construction progress of proj-
ects selected for construction under this authorization is given in indi-
vidual reports. The total cost and expenditures for general studies
for the development of the comprehensive basin plan were $1,069.22
from regular funds for new work.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $45,930.78, will be applied to continuing sur-
veys and preparation of detailed plans for the development of the
comprehensive plan for flood control in the upper Mississippi River
Basin.
                                    Cost and financial summary

Cost of new work to June 30, 1942_____________________________                                        $1, 069. 22
Cost of maintenance to June 30, 1942_

         Total cost of permanent work to June 30, 1942                                                  , 069. 22
                                                                                                       1_______________

Net total expenditures______________                                                                   1, 069. 22
Unexpended balance June 30, 1942                          __      ----------------------45, 930. 78
         Total amount appropriated to June 30, 1942______________                                     47, 000. 00

   Fiscal year ending June 30           1938              1939         1940              1941            1942

Cost of new work ....
                  ----------------------------             $655.32      $142.05           $271.85 -
Cost of maintenance--..-.        --------------     --                        -     --                 ------
Total expended ....------------------------------           627. 27      170. 10            80.00          $191.85-
Allotted ............
            ------------------- --------------           17, 000.00   22, 500.00     30, 000.00        - 22, 500.00


Balance unexpended July 1, 1941__      _____-----$68,                                                     622. 63
Deductions on account of revocation of allotment ___-_________                                   _    22, 500. 00
      Net amount to be accounted for__________________________                                        46, 122. 63
Gross amount expended---------------------------------------                                              191. 85
        Unobligated balance available June 30, 1942___________---                                     45, 930. 78
18. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL
  The costs for work done during the year amounted to $82,536.21,
and the expenditures were $82,314.23. The balance unexpended June
30, 1942, amounting to $19,690.67, plus the sum of $2,300 allotted in
August 1942, will be applied as needed during the fiscal year 1943 to
the payment of expenses incurred under this heading.
                                   Cost and financial summary
Cost of new work to June 30, 1942_
Cost of maintenance to June 30, 1942111111111111111111                                          1 $120, 231. 70
     Total cost of permanent work to June 30, 1942 ----------                                        120, 231. 70
Minus accounts payable June 30, 1942__________________________                                         2, 422. 37
      Net total expenditures----                                                                     117, 809. 33
Unexpended balance June 30, 1942----                                                                  19, 690. 67
        Total amount appropriated to June 30. 1942_                       ---- __                    137, 500. 00
                   RIVERS         AND       HARBORS-ST.                         LOUIS,             MO.,              DISTRICT                                1017


      Fiscal year ending June 30                 1938                   1939                     1940                               1941                    1942


C ost of new w ork .. . . . . ..-- . . . . .                .    - ..  .. ..    ...-                . ..
                                                                                                  --..                 . ,-                            .     -...
Cost of maintenance-__ .....---...-..  .
                                      ---..                         -_ $6, 500. 00              $6, 196.43                    $24,999.06                   $82, 536. 21

Total expended_ __---_             _ -    __-...._____.     __          6, 500. 00               2, 629. 31                   26, 365. 79                   82, 314. 23
Allotted--...------------------              -------------              6, 500. 00              35, 000. 00                   96, 000. 00------------


Balance unexpended July 1, 1941___________________-_________ $102, 004. 90
Gross amount expended_      _____----------__--_               82, 314. 23
       Balance unexpended June 30, 1942 -------------------------                                                                                    19, 690. 67
Outstanding liabilities June 30, 1942------------------------------                                                                                   2, 422. 37
     Balance available June 30, 1942 _____________--____ _                                                                                           17, 268. 30
Amount allotted in August 1942________________________________ _                                                                                      2, 300. 00
          Amount available during the fiscal year 1943----------------                                                                               19, 568. 30

19. OTHER FLOOD-CONTROL PROJECTS FOR WHICH NO ESTIMATES
                      ARE SUBMITTED

                                                                      For last            Expenditures to June 30,                                   Estimated
                                                                    full report,                    1942                                                amount
                     Name of project                                see Annual                                                                         ramequired
                                                                      Report                                                                           requiredte
                                                                        for-              New work                 Maintenance                       to complete


1. Preston drainage and levee district, Illinois 1                       1938                           ......................             .......           $244, 000
2. DeGognia and Fountain Bluff levee and
     drainage district, Illinois 2                                       1939               $17, 000. 00                    -----
                                                                                                                          ---                                 313, 000
3. Perry County drainage and levee districts,
       Nos. 1, 2 and 3, Missouri 3                      _                1941               532, 017.49                       ---                             320, 725
4. Ste. Genevieve levee district No. 1, Missouri 4                      1941                      199. 49                                   _                 35, 000
5. Fort Chartres and Ivy Landing drainage dis-
      trict No. 5, Illinois 2___________________                         1941                      521.43 ________--__                                        112, 500
6. Chouteau, Nameoki and Venice drainage and
      levee district, Illinois 5                                         1938          ----------------------------                                           132, 000
7. St. Louis County drainage and levee district,
       Missouri 5-                                                       1938                                                                                 295, 000
8. Wiedmer chemicals drainage and levee dis-
     trict, Missouri 8                                                   1938                                                                                  76, 500
9. Riverland levee district, Missouri                                   1938                                                                                  73, 000
10. McGee Creek levee and drainage district,
     Illinois River, Illinois 2                                          1940               -                                                                 135, 000
11. Miller Pond drainage
                       Iy(8) and levee district, Ill_                    1941                   34, 251.78 -1Hrsvla
12. Harrisonville and Ivy Landing drainage and
       levee district No. 2, Ill --------------------                    1941                   37, 016.59 ------- _------                                  g 696,500


  1 Levee system now in good condition.
  2 Work under the project has been deferred pending fulfillment of the required local cooperation.
  3 Balance of work is on river-front levees of districts Nos. 1 and 2.
  4 Work deferred pending a review of H. Doc. No. 669, 76th Cong., 3d sess.
    May be modified by project for "Chain of Rocks Reach", recommended to Congress in H. Doec. No. 231,
76th Cong., 1st sess.
  8 Action deferred pending further study.
  7 Low-lying lands in this district have been acquired under authorizations contained in the River and
Harbor Act approved August 26, 1937. Action regarding protection for the remaining areas in the district
deferred pending further study.
  8 Completed.
  9 Exclusive of available funds.
1018           REPORT OF CHIEF OF ENGINEERS,                                    U. S. ARMY,                           1942

Status of all investigations for flood control called for by flood-control acts and
                               committee resolutions

                                                                   Date trans-                                          Recommenda;
             Locality                     Authorization Act         mitted to       Document number                         tion
                                                                     Congress


-Clear Creek, Ill---...._.-.         Flood Control Com-            Feb. 21, 1942   ------------------                   Unfavorable.
                                          mittee      resolution
                                          May 1, 1940.
Crab Orchard Creek, Ill ..--             . do      ____       Feb. 20, 1942 -..................                              Do.
Grassy Creek, Big and               ....   do----------------    do-------------------------                                 Do.
  Little, Ill.
Kaskaskia River, Ill ...             Flood         Control   Act                        ....     .    ..   .      .
                                          June 28, 1938.
Kincaid Creek, Ill ....---------.    Flood Control Com-            Feb. 21, 1942    .                 .              Unfavorable.
                                                                                                               .------------
                                          mittee      resolution
                                          May 1, 1940.
Marys River, ll        .........    ...     do----- -----------       do -                               -----.
                                                                                               -------.--.--                 Do.
Mississippi River in vicinity        Flood Control Com-            May 16, 1942         House 727, 77th                 Favorable.
of Ste. Genevieve Levee               mittee    resolution                              Cong., 2d sess.
and Drainage District.                Feb. 23, 1940.
Reeds Creek, Ill _-_-_. .....        Flood Control Com-            Feb. 21,1942     .U_____-________                     nfavorable.
                                          mittee      resolution
                                          May 1, 1940.



     MISSISSIPPI RIVER BETWEEN THE MISSOURI RIVER
                 AND MINNEAPOLIS, MINN.

   The section of the river covered in this report is divided into three
reaches, under the supervision and direction of district engineers at
St. Louis, Mo., Rock Island, Ill., and St. Paul, Minn.
   The section in the St. Louis district extends from the mouth of
the Missouri River to mile 300 above the Ohio River, a distance of
about 105 miles; the Rock Island district extends from mile 300 to
mile 614, a distance of about 314 miles; and the St. Paul district
extends from mile 614 to the Minneapolis, St. Paul, and Sault Ste.
Marie Railway bridge, Minneapolis, a distance of about 244 miles.
  District engineers: At St. Paul, Minn., Col. John W. Moreland,
Corps of Engineers; at Rock Island, Ill., Col. Clinton W. Ball, Corps
of Engineers, to May 15, 1942, Lt. Col. William J. Matteson, Corps of
Enginers, acting district engineer, May 16-25, 1942, and district engi-
neer since that date; at St. Louis, Mo., Col. Roy W. Grower, Corps of
Engineers.
  Division engineer: Col. Malcolm Elliott, Corps of Engineers, Col.
Roy W. Grower, Corps of Engineers, acting division engineer, May
18-24, 1942.
  Location.--The Mississippi River rises in the northern part of
Minnesota, flows about 2,450 miles in a southerly direction, and
empties into the Gulf of Mexico. The portion included in this report
extends from the mouth of the Missouri River to the Minneapolis,
St. Paul, and Sault Ste. Marie Railway bridge, Minneapolis, a dis-
tance of about 663 miles.
  Previous projects.-Adopted by the River and Harbor Acts of
June 10, 1872, June 18, 1878, August 18', 1894, February 9, 1905,
March 3, 1905, March 2, 1907, June 25, 1910, September 22, 1922,
March 3, 1925, January 21, 1927, and July 3, 1930.
  For further details see pages 1879, 1880, and 1887 of the Annual
Report for 1915, pages 1106, 1107, and 1108 of the Annual Report
for 1932, and page 1047 of the Annual Report for 1938.
MISSISSIPPI RIVER J3ETWEEN MISSOURI RIVER AND MINNEAPOLIS                                                     1019

  Existing project.-This project provides for a channel of 9-foot
depth and of adequate width between the mouth of the Missouri
River (1,276 miles from the Gulf) and the Minneapolis, St. Paul, and
Sault Ste. Marie Railway bridge at Minneapolis, by the construction
of a system of locks and dams, supplemented by dredging. The
project also provides for a further improvement at St. Paul to pro-
vide a basin 9 feet deep, varying in width from 400 to 1,100 feet
and extending downstream from the Robert Street Bridge for a
distance of 2.7 miles, and at Minneapolis to provide adequate ter-
minal facilities.
  The estimate of cost for new work, revised in 1939, is $170,000,000,
which includes $8,259,000 for work upstream from the lower North-
ern Pacific Railway bridge at Minneapolis, but is exclusive of amounts
expended on previous projects. The latest approved estimate for
maintenance and operating cost is $1,805,000 annually, including $795,-
000 for operating and care of locks and dams.
   The existing project was authorized by the following river and
harbor acts:

                Acts                                  Work authorized                            Documents


Sept. 22, 1922_____-.---------     __    Dredging channels to landing places on
                                           the main river and subsidiary sloughs
                                           for the river above the mouth of the
                                           Missouri River.
July 3, 1930--......--------------       Project adopted and to be prosecuted in          H. Doc. No. 290, 71st Cong.,
                                           accordance with the plan for a compre-          2d sess.
                                           hensive project to secure a channel of
                                           0-foot depth; amount authorized to be
                                           appropriated limited to $7,500,000, in
                                           addition to amounts authorized under
                                           the then existing projects.
Feb. 24, 1932 (Public Res. No.           Chief of Engineers granted discretionary
  10, 72d Cong., 1st sess.).               authority to make such modification in
                                           plan as may be advisable.
Aug. 30, 1935 (included in the            Missouri River established as the lower         H. Doc. No. 137, 72d Cong.,
  Public Works Administra-                 limits of the project; authorizes further        1st sess., and Rivers and
tion and Emergency Relief                 improvement of the harbor at St. Paul,           Harbors Committee Doc.
Administration programs).                 Minn.; authorizes appropriation of the           No. 44, 74th Cong., 1st
                                           entire sum required for completion of           sess.
                                           the project.
Aug. 26, 1937.---------          . .--   Project modified in accordance with rec-         Rivers and Harbors Com-
                                           ommendation of the district engineer,           ,mittee Doc. No. 34, 75th
                                           Rock Island, Ill., providing for rectifica-      Cong., 1st sess.
                                           tion of damages that may be caused to
                                           drainage and levee districts bordering
                                           the Mississippi River by seepage and
                                           backwater as a result of the navigation
                                           improvement. The estimated cost is
                                           $2,515,566, including $624,645 for acquir-
                                           ing low-lying lands in 7 districts, $125,000
                                           for continuing a study of the districts
                                           for 5 years, $247,290 for annual rectifica-
                                           tion of damages during the period of
                                           study, $150,000 contingent construction
                                           by the United States, and $1,368,631 for
                                           estimated capitalized increased drain-
                                           age costs.
1020         REPORT OF CHIEF OF ENGINEERS, U.                                 S. ARMY,        1942


                Acts                                Work authorized                         Documents



Aug. 26, 1937---------------.........   Extension of the 9-foot channel above St.    H. Doc. No. 137, 72d Cong.,
                                         Anthony Falls (subject to such changes        1st sess.
                                         as may be found advisable by the Chief
                                         of Engineers and the final approval of
                                         the plan by the Board of Engineers for
                                         Rivers and Harbors, as necessary to
                                         provide adequate terminal facilities for
                                         Minneapolis, Minn.). Final approval of
                                         a plan, incorporating certain changes
                                         found advisable by the Chief of Engin-
                                          eers, was given by the Board of Engin-
                                         eers for Rivers and Harbors Feb. 8, 1938.
                                         Modification of the requirements for
                                         bridge clearances was approved by the
                                         Board of Engineers Oct. 28, 1940, and
                                         by the Chief of Engineers Nov. 27, 1940.
                                         (S. Doc. No. 54, 77th Cong., 1st sess.)
June 26, 1934 (Permanent Ap-            Operating snag boats, and operation and
  propriations Repeal Act).              care of locks and dams provided for
                                         with funds from War Department ap-
                                         propriations for rivers and harbors.
.June 11, 1938 (War Depart-             This appropriation act contained the pro-
   ment Civil Appropriation              vision that no part of the appropriation
   Act, Public, No." 591, 75th           shall be expended for any work upon or
   Cong.).                               incident to the project to extend the
                                         channel of the Mississippi River above
                                         St. Anthony Falls.



  The Chief of Engineers, under date of December 28, 1938, reported
without recommendation that the best determination practicable of
the exact damages that may be caused at Cochrane, Wis., by seepage
and backwater resulting from the creation of pool No. 5 on the Mis-
:sissippi River, is $33,000 (H. Doc. No. 137, 76th Cong., 1st sess.).
    See House Document No. 669 (76th Cong., 3d sess.) for report of
  Chief of Engineers dated February 27, 1940, containing a general
plan for improvement of the Mississippi River between Coon Rapids
Dam and the mouth of the Ohio River for purposes of navigation,
-power development, the control of floods, and the needs of irrigation.
    The latest map and profile published showing this section of the
river have been inserted between pages 20 and 21 of House Document
No. 137, Seventy-second Congress, first session. A map of the section,
Minneapolis to Lake Pepin, is published in House Document No. 583
Sixty-ninth Congress, second session. The latest published maps of
the locality at Moline are in House Document No. 397, Fifty-eighth
Congress, second session, and House Document No. 263, Sixty-ninth
Congress, first session. A map showing location of drainage districts
  (Bellevue, Iowa, to Missouri River) is published in Rivers and Har-
bors Committee Document No. 34, Seventy-fifth Congress, first
session.
  Pertinent data for existing and proposed locks and dams, etc., are
given in the following table:
                                                                                                                                                                                                                                    H



                                           Location                                                       Lock
                                                                                                                                                                                                                                00  H




eD                                                                                                                                                                                                                              00
                                                                               Dimensions                   on miter
                                                                                                      Depthsill                                                                         Per-              Estimated cost
                                                                                                                                                                                        cent-     Year         of each
                                                                                                                                                                    Chaacerfam           age     opened   lock and dam          bd




                                                                                                      MiesCharacter                                                     of dam          com-       to        including          b




                                 Miles                                           Great-                                                                          foundation            pleted,     to        including
h                                above
                                  Ohio
                                 River
                                             Distance from
                                             nearest town             Width
                                                                       of          eto
                                                                                 length
                                                                                                                              Character of founda-navi-
                                                                                                                                      tion
                                                                                                                                                                                                           work in pool                 l




                                                                                                                                                                                         and     gation     and flowage         H
                                                                                                                                                                                                                                h-




6                                                                     chain-     avail-     Lift 1 Upper 1 Lower                                                                        dams                 damages 2
                                                                                   able
                                                                       ber       for full                                                                                                                                       y

w   ,
                                                                                 width

                                                                       Feet       Feet      Feet       Feet      Feet
        St. Anthony Falls up-    853. 9   In city of Minneapo-            56        400      49. 7      15.7      12.5        Some     limestone    Limestone _........                  (3)              4$4, 628, 000.00
          per lock.                         lis, Minn.                                                                          mainly sandstone.
                                                                                                                                No piles.
        St. Anthony Falls        853. 3       do_.
                                          ---....           -   .--       56         400    s 26. 4     15.5     810. 1       Sandstone. No piles__ Sandstone ......                                       53, 631, 000.00
          lower lock and dam.
        Lock and dam No. 1_      847. 6   6.2    miles   above        { 56           400    635. 9    s 13. 5     10. 1 Rock and            piles   in     Piles in gravel .--.__-         100    1917    89 1, 000, 539. 26    00
                                             Omaha R.R.bridge             56         400     35.9     712.5        7.6 1 gravel.
                                             St. Paul, Minn.
        Lock and dam No. 2__     815.2    1.3miles above Hast-        10 110         500      12. 2     16.0      15.1    (Piles    in sand, silt and      Piles in sand, silt and                1930     12 5, 421, 000. 00
                                                                                                                                                                                           100
                                             ings, Minn.               So110      to600       12.2      22. 2     13.0    t     clay.                        clay.                  J      113
        Lock and dam No. 3_ __   796.9    6.1 mile above Red             110         600       8.0      17.0      14.0         ...d o_- - - - - - -        Piles in sand ....... __        100    1938       5, 882, 000. 00
                                             Wing, Minn.
        Lock and dam No. 4__     752. 8   Alma, Wis ---    __            110         600       7.0      17.0      13.0        Piles in sand and            Piles in sand and               100    1935        5, 082, 00.00.0
                                                                                                                                gravel.                      gravel.
        Lock and dam No. 5__     738.1    Minneiska, Minn___             110         600       9.0      18.0      12. 0           (In--do_                 Piles in sand_______            100    1935        5, 313, 000. 00
        Lock and dam No. 5A_     728. 5   3.0 miles above Wi-                        600       5. 5     18.0      12. 5       Piles in sand .........     -_    do _-_- _-                 100    1936        4, 772, 000. 00
                                                                         110
                                            nona, Minn.
        Lock and dam No. 6__     714. 3   Trempealeau, Wis__             110         600       6. 5     17.0      12. 5       Piles in sand, gravel,       Piles in sand and               100    1936       4, 811, 000. 00
                                                                                                                                and silt.                    clay.
        Lock and dam No. 7__     702. 5   Dresbach, Minn ...             110         600       8. 0     18. 0     12. 0       Piles in sand and            Piles in sand ____-_            100    1937       5, 807, 000. 00
                                                                                                                                gravel.
        Lock and dam No. 8 _     679. 2   Genoa, Wis ..-___..            110         600     11.0       22. 0     14. 0       Piles in sand, gravel,       Piles in sand         and       100    1937       6, 281, 000.00
                                                                                                                                and broken rock.             gravel.
        Lock and dam No. 9__     647. 9   3.3   miles   below            110         600       9.0      16.0      13.0        Piles in sand .........      Piles in sand .--..             100    1938       6, 762, 000. 00            -
                                             Lynxville, Wis.
        Lock and dam No. 10_     615. 1   Guttenberg, Iowa_              110         600      8.0       15.0      12.0        --.-do _-                   -..- do -__     -                100    1936       4, 924, 000. 00    d
        Lock and dam No. 11_     583.0    3.7 miles above Du-            110         600     11.0       18. 5     12. 5       Piles in sand, gravel,      __.__do__                        100    1937       6, 902, 000.00     O
                                             buque, Iowa.                                                                       and silt.
        Lock and dam No. 12_     556. 7   Bellevue, Iowa .....           110         600       9.0      17.0      13.0        Piles in sand and            Piles in sand and               100    1938       5, 583, 000. 00
                                                                                                                                gravel.                      gravel.
        Lock and dam No. 13.     522. 5   4.3 miles above Clin-          110         600     11. 0      19.0      13.0        Piles in sand, clay,             do . ..._.._
                                                                                                                                                            .----         .               100     1938       7, 957, 000. 00    I-
                                             ton, Iowa                                                                        and gravel.
          See footnotes at e nd of table.                                                                                                                                                                                       ND
                                                                                                                                                                                                                                                 t-
                        1                                                                                                                                          I




                                           Location                                                               Lock
                                              '                  I
                                                                                                                               -




                                                                              Dimensions                     Depth on miter                                                                               Per-              Estimated cost
                                                                                                                  sill                                                                                    cent-     Year        of each
                                                                                                       I               .            r-                                 I__                                 age     opened   lock and dam
                            Miles                                                                                                                                            Character of dam             com-       to       including
                            above            Distance from                      Great-                                                                                         foundation                pleted,    navi-    work in pool
                             Ohio            nearest town                          est                                                                                                                    locks    gation    and flowage
                            River                                    Width      length                                                   Character of founda-                                              and                damages
                                                                       of        avail-    Lift 1 Upper 1Lower 1                                tion                                                      dams
                                                                     cham-        able                                                                                                                                                           O
                                                                      ber-      for full
                                                                                width
                                     I*                          I Feet          Feet 'I Feet          -I*    Feet     I       -- I-


Lock and dam No. 14_        493. 3 3.7 miles below Le
                                      Claire, Iowa.
                                                                   Feet
                                                                     110
                                                                                 Feet    Feet
                                                                                   600 11.0
                                                                                                              Feet
                                                                                                               20. 5
                                                                                                                           Feet
                                                                                                                            13.5
                                                                                                                                       Ro
                                                                                                                                       Rock..                           Rock ---         -                  100     1939       5, 580, 000. 00   F
Le Claire Lock (Canal.      493. 1 3. 9 miles below Le-                  80        320        11.0             17.6         10.9       --.do--- -------------                                               100     1922             (13)
                                      Claire. Iowa.
Lock and dam No. 15_        482. 9 Foot of Arsenal Is-                 110         600       16. 0           14 24.0        11.0O _dodo _-                              Rock----- ...        .....          100     1934       7,660,000.00
                                     land, Rock Island,                110         360       16.0            1417. 0        11. OJ                                                                                                               M




                                      Ill.
Lock and dam No. 16_        457. 2 1.8 miles above Mus-                110         600        9.0              17.0         12. 0      Piles in       sand and          Piles in sand           and         100     1937       6,115, 000. 00
                                     catine, Iowa.                                                                                       gravel.                          gravel.
Lock and dam No. 17__       437. 1 4.2 miles above New                 110         600        8.0              16. 0        13. 0         --- do___   -                 Piles in sand----       ------      100     1939       5, 631, 000. 00
                                      Boston, Ill.
Lock and dam No. 18 _       410. 5 6.5 miles above Bur-
                                     lington, Iowa.
                                                                       110         600        9.8              16. 5        13. 7      Piles in sand-                   Piles in sand
                                                                                                                                                                         gravel.
                                                                                                                                                                                                and         100     1937       6, 023, 000.00    0
                                                                       110         358
Lock and dam No. 19_        364. 2        Keokuk, Iowa       .....    15110      15600 } 38.2                  14. 0         9.2       Rock ___.                        Rock ...--- ____-                 18100     1913     174, 846, 000. 00
Lock and dam No. 20_ _      343. 2 0.9 mile above Can-                  110        600   10. 0                 15.0         12. 0        _.do___                        Rock and piles in sand              100     1936       5, 006, 000. 00
                                     ton, Mo.                                                                                                                            and gravel.
Lock and dam No. 21 _       324. 9 2.1 miles below                      110        600       10. 5             16. 5        12. O0 Piles in sand             and        Piles in sand and                   100     1938       5, 677, 000. 00
                                      Quincy, Ill.                                                                                   gravel.                              gravel.
Lock and dam No. 22_        301.2  1.5 miles below                      110        600       10. 2             18. 0        13.8   Rock _-    -                         Rock ..-....    ......              100     1938       5, 048, 000. 00
                                      Saverton, Mo.
Lock and dam No. 24__       273. 4 Clarksville, Mo ...                  110        600       15.0              19. 0        12. O0 Rock; piles in sand                  Piles in sand .......               100     1940       6, 680, 000. 00
Lock and dam No. 25_        241.4 Cap Au Gris, Mo____                              600       15. 0             19. 0        12. O0 Piles in sand and                    Piles in sand and                   100     1939       8, 269, 000. 00
                                                                        110                                                          gravel.                              gravel.
Lock and dam No. 26
 (Henry T. Rainey           202.9         Alton, Ill.
                                                                       110         600     1823.   0         1432. 0       S1911.
                                                                                                                            0
                                                                                                                                         Piles in sand ____-- _         Piles in sand- --------              100    1938      13, 250, 000.00    b
Dam).                                                                  110        360 1823. 0                  16.0       19811.0
-                                                                                                                                                          --                            ----
      Total locks and ... locks
                   Total     . .nd--------------------------------------------------------------------------------------------
                                  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..                                                                               --------------- ..                  $14 541,539.
                                                                                                                                                                                                                    $164, 4,-3.226
       dams.
                                                                             ADDITIONAL FEATURES ENTERING INTO COST OF PROJECT
St. Paul Harbor improvements ....                  ..-----------------            .      .   .   -.   ..   .   .     .       .----------         -------------                           -      -           -        0o..9$298, 780. 77
Minneapolis turning basin-                  -    ---                                                                                                     ---                                                            9192, 841.13
Regulating works between lock and dam No. 26 (Henry T. Rainey Dam) and the Missouri River _...................................                                                                                          9545, 315. 22
Rectification of damages to drainage and levee districts.. _..._                                    -__ __2,                                                                                                             577, 000. 00
M iscellaneous .. . . . . . . . . . . . ..           . . . . . . . . . . . ..         . . . . . . . . . . . . ..      . . . . . . . . . . . ..   . ..     . . . . . . . . ..     . . . . . ..       . . .       .      1,844, 523. 62

      Total additional features              .--         __-                                                                                                               -5,                                           458, 460. 74

                                 ------- _
      Total existing project_ ...---
                               _--                                       -    -                                                                                                                      --.        21170, 000, 000. 00

  1 Lifts and depths on miter sills,based on completion of all locks and dams.                                       13Existing Le Claire Canal lock is used as auxiliary to lock No. 14; previous project
  2 Total estimated flowage damages, including clearing, surveys, and Government costs,                            costs, $540,000.
$25,000,000.                                                                                                          14Depth over upper poiree sill. Depth over upper miter sills is 27 feet at locks No. 15;
  3 Existing dam, owned by Northern States Power Co., is complete. Construction                                    and 34 feet at main lock No. 26.
of lock has not been started.                                                                                         15Proposed main lock.
  4 Includes upper approach dredging. (Federal cost only.)                                                            16Not including proposed main lock.
  5 Includes upper and lower approach dredging. (Federal cost only.)                                                  17In addition, cost of $640,868, for first lock, was reported by the Mississippi River
  6 Based on pool elevation of 723.1 in pool No. 1 which is crest of dam. Pool No. 1 is                            Power Co., transferred to Government free in lieu of improvements destroyed (A. R.
normally maintained at elevation 725.1 by flashboards.                                                              1928, pp. 1118-1119). Present estimate includes $3,050,000 for main lock.
  7 Old upper guard sill.                                                                                             18 Lift above possible future pool.  Lift at extreme low water about 28.2 feet.
  8 In addition, $1,948,772.95 was expended from previous projects, and $1,349,557.78 from                            19Based on possible future pool.
operating and care appropriation for reconstruction of first of twin locks.                                           20Includes $40,000 contributed funds.
  9 Actual cost.                                                                                                      21In addition, $620,000 was expended from the allotment for examinations, surveys,
   10Landward lock.                                                                                                and contingencies, covering the original 9-foot survey, and a total of $613,551.44 has been
   11Foundation and masonry for landward lock.                                                                     expended by the Works Progress Administration for miscellaneous clearing and ex-
  12Includes landward lock and appurtenant works. In addition, $1,965,316.22 was ex-                                planade work in the Rock Island district.
pended from previous projects.




                                                                                                                                                                                                                                          o
1024    REPORT   OF CHIEF   OF ENGINEERS,     U.   S.   ARMY,   1942

    Recommended modifications of project.-The following modifica-
tions of the existing project for Mississippi River, Missouri River-
Minneapolis, were recommended by the Chief of Engineers under the
dates shown.
    (a) July 26, 1938. To provide at Red Wing, Minn., a basin 5 feet
below the minimum controlled pool level approximately 450 feet wide
and 800 feet long, at an estimated first cost of $11,500, with annual
maintenance of $300, in addition to the amounts now required, subject
to certain conditions of local cooperation (H. Doc. No. 103, 76th Cong.,
1st sess.).
    (b) December 19, 1939. To provide for enlargement of the flood
capacity of the main channel between Smith Avenue Bridge and State
:Street in the city of St. Paul; for the dredging of a small-boat harbor
.at the lower end of Harriet Island; and for the placing of excavated
material in such manner as to provide necessary fill for a roadway
along the left bank of the river between Market Street and Lambert
Landing, at an estimated first cost of $130,000, with no increase in
annual maintenance; subject to certain conditions of local cooperation
 (H. Doc. No. 547, 76th Cong., 3d sess.).
    (c) April 2, 1941. The provision of a basin at Winona, Minn., by
dredging to a depth of 9 feet an area along the right bank of the
Mississippi River between Chatfield and Carimona Streets, and by
dredging to a depth of 5 feet and protecting with a breakwater an
area between Carimona and Hamilton Streets, at an estimated first
cost of $17,000 with annual maintenance at $600, subject to certain
conditions of local cooperation (H. Doc. No. 263, 77th Cong., 1st sess.).
    (d) April 26, 1941. The Chief of Engineers recommended protec-
tion of existing levees at Sabula, Iowa, against erosion at an estimated
first cost to the United States of $25,000, subject to certain conditions
of local cooperation (H. Doc. No. 328, 77th Cong., 1st sess.).
    (e) July 16, 1941. That the Secretary of War be granted discre-
tionary authority to permit the future modification of the existing
lock and dam improvement No. 2, near Hastings, Minn., for develop-
ment of hydroelectric power in accordance with the provisions of the
Federal Water Power Act, at no cost to the United States. (H. Doc.
No. 432, 77th Cong., 1st sess.).
    Local cooperation.-The authorized plan for the extension above
St. Anthony Falls provides that local interests shall give assurances
satisfactory to the Secretary of War that they will bear the cost of
necessary bridge modifications and adjustments to utility structures
,estimated at $1,774,000, and furnish free of cost to the United States
all lands needed for the improvement and suitable spoil-disposal areas
for new work and for subsequent maintenance as required. These
conditions were complied with by resolution adopted by the city
council of the city of Minneapolis, and approved by the Secretary of
War under date of May 5, 1939. All prior requirements fully com-
plied with.
    Terminal facilities.-A complete list of terminals available to the
public on the Mississippi River between the mouth of the Ohio River
and Minneapolis, Minn., as of January 1, 1940, can be obtained from
the division engineer, Upper Mississippi Valley Division, St. Louis,
1Mo.
MISSISSIPPI RIVER BETWEEN MISSOURI RIVER AND MINNEAPOLIS             1025
               OPERATIONS   AND   RESULTS   DURING   FISCAL   YEAR


    St. Paul district-Regular funds-New work-Lock and dam above
Hastings, Minn. (No. 2).-Work under continuing contract for
foundation and masonry of the landward lock was 66 percent com-
pleted (cofferdam, completed and unwatered; grouting cut-off wall,
completed; all piling driven except steel-sheet piling in cut-off wall
and round timber piling in monoliths R-1, R-2, L-1, and L-2; con-
crete, 42 percent completed; removing existing steel-sheet piling, 80
percent completed; installation of water supply pump, completed;
temporary driveway, completed; and moving service building, com-
pleted). A contract for construction of an esplanade at lock keepers'
dwellings was completed.
    Miscellaneous.-Marginal clearing by hired labor, in pool above
lock and dam No. 10, was completed.
    Design in connection with the landward lock, lock and dam No. 2,
various miscellaneous items, and field and office work in connection
with land and flowage acquisition, were carried on by hired labor
during the year.
    Land and flowage acquisition.-A total of 62 acres of land was
  )purchased in pool No. 3.
    Cost of work by classes.-Lock and dam construction and inci-
dental work, $1,100,040.22; land acquisition, including railroad dam-
aged, etc., $145,701.58; miscellaneous work in pool areas, $3,435.27;
design, engineering, etc., landward lock, lock and dam No. 2, $37,-
148.10; design, engineering, etc. (general), $4,574.88. Cost by con-
tract, $1,100,040.22; by hired labor, $190,859.83.
    Main tenance.-Channel dredging was carried out at 45 localities
by Government plant and hired labor. A total of 2,840,961 cubic
yards of material was removed during the fiscal year at a cost of
$271,806.01, including $23,500.46 for surveys. In addition $6,689.37
was expended for rock blasting at mile 846.6. Maintenance of chan-
nel aids to navigation, maintenance of river gages, stream gaging,
removal of snags, and shore protection and dike repairs, were carried
on during the year at a cost of $24,037.05.
    Operating and care.-The locks and dams were operated as re-
quired and the necessary repairs made thereto and to the appurte-
nant structures at a cost of $447,808.91.
    The cost of work (St. Paul district) during the fiscal year, all
from regular funds, was $2,041,241.39, of which $1,290,900.05 was
for new work, $302,532.43 for maintenance, and $447,808.91 for oper-
ating and care. The expenditures were $2,134.371.19.
    Rock Island district-Regular funds-New work---Lock and dam
construction.-The following work was completed during the year:
By contract: Flow-deflecting dike above upper approach to lock
No. 11; equipment garage at lock No. 14; extension to upper end
of the river wall at locks Nos. 16, 18, 20, and 21; steel mooring piers
at lock No. 19; and an earth dike a short distance above lock No. 22.
By hired labor: Widening upper approach to lock No. 13; and moor-
ing levees at locks Nos. 13 and 15.
    Miscellaneous.-Contracts for 16 spare lock gate units and one
strongback pick-up device and remedial works for the protection of
the Sny Island levee in pool No. 24, were completed. Studies were
1026    REPORT OF CHIEF OF ENGINEERS,        U. S. ARMY,   1942

  continued in connection with power development at lock and dam
  No. 15; new lock, drydock, bridge alterations, and rock excavation
  at lock and dam No. 19; flood control for Rock River; upper ap-
proach improvements, locks and dams Nos. 20 and 22; and revision
of lock gate lifting device for derrick boat Hercules. The prepara-
  tion of plans for pilot trenches and lateral dikes above and below
submersible earth sections of dams 12, 13, 17, 18, and 21; scour pro-
tection at locks 11 and 20 and dam 13; and mooring levees and piers
  at locks Nos. 15 and 22 were carried on by Government forces.
    A total of 401,972 cubic yards of mud and sand and 141,461 cubic
yards of rock was removed from pools 16, 17, and 19 by Government
  plant and hired labor.
    Land and flowage acquisition.-Duringthe fiscal year court orders
  were obtained for immediate possession of 481 acres (fee simple or
flowage easement).
     Cost of work by classes.-Incidental work, lock and dam construc-
tion, $354,219.92; land acquisition, including flowage surveys, rail-
road damages, etc., $545,102.81; rectification of damages to drainage
  and levee districts, $463,461.92; miscellaneous work in pool areas,
'$212,891.10;  engineering, designs, etc., general, $111,875.96. Cost by
  contract, $251,317.41; by hired labor, $1,436,234.30.
     Maintenance.-Channel dredging was carried out at 20 localities
by Government plant and hired labor. The total channel dredged
had a length of about 12.62 miles with widths varying from 200 to
  500 feet. A total of 1,188,807 cubic yards of material was removed
during the fiscal year at a cost of $141,966.18 including $21,847.76
for surveys.
     A total of 11 snags was removed by various engineer department
boats at a cost of $896.94. Maintenance of navigation aids, bar sur-
veys, etc., were carried on at a cost of $8,783.72. A total of 5,000
cubic yards were removed from ends of wing dams at a total cost
of $1,667.80.
     Operating and care.-The locks and dams were operated as re-
quired and the necessary repairs made thereto and to appurtenant
structures at a cost of $653,853.33.
    The cost of work (Rock Island district) during the fiscal year,
all from regular funds, was $2,494,719.68, of which $1,687,551.71 was
for new work, $153,314.64 for maintenance, and $653,853.33 for operat-
ing and care. The expenditures were $3,466,031.18.
    St. Louis district-Regularfunds--New work-Lock and dam con-
struction.-A total of 60 acres of land, about 25 percent of parcel
=3, pool No. 24, was cleared by Work Projects Administration forces
although work is now suspended indefinitely. The following hired
labor work was completed during the year: Channel markers in
pools Nos. 24, 25, and 26; and miscellaneous improvements to locks
:and dam No. 26.
    Miscellaneous.-Design work and surveys in connection with land
and flowage acquisition were carried on by Government forces.
    Land and flowage acquisition.-A total of 1,525 acres of land was
purchased and flowage easements were obtained over 540 acres in
pools 25 and 26.
    Cost of work by classes.-Incidental work, lock and dam construc-
tion, minus $49,177.55; land acquisition, including flowage surveys,
MISSISSIPPI RIVER BETWEEN MISSOURI RIVER AND MINNEAPOLIS              1027

$86,126.95; rectification of damages to drainage and levee districts,
$2,867.92; miscellaneous work in pool areas, $13,041.67; engineering,
designs, etc., general, $2,825.19. Cost by contract, minus $51,160.32;
cost by hired labor, $106,844.50.
   Maintenance.-Channel dredging was done at various localities by
United States dredges. A total of 531,748 cubic yards of material was
removed from 3 bars at a cost of $32,926.60. Aids to navigation were
installed at acost of $9,815.21. Flood relief work was accomplished
at a cost of $1,712.06. Hydrographic surveys were made of 20 miles of
river at a cost of $10,963.57, including repairs to gages.
   Operating and care.-The locks and dams were operated as re-
quired and the necessary repairs made thereto and to appurtenant
structures, at a cost of $272,170.88.
   The cost of work (St. Louis district) during the fiscal year, all from
regular funds, was $383,272.50 of which $55,684.18 was for new work,
$55,417.44 for maintenance and $272,170.88 for operating and care.
The expenditures were $374,286.50.
   The cost of work for the three districts during the fiscal year, all from
regular funds, was $4,919,233.57, of which $3,034,135.94 was for new
work, $511,264.51 for maintenance, and $1,373,833.12 for operating
and care. The expenditures were $5,974,688.87.
                      CONDITION   AT   END OF FISCAL YEAR


  The 9-foot canalization project as a whole, excluding extension of
the project above St. Anthony Falls, Minneapolis, was about 91 percent
complete. The entire project was about 87 percent completed.
   St. Paul district.-Locks and dams Nos. 1 to 10, inclusive (except
landward lock under construction at No. 2, and appurtenant works at
various sites) ; improvement of harbors at St. Paul and Minneapolis;
miscellaneous channel dredging and realignment; channel markers;
and clearing pool areas have been completed. For information per-
taining to locks and dams, see table under paragraph "Existing
project."
   Land and flowage acquisition.-Therehave been acquired approxi-
mately 46,502 acres of land in fee and flowage easement upon approxi-
mately 14,610 acres. Disposition of claims cases in connection with
sites, encroachment areas and damages is pending in pools Nos. 3, 4,
5A, 6, 8, and 9. Completion of acquisition of lands and flowage rights
by the end of the fiscal year 1943 is expected.
   Work remaining to complete the portion of the project in the St.
Paul district included the following: Extension above St. Anthony
Falls; completion of landward lock and appurtenant works at No. 2;
construction of guard and guide walls at Nos. 2 to 10, inclusive; foot-
bridge and access road at No. 7; modification of electrical systems and
construction of stage recorder houses at various sites; and disposition
of claims cases in connection with acquisition of lands and flowage
rights.
   The condition of the channel on June 30, 1942, was such that con-
trolling depths of 9 feet at low water and widths suitable for long-haul
common-carrier service were being maintained in all pools.
1028          REPORT OF CHIEF O'F ENGINEERS,                            U.       S. ARMIY,         1942

  The total costs and expenditures under the existing project (St. Paul
district) to June 30, 1942, exclusive of $40,000 contributed funds ex-
pended for new work, were as follows:

                                         Regular funds
                                             Regular
                                                 funds        Public Works Emergency
                                                                 funds       lief funds
                                                                                        Re-               Total


Costs:
    New work_ __                         $19, 111, 140. 44 $24, 119,958.28          $9, 071, 214. 10   $52, 302, 312. 82
    Maintenance __             -            4, 142, 983. 74--------------------                 -        4, 142, 983. 74
    O perating and care                   1 3, 182, 677. 24 _____- __ .... .....----
                                                                                _3,                         182, 677. 24

         Total costs-_                     26, 436, 801. 42    24, 119, 958. 28      9, 071, 214. 10    59, 627, 973. 80
Expenditures _________________________     26, 503, 638. 43    24, 119, 958. 28      9, 071, 214. 10    59, 694, 810. 81

  1 Includes the sum of $762,195.71 expended between 1930 and 1936 on the operating and care of the works
of improvement, under the provision of the permanent indefinite appropriation for such purposes.

  Rock Island district.-Locks and dams Nos. 11 to 22, inclusive (ex-
cept proposed main lock at No. 19, and appurtenant works at various
localities); alterations to Eagle Point bridge; rock excavation in pool
No. 15; diversion of Henderson River; clearing in most pools; con-
struction of addition to pump house and installation of machinery in
Union Township drainage district; construction of seepage ditch and
remedial works in Des Moines County drainage- district No. 7, Iowa;
construction of remedial works in Sny Island levee district, and con-
struction of extension to upper river walls at locks Nos. 11, 16, 18, 20,
and 21 have been completed. For information pertaining to locks and
dams, see table under paragraph "Existing project."
   Land and flowage acquisition.-Approximately 106,501 acres of land
for which fee title is to be acquired, and 11,207 for which flowage ease-
ments are to be acquired, are involved, of which title to 94,777 acres
and 9,666 acres, respectively, has been acquired, and 11,724 acres and
1,541 acres, respectively, are in process of acquisition. Condemnation
proceedings have been filed on all lands for the completion of the
project.
   Work remaining to complete the portion of the project in the Rock
Island district includes the following: Main lock and appurtenant
works at No. 19; guard walls, guide walls, and mooring facilities at
various sites; clearing in various pools; dredging in various pools to
obtain project depth and alinement; rectification of damages to drain-
age and levee districts; acquisition of land and flowage rights; and
miscellaneous items.
   The condition of the channel on June*30, 1942, was such that con-
trolling depths of 9 feet at low water and widths suitable for long-haul
common-carrier service were being obtained in all pools.
   The total costs and expenditures, under the existing project (Rock
Island district) to June 30, 1942, were as follows:

                                          Regular funds
                                              Regular
                                                  funds       Public Works
                                                                 funds             Emergency
                                                                                     lief fundsRe-         Total


Costs:
    New work__                          $38, 682, 310. 55
                           .......................            $17, 493,434.66      $11,338,864.90      $67, 514, 610. 11
    Maintenance ________ __________...    5, 078, 139. 40                                                5, 078, 139. 40
    Operating and care _________ ___      3, 131, 396. 11                    _                           3, 131, 396. 11
     Total costs ......       ...     .. 46, 891, 846. 06      17, 493, 434. 66     11, 338, 864. 90    75, 724, 145. 62
Expenditures -----------..               44, 301, 294. 90      17, 493, 434. 66     11, 338, 864. 90    73, 133, 594. 46

   1Includes the sum of $395,441.54 expended between 1930 and 1936 on the operating and care of the works
of improvement, under the provisions of the permanent indefinite appropriation for such purposes.
MISSISSIPPI RIVER BETWEEN MISSOURI RIVER AND MINNEAPOLIS                                                                    1029

   St. Louis district.-Locks and dams Nos. 24, 25, and 26 (Henry T.
Rainey Dam), and dikes and revetment at Wood River and Maple
Island have been completed. For information pertaining to locks and
dams, see table under paragraph "Existing project."
   Land and flowage acquisition.-Approximately 32,285 acres of land
in fee, and flowage easements over 5,265 acres are involved, of which
title to 32,240 acres and 4,285 acres, respectively, has been vested in
the United States. It is anticipated that acquisition of land and flow-
age easements will be completed by the end of fiscal year 1943.
   Work remaining to complete the portion of project in the St. Louis
district includes the following: Clearing in pools 24 and 26; construc-
tion of additional channel markers in all pools; rectification of dam-
ages to drainage and levee districts; and acquisition of land and
flowage rights in pools 25 and 26.
   The condition of the channel on June 30, 1942, was such that con-
trolling depths of 9 feet at low water and generally suitable widths
for long-haul common-carrier service were being maintained in all
pools.
   The total costs and expenditures under the existing project (St. Louis
district) to June 30, 1942, were as follows:

                                                                                                 lief fundsRe-
                                                      Regular funds        Public Works        Emergency                 Total
                                                                              funds

Costs:
   New work ____________-.......                      $14, 605, 349.82    $10, 282, 566. 31     $2, 440, 265. 65     $27, 328, 181. 78
   M aintenance___..............                        3, 635, 900. 98      -_____             ____            _      3, 635, 900. 98
   Operating and care__                                    770, 637. 20   __________________                  ___         770, 637. 20

     Total costs_         _______             -        19, 011,888.00      10, 282, 566. 31      2, 440, 265. 65      31, 734, 719.96
Expenditures . ....                     _
                          -_.............--       .    18, 989, 414. 48    10, 288, 566. 31      2, 440, 265. 65      31, 712, 246. 44



  The total costs and expenditures under the existing project, for the
three districts, to June 30, 1942, exclusive of $40,000 contributed funds
expended for new work, were as follows:

                                                      Regular funds        Public Works        Emergency   Re-           Total
                                                                              funds             lief funds


Costs:
    New work________________                          $72, 398, 800. 81   $51, 895, 959. 25    $22, 850, 344. 65    $147, 145, 104. 71
    Maintenance_______________________                 12, 857, 024. 12                                               12, 857, 024. 12
    Operating and care..                              1 7, 084, 710. 55                                                7, 084, 710. 55
      Total costs     _                                92, 340, 535. 48   .51, 895, 959. 25     22, 850, 344. 65     167, 086, 839. 38
Expenditures_                                          89, 794, 347.81      51, 895, 959. 25    22, 850, 344. 65     164, 540, 651. 71


  1 Includes the sum of $1,157,637.25 expended between 1930 and 1936 on the operating and care of the works
of improvement, under the provisions of the permanent indefinite appropriation for such purposes.

  In addition the sum of $1,579,507.38 was expended between 1888
and 1936 for operating snag boats, upper Mississippi River and tribu-
taries, under the provision of the permanent indefinite appropriation
for such purposes.
1030      REPORT OF CHIEiF OF ENGGINEERS,                   U. S. ARMY,        1942

  Proposed operations.-The balance unexpended including accounts
receivable at the end of the fiscal year, plus $94,557.15 covering work
in progress for other agencies, will be applied as follows:
Accounts payable, June 30, 1942          ___---------------------------             $415, 177. 21
New work:
   Lock and dam No. 2 (Hastings) (by contract) :
        Construction of landward lock masonry (con-
          tinuing contract) (July to October 1942)-_ $718, 500. 00
        Approach dredging (July 1942 to June 1943) __ 180, 000. 00
        Gates and machinery (August 1942 to July
          1943) ------------------------------------            150, 000. 00
        Central control station (September 1942 to
          June 1943)                                              30, 000. 00
                                                   __---------------------------
        Power, control and lighting (September 1942
          to August 1943) -----------------------               140, 000. 00
        Esplanade and access road (June 1943 to Sep-
          tember 1943) --------------------------
                         __                                       40, 000. 00
        Guide walls (September 1942 to July 1943)__ 300, 000. 00
        Approach dredging (July 1942 to June 1943)
           (hired labor) ---------------------------            200, 000. 00
        Design, etc. (hired labor) ------------------            43, 300. 00
                                                                                   1, 801, 800. 00
    Lock and dam No. 3 (Red Wing) (by hired labor) :
        Acquisition of land and flowage rights-. .110,                  600. 00
        Design, etc--------------------------------                  2, 200. 00
                                                                                     112, 800. 00
     Lock and dam No. 4 (Alma) (by hired labor) :
         Acquisition of land and flowage rights --- 33, 300. 00
         Design, etc-------------------------------     100. 00
                                                                                      33, 400. 00
     Lock and dam No. 5 (Minneiska)        (by hired
       labor) :
         Acquisition of land and flowage rights--                   14, 000. 00
         Design, etc_-----------------------------                   3, 000. 00
                                                                                      17, 000. 00
     Lock and dam No. 5A (Winona) (by hired labor) :
         Acquisition of land and flowage rights-....                15, 200. 00
         Design, etc--------------------------------                 3, 300.00
                                                                                      18, 500. 00
     Lock and dam No. 6 (Trempealeau) (by hired
       labor) :
         Resurfacing access road (June and July
           1943) (contract) _____________________     15, 000. 00
         Acquisition of land and flowage rights ...-- 62, 000. 00
         Design, etc -...                              3, 000. 00
                                                                                      80, 000. 00
     Lock and dam No. 7 (Dresbach) (by contract)
         Access road (March to July 1943)-----------                 4, 000. 00
         Design, etc. (hired labor) ___-__________                   3, 300.00
                                                                                        7, 300. 00
     Lock and dam No. 8 (Genoa) (by hired labor)
         Acquisition of land and flowage rights ----                 8, 000. 00
         Design, etc __________   __________                         3,000.00
                                                                                      11, 000. 00
     Lock and dam No. 9 (Lynxville) (by hired labor) :
         Acquisition of land and flowage rights------               59, 000. 00
         Design, etc_          ____________-______                   2, 600. 00
                                                                                      61, 600. 00
     Lock and dam No. 10 (Guttenberg) (by contract) :
         Remedial works (August 1942 to August
           1943)       -----------------------                      55, 000.00
         Design, etc. (hired labor) ------------------               2, 600. 00
                                                                                      57, 600.00
MISSISSIPPI RIVER BETWEEN MISSOURI RIVER AND MINNEAPOLIS                                    1031
New work-Continued.
   Lock and dam No. 11 (Dubuque) (hired labor) :
      Acquisition of land and flowage rights ---. $22, 300. 00
       Miscellaneous ----------------------------   5, 000. 00
                                                                                     $27, 300.00
   Lock and dam No. 12 (Bellevue) (hired labor) :
       Acquisition of land and flowage rights------                   15, 000. 00
       Miscellaneous -----------------------------                     5, 000. 00
                                                                                      20, 000. 00
   Lock and dam No. 13 (Clinton) (hired labor) :
       Rectification of damages (levee districts):
         Acquire low-lying land in Carroll County
         District No. 1 (Illinois)----------                      8,000. 00
       Acquisition of land and flowage rights .- __              59, 400. 00
       Miscellaneous             _-----------------------------_ 12, 000. 00
                                                                                      79, 400. 00
   Lock and dam No. 14 (LeClaire) (hired labor) :
       Rock excavation (July and August 1942) __-                     17, 200. 00
       Rectification of damages (levee districts):
         Acquire low-lying land in Carroll dis-
         trict (private) (Iowa) ------------------                     4, 000. 00
                                               --
       Acquisition of land and flowage rights_ ___                   193, 000. 00
       Miscellaneous------------------------------                    13, 000. 00
                                                                                    227, 200. 0(1
   Lock and dam No. 15 (Rock Island) (hired
     labor): Rock excavation (July and August
     1942)_ ---------------------------------------                                  10, 000. 0k
   Lock and dam No. 16 (Muscatine) (hired labor) :
     Rock excavation (July and August 1942) .. _ .10,                                     000. 00
   Lock and dam No. 17 (New Boston) (hired
     labor) :
       Acquisition of land and flowage rights         37, 100. 00
       Miscellaneous______________ -------             6, 000. 00
                                                                                     53, 100. 00
   Lock and dam No. 18 (Burlington)           (hired
     labor) :
       Acquisition of land and flowage rights .....                  29, 700. 00
       Miscellaneous__
                     -      _ ____             ___------------       10, 000. 00
                                                                                     39, 700. 00~
   Lock and dam No. 19 (Keokuk) (hired labor):
     Engineering and design of main lock and dry-
     dock                                                        -                   70,  000. 00
                                                                                     7--------------------------------
   Lock and dam No. 20 (Canton) (hired labor) :
       Dredging (September to December 1942)_                        50, 000. 00
       Miscellaneous_-------------------------                        2, 500. 00
                                                                                     52, 500. 00
   Lock and dam No. 21 (Quincy) (hired labor) :
       Acquisition of land and flowage rights                        59, 400. 00
       Miscellaneous ------------------------------                   6, 000. 00
                                                                                     65, 400. 00
   Lock and dam No. 22 (Saverton) (hired labor) :
       Acquisition of land and flowage rights--____ 104, 000. 00
       Miscellaneous ------------------------------   1, 000. 00
                                                                                    105, 000. 00
   Lock and dam No. 24 (Clarksville) (Rock Island
     district) (hired labor) :
       Rectification of damages (levee districts):
          Acquiring low-lying land in Riverland
            levee district___-------------------------50,    000. 00
       Acquisition of land and flowage rights_ _...     222, 700. 00
                                           (St. Louis                               272, 700. 00
   Lock and dam No. 24 (Clarksville)
     district) (hired labor) : Channel markers (July
     and August 1942)-_                 _-__                 -_                       2, 800. 00
1032    REPORT    OF CHIEF OF ENGINEERS,           U.   S. ARMY,         1942

New work-Continued.
   Lock and dam No. 25 (Cap au Gris) (hired
     labor) :
        Channel markers (July and August 1942)___          $2, 700. 00
        Rectification of damages to drainage and
         levee districts (July 1942 to June 1943)___       50, 000. 00
        Acquisition of land and flowage rights------        9, 900. 00
                                                                            $62, 600: 00
    Lock and dam No. 26 (Henry T. Rainey Dam)
      (Alton) (hired labor) :
        Channel markers (July and August 1942)-_       5, 000. 00
        Rectification of damages to drainage and
          levee districts (July 1942 to June 1943)__ 105, 000. 00
        Acquisition of land and flowage rights --_    72, 400. 00
                                                                            182, 400. 00
    General:
        Rectification of damages (levee districts)
          (hired labor) (Rock Island district) :
             Studies to determine damages ---------- $30, 000. 00
             Construction of ditches when needed---  100,000. 00
             Annuity payments for damages-.......     30, 000. 00
             Engineering, design, hydraulic studies,
               mapping, etc. (hired labor) (Rock Is-
               land district___ ________---------18,      000. 00
                                                                            178, 000. 00

                 Total new work--           _______-----------            3, 659, 100. 00

Maintenance (July 1942 to June 1943) :
   Channel maintenance dredging________               ___________           790, 100.00
    Maintenance of existing regulating works_____                            65, 000. 00
    Surveys, gages, studies and aids to navigation___                       106, 300. 00
    Snagging------------------    ----------------------------                8,100.00

       Total maintenance --------------                                     969, 50.o00
Maintenance (operating and care) (July 1942 to June 1943) :
    Operations ___--_-  ------------------------------                    1, 126, 300. 00
    Ordinary repairs_____________________________                            114, 500. 00
    Improvement and reconstruction                                           336, 400. 00

       Total operating and care                                           1, 577, 200. 00

Unallocated balance (see note below) -----------------------              1, 323, 842. 21

       Total regular funds_________________________________               7, 944, 819. 42
  NOTE.-The unallocated balance includes the sum of $1,295,500, covering items
of new work being deferred because of the war effort. These operations are
proposed for fiscal year 1944 and are included below.
  The sum of $12,677,000, inclusive of $1,295,500, available for new
work (indicated by asterisk) as stated in note above, can be profitably
expended during the fiscal year 1944 as follows:
New work:
   St. Anthony Falls (Minneapolis) : Design _____________------                 $200, 000
   Lock and dam No. 3 (Red Wing) :
       Guard and guide walls________________________       $200, 000
       Surfacing access roads_______________--_--_--- ____   15, 000
                                                                                 215, 000
     Lock and dam No. 4 (Alma) :
         Guard and guide walls_____ ___________________          200, 000
         *Modification of electrical system_____ _____- ___       11, 000
                                                                                 211, 000
MISSISSIPPI RIVER BETWEEN MISSOURI RIVER AND MINNEAPOLIS                                  1033
New work-Continued.
   Lock and dam No. 5 (Minneiska) :
       Guard and guide walls            __-------------------------       $200, 000
       *Modification of electrical system----------                         11, 000
       Stage recorder house--------------------------                        3, 000
                                                                                       $214, 000
     Lock and dam No. 5A (Winona) :
         Guard and guide walls-------------------------                    200, 000
         *Modification of electrical system -------------                   11, 000
                                                                                        211, 000
     Lock and dam No. 6 (Trempealeau) :
         Guard and guide walls_ -----------------------                    200, 000
         *Modification of electrical system -------                         11, 000
                                                                                        211,000
     Lock and dam No. 7 (Dresbach) :
         Guard and guide walls-------------------------                    200, 000
         Footbridge ------------------------------------                    12, 000
         *Modification of electrical system -------------                   11, 000
         Stage recorder house------------------------- --                    3, 000
                                                                                        226, 000
     Lock and dam No. 8 (Genoa) :
         Guard and guide walls-------------------------200,     000
         *Modification of electrical system ---------       11, 000
         Stage recorder hoQuse--------------------------     3, 000
                                                                                        214, 000
    Lock and dam No. 9 (Lynxville) :
        Guard and guide walls-----------------                             200, 000
        Stage recorder house--------------   ----------                      3, 000
                                                                                        203, 000
    Lock and dam No. 10 (Guttenberg) :
        Guard and guide walls_                                             200, 000
        *Modification of electrical system__                                11, 000
        Stage recorder house             ----------                          3, 000
                                                                                        214, 000
    Lock and dam No. 11 (Dubuque) :
        *Guide wall extension-------------------                            50, 000
          *Mooring facilities___         --------------                     20, 000
                                                                                         70, 000
    Lock and dam No. 12 (Bellevue) : Guard and guide walls, etc___                      285, 000
    Lock and dam No. 13 (Clinton) :
          Guard and guide walls, etc__                    -------         $220, 000
         *Clearing pool area_       --         -------------               325, 300
                                                                                        545, 300
    Lock and dam No. 14 (Le Claire) :
        Guide wall extension-------------------                             70, 000
        Removal of lateral dam------------------------                      50, 000
        *Clearing pool area---------------------------                     187, 000
                                                                                        307, 000
    Lock and dam No. 15 (Rock Island) : Guard wall _      __-__-_-__-                   200, 000
    Lock and dam No. 16 (Muscatine) :
        *Guide wall extension--------------------------      $50, 000,
        *Mooring levee and facilities -------------------     90, 000
                                                                      '                 140,000
    Lock and dam No. 17 (New Boston) : Guard and guide walls, etc_                      285, 000
    Lock and dam No. 18 (Burlington) :
        *Guide wall extension-----------------------   -- $50, 000
        *Mooring levee and facilities -------------------  80, 000
                                                                                        130, 000
    Lock and dam No. 19 (Keokuk) :
        Main lock------------------------------------ 3, 050, 000
        Drydock --------------------------------------   410, 000
        Power, control, and lighting ------------------- 200, 000
        Bridge alterations-----------------------------620, 000
        Esplanade ----------------------------------     110, 000
        Clearing pool area--------------     ------       35, 000
                                                                                      4, 425, 000
 1034        REPORT OF CHIEF OF ENGINEERS,                  U. S. ARMY,        1942

New work-Continued.
    Lock and dam No. 20 (Canton) :
        *Guide wall extension--------------------------    $50, 000
        *Mooring facilities--____------------- __       -__ 20, 000
                                                                                         $ 70, 000
        Lock and dam No. 21 (Quincy) :
            *Guide wall extension -- ________-- -- __              -____ 60, 000
             Mooring facilities___________-_________             ___     20, 000
                                                                                          80, 000
        Lock and dam No. 22 (Saverton) : Guard wall_           --                        200, 000.
        Lock and dam No. 24 (Clarksville) (Rock Island district) : *Ac-
          quisition of land and flowage rights_-------------------                        89, 000
        Lock and dam No. 24 (Clarksville) (St. Louis district) : Clearing_                37, 500
        Lock and dam No. 26 (Alton) :
            Clearing -------------------------------------- $280, 000
            *Clearing -------------------------------------       147, 200
                                                                                         427, 200
        General:
            St. Paul district: Miscellaneous design_                     50, 000
            Rock Island district:
                 Engineering and design studies___________               50, 000
                 Acquisition of flowage rights ---------------           41, 000
                 Rectification of damages (levee districts) :
                      Studies to determine damages_-----------           26, 000
                     Annuity payments for damages---------               38, 000
                                                                                         205, 000
                        Total new work____
                                         ----------              --       __   _     9, 615. 000
Maintenance:
        Channel   maintenance dredging______              ____         _____             803, 000
        Maintenance of existing regulating works--                                        65, 000
        Surveys, gages, studies, and aids to navigation_                                 117, 000
        Snagging _    _----     -                                                          4,000
      Total maintenance--------------                                                    999, 000
Maintenance (operating and care):
    Operations ---------------------------------                                    1, 112 000
   iOrdinary repairs    ------                                                         132, 000
        Improvement and reconstruction-------------                                  -   809, 00
        Emergencies_-----------------------------------                                   20, 000
          Total operating and care______--------------____                          2. 073.000
          Total for all work------------------------------------                   12, 677, 000
   It is expected that the proposed expenditures will complete the
project except for incidental work at various locks and dams in the
Rock Island district; payment of capitalized cost relative to rectifica-
tion of damages to drainage and levee districts; and extension of the
project above St. Anthony Falls.
                               Cost and financial summary
"Cost of new work to June 30, 1942 --------------------------    $196, 157, 750.              52
Cost of maintenance to June 30, 1942___ _____________---2 28, 414, 331.                       98
        Total cost of permanent work to June 30, 1942 .----...     224, 572,082.              50
Ijndistributed costs June 30, 1942_______________________               114, 223.             29
        Net total cost to June 30, 1942_________________________   224, 686, 305.             79
.Plus accounts receivable June 30, 1942 __________________--            237, 762.             66
        Gross total costs to June 30, 1942_________________        224, 924, 068.             45
Minus accounts payable June 30, 1942 ____________________               415, 177.             21
       Net total expenditures___________________________         2 224, 508, 891.             24
Unexpended balance June 30, 1942_______________________                        7, 612, 499. 61
        Total amount appropriated to June 30, 1942-----------12 232, 121, 390. 85
   1 Exclusive of $40,000 expended from contributed funds.
  ' Includes $5,863,584.26 from permanent indefinite appropriation of which $4,284,076.88
was for operation and care of locks and dams and $1,579,507.38 for operation of snag boats
and dredge boats.
             RIVERS AND HARBORS-ROCK                                   ISLAND, ILL.,              DISTRICT                   1035

Fiscal year ending June 30              1938                  1939               1940              1941                    1942

Cost of new work ....--.  ....     $23, 330, 225. 24     $10, 360, 688. 56 $5, 320, 981. 26 $3, 800, 330. 21         $3, 034, 135. 94
Cost of maintenance ...._            1, 799, 598. 59       1, 977, 318. 80  1, 993, 263. 95 1, 770, 898. 00           1, 885, 097. 63
      Total cost--..-----..         25, 129, 823.83       12, 338, 007. 36   7, 314, 245. 21   5, 571, 228. 21       4, 919, 233. 57
Total expended-............         25, 818, 311. 92      12, 971, 588. 56   7, 453, 869. 94   5, 030, 360. 46        5, 974, 688.87
Allotted--------------              34, 361, 885. 00       5, 388, 600. 06   4, 073, 552. 32   5, 339, 775. 00        2, 019, 300. 00



Balance unexpended July 1, 1941 ----------------------
                                   _                                                                    $11, 567, 888. 48
Amount allotted from War Department Civil
  Appropriation Act approved May 23, 1941__      $272, 800. 00
(Amount allotted from War Department Civil
  Appropriation Act approved Apr. 28, 1942 ____ 2, 029, 500. 00
                                                                                                            9       309     300     0
                                                                                                                ,      ,,   o, v.

      Amount to be accounted for_____                                                                      13, 870, 188. 48
Deductions on account of revocation of allotment ...........                                                   283, 000. 00
       Net amount to be accounted for______                                                                13, 587,188. 48
Gross amount expended_----    _____________ $6, 098, 369. 79
Less reimbursements collected--- $120,991.66
Less receipts from sales----------   2, 689. 26
                                                123, 680. 92
                                                                                                            5, 974, 688. 87

      Balance unexpended June 30, 1942__                                     _____._____                    7, 612, 499. 61
Outstanding liabilities June 30, 1942__________                               $728, 951. 17
Amount covered by uncompleted contracts ____                                 1, 168, 545. 48
                                                                                                             1, 897, 496. 65

     Balance available June 30, 1942___
                                     --------------------                                                   5, 715, 002. 96
Accounts receivable June 30, 1942_--------------------------                                                   237, 762.66

         Unobligated balance available June 30, 1942----------                                              5, 952, 765. 62

Amount (estimated) required to be appropriated for comple-
tion of existing project 3-----------------------------                                                   12, 708, 700. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1944:
     For new work             3-    ------------------                                                      8, 319, 500. 00
     For maintenance _                      __------------------------------------                          3, 062, 000. 00

         Total -------------                              -        -         ------------                  11, 381, 500. 00
  a Exclusive of available funds.

     IMPROVEMENT OF RIVERS AND HARBORS IN THE
             ROCK ISLAND, ILL., DISTRICT
   This district comprises portions of western Illinois, southwestern
Wisconsin, southern and southwestern Minnesota, eastern and cen-
tral Iowa, and northeastern Missouri, embraced in the drainage basin
of the Mississippi River and its eastern and western tributaries be-
tween mile 300 (above the mouth of the Ohio River) and mile 614,
and of its eastern tributaries only, between Hamburg Bay, at mile
261, and mile 300. This district also includes the Illinois and Mis-
sissippi Canal and the drainage basin of Bureau Creek, Ill.
   That section of the Mississippi River between mile 300 and mile
614 is included in the report of Mississippi River between Missouri
River and Minneapolis, Minn.
1036    REPORT     OF CHIEF OF ENGINEERS,             U.   S.   ARMY,   1942

  District engineer: Col. C. W. Ball, Corps of Engineer, to May 15,
1942; Lt. Col. W. J. Matteson, Corps of Engineers, acting district
engineer May 16 to 25, 1942, and district engineer since that date.
  Division engineer: Col. Malcolm Elliott, Corps of Engineers. Col.
R. W. Grower, Corps of Engineers, acting division engineer May
18-24, 1942.
                                      IMPROVEMENTS

               Navigation                            Flood control-Continued
                                       Page                                     Page
1. Mississippi River between                7. Union Township drainage
       the Missouri River and                     district, Missouri-.------    1045
       Minneapolis, Minn. (Rock              8. Sny Island levee district,
       Island district)-________       1018       Illinois ______      _______  1047
2. Illinois and Mississippi Canal,          9. Coralville Reservoir, Iowa__ 1048
       Ill-----------------            1036 10. Upper      Mississippi    River
3. Mill Creek and South Slough                   Basin, Rock Island dis-
       at Milan, Ill____               1041       trict_-     ______________    1049
4. Examinations, surveys, and              11. Preliminary examinations
       contingencies (general)___      1042       and surveys for flood con-
5. Plant allotment------------_       1043       trol     _________________    1050
                                            12. Other flood-control projects
              Flood control                       for which no estimates are
                                                  submitted--------------1051
6. Green Bay levee and drain-
      age district No. 2, Iowa___      1044

  1. For report on this improvement see page 1018.


                2. ILLINOIS AND MISSISSIPPI CANAL, ILL.

   Location.-This canal connects the Illinois and Mississippi Rivers,
proceeding from a point on the Illinois River about 12 miles from
La Salle, across the State of Illinois to the Mississippi River at the
mouth of Rock River.
   Existing project.-This provides for the construction of a canal
from the Illinois River, near Bureau Junction, running westerly via
the Bureau Creek Valley to Rock River, near Colona, thence in the
bed of Rock River to the rapids near Milan, Ill., and thence to the
Mississippi River at the mouth of Rock River, at Rock Island, the
length of the main line being 75 miles. The feeder, 29.3 miles in
length, extends from Rock Falls on Rock River to the summit level
of the canal, about 28 miles from the Illinois River.
   There are 32 locks in the main canal, described in the following
tabulation. There is also a lock and controlling works at the head
of the feeder at Rock Falls, and a lock in Rock River at Rock Falls
connecting the pool of the Government dam with the power com-
pany's dam below. This lock has dimensions similar to those in the
main canal and cost $75,000.
   The estimate of cost for new work, revised in 1902, was $8,911,-
551.12. The estimated cost of operation and maintenance, made in
1936, is $176,000 annually.
   The existing project was authorized by the following river and
harbor acts:
            RIVERS AND             HARBORS-ROCK                 ISLAND,        ILL.,    DISTRICT           1037

     Acts                         Work authorized                                      Documents


Sept. 19, 1890   Existing project adopted __                               H. Ex. Doc. Nos. 316 and 429, 51st
                                                      ....--------------------
                                                                              Cong., 1st sess., Annual Report, 1890
                                                                              p. 263.
                Estimate of cost for new work revised to $8,911,- H. Doc. No. 297, 57th Cong., 1st sess.
                 551.12.
June 26, 1934 1 Operation and care of the works of improvement
                 provided for with funds from War Department
                 appropriations for rivers and harbors.
July 3, 1930 For payment of $8,450.75 to the Mud Creek spe- H. Doc. No. 108, 70th Cong., 1st sess.
                 cial drainage district for work accomplished by
                 the said district.
    Do-....... Secretary of War authorized to expend from funds Specified in act.
                 appropriated and available for maintenance
                 and improvement of existing river and harbor
                 works the sum of $25,235 as a contribution to-
                 ward the relocation and reconstruction of the
                 highway bridge across the Illinois and Missis-
                  sippi Canal at Wyanet, Bureau County, Ill.,
                 known as Bridge No. 10.


  1 Permanent Appropriation Repeal Act.

    The latest published map is shown on page 2013 of Annual Report
for 1908.




         493202--43-pt. 1, vol. 1----66
                                                         Table showing features of the Illinois and Mississippi Canal
                                                                                                                                                                                                           CIO
                                                                                              LOCKS                                                                                                        0
                                                   Location                                                    Locks

                                                                                            Dimensions                  Depth on miter
                                                                                                                             sill
                            Dis-                                                                                                                                                                            0
        Name               tance                                                                                                           Character of foundation       Year opened      Total cost
                           from          Distance from nearest town or mouth of                  Great-                                                                 to navigation
                                                                                                                                                                                                            Fid
                           Missis-                 navigable tributary                   Width lenth                                                                                                        0
                           sippi                                                           of                                    Lower
                           River                                                         chain- avail-          Lift    Upper
                                                                                                  able   for

                                                                                              er full
                                                                                                 width

                                                                                                                                                                                                            0
                       Miles                                                              Feet     Feet        Feet      Feet     Feet
Lock   No.   1..____--__74.87        Illinois River, 2,000 feet west--- --------------       35   143.08         9.0      8.17      7.0 Sand and clay_________.......Oct. 24,1907              $41, 305.03
Lock   No.   2_....     73.91        At Bureau Junction----                          _       35   143.08         9.0      8.17      7.0 Sand, clay, and gravel ..- ------ do            -       42, 099.69
Lock   No.   3- .......
                    _   73.29        M   mile west of Bureau Junction----........            35   143.08         9.0     8.17       7.0 Quicksand and gravel -_ - _____-do .....                39,172.01
Lock   No.   4_.........71.75        2 miles west of Bureau Junction...                      35   143.08         9.0     8.17       7.0 Sand and gravel .........       -...    do.......       39, 357.10
Lock No. 5__._____
Lock No. 6..._______
                        70.63
                        68.75
                                     3 miles west of Bureau Junction--.
                                     5 miles west of Bureau Junction_
                                                                                  ----
                                                                                             35
                                                                                             35
                                                                                                  143.08
                                                                                                  143.08
                                                                                                                 8.0
                                                                                                                10.0
                                                                                                                          8.17
                                                                                                                          8.17
                                                                                                                                    7.0 _-- do .. . -                   .--..do........
                                                                                                                                    7.0 Sand, hardpan, and gravel_ _..do -..
                                                                                                                                                                                                39, 509.45
                                                                                                                                                                                        .-      41, 927.72
Lock No. 7......____    68.00        3 miles east of Tiskilwa.             ___________       35   143.08         8.0      8.17      7.0 Loam and sand _.......          ----   .do - .          35, 635.09
Lock No. 8 ____. -...   67.02        2 miles east of Tiskilwa_________                       35   149.75         8.0      8.17      7.0 __- do       _                  ----.do . ..    ..      36, 274. 37
             ______
Lock No. 9 ....         66.80        13 miles east of Tiskilwa .___                          35   149. 75        8.0      8.17      7.0 Clay_ -            -          -        _do ... ..       32, 134.93  00
Lock No. 10.._______ 64.98           At Tiskilwa_..-.-...............                        35   149. 75        9.0      8.17      7.0 Sand and gravel ___-                - do - - .          36,113.71
              ____
Lock No. 11 ....        64. 13       1 mile west of Tiskilwa_...._      __                   35   149.75         9.0      8.17      7.0 ..--do..-------------               - do . ....         36, 710. 05
Lock No. 12......... 63.56
Lock No. 13- .....      62.83
                                     1 4 miles west of Tiskilwa__ .
                                     3 miles west of Tiskilwa--- -
                                                                                             35
                                                                                             35
                                                                                                  149.75
                                                                                                  149. 75
                                                                                                                 8.0
                                                                                                                10. O
                                                                                                                          8.17
                                                                                                                          8.17
                                                                                                                                    7.0     -...
                                                                                                                                              do. - _-- - -
                                                                                                                                    7.0 Loam and clay .- __-.
                                                                                                                                                               - - - -   -      do --
                                                                                                                                                                              -do . .           33, 827. 14
                                                                                                                                                                                                32, 294.88
                                                                                                                                                                                                            (12
Lock No. 14-____..__ 62.02           3 miles east of Wyanet           ___________            35   149. 75       10.0      8.17      7.0   Sand  and gravel-........      ..   ..do .----_       31, 524. 90
Lock No. 15 ________
Lock No. 16_...____
                        61.42
                        61.23
                                     23/4 miles east of Wyanet_______
                                     2 miles east of Wyanet __________________
                                                                                             35
                                                                                             35
                                                                                                  149. 75
                                                                                                  149. 75
                                                                                                                10.0
                                                                                                                11.
                                                                                                                          8.17
                                                                                                                          8.17
                                                                                                                                    7.0  ---- do________
                                                                                                                                    8.0 Loam, clay, and sand ....
                                                                                                                                                                        .....   do -- .
                                                                                                                                                                             _- do -- .
                                                                                                                                                                                                29, 974. 01
                                                                                                                                                                                                34, 089. 19
Lock No. 17____...___   60. 98       13%miles east of Wyanet____________________             35   149. 75       10.0      8.17      7.0 Sand and gravel .......... ----.        d o - -.        32, 576. 27
Lock No. 18_ -____      59.90        1 mile east of Wyanet_________________________          35   149. 75        9.0      8.17      7.0 Clay and gravel           -_        . .do ....          35, 372.69
Lock No. 19 ____....__ 59.12         A t W yanet----...... ........ ........ .....           35   149.75        10.0      8.17      7.0 Sand and gravel ..........            _do       ..                   1
                                                                                                                                                                                                34, 239.36
Lock No. 20_...__.__ 58.09           1 mile west of Wyanet ______                            35   149.75        11.0      8.17      7.0 Loam, clay, and sand . --.....          d o -- .....    36, 838. 76
Lock No. 21.________
Guard lock..._______
                        57. 83
                        29.20
                                     13 miles west of Wyanet______________________
                                     29 miles north main-line canal 1 .      -               35
                                                                                             35
                                                                                                  149. 75
                                                                                                  149.00
                                                                                                                11. O
                                                                                                                 (2)
                                                                                                                          8.17
                                                                                                                          8.30
                                                                                                                                    8.0  -----do ... .................
                                                                                                                                    6.5 Limestone................ .....
                                                                                                                                                                         ---do
                                                                                                                                                                         .....      ----..
                                                                                                                                                                                do .... ..
                                                                                                                                                                                do ......
                                                                                                                                                                                                38, 026. 88
                                                                                                                                                                                                32, 678. 57
Rock River lock 3a      29.20        At Rock Falls, Ill.1___________                         35   143.08        (2)       8.47      6.6 ----- do---------------------                           75, 605.01  CO
Lock No. 22_........    46. 32       13 miles west of Wyanet____                             35   143.08          9.0     8.17      7.0 Clay _-_                                do ...          42, 458. 63
Lock No. 23 _________
               ......   37. 12       10 miles east of Geneseo____                            35   143.08         11.0     8.17      7.0 _---do -
                                                                                                                                                                         ----
                                                                                                                                                                                do__ ..
                                                                                                                                                                                do ....
                                                                                                                                                                             .__do    ... .     41,777.95
Lock No. 24.......________
                        27.05        A t Geneseo---..... ...... ....... ...... ....          35   143.08         11.0     8.17      7.0 Clay and gravel .--- ___-.                              47,059.15
Lock No. 25 ..______    21.56        5; miles west of Geneseo_____..                         35   143.08          8.0     8.17      7. O0 Sand__ . . .                     .... do .......      40, 492. 10
Lock No. 26 ... ____    20.46        5 miles east of Colona_...                              35   143.08          9.0     8.17      7.0 .do.do          .               _....   do........      40, 428. 75
Lock No. 27......______ 18.13        24 miles east of Colona-s --. --------.---              35   143.08          8.0     8.17      7.0 Gravel----------------                                  39, 090.66
Lock   No.   28 ...---------... 15. 70   At Colona____  ..---------...       --------------                35       143. 08         8. 0        8. 17              7.0O Rock...----------------- Oct. 24,1907                                   $30,808.53
Lock   No.   29 _---------13.37          2Y miles west of Colona_            --------------                35       143.08         11.0         8.17               7.0     ..... do. _.._..-                     -    -      do       .---       37, 262. 65
Lock   No.   30 ........         4. 62   1 miles east of Milan_____          --------------                35       149.00          0           7. 00              7.0 Rock, etc., hardpan-...... ..... _do                                      71, 588. 00
Lock   No.   31 ........         2 02    1 mile west of Milan .....          ---------------               35
                                                                                                           35
                                                                                                                    145.42
                                                                                                                    143. 08
                                                                                                                                    6. O
                                                                                                                                   12.0
                                                                                                                                                7.17
                                                                                                                                                8.00
                                                                                                                                                                   7. O Clay and gravel-----------
                                                                                                                                                                   7.   - do----------------- do
                                                                                                                                                                                                        do------- -  --                          38, 711.44
Lock   No.   32 ........          . 15   3/zmiles west of Milan_             --------------                                                                                                                                                      85, 468.31
       Total cost of
        locks-     ..         ....                                           --------------      --             -        --   --           --                                                                                                1,382, 432. 98
                                                                                                                                                                                                                                                                        C
                                                                                                                                                                                                                                                                        00

                                                            ADDITIONAL FEATURES ENTERING INTO COST OF PROJECT
                                                                                                                                                                                                                                                                        H
Sterling Dam and dams at Milan, Ill__                                                                                                                                              -       -       -----------                                $128,857.97
Bridges-------    ----------------- ----------------- --------------------------                                                                                    --    1,513,823.25
Culverts. _...... ...           . . . . . . . . . . . . . . .-.- . . --.....                            ------------------- --------------   - --                            410,198,19                                                                                   0
Houses---------------------------------------------------------------------------------------------------------------------------                                             76,974.69                                                                                 W


                                          . . . . . . . . . . . . . . .
Surveys, flow age, and right-of-w ay-.-.--____.......                                  ........ ....... ........ ....... ....... ........ ....... ....... "_.. ....-----.
                                                                                      ......                                                                                 726, 656 61                                                                                I2
Excavations, embankments, clearing, fences, etc-..        .          .       .                         --                                      .-                         2, 956, 451. 61
Rock River pool-Dredging, removing snags and stumps, etc.                                                                                              ...........-          152, 439. 58                                                                               (1
Contribution to Mud Creek special drainage district-dredging                                                                                                                   8, 450. 75
Contribution to State of Illinois-Relocation and reconstruction of highway bridge at Wyanet, Ill       -------------------------------------------------------                25, 235. 00                                                                               00
Miscellaneous---------------------                                ------------------             --------                                               --------                                                                             -223,    622. 78
                                                                                                                                                                                                                                                     ,-----------------

       Total additional features ......- ..              . -. .                              -                                                                 --------                                                                      6,222,710.43
                                                                                                                                                                                                                                                 2. 7.---------------------------..
                                                                                                                                                                                                                                             6...........           O


                                                                                                                                                                                                                                                                        I
       Total cost of project.----------------------                               -      -       -------                                        --         -       -      --   -       -   -   -   -     -.          -----        .          7,605,143. 41
   1 Feeder section.
   2Variable.                                                                                                                                                                                                                                                           H

   s Rock River lock is on Rock River at Rock Falls, Ill. It is located in the south end of the Sterling Dam and about 600 feet below the guard lock of the Illinois and Mississippi
Canal (feeder section).                                                                                                                                                                                                                                             r
    NoTE.--There are no dams except at the guard lock and lock 30. At the former locality there is a fixed dam across the Rock River, with a movable crest constructed of wood,
concrete, and steel; at lock 30 there are crib dams across the north and south channels of Rock River. The north dam has a 60-foot opening and has been superseded by a concrete
power dam a short distance below; the south dam adjoining lock 30 has been reinforced with concrete laid in the water.                                                                                                                                                  dc




                                                                                                                                                                                                                                                                        dj




                                                                                                                                                                                                                                                                    I.3


                                                                                                                                                                                                                                                                        0D
1040      REPORT         OF CHIEF OF ENGINEERS,                U.   S. ARMY,         1942

   Local cooperation.-Fully complied with.
   Terminal facilities.--None.
   Operations and results during fiscal year.-The work done during
the fiscal year consisted of reconstruction of lower gates at lock No.
21; repairs to bridges, buildings, telephone lines, roadways, and
fences; painting tower, gates, and bridge of dam in Rock River at
Sterling, Ill., and bridges over canal; cleaning out culverts, aque-
ducts, and seep ditches, and performing maintenance dredging in
Rock River pool. Work was in progress on the repair of lock No. 12
and aqueduct No. 2, 13/4 miles west of Tiskilwa, Ill., which were dam-
aged by failure of foundation on May 19, 1942. The costs during
the fiscal year were $173,738.23 for operating and care. The expend-
itures were $177,150.73.
   Conditionat end of fiscal year.-The existing project was completed
in 1918. With the exception of lock No. 12 and aqueduct No. 2, which
are being repaired, all locks, dams, aqueducts, buildings, and other
appurtenances are in fair condition. The project depth of the chan-
nel is 7 feet. The bottom width of the canal is 52 feet and width
at the water surface is 80 feet, except at aqueducts where the width
is 40 feet, and at locks 35 feet.
   The total cost to June 30, 1942, from regular funds was $8,642,-
489.31, of which $7,580,143.41 was for construction and $1,062,345.90
was for operation and care. The expenditures were $8,624,306.91.
The costs and expenditures from Emergency Relief funds for removal
of snags and stumps in Rock River pool were $25,000, all new work.
In addition, the sum of $4,143,282.27 was expended between April
1895 and June 30, 1936, on the operating and care of the works of im-
provement under the provision of the permanent indefinite appropria-
tion for such purposes.
   Proposed operations.-The unexpended balance at the end of the
year will be applied as follows:
Accounts payable, June 30, 1942                                 ____-----------
                                                                             $16, 557. 40
Maintenance (operating and care) :
    Operations----------------------------                    $60, 000. 00
    Ordinary repairs             ----------------------------- 60,000. 00
    Improvement and reconstruction-----------------             54, 479. 07
                                                                             174, 479. 07
      Total------------------------------------------                        191, 036. 47
  The additional sum of $290,000 can be profitably expended for op-
erating and care of the canal during the fiscal year 1944, as follows:
Operations       ------------------------------------------------                           $60, 000
Ordinary repairs_____________---------------------__       -----------------------           90, 000
Improvements and reconstruction__                    ----------------------
                                                                         _--_               140,000
        Total_____________________--------------------------                         ---    290,000

                                   Cost and flnanoial summary
Cost of new work to June 30, 1942 -------------------------                          $7, 605, 143. 41
Cost of maintenance to June 30, 1942________ _______----------                        5, 205, 628. 17
       Total cost of permanent work to June 30, 1942___       ------                 12, 810, 771. 58
Undistributed costs June 30, 1942_________-________----------                            -1, 625.00
      Net total cost to June 30, 1942__-__________-_---------                        12, 809, 146. 58
Minus accounts payable June 30, 1942------                                                16, 557. 40
      Net total expenditures -------------------------     -- 12, 792, 589. 18
Unexpended balance June 30, 1942_-   _____________-------------191. 036. 47
      Total amount appropriated to June 30, 1942 __-------    12, 983, 625. 65
                RIVERS AND HARBORS-ROCK                           ISLAND,          ILL.,    DISTRICT            1041

   Fiscal year ending June 30               1938           1939             1940              1941             1942

Cost of new work_
Cost of maintenance                 _    $179, 242. 75   $89, 762. 06   $190, 311. 57      $176, 272. 18     $173, 738. 23
Total expended            .-..........    184, 636. 13    83, 455. 60    181, 929. 91       178, 047. 08      177, 150. 73
Allotted    -         -        --         283, 000. 00   175, 000. 00    175, 000. 00       186, 000. 00      162, 850.00



Balance unexpended July 1, 1941 __      -                       $205, 337. 20
                                               -_____________________
Amount allotted from War Department Civil Appro-
  priation Act approved May 23, 1941____________ $7, 850. 00
Amount allotted from War Department Civil Appro-
  priation Act approved Apr. 28, 1942___________ 155, 000. 00
                                                                 162, 850. 00
       Amount to be accounted for______                                                                    368, 187. 20
Gross amount expended_________________________                               $178,040.21
Less reimbursements collected                                                     889. 48
                                                                                                           177, 150. 73
      Balance unexpended June 30, 1942______________________                                               191, 036. 47
Outstanding liabilities June 30, 1942__________________________                                             18, 008. 72
           Balance available June 30, 1942___ ______                      ____________                     173, 027. 75

Amount that can be profitably expended in fiscal year ending
June 30, 1944, for operating and care 1________________________                                           290, 000. 00
   1 Exclusive of available funds.

                3. MILL CREEK AND SOUTH SLOUGH AT MILAN, ILL.

   Location.-Mill Creek empties into South Slough about 1 mile
east of the town of Milan, Ill., and 6.5 miles above the mouth of South
Slough, which empties into the Mississippi River.
   Previous projects.-Adopted by the River and Harbor Act of Jan-
uary 21, 1927. (For further details see p. 1132, Annual Report for
1932, and p. 1081, Annual Report for 1938.)
   Existing project.-This provides for floodgates in the walls of the
canal, or other devices for carrying the floodwaters of Mill Creek across
the canal right-of-way into Rock River; for the construction of a
levee on the east bank of Mill Creek extending from the Chicago,
Rock Island & Pacific Railroad to the canal embankment; for the
construction of a levee on the west bank of Mill Creek and its exten-
sion in a westerly direction to a connection with Water Street at the
point E, shown on map in prbject document; and for the removal
of obstructions in Mill Creek and South Slough, at an estimated
cost of $87,500 for new work and $2,000 annually for maintenance.
   The existing project was adopted by the River and Harbor Act
approved July 3, 1930 (Rivers and Harbors Committee Doc. No. 19,
71st Cong., 2d sess.). The latest published map is in the project
document.
   Terminal facilities.---None.
   Operations and results during fiscal year.-The work done during
the fiscal year consisted of maintenance dredging in the mouth of Mill
Creek; cutting brush and weeds on banks of Mill Creek and South
Slough and operating spillway gates. The cost of the work was
$2,349.44 for maintenance. The expenditures were $2,349.44.
1042         REPORT OF CHIEF OF ENGINEERS,                          U. S. ARMY,                 1942

   Conditionat end of fiscal year.-The existing project was completed
in 1932. At the end of the fiscal year the project was in good condi-
tion. The total cost under the existing project to June 30, 1942, was
$81,105.37, of which $63,633.58 was for new work and $17,471.79 was
for maintenance. The expenditures were $81,105.37.
   Proposed operations.-The unexpended balance, $2,528.21, will be
applied to minor dredging and snagging to maintain channel.
   The additional sum of $2,000 can be profitably expended during the
fiscal year 1944 for maintenance operations.
                                     Cost and financial summary

Cost of new work to June 30, 1942_--------------------------------                                    $63, 718. 82
Cost of maintenance to June 30, 1942, ___.__ __ ___     -     ____                                     17, 471. 79

         Total cost of permanent work to June 30, 1942-------------81, 190. 61

Net total expenditures--- ---------                              81, 190. 61
Unexpended balance June 30, 1942---------------------------------2, 528. 21
         Total amount appropriated to June 30, 1942---------------                               _     83, 718. 82

   Fiscal year ending June 30          1938         1939             1940                1941             1942


Cost of new work__
Cost of maintenance     _.      ._    $1, 504. 27    $908. 94       $3, 500. 83         $1, 208. 31       $2, 349. 44

Total expended   -1,                     250. 11    1,098. 10        3, 565. 83          1, 208. 31        2, 349. 44

Allotted__                             4, 000.00    2, 000. 00       2, 000. 00          2, 000. 00        2, 000. 00



Balance unexpended July 1, 1941__----                      --                                          $2, 877. 65
Amount allotted from War Department Civil Appropriation Act ap-
proved April 28, 1942_-----------------   ------                                                       2, 000. 00

        Amount to be accounted for__                           --                                       4, 877. 65
Gross amount expended---- --------------------------------------                                        2, 349. 44

      Balance unexpended June 30, 1942--------------------------2, 528. 21
Outstanding liabilities June 30, 1942 ----                         100. 00
        Balance available June 30, 1942_                   ------                       _____           2, 428. 21

Amount that can be profitably expended in fiscal year ending June 30,
  1944, for maintenance 1                                               --        ---                   2--
                                                                                                         , 000. 00
  1 Exclusive of available funds.

     4. EXAMINATIONS, SURVEYS, AND CONTINGENCIES-GENERAL

  The cost of work during the year amounted to $27,651.94; the ex-
penditures were $28,062.04. The balance unexpended June 30, 1942,
$5,665.95 will be applied as needed during the fiscal year 1943 to pay-
ment of expenses incurred under this heading. The additional sum
of $30,000 can be profitably expended during the fiscal year ending
June 30, 1944.
              RIVERS              AND HARBORS-ROC'K ISLAND, ILL.,                            DISTRICT             1043
                                         Cost and financial summary

Cost of new work to June 30, 1942__._______________-___-__-
                                                    ---- ______
                                                                                                           -----------
                                                                                                           $580, 202. 11
Cost of maintenance to June 30, 1942_--________----
      Total cost of permanent work to June 30, 1942____-              580, 202. 11
                                                                -______
Undistributed costs June 30, 1942________________________________       -127. 22
           Net total cost to June 30, 1942_----------                                                       580, 074. 89
Minus accounts payable June 30, 1942                     --------------------            _      _             1, 295.43
           Net total expenditures_________---_______---------                                    _          578, 779. 46
Unexpended balance June 30, 1942________________------------                                                  5, 665. 95
           Total amount appropriated to June 30, 1942______________                                         584, 445. 41

   Fiscal year ending June 30               1938            1939            1940              1941              1942

Cost of new work ......
Cost of maintenance-.............         $39, 132. 24    $36, 635. 92    $47, 556.09    $22, 767. 66          $27, 651. 94
Total expended--...                        35, 585. 75     36, 548. 14     48, 650. 97       23, 069. 25        28, 062. 04
Allotted                                   61, 000. 00     43, 200. 00     42, 000. 00       15, 000. 00



Balance unexpended July 1, 1941___ _________-----------$33,                                                     727.99
Gross amount expended_________ _________________     $31, 553. 32
Less reimbursements collected____- ____----    ----_   3, 491. 28
                                                                                                             28, 062. 04

      Balance unexpended June 30, 1942-----           ----                                                    5, 665. 95
Outstanding liabilities June 30, 1942______________________________                                           2,103. 10

           Balance available June 30, 1942______________________--_                                           3, 562. 85

Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance 1- -- - - - - - - - - - - - -- - - - - - - - - - - - - - - -_ _                   30, 000. 00
   1 Exclusive of available tunds.

               5. PLANT ALLOTMENT, ROCK ISLAND, ILL., DISTRICT

                                         Cost and financial summary
Undistributed costs June 30, 1942                                               -- _____ $1, 770, 100. 27
                                                                            -___________________
Net total cost to June 30, 1942                                                                       1, 770, 100. 27
                                                                                                      1______________________
Plus accounts receivable June 30, 1942__________------___                                _____           376, 539. 96
     Gross total costs to June 30, 1942 ------------------- _ 2, 146, 640. 23
Minus accounts payable June 30, 1942 ._____-__________________ 135, 466. 33
     Net total expenditures ________-__-_______-----___                                               2, 011, 173. 90
                                            ----
Unexpended balance June 30, 1942 _________________________                                                49, 092. 02
           Total amount appropriated to June 30, 1942                       _____________             2, 060, 265. 92

   Fiscal year ending June 30               1938            1939            1940              1941              1942

Total expended---_                       $708, 909. 97   -$1, 388. 93    -$2, 575. 63 -$102, 301. 98          $250, 651. 47
Allotted              - - -   -      -    705, 401.84    -39, 200.00       25, 000. 00   -47, 953. 77          223, 000.00
1044      REPORT OF CHIEF OF ENGINEERS,                        U.   S. ARMY,        1942

Balance unexpended July 1, 1941____$------- _____         -_____ $76, 743. 49
Amount allotted from War Department Civil Appropriationi Act
  approved May 23, 1941-----------------------------------       223, 000. 00

       Amount to be accounted for----------------------------                           299, 743. 49
Gross amount expended __....      _______ - __-     $2, 460, 359. 03
Less :
    Reimbursements collected-- $2, 142, 298. 76
    Receipts from sales-____-----       67, 408. 80
                                                     2, 209, 707. 56
                                                                                        250, 651. 47

      Balance unexpended June 30, 1942------------------------                           49, 092. 02
Outstanding liabilities June 30, 1942_ --------------------------                       260, 919. 33

                                     ----------------------
      Balance available June 30, 1942_                                               -- 211, 827. 31
Accounts receivable June 30, 1942_ _____         _      __              ______          376, 539. 96

       Unobligated balance available June 30, 1942--------------_                        64, 712. 65

Status of all investigations for navigation called for by river and lharbor acts
                           and committee resolutions


         Locality               Authorization
                                    act              Date trans-
                                                      mitted to        Document
                                                                        number         Recommenda-
                                                                                           tion
                                                      Congress

Des Moines River, Iowa,      River and Harbor Act, ......-----------------------------------
construction of dam at or    June 20, 1938.
near Madrid, for naviga-
tion and flood control.


        6. GREEN BAY LEVEE AND DRAINAGE DISTRICT NO. 2, IOWA

   Location.-The work covered by this project is on the right banks
of the Skunk River and Mississippi River, Lee County, approxi-
mately 387-396 miles above the mouth of the Ohio River.
   Existing project.-The plan of improvement provides for the recon-
struction of a system of levees consisting of the following features:
About 8.9 miles of main river levee, 7.3 miles of levee along Skunk
River, 1.7 miles of levee along Lost Creek involving the placing of
200,000 cubic yards of earthwork; excavation of four cut-off channels
for Skunk River and construction of four earth dams across the
present channel of Skunk River, involving the removal of 242,900
cubic yards of earth and placing of 48,550 cubic yards of earth,
respectively. The project will provide protection for 13,337 acres
of farm land. The existing project was authorized by the Flood
Control Act approved June 22, 1936. The estimated cost of new work
revised in 1941, is $139,500 for construction. The estimated cost of
lands and damages is $1,400 for lands and $1,200 for damages.
   Local cooperation.-See page 5 for requirements. Assurances
were approved by the Secretary of War on June 11, 1940. Rights-of-
way for the Skunk River section were approved on June 7, 1940.
Rights-of-way for the Mississippi River section have not been
received.
   Operations and results during fiscal year.-The work done during
the fiscal year consisted of preliminary work in connection with
right-of-way survey, design, and plans for the Mississippi River sec-
tion. The costs during the fiscal year were $4,036.16 for new work.
The expenditures were $9,728.76.
               RIVERS      AND HARBORS-ROCK ISLAND, ILL., DISTRICT                                                            1045
   Condition at end of fiscal year.-Construction work on the Skunk
River section has been completed; work on the Mississippi River sec-
tion has not been started pending fulfillment of requirements of local
cooperation. The total costs to June 30, 1942, were $71,050.59 for
new work. The expenditures were $69,665.73.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $47,134.27, will be applied to accounts payable June 30,
1942, $1,279.86, and to raising and enlarging existing levee system
along the Mississippi River by contract, $45,854.41.
   No operations are proposed during the fiscal year 1944.
                                       Cost and financial summary

Cost of new work to June 30, 1942---------------------------$71, 050. 59
Cost of maintenance to June 30, 1942-.............
      Total cost of permanent work to June 30, 1942                                                  ------               71, 050. 59
Undistributed costs June 30, 1942__                                                                                        -105. 00
         Net total cost to June 30, 1942----------------------------                                                      70, 945. 59
Minus accounts payable June 30, 1942                                      _.        .-----                  ___            1, 279. 86

     Net total expenditures_______  ________________                                                                     69, 665. 73
Unexpended balance June 30, 1942-------------------------------                                                          47, 134. 27
         Total amount appropriated to June 30, 1942--                                                       ___          116, 800.00


    Fiscal year ending June 30                1938               1939                   1940                1941             1942

Cost of new work____............               $151. 83        $3, 772. 30             $1, 675. 46        $61, 414. 84       $4, 036. 16
C ost of m aintenance                  -.  .-.- ..
                                 _____________            . .. . .. . .. . .. . . .. . .. . .. . .. . .. . .. . .. . .
Total expended ____________...                                   3, 875. 59             1, 261. 79         54, 799. 59        9, 728. 76
Alotted ----              ..------------------
                                          100, 000. 00      ------                                        32, 500. 00        49, 300.00


Balance unexpended                July 1, 1941             _                   --                     _            _      $7, 563. 03
Amount allotted from War Department Civil Appropria-
priation Act approved July 19, 1937----------------$2, 700. 00
Amount allotted from War Department Civil Appropria-
tion Act approved June 28, 1939_-------------__     46, 600. 00
                                                                                                                          49, 300. 00
      Amount to be accounted for---- -------------------------                                                           56, 863.03
Gross amount expended---------------------------------                                                                    9, 728. 76
      Balance unexpended June 30, 1942-------------------------47, 134.27
Outstanding liabilities June 30, 1942------------------------__  2, 200. 79
         Unobligated balance available June 30, 1942----------------                                                      44, 933.48
Amount (estimated) required to be appropriated for completion of
    existing     project 1-----------------                                                                              22, 700. 00
   1Exclusive of available funds.

            7. UNION TOWNSHIP                        DRAINAGE DISTRICT, MISSOURI

  Location.-The work covered by this project is on the west bank
of the Mississippi River in Lewis County, Mo., opposite and upstream
from Quincy, Ill., 331 to 335 miles above the mouth of the Ohio
River.
1046        REPORT OF CHIEF OF ENGINEERS,                                 U. S. ARMY,            1942

   Existing project.-The plan of improvement provides for the im-
provement of 3.2 miles of river front levee and 5.9 miles of cross
levees, including the placing of 250,000 cubic yards of earthwork, to
provide protection against a recurrence of the maximum flood of
record to 5,037 acres of farm land. The existing project was se-
lected and approved by the Chief of Engineers for construction under
the general authorization for the Upper Mississippi River Basin
contained in the Flood Control Act approved June 28, 1938. The
estimated cost of new work revised in 1941 is $70,800 for construc-
tion. The estimated cost of lands and damages is $2,300.
   Local cooperation.-See page 5 for requirements. Assurances
and rights-of-way for all sections except a portion of the Durgans
Creek levee were approved by the Acting Secretary of War on
September 8, 1941.
   Operations and results during fiscal year.-The work done during
the fiscal year consisted of the placing of 156,900 cubic yards of
earthwork in levee embankments in the Oyster Creek and Mississippi
River sections by Government plant and hired labor. The costs dur-
ing the fiscal year were $43,848.07. The expenditures were $43,710.26.
   Condition at end of fiscal year.-Construction work on the Oyster
Creek and Mississippi River sections has been completed; work on
the Durgans Creek section has not been started. The total costs to
June 30, 1942, were $50,209.55 for new work. The expenditures were
$50,066.58.
   Proposed operations.-The unexpended balance at the end of the
year, $354.06, will be applied to accounts payable June 30, 1942,
$124.97, and as needed during the fiscal year 1943 to payment of
expenses incurred under this heading.
   No operations are proposed during the fiscal year 1944.
                                      Cost and financial summary

Cost of new work to June 30, 1942____----------------------------                                      $50, 209. 55
Cost of maintenance to June 30, 1942_
      Total cost of permanent work to June 30, 1942____________ _ 50, 209.55
Undistributed costs June 30, 1942-------------------------------    -18. 00

      Net total cost to June 30, 1942--------________________ __                                        50, 191. 55
Minus accounts payable June 30, 1942 __________________________                                             124. 97
     Net total expenditures__________________________                                                   50, 066. 58
Unexpended balance June 30, 1942 ______________________________                                             354. 06

         Total amount appropriated to June 30, 1942_________________                                    50, 420. 64

    Fiscal year ending June 30                1938        1939              1940          1941             1942

Cost of new work___ ..........            .   .....              $750      $4, 971. 05     $640. 43       $43, 848.07
Cost of maintenance----------........................................................
Total expended                ---------
                          --------                -----           750       4, 908. 78      697. 54        43, 710.26
Allotted....--------------------- --------------           58, 750 --------------        12, 070. 64     -; 20, 400. 00
             RIVERS AND HARBORS-ROCK ISLAND, ILL., DISTRICT                                                    1047
                                   -------
Balance unexpended July 1, 1941_______________                                                           $64,464.32
Deductions on account of revocation of allotment                                 ___-------               20, 400. 00

      Net amount to be accounted for__ _________-------44,                                                    064. 32
Gross amount expended- --- ____--_---_---_____ $43, 733.31
Less reimbursements collected_ ____ _____ _______     _    23. 05
                                                                                                          43, 710. 26
      Balance unexpended June 30, 1942:----- -----------                                                      354. 06
Outstanding liabilities June 30, 1942____--------------------                                                 354.06

Amount       (estimated)        required        to be appropriated for completion
   of   existing                       -------------------------------------
                      project ________________--                                                          20, 400. 00
   ' Exclusive of available funds.

                      8. SNY ISLAND LEVEE DISTRICT, ILLINOIS

   Location.-The work covered by this project is on the left bank of
the Mississippi River, in Adams, Pike, and Calhoun Counties, Ill.,
approximately 262-316 miles above the mouth of the Ohio River.
   Existing project.-The plan of improvement provides for the en-
largement of 2.8 miles of river-front levee, extension of existing
levee 1,200 feet to high ground, and the construction of 1.04 miles
of set-back levee, involving the placing of 191,000 cubic yards .of
earthwork, to afford protection to 110,000 acres of farm land and the
town of Hull, Ill. The existing project was authorized by the Flood
Control Act approved June 22, 1936. The estimated cost of new
work, revised in 1940, is $64,100 for construction. The estimated
cost of lands and damages is $760.
   Local cooperation.-Fully complied with.
   Operations and results during fiscal year.-The work done during the
fiscal year consisted of the placement of 17,050 cubic yards of earth-
work in banquette in Mississippi River section of levee between stations
109 and 120 and stations 260+ 50 and 286+ 75 by contract. The costs
during the year were $7,067.23. The expenditures were $7,110.61.
   Condition at end of fiscal year.-The levees are in good condition.
The completed works were turned over to the local interests for main-
tenance on September 4, 1941. The total costs and expenditures to
June 30, 1942, were $61,400.
   Proposed operations.-None. The project has been completed and
turned over to local interests for maintenance.
                                      Cost and financial summary

Cost of new work to June 30, 1942______________________________
                                                              --                                         $61, 400. 00
Cost of maintenance to June 30, 1942

      Total cost of permanent work to June 30, 1942_-----------_      61,400. 00
Net total expenditures__----_____-------- -    ----              _61,    400. 00
Total amount appropriated to June 30, 1942--------------------- 61, 400. 00

   Fiscal year ending June 30            1938               1939          1940              1941             1942

Cost of new work---------        -_     $1, 269. 04       $50, 675. 52   $1, 928. 54          $459. 67       $7, 067. 23
Cost of maintenance                 ------------      ---------------- ----------      --------------------
Total expended--...--..-    -- --        1, 269. 04       30, 522.86     22, 072.06            425. 43        7, 110. 61
              ---
Allotted-- ...........
                  __             .      77,850.00         -6,850.00 1 -6,900.00                    ---       --------
                                                                                                            -2,700.00
1048     REPORT OF CHIEF OF ENGINEERS,                 U.   S. ARMY,       1942

Balance unexpended July 1, 1941_----_               -----------------------      $9, 810. 61
Deductions on account of revocation of allotment___                               2, 700. 00
      Net amount to be accounted for_ __--------_               ------            7, 110. 61
Gross amount expended-           __________--------____ $7, 136.47
Less reimbursements collected __________-------____      ____25.          86
                                                                                  7, 110. 61

                      9. CORALVILLE RESERVOIR, IOWA

   Location.-The work covered by the project is on the Iowa River
in Johnson County, Iowa, approximately 83.5 miles above the mouth
of the waterway which empties into the Mississippi River about 433
miles above the mouth of the Ohio River.
   Existing project.-The plan of improvement provides for the con-
struction of an earth-fill dam, 1,400 feet long at the top, rising ap-
proximately 95 feet above the stream bed, with a reservoir providing
for a controlled storage of 400,000 acre-feet. The outlet works are
located adjacent to the left abutment and the uncontrolled spillway
is located on the right abutment with discharge from spillway enter-
ing the river about 900 feet downstream from the toe of the dam.
The reservoir will accomplish almost complete control of floods and
will minimize flood damages on the Iowa River from the dam to the
mouth of the Cedar River. It will provide a large degree of protec-
tion for lands along the Iowa River below the mouth of the Cedar
River and significant reductions of Mississippi River flows at Keo-
kuk, Iowa, and reduction in flows at Cairo, Ill. The existing project
was selected and approved by the Chief of Engineers under the gen-
eral authorization contained in the Flood Control Act approved
June 28, 1938. The estimated cost of new work, revised in 1940, is
$4,217,000 for construction and $1,790,000 for lands and damages.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-The work done during
the fiscal year consisted of stream gaging and mapping of reservoir
area. The costs during the year were $17,150.07 for new work. The
expenditures were $18,574.53.
   Condition at end of fiscal year.-Construction work has not been
started. The costs to June 30, 1942, were $212,892.37 for new work.
The expenditures were $212,300.62.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $6,847.60, will be applied to accounts payable June 30,
1942, $498.75, and to surveys, hydraulic studies and preparation of
contract plans and specifications, by hired labor, $6,348.85.
   The additional sum of $50,000 can profitably be expended during
the fiscal year 1944 on continuation of the preparation of detailed
plans.
                            Cost and financial summary
Cost of new work to June 30, 1942 _____________________________                $212, 892. 37
Cost of maintenance to June 30, 1942____________
      Total cost of permanent work to June 30, 1942_____________               212, 892. 37
Undistributed costs June 30, 1942__                                    -           -93. 00
      Net total cost to June 30, 1942111                                       212, 799. 37
Minus accounts payable June 30, 1942------_                   ------                498. 75
       Net total expenditures _______                                           212, 300. 62
Uniexpended balance June 30, 1942___                                             6, 847. 60
      Total amount appropriated to June 30, 1942--                             219, 148. 22
             RIVERS           AND HARBORS-ROCK                              ISLAND,           ILL.,      DISTRICT                  1049

    Fiscal year ending June 30                  1938                 1939             1940                   1941                 1942


Cost of new work -. ......-            -       -------------       $20, 580. 14    $146, 163. 65        $28, 998. 51             $17, 150. 07
Cost of maintenance----     -------- -                          --------------    -------

Total expended---------           -   ---     ----------            13, 663. 46     145, 715. 39           34, 347. 24            18, 574. 53

Allotted      _- __                    --                          4
                                                                   423, 600. 00                 -     -180, 000. 00             -24, 451. 78


Balance unexpended July 1, 1941 ___________________           ___                                                             $49, 873. 91
Deductions on account of revocation of allotment ---------------                                                      _        24, 451. 78

           Net amount to be accounted for ______________                                              __                       25, 422. 13
Gross amount expended_                                                                              $18, 586. 53
Less reimbursements collected ______________________                                                         12. 00
                                                                                                                               18, 574. 53

           Balance unexpended June 30, 1942                                                                                       847. 60
                                                                                                                                6_______________,
Outstanding liabilities June 30, 1942_ ____------__                                                                               538. 58

           Unobligated balance available June 30, 1942__                                      __-            -                  6, 309. 02

Amount (estimated)  required to be appropriated for completion of
                  i
existing project 1                                                   5,787,851.78
Amount that can be profitably expended in fiscal year ending June 30,
                     1
1944, for new work ----- _        _ _---------------------------      50, 000.00
    Exclusive of available funds.

      10. UPPER MISSISSIPPI RIVER BASIN, ROCK ISLAND DISTRICT

   Location.-The Mississippi River Basin above the Ohio River, exclu-
sive of the Missouri River Basin, in the Rock Island district.
   Existing project.-The Flood Control Act of June 28, 1938, approved
the general comprehensive plan for flood control and other purposes in
the upper Mississippi River Basin described in Flood Control Commit-
tee Document No. 1, Seventy-fifth Congress, first session, with such
modifications thereof as in the discretion of the Secretary of War and
the Chief of Engineers may be advisable, and authorized $6,600,000 for
reservoirs and $2,700,000 for local flood-protection works on the upper
Mississippi and Illinois Rivers; the reservoirs and local protection
projects to be selected and approved by the Chief of Engineers. The
act specifically provides that the authorization shall include the en-
largement and extension of a system of levees located on the south side
of the Sangamon River east of Chandlerville, Ill., as set forth in House
Document No. 604, Seventy-fifth Congress, third session. The follow-
ing individual projects located in the Rock Island district were consid-
ered in the comprehensive plan:
                                                               Reservoirs

                                                                                                                               Total esti-
                       Name                                    Tributary basin                       State                     mated Fed-
                                                                                                                                eralcost

Central City-___                                          Wapsipinicon--------.            Iowa-----              -       _      $2,290,000
Coralville I                                              Iowa ---                            do --                               6,007,000
Rochester                                                  _-_do     -                 -      do---                               3, 952,000
Howell ----------     -    --------
                              _             _ _- __-_     Des Moines -..                       do                -               13, 544,000

                                                                 Levee
Union Township drainage district 1----                  __ - ------
                                                                .....              . I Missouri.----
                                                                                                  -                   -              70, 800
  1See individual report for details of project.
1050          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                      1 a42

   Local cooperation.-See page 5 for requirements.
   Operations and results durzna fiscal 'ear.-None other than those
shown on individual reports for Coralville Reservoir and the Union
Township drainage district projects.
   Condition at end of fiscal year.-The construction progress of Coral-
ville Reservoir and Union Township drainage district projects, which
have been selected for construction under this authorization, is given
in individual reports.
   Proposed operations.-No operations are proposed in the fiscal years
1943 and 1944 other than those shown in the individual reports.
11. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL

  The costs for work during the fiscal year amounted to $113,498.72.
The expenditures were $120,210.73. The balance unexpended June 30,
1942, $4,815.79, plus the sum of $29,200 allotted in August 1942, will
be applied as needed during the fiscal year 1943, to the payment of
expenses incurred under this heading. The additional sum of $28,400
can be profitably expended during the fiscal year ending June 30, 1944.
                                       Cost and financial summary
Cost of new work to June 30, 1942
Cost of maintenance to June 30, 1942--____________---                                                ___           $568, 070. 87
            Total cost of permanent work to June 30, 1942_____________                                                568, 070. 87
Undistributed costs June 30, 1942__-                 -      ----------                                                        -3.       26

      Net total cost to June 30, 1942______________-___________                                                      568, 067. 61
Minus accounts payable June 30, 1942__-                    _____                                                       1, 733. 40
                                                                                                                       1____________-

     Net total expenditures---------------_________________ ____________                                     _       556, 334. 21
Unexpended balance June 30, 1942               ---
                                              ________________---     -__                                              4, 815. 79
            Total amount appropriated to June 30, 1942_________________                                              571, 150. 00

   Fiscal year ending June 30             1938              1939                  1940                1941                   1942

Cost of new work ------
Cost of maintenance -----___
                                         -I        --   -------    ---   -        -       -       -- - - - - -
                                           $900. 00          549.
                                                          $76,  86               133.
                                                                             $195,  59             $181, 988. 70            498. 72
                                                                                                                        $113,
Total expended                   ---          900.00       71,801.83         186, 897. 33           186,524. 32             120, 210. 73
Allotted_              -------           67, 900. 00      178, 500.00        249, 150. 00            75, 600. 00                    -




Balance unexpended July 1, 1941 _-_----                                                                          $125, 026. 52
Gross amount expended           ---------                                                     $121, 667. 73
Less reimbursements collected_________________                                                   1, 457. 00
                                                                                                                     120,210. 73
      Balance unexpended June 30, 1942____________                                                 _________           4, 815. 79
Outstanding liabilities June 30, 1942__                                                                                2, 991. 47
    Balance available June 30, 1942 -------------------------- 1, 824. 32
Amount allotted in August 1942 ------------------------------ 29200. 00

Amount available during the fiscal year 1943 .---------------                                                      - 31, 024. 32
Amount that can be profitably expended in fiscal year ending June
                                               -- - - - -- - - -- --          -       -       -                  -
    30, 1944, for maintenance 1 - -                                                                     ___           28, 400. 00
  1Exclusive of available funds,
                  RIVERS             AND       HARBORS-ROCK                              ISLAND,             ILL.,     DISTRICT             1051

12. OTHER FLOOD-CONTROL PROJECTS FOR WHICH NO ESTIMATES
                      ARE SUBMITTED

                                                                           For last full Costs and expenditures to
                                                                            report see          June 30, 1942                       Estimated
                         Name of project                                     Annual                                                   arequired to
                                                                             Report                                                 required to
                                                                              for-       New work      Maintenance                   complete


1. Green Island levee and drainage district No. 1,
        Iowa    1_                                                               1938           ----------                   --             $68,000
2. Carroll County levee and drainage district No.
      1, Illinois 1_i
                   _-___------------.-..._
                                       .      .                                  1938                                                        13, 200
3. Keithsburg drainage district, Illinois 1                                     1938                                                        11,000
4. Janesville and Indian Ford Dams, Wis.L                                       1938                                                        29, 000
5. Henderson County drainage district No. 3,
      Illinois 2                                                                 1939                                                       13, 600
6. Gregory drainage district, Missouri .-                                       1940                   $77, 100                         (3)
7. Fabius River drainage district, Missouri _                                   1941                    60, 500                         (3)
8. South Quincy drainage and levee district,
        Illinois .        .      .       .     .      .         ..               1940                    61,200                          (3)
9. South River drainage district, Missouri                     -----            1941                    55,300    .                     (3)
10. Penny Slough, Rock River, Ill                                                1940                    85,800                          (3)
11. Freeport on Pecatonica River, Ill.                                 .         1941          --------------...............              463, 000

   1 Work under the project has been deferred pending further study.
   2 Work under the project has been deferred pending fulfillment of the required local cooperation.
   3 Completed.

Status of all investigations for flood control called for by flood-control acts and
                                                          committee resolutions


                                                                                      Date trans-
               Locality                        Authorization Act                       mitted to           Document No.           Reommenda-
                                                                                       Congress                                      tion


Bureau Creek, Ill __             -__..       Commerce Committee
                                               resolution, Jan. 9,
                                               1942.
Cedar River, Iowa .........                  Flood Control Act,                   Oct.        8, 1941                             Unfavorable.
                                               Aug. 28, 1937.
Des Moines River, Iowa,                      River and Harbor Act,
construction of dam at or                     June 20, 1938.
near Madrid, for naviga-
tion and flood control.
Edwards River, Ill ......---                         Flood Control Act,           Feb. 12, 1942                                       Do.
                                                       Aug. 11, 1939.
Fabius (North) River, Mo__ Flood Control Act,                                     Oct. 15, 1941                                       Do.
                                                       June 22, 1936.
Fox Island, Clark County,                            Flood Control Act,           Mar. 13, 1942                                       Do.
  Mo., dam at northern                  end            June 28, 1938.
  of.
Fox River and tributaries,                         -- __do      -_               --      do    -.....                                 Do.
  Missouri.
Galena (Fever)            River,          Ill.       Flood    Control    Act,     July 26, 1941          House 336, 77th          Favorable.
  and Wis.                                             Aug. 28, 1937.                                     Cong., 1st sess.
H en d e r s on R iv  e r ,  I ll  .  .  . . . . .   Flood    Control    Act,
                                                       June 28, 1938.
Iow a R iver, Iow        a  -..     .-...            Flood    Control    Act,     Oct.        8, 1941                             Unfavorable.
                                                       Aug. 28, 1937.
McCraney,       Hadley,           Kaiser,            Flood    Control    Act,
  Six Mile, and Bay Creeks                             June 28, 1938.
  and their tributaries,              Pike
  County, Ill.
Mississippi River at and in                          Flood Control Com-           July 22, 1941          House 328, 77th          Favorable.
  the vicinity of Sabula,                              mittee     resolution,                             Cong., 1st sess.
  Iowa.                                                Aug. 2, 1939.
Plum River and tributaries,                          Flood Control Act,           Feb. 12, 1942          ------------------ Unfavorable.
  Carroll County, Ill.                                 Aug. 11, 1939.
Rock River, Ill.......----------...                  Flood Control Act,
                                                       June 28, 1938.
Rock River, Ill. and Wis ..                          Flood Control Com-
                                                       mittee      resolution,
                                                       Apr. 13, 1938.
     Do-----..........----------------               Commerce       Commit-
                                                       tee resolution, Mar.
                                                       5, 1938.
Salt River, Mo---------.........                     Flood Control Act,
                                                       June 22, 1936.
Turkey River, Iowa......... Flood Control Act,                                    Apr. 10, 1942          House 700, 77th          Favorable.
                                                       Aug. 28, 1937.                                     Cong.. 2d sess.
Wyaconda River, Clark and ---. do_ ____---........                                Feb. 12, 1942          ...............-....- Unfavorable.
  Lewis Counties, Mo.
1052        REPORT OF CHIEF OF ENGINEERS, U.                                               S. ARMY,       1942

    IMPROVEMENT OF RIVERS AND HARBORS IN THE
             ST. PAUL, MINN., DISTRICT
  This district comprises western Wisconsin, a small western portion
of the upper peninsula of Michigan, the major portion of Minnesota,
northern and eastern North Dakota, and small portions of northeast-
ern South Dakota and northern and northeastern Iowa embraced in
the drainage basins of the Mississippi River and tributaries from its
source to mile 614 above the mouth of the Ohio River, of the Red River
of the North and tributaries, and of those streams north of the Mis-
souri River Basin in North Dakota. That section of Mississippi
River above mile 614 is included in the report on Mississippi River
between Missouri River and Minneapolis, Minn.
  District engineer: Col. J. W. Moreland, Corps of Engineers.
  Division engineer: Col. Malcolm Elliott, Corps of Engineers; Col.
Roy W. Grower, Corps of Engineers, acting division engineer May
18 to 24, 1942.
                                                    IMPROVEMENTS


                   Navigation                                                             Flood control
                                                         Page                                                               Page
1. Mississippi River, between the                                     9.     Dry Run, Iowa-__                  1064
      Missouri River and Minne-                                      10.      Lake Traverse and Bois De
      apolis Minn. (St. Paul dis-                                                Sioux River, S. Dak ____       1065
       trict)                      1018                              11.      Lac Qui Parle Reservoir, Min-
2. Reservoirs at headwaters of                                                  nesota River, Minn________ 1068
      Mississippi River--------- 1052                                12.      Upper Mississippi           River
3. Black River, Wis---_..._       1055                                          Basin, St. Paul district....__  1071
4. St. Croix River, Wis., and                                       13.      Preliminary examinations and
              ___1057
       Minn ------------------                                                   surveys for flood control___ 1072
5. Minnesota River, Minn-..-      1059
6. Examinations, surveys, and
      contingencies (general)___ 1061.
7. Other projects for which no
      estimates are submitted___ 1062
8. Plant allotment------------1062
    1. For report on this improvement see page 1018.
          2. RESERVOIRS AT HEADWATERS OF MISSISSIPPI RIVER

  Location.-Reservoirs are located on the Mississippi River and sev-
eral of its tributaries, in Itasca, Beltrami, Hubbard, Aitkin, Cass, and
Crow Wing Counties, Minn., as follows:

                                                         Outlet                                                  Area

       Name of reservoir                                                                 Watershed
                                               River                          PaulSt.
                                                                            Above                     Original
                                                                                                       lake         Reservoir


                                                                                          Square      Square            Square
                                                                               liles       miles       miles             miles
Winnibigoshish ....-------------   Mississippi .- _...                ._           408       1, 442         117             179. 4
Leech Lake ______________--- ..    Leech ___                                       410       1, 163         173             250.9
Pokegama             ._____--..    Mississippi ..._____...                         344          660          24              35.0
Sandy Lake__                       Sandy-__-___-__- -               _              267          421           8              16. 6
Pine River_______        -------   Pine- _________--__                             199          562          18              23. 7
Gull Lake________--      ------    Gull .........-------------------.......        168          287          20              20. 5
                RIVERS AND       HARBORS-ST.               PAUL,   MINN.,        DISTRICT        1053
   Previous project.-Adopted by the River and Harbor Act of June
14, 1880. For further details see page 1888 of the Annual Report for
1915, and page 1098 of the Annual Report for 1938.
   Existing project.-This provides for the reconstruction of the five
original reservoir dams, viz, Winnibigoshish, Leech Lake, Pokegama,
Sandy Lake, and Pine River, and the construction of Gull Lake
Reservoir. .
   The estimated cost revised in 1928, exclusive of amount expended on
previous projects, was $895,000. The estimated cost of operation and
maintenance of the reservoirs, made in 1936, is $25,000 annually. The
above dams are of solid concrete construction, Pokegama being built
on bedrock and the others on pile foundations. The Sandy Lake Dam
includes a lock 160 feet long, 30 feet wide, with a maximum lift of
9.5 feet and a depth of 2.5 feet on the lower sill at low water. The
abandonment of the ditches to connect Long Lake to Round Lake and
Round Lake to Gull Lake was recommended in House Document No.
413, Sixty-fourth Congress, first session, and was ordered by Congress
in the River and Harbor Act of July 27, 1916.
   The existing project was authorized by the following river and
harbor acts:

     Acts                                Work authorized                                Documents


Mar. 3,1899      For reconstruction of 4 of the 5 original dams, and surveys to
                  determine the extent of lands overflowed by the reservoirs.
Mar.   2,1907    Reconstruction of Sandy Lake Dam and the construction of Gull
                  Lake Reservoir.
June 25,1910     Construction of an equalizing canal between Winnibigoshish and    H. Doc. No. 363, 61st
                   Leech Lake Reservoirs (no work was done and this part of the     Cong., 2d sess.
                   project was abandoned in the act of Mar. 4, 1915).
June 26, 19341   Operation and maintenance provided for with funds from War
                  Department appropriations for rivers and harbors.


  1 Permanent Appropriations Repeal Act.

    For maps see pages 1973 and 1978, Annual Report for 1911.
       Lower operating limits authorized by regulations approved Feb. 4, 1936

                 Reservoir                Minimum                    Reservoir                Minimum
                                            stage                                               stage

Winnibigoshish -----------------------          6. 00   Sandy Lake-._._--..........._.                7.00
Leech Lake_- -                                  1.00    Pine Lake ------------------------....        9.00
Pokegama- - - _     -   ----    ---             6.00    Gull Lake- ...- ..... .......-..--            5.00



  Local cooperation.-Fully complied with.
  Terminal facilities.-None.
   Operations and results during fiscal year.-The reservoirs were
operated as required and the necessary repairs made to the appurte-
nsant structures.


         493202-43-pt. 1,vol.        -     67
1054          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                1942

                                Mean monthly stages for the fiscal year

                                                          1941                                                    1942
          Reservoir

                                 July       Aug. Sept.         Oct.         Nov.    Dec.     Jan.   Feb.     Mar.      Apr.    May     Jwne


Winnibigoshish         ....---------10.74   10. 31 9. 80 9. 88 9. 98 9. 89 9. 48 8. 94 8. 52 8. 74 9. 57                               10.40
Leech Lake ......-------------.      2.78    2.54 2. 71 2.75   2. 60 2. 34 1.98  1.76 1.70 1.89 2.35                                    286
Pokegama-             -____-____     9.82    8.10 8.10 8. 51   6.43 7.02   7.73 7. 12 6. 57 6. 65 8.50                                 10.09
Sandy Lake___________ 10.71                 10.18 10.88 10.61 10.57 10. 24 9. 24 8.32  7.82  8. 14 9. 91                               10.62
Pine River------------- 13.55               13.12 13.54 13.68 13.48 13.15 12.45 11.90 11.60 11.67 13.21                                13.88
Gull Lake_    ___               _6.301       6.07  6.48 6.62 6.56 6.40     5.98 5.61   5.44 5.60 6.45                                   6.56



  The mean monthly stage is the average of the stages on the 1st, 10th,
20th, and last of the month.
   The total costs for the year were $17,850.23 for operating and care.
The total expenditures were $18,112.30.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1937. The 5 dams originally built of timber have been
reconstructed of concrete. A concrete dam has been constructed at
Gull Lake. Three dikes at Winnibigoshish, 4 at Pokegama, 2 at
Sandy Lake, and 16 at Pine River have been constructed. Flowage
rights have been acquired on all lands affected by the construction,
maintenance, and operation of the reservoirs.
                                                                Previous projects               Existing projects
                                       Capacity at
           Reservoir                    maximum                                                                                Total cost
                                       stage (cubic           Com-                             Corn-
                                           feet)              pleted               Cost        pleted            ost
                                  i                       i




Winnibigoshish        ..-.... 42, 163, 000, 000               1884           $214, 000. 00     1900        $173, 470. 00        $387, 470. 00
Leech Lake __---.._____       32, 379, 000, 000               1884            171, 805.00      1902          84, 380. 00         256, 185. 00
Pokegama_         _            5, 260, 000, 000               1884             85, 000. 00     1904         126, 030. 00         211, 030.00
Sandy Lake __-                 3, 158, 000, 000               1895            114, 000. 00     1909         117, 020. 00         231, 020. 00
Pine River ____                7, 733, 000, 000               1886             97, 000. 00     1907         133, 320. 00         230, 320. 00
Gull Lake    _                 3, 085, 000, 000                ..   .   .
                                                                                               1913          86, 826. 00          86, 826. 00
Surveys and flowage rights__                                                                                160, 939. 49         160, 939. 49

      Total, new work_                                                        681,805.00                     881, 985. 49      1, 563, 790. 49
Total operating and care ...                                                  100, 857. 10                   136, 042. 22         236, 899. 32
Permanent indefinite ap-
propriation for operating
and care, Feb. 1, 1895, to
end of fiscal year 1936 _.                                                                                  967, 197. 08        967, 197.08

       Total- ____---....             93, 778, 000, 000                       782, 662.10                  1, 985, 224. 79     2, 767,886. 89



   All reservoirs and appurtenances were in good condition and in
operation at the end of the fiscal year.
   The total costs under the existing project to June 30, 1912, were
$1,018,027.71, being $881,985.49 for new work and $i36 042.22 for op-
erating and care. Total expenditures were $1,017,973.36. In addi-
tion, the sum of $967,197.08 was expended between February 1, 1895,
and June 30, 1936, on the operation and care of the works of improve-
ment under the provisions of the permanent indefinite appropriation
for such purposes.
   Proposed operations.-The unexpended balance will be applied as
follows:
Accounts payable June 30, 1942--______ _____                                                                                       $54.35
Maintenance (operating and care) :
    Operations -----------------------          _____                                                                         20, 383.11
    Ordinary repairs ----------------------------                                                       ______                 3,703.03
          Total --------------------------------------------------                                                            24, 137. 46
              RIVERS AND HARBORS-ST.                                         PAUL, MINN.,             DISThICT              1055

   The additional sum of $20,000 can be profitably expended during
&efiscal year 1944 as follows:
Maintenance (oper.ating and care) :
   Operations      ---------------------------------------------                                                        $16, 920'
   Ordinary repas         ------------------ --------------- ----------                                                    3, 080

         Total            ----------------------------------------------                                                  20, 000

                                        Gost and finnciat scrnmary

Ct of new work to June 30, 1942-----------------                                            -------            $1, 563, 790.49
Cost of maintenance to June 30, 1942_---------------------                                                      1, 204,   096. 40

     Total cost of permanent work to June 30, 1942-----------2, 767, 886. 89
Minus accounts payable June 30, 1942 -------------------------        54. 35

Net total expenditures. ------------------------------------                                                    2, 767, 832. 54
Unexpended balance June 30, 1942 -------------------------                                                          24, 137. 46

        Total amount appropriated to June 30, 1942--------------2, 791, 970. 00'

   Fiscal year ending June 30                  1938                   1939           1940               1941              1942


Cost of new work_       -                       $169. 45
Cost of maintenance-......
                      - -                     23, 160. 14          $17, 750.87     $17, 650. 44       $20, 223. 68      $17, 850. 23
      Total cost _                 -          23, 329. 59           17, 750. 87     17, 650. 44        20, 223. 68        17, 850. 23

                          __
Total expended_------- _--..                  22, 059. 31           18, 490. 49     18, 663. 69        19, 992. 44        18, 112. 30

Allotte......----------------------           37,000.00             20, 000. 00     26, 000. 00        11, 500. 00        21, 000. 00



                               -------------------------------
Balance unexpended July 1, 1941__                                                                                    $21, 249. 76
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942   ------------------------------                                                             21, 000. 00

      Amount to be accounted for----------------------------                                                          42, 249. 76
Gross amount expended          ---------           $18, 998. 56
Less reimbursements collected----------------------     8E6. 26
                                                                                                                      18, 112. 30
      Balance unexpended June 30, 1942          __ ____________------                                                 24, 137. 46
Outstanding liabilities June 30, 1942 -_____--_- __-____ _ __- -                                                          109. 28
        Balance available June 30, 1942                                           ________________                    24, 028. 18
Amount that can be profitably expended in fiscal year ending June
30, 1944 for maintenance ---------------------------------                                                           20, 000. 00
  1 Exclusive of available funds.

                                           3. BLACK RIVER, WIS.

   Location.-The source of the river is in west central Wisconsin.
The river drains an area of 2,270 square miles lying wholly in Wis-
consin, and flows in a general southwesterly direction a total distance
of about 160 miles to its confluence with the Mississippi River at La
Crosse, Wig., 698.2 miles above Cairo, Ill., and 154.8 miles below the
lower Northern Pacific Railway bridge at Minneapolis. The portion
of the stream included in this improvement extends from the mouth
to a point 1.4 miles upstream. (See U. S. Geological Survey map of
Wisconsin, scale 1: 500,000 for general location.)
1056     REPORT OF CHIEF OF ENGINEERS, U. S. AIMY,                        1942

   Existing project.-This provides for a channel depth of 9 feet below
the normal elevation of pool No. 8, Mississippi River, substantially
from bank to bank and extending from the mouth to a point 1.4 miles
upstream.
   The estimated cost of new work made in 1942 is $72,000. The latest
 (1937) approved estimate of annual cost of maintenance is $2,500.
   The existing project was authorized by the River and Harbor Act
of August 26, 1937 (Rivers and Harbors Committee Doc. No. 23, 75th
Cong., 1st sess.). This document contains the latest published maps.
   Local cooperation.-The existing project stipulates that local inter-
ests furnish, free of cost to the United States, necessary rights-of-way
and suitable spoil-disposal areas for new work and for subsequent
maintenance as required, and furnish assurances satisfactory to the
Secretary of War that they will construct adequate terminal facilities
open to the public on equal terms. These conditions were compiled
with by resolutions and agreements adopted by the city council of the
city of La Crosse and approved by the Secretary of War on September
5, 1940. The data covering rights-of-way and spoil areas were ap-
proved by the Chief of Engineers on December 17, 1940.
   Terminal facilities.-Wadhams division of the Socony-Vacuum Oil:
Co., owns and operates an oil terminal on the left bank 0.4 mile above
the mouth. The city of La Crosse has awarded a contract for construc-
tion of a public terminal on the left bank 1.4 miles above the mouth.
   Operations and results during fiscal year.-None. The cost of new
work, $131.67, and the expenditures, $14,668.70, were from operations
the previous year.
   Condition at end of fiscal year.-The existing project was about 87
percent complete. Channel dredging completed provides 9-foot depth
for width of about 300 feet throughout the full length of the project
except for contraction to 100 feet at the Chicago, Milwaukee, St. Paul
& Pacific Railroad bridge, mile 1.0. Work remaining to complete the
project consists of removal of obstructions at various points outside
the dredged area to clear the channel to full project width. The total
costs and expenditures under the existing project to June 30, 1942, were
$67.584.96 for new work.
   Proposed operations.-No operations are proposed during the fiscal
year 1943.
   The sum of $7,000 can be profitably expended during the fiscal year
1944 as follows:
New work: Dredging channel (removal of obstructions) with Govern-
  ment plant and hired labor (September 1943) ---------------------- $4, 500
Maintenance: Dredging channel with Government plant and hired labor
  (September 1943) ---------------------------                        2, 500
       Total all work------------------------------------------------7,             000

                           Cost and financial summary
Cost of new work to June 30, 1942--------------------------------- $67, 584. 96
Cost of maintenance to June 30, 1942_____________________________--

       Total cost of permanent work to June 30, 1942_                        67. 584. 96
                                   --
Net total expenditures_ ____---_--_67    __ -              --                    584 96
Unexpended balance June 30, 1942___-------------_                            15. 415 04

       Total amount appropriated to June 30, 1942--.....        _   ---      83, 000. 00
               RIVERS AND HARBORS---ST. PAUL, MINN., DISTRICT                                                              1057

    Fiscal year ending June 30                   1938                1939                 1940           1941            1942


Cost of new work        _____       _ ____------- _      ...
                                                          _        _--------_----....    $4, 097. 17   $63, 356. 12        $131. 67
Cost of maintenance .-- --------              ------      ------------ -------------------------------------
Total expended .....                   ___.-      .-
                                    _...........___                ___                    4, 039. 59    48, 876. 67      14, 668. 70

Allotted---------------- -------              $85, 000         .          ....-....                      2, 5000        -4, 500. 00


Balance unexpended July 1, 1941_________---------------- -    $34, 583.74
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942-------------------------------------   2, 500. 00

      Amount to be accounted for_______-------_------------                                                           37, 083. 74
Deductions on account of revocation of allotment-------------                                              -----       7, 000. 00

      Net amount to be accounted for______________-------------                                                       30, 083. 74
Gross amount expended____________------------------             $14, 760. 09
Less reimbursements collected-_____-_-__-------------                 91. 39
                                                                                                                      14, 668. 70

         Balance unexpended June 30, 1942_-__                                           _________-------15, 415. 04

Amount (estimated)     required to be appropriated for completion of
                  1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
existing project                                                                                                      4,500. 00

Amount that can be profitably expended in fiscal year ending June
30, 1944:       1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
    For new work                                                                                                       4, 500.00
   For maintenance ___---------------------------------                                                                2:, 500. 00
                    - - - - - - -     - - -- -- - - -- - -- - -- - - - - - - - - - - ------ -----
         Total 1-                                                                                                     7, 000. 00
   1 Exclusive of available funds, being recommended for revocation.

                             4. ST. CROIX RIVER, WIS. AND MINN.

   Location.-The source of the river is in northwestern Wisconsin. It
is about 160 miles long and for its greater part forms the boundary
between Wisconsin and Minnesota. It flows southwesterly and then
southerly into the Mississippi River at Prescott, Wis., 41.5 miles below
the Northern Pacific Railroad bridge, Minneapolis, Minn. The por-
tion included in this improvement extends from the mouth to Taylors
Falls, a distance of 52.3 miles. (.See U. S. Geological Survey map of
Minnesota, scale 1: 500,000, for general location.)
   Existing project.-This provides for the maintenance of a channel
9 feet in depth and of suitable width from the mouth to Stillwater
 (24 miles) in connection with the improvement of the upper Missis-
sippi River to afford a depth of 9 feet, and a channel 3 feet deep at
mean low water, between Stillwater and Taylors Falls (28 miles);
also the improvement of the harbor and water front at Stillwater.
   The estimate of cost of new work, revised in 1927, was $150,400.
   The latest (1941) approved estimate for annual cost of maintenance
for that portion of the project between the mouth and Stillwater is
$10,000. The latest authorization (1939) for maintenance work on
the stretch between Stillwater and Taylors Falls is limited to an
expenditure of not to exceed $5,000 per year.
1058       REPORT OF CHIEF OF ENGINEERS,                           U. S. ARM~Y,          1942

  The existing project was authorized by the following river andi
harbor acts:

    Acts                     Work authorized                                   DhsPaaents



June 18,1878    Dredging, etc., for a 3-foot channel between    H. Ex. Doc.. No,.. 75, pt. 6, 43d Cong.,. 2?
                 the mouth and Taylors Falls.                     sess.; Annual Report 1875, p. 372.
June 3,1896     Harbor and water front at Stillwater_........
Jan. 21,1927    A 6-foot channel to Stillwater    ___           H. Doc. No. 378, 69th Cong., 1st sess.
Aug. 30, 1935   The 9-foot channel from the mouth to Still-     H. Doc. No. 1844 T2d Cong., 1st sess.
                 water.



  The latest published map is in House Document No. 1008, Sixty-
fourth Congress, first session.
  Terminal facilities.-At Stillwater there is a concrete-paved levee,
550 feet long and 40 feet wide, sloping from the top of the river bank
to the water. There is also a piling and timber trestle wharf on the
right bank, of which 276 feet is dock and 96 feet approach. At other
points along the river landings are made on the banks. The facilities
are considered adequate for existing commerce.
  Operations and results during fiscal year.-Maintenance channel
work, involving removal of 97 snags was carried out by Government
plant and hired labor in the section of the river between Stillwater,
Minn. (mile 23.3), and mile 39.5. Costs and expenditures for the year
were $902.50 for maintenance.
   Conditionat end of fscal year.-All new work was completed in 1930.
The extension to provide a 9-foot channel from the mouth to Stillwater
was completed on August 12, 1938, when full pool at dam No. 3 of the
Mississippi River canalization project was acquired. The maximum
draft that could be carried June 30, 1942, between Stillwater and
Taylors Falls was about 2.5 feet; below Stillwater, 9 feet. The total
costs to June 30, 1942, were $245,700.89, being $150,409.50 for new work
and $95,291.39 for maintenance.          The total expenditures were
$245,700.89.
  Proposed operations.-The balance unexpended will be applied as
follows :
Maintenance:
    Dredging channel between Stillwater and mouth by Government
      plant and hired labor (August 1942) -------------------      $24, 000 00
    Preliminary surveys for dredging by hired labor---------------      462. 33
        Total maintenance--------                        -------------------                   24, 462.33
   The additional sum of $51,000 can be profitably expended during the
fiscal year 1944 as follows:
Maintenance:
    Dredging channel between Stillwater and mouth by Government
      plant and hired labor (August 1943) ---------  _   -      $50, 000
    Preliminary surveys for dredging by hired labor               1-------------------
                                                                   , 000
        Total maintenance--------------- ----------------------                                        51, 000
              RIVERS AND HARBORS-ST. PAUL, MINN.,                                                DISTRICT                1059
                                         Cost and financial summary
Cost of new work to June 30, 1942----------------------------- $150, 409.50
Cost of maintenance to June 30, 1942__------------------------------ 95,291. 39
        Total cost of permanent work to June 30, 1942--------------245, 700. 89

Net total expenditures------------------------ ---------------      245, 700. 89
Unexpended balance June 30, 1942_------------_ -------------------- 24, 462. 33

        Total amount appropriated to June 30, 1942-----------------                                                 270, 163. 22

   Fiscal year ending June 30               1938                 1939               1940               1941             1942


Cost of new work .....         . ....       ....         .....          ....       ------         ------       -- --------------
Cost of maintenance                       $15, 679. 30           $911. 61          $1, 120. 47    $9, 935. 76             $902. 50

Total expended ____                  _     15, 679. 30            911. 61           1, 066. 82         9, 989. 41          902. 50

Allotted___ ________________   ___         20, 000. 00      15, 000. 00        .                 -5,     000. 00        13, 000. 00



Balance unexpended July 1, 1941- __-----------------             $12, 364. 83
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942--------------------- ------------------ 24, 000. 00

     Amount to be accounted for ----------------------                                                               36, 364. 83
Deductions on account of revocation of allotment-----------------                                                    11, 00. 00

      Net amount to be accounted for---------------------------25, 364. 83
Gross amount expended----------------------------- -- $935. 89
Less reimbursements collected--------------- ----        33. 39
                                                                   902. 50

        Balance unexpended June 30, 1942----------------------__                                                     24, 462. 33
Amount that can be profitably expended in fiscal year ending June 30,
   1944, for maintenance 1_------                                                                                    51, 000. 00
   SExclusive of available funds.
                                 5. MINNESOTA RIVER, MINN.

   Location.-This river has its source in South Dakota, about 35 miles
from Browns Valley, Minn. It is about 400 miles in length, its gen-
eral direction of flow being easterly, and it empties into the Mississippi
River at St. Paul, Minn. For general location, see United States
Geological Survey map of Minnesota.
   Previous projects.--The original project was adopted by the River
and Harbor Act of March 2, 1867, and modified by the River and
Harbor Acts of August 11, 1888, and July 13, 1892. For further
details see page 1890 of Annual Report for 1915, and page 1105 of
Annual Report for 1938.
  Existing project.-This provides for open-channel improvement
from the Mississippi River to Shakopee (25.6 miles). The object to be
accomplished by this improvement is to obtain a channel with 4 feet
of water from the Mississippi River to Shakopee, which will accom-
modate vessels of 3-foot draft.
  The estimate of cost for new work, made in 1892, was $10,000, ex-
clusive of amounts expended on previous projects. The latest (1941)
approved estimate for annual cost of maintenance is $2,500. The exist-
ing project was adopted by the River and Harbor Act of July 13,
1892 (p. 2209 of the Annual Report for 1891). The latest published
map will be found on page 1574 of the Annual Report for 1888.
1060     REPORT OF CHIEF OF ENGINEERS,                  U. S. ARMY,       1942

   Local cooperation.-None required under the existing project.
   Local interests on March 27, 1942, requested that the section of the
channel between the mouth and Savage, Minn., be dredged to a depth
of 9 feet, and agreed to contribute funds in the amount of $90,000 to
defray costs of dredging in excess of the authorized 4-foot project
depth. On May 14, 1942, the Secretary of War under authority con-
tained in section 4 of the River and Harbor Act approved March 4,
1915, authorized acceptance of the local contribution, and dredging as
proposed has been approved by the Chief of Engineers.
   Terminal facilities.-None.
   Operations and results during fiscal year.-Navigation aids were
placed and serviced as required between the mouth and Shakopee.
  urveys, plans, and specifications pertaining to a contract for dredging
from the mouth to mile 13.7 (near Savage, Minn.) were completed by
hired labor. Costs and expenditures for the year were $2,197.16 for
maintenance.
   Condition at end of fiscal year.-The existing project was completed
in 1931. Navigation by small craft to Shakopee was practicable for
drafts not in excess of 3 feet. The total costs and expenditures under
the existing project to June 30, 1942, were $48,506.35, being $12,730.69
for new work and $35,775.66 for maintenance.
   Proposed operations.-The balance unexpended including antici-
  ated allotment of $12,000 and additional contribution of $30,000 will
be applied as follows:
Maintenance:
   Contract:
        Dredging 9-foot channel from mouth to mile 13.7, near Sav-
          age, Minn. (July to October 1942) :
             Dredging to a depth of 4 feet--Government funds --- _ $20, 000. 00
             Dredging in excess of 4 feet to provide depth of 9 feet-
               Contributed funds___--                ____-----_---_--__- 120, 000. 00
   Hired labor :
        Dredging channel from mouth to Shakopee (September
          1942) _-----------------------------------                       2,500. 00
        Removal of snags from mouth to Shakopee (September
          1942)                                                                60. 64
                                                                              7-----------------------
              Total maintenance_-___---___--__              -__--             143, 260. 64
   The additional sum of $3,000 can be profitably expended during
fiscal year 1944 as follows:
Maintenance:
   Dredging channel from mouth to Shakopee by Government plant and
      hired labor (August 1943) ------------------------------------- $2, 500
   Removal of snags from mouth to Shakopee by Government plant and
      hired labor (August 1943) --------------------------------------    500
         Total maintenance------------------------------------------3, 006

                             Cost and financial summary
Cost of new work to June 30, 1942_________--_________-__--__                 $130, 273. 48
Cost of maintenance to June 30, 1942--____________-_----.                      35, 775. 66
       Total cost of permanent work to June 30, 1942                           1------------166,
                                                                                     049. 14
Net total expenditures___________-----               ___-------                166, 049. 14
Unexpended balance June 30, 1942---                                             11, 260. 64

       Total amount appropriated to June 30, 1942-....           --      - - 177, 309. 78
  IIn addition, $90,000 contributed by local interests under authority of sec. 4, River and
Harbor Act approved Mar. 4, 1915.
                RIVERS AND HARBORS-ST. PAUL, MINN., DISTRICT                                                    1061

    Fiscal year ending June 30             1938                1939            1940           1941             1942

Cost of new work--------                --------------                ------------------           --------------
Cost of maintenance_________                           ______________         $5, 914. 18      $128. 02     $2, 197. 16
Total expended_________          __     _____________________                  5, 914. 18        128. 02        2, 197. 16
Allotted ---------------------- --------------                    $6, 000      1,000. 00      2, 500. 00       10, 000. 00


Balance unexpended July 1, 1941                         _____-      $3, 457. 80
                                                   -___________________
Amount allotted from War Department Civil Appropria-
tion Act approved May 23, 1941____________________ $10, 000. 00
Amount allotted from War Department Civil Appropria-
tion Act approved Apr. 28, 1942___--------------------- 3, 000. 00
                                                                                                            13, 000. 00
      Amount to be accounted for---------------__                                                           16, 457. 80
Deductions on account of revocation of allotment________-__----                                              3, 000. 00

      Net amount to be accounted for_-__ _    __----- __----                                                13, 457. 80
Gross amount expended -- ___---------------------------                                                      2,197. 16
           Balance unexpended June 30, 1942----------------------                                           11, 260. 64

Amount that can be profitably expended in fiscal year ending June
                             - -- -- -- -- -- - -- -- -- -- - -- -- -- -- -- - -
30, 1944, for maintenance 2                                                                                 3, 000. 00
    2   Exclusive of available funds.

        6. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                              (GENERAL)
   The cost of the work during the year was $67,961.94 and the expend-
itures were $71,530.26. The unexpended balance, $32,530.99, includ-
ing accounts receivable at the end of the year, will be applied as
needed during the fiscal year 1943 to payment of expenses incurred
under this heading.
   The additional sum of $49,000 can be profitably expended during
the fiscal year 1944.
                        Cost and financial summary
Cost of new work to June 30, 1942_________________      _----      ----
Cost of maintenance to June 30, 1942 ----------------------- $827, 096. 66

                                                             -
      Total cost of permanent work to June 30, 1942___-___-__-                                             827, 096. 66
Undistributed costs June 30, 1942___-_          __--------1,                                                    608. 55

      Net total cost to June 30, 1942____________--------------- 828, 705. 21
Plus accounts receivable June 30, 1942___________-------------3, 407. 00
      Gross total costs to June 30, 1942_______---------------                                             832, 112. 21
Minus accounts payable June 30, 1942____----------------                                                     1,527. 14

     Net total expenditures__------------------------                                                  1830, 585. 07
Unexpended balance June 30, 1942__--____--- __----------------                                           29, 123. 99

        Total amount appropriated to June 30, 1942_________-_--_           '1859, 709. 06
   SIncludes $14,341.31 from permanent indefinite appropriation for gaging waters of the
Mississippi River and its tributaries.

    Fiscal year ending June 30             1938                1939            1940           1941             1942

Cost ofnew work            -------------          --------         ------ -------------- --------------
Cost of maintenance                   $54, 014. 35           $59, 548. 90    $86, 505. 16   $97, 202. 03      $67, 961. 94

Total expended ___       _--.
                          ...           54, 934. 55           49, 382. 18     93, 943.49     94, 202. 87       71, 530. 26
Allotted-,,_.     -      _-------       63, 000. 00          114, 500. 00     93, 000. 00    78, 000. 00       31, 000. 00
1062          REPORT OF CHIEF OF ENGINEERS,                                      U. S. ARMY,              1942

Balance unexpended July 1, 1941_ _........._________ $69, 654. 25
Amount allotted from War Department Civil Appropria-
  tion Act approved June 24, 1940______-----
                                       ----    -   - -   $500. 00
Amount allotted from War Department Civil Appropria-
  tion Act approved May 23, 1941    _______              -------------
                                                       26, 000. 00
Amount allotted from War Department Civil Appropria-
  tion Act approved June 11, 1938-----------------      4,500. 00
                                                                   31, 000. 00

      Amount to be accounted for-------------          ---------------         100, 654. 25
Gross amount expended--        _-----------------------$139,254. 68
Less reimbursements collected____--_--_---_    __----_             67, 724. 42
                                                                                71, 530. 26

      Balance unexpended June 30, 1942 ______-                ______--                                           29, 123. 99
Outstanding liabilities June 80, 1942---------------------------3,                                                   100. 28

      Balance available June 30, 1942_______-                                     ____-________-                 26, 023. 71
Accounts receivable June 30, 1942_                                                                                3,407. 00

          Unobligated balance available June 30, 1942 _______                                    ____--          29, 430. 71

Amount that can be profitably  expended in fiscal year ending June 30,
1944, for maintenance 2 -_ - _____                              ___-                                            49, 000. 00
   2 Exclusive      of available funds.

   7. OTHER PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED

                                                                   For last     Cost and expenditures to          Estimated
                                                                  full report         June 30, 1942                amount
                     Name of project                              see Annual                                     required to
                                                                    Report
                                                                     for-       New work        Maintenance       complete

1. Mississippi and Leech Rivers, Minn.l ____                          1929      $277, 615. 12     $40, 251. 01   Completed.
2. Red River of the North, Minn, and N. Dak.Z2_                       1921       302, 413. 60      76, 209. 40
3. Mississippi River between
                           3           Brainerd and                   1925        47, 793.81        3, 890. 79
     Grand Rapids, Minn.                       -- -- -- -- --
4. Lake Traverse, Minn. and S.Dak. 4.                                 1921            91.83
5. Red Lake and Red Lake- River,         - - - - - - - 5- -...
                             - - - - - - Minn.1           - -- -- -   1923         9,070.00
6. Chippewa River, Wis._                                              1902       201, 743.65
7. Wisconsin River, Wis.' 78---------------------.                    1888

  I No commerce        reported.
  2 Abandonment        recommended in 1915 (H. Doc. No. 1666, 63d Cong., 3d sess.), and June 24, 1926 (H. Doc.
No. 467, 69th Cong., 1st sess.).
3 Abandonment recommended June 24, 1926 (H. Doc. No. 467, 69th Cong., 1st sess.).
4Abandonment recommended in 1915 (H. Doc. No. 439, 64th Cong., 1st sess.), and June 24, 1926 (H. Doc.
No. 467, 69th Cong., 1st sess.).
b Abandonment recommended in 1915 (H. Doc. No. 1666, 63d Cong., 3d sess.).
8 Abandoned by River and Harbor Act approved June 13, 1902.
7 Originally included in project "Fox and Wisconsin Rivers, Wis." Abandonment of improvement of
Wisconsin River by channel contraction works recommended in 1886-87 (H. Ex. Doc. No. 65, 49th Cong.,
2d sess.).
  8 Expenditures included under project "Fox and Wisconsin Rivers, Wis."                        No break-down available.

             8. PLANT ALLOTMENT, ST. PAUL, MINNESOTA, DISTRICT
                                            Cost and financial summary
Undistributed costs June 30, 1942_______-                                    _______________               $1,353, 156. 92
Net total cost to June 30, 1942______________--___________                                                   1,353, 156. 92
Plus accounts receivable June 30, 1942_-......- ____________                                                    83, 757. 29
      Gross total costs to June 30, 1942____________________                                                 1,436, 914. 21
Minus accounts payable June 30, 1942 _______________8______-                                                    82, 376. 53
     Net total expenditures-----     --  -------                                                             1,354, 537. 68
Unexpended balance June 30, 1942--...........-_                                                      __        176, 911.06
           Total amount appropriated to June 30, 1942 ------                                                 1, 531, 448. 74
                RIVERS AND HARBORS                      ST. PAUL, MINN.,                            DISTRICT             1063

    Fiscal year ending June 30            1938            1939             1940                       1941              1942

Total expended----------             -$527, 584. 78     $94, 739. 11   -$75, 795. 35                $63, 881. 87       $86, 433. 71
Allotted __________--------------     -680, 401. 84      20, 000.00      112, 500.00                 66, 691.40         49, 450.00


Balance unexpended July 1, 1941_------------------------------                                                     $213, 894. 77
Amount allotted from War Department Civil Appro-
priation Act approved June 24, 1940-------------- $45, 000. 00
Amount allotted from War Department Civil Appro-
priation Act approved May 23, 1941_---------         2, 450. 00
Amount allotted from War Department Civil Appro-
priation Act approved Apr. 28, 1942_----------       2, 000. 00
                                                                                                                     49, 450. 00

      Amount to be accounted for_   -----------------------------                                                   263, 344. 77
Gross amount expended---------------------             $1, 345, 289. 09
Less:
    Reimbursements collected-         $1, 247, 774. 16
    Receipts from sales -----------        11, 081. 22
                                                        1, 258, 855. 38
                                                                                                                     86, 433. 71
      Balance unexpended June 30, 1942---_ --------------------                                                     176, 911. 06
Outstanding liabilities June 30, 1942-------------$195, 776. 67
Amount covered by uncompleted contracts --------      51, 791. 56
                                                                                                                    247, 568. 23

      Balance available June 30, 1942-------------------- ------                                                    70, 657. 17
Accounts receivable June 30, 1942------------------------------                                                     83, 757. 29

           Unobligated balance available June 30, 1942-------------                                                  13, 100. 12

Status of all investigations for navigation called for by river and harbor acts
                           and committee resolutions

                                                             Date trans-
             Locality               Authorization act        mitted to            Document No.                     Recommenda-
                                                              Congress

Lake City Harbor, Minn___ Rivers and Harbors
                              Committee resolu-
                              tion, July 18, 1939.
Mississippi River, upper,   Rivers and Harbors              Nov. 4, 1941      House 432, 77th                      Favorable.
near Hastings, Minn., for    Committee resolu-                                Cong. 1st sess.
hydroelectric power.         tion, Nov. 4, 1938.
Mississippi River, improve- Rivers and Harbors                               ....................
ment in Lake Pepin.          Committee resolu-
                              tion, Dec. 19, 1938.
Mississippi River-Missouri  Commerce Commit-
  River to Minneapolis, im-   tee resolution, Aug.
provement of harbor at       30, 1938.
Lansing, Iowa, for small
craft.
Mississippi River at Mc- Commerce Commit-
Gregor, Iowa, improve-      tee resolution, Feb.
ment of harbor for small     19, 1938.
craft.
Mississippi River at Minne- Rivers and Harbors
apolis, Minn., to modify     Committee resolu-
existing project.           tion Apr. 24, 1941.
Mississippi River at Wa-    Rivers and Harbors
basha, Minn.                 Committee resolu-
                             tion Apr. 30, 1940.
Mississippi River between   Rivers and Harbors
Missouri River and Minne-    Committee resolu-
apolis, damages by seep-    tion June 6, 1939.
age and backwater in
Minnesota and Wisconsin
  (pools Nos. 5-A, 7, 8, 9,
10, and 11).
1064      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                             1942

    Status of all investigations for navigation called for by river and harbor acts
                        and committee resolutions-Continued

                                                        Date trans-
         Locality               Authorization act       mitted to       Document No.              Recoonda-
                                                         Congress

Mississippi River between      Rivers and Harbors
Missouri River and Minne-      Committee     resolu-
apolis, damages by seep-       tion Mar. 16, 1939.
age and backwater from
Pools Nos. 3, 4, 5, and 6,
Wisconsin, and from open-
ing gates at Red Wing,
Minn., and Alma, Foun-
tain City, and Trempe-
aleau, Wis.
Mississippi River between Rivers and Harbors
MissouriRiverandMinne-     Committee resolu-
apolis, damage by seep-    tion, Mar. 1, 1939.;
age and backwater in
Minnesota (pools Nos. 3,
4, 5, 7, and 8).
Mississippi River between Rivers and Harbors
MissouriRiverandMinne-     Committee resolu-
apolis, damage by seep-    tion, Mar. 10, 1939.
age and backwater in the
  State of Iowa (pools Nos.
9, 10, and 11).
Mississippi River between      Rivers and Harbors
MissouriRiverand Minne-        Committee     resolu-
apolis, damage by seep-        tion, Apr. 4, 1939.
age and backwater in
State of Minnesota (pools
Nos. 5-A and 6).
Missouri River diversion       Commerce     Commit-
project    (under special      tee resolution, June
board).                         22, 1937.
St. Croix River, Minn. and     Rivers and Harbors       Aug.   4,1941   ...------------------     Unfavorable.
  Wis., improvement in vi-      Committee     resolu-
cinity of Stillwater, Minn.    tion, Mar. 16, 1939.



                                       9. DRY RUN, IOWA

  Location.-In northeastern Iowa, on Dry Run, a tributary of the
upper Iowa River at Decorah, Iowa.
  Existing project.-The Flood Control Act approved June 22, 1936,
authorized a flood-retention reservoir and channel enlargement down-
stream for the protection of the city of Decorah. The Flood Control
Act approved August 18, 1941, Public, No. 228, Seventy-seventh Con-
gress, first session, modified the project to provide for diversion of
Dry Run into the upper Iowa River, a levee system along the upper
Iowa River in Decorah for protection of adjacent property against
augmented high-water flow, raising a section of railroad tracks and
State Highway No. 9, and necessary alterations to bridges and pro-
tection to existing structures in the vicinity. The diversion is to be
accomplished by a dam across Dry Run at a point about 1 mile south-
west of Decorah and a diversion channel 3,200 feet in length from that
point through high ground to the upper Iowa River on the north.
The project will provide complete protection to residential, industrial,
and commercial areas totaling about 260 acres within the city limits
of Decorah against the maximum probable flood on Dry Run and the
upper Iowa River. Floods creating serious damages have occurred
about once every 11 years. The estimated Federal cost is $460,000, and
the cost to local interests for lands and damages is $22,000.
  Local cooperation.-See page 5 for requirements.
                   RIVERS AND                 HARBORS--ST.                  PAUL, MINN.,               DISTRICT             1065
   Operations and results during fiscal year.-None. The cost of new
work, $95:55, and the expenditures, $138.37, were for operations accom-
plished during the previous year.
   Condition at end of fiscal year.-Surveys have been substantially
completed. No construction work has been done. The total costs and
expenditures under the existing project to June 30, 1942, were $29,315.33
for new work.
   Proposed operations.-The balance unexpended, $35,684.67, will be
applied to new work, design of the proposed improvements.
                                              Cost and financial summary

Cost of new work to June 30, 1942_________ ___________________ $29, 315. 33
Cost of maintenance to June 30, 1942_
             Total cost of permanent work to June 30, 1942 ____________                                                29, 315. 33

Net total expenditures--------------------------------_                                                                29, 315. 33
Unexpended balance June 30, 1942________________________________                                                       35, 684. 67
             Total amount appropriated to June 30, 1942_______________                                                 65, 000. 00

    Fiscal year ending June 30                     1938              1939                1940             1941             1942

Cost of new work              -__                 $4, 583.44         $416. 56         $21,975. 14       $2, 244. 64           $95. 55
Cost of maintenance -
Total expended------------------                   4, 574. 23            425. 77        21, 911. 46      2, 265. 50           138. 37
Allotted_ -----------------------                  5, 000. 00   _   __                379, 000.00     -354, 000.00         35, 000.00



Balance unexpended July 1, 1941                                                ------------                               $823. 04
Amount allotted from War Department Civil Appropriation Act ap-
   proved Apr. 28, 1942                                                               -----                            35, 000.   00

      Amount to be accounted for --------------------------- _                                                         35, 823. 04
Gross amount expended -------------------------------- $628. 63
Less reimbursements collected---------------------------       488. 26
                                                                                                                           138. 37

            Unobligated balance available June 30, 1942------------                                           __       35, 684. 67

Amount (estimated)                     required to be appropriated for completion of
   existing          project 1-----------------                                                                       395, 000. 00
   1 Exclusive of available funds.

                10. LAKE TRAVERSE AND BOIS DE SIOUX RIVER, S. DAK.

  Location.-The works covered by this project lie along Lake Tra-
verse and Bois de Sioux River between the upper end of Lake
Traverse at Browns Valley, Minn., and the mouth of Bois de Sioux
River at Breckenridge, Minn. The lake drains through the river to
the Red River of the North, and the two waters form a portion of
the boundary between the State of Minnesota and the States of North
and South Dakota.
  Existing project.-The plan of improvement provides for use of
Lake Traverse as a flood control and water conservation reservoir
and for clhannel improvement in the river below the lake. It includes
construction of a dam near White Rock, S: Dak., at the north end
of Lake Traverse, a structure at the Reservation Highway crossing
1066    REPORT OF CHIEF OF ENGINEERS,         U. S. ARMY,    1942

for control of the upper section of the reservoir, levees, and embank-
ments necessary near Browns Valley, Minn., and channel improve-
ment of approximately 24 miles of the Bois de Sioux River from the
outlet of Lake Traverse northward toward Breckenridge, Minn. The
dam near White Rock, S. Dak., consists of a movable-gate control sec-
tion between two sections of rolled fill embankment with a total length
of approximately 14,400 feet from high ground on the Minnesota
side to high ground on the South Dakota side, and, supplemented by
channel improvement of the Bois de Sioux River downstream and
an embankment approximately 5,000 feet long at the south end of
Lake Traverse for the protection of Browns Valley, Minn., consti-
tutes the flood-control feature of the project. The structure at Res-
ervation Highway crossing consists of a stone-paved dike spillway
with superimposed stop log spans with total length of approximately
113 feet between steel sheet pile abutment walls behind which com-
pacted fill connects with the existing highway, and will be operated
to restore and maintain the water level in the upper section of the
lake. The project, with reservoir capacity for flood control of 126,-
000 acre-feet, will afford protection to about 42,000 acres of agricul-
tural land from floods up to those which may be expected to occur
once in 30 years and should restore Lake Traverse to its former natu-
ral condition as a habitat for an abundance of wildlife and fish.
    The latest approved estimate of cost (1937) is $1,474,000, of which
$1,115,200 is for construction and $358,800 for land and damages.
The latest (1941) approved estimate of annual cost of maintenance
is $5,500.
    The existing project was authorized by the Flood Control Act ap-
proved June 22, 1936.
    Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
    Operations and results during fiscal year.-Contracts for reconstruc-
tion of Reservation Highway, channel improvement of the Bois de
Sioux River, Browns Valley Dike, and for alterations to South Dakota
Highway No. 10 and Roberts County Highway were completed. Erec-
tion of a barn at White Rock Dam by hired labor was about 90 percent
complete. Acquisition of land during the year involved purchase of
176.55 acres, flowage easements on 605.38 acres and special easements
on 165.23 acres. Costs for the year for highway reconstruction were
$39,248.35; for channel improvement, $23,575.42; for dike, dam, and
control structure construction, $27,442.54; for acquisition of land and
flowage rights, $42,249.70; for building construction, $4,307.27; and
$2,137.75 for designs and surveys. Cost of new work by contract was
$89,837.13; by hired labor, $49,123.90.
    Operation of the White Rock Dam and the reservation control
structure, initiated December 1, 1941, was performed as required.
   Total costs for the year were $140,901.54, of which $138,961.03 was for
new work and $1,940.51 for operating and care. The expenditures were
$187,812.05.
    Condition at end of fiscal year.-The existing project as a whole was
74 percent complete. Contracts have been completed as follows: Fram-
ing and exterior of dam tender's dwelling, May 10, 1940; Great North-
ern Railway bridge, July.22, 1940; reservation control structure, Sep-
tember 4, 1940; Blackmer and White Rock Highway bridges, October 3,
          RIVERS     AND HARBORS-ST.         PAUL, MINN.,       DISTRICT          1067
1940; White Rock Dam, May 24, 1941; Chicago, Milwaukee, St. Paul &
Pacific Railroad bridge at White Rock, June 13, 1941; Browns Valley
dike, August 30, 1941; Bois de Sioux channel improvement, October 4,
1941; reconstruction of Reservation Highway, October 7, 1941, and
alteration to South Dakota Highway No. 10 and Roberts County High-
way, on November 14, 1941. Utilities and foundation for dam tender's
dwelling have been completed by hired labor. Work in progress con-
sisted of erection of a barn at White Rock Dam by hired labor. Work
remaining to be initiated to complete the project included alterations
of bridges and raising of highways along the Minnesota side of Lake
Traverse, construction of an esplanade, completion of utilities building
and slope protection at White Rock Dam, and surfacing Reservation
Highway.
   Approximately 1,278 acres of land for which fee title is to be
acquired and about 5,910 acres upon which flowage easements and
special easements are to be obtained are involved in the land and
flowage acquisition. Of these totals, fee title to 1,026.55 acres has
been acquired, flowage easements on 605.38 acres, and special easements
on 165.23 acres have been acquired.
   The white Rock Dam and the Reservation Control Structure are in
operation.
   The total costs under the existing project to June 30, 1942, were
$1,015,668.16, of which $1,043,727.65 was for new work and $1,940.51
for operating and care. The expenditures were $1,046,558.21.
   Proposed operations.-The balance unexpended, including accounts
receivable at the end of the year will be applied as follows:
Accounts payable June 30, 1942-------___ ------------------------------         $847. 84
New work:
    Hired labor :
        Design and surveys___ ______.______-                 $7, 832.34
        Acquisition of land and flowage rights--------- 303, 089. 40
    Contract:
        Slope protection, White Rock Dam (July to Au-
          gust 1942)-------------------------------    __    10,000.00
        Resurfacing Highway No. 117 (July to Septem-
          ber 1942) ----------------------------------       20,000.00
        Raising and reconstruction of Highway Nos. 27
          and 28 (September 1942 to July 1943)     -.--..     6, 057. 45
        Construction of esplanade (April to July 1943) __     2, 585. 00
        Alteration and reconstruction of bridges (Jan-
          uary to June 1943)                 -_              25, 000. 00
        Completion of service buildings (July 1942)    ---..     518. 14

           Subtotal, new work_-----------------------------------            375, 032. 33

          Total ------------------------------------           -------       375, 930. 17
Maintenance (operating and care) :
    Operations              ----     -----                     $5, 944. 30
    Ordinary     repairs---------------------------------       2, 968. 24

      Total operating and care------------------------------------8,             912. 54
Balance available for revocation----------------------------------               736. 97

      Total all work --      ____-___-__-________---_385,                        579. 68
  It is expected that the proposed expenditures for new work will
complete the project..
1068         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                             1942

  The additional sum of $5,500 can be profitably expended for operat-
ing and care during the fiscal year 1944 as follows:
Operations-----------------------            ------------                                                       $5, 000
Ordinary repairs    --------------------------------------------                                                    500
           Total operating and care-----              ----------------------------                                5, 500
                                     Cost and financial summary

Cost of new work to June 30, 1942__________________________                                        $1,043, 727. 65
Cost of maintenance to June 30, 1942---------------------------                                         1,940. 51
      Total cost of permanent work to June 30, 1942----------                                          1, 045, 668. 16
Plus accounts receivable June 30, 1942__________ _____ ____                                                 1, 737. 89

      Gross total costs to June 30, 1942__________________                                          1, 047, 406. 05
Minus accounts payable June 30, 1942_.                                                                      847. 84

     Net total expenditures                                                                               046, 558. 21
                                                                                                       1------------------------------,
Unexpended balance June 30, 1942___________________________                                              383, 841. 79
           Total amount appropriated to June 30, 1942___________                                       1, 430, 400. 00

   Fiscal year ending June 30          1938           1939            1940                  1941                1942

Cost of new work    _           ------        --------------       $335, 996. 26      $568,770.36            $138, 961. 03
Cost of maintenance   .-------- -----                    ------                                                 1,940.51
Total expended         _ _.._.280,                                      940.   72         577, 805. 44        187, 812. 05
Allotted    ----------------------------------    -               1,475, 500.00             4,000.00          -49,100.00


Balance unexpended July 1, 1941__                       -----                       __-                  $620, 753.84
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942-------------------------------------                                                 5, 500. 00

      Amount to be 'accounted for_ _-_-      ______----_-_  _   626, 253. 84
Deductions on account of revocation of allotment _______________54, 600. 00

      Net amount to be accounted for--------------------------                                            571, 653. 84
Gross amount expended---------       -------------------------                                           187, 812. 05

      Balance unexpended June 30, 1942-----------------------                                            383, 841. 79
Outstanding liabilities June 30,. 1942_____________ $269, 562. 84
Amount covered by uncompleted contracts-- ____--   _    6, 332. 45
                                                                                                         275, 895. 29

      Balance available June 30, 1942________________________     107, 946. 50
Accounts receivable June 30, 1942__                                 1, 737. 89
                                                       __-_-_-_-_-_-_-

           Unobligated balance available June 30, 1942_____________                                      109, 684. 39

Amount that can be profitably - expended      in fiscal year ending June
                                - -- - -- - -- -- - -- -- - -- -- - -- -- - -- - --                -
30, 1944, for maintenance 1____________________                                                             5, 500. 00
  s Exclusive of available funds.

           11. LAC QUI PARLE RESERVOIR, MINNESOTA RIVER, MINN.

  Location.--The works covered by this project lie along Marsh and
Lac qui Parle Lakes and the Minnesota River between the head of
Marsh Lake and Granite Falls, Minn.
  Existing project.-Constructionof the Lc qui Parle Reservoir was
initiated as a Works Progress Administration project sponsored by
         RIVERS    AND    HARBORS-ST.   PAUL, MINN.,   DISTRICT    1069
the State of Minnesota, prior to its authorization as a Federal project
by the Flood Control Act approved June 22, 1936. The present plan
of improvement provides for completion and maintenance by the War
Department of the structures on Marsh and Lac qui Parle Lakes and
the Chippewa River diversion works, substantially completed by the
Work Projects Administration for use of Marsh and Lac qui Parle
Lakes as flood control and water conservation reservoirs, and for chan-
nel improvement of the Minnesota River below the lakes. The project
includes a main dam at the outlet of Lac qui Parle Lake, a structure
between Marsh Lake and Lake Lac qui Parle, for control of the Marsh
Lake Reservoir, a dam and diversion channel near Watson, Minn., for
diverting floodwaters of the Chippewa River into the Lac qui Parle
Reservoir, necessary alterations to highways, railroads, and bridges in
the vicinity, and improvement of the channel of the Minnesota River
at various locations between Lake Lac qui Parle and Granite Falls.
The Lac qui Parle Dam, which carries a highway across the Minne-
sota River, consists of a control structure of 12 bridge spans incor-
porating sluice gates and a fixed spillway weir, a 2,500-foot emergency
spillway, and sections of highway embankment connecting with high
ground on either side of the valley. The Marsh Lake Dam consists of
a 110-foot concrete spillway and two sections of dredged earth fill
totaling approximately 8,500 feet in length. The Chippewa River
Flood Diversion Dam consists of a concrete fixed crest structure sup-
porting a highway bridge, and a section of earth fill through which is
provided a conduit for discharge of low water flow. The diversion
channel for passing floodwaters of the Chippewa River into the Lac
qui Parle Reservoir is 3,500 feet in length cut through a natural ridge
separating the river and an arm of the lake. A rolled earth fill dike
extending along the lower south side of the channel is an extension of
the diversion dam and serves also to protect the adjacent railroad
tracks from being flooded. Improvement of the Minnesota River be-
tween Lake Lac qui Parle and Granite Falls consists of rock removal
and cut-offs at various locations to provide for increasing the bank-
full capacity of the channel to about 4 000 second-feet. The project,
with reservoir capacity of about 94,500 acre-feet for flood control
above normal elevations of the two conservation pools, will provide
protection for agricultural lands against summer floods estimated to
have a ferquency of about once in 25 years and protection against
spring floods having a frequency of about once in 12 years. Storage
of 58,500 acre-feet for conservation purposes provided below normal
elevations of conservation pools will result in improved lake levels for
recreation and game conservation in addition to providing for in-
creased low water flow downstream for agricultural interests and for
sewage disposal at Granite Falls.
    The estimated cost to the United States for completion of the
project, revised in 1942, is $295,000 for construction and $460.000 for
lands and damages.       The estimated annual cost of maintenance is
 $9.000.
    Local cooperation. Section 2 of the Flood Control Act approved
June 28, 1938, applies.
    Operations and results during fiscal year.-Contracts for channel
improvement of Minnesota River and for Lac qui Parle Dam im-
      493202-43~-pt. 1,vol. 1-68
1070     REORT OF CHIEoF OF ENGINEERS,                        U. S.   ARMY,       1942

provements were completed. Under contract for Marsh Lake Dam
improvements, 7,700 cubic yards of material were removed, com-
pleting 56 percent of the channel excavation. Acquisition by hired
labor of an easement on 33 acres of land for the channel improvement
of the Minnesota River was in progress. Costs for the year for dam
improvement were $19,742.39; $173,222.82 for channel improvement;
$8,879.61 for land and flowage rights; and $11,053.32 for surveys and
designs. Cost by contract, $192,965.21; by hired labor, $19,932.93.
Total costs for the year were $212,898.14 for new work. The expendi-
tures were $213,724.94.
   Condition at end of fiscal year.-The existing project as a whole
was 32 percent complete. A contract for Lac qui Parle Dam improve-
ments was completed April 10, 1942, and a contract for channel im-
provement of Minnesota River was completed April 13, 1942. Work
in progress consisted of Marsh Lake Dam improvements, 21 percent
completed and field and office work in connection with land and flow-
age rights acquisition. Work remaining to be initiated to complete
the project includes raising the Great Northern Railway crossing
near Appleton, raising or relocating the Louisburg-Correll Highway,
and clearing portions of reservoir areas. The total costs under the
existing project to June 30, 1942, were $242,225.17 for new work.
The expenditures were $242,499.44.
   Proposed operations.-The balance unexpended, including accounts
receivable at the end of the year, will be applied as follows:
Accounts payable June 30, 1942              --          -----------                      $710. 90
New work:
   Hired labor:
       Design      ..----------------------------------             $1, 72. 24
       Land acquisition---------------------------- 35, 057. 80
       Railroad damages--                                               000. 00
                                                                    5--------------------------0,
   Contract:
       Raise Great Northern Ry. crossing (August
          1942) -------------------------------                      47, 125.00
       Raise or relocate Louisburg-Correll Highway
          (August to October 1942) --                                12, 800. 00
          Clearing (November 1942 to March 1943) ____                  23, 900. 00
          Bituminous surface spillway, Lac qui Parle Dam
            (July to August 1942) __----------------------__            5, 900. 00
          Complete Marsh Lake Dam improvements (Au-
            gust 1942) _-_               _-----------                  15, 142. 82
          Reserve for change orders and contingencies___                3, 970. 97
          Crane and bulkhead (July to August 1942) .-.                  1, 100. 00
            Subtotal, new work                                             __ _      506, 724.83

          Total-------------------------                                             507, 435. 73
Maintenance :
     Operations       ----                                             $5, 200. 00
     Ordinary repairs________________________________                   3, 800. 00

       Total operating and care____------------------------                              9, 000. 00

       Total all work__ _________________________-____________                       516, 435. 73
  It is expected that the proposed expenditures will complete the
project except for additional clearing.
  The additional sum of $9,000 can be profitably expended during
the fiscal year 1944, ws follows:
              RIVERS AND HARBORS-ST.                                         PAUL, MINN., DISTRICT                         1071
Maintenance:
    Operations  _-------------------------------------------------- $5, 000
    Ordinary repairs ---------------------------------------------- 4,000

           Total----------------                     ------------------------------------                                     9, 000
                                         Cost and financial summary

Cost of new work to June 30, 1942____   _____________________                                                        $242, 225.17
Cost of maintenance to June 30, 1942__________   ______
      Total cost of permanent work to June 30, 1942_           ___                                                    242, 225. 17
Plus accounts receivable June 30, 1942________________________--                                                           985. 17

      Gross total costs to June 30, 1942--____________-___                                                  ___      243, 210. 34
Minus accounts payable June 30, 1942____---------------                                                                   710. 90
     Net total expenditures___________________________                                                               242, 499.44
Unexpended balance June 30, 1942_                    __-_______
                                           -_____________                                                            515, 450. 56
           Total amount appropriated to June 30, 1942-____________ _                                                  757, 950.00

   Fiscal year ending June 30               1938                      1939          1940                 1941             1942

Cost of new work           -    --                                     $404. 38   $22, 599. 94       $6, 322. 71        $212,898.14
Cost of maintenance                  -           -     ---                                               -.--            --      --
Total expended .....     ...         ________    ___         _____    _______      23, 121. 80           5,652. 70       213, 724. 94
Allotted                                                             13, 000.00   82, 350.00        209,000.00           453, 600.00



Balance unexpended July 1, 1941-----------------------------       $275,575. 50
Amount allotted from War Department Civil Ap-
  propriation Act approved June 28, 1939-   ---       $54, 600. 00
Amount allotted from War Department Civil Ap-
  propriation      Act approved                 May          23,     1941-----              390, 000. 00
Amount allotted from War Department Civil Ap-
propriation Act approved Apr. 28, 1942 .... _......                                              9,000. 00
                                                                                                                     453, 600.00
           Amount to be accounted for ______________________________                                                 729, 175. 50
Gross amount expended________________________________                                                                213, 724. 94
           Balance unexpended             June 30,                 1942                            _
                                                                                    ________________                 515, 450. 56
Outstanding liabilities June 30, 1942                                                            $2, 813. 82
Amount covered by uncompleted contracts.------....                                               66,406. 75
                                                                                                                      69, 220. 57
           Balance available June 30. 1942------                                                                     446,229. 99
Accounts receivable June 30, 1942--                                                                 --                    985. 17
           Unobligated balance available June 30, 1942_______________                                                447, 215. 16
Amount (estimated) required to be appropriated for completion
of existing project 1______________                                                                                   6.000 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance    ---------------------------------                                                        9,000. 00
  1 Exclusive of available funds.
           12. UPPER MISSISSIPPI RIVER BASIN, ST. PAUL DISTRICT
  Location.-The Mississippi River Basin above the Ohio River,
exclusive of the Missouri River Basin, in the St. Paul district.
  Existin project.-The Flood Control Act of June 28, 1938, ap-
proved the general comprehensive plan for flood control and other
1072       REPORT OF CHIEF OF ENGINEERS,                                      U. S. ARMY,                    1942

purposes in the upper Mississippi River Basin described in Flood
Control Committee Document No. 1, Seventy-fifth Congress, first
session, with such modifications thereof as in the discretion of the
Secretary of War and the Chief of Engineers may be advisable, and
authorized $6,600,000 for reservoirs and $2,700,000 for local flood-
protection works on the upper Mississippi and Illinois Rivers; the
reservoirs and local protection projects to be selected and approved
by the Chief of Engineers. The act specifically provides that the
authorization shall include the enlargement and extension of a sys-
tem of levees located on the south side of the Sangamon River east
of Chandlerville, Ill., as set forth in House Document No. 604, Sev-
enty-fifth Congress, third session. The following project located in
the St. Paul district is included in the comprehensive plan:

                                                                                                                     Total esti-
             Name                              Tributary basin                               State                   mated cost

Black River Reservoir .---             Black                                 Wisconsin ----------------                $6, 541, 000


   Local cooperation.-See page 5 for requirements.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been undertaken.
   Proposed operations.-None.
13. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL

  The cost of the work during the year was $119,501.29, and the ex-
penditures were $120,069.34. The balance unexpended on June 30,
1942, $6,665.30, plus the sums of $25,000 allotted in August 1942 and
$4,700 allotted in September 1942, will be applied as needed during
the fiscal year 1943 to payment of expenses incurred under this head-
ing.
                                       Cost and financial summary

Cost of new work to June 30, 1942----                                                                          -__
Cost of maintenance to June 30, 1942----------------------------$446, 962. 24
      Total cost of permanent work to June 30, 1942-      ___                                                      446, 962. 24
Minus accounts payable June 30, 1942----------------------------                                                     3, 327. 54
      Net total expenditures ------------------------------------                                                  443, 634. 70
Unexpended balance June 30, 1942                                                                                        665.30
                                                                                                                     6---------------------------
                                                                                                                     6,

         Total amount appropriated to June 30, 1942 ----------------                                               450, 300. 00

   Fiscal year ending June 30              1938             1939                1940                  1941               1942

Cost of new work-                  -                                     -
Cost of maintenance   ........            $5, 409. 71     $59, 041. 72       $147, 814. 78      $115, 194. 74         $119, 501.29
Total expended--------------_              3, 900.00       53, 670.47         153, 553. 92       112, 440. 97           120, 069.34
Allotted.......         .....----------------------
                                             59, 400.00    99,000.00          177, 900.00            70, 000, 00        44, 000.00
             RIVERS AND HARBORS-ST.                            PAUL, MINN.,                    DISTRICT                      1073
Balance unexpended July 1, 1941------------------------------$82,     734. 64
Amount allotted from War Department Civil Appropriation Act
  approved May 23, 1941__________                                 44, 000. 00
      Amount to be accounted for___----------------                                      ----                       126, 734. 64
Gross amount expended--           -___
                            _______---------                                                                        120, 069. 34
      Balance unexpended June 30, 1942___ _____---_____---6, 665.30
Outstanding liabilities June 30, 1942--------------------------- 3, 477. 73
     Balance available June 30, 1942__------------------------                                                        3, 187. 57
Amount allotted in August and September 1942 -_________--                                                            29, 700. 00
        Amount available during the fiscal year 1943                           -- __-____---32, 887. 57
Status of all investigations for flood control called for by flood-control acts and
                                             committee resolutions

                                                             Date trans-
          Locality                   Authorization act        mitted to         Document No.                        Recommenda-
                                                              Congress

Chippewa River and tribu-      Commerce Committee
taries, Wisconsin.             resolution, Oct. 28,
                                     1941.
Clearwater River, Minn _ _     Flood Control Act,
                                 June 28, 1938.
Forest River, N. Dak_ __...    Commerce Committee
                                 resolution, Dec. 1,
                                 1938.
Gilmore Creek, Winona          Flood Control Act, May 16, 1942_                                                     Unfavorable.
County, Minn.                   Aug. 28, 1937.
Goose River and tribu-         Flood Control Act, -- - - - - - -
taries, North Dakota.           Aug. 11, 1939.
Hay Creek, Goodhue             Flood Control Act, -- - - - - - -
County, Minn.                  June 28, 1938.
Hendricks Lake, S. Dak.        Flood Control Act, -- - - - - - -
and Minn., inlets and           Aug. 18, 1941.
outlets.
Kickapoo River, Wis..._..-_    Flood Control Act,
                                 Aug. 28, 1937.
Little Minnesota River, di-    Commerce Committee
  version of waters into        resolution, Nov. 4,
  Lake Traverse, for flood       1940.
  control and water conser-
  vation.
Minnesota River, Minn_ .__     Flood Control Act,                             ---'-'--------------
                                 June 22, 1936.
Missouri River diversion       Commerce Committee
  project (under special        resolution, June 22,
  board).                        1937.
Park River, N. Dak., tribu-    Commerce Committee                                   -   - --   -   -   ----   " -

  tary of Red River of the      resolution, Dec. 1,
  North.                         1938.
Pembina River and tribu-       Flood Control Act,                              -------------------

  taries, North Dakota.          June 28, 1938.
Red Lake River and tribu-      -__    do     .............                    --------------------

  taries, Minnesota.
Red River of the North         Flood Control Act,
  drainage basin, Minnesota,     Aug. 18, 1941.
  South Dakota, and North
  Dakota.
Root River, Fillmore,          Flood Control Act,
  Mower, Olmsted, Win-           Aug. 28, 1937.
  ona, and Houston Counties,
  Minn.
Roseau River, Minn., tribu-    Flood Control Act,
  tary of Red River of the       June 22, 1936.
  North.
Sheyenne River, N. Dak.,       Commerce Committee
  tributary of Red River of      resolution, Sept. 1,
  the North.                     1938.
Wells Creek, Goodhue           Flood Control Act,            Feb. 9, 1942__   --------------------
                                                                                                                       Do.
  County, Minn.                  June 28, 1938.
Whitewater River in south-     Flood Control Act,            Feb. 14,1942__   --------------------
                                                                                                                       Do.
  eastern Minnesota.             Aug. 28, 1937.
Wisconsin River and tribu-     Commerce Committee                             --------------------

  taries.                        resolution, Oct. 28,
                                 1941.
Zumbro River in south-         Flood Control Act,            Feb. 9, 1942__                                            Do.
eastern Minnesota.              Aug. 28, 1937.
1074     REPORT     OF CHIEF OF       ENGINEERS,      U.   S. ARMY,    1942

    IMPROVEMENT OF RIVERS AND HARBORS IN THE
            KANSAS CITY, MO., DISTRICT

  This district comprises a portion of southwestern Iowa, northwest-
ern, central, and western Missouri, northern Kansas, southern Ne-
braska, and a portion of northeastern Colorado embraced in the drain-
age basin of the Missouri River and tributaries from Rulo, Nebr., to
the mouth. The report on the section of the Missouri River from Kan-
sas.City, Mo., to Rulo, Nebr., is included in report upon improvement
of rivers and harbors in Omaha, Nebr., district.
  District engineer: Lt. Col. A. M. Neilson, Corps of Engineers, to
April 1, 1942; Lt. Col. Francis H. Oxx, Corps of Engineers, since that
date. Division engineer: Col. F. S. Besson, Corps of Engineers, to
April 9, 1942; Col. Lewis A. Pick, Corps of Engineers, since that date.
                                   IMPIROVEMENTS

               Navigation                           Flood control-Continued
                                     Page
1. Missouri River, Kansas City                                          Page
      to mouth--------------- 1074     8. Kanopolis Reservoir, Mis-
2. Missouri River, Kansas City             souri River Basin, Kans__ 1090
      to Rulo  --------------    1096 9. Missouri River Basin, Kan-
                                                                         1093
3. Osage River, Mo____          1080       sas City district---------_
4. Examinations, surveys, and        10. Preliminary examinations
      contingencies (general)___ 1083       and surveys for flood con-
5. Other projects for which no             trol-------------------- 1094
      estimates are submitted__  1084 11. Other flood-control projects
6. Plant allotment------------1085         for which no estimates are
                                            submitted- -______ -       _ 1095
              Flood control
7. Kansas Citys on Missouri
      and Kansas Rivers, Mo.
      and Kans-__    _____ -1085
           1. MISSOURI RIVER, KANSAS CITY TO THE MOUTH

   Location.-The Jefferson, Madison, and Gallatin Rivers conjoin at
Three Forks, Mont., to form the Missouri River, which flows south-
easterly 2,464.4 miles across or along seven States to the Mississippi
River, 17 miles above St. Louis. For description, see page 1149, Annual
Report for 1932. Practically the entire length of the section from
Kansas City to the mouth is contained within the State of Missouri.
   Previous projects.-The first appropriation for improvement by
regulation was made in the River and Harbor Act of June 18, 1878.
The original plan for comprehensive improvement was adopted by the
River and Harbor Act of August 2, 1882, modified by River and Harbor
Acts of July 5, 1884, September 19, 1890, and June 13, 1902. For fur-
ther details see page 1891 of Annual Report for 1915, and page 1153
of Annual Report for 1938.
   Existing project.-This provides for securing a permanent navigable
channel with a minimum low-water depth of 6 feet and a minimum
width of 200 feet, with a reasonable additional width around the bends,
   1The mileage for the Missouri River between the mouth and Three Forks, Mont., is
measured along the 1932 channel line from the mouth to Rulo, Nebr.; along the 1939 pro-
posed improved channel line from Rulo to Sioux City, Iowa; along the 1930 channel line
from Sioux City to Fort Benton, Mont.; and along the 1890 channel line from Fort
Benton to Three Forks.
               RIVERS      AND HARBORS-KANSAS                      CITY,     MO.,     DISTRICT           1075

by means of bank revetment, permeable dikes to contract and stabilize
the waterway, removal of snags, and occasional dredging. Length of
section under improvement (mouth to upper end of Quindaro Bend)
is 386.2 miles. Ordinary and extreme fluctuations of stage are 16 and
38 feet, respectively.
   The estimate of cost for new work, revised in 1938, is $80,000,000,
exclusive of amounts expended on previous projects. The estimated
cost for annual maintenance is $2,000,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                       Work authorized                                    Documents



July 25,1912       Project adopted for securing a permanent navi-       H. Doc. No. 1287, 61st Cong., 3d sess.
                     gable 'channel of 6-foot depth.
Aug.     8, 1917   This act fixed the upstream limit of the improve-    H. Doc. No. 463, 64th Cong., 1st sess,
                      ment at the upper end of Quindaro Bend (386.2 1
                     miles from the mouth), and provided for dredg
                     ing.
Mar. 3,1925        For a minimum width of 200 feet, with a reason-
                      able additional width around the bends.
Aug. 30, 1935      For completion of improvement from the mouth         H. Doc. No. 238, 13d Cong., 2d sess 7
                     to Sioux City, Iowa.


               11932 mileage.            2 Contains latest published maps of the Missouri River.

  Recommended modifications of project.--Under date of February
24, 1939, the Chief of Engineers recommended adoption of a project
for Missouri River between Sioux City and the mouth to provide for
a channel of 9-foot depth and width not less than 300 feet, to be
obtained by revetment of banks, construction of permeable dikes to
contract and stabilize the waterway, cut-offs to eliminate long bends,
closing of minor channels, removal of snags, and dredging as re-
quired, at an estimated construction cost of $6,000,000, in addition
to the amounts previously authorized, and with no increase in the
annual maintenance of $4,500,000 (H. Doc. No. 214, 76th Cong., 1st
sess.).
  Local cooperation.-The project provides that cooperation from
benefited localities may be required, in case a comprehensive plan
is adopted by Congress, for an apportionment of expense where any
improvement confers special benefit; and receipt of contributions
from private parties, to be expended with Government'funds upon
authorized works where such would be in the interest of navigation,
is authorized by the River and Harbor Act of March 4, 1915. The
Secretary of War has approved the general principle of cooperative
construction on the Missouri River below Kansas City on the basis
that 25 percent of the cost of any special installation shall be paid
by the United States and 75 percent by the local interests.
   The total amount contributed by local interests in cooperation with
the United States from 1918 to June 30, 1942, was $665,662.80, of
which $8,647.11 was returned to contributors.
  Work done by private interests for the benefit of the public during
the fiscal year 1942 was as follows:
1076            REPORT       OF CHIEF OF ENGINEERS,                U.       S. ARMY,         1942

  Big Blue Bend.-The Standard Oil Co. constructed a stone fill
around the Government-owned timber piling spur dike No. 379.91
at a cost of $35,000.
   DeWitt Bend.--The Wabash Railroad Co. placed 796 cubic yards
of limestone riprap on existing mattress; renewed willows in 300
squares of mattress; and renewed wire and cable in 350 squares of
mattress, along the left bank of the Missouri River in DeWitt Bend,
in the vicinity of mile 257.5 (1932 mileage), at a cost of $7,506.
   Lupus Reach.-The Missouri Pacific Railroad Co. constructed 1,000
linear feet of loose fascine type willow mattress and riprap along the
right bank at Lupus, Mo., in the vicinity of mile 174.7 (1932 mileage),
at a cost of $20,361.
   Hermann Reach.-The Missouri Pacific Railroad Co. constructed
1,500 linear feet of bank protection on the right bank at Hermann, Mo.,
in the vicinity of mile 94.3 (1932 mileage), at a cost of $25,536.
   Terminal facilities.-Facilities for transferring grain, petroleum
products, and other commodities are maintained at various locations
on this section of the river. These facilities are listed in the follow-
ing table:

                                                                                           Location 2


                             Description of facility 1                         Miles
                                                                               above
                                                                               mouth           Nearest town
                                                                                (1932
                                                                              mileage)

Oil-loading facilities ---   -----------------------------------------           384.6       K an s as   C it y,
                                                                                               Kans.
    Do ------    _________   -   -____
                                     -
                                   _______ ____-________    _-__        .        379.6           Do.
Grain elevator, conveyor, and dock-publicly owned, leased to private             379. 1          Do.
  concern.
Warehouse, escalator, bulk-handling dock, and concrete loading plat-             378. 6.     Kansas City, Mo.
form- publicly owned, leased to Inland Waterways Corporation
 (Federal Barge Lines).
Warehouse and concrete loading platform- publicly owned, leased to               377.2           Do.
War Department.
Oil-loading facilities_ ---------------------------------------------            367. 9      Sugar Creek, Mo.
Grain-loading facilities ------------------------------------------------        297.15      Waverly, Mo.
    Do ---                                                                       297.1           Do.
    Do -............................                     -------               a 226. 9      Glasgow, Mo.
Facilities for loading raw material for the ceramic industry --------------      116.8       Chamois, Mo.
    Do                                                                            96.82      Hermann, Mo.
Facilities for transferring sand and gravel--....                                 28.0       St. Charles, Mo.

  1 Privately owned and operated unless otherwise indicated.
  2On right bank unless otherwise indicated.
  3 On left bank.

    The above-listed facilities are considered adequate for existing
commerce. Additional terminals, however, are contemplated for con-
struction at other points as soon as conditions warrant.
    Operations and results dwring fiscal year-New work.-This work
consisted of the construction by contract of 16 dikes and 11 dike exten-
sions totaling 12,136 linear feet (2 rock-filled dikes included totaling
451 linear feet), 12 lengths of revetment totaling 19,021 linear feet,
and excavation of 1 pilot canal totaling 453,680 cubic yards of ma-
terial at a total cost of $822,690.73; construction by hired labor of
2 dikes, and a dike extension, totaling 1,775 linear feet, 5,595 linear
feet of revetment (260 linear feet of shore piles only included), 19,811
linear feet of bank protection, removal of 16.114 linear feet of existing
           RIVERS AND HARBORS-KANSAS                    CITY,         MO.,   DISTRICT          1077
structures, point removals at 6 localities, totaling 684,656 cubic yards,
by Government-owned dredges and dragline at a total cost of $492,-
636.13; surveys, appraisals, acquisition proceedings, and related work:
in connection with the acquisition of rights-of-way for channel
changes, and prosecution of engineering, design, and surveys at a total
cost of $64,909.49.
   In addition to completed works, there are in the process of construc-
tion, by contract, 9 dikes to total approximately 4,910 linear feet;
and 15 lengths of revetment to total approximately 12,136 linear feet;
and by hired labor, 1 length of revetment to total approximately 900
linear feet and there are in process of removal of 75 existing structures
at various localities in this section of the river.
   Continuing-contract commitments in the total amount of $3,278,-
468.98 have been authorized, for which funds in the amount of $2,578,-
534.23 have heretofore been provided. The total cost of new work
prosecuted with regular funds was $1,380,236.35.
   Regular funds--Maintenance.-This work consisted of the repair
by contract of 135 linear feet of dikes at a total cost of $1,498.24; the
accomplishment by hired labor of the following: Removal of 8,391,639
cubic yards of material from 54 localities by U. S. dredges Black,
Clark, Mitchell, Lewis, and a Government-owned dragline, also wash-
ing by towboat Suter at a total cost of $276,943.81; raising of 420
linear feet of existing structures, construction of 471 linear feet of
rock-filled and chute-closure dikes, the repair of 25,378 linear feet
of dikes and 23,526 linear feet of revetment, and the construction of
21,667 linear feet of protection of accretion, and 570 linear feet of re-
vetment realinement, at a total cost of $832,952.01; removal of 130
snags at a cost of $2,522.38; engineering, design, and surveys in con-
nection with maintenance work at a total cost of $97,769.60; marking
channel for navigation at a cost of $131,280.38; and stream gaging
for special studies and working data at a cost of $5,525.20.
   The total cost of maintenance, all prosecuted with regular funds,
was $1,348,491.62.
    The total costs for the fiscal year were as follows:

                                                      New work          Maintenance        Total

Regular funds   ----------------------------------   $1,380, 236.35     $1,348, 491.62   $2, 728, 727. 97



  The total expenditures were $1,516,014.34, all from regular funds.
  Condition at end of fiscal year.-The existing project was about
95 percent completed at the end of the fiscal year. The physical
extent of work accomplished was 1,741,965 linear feet of dikes, 992,-
264 linear feet of revetment, 29,499 linear feet of abatis, 23,320 linear
feet of bank protection, 35,842 linear feet of retards, 16,561 linear
feet of levees, 5 revetment spillways, excavation of 4,545,734 cubic
yards of material in the construction of pilot canals, removal of
70,290 linear feet of existing structures, dredge fills totaling 1,453,332
cubic yards, removal of 432,664 cubic yards of rock, removal of 81,-
081,860 cubic yards of material by dredging, and removal of 2,585,-
589 cubic yards of material in the improvement of bank alinement.
In general, the majority of the structures that have not accomplished
1078        REPORT         OF    CHIEF OF ENGINEERS,                       U.    S.      ARMY,              1942


the purpose intended are in only fair condition. Although addi-
tional dikes and revetment are required for permanent establish-
ment of the project dimensions, a channel with a minimum depth of
6 feet and a minimum width of 200 feet is in general available
throughout the navigation season, which approximately covers the
period from March 1 to November 30. Due to a period of high
water, the controlling depth at the end of the fiscal year was in
excess of 9 feet. The practicable draft at ordinary stages of the
river is 5.5 feet. This section of the river has been used for com-
mercial navigation since June 1935.
   The total cost of the existing project to June 30, 1942, was as
follows:

                                                             New work             Maintenance                       Total

Regular funds      -                                         $68,072,660.59           $19, 864,125.46             $87, 936,786.05
Emergency Relief funds _                                       1, 375, 243. 49               133, 756. 51           1, 509, 000.00
Public Works funds _--                                         6, 468, 490. 38                                      6, 468, 490. 38
      Total -_------
                   - ---      .-   -                          75, 916, 394. 46         19, 997, 881. 97            95, 914,276.43



   The total expenditures under the existing project to June 30, 1942,
were $95,928,398.88 ($87,950,908.50 regular funds, $6,468,490.38 Public
Works funds, and $1,509,000 Emergency Relief funds).
   For expenditures by local interests, see paragraph "Local coopera-
tion."
   Proposed operations.-The unexpended balance ($3,714,996.97) of
regular funds, together with advances for plant. ($150,000) and
accounts receivable ($69,744.25) will be applied during the fiscal
year ending June 30, 1943, as follows:

                                                                                               Estimated
                                                                                                 date of             Amount
                                                                                               completion
                                                                                         I                    I

                                                              . -. . . . . . . . . . .
A c c ou n ts pa ya ble J une 30, 1942 . - --- ----- -----------..                                                   $205,621.80
New work (July 1, 1942, to June 30, 1943):
      Channel improvement and bank protection by dike and revetment con-
         struction-by contract:
            Completion of existing contracts:
                Quindaro to Malta Bend, dikes and revetment--                 -- _     June 30, 1943                  157, 345. 94
                Malta Bend to Rocheport Reach, dikes and revetment ........            June 30, 1943                  156, 415. 35
                Saline City to Rising Creek Bends, revetment ----------------          June 30, 1944                   47, 464. 05
                Rocheport Reach to Providence Bend, revetment_                         June 30, 1943                   46. 953. 90
                R ocheport to Dundee Reaches, dikes and revetment                  .   June 30,1943                    98, 368.65
                Dundee Reach to Hinkles Bend, dikes and revetment _......              June 30, 1944                   47, 846. 39
                Hinkles to Weldon Springs Bends, revetment             _               June 30, 1944                  236, 834.44
                Weldon Springs Bend to St. Charles Reach, revetment- --                June 30,1944                   114, 453. 49
                St. Charles Reach to Amazon Bend, revetment _._-...-. ..-              June 30, 1944                  123, 547. 18
                Quindaro to Amazon Bends, dike and revetment ...-......--.             June 30, 1943                  725, 000. 00
      By hired labor:
            Completion of existing jobs:
                Kansas City to Dundee Reaches, removal of existing structures_ June 30, 1944                           23, 278. 56
                Randolph to Sissons Bends, acquisition of rights-of-way .......        Sept. 30, 1942                      170. 87
                Little Blue Bend to Portland Reach, removal of rock ..........         May 31, 1943                    75, 000.00
                Portland Reach to Bellefontaine Bend, acquisition of rights.
                  of-w ay -..... .. -.... .. ... .. .. .. ... .. .. ..                 June 30,1943                     9, 989. 80
                Dundee Reach to Amazon Bend, removal of existing structures_ June 30, 1944                             26, 861. 57
                Emergency construction to protect existing structures and main-
                   tain desired alinements                                             June 30,1943                    54, 108. 11
                Point removal to obtain desired alinements ....                        June 30, 1943                   10, 000. 00
                Engineering, design, and surveys ........----------------------             . ....  .                  80, 644. 57
               Total new work--_          .--.       ---.-                                                          2, 034, 282. 87
            RIVERS AND HARBORS-KANSAS CITY, MO., DISTRICT                                                                   1079

                                                                                                       Estimated
                                                                                                         date of        Amount
                                                                                                       completion

Maintenance, (July 1, 1942, to June 30, 1943):
   By contract (by negotiation):
       Maintenance of structures:
           Dike and revetment repair________________________ $150, 000
           Protection of accretions .        ---              300, 000
            Chute-closure dikes______            ________________________             125, 000
                                                                                                                            000.00
                                                                                                                        $575,
   By hired labor:
      Maintenance of structures:
          Dike and revetment repair______________________ $305, 067. 44
          Protection of accretions___________________________ 53, 405. 97
          Minor revetment realinement ------------------ 14, 364. 41
                                                                                                                         372, 837. 82
       Channel dredging--   ---------------------------------------------------                                          512, 157. 09
       Channel marking-----        --------------------------------------------------                                     95, 166. 81
       Snagging__                                                                                                          19, 653. 00
       Engineering, design, and surveys ___________________ _______________                                              120, 021.83

         Total maintenance ____________________________                                                                1, 694, 836. 55
         Total for all work___                                       - - --------------                                3, 934, 741. 22



  The additional sum of $2,750,000 can be profitably expended during
the fiscal year ending June 30, 1944, as follows:
New work (July 1, 1943, to June 30, 1944):
   Channel improvement and bank protection by dike and revet-
     ment construction:
       By contract_------------------------                                                                            $520, 000
       By hired labor_________ _ ____                                                                                    150, 000
       Engineering, design, and surveys - - ---
                                             _ -------------             -                                                80, 000
               Total new work-------------------------------------                                                      750, 000

Maintenance (July 1, 1943, to June 30, 1944):
   By contract: Maintenance and repair of existing works_                                                               430, 000
   By hired labor:
        Maintenance and repair of existing works     __                                                                 800, 000
        Channel dredging_--------------------------------------                                                         500, 000
        Channel marking----------------------------- ---------                                                          120, 000
            Snagging--------_                                                                 ------                      20, 000
            Engineering, design, and surveys _-----------                                                - -- -- -       130, 000
               Total maintenance_----------------------------                                                        2, 000, 000

               Total for all work -------------------------------                                                    2, 750, 000

                                        Cost and financial summary
Cost of new work to June 30, 1942-------------------------                                                 12   $83, 176, 497. 85
Cost of maintenance to June 30, 1942------------------------                                                    320, 400, 909. 06
     Total cost of permanent work to June 30, 1942             103, 577, 406. 91      ----------
Undistributed costs June 30, 1942_----------------------------      150, 000. 00
      Net total cost to 'June 30, 1942                                                                          1Q3, 727, 406. 91
Plus accounts receivable June 30, 1942_________ ____                                              -______             69, 744.25

       Gross total costs to June 30, 1942                         _____               -----                     103, 797, 151. 16
Minus accounts payable June 30, 1942-----------------------                                                          205, 621. 80
     Net total expenditures--------------------------------103, 591, 529. 36
Unexpended balance June 30, 1942___---------------------------3, 714, 996. 97
       Total amount appropriated to June 30, 1942-                                        -107,                      306, 526.33
  1Cost reduced by $1,338,156.58 by authority of the Chief of Engineers, March 3, 1942,
"Adjustments in cost accounts."
  2 Exclusive of $644,374.05. contributed funds.
  ' Exclusive of $12,641.64, contributed funds.
 1080         REPORT OF CHIEF OF ENGINEERS,                                          U. S. ARMIY,              1942


  Fiscal year ending June 30                 1938                 1939               1940               1941               1942


Cost of new work ___----                  $421, 458. 69      $1, 254, 053. 22   $3, 024, 341.05    $2, 004, 100. 75   $1, 380, 236. 35
Cost of maintenance .......              1, 428, 193.47       1, 003, 722. 93    1, 261, 693.95     1, 506, 241. 04    1, 348, 491.62

       Total cost ....... -            -...1, 849, 652. 16    2, 257, 776. 15    4, 286, 035. 00    3, 510, 341. 79    2, 728, 727. 97

Total expended ......------------        1, 965, 086. 75      2, 276, 273. 72    3, 892, 204. 42    3, 905, 927. 38    1, 516, 014. 34

Allotted __-----------------             3, 272, 447.88       3, 700, 000. 00    4, 099, 000. 00    4, 195, 000. 00    1, 417, 593.42



Balance unexpended July 1, 1941________________________--------------                                          $3, 813, 417.89
Amount allotted from War Department Civil
  Appropriation Act approved June 24, 1940_ ___               $46, 450. 00
Amount allotted from War Department Civil
Appropriation Act approved May 23, 1941____                 200, 000. 00
Amount allotted from War Department Civil
  Appropriation Act approved Apr. 28, 1942_____ 2, 509, 300. 00
                                                                                                                               . 00
                                                                                                                 r, 755.,v--750.
                                                                                                                 2.         .     .
                                                                                                                                         I

     Amount to be accounted for_________            ______                                                       6, 569, 167. 89
Deductions on account of revocation of allotment__ ____ __                                                       1, 338, 156. 58

      Net amount to be accounted for__ __________                                                                5, 231, 011. 31
Gross amount expended_________________          _ $3, 104, 170. 92
Less:
    Reimbursements collected___ $250, 000. 00
    Receipts from sales-- ------ 1, 338, 156. 58
                                                   1, 588, 156. 58
                                                                                                                 1, 516, 014. 34
      Balance unexpended June 30, 1942___                                                                        3, 714, 996. 97
Outstanding liabilities June 30, 1942____________                                     $22, 429. 95
Amount covered by uncompleted contracts --                                         2, 071, 864. 66
                                                                                                                 2, 094, 294. 61

     Balance available June 30, 1942                                                                                620, 702.36;
                                                                                                                 1----------------------1,
Accounts receivable June 30, 1942-__--                                   __-                                           9, 744. 25
                                                                                                                     6_______
          Unobligated balance available June 30, 1942                                                             , 690, 446. 61
                                                                                                                 1------------
Amount (estimated) required to be appropriated for comple-
tion of existing project 4________________                                                                      2, 049, 300. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1944:
   For new                                       - - - - - - - - - - -___
               work44- - - - - - - --- - - - - -_________
          Fornewwor                                                    - - - - - -_- -                             750, 000.00
                                                                                                                   75000.0
   For maintenance -----------------------------------                                                          2, 000, 000. 00
             Total'           -----------------------------------------                                         2, 750, 000. 00
   * Exclusive of available funds.

                       2. MISSOURI RIVER, KANSAS CITY TO RULO

  See report on Missouri River, Kansas City to Sioux City.                                                                  Page
1096.
                                               3. OSAGE RIVER, MO.

  Location.-This river, rising in eastern Kansas, flows easterly 516
miles in sinuous bends to the Missouri River, 129 miles above its
mouth and 14 miles below Jefferson City.
              RIVERS AND          HARBORS-KANSAS                  CITY,     MO.,         DISTRICT       1081
   Existing project.-This provides for a lock and dam and for open-
channel work consisting of wing dams and training walls, removal
of obstructions, and dredging between the mouth and Warsaw to
obtain a uniform depth of 3 feet. The length of section included in
the project is 164.7 miles 1 and consists of two parts, mouth to Bag-
nell Dam (Federal Power Commission project No. 459 at mile 75.4
above the mouth) and Bagnell Dam to legal head of navigation (im-
mediately below Warsaw). Ordinary and extreme fluctuations of
stage on the Osage River below Bagnell Dam are 15 and 41 feet and on
the Lake of the Ozarks, formed by Bagnell Dam, are 10 and 30 feet.
   The estimate of cost of new work, revised in 1928, is $250,000, ex-
clusive of the lock and dam, for open-channel work as far as the
mouth of the Niangua River (107 miles above the mouth of the Osage
River). The latest (1936) approved estimate of cost for annual main-
tenance is $18,500, including $6,000 for operating and care of lock
and dam. The following table shows the principal features of the
lock and dam included in the project:
                                 Lock and dam No. 1, Osage River

Nearest railroad station-----------------------  Osage City, Mo., 6 miles.
Distance above mouth of river------------------7.4 miles.
Lock dimensions_-----------------------------    42 by 220 feet.
Lift of lock--__---       ___----------------16                                  feet.
Depth on lower miter sill at low water-----------                         9 feet.
Character of foundation            -----------------------                Piles in gravel.
                                                                                                       1
Kind of dam__                                       ---                            with movable crest.
                                                                          F---------------
                                                                          Fxed
Type of construction ------------------------                             Concrete.
Year completed-----------------------------                               Lock, 1906; dam, 1911.2
Cost 3_-------------------------------_                                   $468,419.98.
   1 9-foot fixed dam of concrete with 7-foot movable crest of chanoine wickets and Chitten-
den drum weirs.
   2 Dam partially failed and was not entirely reconstructed until 1914.

   8Exclusive of $260,171.72, cost of reconstruction and repairs incident to the partial
failure.
  The existing project was authorized by the following river and
harbor acts:

       Acts                            Work authorized                                     Documents


Mar. 3,1871      Project adopted for deepening the channel over the shoals         H. Ex. Doc. No. 60, 41st
                   by dredging as far as Roscoe (238.5 miles above the mouth).       Cong., 3d sess., and An-
                                                                                     nual Report, 1871, p. 327.
Sept. 19, 1890   For beginning construction of a lock and dam_
Mar. 3,1899      For a lock and dam -__ -___
                                           ___.      . _ ________.----             Annual Report, 1898, p. 3474.
June 24, 1902    This act declared the river nonnavigable above the dividing
                  line between Benton and St. Clair Counties, Mo. (a point
                  approximately 185 miles above the mouth).
Mar. 4,1904      This act declared the river not to be a navigable stream
                  above a point which is located immediately downstream
                  from Warsaw, Mo.
June 26, 19341   Operating and care of the lock and dam provided for with
                   funds from War Department appropriations for rivers and
                   harbors.

  1   Permanent Appropriations Repeal Act.
  For latest published maps see H. Doc. No. 91, 73d Cong., 1st sess.

      1 Osage River and Lake of the Ozarks mileage.
1082   REPORT OF CHIEF OF ENGINEERS,        U.   S.   ARMY,   1942

  Terminal facilities.-On the Lake of the Ozarks, formed by Bag-
nell Dam, there are several marine ways and drydocks operated by
private interests which are capable of handling any boats now operat-
ing or likely to be operated on the lake. There also exist a few
docks which are open to the public, and numerous private docks and
storage facilities. These facilities adequately fulfill existing needs.
   On the Osage River below Bagnell Dam there are several small
boat docks maintained by private interests whih adequately fulfill
existing needs.
   Operations and results during fiscal year-Maintenance.-Work
consisted of the operation and care of the lock and dam as required
for passage of small craft at a total cost of $5,708.86. There were 27
lockages required for 27 small craft, 4 towboats, and 4 barges which
passed through the lock. The total cost was $5,708.86, and the ex-
penditures were $5,881.85.
   Condition at end of fiscal year.-Except for the construction of two
wing dams, one in 1925 and one in 1926, the open-channel work was
completed sufficiently in 1919 to provide reasonable accommodations
for the commerce actually using the channel. Upon the completion
of Bagnell Dam in 1931, navigable depths in excess of the project
depth were made available at all times on the portion of the project
upstream from mile 75.4. Navigation activities on the latter section
have increased considerably with the development of the Lake of the
Ozarks as a recreational area. Local interests and navigators have
indicated: a-desire that the Department undertake to remove the ac-
cumulation of drift which is carried into the lake by large inflows
from the upper Osage River and tributaries to the lake and which
occasionally constitutes a hazard and, at times, an obstruction to navi-
gation.
   The controlling depth from the mouth of the river to mile 21, or
about 14 miles above the lock and dam, is 3 feet, and drafts of 2 feet
over this section are practicable. The controlling depth from mile
21 to Bagnell Dam is 2 feet and drafts in excess of 18 inches are not
practicable. On the Lake of the Ozarks, depths of 10 feet or more
are available at any ordinary stage of the lake from Bagnell Dam
to Warsaw. The topography adjacent to the lake is such as to form
various coves in the lake of which many have dependable channels
for navigation for considerable distance above their confluences with
the main stem of the lake.
   The total cost of the existing project to June 30, 1942, was $1,248,-
613.13 from regular funds, of which $658,075.71 was for new work,
$513 847.22 was for maintenance, and $46,690.20 was for operation and
care of the lock and dam. The total expenditures were $1,248,676.36
from regular funds. In addition, the sum of $190,561.10 was expended
between July 1, 1912, and June 30, 1935, on the operation and care
of the works of improvement, under the provision of the permanent
indefinite appropriation for such purposes.
  Proposed operations.-The unexpended balance ($6,821.57) of reg-
ular funds and accounts receivable ($63.23) at the end of the fiscal
year will be applied during the fiscal year ending June 30, 1943, as
follows:
            RIVERS AND HARBORS-KANSAS                            CITY, MO.2 DISTRICT                 1083
Maintenance (July 1, 1942, to June 30, 1943, operation and care):
    Operation of lock and dam---------------------------------_                                 $6, 772. 87
    Ordinary maintenance and repairs (less rental)----------------                                  -- 1. 30
    Improvement and reconstruction ----------------------------                                       63. 23
    Emergencies-- --------------------------------------------                                       50. 00
        Total_----------------------- ---------------- -----------                               6,884. 80
  The additional suny oaf$5;000 can be prefitably expended during
the fiscal year ending June 30, 1944, as follows:
Maintenance (July 1, 1943, to June 30, 1944, operation and care):
    Operation of lock and dam-------------------------------------$4, 850
    Ordinary maintenance and repair (less rental) -                   100
    Emergencies---- _-------------------------------------------       50
        Total---------        ------------------------------------------                              5, 000
                                  Cost and fincncial summary
,Cost of new work to June 30, 1942____________________________                              $658, 075. 71
Cost of maintenance to June 30, 1942                        ___                              7____________________
                                                                                              81, 098. 52
      Total cost of permanent work to June 30, 1942------------                            1, 439, 174. 23
Plus accounts receivable June 30, 1942________         - _____--    __                              63. 23
        Gross total costs to June 30, 1942 _____________________                           1, 439, 237. 46
Net total expenditures_________---- -----          ____                                    1, 439, 237. 46
Unexpended balance June 30, 1942_____________-______________                                    6, 821. 57
        Total amount appropriated to June 30, 1942_______________                          1, 446, 059. 03


   Fiscal year ending June 30         1938          1939            1940           1941              1942

Cost of new work_____________.                                                   --------i.---
Cost of maintenance -_ _.___...      $4, 848. 54   $5, 134. 08     $5,066. 38    $15, 981.34         $5, 708. 86
Total expended_______                 4, 601. 77    5, 283. 23      5, 152. 07    15, 853.51          5,881.85
Allotted_                            10, 000. 00    5, 000. 00     16, 000. 00     5, 000. 00         7, 575. 00


Balance unexpended July 1, 1941------------------------------                                   $5, 128. 42
Amount allotted from War Department Civil Appro-
  priation Act approved June 24, 1940-  -     -        $875. 00
Amount allotted from War Department Civil Appro-
  priation Act approved Apr. 28, 1942                6, 700. 00
                                                                                                  7, 575. 00

      Amount to be accounted for                                                                  2, 703. 42
                                                                                                 1--------------------------
Gross amount expended ---------------------------------------                                     5, 881. 85

     Balance unexpended June 30, 1942-------------------_                                         6, 81. 57
Accounts receivable June 30, 1942-----------------------------                                        63. 23

         Unobligated balance available June 30, 1942-                  ----       ---             6, 884. 80

Amount that can be profitably expended in fiscal year ending
June 30, 1944, for maintenance -____________                                                     5, 000. 00
   1 Exclusive of available funds.

    4. EXAMINATIONS,              SURVEYS, AND CONTINGENCIES                            (GENERAL)

    The cost of work during the year was $38,465.28 and the expendi-
tures were $30,943.64.              The unexpended balance, $529.17 (including
accounts receivable), together with anticipated allotment of $39,100,
1084        REPORT OF CHIEF OF ENGINEERS,                                      U. S. ARMY,                  1942

will be applied as needed during the fiscal year 1943 to the payment of
expenses to be incurred under this heading. The additional sum of
$46,000 can be profitably expended during the fiscal year ending June
30, 1944.
                                        Cost and financial summary

Cost of new work to June 30, 1942_____________________________                                               -
Cost of maintenance to June 30, 1942__-____ ____                                   __----------.             $952, 800. 49

      Total cost of permanent work to June 30, 1942-                                                              52, 800. 49
                                                                                                                 9-----------
Plus accounts receivable June 30, 1942------------------------                                                         236. 18

     Gross total costs to June 30, 1942___________________                                                       953, 036. 67
Minus accounts payable June 30, 1942____________________________                                                        5. 10

     Net total expenditures________________________         _                                                    953, 031. 57
Unexpended balance June 30, 1942______________________________                                                        292. 99

         Total amount appropriated to June 30, 1942___________                                                   953, 324. 56

   Fiscal year ending June 30                1938               1939             1940               1941                1942


Cost of new work..       . . .         .--------------.
                                           . . . . .-----------
                                                         ..--        -- -- -- - -- --..
                                                                                     . .. . .       . .                  .-
Cost of maintenance                        $102, 345. 57  $64, 317. 98     $51, 027. 37    $30, 574. 00                $38, 465. 28
'Total expended----------------             65,637. 18         68, 213. 00     51, 374. 77         39, 204. 46          30, 943. 64
Allotted__------......--------------       155, 260. 00      -63, 054. 78      48, 418. 00         28, 750. 00



Balance unexpended July 1, 1941---------------------------------                                                 $31, 236. 63
(Gross amount expended,___--___-------__      ---
                                              _______   $36, 446. 89
Less reimbursements collected -- _________-- ______- -    5, 503. 25
                                                                                                                     30, 943. 64
      Balance unexpended June 30, 1942_-___                                             ______          -        -      292. 99
Outstanding liabilities June 30, 1942_________-----
                                      ..........-                                                                       209. 35
      Balance available June 30, 1.942 ----------------------------                                                      83. 64
Accounts receivable June 30, 1942______ _________________          _                                                    236. 18
         Unobligated balance available June 30, 1942 _____-___-___-                                                     319. 82
Amount that can be profitably expended in fiscal year ending June
30, 1944, for maintenance _______________       ________        _                                                   46, 000. 00
   1 Exclusive of available funds.

:5.OTHER PROJECTS FOR WHICH NiO ESTIMATES ARE SUBMITTED
                      [Commercial statistics for these projects are given in pt. 2 of report]

                                                                For last      Cost and expenditures to                Estimated
                                                              full report           June 30, 1942                      amount
                   Name of project                            see Annual                                             ream     to
                                                                Report                                               required to
                                                                 for-         New work        Maintenance             complete


Gasconade River, Mo.l2________                                         1931   $139, 003. 21        $85,076.57            (3)


4 Improvement adequate for existing needs.
  2 Curtailment of project recommepded in I.              Doc. No. 467, 69th Cong., 1st sess.
 :8 Project for m ainjenance only.
               RIVERS AND HARBORS-KANSAS                                    CITY, MO., DISTRICT                       1085
                 6. PLANT ALLOTMENT, KANSAS CITY, MO., DISTRICT

                                             Cost and financial summary
Undistributed costs June 30, 1942_                          ------               -------                 $3, 093, 243. 22
Net total cost to June 30, 1942-----------------------------  3, 093, 243. 22
Plus accounts receivable June 30, 1942------------------------307, 876. 96
      Gross total costs to June 30, 1942 ----------- ---------                                            3, 401, 120. 18
Minus accounts payable June 30, 1942-------------------------                                                394, 612.29

     Net total expenditures------------------------------                                                  3, 006, 507. 89
                               ---------------------------
Unexpended balance June 30, 1942_                                                                            192, 812. 52
           Total amount appropriated to June 30, 1942-----------                                          3,199, 320. 41

    Fiscal year ending June 30                  1938            1939             1940             1941              1942


Total expended       --       _- -__--        $61, 855. 15 -$247, 708. 49   -$366, 684. 52 -$154, 322. 98       $1, 263, 225. 69
Allotted____....--   ... __________...   _   -40, 477. 88   -237, 745. 22     -79, 570. 45    -310, 000. 00      1, 063, 156. 58



Balance unexpended July 1, 1941--------------------------_ ---                                                $392, 881. 63
Amount allotted from War Department Civil Appropriation Act
approved May 23, 19411---------------------------------,                                                      338, 156. 58
      Amount to be accounted for                                                                              731, 038. 21
                                                                                                           1-----------------------,
Deductions on account of revocation of allotment ----------                                                   275, 000. 00

       Net amount to be accounted for---------------------1,                                                   456, 038. 21
Gross amount expended---------------------$6,041,726.23
Less :
    Reimbursements collected _--- $4, 760, 719. 46
    Receipts from sales ---------      17, 781. 08
                                                        4, 778, 500. 54
                                                                                                           1, 263, 225. 69

      Balance unexpended June 30, 1942__----------------------                                                 192, 812. 52
Outstanding liabilities June 30, 1942-----------------------                                                   417, 534. 61
     Balance available June 30, 1942_ _. __                                                                -224, 722. 09
Accounts receivable June 30, 1942_      _--                                         -------                  307, 876. 96
           Unobligated balance available June 30, 1942__---------                                               83, 154. 87

7. KANSAS CITYS ON MISSOURI AND KANSAS RIVERS, MO. AND KANS.

   Location.-Kansas Citys on Missouri and Kansas Rivers in Mis-
souri and Kansas. The municipal and industrial areas which require
flood protection extend from the mouth of the Kansas River about
61- miles up and 91/2 miles down the Missouri River and 91/2 miles
up the Kansas River.
   Existing project.--The general plan of improvement contemplates
protection works, consisting principally of levees and flood walls, for
10 separate project units which are designated as follows: Argentine;
Armourdale; Central Industrial; Fairfax-Jersey Creek; North Kan-
sas City; East Bottoms; channel improvement, Kansas River: bridge
and approach alterations, Kansas River; channel improvements, Mis-
souri River; floodway improvement, Missouri River.
           493202-43--pt. 1, vol. 1----69
1086     REPORT OF CHIEF            OF ENGINEERS,   U.   S.   ARMY,   1942

   Project plans have been completed for the Fairfax-Jersey Creek
and channel improvement, Kansas River, units. These consist of the
following features:
   Fairfax-Jersey Creek unit.-About 32,514 feet of earth levee, 1,981
feet of concrete flood walls, and 33,100 feet of bank-protection works,
extending along the right bank of the Missouri River from a point
immediately above the Kansas City, Kans.. water and light plant
(mile 385.3 ) downstream to the mouth of the Kansas River, thence
along the left bank of the Kansas River to the vicinity of the Inter-
city viaduct (mile 0.3 2) ; pumping plants; and appurtenant works.
   Channel improvement, Kansas River, unit.-Bank-stabilization
works along the right bank of the Kansas River from the Seventh
Street Bridge to the Kansas City Terminal railroad bridge (mile
3.50 to mile 2.49 2) ; excavation of a foreshore bar along the right
bank of the Kansas River, extending from the Kansas City Southern
railroad bridge (mile 0.84 2) to the mouth; and removal of major
obstructions from the bed of the main channel of the Kansas River
between the Argentine bridge (mile 5.1.3 2) and the mouth.
   Detailed plans for the other project units have not been com-
pleted. The general plan, however, contemplates substantially com-
plete flood protection for the Kansas Citys with reservoir control of
the Kansas River. The Flood Control Act approved June 22, 1936,
authorized the existing project at an estimated construction cost not
to exceed $10,000,000; estimated cost of lands and damages, $8,000,000.
   Recommended modification of project.-Under date of April 24,
1940, the Chief of Engineers recommended that the existing project
be modified to authorize the construction of cut-offs at and in the
vicinity of Liberty Bend, Missouri River, without increase in the
authorized cost of the project (H. Doc. No. 722, 76th Cong., 3d sess.).
   Local cooperation.-See page 5 for requirements. The necessary as-
surances of local cooperation with respect to all units of the project in
Kansas were approved by the Secretary of War on July 6, 1938, and
the rights-of-way for the Fairfax-Jersey Creek and channel improve-
ment, Kansas River, units have been furnished. Local interests at
Kansas City, Kans., have contributed to the United States the net sum
of $45,689.96 to defray the extra cost of various features of construc-
tion in connection with the Fairfax-Jersey Creek unit, desired by local
interests but not required for adequate flood protection. The assur-
ances of cooperation by the city of Kansas City, Mo., in connection
with construction of the Central Industrial and East Bottoms units
within the State of Missouri were approved by the Secretary of War
on March 22, 1941, and the assurances of local cooperation in connec-
tion with the construction of the North Kansas City unit were approved
by the Secretary of War on June 17 and 20, 1941. Preliminary
negotiations for the acquisition of rights-of-way to be furnished the
United States in connection with the construction of the Central
Industrial unit of the project are in progress by local interests. The
acceptance of contributed funds in the amount of $25,000.00 to defray
l Above mouth of Missouri River.
  2 Above mouth of Kansas River.
        RIVERS AND HARBORS-KANSAS            CITY,   MO.,   DISTRICT   1087

the extra cost of installing pumping plants in lieu of the raising of
drainage ditch levees in the Fairfax-Jersey Creek unit, was approved
by the Secretary of War on February 27, 1942.
   Operations and results during fiscal year.-The work under the
project consisted of the following:,
   Fairfax-JerseyOreek unit.-Engineering,design, and surveys were
prosecuted by hired labor at a total cost of $200.29. The levees were
partially reseeded by hired labor at a total cost of $2,169.57. Owing
to the contractor's inability to obtain the necessary materials, no con-
struction work has been performed during this fiscal year. The total
cost during the fiscal year (including a minor cost adjustment of $1.09
in contractor's earnings for the fiscal year 1941) was $2,370.95.
   Central Industrialunit.--Project plans were prosecuted at a total
cost of $7,221.84. Construction work has not been initiated for this
unit of the project.
   Armourdale unit.-Work in connection with the preparation of de-
tailed plans was prosecuted at a total cost of $380.33.
   Bridge and approachalterations,Kansas River, unit.-Engineering,
design, and surveys were prosecuted by hired labor at a total cost of
$62.19. Expert engineering services in connection with the raising of
the existing James Street Bridge were furnished by contract at a total
cost of $1,184.50. The total cost during the fiscal year was $1,246.69.
   The total cost during the fiscal year, all for new work, was $14,029.85
 (inclusive of $2,810.04 of contributed funds which were returned to
local interests).
   The expenditures during the fiscal year, all for new work, were
$102,056.57 from regular funds and $22,407.89 from contributed funds,
a total of $124,464.46.
   Condition at end of fiscal year.-The existing project is about 26
percent complete at the end of the fiscal year. Except for the pumping
plants in Fairfax-Jersey Creek unit and removal of obstructions in the
Channel improvement, Kansas River unit, these units were completed
at the end of the fiscal year 1941. Completed work included the con-
struction of 32,514 linear feet of earth levees, a levee drainage system,
approximately 13,974.31 squares of foundation and toe-protection
mattress, 30,881.62 square miles of revetment paving, 965.33 linear feet
of steel sheet-pile wall, 11 sewer outlets, 1,981 linear feet of flood walls,
and 5 flood sills in connection with the Fairfax-Jersey Creek unit; the
excavation and disposition of 361,013 cubic yards of material in con-
nection with the removal of the foreshore bar, removal of 14,255 cubic
yards of objectionable material, and placement of 34,047 cubic yards
of earth fill, 25,426.16 tons of stone, and 4,149.05 squares of bank paving
in connection with bank stabilization under the channel improvement,
Kansas River unit.
   The total cost (exclusive of $45,689.96, contributed funds) of the
existing project (all new work) at the end of the fiscal year was
$2,543,526.91 and the total expenditures were $2,542,282.87 (exclusive
of $45,689.96, contributed funds).
   Proposed operations.--The unexpended balance of $1,844,817.13 of
regular funds and accounts receivable, $600.75, at the end of fiscal year
1088      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                              1942

plus the sum of $50,000 allotted in August 1942 will be applied during
the fiscal year ending June 30, 1943, as follows:
Accounts payable June 30, 1942                                    ____________             $682. 33
New work (July 1, 1942, to June 30, 1943) :
   Fairfax-Jersey Creek unit:
        Existing contract: Furnishing mechanical and electrical
           equipment for pumping plants__--__---                   ------------
                                                                              ___     123, 461. 60
         Proposed contracts: Construction of pumping plants___                        111, 538. 40
         By hired labor:
              Seeding of levees _----------------                          --  -_           268. 65
              Engineering and design__ _____                      -____________11,          196. 90
    Channel improvement, Kansas River unit:
         By hired labor:
              Removal of obstructions__ _________________--109, 766. 66
              Engineering and design________________________                             3, 323. 71
    Armourdale unit:
         By hired labor: Preparation of project plan-_------__                         45, 169. 00
    Central Industrial unit:
         Proposed contract: Raising existing levees and con-
           structing new levees and flood walls ----------------                   1, 368, 095. 64
         By hired labor:
              Preparation of project plan ---------------------                          6, 206. 71
              Engineering and design_______________________--                          45, 000. 00
    Bridge and approach alterations Kansas River, unit:
         Contract:
              Expert engineering services ----------------------                         1, 313. 25
              Raising of James Street Bridge          --------------------              18, 698. 05
         By hired labor:
              Preparation of project plan ______-________                                   459. 17
              Engineering and design________________________                                237. 81
   North Kansas City unit: Preparation of detailed plans, by
      hired labor _                                                                     50, 000. 00
           Total new work _____________-------------------1, 894, 735. 55
           Total for all work_____             ____---------------------1,             895, 417. 88
   The additional sum of $800,000 can be profitably expended during
the fiscal year ending June 30, 1944, as follows:
New work (July 1, 1943, to June 30, 1944) :
   Construction (by contract) :
       Central Industrial unit                                   $---------------
                                                                       000
       North Kansas City unit________-- ____------------------330, 000
       Channel improvement, Kansas River unit------------------    26,000
         Total       -------------------------------------------- 800, 000
  The proposed expenditures for the fiscal year 1943, together with
additional funds that can be profitably expended during the fiscal
year 1944, as indicated above, are sufficient to advance the project
to 52 percent of completion.

                               Cost and financial summary
                                        REGULAR    FUNDS

Cost of new work to June 30, 1942__________________ _________ $2, 543, 526. 91
                                                 -------------------
Cost of maintenance to June 30, 1942_________________--
      Total cost of permanent work to June 30, 1942              -----------       2, 543,   526. 91
Undistributed costs June 30, 1942_-------------------------_                         -- 1,   162. 46
      Net total cost to June 30, 1942--------------- --------                      2, 542,   364. 45
Plus accounts receivable June 30, 1942 ______-- ____----  -        - -               -       600. 75
      Gross total costs to June 30, 1942__________________-----                    2,542,    965. 20
Minus accounts payable June 30, 1942--                                                             33
                                                                                             6----------82.
        Net total expenditures____---                                              2, 542, 282. 87
Unexpended balance June 30, 1942 ---                                              1, 844, 817. 13
      Total amount appropriated to June 30, 1942- -4,                                 387, 100. 00
            RIVERS AND             HARBORS-KANSAS                           CITY,      MO.,        DISTRICT               1089

   Fiscal year ending June 30               1938               1939             1940                  1941              1942

Cost of new work----------                                  $35, 427. 15     $267, 973. 93 $2,226, 095. 98             $14,029.85
Cost of maintenance ---                                               -

Total expended----------------____        __________         31,060. 12       140, 232. 23       2, 268, 933. 95       102,056. 57
Allotted.....---------------------------------              105,000. 00     2, 635,000. 00       1,047, 100.00         600,000. 00


Balance unexpended July 1, 1941-------------------------------- $1, 346, 873. 70
Amount allotted from War Department Civil Appropriation Act
approved Apr. 28, 1942 ----------------------------------          600, 000. 00
      Amount to be accounted for-------------------------1,                                                         946, 873. 70
Gross amount expended__________________________ $127, 644. 97
Less reimbursements collected ________________-   25, 588. 40
                                                                                                                    102, 056. 57
      Balance unexpended June 30, 19421--------------------,                                                        844, 817. 13
Outstanding liabilities June 30, 1942--------------$2, 061. 00
Amount covered by uncompleted contracts----------18, 970. 37
                                                                                                                     21, 031. 37
     Balance available June 30, 1942 .____________________                                                    1, 823, 785. 76
Accounts receivable June 30, 1942  __                    _____-                                                -      6_______________
                                                                                                                      600. 75
Unobligated balance available June 30, 1942                                                                    , 824, 386. 51
                                                                                                              1__________________
Amount allotted in August 1942-----------------------------                                                       50, 000. 00
        !Amount available           during the fiscal year 1943___________                                    1, 874, 386. 51

Amount (estimated) required to be appropriated for completion
   of existing project 1--.              ----                                    ------                       5, 562, 900. 00

Amount that can be profitably- expended     in fiscal year ending
                                - ---- ---- -- - - - -------- ------
June 30, 1944, for new work                                         -                                              800, 000. 00
1Exclusive of available funds.
                                                CONTRIBUTED FUNDS

Cost of new work to June 30, 1942---------------------------$45,                                                         689. 96
Cost of maintenance to June 30, 1942____________      __                                                     ----------
       Total cost of permanent work to June 30, 1942---------                                                        45, 689. 96
Net total expenditures-------------------------------------                                                          45, 689. 96
Total amount contributed to June 30, 1942-----------------------                                                     45, 689. 96

   Fiscal year ending June 30               1938               1939             1940                  1941              1942


Cost of new work _______________--.._____-.....----..                          $4, 103.74          $44, 396. 26        -$2, 810. 04
                   .. -
Cost ofmaintenance-----         - ------------------            -------- ------------        ---       -------- -
                         _ _ . .__...............------
Total expended ..............                 --'... - -_                        .           .      23, 282.07          22, 407. 89

Contributed ..              ....----------------------------------------.
                      ..------                                                         0 --
                                                                               48, 500.00                               -2, 810. 04


Balance unexpended July 1, 1941 --------------                                                                       25, 217.93
                                                                                                                    $--------------
Deductions on account of revocation of allotment_____________                                                         2,810. 04

      Net amount to be accounted for       -------------------                                                       22,407. 89
Gross amount expended__----          -------------------------                                                       22, 407. 89
1090        REPORT         OF CHIEF OF ENGINEERS,                            U.    S. ARMY,          1942

CONSOLIDATED COST AND FINANCIAL SUMMARY                            FOR KANSAS           CITYS, MO. AND KANS.

Cost of new work to June 30, 1942________________----------                                           $2, 589, 216. 87
Cost of maintenance to June 30, 1942-----------                                                      ------------
      Total cost of permanent work'to June 30, 1942                _-------___                         2, 589, 216. 87
Undistributed costs June 30, 1942 _-----------------------------1,                                             162. 46
      Net total cost to June 30, 1942______________-----------------------                             2, 588, 054.41
Plus accounts receivable June 30, 1942_---------- --------------                                               600. 75
     Gross total costs to June 30, 1942_-----------------                                              2, 588, 655. 16
Minus accounts payable June 30, 1942 --------------------------                                                682. 33
     Net total expenditures           _ _------------------------------                                2, 587, 972. 83
Unexpended balance June 30, 1942-------         _-----------------                                     1, 844, 817. 13
          Total amount appropriated and contributed                               to June 30,
            1942    -------------------------------------------                                        4, 432, 789. 96

Fiscal year ending June 30            1938            1939                1940               1941               1942

Cost of new work_          --                        $35, 427. 15        $272, 077. 67 $2, 270, 492. 24         $11, 219. 81
Cost of m aintenance            ----            . .. .. .. .. .. . --
                                         ----------...                   - - - - - - ----------
Total expended         _   --                         31, 060. 12         140, 232. 23    2, 292, 216. 02       124, 464. 46
                             ....
Allotted and contributed----------             -     105, 000.00        2, 683, 500.00    1,047, 100.00         597, 189. 96


Balance unexpended July 1, 1941--------------___            $1, 372, 091. 63
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942__________________--00,                      000. 00
      Amount to be accounted for _______ _____      ___________                                        1, 972, 091. 63
Deductions on account of revocation of allotment_._____                                                     2, 810. 04

      Net amount to be accounted for__---- __---.--.____                                              1, 969, 281. 59
Gross amount expended________--_--_----------      $150, 052. 86
Less reimbursements collected_______---------        25, 588. 40
                                                                                                            124  464 46
                                                                                                            1, 844,817. 13

      Balance unexpended June 30, 1942_________________                                                1, 844, 817. 13
Outstanding liabilities June 30, 1942______
                                      -----           2, 061.00
Amount covered by uncompleted contracts--------      18, 970. 37
                                                                                                             21, 031. 37

          Balance available June 30, 1942---                                                              823, 785. 76
                                                                                                       1------------------,
TAccounts receivable June 30, 1942-----------------------------                                                 600. 75

    Unobligated balance available June 30, 1942-----------1,                                                824, 386. 51
Amount allotted in August 1942------------------------------                                                 50, 000. 00
          Amount available during fiscal year 1943----------                                           1, 874, 386. 51

Amount (estimated) required to be appropriated for completion
     of    existing project 1---------------------------------                                        5, 562, 900. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for new work 1-----------------------------                                                 800, 000. 00
1 Exclusive of available funds.

        8. KANOPOLIS RESERVOIR, MISSOURI RIVER BASIN, KANS.

   Location.-The Kanopolis dam site is located on the Smoky Hill
River about 19 miles west and 16 miles south of Salina, Kans., and is
approximately 205 river miles above the mouth of the stream.
   Existing project.-The plan of improvement provides for the con-
struction of an earth fill dam, with a height of about 125 feet above
the stream bed and a total length of 15,400 feet, including 4,300 feet
of dike section on the left abutment and 2,600 feet of dike section on
        RIVERS AND     HARBORS-KANSAS        CITY, MO.,   DISTRICT    1091

the right abutment; with a reservoir providing for storage capacity
of 450,000 acre-feet, of which 400,000 acre-feet of capacity is for flood
control and 50,000 acre-feet for recreation and stream-flow regula-
tion. The outlet works and spillway are to be located in the right
abutment. The reservoir will control approximately 95 percent of
the drainage area of the Smoky Hill River above Salina, Kans.
   It is contemplated that the Kanopolis reservoir will be operated in
combination with proposed reservoirs to be located on other major
tributaries of the Kansas River. The primary purpose of the project
is flood control for municipal and agricultural areas along the Smoky
Hill and Kansas Rivers, with incidental benefits in reducing Missouri
and Mississippi River flood stages.
   The existing project was selected for construction as a unit in the
general comprehensive plan for flood control and other purposes in
the Missouri River basin authorized by the Flood Control Act ap-
proved June 28, 1938 (Public, No. 761, 75th Cong., 3d sess.). The
estimate of cost, revised in 1940, is $8,977,000, of which $7,654,300 is for
construction and $1,322,700 for lands and damages.
   Local cooperation.-Section 2 of the Flood Cntrol Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Miscellaneous surveys
and examinations, sampling, tests, and stream gaging in connection
with engineering and design were prosecuted at a cost of $4,953.38.
Cadastral and subdivision surveys on all land involved were com-
pleted; appraisals, negotiations, and preparation of maps and plats
were prosecuted in connection with the acquisition of lands required
for the project, and 5,635.71 acres of land were acquired at a cost of
$485,287.52. Operations also included the completion, by contract,
of the diversion works at a cost during the fiscal year of $154,086.22;
construction of embankment and excavation of spillway by contract
at a cost during the fiscal year of $1,573,435.70.
   The work performed by contract in connection with the construc-
tion of the diversion works, during the fiscal year, involved the ex-
cavation of 27,134 cubic yards of material and the placement of
4,893 cubic yards of backfill and embankment, 400,837 pounds of
reinforcement steel, 30,794 pounds of steel bracing, and 5,403 cubic
yards of concrete; and the work performed, during the fiscal year,
in the construction of embankment and the excavation of spillway
involved the excavation of 6,999,856 cubic yards and the placement
of 1,200,400 cubic yards of pervious fill, 1,306,943 cubic yards of ran-
dom fill, and 1,413,180 cubic yards of impervious fill in the embank-
ment, 964,869 cubic yards of fill in the upstream blanket, and 505,718
cubic yards of fill for the downstream berm.
   The total cost during the' fiscal year, all for new work, was $2,-
217,762.82 and the total expenditures were $2,377,687.52, all from
regular funds.
   Condition at end of fiscal year.-The project is approximately
50 percent complete at the end of the fiscal year. Work in connection
with the acquisition of lands required is 70 percent complete. Con-
struction of the Government buildings, the access road, and the di-
version works has been completed. Construction of the diversion
works involved the excavation of 248,955 cubic yards of material and
the placement of 17,791 cubic yards of backfill and embankment,
2,061,285 pounds of reinforcement steel 1,270,488 pounds of steel
1092      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                             1942

bracing, and 22,158 cubic yards of concrete. Construction of the dam
and the excavation of the spillway have involved the excavation of
10,322,056 cubic yards of material, the placement of 1,832,100 cubic
yards of pervious fill, 1,579,243 cubic yards of random fill, 2,006,480
cubic yards of impervious fill, 1,566,969 cubic yards of fill in the up-
stream blanket, and 786,618 cubic yards of fill for the downstream
berm of the embankment.
   The total cost (all new work) of the existing project to June 30,
1942, was $4,478,615.98, and the expenditures were $4,138,808.68 from
regular funds.
   Proposed operations.-The unexpended balance, $3,786,191.32, at
the end of the fiscal year will be applied during the fiscal year ending
June 30, 1943, as follows:
Accounts payable June 30, 1942__------____________________            $334, 229.97
New work (July 1, 1942, to June 30, 1943) :
    By contract:
        Completion of existing contracts: Construction of em-
          bankment and excavation of spillway, July 1, 1942,
          to June 30, 1943_________________-------________           2, 830, 811. 23
    By hired labor:
        Installation of safety measures in the control tower ...             650. 00
        Clearing of reservoir area, July 1, 1942, to Feb. 1, 1943__      33, 800. 00
        Relocation of Government-owned buildings, July 1 to
          Dec. 1, 1942_--------------------------------------            15, 000. 00
        Acquisition of land, July 1, 1942, to Jan. 15, 1943--------     452, 102. 09
        Engineering and design____________--   -    -    -- ________    119, 598. 03
             Total for new work                 .______                            3,451, 961. 35
                                                                  -_________________
             Total for all work______________________________                                    3, 786, 191. 32
  The additional sum of $1,052,000 can be profitably expended dur-
ing the fiscal year ending June 30, 1944, on new work, construction
by contract of protective works at spillway crest.
  The proposed expenditures for the fiscal year 1943, together with
the amount that can be profitably expended during the fiscal year
1944, as indicated above, are sufficient to complete the project.
                                 Cost and financial summary
Cost of new work to June 30, 1942 -----
Cost of maintenance to June 30, 1942
                                                       ___----------___
                                                             ______           ___
                                                                                                $4, 478, 615. 98


      Total cost of permanent work to June 30, 1942-_________                                    4, 478, 615. 98
Undistributed costs June 30, 1942--_____- -----          -----                                      -5, 577. 33
     Net total cost to June 30, 1942___-------------                                __           4,473, 038. 65
Minus accounts payable June 30, 1942 _____-.____                             ____        __        334, 229. 97

      Net total expenditures____ ._____  ________     -_                                         4, 138, 808. 68
Unexpended balance June 30, 1942-----------------------                                          3, 786, 191. 32
        Total amount appropriated to June 30, 1942 __________                                    7, 925, 000. 00

   Fiscal year ending June 30         1938            1939            1940               1941             1942

Cost of new work ..............           - -  $37, 897. 74 $152, 449. 24 $2, 070, 506. 18 $2, 217, 762. 82'
C ost ofm aintenance ............
                            -.. .................. ... ... .. ... ... ..             - --------
Total expended ...-.....
                      ... ... _-              ----
                                             -___    35,243. 95     143, 470. 04    1, 582,407. 17     2, 377, 687. 52
Allotted .................       .     ...... 1,450, 000. 00      1,925, 000. 00    1,900, 000.00      2, 650, 000. 00
             RIVERS AND HARBORS                              KANSAS CITY, MO., DISTRICT                       1093
Balance unexpended July 1, 1941----------------------------- $3, 513, 878. 84
Amount allotted from War Department Civil Appropriation Act
  approved Apr. 28, 1942_
                       -------------------------------------- 2, 650, 000. 00

      Amount to be accounted for-----------------------------6, 163, 878. 84
Gross amount expended------------------------- $2, 378, 434. 06
Less:
    Reimbursements collected----------- $223. 69
    Receipts from sales----------------- 522. 85
                                           -----        746. 54
                                                                2, 377, 687. 52

      Balance unexpended June 30, 1942--------------    --------                                      3, 786, 191. 32
Outstanding liabilities June 30, 1942-------------- $54, 532. 30
Amount covered by uncompleted contracts--------. 3, 174, 395. 90
                                                                                                      3, 228, 928. 20

          Unobligated balance available June 30, 1942-------- ------                                    557, 263. 12

Amount (estimated) required           to be appropriated for completion
                     - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - -
of existing project                                                                                  1, 052, 000. 00
Amount that can be profitably expended in fiscal year ending
   June 30, 1944, for new work                  1_--------                              ---           1, 052, 000. 00
     Exclusive of available funds.

                 9. MISSOURI RIVER BASIN, KANSAS CITY DISTRICT

   Location.-The flood-control improvements included in this project
are located on tributaries of the Missouri River and are in the States
of Nebraska, Kansas, and Missouri. More definite locations of in-
dividual items are given in the following paragraph.
   Existing project.-The general comprehensive plan for flood con-
trol in the Missouri River Basin, as set forth in Flood Control Com-
mittee Document No. 1, Seventy-fifth Congress, first session, was
approved by the Flood Control Act approved June 28, 1938, with
such modifications as may be advisable in the discretion of the Sec-
retary of War and Chief of Engineers. The Flood Control Act of
August 18, 1941, modified the comprehensive plan to include the project
for the Harlan County Reservoir on the. Republican River, Nebr.
 (H. Doc. No. 842, 76th Cong. 3d sess.), and such other supplemental
flood-control works on the Republican River as the Secretary of War
and the Chief of Engineers may find advisable. A total of $16,000,000
has been authorized for the initiation and partial accomplishment of
the plan ($9,000,000 by the Flood Control Act of June 28, 1938, and
$7,000,000 by the Flood Control Act of August 18, 1941). The fol-
lowing is a list of the reservoirs considered in the plan and modifica-
tions thereof:
Reservoir :                                                                                    Total estimated cost
      Harlan County, Republican River, Nebr--------------------$20, 078, 098
      Milford, Republican River, Kans------------ --------------          20, 904, 000
      Tuttle Creek, Big Blue River, Kans-----------------27,                  953, 000
      Kanopolis, Smoky Hill River, Kans -----------------------               977, 000                  28,
      Osceola, Osage River, Mo_         --------------------------------- 28, 530, 000
      Pomme de Terre, Pomme de Terre River, Mo                              , 169, 000
                                                                           6----------------
      South Grand, South Grand River, Mo----------------------10, 368, 000
      Arlington, Gasconade River, Mo----------------------                 7, 319, 000
      Richland, Gasconade River, Mo---------------------------- 6, 892, 000
      Chillicothe, Grand River, Mo---                             ----- _ 28, 290, 000
   1 Alternate to Harlan County Reservoir.
   2 Details of this project are given in individual report.
1094        REPORT        OF CHIEF OF ENGINEERS,                       U. S. ARMY,            1942


   Local cooperation.-See page 5 for requirements.
   Condition at end of fiscal year.-Construction progress of the
Kanopolis Reservoir is given in an individual report. There have
been no costs or expenditures under this heading except those for the
Kanopolis Reservoir which are shown in the individual report for
that project.
   Proposed operatiqns.-The operations proposed during the fiscal
year 1943 on the Kanopolis Reservoir are shown in the individual
report for that project. It is proposed to apply the sum of $90,000,
allotted in August 1942, to surveys, engineering studies, and design
of flood-control dams and reservoirs included in the comprehensive
plan. The sum of $200,000 can be profitably expended during the
fiscal year 1944 for the further accomplishment of the comprehen-
sive plan.
                                    Cost and financial summary
Cost of new work to June 30, 1942                           --                                                     __-
Cost of maintenance to June 30, 1942----------------------------------

      Net total expenditures
Total amount appropriated to June 30, 1942__                                                            -

Amount allotted in August 1942_______________-___-__________                                            $90, 000
Amount available during the fiscal year 1943 _______-______--- -90,                                          000

Amount that can be profitably expended in fiscal year ending June 30,
1944, for new work-------------------------         --------------- 200, 000
      10. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD
                            CONTROL

   The cost of work during the year was $78,389.41 and the expendi-
tures were $80,728.01. The balance unexpended at the end of the
fiscal year, $23,095.67, including accounts receivable, $42.51, plus the
sum of $7,550 allotted in August 1942 will be applied to payment of
expenses incurred under this heading during the fiscal year ending
June 30, 1943.
                                    Cost and financial summary

Cost of new work to June 30, 1942________
Cost of maintenance to June 30, 1942 ----------------------                                         $177, 775. 47
      Total cost of permanent work to June 30, 1942_________                                         177, 775. 47
Plus accounts receivable June 30, 1942 __________________---___                                            42. 51

      Gross total costs to June 30 1942 _________- ___      __                                _      177, 817. 98
Minus accounts payable June 30, 1942__------     ______----                                            4, 646. 14

     Net total expenditures_______-___________ ______                                                173, 171. 84
Unexpended balance June 30, 1942_______________________                                               23, 053. 16
         Total amount appropriated to June 30, 1942--------                                __       196, 225. 00

   Fiscal year ending Juen 30              1938           1939           1940          1941                 1942

Cost of new work__---------------------------------------------------------------.--
Cost of maintenance .       -..........     $501.83     $15, 430. 85   $23, 204.88   $60, 248. 50       $78, 389. 41
Total expended ................      -       500.99      14,921.28      23,874.90     53,146.66             80, 728.01
Allotted .......................          35, 300. 00   123, 400. 00     2, 525.00    35, 000. 00 .
            RIVERS      AND     HARBORS-KANSAS                       CITY,       MO.,      DISTRICT         1095

Balance unexpended July 1, 1941------------------------------ $103, 781. 17
Gross amount expended----------------------------- $80, 930. 28
Less reimbursements collected-- ----------------------  202. 27
                                                                80, 728. 01
      Balance unexpended June 30, 1942 --------------------                                            23, 053. 16
Outstanding liabilities June 30, 1942-----------------------------                                      5, 920. 73
     Balance available June 30, 1942---------------------------                                        17, 132. 43
Accounts receivable June 30, 1942---------------------42.                                                       51

     Unobligated balance available June 30, 1942--------------                                         17,174. 94
Amount allotted in August 1942---------------------------_  __                                          7, 550. 00
        Amount available during the fiscal year 1943--------------                                     24, 724. 94

11. OTHER FLOOD CONTRIOL PROJECTS FOR WHICH NO ESTIMATES
                      ARE SUBMITTED

                                                         For last      Cost and expenditures to         Estimated
                                                       iull report           June 33, 1942               amount
                 Name of project                       see Annual                                        required
                                                         Report                                        to complete
                                                          for-         New work         Maintenance    tocomplete


1. Kansas River at Lawrence, Kans.'_ _ _ ____- .          1938                                              $165, 100
2. Topeka, Kansas River, Kans._                _          1941        2 $745, 859. 23                       3 316, 000
1 Awaiting local cooperation.
2 Includes $7,659.31 contributed funds.
3 Exclusive of available funds.


Status of all investigations for flood control called for by flood-control acts and
                              committee resolutions

                                                            Date trans-                               Recommenda-
          Locality                 Authorization act         mitted to          Document number           tion
                                                             Congress

Beaver and Sappa Creeks,     Flood Control Act
Kans. and Nebr.               June 28, 1938.
Chariton River, Iowa ......  Flood Control Act
                               Aug. 28, 1937.
Chariton River, Mo .......   Flood Control Act
                               June 28, 1938.
Chariton River, Mo .-....    Flood Control Com-
                               mittee     resolution
                               Deb. 10, 1938.
Chariton River, Schuyler Flood Control Act,
County, Mo.                   Aug. 28, 1937.
Grand River and tributaries, Flood Control Act,
Mo.                          June 28, 1938.
Kansas Riverandtributaries Flood Control Com-
                              mittee     resolution
                               Apr. 2, 1936.
Kansas River at Manhattan, Flood Control Act,
Kans.                        June 22, 1936.
Kansas River, Kans., at ----- do---          .---------    Oct.      6, 1941                          Unfavorable.
Lawrence, North Law-
rence, and immediately
contiguous area.
Marais des Cygnes River, - ..do -- -
Kans.
   Do _ .----- ......_   Flood Control             Act,                        --------------------
Marmaton River, Kans ...-- -
                                  May 6, 1936.
                                Flood Control      Act,    Oct. 13, 1941       --------------------      Do.
Missouri and Kansas Riv-
ers, Mo. and Kans., at
                                  June 22, 1936.
                                Flood Control
                                  June 22, 1936.
                                                   Act,    -- - - - - - -      --------------------
Kansas Citys.
Missouri River, protection      Commerce Commit-
of Kansas Citys, Mo. and        tee resolution, Apr.
Kans., and adjacent areas       29, 1941.
from floods.
1096       REPORT        OF CHIEF OF ENGINEERS,                            U.       S. ARMY,               1942

Status of all investigations for flood control called for by flood control acts and
                       committee resolutions-Continued

                                                                Date trans-                                  Recommenda-
         Locality               Authorization act                mitted to      Document number                  tion
                                                                 Congress

Osage (Little) River, Kans__   Flood    Control      Act,       Nov. 22, 1941                          _     Unfavorable.
                                Aug. 28, 1937.
Republican River and trib-     Flood Control Com-
utaries, west of Harlan,       mittee resolution,
County dam site.               June 20, 1940.
Republican River at Wray,      Flood    Control      Act,       Mar. 18, 1942   -     _.--------------            Do.
Colo.                          June 28, 1938.
Smoky Hill River, Kans __.     Flood     Control     Act,   -                                     --
                                 June   22, 1936.
Smoky Hill River and           Flood     Control     Act,
minor tributaries, of Kan-      Apr.   10, 1936.
sas River.
Weldon River, Mo ________      Flood Control Act,
                                 June 22, 1936.


      IMPROVEMENT OF RIVERS AND HARBORS IN THE
                OMAHA, NEBR., DISTRICT
   This district comprises a portion of southeastern North Dakota,
southern and eastern South Dakota except a small northeastern
portion, a small portion of southwestern Minnesota, western Iowa,
a small portion of northwestern Missouri, northern Nebraska ex-
clusive of the northwestern corner, a portion of northern central
Colorado, and southeastern Wyoming embraced in the drainage basin
of the Missouri River and tributaries from the mouth of the Cheyenne
River, exclusive, to Rulo, Nebr.
   The improvement of that section of the Missouri River from Rulo,
Nebr., to Kansas City, Mo. (Quindaro Bend), is under the juris-
diction of the Kansas City, Mo., district.
   District engineer: Col. Helmer Swenholt, Corps of Engineers, to
February 1, 1942; Col. Lewis A. Pick, Corps of Engineers, to May 15,
1942; Maj. E. W. Niles, Corps of Engineers, since that date.
   Division engineer: Col. F. S. Besson, Corps of Engineers, to April
9, 1942; Col. Lewis A. Pick, Corps of Engineers, since that date.
                                              IMPROVEMENTS

                    Navigation                                       Flood control-Continued
                                                    Page                                                                Page
1. Missouri River, Kansas City,                          7. Cottonwood Springs Reser-
      to Sioux City_                                1096       voir, Fall River Basin, S.
2. Missouri River, Sioux City,                                Dak                                                      1111
      to Fort Benton__________                      1106 8. Missouri River, Sioux City,
3. Examinations, surveys, and                                 Iowa, to Kansas City, Mo_                                1112
      contingencies (general)__                     1108  9. Preliminary     examinations
4. Plant allotment_                                1109       and surveys for flood con-
                                                               trol_ __    __   -                                       1113
                    Flood control                        10. Other flood-control projects
5. Hot   Springs, Fall River                                  for which no estimates are
      Basin, S. Dak_                                           submitted _                                              1114
                                                    1110
6. Cold Brook Reservoir, Fall
      River Basin, S. Dak ____                      1110

              1. MISSOURI RIVER, KANSAS CITY TO SIOUX CITY

  Location.--The Jefferson, Madison, and Gallatin Rivers conjoin
at Three Forks, Mont., to form the Missouri River, which flows
                   RIVERS      AND     HARBORS-OMAHA,                    NEBR.,     DISTRICT            1097
southeasterly 2464.4 miles across or along seven States to the Missis-
sippi River, 17 miles above St. Louis.
   The river is the boundary between the States of Missouri, Kansas,
Nebraska, and Iowa. For description, see page 1149, Annual Re-
port for 1932.
  Previous projects.-Under the River and Harbor Act of August
14, 1876, the first regulation works were constructed at St. Joseph
and Nebraska City, but a project for systematic river improvement
was not adopted until August 2, 1882, modified by the River and
Harbor Acts of July 5, 1884, September 19, 1890, and June 13, 1902.
For further details see page 1893, Annual Report for 1915, and page
1175, Annual Report for 1938.
  Existing project.-This provides for securing a permanent navi-
gable channel 6 feet in depth and to conform to the character (min-
imum low-water depth of 6 feet and minimum width of 200 feet,
with a reasonable additional width around the bends) and methods
of improvement of the section of river between the upper end of
Quindaro Bend and the mouth, namely, by means of bank revetment,
permeable dikes to contract and stabilize the waterway, removal of
snags, and occasional dredging. Length of section under improve-
ment (upper end of Quindaro Bend to Sioux City) is 375.3 miles.
The ordinary fluctuation is about 14 feet and the extreme fluctuation
about 38 feet.
   The estimated cost of new work, revised in 1935, is $92,000,000,
exclusive of amounts expended on previous projects. The estimated
cost of annual maintenance is $2,500,000.
   The existing project was authorized by the following River and
Harbor Acts:

       Acts                        Work authorized                                    Documents 1



Jan. 21,1927       Appropriation of $12,000,000 authorized for the        H. Doc. No. 1120, 60th Cong., 2d sess.
                    existing project.
July     3, 1930   Appropriation oi $15,000,000 additional authorized;
                    additional allotments totalling $29,153,108 were
                    made by the Public Works Administration
                    under the provisions of the Natiosnal Industrial
                    Recovery Act of June 16, 1933, and $9,669,791.92
                    allotted under the provisions of the Emergency
                    Relief Appropriation Act of Apr. 8, 1935.
Aug. 30, 1935      For completion of the project from the mouth to        H. Doc. No. 238, 73d Cong., 2d sess.
                    Sioux City, Iowa.


  1 Contain the latest published maps of Missouri River.


   Recommended modifications of project.-Under date of February
24, 1939, the Chief of Engineers recommended adoption of a project
for Missouri River between Sioux City and the mouth to provide for
a channel of 9-foot depth and width not less than 300 feet to be ob-
tained by revetment of banks, construction of permeable dikes to con-
tract and stabilize the waterway, cut-offs to eliminate long bends,
closing of minor channels, removal of snags, and dredging as re-
quired, at an estimated construction cost of $6,000,000, in addition to
the amounts previously authorized, and with no increase in the an-
1098      REPORT OF CHIEF OF ENGINEERS,   U.   S.   ARMY,   1942

nual maintenance of $4,500,000 (H. Doc. No. 214, 76th Cong., 1st
sess.).
   Terminal facilities.-At Leavenworth, Kans., approximately 3,000
feet above the railroad bridge, there is a grain elevator owned by
private interests. The facilities for loading grain onto barges are
not connected with the elevator but can be readily connected and
put into operation when required.
   At Brownville, Nebr., plans are under preparation and site pur-
chased by Hart-Bartlett-Sturtevant Grain Co., Kansas City, Mo.,
for a grain elevator. The terminal will have highway and railway
connections.
   At Nebraska City, Nebr., at approximate mile 579.6, the Nebraska
City Dock Board has completed a 50,000-cubic-yard fill for river-
front improvement protected by stone riprap; and a loading plat-
form (50 by 35 feet) built over pile revetment. Plans call for con-
struction of a concrete-floored dock (200 by 60 feet) and corrugated-
iron warehouse. The Western Elevator Co., of Kansas City, Mo.,
has completed a million-bushel grain elevator. The terminal facili-
ties will be served by two railroads and paved highways and will be
open for-general public use.
   At Plattsmouth, Nebr., approximately 1 mile above the railroad
bridge, Cass County has completed construction of a concrete-floored
dock (56 by 250 feet) and warehouse of wood and corrugated-
metal construction. Highway connections have been provided and
railway connections and additional handling and storage facilities
are to be provided.
   At Omaha, Nebr., definite plans have been made for an all-purpose
terminal at an estimated cost of $1,000,000 at approximate mile
632.3. Terminal facilities will include a steel-piling sea wall, dock
house, crane house, platforms, and a 300,000-bushel grain elevator
and head house. The facilities will be served by 14 railroads and
paved highways and will be open for general public use.
    The Socony-Vacuum Oil Co. has completed a temporary terminal,
at approximate mile 640.6, with facilities for handling and storing
petroleum products.
    At Blencoe, Iowa, a privately owned dock is being promoted by
the Blencoe Farmers Elevator Co. It is planned to handle, chiefly,
grain, lumber, and oil, and will be for use by cooperatives of west-
ern Iowa.
    At Sioux City, Iowa, tentative plans have been made to establish
a dock area by means of a sheet steel piling sea wall and a dredged
fill at approximate mile 759.0. It is planned to construct a sheet
steel warehouse and appropriate platforms. The facilities will be
served by both railway and highway. The Socony-Vacuum Oil
Co. has constructed temporary unloading facilities for handling and
storing petroleum products at approximate mile 755.9.
     Promotion of terminals has been indicated at the following towns:
Blair, Tekamah, and Decatur, Nebr.; Onawa, Whiting, and Cali-
  fornia Junction, Iowa.
     The facilities are considered adequate for existing needs.
          'RIVERS AND   HARBORS-OMAHA,           NEBR.,   DISTRICT   1099
               OPERATIONS   AND   RESULTS DTJUING FISCAL YEAR

   New work completed during the year with Government funds con-
sisted of 25 dikes and 4 dike extensions totaling 19,948 linear feet;
8 rock dikes totaling 7,207 linear feet and 737 linear feet of willow
foundation mattress for rock dikes; 57 lengths of revetment totaling
74,698 linear feet; 5 lengths of asphalt revetment totaling 7,891 linear
feet; removal of 228,923 cubic yards of rock at 3 localities by the
dredge Koekuk; completion of 3 pilot canals totaling .18,139 linear
feet for a total of 509,144 cubic yards excavation and point removal
at 2 localities by U. S. dredge Black and a Government-owned drag-
line for a total of 383,393 cubic yards. Miscellaneous new work ac-
complished with regular funds consisted of 3 nose-protection struc-
tures for pilot canal entrance totaling 2,246 linear feet; 3,057 linear
feet of bank-protection mattresses to protect designed alinement; 420
linear feet of temporary pile protection for revetments; removal or
salvage of 118 linear feet of pilot canal nose protection, 736 linear
feet of dikes, 255 linear feet of revetment plus the expenditure of
$84,532.88 for removal of miscellaneous structures due to adoption
of more economical lay-outs; completion of 1 chute-closure structure
totaling 565 linear feet; 500 linear feet of rough grading to provide
a more rapid prosecution of the work; clearing 303 acres to activate
erosion along desired bank alinement; repair and replacement of
3,796 linear feet of dikes and 22,442 linear feet of revetment.
   In addition to completed works there are in process of construction
under contract and by hired labor 3 dikes totaling 7,469 linear feet
of construction; 14 lengths of revetment totaling 34,294 linear feet
and repair or replacement of 1,468 linear feet of revetment.
    Maintenance consisted of: Repair and replacement of 4,301 linear
feet of impermeable structures; 30,343 linear feet of revetment and
6,702 linear feet of rock and pile dikes; construction of 16,671 linear
feet of protection of accretion; 752 linear feet of rock-filled dikes
and the removal from the channel of 17 snags.
   Dredging (regular funds) during the year by U. S. dredges, Gen-
eral Chittenden, Robert McGregor, and 1 leased dredge resulted in
the removal of 5,725,800 cubic yards of material from 26 localities
at a cost of $360,410.49 charged to new work and 1,493,173 cubic
yards of material from 6 localities and the placement of 85,800
cubic yards of dredge fill for accretions by 3 Government dredges
at a cost of $77,123.34 charged to maintenance. Surveys, appraisals,
acquisition proceedings, and related work in connection with the ac-
quisition of rights-of-way for channel changes and prosecution of
unallocated surveys for engineering and channel-rectification studies
amounted to $71,486.41; stream gaging amounted to $6,692.79 and
bank clearing amounted to $17,218.32; all charged to new work. The
cost of surveys in connection with maintenance work was $43,753.03;
stream gaging for special studies and working data at a cost of
$3,681.13; snagging at a cost of $4,456.48; marking channel for navi-
gation and navigation aids at a cost of $11,319.66; all charged to
maintenance.
    Work done for other interests -included 892 linear feet of pile-
clump structure and 700 linear feet of willow-protection mattress.
The above work was done for the Navy Department to protect the
Omaha Steel Works' boat basin.
1100        REPORT OF CHIEF OF ENGINEERS,                       U.       S. ARMY,           1942

   The total costs and expenditures for the fiscal year were as follows:
                                                           Costs
                                                                 -----   _            ---       Expenditures
                                      New work          Maintenance              Total

Regular funds ....   -. _.........
                          ___        $3, 204, 071. 23     $702, 152. 71      $3, 906, 223. 94    $4, 604, 471. 4(



                              CONDITION AT END OF FISCAL YEAR


   The work between Kansas City, Mo. (upper end of Quindara Bend),
and Rulo, Nebr., is approximately 94 percent completed; between Rulo
and Omaha, Nebr., it is approximately 98 percent completed; and be-
tween Omaha, Nebr., and Sioux City, Iowa, it is approximately 75 per-
cent completed. The entire project was approximately 89 percent
completed at the end of the fiscal year.
   Kansas City, Mo., to Rulo, Nebr.-The majority of structures in this
section that have not yet accomplished the purpose intended are in
fairly good condition. Construction of new work is still in progress;
however, at reasonably high otages of the river during the navigation
season, a channel with a minimum depth of 6 feet and a minimum
width of 200 feet is available throughout this section. Due to a period
of high water, the controlling depth at the end of the fiscal year was
approximately 9 feet. The practical draft at ordinary stages of the
river is 51/2 feet. This section of the river has been used for commer-
cial navigation since May 1939. The work remaining to be done to
complete this section of the river under the existing project consists
chiefly of the construction of additional dikes and revetment.
   Rulo to Omaha, Nebr.-Continuedimprovement is noted in this sec-
tion, which has been used for commercial navigation since May 1939.
The last serious hazard to maintaining a reliable channel was removed
with the opening of the Civil Bend Pilot Canal. The channel is
practically completed .except for the construction of several isolated
revetments to permanently stabilize the designed alinement. With
continued releases from the Fort Peck Dam the designed navigable
channel depth can be assured for continuous commercial navigation
throughout the operating season.
   Omaha, Nebr., to Sioux City, Iowa.-A marked improvement of the
channel has resulted from construction operations during the past
fiscal year. The exceptional duration and discharge of the high waters
of May and June 1942, set up both the Omadi and Browers Pilot
Canals, resulting in a satisfactory channel in all but a short stretch of
river in Little Sioux Reach where the channel line has not yet pro-
gressed to the permanent alinement. Commercial navigation over this
section was inaugurated by a large oil company during June 1940.
The first up-river trip of a commercial barge line was completed on
May 29, 1941, when a tow consisting of one barge, loaded with approxi-
mately 9 carloads of general merchandise, unloaded at Sioux City and
took aboard a cargo of grain for southern terminals. There now exists
reasonably reliable depths to accommodate drafts up to 51/2 feet at
the designed navigable stage. It is expected that reliable conditions
for continuous commercial navigation should be assured by June 1943.
   Under the existing project, beginning with the allotment from War
              'RIVERS        AND      HARBORS-OMAHA,                     NEBR.,              DISTRICT                       1101

Department Appropriation Act of March 23, 1928, for systematic work
on the 6-foot channel, the work accomplished includes 847,167 linear
feet of revetment for permanently fixing the banks, 1,915,991 linear
feet of pile dikes, 9,407 linear feet of rock dikes, 143,884 linear feet of
abatis, 2,287 linear feet of jetties, recrowning 700 linear feet of an
existing levee, 19,218 linear feet of retards for stabilization of channel
widths, construction of five impermeable structures to close off auxil-
iary channels, construction of 48,237 linear feet of asphalt revetment,
effecting three channel cut-offs, and removal of 67,821,557 cubic yards
of material dredged from the channel to obtain project depth and
width.
   The total cost and expenditure on work under the existing project is:

                                                                      Cost
                                                            --         -            --                      -      Expenditures
                                            New work             Maintenance                     Total


Regular funds_                             $43,142,172.   34     $3, 631, 933. 87        $46,774,106.21            $47,629,142.41
Public W orks funds--------------------     29, 038, 236. 29         114, 871. 71         29, 153, 108.00           29, 152, 416. 43
Emergency Relief funds____ __ __ __          9, 613, 073. 19          56, 644. 65          9, 669, 717. 84           9, 669, 717. 84
      Total funds---------
                 ....        ------   --    81,793,481.82         3, 803, 450. 23          85, 596, 932. 05         86, 451, 276. 68



  Proposed operations.-The unexpended balance of $3,131,667.37,
together with advance for plant $650,000 and accounts receivable,
$19,759.45, from regular funds at the end of the year will be expended
as follows:

                                                      Estimated           Kansas              Rulo, Nebr.,               Kansas
                                                        date of           City to               to Sioux                 City to
                                                      completion        Rulo,Nebr.                City                 Sioux City

Accounts Payable_____________                       ___    ________     $ 18, 031. 88            $208, 037. 12          $226, 069. 00
New work (channel contraction and bank pro-
tection by dike and revetment construction):
    By contract:
        Completion of existing contracts:
           Sioux City-Winnebago Bends, con-
             tinuing contract for revetment _        June 30, 1943 ____________                   233, 973. 25
           Omadi-Browers Bends, dikes .......        Sept. 30, 1942____________                    83, 224. 21
           Snyder-Louisville Bends, continu-
             ing contract for revetment______        June 30, 1943      .                         275, 105.03
           ]llack Bird Bend-Little Sioux
             Reach, continuing contract for
             dikes and revetment _--__--....         July 31, 1942 -_-_-...                              100. 00   .
            Decatur   Reach-Louisville     Bend,
             dikes_         _                         __do.....           . ....                         783. 51
            Louisville-Blair Bends, continuing
             contract for dikes and revetment        June 30, 1943      .........                 189, 913. 85
            Little Sioux Reach-Sandy       Point
             Bend, dikes and revetment________       Sept. 30, 1942 --...              ___          4 628. 06
                                                                                                   57,
            DeSoto-Florence Bends, revetment_        Oct. 31, 1942                                 29, 611. 63
            Gibson-Tobacco Bends, dikes and
              revetment       __                     June 30, 1943 .....                           40, 524. 28
            Papillion-Nishnabotna Bends, con-
                                         ________.
             tinuing contract for revetment                         .... -_---
                                                          do..... _---                             41, 783. 23
            Rock Bluff-Nebraska Bends, dikes
              and revetment                          Aug. 31, 1942 .....                           34, 216. 74
            Rock Bluff-Frazers Bends, continu-
              ing contract for dikes                 July 31, 1942        . ...              .            17. 98
            Frazers-Peru Bends, dikes and re-
             vetment ..                                   do                       -                     100. 29
            Peru-Rulo Bends, continuing con-
              tract for revetment              June 30, 1943                  -.   ....           168, 759. 75
            Rulo to Quindaro Bends, dikes and
              revetment . . . . . .          ..- .do....                     80, 661. 27
               Total existing contracts                                      80, 661. 27      1, 155, 741. 81          1,236, 403. 08

        493202--43--pt. 1, vol. 1--        70
1102        REPORT              OF CHIEF OF ENGINEERS,                                                U.          S. ARMY,                    1942


                                                                       Estimated                      Kansas     Rule, Nebr.,                                    Kansas
                                                                         date of                      City to      to Sioux                                      City to
                                                                       completion                    Rule, Nebr.     City                                      Sioux City

New work-Continued.
   Proposed contracts:
       Dakota-Winnebago Bends, revetment ..      June 30, 1943                                                                      $131, 633. 32 _____
       Rulo to Parkville Bends, dikes and
        revetment ------.--------------     -... -_ do_        . $295, 000.00

            Total proposed contracts- ------ ----                                                    295, 000. 00                    131, 633. 32                  $426, 633. 32

    Repairs by contract: Repair of structures
     in uncompleted sections of river ----------                     June 30,1943                    -.-     -.                      $83,754.42

      Total repairs by contract ---------------                                                                   -   -               83, 754. 42                   $83,754.42
    By hired labor:
       Bartlett Bend, revetment construction__                       Sept.           30, 1942              --------
                                                                                                              -.                      17, 883.29 ........  ------
       Bartlett Bend, suspended mattress----                         Oct.            10, 1942                                          5, 624. 43          -
       Civil Bend, revetment construction ....                       Aug.            31,1942           ---                             3,127.75            --
       Rush Bottom Bend, compact layer -..                           Oct.            15, 1942                                             892.12
       Barney Bend, revetment construction...                        Aug.            31,1942                                          14, 948.11
       Glovers Point Bend, dike construction__                       Oct.             1,1942         .--      --                       4, 842. 38            -
       Browers Bend, revetment construction--__                      Oct.             5, 1942                                          3, 777.15             -
       Civil Bend, revetment construction.. - -                      Sept.           30, 1942                                         31,286.02
       Omadi Bend, revetment construction -_                         Aug.            31,1942                                           1, 200. 45
       Deroin Bend, revetment repair---.....   -                     July            31,1942                                           5, 344. 59 --------- -----
       Reinforcing existing structures to close
          existing chutes, new work areas.             ---          June 30,1943                       .-.. ------.
                                                                                                             -                        15, 904. 76 --------------
       Glovers Point Bend, remove bank pro-
          tection mattress and pave bank-------                      Sept. 15,1942                     -                  ..          10,880.00 -------------.
    Dredging:
       Sioux City to Rulo, point removal to
          obtain desired alinement, dredges
          Robert McGregor, General Chittenden,
          and a leased dredge--           -------------- June 30,1943 __.                                                            140, 582. 73 1_____
       Sioux City to Rule, channel dredging,
          dredges Robert McGregor, General
          Chittenden, and a leased dredge-- --                     _---do .....                                                       29, 901.36
       Emergency construction to protect exist-
          ing structures and preserve desired
          alinem ent__..  ..-.. . ....      ....    ....    ... --     do_   ...       5, 914. 87                                     80, 170. 62
       Point removal to obtain desired aline-
          ments.__-----------------------------.                  May 31,1943          5, 000.00
       Removal of existing structures, Rule
          to Parkville Bends ..----------------                  June 30, 1943         6, 545. 19
       Acquisition of rights-of-way, Rule to
          Weavers Bend ---------------                     -      Nov. 30, 1942        8, 256. 53
       Acquisition of rights-of-way, Bean Lake
          Bend _                   .............---------------- Sept. 30, 1942        1, 580. 37
       Removal of rock, White Cloud to Atchi-
         son Bends_             __---------                       Aug. 15,1942       35, 706. 16
       Engineering, design, and surveys .......                   June 30,1943       32, 952. 33                                      27, 724. 51
       Stream gaging .-            _ .... _--------_------- ___do -----          ........                                               6, 124. 16
       Bank clearing                    ----------             - -- do.-.-                                                              9, 568. 95
       Repair of structures in uncompleted sec-
         tions of river ----------                       --- _       . o -- - -                                                       21, 902. 47
                                                                                                I                              I
                                                                                                                                                     i
                                                                                                I'
         Total for hired labor                              -                                         95, 955. 45                    431, 685.85                 527, 641. 30
         Grand total new work..........                                                              471, 616. 72                  1, 802, 815.40              2,274, 432. 12
                                                                                 '                                             I                     I




                                                                                                Kansas City                        Rulo, Nebr.             Kansas City
                                                                                                     to                                to                       to
                                                                                                Rulo, Nebr.                        Sioux City               Sioux City

Maintenance (July 1, 1942, to June 30, 1943):
   By contract:
       Maintenance of structures. -                                                                  $30, 000. 00                       972.03
                                                                                                                                    $133,
       Papillion-Nishnabotan Bends, accretion paving revet-                                                                                                    ------------
         m en t . .. ...   ..   ...   ..   ...   ...   ..   ...   ..---..   ..        ..                                              15, 658. 66
                                                        .
      Protection of accretion --------------------------...        .                                  50, 000. 00                                        ----------
      Chute closure structures------------......................                                      55, 500. 00                     47, 713. 70
   By hired labor:
      Dike and revetment repair. ---
      Protection of accretions ------........               ......
                                                                                                     102, 343. 92
                                                                                                     134, 276. 09
                                                                                                                                     101, 182. 37        ------------ '
      Pin Hook Bend, accretion paving--- -----------------
      Tobacco Bend, accretion paving -.............
                                              --
                                                                                                                                      39, 079.96
                                                                                                                                                         -------------
      Rock Bluff Bend, accretion paving
      Otoe Bend, suspended screen mattress ---
                                                          --
                                                                                                                                      47, 844.19
                                                                                                                                           46.08
                                                                                                                                      12, 852. 17
                                                                                                                                                         ------------
                                                                                                                                                         - -   -    - - - - - -    -

      Otoe Bend, compact layer -.......-.-           _-............                                                                    6, 390. 00
      Browers Bend, suspended screen mattress -.......
                                                                                                                                                         - -   -    - - - - - -    -

                                                                                                                                      21, 041.38         - -   -    - - - --   -   -

      Accretion paving, Tobacco, Rock Bluff, Civil, Kansas
        Bend, etc.----------- ---------------       --- ---. __                                                                     109, 307. 36         - -   -    - - - - - -    -
               RIVERS AND             HARBORS-OMVAHA,                                 NEBR.,           DISTRICT                      1103

                                                                                     Kansas City       Rulo, Nebr.       Kansas City
                                                                                          to               to                 to
                                                                                     Rulo, Nebr.       Sioux City         Sioux City

Maintenance-Continued.
   By hired labor-Continued.
      Minor realinements in connection with accretion
         paving__------------------                                                                      $35,000.00 -------------
      Dredging fills for accretions, Dakota, Frazers Bend,
         etc ----------------------------                                                                 50,000.00      .               .
          Total for structure maintenance                       -        -   -        $372, 120. 01      620, 087..90             $992, 207. 91
   Snagging ------------- - -  ------------------ ----------                             9, 980. 03        25, 000. 00 --------------
   Navigation aids -----                                                                                   14, 989. 54 ............
   Channel marking --                              ---                                  30, 000. 00
   Channel dredging--------                                                            150, 000. 00        30, 000.00
   Engineering, design and surveys               -        -                             44, 122. 04         4, 626. 18   .           .       .

     Grand total for maintenance-------
                                 .....----------....                 -           -     606, 222. 08       694, 703. 62           1,300, 925. 70
     Total for all work- -------------------       ------------- - -                 1,095, 870. 68    2, 705, 556. 14           3,801,426. 82

  Public Works funds.-The balance unexpended $691.57, from the National Industrial Recovery Act, will
be applied to payment of outstanding liabilities.
r The additional sum of $5,200,000 can be profitably expended during the fiscal year ending June 30, 1944,
as follows:

                                                                                     Kansas City       Rulo, Nebr.           Kansas City
                                                                                          to                to                   to
                                                                                     Rulo, Nebr.       Sioux City            Sioux City

New work (July 1, 1943, to June 30, 1944):
   Channel contraction and bank protection by dike and
    revetment construction:
      By contract------                                                                   $390, 000       $2, 500, 000   .       -.........
      By hired labor:
          Emergency construction to protect existing struc-
            tures and maintain designed alinements-..-....                                  25, 000           235, 000       .
          Removal of existing structures_             _ -                                   20,000 ..--
          Point removal to obtain desired alinements .....  _                               25, 000           225, 000
          Engineering, design and surveys__________________                                 40, 000            40, 000
               Total new work ---.------------.        .....                               500,000         3,000,000               $3, 500,000
Maintenance (July 1, 1943, to June 30, 1944) by contract:
   Maintenance and repair of existing works
   By hired labor:
                                                      _                                    150, 000           350, 000   -
       Maintenance and repair of existing works-...........                                435, 000           440, 000 ----
       Channel dredging                                                                    125, 000            30, 000________
       Channel marking                                                                      30, 000            10, 000
       Navigation aids---.......................      .............                     _.   ..                20, 000           -- --
       Snagging                                                                             10,000             30, 000
       Engineering, design and surveys---                                                   50, 000            20, 000--
           Total maintenance------             -         - -_-----                         800, 000           900,000                1, 700, 000
           Total for all work    --------                                                1, 300, 000       3, 900, 000 1             5, 200,000

                                      Cost and financial summary
                                MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1942_--------------------- $45, 594, 403. 65
Cost of maintenance to June 30, 1942--------------------  4, 202,137. 80
       Total cost of permanent work to June 30, 1942__---__                                            ____         49, 796, 541. 45
Undistributed costs June 30, 1942                                                                                ' 1, 061, 223. 16
       Net total cost to June 30, 1942__ ---- _____ -____      50, 857, 764. 61
Plus accounts receivable June 30, 1942-----------------------      19, 759. 45
       Gross total costs to June 30, 1942----__    -         50, 877, 524. 06
                                                         -_______
Minus accounts payable June 30, 1942 ___ __ _________-___       225, 946. 41
       Net total expenditures--..__________   _____________                                                       2   50, 651, 577. 65
Unexpended balance June 30, 1942___________________________                                                           3, 131, 544. 78
         Total amount appropriated to June 30, 1942 _____________                                                 253,       783, 122. 43
   1 Includes $650,000 advances, K. C.-Sioux City.
  2 Includes $134,385.25 allotted from F. W. P. Act of Aug. 26, 1935, and $9,669,717.84 E. R. A. funds.
1104         REPORT             OF CHIEIF                    OF         ENGINEERS,                 U.      S.   ARMY,                 1942



  Fiscal year ending                         1938                       1939                   1940                    1941                         1942
       June 30


Cost of new work                   $4,908,359.45               $6, 351, 801. 20            $5, 931, 597. 39     $3, 327, 165.85              $3, 204, 071.23
Cost of maintenance_-_                363, 390. 11                 647, 374. 81                445, 354. 53         576, 454. 69                 702, 152. 71

      Total cost-......             5, 271, 749. 56               6,999, 176. 01           6, 376, 951. 92        3, 903, 620. 54             3, 906, 223. 94

Total expended------                5,170, 764. 69                6, 537, 219. 03          6, 906, 034. 79        4, 012, 962. 67             4, 604, 471. 40

Allotted   --------------
                   _                7, 511, 000. 00            10, 131, 500. 00            4, 046, 618. 90        3, 236, 600. 00             2, 310, 250. 00


Balance unexpended July 1, 1941_________                                                                          _ __                $5, 425, 766. 18
Amount allotted from War Department Civil
  Appropriation Act approved June 24, 1940_                                                              $50, 250. 00
Amount allotted from War Department Civil
  Appropriation Act approved April 28, 1942__                                                      2., 260, 000. 0(0)
                                                                                                                                       2, 310, 250. 00
           Amount to be accounted for                                                                                                  7, 736, 016. 18
Gross amount expended_                                              -             -              $4 ,724, 578. 43
Less reimbursements collected _                                         --                --            120, 107. 03
                                                                                                                                       4, 604, 471. 40
      Balance unexpended June 30, 1942__                                                                                               3, 131, 544. 78
Outstanding liabilities June 30, 1942     -                                                            $67, 776. 08
Amount covered by uncompleted contracts_...                                                        1,, 751, 987. 98
                                                                                                                                       1, 819, 764. 06
      Balance available June 30, 1942_                                                -                                                1, 311,780. 72
Accounts receivable June 30, 1942____                                                                                                        19, 759. 45

           Unobligated balance available June 30, 1942-                                                                                1, 331, 540. 17

Amount (estimated) required to be appropriated for completion
tion of existing project 3 4                                                                                                          7, 684, 800. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1944:
      For new work 4_______________________________________                                                                            3, 500, 000. 00
      For maintenance 4               -_                                                                                               1, 700, 000. 00
                     --
           Total 4         __            _                                                                        --                   5, 200, 000. 00
  3 Excludes $247,277.84 undistributed costs.
  4 Exclusive of available funds.
                                                           PUBLIC WORKS FUNDS

Cost of new work to June 30, 1942                                                                                                  $29, 038, 236. 29
                                                                                                                                   $________________-__
Cost of maintenance to June 30, 1942 ______________________                                                                                 114, 871. 71
     Total cost of permanent work to June 30, 1942 _____   __                                                                         29, 153, 108. 00
Minus accounts payable June 30, 1942_           _
                                             -------------                                                                                     814. 16
     Net total expenditures__________________________                                                                                 29, 152, 293. 84
Unexpended balance June 30, 1942_________________________                                                                                      814.16
           Total amount appropriated to June 30, 1942__________                                                                       29, 153, 108. 00

    Fiscal year ending June 30                             1938                   1939                  1940                   1941                  1942

Cost of new work                             _       $2, 054, 163. 19  $719, 679. 96 $148, 754. 50                            $2, 175. 30
C ost of m aintenance ----          --------               6,809.92 --- -- -- -- .. .. .. .. .. ...                      ..    .. .. .. ..     ..    ..    ..   ..
      Total cost -        ------- _----          .    2, 060, 973. 11          719, 679. 96        148, 754. 50                2, 175. 30
Total expended               - -     -                2, 304, 973. 26        1, 014, 723. 52       202, 926.16                45, 476. 12            -$122. 59
Allotted
               RIVERS AND HARBORS-OMAHA,                                        NEBR.,       DISTRICT                 1105
Balance unexpended July 1, 1941                       _-._-------                                -                  $691. 57
Gross amount expended
Less reimbursements collected -----------------------                                     $122. 59
                                                                                                                  -122.     59
Balance unexpended June 30, 1942 ----------------------------                                                        814. 16
Outstanding liabilities June 30, 1942------------------ $691. 57
Amount covered by uncompleted contracts---               122. 59
                                                                                                                     814. 16
CONSOLIDATED COST AND FINANCIAL                     SUMMARY         FOR MISSOURI           RIVER, KANSAS            CITY    TO
                                                     SIOUX CITY

Cost of new work to June 30, 1942_       ---------------------- $84, 380, 098. 38
Cost of maintenance to June 30, 1942_________________-------          4,373, 654. 16
    Total cost of permanent work to June 30, 1942 ____________      88, 753, 752. 54
Undistributed costs June 30, 1942____                                1, 061, 223. 16
      Net total cost to June 30, 1942______---------------        - 89, 814, 975. 70
Plus accounts receivable June 30, 1942-------------------------          19, 759.45
      Gross total costs to June 30, 1942__-- ______8-______-__ 80, 834, 735. 15
Minus accounts payable June 30, 1942 ------------            ___-       226, 760. 57
      Net total expenditures-------------------------------- 289, 607, 974. 58
Unexpended balance June 30, 1942 ---     __-- ------- ________       3, 132, 358. 94
      Total amount appropriated to June 30, 1942          -________--
                                                                  2 92, 740, 333. 52
  1 Includes $650,000 advances, Kansas City-Sioux City.
  2 Includes $134,385.25 allotted from F. W. P. Act of Aug. 26, 1935, and $9,669,717.84
E. R. A. funds.

  Fiscal year ending          1938                  1939                    1940              1941                  1942
       June 30

Cost of new work .. _    $8, 110, 931. 07       $8,287,092.67       $6, 103, 119. 15      $3,440,813.88                   23
                                                                                                                $3,204,071.
Cost of maintenance___       370, 200. 03          647, 374.81             445, 354. 53      576, 454.69            702, 152. 71
     Total cost ..-..     8, 481, 131. 10        8, 934, 467.48      6, 548, 473.64        4, 017, 268. 57       3, 906, 223. 94
Total expended _-----_    8, 656, 721.32         9, 016, 695. 40     7, 108, 889. 73       4, 192, 749. 96       4, 604, 471. 40

                       7, 511, 000. 00
Allotted-...............                        10, 126, 604. 73     4, 180, 691.34        3, 236, 525. 92        2, 310, 250.0


Balance unexpended July 1, 1941                      _____________________________                      $5, 426, 457. 75
Amount allotted from War Department Civil Ap-
propriation Act approved June 24, 1940--_____--    $50, 250. 00
Amount allotted from War Department Civil Ap-
propriation Act approved Apr. 28, 1942--------- 2, 260, 000. 00
                                                                                                             2, 310, 250. 00
      Amount to be accounted for___________________________                                                  7, 736, 707. 75
Gross amount expended_______________________ $4,724, 578. 43
Less reimbursements collected_________________                                       120, 229. 62
                                                                                                             4, 604, 348. 81
      Balance unexpended June 30, 1942_____-----___--------                                                  3,132, 358.94
Outstanding liabilities June 30, 1942------------    $68, 467. 65
Amount covered by uncompleted contracts- ------   1, 752, 110. 57
                                                                                                             1, 820, 578. 22
     Balance available June 30, 1942_______________________                                                  1,311, 780. 72
Accounts receivable June 30, 1942_----         ________---__                                                     19, 759. 45
     Unobligated balance available June 30, 1942 ____________                                                1, 331, 540. 17
Amount (estimated) required to be appropriated for com-
   pletion of existing project              4               ------------                                     7, 932,086. 06
Amount that can be profitably expended in fiscal year ending
   June 30, 1944:
      For new work 4___________________                            ___________________                       3, 500, 000. 00
     For maintenance                          -----------                                                    1, 700, 000. 00
        Total 4 _-___--------------5,                                                                           200, 000. 00
   3Includes $247,277.84 undistributed costs.
   4Exclusive of available funds.
1106   REPORT   OF CHIEF OF ENGINEERS,      U. S.   ARMY,   1942

         2. MISSOURI RIVER, SIOUX CITY TO FORT BENTON

   Location.-See page 1096. Through this section the river flows
across the States of Montana, North Dakota, and South Dakota, form-
ing the northeastern boundary of Nebraska.
   Previous projects.-Projects were adopted and modified by river
and harbor acts as follows: August 14, 1876, above the mouth of the
Yellowstone; June 18, 1878, Sioux City; March 3, 1879, Vermilion;
and August 2, 1882, Sioux City to Fort Benton. Modifications of
September 19, 1890, and August 18, 1894, extended the improvement
to Great Falls, then to Stubbs Ferry, Mont. (For further details see
p. 1108 of Annual Report for 1927, p. 1894 of Annual Report for 1915,
and p. 1184 of Annual Report for 1938.)
    Existing project.-This provides for the expenditure of from
$75,000 to $150,000 yearly during the first 5 years of the project in
the removal of snags and rocks from the channel and in bank pro-
tection at various locations between Sioux City, Iowa, and Fort Ben-
ton, Mont. Since the expiration of the 5-year limit, funds have
been expended for snagging and maintenance of structures. The
length of section included in the project is 1,441.4 miles and consists
of two parts: Sioux City, Iowa, to Fort Peck Dam, Mont. (mile
1,868.7), and Fort Peck Dam to Fort Benton, Mont. At Sioux City
the ordinary fluctuation is about 10.4 feet, and the extreme fluctuation
 (freshet of 1892 from Floyd River) is about 25 feet. At Fort Ben-
ton the ordinary fluctuation is about 7.3 feet, and the extreme fluctu-
ation about 19 feet.
   The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 91, 62d Cong., 1st sess.). The latest pub-
lished map is in the project document.
   Local cooperation.-Works for the benefit of the public constructed
by private interests were:
   Pierre, S. Dak.: The city is constructing a bulkhead and fill along
the left bank, at mile 1,174.0 (1.890 mileage). The work is 60 percent
completed. A series of clump dikes are under construction along the
left bank, from mile 1,171.5 to mile 1.174.1 (1890 mileage) and are
CO percent completed. No work was accomplished this year. Cost
data is not available.
   Chamberlain, S. Dak.: The Department of the Interior is construct-
ing revetment on the right bank, near Chamberlain. Eleven thousand
eighty-five feet of revetment have been completed, and 950 linear feet
is yet to be completed. No work has been accomplished this year due
to curtailment of Civilian Conservation Corps operations under which
the project was being constructed. Cost data is not available.
    Sioux City, Iowa: The city is constructing a longitudinal pile dike
with suspended mattress and dredged fill along the left bank, mile
809.0 to mile 810.6 (1890 mileage). The work is approximately 70
percent completed. Construction operations accomplished by W.
P. A. labor have been suspended, due to the National Emergency.
Cost data is not available.
    Terminal facilities.-The facilities are considered adequate for
existing commerce.
    Operations and results during fiscal year.-Work accomplished
during the year amounted to $4,731.20 charged to maintenance. Ex-
penditures during the fiscal year were $4,410.45.
                  RIVERS AND HARBORS-OMAHA,                              NEBR.,          DISTRICT                 1107
   Condition, at end of fiscal year.--As cutting of the bank is less
marked above Sioux City and is of little moment above the mouth
of the Yellowstone River, demand for bank protection work is not
so urgent as on the lower Missouri River. In 1878, rock dams and
dikes were built between Fort Benton and Carroll, Mont., to con-
centrate the meager low-water flow, and the rapids were cleared of
rocks and boulders; but, lacking maintenance, the river has reverted
for the most part to the, previous state. Limited appropriations hold
Government expenditures to meritorious cooperative projects, and a
small amount of repair to existing works.
   From April to October, inclusive, drafts of 30 inches are prac-
ticable to Pierre, 26 inches to the Yellowstone River, and 18 inches
to the Fort Peck Dam. Depths which will accommodate large boats
are available on the Fort Peck Reservoir and drafts of 22 inches are
practicable from the reservoir to Fort Benton.
   The cost and expenditures under the existing project to June 30,
1942, were $516,484.77 for new work and $121,022.61 for maintenance,
a total of $937,507.38. The expenditures were $937,507.38.
   Proposed operations.-The unexpended balance, $7,434.20, at the
end of the fiscal year will be applied to snagging and maintenance
operations where required. The additional sum of $10,000 can be
profitably expended during the, fiscal year ending June 30, 1944, for
maintenance and snagging operations.
                                   Cost and financial summary
Cost of new work to June 30, 1942___-- ----     __-_________ $3, 123, 140. 64
"Cost of maintenance to June 30, 1942________________ _____       637, 428. 35
         Total cost of permanent work to June 30, 1942___________                                     3, 760, 568. 99

Net total expenditures -------------------                                                            3, 760, 568. 99
Unexpended balance June 30, 1942____________- _______________                                              7, 434. 20
         Total amount appropriated to June 30, 1942____________                                       3, 768, 003. 19

   Fiscal year ending June 30           1938              1939             1940               1941               1942


Cost of new work ---        - -   -------------- -------------- --------   - ---------     $          0      -
Cost of maintenance________   _                       _ ..........
                                    _... .... - ...- _--           __.....    .. ..        $5, 834. 60           $4, 731.20

Total expended.-----------------        -$900. 00    _-                                       6, 155. 35          4, 410. 45

Allotted------_   ----------------   -6, 301. 26                            $10, 000          5, 000. 00          3, 000.00



Balance unexpended July 1, 1941__-- _________-__________$8, 844. 65
Amount allotted from War Department Civil Appropriation Act
Approved Apr. 28, 1942_--------------------- __________
                                                       ---  3, 000. 00

      Amount to be accounted for ------    ___________----                                                 11, 844. 65
Gross amount expended---------------------------- $4, 731.20
                                             -
Less reimbursements collected__________ ________--   -     320. 75
                                                                                                            4, 410. 45
      Balance unexpended June 30, 1942 _______ ____________                                                 7, 434. 20
Outstanding liabilities June 30, 1942 ___--______ --   ___-                                                 1, 300. 00
         Balance available June 30, 1942_------                                     -------                 6, 134. 20
Amount that can be profitably expended  in fiscal year ending
June 30, 1944 for maintenance 1-----  _-_-_-_-_-_---10,                                                         000. 00
  1Exclusive      of available funds.
1108        REPORT OF CHIEF OF ENGINEERS,                                           U. S. ARMY,              1942

     3. EXAMINATIONS,                               SURVEYS, AND CONTINGENCIES (GENERAL)

   The cost of work during the year was $90,826.80 and the expendi-
tures were $87,556.04. The balance unexpended and accounts re-
ceivable at the end of the fiscal year, $6,852.14, will be applied as
needed during the fiscal year 1943 to payment of expenses incurred
under this heading. The additional sum of $35,000 can be profitably
expended during the fiscal year 1944.
                                                    Cost and financial summary

Cost of new work to June 30, 1942----------
Cost of maintenance to June 30, 1942____________________.           -------------------------                  $486, 759. 86

      Total cost of permanent work to June 30, 1942 __________    486, 759. 86
Undistributed costs June 30, 1942--------------------------------   3, 402. 32
                                     ------------------------------ 490, 162. 18
      Net total cost to June 30, 1942_
Plus accounts receivable June 30, 1942 _____- ____          -_________- 735. 42

      Gross total costs to June 30, 1942________________ ______                                                    490, 897. 60
Minus accounts payable June 30, 1942__________             _                                                         5, 724. 97

     Net total expenditures-------------------------------485, 172. 63
Unexpended balance June 30, 1942 ______________   _________  6, 116. 72
         Total amount appropriated to June 30, 1942                                 ________________               491, 289. 35

    Fiscal year ending June 30                         1938            1939           1940            1941                 1942

                                                                                                                                         .
Cost of new work        -------     ---..........
Cost of maintenance- ........-                       $54, 738. 54    $42, 830. 93   $31,821.01     $130, 483. 06          $90, 826. 80
Total expended __         _ __                        50, 181. 23     76, 187. 31    54, 885. 25     81, 632. 53           87, 556.04
Allotted- -----    _-             ___--              81, 000. 00      69, 800. 00   56, 500. 00      91, 900. 00           37, 100. 00


Balance unexpended July 1, 1941_______________________      ____                                                   $56, 572. 76
Amount allotted from War Department civil appropria-
  tion act approved June 24, 1940__----___-------    $25, 250. 00
Amount allotted from War Department civil appropria-
  tion act approved May 23, 1941___________________    11, 850. 00
                                                                                                                   - 37, 100. 00
      Amount to be accounted for---------------------------93,                                                             672. 76
Gross amount expended____________________-________             $96, 075.50
Less reimbursements collected______________________              8, 519. 46
                                                                                                                    87,
                                                                                                                    S      556. 04

      Balance unexpended June 30, 1942________________________                                                       6, 116. 72
Outstanding liabilities June 30, 1942______________ _________                                                        3, 539. 93

      Balance available June 30, 1942 _______________________                                                         2, 576. 79
Accounts receivable June 30, 1942____ __ _______-______
                                                _                                                                        735. 42

        Unobligated balance available June 30, 1942______________                                                    3, 312. 21
Amount that can be profitably expended in fiscal year ending June
30, 1944 for maintenance 1___________________________       ____                                                   35, 000. 00
  1Exclusive      of available funds.
                RIVERS AND HARBORS-OMiAHA,                                   NEBR.,          DISTRICT               1109
                4. PLANT ALLOTMENT, OMAHA, NEBR., DISTRICT
                                         Cost and financial summary
Undistributed costs June 30, 1942___ _--------                                                               $189, 803. 40

Net total cost to June 30, 1942-----------------------_               189, 803. 40
Plus accounts receivable June 30, 1942--------------------------      457, 345. 50
       Gross total costs to June 30, 1942------------------------     647, 148. 90
Minus accounts payable June 30, 1942--------------------------        230, 006. 88
      Net total expenditures-----------------------------------       417, 142. 02
Unexpended balance June 30, 1942_   --------------      ---------     333, 152. 05
       Total amount   appropriated  to June   30, 1942---------------750,  294. 07

   Fiscal year ending June 30                1938                1939            1940           1941               1942


Total expended---------------             $119, 806. 52   -$77, 385. 56    -$82, 563. 50      $33, 313. 55     -$102, 532. 22

Allotted...___-------------------              900. 00    _44,                     570. 45   -150,000.00           75,000.00

Balance unexpended July 1, 1941-__ ______________--_---_---                                                  $155, 619. 83
Amount allotted from War Department Civil Appropriation Act
  approved May 23, 1941________ _______________________       _                                                75, 000. 00
      Amount to be accounted for ________________---------                                                    230, 619. 83
Gross amount expended-----------------------$2, 457, 096. 71
Less:
    Reimbursements collected---- $2, 556, 256. 58
    Receipts from sales_______._        3, 372. 35
                                                   2, 559, 628. 93
                                                                    -102, 532. 22
      Balance unexpended June 30, 1942____________ __ __ _            333, 152. 05
                                       ---
Outstanding liabilities June 30, 1942_________________        ___     333, 152. 05
      Balance available June 30, 1942_________________--
Accounts receivable June 30, 1942_____________                        457, 345. 50
      Unobligated balance available June 30, 1942_ .____--__-         457, 345. 50
Status of all investigations for navigations called for by river and harbor acts
                           and committee resolutions
                                                                   Date trans-                               Recommenda-
          Locality                     Authorization act            mitted to           Document No.             tion
                                                                    Congress
           --          --



Big Sioux River, S. Dak.          Rivers and Harbors
   (navigation and flood con-       Committee resolu-
 . trol).                          tion, Nov. 22, 1939.
Bowman irrigation project         Commerce Committee
   on Grand River, N. Dak.         resolution, June 22,
                                    1937.
Heart River, N. Dak.,              -   _ do _ ..............
  Heart-Butte irrigation
  project.
Little Missouri and tribu-        Commerce Committee
  taries, including Beaver         resolution, Oct. 25,
  Creek, Mont. and N. Dak.,        1937.
  for flood control and irriga-
  tion.
Missouri River diversion          Commerce Committee
  project (under special           resolution, June 22,
  board).                          1937.
Missouri River at Gavins          Rivers and Harbors
  Point, Yankton, S. Dak.,         Committee resolu-
  construction of lock and         tion, Feb. 18, 1938.
  dam for navigation, flood
  control, power, and irriga-
  tion.
Missouri River from Sioux         Rivers and Harbors
  City, Iowa, to Chamber-          Committee resolu-
  lain, S. Dak., improve-          tion, Mar. 7, 1939.
  ment for navigation.
Missouri River, improve-          Rivers and Harbors
  ment in South Dakota             Committee resolu-
  (power to develop manga-         tion, Jan. 19, 1940.
  nese deposits).
1110    REPORT OF CHIEVF OF ENGINEERS,           U. S. ARMY,     1942

            5. HOT SPRINGS, FALL RIVER BASIN, S. DAK.

   Location.-Hot Springs, in Fall River County, S. Dak., is situated
on both sides of Fall River, immediately south of the junction of
Cold Brook and Hot Brook, which combine to form Fall River.
   .Existingproject.-The project was authorized by the Flood Con-
trol Act approved August 18, 1941, as a unit of the general plan of
flood protection on the Fall River and tributaries, South Dakota
substantially in accordance with the recommendation of the Chief
of Engineers in House Document No. 655, Seventy-sixth Congress,
third session. The general plan of improvement provides for the
protection from flood damage of the people and property of the
town of Hot Springs, S. Dak. The plan of improvement at Hot
Springs provides for the widening, deepening, and straightening
of the present channel of Fall River from a point near the confluence
of Hot Brook and Cold Brook to a point 400 feet below Eighth Street
bridge or a total distance of approximately 6,000 feet. Clearing of
trees, boulders, concrete slabs, and all obstructions to flow is pro-
vided for.
   The estimated Federal cost is $190,000 for construction. The esti-
mated local cost is $960 for bridge modifications.
   Local cooperation.-See page 5 for requirements. Inr addition
to the usual requirements for local cooperation as provided by law,
local interests are required to bear the expense of bridge modifica-
tions and give assurances satisfactory to the Secretary of War that
they will take such measures as may be necessary to prevent any
encroachments upon the flood-channel capacities to be provided by
the improvements.
   Local interests have indicated their willingness to comply with the
requirements of local cooperation.
    Operations and results during the fiscal year.-None.
    Condition at end of fiscal year.-No construction work has been
done on the project.
   Proposed operations.-There are no funds available for this pro-
ject, and no work is contemplated during the fiscal year 1943.
   The sum of $20,000 can be profitably expended during the fiscal
year 1944, for the preparation of detailed plans.
                        Cost and financial summary

Cost of new work to June 30, 1942-----------------------------------------
Cost of maintenance to June 30, 1942---------------------     -----------

      Net total expenditures.--------------------       -        -----------
Total amount appropriated to June 30, 1942-----------------       -----------

Amount (estimated) required to be appropriated for completion
of existing project--------------     -----------------------    $190, 000.00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for new work-----------------------------------          20, 000. 00

       6. COLD BROOK RESERVOIR, FALL RIVER BASIN, S. DAK.

  Location.-The Cold Brook site is on Cold Brook in Custer County,
S. Dak., approximately 41/2 miles north of the town of Hot Springs.
   Existing project.-The project was authorized by the Flood Con-
trol Act approved August 18, 1941, as a unit of the general plan
           RIVERS   AND HARBORS----1OMAHA,      NEBR.,   DISTRICT      1111
of flood protection for the Fall River and tributaries, South Dakota,
substantially in accordance with the recommendation of the Chief
of Engineers in House Document No. 655, Seventy-sixth Congress,
third session. The general plan of improvement provides for the
protection from flood damage of the people and property of the
town of Hot Springs, S. Dak.
   The Cold Brook Reservoir is designed to control an area of 60.5
square miles, and have a capacity of 3,100 acre-feet at spillway
crest, with surcharge at maximum pool of 1,000 acre-feet. The
following features are included: Construction of an automatically
operated rock and earth fill dam with uncontrolled outlet; a 7-foot
diameter uncontrolled reinforced concrete conduit under the dam
through firm rock, designed to empty the reservoir from spillway
crest elevation in approximately 24 hours; construction of two dikes
totaling approximately 855 linear feet, having a maximum height of
30 feet and a top width of 6 feet; and an emergency spillway with
a discharge capacity of 68,300 cubic feet per second at maximum pool
elevation through solid rock adjacent to the reservoir. The esti-
mated cost of Cold Brook Reservoir is $393,000 for construction and
$2,000 for lands and damages.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during the fiscal year.-None.
   Condition at end of fiscal year.-No construction work has been
done on the project.
   Proposed operations.-There are no funds available for this pro-
ject and no work is contemplated during the fiscal year 1943. The
sum of $30,000 can be profitably expended during the fiscal year
1944 for the preparation of detailed plans.
                        Cost and financial sumnmary

Cost of new work to June 30, 1942
Cost of maintenance to June 30, 1942__________________

      Net total expenditures____________
Total amount appropriated to June 30, 1942______________________-----------

Amount (estimated) required to be appropriated for completion
of existing project------------------------------------------ $395, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1944, for new work___---        _____-----------      30, 000. 00

7. COTTONWOOD       SPRINGS RESERVOIR, FALL RIVER BASIN, S. DAK.

   Location.-The Cottonwood Springs Creek site is on Cottonwood
Springs Creek one-half mile above its confluence with Hot Brook,
and approximately 51/2 miles west of the town of Hot Springs, in
Fall River County, S. Dak.
   Existing project.-The project was authorized by the Flood Con-
trol Act approved August 18, 1941, as a unit of the general plan for
flood protection in the Fall River Basin, substantially in accordance
with the recommendation of the Chief of Engineers in House Docu-
ment No. 655, Seventy-sixth Congress, third session. The general
plan of iinprovement provides for the protection from flood damage
1112     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                         1942

of the people and property of the town of Hot Springs, S. Dak. The
Cottonwood Springs Reservoir will control an area of 26 square miles
and have a capacity of 4,080 acre-foot at spillway crest with sur-
charge at maximum pool of 1,820 acre-feet. The following features
are included: Construction of an automatically operated rock and
earth-fill dam faced upstream and downstream by dump rock; a
6-foot diameter uncontrolled reinforced concrete conduit under the
dam; and an emergency spillway of 13,000 cubic feet per second
capacity at maximum pool elevation through the solid rock right
abutment.
  The estimated cost of the Cottonwood Springs Reservoir is $462,000
for construction and $3,000 for lands and damages.
  Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-No construction work has been
done on'the project.
  Proposed operations.-There are no funds available for this proj-
ect, and no work is contemplated during the fiscal year 1943. The
sum of $30,000 can be profitably expended during the fiscal year 1944
for the preparation of detailed plans.
                            Cost and financial summary
Cost of new work to June 30, 1942_ ...     __-____----_____-------------
Cost of maintenance to June 30, 1942__________________________--__----------

      Net total expenditures----------------------------------------
Total amount appropriated to June 30, 1942 --------------------------

Amount (estimated) required to be appropriated for completion of
existing project___--------------------            -------------------- $465, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1944, for new work                  _------------------------------------_ 30, 000. 00

8. MISSOURI RIVER, SIOUX CITY, IOWA, TO KANSAS CITY, MO. (FLOOD
                            CONTROL)

   Location.-The Missouri River is formed by the confluence of the
Gallatin, Madison, and Jefferson Rivers at Three Forks, Mont., in
the southwestern part of that State. From Three Forks, the stream
flows in a general northerly and northeasterly direction to the vi-
cinity of 30 miles below Fort Benton, Mont., swings east to Sanish,
N. Dak., in the northwestern part of North Dakota; and from there
flows generally southeast through Sioux City, Iowa, to Kansas City,
Mo., the upper and lower limits, respectively, of the area included in
this plan of improvement.
   Existing project.-The Flood Control Act approved August 18, 1941,
approved the comprehensive plan for flood protection in the vicinity
of Sioux City, Iowa, and along both banks of the Missouri River
between Sioux City and Kansas City for flood control, in accordance
with the recommendation of the Chief of Engineers in House Docu-
inent No. 821, Seventy-sixth Congress, third session, and authorized
$1,000,000 for the initiation and partial accomplishment of the project.
   The plan of improvement provides for the construction of dikes,
            RIVERS      AND HARBORS-OMAHA,                               NEBR.,   DISTRICT            1113

revetments, and channel improvement along the Missouri River be-
tween Kenslers Bend, Nebr., and the Combination Bridge at Sioux
City, Iowa, at an estimated cost of construction of $875,000, with
annual maintenance of $30,000; and for the construction of levees
and appurtenant flood-control works for the protection of agricultural
lands and small communities on both banks of the Missouri River
between Sioux City, Iowa, and Kansas City, Mo., against floods of
the approximate magnitude of the flood of July 1938, at an estimated
cost of $5,050,000 for construction and of $160,000 for lands and
damages.
  Local cooperation.-See page 5 for requirements.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-Work has not been started.
  Proposed operations.-The sum of $20,000, allotted in August 1942,
will be applied during the fiscal year 1943 to the preparation of de-
tailed plans. The additional sum of $100,000 can be profitably ex-
pended during the fiscal year 1944 for the preparation of detailed
plans.
                                    Cost and financial summary
Cost of new work to June 30, 1942      .____-___________________--
Cost of maintenance to June 30, 1942___________________--_____    _____

      Net total expenditures__                                                                  ---
Total amount appropriated to June 30, 1942__
Amount allotted in August 1942-----------------------------------                                  $20, COO
Amount available during the fiscal year 1943______________
                                                --             __ -                                 20, 000

Amount (estimated)         required to be appropriated for completion of
  existing project     -----------------------__                                     ---            905, 000
                                                                                                 5, 9---------
Amount that can be profitably expended in fiscal year ending June
  30, 1944, for new work           1_________---------------                               --      100, 000
  1 Exclusive of available funds.

9. PRELIMINARY EXAMINATIONS                                    AND SURVEYS FOR FLOOD CONTROL

  The cost of work during the year was $83,288.32 and the expendi-
tures were $75,282.22. The balance unexpended, $36,395.32, at the
end of the fiscal year, plus the sum of $23,600 allotted in August
1942 will be applied as needed during the fiscal year 1943 to payment
of expenses incurred under this heading.
                                   Cost and financial summary
Cost of new work to June 30, 1942__
Cost of maintenance to June 30, 1942                           _________________________    $555, 482. 88

      Total cost of permanent work to June 30, 1942 ------ ________                             555, 482. 88
Undistributed costs June 30, 1942_---------__   ______ -- _______
                                                ___                                             -6, 392. 39

      Net total cost to June 30, 1942__________________---________                              549, 090. 49
Plus accounts receivable June 30, 1942_____ ________________                                          11. 02

      Gross total costs to June 30, 1942___________________________                             549, 101. 51
Minus accounts payable June 30, 1942____________________________                                  5, 521. 83
     Net total expenditures___---__--__                                                         543,579 68
Unexpended balance June 30, 1942--------------__                                                 36, 395. 32

       Total amount appropriated to June 30, 1942-------                                        5-79, 975. 00
1114         REPORT OF CHIEF OF ENGINEERS,                                      U. S. ARMY,                    1942


    Fiscal year ending June 30                1938              1939            /1940                   1941              1942


Cost of new work .- -------            ----      ------    -------           -    -
Cost of maintenance                  ---                    $137, 415. 20     $255, 924.67            $78, 854.69       $83, 288. 32

T otal expended _____-.
                   . . . . . .                               102, 636. 60
                                              . . ._____________               239, 297. 50           126, 363. 36       75, 282. 22

Allotted      -              -             98, 000. 00       207, 500. 00      150, 425. 00           29,000. 00         95,050.00



Balance unexpended July 1, 1941 ----------------------------                                                         $16, 627. 54
Amount allotted from War Department Civil Appropriation Act,
approved May 23, 1941----------------------------------------                                                        95,050. 00

       Amount to be accounted for--           ------------------------                                               111, 677. 54
Gross amount expended------------------------- $75, 379. 62
Less:
     Reimbursements collected ----------                $95. 40
    Receipts from sales--------------------2.                00
                                                                                      -                97. 40
                                                                                                                      75, 282. 22
      Balance unexpended June 30, 1942 -----------------------                                                        36, 395. 32
Outstanding liabilities June 30, 1942---------------------------                                                       6, 829. 08
      Balance available June 30, 1942--------------------------                                                       29, 566. 24
Accounts receivable June 30, 1942------------------         ----                                                           11. 02

    Unobligated balance available June 30, 1942---------------29, 577. 26
Amount allotted in August 1942----------- -------------------- 23, 600. 00

           Amount available during the fiscal year 1943----------------                                               53, 177. 26

10. OTHER FLOOD-CONTROL PROJECTS FOR WHICHI NO ESTIMATES
                      ARE SUBMITTED

                                                                  For last    Cost and expenditures to
                                                                  full re-          June 30, 1942                     Estimated
                     Name of project                              port see                                            amount re-
                                                                  Annual                                               quired to
                                                                  Report      New work                Mainte-          complete
                                                                   for-                               nance


1. W ibaux, M ont.1 __ . .. . .. . .. . ... .. . . .                1938       .- ..-
                                                                                   --        -- -     - - - -              $42, 300
2. Marmarth, N. Dak.' -------------        ------.-----.      ... 1938                                                     2 18, 970
3. Council Bluffs, Iowa (Act of 1936)3_                             1939          $325.00                                 (4)
4. Forsyth, Yellowstone River, Mont.'                           1939            2, 209.39       .                               97, 000
5. Belle Fourche, Cheyenne River, S. Dak________                1940           37, 409. 97                                (4)
6. Missouri River, Niobrara, Nebr__                             1941           99, 369. 58            $3, 106. 65
7. Platte River near Schuyler, Nebr- __                     ... 1941          -..........                                   63, 000
8. Council Bluffs, Missouri River and Indian Creek,
     Iowa (Act of 1941).............................            1941         ------------           .-------------- -           18, 000
9. Snagging and clearing under authority of sec. 2 of
     the Flood  Control   Act   approved  Aug.     28,  1937,
     as amended- --------------          --------------         1941            1,0    0
                                                                                1,000.00       -(4)


   1Awaiting local cooperation.
  2 The levee system at the town of Marmarth, N. Dak., has been improved by Work Projects Administra-
tion projects so that at an additional cost of $3,230 the existing levees can be completed to protect the prin-
cipal portion of the town against all floods of past magnitude.
  a Completed as a Public Works Administration project.
  4 All of the work desired by local interests at the present time has been completed.
               RIVERS AND           HARBORS---0OAHA,                            NEBR.,      DISTRICT             1115
Stqtus of all iryvestigations for flood control called for by flood-control acts and
                               committee resolutions
                                                             Date trans-             Document num-         Recommenda.
          Locality               Authorization act            mitted to              Document num-         Recommenda
                                                              Congress                     e                   tion

Bad River, from Philip to       Flood Control Act,
  Fort Pierre, S. Dak.            Aug. 28, 1937.
Bear Creek, Colo ______         Flood Control Com-
                                  mittee resolution,
                                  June 16, 1938.
Belle Fourche River and         Flood Control Act,         Aug.             9,1941                         Unfavorable.
  tributaries, Wyoming.           June 22, 1936.
Big Horn Canyon Reservoir,      Sec. 7, of Flood Con-     ...............
  Mont. (supplemental 308         trol Act, June 22,
  report).                        1936.
Big Horn River and tribu-       Flood Control Act,
  taries, Wyoming.                June 22, 1936.
Big Sioux River, So. Dak.       Rivers and Harbors
    (Navigation and Flood         Committee resolu-
  Control).                       tion, Nov. 22, 1939.
Bowman irrigation project       Commerce Committee
   on Grand River, N. Dak.        resolution, June 22,
                                  1937.
Boyer River, Iowa.....-.        Flood Control Act,
                                  Aug. 28, 1937.
Heart River, N.         Dak.,   Commerce Committee
  Heart-Butte      irrigation     resolution, June 22,
  project.                        1937.
Knife River and tributaries,    Flood Control Act,
  North Dakota.                   Aug. 11, 1939.
Little Missouri River and       Commerce Committee
  tributaries, including          resolution, Oct. 25,
  Beaver Creek, Mont. and         1937.
  N. Dak., for flood control
  and irrigation.
Little Sioux Rivez, Iowa .      Flood Control Act,
                                  Aug. 28, 1937.
Missouri River diversion        Commerce Committee
project   (under special        resolution, June 22,
board).                          1937.
Missouri River, flood control   Flood Control Com-
at Bismarck, N. Dak.            mittee    resolution,
                                  May 2, 1939.
Missouri River at Gavins        Rivers and Harbors
Point, Yankton, S. Dak.,         Committee resolu-
construction of lock and         tion, Feb. 18, 1938.
dam for navigation, flood
control, power and irriga-
tion.
Missouri River, flood control   Flood Control Com-
at Mandan, N. Dak.               mittee    resolution,
                                  May 2, 1939.
Missouri River from Sioux       Flood Control Com-
City, Iowa to the Ne-            mittee    resolution,
braska-South Dakota State        Aug. 2, 1939.
line.
Missouri River, Knox and Commerce Committee
  Dixon Counties, Nebr.,        resolution, July 18,
flood protection and bank      1939.
erosion.
Missouri River, improve- River and Harbors
ment in S. Dak. (power          Committee resolu-
to    develop manganese        tion Jan. 19, 1940.
  deposits).
Nishnabotna River, Iowa __ Flood Control Act,                                        -------------------
                                 Aug. 28, 1937.
Platte (North) River and       Flood Control Act,            Mar. 13, 1942           -------------------       Do.
tributaries, Wyoming.           June 22, 1936.
Platte (South) River and       Flood Control Act,                                    -------------------

  tributaries Colorado, Wy-      Aug. 11, 1939.
  oming, and Nebraska.
Powder River and tribu- Flood Control Act,
  taries, Wyoming.               June 22, 1936.
Rapid Creek, S. Dak-...... Flood Control Com-
                                 mittee    resolution,
                                 June 13, 1938.
                     --
Soldier River, Iowa __.     .. Flood Control Act,
                                 June 28, 1938.
White River, 8. Dak -_-   .    Flood Control Act,
                                 Aug. 28, 1937.
White and Bad Rivers,          Flood Control Corn-
  S. Dak.                        mittee    resolution,
                                 Aug. 18, 1937.
Yellowstone River, Mont_ -     Flood Control Act,
                                 Aug. 28, 1937.
Yellowstone River, Wyo.,       Flood Control Com-
  Mont., and N. Dak.             mittee    resolution,
                                 Aug. 18, 1937.
1116     REPORT OF CHIEF OF ENGINEERS,              U. S. ARMIY,    1942

IMPROVEMENT OF RIVERS AND HARBORS IN THE FORT
            PECK, MONT., DISTRICT
   This district comprises all of Montana, except the northwestern por-
tion, southwestern North Dakota, northwestern South Dakota, a small
portion of northwestern Nebraska, and northern Wyoming embraced
in the drainage basin of the Missouri River and tributaries above the
mouth of the Cheyenne River, inclusive.
   District engineer: Lt. Col. R. Selee, Corps of Engineers.
   Division engineer: Col. F. S. Besson, Corps of Engineers, to April
9, 1942, and Col. Lewis A. Pick, Corps of Engineers, since that date.
                                  IMPROVEMENTS

                                    Navigation
                                                                               Page
1. Missouri River at Fort Peck, Mont_____________________-_____--_---_         1116
2. Examinations, surveys, and contingencies (general) _   __      __--         1125
                                  Flood control
3. Preliminary examinations and surveys-flood control-----------------1125
4. Other flood-control projects for which no estimates are submitted--_--- 1126
                  1. MISSOURI RIVER AT FORT PECK, MONT.
   Location.-The site of the Fort Peck Reservoir is in the Missouri
River Valley in McCone, Valley, Garfield, Phillips, Petroleum, and
Fergus Counties, Mont. The dam site is approximately 11 miles above
the mouth of the Milk River in sections 14, 15, 16, 21, and 22, T. 26 N.,
R. 41 E. The west (left) abutment is in Valley County and the east
 (right) abutment is in McCone County. Nearest towns are Glasgow,
17 miles northwest, and Nashua, 9 miles north.
   Existing project.-The project provides for construction of an earth
dam for impounding water for the improvement of navigation on the
Missouri River, Sioux City to the mouth, and a power plant. The
estimate of cost for new work, revised in 1942, is $124,200,000. De-
tailed data regarding the project are as follows:
                                   Description
Location, miles above mouth of Missouri River_------------------           1, 868. 7
Concrete spillway in right abutment, discharge capacity (second-
  feet) __-____         ---                                                250 000
Height of main dam above stream bed (feet) __________         -____-_       250. 5
Height of crest stone above stream bed (feet) ---------------------          252. 0
Elevation of crest stone (feet, mean sea level) .     --------            2,280. 0
Tunnels for releasing water from reservoir (4), diameter (feet) __          24'8"
Power plant-initial installation, one 35,000-kilowatt unit and one
  15,000-kilowatt unit (kilowatts)                                         50, 000
Maximum pool level (feet, mean sea level) ------  ______-______-_2,
Normal pool level (feet, mean sea level) ------------------------
                                                                               250
                                                                            2, 246
Crest length of dam (feet) __-- ___                              __        21, 026
Maximum storage capacity (acre-feet) --------------------- __         19,412, 000
Maximum surface area of reservoir (acres)   ---------------------         245, 000
Maximum length of reservoir (miles)       --------------------------           189
Clear width of reservoir (miles) ______________- ___                            16
Normal operating storage capacity (acre-feet)  ------------------     18, 400, 000
Total construction cost of project (estimated)-
Annual operation and maintenance cost (estimated) -
                                                      --  --
                                                                    $124, 200, 000
                                                                  - $310, 000
Date construction started, Oct. 23, 1933.
Estimated date of completion, December 1944.
Datum-mean sea level (1929 adjustment, U. S. Coast and Geodetic Survey).
            RIVERS       AND     HARBORS-FORT                PECK, MONT.,             DISTRICT        1117
    The existing project was authorized by the following acts:

     Acts                        Work authorized                                     Documents


Aug. 30, 1935 1 Construction of earth dam...._
                                           __..__        ......_       H. Doc. No. 238, 73d Cong., 2d sesp.
                                                                       (Specified in act.)
May 18,19382     Completion, maintenance, and operation of a
                  hydroelectric power plant, subject to certain
                  provisions contained in the act respecting the
                  transmission and sale of electric energy. This
                  act also authorizes the installation of additional
                  power generating facilities by the Secretary of
                  War when deemed necessary in the judgment
                  of the Bureau of Reclamation.


  I Included in Public Works Administration program in 1933.
  2 Public, No, 529, 75th Cong., 3d sess.

  (Maps showing transportation facilities, power-market area, power plants, etc., are contained in Senate
committee print, 75th Cong., 2d sess.)


   Terminal facilities.-None.
                        OPERATIONS AND RESULTS DURING FISOAL YEAR

  The work accomplished during the fiscal year was as follows:
  Dam.-Hired-labor operations were continued. The following
costs were incurred during the fiscal year:
                                                                                 Quantity,
Upstream facing:                   Feature                                     cubic yards           Cost
    Blanket gravel placed------------------------------                  180                     $2, 325. 63
    Quarry stone placed             ------------------------         _ 2,102                     28, 111.41
Roads, walks, and grading in shaft area-------------------- --                                    8, 677. 13
Road from power plant to shaft area---------------------------                                    5, 590. 82
Downstream berm road------              ------------------------------                           11, 788. 40
Miscellaneous work-----------......      ----------------------------                            11, 926. 64
         Total       ----------------------------------------------                              68, 420.03
  Diversion tunnels.-Work in connection with unwatering and clean-
ing tunnel No. 1 was completed. Test installation of the stop logs
and other miscellaneous operations were continued. The following
costs were incurred during the fiscal year:
Unwatering and cleaning tunnel No. 1------------------------------                             $15, 163. 16
Stop log test installation   -----------------------------------                                18, 290. 53
Miscellaneous work---      -----------------------------------                                   4, 561. 51
         Total--         -------------------------------------------                             38,015. 20
   Spillway.-Miscellaneous hired-labor operations were continued,
the cost of which was $1,890.75.
   Miscellaneous construction.-Hired labor operations were con-
tinued, the cost of which was $17,942.93. Contract operations were
completed; the cost for the fiscal year was $8,929.53.
   Lands.--Acquisition of lands required in connection with the proj-
ect was continued, the cost of which was $5,274.74. An adjustment
of the cost previously reported reduced the net amount for the fiscal
year to - $4,992.78.
       493202--43---pt. 1, vol. 1--71
1118    REPORT OF CHIEF OF ENGINEERS,                      U.    S.   ARMY,        1942

   Permanent buildings and utilities.-Construction of a filtration
plant for permanent water supply and other miscellaneous hired-
labor operations were continued. The cost incurred during the fiscal
year was $9,521.38.
   Power plant.-Contract and hired-labor operations were con-
tinued. The following costs were incurred during the fiscal year:
Designs, plans, tests, etc. (hired labor) --------------------------                 $25, 628. 56
Designs, plans, tests, etc. (contract) -----------------------------                   8, 554.18
Substructure (contract) ----------------------------------------                      57, 502. 24
Turbines (contract) ---------------------------------------------                     20, 927. 89
Governors (contract) _______________           _________                                  383. 84
Generators (contract) _----------__                                                   19, 863. 23
Cubicles and switchboards (contract)            --------                    ----           622. 95
Butterfly valves (contract)                                                             6,913.91
                                                                                      6------------
Superstructure, pipeline, penstock, and substation (minimum con-
  struction for one 35,000-kilowatt unit) (contract)            ---------------
                                                                 207,659.91
Miscellaneous   (hired labor)                                     -------                 6, 488. 26

       Total--------------------------------------------------414.                          544. 97
   Reservoir (exclusive of lands).-From the beginning of the fiscal
year until August 12, the reservoir was operated in conjunction with
maintenance dredging, to maintain a six-foot channel on the Missouri
River from Kansas City to the mouth. Releases during this period
averaged approximately 11,100 cubic feet a second. From August 12
to November 14 the reservoir was operated solely in the interest of
navigation on the Mississippi River. Releases during the period aver-
aged approximately 3,500 cubic feet a second. From November 15,
1941, to March 15, 1942, all inflows except 1,000 cubic feet a second were
stored. From March 16, 1942, to the end of the fiscal year, releases
were made from the reservoir for providing, in conjunction with main-
tenance dredging, a six-foot channel on the Missouri River, from
Kansas City to the mouth. Storage, during this latter period, of 88
percent of the inflow or approximately 3,800,000 acre-feet resulted in
substantial reductions in flood heights on the Missouri River during
the spring high-water period.
   Miscellaneous operations.-Hired-labor operations in connection
with the camp, railroad, electrical system, etc., were continued.
Charges to construction features and other credits exceeded costs in
the amount of $15,320.44 during the fiscal year.
   Demobilization. Hired-labor operations were continued, the cost
of which was $46,023.71.
   Maintenance, operation,and care.-The cost of maintenance, opera-
tion, and care of the dam, tunnels, spillway, reservoir, camp, etc., was
$300,726.08 during the fiscal year.
   The total cost of new work during the fiscal year was $414,544.97,
Power Plant funds; $9.60, Public Works funds; and $170,420.71,
regular funds; a total of $584,975.28. The cost of maintenance, opera-
tion, and care was $300,726.08. regular funds. The total expenditures
were $363,909.56, Power Plant funds; $9.60, Public Works funds;
and $759,109.77, regular funds; a total of $1,123,028.93.
                         CONDITION   AT   END   OF   FISCAL      YEAR


  Permanent work on the project was approximately 94 percent com-
pleted. All preparatfory work in the nature of temporary camp, roads,
power lines, plant, shops, etc., was completed.
          RIVERS   AND      HARBORS-FORT        PECK, MONT.,                 DISTRICT    1119

   Darnm.-Clearing and grubbing, stripping base of dam, construction
of steel-sheet piling cut-off wall, the rock and gravel toes, the hydraulic
fill and the rolled fill are completed. The following quantities have
been placed:
                                                                                    Cubic yards
Hydraulic fill-------------------------------------------                         122, 178, 000
Rolled fill   --      ___----------              --     ----------                  3, 337, 067
Gravel at toe of dam--------------------------------------------                    3, 112, 904
Rock at toe of dam ---------------------------------------------                       289, 297
Gravel on upstream face of dam------------------------------                           791, 368
Field stone on upstream face of dame_._--------------                -----              209, 070
Salvage field stone on the upstream face of dam------------------                       129, 887
Quarry stone on upstream face of dam_ _______---------------                            442, 939
Salvage quarry stone on upstream face of dam_--------------------                        89, 427

   The dam proper has cost $50,404,631.83 to date and is 98 percent
completed.
   Diversion tunnels.-The four diversion tunnels, having an, aggre-
gate length of 24,386 linear feet, are practically complete, except the
transition section in No. 1 main control shaft, which is not completed.
The tunnels and appurtenant works have cost $31,696,053.27 and are
99 percent completed.
   Spillway.-The channel has been excavated, a total of 13,847,387
cubic yards having been removed, and 268,625 cubic yards of concrete
have been placed in the channel lining; 291,826 cubic yards of con-
crete have been placed in the bridge, columns, piers, foundation, floor
slab, and training walls of the gate structure. Sixteen gates have been
erected and the operating equipment installed. The spillway has cost
$18,192,884.58, and is practically completed.
   Reservoir (exclusive of lands).-Eightthousand five hundred acres
have been cleared, the cost of which is $280,941, and the clearing opera-
tions are 89 percent completed. Useful storage at the end of the fiscal
year amounted to 6,188,000 acre-feet, a gain of 4,800,000 acre-feet (lur-
ing the fiscal year. The pool elevation on June 30, 1942, was 2,180.7
feet above mean sea level, an increase of 53.5 feet during the fiscal
year.
   Power plant.-Construction of the power plant and appurtenant
works has cost $2,352,472.70, and is 32 percent completed.
   Lands.-Appraisal of lands required for the project is complete.
A total of 169,338 acres for the dam site and reservoir areas have
been acquired or are in process of condemnation, the cost of which
was $2,410,684.02.     In addition thereto 119,671 acres of public
domain are contained within the dam site and reservoir areas. Land
acquisition is 98 percent completed.
   Permanent buildings and utilities.-Twelve permanent dwellings,
administration building and utilities therefor are complete, and
the filtration plant for water supply is practically completed. Per-
manent buildings and utilities have cost $663,524.70 and are 42 per-
cent completed.
   MIiscellaneous construction and operation.-Temporary quarters
have been constructed and operated, the net cost of which was
$3,658,113.14 to date. The railroad facilities have been constructed
and operated, the net cost of which is $2,925,403.16 to date. Elec-
trical transmission and distribution lines and appurtenant works
have been constructed and operated, the net cost of which was
1120         REPORT OF CHIEF OF ENGINEERS,                           U. S. ARMY,           1942

'$2,555,397.64 to date. Construction of shops and miscellaneous items
  has cost $165,920.29. Miscellaneous operation during construction has
,cost $267,593.09 to date. Demobilization has cost $93,627.47.
     The work remaining to complete the project consists of the com-
  pletion of the work in progress; constructing dwellings streets, and
  sidewalks; remodeling laundry building for storage of equipment;
  miscellaneous water distribution lines; installing drainage systems
  on downstream slope and abutments of the dam; constructing road
  from tunnel shafts to spillway; miscellaneous road surfacing; paint-
  ing tunnel trash racks and spillway 'gate structure; purchasing and
  installing generator set, hoist car, machine-shop equipment, and stop
logs for the spillway; maintaining crest of dam to elevation 2275.5
  mean sea level; constructing permanent road on crest of dam; in-
  stalling well system for pressure relief under downstream toe of
  dam; installing drainage system on crest of dam; and constructing
  additional facilities for the power plant.
     The cost of new work under the existing project to June 30, 1942,
was    $116,349,771, of which $45,996,070.98 were regular funds; $2,352,-
  472.70 were Power Plant funds; $49,531,000 were Public Works funds;
  and $18,470,227.32 were Emergency Relief funds. The cost of mainte-
  nance, operation, and care was $300,726.08 regular funds. Expendi-
  tures were $47,052,591.58 regular funds; $2,212,822.05 Power Plant
  funds; $49,530,940.10 Public Works funds; and $18,470,227.32 Emer-
  gency Relief funds; a total of $117,266,581.05.
     Proposed operations-(a) Public Works funds.--The balance un-
  expended ($59.90) at the end of the year will be applied to the
  payment of outstanding liabilities.
     (b) Regular funds.-The balance unexpended ($1,646,841.04) and
  accounts receivable ($365,679.88) at the end of the year will be ap-
  plied toward the completion of the Fort Peck Dam and Reservoir.
  It is proposed to carry on operations during the fiscal year 1943 as
  follows:

                                                                                   Estimated
                                                                                     date of        Amount
                                                                                   completion


Accounts payable June 30, 1942 ____________________________________                                  $80, 296. 81
New work (July 1, 1942, to June 30, 1943):
   Construction of Fort Peck Dam and Reservoir, including all works
     incidental thereto:
       Existing contract: Transition section in tunnel No. 1 main shaft -         June 30, 1943      140, 000. 00
       Proposed contract: Well installation for pressure relief under down-
          stream toe of dam_______________________________________________        Sept. 30, 1942      52, 000. 00
         Proposed hired labor:
            Drainage system on crest of dam                                      Apr. 30, 1943       10, 000. 00
            Diversion tunnels-stop log test installation_                        Sept. 30, 1942       6, 000. 00
             Water distribution liheto power plant area_......................   June 30, 1943       10, 000. 00
             Relocation of miscellaneous electric distribution lines-----------  Jan. 31,1943
             Repair and modification of temporary buildings in the town site _ Nov. 30, 1942
                                                                                                     20, 000. 00
                                                                                                     30, 000.00
             Completion of filtration plant for permanent water supply-...... Sept. 15, 1942             260. 00
             Acquisition of lands .________________________-...........          June 30, 1943        5, 000.00
            Demobilization-     _ _- . . . . .-- ----------------
                                                      . .             -do                  _._.... 50, 000. 00
             Miscellaneous-operation of shops and yards, electric service      .---  do               9, 291.75
               Total proposed hired labor_ ....-...............--           . _....----             140, 551.75
         Reserve for leave accrued prior to July 1, 1942 ___________. .. . ..............._
                                                                              ...--                 155, 029. 55
          Balance available for future construction..                        __     ..           1, 077, 642. 81
Maintenance (operating and care):
    Operation .---------------------                                                                 356, 425. 00
    'Ordinary repairs ............
                               _      _ _-----------          ---......-----------------------         10, 575.00
      Total maintenance ... ....------------...                                     -----------       367,000.00
      Grand total-     - --..- - - _- _ - - --. .            .-
                                                              . .......         . .          .     2, 012, 520. 92
            RIVERS AND HARBORS-FORT                                     PECK, MONT., DISTRICT                                    1121
   (c) Power plant fumds.-The balance unexpended ($4,932,177.95)
at the end of the year will be applied toward the completion of the
power plant, Fort Peck Dam. It is proposed to carry on operations
during the fiscal year 1943 as follows:
                                                                                                       Estimated
                                                                                                         date of             Amount
                                                                                                       completion
Accounts payable June 30, 1942___
                                .. _____ _                ___.... ____________                   _________
                                                                                                  ....                      $139, 650. 65
New work (July 1, 1942, to June 30, 1943):
    Construction of power plant, Fort Peck Dam:
       Existing contracts:
            Designs and plans__________________________________                                      June 30, 1943             10, 385. 53
            Turbines ..-        -.------------------------------------------                        ----- do -----             40, 242. 62
            Governors                         .......
                                 ---------------------------------------------- do......-----                                   4, 772. 52
            Generators     .....---------------------------------------------   do-...                                        458, 263. 51
            Cubicles and switchboards         _
                                            _------------- ----------------- Dec. 31, 1942                                    227, 338. 82
            Butterfly valves (all work suspended June 22, 1942)- __-....-__ ....----.....                                     154,126. 93
            Superstructure, pipe line, pen stock and substation (minimum
               construction for one 35,000-kilowatt unit)-            .------   __---        -        June 30, 1943         1, 437, 340.09
                 Total existing contracts.                  .......                  .....                                   2, 332, 470. 02
                                                                                                  ............--------------------------------------
                                                 ...--.
        Proposed contract: Rewinding transformers---                       -------                    Mar. 31,1943             35,000.00
Balance available for future construction __ __________....._____                           _-_________-_ 2,425, 057. 28
                                                                                 ____________
      Grand total-_ _       ..         -                   -.--                      . -_             _-.- 4,932,177.95

  The sum of $567,000 regular funds can be profitably expended
during the fiscal year ending June 30, 1944, as follows:
New work (July 1, 1943, to June 30, 1944) :
   Proposed contract: Road surfacing---                                                                                             000'
                                                                                                                              $---------------------70,
      Proposed hired labor:
          Reservoir clearing---                   --- ---------                                                                 40, 000
          Demobilization                                                                                                            000
                                                                                                                                1------------------------
          Contingencies-------                      ---   ------------------------------                                        75, 000
               Total proposed hired labor.----------------------------130, 000

          Total new work                ----------------------------------- 200,000
Maintenance (operating and care) :
    Operation--   --------------------------------------------              355, 000
    Ordinary repairs--                                                       12, 000
         Total maintenance                  -          -----------------------------------
                                                                                        367, 000

         Grand      total--------                 --      -----------------------------                                       567, 000
  It is expected that the present construction requirements for the
power plant will be completed during the fiscal year 1943 and that
the construction of additional facilities will be deferred beyond the
end of the fiscal year 1944.
                                       Cost and financial summary
                               MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1942___         __------------------ $45, 996, 070. 98
Cost of maintenance to June 30, 1942------------------------             300, 726. 08
      Total cost of permanent work to June 30, 1942------------ 46, 296, 797. 06
Undistributed costs June 30, 1942_ ---     __------          .._____     470, 411. 45
      Net total cost to June 30, 1942__--______     __________     _ 46, 767, 208. 51
Plus accounts receivable June 30, 1942. ----------------------           365, 679. 88
      Gross total costs to June 30, 1942      ________----__--47, 132, 888. 39
Minus accounts payable June 30, 1942-------------------------             80, 296. 81
      Net total expenditures- ------     ----------                                                                47, 052, 591. 58
Unexpended balance June 30, 1942__ --------                -                                                        1, 646, 841. 04
     Total amount appropriated to June 30, 1942 ----------                                                         48, 690, 432. 62
1122         REPORT OF CHIEF OF ENGINEERS,                                              U.      S. ARMY,                      1942


Fiscal year ending June 30                  1938                    1939                   1940                      1941                    1942


Cost of new work        _---- $13, 241,944.84
                    ..----                                     $10, 987, 833. 93 $6, 081, 238. 42 $2, 024, 698. 14                      $170, 420. 71
Cost of maintenance           -
                       -- -- --------------                    -------------- ----------------------------                               300, 726.08

      Total cost_------------           13, 241, 944. 84        10, 987, 833. 93   6, 081, 238. 42           2, 024, 698. 14              471, 146. 79

               ...---
Total expended---                 -..   13, 166, 209. 63        11, 193, 325. 49   6, 739, 827. 65           1, 623, 029. 49              759, 109. 77

Allotted_-----------------17, 515, 000. 00                       9, 338, 304. 08   1, 279, 128. 54             200, 000. 00               367, 000. 00



Balance unexpended July 1, 1941_                            $2,038,950.81
Amount allotted from War Department Civil Appropriation Act
  approved April 28, 1942              ----------              367, 000. 00

           Amount to be accounted for                            -----             -_                                             2, 405, 950. 81
Gross amount expended      --------------          $1, 260, 547. 05
Less:
    Reimbursements collected-------- $401, 662. 60
      Receipts from sales__ _-___-_                        -             99, 774. 68
                                                                                                   501, 437. 28
                                                                                                                                     759, 109. 77

      Balance unexpended June 30, 1942_-                    -                                                                     1, 646, 841. 04
Outstanding liabilities June 30, 1942----------------$286, 752. 90
Amount covered by uncompleted contracts-        -       122, 343. 80
                                                                                                                                    409, 096. 70

           Balance available June 30, 1942                                                  -       -                             1, 237, 744. 34
Accounts receivable June 30, 1942 -                                 ----------------                              -                1365, 679. 88

           Unobligated balance available June 30, 1942_                                                       _                   1, 603, 424. 22
Amount (estimated) requiredto be appropriated for completion of
   existing project 2                    _          _            ------------
                                                               ___________                                                          921, 340. 00

Amount that can be profitably expended in fiscal year ending June
30, 1944 :                                                                                                                         200 , 000 . 00
   For new work 2__           _____
   For maintenance 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                          -
                                                                                                                                    367, 000. 00

         Total 2_ ----       ----    --      ---                                            -       ------                           567, 000. 00
   1 Includes $19,984.81 due from power-plant funds.
   2 Exclusive of available funds.

                                                    POWER PLANT FUNDS

                                             _
Cost of new work to June 30, 1942_______________ _                                                                                2, 352, 472.70
                                                                                                                                 $_________
Cost of maintenance to June 30, 1942_______________-_
           Total cost of permanent work to June 30, 1942                                                                          2, 352, 472. 70
Minus accounts payable June 30, 1942_________________                                                                              1 139, 650. 65

           Net total expenditures________________________                                                                         2, 212, 822. 05
Unexpended balance June 30, 1942__                                                                                                4, 932, 177. 95

           Total amount appropriated to June 30, 1942                                   -                                         7, 145, 000. 00

   Fiscal year ending June 30                   1938                     1939               1940                      1941                    1942

Cost of new work _        ........       ..
                              ______________   __.. __     $660, 162. 79 $1, 277, 764. 94                                               $414, 544. 97
Cost of maintenance ----------------------------------------
                                                          ------         - ------     --                                             ------

Total expended                                   __
                             ___ __.......________.........     ...
                                                            ___________                 557, 201.64          1, 291, 710.85               363, 909. 56
Allotted        ......................--------...
            --------------------..                         -- $2,00, 000.00        2,000,000.00              1,845,000. 00            1,300,000.00
               RIVERS AND HARBORS--FORT                             PECK, MONT., DISTRICT                       1123

Balance unexpended July 1, .1941--_ ----------------------                                         $3, 996, 087. 51
Amount appropriated in War Department Civil Appropriation
Act approved Apr. 28, 1942------        --------------------                                        1, 300, 000. 00

      Amount to be accounted for_____---- _   __---------         5, 296, 087. 51
Gross amount expended_-                       -$384,     088. 31
                                                 $-------------------
Less reimbursements collected------------------- 20, 178. 75
                                                                     363, 909. 56

      Balance unexpended June 30, 1942__________------                                               4, 932, 177. 95
Outstanding liabilities June 30, 1942___________ 1 $258,838.89
Amount covered by uncompleted contracts----- 1, 460,025.97
                                                                                                     1, 718, 864. 86

        Balance available June 30, 1942----- --------------                                          3, 213, 313. 09
  1 Includes $19,984.81 due to maintenance and improvement funds.
                                             PUBLIC       WORKS     FUNDS

Cost of new work to June 30, 1942------------- --------                                        $49, 531, 000. 00
Cost of maintenance to June 30, 1942--------------------                                     ---------------

     Total cost of permanent work to June 30, 1942 .-....                                          49, 531, 000. 00
Minus accounts payable June 30, 1942                                                                         59. 90

     Net total expenditures------------------------------                                          49, 530, 940. 10
Unexpended balance June 30, 1942-------------------------                                                    59.90

         Total amount appropriated to June 30, 1942---------                                       49, 531, 000. 00

   Fiscal year ending June 30                1938            1939            1940          1941                1942


Cost of new work-__-       ------ _ -$20,      727. 35     $22, 963. 25     $7, 428. 33     -$7. 16                   $9. 60
Cost of maintenance- _---------                     ----------------------------------             --------------
Total expended _--____      --___-_         35, 586. 22     15, 929. 11      1, 027. 21           3. 36                9. 60
Allotted....


Balance unexpended July 1, 1941-----------------------------                                                   $69. 50
Gross amount expended       --------------------------------                                                     9. 60
      Balance unexpended June 30, 1942----     -----------------                                                59. 90
Outstanding liabilities June 30, 1942_ -------------------     ------                                           59. 90
                                         EMERGENCY RELIEF FUNDS

Cost of new work to June 30, 1942    ------------------------                                  $18, 470, 227. 32
Cost of maintenance to June 30, 1942---_--------------------
         Total cost of permanent work to June 30, 1942-----------18, 470, 227. 32
Net total expenditures----------- --  -----------------------                                      18, 470, 227. 32
Total amount appropriated to June 30, 1942 ----        ----                                        18, 470, 227. 32

   Fiscal year ending June 30                1938            1939            1940          1941                1942

Cost of new work.------------         $1, 675, 669. 28    $260, 863. 10     $8,466.95     -$114.64
Cost of maintenance       ---
Total expended----------------           357, 417. 72        1,976. 12       -132. 92      -114. 64
Allotted...........      .----                .---         -2, 989. 82    -26, 668. 22     -114. 64
1124        REPORT OF CHIEF OF ENGINEERS,                                    U. S. ARMY,               1942

            CONSOLIDATED COST AND FINANCIAL SUMMARY--FORT                                  PECK PROJECT

                                              -
Cost of new work to June 30, 1942_ __ ___________---                                                $116, 349, 771. 00
Cost of maintenance to June 30, 1942 -------------                                     --------           300, 726. 08

      Total cost of permanent work to June 30, 1942--------                                           116, 650, 497. 08
Undistributed costs June 30, 1942___----------------------------                                           470, 411. 45

       Net total cost to June 30, 1942--------------------                                            117, 120, 908. 53
Plus accounts receivable June 30, 1942------------------------                                             345, 695. 07

     Gross total costs to June 30, 1942________________--                                             117, 466, 603. 60
Minus accounts payable June 30, 1942     _____---  -- ____---                                              200, 022. 55

     Net total expenditures----------------------------                                               117, 266, 581.05
Unexpended balance June 30, 1942_____________-___-__-                                                   6, 579, 078. 89

         Total amount appropriated to June 30, 1942------------123,                                            845, 659. 94

  Fiscal year ending            1938                 1939                1940                1941                  1942
        June 30

Cost of new work -_-      $15,118, 341. 47 $11, 271, 660. 28        $6, 757, 296. 49     $3, 302, 341. 28         $584, 975. 28
Cost of maintenance      ---------------- -----------------------                                                  300, 726. 08

                    -
      Total cost- .__      15, 118, 341. 47     11, 271, 660. 28     6, 757, 296.49       3, 302, 341. 28          885, 701.36
Total expended .....       13, 559, 213. 57     11, 211, 230. 72     7, 297, 923. 58      2, 914, 629. 06        1, 123, 028. 93
               --
Allotted__------.          17, 515, 000. 00     11, 335, 314. 26     3, 252, 460. 32      2, 044, 885. 36        1, 667, 000. 00



Balance unexpended July 1, 1941__                                                                      $6, 035, 107. 82
Amount allotted from War Department Civil
  Appropriation Act approved April 28, 1942__                                   $367, 000. 00
Amount appropriated in War Department Civil
  Appropriation Act approved April 28, 1942__                                1, 300, 000. 00
                                                                                                            1, 667, 000. 00

      Amount to be accounted for _______________
                                    --            -           ____                                          7, 702, 107. 82
Gross amount expended--------------------           $1, 644, 644. 96
Less:
    Reimbursements collected----   $421,841. 35
    Receipts from sales-----------    99, 774. 68
                                                        521, 616. 03
                                                                                                            1, 123, 028. 93
      Balance unexpended June 30, 1942____________________                                                  6, 579, 078. 89
Outstanding liabilities June 30, 1942-----------  $525, 666. 88
Amount covered by uncompleted contracts -        1, 582,369. 77
                                                                                                            2, 108, 036. 65

     Balance available June 30, 1942__________________ _                                                    4, 471, 042. 24
Accounts receivable June 30, 1942_.______________ ________                                                     345, 695. 07
     Unobligated balance available June 30, 1942 --                                                         4, 816, 737. 31
Amount (estimated) required to be appropriated for comple-
tion of existing project - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                   921, 340. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1944:   - - --
   For new work -____________          __________
                                                   -- - -- - -- -                                             200, 000. 00
   For maintenance 1 _ - - - ______- - - -____
                                            -   -   --
                                                  _________                                                   367, 000. 00
          Total-------------------                     --------------------------                             567, 000. 00
  2Exclusive of available funds.
              RIVERS AND HARBORS-FORT                                            PECK, MONT., DISTRICT                                      1125
      2. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)
  The cost and expenditures during the year were $15,952.19. In
addition to the balance unexpended ($47.81), $27,400 will be required
for the payment of expenses to be incurred under this heading during
the fiscal year 1943. The additional sum of $35,000 can be profitably
expended during the fiscal year ending June 30, 1944.
                                             Cost and financial summary
Cost of new work to June 30, 1942
                                                                             ---------------------
                                                                                                                                --------
                                                                                                                                $25, 877. 19
Cost of maintenance to June 30, 1942-
           Total cost of permanent work to June 30, 1942--------------25, 877.19

Net total expenditures____--------     ------------ ---------------                                                              25, 877. 19
Unexpended balance June 30, 1942___-------------   __- _______                                                                     - 47. 81
           Total amount appropriated to June 30, 1942_..                                      _____...__                   _     25, 925. 00

    Fiscal year ending June 30                    1938                    1939               1940                   1941                   1942

C ost of new work . . . . . . . . . -------------
                                      . . . . .                            .     . . ---.
                                                                            . -----
                                                                    ---------                . . .
                                                                                             ---..        .   . .     . . .          ..    . . .
Cost of maintenance_ _________                 ------
                                            ......--------           --------------            $4, 925                $5, 000             $15, 952. 19
Total expended ._________.________..________ ._                     __ ...      .....            4, 925                5, 000              15, 952. 19
Allotted.....--------------------            -----------------..----------                       9, 925               16, 000    .


Balance unexpended July 1, 1941_____-------------------------                                                                   $16,000. 00
Gross amount expended__ -------------                                                                                 _          15, 952. 19

           Balance unexpended June 30, 1942_ .-                                   __.__-                  ____-----47.                              81

Amount that can be profitably expended in fiscal year ending June 30,
1944, for maintenance 1---------------------------------------                                                                  35, 000. 00
   1 Exclusive of available funds.

3. PRELIMINARY EXAMINATIONS AND SURVEYS FOR FLOOD CONTROL
  The cost of work during the year was $1,120.23, and the expenditures
were $977.38. The balance unexpended at the end of the year, amount-
ing to $3,181.61, will be applied to the payment of expenses incurred
under this heading during the fiscal year 1943.
                                             Cost and financial summary
Cost of new work to June 30, 1942-----------------------------------
Cost of maintenance to June 30, 1942---        --------------------- $25, 961. 24
      Total cost of permanent work to June 30, 1942_______--- - 25, 961. 24
Minus accounts payable June 30, 1942 --------------------------     142. 85

     Net total expenditures     ------------------------------- 25, 818. 39
Unexpended balance June 30, 1942--  ________________________     3, 181. 61

           Total amount appropriated to June 30, 1942____-- ---                                                                 29, 000. 00

    Fiscal year ending June 30                    1938                    1939               1940                   1941                  1942

Cost of new work . -.-----------...                                            ..... ... ........
                                                                     ---------...                             ... ...-----       -                .....
Cost of maintenance         .-   --.     -   --   ..     ---             $951. 19    $18, 203. 27              $5, 686. 55                $1, 120. 23
Total expended ....... _               ...                     ..             944. 62       17, 936. 03         5, 960. 36                    977. 38
Allotted--------------- ----- -----------                                26, 000. 00 -------------             ------                       3, 000. 00
1126           REPORT OF CHIEF OF ENGINEERS,                                                  U. S. ARMY,                   1942

Balance unexpended July 1, 1941          ------------------------------ $1, 158. 99
Amount allotted from War Department Civil Appropriation Act ap-
proved May 23, 1941__ ---------------------------------------           3, 000. 00

      Amount to be accounted for----------------------------                                                                       4, 158. 99
Gross amount expended ---------------------------------------                                                                         977. 38
      Balance unexpended June 30, 1942-------------------------                                                                    3, 181.61
Outstanding liabilities June 30, 1942------------------------------                                                                   172.85

            Unobligated balance available June 30, 1942-----------------3,                                                            008.76

4. OTHER FLOOD-CONTROL PROJECTS FOR WHICH NO ESTIMATES
                     ARE SUBMITTED

                                                                    For last               Cost and expenditures to
                                                                  full report,                              June 30, 1942          Estimated
                       Name of project                                Annual
                                                                  seeReportquired                                                         tre-
                                                                                                                                   quired to
                                                                     Repor                 New work                   1ainte-      complete


Glasgow, Mont.12- - - - - - - - - .----------------------------
                                   -- --      .                       1939                 $16, 831. 61        -            -
Harlem, Mont.                                                         1938              ..........--------------                         $9, 030
Saco, Mont.2. .       -- ....-.. ......     _.._                      1938                      654. 67 --------------                   26, 800

  1 Project completed.
  2 Awaiting local cooperation.

Status of all investigations for flood control called for by flood-control acts and
                                committee resolutions

                                                                        Date trans-
              Locality                      Authorization act            mitted to                     Document number          Recommenda-
                                                                           Congress


Milk River, Mont.......---------. Commerce Committee                 --------------......................
                                             resolution, Apr. 11,
                                             1939.
Rock Creek, Mont ..--------..... Commerce Committee
                                  resolution, Dec. 15,
                                             1938.
Shoshone River, North Fork Flood Control Act,
and South Fork, and         Aug. 18, 1941.
tributaries, Wyoming.
                                     FINDING LIST
  SHOWING THE SUBDIVISIONS OF THIS REPORT BY DIVISIONS,
          DISTRICTS, BOARDS, AND COMMISSIONS

                                                                                        Page


                                                                            Volume 1           Volume 2


Board of Engineers for Rivers and Harbors                                              20
NORTH ATLANTIC         DIVISION:
    Boston, Mass., district                            _                            22
    Providence, R. I., district _______________________                             70
    New York, N. Y., district -----------------------                              165
    Syracuse, N. Y., district_                                                     281
    Philadelphia, Pa., district__                                                  322
    Baltimore, Md., district-----------                                            371
    Washington, D. C., district--                    -                             394
SOUTH ATLANTIC        DIVISION:
    Norfolk, Va., district________    ______________                               417
    Wilmington, N. C., district___________________                                 463
    Charleston, S. C., district                                                    510
    Savannah, Ga., district_-                    _______________                   541
    Jacksonville, Fla., district_                                                  566
    Mobile, Ala., district_                                                        628
LOWER      MISSISSIPPI VALLEY        DIVISION:
    New Orleans, La., district_        -                                           706                 -
    Vicksburg, Miss., district  -                                                  789
    Memphis, Tenn., district__---------                                            832
SOUTHWESTERN         DIVISION:
    Galveston, Tex., district___________                                           852            -
    Denison, Tex., district___             ____________                            927
    Albuquerque, N. Mex., district                                                 934                 -
    Little Rock, Ark., district_______________________                             943
    Tulsa, Okla., district_____________                                            968
UPPER     MISSISSIPPI VALLEY         DIVISION:
    St. Louis, Mo., district____---___                    ____________             992
    Rock Island, Ill., district -                                                 1035
    St. Paul, Minn., district_                                                    1052
MISSOURI      RIVER DIVISION:
       Kansas City, Mo., district__              -                                1074
       Omaha, Nebr., district                                                     1096
       Fort Peck, Mont., district_                                                1116
OHIO     RIVER DIVISION:
       Nashville, Tenn., district -----                                                               1141
       Louisville, Ky., district_-----                   -----           _ _--                        1174
       Cincinnati, Ohio, district_                                                                    1217
       Huntington, W. Va., district-                                                                  1239
       Pittsburgh, Pa., district__                   -              -                                 1281
GREAT LAKES        DIVISION:
       Duluth, Minn., district__________________________                                              1325
       Milwaukee, Wis., district                                                                      1348
       Chicago, Ill., district____________________________ _________                                  1432
       Detroit, Mich., district_____      ___________________                    ___                  1476
       Buffalo, N. Y., district_                                                                      1514
MOUNTAIN       DIVISION:
       Denver, Colo., district___________________________                                             1579
       Salt Lake City, Utah, district                                                                 1581
11                                              INDEX:


                                                                                          Page

                                                                               Volume 1           Volume 2


SOUTH PACIFIC DIVISION:
      Los Angeles, Calif., district__ _               -----------                                      1583
      San Francisco, Calif., district_______-------------------------------                            1623
      Sacramento, Calif., district ----------------------------------                                  1652
      Honolulu, T. H., district_--_ ___'___________ --------                                           1839
NORTH PACIFIC DIVISION:
      Portland, Oreg., district_-----------                                                            1681
      Seattle, Wash., district-------------_            ----        -----------                        1796
Puerto Rico district___                 -
                                  __-______-__________-_
                                               -         --                                            1839
California Debris Commission------------                      -----------                              1873
Mississippi River Commission_                 __              -________---___   -------                1891
Beach Erosion and Shore Protection Boards__                     --------     _          -------        2000
Permanent International Association of the Congresses
   of Navigation ----------------------------------------------
                            _                                                                          2002
hliscellaneous Civil Works_ _            -          --
                                                     _________-                ------                  2006
Investigations--------------------------------------_--------                                          1841
                                                 INDEX

                                                                                                Page

                                                                               Volume 1                Volume 2


                                     A
Abandonment and curtailment of river and harbor proj-
                          ---------------------------------------
  ects, review of reports__    ____     ___________                   2005
Aberdeen, Ohio, flood control_ _       -__________-_____   ____       1235
Absecon Creek, N. J., navigation_______-____________       367
Absecon Inlet, N. J.:
    Investigation------------ ---------------------        368----------
      Navigation --------------------------                                       -       362
Academy Creek, Brunswick Harbor, Ga., improvement_                                        555
                                -------------
Accotink Creek, Va., navigation-_                                                         413
Acushnet River, New Bedford Harbor, Mass., improve-
  ment ---------------    ------------------------                                         80
Adams, Hoosic River dBasin, Mass., flood control                                          280len
                                                                                          280
Adams levee unit, Ind., flood control_--                  ----                 ----                         1212
Addicks Reservoir, Texas, flood control-------_, _ ---                                    913
Addison, N. Y., flood control__________ ______________                                    295
Advanced funds for river and harbor improvements and
for flood-control works_-------------------------_                                        15
Agate Bay Harbor, Minn.:
      Investigation---------------------                                              -                     1346
     Navigation ----------------------------------------------                                             1345
Alabama-Coosa branch of Mobile River system, investi-
  gation ----------------------------------------                        698, 705 ___
Alabama River, Ala________________________________                            673
Alabama, State of, removal of water hyacinths from-- -                        669
Alameda Creek, Calif., investigation-                 -_ _.-------------_ _       ----                     1652
Alamitos Bay, Calif., investigation____________________                    _____                           1597
Alamogordo Dam, N. Mex.:
     Flood control_ _-_------------
                          _     -----------                                   926
     Investigation__-----------------------------------                       942
Albemarle and Chesapeake Canal, N. C. and Va., im-
  provement----------------------------------452----------
Albemarle Sound, N. C., improvement of waterway to
   Norfolk, Va., via Pasquotank River-...                            ---.-                449
Albuquerque, N. Mex., engineering district_ _ _ _ _ _                                     934
Alexandria, Va., improvement of Potomac River at..                                        400
Algoma Harbor, Wis.:
     Investigation ----------------------------------------                                            1430
     Navigation -----------------------                         ------------ ----------                1372
Alhambra Creek, Calif., investigation                 _-------------                   ---            1652
Alhambra Wash, Los Angeles, Calif, flood control---                  ....      -------     _         -1598
Aliso Creek Dam, Calif., flood control---------------------------                                     1611
Alkali Canyon, Oreg., investigation----------------_ _-_                                               1794
Allatoona Reservoir, Coosa River Basin, Ga., flood con-
  trol_ -------------------------------------------                                    699
Allegheny River Reservoir, Pa., flood control----------- ----                                         1169
Allegheny River, Pa. and N. Y.:
     Construction of locks and dams_                     -         -_________----------               1286
                                          _
     Flood-control reservoirs_ _-------------                          --------------           -     1320
     Improvement by open-channel work                             -_----------                    -- 1295
     Investigation----__-               -     -------                            _          .._1296, 1324
                                                                                                  I
IV                                                INDEX


                                                                                                   Page


                                                                                        Volume 1          Volume 2

Aliens Creek, Tex., investigation_                                                911,926
Alligator River, N. C., improvement of waterway via__                                   453
Aloha-Rigolette area, La., flood control_                                               823------------823
Alloway Creek, N. J_ _                _-_-__       ------                               367
Almond, N. Y., flood control______ _ -                             -___________         297
Almond Reservoir, N. Y., flood control- ----------------                                291
Alpena Harbor, Mich.:
     Investigation_________________________                                                               1512
     Navigation--- -------------------------------------------                                            1511
Altamaha River and Sound, Ga.:
     Investigation ---------------------------------                              564, 565
     Navigation_------------------------------------                                    552
Altus Project, Okla., investigation                    -----------      - - _-          934
Alviso Harbor and Creek, Calif., investigation _ -                                       __               1650
Ambrose Channel, New-York Harbor, N. Y., improve-
  ment_                                                                                   97
                                                                                         1-------------------------------------
American River, Calif., investigation_                                         _ __ __ __ _ __            1681
American River, Calif. (North Fork and Middle Fork),
  construction of reservoirs -------------------------------------                                        1880
Amherstburg Channel, Detroit River, Mich., improve-
     ment           - --                                --       ---------   --------                          1491
Amite River, La., navigation_______________________                           732
Anacortes Harbor, Wash., navigation _ _ _                                                                      1823
Anacostia Park, D. C_____________________________________                                                      2010
Anacostia River, D. C. and Md.:
    Investigation-_ _                                                         417
    Navigation -------------------                     ---------------        394
    Reclamation and development of the flats _ _ _ _ _ __ _ _                 _                                2010
Anahuac Channel, Tex., navigation------_             --------        _        885
Anchorage grounds, rules for establishment of--------------------                                              2006
Anclote River, Fla.:
    Investigation------------------------                                     623
    Navigation---------------------                    --
                                                      -------------           622
Anderson, Ind., flood control__________________________________                                                1215
Androscoggin River, Maine and N. H., investigation                              70
Animas River, Colo., investigation_                                                                            1622
Annapolis Harbor, Md., navigation -_                __ _      __              389
Annisquam River, Mass.:
    Investigation--_-------------------------------                             60
    Navigation ----------------------                                           37
Antelope Creek, snagging, flood control_-----                     _ __                                         1677
Apalachicola Bay, Harbor, and River, Fla., Ga.,           and    Ala.:
    Improvement of channel to St. Andrews Bay _--___                          630
    Improvement of harbor and bay--------_ _                                  643
    Improvement of river, including the cut-off, Lee
       Slough, and lower Chipola River_----                 -                 645
    Improvement of waterway to St. Marks River ..                      _      697
    Investigation___ _--             --                                  698, 705
Appomattox River, Va.:
    Investigation----------------------_ _            -----------             461
    Navigation ------------------------------------                           431
Appoquinimink River, Del., navigation________________                         367
Appropriations:
    Rivers and harbors and flood control__ --------       _                                 1, 13
Aqueduct, Washington, D. C., maintenance and repair
        _
  of ----------------------------------     -------------                                ---------             2014
Aquia Creek, Va., navigation________ ________________                                         413
                                                  INDEX                                                          V


                                                                                               Page

                                                                                    Volume 1          Volume 2


Aransas Bay and Pass, Tex.:
    Improvement at Port Aransas__                                              899
    Improvement of channel to Corpus Christi (via
      Turtle Cove) ---------------------------------                           899
    Investigation -----------------------------------                          911
Arcadia Harbor, Mich., navigation_                          -------------                                  1429
Arcadia Wash system, Los Angeles, Calif., flood con-
  trol_-------------------------------------------------------                                             1598
Arkabutla Reservoir, Miss___-                         -___ -_____________                                  1972
Arkansas River, Ark. and Okla.:
    Flood control_ ____________________________                           958, 985
     Investigation         --------------------------------                         952, 967,
                                                                                     970, 991
     Navigation ----------------------------------      832, 952,
                                                              969
Arkport Reservoir, N. Y., flood control _______________      291
Arlington Reservoir, Mo., flood control________________     1093
Arroyo Colorado, Tex. and Colo., investigation                911       ---------
Arroyo Grande Creek, Calif., investigation_--------------------_                                           1622
Arthur Kill, N. Y. and N. J.:
     Navigation ------------------------------------          243
     Navigation of channel to Raritan River
Ashepoo River, S. C., improvement of waterway via
                                                              249     -----------
                                                              534
Ashland Harbor, Wis.:
     Improvement                              _   -----------------                                        1330
    Investigation_------------------------------------------                                               1346
Ashland, Ky., flood control___________ ________________________                                            1235
Ashley River, S. C., navigation_______________________      529
Ashtabula Harbor, Ohio:
    Investigation___
    INaveigation-- ----------------------------- ----__----------
                                                             __                                            1576
                                                                                                           1576
     Navigation                                                                                            1535
Association of Congresses of Navigation, Permanent
  International-----------------------------------------------_                                            2002
Atchafalaya River, La.:
     Investigation_ ----------------------------------                                   780
     Navigation ------------------------------------                                     749
     Removing snags and wrecks_                                                     807, 842     ___
Atlantic-Gulf Ship Canal, Fla., navigation                                               622
Atlantic Ocean to Gulf of Mexico, waterway across
  Florida, investigation_________________________ ____                623
Atwood Reservoir, Ohio, flood control____________ ____-_______                                             1255
Auglaise River, Ohio, investigation______________ __- --            ___                                    1514
Augusta, Ga., flood control--           _____ ____________            565
Augusta, Kans., flood control _______________-----                    990
Augusta, Ky., flood control--------------------_        ----  -------                                      1235
Augusta to Clarendon, White River, Ark., flood control__              849
Aurora, Ind., flood control___________________________          _____                                      1235
Au Sable Harbor, Mich., navigation_                          __----     _ --                               1511
Au Sable River, Mich., investigation_________------ ---      _1512
Avoca, N. Y., flood control_ _ _ _ _ __ _                             295
                                     B
Babylon Creek (Sumpawanus Inlet), N. Y., navigation__                                    274
Back Cove, Portland Harbor, Maine, improvement - --                                       28
Back Creek, Md., navigation_       __     __ ___                                    337, 389
Back Creek, Va., improvement of channel to York River_                                   460
Back Sound, N. C., navigation_____________________                                       488
Back Sound to Lookout Bight, N. C., investigation                                        5-.
                                                                                         507.
Bad River, S. Dak., investigation__ ______------                                        1115----.
VI                                               INDEX


                                                                                             Page

                                                                                  Volume 1          Volume 2


Bagaduce River, Maine, navigation--------_                                                     58
Bagnell Dam, Mo----------_               -------------------------                           1081
Bakers Bay, Columbia River, Wash., navigation                       ------------------                      1750
Ballona Creek, Calif.:
     Flood control, channel and jetties__             ---------------------------                           1599
     Investigation ----------------------------------------------                                           1622
Baltimore, Md.:
     Engineering district_________- _______________                                           371
     Harbor and channels:
          Investigation _                              ------------------                     390
           Navigation---------------------_                       -----------                 372
Bangor Harbor, Maine________-__________________--_                                             23
Banner, Ill., special drainage and levee district, flood
  control-------------------------------------------------                                                  1471
Banning Canyon, Calif., investigation_                                              __------     _          1622
Barataria Bay and Bayou, La., navigation-----------_                                          735       -
Barcelona Harbor, N. Y., investigation ---------------------------                                          1576
Bar Harbor, Maine, navigation_                          ----------                             58
Barker Reservoir, Tex., flood control_                                                        913
Barnegat Inlet, N. J.:
     Investigation -----------------------------------                                        368
     Navigation ------------------------                               ------------           364
Barre Falls Reservoir, Connecticut River Basin, Mass.,
  flood control----------------------------_                           --------               135
Barren Island Gaps, Md., navigation _______________ -                                         388
Barren River, Ky. and Tenn.:
     Investigation ---------------------------------------------                                            1216
     Navigation ----------------------------------------------                                              1174
Bartholomew Bayou, La. and Ark.:
     Improvement            of Louisiana-Texas                 Intracoastal
        Waterway via-- ----------------------------
                                         _                                                    753
     Investigation -----------------------------------                                        830
     Navigation ------------------------------------                                          810
Bass Harbor Bar, Maine, navigation_ -------------                                _             58
Bass River Harbor, Mass., investigation                 ------------------                    133
Bastrop Bayou, Tex., navigation______________-____                                            910
Bath, Kennebec River, Maine, navigation-- --- _ _------25
Bath, N. Y., flood control_ ______________________                                            295
Baton Rouge to New Orleans, La., navigation                                   _               716
Battery, The, New York Harbor, N. Y., removal of shoal
  in Hudson River------------_                 ----------------------                         214
Battle Creek, Calif., investigation___---------------------                                                 1680
Baudette Harbor and River, Minn., navigation_ _                                    _ _ __ _                 1345
Bautiste Creek, Calif., investigation -----------------------------                                         1623
Bay Creek, Ill., investigation ___                    _________             _____            1051
Bayfield Harbor, Wis., investigation_                                   --          _---           -_       1346
Bayou Bodcau, Red Chute, and Loggy Bayou, La.,
  flood control -------------------------------------                                         820
Bayou Galion, La., snagging, flood control-----------_                                        827
Bayou La Batre, Ala., navigation---_                -     -------                        685
Bayou Pierre, La.:
    Flood control ----------------------------------                                     817
                            ----------
       Navigation.---_ _ _--_-_                              -       -      -      -     810
Bayou Pierre, Miss., navigation_                                                         779
Bayou Teche and Vermilion River, La., flood control___                                   785
Bay Ridge Channel, New York Harbor, N. Y., naviga-
     tion__                        _      ----__-__                       __             201
Bay River, N. C., navigation_______________________                                      506
Bay Shore Harbor, N. Y., investigation--                                                 276
Bayside Channel, New York Harbor, N. Y., improve-
  ment_      - _-_______
                     -     - _____ --                                                    197
                                                  INDEX                                                VII


                                                                                          Page

                                                                              Volume 1           Volume 2


Beach City Reservoir, Ohio, flood control--------------------------                                   1255
Beach Erosion Board            -------------------------------------------                            2000
Bear Creek and River, Calif., investigation----_----                                                  1680
Bear Creek, Miss. and Ala.:
    Investigation ------------------------------------------                                          1173
    Navigation ----------------------------                   -------           810
    Snagging, flood control_______________-___ ______                           827
Bear Creek, Colo., investigation___________________                           1115
Bear River, Calif., construction of reservoir-__-              ----------      __ __                  1880
Bear Creek, Ky., navigation__________________________                      ____                       1174
Beaufort Harbor and River, N. C.:
    Improvement of harbor___________________---------------_                    484
    Improvement of waterways to Cape Fear River
      including waterway to Jacksonville, N. C_              -------- _         490
    Improvement of waterway to Pamlico Sound via
      Core Sound --------             -----------------------                  486
    Improvement of waterway to New River_-------                                490
    Investigations_ -------------------------------                       507, 564
Beaufort Inlet, N. C.:
      Improvement of Morehead City Harbor, N. C ..--                                    495
    Improvement of waterway to Norfolk, Va----------                                    452
Beaufort, S. C.:
    Improvement of waterway to Charleston_ _ -__                                        534
    Improvement of waterway to St. Johns River, Fla__                                   566
    Improvement of waterway to Savannah, Ga5......                                      548
Beaver Creek, Mont., Kans., Nebr., N. Dak., and S.
  Dak., investigation -------------------------------                                  1095
Beaver Dam, Wash., Ariz., Utah, and Nev., investiga-
  tion_                            ------------                           ------   _                  1622
Beaver drainage district, Columbia County, Oreg., flood
  control ----------------------------------------------------                                    1793
Beaverkill Creek and River, N. Y., investigation_                                   371
Beaver River, Okla., investigation_ - - - - - - - ----                         _    991----------
Beaver River, Pa. and Ohio:
     Flood-control reservoirs-_                    -    ------                                    1320
     Investigation________________________                                                  1296, 1324
     Navigation _                                       --------------------------                1295
Belfast Harbor, Maine:
     Investigation ------------------------------------                               60---------
     Navigation -------------------------------------                                 58---------
Belhaven Harbor, N. C., navigation____________-______                               470
Belknap, Ill., flood control_-------------__---_                                                  1212
Bellaire, Ohio, flood control ------------------------------------                                1320
Bellamy River, N. H., navigation---------------------                                 58
Bell Drainage District, Sangamon River, Ill., flood con-
  trol- ---------------------------------------------                               ----          1475
Belle Fourche, Cheyenne River, S. Dak., flood control___                           1114
Belle Fourche River, Wyo., investigation--------------                             1115
Belle River, Marine City, Mich., navigation---------------------                                  1511
Bellevue Conservancy District, Ohio, investigation__--------------                    _1579
Bellevue, Ky., flood control--_ _________________-   -___-_____                                   1235
Bell Foley Reservoir, Ark., flood control---------------_                           964
Bellingham Bay and Harbor, Wash., navigation-_---- ----------                            _        1823
Belpre, Ohio, flood control_ -------------------------------------                                1277
Benbrook Reservoir, Tex. See Trinity River-888_-_-                                  888
Benedict Canyon, Los Angeles, Calif., flood control---------------                                1.599
Bennetts Creek, Va., investigation__________________-_                              461----------
Bennington, Hoosic River Basin, Vt., flood control--.-                              280
Benton Harbor Canal, St. Joseph Harbor, Mich., im-
  provement-_ ---------          ----  -------     -                           -------- _             1396
Benwood, W. Va., flood control-_      --- --------                                     _--            1320
          493202-43--pt. 1, vol. 1--72
VIII                                 INDEX


                                                                        Page

                                                             Volume 1          Volume 2

Berlin Reservoir, Ohio, flood control                                          1313, 1320
Betsie Lake, Frankfort Harbor, Mich., improvement_-                                  1422
Beverly Harbor, Mass., navigation-                                  58
Big Bend Reservoir, W. Va., flood control                                           1278
Big Black River, Miss.:
     Flood control_                                                825
     Navigation                  ---------                         810
     Snagging-                                                     827
Big Bottom, Ark., flood control                                    966
Big Bull Creek, S. C., investigation                               540
Big Creek, Ark., flood control_ _                                  852
Big Creek, La., snagging, flood control_                           827
Big (Cunningham) Creek, Ohio, navigation                                            1575
Big Darby Creek Reservoir, Ohio, flood control __----                               1235
Big Deadmans Creek, Calif., investigation-                                          1680
Big Dry Creek Reservoir and Diversion, Calif., flood
  control_----      -      -     -                                                  1675
Big Horn Canyon Reservoir, Mont., investigation .....            1115
Big Horn River, Wyo., investigation                              11115
Big Lagoon, Fla., improvement of intracoastal waterway
  via _                                                            636
Big Lake, Ill., flood control_                                             1468, 1474
Big Marco Pass, Fla., to Naples, Fla., channel improve-
  ment ____ _ __                                                   622
Big Pigeon Bayou, La., navigation _                                779
Big River Reservoir, Mo., flood control-                         1015
Big Sand Creek, Miss., investigation                               830
Big Sandy River, Ariz., investigation_                                              1622
Big Sandy River, W. Va. and Ky.:
     Flood control reservoirs                                                    1278
     Investigation_ __                     _________                       1253, 1281
     Navigation_--------------              --------------                       1248
Big Sioux River, S. Dak., investigation                    1109, 1115
Big Slough to Belle Plaine, Kans., flood control .......           990
Big Suamico River, Wis., navigation_                                                1356
Big Sunflower River, Miss., improvement_                           804
Big Sur River, Calif., investigation__                                              1652
Big Thoroughfare River, Md.:
     Investigation__________________________________               390
     Navigation     _---   ---------------------------             381
Big Timber Creek, N. J., navigation                               354
Bill Williams River, Ariz., investigation                                           1622
Biloxi Harbor and Bay, Miss.:
     Investigation ___                                             698
     Navigation---- ---------------------------                    689
Binghamton, N. Y., flood control              --
                                             __                    292
Birch Hill Reservoir, Connecticut River Basin, Mass.,
  flood control__________--------------------                135, 142
Birch Reservoir, W. Va., flood control_               - _
                                           ---------------        595
                                                                                    1278
Biscayne Bay, Fla., navigation_---_
Bisteneau Lake, La., navigation-------------------                 810
Black Bayou Reservoir, La., flood control_                        812
Black Bayou, La., snagging, flood control                         827
Blackfish Bayou, Ark., navigation                 ___             837
Black Lake, Mich.:
     Investigation _ __------------------------------
                         __ _                                                       1430
     Navigation       --------------------------------                              1403
Black Rascal Creek, Calif., investigation ....                                      1680
                                               INDEX                                                    IX


                                                                                          Page


                                                                               Volume 1          Volume 2


Black River, Ark., Mo., and La.:
    Flood control _966
     Investigation ------------------------------                              830, 967
     Navigation_----------------------------------                           794, 946
Black River Harbor, N. Y., navigation ---------------------------                                1575
Black River, Lorain Harbor, Ohio, improvement --------                                           1522
Black River, Mich.:
     Investigation--_        ---------------------------------                       ----        1512
     Navigation ------------------------------------                            ----------       1499
Black River, Poplar Bluff, Mo., to Knobel, Ark., flood
  control-------------------------------------------                              966
Black River, N. C., navigation__________________                           _      506
Black River, N. Y., investigation______ ______
Black River Reservoir, Wis., flood control----------_
Black River, Wis., navigation -------------------------
                                                                    _______ _-___
                                                                        _        1072
                                                                                 1055
                                                                                         -
                                                                                            -    1579


Black Rock Channel, N. Y.:
     Investigation___________________________                                                    1576
     Navigation----------------------------------------------                                    1553
Black Rock Harbor, Conn., navigation____________                                   120
Blackstone River, R. I. and Mass., investigation                                   165
Black Warrior River, Ala., navigation_                                            679
Blackwater Reservoir, Merrimack River Basin, N. H.,
  flood control_-------------------------------------                          62, 65
Blackwater River, Fla., navigation--------------------                            663
Blackwater River, Va., navigation--------------------                             456
Blackwell, Okla., flood control ------------------------                          990
Blakely Mountain Reservoir, Ark.:
     Flood control__-__----_ __                       --
                                                   ____________        ___        829
     Investigation -----------------------------------                            830
Blanchard Channel, Los Angeles, Calif., flood control_                                           1598
Blanchard River, Ohio, investigation_----------------_ _----_                                    1514
Blind Brook, N. Y., investigation_                                                281
Blind Slough Diking District, Clatsop County, Oreg.,
  flood control-      ---------------------------------------------                              1793
Block Island, R. I.:
     Construction of harbor of refuge------------------                             94
     Improvement of Great Salt Pond_________________                                96
     Investigation -----------------------------------                             133
Blood River, La., navigation_________________________                             730
Bloomsburg, Pa., flood control -----------------------                            321
Blue Gum Canyon, Los Angeles, Calif., flood control--------------                                1598
Blue Mountain Reservoir, Ark., flood control_             -------          _      954       --
Bluestone Reservoir, New River, W. Va., flood control                   ------------       1259, 1278
Bluff Creek, Miss., navigation__________ _______                           _      697 ______
Blynman Canal, Mass___                 __--        -         -__
                                                   _______-______-_                 37
Boards:    * Commissions.
     See also
     Beach erosion --------------------------------------------                                       2000
     Engineers for Rivers and Harbors _______________          20
     International:
        Lake Champlain Board of Control------ __---------_     --                                     2025
         Lake of the Woods, Board of Control--- ------ _ _--            ---_                          2028
         Lake Superior, Board of Control_-- ------- _----------_                                      2027
         Massena, Board of Control _____ ____-____- _________        -                                2027
         Niagara River, Special____________--------------------------------                           2026
         St. Croix River, Maine, and New Brunswick,
            Board of Control-     -    ---__-_
                                           __                 _
                                                          -__--                                       2024
    Shore protection board_ ------------------------------------                                      2000
Boca Ciega Bay, Fla.:
     Improvement -           ----            ----   -           -   -      -        622
     Investigation--           ---------                -----                       624
 X                                                 INDEX


                                                                                                  Page


                                                                                    Volume 1             Volume 2


Bodcau Bayou Reservoir, La., flood control _ _.__ _                            818
Bodega Bay, Calif., navigation- . .                        _-_                  -                             1642
Boeuf Bayou, La., investigation_ --------------                      _   781, 788                   ___
Boeuf River, La.:
    Investigation---------                                                     830
     Navigation ---------------------                    ---------------       800
Bogue Falia, La., navigation _---------------------_                           726
Bogue Phalia, Miss., investigation_-----------------_                          830
Bois de Sioux River, S. Dak., flood control----------_                      _1065
Bolivar Reservoir, Ohio, flood control_ _ __ __ _ __ _                                                        1255
Bonfouca Bayou, La., navigation-__________________                             723
Bonnet Carre spillway___---- -- __-------------------                                                        1965
Bonneville, Oreg., construction of dam at---                  -       -     -_                               1724
Bon Secours Bay and River, Ala., improvement of Intra-
  coastal Waterway via            _____________
                                    --               _____--
Bonneville Reservoir, Ky., flood control_____-__-_____ ___-__
                                                                ___-_          636
                                                                                                              1235
Boothbay Harbor, Maine, navigation ------------------                           58
Boston, Mass.:
    Engineering district___-____                   _______----_                 22
    Improvement of harbor______-___-_____-______                                42
    Investigation_ --------------------                -------------            60
Boundary waters:
    Between Lake of the Woods and Lake Superior,
       surveys and charting            ________________-____                 _____                       -   2020
    Investigations and surveys:
         Lake Champlain_-_____                 ----------            ---------                               2020
            Lake of the Woods                     __________ _------            -------                      2020
         Rainy Lake, Minn. and Ontario-__----                              __ __________                     2020
         St. Lawrence River             __---             --------------                   -- _              2021
    Supervision and inspections:
         Lake Champlain__________----------------                              ----------                    2007
         Lake Superior_     -------------------------------------                                            2007
         Niagara Falls                             ------------------------                                  2007
         St. Croix River, Maine and New Brunswick,
            board of control_ __-----------                         -----------------                        2007
         St. Lawrence River___--------                    -----------         -------       ----             2007
Bowie River, Miss., investigation_____-------------                                        705
Bowman irrigation project, North Dakota, investigation_ 1109, 1115
Boyer River, Iowa, investigation _ ---                                                    1115
Brackenridge, Pa., flood control_ __--------------
                                              _----------                                                    1320
Brady, Tex., flood control____ ___--- ---------------                                      920
Brandywine River, Wilmington Harbor, Del., improve-
  ment--------------           -----------------                   ------                  335
Branford Harbor, Conn., navigation ------------------                                      110
Brazos Island Harbor, Tex.:
    Investigation_ -----------------------------------                                     911
                          _        _----
    Navigation----------------------                         --------                      906
Brazos River, Tex.:
    Improvement from Velasco to Old Washington                                             910
      Investigations__                 ----------------------                       911, 926        _
Brea Dam, Calif., flood control____________-------------------               1611, 1613
Breton Bay, Md., navigation ____---_ _ --- -----------                  413
Brevoort levees, Indiana, flood control ---------------------------                1185
Brewton, Ala., flood control___        ________--------------           705----------
Bridgeport Harbor, Conn., navigation _                      ----------- 119
Bridges:
     Construction across navigable waters--------------                                      _               2006
     Rules governing opening of draws------- ----------                                                      2006
Brilliant, Ohio, flood control________ _---------                                         -----             1320
Broad Creek, Md., navigation__ _______-----                                                 389         -------
                                                INDEX                                                XI


                                                                                       Page

                                                                           Volume 1           Volume 2


Broad Creek River, Del.:
    Investigation-----------------------------------                             390
      Navigation- _-       -                     -------------                   388
Broadkill River, Del.:
    Investigation -----------------------------------                        368
     Navigation_ --------------------------------                     347, 367
Broad Sound Boston Harbor, Mass., improvement                                 42
                                                 --
Broadwater Creek, Md., investigation______________                           390
Brockway Reservoir, Connecticut River Basin, Vt.,
  flood control--------------------------_                ----------         135
Bromley, Ky., ffood control------------------------------------                                 1235
Brookport, Ill., flood control_            _____________________________                  1207, 1212
Brookville Reservoir, Ind., flood control_--------_ _              ----------- _                1235
Bronx River, N. Y.:
    Investigation_-----------------------------------                        281
      Navigation _ _ _ _-------
                         _ _ __ __                                               174
Broward County, Fla., waterway through, investigation__                         627
Browns Creek, N. Y., navigation ____________-------_                            274
Brule, Plaquemine Bayou, La., improvement-----------                            770
Brunswick Harbor, Ga., navigation_----------------_                             554
Buckhannon River, W. Va.:
     Flood control       ___-__-_ _-_-_____________                 _____-        ___              1320
    Investigation__________________________ -1324
     Navigation_ -----------------------------------                      ----------              1295
Buckhorn Reservoir, Ky., flood control_--               ------ __-------_                         1235
Bucksport Harbor, Maine, navigation _____________---_                             58
Buena Vista, Ohio, flood control________________________________                                   1235
Buffalo Bayou, Tex.:
    Flood control_ ___-___                         ---
                                              ______-  _________                912
    Improvement of waterway to Houston                                            80
                                                                                8------------
Buffalo Creek, N. Y., investigation                                                                1579
Buffalo, N. Y.:
    Engineer district_____________________________                    -__________                 1514
    Improvement of Black Rock Channel and Tona-
       wanda Harbor_-----------------------------------------                                     1553
    Improvement of harbor -------------------------------------                                   1547
    Investigation of harbor and river_------------ ____________                                   1576
Buffalo River, Miss., flood control___________ _________                        787
Buggs Island Reservoir, Va., investigation--                                     463
Bulkhead lines, establishment ----------------------------------                                  2006
Bull Shoals Reservoir, Ark., flood control ---------------                 964
Burbank eastern system, Los Angeles, Calif., flood con-
  trol -------------------------------------------------------                                     1598
Burbank western system (lower), Los Angeles, Calif.,
  flood control_-        __ -          ______-__-----             _-_--___                         1598
Burbank western system (upper), Los Angeles, Calif.,
  flood control_-______________               _________----__-_----------                          1598
Bureau Creek, Ill., investigation ____________-_______                   1051
Burlington Harbor, Vt.:
     Investigation_---------------------------------                       276
     Navigation ------------------------------------                       237
Burlington, Kans., flood control _______________-__           _            990
Burns Creek, Calif., investigation_-------------------_ _-                                        1680
Burnsville Reservoir, W. Va., flood control----------_         ----------    _                    1278
Burr Creek, Conn., navigation__________-_____---_                          120
Buttahatchee River, Miss., and Ala., investigation                         705
Butte Creek, Calif.:
     Investigation----------------------_ _-------------                  ------                  1681
     Snagging, flood control_ ____------ ___-___--___ -----                                    -1676
XII                                    INDEX


                                                                            Page

                                                                 Volume 1           Volume 2


Buttermilk Channel, New York Harbor, N. Y., naviga-
tion-------------_-_                                                 203
Buzzards Bay, Mass., improvement of Cape Cod Canal,
  Mass          _ ______                                               53
Byram River, Conn., investigation-._--- _--------                     281
Byram River, Port Chester Harbor, N. Y., improvement_                 166
Caballero Creek, Los Angeles, Calif., flood control_   --                                1598
Cache Creek, Calif., snagging, flood control-                                            1677
Cache River, Ark., and Mo., investigation_                            852
Cache River, Ill.:
    Diversion for flood control                                                 1209, 1212
      Investigation_ __                                                               1216
Caddo Lake, Tex., and La., improvement by construc-
  tion of dam at foot of______                                        792
Caddo Lake Dam, La.:
     Investigation-___---          -------------                      830
      Navigation_---------------                                      792
Caddoa (John Martin) Reservoir, Colo., flood control_ _-              937
Cadron Creek, Ark., investigation_                                    967
Caesar Creek Reservoir, Ohio, flood control_                                             1235
Cagles Mill Reservoir, Ind., flood control                                               1213
Cahaba River, Ala., navigation_____________________                   697
Caillou Bayou, La. (Little)_________                                  740
Calaveras River, Calif., investigation__                                                 1681
Calcasieu Pass and River, La.:
     Improvement of Intracoastal Waterway via .......                 753
      Investigation ___ _                                   --   780, 787
     Navigation -------
                 _ _ _ __ __                                          771
California Debris Commission                                                             1873
California, Ohio, flood control_                                                         1235
Calion, Ouachita River, Ark., flood control __ _ __ _ __ _ _          829
Caloosahatchee River, Fla.:
     Investigation __      __-- ________                         624, 627
     Navigation-        __                         -                  598      --
Calumet Harbor and River, Ill., and Ind.:
     Improvement of harbor (South Chicago Harbor)
     Improvement of river_
                                                        --                            1440
                                                                                1440, 1451
     Investigation___________________________                                         1465
Calumet Lake, Ill., navigation__                                                      1464
Calumet-Sag Channel, Ill.:
     Investigation                                                                       1465
     Navigation------------                                                              1451
Cambridge Harbor, Md.:
     Investigation      ________________________                      390
     Navigation               -        ----                           388
Cambridgeport Reservoir, Connecticut River Basin, Vt.,
  flood control              -              --                        135
Camden Harbor, Maine, navigation -__--                                 58
Canadian (South) River, N. Mex., Conchas Dam and
  Reservoir_ __--                      --    -----                    935
Canal Creek, Calif., investigation__   __      _____                                     1680
Canals:
      See also Waterways.
      Albemarle & Chesapeake Canal, N. C., improvement_               452
      Atlantic-Gulf Ship Canal, Fla., improvement ......              622      ----
      Benton Harbor Canal, St. Joseph Harbor, Mich.,
        improvement__                                                                    1396
      Cape Cod Canal, Mass.:
          Investigation                 __                             60
           Navigation                                                  53
      Cascades Canal, Columbia River, Oreg_                                              1754
                                          INTDEX                                   xIII


                                                                       Page

                                                            Volume 1          Volume 2


Canals-Continued.
   Chesapeake & Delaware Canal, Del., and Md., navi-
      gation----------------------------------                   337
   Chicago Sanitary and Ship Canal, Ill., improvement_                             1451

   Company Canal, La., improvement of Louisiana and
      Texas Intracoastal Waterway via_______                     752
   Cross-Florida Barge Canal, navigation                         575
   Dalles-Celilo Canal, Oreg. and Wash., improvement-                              1733
   Delaware and Raritan Canal, N. J., investigation___           276
   Dismal Swamp Canal, Va. and N. C., improvement
      of waterway via-----------------------_                    449
   Drummond Lake Canal, Va. and N. C., improve-
      ment of waterway via_                                      449
   Estherville-Minim Creek Canal, S. C., improvement_            518
   Florida East Coast Canal, Fla., improvement ..-.              579
   Florida Ship Canal, improvement__             _               622
   Hanson, La., improvement of waterway to Mermen-
      tau River ----------------                                 759
   Harvey Canals, La., improvemnnt of Intracoastal
       Waterway via------------__                                752
   Houma, Terrebonne Ship Canal, La., investigation _            780
   Illinois and Mississippi Canal, Ill., navigation . ---       1036
   Industrial Canal, Ala., improvement of Mobile Har-
      bor, Ala--------______                   _                 665
   Inner Harbor Navigation Canal, New Orleans, La__         629, 711
   J. D. Young Canal, improvement of Oklawaha
       River, Fla__     _ _ ___     --                           576,
    Kyle and Young Canal, improvement of Oklawaha
      River, Fla-------_   __             _                      576
    Lake Borgne (Violet) Canal, La., navigation    -..           721
    Lake Washington Ship Canal, Wash          __ _                       1807, 1815,
                                                                                1824
    Lobdell Canal, Del., improvement of Wilmington
       Harbor, Del________        _____                 -        335
    Louisville and Portland Canal, Ohio River, Ky., en-
       largement-----------------______________                                    1128
    New York State Barge Canal, N. Y.:
           Enlargement __ __ _ __ _ __ __                        230
           Investigation___________________________              276
    Nicaraguan Canal, investigation _--                            ___             2003
    Port Arthur, Tex., Sabine-Neches Waterway, naVi-
       gation_ ____________________-                             853
    Ruth Canal (diversion canal), La_                       746, 785
    St. Lucie Canal, Fla., improvement                           598
    St. Marys Falls Canal, Mich., improvement __                                   1477
    Sturgeon Bay and Lake Michigan Ship Canal, Wis.:
           Investigation__ __________________                                      1431
         Navigation                       -----------                              1369
    Violet (Lake Borgne) Canal, La., improvement of
       Dupre Bayou_                __        -                   721
    Washington Canal, N. J., navigation __ _ _ ___ __ _          261
    West Galveston Bay and Brazos River Canal, Tex__             860
Canandaigua Lake, Oswego River Basin, N. Y., flood
  control   --------------------------------------               284
Canapitsit Channel, Mass., navigation_                           132
Canaveral Harbor, Fla., investigation                            624
Cane River, La., navigation__                        __          810
Caney Bayou, La., snagging, flood control                        827
Caney Creek, Okla. and Kans., flood control-                     990
Caney Fork River, Tenn., navigation_               _                               1158
XIV                                                   INDEX


                                                                                          Page

                                                                               Volume 1          Volume 2


Caney River, Okla., flood control_ ----------------            _      978
Canisteo, N. Y., flood control--___ ____-_______--             -      296
Canisteo River, N. Y., investigation ------------------               321
Cannelton, Ind., flood control ------------------------------------                                   1212
Canton Reservoir, Okla., flood control-----------------          972, 987
Cape Charles City Harbor, Va.:
    Investigation---------------_         --------------------        461
    Navigation ------------------------------------                   446
Cape Cod Canal, Mass.:
    Investigation----------------------------------                    60
    Navigation ------------------------------------                    53
Cape Fear, N. C.:
    Improvement above Wilmington ------------------                   501
    Improvement at and below Wilmington ------------                  498
      Improvement of Northeast Branch-----_                               --         506
      Improvement of waterways to Beaufort, N. C., in-
        cluding waterway to Jacksonville, N. C                                      490             ------
      Improvement of waterway to Winyah Bay, S. C___                                492
      Investigation ---------------------------------                          507, 539
Cape Lookout, N. C., improvement of harbor of refuge_                                506
Cape May, N. J., improvement of Cold Spring Inlet,
  N. J-------------------------------------------                                 360
Cape Porpoise Harbor, Maine:
     Investigation-----------------------------------                               60
     Navigation -----------------------------------                                 58
Cape Vincent Harbor, N. Y., navigation----------------                            -    -       1575
Carbon Canyon Dam and Channel, Santa Ana River
  Basin, Calif., flood control________ ---------------------------------                 1611, 1619
Carlin Bayou, La.:
     Investigation__------------------------------                      --        781
     Navigation---_ -------------                   --------------   ---          762
Carlyle Reservoir, Ill., flood control___________ _______                       1015
Carmel River, Calif., investigation________________________                                    1652
Carp River, Mich., improvement_ ___-_____--___-__-__________-                                  1425
Carrabelie Bar, Harbor, and River, Fla., navigation-                              641
Carroll County, Ill., flood control__---------------                   _        1051
Carroll Lake, La., snagging, flood control________ ____                           827
Carrollton, Ky., flood control----------------------------------                               1235
Carson River, Calif. and Nev., investigation                  ----------------------           1680
Carters Creek, Va., navigation_--------------------_                              413
Carvers Harbor, Maine, navigation-_______ ________                                  58
Cascade Locks, Columbia River, Oreg., bridges                      _                           1732
Cascades Canal, Columbia River, Oreg ------------                         _ ___-----_          1754
Caseys Pass, Fla., navigation------------------------_                            622
Cashie River, N. C., navigation__________________ _                               466
Castle Rock, Cowlitz River, Wash., flood control-_                               __ _          1794
Castlewood Reservoir, Colo., flood control                -----------------------              1580
Cathance River, Maine, navigation -                                                 58
Cattaraugus Creek, N. Y., navigation                                                           1575
Cavallo Pass, Tex., improvement of channel to Port
  Lavaca                             --------------                                  897
Cave Run Reservoir, Ky., flood control_ _            _                                                1235
Cayuga Creek and Lake, N. Y., investigation- -------------------                                      1579
Cazenovia Creek, N. Y., investigation-__------------         ---                                      1579
Cedar Bayou, Tex., improvement __________________---          889
Cedar Bay to Thoroughfare Bay, N. C., improvement___          482-
Cedar   Creek, Conn., improvement ....            ------                        -    120.
Cedar   Keys Harbor, Fla., navigation-        __--       -----                       622
Cedar   River, Iowa, investigation_-------                                          1051
Cedar   River, Mich., navigation_-------------                                                        1429
Cedar   River, Wash., investigation_ -        ---                                                     1838
                                             INDEX                                               XV


                                                                                   Page


                                                                        Volume 1          Volume 2


Center Hill Reservoir, Tenn., flood control_ ----            -_ _------          ---   1166, 1169,
Centinela Creek, Los Angeles, Calif., flood control__-_-                        _ -
                                                                             _--_            1599
Central City Reservoir, Iowa, flood control------------                        1049
Ceredo, W. Va., flood control_                              --------------- 1268, 1277
                                           ____________________
Chagrin River, Ohio, investigation__________________________                                 1579
Chambers Creek, Miss. and Tenn., investigation------------------                             1173~
Champlain Lake, N. Y. and Vt.:
    Burlington Harbor, Vt., improvement_-----_ __                        -_     237
    Channel between North and South Hero Islands,
       navigation_     ----------------------------------                       275
    Gordons Landing, Vt., navigation ------------------                         275
    International Board of Control___                                      ___--             2025
    Narrows of, navigation-------------------                                   235
    Rouses Point, navigation _             ______------------------             275
    Rouses Point Harbor, investigation                                          276
    St. Albans Harbor, Vt., navigation -----------------                        275
    Surveys and charting_--------------------------------------
                                __ __ __ __ _                                                2020
Chandlerville, Ill., east of, flood control_- ----           _ _-----------                  1475
Chandlerville No. 2 Reservoir, Ill., flood control            _       l1473
Channels. See Canals and waterways.
Chariton River, Iowa and Mo., investigation           -----------             1095
Charles Mill Reservoir, Ohio, flood control_---- ---------------                     _       1255
Charles River, Boston, Mass., improvement------------                            43
Charleston, S. C.:
    Engineering district________________________-_                              510
    Improvement of harbor__.                                                    525
    Improvement of waterway to Beaufort----------                               534
     Improvement of waterway to Winyah Bay.....                              518
    Investigation of waterway to St. Johns River, Fla__                      564
Charlevoix Harbor, Mich., navigation__________________________                                   1426
Charlotte Harbor, Fla., navigation-_ __           ________                   607
Charlotte (Rochester) Harbor, N. Y., navigation                                                  1562
Charts and maps, northern and northwestern lakes                                                 2020
Chatham (Stage) Harbor, Mass.:
    Investigation      ___
                        ---------------------                                 133
    Navigation ---------
                _               ---------------------------                    73
Chattahoochee River, Ga. and Ala.:
    Investigation -------------------------------                            698
     Navigation _ _ _ _ __ _                                                 649
Chattanooga, Tenn., and Rossville, Ga., flood control                                            1170
Cheat River, W. Va.:
    Investigation------------------------_                                                       1324
    Navigation ---------------------------------------------                                     1295
Cheboygan Harbor and River, Mich., improvement of
  harbor_ -----------------------------------------                         -   ------           1494
Cheesequake Creek, N. J., navigation _                       -----------         275
Chefuncte River, La., navigation __________------726
Chehalis River, Wash.:
    Investigation--_--- ----------------------------------------                                 1838
    Navigation ---------------                     ------------------------------                1799
Chelsea River or Creek, Mass., improvement_                                       43
Chemung River, N. Y.:
    Flood control_           -      ___--       _______---_______                290
    Investigation ---------------                    ---------------             321
Chenango River, N. Y., investigation --------------------                        321
Chena Slough, Alaska, flood control____________    -----------------------------
                                                                        _______                  1836
Chequamegon Bay, Ashland Harbor, Wis., improve-
  ment_ _-------------------------------------------                                             1330
Cherokee Canal, Calif., investigation_---------------------------
Cherokee County, Kans., flood control--- ------
Cherokee, Salt Fork of Arkansas River, Okla., flood
                                                              _      ____        990
                                                                                                 1681


  control-____-_         ______974-                                                          -
XVI                                            INDEX


                                                                                     Page

                                                                          Volume 1          Volume 2


Cherry Creek, Colo., flood control___________________________                                    1580
Cherry Creek Reservoir No. 1, Colo., flood control__                                             1580
Cherrystone Inlet, Va., navigation _                                         447
Chesapeake and Albemarle Canal, N. C. and Va., im-
  provement_---------------------------------------                          452
Chesapeake & Delaware Canal, Del. and Md.:
    Investigation------------------                                          368
     Navigation ------------------------------------                         337
Chesapeake Bay, Md. and Va.:
    Investigation -----------------------------------                        390
    Thimble Shoal, improvement_____________________                          423
Chester River, Md., navigation___________________-__                         378
Chester River, Pa., navigation _                 -     -           _         367
Chestnut Creek, Va., investigation-                     --
                                                    __-----------------_  _-1281
Chetco River, Oreg., investigation -------------------------------                               1755
Chetopa, Kans., flood control________________________                        990
Chicago Harbor and River:
    Improvement of harbor_------------------------------------                                   1435
    Improvement of river                                                _                        1438
    Improvement of South Chicago Harbor_                             _                           1440
                                  -
    Investigation_ __________________                 ______________________                     1465
Chicago, Ill., engineering district-------- ---------------------                _               1432
Chicago Sanitary and Ship Canal, Ill., navigation         -------------------                    1451
Chickasaw Creek, Ala:
    Investigation---------------------------------                     699, 705             _-------
    Navigation ------------------------------------                          697
Chickasawhay River, Miss., investigation
Chico Creek, Calif., snagging, flood control_
                                                  -------------- _
                                                                       699, 705
                                                                       _      _ __               1676
Chicopee, Connecticut River Basin, Mass., flood control__              136, 159
Chicopee River, Mass., investigation
ChiUllicothe Reservoir, Mo., flood control
                                           ------------------
                                                      __                     165
                                                           _     _         1093
Chilo, Ohio, flood control -------------                               __ ____-_                 1235
Chincoteague Inlet and Bay, Va.:
     Investigation _-----------------------------------
                     _                                                         390
     Navigation_-----------------------------                                  389
     Waterway to Delaware Bay, navigation              ------------            367
Chipola River, Fla.:
     Investigation___
                    ---------------------------------                      698, 705
     Lower river, navigation ---------------------------                        645
     Upper river, navigation_                 -         - - -             -     697
Chippewa River, Wis., navigation --------------------                          1062
Chittenango Creek, N. Y., investigation __ __                                                    1579
Chitto Bogue, La., navigation________________________                          697
Chocolate Bayou, Tex., navigation_________________ _                           910
Choctawhatchee Bay and River, Fla. and Ala.:
     Improvement of East Pass Channel_______________                           659
     Improvement of river_               ------                                656
     Improvement of waterway to Pensacola Bay, Fla__                           634
     Improvement of waterway to West Bay, Fla -...                             632
      Investigation____ ---             __
                                       -----      -         --   -    -        699
Chopawamsic Creek, Va., navigation-------_           ------- _                 403
Choptank River, Md., navigation_____________________                           388
Choptank River to Little Choptank River, Md., water-
  way, navigation ----------------------------------                           388
Chouteau, Nameoki, and Venice drainage and levee
  district, Illinois, flood control______________________                     1017
Chowchilla River, Calif., investigation-      _ -_ ---------                    __               1681
Christina River, Del., improvement of Wilmington Har-
  bor    --         ----                                                       334
Chunky Creek, Miss., investigation-_---.----                         .-- 699, 705
                                                 INDEX                                          XVII


                                                                                     Page


                                                                          Volume 1          Volume 2


Cimarron River, N. Mex., Okla., and Kans., investiga-
  tion _                                     ---------                          991
Cincinnati, Ohio:
     Engineering district_                                    -         - __---           -_    1217
     Flood control--------------------------                        ---------------       1229, 1235
     Investigation_____----------------                     ---------- -______ _        _       1238
Clackamas River, Clackamas County, Oreg., flood con-
trol------                                                                 -                   1793
Claiborne Harbor, Md., navigation                           -                       388
Claremont Reservoir, Connecticut River Basin, N. H.,
  flood control_-----------------------------------                            135, 137   ________-
Clarendon to Laconia Circle, Ark., flood control                                    852
Clarendon, White River, Ark., flood control..                                       849
Clarion River, Pa., investigation__                                                             1324
Clark Creek, S. C., navigation________________________                              538
Clark Hill, Ga. and S. C., flood control ------------------                         565
Clarksville, Ark., flood control ------------------------                           966
Clarksville, Ind., flood control________________________                                  1192, 1212
Clatskanie River, Oreg., navigation                  _ _ __ __ ___ __ __ __ -   - - -           1711
Clear Creek, Ill.:
     Flood control ___                       _            -                        1004
     Investigation -____                                                           1018
Clear Creek and Lake, Tex.:
     Investigation___--_                                                            912
     Navigation _ _ _ _ _                                                           891
Clear Lake area, California, investigation-                                                     1681
Clear Lake, Ill., flood control_                                                                1475
Clearwater Harbor, Fla., improvement of channel to
  Tampa Bay_ ____ __ _            --                                            622
Clearwater Reservoir, Mo., flood control              -   959, 964
Clearwater River, Minn., investigation-__                     1073
Clendening Reservoir, Ohio, flood control_                                                       1255
Clendenin Reservoir, W. Va., flood control_                                                      1278
Cleveland Harbor, Ohio:
      Investigation _-__                                                                         1576
      Navigation _ _ _                                                                           1527
Cleves, Ohio, flood control                                                                      1235
Clinch River, Tenn. and Va.:
      Investigation __                                                                           1173
      Navigation _ _ _ _ _                                                                       1158
Clinton Harbor, Conn., navigation_                             132
Clinton, Ind., flood control_                                                                    1212
Clinton River, Mich.:
     Investigation-_                                                                             1514
      Navigation _ _                                                                             1511
0tlintwood Reservoir, Va., flood control_                                                        1278
Cloverport, Ky., flood control__________________________________                                 1212
Clyde, Pawtuxet River Basin, R. I., flood control -.           165.
                                                               165
Coal Creek, Ill., flood control_                                                          1474, 1476
Coal Grove, Ohio, flood control--------------                                                   1235
Coan River, Va., navigation ------------------------      403, 413                               -
Coasters Harbor Island, R. I., navigation                --------------
                                                               132
Cobscook Bay, Maine, navigation-----------------                58
Cocheco River, N. H., navigation          -       -__   -       58
Cockrells Creek, Va., navigation            -----              413
Cocodrie Bayou, La., investigation -------------------    781, 788
Coden Bayou, Ala., investigation---------------------          699
Codorus Creek, Pa., flood control -----------                  391
Coeur D'Alene, Idaho, flood control_-     -------------                               _          1828
Cohansey River, N. J., navigation -------------------                          358
XVIII                                    INDEX


                                                                                    Page

                                                                         Volume 1          Volume 2


Cohasset Harbor, Mass., navigation-------------------                          58
Cohocton River, N. Y., investigation--                - __     --             321
Cold Brook Reservoir, S. Dak., flood control
Cold Spring Inlet, N. J., navigation-........
                                                  -----------       1110
                                                        ----         360
Coldwater Canyon, Los Angeles,       Calif., flood control --------------                       1599
Coldwater River, Miss., navigaticn-- ----- _ _-------_                        810
Colewa Creek, La., snagging, flood control_ __ _                              827
Colfax, La., flood control -----------------------------                      829
College Creek, Md., navigation-__________-___________                         389
Collinsville, Ala., flood control_______________________                      705
Colorado River, Tex., improvement of waterway to
  Corpus Christi                          -------------                       860
Colorado River, Tex. and Ariz., investigation-              ---__   912, 926   1583,            1622
Columbia drainage and levee district No. 3, Illincis,
  flood control_------------------------------------_                     1007
Columbia Drainage District No. 1, Oregon, emergency
  repairs, flood control           _______            -_________________
                                                                   ________                     1792
Columbia, La., flood control_________________________                      829
Columbia River, Oreg. and Wash.:
     At Bakers Bay, Wash., navigation --------------------------                                1750
     Bonneville, Oreg., construction of dam at            --------------------                  1724
     Bridges at Cascade Locks ----------------------------------                                1732
     Cascades Canal_________                 -----------------------------                      1754
     Celilo Falls tb Snake River, including tributaries,
        improvement from__________________________________                                      1736
     Celilo Falls to The Dalles Rapids, navigation------_             ---    _                  1733
     Chinook, Wash., to head of Sand Island, navigation              _                          1752
     Investigation_        --------------------------------------- 1755,                        1794
                                                                                       1824, 1838
    Mouth, improvement__________________________ __________                                     1699
    Mouth to Vancouver, Wash., improvement                   -------------------                1705
    Vancouver to Bonneville, improvement_--__ ---------         _    -_                         1721
    Wenatchee to Kettle Falls, Wash., navigation-_ ------------         _                       1823
Columbus, Colorado River, Tex., flood control                      920
Colville River, Wash., investigation-_ -----------------        __   _                          1838
Commerce for calendar year 1941-_                                    4
Commissions:
     See also Boards.
     California Debris Commission_                   -- __-- -- _                               1873
     Mississippi River Commission___________________________                                    1891
     Permanent International Association of Congresses
        of Navigation-        _ -_   -               --                                         2002
Company Canal, La., improvement of Louisiana and
  Texas Intracoastal Waterways via                                 752
Compton Creek; N. J., navigation -                                 275
Compton Creek, Los Angeles, Calif., flood-control:
    Alameda St. to Hooper Ave., storm drain                   -- -                              1598
    Hooper Ave. storm drain to Main St__________                                                1598
Conchas Dam and Reservoir, N. Mex_                                 935
Conecuh River, Ala., navigation__ - _                              664
Conemaugh River, Pa., investigation_ -_                              __                         1296
Conemaugh River Reservoir, Pa., flood control__                 _      _                        1320
Conewango Creek, N. Y., investigation__------ ---        ------- _ _                            1324
Coney Island Channel, N. Y., navigation            -----           274
Coney Island Creek, N. Y., navigation_____                         274
Congaree River, S. C.:
    Investigation-__                                               539
    Navigation------_  --------------
                                   _                               522
Congresses of Navigation, Permanent International As-
  sociation of---_ __-_-_---_--------
                                 _2002                           _
Conneaut Harbor, Ohio, navigation-               -              -_ ---                           1538
                                          INDEX                                           XIX


                                                                              Page


                                                                   Volume 1          Volume 2


Connecticut River Basin, Vt., N. H., Mass., and Conn.,
  flood control:
     Local protection projects_ -------------------           _          136
     Reservoirs -------------------------------------                    135
Connecticut River, Mass. and Conn.:
     Investigation_--____________                   ______ --      133, 165
     Navigation above Hartford, Conn_______-_____                       1321
    Navigation below Hartford, Conn------_                          -    105
Consolidated cost and financial summary-------                            18
Consolidated diking and improvement district No. 1,
  Cowlitz County, Wash., flood control_--------_ _                          _
                                                                      ---------        1794
Contentnea Creek, N. C.:
    Navigation ------------------------------------                     506
    Snagging, flood control            -______________________          507
Cooper River, N. J., navigation _------------------_                    353
Coosa River, Ga. and Ala.:
    At Rome, Ga., flood control                   _                     705       .
    Investigation__                                                699, 705
    Navigation                     -        -         _                  6
                                                                        675     -
Coosawatte River, Ga., navigation_-                                     697
Coosaw River, S. C., improvement of waterway via ...                    534.
Coos Bay, Harbor, and River, Oreg.:
    Improvement of entrance to bay and harbor                                          1685
    Improvement of river                    _       _   _                              1687
    Investigation__                                                              1755, 1794
Copes Corner Reservpir, N. Y., flood control_                           291
Coquille River, Oreg.:
    Investigation__                                                              1755, 1794
    Navigation _                                                                       1683
Coralville Reservoir, Iowa, flood control                         1048, 1049-.------...
Coraopolis, Pa., flood control____________ _____________________                       1320
Cordova Harbor, Alaska:
    Investigation-_                                                                    1824
Corea Harbor, Maine, navigation_                                          58
Core Sound, N. C., improvement of waterway to Beau-
  fort Harbor_                                                          486
    Investigation__                                                     507
Corkscrew River, Fla., investigation-                   -.-             627
Corney Bayou, La., navigation_                - _                       810
Corning, N. Y., flood control_                                          294
Cornucopia Harbor, Wis., improvement_                                                  1345
Coronado, Calif., investigation_                                                       1597
Corpus Christi, Tex.:
    Channel to Encinal Peninsula Naval Seaplane Base_                   904
    Improvement of channel to Aransas Pass-- ------            _        899
    Improvement of intracoastal waterway to the Mis-
       sissippi River _      -----------------------           _   752, 859          -
    Investigations_               -------------------                   912
Corsica River, Md., navigation-                                         388
Cortableau Bayou, La., investigation-----------------781,               788
Cossatot River, Ark., investigation --------------------                934
Cost and financial summary, river and harbor works         -   _          18
Cotaco Creek, Ala., investigation--------------------------                            1173
Cottage Grove Reservoir, Oreg., flood control-----------        _      _ --      1783, 1784
Cottonwood Creek, Calif., investigation------ -----------------               _        1680
Cottonwood Falls, Kans., flood control---                _-- _          990
Cottonwood Springs Reservoir, S. Dak. flood control .                   1111
Council Bluffs, Iowa, flood control ___________________                 1114
Council Bluffs, Missouri River, and Indian Creek, Iowa,
  flood control_ --  __    ______         ---_ __----- _____            1114
xx                                   INDEX


                                                                           Page


                                                                Volume 1          Volume 2


Courtenay, Fla., channel improvement-                 ---            622
Covington, Ky., flood control____________                                              1235
Cowan Creek, Ohio, investigation __              -                                     1238
Cow Creek, Calif., investigation ----------------                                      1680
Cow Creek, Kans., investigation _.--                                 991
Cowlitz County drainage improvement district No. 1,
  Washington, flood control -                                                          1793
Cowlitz River, Wash., navigation__                                                     1745
Cowpasture River, Va., improvement of James River,
  Va---------------------               -----                        426
Coyote Creek, Los Angeles, Calif., flood control* - -                                  1598
Coyote River, Calif., investigation           -                                        1652
Crab Orchard Creek, Ill., investigation -                           1018
Craft, sunken, removal of__
Crane Creek, Ill., flood control______________________                        1474, 1475
Crawford County levee district, Arkansas River, Ark.,
  flood control        ----------------   ------                     966
Crescent City Harbor, Calif., navigation __-                                           1649
Crescent Lake and Dunns Creek, Fla., improvement ---                 622
Crescent Lake, Fla., investigation___                                624
Criehaven Harbor, Maine, navigation                                   58
Crisfield Harbor, Md.:
     Investigation------------                                       390
     Navigation------------------------------------                  389
Croatan Sound, N. C., improvement of waterway via___                 449
Cromline Creek, N. Y., investigation__                               281
Crooked Creek Reservoir, Pa., flood control        --                         1299, 1320
Cross Bayou, La., snagging, flood control _-      -         -        827
Cross-Florida Barge Canal, navigation         -        --            575
Cross Rip Shoals, Mass., navigation _     ---                         76
Crow Creeks, Ill., investigation_________                                              1476
Crystal River, Fla., navigation                                      622
Cucamonga Creek, Calif., investigation_                                                1622
Cuivre River, Mo., navigation_                                      1001
Cumberland, Md., flood control_                                      417
Cumberland River, Ky., and Tenn.:
                     _
     Flood control ---------------                                                     1161
     Investigation          -----------------------------                     1159, 1173
     Navigation---------------------------------                                       1142
Cuimberland Sound, Ga., and Fla.
     Improvement of waterway between Savannah and
        Fernandina----------------------------------                 549
     Improvement of waterway to St. Johns River, Fla _               566
Cunningham Creek, Ohio, navigation                                                     1575
Current River, Ark., and Mo., navigation__                          952
Curtailment and abandonment of river and harbor proj-
  ects, review of reports____        ------------                                     2005
Curtis Bay, Baltimore, Md., navigation            -                 372
Curtis Creek, Md., investigation --------------------
                                    __                              390
Cutler Bayou, La., improvement              -                       735
Cuttyhunk Harbor, Mass., navigation                    --           132
Cuyahoga River, Ohio, investigation             -                             1576, 1579
Cypress Bayou, Tex. and La.:
     Construction 6f dam at foot of Caddo Lake .......               792
    Improvement of, including connecting lakes between
       Shreveport, La., and Jefferson, Tex__________                 791
Cypress Creek, Md., navigation---------------------                  389
                                                    INDEX                                                                                 XXI


                                                                                                                             Page

                                                                                                        Volume 1                    Volume 2


                                     D

Dalecarlia Reservoir, Washington, D. C-_-_-_----- - -----------      _                                                                2014
Dale Hollow Reservoir, Tenn. and Ky., flood control       .   - -                                                               1164, 1169
Dalles-Celilo Canal, Oreg. and Wash., improvement-----------___                                                                       1733
Damariscotta River, Maine, navigation----------___                58
Dams, water power. See Water power.
Danvers River, Mass., investigation -------------------           60
D'Arbonne Bayou, La., improvements-810------                    810
Dardanelle, Ark., flood control_                                966
Darien Harbor, Ga.:
    Investigation_ -__                                                 _____                                        564
    Navigation----                                                                                                  563               -
Dark Head Creek, Md., navigation                               -                                                    376
Davenport Center Reservoir, N. Y., flood control                                                                    29....
                                                                                                                    291
Davis Creek, N. C., improvement of waterway via .....                                                               493
Davis Brook, N. Y., investigation____________________                                                                                     1324
Dawho River, S. C., improvement of waterway via                                                                     534..
                                                                                                                    534
Dayton, Ky., flood control_                       _-___                                                                                   1235
Dayton, Touchet River, Wash., flood control                                                      --                      -                1794
Dead Horse Canyon and Royal Boulevard Channel, Los
  Angeles, Calif., flood control _--                                                                                                      1598
Deadmans Bay, Fla., improvement of Steinhatchie River_                                                              622
Deals Island, Md.:
    Lower Thoroughfare, improvement                                                                                 389
    Upper Thoroughfare, improvement                                                                                 389
Debris control, Sacramento, Calif     __ -____                                                                                            1877
Debs Inlet, N. Y., navigation-    __       _                                                                        192
Decorah, Iowa, flood control                                                                                       1064
Deep Bay, N. C., to Swan Quarter Bay, N. C., water-
  way, navigation                            -                         --                                           506
Deep Creek, Va.:
    Investigation_     -                                                                                        461
    Navigation_       -           -                       --       -                                       449, 460
Deep Hole Creek, Va., investigation                                                                             461
Deep River area, Wahkiakum County, Wash., flood con-
  trol_                                                                                                                                   1761
Deep River, Wash., navigation                                               -   --               ----                                     1749
Deer Creek, Calif.:
    Investigation __-                                                           -                     --             -          1622, 1688
    Snagging, flood control                                    -                    --                                                1677
Deer Creek Prairie levee unit, Ind., flood control                                                             -                          1212
Deer Creek Reservoir, Ohio, flood control_ _                                                                                              1235
Deer Island area, Columbia County, Oreg., flood control_-                                                                                 1772
Deer Island Thoroughfare, Maine, navigation-- ------ _                                                               58
Degognia and Fountain Bluff, Ill., flood control    .                                                              1017
Delaware & Chesapeake Canal, Del. and Md.:
    Investigation_-----------                                                                                       368
    Navigation-_ --                                    _ _
                                                    _-__-_                  _                                       337
Delaware and Raritan Canal, N. J., investigation..                              - -      .                          276
Delaware Bay and River, Pa., N. J., and Del.:
    At Camden:
        Investigation-_____                     _                                                                   368
            Navigation-         __          ________                                                                330
    At or near mouth of Neversink River, navigation___                                                              367
    Breakwater and harbor of refuge in bay:
        Investigation              _ ___                                                                            368
        Navigation-      _      -                _ _-                                                               367
    Flood-control investigations _-                                    -                 -                          371
    Philadelphia to sea:
           Investigation_                                                                                           368
            Navigation--_            ----        ------                -                     -             -        325
 XXII                                        lNDEX


                                                                                    Page

                                                                         Volume 1          Volume 2


Delaware Bay and River, Pa., N. J., and Del.-Con.
    Philadelphia to Trenton, improvement                                      322
    Waterway to Chesapeake Bay, Del., and Md.:
          Improvement                 __                                      337
          Investigation_                                                      368
    Waterway to Chincoteague Bay, navigation                                  367
    Waterway to Rehoboth Bay:
          Improvement                                                         347
          Investigation__                                                     368
Delaware Reservoir, Ohio___                                                                     1235
DeLeon Springs, Fla., investigation                                           624
Denison, Tex., engineering district-----------------                          927
Denison Reservoir, Tex., flood control-------   ------                        928
Dennis Creek, N. J., navigation_____                                          367
Denver, Colo., engineering district_     _                                                      1579
De Poe Bay, Oreg.:
    Investigatiokn       _  ____----                                                            1755
    Navigation _-_            __ _                                                              1695
Derelicts. See Wrecks.
Des Cannes Bayou, La., navigation_                                             767
Des Glaises Bayou, La., flood control_                                         783
Des Moines River, Iowa, investigation                                   1044, 1051
Des Plaines River, Ill.:
      Investigation_ _----------------------------                                           1465
     Navigation, Illinois waterway_                                                          1451
Detroit Harbor, Wis____---_-------           -----------------                               1368
Detroit, Mich., engineering district                                                         1476
Detroit Reservoir, Oreg., flood control-----                                           1783, 1789
Detroit River, Mich.:
     Investigation       ------------------------------                                         1512
     Navigation--------------------------------                                                 1491
De Valls Bluff, White River, Ark., flood control--------                      852
Dewey Reservoir, Ky., flood control__ _                                                         1278
Dickinson Bayou, Tex., navigation_-------------------                         892
Diking and improvement district No. 4, Wahkiakum
  County, Wash., flood control--------------------                                              1758
Diking and improvement district No. 5, Cowlitz County,
  Wash., flood control------             -------------------                                    1793
Diking district No. 2, Clatsop County, Oreg., flood con-
  trol-----------       ----------------------------                                            1793
Diking district No. 3, Clatsop County, Oreg., flood con-
  trol---------------------                 ----------------                                    1793
Diking district No. 5, Clatsop County, Oreg., flood con-
  trol-------------                 -----------------------                                     1793
Diking districts Nos. 1 and 3 (Puget Island) and Little
  Island, Wahkiakum County, Wash., flood control_ -- _                                          1794
Diking improvement district No. 2, Cowlitz County,
  Wash., flood control---------------------------                                               1793
Diking improvement district No. 13, Cowlitz County,
  Wash., flood control_---------------------------                                              1793
Diking improvement district No. 1, Pacific County,
  Wash., flood control__---------------------------                                             1794
Diking improvement district No. 11, Cowlitz County,
  Wash., flood control_______----______________-------------------                              1781
Dillon Reservoir, Ohio, flood control _ _ _ __ _ __ ------     __ _ _                           1278
Dirty Creek, Okla., investigation ------------------                          991
Dismal Swamp Canal, Va. and N. C., improvement of
  waterway via_----------             ---------------------                   449----------
District of Columbia:
     Anacostia Park     ___------         ------------------                                   2010
     Anacostia River., reclamation of flats_                                                   2010
                                           INDEX                                           XXIII


                                                                                 Page

                                                                   Volume 1             Volume 2


District of Columbia-Continued.
    Aqueduct, increasing water supply________________         ----------                    2014
    Aqueduct, maintenance and repair-----------_       -----------      _                   2014
    Government buildings, consumption of water in          --------------                   2014
    Improvement of Potomac River -------------           _           394
    Water supply, increase in____________ ___________              ______                   2014
Dog Creek, Calif., flood control______________--    __    __-_____                          1675
Dog Island Harbor, St. George Sound, Fla., improvement_              641
Dog River, Miss., navigation_                                        686
Dogue Creek, Va., navigation _--------------------_                  403
Dogy and Clear Creeks, Okla., investigation ------------             991
Donovan Levee, Ill., flood control----------------       _      __                           1475
Dorcheat Bayou, La., navigation-                 -                   810
Dorchester Bay and Neponset River, Mass.:
     Investigation    -                     -       -                       60
    Navigation                                                  58
Dorena Reservoir, Oreg., flood control_                            _                1783, 1786
Double Bayou, Tex., improvement----------------               884
Double Creek, N. J., navigation_                              367
Dover, Ky., flood control_              -__________________
                                                         ________                            1235
Dover Reservoir, Ohio, flood control -                   -                                   1255
Drainage district No. 1, Clabsop County, Oreg., flood
  control-----------------------                                                            1793
Drawings, northern and northwestern lakes__                                                 2020
Drift removal from New York Harbor___________                 217
Drum Inlet, N. C., navigation ____________________            483
Drummond Lake Canal, Va. and N. C., improvement
  of waterways via--_          -    __ - - -                  449
Dry Run, Iowa, flood control                                 1064
Duck Creek, Calif., investigation_                                                           1680
Duck Creek (Smyrna River), Del., navigation --------- -                    342
Duck Creek, Wis., investigation_                                                             1430
Duck Island Harbor, Conn., navigation ----------------                     108
Duck River, Tenn., navigation_----------------------------                                   1158
Dulac Bayou, La., improvement of waterway via Grand
Caillou and Le Carpe Bayous, La., to____                                  742
Duluth, Minn.:
     Engineering district_ ____________________________               __                     1325
   Improvement of Duluth-Superior Harbor_                                                    1326
Dunkirk Harbor, N. Y.:
   Investigation_________________________                                                   1576
    Navigation ------------------------------                     ------------              1545
Dunlap Creek, Pa., investigation-------------------------------                             1324
Dunns Creek and Crescent Lake, Fla., navigation .... _                    622
Dupont Bayou, La., improvement                                            735
Dupre Bayou, La., navigation.. -------------------------                  721
Duwamish River, Wash.:
   Improvement of east and west waterways, Seattle
      Harbor __                               -----------------                              1814
    Investigation-----------------------------------                                         1838
Duxbury Harbor, Mass.:
   Investigation -----------------------------------                       60
   Navigation --------------------------------
                _                                               ---        58
Dymers Creek, Va., navigation_                                            413

                                E
Eagle Creek Reservoir, Ohio, flood control__--------- ----------            _               1320
Eagle Harbor, Mich.:
     Investigation  -------------------------------                                         1346
     Navigation -------                     ------------------ -1345
        493202-43--pt. 1, vol. 1----73
XXIV.                                            INDEX


                                                                                            Page

                                                                                 Volume 1           Volume 2


Eagle Lake to Matagorda, Colorado River, Tex., flood
  control------------------------------------------                                       919
Eagle Town Reservoir, Okla., investigation                -------------                   934
East Bay Bayou (Hanna Reef), Tex., navigation.                                            910
East Boothbay Harbor, Maine, navigation-__---                          ___-        --      58
East Cape Girardeau and Clear Creek, Ill., flood control_                                1002
East Chester Creek, N. Y., navigation                    ___-------170
East Fork Reservoir, Ohio, flood control_------------------------                                           1235
East Hartford, Conn., flood control----_                            -----            136, 152
East Liverpool, Ill., flood control_-__-__                      -__----_ -_______                           1476
East Lynn Reservoir, W. Va., flood control_                       -_
                                                                  _--           - _----------1278
East Pass Channel, Fla., from Gulf of Mexico into Choc-
  tawhatchee Bay:
    Investigation-----------------------------------                                      699
    Navigation-----------------------------------                                         659
East Pass, Fla., improvement of Carrabelle Harbor-.....                                   641
East Pearl River, Miss., navigation- ---- ----- __                        _----697
East Peoria, Ill., flood control -----------------------------------                                        1475
East Poplar Bluff and Poplar Bluff, Mo., flood control-_                                  966
East River, Brunswick Harbor, Ga., improvement                                            554
East River, N. Y.:
    Improvement, including Coenties Reef -------------                                    206
    Investigation -----------------------------------                                     276
East Rockaway (Debs) Inlet, N. Y., navigation                    --------                 192
East St. Louis, Ill., flood control -----------------------                              1010
East Sidney Reservoir, N. Y., flood control -------------                                 291
Eaton Wash, Los Angeles; Calif., flood control_ _ _--------------1598
Eau Gallie, Fla.:
    Investigation---------------------------------_                                       624
    Navigation         -----------------------------------                                622
Eau Gallie Inlet, Fla., investigation_-_------------                         _            624
Echo Bay Harbor, N. Y., navigation-__-_____---------                                      274
Edenton Harbor, N. C., navigation------------------                                       506
Edgartown Harbor, Mass., navigation__ ___                         -             -______ 77
Edisto River, S. C.:
     Investigation ..---------------------------------                              539, 540
     Navigation-----------------------                               ------------        538
Edwards River, Ill., investigation-_____-                         ______-               1051
Edwardsville, Pa., flood control --                - ---------------_                    315
Eel River, Calif.:
     Flood control ---------                  ----------------------------                                  1651
     Investigation -----------                -----------------------------                                 1652
Eel River, Mass., improvement----------------__---_                                        51
Eighteen Mile Creek, N. Y., navigation _ _                        ---- _ _ _ __-          __          -_ 1560
Eightmile River, Conn., navigation _ __ _ __ _ _- _ _                                    132
Elizabeth River, N. C., improvement of waterway to
  Winyah Bay, S. C                                                                       492
Elizabeth River, N. J., navigation _ -------                           --         _      275
Elizabeth River, Va.:
     Improvement of Norfolk Harbor, including Eastern,
       Southern, and Western Branches-----                           - - - - - --        418
     Improvement of waterway to sounds of North
       Carolina        --------------------------------                                  448
Elk City (Table Mound) Reservoir, Kans., flood control-                                  987            -
Elkins, W. Va., flood control---------                     --------------------------                       1320
Elk River, Ala. and Tenn., navigation               ---------------------                    _              1158
Elk River, Md., navigation _                                                        337, 388
Elk River, W. Va., navigation--------------------------------                                               1252
Elliot Bay, Wash., improvement of Duwamish River and
  east and west waterways_     -------------------- ----                                                    1814
                                                INDEX                                                XXV


                                                                                      Page

                                                                          Volume 1           Volume 2


Elmira, N. Y., flood control__-- -     __ --                          9--293
Eloi Bay, La., improvement_-_                   ..-----  ----       719
Elokomin Slough, Wash., navigation- -          _ _---------------------                              1746'
Embarrass River, Ill., investigation_ -___        __    _____-_------__                              1216
Emerald Wash, Los Angeles, Calif., flood control             -----------------                       1598.
Emergency relief program_        __      -
                                         __       --
                                                  _         --
                                                           __       - 9 --
Emergency repairs and rescue work, flood control:
     Albuquerque, N. Mex., district_ --------------            _    939
      Denver, Colo., district-          --                                                           1581
    General statement_------___       _-   -        -__-__-____    7
    Portland, Oreg., district_________________________      ____                                     1792
    Sacramento, Calif., district___                                                                  1678
Emery River, Tenn., investigation_       ________- ____--- ________ -                                1173
Emporia, Kans., flood control__________ __________               990
Encinal Peninsula, Corpus Christi Bay, Tex        __             904
Engineers, the Board of, for Rivers and Harbors....                              20
Erie Basin, N. Y., improvement of channel in Lake Erie---_ __ __ __ _                  1553
Erie Canal, N. Y., enlargement___                                           230
                                                                   -_______________
Erie Harbor, Pa.:
     Investigation_____________                       -_______     -- _1576
     Navigation ----------------------------------------------                         1541
Erie, Lake:
     Black Rock Harbor, improvement of entrance to------------ __                      1553
     Surveys, charts, etc_________               ________________        -      -_____ 2021
     Water levels_ ------------------------------------------                          2022
Escambia River, Fla., navigation ____________________                       664
Essex River, Mass., navigation             _________________   _____         58
Estero River, Fla., investigation_                                             627
Estherville-Minim Creek Canal, S. C., improvement ..                           518
Estimates of appropriations required:
    Miscellaneous civil works _-----------------_                        _     -----_                2008
    Rivers and harbors and flood control_-                       -____           20
Eufaula Reservoir, Okla., investigation-_ -------                   _          991
Evansville, Ind., flood control ________________-     -__-__                 _____       1199, 1212
Everett Harbor, Wash.:
    Investigation      _         -------------------------------                                     1824
    Navigation ----------------------------------------------                                        1818
Exeter River, N. H., navigation _------------------_                            58
Expenditures:
     Miscellaneous civil works_ ------------                                     15
     Rivers and harbors and flood control_----__                              1, 15
                                 F
Fabius River, Mo.:
    Flood control_ ---------------------------------                          1051
     Investigation-_ _ - _ _--                   --------                     1051
Fahrens Creek, Calif., investigation______ _____________                      ____                   1680
Fairbanks, Alaska, flood control____________ _________                                               1836
Fairfax-Kaw City, Okla., investigation-_ --------                _             991
Fairhaven Harbor, Mass., navigation -------------------                         79
Fairport Harbor, Ohio:
     Investigation ---------------------------------------------                                     1576
     Navigation ------------------------------------                         ----------              1532
Fall River Harbor, Mass., navigation_________________                            83
Fall River Reservoir, Kans., flood control--------------                        987
Fall River, S. Dak., flood control------ ----------                           1110
Falmouth Reservoir, Ky., flood control__                                                             1235
Fancher Creek, Calif., flood control----_                   ---------                                1675
Fancy Bluff Creek, Ga., navigation _-563                                             -       . ...
XXVI                                             INDEX


                                                                                           Page

                                                                                Volume 1          Volume 2

Far Creek, N. C., navigation_                                                        472
Farm Creek, Ill., investigation_                                                                       1476
Farm Creek, Md., investigation                                                       390
Farmers levee and drainage district,                      Illinois,     flood
  control___________               __-------------                                                     1472
Faulkner County, Ark., flood control___
Feather River, Calif.:
    Investigation                  __ __ _                                                             1681
     Navigation_            __               _       -        ----                                     1664
Federalsburg, Md., flood control_                                                    393
Federal Water Power Act, investigation and supervision
  of projects_---------    ------------------      ---                                                 2004
Fenwicks Island Cut, S. C., improvement of waterway
      _ __
  via --          ---   -        ---------       -       ------                      534
Fernandina Harbor, Fla.:
     Improvement of waterways to Savannah, Ga .                                      548
     Navigation_------------ -------------            ---                       560, 566
Fern Ridge Reservoir, Oreg., flood control-                       ---                         1783, 1787
Fighting Island Channel, Detroit River, Mich., improve-
  ment_ __                                                                                             1491
Filtration plant, Washington Aqueduct, D. C_                                                           2014
Financial summary as of June 30, 1942_                                                18
Fire Island Inlet, N. Y., navigation__                                               190
Fish Creek, N. Y., investigation _                                                   281
Fishing Bay, Md., navigation_ __                                                     388
Fishing Creek, Md., navigation_________                                              386
Fishing Creek, N. C.:
     Investigation _ - - - - - - - -                                            507, 509
     Navigation        - --                  --                                      506
Fishtrap Reservoir, Ky., flood control_                                                                1278
Fivemile River Harbor, Conn., navigation _                                           132
Flathead Lake, Mont., improvement of Poison Bay_                                                       1823
Flathead River, Mont.:
     Investigation. _--               -     ---- - --     -                                            1838
     Navigation     ---------------------------                                                        1823
Flint River and Creek, Ala. and Tenn., investigation_--                                                1173
Flint River, Ga., navigation___                                                 646, 647
Flomaton, Ala., flood control at-                                                    705
Flood control:
     Appropriations_                                                                  13
     Authorizations_                                                                   5
     Emergency repairs and rescue work-                                                7
    Funds_---------------------                                                        5
    General _ _             ----------------...           .       .       .            4
    Survevs for_---------------                                                                        1841
Florence, Kans., flood control_______________---__                                   990
Florida Bay, Fla., Intracoastal Waterway to Miami Bay,
   Fla., improvement_ __......            ...... .........                           622
Florida East Coast Canal, improvement of Intracoastal
   Waterway, Jacksonville to Miami, Fla., via____                     -----          579
Florida, removal of water hyacinths from waters of State_                       618, 669
Florida River, Fla., navigation-         __          -                -              645
Florida Ship Canal, improvement-__                                                   622
Flushing Bay and Creek, N. Y.:
     Investigation..._ _     ........---        .. ........                          276
     Navigation             __---------                                              178
Follansbee, W. Va., flood control_   -- __--________                                                   1320
Fond du Lac Harbor and River, Wis., investigation___                                                   1432
Fore (Weymouth) River, Mass., improvement ___                                         47
Forestitver, N. Dak., investigation.                 ------                         1073
                                                INDEX                                             XXVII


                                                                                         Page

                                                                              Volume 1          Volume 2


Forked Deer River, Tenn.:
    Navigation_---------------------------------------------                            1158
    Snagging, flood control_-------------.--                           _    -850
Forsyth, Mont., flood control_ ___________________                          1114
Fort Chartres and Ivy Landing, Ill., flood control-......                   1017
Fort Gibson Reservoir, Okla., flood control------------ 983, 987
Fort Peck, Mont.:
     Construction of reservoir_          -_                                 1116----------
    Engineering district__                                                  1116
Fort Pierce Harbor, Fla., navigation__________________                       588----------
Fort Point Channel, Boston Harbor, Mass., improvement_                         43
Fort Supply Reservoir, Okla., flood control------------                      970
Forty Fort, Pa., flood control_                                  -___
                                                    -________________        321
Foster Creek, Wash., investigation__-_         -----------------         __          -_ 1824
Fountaine Que Bouille River, Colo., investigation                            942--------
Fountaine Qui Vouille River, Colo., investigation-                  _ __     942---------
Fourche Bayou, Ark., investigation-- -------                                       968-
Fox Island, Mo., investigation___________-___________                             1051
Fox River, Ill. and Wis.:
     Improvement of Green Bay Harbor_               --------------------------                       1358
     Investigation_________                 ___________  --------------------- 1430,                 1432
     Navigation ------------------------------------                         ----------              1361
Fox River, Mo., investigation_                                                    1051
Foys Flats, N. C., improvement of Trent River at                                    480
                                                                                    480...
Frankfort Harbor, Mich., navigation__          ----------------------------                          1422
Frankfort, Ky., flood control__-----------------------------------                                   1235
Franklin Falls Reservoir, N. H., flood control_- ----                 _         62, 63
Franklin to Mermentau, La., improvement of waterway
  from_--------------------------------------------                                 759
Frazeysburg Reservoir, Ohio, flood control_-                  ------ __                  _
                                                                                      -----          1278
Freeport Harbor, Tex., navigation __________________                                893
Freeport on Pecatonica River, Ill., flood control             ---------           1051
Freeport, Pa., flood control_ ------------------------------------
                                                 ____                                                1320
French Broad and Little Pigeon Rivers, Tenn., naviga-
  tion_ --------------------------------------------                              ------             1158
French Creek Reservoir, Pa., flood control----------_                   -------------                1320
Fresno County Stream Group, Calif., flood control__------_ __-_                                      1675
Fresno River, Calif., investigation------------------------------                                    1681
Fullerton Dam, Calif., flood control_____________________________                            1611,   1615
Fullerton, Ky., flood control_ -------                __           --
                                                             ---__--_      ___              -_       1235
Funds advanced for river and harbor improvements and
  for flood control works____  ---     __                  -------                    15
                                    G

Gaging northern and northwestern lakes, level_                                                       2020
Galena River, Ill. and Wis., investigation--_ --------                            1051
Galveston Bay and Harbor, Tex.:
    Improvement of Galveston Channel---------------                                872
    Improvement of Galveston-Texas City Channel                                     75
                                                                                   875
    Improvement of harbor entrance _ _ _                                           869
      Improvement of Port Bolivar Channel--                                        878
      Improvement of waterway to Houston--                                         880
Galveston, Tex., engineering district---------_                 ----- _            852
Garden Creek, Va., investigation _ _                                               417
Garza Dam, Tex. See Trinity River_ -----                       ------     _        888
Gasconade River, Mo., navigation                                                  1084
Gastineau Channel, Alaska, investigation        _                                                    1824
Gauley River, W. Va., navigation__----------                                       _ __              1252
Gaysville River, Connecticut River Basin, Vt., flood
                --
  control- _ __---__--_       -------        - -     -                             135
XXVIII                               INDEX


                                                                      Page

                                                           Volume 1          Volume 2


Gedney Channel, New York Harbor, N. Y., improve-
  ment      --------------------------------------              197
Genesee River, Charlotte Harbor, N. Y.:
    Investigation    ____------------------------------                           1579
    Navigation_       __ __ ___ _- -_ _- _                                        1562
George, Lake, St. Johns River, Fla., improvement .....          573
Georges River (Thomaston Harbor), Maine, navigation              58
Georgetown Harbor, S. C., improvement of Winyah Bay_            510
Georgetown, White River, Ark., flood control __ _               849
Gila River, Ariz. and N. Mex., investigation_-_ __                                1622
Gill Township Levee unit, Indiana, flood control___                               1184
Gilmore Creek, Minn., investigation
Gimlet Creek, Ill., investigation____                                             1476
Girtys Run, Pa., investigation___ _       ________                                1324
Gladstone Harbor, Mich., navigation           _                                   1429
Glasgow, Mont., flood control_
Glencove Creek, N. Y., navigation __
Glencove Harbor, N. Y., navigation__                            274
Gloucester Harbor, Mass.:
     Investigation _                                             60
    Navigation                                                   37
Golconda, Ill., flood control___                                         1203, 1212
Goldsboro, Neuse River, N. C., flood control_                   509
Goose Creek, N. C., improvement of waterway from
  Norfolk to Beaufort Inlet, N. C-      .-                      452
Goose River, N. Dak., investigation                            1073
Gordon River, Fla., investigation_                              627
Gordons Landing, Lake Champlain, Vt., navigation ....           275
Goshen Creek, N. J., navigation_                                367
Government buildings, District of Columbia, consump-
  tion of water in _                                                              2014
Gowanus Creek Channel, New York Harbor, N. Y.,
  navigation__ _       -   __       -                           274----------
Grand Bayou Pass, La., navigation                               734----------
Grand Caillou Bayou, La.:
     Investigation-_                  _                         780
    Navigation _                                                742
Grande Ronde River, Oreg., investigation                                          1794
Grand Haven Harbor, Mich., navigation                                             1405
Grand Marais, Mich., improvement of harbor of refuge_                             1340
Grand Marais Harbor, Minn.:
    Investigation ____       _____              ______                         1346
    Navigation _ _                                                             1325
Grand River Basin, Ohio, investigation                                   1296, 1324
Grand River, Fairport Harbor, Ohio, improvement_                               1532
Grand (Neosho) River, Kans., Okla., Mo., and Ark.:
    Flood control_ _          _ ._                              987
    Investigation__ _                                           991
Grand River, Mich., navigation
Grand River, Mo., investigation_                               1095
Grand Tower, Ill., flood control_                              1015
Grand Traverse Bay, Mich., investigation
Grandview, Ind., flood control___                                                 1212
Grant Parish below Colfax, La., flood control-
Grapevine Reservoir, Tex. See Trinity River_
                                                    -           829
                                                                888
Grasse River (Massena), N. Y., navigation                                         1575
Grassy Creek, Big and Little, Ill., investigation             1018
Grays Harbor, Wash., navigation__          _ __ _ _ _ ._                          1799
                                                     INDEX                                              XXIX


                                                                                              Page

                                                                                   Volume 1          Volume 2


Grays Reef Passage, Mich., navigation --------------------------                                          1429
Grays River, Wash., navigation_       -__________--_____                                                  1748
Great Chazy River, N. Y., navigation_-___-----------                   275
Great Kills, Staten Island, N. Y., navigation_-----------              252
Great Lakes:
    Control and regulation of waters of Niagara River
      and preservation of Niagara Falls_ _. _---------------                                          -_ 2026
    Investigation of coast --------- .-----                 ----------                           { 13465, 143012
     Investigation of deeper waterways to Atlantic tide-
       water ---- ------------------------------------                                      276            1576
     Surveys, charts, etc., of northern and northwestern
       lakes--------------------------------------------------                                             2020
     Water levels ---------------------------------------------                                            2022
     Waterway to Hudson River:
          Improvement------------------------------                                        230
          Investigation ------------------------------                                     276             1576
Great Miami River, Ohio, flood-control reservoirs                                                          1235
Great Pee Dee River, S. C.:
     Investigation ----------------------------------                                      539
     Navigation ----------------------------                           -------             515
Great Salt Lake, Utah, investigation_-----------_ _                                     --                 1583
Great Salt Plains Reservoir, Okla_ -_______                               _____-           975
Great Salt Pond, Block Island, R. I., navigation ....                                        96           --
Great Sodus Bay 1iarbor, N. Y.:
     Investigation______________-       -        -        ____                                             1577
     Navigation-_      -----------------------------------                                     ------      1564
Great South Bay, N. Y., navigation___---------                                   _   188, 274 -----
Green Bay Harbor, Wis., navigation---------___-----___-__                                                  1358
Green Bay, Iowa, flood control_ --------------------                                      1044
Green Island, Iowa, flood control--__---_                   -------               _      1051
Greenport Harbor, N. Y., navigation ___------------                                        274
Green River,   Ky.:
     Flood control --------------------------------------------                                            1213
                  _
     Navigation------------------------------------                                  ------ --             1174
Green River, Mass., investigation_ ----------------                               _        165
Green River, Utah, Wash., and Wyo., investigation---------------                                     1583, 1838
Greenup, Ky., flood control_----------------------_ _-_                                                    1235
Greenwich Bay, R. I., navigation-__-                             ---- ___- ---             132
Greenwich Harbor, Conn., navigation                 ------------------                     130
Greers Ferry Reservoir, Ark.:
    Flood control _-----------------                        --------------                 964
     Investigation_---------------------------------                                       968
Gregory drainage district, Missouri, flood control- --- _-                               1051
Grosse Tete Bayou, La., navigation ------                      __----_                     743----
Guadalupe River, Calif., investigation---------------------_                                     --        1652
Guadalupe    River, Tex.:
     Improvement to Victoria_ --                        -
                                                        __-             -       -___
                                                                                __         910
     Investigation ---------------------------------                                 912, 926 ___
Gulf Intracoastal Waterway, navigation---------------                                      629
Gulfport Harbor, Miss.:
     Investigation-----------------------------------                                      699
     Navigation ------------------------------------                                       691
Gull Lake reservoir, Minn_- -                         -        -
                                                               ___-        -__-          1052
Gully Brook, Conn., investigation_ ------------------                                      165
Guyandot River, W. Va., flood-control reservoir                   ----------------           _             1278
Guyandot River, W. Va., navigation_ ---------                                -----------
                                                                             -                     -       1252,
XX                                   I~DEX

                                                                        Page

                                                             Volume 1          Volume 2

                           H

Hackensack River, N. J., navigation _ .                           240
Hadley Creek, Ill., investigation__                              1051
Haines Canyon, Los Angeles, Calif., flood control_                                  1598
Hammersley Inlet, Wash., navigation_                                                1823
Hammondsport, Oswego River Basin, N. Y., flood con-
  trol-                                                           286
Hampton Creek, Va., navigation_                                   430
Hampton Roads, Va.:
     Improvement of approaches to Norfolk Harbor .                418
     Improvement of channel to Phoebus, Va ... _____.             460
Hanging Rock, Ohio, flood control_     -                                            1235
Hanna Reef, Tex., navigation_                                     910
Hanover Township, Pa., flood control                              313
Hansen flood control basin___                                                       1598
Hanson, La., improvement of waterway to Mermentau
  River----           -----------           --      -              759
Harbor Beach, Mich., harbor of refuge_                                              1511
Harbor lines, establishment_______________                                          2006
Harbors and rivers. See Rivers and harbors.
Hardee Creek, N. C., improvement of Tar River                      473
Harlan County Reservoir, Nebr., flood control                     1093
Harlem, Mont., flood control____________                          1126
Harlem River, N. Y., navigation___________                         212
Harpers Ferry, W. Va., flood control_                __ _          417
Harraseeket River, Maine, navigation-_----                          58
Harrisburg, Ill., flood control__                                              1202, 1212
Harrisburg, Pa., flood control         __                 -        393
Harrisonville and Ivy Landing drainage and levee dis-
  trict No. 2, Illinois, flood control___        -_    __         1017
Hartford, Conn., flood control_                               136, 148
Hartford, Kans., flood control__                                   990
Harvey Canals, La., improvement of Intracoastal Water-
  way via                      -    -_                             752
Hassayampa River, Ariz., investigation__.                                           1622
Hatchie River, Miss. and Tenn.:
     Investigation_._                          -    -_             852
     Snagging, flood control_---                 --------          850
Havre de Grace, Md., improvement of Susquehanna
  River near _             --------       -----                    388
Hawaii, engineering district at Honolulu_                                           1839
Hay Creek, Minn., investigation_.___                              1073
Haysi Reservoir, Va., flood control___                                              1278
Hay (West) Harbor, N. Y., navigation_                              132
Heart River, N. Dak., investigation_                        1109, 1115
Hell Gate, East River, N. Y., navigation-                          276
Hempstead County levee district No. 1, Arkansas, flood
  control                                                          829
Hempstead Harbor, N. Y., navigation_                          180, 274
Henderson County, Ill., flood control-                            1051
Henderson River, Ill., investigation_-                            1051
Hendricks Lake, S. Dak. and Minn., investigation .....            1073
Hendry Creek, Fla., investigation---              ___              627
Hennepin, Ill., flood control_                                                      1475
Herberts Creek, Va., navigation_                                   430
Herring Bay, Md.:
     Investigation______                                           390
     Navigation-        --       -                                 389
                                                  INDEX                                             XXXI


                                                                                         Page

                                                                              Volume 1           Volume 2


Herring Creek, Md., navigation___                 _____________-_                      403
Higgins Canyon, Los Angeles, Calif., flood control----------_                          ----_          1599
Higginsport, Ohio, flood control-              __-_______--________ _                        _        1235
Hillsboro Bay, River, and Inlet, Fla.:
     Investigation__           - --                                            624, 625,
                                                                                627, 628
     Navigation         -------------------- ---------------                           610
Hingham Harbor, Mass., navigation-______ _____---                              -         58
Hiwassee River, Tenn., navigation__________________________                                           1158
Hobolochito River, Miss., investigation-------------___                                 705
Hocking River, Ohio:
     Flood control-------------------------------- ------------                                       1278
     Investigation--------__                                                                          1281
Holland Harbor, Mich.:
     Investigation__- _ __- ___---__.-.--                     __________________                      1430
     Navigation ----------------------------------------------                                        1402
Hollywood Harbor, Fla.:
     Investigation-----------------------------------                                   624
     Navigation-_ -----------------------------------                                  593
Holmes River, Fla., navigation _____________________                                    697
Holston River, Tenn., navigation_                                                                     1158
Holyoke, Mass., flood control_             ________________               _      136, 160 _
Homochitto River, Miss., flood control--- ------                    _____               782
Homosassa River, Fla., navigation____________________                                   622
Honey Creek levee unit, Ind., flood control----------_                      ---------      _          1212
Honey Hill Reservoir, Connecticut River Basin, N. H.,
  flood control - --                                                                    135
Honga River, Md., navigation________________________                                   388
Honolulu, Hawaii:
     Engineering district____________________________                              __                1839
Hood River, Oreg., bridges                  ---------------------------                              1732
Hoosick Falls, Hoosic River Basin, N. Y., flood control__                              278
Hoosic River, N. Y., Vt., and Mass., flood control                                     278
Hopkinton-Everett Reservoir, Merrimack River Basin,
  N. H., flood control --------------------------------                                  62
Hoquiam River, Wash., navigation____________________________                                         1823
Hords Creek Reservoir, Texas, flood control ------------                               921
Hornell, N. Y., flood control_________________________                                 296
Horn Harbor, Va., navigation _____________________ _                                   460
Horn Island Pass, Miss., investigation -----------------                               699
Horse Creek, Fla., investigation---------------------_                     -           627
Hoskins Creek, Va., navigation-----------    _                   __ -                  413
Hot Springs, Fall River Basin, S. Dak., flood control----                             1110
Houma-Terrebonne Ship Canal, La., investigation_                                       780
Housatonic River, Conn.:
                      ___ _ _ __ _ __ __ _
     Investigation-------                                                              165
     Navigation ------------------------------------
                                   __________                                          117
Houston to Galveston Ship Channel, Tex.:
     Flood control __-____-                                 -_______
                                                      ______________                   912
     Investigation__   -----------------------------------
                          _                                                            912
     Navigation ------------------------------------                                   880
Howell Reservoir, Iowa, flood control            -----------------                   1049
Hubly Bridge, Sangamon River, Ill., flood control                                                    1475
Hudson River, N. Y.:
     Improvement above New York__                                                      223
     Improvement at New York _                                                         214
     Investigation___  -----------------------------------                             276
     Peekskill Harbor, improvement-________________                                    219
     Rondout Harbor, improvement-----                       --------    _              221.            .
XXXII                                     INDEX


                                                                                Page

                                                                     Volume 1          Volume 2


Hudson River, N. Y.-Continued.
    Tarrytown Harbor, improvement_                                        275
    Waterway to Great Lakes-enlargement of New
       York State Barge Canal_                                       230, 276
Huerfano River, Colo., investigation        _ _ _ _.   _                                    1581
Hulah Reservoir, Okla _                                                   978
Humboldt Bay, River, and Harbor, Calif., navigation            -_                           1646
Humboldt, Kans., flood control-__                                         990
Humboldt River, Nev., investigation _                                                       1680
Hungary Horse Dam, Mont., investigation_                                                    1838
Huntington Harbor, N. Y., navigation-                                     182
Huntington, W. Va.:
    Engineering district__                                                                   1239
    Flood control_                                                                     1262, 1277
Huron Harbor, Ohio:
    Investigation_                                                                          1577
    Navigation _ _ _                                                                        1518
Huron Lake:
    Surveys, charts, etc_                                                                  _2021
    W ater levels _ -     - - - - - - - -                                                  ,2022
Hutchinson, Kans., flood control_                                         990
Hutchinson River (East Chester Creek), N. Y.:
    Investigation ...          ___                                        281
    Navigation--_ _-_                                                     170
Hyacinths, water, removal, from Alabama, Florida, Mis-
sissippi, Louisiana, and Texas waters__    _                        618, 669,
                                                                          775.
Hyannis Harbor, Mass., navigation        -                                132
Hydraulic mining in California, regulation and prepara-
tion of plans_------ ----          _        _ - -                                          1874
Hydraulics. See Water levels.
Hydrology. See Water levels.
                                I
Ice Harbor at Marcus Hook, Pa., navigation.                               367
Ice Harbor at New Castle, Del., navigation_                               367
Illinois and Mississippi Canal, Ill., navigation                         1036
Illinois and Sangamon Rivers, Ill., investigation-                                           1476
Illinois River, Okla., investigation_                                     992
Illinois River, Ill.:
      Flood control_                                                     1013
      Investigation     _         .                                      1002          1465, 1476
      Navigation -                                                                           1451
Illinois waterway, Illinois, navigation----------                                            1451
Imperial River, Fla., investigation                                       627
Indiana Harbor, Ind.:
      Improvement___- -_ - _-  -    --                   -   - - -                           1444
      Investigation_ _                 _ _ _ _ __                                            1465
Indianapolis, Fall Creek levee, Indiana, flood control_-                                     1189
Indianapolis, Warfleigh levee, Indiana, flood control_                                       1215
Indian Ford Dam, Wis., flood control_                                    1051
Indian River Inlet and Bay, Del.:
      Investigation ..      _       __ _ _             .                  368
      Navigation        -                                                 350
Indian River, Fla.:
      Improvement of Intracoastal Waterway, Jackson-
         ville to Miami, Fla., via--------------------                    579----------
      Investigation _....        _-                 --     - -            627 ---------
                                               INDEX                                       xxxIII


                                                                                   Page

                                                                        Volume 1          Volume 2

Indian Rock Dam, Pa., flood control_-_         ------                        391
Inland waterways. See Canals and Waterways.
Inner Harbor Navigation Canal, New Orleans, La .....                    629, 711
Inside routes. See Canals and Waterways.
Insular possessions:
     Honolulu, Hawaii, engineering district-----------                                         1839
     Puerto Rico engineering district ---------------                                          1839
International Association of Congresses of Navigation__                                        2002
Interoceanic Canal surveys ---- ___________-------                                             2003
Intracoastal waterways. See Canals and Waterways.
Investigations outstanding for navigation, flood control,
  etc-------------                                                                             1841
Iola, Kans., flood control_                                                  990
Iowa River, Iowa, investigation                                             1051
Ipswich River, Mass.:
     Investigation___                                                         60
     Navigation--                   -----                                     58
Irondequoit Bay, N. Y., investigation___-__-____-__-_-                                      1577
Ironton, Ohio, flood control-___          ____________                                1223, 1235
Irrigation, surveys for____    ______________________                                       1841
Irvington Harbor, N. Y., navigation _          --- --- -                     275
Island Creek, Md., navigation___ _                                           388
Isles of Shoals Harbor, Maine and N. H., navigation
Ithaca, Oswego River Basin, N. Y., flood control ......
                                                                  --          58
                                                                             287
                                   J
Jackson Creek, Va., navigation_                                              413
Jackson Harbor, Wis                                                                            1368
Jackson River, Va., improvement of James River, Va __                        426
Jacksonville, Fla.:
    Engineering district__________ ____________                              566
    Improvement of Intracoastal Waterway to Miami,
       Fla-                                                                  579
     Improvement of St. Johns River opposite--             -------           569
    Investigation of waterway to Miami-------                                624
Jacksonville, N. C., improvement of waterway to Beau-
  fort_--   --             _  _ .-    .       -  -                           49.0
Jamaica Bay, N. Y., navigation_______                                        194
James River, Va.:
     Investigation _-               . .                                 461, 463
     Navigation_               .       -----                                 426
Janesville Dam, Wis., flood control __                     _-_ ___          1051
Jefferson Island, Md., investigation ----          --                        390
Jefferson-Shreveport Waterway, La. and Tex.:
     Improvement        -                      - --- - - -          -        791
     Investigation_ -                        -     - -----      ---     811, 830
Jeffersonville-Clarksville, Ind., flood control__-___- --                                 1192, 1212
Jekyll Sound, Ga., improvement of waterway via-
Jersey Shore, Pa., flood control____________________
                                                             -----           549
                                                                             321
Jessamine Creek Reservoir, Ky., flood control__-____--                                         1235
Joanna Reservoir, Mo., flood control_                                       1015
John Day River Area, Clatsop County, Oreg., flood
   control         ---------------------------------                                           1775
John Day River, Oreg., investigation__-_-_-----                                                1794
John Martin Reservoir, Arkansas River, Colo., flood
   control-------                                                            937
Johnsons Bayou, La., navigation --------------              -                910
Johnstown Channel, Pa., flood control_       -                                            1301, 1320
Jones Inlet, N. Y., investigation__                                          276
XXXIV                                       INDEX


                                                                                    Page

                                                                         Volume 1          Volume 2


Jonesville, La., flood control___________--------                             829
Jordan River, Miss., navigation--      -------------                          693----------
Joynes Branch, Va., navigation-_                -------------                 444
                                 K
Kaiser Creek, Ill., investigation________       -------------                  1051
Kalamazoo River, Mich., navigation______----------------                                         1401
Kanab Creek, Utah and Ariz., investigation                ----------                             1622
Kanawha River, W. Va.:
    Flood-control reservoirs -----------------------------------                                 1278
    Navigation-----------_ __------ -----------                ---      -----------              1245
Kankakee River Basin, Ill. and Ind.:
    Flood control --------------------------                       --------    ------            1476
    Investigation___ ____________                                            --      -           1476
Kanopolis Reservoir, Missouri River, Kans_                                     1093
                                                                       1--------090,
Kansas City, Mo., engineering district-----------------_                       1074
Kansas Citys, Mo. and Kans., flood control__                  ----------       1085
Kansas River, Mo. and Kans., investigation_ --          -                    1095
Karlson Island, Clatsop County, Oreg., flood control----_                    -             -     1794
Karnak, Ill., flood control___________________________                         ____            1212
Kaskaskia Island, Ill., flood control ____________---1005, 1015
Kaskaskia River, Ill.:
                                                                                           ---  -
    Flood control _                                                     _         1015
    Investigation-----------------------------------_                             1018
    Navigation ------------------------------------                               1001
Kaweah River, Calif., investigation                                            __ _-----       1681
Kaw, Okla., flood control_________________________                                  990
Kayaderosseras Creek, N. Y., investigation          ------------                    281
                                                                                  1051
Keithsburg, Ill., flood control________________-_____
Kelly Lake, Ill., flood control_                          ----------------
                                                       ___--                      ----         1475
Kennebec River, Maine:
    Investigation_-----------------------------------                                70
    Navigation--------------                                                         25
Kennebunk River, Maine, navigation-----------------                                  33
Kenosha Harbor, Wis., navigation__________________-------_                                     1394
Kenova, W. Va., flood control______ __-                               -      -______
                                                                   -_________-           1268, 1277
Kenton Reservoir, Okla., investigation _ _-----------_                              991
Kentucky River, Ky.:
    Flood-control reservoirs _               __-__________-______--------_                     1235
    Investigations          ___________________                                                1238
    Navigation---------------_
                           _---------        -------                       -----------         1217
Kern River, Calif., investigation_______________________                          __     1680, 1681
Keuka Lake, Oswego River Basin, N. Y., flood control_                               285
Kewaunee Harbor, Wis., navigation______________                           _--------            1374
Keweenaw Waterway, Mich., navigation                                            - _            1334
Keyport Harbor, N. J.:
    Investigation___                    __--_-----------276
    Navigation ----------------                     --------------------            275
Key West, Fla., improvement of harbor at-----------_                                622
Kiamichi River, Okla., investigation -------------------                            934
Kickapoo River, Wis., investigation_-----------                              1073
Kilchis River, Oreg., investigation_------------------------                                     1795
Kill Van Kull, N. Y. and N. J., improvement of Staten
   Island-New Jersey Channels _ -------------------                           244
Kimball Bayou, La., snagging, flood control------------                       827
Kincaid Creek, Ill., investigation------------------                      -1018
Kinderhook Creek, N. Y. and Mass., investigation...                            281
                                                 INDEX                                            XXXV


                                                                                        Page

                                                                             Volume 1          Volume 2


Kingman Lake, D. C., reclamation and development of
  Anacostia River and flats-----_____---__           _-___---_ --                              ___2011
Kingston Harbor, Mass., navigation------------------         58
Kingston, Pa., flood control-        -_______
                                     _--___--   ____       315
Kinnickinnic River, Wis., navigation----------------_                                               1388
Kiskiminitas River, Pa., investigation--_    -------------     -_
                                                              __                              1296, 1324
Kissimmee River, Fla.:
     Investigation----------------------- ------------        627
     Navigation------- - - - - - - - - - - - - - - - - -      622
Kittanning, Pa., flood control ______---    ___-___-_____________                             1320, 1323
Klamath River, Calif., snagging, flood control--              ------------------                    1650
Klamath River, Oreg., investigation----------------------__                                         1652
Knappa Area, Clatsop County, Oreg., flood control                  ----------------                 1774
Knapps Narrows, Md., navigation ___-______________            388
Knife River Harbor, Minn., investigation___________________                                         1346
Knife River, N. Dak., investigation______________            1115
Knightville Reservoir, Mass __                             -----             135, 144          ____
Knobbs Creek, N. C., navigation____________________          458
Kootenai River, Idaho and Mont.:
    Investigation_------------------------------------------                                       1838
    Navigation      ----------------------------------------------                                 1823
                                    L

La Batre Bayou, Ala., navigation ---------------------                 685
Lacey, Langellier, West Matanzas, and Kerton Valley,
  Ill., flood control-------------------------------------------                                   1475
Lackawanna River, Pa.:
     Investigation-------------------                              321, 393----
     Snagging, flood control___________                 _____----_     320
Lacombe Bayou, La., navigation ---------------------                   724
Lac Qui Parle Reservoir, Minn____________________ _                   1068
Lafayette River, Va.:
     Investigation ------------------------------------                461
      Navigation_---------                         ---------                      460
Lafourche Bayou, La.:
    Investigation-----------------------------------                                 780
    Navigation ------------------------------------                                  737
La Grange, Colorado River, Tex., flood control---------                           - 926
La Grange Bayou, Fla., navigation__ _ ______--------_                                658
Laguna Canyon, Calif., investigation__---------------------_                                       1622
Laguna Dominguez, Calif., investigation-                    _   - ---------------- _ __            1622
Laguna Madre, Tex., investigation________________                                    912
Lake Borgne (Violet) Canal, La., navigation ------------                             721
Lake Brownwood Reservoir, Tex., flood control-........ .                             921
Lake Calumet, Ill., navigation___------------------_ _                            ---------        1464
Lake Champlain, N. Y. and Vt. See Champlain Lake.
Lake Charles Deep Water Channel, La-___________.__                                   774
Lake City Harbor, Minn., investigation ----------------                            1063
Lake Crescent, Fla., navigation-__________________-___                               622
Lake George, Fla., improvement of St. Johns River, Fla_                              573
Lake Griffin, improvement of Oklawaha River, Fla                                     576
Lake Harbor, Mich., investigation _ _-------------                         _                       1430
Lake Mabel, Fla., improvement of Hollywood Harbor__                                  593
Lake Michigan Ship Canal, Wis.:
    Investigation ---------------------------------------------                                    1431
    Navigation ------------------------------------                              ----------        1369
XXXVI                                              INDEX


                                                                                               Page

                                                                                    Volume 1          Volume 2


Lake Okeechobee, Fla.:
     Investigation_ ---------------------------------                                  624, 627 _-              -
     Navigation------------------------------------                                          598
-Lake  of the Woods, Minn.:
     International Control Board--------------------------------                                              2024
     Regulation of levels___----------------------------- --------                                            2024
     Surveys and charting-------------------------------------                                                2024
Lake Pontchartrain, La.:
     Investigation- ----------------------------------                                       788
     Navigation------------------------------------                                          638
Lake River, Wash., navigation ____ _______-------___                                                       -_ 1742
Lakes, Great. See Great Lakes.
Lake Superior Board of Control --------------------------------                                               2027
Lake Traverse, Minn. and S. Dak., navigation---------                                       1062
Lake Traverse and Bois de Sioux River, S. Dak., flood
  control------          ----------------------------------                                 1065
Lake Washington, Miss., improvement_-----------_ _                                 -      - 810
Lake Washington Ship Canal, Wash., improvement---------------                                           1807, 1815
Lake Winnepesaukee, N. H., navigation ----------------                                         58
Lake Worth Inlet, Fla.:
     Investigation-----------------------------------                                        624
     Navigation-                                                                             590
La Lanche Bay, Ala., improvement of Intracoastal
  Waterway via------------------------------------                                           636
La Loutre Bayou, La.:
     Investigation ------------------------------------                                       780
     Navigation_ -----------------------------------                                          719
Lamoille River, Vt., flood control__                       -     _                            280
Lamprey River, N. H., navigation__------_                                   _8-- _               8-----
Lancaster, Cayuga Creek, N. Y., flood control-_------                                          -              1577
L'Anguille River, Ark.:
     Flood control ----------------------------------                                         852
     Navigation-----------------------------------                                            837
La Plata River, Colo., investigation----_-- ----------------                                 _                1622
Larchmont Harbor, N. Y., navigation-_ -----------                              __        -- 274
Latham Slough, Calif., improvement_--                          _________________                              1666
La Trappe River, Md., navigation--__- -                                    ----
                                                                        _______               388
Lavaca Bay, Tex., improvement of channel from Pass
   Cavallo to Port Lavaca---------------__-_______                                              g897
Lavaca River, Tex.:
      Investigation--------------------------------_                                    912, 926
      Snagging, flood control--------------------------                                       924
Lawrenceburg, Ind., flood control_------------------------_                                             1225, 1235
Lawrence, Kans., flood control-----------------------                                       1095
Leaf River, Miss.:
      Investigation ----------------------------------                                        705
      Navigation -----------------------------------                                          697
Le Carpe Bayou, La.:
      Investigation_----------------------------------                                        780
      Navigation -----------------------------------                                           742
Leech Lake Reservoir, Minn_-------                               ___---         -____-     1052
Leech River, Minn., navigation_-----__                               ---
                                                                    ___-__-_                1062
Lee Slough, Apalachicola River, Fla., navigation                                              65...
                                                                                               645
Leesville Reservoir, Ohio, flood control_ ---------                                  _ _----_                 1255
Lehigh River, Pa., investigation ---------                      _-------------371
Leipsic River, Del., navigation-_ __-------------__                                           367
Leland Harbor, Mich.:
      Investigation___   -----------------------------------------                                             1430
        Navigation-----------___                          -          -----           _        __-           1425
                                                     INDEX                                             XXXVII


                                                                                               Page

                                                                                    Volume 1          Volume 2

Lemon Creek, Staten Island, N. Y., navigation----------                                          275
Leon River, Tex., investigation-----------------------                                           926-
Leroy, Kans., flood control__---------------------------                                         990
Levees between Shelby Bridge and Baum's Bridge, Kan-
  kakee River, Ind., flood control_             ----------------------  _----_                                 1476
Levee unit No. 1, Wabash River, Ill., flood control_                                                           1215
Levee unit No. 2, Wabash River, Ind., flood control-------_                                                    1215
Levee unit No. 3, East Fork of White River, Ind., flood
  control-------------------------------------------------                                                     1215
Levee units Nos. 3 and 4, Wabash River, Ill. and Ind.,
  flood control -----------------------------------------------                                                1215
Levee unit No. 5, Wabash River, Ind., flood control_                                   ----    _        -_     1215
Levee unit No. 8, West Fork of White River, Ind., flood
  control-               --------------------------------------------                                          1191
Levee unit No. 9, West Fork of White River, Ind., flood
  control -------------- ----------------------------------                                           -        1215
Levee unit No. 10, West Fork of White River, Ind., flood
  control------------------------------------------                                              --   ---      1215
Levels, water. See Water levels.
Levering Creek, Md., navigation - - - - -                               - -          _           381
Levisa Fork, Big Sandy River, Ky.:
     Investigation----------------------------_                                 -----           -------- 1253, 1281
     Navigation ----------------------------------                                        ---------            1248
Lewes River, Del., navigation ------------------------                                           347----------
Lewis and Clark River area, Clatsop County, Oreg., flood
  control ---------------------                           -----------------------------                        1778
Lewisport, Ky., flood control__________--______---------------_____                                            1212
Lewis River, Wash.:
     Flood control_ ---------------------                               -----------------                      1781
     Navigation----------_                                ---------------------         --- --------           1743
Licking River, Ky.:
     Flood-control reservoirs-----------------------------------                                               1235
     Investigation --------------------------------- ---------                                                 1238
     Navigation_ ---------------------------------                                        ----------           1222
Licking River, Ohio, investigation ------ __------___-------__--__                                             128.1
Lisle, N. Y., flood control----------------------------                                          292               -
Little Black River, Mich., investigation- -- __----------------_                                               1347
Little Black River, Mo. and Ark., flood control
Little Caillou Bayou, La.:
                                                                   ----------                    966
     Investigation -------------------------- -------                                            780
     Navigation               -------------------                -----------------               740
Little Calumet River, Ill. and Ind.:
     Investigation---------------------------------------------                                                1476
     Navigation--- --------------------------------------------                                                1451
Little Choptank River to Choptank River, Md., water-
  way, improvement-------------------------------                                                388
Little Colorado River, Ariz., investigation-------------_                                                      1622
Little Creek, La., snagging, flood control---------------                                        827 -___
Little Deadmnans Creek, Calif., investigation-----------_----------                                            1680
Little Egg Harbor, N. J., navigation ------------------                                          367----------
Little Elk River, Md., navigation--------------_------                                           388
Little El mn Reservoir, Tex. See Trinity River----------__                                       888
Little Harbor, N. H., navigation-------------------_                          ---            58
Little Harbor, Woods Hole, Mass., navigation-------__                132                           --
Littlejohn Creek, Calif., investigation ------------------------    __                                      1681
Little Kanawha River, W. Va.:
     Flood-control reservoirs_ -- _____ ______--                 __                                         1278
     Investigation----------------------------------- ----------                                            1281
     Navigation - - - -------------------------------- ----------                                           1243
Little Machipongo River, Va., navigation- ------- --- ,-                                   460 ,-        ..---
XXXVIII                                      INDEX


                                                                                    Page
                                                                         Volume 1          Volume 2

Little Miami River, Ohio:
                                                --
      Flood-control reservoirs- - _____________-__         -         -                          1235
      Investigation ___                                                                         1238
Little Minnesota River, investigation                                         1073
Little Missouri River, Ark.:
      Flood control in basin_                                                   813
      Flood control, Murfreesboro, Ark., to the mouth             ---           814
      Investigation       __ - - - - -- - - - -     -                           830
      Navigation_--------------------------                                     810
Little Missouri River Mont. and N. Dak., investigation_ 1109, 1115
Little Peedee River, S. C., navigation___---_-_-                 _ --    -      538
Little Pigeon and French Broad Rivers, Tenn., improve-
   ment- -- -------------------------------------                                               1158
Little Pigeon Bayou, La., navigation_                                           779
Little Red River, Ark., investigation_                                          968
Little River, Ark., investigation_ _ _ __ __ _--- __--_ _ __ __ _               934
Little River, Del., navigation_-__________________                              343
Little River, La., navigation___________-__-_______                             810
Little River, N. C. and S. C., investigation _ _ _ __ __ _ _                    539
Little River, S. C., improvement of waterway via             -----              493
Little Rock, Ark.:
     Engineering district__      - - -- - -                                     943
      Flood control_     ---------------------------                            966
Little Rock to Pine Bluff, Arkansas River, Ark., flood
  control        - - ---       -------------------------                        966
Little Sioux River, Iowa, investigation- ----------                           1115
Little Sodus Bay, N. Y., navigation___                                                          1567
Little Tallahatchie River, Miss.:
      Construction of Sardis Reservoir_                                                         1978
     Navigation       -    -   -- -- -- -                                       810
Little Tennessee River, Tenn., navigation_                                                      1158
Little Wicomico River, Va., navigation_--                 -----            403, 407
Little Woods Hole Harbor. Mass., investigation----.-...                         134
Liveoak Wash, Los Angeles, Calif., flood control--_-----                                        1598
Liverpool, Ill., flood control              _                                                   1470
Lobdell Canal, improvement of Wilmington Harbor, Del,                           335
Local cooperation--------------------------------                                  5
Local protection projects, Connecticut River Basin-             ---             136
Lock Haven, Pa., flood control____________                        ___           321
Locklies Creek, Va., navigation-            _----__-___                         413
Lockwoods Folly River, N. C., navigation_-------------                          504
Logan Reservoir, Ohio, flood control                                                           1278
Logansport, Ind., flood control_                                                               1215
Loggy Bayou, La., navigation__-                    -__----        _---          810
Lone Rock Reservoir, Ark., flood control--------------                          964
Long Beach Boulevard, Los Angeles, Calif., flood control-                                      1598
Long Beach Harbor, Calif., navigation_          ------------                                   1589
Long Island intracoastal waterway, New York, naviga-
  tion-----------------------------------------                                 188
Longs Canyon, Colo., investigation_- -___-_------ - -                           942
Lookout Bight, N. C., navigation-------------                                   488
Lookout Bight, N. C., Back Sound to, investigation-----                         507
Lookout Cape, N. C., improvement of harbor of refuge__
Lookout Point Reservoir, Oreg., flood control--.
Lopez Canyon diversion, Los Angeles, Calif___
                                                                     -          506
                                                                                               1783
                                                                                               1598
Lopez flood-control basin, Los Angeles, Calif_----------                                       1598
Lorain Harbor, Ohio, navigation__---------                   ---                               1522
Los Angeles, Calif.:
     Engineering district________--------                -           -____                     1583
     Flood control on river_.-----------------------                                           1597
     Improvement of harbor__._-____--------___ --                                              1589
     Investigation of harbor and river.-----------------                                       1622
                                       INDEX                                    XXXIX


                                                                       Page

                                                            Volume 1          Volume 2


Los Angeles County drainage area, California, flood con-
  trol-----      -----------------------------------                               1597
Los Angeles River channel, flood control             _                             1598
Lost Creek, Ill., flood control__                                                  1475
Lost River, Ind., investigation-.-                -                                1216
Louisiana and Texas intracoastal waterway:
     Improvement, Mississippi River to Corpus Christi__     752, 859
    Investigation___                                        780, 912
Louisiana, State of, removal of water hyacinths from ...    669, 775
Louisville and Portland Canal, Ky., enlargement_                                   1128
Louisville, Ky.:
    Engineering district____                                                        1174
    Flood control_                                                            1195, 1212
Lowell Creek, Alaska, flood control_                                                1832
Lowell, Mass., flood control____________                      62, 67
Lower Chipola River, Fla__                ___                    645
Lower Machodoc Creek, Va., navigation __                         413
Lower San Francisco Bay, Calif., navigation                                        1649
Lower Thoroughfare, Deals Island, Md., navigation ....           389
Loyalhanna Reservoir, Pa., flood control_                                     1307, 1320
Lubec Channel, Maine, navigation.                                 58
Ludington Harbor, Mich.:
    Investigation                                                                  1430
    Navigation                                                                     1415
Ludlow, Ky., flood control_                                                        1235
Ludlow Reservoir, Connecticut River Basin, Vt., flood
  control                                                        135
Lugert-Altus Reservoir, Okla., flood control_                    932
Lumber River, N. C. and S. C.:
    Investigation                                                540
    Navigation                                                   538
Lussenhop levee, Illinois, flood control___                                    -   1475
Luxapalila River, Ala. and Miss.:
    Investigation- _ _                                           705
    Snagging, flood control_                                     703
Lyford levees, Ind., flood control_                                                1182
Lynch River, S. C., navigation_                                  538
Lynn Harbor, Mass., navigation__                                  58
Lyon County, Kans., flood control_                               990
Lytle Creek, Calif., investigation                                                 1622
                             M

Mable Bay and Lake, Fla., improvement of Hollywood
Harbor                                                          593
Macatawa Lake, Mich.:
   Investigation._.----                          -----                             1430
   Navigation_--------------------------------                                     1403
Machias River, Maine, navigation_---- ---                         58
Machodoc (Upper) Creek, Va., improvement__                       413
Mackay Creek, N. C., navigation______                            506
Mackinack Harbor, Mich., improvement_        ---      ---                          1511
Mackinac Island, Mich., to Round Island, Mich., chan-
nel, improvement_____ __-__- _____________                                        1511
Mackinac Straits, Mich., improvement of Poe Reef Shoal_                            1511
Mackinaw City Harbor, Mich., investigation_-_-----                                 1512
Mackinaw River, Ill., investigation_-               ---                            1476
Macon Bayou, La.:
   Investigation------------------                               830
   Navigation_ -----------------------------                     798
Madera County group, California, investigation_                                    1681
Mad River, Calif., investigation_                                                  1652
       493203-43--pt. 1, vol. 1---74
KL                                         INDEX


                                                                                        Page
                                                                          Volume 1             Volume 2

Mad River, Ohio, investigation_---_       ------                 ...-                               1238
Magruder drainage district, Columbia County, Oreg.,
flood control---------------------------- -----                                                   1793
Mahoning Creek, Pa., investigation_ _                                                              1324
Mahoning Creek reservoir, Pa., flood control-                                                1305, 1320
Mahoning River, Ohio, investigation_                                                         1296, 1324
Mahoning River, Pa. and Ohio, navigation                                                           1295
Main ship channel, New York Harbor, N. Y., improve-
ment--------------------------               ------------                         197
Maiden River, Mass., navigation        ----------                                   58
Malheur River, Oreg.:
    Investigation-------------       -----------------                                              1795
    Snagging, flood control__----        -----------                                                1791
Mamaroneck Harbor, N. Y., navigation._-            ...-....-                       168
Mamaroneck River, N. Y., investigation           ---  ------                       281
Manasquan Inlet and River, N. J.:
    Investigation_                           -----------     .-----                276
    Navigation--------------------------------                                     268
Manatee River, Fla.:
    Investigation------------------------------                                    624
    Navigation-             _          ...          -------
                                                  .--                              622
Manchac Bayou, La., navigation..        ...... __ ----                             732
Manchac Pass, La., navigation__._              .____ .____                         729
Manchester Harbor, Mass.:
    Investigation------------------------------                                      60
     Navigation _ .          .    ..                     _.                          58
Manchester, Ohio, flood control_-----               _-------_--                                     1235
Mancos River, Colo., investigation_._..._.___..___.                                                 1622
Mangun-Salt Fork, Okla., investigation--------------                               934
Manhasset Bay, N. Y.:
    Investigation_--_-_ -------------------                                        276
    Navigation--------------------------------                                     274
Manistee Harbor and River, Mich.:
    Investigation ___    - -             ---
                                         -
                                         --                     -       -- - - - - - - - -          1430
    Navigation-                               _-----_--
                                             -----------------          -- - - - - - - - -          1418
Manistique Harbor, Mich., navigation--------------                      -- - - - - - - - -          1348
Manitowoc Harbor, Wis., navigation_..._.__- - .....__                   -- - - - - - - - -          1379
Mannford Reservoir, Okla.:
     Flood control--      _---------------------------                             987----------
   Investigation-__- __----    ---------      ----------                           991
Manokin River, Md.:
   Investigation....--.------.    -----------      ---                             390
     Navigation _            -         ----------------------                      389
Mansfield Reservoir, Ind., flood control___------------                                             1213
Manteo (Shallowbag) Bay, N. C., navigation-----------                           469
Mantua Creek, N. J., navigation----__-__----------                         325, 367
Maps and charts, northern and northwestern lakes---                                                 2020
Marais des Cygnes River, Kans., investigation          -------                   1095
Marblehead Harbor, Mass., navigation_ __.                 ....                     58
Marcus Hook, Pa., ice harbor at___----------......                                367
Mare Island Strait, Calif., navigation_-----------                                                  1636
Marine City, Mich., navigation_---------------                                                      1511
Mariposa Creek, Calif., investigation-----------------                                              1680
Markham Ferry Reservoir, Okla., flood control-.......                      982, 987
Marmarth, N. Dak., flood control_ _ ____ - -___- ._                           1114
Marmaton River, Kans., investigation _.__          -- - ..                    1095
Marquette Bay and Harbor, Mich.:
    Construction of harbor of refuge in bay----------                                               1338
    Improvement of harbor--      --------------------                                               1339
     Investigation -----
                     _   --------------------------                                                 1346
Marshall Creek, Los Angeles, Calif., flood control---_-_                                            1598
                                       INDEX                                           XLI


                                                                           Page


                                                                Volume 1          Volume 2


Marshland draiuage district, Columbia County, Oreg.,
flood control_ ------------------------------------                                   1793

Marshyhope Creek, Md., flood control_ -----------                    393
Martins Ferry, Ohio, flood control_------         __                          1320,1323
Marys River and Muddy Creek, Benton County, Oreg.,
flood control_-----------------------               ___                               1793
Marys River, Ill., investigation__                                  1018
Mason and Menard, Ill., flood control_                                              1475
Mason, W. Va., flood control_                                                       1277
Massena Board of Control, operations of International_                              2027
Massillon, Ohio, flood control       _ _____                                  1269, 1277
Matadero Creek, Calif., investigation-                                              1652
Matagorda Bay, Tex., improvement of Louisiana-Texas
Intracoastal Waterway           _..                                 860
Matagorda, Tex., flood control         --                            919
Matanuska River, Alaska, investigation                                                 1838
Matanzas River, Fla., navigation_ _- -                               584
Matawan Creek, N. J.:
    Investigation------------                                        276
    Navigation---------------                                        275
Matinicus Harbor, Maine, navigation_                                  58
Mattaponi River, Va.:
    Investigation_------------                                       461
    Navigation.----                                                  438
Mattawoman Creek, Md., navigation                                    403
Mattituck Harbor, N. Y                                               185
Mauckport, Ind., flood control_                                                        1212
Maumnee Bay and River, -Ohio, improvement of Toledo
Harbor         -------------        ---           -                          1506, 1511
Maumelle River, Ark., investigation_ -----       --                  968
Maurice River, N. J., navigation_                                    367
Maysville, Ky., flood control                                                          1235
McCraney Creek, Ill., investigation_                                1051
McCreadys Creek, Md., navigation-                                    390
McGee Creek, Ill., flood control                                    1017
McKees Rocks, Pa., flood control_                                                      1320
McKenzie River, Oreg., flood control_                                                  1794
Medomak River, ..Maine, navigation                        -           58
Meherrin River, N. C. and Va.:
      iiiibstigation-         --- ,                             461, 463
     Navigation --------              -                              464
Melbourne Harbor, Fla., navigation _                                 622
Memphis Harbor, Tenn., improvement of Wolf River ---                 839
Memphis, Tenn.:
     Engineering district_______________________                     832
     Flood control- -_ _- _ _---     -- ---- __ -__ __ __ __         845
Menominee Harbor and River, Mich., and Wis., naviga-
  tion. _--- -------- ----          -------------                                 1351, 1388
Meramec Reservoir, Mo., flood control_
Merced    County    group, California,
                                            ---. ---
                                           investigation_
                                                                    1015
                                                                                       1681
Meredosia Lake and,Willow Creek, Ill., flood control -              1013
Mermtau River, La.:
     Flood control_ __---.-.           -......-..    ...    .         786
     Improvement, including tributaries                               767
     Improvement of waterway to Franklin, La .........                759
     Improvement of waterway to Sabine River, via ....                753
     Investigation      ___--------    --                        780, 787
Merrimack River Basin; N. H. and Mass., flood control _               61
XLII                                          INDEX


                                                                                     Page

                                                                          Volume 1          Volume 2


Merrimack River, N. H. and Mass.:
    Investigation_-------------------------------_                        60, 70         __
    Navigation----- ------------------------------                             58
Metamora Reservoir, Ind., flood control-------                 __ ---     -------_                1235
Meto Bayou, Ark., investigation_____________ ______                          852
Metropolis, Ill., flood control -----------------------------------                               1212
Mettawee River, N. Y., investigation _-------------_                         281
Miami Harbor and River, Fla.:
    Improvement of harbor________________                  ______            595
    Improvement of Intracoastal Waterway to Florida.
       Bay, Fla-----------------------------_                    -------- 622
    Improvement of Intracoastal Waterway to Jackson-
       ville, Fla ------------------------------------                       579
    Improvement of river ________________ _______                            622
    Investigation of waterway to Jacksonville, Fla -_ _                      624
    Investigation of waterway to Key West, Fla_ -                 _ _.       624
    Investigation ---------------------------------                    624, 628
Miami River, Ohio, investigation --------------------------------                                 1238
Miami River, Oreg., investigation         ---------------------            __                     1795
Mianus River, Conn., investigation_ ---------                -          -_ 133
Michigan City Harbor, Ind.:
    Investigation ---------------------------------------------                                   1465
    Navigation -------------------------------------------                                        1448
Michigan Lake:
    Canal to Sturgeon Bay, improvement -----------------                                          1369   ,
    Investigation_---------------                                                                 1465
     Surveys, charts, etc_         -            ----------                                        2020
     Water levels --------------         -------------------------                                2022
Middle Fork, American River, Calif., construction of
reservoir                             -----------------                 --------                 1880
Middle Fork River, W. Va., investigation-             _ _ --       ------------- _                1324
Middleport, Ohio, flood control____        ____ --------------------------
                                                         _______                                  1277
Middle Rio Grande Conservancy District, New- Mexico,
emergency repairs, flood control_---------------_                               940
Middle River, Calif., navigation___________________-----_                                         1666
Middle River, Md., navigation _-----------------                   _             376
Middlesboro, Ky., flood control-------------------------------                                    1159
Midland  Drainage      District, Columbia      County,      Oreg.,
flood control---------------------------------------------                                       1793
Miles Creek, Calif., investigation--------------------- ----------                                1680
Milford Harbor, Conn., navigation___-___--           ________                    115
Milford Haven, Va., navigation       -------------------------                   413
Milford Reservoir, Kans., flood control -------------------                    1093---
Milk River, Mont., investigation---------_                 1126
Mill Creek, Calif.:
     Investigation                                                                                1680
     Snagging, flood control __-------------------------------
                                _                                                                 1677
Mill Creek and South Slough, Ill., navigation--_ - _- _ _-1041----------
Mill Creek or River, Conn., improvement of New Haven
Harbor_ -----------------------------------------
             _                                                       111---------
Mill Creek, Tex., investigation -----------------------      912, 926 .        --
Mill Creek Valley, Ohio, investigation__---------------------                                     1238
Mill Creek, Va., navigation-____       ___-------------413
Mill Creek, Wash., flood control_ -------------------------------                                 1756
Miller Bay, Wis., investigation_             --------------------                                 1430
Miller Pond, Ill., flood control__
                                 ---------          ____-__
Millersburg Reservoir, Ohio, flood control_----- ---------------
                                                                  1015, 1017
                                                                           _
                                                                                              -   1278
Mill Four drainage district, Yaquina River, Oreg., flood
Milton-Freewater, Walla Walla River, Oreg., flood con-
  trol --        __.----.------------------------                                                 1758
                                               INDEX                                             XLIII


                                                                                       Page


                                                                            Volume 1          Volume 2


Milton, Pa., flood control ----------------------------              321
Milwaukee River, Wis., investigation-----------------                                              1432
Milwaukee, Wis.:
                         ---------------- -------
    Engineering district___________                       ---------   ----                         1348
    Improvement of harbor______________                 -----------------                          1387
    Investigation of harbor_                                                                       1430
Mimbres River, N. Mex., investigation_-----------                    942
Mingo Creek, S. C., navigation__                                     517
Mingo Junction, Ohio, flood control___________________                                             1320
Minim Creek-Estherville Canal, S. C., improvement...                 518                 -
Mining City Reservoir, Ky., flood control---------------------_                                   1213
Mining, hydraulic, in California_________ _______________--_____                                  1874
Minnesota River, Minn.:
    Flood control_ ___                                              1068 -
     Investigation _ _ _                    --------                            1073
    Navigation _ _ _ _ __                                                       1059     -
Miscellaneous civil works, general statement regarding__                          12
Mispillion River, Del., navigation___                                            346     -
Mississinewa River, Ind., investigation                                                            1216
Mississippi River:
    Flood control           ----------------                                       8
    Investigations:
         For flood control________---        ---    -                            830               1238
                                                                            780, 781,
                                                                            788, 1002,
                                                                   -
                                                                -General   1018, 1051, - -
                                                                                 1063
    Illinois and Mississippi Canal_                                              1036----------
    Missouri River to Minneapolis_ _ _ _                                         1063
    Locks and dams_                                                              1020
    Reservoirs at headwaters of_                                                 1052
Mississippi River Commission _ _                                                 _          1891
    Report of the President _ _                                                             1907
          Flood control on lower Mississippi River:
              Alluvial valley mapping__________________________                                    1915
              Arkabutla Dam and Reservoir, Miss_                                                   1972
              Atchafalaya floodway, Louisiana_ _ _                                                 1958
              Atchafalaya River and Basin, improve-
                ments_--------------------------------------                                      1961
              Bank protection and regulation---------------------_                                1926
              Birds Point-New Madrid floodway, Mis-
                souri-----------------------------------------                          --        1957
              Boeuf floodayv, Arkansas and Louisiana _                                            1957
              Bonnet Carre Spillway, La_-------------------------                                 1965
              Channel improvements ___________________________                                    1922
              Charenton drainage and navigation canal,
                Louisiana----------_             ------------------             -----             1964
              Coast storm of September 1941_---------------------                                 1991
              Dams and reservoirs _ _ _                                  --__--            -_     1967
              Discharge data--------------_                  -----------     ----------           1991
              Emergency work on tributaries ---------------------                                 1904
              Enid Dam and Reservoir, Miss ----------------------                                 1973
              Eudora floodway, Arkansas and Louisiana                        _                    1958
              Experiment Station, Waterways--------------------_                                  1977
              Floodways_                                                                          1957
              General stages of the lower Mississippi
                River--------------------------------------                                       1917
              Head of Passes to Ohio River, condition of
                channel---------------------------------                                           1926
                High water and crest stages_-                -1988
XLIV                                    INDEX


                                                                                Page

                                                                     Volume 1          Volume 2


Mississippi River Commission-Continued.
    Report of the President--Continued.
          Flood control on lower Mississippi River-Con.
              Improvement dredging-_________                      _____--______1919, 1920,
                                                                                       1922
              Levees -------------------------------                       --------    1930
              Low water --------------------------------                               1985
               Morganza floodway, Louisiana ----------------------                     1958
              New Grenada Dam and Reservoir, Miss_ __ _ _                              1974
              River stages and discharges- ---------------------
                                                             _                         1985
              Sardis Dam and Reservoir, Miss -------------------- _                    1971
              St. Francis Basin project:
                    Marked Tree Siphon, Ark_                              __------_    1969
                   Tyronza River Chainel _ _----------------_ _1969
                    Wappapello Dam and Reservoir, Mo           -----------             1968
                   Wax Lake Outlet------- ----------------------                       1964
              Storm of September 1941_                  __________ -_____-__           1991
              Yazoo Basin project:
                   Arkabutla Dam and Reservoir, Miss           ------------            1972
                   Channel improvements, etc_--------_ _-------                      _ 1974
                   Enid Dam and Reservoir, Miss _ - _ _ _ _ _                          1973
                    New Grenada Dam and Reservoir,
                       Yalobusha River, Miss_                             __------_    1974
                   Sardis Dam and Reservoir, Miss------_                               1971
          Waterways Experiment Station, Vicksburg,
            Miss --------------------------------------------                          1977
Mississippi River System, improvements:
    Baton Rouge to New Orleans, La_________________                              716
    Brainerd and Grand Rapids, Minn., navigation-....                           1062
    Illinois and Mississippi Canal, Ill ------------------                      1036
     Mississippi River, Minn -------------------------                          1062
     Missouri River to Minneapolis_                                             1018
          Locks and dams_----------------                       -     - _       1020
     Missouri River to Ohio River- _____________---                              993-_
    New Orleans, La., to Corpus Christi, Tex., Intra-
       coastal Waterway ----------------------------                             859
    Passes:
          South Pass        --------------------------------                     707
          Southwest Pass, including shoals between
            Cubits Gap and Head of Passes         -------------                  707
     Waterway to Teche Bayou-                  __---_          ____---           751
     Snag boats below Missouri River, operation of-                         807, 842
Mississippi Sound, Miss. and Ala.:
     Gulfport Ship Island Channel and Ship -sland Pass,
       navigation ----------------------------------                             691
     Improvement ofs_ Intracoastal Waterway via--------                          638
     Vicinity of Pass Christian, Miss., investigation         -.-          699-
Mississippi, State of, removal of water hyacinths from
waters of ---------------------------------------                         669
Missouri River:
    Flood control, Sioux City to Kansas City--
                                             ..... -1112
                                                      _
     Flood control in basin__-----------                                  1093.
     Investigation--___        __________________-___1064, 1073,
                                                                    1095, 1109,
                                                                          1115
     Navigation:
         At Fort Peck, Mont-__________________                            1116
         Kansas City to mouth_ ---------------------                      1074
         Kansas City to Sioux City--   -                    -1096
         Sioux City to Fort Benton----_             -          --         1106
Mobile, Ala., engineering district.---   -              -            -_    628                    .
                                                   INDEX                                                   XLV


                                                                                           Page

                                                                                Volume 1          Volume 2


Mobile Bay, Harbor, and River, Ala.:
   Improvement of harbor and bar_-                    -__--_--_
                                                           -                    -_     665
   Intracoastal Waterway to New Orleans, La.:
        Investigation -------------------------------                                  781
          Navigation----.-.    -----    ----- _-- _                                    638
      Improvement of Intracoastal Waterway to Pensa-
        cola Bay, Fla- .-----------    - ------------                                  636
    Investigation----------------------------------                                     699
Mobile River, Ala., removing the water hyacinths in
    river and tributaries_          -- ----        .-- ____.----                        669
Moccasin Slough, navigation_        ---------------- __              -               - 645
Mohawk Reservoir, Ohio, flood control_----.--                          _....---.--_ _                      1255
Mohawk River, N. Y., investigation- -------______--                        _            321
Mohicanville Reservoir, Ohio, flood control_                   ------ __                   _
                                                                                         -----             1255
Mojave River, Calif., investigation--. _..-------------_          --                ___        --          1622
Mokelumne River, Calif.:
    Investigation_----------------------------_                                      --
                                                                                ________                   1681
    Navigation---------------------------------------------                                                1659
Molalla River, Clackamas County, Oreg., flood control------------                                          1793
Mona Lake, Mich., investigation_-_ _                 --- __-          -______--_______                     1430
Monhegan Harbor, Maine, investigation----                          -----                  61
Monongahela River, W. Va. and Pa.:
    Flood-control reservoirs ----------------------------------                                            1320
    Investigation______            ___-----------------------------------------1296,                       1324
    Navigation ------------------------------------                               ----------               1282
Monroe Bay and Creek, Va., navigation ---------------                                   413
Monroe Harbor, Mich., navigation               ----------------------------                  _             1504
Monterey Bay and Harbor, Calif.:
    Investigation_------------- __     __                                    - _-- - -_                    1650
    Navigation--- --------------------------------                                ----------               1649
Montezuma River, Colo., investigation-----_ _                           -------------
                                                                                   _              --       1622
Montgomery, Pa., flood control__--_______- _____--___                                   321
Montour Falls, Oswego River Basin, N. Y., flood control _                                289
Moorefield, W. Va., flood control------_                           ---------           417
Moores Ferry Reservoir, Va., flood control---------__ .1278         ---------   _
Moosabec Bar, Maine, navigation --------                 ______                58----
Moose River, N. Y., investigation ------------------------------                         1579
Morehead City Harbor, N. C., navigation--- _----- _                       -- 495
Morgan City to Mississippi River, investigation--------                       781
Mormon Channel, San Joaquin River, Calif., improve-
ment     _          --.        -         _         __          -                        1657
Morris Cove New Haven Harbor, Conn., improvement-                             111
Morristown Harbor, N. Y., navigation ----------------------                      _       1575
Moscow, Ohio, flood control    ______--------------     ----------------------           1235
Moses Coulee, Wash., investigation_________________________                              1838
Mosquito Creek Reservoir, Ohio, flood control                 --------------------       1320
Mounds and Mound City, Ill., flood control---_----_               -------        _ 1209, 1212
Moundsville, W. Va., flood control----               ___-_________                       1320
Mountain Brook Reservoir, Merrimack River Basin,
N. H. flood control------------------------------                             62
Mount folly, Rancocas Creek, N. J., flood control_                            369
Mount Hope Bay, improvement of Fall River Harbor,
Mass       -------------------------------------------                        83
Mouth of Sangamon River, Ill., flood control---------------------                        1475
Mud Creek, Va., navigation_ --------------------------                        447----------
Mud Lake, Mermentau River, La., improvement                                            768-
                                                                                       768
Mud Mountain Dam, Wash., flood control                    -----------------------                          1826
Mud River, Ky., investigation__________________                          __ ___                            1216
Mud River Reservoir, W. Va., flood control__                                                               1278
Mulberry Creek, Va., navigation---  .---------                                         413-            -
Mulock Creek, Fla., investigation--       ------                                       627....             ..
XLVI                                INDEX


                                                                     Page

                                                          Volume 1           Volume 2

Multnomah Channel, Oreg., navigation_.                                                  1712
Multnomah drainage district No. 1, Multnomah County,
Oreg., flood control                                                                   1763
Muncie, Ind., flood control__         _                                                 1187
Muncy, Pa., flood control           ___                        321
Murderkill River, Del., navigation_                            344
Muskegon Harbor, Mich., navigation-                                                     1408
Muskingum River, Ohio:
    Flood-control reservoirs -                                              1253,       1278

    Investigation_-----------                                               1253,       1281

    Navigation -                                                                        1239

Mystic River, Conn.:
    Investigation_                                             133
    Navigation                                                  99
Mystic River, Mass., navigation__                               40
                          N

Nandua Creek, Va., navigation__                                460
Nansemond River, Va., navigation            _                  435
Nantasket Beach Channel, Boston Harbor, Mass., im-
  provement_______________--                                    43
Nanticoke, Pa., flood contro--                                 321
Nanticoke River (including Northwest Fork), Del. and
  Md., navigation                                              388
Nantucket Harbor and Sound, Mass.:
     Construction of harbor of refuge _-                        74
     Improvement of:
           Cross Rip Shoals_                                    76
           Pollock Rip Shoals_                                  71
Napa River, Calif.:
     Investigation _                                                                    1652

     Navigation__ _            _ _---------                                             1638

     Snagging, flood control_                                                           1650

Naples, Fla., to Big Marco Pass, Fla., channel improve-
  ment-----------------                                        622
Narragaugas River, Maine, navigation                            58
Narrows of Lake Champlain, N. Y. and Vt., navigation -         235
Narrows Reservoir, Ark., flood control_                        813
Naselle River, Wash., investigation
                                                     -
                                                                                        1838



Nashua, Merrimack River Basin, N. H., flood control -           62
Nashville, Tenn., engineering district_                                                 1141

Natalbany River, La., navigation_                              730
Natchitoches Parish, La., flood control                        820
Natrona, Pa., flood control__                                                           1320
Navidad River, Tex., investigation_                       912, 926
Navigable waters. See Bridges; Wrecks; and Regula-
  tions.
Navigation, Congresses of, Permanent International
  Association _ _ __ __                _ __ _ __ _                                      2002
Navigation, surveys for----------------------------                                     1841
Neabsco Creek, Va., navigation                                 413
Neah Bay, Wash., navigation_                                                            1805
Neale Sound, Md., navigation_
Near Dardanelle, Arkansas River, Ark., flood control
Near Fort Gibson, in Muskogee County, Okla., flood
                                                    ---        413
                                                               966
control                                                       990                  -
Necanicum River, Oreg., investigation                                                   1755
Neches River, Tex.:
     Improvement of Sabine-Neches Canal-_                      853
     Investigation      _        _                             926
                                                 INDEX                                             XLVII


                                                                                         Page

                                                                              Volume 1          Volume 2


Neebish Channels, St. Marys River, Mich., improvement.                             -_ ___             1477
Nehalem Bay and River, Oreg.:
    Investigation__          ___________---------------_ _________                                    1795
    Navigation------------------------------------                               ----------           1754
Neodesha Reservoir, Kans., flood control----------                                     987
Neosho Falls, Kans, flood control---------------------________________                990
Neosho Rapids, Lyon County, Kans., flood control------                                 990
Neosho River, Kans., investigation -------------                                       991
Neponset River, Mass.:
    Investigation---------------------------------                                      60
    Navigation ----------------------                          ---------                58
Neshaminy Creek, Pa., investigation-_________----__--                                  371
Neskowin Creek, Oreg., investigation__ ------------------                          _ _1795
Nestucca River, Oreg., investigation-_                      ---------------           _ _1795
Neuse River, N. C.:
    Investigation_____ __________________________                                507, 509
    Navigation ----------------------                            --------              478
Neversink Creek and River, N. Y., investigation                                        371----
                                                                                       371
New Albany, Ind. flood control___________ __________                                          1196,   1212
Newark Bay, N. J.:
    Investigation-------------------------- ---------                                  276
    Navigation---------------                      ---------------------               240
Newark, Ohio, flood control__________
                                    -______________-_____                                     1273,   1277
New Bedford Harbor, Mass., navigation                ---------------                    79
Newbegun Creek, N. C., navigation___________          -506
New Bern, N. C., navigation_                                                           481
New Boston, Ohio, flood control_-----------------_ _---                                       1227,   1235
New Brunswick Harbor, N. J., navigation-______ ____                                    256
New Buffalo Harbor, Mich., navigation_------_                          -----              _           1464
Newburyport Harbor, Mass., navigation                            ___                     35
New Castle, Del., ice harbor at -------------------                           _        367
New Creek, N. Y., investigation__                                                      281
New Cumberland, W. Va., flood control--------------------                                             1320
New Harbor, Maine, navigation_                                                           58
New Haven, Conn., breakwaters_ -----------------                              _        114
New Haven Harbor, Conn., navigation---------------_                                    111
New Jersey and New York Channels, improvement _ __                                     243
New Jersey Intracoastal Waterway, navigation_                                          268
New Jersey-Staten Island Channels, N. Y. and N. J., im-
provement_---------------------------------------                                     197
New Kensington, Pa., flood control----------------                                                    1320
New London Harbor, Conn., navigation____________                                       101
New Martinsville, W. Va., flood control_ _-----------------_ _-_                                      1277
New Orleans, La.:
    Engineering district ------------------------------                                706
    Improvement of Intracoastal Waterway to Corpus
      Christi, Tex ----------------------------------                                  752
    Improvement of Intracoastal Waterway to Mobile
      Bay, Ala----------------                  --------------------                   638
    Improvement of Mississippi River to Baton Rouge,
      La------------------------------------------                                     716
Newport, Ark., flood control_                      --
                                             ______-_____________                      966
Newport Bay Harbor, Calif.:
    Investigation_                                                                                    1597
    Navigation _                                      --------------------------                      1587
Newport Harbor, R. I., navigation--------------------                                    86
Newport, Ky., flood control_______________----------------- 1232,                                     1235
Newport News Creek, Va., investigation ---------------                                 461
Newport News, Va., improvement of channels to-.... _                                   424
Newport River, N. C., improvement of waterway be-
tween Beaufort and New River_ -------   ---                                        490-
X INI                                   INDEX


                                                                            Page

                                                                 Volume 1          Volume 2


New Richmond, Ohio, flood control.-._._.__.._.._.__                                        1235
New River, N. C., improvement of waterway to Swans-
  boro and Beaufort.                                                   490
New River, Va. and W. Va., flood control                                                   1259
New Rochelle Harbor, N. Y., navigation-                                274
Newtown Creek, N. Y., navigation                                       209
New York and New Jersey Channels, navigation                           243
New York Bay and Harbor, N. Y.:
    Ambrose Channel, navigation_                                       197
    Anchorage Channel, navigation__                                    197
    Arthur Kill, navigation_____                                       243
    Bay Ridge Channel, navigation__                                    201
    Bayside Channel, navigation_          _                            197
    Bronx River navigation_       _        ___                         174
    Buttermilk Channel, navigation-                                    203
    Coney Island Channel, navigation-                                  274
    Coney Island Creek, navigation-                                    274
    Craven Shoal, removal of-                                          197
    Delaware River, waterway to, investigation          - -            276
    Drift, collection and removal            .   _ _                   217
    East Chester Creek, navigation-----                                170
    East River, improvement, including Coenties Reef__                 206
    Flushing Bay, navigation_                                          178
    Gedney Channel, navigation_            __._.   _                   197
    Gowanus Creek Channel, navigation_                                 274
    Great Kills, Staten Island, navigation-                            252
    Harlem River, navigation       ______                              212
    Hell Gate, East River, navigation      _                          206
    Hudson River Channel, navigation_                                 214
    Hutchinson River (East Chester Creek), navigation_                170
    Kill Van Kull, navigation__                                  197, 243
    Liberty (Bedloe) Island, navigation-_                             197
    Main Ship Channel, navigation_              -                     197
    New Jersey-Staten Island Channels-                                244
    Newtown Creek, N. Y., navigation                                  209                  2007
    Oil pollution, New York Harbor-.
    Red Hook Channel, navigation__                                     201
    Shooters Island Channel, navigation--_---                          246
    Staten Island Sound, navigation-_                                  244
    Supervision, to prevent destructive or injurious
      deposits -----                                                   -2008
                                                                       165-L
New York engineering district-_-       ---          -                              -   -     -

New York State Barge Canal, N. Y.:
    Enlargement--                                                      230
     Investigation._                                                   276
New York State canals, surveys and charting of natural
  navigable waters_                                                                        2020
Nezpique Bayou, La., navigation-                                  - -- -- - -
Niagara Control Board______                                                                2026
Niagara Falls:
    Preservation of Falls and permits for water-power
      diversions-------------------------------                                            2026
                                                                                           2026
    Supervision of power companies----------------
Niagara River, N. Y.:
    Black Rock Channel and Tonawanda Harbor, navi-
      gation      ----------------------------------                                       1553
    Buffalo Harbor, navigation.------------------           --                             1547
    Control and regulation of water of, and preserva-
      tion of the Falls_-     --        _____----------------                              2026
    Investigation        ------------------------------                                    1577
     Navigation ---------------                  -----------                               1558
                                         INDEX                                       XLIX


                                                                           Page

                                                                Volume 1          Volume 2

Niagara Special International Board            -----      --                          2026
Niagara St. to Stewart and Gray Road, Los Angeles,
  Calif., flood control_  _____                                                       1598
Nicaraguan Canal, survey      .           -----------                                 2003
Nimrod Reservoir, Ark., flood control--------------                 956
Niobrara, Nebr., flood control_                                    1114
Nishnabotna River, Iowa, investigation_                            1115
Nisqually River, Wash., investigation_                                                 1838
Nissequogue River, N. Y., investigation                             276
Nolin Reservoir, Ky., flood control _                                                  1213
Nolin River, Ky.:
     Investigation__      .                                                            1216
     Navigation      _ _ _ _ __                                                        1174
Nome Harbor, Alaska, navigation_                                                       1825
Nomini Bay and Creek Va., navigation                                413
Nonconnah Creek, Tenn., flood control _                             845
Nooksack River, Wash., investigation                                                   1838
Norfolk Harbor, Va.:
     General improvement, including main channel of
       Elizabeth River and portions of southern, eastern,
       and western branches_----------------------                  418
     Improvement of channels to Newport News-            -----      424
     Improvement of Scotts Creek, Va--------------                  420
     Improvement of Thimble Shoal---------------                    423
     Improvement of waterways to Beaufort Inlet -- .                452
     Improvement of waterway to sounds of North
       Carolina__--------------------------------                    448
Norfolk, Va., engineering district____----------------               417
Norfork Reservoir, Ark., flood control--------------            961, 964
Normal, Ky., flood control         __-----------------------                           1235
North Adams, IHoosic River Basin, Mass., flood control__             278
North Alexander, Ill., flood control-    ------------               1003
Northampton, Mass., flood control-----------------              136, 162
North Andover, Merrimack River Basin, Mass., flood
  control_      -                  __                                 62
North Canadian River, N. Mex., Tex., and Okla.:
    Flood control                                                   970
    Investigation_                                                  991
North Canal, Tex. See Buffalo Bayou, Tex-                           913
North Carolina sounds, improvement of waterway to
Norfolk, Va       __             _________------                   448
North Concho River, Tex., flood control---------                    922
Northeast River, Md., navigation_ ------------------
                                                  _ __              388
Northeast River, N. C., navigation____----------                    506
Northern and northwestern lakes __----------------                                    2020
North Fork, American River, Calif., construction of
reservoir_------------------------------------                                        1880
North Hartland Reservoir, Connecticut River Basin,
Vt., flood control_____              __ ___---------------         135
North Little Rock, Ark., flood control-__                           952
North Little Rock to Gillett, Ark. (above Plum Bayou),
flood control_                 _                                   966
North Little Rock to Gillett, Ark. (below Plum Bayou),
flood control_--                                                    848
North New River Canal,:Fla., investigation_                     625, 628
North Plymouth Harbor, Mass., navigation-
North Portland Harbor, Oreg., improvement_-
                                                        - -           58
                                                                                       1754



North River, Mass., investigation-_-                                  61
North Springfield Reservoir, Connecticut River Basin,
  Vt., flood control-----------------------------                    135

Norwalk Harbor, Conn., navigation_                     _ __ _        124
L                                                INDEX


                                                                                       Page

                                                                            Volume 1          Volume 2

Norwich Harbor, Conn., improvement of Thames River.                           102
Novato Creek, Calif., investigation_ .                --------- ______         -___                1652
Noxubee River, Ala. and Miss.:
    Investigation -----------------------------------                         706
    Navigation -----------------------------------                            697
                                    ---------------------------------
Noyo River, Calif., navigation_______                                                              1644
Nue es River, Tex., investigation_              ---- ________--_              926
No. 2, Barren Reservoir, Ky., flood control--                   __-----------    .-----            1213
No. 2, Green Reservoir, Ky., flood control -----------------------                                 1213


Oak Bay to Port Townsend Bay, Wash., waterway im-
  provement--------------------------------------                                      ----         1808
Oak Creek, Md., improvement of channel to Plain Deal-
  ing Creek ----------------------------------------                                   388
Oakford, Ill., flood control_ __________---____-                                 -____________ 1475
Oakland Harbor, Calif.:
    Investigation____________________                   - __             ----------
                                                                     _________                      1650
    Navigation ----------------------------------------------                                       1629
Obed River, Tenn., investigation . _                              -______________--     --
                                                                                     _____          1173
Obey River, Tenn., navigation _----                       _____-                 _____              1158
Obion River, Tenn.:
     Navigation -----------------------------------------------                                     1158
    Snagging, flood control_________                   _____________
                                                               --                 -850
Occohannock Creek, Va.:
     Investigation -----------------------------------                                 461
     Navigation ------------------------------------                                   445
Occoquan Creek, Va., navigation --- __                     _____-           -__-       405
Ocean City Harbor and Inlet, Md., navigation---------                                  384
Ochlockonee River, Ga. and Fla., navigation -                                      _ __697_
Ocmulgee River, Ga., navigation                                     -_______
                                                                   __--            - 552
                                                                                       5----      .
Oconee River, Ga., navigation______----__________                        ___           552
Oconto Harbor, Wis.:
     Investigation _-------------------------------_ __-----_                                       1430
     Navigation ----------------------------------------------                                      1353
Ogdensburg Harbor, N. Y.:
     Investigation -------------------                   --------------------------                 1577
     Navigation ----------------------------------------------                                      1572
Ogeechee River, Ga., investigation-____________-                             _         565
Ohio River:
     Flood control in basin:
          Cincinnati district -----------------------------------                                   1234
          Huntington district_                                                              -       1276
          Louisville district_-_                                                                    1211
          Nashville district______--              ------        -----------                         1168
          Pittsburgh district ___________--------------1319
     General improvement (open-channel work)                                                        1135
     Investigation_                                                                           1182, 1216
                                                                                              1223, 1238
                                                                                              1253, 1324
     Locks and dams, construction______________________________                                     1127
Okeechobee Lake drainage areas:
     Improvement----------------------------------                                     598----------
     Investigation ---------------------------------                             624, 627
Oklawaha River, Fla.:
     Improvement of ship canal across Florida, via -...                                622
      Navigation_              -          -------------                         -576
Olcott Harbor, N. Y., improvement                                                                  1560
Oldmans Creek, N. J., navigation--_ -                         --------             367
Old River, Calif., navigation. ------                     -                                        1671
                                                INDEX                                      11




                                                                           Page

                                                                Volume 1            Volume 2


Old River, Fla. and Ala., improvement of intracoastal
  waterway, via_------------------------------- -                        636
Old River (present mouth of Red River), La., removing
  snags and wrecks_---______________-________                    807, 842
Old Town Creek, Miss., navigation.       -                            697
Olympia Harbor, Wash., navigation.                                                       1809
Omaha, Nebr., engineering district_                                 1096
Onancock River, Va., navigation_ _ _ _ _                             443
Onondaga Creek, N. Y., flood control. -  .                           282
Onset Bay, Cape Cod Canal, Mass., improvement. _                      53
Ontario Lake:
    Improvement of St. Lawrence River to Ogdensburg,
      N. Y--                                                                             1575
    Surveys, charts, etc__________________________                                       2021
    Water levels. . .                                                                    2022
Ontonagon Harbor, Mich., :na ig tion_ _
Oologah Reservoir, Okla.:
    Flood control. - - -                                                 987
    Investigation_------_------_----                                     991
Oostenaula River, Ga., navigation _                                      697
Optima Reservoir, Okla., flood control_ ..                               990
Orange Creek, Fla., snagging, flood control                              626
Orange River, Fla., navigation- -                                        622
Oregon Slough, Oreg., navigation                                                         1754
Osage River, Kans. and Mo.:
    Investigation       _______________                             1096
    Navigation_ - ---       -----                                   1080
Osceola Reservoir, Mo., flood control__                             1093
Oswgo Canal, N. Y., enlargement.___________________                  230
Oswego Harbor and River, N. Y., navigation_                                              1568
Oswego River Basin, N. Y., flood control_                                282
Ottawa River, Ohio, investigation. . .
Otter Creek, N. C., investigation -
                                                           -.                            1514
                                                                 507, 509
Otter Creek, Vt.:
"   Investigation                            --       -          276, 281
    Navigation    --                                                     275
Otter River, Mich., investigation_ _
Ouachita River and river system, Arkansas and Louisi-
  ana:
    IhvestigaYins          -            . _                      811; 830
    Navigation                 _-             _ _-------                 794
Outstanding investigations for navigation, flood control,
  etc--------------------                                                                1841
Owasco Inlet, N. Y., investigation_                                      321
Owasco Lake, Oswego River Basin, N. Y., flood control.                   283
Owensboro, Ky., flood control          ____                                              1212
Owens Creek, Calif., investigation                                                       1680
Owensmouth Ave. to Niagara St., and Stewart and Gray
   Rd. to Pacific Ocean, Los Angeles, Calif., flood control_                             1598
Owls Head Harbor, Maine, navigation _ _ _ __ _ _                          58
Qxf rd, N.      ., fi4g contr-       ---                                 292
'yster      :a4a. ; inprovement of intracoastal waterway
           :ay,
   via_-_               - -- ----    -                                   636
Oyster Creek, Tex., navigation__________                                 910
Oyster Creek Channel, N. J., navigation                                  364
Ozan Creek, Ark., flood control-___- -       -_____                      813
                                    P
Pacoima Wash Channel, Los Angeles, Calif., flood control                                 1598
                                                                                         1----------
Paducah, Ky., flood control_----
                             ..  _ __.....  --..
                                              _   _ _.          -1205,         I.        1212
LII                                           INDEX


                                                                                       Page

                                                                           Volume 1           Volume 2


Pagan River, Va., improvement ----------------------                     : 434
Pahokee, Fla., investigation_____-------------------                       624
Paint Creek Reservoir, Ohio, flood control------------ ----------                                     1235
Painted Post, N. Y., flood control           -------------                 294
Paint Rock River, Ala., investigation_ -------------             ---------                            1173
Pajaro River, Calif., investigation_1______--_---     -      - ___--1652
Palarm Creek, Ark., investigation-------------968
Palm Beach, Fla., navigation          ---------------                590, 622
                                                                               ----           __
                                                                                                      795
                                                                                                          -
                                                                                                     1---------------------
Palouse River, Idaho, investigation
Pamlico River, N. C., navigation_-----------------                         473
Pamlico Sound, N. C.:
    Improvement of waterway to Beaufort Harbor_                            486
    Improvement of waterway to Beaufort Inlet                              453
    Improvement of waterway to Norfolk, Va                                 448
    Investigation__ -----------------------------                          507
Pamunkey River, Va.:
    Investigation---_ ----------------              ----------       461, 463             ___
    Navigation-----         ---------         -----------------            440
Pantego Creek, N. C., navigation__---------------                          470
Panther Creek, Ill., flood control ------------------ ------                                          1----475
Paonia, Colo., investigation------------------------------------                                  1583
Parish Creek, Md., navigation-------------------------                           389
Parkersburg, W. Va., flood control__--------             ------------------               1275, 1277
Park River, N. Dak., investigation__                                            1----------------
                                                                               1073
Parnassus, Pa., flood control                ----------------------------                         1320
Pascagoula Harbor and River, M~ss.:
    Improvement of harbor_____---------------- ---                           -686
    Improvement of river_ ______-------------                       -----        697
    Investigation--_        -----------------------------                   699, 705
Pasquotank River, N. C., waterway from Norfolk to
  Sounds of North Carolina:
    Investigation_--- -----------------------------                              461
    Navigation ---------------------------------                                 449
Passaic River, N. J.:
    Investigation_    ----------------------------                               281
    Navigation------------------------                                           240
Passamaquoddy tidal-power project, Maine------------                               58
Pass Cavallo, Tex.:
     Channel to Port Lavaca, navigation-----------                               897
     Investigation_------------------------------                                912
Pass Manchac, La., navigation______-----------------                             729
Patapsco River, Md., Baltimore Harbor and Channels,
  navigation_---------------------------------------                             372
Patoka River, Ind., investigation____     -----------------                                          1216
Patriot, Ind., flood control_-------------------------------                          -              1235
Patuxent River, Md., navigation _ _                                              413
Pawcatuck River, R. I. and Conn., navigation97                                            ----------
Pawtucket (Seekonk) River, R. I., navigation __ _ _                               90-              ---
Pawtuxet River Basin, flood control- ---------                                   165
Payette River, Idaho, investigation_______             -------------- __1795     -
Paynes Creek, Calif., investigation--------------------               -----_ _     1680
Peace Creek, Fla., navigation_------------------------                  607
Peach Orchard Bluff, Ark., improvement of White River_                  943----------
Pearl River, Miss. and La.:
    Flood control------_ -----------------------                        705
      Investigation-_         --------             ------------ -          699, 706 ---------
      East Pearl River, navigation ___--              ----------                 697
      West Pearl River, navigation -----------------                             694--             ----
Pease River, Tex., investigation_-----------------                             934
Pecan Bayou, Tex., flood control_------------                                - 921--
Pecan Island to White Lake, La., waterway ---                                  766.........
                                        INDEX                                     III


                                                                     Page

                                                           Volume1          Volume 2


Pecatonica River, Ill., flood control                          1051
Peconic River, N. Y., navigation_                               187
Pecos River, Tex. and N. Mex.:
    Flood control_                                              926
    Investigation                                               942
Peedee, Great, River, S. C.:
    Investigation         ----        -----     ---             539
     Navigation __                                              515
Peekskill Harbor, N. Y., navigation                             219
Pekin and La Marsh drainage and levee district, Ill.,
  flood control-           _-      - .     __                                    1475
Pembina River, N. Dak., investigation_-----                   1073
Pendleton, Umatilla River, Oreg., flood control_                                 1793
Peninsula drainage district No. 1, Multnomah County,
  Oreg., flood control_                  _                                       1766
Peninsula drainage district No. 2, Multnomah County,
  Oreg., flood control_                                                          1767
Penny Slough, Rock River, Ill., flood control-........        1051
Penobscot River, Maine, navigation_                             23
Pensacola Bay and Harbor, Fla.:
     Improvement of harbor_                                     660
     Improvement of Intracoastal Waterway from bay
       to Mobile Bay, Ala_                                      636
     Improvement of waterway to Choctawhatchee Bay,
       Fla _                                                    634
     Investigation _      _____                                 699
Pensacola Reservoir, Okla., flood control                  980, 987
Pensaukee Harbor, Wis., navigation                                               1355
Pentwater Harbor, Mich., navigation _                                            1413
Pepperells Cove, Maine, navigation _                             58
Pequert River, N. J., investigation                             371
Pere Marquette Lake, Ludington Harbor, Mich., im-
  provement_                                                                     1415

Permanent International Association of Congresses of
  Navigation _                                                                   2002
Permits (miscellaneous civil works)-                   _                         2006
Perquimans River, N. C., navigation     _                      506
Perry County, Mo., flood control_                             1017
Peru levees, Ind., flood control_                                                1215
Petaluma Creek, Calif.:
     Investigation-_____                                                         1652
     Navigation_                _                                                1639
Petersburg, Va.:
     Improvement of Appomattox River_                           432
     Investigation of Appomattox River                          461
Petit Anse Bayou, La.:
     Investigation ...  .......                                 781
     Navigation                                                 762
Petit Jean River, Ark., investigation                           968
Petoskey Harbor, Mich.:
     Investigation____                                                           1430
     Navigation                     --                                           1429
Philadelphia, Pa., engineering district                         322
Phoebus, Va., improvement of channel to Hampton
  Roads_____                                                    460
Picket Wire River, Colo., investigation_                        942
Piedmont Reservoir, Ohio, flood control_                                         1255
Pierre Bayou, La.:
     Flood control                                              817
     Investigation__                    _                       831
     Navigation                                                 810
LIV                                          INDEX


                                                                                      Page


                                                                           Volume 1          Volume 2


Pierre Bayou, Miss., navigation _--------------                         _        779
Pigeon (Little) and French Broad Rivers, Tenn., im-
               -------------------------------------------------
  provement_____                                                                                  1158
Pigeon Bayous, La., improvement ---------------------                            779
Pilot Rock, Birch Creek, Oreg., flood control---------------------                                1794
Pine Bluff, Ark., improvement of Arkansas River at--                        833, 952
Pine Creek, Calif., snagging, flood control_ __ _ __ _ __ _                                       1677
Pine River Reservoir, Minn___ ___                      ______________           1052
Pine River, St. Clair City, Mich., navigation---------------------                                1511
Pineville, Ky., flood controL_______-__                    _____ _____--_______                   1172
Pineville, Red River, La., flood control_                                        822
Pirates Cove Channel, Fla., investigation--------------                          624
Piscataway Creek, Md., navigation_ _ _ _ _ _                                     403
Pittsburgh Harbor, Pa., navigation _ _ _                                                          1295
Pittsburgh, Pa., engineering district __ _ _ __                  _ __ _-                          1281
Pittsburgh, Pa., flood control-------------------- ---                    - ---                   1320
Plain Dealing Creek, Md., improvement of channel to
   Oak Creek-------------------------- ------- ---                               388
Plaquemine Bayou, La., improvement of Intracoastal
   Waterway, via -----------------------------------                              753
Plaquemine Brule Bayou, La., navigation_--------------                           770
Platte River, Colo., Nebr., and Wyo., investigation ....                        1115
Platte River near Schuyler, Nebr., flood control
Plattsburg Harbor, N. Y., navigation
                                                           --------
                                              ------------------
                                                                                1114 -
                                                                                 275
Playa del Rey Inlet Harbor and Basin, Venice, Calif.,
   investigation -----------------------------------------------                                  1597
Pleasant Hill Reservoir, Ohio, flood control_ ---                   -_          .----- -          1255
Pleasant River, Maine, navigation-_                      ______- ____--            58
Pleasantville to Atlantic City, N. J., waterway investi-
   gation.------------------------------------------                              368
Plum Island Basin, Newburyport Harbor, Mass                                        35
Plum River, Ill., investigation_______________________                          1051
Plymouth Harbor, Mass., navigation_______--                       ----- _          51
Plymouth, Pa., flood control_ ------                                -          317
Poca Reservoir, W. Va., flood control-----                              ---------                 1278
Pocomoke River, Md., navigation-----------------_                            389
Poe Reef Shoal, Straits of Mackinac, Mich., improve-
  ment-----------------------------------------------------                                  1511
Point Judith Pond, R. I., navigation_--------------                          132
Point Judith, R. I., harbor of refuge, navigation                              92-----
                                                                               92
Point Lookout Harbor, Mich., investigation-.                         --       ----
                                                                           .------     --- -_1512
Point Pleasant, W. Va., flood control__ ___------------__                          -___      1277
Point Remove Creek, Ark., investigation           --------------            968
Pokegama Reservoir, Minn _ _                 ---------------------         1052
Polecat Creek, Okla., investigation --------------------                     991
Pollock Rip Channel, Mass., navigation----------                               71 -
Pollution of navigable waters, New York Harbor-----------------                             2008
Polson Bay, Flathead Lake, Mont., navigation_ _----------                                    1823
Pomeroy, Ohio, flood control _-_-_- _                                  -
                                                                   -------       _           1277
Pomme de Terre Reservoir, Mo., flood control----------                     1093
Ponce de Leon Inlet, Fla., investigation ---------------                    625
Ponchatoula River, La ______________-------------_                          730----------
Pontchartrain Lake, La.:
     Investigation_-----------------------------------                      788
     Navigation -------------------------------------                       638
Pontiac Diversion, Pawtuxet River Basin, R. I., flood
  control ------------------------------------------                         165
Poplar Bluff, Mo., to Knobel, Ark., flood control                            966
Poquonock River, Conn., navigation                                           119
Portage Lake harbor of refuge, Mich., navigation- --                    ------------ -            1420
                                                             INDEX                                                 LV


                                                                                                     Page


                                                                                          Volume 1          Volume 2


Portage River, Ohio:
     Investigation__ ---------------------------------------------                                               1514
     Navigation _           -------------------------------------------                                          1508
Port Angeles Harbor, Wash., investigation__-
Port Aransas, Tex., navigation____-____________
                                                                  _---                -----------
                                                                                            _
                                                                                          899
                                                                                                                 1824
Port Arthur Canal, Tex., navigation ---------------                         _             853
Port Bolivar, Tex., improvement of channel to ----------                                  878
Port Chester Harbor, N. Y., navigation ----------------                                   166
Port Clinton Harbor, Ohio, navigation------_                     ----------------            _    -              1508
Port Everglades, Fla.:
     Investigation___-                                                                    624
     Navigation ------------------------------------                                      593
Port Gamble Harbor, Wash., improvement_                       ---- __            --------- _                     1823
Port Henry Harbor, N. Y., navigation____--__                             -____            275
Port Huron, Mich., improvement of Black River at---                                   ------------               1499
Port Jefferson Harbor, N. Y., navigation ---------------                                  274
Portland and Louisville Canal, Ky., enlargement ------------------                                               1128
Portland Harbor, Maine:
     Investigation--- ---         ----           ---------------------                      61        .
     Navigation- ---------------                    --------------                      -28
Portland Harbor, N. Y., navigation____ --- _____---- ____--__-___                                                1575
Portland, Oreg., engineering district ___________-____----__-_____                                               1681
Port Lavaca, Tex., channel to Pass Cavallo, navigation__                                  897
Port Ontario Harbor, N. Y., navigation----- -----------------                                _                   1575
Port Orchard Bay, Wash., navigation ---------------------------                                                  1823
Port Orford, Oreg., investigation ---------------------                                                          1755
Portsmouth Harbor, N. H., navigation________                            ____                58
Portsmouth Harbor, Va., channel to Nansemond Ord-
  nance Depot, navigation____________--                  ______     -       _             437
Portsmouth, Ohio, flood control ------------------------------                                    1227,          1235
Port Townsend Bay to Oak Bay, Wash., waterway im-
  provement__     -------------------                                                                            1808
Port Washington Harbor, Wis., navigation_------_                      -------------           _                  1384
Port Wing Harbor, Wis., navigation_                                             __----       _ --                1345
Poteau River, Ark. and Okla., investigation                      ------------             991
Potomac River:
     Flood control _ _ _ _-__ _        __ _                                               414
     Improvement at Alexandria, Va                                                        400
     Improvement at Lower Cedar Point, Md_--                                              413
     Improvement at Mount Vernon, Va                           ___                        404
     Improvement at Washington, D. C _                                                    394
     Improvement below Washington, D. C                           _                400, 402       ___
     Investigation__  -----------------------------------                                 417
     North side of Washington Channel, D. C                              _                397
Potowomut River, R. I., navigation---------------                                         132
Powder River, Oreg., investigation__                                                                             1795
Powder River, Wyo., investigation-------------------_                         -          1115
Power Companies at Niagara Falls, N. Y., supervision of_
Power, surveys for             ..                ---   ---       ------------------
                                                                                        ----                     2026
                                                                                                                 1841
Power, water. See Water power.
Prado Dam, Calif., flood control_-         -      --                                                             1611
Prattville, Autauga Creek, Ala., flood control_                     701
Prescott Area, Columbia County, Oreg., flood control          - -                                                1794
Presque Isle Harbor, Marquette, Mich., navigation          _ -1338
Presque Isle Peninsula, Erie, Pa., improvement .-----.          .                                                1541
Preston drainage and levee district, Illinois, flood control_      1017
Prestonville, Ky., flood control-_______________------___               ___                                      1235
Presumpscot River, Maine, investigation__                            61      --
          49:A20-4-D.     1.    vol.   1   -75
LVI                                      INDEX


                                                                                         Page

                                                                              Volume 1          Volume 2


Private structures and operations in navigable waters,
  permits for (Miscellaneous Civil Works)                 -          --                              2006
Proctor, Otter Creek, Vt., flood control__                                         280
Proctorville, Ohio, flood control-       _ _              -                                          1277
Providence Harbor and River, R. I.:
    Improvement_                                                                    88
    Improvement of Pawtucket (Seekonk) River ......                                 90
     Investigation_____ __--_                -------                               133
Providence, R. I., engineering district -                                           70
Provincetown Harbor, Mass.:
      Investigation---------                                                        61
      Navigation        -                                                           59
Public Works program.-            -                                                  9
Pudding River, Oreg., flood control       --   -   --                                                1794
Puerto Rico:
     Engineering district     -                                                                      1839
Puget Sound, Wash.:
     Improvement of, and tributaries        -                                                        1806
     Improvement of Lake Washington Canal       _                                                    1807
Pultneyville Harbor, N. Y., navigation        -                                                      1575
Pungo River, N. C., improvement of waterway from
  Norfolk to Beaufort Inlet, N. C_                                                 453
Pungo River, N. C., improvement of Bellhaven Harbor__                              470
Punxsutawney, Pa., flood control                                                                     1320
Purdy Reservoir, Okla., investigation                                              934
Purgatoire River, Colo., investigation    -                                        942
Purification of water supply at Washington, D. C_                                                    2014
Putah Creek, Calif.:
     Investigation                      -----------                                                  1681
     Snagging, flood control_                                                                        1677
Put in Bay Harbor, Ohio, navigation                                                                  1511
Puyallup River, Wash., improvement of Tacoma Harbor_                                                 1810

                                 Q
Quantico Creek, Va., navigation_          __-                                      403
Quartz Creek Reservoir, Oreg., flood control_                                                        1783
Queen Creek, Ariz., investigation .. _ ........- -
Queenstown Harbor, Md., navigation -
                                                        -                          388
                                                                                                     1622

Queue de Tortue Bayou, La.:
     Investigatio n _.._ . ------- --------------------                       781, 788
     Navigation-_                                                                  779
Quillayute River, Wash.:
     Investigation_                                                                                  1838
     Navigation                                                                                      1803
Quinnipiac River, New Haven, Conn., navigation                -...                 111
Quiver River, Miss., snagging, flood control _                                     827
                                 R
Raccoon Creek, N. J., navigation------------------                                 356
Racine Harbor, Wis.:
      Investigation ----    --       -                                                               1430
    Navigation____        _-------------                                                             1390
Racine, Ohio, flood control------------------------                                                  1277
Rahway River, N. J., navigation_                                                   275
Rainier drainage district, Columbia County, Oreg., flood
  control _ _      --                                                                                 1771
Rainy River, Minn., investigation                                                               1346, 1347
Raisin River, Mich., improvement of Monroe Harbor_                        -                           1504
Rancocas Creek, N. J., flood control                                               369
                                                    INDEX                                                            LVII


                                                                                                        Page


                                                                                           Volume 1            Volume 2


Rancocas River, N. J., navigation -----------                    - -           352
Rapid Creek, S. Dak., investigation------------------- 1.115
Rapides Bayou, La., investigation __-______________                      781, 788---            _-_-
Rappahannock River, Va.:
    Investigation--------------------_                   ------ -------        417
    Navigation-_ ----------------------------------                            409
Raritan Bay and River, N. J.:
    Improvement of channel to Arthur Kill__                   -,               249
    Improvement of bay_        ------------------------------                  244
    Improvement of river- --------------------------                           255
    Investigation _           -----             ------------------             276
Red Bank Creek, Calif., flood control-_                                 _---------------------_-_1675
Red Bank Reservoir, Pa., flood control_                                                          1320
Red Hook Channel, New York Harbor, N. Y., naviga-
  tion     wFult-______--__---                                                                     201
Red Lake and Red Lake River, Minn., navigation...     1062
Red Lake River, Minn., investigation-- - -   --   -1073
Redondo Beach Harbor, Calif., investigation------                                                                    1597
Red River, La., Ark., Tex., and Okla.:
    Below Fulton, Ark-------------_                     789
     Cypress Bayou and lakes to Jefferson, Tex., im-
         provement-               -- -
                                 _..-    ---                                         791
     Fulton Ark., to mouth of Washita River, Okla                          ----      928
                                                                               781, 788,
                                                                             nvestigations                )
     Investigations --                                 ----                          1-812, 831 ,              - -
                                                                                           928, 934
    Jefferson-Shreveport waterway improvement .-                                                791..
                                                                                                791
Red River of the North Drainage Basin, Minn., S. Dak.,
  and N. Dak., investigation                              __     1073
Red River of the North, Minn. and N. Dak., navigation__          1062
Red River Parish, La., flood control__                              829
Red River, Tenn., navigation_________________________________                                                        1158
Redstone Creek, Pa., investigation-_           --------- _   _ _ --                                                  1324
Redwood Creek, Calif.:
    Investigation-----------------------------------           --------                                              1650
    Navigation -------------------------------
                              _                                                                                      1627
Reeds Creek, Ill., investigation                                 1018
Reedy River, S. C., investigation___________________ _              540
Regulations and rules for anchorage grounds, danger
  zones, fishing, navigation, opening of drawbridges,
  and restricted areas _                                          --             -   _--      -                -_    2006
Regulation of hydraulic mining and preparation of plans__                                                            1874
Rehoboth Bay, Del., waterway to Delaware Bay:
    Improvement                                                                                    347
    Investigation-                                                                                 368
Republican River, Kans., Colo., and Nebr., investigation_                                         1096
Reservoirs, Washington Aqueduct, D. C__--                              -------                      _ _              2014
Rescue work and emergency repairs, flood contro -.                                                   77.-..
Richland Reservoir, Mo., flood control_-  ------ _ ____                                           1093
Richmond Harbor, Calif.:
    Investigation-- -------------------------------                                   ---------                      1650
    Navigation ----------      ----------------------------------                                                    1633
Richmond Harbor, Maine, navigation_________________                                                58
Richmond Harbor, Va., improvement of James River__                                                461
Richmonds Island Harbor, Maine, navigation __ _
Ridgeley, W. Va., flood control---_ -417
                                                                            _                       58
Rio Grande, Colo. and N. Mex., investigation_              942
                                -------------------------------
Rio Hondo, Calif., flood control__________                                                                           1598
Rio Hondo Channel: Santa Fe Ry. to Whittier Nar-
  rows flood-control basin--               -------------------.                      .. ---         --...-.          1598
LVIII                                    INDEX


                                                                               Page


                                                                    Volume 1          Volume 2


Ripley, Ohio, flood control _                                                              1235
Rising Sun, Ind., flood control        __                                                  1235
Riverdale, Connecticut River Basin, Mass., flood control-           136, 165
Riverland levee district, Missouri, flood control-                     1017
Rivers and harbors:
     Abandonment and curtailment of projects-                                              2005
     Advanced funds for improvement of_                                   15
     Appropriations for operations                                        13
     Board of engineers for__            _                                20
     Bridges, construction____                                                             2006
     Bridges, regulations for opening of draws-                                            2006
     Contributed funds for improvement of_                                13
     Cost and financial summary (consolidated) ....                       18
     Estimate of appropriations for_                                      20
     Expenditures during the past year-_ _                                15
     Harbor lines, establishment_           _____         __                               2006
     Public Works Program__._                                ____          9
     Regulations for establishment of anchorage grounds_                                   2006
     Regulations for opening of drawbridges__                                              2006
     Structures other than bridges, permits for erection_                                  2006
Riverview, W. Va., flood control---_     -                                                 1277
Roanoke River, N. C. and Va.:
     Investigation__ __              .          . ........              463
     Navigation _                 -                                     467
Rochester (Charlotte) Harbor, N. Y., navigation                                            1562
Rochester Reservoir, Iowa, flood control_                              1049
Rock Creek, Fla., investigation___                                      627
Rock Creek, Mont., investigation                                       1126
Rockhall Harbor, Md., navigation          _                             388
Rock Harbor, Mass., investigation__                                      61
Rockhold Creek, Md.:
     Investigation                                                      390
     Navigation                                                         389
Rock Island, Ill., engineering district-                               1035
Rockland Harbor, Maine, navigation__                                     58
Rockport Harbor, Maine, navigation________________                       58
Rockport Harbor, Mass., navigation--                                     58
Rockport, Ind., flood control_           _                                                1212
Rock River, Ill. and Wis.:
     Flood control_                                                    1051
     Investigation                                                     1051-----------
Rocky Ford drainage and levee district, Ill., flood con-
  trol_---------                                                                          1475
Rocky Fork Reservoir, Ohio, flood control                                                 1235
Rocky River, N. C., investigation_                                      540
Rocky River Harbor, Ohio, navigation-                                                   1525
Rogers City Harbor, Mich., navigation_                                                  1511
Rogue River, Oreg., investigation__                                               1755, 1795
Rollinson Channel, N. C., navigation_                                   476
Rome, Ga., flood control_______________                                 705
Rondeway Bayou, La., navigation ___ -                                   810
Rondout Harbor, N. Y., navigation                                       221
Root River, Minn., investigation _       -                             1073
Root River, Wis., improvement of Racine Harbor_ -                                         1391
Roseau River, Minn., investigation_                                    1073
Roseville, Ohio, flood control________________________                                    1277
Rossview Reservoir, Tenn. and Ky., flood control__                                        1169
Rossville, Ga., flood control___________                                                  1170
Rouge River, Mich., navigation_                                                           1501
Rough Reservoir, Ky., flood control_                                                      1213
                                                  INDEX                                                   LIX


                                                                                         Page

                                                                             Volume 1           Volume 2


Rough River, Ky.:
    Investigation--------------------------------------------                                  1216
    Navigation ------------------------------------                               ---------    1179
Round Island, Mich., to Mackinac Island, Mich., channel
  improvement                            _------------------------------     ----------        1511
Rouses Point, Lake Champlain, N. Y.:
    Investigation-------------_     ----------------------                          276----------
    Navigation--- ----------------------------                           ---        275----------
Royal River, Maine, navigation -----------------------                               58-    ---
Rubio Canyon diversion, Los Angeles, Calif., flood con-
trol --------------------------------------           ------------                                   1598
Rules and regulations. See Regulations and rules.
Russell and Allison levee unit, Ill., flood control------------------                                 1212
Russell, Ky., flood control_________ ______________            ____---                                1235
Russian River, Calif., investigation _ _ _ _ _                                                        1652
Ruth Canal (diversion canal), La__-            _____-___        746, 785                        ----------
Rutland, Otter Creek, Vt., flood control                ---------------
                                                                     277                          -



Sabine-Neches Waterway, Tex.:
    Investigation_  -_-___---                                                 912, 926 --------
     Navigation____ __            -       -_______-_______
                                                      _______-853-                                    ----
Sabine River, La. and Tex.:
     Improvement of intracoastal waterway to Corpus
       Christi, Tex _                                                              8----------------------------------
                                                                                    59
     Improvement of intracoastal waterway to New
        Orleans, La _____                ------------                              752                -
     Improvement of Sabine-Neches Canal-                        __ ---             853
     Improvement of Sabine Pass Harbor _ __ _                                      854                    -
     Investigation_ -----------------------------------                            912          -
Sackets Harbor, N. Y.:
     Investigation       --------------------------
                          _                                                                  1577
     Navigation__                                                                            1575
Saco, Mont., flood control_-__-_____                                     -______ 1126----------
Saco River, Maine:
     Investigation -----------------------------------                             -70           --
     Navigation                                                                     31
Sacramento, Calif., engineering district---------------                                               1652
Sacramento River, Calif.:
     Debris control__   --------------------------              -------                                67-98
     Emergency repairs, flood control                                                                 1678
     Flood control_--------------------------------                           7
     Hydraulic mining                                                                                 1874
     Investigation-----------------------------------------_                     1680,                1681
     Navigation_-------------------------------------                   -------                       1660
     Removal of debris by California Debris Commission                    -----------                 1877
     Reservoirs ------------------------------------------------                                      1880
     Snagging, flood control------------------------------------                                      1676
Sag Harbor, N. Y., navigation_----------                      _             274            ----------
Saginaw Bay and River, Mich.:
                            __                 __
     Investigation_-----------------------------------       _1514       -------
     Navigation_ ________ _                       -__-------                                          1496
St. Albans Harbor, Lake Champlain, Vt., navigation -.                    -  275
St. Andrews Bay, Fla.:
     Improvement of channel to Apalachicola River -.                        630
     Navigation_ ________6_________                          ____            54
St. Anthony Falls, Minn., improvement of Mississippi
   River from Missouri River to Minneapolis00--                    ___     1020
LX                                             ITNDEX


                                                                                              Page


                                                                                 Volume 1            Volume 2


St. Augustine Harbor and Inlet, Fla.:
     Investigation_-----------------------------------            625
                                        __
     Navigation ------------------------------------           -- 584
St. Clair Flats Canal, Lake, and River, Mich.:
     Gages---------------------------------------------------_                                               2020
     Improvement of channels in Lake St. Clair                  ------------------                           1488
     Improvement of St. Clair River -----------------------------                                            1485
     Investigation_ _ _ _ _ _ _ _ _ _ _                         _                 _ __                       1512
St. Croix River, Maine, navigation       _               _            58
St. Croix River, Maine and New Brunswick, operations
   of International Board of Control______                         --
                                                      -_______---- _____                                     2024
St. Croix River, Wis. and Minn.:
                    -----------------------------------
      Investigation__________________                              1064
     Navigation_____ _ _-                                                              1057
St. Denis Bayou, La., improvement_________________                                      735
St. Francis River, Ark.:
     Investigation -----------------------------------                                  852
     Navigation ------------------------------------                                    837
St. Francis River, Mo., construction of Wappapello Dam_                                                      1968
St. George Sound, Fla., navigation_         -_________________                          641          -
St. Ignace Harbor, Mich., investigation_-------------------------                                            1512
St. Jeromes Creek, Md., navigation________________                                      408
St. Johns River, Fla.:
     Improvement between Jacksonville and Palatka _ _                                   622
     Improvement between Palatka and Lake Harney___                                     573
     Improvement, Jacksonville to the ocean___                _                         569
     Improvement of waterway to Beaufort, S. C                                          566
                                                                                        566...
     Jacksonville, Fla., to Miami, Fla., waterway, im-
        provement--------------------------------                                       579
     Investigations-----------_                                   564,                 625,
                                                                                        628
St. Jones River, Del., navigation_____________________                                  367
St. Joseph Harbor and River, Mich.:
     Improvement of harbor_________________________________                                            1396
     Improvement of river ______________            _________________
                                                         _____                                   1396, 1429
St. Josephs Bay, Fla., improvement of entrance -.....                                   652
St. Lawrence River:
     Board of control to control the operation of the St.
       Lawrence River Power Co., near Massena, N. Y                               __                         2027
     Improvement between Ogdensburg, N. Y., and
        Lake Ontario __             -_    -_                                 _                               1575
     Preliminary investigations___________________                               271, 277
     Surveys and gages                                                                                       2027
St. Louis County, Mo., flood control                                --                 1017
St. Louis, Mo., engineering district                                     -              992
St. Lucie Canal, Inlet, and River, Fla.:
     Improvement of canal and river_                    -                               598
     Improvement of inlet_________________________                                      622
     Investigation_                                                              625, 628
St. Malo Bayou, La.:
     Investigation _                                                     -              780
     Navigation_     _                                                                  719
St. Maries, Idaho, flood control-_                                                                           1829
St. Marks River, Fla.:
    Improvement of waterway               to Apalachicola Bay,
       Fla--                                                -                           697
     Investigation_                                                                     699              -
     Navigation                                                                        640----------
St. Marys River and St. Marys Falls Canal, Mich., chan-
   nels and waters connecting the Great Lakes, navi-
   gation_________                ___ ___         _     I_                                                   1477
                                                             INDEX                                            LXI


                                                                                                  Page

                                                                                     Volume 1            Volume 2


St. Marys River, Ga. and Fla.:
     Investigation_          -                                                       564, 565
     Navigation-                           ---------------                                559
St. Marys, W. Va., flood control______________________                               ________                 1277
St. Paul, Minn., engineering district_                                                  1052
St. Petersburg Harbor, Fla.:
     Investigation_-----------------------------------                                      625
     Navigation-         _                    _ __-_-                                       614
St. Regis River, Mont., investigation__                                                                       1838
Ste. Genevieve, Mo., flood control ____________________                                    1017
Sakonnet Harbor and River, R. I.:
     Improvement of river ______________132
     Improvement of harbor__                                                                132
     Investigation___-----------------------                                                134
Salem Harbor, Mass., navigation_____________________                                         58
Salem River, N. J., navigation_                                                             357
Salinas River, Calif., investigation________________________                                                  1652
Saline Point, La., flood control_                                                           824
Saline River, Ark.:
     Investigation    _                                                                     831
     Navigation-----                                                                        810
Salkahatchie River, S. C., navigation__________________         538
Salmon Creek, Alaska, investigation-        -     --
                                                  __            _                                             1838
Salmon River, Alaska, flood control_________         __-- _________                                           1834
Salmon River, Idaho, investigation_                                                                           1795
Salmon River, Oreg., snagging, flood control_                 -                                               1791
Salt Creek, Ill.:
     Flood control----------------------------------------_                                ----               1475
     Investigation___ __-_                          _ -_                                                      1476
Salt Creek of Arkansas River, Okla., investigation .. _                                     992
Salt Fork of Red River, Okla., investigation
Salt Lake City, Utah, engineering district___
                                                            -        -_                     934
                                                                                                              1581
Salt River, Ky., investigation_                                                                               1216
Salt River, Mo., investigation-_                                                           1051
Salyersville, Ky., flood control_--------                                                                     1233
Samammish River, Wash., investigation-       -                                                                1838
Sampit River, S. C., improvement of Georgetown Harbor_      510
San Angelo Reservoir, Tex., flood control      _            922
San Angelo, Tex., flood control      _                      922
San Antonio and Chino Creeks, Calif., channel improve-
  ment, flood control ____________ _________________ _________                                             1611
San Antonio Dam, Calif., flood control                                                               1611, 1616
San Antonio River, Tex., investigation                 912, 926
San Bernard River, Tex., improvement of waterway to
   Corpus Christi                _   -         -         -                                  860
San Diego County, Calif.:
    Streams flowing into Pacific Ocean, investigation                                ___                      1622
    Streams flowing into Salton Sea, investigation_--                                 -                       1622
San Diego Harbor and River, Calif.:
     Improvement of harbor________-                                             __        _____               1584
    Investigation __                                                                                          1597
Sandusky Harbor and River, Ohio:
     Investigation_______________ ____-------                                                                 1579
     Navigation _             -   -                                                                      1515, 1575
Sandy Bay, Cape Ann, Mass.:
    Investigation                                                    ----                    61
     Navigation                                                                              58
Sandy drainage district,                 Multnomah             County, Oreg.,
   flood control-            -   -1762
LXII                                              I1DEX


                                                                                              Page

                                                                                   Volume 1          Volume 2


Sandy Hook Bay, N. J., navigation____                           __-____----                 263
Sandy Lake Reservoir, Minn______________ _________                                       1052
San Francisco Bay and Harbor, Calif.:
     Improvement of harbor _----------------------_ ____------                                               1624
     Improvement of lower bay _________________________---_                                                  1649
     Improvement of Oakland Harbor________________________-_                                                 1629
San Francisco, Calif., engineering district---------_                       ------------        _            1623
San Fralcisquito Creek, Calif., investigation                ----------------------                          1652
San Gabriel River, Calif.:
     Flood control ___      --------------------------------------------                                     1598
     Investigation_____ ______________-__________ __-                                            -           1622
San Gabriel River channel:
     From Santa Fe flood-control basin to the ocean                      --------------                      1598
     San Gabriel Canyon to Santa Fe flood-control basin_                                                     1598
     Walnut Creek to Pacific Ocean -----------------------------                                             1598
Sangamon River and Salt Creek, Ill., flood control_-- ------ __---_                                          1475
Sangamon River Basin, Ill., flood control____________ ________ _                                             1475
Sangamon River from mouth of Salt Creek to Roby, Ill.,
  flood control ------------------------------------                               -----------               1476
Sangamon River, Ill., investigation -------------------------------                                          1476
San Jacinto River, Calif., investigation_                        -_
                                                                _--------------_         _             -_    1623
San Jacinto River, Tex.:
     Improvement of waterway via_____________ _-                                _           880
     Investigation -----------------------------------                                      927
San Joaquin River, Calif.:
     Hydraulic mining_______________________________                                                --       1874
     Improvement of Stockton and Mormon Channels------------_                                                1657
     Investigation_________--         -       -              --
                                                     _________                     _-1680,                   1681
     Navigation ----------------------------------------------                                               1653
     Work of California Debris Commission                            _      _                                1873
San Jose Wash, Los Angeles, Calif., flood control----------_                               ----_             1598
San Juan Dam, Santa Ana River Basin, Calif., flood con-
  trol      --------------------------------------------------                                       1611,   1618
San Leandro Bay, Calif., investigation                                                                       1650
San Lorenzo Creek and River, Calif.:
     Investigation_---------------------------------------------                                             1652
     Snagging, flood control__________________________                                 ____ _                1650
San Luis Obispo Harbor, Calif., navigation-------_                        ------------         _             1596
San Luis Rey River, Calif., investigation-                               -_
                                                                       _---------------_                     1623
San Pablo Bay, Calif., navigation___________________----                      ------              _          1636
San Rafael Creek, Calif., navigation _ _ _ _ _ __ _
Santa Ana River, Calif.:
                                                           _                                                 1641
     Flood control                 --------------------------------------------                              1610
     Investigation -----------------------------------                                                       1623
Santa Anita Wash, Los Angeles, Calif., flood control                     --------------                      1598
Santa Barbara Harbor, Calif.:
     Investigation ---------------------------------------------                                             1597
                              _
     Navigation ---------------------------------------------                                                1594
Santa Clara River, Calif., investigation-------------------------_                                           1623
Santa Cruz River, Ariz., investigation_ _ _ _                                                                1623
Santa Fe flood control basin, Los Angeles, Calif                  -------------------                        1598
Santa Isabel Creek, Tex., investigation---- ---------                         _             927
Santa Margarita River, Calif., investigation----- ---------------                               _            1623
Santa Maria River, Calif., investigation-                        ---__---------------_ __                    1623
Santa Monica MOuntains, streams draining, investiga-
  tion_ --------------------------------------------                                                         1622
Santa Rosa Sound, Fla., improvement of waterway to
  Pensacola Bay-_                                                                           634
Santa Ynez River, Calif., investigation --------------------..                                               1623
                                        INDEX                                                 LXIII


                                                                                 Page

                                                                    Volume 1-            Volume 2


Santee River, S. C.:
     Investigation--------------------                                        539
     Navigation-------------         --                                       520
Santiam River, Oreg., flood control                                                              1794
Sapelo Harbor, Ga., navigation _ - - -                                         563
Sappa Creek, Kans. and Nebr., investigation__                                 1095
Sarasota Bay, Fla., navigation                                                 622
Saratoga Lake, N. Y., investigation                                            281
Sardis Reservoir, Miss., flood control                                                           1971
Sasanoa River, Maine, navigation                                                58
Satilla River, Ga., navigation                                                 557
Saugatuck Harbor, Mich., navigation ----------                                                   1401
Saugatuck River, Conn.:
    Investigation_ -                -      --     --                           134
     Navigation_-                                                              132
Saugerties Harbor, N. Y., navigation___                                        275
Sault Ste. Marie, Mich., investigation                                                           1512
Sauvie Island (areas A and B), Multnomah County,
  Oreg., flood control------------                                                               1768
Savannah Ga., engineering district_                                            541
Savannah Harbor and River, Ga.:
     Improvement of harbor_                                               541
     Improvement of river above Augusta - -- -                            563
     Improvement of river at Augusta-------------                         563
     Improvement of river below Augusta_                                  545
     Improvement of waterway to Beaufort, S. C ----                       548
     Improvement of waterway to Fernandina, Fla -...                      560
    Investigation__ -----------------------------                    564, 565
Saw Mill River, N. Y., investigation----_ _       ---                     281
Sawpit Wash, Los Angeles, Calif., flood control__     - -                                        1598
Sawtelle-Westwood (lower), Los Angeles, Calif., flood
  control _             -                              --   --                                   1599
Sawtelle-Westwood (upper), Los Angeles, Calif., flood
  control_--------------                                                                         1599
Saybrook Harbor, Connecticut River, Conn., improve-
  ment _ ---------------------------------          ----                       105
Scappoose drainage district, Columbia County, Oreg.,
  flood control -                       --       --                                              1770
Schedules, toll bridge_ --                                                                       2006
Schooner Bayou lock and dam, La., improvement of
  waterway to Mermentau River                                                  760
Schuylkill River, Pa., navigation                                              332
Scioto River, Ohio:
                                      _
     Flood-control reservoirs ------------------                                            1235
     Investigation__                                                                 1223, 1238,
                                                                                            1579
Sciotoville, Ohio, flood control                                                            1235
Scituate Harbor, Mass., navigation                                              58
Scotts Creek, Va., Norfolk Harbor, navigation --                               420
Scuppernong River, N. C., improvement_                                         506
Seahorn drainage and levee district, Ill., flood control___                   1013
Seattle Harbor, Wash., improvement of Duwamish River
  and east and west waterways_                                                           1807,   1813,

Seattle, Wash., engineering district_                                                            1796
Sebastian Inlet, Fla., investigation _                                         625
Sebewaing River, Mich.:
     Investigation______--------------------                                                     1512
     Navigation _                                                                                1511
Sebewaing, Sebewaing River, Mich., flood control-------          ----------          1           1512
LXIV                                             TNDEX


                                                                                               Page

                                                                               Volume 1               Volume 2


Seekonk (Pawtucket) River, R. I.:
     Investigation__---------------------------------_                  165
     Navigation___                _____                                  90
Seneca River, N. Y., investigation ------------------------------                                          1579
Senecaville Reservoir, Ohio, flood control------             _---                                          1255
Sepulveda flood-control basin, Calif------_-----------------                                               1598
Sevier River, Utah, investigation_                              -
                                                                __--- -- _                                 1583
Seymour Narrows, British Columbia, Canada, investi-
  gation-----------__------------------------------------------                                            1824
Shallotte River, N. C., navigation --------------------                 506
Shallowbag Bay, N. C., navigation---------------_                       469
Sheboygan Harbor, Wis., navigation---------------------- ----            __                                1382
Sheepshead Bay, N. Y., navigation --------------------                  274
Sheldrake River, N. Y., investigation_------------------                281
Shenandoah River, W. Va., navigation---_---------                       413
Shenango Reservoir, Pa. and Ohio, flood control-------_ --------                                           1320
Sheyenne River, N. Dak., investigation_                    -----------------
                                                                      1073
Shinnecock Canal, improvement of Long Island Intra-
   coastal Waterway, N. Y_________________ _________                                       188
Ship Island Pass, Miss., improvement of pass and chan-
  nel to Gulfport ----------------------------------                                       691
Shipyard River, S. C.:
    Investigation ----------------------------------                                       539
      Navigation              ---------------                                              532
Shoal Harbor, N. J., navigation ----------------------                                    275
Shoals, Ind., flood control ----------------------------                                 ---               1215
Shoals Reservoir, Ind., flood control__- ----                                                              1213
Shooters Island Channel, N. Y. and N. J., improvement_                           246
Shore Protection Board_-----------------------------------------                                           2000
Short Creek, Ohio, investigation_________________                       _____    __-_                      1324
Short Creek, Ariz. and Utah, investigation-_         --------------------                                  1623
Shoshone River, Wyo., investigation                                             1126
Shreveport, La., to Jefferson, Tex., improvement of
  waterway:
    Investigation ---------------------------------                         811, 830
    Navigation ------------------------------------                              791
Shrewsbury River, N. J.:
      Investigation                         ------------                                   277
     Navigation---------------------                                                       266
Sierra Madre Villa Channel, Los Angeles, Calif., flood
  control-----------_                                                          -----                       1598
Silver Lake Harbor, N. C., navigation -----------------                                    477
Silvies River, Oreg., investigation_                                                                       1681
Sinepuxent Bay, Md., navigation                  _                                  384
Sipsey River, Ala. and Miss., investigation                                    699, 706
Sitka Harbor, Alaska:
     Investigation      -------------------------------------                                              1824
Siuslaw River, Oreg.:
     Investigation -----------------------------------                             -------                 1755
     Navigation --------------------------------------------
                      _                                                                                    1754
Six Mile Creek, Ark., investigation_-_-------------------                                968
Six Mile Creek, Ill., investigation_____________________                                1051
Six Mile Cypress Slough, Fla., investigation
Skaggs Ferry, Black River, Ark., flood control .........
                                                                     -                   627
                                                                                         966
Skagit River, Wash.:
      Flood control                    -------------                 ___               -----               1838
      Investigation   -----------------------------------                                                   1839
      Navigation_ -------------------------------------------                                         1807, 1823
                                                 INDEX                                             LXV


                                                                                       Page


                                                                            Volume 1          Volume 2


Skagway Harbor and River, Alaska:
     Investigation___________________________                                                      1824
Skamokawa Creek Area, Wahkiakum County, Wash.,
  flood control -----------------------------------------------                                    1760
Skamokawa Creek, Wash., navigation_-----_ _-----------------                                       1747
Skamokawa Slough, Wash., navigation--         ---- _ _    ------------- _                          1754
Skipanon Channel and River, Oreg.:
     Improvement of channel_______________________________                                         1702
     Investigation-____                               _                                            1755
Skokomish River, Wash., investigation -----------------------                                      1839
Skykomish River, Wash., investigation      _                                                       1839
Slack-water systems. See Canals and Waterways.
Slaughter Creek, Md., navigation                             388
Smith Creek, Md., navigation_                                                      413
Smiths Creek and River, N. C. and Va.:
    Investigation-----------------------------------                              463
    Navigation _                                                                  506
Smokes Creek, N. Y., investigation                                          __ _ __                1579
Smoky Hill River, Kans.:
    Flood control_                                                                1091
    Investigation                           -------                               1096
Smyrna River, Del., navigation                                                     342
Snagging and clearing, under authority of sec. 2, Flood
  Control Act approved Aug. 28, 1937, as amended:
    Galveston district______________________________                               924
    Jacksonville district________________________    _                             625
     Little Rock district_                                                         966
     Memphis district___________               _____________-___                   850
     Mobile district ______________________________                                703
     Omaha district _         __                                                  1114
     Pittsburgh district___________________________                                                1323
     Portland district______________________________                                               1791
     Sacramento district _                        _                           -                    1676
     San Francisco district_                                            _                          1650
     Seattle district _ _ _ _                                           _          3 _             1838
     Syracuse district                _       ___________________                  320
     Vicksburg district _                 -               -         _              827
    Wilmington district_                                   507
Snake River, Idaho, Oreg., and Wash.:
    Investigation____________________________________________                             1755, 1795
     Navigation_             __       -                                                            1739
Snohomish River, Wash.:
     Investigation_____________                 ___                                       1824, 1839
     Navigation-      _         _             _-_                                               1807
Snoqualmie River, Wash., investigation-_ _                                                         1839
Sny Island, Ill., flood control_______________________       1047
Socastee Creek, S. C., improvement of waterway via-...        493
Soda Lake, La., improvement of waterway via -.......          791
Soldier River, Iowa, investigation     _________________     1115
Sonoita River, Ariz., investigation    _______________________                                     1623
Sonoma Creek, Calif., investigation ______ _________________ ____                                  1652
South Beardstown and Valley levee and drainage dis-
  tricts, Illinois, flood control______________________________                           1465, 1474
South Beardstown drainage and levee district, Illinois,
  flood control _ _ _ _ _ _ _ _ _ _                                                                1466
South Bristol Harbor, Maine, navigation ---------------                             58
South Canadian River, N. Mex., Okla., Tex., and Ariz.:
     Conchas Dam _ _ _ _ _ _                                                       935
     Investigation                -                                         970, 992
LXVI                                            INDEX


                                                                                           Page


                                                                               Volume 1           Volume 2


South Chicago Harbor, Ill., improvement ______----_ _             _____----                            1440
Southern New York flood-control project_              --------------      290
South Fork of Cumberland River, Ky., navigation           _ __                                         1158
South Grand Reservoir, Mo., flood control---                 -_ --- 1093
South Haven Harbor, Mich., improvement__-                  -
                                                     _-----------         __ __                        1398
South Milwaukee Harbor, Wis., navigation--------_ _                   ---------_                       1429
South Pass, Mississippi River, maintenance of channel__                   707
South Platte River, Colo., emergency repairs, flood
  control ------------------------------------------                 ---------                         1581
Southport Harbor, Conn., navigation __________________                    123
South Portsmouth, Ky., flood control_                                                                  1235
South Quincy, Ill., flood control ______________________                1051
South River, N. C., navigation ______________________                     506
South River, N. J., navigation-------------------                         261
South River, Mo., flood control_                                                     1051
South Slough and Mill Creek, Ill., navigation                                           1041
South Tunbridge Reservoir, Connecticut River Basin,
  Vt., flood control ________________________________                                     135
Southwest Pass, Mississippi River, improvement, includ-
  ing shoals between Cubits Gap and Head of Passes___                                     707
Spencer Reservoir, Ind., flood control__--------_ _----                                 _ _ __ _     1213
Spokane River, Wash. and Idaho:
     Flood control                           _                                          -----        1838
                                                                                                     1--------------------
     Investigation__-----------------------_                  -------- --             --------       1839
Spoon River, Ill., investigation- -- _ _.-------------- ------                                       1476
Springdale, Connecticut River Basin, Mass., flood control_                         136, 165
Springfield, Ill., flood control________________________                                             1475
Springfield, Mass., flood control__________________--                        _     136, 155
Spring Lake, Ill., flood control______________---_-_--                        _______-_              1475
Spuyten Duyvil Creek, N. Y., navigation___________-_                                      212
Stage Harbor, Mass_                            ______________---_                           73
Stamford Harbor, Conn., navigation ____________-----                          _           126
Stanislaus River, Calif., investigation _ --                      ----------------- _ _ _        -__ 1681
Starlings Creek, Va., navigation ____________-----                                        383
Staten Island Sound (Arthur Kill), N. Y. and N. J.,
  navigation-__________-_                      _        ------------                      244
Steamboat Slough, Wash., navigation_________________-__________                                      1754
Steele Bayou, Miss., navigation _______________----__                                     810
Steer Creek, W. Va., flood control____________________                          __________           1278
Steinhatchee River, Fla., navigation ---              _        --------                   622
Stewarts Ferry Reservoir, Tenn., flood control--------------------                                   1169
Stillaguamish River, Wash.:
      Flood control_--------------------------------------------                                     1838
      Investigation _-   __ __ __ _ _    -----             _
                                                      _ _ __839                                       11807
      Navigation________________________   __      __________
      Navigation----------------------------------------------                                        1807
Stillwater Harbor, Minn., improvement of St. Croix
   River_-------------------------------------------                                 1057
Stillwater Reservoir, Pa., flood control_- ------ __                               -_ 309
Stockton Channel, San Joaquin River, Calif., improve-
   ment_-          -            -       -         -          -             -                       -_ 1657
Stockton Harbor, Maine, navigation-         __                                         58
Stonington Harbor, Conn., navigation_____________                                     132
Stony Creek, Calif., snagging, flood control_-                                                         1677
Straight Creek, Ohio, flood control__________________----------                                        1238
Stringtown-Fort Chartres and Ivy Landing, Ill., flood
   control_ _----                                                                    1015
Sturgeon Bay and Lake Michigan Ship Canal, Wis.:
     Investigation_ __ ---------------------------                                                     1431
      Navigation_           _                                ------                                    1369
Sturgeon River, Mich., investigation----                              --       - -------
                                                                                   -                   1347
                                              INDEX                                        LXVII


                                                                                 Page


                                                                      Volume 1          Volume 2


Sturgis, Ky., flood control_________________________            _______                      1212
                                             __
Styx River, Fla., navigation --------------------------            645
Sucarnoochee Creek, Ala., investigation- -- _ --------   _         706
Sugar Creek levee unit, Indiana, flood control_                                              1212
Sugar Hill Reservoir, Connecticut River Basin, N. H.,
                  __
  flood control ------------------------------------               135
Suisun Bay Channel, Calif., navigation-------------------------__                            1667
Suisun Channel, Calif., navigation ------------------------------                            1669
Sullivan Falls Harbor, Maine, navigation --------------             58
Sulphur River, Tex. and Ark.:
    Investigation -------
                  __ __ __ _ __                                       812, 810_
                                                                           831
    Navigation____________________________
    Navigation-------------------------------------                       810      -----

Summersville Reservoir, W. Va., flood control--------------------                            1278
Sumpawanus (Babylon Creek) Inlet, N. Y., navigation-                 274
Sunbury, Pa., flood control_ ---------------------------             319
Sunflower River (Big), Miss., improvement ------------               804
Sunken craft, removal of --------------------------------------                              2006
Superior-Duluth Harbor, Wis., improvement         ---------------       _                    1326
Superior, Lake:
     Board of control__            -___________----_____---                                  2027
     Surveys, charts, etc ---------------------------------------                            2020
     Water levels_                                                                           2022
Supervision of New York Harbor, N. Y., to prevent de-
  structive or injurious deposits__________________________ __            _                  2008
Surface levels. See Water levels.
Surry Mountain Reservoir, N. H., flood control------          135, 139
Surveys:
     General statement regarding ___________         _____             11
     International boundary waters _ _                                                       2024
     Navigation, flood control, power, and irrigation     -----                              1841
     Northern and northwestern lakes _                ---  _--       -- _                    2020
Susquehanna River, Pa., Md., and N. Y.:
     Flood control in upper river watershed -------------            290
     Investigation_ --------------------------------          321, 390,
                                                                     393
     Navigation above and below Havre de Grace, Md__                 388
Sutton Reservoir, W. Va., flood control----------- _-------------                            1278
Suwannee River, Fla. and Ga.:
     Investigation_____________ ___________                    625, 628
     Navigation ------------------------------------                 622
Swan Quarter Bay, N. C., to Deep Bay, N. C., waterway,
  navigation_                                                        506
Swansboro, N. C., waterway to New River and Beaufort,
  improvement_ _________                                             490
Swanton Harbor, Vt., navigation---------------------                 275
Sweet Home Reservoir, Oreg., flood control----------_      ---------     _                   1783
Swift Creek, N. C.:
     Investigation -__ __ __-_ _         _
                                       _---                           507, 509
    Navigation      _______________________________                506
Swiger, Whitney, Young-Hoblit levee, Ill., flood control     ------------                    1475
Swinomish Slough, Wash., navigation-------_       ------------       _ 1807,                 1820
Swoyerville, Pa., flood control________________________            321
Sycamore Canyon, Los Angeles, Calif., flood control-_ ----------       _                     1598
Syracuse, Ohio, flood control --------------------------
                                _                              ----------                    1277
Syracuse, Oswego River Basin, N. Y., flood control                 282

                                   T
Table Mound Reservoir, Kans., flood control_,_                             987
Table Rock Reservoir, Mo., flood control------        -           -        964
LXVIII                                INDEX


                                                                         Page

                                                              Volume 1          Volume 2


Tacoma Harbor, Wash., navigation_____                                                1810
Tacoma, Puyallup River, Wash., flood control                  _      __              1825
Tallahatchie River, Miss., navigation----------------               810
Tallapoosa River, Ala., navigation-_         _-------- -- -         697
Tampa Bay and Harbor, Fla.:
     Improvement of channel to Clearwater Harbor                    622
     Investigation               -              - --                625
     Navigation --                                                  609
Tanana River, Alaska:
     Flood control_______- -____________                                             1836
     Investigation--      ------------------                         _               1824
Tangier Channel, Va., navigation                       - -          389
Tangipahoa River, La., navigation_                                  728
Tappan Reservoir, Ohio, flood control__                                              1255
Tar Bay, Md., navigation___________-________________                388
Tar Creek, Ill., flood control_                                                      1475
Tarentum, Pa., flood control                                                         1320
Tar River and Creek, N. C.:
     Flood control -------------                                   509
     Investigation_-                                          507, 509
     Navigation ----------------------------                       473
     Snagging, flood control______________                         508
Tarrytown Harbor, N. Y., navigation_                               275
Taunton River, Mass.:
     Investigation___                                                134
     Navigation ----------------------------                      83, 85
Taylor Creek, Fla., navigation - - --                               598
Taylors Creek, N. C., navigation_________ ____________              486
Tchula Lake, Miss., navigation-_                                    810
Teche Bayou, La.:
     Flood control ------------------- -------------               785
     Investigation_                                           781, 788
    Navigation   ---------------------------                        745
     Navigation, waterway to Mississippi River .   ----            751
Teche-Vermilion Waterway, La., investigation                       781
Tell City. Ind., flood control                                              1198, 1212
Tenants Harbor, Maine, navigation-                     - -- -- -    58
Tenasillahe Island, Clatsop County, Oreg., flood control_                            1793
Tenkiller Ferry Reservoir, Okla.:
     Flood control              -          - .-                    987
     Investigation                  -----------------              992
Ten Mile Creek, Ill., investigation______ ____________1476
Tennessee River, Tenn., Ala., and Ky.:
     Investigation_____                                            699               1159
     Navigation --------- -----------------------------------                        1149
Tensas Bayou, La., snagging, flood control                  _    _ 827
Y1ensas River, La.:
     Investigation_                   -------------------          831
     Navigation------------------------------------                798
Terrebonne Bayou, La., navigation -                                739
Terre Haute, Ind., flood control at__                                                1215
Terre Noire Creek, Ark., flood control                             813
Terry Creek, Ga., improvement_--                                   555
Texas and Louisiana Intracoastal Waterway:
     Improvement, Mississippi River to Corpus Christi_             859
     Investigation                                               - 912
Texas City Harbor, Tex., improvement of channel to
  Galveston _ _-                                                   875
Texas, State of, removal of water hyacinths from waters
  of--------------------------------------                         669
                                           INDEX                                         LXIX


                                                                              Page

                                                                   Volume 1          Volume 2


Thames River Basin, Conn., R. I., and Mass., flood con-
  trol_                                                         165
Thames River, Conn., navigation____________________             102
Thimble Shoal, Chesapeake Bay, Va., navigation .-.--            423
Thompson Creek, Los Angeles, Calif., flood control---                                     1598
Thompson Lake, Ill., flood control________-
                                      -        ________--__________                       1475
Thoroughfare Bay with Cedar Bay, N. C., channel con-
  necting, navigation - -                                       482
Three Islands Reservoir, Tenn., flood control_                                            1169
Three Mile Creek, Ala., improvement of Mobile Harbor__          666
Tia Juana River, Calif., investigation    _ _                                             1623
Tibbee Creek, Miss., snagging, flood control       -
Tickfaw River, La., improvement of, including tribu-
                                                                703
  taries _-                       -   -                         730
Ticonderoga River, N. Y., navigation       _                    275
Tigre Bayou, La.:
     Investigation-_           ----             ---                     781
     Navigation--- ---------------------------                          762
Tilghman Island Harbor, Md., navigation                                 388
Tillamook Bay, Bar, and entrance, Oreg.:
     Improvement _ _                                                                      1697
     Investigationn                                                                       1755
Tillamook River, Oreg., investigation -- __ ____                         _                1795
Tioga River, N. Y., investigation                                       321
Tionesta Reservoir, Pa., flood control             -- - -           -                1296, 1320
Tioughnioga River, N. Y., investigation -                               321
Tiptonville to Obion River, Tenn., flood control -
Titlow Creek, Va., navigation________________________
                                                       ------           852
                                                                        444
Toledo Harbor, Ohio, navigation-_                                                         1506
Tolomato River, Fla., navigation                                        584
Tombigbee River, Ala. and Miss.:
I   Flood control_        _                            --              705
    InvestigationL           -  -                                  699, 706               1159
    Navigation_                                                    679, 697     _
    Snagging, flood control__________________________                   703
Toms River, N. J.:
    Investigation- -                                                    368
    Navigation---                                                       367
Tonawanda Harbor, N. Y.:
    Investigation--                                                                  1576, 1579
     Navigation_ _-
                 -                          -                                             1553
Topeka, Kans., flood control                                  1095
Toronto Reservoir, Kans., flood control        --              987
Totuskey Creek, Va., navigation_                               410
Town Creek, N. C., investigation--                        507, 509                      ---
Town Creek, S. C., improvement of Charleston Harbor----        525
Town River, Mass., navigation_        -      -                  59
Townsend Inlet, N. J., investigation__________________         368
Trabuco Dam, Calif., flood control_ _____________________________                          1611
Tradewater River, Ky.:
    Flood control                       - -                                               1212
     Navigation                       --                     ---                          1182
Trask River, Oreg., investigation _____________________             _______               1795
Traverse Bay, Mich., investigation__                                                      1431
Traverse Lake, S. Dak., flood control                                   1065
Tred Avon River, Md., navigation_-                                       388
Trent River, N. C.:
     Investigation--   -                                                507
    Navigation_      -    --  -                 -                       480
Trespalacios Bay, Tex., improvement of Louisiana-Texas
  Intracoastal Waterway __________________________                      860
LXX                                 1NDEX


                                                                       Page


                                                            Volume 1          Volume 2


Trinity River, Tex.:
    Investigation                                           912, 927
     Navigation_                                            887, 910
    Snagging, flood control_                                     924
Troublesome River, Colo., investigation                                            1583
Truckee River, Calif. and Nev., investigation                                      1681
Tualatin River, Oreg.:
      Flood control_                                                               1794
      Investigation _                                                              1795
Tuckahoe River, Md., navigation_                                 388
Tuckerton Creek, N. J., navigation_----                          367
Tug Fork, Big Sandy River, W. Va. and Ky.:
    Improvement                     - -                                            1248
    Investigation___________________________                                       1253
Tujunga Wash Channel, Los Angeles, Calif., flood control_                          1598
Tule River, Calif., investigation_________                                         1681
Tully Reservoir, Mass., flood control_                      135, 146
Tulsa and West Tulsa, Arkansas River, Okla., flood
  control-----------                                             979
                                    --
Tulsa, Okla., engineering district _---                          968
Tuolumne River, Calif., investigation ---------------                              1681
Turkey River, Iowa, investigation - - -- - - -- -               1051
Turners Cut, N. C., navigation____________-_____                 449
Turtle Creek, Brunswick Harbor, Ga., improvement      --         555
Tuscarawas River, Ohio, investigation                                              1281
Tuttle Creek Reservoir, Kans., flood control -                  1093
Twelvemile Bayou, La., improvement of waterway via__             791     i----_--27


Twelve Pole Creek, W. Va., flood-control reservoir __                              1278
Twin Rivers, Wis., improvement of Two Rivers Harbor-                               1377
Twitch Cove, Md.:
     Investigation_            -                                 390
     Navigation_                                                 381
Two Rivers Harbor, Wis.:
     Investigation __                                                              1431
      Navigation -------------------------                                         1377
Tyaskin Creek, Md., navigation-                                  388
Tygart River, W. Va., dam construction__                                           1292
                            U
Ullin, Ill., flood control____________________________                       1212
Umatilla River, Oreg., investigation_                                        1795
Umpqua Harbor and River, Oreg.:
     Flood control--------------------                                       1793
     Investigation_----------------__-                                 1755, 1795
     Navigation_                     _ -    -                                1689
Union River, Maine, navigation_                                58
Uniontown, Ky., flood control_____________                                   1212
Union Township, Mo., flood control ---------------     1045, 1049--__----
Union Village Reservoir, Vt., flood control              135, 138
Upper Chipola River, Fla., improvement                        697
Upper Grays River area, Wahkiakum County, Wash.,
  flood control_________________ ______________                              1794
Upper Machodoc Creek, Va., navigation __      --              413
Upper Mississippi River Basin, flood control_          1015, 1049,           1473
                                                          1071.
Upper Puyallup River, Wash., flood control_                    ---- ----     1838
Upper Thoroughfare, Deals Island, Md., navigation ....        389
Upper White River, Ark., navigation___ --- _ _                947
Urbanna Creek, Va., navigation_                               413
                                              INDEX                                                   LXXI


                                                                                          Page

                                                                           Volume 1               Volume 2


                              V
Valdez Harbor, Alaska:
    Investigation_ ----------------                          ----- -----                               1824
Vanceburg, Ky., flood control             --           -----                                           1235
Venice Inlet, Fla., navigation-_                                      622
Ventura Harbor and River, Calif., investigation--------                                                1623
Verdigris River, from mouth to Madison, Kans., flood
  control_----------------.-                                                            990
Verdigris River, Kans., investigation--_ ---                          -                 992
Verdugo Wash., Los Angeles, Calif., flood control:
    Concord to Upper Canada Bridge-----------------                  ----------                        159g
    Upper Canada Bridge to debris basin--------                              _--                       1598
Vermilion Bay and River, La., improvement of Intra-
  coastal Waterway via------------                  ------------------          753
Vermilion Bayou, La., navigation ---------------------                          764
Vermilion Harbor, Ohio:
    Investigation ---------------------------------------                                              1577
      Navigation--                          __________                                                 1520
Vermilion Lock, La., improvement_...................                                    755
Vermilion River, Ill., investigation   _-                                                              1476
Vermilion River, La.:
     Flood Control        _                                                     785
     Investigation_                                                        781, 788                    13
Vevay, Ind., flood control_________________                                                            1235
Vicksburg, Miss., engineering district__                                                789
Victory Reservoir, Connecticut River Basin, Vt., flood
  control                                                                               135
Vidal Bayou, La., navigation_-               -                                          810
Village Creek, White River, and. Mayberry districts,
  Ark., flood control_ -                  -                                             966
Villa Park Dam, Calif., flood control_-                                   --                           1611
Vineyard Haven Harbor, Mass., navigation_                                            78
Vinton Waterway, La., navigation          -                                         779
Violet Canal Route, La., investigation__                                            781
Virgin River, Nev., Ariz., and Utah, investigation -                      - -       -                  1623
Virginia coast waterway, improvement------_      -----                                  389
                                       W
Wabash levee unit No. 6, Illinois, flood control                          - -   -                      1212
Wabash River, Ind. and Ill.:
   Flood control             --------------- -                                                    1213, 1215
   Investigation _ -                      -                                                             1216
Waccamaw River, N. C. and S. C.:
   Improvement of river_                                                                513
   Improvement of waterway via-------------                                             493
      Investigation___.                                                                 540
Waddington Harbor, N .Y., navigation          _                                               _        1575
Wadmalaw River, S. C., improvement of waterway via__                                534
Wainwright Slough, N. C., navigation-__-----_   ---------                           486
Waldo, Fla., investigation                    - -   - -   - -   - -                     625
Walker River, Calif. and Nev., investigation                                                  1681
Wallabout Channel, N. Y-               -----------                                  274--------
Wallace Lake Reservoir, La., flood control_                                         815
Wallkill River, N. Y. and N. J., investigation------                                    281
Walluski River, Clatsop County, Oreg., flood control-------                                            177$



          493202--43--pt. 1, vol. 1-   76
LXXII                                    INDEX


                                                                                    Page

                                                                     Volume 1               Volume 2


Walnut Bayou, Ark., investigation_____-_-___-_-___                                934----------
Walnut Creek Inlet Channel, Los Angeles, Calif., flood
control---------------------------------------                                                  1598
Walnut Creek, Okla., investigation------__                                        934
Walnut Creek system, Los Angeles, Calif., flood control_                                         1598
Wappapello Dam and Reservoir, Mo_______                                --   ---         -        1968
Wappinger Creek, N. Y., navigation_                   _       _                   220
Wappoo Creek, S. C., improvement_                                                 534
Wareham Harbor, Mass., navigation_______                                           58
Warren River, R. I., navigation                  ____                             132
Warrenton diking district No. 1, Clatsop County, Oreg.,                                          1793
flood control-------------------------------------
Warrenton diking district No. 2, Clatsop County, Oreg.,                                          1793
flood control---     --         ------                      ---
Warrenton diking district No. 3, Clatsop County, Oreg.,                                          1793
flood control---------------------------------
Warrior River, Ala.:
    Investigation-                - ___--                            699, 706                    1159
    Navigation_                                 ----         -            679
Warroad Harbor and River, Minn., navigation-                                                     1342
Warwick River, Md., navigation_.___________                                       388
Warwocd, W. Va., flood control ____________________                                              1320
Washington Bayou and Lake, Miss., navigation .......                              810
Washington Canal, N. J., navigation_                                              261
Washington, D. C.:
    Anacostia Park_                                              _                               2010
    Anacostia River, reclamation of flats_                                                       2010
    Aqueduct-----------------                                                                    2014
    Engineering district_                                                         394
    Flood control_                                                                414
    Government buildings, consumption of water in_ _-                                            2014

    Harbor at                                                                     394
Washington Island Harbor, Wis., navigation_                                                      1367
Washington Lake Ship Canal, Wash.:
    Improvement          ------------------------------                                          1807
    Investigation_                                                                               1824
Washita River, Okla., investigation_                                              934
Washita Valley, Okla., investigation                                              934
Waterbury, Winooski River Basin, Vt., flood control ..-                           280
Water consumption, Government buildings, District of
Columbia---------          --------------------------                                           2014
Wateree River, S. C.:
    Investigation------          ------------------------                         539
    Navigation _                                          --                      538
Waterford, Hudson and Mohawk Rivers, N. Y., flood
control      __--------                                                          280
Water hyacinths, removal of, from Florida, Alabama,                  618, 669,
Mississippi, Louisiana, and Texas waters                                 775
Water levels, northern and northwestern lakes__                                                  2022
Water power:
    Dams:
         Columbia River at Bonneville, Oreg                                                      1724
         Missouri River at Fort Peck, Mont--------                          1116
         Tennessee River_ _              --                                                      1152
    Investigations for Federal Power Commission_                                                 2004
    Niagara River, N. Y., contcol and regulation of----                                          2026
Waters, navigable. See Bridges, Rivers and Harbors,
and Wrecks.
Water supply, Washington, D. C ___-_                  ___                                        2014
Water Valley Reservoir, Ark., flood control_                                      964
                                         INDEX                                           LXXIII


                                                                             Page

                                                                  Volume 1          Volume 2


Waterways:
    See also Canals.
    Anclote River to St. Marks, Fla., investigation .      -           623
    Apalachicola Bay and River, Fla.:
        Improvement of channel to St. Andrews Bay_                     630
        Improvement of waterway to St. Marks River,
           Fla-------------------------------------                    697
    Atlantic-Gulf Barge Canal, Fla., investigation - --                623
    Atlantic Ocean to Gulf of Mexico, waterway across
      Florida, investigation----------------_         ---------        623
    Beaufort, N. C.:
        Improvement of waterway to Cape Fear River,
           including waterway to Jacksonville, N. C -_                 490
              Investigation_------------------------_                  507
        Improvement of waterway to New River                           490
        Improvement of waterway to Pamlico Sound
           via Core Sound___ -------------------              _        486
    Beaufort, S. C., to St. Johns River, Fla., improve-
     ment_     ------------------------------------               548, 566
    Beaufort to Jacksonville, N. C., improvement                       490
    Brazos River and Matagorda Bay, Tex-              __ ---           860
    Cape Cod Canal, Mass., improvement -------------                    53
    Cape Fear River, N. C., to Winyah Bay, S. C.:
        Investigation_______________ ____________507,                  539          __
        Navigation-                                -492
    Charleston, S. C.:
        Improvement of waterway to Beaufort ----                       534
        Improvement of waterway to Winyah Bay -----                    518
        Investigation of waterway to St. Johns River_-                 564
    Chesapeake Bay to Delaware River, Del. and Md.
      (Chesapeake and Delaware Canal), improvement__                   368
    Choctawhatchee Bay, Fla.:
        Improvement of waterway to Pensacola Bay-_                     634
        Improvement of waterway to West Bay-...... .                   632
    Clearwater Harbor to Tampa Bay, Fla., improve-
      ment ---------------------------------------                     622
    Core Sound to Beaufort Harbor, N. C., improve-
      ment_                                                            486
    Delaware Bay, Del.:
        Waterway to Chincoteague Bay, Va., improve-
          ment -----------------------------------                     367
        Waterway to Rehoboth Bay, Del., navigation__                   347
    Delaware River to Chesapeake Bay:
        Investigation _----_                  -------                  368
           Navigation-     -----------------
                            _                          ------------    337
    Dulac Bayou, La., improvement of waterway via
        Grand Caillou and Le Carpe Bayous, La       --------            742
    Duwamish Waterway, Wash., improvement           ------------------                     1814
    Franklin to Mermentau, La., improvement                            759
    Galveston to Houston, Tex., improvement        ----------           880
    Great Lakes-Hudson        River:
          Improvement -----------------------------                    230
          Investigation-------------------------------                 276
    Gulf Intracoastal Waterway, navigation      -----------             629
    Hylebos waterway,         Tacoma        Harbor, Wash.,   im-
       provement---------_               ------------------------------------              1811
    Illinois waterway, Illinois, navigation------_           --------- __                  1451
    Indian River Inlet to Rehoboth Bay, Del., investi-
       gation_ _- Canal, survey
     Interoceanic                                           ---         368
                                                                 200---------------
    Interoceanic Canal, survey------------_--------------------2003
LXXIV                                       INDEX


                                                                                        Page


                                                                             Volume 1          Volume 2


Waterways-Continued.
   Jacksonville to Miami, Fla.:
       Investigation -------------------------------                              624
            Navigation                             ------------                   579
     Jefferson, Tex., to Shreveport, La., improvement .. _                        791
     Keweenaw Bay to Lake Superior, Mich., improve-
        ment __                                                                   __                1334
     Little Choptank River to Choptank River, Md.,
        waterway, improvement_______ ________________                             388
     Long Island Intracoastal Waterway, N. Y., im-
        provement_ _            -_________          ------                        188
     Louisiana and Texas Intracoastal Waterway:
          Improvement, Mississippi River to Corpus
             Christi ____         _                                          752, 859
          Improvement to Bayou Dulac_                                             742
           Investigation___------                                                 780
          Investigation, Corpus Christi to Rio Grande _2                          912
     Mackinac Island, Mich., to Round Island, Mich.,
        improvement                           -----                                                 1511
     Miami, Fla.:
          Improvement of waterway to Florida Bay. - - -                           622
          Improvement of waterway to Jacksonville .- - -                          579
     Mississippi River, La., improvement of Intracoastal
        Waterway to Corpus Christi, Tex _               -  -                 752, 859
     Mississippi River to Sabine River, La. and Tex.,
        improvement_          __           --                                     752
     Mobile Bay, Ala.:
          Improvement of waterway to New Orleans, La__                            638
          Investigation of waterway to New Orleans, La__                          781
     New Jersey Intracoastal Waterway, navigation -..                             268
     New River, N. C., to Swansboro and Beaufort,
        improvement __-                                                           490
     New York and New Jersey Channels, improvement _                              244
     New York Bay to Delaware River, investigation___7                            276
     New York State Barge Canal, N. Y.:
           Enlargement ___--------------                                          230
         Investigation-_                             -                            276
     Norfolk, Va., to Beaufort Inlet, N. C., navigation___                        452
     Norfolk, Va., to sounds of North Carolina, navi-
        gation___________---                                                      448
     Pamlico Sound, N. C.:
          Improvement of waterways to Beaufort                    Harbor_         486
          Improvement of waterways to Beaufort                    Inlet-__        452
     Pass Cavallo to Aransas Pass, Tex-_                                          897
     Pensacola Bay, Fla., to Mobile Bay, Ala.,                    naviga-
       tion,                                                                      636
     Poe Reef Shoal, Straits of Mackinac, Mich.,                  naviga-
        tion--_                                                                                     1511
     Port Aransas to Corpus Christi, Tex., improvement_                           899
     Port Townsend Bay to Oak Bay, Wash., improve-
        ment___                                               -         -     -                     1808
     Rehoboth Bay to Delaware Bay:
         Investigation_                                                           368
         Navigation___                                                            347
     Sabine-Neches Waterway, Tex., navigation                                     853
                                                                                  853      --
     Savannah, Ga., to Beaufort, S. C., improvement-...                           548
     Savannah, Ga., to Fernandina, Fla., improvement_                             548
     Swan Quarter Bay to Deep Bay, N. C., navigation_                             506
     Teche Bayou to Mississippi River, navigation -5_                             751
     Tombigbee River, Ala. and Miss., waterway con-
       necting Tennessee and Tombigbee Rivers, investi-
       gation                                                                     699
                                               INDEX                                                           LXXV


                                                                                                Page


                                                                                  Volume 1             Volume 2


Waterways-Continued.
   Vinton Waterway, La., improvement _3_                                                  779
    Virginia coast waterway, navigation__                                                 389
    White Lake to Pecan Island, La., navigation...                                        766
    Winyah Bay to Charleston, navigation                                                  518
Waterways Experiment Station, Vicksburg, Miss_                                                                  1977
Watkins Glen, Oswego River Basin, N. Y., flood control__                                  288
Watson Bayou, Fla., nav'igation -     - -            -                                    654
Watts Levee, Ill., flood control___________ ________                                                            1475
Waukegan Harbor, Ill., navigation                                                                               1432
Wax Lake Outlet (Mississippi River flood control)                                                               1964
Way Cake Creek, N. J., investigation                                                      277
Webb District Improvement Co., Columbia County,
Oreg., flood control __________________________                                        ______                  1793
Weiser River, Idaho, investigation   _    _                                                                     1795
                                          -----
Weldon River, Mo., investigation_______________         _                               1096
Wellfleet Harbor, Mass., navigation__-                                                    59
Wetlsburg, W. Va., flood control                                                                                1320
Wells Creek, Minn., investigation______ __------------1073
Wells Harbor, Maine, navigation_-                                                          58
Wellsville, Ohio, flood control_    ______-
                                       --                                                ___       1316, 1320
West Bay, Fla., improvement of waterway to Choctaw-
  hatchee Bay__             _        _ __                                                 632
West Bridgewater, Pa., flood control--      -----------                                   ___                   1320
West Brookfield Reservoir, Connecticut River Basin,
  Mass., flood control                                     -----------                    135
West Canaan Reservoir, Connecticut River Basin, N. H.,
flood control _ _                                                                        135
Westchester Creek, N. Y., navigation_---_                                                 173
West Divide, Colo., investigator_                 ---------------                                               1583
Westfield River, Mass., investigation                                                     165
West Fork Reservoir, Little Kanawha River, W. Va.,
flood control                              --------------                        ---                           1278
West Fork Reservoir, Monongahela River, W. Va., flood
control               --------------------                                                                     1320
West Fork River, W. Va., investigation              -                                                           1324
West (Hay) Harbor, Fishers Island, N. Y., navigation _3                                   132
Westland District Improvement Co., Columbia County,
Oreg., flood control_---------------                                                                           1793
West of Benedict, Kans., flood control_                 -----                            990
West of Elk City, Kans., flood control                    ------                         990
West of Fredonia, Kans., flood control_ _990-----------                                  9
West of Morrilton, Ark., flood control_ _                                                 966
West   Oneonta Reservoir, N. Y., flood control _ _                                     291
       Palm Beach Canal-Okeechobee, Fla., investigation-                         624, 625,
                                                                                       628
West
West   Pearl River, Miss. and La., navigation     _                                       694          -             -
West    Peterboro Reservoir, Merrimack River Basin,
  N. H., flood control_______               ____                         __---------       62
West Pittston, Pa., flood control_-            --                                         321
Westport district, Columbia and Clatsop Counties, Oreg.,
  flood control _-----------------                                                                              1773
Westport Harbor, Conn.:
   Investigation   -    ---------------                                                   134
     Navigation __                          -------------------                           132              -
Westport River, Mass., navigation         -                  ---------                     82
Westport Slough, Oreg., navigation                                                                              1710
West River, Conn., navigation      _ _111                                                                       --

West River, Md., investigation   __                                                       390
West Springfield, Mass., flood control_             _136,                                 157
LXXVI                                            INDEX


                                                                                            Page

                                                                                Volume 1               Volume 2


West Terre Haute, Ind., flood control---------------------------_                                           1212
West Tulsa, Okla., flood control____________
Weymouth Back River, Mass., navigation _ _ - _ _
Weymouth Fore River, Mass., navigation_
                                                              _979
                                                                49
                                                                47
Whatcom (Bellingham) Harbor, Wash., improvement of
Whatcom Creek waterway _                        _      _                                                   1823
Whatcom Creek, Wash., investigation- _ _----------------------_                                             1839
Wheeling, W. Va., flood control _ _                                                                         1320
White Lake Harbor, Mich., navigation_-------------_ _     __-----_                                          1411
White Lake to Pecan Island, La., waterway, navigation _        766
Whiteoak Creek, Ohio, investigation__________________ __________                                            1238
White Oak Reservoir, Tex., flood control ---------------      913
White River, Ark. and Mo.:
      Investigations --------------------------------                           952, 968
     Navigation                                                                      835, 943
White River Basin, Ark. and Mo., flood control                 --------                    963
White River, Ind.:
     Flood control --------------------------------------------                                             1187
     Navigation _                                    ---------------------------                            1182
White River, S. Dak., investigation_ --------------                           _          1115
White River, Wash., flood control_ _ _ _ _ __ __ __ _ _ _ _                                                 1826
White Rock Dam, S. Dak., flood control               ---------------                     1065
Whitewater River, Calif., investigation ---------------------------                                         1623
Whitewater River, Minn., investigation ----------------                                  1073
Whitney Point, N. Y., flood control_______                                    _-           2-_
                                                                                           292
Whitney Point Reservoir, N. Y., flood control_                                             291
Whitney Reservoir, Brazos River, Tex., flood control__                                     917
Whittier Narrows flood-control basin, Los Angeles, Calif--- ------                             _            1598
Wibaux, Mont., flood control _________________-- -                        - _            1114
Wichita and Valley Center, Kans., flood control                 --------                   990
Wickford Harbor, R. I.:
     Investigation____ ______-__-                            -______
                                                                   ______                  134
     Navigation ------------------------------------                                       132
Wicomico River, Md., navigation             --------------------                           379
Wiedmer Chemicals drainage and levee district, Missouri,
flood control_-----------------------------------                                       1017
Wilder, Ky., flood control____                _______________                  __-- ______                  1235
Wilkes-Barre-Hanover Township, Pa., flood control -_                                       313
Wilkesboro Dam, N. C., investigation -----------------                                     540
Willamette River, Oreg.:
     Fish facilities, flood control__            _____-__-___ ________-- -                                  1783
     Flood control_-- _________                    ------                                                   1779
     Flood control in basin_ __-1782
     Improvement above Portland, navigation-------------------_                                             1714
     Improvement at Willamette Falls, navigation-- --- __------_                                            1718
     Improvement below Portland, navigation --------------------                                            1705
     Investigation ---------------------------------                               ---------                1755
     New Willamette Falls navigation lock, flood control- ------------                                      1783
     Open river navigation improvement, flood control_                            _- ----
                                                                                  --     _                  1783
Willamette Slough, Oreg., improvement _ _ __ __ _ ___ _ _ _                                                 1712
Williamsport, Pa., flood control_ ___________________-                                     310
Williamsville Reservoir, Connecticut River Basin, Vt.,
flood control__ ------------------------------------                                      135
Willapa Harbor and River, Wash.:
     Investigation -------------------------------------------                                              1839
     Navigation_ ----------------------------------------------                                             1796
Willoughby Channel, Va., navigation                           ---                     429
Willow Creek, Ill., flood control--------_               -------------               1013          -

Willow Creek, Oreg., investigation _--               ---------                                              1795
Willowemoc River, N. Y., investigation _                       --   -----             371
Wills Creek Reservoir, Ohio, flood control_                                                                 1255
                                         INDEX                                           LXXVII


                                                                                 Page

                                                                     Volume 1           Volume 2

Wilmette Harbor, Ill., investigation_                                                        1465
Wilmington Harbor, Del., navigation                                        334-
Wilmington, N. C.:
    Engineering district _ __ __ _                                         463
    Improvement of Smiths Creek _                                          506
Wilson and Wenkel and Prairie Du Pont drainage and
levee districts, Illinois, flood control_                                1008
Wilson Canyon and Mansfield St. Channel, Los Angeles,
Calif., flood control__          ______                                                     1598
Wilson Point Harbor, Conn., navigation--                   ------          132

Wilson River, Oreg., investigation                                                           1795
Windmill Point Creek, Va., investigation __   _---                        461
Winery Canyon, Los Angeles, Calif., flood control _-                                         1598
Winfield, Kens., flood control_                                            990
Winnibigoshish Reservoir, Minn_______________                             1052
Winooski River, Vt.:                                                                          .
    Flood control--                __-------
                              -______                                      280
    Investigation_-------------           -                                281
Winsted, Connecticut River Basin, Conn., flood control__              136, 165
Winthrop Harbor, Mass., navigation__         __                             58
Winyah Bay, S. C.:
    Improvement of waterway to Cape Fear River, N. C_                     492
    Improvement of waterway to Charleston _         --- -                 518
    Navigation                                                            510
Wisconsin River, Wis.:
    Investigation _                                                      1073
    Navigation                                       --------            1062
Wister Reservoir, Okla.:
    Flood control                                                         987
    Investigation               ------------------------                  992
Withlacoochee River, Fla.:
    Investigation      -----------------------------                  625, 628
    Navigation_                                      --                    616
Wolf Bay, Ala., improvement of Intracoastal Waterway
  via_ _                                                                  636
                                                                                          1216
Wolf Creek, Ky., investigation_        __-   ------
Wolf Creek Reservoir, Ill., flood control           -                                     1213
Wolf Creek Reservoir, Ky., flood control_-          -                               1161, 1169
Wolf River, Miss., navigation                                             693
Wolf River, Tenn., flood control_____________________                     845
Wolf River (Memphis Harbor), Tenn., navigation .....                      839
Wolf River (tributary of the Fox), Wis., improvement_                                        1361
Woodbridge Creek, N. J.:
    Investigation-__-------     ---                                       277
    Navigation       _ _--                         ------                 250
Woodbury Creek, N. J., navigation"           -       -- ----              367
Wood River drainage and levee district, Illinois, flood
control----------------            -----------------               1011, 1015
Woods Hole Channel, Mass., navigation_                                     132
Woods Hole Harbor, Mass., investigation_                                   134
Woodson drainage district, Columbia County, Oreg.,
flood control     -
                                               ----------
                                                                                            1793



Wrecks (miscellaneous civil works)                                                          2006.
Wyaconda River, Mo., investigation--------------

                                Y
Yadkin River, N. C.:
    Investigation_                                                        540
    Navigation      --   -                                                538
Yadkin-Pee Dee River, N. C. and S. C., investigation___                   539
LXXVIII                                             INDEX


                                                                                                          Page

                                                                                            Volume 1             Volume 2


Yakima River, Wash.:
    Flood control_                                                                                                    1831
      Investigation_                                                 -      -               -                         1839
Yalobusha River, Miss.:
      Navigation                  --       ----         --         ------                            810
     Snagging, flood control_                                             827
Yamhill River, Oreg.:
     Investigation -------------------------------                              1756, 1795
     Navigation_ -        _                                                           1714
Yampa River, Colo., investigation____________________                ______           1583
Yaquina Bay, Harbor, and River, Oreg.:
     Improvement of bay and harbor_--------------_ _                                  1693
     Improvement of river___________________________________                          1692
     Investigation_______________________ __________________                          1756
Yazoo River, Miss.:
     Flood control -------------------------------                   ----------       1970
     Improvement of mouth_________________________                        806
     Investigation -----------------------------------                    812
     Navigation--------------------------------_                 ---      802
Yellow Creek, Ky., investigation________________________ _______                      1173
Yellow Creek, Tenn., and Miss., investigation_                                        1173
Yellowstone River, N. Dak., Mont., and Wyo.:
     Flood control _         __________________________- ___             1114
     Investigation-_                                                     1115
York Harbor, Maine, navigation ______________________                      58
York, Pa., flood control                        ---                       391
York River, Va., navigation                         -                     460
York Spit Channel, Va., navigation                             -     372, 441 _
Youghiogheny River, Pa.:
     Investigation__-----------------------------------------_                  1296, 1324
     Navigation-_          -------------------------                                  1291
Youghiogheny River Reservoir, Pa., flood control--------------_                 1310, 1320
Youngs Bay and River, Oreg.:
     Investigation_ --------                                                          1756
     Navigation       _ -------                                   -----                 ------                        1703
Youngs River Dikes, Clatsop County, Oreg., flood con-
  trol_ _-                                          -                            ---    -        -                    1777
Yscloskey Bayou, La.:
    Investigation__   ----------------------------
                              _                                                                      780----------
     Navigation_ ------------------------------------                                                719----------
Yuba River, Calif.:
     Construction of restraining dams---               ---------                _ _-----_                             1877
     Construction of reservoir_ --------------------                                  __              _     ---       1880
    Investigation__________________________________-____                                                              1681
                                       Z




Zanesville, Ohio, flood control-----------------------------------                                                    1277
Zippel Bay Harbor, Minn., improvement-------                                                                          1345
Zumbro River, Minn., investigation _ -__ _- --------
                                            _                 1073-
Zuniga Shoal, San Diego Harbor, Calif_                                                                                1584


                                                  END OF VOL. I
